MSO Hampton Roads
Reportable Marine Casualty&
Scheduling Inspections
-Mr. Ken Edmundson, Senior Marine Inspector
-ENS Shawn Simeral
![Page 2: Uscg presentation](https://reader035.fdocuments.net/reader035/viewer/2022062405/555bc770d8b42ae4478b4760/html5/thumbnails/2.jpg)
Marine Casualty?
Any casualty:
U.S. navigable waters
U.S. vessel
ACP vessels included
Immediately after addressing safety concerns, notify the nearest Coast Guard Sector.
![Page 3: Uscg presentation](https://reader035.fdocuments.net/reader035/viewer/2022062405/555bc770d8b42ae4478b4760/html5/thumbnails/3.jpg)
Written Notification Must be filed within five days
CG-2692 Report of Marine Injury Accident or Death
![Page 4: Uscg presentation](https://reader035.fdocuments.net/reader035/viewer/2022062405/555bc770d8b42ae4478b4760/html5/thumbnails/4.jpg)
1. Grounding/Allision
• Intended• Unintended
2. Loss of: Main propulsion Primary steering Maneuverability
![Page 5: Uscg presentation](https://reader035.fdocuments.net/reader035/viewer/2022062405/555bc770d8b42ae4478b4760/html5/thumbnails/5.jpg)
3. Adverse affects to service or route: Fire Flooding Failure /damage to:
o fire systemso lifesavingo power generating equipmento bilge
![Page 6: Uscg presentation](https://reader035.fdocuments.net/reader035/viewer/2022062405/555bc770d8b42ae4478b4760/html5/thumbnails/6.jpg)
4. Loss of life
5. Injury:• Professional medical
treatment • Unfit to perform
duties.
7. Damage over $25,000
![Page 7: Uscg presentation](https://reader035.fdocuments.net/reader035/viewer/2022062405/555bc770d8b42ae4478b4760/html5/thumbnails/7.jpg)
MSO Hampton Roads
Scheduling Inspections COI 5 year renewal
– Written Application w/in 30 days (CG-3752)
– Local CG Sector– Schedule w/in 90
days– ACP vessels =
Complete ABS prior to CG
![Page 8: Uscg presentation](https://reader035.fdocuments.net/reader035/viewer/2022062405/555bc770d8b42ae4478b4760/html5/thumbnails/8.jpg)
MSO Hampton Roads Annual & Periodic Exam
– 3 months before/after anniversary
– 1 or 2 weeks notice– No written notice– ACP vessels = Complete
ABS before CG Dry-dock
– Time frame same as COI Renewal
– Package review
![Page 9: Uscg presentation](https://reader035.fdocuments.net/reader035/viewer/2022062405/555bc770d8b42ae4478b4760/html5/thumbnails/9.jpg)
MSO Hampton Roads Scope of Inspection
– Conventional• Full Tests• Documents• ABS & CG coordination
allowed– ACP
• Spot Check• Documents• ABS & CG coordination not
allowed (oversight) • Expand as needed
![Page 10: Uscg presentation](https://reader035.fdocuments.net/reader035/viewer/2022062405/555bc770d8b42ae4478b4760/html5/thumbnails/10.jpg)
Contact InformationSector Hampton Roads Prevention200 Granby StreetNorfolk ,VA 23510-1888Ph #: (757) 668-5511Fax #: (757) 668-5532
Command Duty Officer #: (757) 668-5555 (24 Hour)
Ken Edmundson: [email protected] Simeral: [email protected]
QUESTIONS?