US ITER TBM MeetingIdaho Fall, Idaho, Aug 10-12-2005
M DagherP Fogarty
1. TBM/ITER General Arrangement2. Equatorial Test port Configuration3. Test Port Assembly4. Ancillary Systems Layout
1. Port Cell Area2. TCWS Area
![Page 2: US ITER TBM Meeting Idaho Fall, Idaho, Aug 10-12-2005 M Dagher P Fogarty](https://reader036.fdocuments.net/reader036/viewer/2022062807/56815133550346895dbf4b87/html5/thumbnails/2.jpg)
![Page 3: US ITER TBM Meeting Idaho Fall, Idaho, Aug 10-12-2005 M Dagher P Fogarty](https://reader036.fdocuments.net/reader036/viewer/2022062807/56815133550346895dbf4b87/html5/thumbnails/3.jpg)
Port Cell Area
Pipe Shaft Area
Bio-shield
Cryostat
Test Port Assy
![Page 4: US ITER TBM Meeting Idaho Fall, Idaho, Aug 10-12-2005 M Dagher P Fogarty](https://reader036.fdocuments.net/reader036/viewer/2022062807/56815133550346895dbf4b87/html5/thumbnails/4.jpg)
Pipe Shaft Area
Tokamak Building, East-West Section View
TCWS AreaTBM Cooling system
Equipment Room
Bio-Shield
Port Cell Area
Cryostat
![Page 5: US ITER TBM Meeting Idaho Fall, Idaho, Aug 10-12-2005 M Dagher P Fogarty](https://reader036.fdocuments.net/reader036/viewer/2022062807/56815133550346895dbf4b87/html5/thumbnails/5.jpg)
TCWS AreaTBM Cooling system
Equipment Room
Bio-Shield
EquatorialPort Cell Area
Shielding Blanket
Equatorial Port Assembly
![Page 6: US ITER TBM Meeting Idaho Fall, Idaho, Aug 10-12-2005 M Dagher P Fogarty](https://reader036.fdocuments.net/reader036/viewer/2022062807/56815133550346895dbf4b87/html5/thumbnails/6.jpg)
Test Port General Layout
Equatorial Level Section
Vacuum Vessel
Test Blanket Module
Cryostat Bio-Shield
Pipe Shaft Area
Port Cell AreaEquatorial Level
0.0
Transporter
Frame Assembly
VV Port Extension
VV Closure Plate
![Page 7: US ITER TBM Meeting Idaho Fall, Idaho, Aug 10-12-2005 M Dagher P Fogarty](https://reader036.fdocuments.net/reader036/viewer/2022062807/56815133550346895dbf4b87/html5/thumbnails/7.jpg)
Test Port Configuration
VV Port Extension
VV – Cryostat Duct
Cryostat Bio-Shield
TBM Frame Assy
VV Closure Plate
Pb-Li Concentric Pipe
Transporter
Port Cell Area
![Page 8: US ITER TBM Meeting Idaho Fall, Idaho, Aug 10-12-2005 M Dagher P Fogarty](https://reader036.fdocuments.net/reader036/viewer/2022062807/56815133550346895dbf4b87/html5/thumbnails/8.jpg)
![Page 9: US ITER TBM Meeting Idaho Fall, Idaho, Aug 10-12-2005 M Dagher P Fogarty](https://reader036.fdocuments.net/reader036/viewer/2022062807/56815133550346895dbf4b87/html5/thumbnails/9.jpg)
3.6m
Test Port Configuration
4.8m
TBM
TBM Frame Assy
Transporter
VV Port Extension
VV Closure Plate
Bio-Shield
![Page 10: US ITER TBM Meeting Idaho Fall, Idaho, Aug 10-12-2005 M Dagher P Fogarty](https://reader036.fdocuments.net/reader036/viewer/2022062807/56815133550346895dbf4b87/html5/thumbnails/10.jpg)
TBM Frame Assembly
![Page 11: US ITER TBM Meeting Idaho Fall, Idaho, Aug 10-12-2005 M Dagher P Fogarty](https://reader036.fdocuments.net/reader036/viewer/2022062807/56815133550346895dbf4b87/html5/thumbnails/11.jpg)
![Page 12: US ITER TBM Meeting Idaho Fall, Idaho, Aug 10-12-2005 M Dagher P Fogarty](https://reader036.fdocuments.net/reader036/viewer/2022062807/56815133550346895dbf4b87/html5/thumbnails/12.jpg)
![Page 13: US ITER TBM Meeting Idaho Fall, Idaho, Aug 10-12-2005 M Dagher P Fogarty](https://reader036.fdocuments.net/reader036/viewer/2022062807/56815133550346895dbf4b87/html5/thumbnails/13.jpg)
ITER
Overall view of Frame Cooling channels at the front of Frame
![Page 14: US ITER TBM Meeting Idaho Fall, Idaho, Aug 10-12-2005 M Dagher P Fogarty](https://reader036.fdocuments.net/reader036/viewer/2022062807/56815133550346895dbf4b87/html5/thumbnails/14.jpg)
Design of “removable back-side shield” structure has been developed to accommodate possible different TBM attachments (support structures,
electrical connection, cooling pipes and instrumentation).
ITER
Fastening the bolts
Lip seal
(B) Removable back-side shield
![Page 15: US ITER TBM Meeting Idaho Fall, Idaho, Aug 10-12-2005 M Dagher P Fogarty](https://reader036.fdocuments.net/reader036/viewer/2022062807/56815133550346895dbf4b87/html5/thumbnails/15.jpg)
25
25 mm gap all around inside frame openings25
25
1710
504
5
413
![Page 16: US ITER TBM Meeting Idaho Fall, Idaho, Aug 10-12-2005 M Dagher P Fogarty](https://reader036.fdocuments.net/reader036/viewer/2022062807/56815133550346895dbf4b87/html5/thumbnails/16.jpg)
15Divider
413ModuleDepth
28 First Wall
95Inner Back
Plate
4(typ wall)
20(channel)
7(channel)
120PbLiOUT
80PbLi - IN
504 Module Width
Helium IN PlenumFirst Wall
(Upper Channel)
Helium IN PlenumFirst Wall
(Lower Channel)
139.3(typ 3 places)
Helium OUT Plenums(Top & Bottom Plates,Grid Plates & Dividers)
15 Grid Plate
7 (channel)
75Outer Back
Plate
Helium OUTFirst Wall
Helium IN
Helium IN
AllHelium
OUT5(typ wall)
Back Plates
65
85
Helium flow channelsfor actively cooling
The back plates
Dimensions in millimeters
Plan ViewBlanket Module
68mm I.D. Pipe Inlet
68 mm I.D.Pipe Inlet
![Page 17: US ITER TBM Meeting Idaho Fall, Idaho, Aug 10-12-2005 M Dagher P Fogarty](https://reader036.fdocuments.net/reader036/viewer/2022062807/56815133550346895dbf4b87/html5/thumbnails/17.jpg)
Ancillary Systems
• Port Cell Area– Primary Coolant Loop Pb-Li – He – Tritium Extraction System
• TCWS Area– Primary FW He Coolant Loop – Secondary Coolant Systems
![Page 18: US ITER TBM Meeting Idaho Fall, Idaho, Aug 10-12-2005 M Dagher P Fogarty](https://reader036.fdocuments.net/reader036/viewer/2022062807/56815133550346895dbf4b87/html5/thumbnails/18.jpg)
Pb-Li Primary Coolant Loop
Transporter, Port Cell Area
Secondary He Coolant Loop
TCWS
Test Port
Primary He Coolant Loop
TCWS
![Page 19: US ITER TBM Meeting Idaho Fall, Idaho, Aug 10-12-2005 M Dagher P Fogarty](https://reader036.fdocuments.net/reader036/viewer/2022062807/56815133550346895dbf4b87/html5/thumbnails/19.jpg)
Pb-Li Primary Coolant Loop Schematic
![Page 20: US ITER TBM Meeting Idaho Fall, Idaho, Aug 10-12-2005 M Dagher P Fogarty](https://reader036.fdocuments.net/reader036/viewer/2022062807/56815133550346895dbf4b87/html5/thumbnails/20.jpg)
Pb-Li Primary Coolant Loop
Pb-Li Concentric Pipe
Pb-Li Dump Tank
Pb-Li Mixing Tank
Pb-Li – He Heat Exchanger
Tritium Extraction System
Pb-Li Pump
Expansion Tank
![Page 21: US ITER TBM Meeting Idaho Fall, Idaho, Aug 10-12-2005 M Dagher P Fogarty](https://reader036.fdocuments.net/reader036/viewer/2022062807/56815133550346895dbf4b87/html5/thumbnails/21.jpg)
![Page 22: US ITER TBM Meeting Idaho Fall, Idaho, Aug 10-12-2005 M Dagher P Fogarty](https://reader036.fdocuments.net/reader036/viewer/2022062807/56815133550346895dbf4b87/html5/thumbnails/22.jpg)
He Secondary Coolant Loops
He Circulator
Heater Element
He-H2O Heat Exchanger
Pressure Control Sub-System