U.S. Energy Codes: Design, Deploy, and Operate (Webinar ......The Case for Performance Standards ......

24
U.S. Energy Codes: Design, Deploy, and Operate GBPN Webinar Dec 11, 2013

Transcript of U.S. Energy Codes: Design, Deploy, and Operate (Webinar ......The Case for Performance Standards ......

Page 1: U.S. Energy Codes: Design, Deploy, and Operate (Webinar ......The Case for Performance Standards ... 90% Compliance Pilot Studies US Department of Energy, Final Report June 2013 BARRIERS:

U.S. Energy Codes: Design, Deploy, and Operate

GBPN WebinarDec 11, 2013

Page 2: U.S. Energy Codes: Design, Deploy, and Operate (Webinar ......The Case for Performance Standards ... 90% Compliance Pilot Studies US Department of Energy, Final Report June 2013 BARRIERS:

New Buildings Institute

Page 3: U.S. Energy Codes: Design, Deploy, and Operate (Webinar ......The Case for Performance Standards ... 90% Compliance Pilot Studies US Department of Energy, Final Report June 2013 BARRIERS:

Design – Operate - DeployDrivers to Performance Codes

• Design - Reductions to 2030 and Zero Net Energy

• Operate – Buildings delivering actual energy savings

• Deploy - Adoptions in jurisdictions nationwide and compliance rates to 90%

Page 4: U.S. Energy Codes: Design, Deploy, and Operate (Webinar ......The Case for Performance Standards ... 90% Compliance Pilot Studies US Department of Energy, Final Report June 2013 BARRIERS:

Model Codes ‐ Design

90.1‐2010 (IECC 2012)

Page 5: U.S. Energy Codes: Design, Deploy, and Operate (Webinar ......The Case for Performance Standards ... 90% Compliance Pilot Studies US Department of Energy, Final Report June 2013 BARRIERS:

Range of Outcome

90.1‐2010 (IECC 2012)

Page 6: U.S. Energy Codes: Design, Deploy, and Operate (Webinar ......The Case for Performance Standards ... 90% Compliance Pilot Studies US Department of Energy, Final Report June 2013 BARRIERS:

6

Variability at lower EUI?

140120100806040200

3.0

2.5

2.0

1.5

1.0

0.5

0.0

Design EUI (Adj2)

Act

ual /

Des

ign

EUI

(Adj

2)

1

CertifiedSilverGoldPlatinum

LEEDlevel

Page 7: U.S. Energy Codes: Design, Deploy, and Operate (Webinar ......The Case for Performance Standards ... 90% Compliance Pilot Studies US Department of Energy, Final Report June 2013 BARRIERS:

ZNE Retrofit Example in Portland Oregon - before and after

Page 8: U.S. Energy Codes: Design, Deploy, and Operate (Webinar ......The Case for Performance Standards ... 90% Compliance Pilot Studies US Department of Energy, Final Report June 2013 BARRIERS:

Plug loads to 2030

Figure 3: Change in Energy Use by SystemSource: Graph created by Ecova with data from EIA 2008 Annual Energy Outlook

Page 9: U.S. Energy Codes: Design, Deploy, and Operate (Webinar ......The Case for Performance Standards ... 90% Compliance Pilot Studies US Department of Energy, Final Report June 2013 BARRIERS:

0

1

2000 2010 2020 2030

Ene

rgy

Use

Operating Characteristics

Design Components

Tenant Behavior

Components of energy outcomes

Page 10: U.S. Energy Codes: Design, Deploy, and Operate (Webinar ......The Case for Performance Standards ... 90% Compliance Pilot Studies US Department of Energy, Final Report June 2013 BARRIERS:

Energy Codes – Operate

TARGETS and ENFORCEMENT

The 2 BIG Challenges

Page 11: U.S. Energy Codes: Design, Deploy, and Operate (Webinar ......The Case for Performance Standards ... 90% Compliance Pilot Studies US Department of Energy, Final Report June 2013 BARRIERS:

Setting Targets?

The Basis for Zero Net Energy (ZNE) Policy

Best practiceexisting building (ZNE…)

Portfolio Mgr. EUI

Nat. avg. Office EUI (CBECS)

Case Study: The Beardmore EUI

Better

zEPI ‐ Based on AEC / Charles Eley’s Beyond Percent Savings

Page 12: U.S. Energy Codes: Design, Deploy, and Operate (Webinar ......The Case for Performance Standards ... 90% Compliance Pilot Studies US Department of Energy, Final Report June 2013 BARRIERS:

Range of Outcome

90.1‐2010 (IECC 2012)

Page 13: U.S. Energy Codes: Design, Deploy, and Operate (Webinar ......The Case for Performance Standards ... 90% Compliance Pilot Studies US Department of Energy, Final Report June 2013 BARRIERS:

Building Energy Disclosure

Page 14: U.S. Energy Codes: Design, Deploy, and Operate (Webinar ......The Case for Performance Standards ... 90% Compliance Pilot Studies US Department of Energy, Final Report June 2013 BARRIERS:

The Red Line for Energy Codes

Occupancy

CERTIFICATE OF OCCUPANCY

Design, Build, Commission……….

Page 15: U.S. Energy Codes: Design, Deploy, and Operate (Webinar ......The Case for Performance Standards ... 90% Compliance Pilot Studies US Department of Energy, Final Report June 2013 BARRIERS:

Enforcement Mechanisms

• Conditional Occupancy – IgCC (proposed)

• Performance/Surety Bond - Seattle• Tax or Utility Rate Structures• Licensing - Boulder• Public Pillory/Accolades• Periodic RetroCx – New York City• Litigation

R

Page 16: U.S. Energy Codes: Design, Deploy, and Operate (Webinar ......The Case for Performance Standards ... 90% Compliance Pilot Studies US Department of Energy, Final Report June 2013 BARRIERS:

Boulder CO SmartRegsThe Case for Performance StandardsThe City of Boulder’s Climate Action Plan calls for greenhouse gas emissions reductions across, Boulder residents overwhelmingly approved a Climate Action Tax to fund Climate Action Plan efforts. For more than a decade the city has been incrementally strengthening minimum energy efficiency standards for residential new construction and remodels as well as for commercial construction and renovation. Despite these efforts, Boulder has not been on track to meet its 2012 Climate Action Plan goals, and the city determined that it needed additional policy tools to encourage market innovation in improving existing residential building energy performance. Rental units make up more than 50 percent of Boulder’s dwellings and thus offered a logical next opportunity for energy savings. The city designed its “SmartRegs” ordinances to deliver multiple public and private benefits including improved building quality and marketability; safer, healthier, and more comfortable housing; lower energy bills for occupants; and reduced greenhouse gas emissions.

Page 17: U.S. Energy Codes: Design, Deploy, and Operate (Webinar ......The Case for Performance Standards ... 90% Compliance Pilot Studies US Department of Energy, Final Report June 2013 BARRIERS:

Boulder CO SmartRegsSUCCESS• One year after the regulations went into effect, the city 

had handily exceeded its first‐year goals of 1,000 units inspected and 500 units achieving compliance. 

• Some property owners are voluntarily choosing to upgrade beyond the minimum requirements. 

• Given its broad support and successful early rollout, SmartRegs shows promise for overcoming transaction costs and reducing barriers to energy efficiency gains in the residential rental sector.

Page 18: U.S. Energy Codes: Design, Deploy, and Operate (Webinar ......The Case for Performance Standards ... 90% Compliance Pilot Studies US Department of Energy, Final Report June 2013 BARRIERS:

Energy Code – Deploy(Adoptions)

Page 19: U.S. Energy Codes: Design, Deploy, and Operate (Webinar ......The Case for Performance Standards ... 90% Compliance Pilot Studies US Department of Energy, Final Report June 2013 BARRIERS:

Energy Code – Deploy(Compliance)

90% Compliance Pilot StudiesUS Department of Energy, Final Report June 2013

BARRIERS: The top barriers to compliance continue to be:1. Lack of training2. Lack of resources3. Lack of compliance information on plan submissions

Page 20: U.S. Energy Codes: Design, Deploy, and Operate (Webinar ......The Case for Performance Standards ... 90% Compliance Pilot Studies US Department of Energy, Final Report June 2013 BARRIERS:

RE 188 in the 2015 IECC

Target ERI by ClimateZone

Climate Zones 1‐2: 52

Climate Zone 3: 51

Climate Zone 4: 54

Climate Zone 5: 55

Climate Zones 6:     54

Climate Zones 7 ‐8: 53

• RE‐188 would allow homes to comply by achieving a target ERI score AND

• Meeting the code’s mandatory measures, hot water pipe insulation requirements, and prescriptive envelope requirements from the 2009 IECC.

Page 21: U.S. Energy Codes: Design, Deploy, and Operate (Webinar ......The Case for Performance Standards ... 90% Compliance Pilot Studies US Department of Energy, Final Report June 2013 BARRIERS:

Goals of the Concept

• Provide a platform to movethe code toward net‐zero

• Increase compliance for residential energy codes.– Develop format that would encourage third party inspection

– Reduce jurisdiction manpower requirements to review energy

Page 22: U.S. Energy Codes: Design, Deploy, and Operate (Webinar ......The Case for Performance Standards ... 90% Compliance Pilot Studies US Department of Energy, Final Report June 2013 BARRIERS:

Design - Operate - Deploy

• Design – Net zero: consumption = production (i.e performance)

• Operate – “Performance” is the only option

• Deploy – “Performance” is easier to enforce but challenged by targets & enforcement

Page 23: U.S. Energy Codes: Design, Deploy, and Operate (Webinar ......The Case for Performance Standards ... 90% Compliance Pilot Studies US Department of Energy, Final Report June 2013 BARRIERS:

U.S. Congress

Page 24: U.S. Energy Codes: Design, Deploy, and Operate (Webinar ......The Case for Performance Standards ... 90% Compliance Pilot Studies US Department of Energy, Final Report June 2013 BARRIERS:

U.S. Energy Codes: Design, Deploy, and Operate

GBPN WebinarDec 11, 2013

[email protected]