![Page 1: U.S. Department of Energy’s Vehicle Technologies … · U.S. Department of Energy’s Vehicle Technologies ProgramVehicle Technologies Program Plug-in Vehicles and Charging Infrastructure](https://reader036.fdocuments.net/reader036/viewer/2022071013/5fcc2902daedb40740441a82/html5/thumbnails/1.jpg)
U.S. Department of Energy’s Vehicle Technologies ProgramVehicle Technologies Program
Plug-in Vehicles and Charging Infrastructure Usage Patterns: Lessons Learned From the First TwoLessons Learned From the First Two Years – SAE Gov’t/Industry 2013
Jim FrancfortDOE’s Idaho National Laboratoryy
SAE Government / Industry Meeting 2013Washington D.C.gFebruary 2013This presentation does not contain any proprietary or sensitive information
![Page 2: U.S. Department of Energy’s Vehicle Technologies … · U.S. Department of Energy’s Vehicle Technologies ProgramVehicle Technologies Program Plug-in Vehicles and Charging Infrastructure](https://reader036.fdocuments.net/reader036/viewer/2022071013/5fcc2902daedb40740441a82/html5/thumbnails/2.jpg)
AVTA ParticipantsTh Ad d V hi l T ti A ti it (AVTA) i th U S• The Advanced Vehicle Testing Activity (AVTA) is the U.S. Department of Energy, Vehicle Technologies Program’s (VTP) singular field, tract, and laboratory based source of t ti li ht d t h l hi l t d b ttesting light-duty whole vehicle systems and subsystems– Idaho National Laboratory manages the AVTA for VTP– ECOtality provides testing support via a competitively y p g pp p y
bid NETL (National Energy Testing Laboratory) contract
• For the EV Project, ECOtality is the project lead and INL j , y p jprovides data collection, analysis and dissemination support
• Test partners include electric utilities, Federal, state andTest partners include electric utilities, Federal, state and local government agencies, private companies, and individual vehicle owners
2
![Page 3: U.S. Department of Energy’s Vehicle Technologies … · U.S. Department of Energy’s Vehicle Technologies ProgramVehicle Technologies Program Plug-in Vehicles and Charging Infrastructure](https://reader036.fdocuments.net/reader036/viewer/2022071013/5fcc2902daedb40740441a82/html5/thumbnails/3.jpg)
AVTA GoalsTh AVTA l• The AVTA goals– Petroleum reduction and energy security– Benchmark technologies that are developed via DOEBenchmark technologies that are developed via DOE
research investments• Provide benchmark data to DOE, National Laboratories
(ANL, NREL, ORNL, PNNL), Federal Agencies (DOD, DOI,(ANL, NREL, ORNL, PNNL), Federal Agencies (DOD, DOI, DOT, EPA, USPS), technology modelers, R&D programs, vehicle manufacturers (via USCAR’s VSATT, EESTT, GITT), and target and goal setters ), g g
• Assist fleet managers, via Clean Cities, FEMP and industry gatherings, in making informed vehicle and infrastructure deployment and operating decisionsinfrastructure deployment and operating decisions
3
![Page 4: U.S. Department of Energy’s Vehicle Technologies … · U.S. Department of Energy’s Vehicle Technologies ProgramVehicle Technologies Program Plug-in Vehicles and Charging Infrastructure](https://reader036.fdocuments.net/reader036/viewer/2022071013/5fcc2902daedb40740441a82/html5/thumbnails/4.jpg)
Vehicle / Infrastructure Testing Experience77 9 illi il l d 10 736 l i• 77.9 million test miles accumulated on 10,736 electric drive vehicles representing 115 models
• EV Project: 7,317 Leafs, Volts and Smart EVs, 9,493 EVSE and DC Fast Chargers (DCFC), 60.1 million test miles
• ChargePoint: 3,799 EVSE reporting 553,439 charge events
• PHEVs: 14 models, 430 PHEVs, 4 million test miles• EREVs: 1 model, 150 EREVs, 900,000 test miles• HEVs: 21 models 52 HEVs 6 2 million test miles• HEVs: 21 models, 52 HEVs, 6.2 million test miles • Micro hybrid (stop/start) vehicles: 3 models, 7 MHVs,
509,000 test miles NEV 24 d l 372 NEV 200 000 t t il• NEVs: 24 models, 372 NEVs, 200,000 test miles
• BEVs: 47 models, 2,000 BEVs, 5 million test miles • UEVs: 3 models, 460 UEVs, 1 million test miles
4
, ,• Other testing includes hydrogen ICE vehicle and
infrastructure testing Note: all 4th quarter 2012 data is preliminary and subject to change
![Page 5: U.S. Department of Energy’s Vehicle Technologies … · U.S. Department of Energy’s Vehicle Technologies ProgramVehicle Technologies Program Plug-in Vehicles and Charging Infrastructure](https://reader036.fdocuments.net/reader036/viewer/2022071013/5fcc2902daedb40740441a82/html5/thumbnails/5.jpg)
INL Vehicle/EVSE Data Management Process
File serverFile serverSQL Server data warehouseSQL Server data warehouse
File serverSQL Server data warehouse
HICEVs
Parameters range checkParameters range check
Lame data checkLame data check
Missing/empty parameter checkMissing/empty parameter check
Conservation of energy checkConservation of energy check
SOC continuitySOC continuity
Parameters range check
Lame data check
Missing/empty parameter check
Conservation of energy check
SOC continuity
Data qualityreports
Process Driven by Disclosure Agreements
INL Database
SQL Server data warehouseSQL Server data warehouse
Report generatorReport generator
SQL Server data warehouse
Report generator
HEVs
INL V hi l D t
Transfer completionTransfer completionTransfer completion
Individual vehicle reports
PHEVsINL Vehicle Data Management System
reports
Fleet summary
BEVs & EREVs
yReports - Public
Focused technicalanalyses and
EVSE & Chargersanalyses and
custom reports25 50 75 100 125 150 175 200 225 250 275 30
Trip Fuel Economy (mpg)
p gg ( p p p )
CD trips
CD/CS trips
CS trips
Log. (CD trips)
Log. (CD/CS trips)
Avg Hourly Vehicle Charging Demand
9 9 9 9 9 9 9 9 9 9 9 9 9 9 9 9 9 9 9 9 9 9 9 9
Mon AM - Tues AM
Tue AM - Wed AM
Wed AM - Thu AM
Thu AM - Fri AM
Fri AM - Sat AM
Sat AM - Sun AM
Sun AM - Mon AM
0.1
0.2
0.3
0.4
0.5
0.6
0.7
0.8
25 50 75 100 125 150 175 200 225 250 275 30
Trip Fuel Economy (mpg)
p gg ( p p p )
CD trips
CD/CS trips
CS trips
Log. (CD trips)
Log. (CD/CS trips)
Avg Hourly Vehicle Charging Demand
9 9 9 9 9 9 9 9 9 9 9 9 9 9 9 9 9 9 9 9 9 9 9 9
Mon AM - Tues AM
Tue AM - Wed AM
Wed AM - Thu AM
Thu AM - Fri AM
Fri AM - Sat AM
Sat AM - Sun AM
Sun AM - Mon AM
0.1
0.2
0.3
0.4
0.5
0.6
0.7
0.8
5
Time of Day
600-
659
700-
759
800-
859
900-
959
1000
-105
911
00-1
159
1200
-125
913
00-1
359
1400
-145
915
00-1
559
1600
-165
917
00-1
759
1800
-185
919
00-1
959
2000
-205
921
00-2
159
2200
-225
923
00-2
359
000
- 059
100-
159
200-
259
300-
359
400-
459
500-
559
Time of Day
600-
659
700-
759
800-
859
900-
959
1000
-105
911
00-1
159
1200
-125
913
00-1
359
1400
-145
915
00-1
559
1600
-165
917
00-1
759
1800
-185
919
00-1
959
2000
-205
921
00-2
159
2200
-225
923
00-2
359
000
- 059
100-
159
200-
259
300-
359
400-
459
500-
559
Modeling and simulation input
![Page 6: U.S. Department of Energy’s Vehicle Technologies … · U.S. Department of Energy’s Vehicle Technologies ProgramVehicle Technologies Program Plug-in Vehicles and Charging Infrastructure](https://reader036.fdocuments.net/reader036/viewer/2022071013/5fcc2902daedb40740441a82/html5/thumbnails/6.jpg)
Data Collection, Security and ProtectionAll hi l EVSE d PII d t i l ll t t d b• All vehicle, EVSE, and PII raw data is legally protected by NDAs (Non Disclosure Agreements) or CRADAs (Cooperative Research and Development Agreements)
Li it ti h i t d ll– Limitations on how proprietary and personally identifiable information can be stored and distributed
– Raw data, in both electronic and printed formats, is not shared ith DOE in order to a oid e pos re to FOIAshared with DOE in order to avoid exposure to FOIA
– Vehicle and EVSE data collection would not occur unless testing partners trust INL would strictly adhere to NDAs and CRADAsto NDAs and CRADAs
– Raw data cannot be legally distributed by INL
6
![Page 7: U.S. Department of Energy’s Vehicle Technologies … · U.S. Department of Energy’s Vehicle Technologies ProgramVehicle Technologies Program Plug-in Vehicles and Charging Infrastructure](https://reader036.fdocuments.net/reader036/viewer/2022071013/5fcc2902daedb40740441a82/html5/thumbnails/7.jpg)
EV Project Goal, LocationsLocations, Participants, and Reportingp g
G l B ild d t d t h i i f t t d• Goal: Build and study mature charging infrastructures and take the lessons learned to support the future streamlined deployment of grid-connected electric drive vehiclesECOt lit i th EV P j t l d ith INL Ni d• ECOtality is the EV Project lead, with INL, Nissan and Onstar/GM as the prime partners, with more than 40 other partners such as electric utilitiesEV P j t ti i INL t bl d th di ti t• EV Project reporting requires INL to blend three distinct data streams from ECOtality, Nissan and Onstar/GM
• 40 different EV Project reports are generated quarterly for th l bli DOE ECOt lit j t ti i t
7
the general public, DOE, ECOtality, project participants, industry, regulatory organizations, as well as per special requests
![Page 8: U.S. Department of Energy’s Vehicle Technologies … · U.S. Department of Energy’s Vehicle Technologies ProgramVehicle Technologies Program Plug-in Vehicles and Charging Infrastructure](https://reader036.fdocuments.net/reader036/viewer/2022071013/5fcc2902daedb40740441a82/html5/thumbnails/8.jpg)
EV Project – EVSE Data Parameters Collected per Charge EventCollected per Charge Event • Data from ECOtality’s Blink EVSE network• Connect and Disconnect TimesConnect and Disconnect Times• Start and End Charge Times• Maximum Instantaneous Peak Power
A P• Average Power• Total energy (kWh) per charging event• Rolling 15 Minute Average Peak Powerg g• Date/Time Stamp • Unique ID for Charging Event
U i ID Id tif i th EVSE• Unique ID Identifying the EVSE • And other non-dynamic EVSE information (GPS, ID, type,
contact info, etc.)
8
![Page 9: U.S. Department of Energy’s Vehicle Technologies … · U.S. Department of Energy’s Vehicle Technologies ProgramVehicle Technologies Program Plug-in Vehicles and Charging Infrastructure](https://reader036.fdocuments.net/reader036/viewer/2022071013/5fcc2902daedb40740441a82/html5/thumbnails/9.jpg)
EV Project – Vehicle Data Parameters Collected per Start/Stop EventCollected per Start/Stop Event• Data is received via telematics providers from Chevrolet
Volts and Nissan Leafs• Odometer• Battery state of charge • Date/Time Stamp• Date/Time Stamp • Vehicle ID• Event type (key on / key off) • GPS (longitude and latitude)• Recorded for each key-on and key-off event
Additi l d t i i d• Additional data is received monthly from Car2go for the Smart EVs
9
![Page 10: U.S. Department of Energy’s Vehicle Technologies … · U.S. Department of Energy’s Vehicle Technologies ProgramVehicle Technologies Program Plug-in Vehicles and Charging Infrastructure](https://reader036.fdocuments.net/reader036/viewer/2022071013/5fcc2902daedb40740441a82/html5/thumbnails/10.jpg)
EV Project – Vehicle Deployments / Miles• 7,346 vehicles reporting
data– 5,801 Leafs. 79% 5,000
6,000
7,000
8,000
Leafs Volts Total Vehicles Smart Evs
EV Project Leafs, Smart EVs and Volts ProvidingData ‐ 7,346 (1/6/13)
– 1,215 Volts. 17%– 330 Smart EVs. 4%
• 60 1 million total miles1,000
2,000
3,000
4,000
• 60.1 million total miles• 150,000 test miles per
day
0
40 000 00045,000,00050,000,00055,000,00060,000,00065,000,000
Leafs Volts Total Miles Smart Miles
EV Project Leafs, Smart EVs and Volts Miles Reported ‐ 60.1 Million (1/6/13)
5 000 00010,000,00015,000,00020,000,00025,000,00030,000,00035,000,00040,000,000
10
05,000,000
![Page 11: U.S. Department of Energy’s Vehicle Technologies … · U.S. Department of Energy’s Vehicle Technologies ProgramVehicle Technologies Program Plug-in Vehicles and Charging Infrastructure](https://reader036.fdocuments.net/reader036/viewer/2022071013/5fcc2902daedb40740441a82/html5/thumbnails/11.jpg)
EV Project – EVSE Deployment and Use• 9 493 total EVSER id ti l & C i l EVSE& DCFCP idi D t 9 493 (1/6/13) • 9,493 total EVSE
– 6,864 (72%) Residential EVSE 2 575 (27%) non-6,000
7,000
8,000
9,000
10,000Number Residential EVSENumber of Commercial EVSETotal EVSE providing dataNumber of DC Fast Chargers
Residential &Commercial EVSE & DCFC ProvidingData ‐ 9.493 (1/6/13)
2,575 (27%) non-residential EVSE
– 54 (1%) DCFC1 7 illi h0
1,000
2,000
3,000
4,000
5,000
• 1.7 million charge events– 1,579,894 (92%)
0
Residential& Commerical EVSE & DCFC Events Reported ‐ 1.7 Million (1/6/13)
Residential EVSE– 131,298 (8%) non-
residential EVSE1,200,000
1,400,000
1,600,000
1,800,000
2,000,000
# Residential Charging EventsNumber of Comm Charging EventsTotal Number Charging EventsNumber of DCFC Events
– 8,820 (1%) DCFC
200,000
400,000
600,000
800,000
1,000,000
11
0
![Page 12: U.S. Department of Energy’s Vehicle Technologies … · U.S. Department of Energy’s Vehicle Technologies ProgramVehicle Technologies Program Plug-in Vehicles and Charging Infrastructure](https://reader036.fdocuments.net/reader036/viewer/2022071013/5fcc2902daedb40740441a82/html5/thumbnails/12.jpg)
EV Project – Total Charge Energy (MWh)14 418 MWh total• 14,418 MWh total electricity charged– 13,328 MWh
(92%) id ti l12,000
14,000
16,000Residential MWhCommercial MWhTotal EV Project MWhDCFCMWh
Residential, Commercial & DCFCMWH Reported ‐ 14,418 (1/6/2013)
(92%) residential– 1,029 MWh (7%)
non-residential4,000
6,000
8,000
10,000DCFC MWh
– 61 MWh (0.4%) DCFC 0
0
2,000
• Vehicle efficiency cannot be accurately calculated using total vehicle miles and total energytotal vehicle miles and total energy– Non-EV Project vehicles sometimes charge at EV
Project EVSEEV Project vehicles may charge at 110V or other 240V
12
– EV Project vehicles may charge at 110V or other 240V non-EV Project EVSE
![Page 13: U.S. Department of Energy’s Vehicle Technologies … · U.S. Department of Energy’s Vehicle Technologies ProgramVehicle Technologies Program Plug-in Vehicles and Charging Infrastructure](https://reader036.fdocuments.net/reader036/viewer/2022071013/5fcc2902daedb40740441a82/html5/thumbnails/13.jpg)
EV Project Overview Report 4th Quarter 2012• San Francisco has 17% of all EVSE 30% of all Leafs
N b f L f V lt & EVSE R ti D t b R i E d f 4th Q t 2012
• San Francisco has 17% of all EVSE 30% of all Leafs• Washington DC has 16% and Texas has 18% of all Volts
1,5001,6001,7001,800
EVSE Leafs Volts Smart Evs
Number of Leafs, Volts & EVSE Reporting Data by Region - End of 4th Quarter 2012
1,0001,1001,2001,3001,400
500600700800900
0100200300400500
13
0PHX/ Tuscon
LA San Diego
San Fran Wash DC
Oregon Tenn Texas Wash St. Chicago Atlanta Philly
![Page 14: U.S. Department of Energy’s Vehicle Technologies … · U.S. Department of Energy’s Vehicle Technologies ProgramVehicle Technologies Program Plug-in Vehicles and Charging Infrastructure](https://reader036.fdocuments.net/reader036/viewer/2022071013/5fcc2902daedb40740441a82/html5/thumbnails/14.jpg)
EV Project – National Datad
• Number of vehiclesLeafs3 696
Volts1 006
4rd quarter 2012 Data Only
• Number of vehicles• Number of Trips• Distance (million miles)
3,696956,366
6.6
1,006362,848
3.0• Average (Ave) trip distance• Ave distance per day• Ave number (#) trips between
6.9 mi29.2 mi
3 8
8.1 mi40.4 mi
3 5Ave number (#) trips between charging events
• Ave distance between charging events
3.8
26.3 mi
3.5
28.1 micharging events
• Ave # charging events per day 1.1 1.4
* Note that per day data is only for days a vehicle is driven
14
* Note that per day data is only for days a vehicle is driven
![Page 15: U.S. Department of Energy’s Vehicle Technologies … · U.S. Department of Energy’s Vehicle Technologies ProgramVehicle Technologies Program Plug-in Vehicles and Charging Infrastructure](https://reader036.fdocuments.net/reader036/viewer/2022071013/5fcc2902daedb40740441a82/html5/thumbnails/15.jpg)
EV Project – Leaf Operations Trends • Some decreases in average miles per day and average g p y g
miles per charge
Ni f D i O i B h i
27.530
32.535
Nissan Leaf Driver Operations Behavior
17.520
22.5257.5
Avg Trip Distance ‐MilesAvg Miles per dayAve Trips Between ChargesA Mil Ch
57.510
12.515 Ave Miles per Charge
Ave # Charges per Day
02.55
1st 2011 2nd 2011 3rd 2011 4th 2011 1st 2012 2nd 2012 3rd 2012 4th 2012
15
Number of Leafs reporting each quarter35 956 2,394 2645 2987 2911 3200 3696
![Page 16: U.S. Department of Energy’s Vehicle Technologies … · U.S. Department of Energy’s Vehicle Technologies ProgramVehicle Technologies Program Plug-in Vehicles and Charging Infrastructure](https://reader036.fdocuments.net/reader036/viewer/2022071013/5fcc2902daedb40740441a82/html5/thumbnails/16.jpg)
EV Project – Leaf Charging Location Trends• 9% increase in home charging and 10% decrease in non-% g g %
home charging as a revenue model is introduced
Nissan Leaf Driver Charing Behavior
80%
90%
100%g
40%
50%
60%
70% Percent home charging
Percent away from home charging
Percent unknown locations
10%
20%
30%
40%
Number of Leafs reporting each quarter
0%
10%
1st 2011 2nd 2011 3rd 2011 4th 2011 1st 2012 2nd 2012 3rd 2012 4th 2012
16
Number of Leafs reporting each quarter35 956 2,394 2645 2987 2911 3200 3696
![Page 17: U.S. Department of Energy’s Vehicle Technologies … · U.S. Department of Energy’s Vehicle Technologies ProgramVehicle Technologies Program Plug-in Vehicles and Charging Infrastructure](https://reader036.fdocuments.net/reader036/viewer/2022071013/5fcc2902daedb40740441a82/html5/thumbnails/17.jpg)
EV Project – Volt Operations Trends • Average quarterly increases in miles per day and per g q y p y p
charge have decreased most recently
Chevy Volt Driver Operations Behavior
35
40
45y p
20
25
30
Avg Trip Distance ‐MilesAvg Miles per dayAve Trips Between Charges
5
10
15
Ave Trips Between ChargesAve Miles per ChargeAve # Charges per Day
Number of Volts reporting each quarter
0
4th 2011 1st 2012 2nd 2012 3rd 2012 4th 2012
17
Number of Volts reporting each quarter45 317 408 809 1006
![Page 18: U.S. Department of Energy’s Vehicle Technologies … · U.S. Department of Energy’s Vehicle Technologies ProgramVehicle Technologies Program Plug-in Vehicles and Charging Infrastructure](https://reader036.fdocuments.net/reader036/viewer/2022071013/5fcc2902daedb40740441a82/html5/thumbnails/18.jpg)
EV Project – Volt Charging Location Trends• 3% increase in home charging and 1% decrease in non-% g g %
home charging as a revenue model is introduced
Ch V lt D i Ch i B h i
80%
90%
100%Percent home charging
Percent away from home charging
Percentunknown locations
Chevy Volt Driver Charging Behavior
50%
60%
70%Percent unknown locations
20%
30%
40%
0%
10%
4th 2011 1st 2012 2nd 2012 3rd 2012 4th 2012
18
Number of Volts reporting each quarter45 317 408 809 1006
![Page 19: U.S. Department of Energy’s Vehicle Technologies … · U.S. Department of Energy’s Vehicle Technologies ProgramVehicle Technologies Program Plug-in Vehicles and Charging Infrastructure](https://reader036.fdocuments.net/reader036/viewer/2022071013/5fcc2902daedb40740441a82/html5/thumbnails/19.jpg)
EV Project – Residential EVSE L2 Use Trends • Continued gradual increases in time vehicles connected g
per charge and in AC KWh transferred per charge event
Residentiial EVSE Infrastructure Use Trends
20.0
22.5
25.0Ave Hrs Vehicle Connt R2 WDAve Hrs Vehicle Connt R2 WEAve Hrs Vehicle Draw KW R2 WDAve Hrs Vehicle Draw KW R2 WE
Residentiial EVSE Infrastructure Use Trends
10 0
12.5
15.0
17.5 Ave Hrs Vehicle Draw KW R2 WEAve AC KWh/charge Event R2 WDAve AC KWh/charge Event R2 WE
2.5
5.0
7.5
10.0
Number of Residential EVSE Level reporting each quarter
0.0
2.5
1st 2011 2nd 2011 3rd 2011 4th 2011 1st 2012 2nd 2012 3rd 2012 4th 2012
19
Number of Residential EVSE Level reporting each quarter35 955 2413 2704 3324 3338 4020 4737
Residential EVSE Level 2 = R2, Weekend = WE, Weekday = WD
![Page 20: U.S. Department of Energy’s Vehicle Technologies … · U.S. Department of Energy’s Vehicle Technologies ProgramVehicle Technologies Program Plug-in Vehicles and Charging Infrastructure](https://reader036.fdocuments.net/reader036/viewer/2022071013/5fcc2902daedb40740441a82/html5/thumbnails/20.jpg)
EV Project – Public EVSE L2 Use Trends • Increases in kWh per charge and time energy is drawnp g gy• Average time vehicle connected appears to be rising this
last quarter Non-Residential EVSE Infrastructure Use Trends
9
10
11
12 Ave Hrs Vehicle Connt P2 WDAve Hrs Vehicle Connt P2 WEAve Hrs Vehicle Draw KW P2 WDAve Hrs Vehicle Draw KW P2 WEA e ACKWh/charge E ent P2 WD
Non-Residential EVSE Infrastructure Use Trends
5
6
7
8Ave AC KWh/charge Event P2 WDAve AC KWh/charge Event P2 WE
1
2
3
4
5
Number of Public EVSE Level reporting each quarter
0
1
3rd 2011 4th 2011 1st 2012 2nd 2012 3rd 2012 4th 2012
20
Number of Public EVSE Level reporting each quarter170 438 955 1483 1818 1991
Public EVSE Level 2 = P2, Weekend = WE, Weekday = WD
![Page 21: U.S. Department of Energy’s Vehicle Technologies … · U.S. Department of Energy’s Vehicle Technologies ProgramVehicle Technologies Program Plug-in Vehicles and Charging Infrastructure](https://reader036.fdocuments.net/reader036/viewer/2022071013/5fcc2902daedb40740441a82/html5/thumbnails/21.jpg)
EV Project – EVSE Infra. Summary Report• Percent of public L2 EVSE deployed is now 30% of all L2 p p y %
EVSE
90%
100%Percent Residential & Public EVSE of Total Number of EVSE
40%
50%
60%
70%
80%
Percent Res
Percent Pub
0%
10%
20%
30%
40%
Percentage AC MWH & Charge Events - Public and Residential EVSE0%1st 2011 2nd 2011 3rd 2011 4th 2011 1st 2012 2nd 2012 3rd 2012 4th 2012
70%
80%
90%
100%
Percent Res AC MWH
PercentPub AC MWH
g g
• As measured by kWh use and number of
30%
40%
50%
60%Percent Pub AC MWH
Percent Res Charge Events
Percent Pub Charge Eventscharge events, revenue model may be decreasing public L2
210%
10%
20%
1st 2011 2nd 2011 3rd 2011 4th 2011 1st 2012 2nd 2012 3rd 2012 4th 2012
EVSE use
![Page 22: U.S. Department of Energy’s Vehicle Technologies … · U.S. Department of Energy’s Vehicle Technologies ProgramVehicle Technologies Program Plug-in Vehicles and Charging Infrastructure](https://reader036.fdocuments.net/reader036/viewer/2022071013/5fcc2902daedb40740441a82/html5/thumbnails/22.jpg)
EV Project – Public Level 2 EVSE Usage• Contribution of Car Sharing Fleets is significant
All territoriesVehicles Charged Car sharing fleet Nissan Leaf Chevrolet Volt Unknown
• Contribution of Car Sharing Fleets is significant
Vehicles Charged Car sharing fleet Nissan Leaf Chevrolet Volt Unknown
Percent of charging events 25% 21% 5% 49%
Percent of kWh consumed 38% 17% 3% 41%
San DiegoVehicles Charged 300 Car2Go fleet Nissan Leaf Chevrolet Volt Unknown
Percent of charging events 59% 16% 2% 23%e ce t o c a g g e e ts 59% 6% % 3%
Percent of kWh consumed 72% 11% 1% 16%
Oregon (Car2Go in Portland)V hi l Ch d 30 C 2G fl t Ni L f Ch l t V lt U kVehicles Charged 30 Car2Go fleet Nissan Leaf Chevrolet Volt Unknown
Percent of charging events 5% 29% 4% 61%
Percent of kWh consumed 11% 27% 4% 58%
22
![Page 23: U.S. Department of Energy’s Vehicle Technologies … · U.S. Department of Energy’s Vehicle Technologies ProgramVehicle Technologies Program Plug-in Vehicles and Charging Infrastructure](https://reader036.fdocuments.net/reader036/viewer/2022071013/5fcc2902daedb40740441a82/html5/thumbnails/23.jpg)
EV Project – EVSE Infra. Summary Report• National Residential and Public Level 2 Weekday EVSE
th4th Quarter 2012• Residential and public connect time and energy use are
fairly opposite profiles. Note different scalesNational Residential Connect Time National Public Connect Time
National Public DemandNational Residential Demand
23
![Page 24: U.S. Department of Energy’s Vehicle Technologies … · U.S. Department of Energy’s Vehicle Technologies ProgramVehicle Technologies Program Plug-in Vehicles and Charging Infrastructure](https://reader036.fdocuments.net/reader036/viewer/2022071013/5fcc2902daedb40740441a82/html5/thumbnails/24.jpg)
EV Project – EVSE Infra. Summary Report• Residential Level 2 Weekday EVSE 4th Quarter 2012y• San Diego and San Francisco, with residential L2 TOU
rates, are similar to national and other regional EVSE connect profiles
Los AngelesSan Diego
Washington StateSan Francisco
24
![Page 25: U.S. Department of Energy’s Vehicle Technologies … · U.S. Department of Energy’s Vehicle Technologies ProgramVehicle Technologies Program Plug-in Vehicles and Charging Infrastructure](https://reader036.fdocuments.net/reader036/viewer/2022071013/5fcc2902daedb40740441a82/html5/thumbnails/25.jpg)
EV Project – EVSE Infra. Summary Report• Residential Level 2 Weekday EVSE 3rd Quarter 2012y Q• TOU kWh rates in San Diego and San Francisco clearly
impact when vehicle charging start times are setLos AngelesSan Diego Los AngelesSan Diego
Washington StateSan Francisco
25
![Page 26: U.S. Department of Energy’s Vehicle Technologies … · U.S. Department of Energy’s Vehicle Technologies ProgramVehicle Technologies Program Plug-in Vehicles and Charging Infrastructure](https://reader036.fdocuments.net/reader036/viewer/2022071013/5fcc2902daedb40740441a82/html5/thumbnails/26.jpg)
EV Project – EVSE Infra. Summary Report• DC Fast Chargers Weekday 4th Quarter 2012g y Q• 54 DCFCs connected and demand profiles
Weekday Connected Profile• 1.9 average charge
t d DCFCWeekday Connected Profile events per day per DCFC• Leafs 39% charge events
and 41% energy• Unknowns other charge
events and energy• 18.8 minutes average
Weekday Demand Profile
gtime connected
• 18.8 minutes average time drawing energytime drawing energy
• 7.0 kWh average energy consumed per charge
26
![Page 27: U.S. Department of Energy’s Vehicle Technologies … · U.S. Department of Energy’s Vehicle Technologies ProgramVehicle Technologies Program Plug-in Vehicles and Charging Infrastructure](https://reader036.fdocuments.net/reader036/viewer/2022071013/5fcc2902daedb40740441a82/html5/thumbnails/27.jpg)
L2 Access Fees Structure4th Q t i fi t id d i l t ti f i l• 4th Quarter is first widespread implementation of simple and low cost access fees
• Blink member– Affiliate credit card with free Blink RFID “In Card”– Level 2 access fee of $1.00 per hour of connect time
• Guest No Blink RFID “In Card” required• Guest - No Blink RFID In Card required– Guest Code using quick reservation code or website– Level 2 access feel of $2.00 per hour of connect time
• Future pricing – Pricing to reflect regional electricity rates– Cover electricity costs in all cases– Cover electricity costs in all cases
27
![Page 28: U.S. Department of Energy’s Vehicle Technologies … · U.S. Department of Energy’s Vehicle Technologies ProgramVehicle Technologies Program Plug-in Vehicles and Charging Infrastructure](https://reader036.fdocuments.net/reader036/viewer/2022071013/5fcc2902daedb40740441a82/html5/thumbnails/28.jpg)
DC Fast Charge (DCFC) Fees StructureE DCFC ith i iti l f h i• Encourage DCFC use with initial free charging
• Implement DCFC access fees by region in 1st Quarter 2013 with beta testing currently underway
• Initial fee structure simple and low cost– Accommodate varying vehicle charge rates
Accommodate select limitation of charging output– Accommodate select limitation of charging output power
• Blink member$2 h li i d $ 00 i– $25 per month unlimited use or $5.00 per session
• Guest – $8.00 per session$8.00 per session
28
![Page 29: U.S. Department of Energy’s Vehicle Technologies … · U.S. Department of Energy’s Vehicle Technologies ProgramVehicle Technologies Program Plug-in Vehicles and Charging Infrastructure](https://reader036.fdocuments.net/reader036/viewer/2022071013/5fcc2902daedb40740441a82/html5/thumbnails/29.jpg)
• Permit timeliness has not been a problemResidential Lessons Learned• Permit timeliness has not been a problem• Majority are over-the-counter• Permit fees vary significantly- $7.50 to $500.00
29
![Page 30: U.S. Department of Energy’s Vehicle Technologies … · U.S. Department of Energy’s Vehicle Technologies ProgramVehicle Technologies Program Plug-in Vehicles and Charging Infrastructure](https://reader036.fdocuments.net/reader036/viewer/2022071013/5fcc2902daedb40740441a82/html5/thumbnails/30.jpg)
• Average residential installation cost ≈$1 375Residential Lessons Learned• Average residential installation cost ≈$1,375• Individual installations vary widely• Some user bias to lower costs
30
![Page 31: U.S. Department of Energy’s Vehicle Technologies … · U.S. Department of Energy’s Vehicle Technologies ProgramVehicle Technologies Program Plug-in Vehicles and Charging Infrastructure](https://reader036.fdocuments.net/reader036/viewer/2022071013/5fcc2902daedb40740441a82/html5/thumbnails/31.jpg)
• ADA significantly drives costCommercial Lessons Learned
ADA significantly drives cost– Accessible charger– Van accessible parking– Accessible electric and– Accessible electric and
passage routes to facility• Permit fees and delays can
are significantare significant– Load studies– Zoning reviews
31
![Page 32: U.S. Department of Energy’s Vehicle Technologies … · U.S. Department of Energy’s Vehicle Technologies ProgramVehicle Technologies Program Plug-in Vehicles and Charging Infrastructure](https://reader036.fdocuments.net/reader036/viewer/2022071013/5fcc2902daedb40740441a82/html5/thumbnails/32.jpg)
Commercial Lessons Learned• Commercial permits range $14 to $821• Commercial permits range $14 to $821
32
![Page 33: U.S. Department of Energy’s Vehicle Technologies … · U.S. Department of Energy’s Vehicle Technologies ProgramVehicle Technologies Program Plug-in Vehicles and Charging Infrastructure](https://reader036.fdocuments.net/reader036/viewer/2022071013/5fcc2902daedb40740441a82/html5/thumbnails/33.jpg)
• Demand and energy costsCommercial Lessons Learned
Demand and energy costs are significant for some utilities
– 25¢/kWh25¢/kWh– $25/kW
• Some utilities offer commercial rates withoutcommercial rates without demand charges
• Others incorporate 20 kW to 50 kW demand thresholds50 kW demand thresholds
• Nissan Leaf is demand charge free in some electric utility service territoriesutility service territories
33
![Page 34: U.S. Department of Energy’s Vehicle Technologies … · U.S. Department of Energy’s Vehicle Technologies ProgramVehicle Technologies Program Plug-in Vehicles and Charging Infrastructure](https://reader036.fdocuments.net/reader036/viewer/2022071013/5fcc2902daedb40740441a82/html5/thumbnails/34.jpg)
Recurring Nissan Leaf DC fast charge demand chargesCommercial Lessons Learned• Recurring Nissan Leaf DC fast charge demand charges
are significant in many utility service territories
34
![Page 35: U.S. Department of Energy’s Vehicle Technologies … · U.S. Department of Energy’s Vehicle Technologies ProgramVehicle Technologies Program Plug-in Vehicles and Charging Infrastructure](https://reader036.fdocuments.net/reader036/viewer/2022071013/5fcc2902daedb40740441a82/html5/thumbnails/35.jpg)
ChargePoint America ARRA Project• Conducted by Coulomb• Project to Sept. 2012• 3,799 EVSE installed
and reporting datap g– 1,743 Residential– 179 Private /
commercialcommercial– 1,868 Public– 9 unknown
• 553,439 charge events• 3,856 AC MWh
35
![Page 36: U.S. Department of Energy’s Vehicle Technologies … · U.S. Department of Energy’s Vehicle Technologies ProgramVehicle Technologies Program Plug-in Vehicles and Charging Infrastructure](https://reader036.fdocuments.net/reader036/viewer/2022071013/5fcc2902daedb40740441a82/html5/thumbnails/36.jpg)
ChargePoint America ARRA Project• July – Sept. 2012 datay p• 3,361 units• Percent time vehicle
connectedconnected• Residential 45%• Private/com 28%• Public 8%
• Percent time drawing powerpower• Residential 9%• Private/com 6%
P bli 2%• Public 2%• EVSE data only
36
![Page 37: U.S. Department of Energy’s Vehicle Technologies … · U.S. Department of Energy’s Vehicle Technologies ProgramVehicle Technologies Program Plug-in Vehicles and Charging Infrastructure](https://reader036.fdocuments.net/reader036/viewer/2022071013/5fcc2902daedb40740441a82/html5/thumbnails/37.jpg)
ChargePoint America: June – Sept. 2012Public Connect Time Commercial Connect Time Residential Connect Time
Public Demand Commercial Demand Residential DemandPublic Demand Commercial Demand Residential Demand
• Public is open access. Commercial are limited access• Public and commercial reflect at work charging• Residential reflects end of day return-to-home charging
37
Residential reflects end of day return to home charging• Note difference in scales
![Page 38: U.S. Department of Energy’s Vehicle Technologies … · U.S. Department of Energy’s Vehicle Technologies ProgramVehicle Technologies Program Plug-in Vehicles and Charging Infrastructure](https://reader036.fdocuments.net/reader036/viewer/2022071013/5fcc2902daedb40740441a82/html5/thumbnails/38.jpg)
EVSE Testing• AC energy consumption 60
70
80
EVSE AC W Consumption Prior to Charge
EVSE AC WConsumption During Charge
EVSE AC Watt Consumption Prior to & During Chevy Volt Charging
gy pat rest and during Volt Charging benchmarked
• Steady state charge 10
20
30
40
50EVSE AC W Consumption During Charge
y gefficiency benchmarked 0
See http://avt.inel.gov/evse.shtml for individual testing fact sheets
EVSE Efficiency During Steady State Charge • Most EVSE consume
98.00%
98.50%
99.00%
99.50%
100.00% • Most EVSE consume 13 W or less at rest. Higher watt use tied to more EVSE features
96.00%
96.50%
97.00%
97.50%
• Most EVSE under 30 W during charge
• Most EVSE 99+%
38See http://avt.inel.gov/evse.shtml for individual testing fact sheets
Most EVSE 99+% efficient during steady state charge of a Volt
![Page 39: U.S. Department of Energy’s Vehicle Technologies … · U.S. Department of Energy’s Vehicle Technologies ProgramVehicle Technologies Program Plug-in Vehicles and Charging Infrastructure](https://reader036.fdocuments.net/reader036/viewer/2022071013/5fcc2902daedb40740441a82/html5/thumbnails/39.jpg)
Hasetec DC Fast Charging Nissan Leaf• 53.1 AC kW peak grid powerp g p• 47.1 DC kW peak charge power to Leaf energy storage
system (ESS)• 15.0 Grid AC kWh and 13.3 DC kWh delivered to Leaf ESS15.0 Grid AC kWh and 13.3 DC kWh delivered to Leaf ESS• 88.7% Overall charge efficiency (480VAC to ESS DC)
39
![Page 40: U.S. Department of Energy’s Vehicle Technologies … · U.S. Department of Energy’s Vehicle Technologies ProgramVehicle Technologies Program Plug-in Vehicles and Charging Infrastructure](https://reader036.fdocuments.net/reader036/viewer/2022071013/5fcc2902daedb40740441a82/html5/thumbnails/40.jpg)
Conductive System Benchmarking
40
4
Entire report can be found at: http://avt.inel.gov/pdf/phev/EfficiencyResultsChevroletVoltOnBoardCharger.pdf
![Page 41: U.S. Department of Energy’s Vehicle Technologies … · U.S. Department of Energy’s Vehicle Technologies ProgramVehicle Technologies Program Plug-in Vehicles and Charging Infrastructure](https://reader036.fdocuments.net/reader036/viewer/2022071013/5fcc2902daedb40740441a82/html5/thumbnails/41.jpg)
Additional Battery Testing• Initiated field and lab DC Fast Charge and Level 2 charging g g g
study of impacts on battery life in 6 Nissan Leafs– Two vehicles driven on road and L2 charged
Two driven identical routes DCFC charged– Two driven identical routes DCFC charged– One L2 and 1 DCFC in battery lab– At 10k miles each vehicle similar minimal capacity fade
• Battery mule test vehicle provides field testing of traction battery packs at any power and efficiency level– Current test pack is EnerDel Li-ion 345 V rated 70 AhCurrent test pack is EnerDel Li ion 345 V rated 70 Ah– 8,600 miles of on-road driving and L2 charging has
resulted in 10% capacity fade (63.2 Ah to 56.8 Ah) per EVPC and C/3 lab testsEVPC and C/3 lab tests
41
![Page 42: U.S. Department of Energy’s Vehicle Technologies … · U.S. Department of Energy’s Vehicle Technologies ProgramVehicle Technologies Program Plug-in Vehicles and Charging Infrastructure](https://reader036.fdocuments.net/reader036/viewer/2022071013/5fcc2902daedb40740441a82/html5/thumbnails/42.jpg)
Summary• EV Project vehicles connected much longer than needed j g
to recharge - opportunities to shift charging times• Significant residential Level 2 EV Project charging occurs
off-peak with charge-starts at midnight per TOU ratesoff peak with charge starts at midnight per TOU rates indicates consumers are price sensitive
• Revenue models for public charging are currently being introduced – long term impacts?introduced long term impacts?
• Only about 60% of EV Project data collected to date• DCFC charge events have significant demand impacts
b t this is an electric tilit polic decisionbut this is an electric utility policy decision• How, where, when we measure EVSE and vehicle system
charging efficiencies results in significantly different ltresults
42
![Page 43: U.S. Department of Energy’s Vehicle Technologies … · U.S. Department of Energy’s Vehicle Technologies ProgramVehicle Technologies Program Plug-in Vehicles and Charging Infrastructure](https://reader036.fdocuments.net/reader036/viewer/2022071013/5fcc2902daedb40740441a82/html5/thumbnails/43.jpg)
AcknowledgementThis work is supported by the U.S. Department of
Energy’s EERE Vehicle Technologies Program
g
More Informationhttp://avt.inl.gov
This presentation will be posted in the publications section of the above website
43