Louisiana Recovery Field Office  As of: 29 Apr 07 

U. S. Army Corps of Engineers

Louisiana Recovery Field Office

Mission Overview

Page 2: US Army: standardwebbrief

8/14/2019 US Army: standardwebbrief

http://slidepdf.com/reader/full/us-army-standardwebbrief 2/16

Page 3: US Army: standardwebbrief

8/14/2019 US Army: standardwebbrief

http://slidepdf.com/reader/full/us-army-standardwebbrief 3/16

The Face of the Corps! 

www faceofthecorps com

US ArmyCorps of Engineers

Louisiana Recovery Field Office  As of: 29 Apr 07 

The U.S. Army Corps of Engineers Louisiana Recovery Field

Office (LA RFO) provides FEMA Emergency Support

Function # 3 (ESF3) mission recovery support to includetechnical assistance, debris removal, including demolition and

private property debris removal, temporary housing support,

and others as assigned to the affected citizens of Louisiana in

order to facilitate recovery from Hurricanes KATRINA and RITA

As of 1 Mar 07

LA RFO Mission

Page 4: US Army: standardwebbrief

8/14/2019 US Army: standardwebbrief

http://slidepdf.com/reader/full/us-army-standardwebbrief 4/16

The Face of the Corps! 

www faceofthecorps com

US ArmyCorps of Engineers

Louisiana Recovery Field Office  As of: 29 Apr 07 

2006 LA-RFO 

Debris Removal

Critical Public Facilities

Temporary Roofing

QualityAssurance

31 Major Contracts - $2.3 Billion

Setting the stage for full recovery

Page 5: US Army: standardwebbrief

8/14/2019 US Army: standardwebbrief

http://slidepdf.com/reader/full/us-army-standardwebbrief 5/16

The Face of the Corps! 

www faceofthecorps com

US ArmyCorps of Engineers

Louisiana Recovery Field Office  As of: 29 Apr 07 

Water & Ice MissionSustaining Life for Victims and the Response

National Response Plan

• Advance contracts with suppliers.

• Pre-positioned in staging areas.

• Final distribution through localgovernments

2,178 truckloads water deliveredOne truckload is ~18,000 liters (40 M Total)A rural water tank holds about 1 M liters

1,533 truckloads ice delivered One truckload is ~40,000 lbs (61 M Total)One truckload = 40 filled ice machines

  Mission ~ 62,000 ice machines equivalent

COMPLETE

Page 6: US Army: standardwebbrief

8/14/2019 US Army: standardwebbrief

http://slidepdf.com/reader/full/us-army-standardwebbrief 6/16

The Face of the Corps! 

www faceofthecorps com

US ArmyCorps of Engineers

Louisiana Recovery Field Office  As of: 29 Apr 07 

Assessments: 928Generators Installed: 288 generators

Katrina: 140Rita: 148

COMPLETE

Power MissionSustaining Life, Powering the Response

Page 7: US Army: standardwebbrief

8/14/2019 US Army: standardwebbrief

http://slidepdf.com/reader/full/us-army-standardwebbrief 7/16

The Face of the Corps! 

www faceofthecorps com

US ArmyCorps of Engineers

Louisiana Recovery Field Office As of: 29 Apr 07

Classrooms: 216Other Critical Facilities: 94

SUNO Campus, NOLA

COMPLETE

Angie Junior HSAngie, LA

Critical Public Facilities

Total: 310

Restoring Community Normalcy and Key Operations

Page 8: US Army: standardwebbrief

8/14/2019 US Army: standardwebbrief

http://slidepdf.com/reader/full/us-army-standardwebbrief 8/16

The Face of the Corps! 

www faceofthecorps com

US ArmyCorps of Engineers

Louisiana Recovery Field Office As of: 29 Apr 07

Temporary Roofing

Total: 81,242Katrina: 62,434Rita: 18,808

COMPLETE9 square miles of roofs repaired = Bogalusa, La,

entire city area covered one piece at a time

Stabilizing families and community economic systems

Page 9: US Army: standardwebbrief

8/14/2019 US Army: standardwebbrief

http://slidepdf.com/reader/full/us-army-standardwebbrief 9/16

The Face of the Corps! 

www faceofthecorps com

US ArmyCorps of Engineers

Louisiana Recovery Field Office As of: 29 Apr 07

Site Review and Assessments1,217 potential sites

 

Detailed Assessments144 approved sites QA SupportConstruction Completed109 sites

All Construction Complete;Inspection Continues

Temporary HousingStabilizing families and community economic systems

Page 10: US Army: standardwebbrief

8/14/2019 US Army: standardwebbrief

http://slidepdf.com/reader/full/us-army-standardwebbrief 10/16

The Face of the Corps! 

www faceofthecorps com

US ArmyCorps of Engineers

Louisiana Recovery Field Office As of: 29 Apr 07

2007 LA-RFO Contracts10 Demolition Contracts - $150 million

Setting the stage for full recovery

Using Small Business

45% of RFO contractor 

subcontracted dollarshave gone to Louisianafirms

LA-RFO has awarded395 contracts to large

and small Louisianabusinesses, 286 of those going to smallbusiness

Page 11: US Army: standardwebbrief

8/14/2019 US Army: standardwebbrief

http://slidepdf.com/reader/full/us-army-standardwebbrief 11/16

The Face of the Corps! 

www faceofthecorps com

US ArmyCorps of Engineers

Louisiana Recovery Field Office As of: 29 Apr 07

New OrleansMission: 12.6 MCYTo Date: 12.5 MCY

Est. Completion: 8/07

As of 19 Feb 2007 Removed % CompleteKatrina 20.6 MCY 99%Rita 6.6 MCY 100%Total 27.4 MCY 99%

Debris Removal

ROW Trees: 8,300 Tires: 259,000

Total Mission Estimate: 27.4 million cubic yards

Debris would fill 6-7 Superdomes or 7-8 Empire State Buildings

Page 12: US Army: standardwebbrief

8/14/2019 US Army: standardwebbrief

http://slidepdf.com/reader/full/us-army-standardwebbrief 12/16

The Face of the Corps! 

www faceofthecorps com

US ArmyCorps of Engineers

Louisiana Recovery Field Office As of: 29 Apr 07

Private Property DebrisRemoval Sites

Estimated SitesKatrina Orleans Parish 26,126

Other Parishes 44,363Rita 2, 834

 

Total 73,323

Sites CompletedKatrina Orleans Parish  25,035

Other Parishes 13,165Rita 2,834

Total 41,034

New Orleans Estimate26,126

Collected To Date25,035

Estimated Completion8/07

Page 13: US Army: standardwebbrief

8/14/2019 US Army: standardwebbrief

http://slidepdf.com/reader/full/us-army-standardwebbrief 13/16

The Face of the Corps! 

www faceofthecorps com

US ArmyCorps of Engineers

Louisiana Recovery Field Office As of: 29 Apr 07

Demolition

Estimated Demolition MissionKatrina Orleans Parish 15,000

Other Parishes 1,786Rita 1,018

 

Total 17,804

Demolitions CompletedKatrina Orleans Parish  3,124

Other Parishes 1,670Rita 1,017

Total 5,811

Page 14: US Army: standardwebbrief

8/14/2019 US Army: standardwebbrief

http://slidepdf.com/reader/full/us-army-standardwebbrief 14/16

The Face of the Corps! 

www faceofthecorps com

US ArmyCorps of Engineers

Louisiana Recovery Field Office As of: 29 Apr 07

Orleans Area DebrisManagement Areas

Recovery 1• Vegetative Debris

Chef Menteur (Enhanced Type III)• C&D (Construction/Demolition) April 13 to August 15, 2006

River Birch (Type I and II)• Regulated Asbestos-Containing Material (RACM)

Highway 90 (Type III)• C&D

Gentilly (Type III)• C&D and Non-RACM, White Goods Processing

Page 15: US Army: standardwebbrief

8/14/2019 US Army: standardwebbrief

http://slidepdf.com/reader/full/us-army-standardwebbrief 15/16

Page 16: US Army: standardwebbrief

8/14/2019 US Army: standardwebbrief

http://slidepdf.com/reader/full/us-army-standardwebbrief 16/16

The Face of the Corps! 

faceofthecorps com

US ArmyCorps of Engineers

Louisiana Recovery Field Office As of: 29 Apr 07

www.faceofthecorps.co