    Ohio Department of Transportation

    w w w . t r a n s p o r t a t i o n . o h i o . g o v

    John R. Kasich, Governor Jerry Wray,Director

    U.S. 33 Corridor Safety

    Improvements

  • 7/29/2019 U.S. 33 Corridor Safety Improvements

    2/21

    O h i o D e p a r t m e n t o f T r a n s p o r t a t i o n

    Todays Agenda

    Recent History

    Crash Statistic Update

    Superstreet Review Funding Update

    Corridor Recommendations

  • 7/29/2019 U.S. 33 Corridor Safety Improvements

    3/21

    O h i o D e p a r t m e n t o f T r a n s p o r t a t i o n

    Corridor Recent History

    1958/59 - U.S. 33 widened to 4 lanes

    1996 - Prepare to Stop When Flashing(PTSWF) lights added @ 3 locations

    2004 - U.S. 33 Corridor Study

    2006 - High Bowen intersection made

    right-in/right out only

  • 7/29/2019 U.S. 33 Corridor Safety Improvements

    4/21

    O h i o D e p a r t m e n t o f T r a n s p o r t a t i o n

    Corridor Recent History

    2007 - Interchange added at Hill DileyRoad

    2011 Proposed Carroll/WinchesterRoad interchange removed from TRACdue to Statewide funding shortfall

  • 7/29/2019 U.S. 33 Corridor Safety Improvements

    5/21

    O h i o D e p a r t m e n t o f T r a n s p o r t a t i o n

    Corridor Recent History

    Summer 2012 ODOT removesPrepare to Stop When Flashing

    (PTSWF) lights at Winchester,

    Pickerington, and Sharp Roadintersections

    Installed passive, state-of-the-art Dilemma

    Zone Detectors

  • 7/29/2019 U.S. 33 Corridor Safety Improvements

    6/21

    O h i o D e p a r t m e n t o f T r a n s p o r t a t i o n

    US 33/Pickerington Road

    Preliminary Crash Statistics

  • 7/29/2019 U.S. 33 Corridor Safety Improvements

    7/21

    O h i o D e p a r t m e n t o f T r a n s p o r t a t i o n

    US 33/Winchester

    Preliminary Crash Statistics

  • 7/29/2019 U.S. 33 Corridor Safety Improvements

    8/21

    O h i o D e p a r t m e n t o f T r a n s p o r t a t i o n

    Corridor Recent History

    Late Summer 2012 ODOT proposesSuperstreet as a short term (10 15years) solution

    Obtains $8.5M ODOT Safety Grant

  • 7/29/2019 U.S. 33 Corridor Safety Improvements

    9/21

    O h i o D e p a r t m e n t o f T r a n s p o r t a t i o n

    US 33/Winchester Road

    Superstreet Review Pluses:

    Could solve medium-term traffic congestion, safety concerns

    Reduces conflict points at Winchester intersection from 45 to12

    Reduce cycle time for mainline and side street traffic signals Relatively inexpensive ($5M +/-) as opposed to full

    interchange

    ODOT can cover costs

    Likely few R/W takes

    Retains access to/from Winchester

    Full interchange may never get funded

  • 7/29/2019 U.S. 33 Corridor Safety Improvements

    10/21

    O h i o D e p a r t m e n t o f T r a n s p o r t a t i o n

    US 33/Winchester Road

    Superstreet Review Minuses:

    US 33 mainline traffic would still need to stop

    Would not likely solve long-term (i.e. 20+ years) trafficconcerns

    Longer-distance thru and turn movements for Winchestertraffic

    Might not be well-received initially by public, especially locals

    If interchange eventually gets built, Super Street featureswould need to be fully/partially removed

  • 7/29/2019 U.S. 33 Corridor Safety Improvements

    11/21

    O h i o D e p a r t m e n t o f T r a n s p o r t a t i o n

    Superstreet Update

    2013 Superstreet preliminaryengineering indicates that Superstreetconcept at Winchester intersection will

    only be of benefit for 5 years +/-

    Preliminary engineering studiesindicate that a Superstreet @ US 33/

    Pickerington would eventually require asignal @ US 33/Allen Road, which isnot preferred

  • 7/29/2019 U.S. 33 Corridor Safety Improvements

    12/21

    O h i o D e p a r t m e n t o f T r a n s p o r t a t i o n

    US 33/Winchester Road

    Tentative Schedule

    ODOT District Five has begun US33/Winchester Road interchangedesign

    TRAC Working Session Presentation inMarch, 2013

    R/W, Environmental Design Costs only

    Once Environmental is cleared, second TRACpresentation in Summer 2013 to seekConstruction funding

  • 7/29/2019 U.S. 33 Corridor Safety Improvements

    13/21

    O h i o D e p a r t m e n t o f T r a n s p o r t a t i o n

    US 33/Winchester Road

    Tentative Schedule

    Environmental Fieldwork March 2013

    Public Involvement Meeting April 2013

    NEPA Clearance August 2013

    R/W Acquisition September 2013

    Design package submittal August 2014

    Shovel-ready by 12/31/2014 Contingent on TRAC Funding

    Approval

  • 7/29/2019 U.S. 33 Corridor Safety Improvements

    14/21

    O h i o D e p a r t m e n t o f T r a n s p o r t a t i o n

    US 33/Winchester Road

    Current Funding

    Earmarks: $3.6M (Construction only)

    ODOT Safety: $8.5M

    Design: $1.2M

    Significant Major New R/W,Construction commitment needed from

    TRAC

  • 7/29/2019 U.S. 33 Corridor Safety Improvements

    15/21

    O h i o D e p a r t m e n t o f T r a n s p o r t a t i o n

    US 33/Winchester Road

    Potential Alternatives

    Full interchange could cost $60M +/-

    Seeking lower-cost alternatives

    Dont touch Railroad R/W

    Minimize impact to commercial businesses atcurrent intersection

  • 7/29/2019 U.S. 33 Corridor Safety Improvements

    16/21

    O h i o D e p a r t m e n t o f T r a n s p o r t a t i o n

  • 7/29/2019 U.S. 33 Corridor Safety Improvements

    17/21

    O h i o D e p a r t m e n t o f T r a n s p o r t a t i o n

    US 33/Pickerington Road

    Recommendation

    Superstreet concept does not workhere due to impacts @ adjacent at-grade intersections

    Removing signal/mountable medianremains an option in the future

    ODOT recognizes secondary impacts ofthis action if taken

  • 7/29/2019 U.S. 33 Corridor Safety Improvements

    18/21

    O h i o D e p a r t m e n t o f T r a n s p o r t a t i o n

    US 33/Pickerington Road

    Recommendation

    We will also seek TRAC funding forPreliminary Development of aPickerington Road interchange

    Depending on costs, Pickerington Roadmay need to get built in stages (e.g.overpass first, then ramps)

    Timeline will be up to TRAC, IFapproved

  • 7/29/2019 U.S. 33 Corridor Safety Improvements

    19/21

    O h i o D e p a r t m e n t o f T r a n s p o r t a t i o n

    Other Corridor

    Recommendations

    Interchange will not be @ Allen Road

    Too many local roadway improvementsneeded to facilitate this location

    Much more R/W needed

    Environmental issues

    Would still require a Pickerington Road

    overpass Not preferred by local community (2004)

  • 7/29/2019 U.S. 33 Corridor Safety Improvements

    20/21

    O h i o D e p a r t m e n t o f T r a n s p o r t a t i o n

    Other Corridor

    Recommendations

    Work with Fairfield County Engineer,local stakeholders to identify potentialimprovements to local roadway system

    Remove all non-interchange accesspoints on US 33 between Lancaster andFranklin County Line

    Farm drives

    Residential subdivisions

    At-grade intersections

  • 7/29/2019 U.S. 33 Corridor Safety Improvements

    21/21

    O h i o D e p a r t m e n t o f T r a n s p o r t a t i o n

    Discussion?