Construction and Motorist Information Brighton Transportation Service Center 10321 E. Grand River, Suite 500 Brighton, MI 48116 Prepared by: MDOT Graphic Design & Mapping Unit \Office of Communications\brochures\US-12 Saline (01/16 ge) US-12 Reconstruction For More Information Call the Brighton Transportation Service Center at: 810-227-4681 Visit MDOT's Website at: www.michigan.gov/mdot April - November 2016 City of Saline (Michigan Avenue) Long-term Benefits Construction on US-12 will enhance the down- town community and provide long term infra- structure improvements. How Will We Keep Motorists Informed? For up-to-date information on this project, go to www.michigan.gov/drive or download the free Mi Drive app from iTunes and Google Play. Follow MDOT's University Region on Twitter at: www.twitter.com/MDOT_A2.

Transcript of US-12 (Michigan Avenue) Reconstruction, Saline · (MDOT) will reconstruct US-12 (Michigan Avenue)...

Page 1: US-12 (Michigan Avenue) Reconstruction, Saline · (MDOT) will reconstruct US-12 (Michigan Avenue) in downtown Saline from N. Maple Road/Old Creek Drive to the bridge over the Saline

Construction and Motorist Information

Brig

hton

Tra

nspo

rtat

ion

Ser

vice

Cen

ter

1032

1 E

. Gra

nd R

iver

, Sui

te 5

00B

right

on, M

I 481

16

Prepared by: MDOT Graphic Design & Mapping Unit \Office of Communications\brochures\US-12 Saline (01/16 ge)

US-12

Reconstruction

For More InformationCall the Brighton

Transportation Service Center at:

810-227-4681

Visit MDOT's Website at:

www.michigan.gov/mdotApril - November 2016

City of Saline

(Michigan Avenue)

Long-term BenefitsConstruction on US-12 will enhance the down-town community and provide long term infra-structure improvements.

How Will We Keep Motorists Informed?For up-to-date information on this project, go to www.michigan.gov/drive or download the free Mi Drive app from iTunes and Google Play.Follow MDOT's University Region on Twitter at: www.twitter.com/MDOT_A2.

Page 2: US-12 (Michigan Avenue) Reconstruction, Saline · (MDOT) will reconstruct US-12 (Michigan Avenue) in downtown Saline from N. Maple Road/Old Creek Drive to the bridge over the Saline

What Is Being Done?The Michigan Department of Transportation (MDOT) will reconstruct US-12 (Michigan Avenue) in downtown Saline from N. Maple Road/Old Creek Drive to the bridge over the Saline River. Work includes widening US-12 to five lanes be-tween Monroe Street and Harris Street to add a center turn lane, storm and sanitary sewer and water main upgrades, sidewalk improvements, and traffic signal upgrades.In addition, downtown amenities will be updated as part of a streetscape enhancement grant in partnership with the City of Saline. These up-grades include tree removal and replacement, enhanced crosswalks at major intersections, the addition of mid-block islands, and enhanced lighting along the corridor.

When Will This Be Done?Work on this project begins in April and is ex-pected to be finished in November.

MICHIGAN AVENUE

Mill Pond

Saline River

EVI

RD

KE

ER

C D

AO

R EL

PA

M

WILLIS ROAD

TE

ERT

S SI

RR

AH

ANN

ARBO

R STR

EET

HENRY STREET

MO

NR

OE STR

EET

LEWIS STREET

MILLS RO

AD

BEMIS ROAD

EVI

RD L

AIRT

SU

DNI

MICHIGAN AVENUE

Saline

12

12

DL

O

How Will Traffic Be Affected?During construction, only one lane of west-bound traffic will be open between Monroe Street and Maple Road, with eastbound traffic detoured using Henry Street. Henry Street will be resurfaced after construction on US-12 is complete.One lane will be open in each direction between the bridge and Monroe Street. There also will be short-term intersection closures with a detour posted. Temporary traffic signals will be in place on Henry Street at Ann Arbor Street, Harris Street and Old Creek Drive. Trucks will be encouraged to use M-50 or I-94, as oversized loads will be prohibited along US-12 during construction. The roadway is expected to reopen to two-way traffic with construction complete by November. Final restoration will take place in spring 2017.