URS 01 - Rotary Press Tablet Machine SPL

23
SQUARE PHARMACEUTICALS LTD SALGARIA, PABNA. URS OF ROTARY TABLET PRESS MACHINE. CONTENTS ARTICLE 1: - BASIC REQUIREMENTS ARTICLE 2: - - - - - - - GENERAL CHARACTERISTICS Type of Construction - State of the Art GMP Materials: S.S. AISI 316/316L Cleaning Interchangeability Format or Product change Effectiveness of Seals Heat Insulation 45 0 C No Asbestos Electrical Requirement ARTICLE 3: - - - - SUPPLIER'S RESPONSIBILITY Noise level < 75 dB(A) Machinery Safety & Guarding of dangerous parts Appropriate National Standards E.g. B.S. TUV, ASME, ISPESL. Supply of pressure reducing valves ARTICLE 4: - - - - SERVICES Characteristics of services on site Consumption (to be specified by Supplier - with Quotation) Main Physical Data Changes to Services or Main Physical Data ARTICLE 5: PLANS, DOCUMENTS AND O & M MANUALS ARTICLE 6: CUSTOMERS RESPONSIBILITIES ARTICLE 7: - TRIAL SAMPLES Supplier to request quantities to be sent ARTICLE 8: - INSPECTION VISIT/ACCEPTANCE TRIALS Acceptance trials at Supplier's works ARTICLE INSTALLATION Page 1 of 23

Transcript of URS 01 - Rotary Press Tablet Machine SPL

Page 1: URS 01 - Rotary Press Tablet Machine SPL

SQUARE PHARMACEUTICALS LTDSALGARIA, PABNA.

URS OF ROTARY TABLET PRESS MACHINE.

CONTENTS

ARTICLE 1: - BASIC REQUIREMENTS

ARTICLE 2:-------

GENERAL CHARACTERISTICSType of Construction - State of the Art GMPMaterials: S.S. AISI 316/316LCleaningInterchangeabilityFormat or Product change Effectiveness of SealsHeat Insulation 450C No AsbestosElectrical Requirement

ARTICLE 3: ----

SUPPLIER'S RESPONSIBILITYNoise level < 75 dB(A)Machinery Safety & Guarding of dangerous parts Appropriate National Standards E.g. B.S. TUV, ASME, ISPESL. Supply of pressure reducing valves

ARTICLE 4: ----

SERVICESCharacteristics of services on siteConsumption (to be specified by Supplier - with Quotation)Main Physical Data Changes to Services or Main Physical Data

ARTICLE 5: PLANS, DOCUMENTS AND O & M MANUALSARTICLE 6: CUSTOMERS RESPONSIBILITIESARTICLE 7:

-TRIAL SAMPLES Supplier to request quantities to be sent

ARTICLE 8:-

INSPECTION VISIT/ACCEPTANCE TRIALSAcceptance trials at Supplier's works

ARTICLE 9: INSTALLATION

ARTICLE 10: COMMISSIONING AND VALIDATION ON SITE & PERSONNEL TRAINING

ARTICLE 11 EXPORT PACKAGING, DELIVERY FOB, INSURANCE AND PROTECTION.

Name Designation Signature & DatePrepared by Tridip Bhattacharjee Executive, EngineeringChecked by Mazibur Rahman Manager, MaintenanceChecked by Mizanur Rahman Sr. Manager, ProductionReviewed by A.K.M Khairul Alam Sr. Manager, MaintenanceApproved by Jiban Kumar Ghosh General Manager, Factory

USER REQUIREMENT SPECIFICATION

Page 1 of 14

Page 2: URS 01 - Rotary Press Tablet Machine SPL

SQUARE PHARMACEUTICALS LTDSALGARIA, PABNA.

URS OF ROTARY TABLET PRESS MACHINE.

1.1 Basic Requirements

Compression of Pharmaceutical powders or granules into tablets at variable speed

The machine will complete of -

- Auto loading system

- Dedusting equipment

- Dust collector etc.

- Magnesium spray system

- All connecting pipes and accessories

- Tool box with necessary tools.

- Supplier shall include the machinery dimension & layout of the quoted machine considering safety cover

opening.

The equipment defined in this specification shall confirm to:

- The current state of the art GMP

- European machine agency (EMA) and FDA regulations and guidelines, as may be applied to this type of

equipment.

1.2. Machine Functions

1.2.1. Product:

Tablets of different shapes (Round, Caplet, Oblong, Oval) and sizes ranging from 6 to 25 mm in diameter for

round tablet and from 10/5 mm to 25/10 mm for Caplet tablet.

Sl n o. Name of the product Shape Size Weight RPM Output

Tablet/hr.

01 Calbo 500 Caplet 19 X 9.2 1459 mg

02 Calbo D Caplet 19 X 9.2 1461 mg

03 Cotrim DS Caplet 19 X 9.2 1100 mg

04 Calboplex Caplet 19 X 9.2 1800 mg

05 Contilex Caplet 19 X 9.2 900 mg

06 Filwel Gold Caplet 19 X 9.2 1450 mg

07 Filwel silver Caplet 19 X 9.2 1450 mg

Supplier will fill up the above table (RPM & Output Tablet hr.)

1.2.2. Capacity:

Normal working capacity of the machine should be 300000 (Three lacs) tablets / hour.

1.2.3. Design & Tooling:

Double sided, D-type tooling

Page 2 of 14

Page 3: URS 01 - Rotary Press Tablet Machine SPL

SQUARE PHARMACEUTICALS LTDSALGARIA, PABNA.

URS OF ROTARY TABLET PRESS MACHINE.

1.2.4. Auto loading system:

Auto loading equipment is to be set for loading the powder / granules from storage drum/container to

Machine Hopper. Autoloader will be On/OFF according to product level of hopper.

1.2.5. Hopper arrangement:

Hopper arrangement will allow connection of lay-flat tube to the hopper, ensuring proper feeding of materials

to feed frame. Level sensor required in hopper to control feed from IBC above. Level sensor will be

integrated with existing control panel. Inside the hopper there should be looking glass for monitoring powder

level.

Surface finishes of hopper will be Internal: 0.38 to 0.51 micron Ra and External: 0.51 to 0.64 micron Ra.

1.2.6. Compaction force:

Machine to be equipped with 100 KN (Maximum) pre-compression facility and main compaction force will be

100 KN (maximum)

1.2.7. Essential Feature:

Upper punch guides to be fitted with keyways for shaped punches.

Dust control connections from tabletting machine and deduster to central dust extraction system.

-Toughened glass hinged viewing panels.

-Automatic lubrication where required.

-Variable speed rotary paddle granule feeder.

1.2.8. Dedusting equipment

Dedusting / polishing equipment to be set for polishing the final product. Its speed must be synchronised

with basis machine speed.

1.2.9. Dust collector etc.

Dust collector is to be used for collecting extra dust form the different points of the machine. Machine should

have provision to control suction pressure to control dust.

1.2.11. All connecting pipes and accessories

Other accessories to be used for connecting the machine as usable.

1.2.12. Tool Box

Tool box to be supplied with necessary tools for maintenance the machine.

1.3. Option: Supplier should quote separate price for each option.

- Auto loading system

- Tablet deduster:

Page 3 of 14

Page 4: URS 01 - Rotary Press Tablet Machine SPL

SQUARE PHARMACEUTICALS LTDSALGARIA, PABNA.

URS OF ROTARY TABLET PRESS MACHINE.

-Tablet deduster machines,

- Automatic weight controlling unit.

- Safe feature with alarm system

- Touch screen / operator interface including product parameter setting and monitoring system

- Upper punch pressure (Pre & main pressure) monitoring system (upper punch pressure guide display

system)

- Dust collector

- Automatic lubricating system with alarm.

- Hard chrome plating for die table

- A set of tools to assist with change part removal and replacement

- Anti vibrating mounting

- Additional lower cam to adjust depth of die fill

- Compaction force monitoring and controlling system

- Feedback to adjust depth of die fill lower cam to control tablet weight

- Upper & lower punch tightness detector

- Ejection force indicator

- Pre & main pressure control from touch screen.

- Automatic sampling system

- Automatic gate to drive out of specification tablets

- Parts in contact with the product should SS 316 L and other will be SS 304. Surface mounted

adjacent to working area should be constructed in SS construction and complete covering of the

machine top is required for ensuring safety and protection.

1.5. Wear and Tear Spare PartsThe supplier shall include a budget quotation for “wear and tear” spare parts and electrical and

electronic spares for two years normal (single shift) operation. List to be itemised with unit prices,

after order placement.

Like autoloader filter (qty: 10 pc), all type of silicon gasket (Qty: 05 each), oil seal, scraper (Qty: 02

set), good quality upper & lower punch Dust seal (2 sets), proximity sensor, V belt etc along with

other spares as recommended by the supplier.

1.6. Room dimension:

Room dimension of Tablet compression is 6800 mm (L) X 5400 mm (W) X 2850 mm (H)

1.7 Documentation (In English) - Instruction manual for installation, start up, operation, maintenance, format changeover, calibration, troubleshooting; - All mechanical, electrical, pneumatic, hydraulic, lubrication plans, complete parts list with parts assembly drawing. - Logic diagram for control system/software- Manual/catalogue of all standard components,

Page 4 of 14

Page 5: URS 01 - Rotary Press Tablet Machine SPL

SQUARE PHARMACEUTICALS LTDSALGARIA, PABNA.

URS OF ROTARY TABLET PRESS MACHINE.

- Test Certificate of main Components,- List of MOC of all product contact parts, Certificate of MOC for product contact parts, - Calibration certificate for critical measuring/monitoring instruments- SOP (Standard Operating Procedure), Design Qualification (DQ), Installation Qualification (IQ) & Operational Qualification (OQ).

Note: Except IQ/OQ, all other documents should be 02 set (01 set original & 01 set copy. Where appropriate soft copies of documents to be provided. Also check article no. 5.0 Plans & Documents for instruction on documentation.

1. 8 Customer Reference

A customers list for similar model of equipment supplied (especially in Bangladesh) to be included in the offer.

1. 9 URS Revision History

RV 00 11-11-2011 PreliminaryRevision No. Date Description

ARTICLE 2: GENERAL CHARACTERISTICS

2.1 Type of Construction

The Equipment defined in this specification shall conform to:

- The current state of the art GMP

- WHO & cGMP regulations and guidelines, as may be applied to this type of equipment.

Thus, the supplier shall in the design and construction of the equipment, be obliged to separate the purely technical parts (motors, etc.) from the purely pharmaceutical parts in direct contact with the product, so far as is practicable.

Stainless steel must be welded under inert gas (argon or nitrogen) and the welds treated by pickling and passivation, to prevent any subsequent corrosion. All welds to be crack and crevice free. Internal welds and welds likely to be in contact with the product shall be ground smooth and flush. All other welds to be ground smooth. All welds shall be polished to the same standard as the surrounding areas.

Stainless steel fabrication areas should be totally segregated from any areas where carbon steel machining, grinding or similar operations are carried out.

2.2 Materials to be used

All parts of the equipment in contact with the product shall be stainless steel, SS316L and polished or, as otherwise requested in the User Requirement Specification [URS] (Article 1) of this Specification, or other materials compliant with FDA Regulations 21 CFR 311.65, e.g. PTFE, silicone or viton rubber. Surfaces that contact components, in-process materials, or drug products shall not be reactive, additive, or absorptive, so as to adversely affect product quality.

Product contact surfaces shall have a surface better than Ra 0.5 micron.

Page 5 of 14

Page 6: URS 01 - Rotary Press Tablet Machine SPL

SQUARE PHARMACEUTICALS LTDSALGARIA, PABNA.

URS OF ROTARY TABLET PRESS MACHINE.

All product contact lubricants shall be food grade.

With the exclusion of certain ancillary items in the technical area, the use of materials requiring painting to resist corrosion shall be avoided.

2.3 Cleaning

The design and construction of the equipment shall be such that sharp angles and corners and other parts, not easily accessible for cleaning are avoided.

2.4 Interchangeability (In the case of several machines of the same type).

As a general rule, all equipment and machines of the same type shall be identical, unless otherwise specified. All mechanical, electrical and electronic parts, and accessories including spares, should be capable of being fitted to any of the machines of the same type, without any sort of adaption. An exception to this is where matched sets are vital to the balancing of specific items of rotating equipment.

2.5 Format or Product Change

In order to reduce the time taken for a format or product change, the supplier shall make every effort to standardise the types of fixing for the change parts required for each format. All the change-parts relative to a particular format shall be engraved with the same reference, to aid identification.The facility to change format parts with the use of tools and positive location of change parts is preferred wherever practical.

2.6 Effectiveness of Seals

For normal operation with the services defined in Article 4, there must be no escape of product, water or other fluid.

In the case where some loss is inherent in the normal functioning of the equipment, this loss should be contained in such a way as to prevent the escape of product etc. onto the walls and floors of the production area.

2.7 Heat Insulation

During normal operation, no external part of the equipment should reach a temperature in excess of 550C.

Where parts are likely to attain a temperature in excess of 550C, they should be insulated with mineral or chemical insulating materials and clad. For those parts in the pharmaceutical zone, this cladding shall be in stainless steel (AISI 304).

Note: No asbestos, in any form, shall be permitted for any purpose.

2.8 Electrical Requirements

All wiring shall be carried out in accordance with the latest edition of CENELEC/IEC Regulations.

All electrical equipment located in process areas should be rated to IP55 (dust proof and protected against water jets) unless specified otherwise in User Requirement Specification and terminations within the machine made in sealed junction boxes.

Page 6 of 14

Page 7: URS 01 - Rotary Press Tablet Machine SPL

SQUARE PHARMACEUTICALS LTDSALGARIA, PABNA.

URS OF ROTARY TABLET PRESS MACHINE.

Electrical equipment located in non-process technical (plant) areas should be rated to IP41 minimum.All equipment should be fitted with an hours run meter and should be designed to interface with the ‘whole’ line to include emergency stop buttons.

Control devices 4 to 20 mA for analogue signals. 24Vdc for digital.

PLC preference is Siemens.

ARTICLE 3: SUPPLIER'S RESPONSIBILITIES

The supplier guarantees that all calculations, plans, estimates and other documents shall comply with the standards of the trade. Examinations and signature by the CUSTOMER of any document prepared by the supplier shall not on any account exempt the supplier, even in part, from responsibility.

The supplier guarantees that the equipment supplied shall conform to the standards of the trade, the relevant Manufacturing Standard including Safety Standards, and the requirements of legislative or regulatory provisions applicable. In particular:-

3.1 Noise

The noise levels at the work place for each machine, operating at maximum speed must be below 75 dB(A) at operator work position, or 1 metre from machine. The supplier shall state noise levels during normal operation of the equipment.

3.2 Machinery Safety & Guarding of Dangerous Parts

The machine guarding shall satisfy the requirements of BS 5304 (1988) or equivalent national standard. Guards shall be fitted so that machine will not run with an interlocked guard open.

The supplier shall ensure that the equipment is designed as a minimum, where applicable, in accordance with the following:

ISO/TR 12100 : 1992 Safety of Machinery (Basic concepts, general principles for design), Parts 1 & 2

ISO 15534 : 2000 Ergonomic Design for the Safety of Machinery, Parts 1 & 2

ISO 13849-1 : 1999 Safety of Machinery – Safety related parts of control systems – Parts 1: General principles for design

ISO 13850 : 1996 Safety of Machinery – Emergency Stop – Principles of Design

ISO 13852 : 1996 Safety of Machinery – Safety distances to prevent danger zones being reached by the upper limbs

ISO 13853 : 1998 Safety of Machinery – Safe distances to prevent danger zones being reached by the lower limbs

ISO 13854 : 1996 Safety of Machinery – Minimum gaps to avoid crushing of parts of the human body

ISO14119 : 1998 Safety of Machinery – Interlocking devices associated with Page 7 of 14

Page 8: URS 01 - Rotary Press Tablet Machine SPL

SQUARE PHARMACEUTICALS LTDSALGARIA, PABNA.

URS OF ROTARY TABLET PRESS MACHINE.

guards – Principles for design and selection

3.3 Certification of Pressure Vessels, Lifting Equipment

Equipment shall be tested and certificated by the National Inspection Authority of the country of origin, eg. B.S. 5500, TUV, ASME, ISPESL.. In addition, SQUARE’S Insurers may carry out any tests deemed necessary at the supplier‘s works.

3.4 Pressure Reducing Valves

The supplier shall include with his quotation any Pressure Reducing Valves (e.g. for steam and compressed air), that he considers necessary.

ARTICLE 4: SERVICES

Supplier must complete and return this page and following page with quotation. Copy this page as necessary in cases of multiple equipment offered.

Failure to comply with this requirement may render the quotation invalid.

Information to be supplied by the supplier at the time of Quotation.

4.1 Characteristics Of Services On Site

Consumption Max (peak) Mean

- Electricity 400V (10%) 3-phase __________ _______4-wire N & Earth 50Hz

- Electricity 220V (10%) Single-phase 50 Hz __________ _______

- Compressed Air (Instrument) 6 bar __________ _______

- Compressed Air (Product Contact) 6 bar __________ _______

4.2 Main Physical Data

- Maximum size installed (mm) Lx Wx H

- Note of any additional access requirements (mm) _______________

- Maximum weight installed (kg) _________

- Minimum size of access openings for transfer/positioning (mm) Lx Wx H

- Is foot-print provided with quotation Yes/No

Page 8 of 14

Page 9: URS 01 - Rotary Press Tablet Machine SPL

SQUARE PHARMACEUTICALS LTDSALGARIA, PABNA.

URS OF ROTARY TABLET PRESS MACHINE.

4.3 Changes to Services or Main Physical Data

Changes in any of the information shown in Section 4.1 and 4.2 above shall be advised immediately to SQUARE in writing by letter (as well as by confirmation drawing). This applies to all suppliers during the quotation period, and to the successful supplier through the contract period.

ARTICLE 5: PLANS & DOCUMENTS5.1. Documentation in English5.1.1. Certificate of material of construction (MOC)5.1.2. Calibration certificate5.1.3. Design qualification (D.Q.)5.1.4. Format for FAT / I.Q. / O.Q. documentations5.1.4. Catalogue of used equipment / instruments5.1.5. Documentation of sound level (not more than 75 dB)

5.1.6. Operation, Maintenance, & parts manual containing the following5.1.6.1 Mechanical assembly diagram5.1.6.2. Electrical schematic & wiring diagram5.1.6.3. Pneumatic schematic diagram5.1.6.4. PLC ladder diagram5.1.6.5. Hydraulic schematic diagram5.1.6.6. Procedure of operation & maintenance5.1.6.7. Procedure of trouble shooting using hard ware & software5.1.6.8. Transportation, Installation and Start up procedure5.1.6.9. Schematic diagram of lubrication system5.1.6.10. Instruction of cleaning etc.5.1.6.11. SOP (Standard operating procedure)5.1.6.12. Preventive maintenance schedule5.1.6.13. Instruction of change over

5.2 Within two weeks, at the latest, of placement of the order, the supplier shall issue a detailed programme for the supply of the equipment, which will include all of the dates agreed before order placement.

Programme to detail the equipment supply and the following:

a) Proposed issue dates of documentsb) Approval dates of documentsc) Key activitiesd) The critical path

5.3 Within four weeks, at the latest, of placement of the order, the supplier shall furnish P & IDs and plans and drawings of the equipment showing front elevation, side elevation and plan view (footprint). The plans should show:-

- Overall dimensions which shall identify any skids, etc.- Position and types of connection for all services including any remote service

requirements.- Confirmed characteristics and consumption of all services – (Complete and return

copy of Article 4).- Fixing points of the equipment for unloading and for moving into position.- The weight of each item of equipment.- Access requirements around the equipment for Operation, cleaning, maintenance.

Page 9 of 14

Page 10: URS 01 - Rotary Press Tablet Machine SPL

SQUARE PHARMACEUTICALS LTDSALGARIA, PABNA.

URS OF ROTARY TABLET PRESS MACHINE.

Copies or samples of any check lists or documentation used to record tests and checks normally conducted at installation and commissioning, i.e. installation and commissioning method statements.

Copies or samples of any checklists or documentation used to record tests and checks normally conducted at pre-delivery inspection (PDI) Factory Acceptance Tests (FAT).

5.4 The supplier shall provide, at the time of the inspection visit/acceptance trials 3 copies of the following documents, all in English language (professionally/technically translated, if necessary).

- Suppliers own documentation of the following:a) Equipment completeness and compliance to the specifications and designb) Equipment operational compliance

- All Mechanical Plans “As built Drawings”- All Electrical Plans “As built Drawings”- Instruction Manual for installation, start up, operation, preventive maintenance,

format change over, calibration, fault finding and rectification.- Approved, amended or modified installation and commissioning methods

statements.- Approved, amended or modified validation documentation for Installation

Qualification (IQ) and Operational Qualification (OQ) (Refer Article 10).- Equipment Details:--

a) Manufacturer's nameb) Model No./frame sizec) Serial No.d) Drawing No.(s)e) Date of manufacturef) Test certificates and statutory documentationg) Performance curves for pumps, fans, etc.h) Technical Information: This shall include technical specifications and design

dutiesi) Suppliers' spares lists for 2 years operationj) Lubrication schedulek) Preventive maintenance schedulel) List of all instruments

The supplier should note that where a packaged unit is offered, the information under a) - l) for component parts for each sub-supplier will be required.

ARTICLE 6: DEFINITION OF SQUARES’ RESPONSIBILITIES6.1. Shipping to Chittagong seaport.

6.2. Customs Clearance.

6.3. Transport of equipment from Chittagong to factory site at Pabna.

6.4. Unloading, temporary storage, movement into position.

Page 10 of 14

Page 11: URS 01 - Rotary Press Tablet Machine SPL

SQUARE PHARMACEUTICALS LTDSALGARIA, PABNA.

URS OF ROTARY TABLET PRESS MACHINE.

6.5. Provision of suitably qualified maintenance personnel for attendance at FAT (Article 8) and training by supplier, both at supplier’s works and on-site (Article 10).

6.6. Provision of suitably qualified and experienced tradesmen to conduct installation under supplier’s supervision (Article 9).

6.7. Civil Work, associated with installation.

ARTICLE 7: SAMPLES OF MATERIALS & COMPONENTS FOR TESTS

The supplier shall specify and agree with SQUARE the quantities of materials and components required for his own tests and for acceptance trials as agreed and confirmed prior to ordering, together with delivery date required and method of packaging within one month of placement of the order.

SQUARE shall undertake to supply free of charge the materials/components requested by the supplier for tests and trials by the date specified.

ARTICLE 8: INSPECTION VISIT/ACCEPTANCE TRIALS

In certain selected cases, a pre-inspection visit shall be conducted by SQUARE to check on progress and to perform preliminary checks and inspections and review documentation.

The nature and extent of Inspection Visit and any Acceptance Trials shall be agreed with supplier before order placement. This shall be conducted on the premises of the supplier or nominated company in the presence of the representative(s) of SQUARE at a date fixed by mutual agreement. The supplier is asked to give at least 4 weeks advance notice, when he is ready for such visit/trials.

During this visit the equipment will be inspected and examined for its compliance with this specification; and appropriate tests performed:- e.g.

- Wherever possible a complete production run at normal operating rate for a period of not less than 2 hours duration using materials supplied (Article 7).

- Product change-over including cleaning, dismantling and reassembly of pumps and valves, etc.

The Acceptance Trials shall be considered to be satisfactory if the overall levels of performance of output and quality specified in User Requirement Specification - specific requirements, are achieved.

Only after satisfactory Inspection (and Acceptance Trials) the equipment may be packed and despatched to the SITE.

For any revisit by SQUARE as a result of a failure at Inspection visit and/or Acceptance Trials; the costs including travel and hotel shall be at the supplier’s expense.

ARTICLE 9: INSTALLATION

The supplier shall include in his quotation, as a separate optional price, for supervision of mechanical, electrical and pneumatic installation of all his equipment, including remote items. The supplier is to list and describe the extent and termination of mechanical and electrical requirements which he regards as "by others", in order to clarify the responsibilities of all parties concerned. Similarly any Builders Work or Drainage requirements must be clearly identified.

Page 11 of 14

Page 12: URS 01 - Rotary Press Tablet Machine SPL

SQUARE PHARMACEUTICALS LTDSALGARIA, PABNA.

URS OF ROTARY TABLET PRESS MACHINE.

Services “by others” may be assumed to be valved/isolated within 3 metres of the equipment.

ARTICLE 10: ON SITE COMMISSIONING, VALIDATION AND TRAINING OF OWNER'S PERSONNEL

The supplier shall quote separately for the provision of a competent English speaking, Commissioning Engineer (or Engineers) on site to:-

10.1 Supervise the installation of the equipment (Refer Article 9).

10.2 Check equipment installation, perform the start-up of the equipment and the commissioning to agreed commissioning method statements including the calibration of critical instruments, gauges etc.

For commissioning, the quotation should be on a fixed lump sum basis with rates for man-day working, and an indication of on site programme.

10.3 Supervise Site Acceptance Tests (SAT) at site and rectify any problems.

(The supplier will be asked to provide examples of commissioning documentation at the Technical/Commercial Meeting prior to order placement).

10.4 The training of client's maintenance personnel:

at supplier‘s works at SQUARE’s site in Pabna.

For training, the quotation should be on a man training day basis, with an indication of the number of days of training normally required. A training programme, to be approved by SQUARE shall be required.

10.5 The supplier shall quote separately for the following Validation (Qualification) Services.

10.5.1 Provision of detailed DQ, IQ and OQ Protocols for SQUARE approval prior to practical qualification.

10.5.2 The performance of practical IQ and OQ.

Note: The supplier should comply with the following validation requirements as appropriate:

- Demonstrate compliance with the Specification.- Provide documentation showing that computer software has been developed

according to agreed protocols to comply with Good Automated Manufacturing Practice (GAMP), in particular to comply with the document GAMP-3 or the latest current version, prepared by the GAMP forum.

- Provide drawings for Design Qualification at agreed dates- Record all changes and advise the client of any changes made.- Allow inspection during construction and testing (if required by SQUARE ).- Advise the client of their test procedures.- Ensure the item operates to specification.

Page 12 of 14

Page 13: URS 01 - Rotary Press Tablet Machine SPL

SQUARE PHARMACEUTICALS LTDSALGARIA, PABNA.

URS OF ROTARY TABLET PRESS MACHINE.

- Provide documented proof of testing.- Provide accurate as built drawings at agreed dates.- Provide start-up, operating and maintenance instructions at agreed dates.

- Provide certificates of calibration for gauges and sensors and Materials Compliance Certificates when requested.

- Provide certificates of calibration for all testing equipment at agreed dates.

Installation Qualification (IQ) is the formal, documented inspection of the installation to verify all installation specifications have been met and that the equipment conforms to the specification.

IQ Protocols should include, but not be confined to:

i) Description of item and function.ii) Objectives of IQ and scope.iii) Record and verification of components and documentation availability

check.iv) Verification of as built drawings and installation.v) Verification of services and connections.vi) Certificates of compliance for product contact materials.vii) Pressure test certificates (where appropriate).viii) Certificates of all Ex-rated components (where appropriate).ix) Test equipment used and date of calibration.x) Calibration of all critical instruments.xi) Conclusions including a clear statement on whether the item has been

successfully qualified or not.

Operational Qualification demonstrates according to a formal protocol that the equipment will operate as intended throughout all anticipated operating ranges.

OQ Protocols should include:-

i) Description of item and function.ii) Objectives of OQ and scope.iii) References to manuals, guidelines etc. required to carry out OQ.

iv) Test equipment used and date of calibration.v) Test objectives, methods and acceptance criteria.vi) Test results.vii) Conclusions including a clear statement on whether the item has been

successfully qualified or not.

The supplier would be required to undertake the validation tests and record all data in the prepared protocols on site, witnessed by SQUARE’s representative.

It will be the supplier’s responsibility to ensure the equipment conforms to the test procedures, and if a failure occurs, make such modifications as may be necessary and re-test the equipment to prove the equipment meets the requirements, at the supplier’s expense.

10.6 Documentation Standards

Page 13 of 14

Page 14: URS 01 - Rotary Press Tablet Machine SPL

SQUARE PHARMACEUTICALS LTDSALGARIA, PABNA.

URS OF ROTARY TABLET PRESS MACHINE.

10.6.1 All certificates must be dated and signed.

10.6.2 Calibration certificates for testing instruments shall show the period of validity.

10.6.3 All checklists must have a signature and date by each item. (A tick or cross is not sufficient).

10.6.4 Acceptable limits must be indicated for each design parameter.

10.6.5 Full explanations must follow any results that deviate from design parameters.

10.6.6 Any alterations or corrections to the documents should be initialled and dated. Correction fluid should not be used. Corrections must be made by deleting with a single line and signed and dated.

10.6.7 A statement shall be incorporated into the documentation which details the qualification and position of every signatory.

10.6.8 Drawings must be annotated to show that they have been checked.

10.6.9 The position (Job title) and affiliation (company) of all persons signing protocols must be shown.

ARTICLE 11: EXPORT PACKAGING, DELIVERY FOB, INSURANCE AND PROTECTION

The supplier will be fully responsible for all arrangements and costs of transport, insurance, taxes and duties required to deliver the equipment to nearest seaport as required in performance of the Work under the order, i.e. a Free on Board (FOB). SQUARE will not be responsible for any costs associated with storage due to the supplier’s failure to comply with the Schedule of Key Dates.

It will remain the supplier’s responsibility to adequately protect equipment under his supply whilst in transportation, off loading, and final positioning up to and including installation and commissioning.

Page 14 of 14