MANUFACTURE OF UREA
( Capacity : 1500 MTD )
PROJECT REPORT
Submitted to Panjab University,Chandigarh
In Partial Fulfillment of the requirements
For the Degree ofBACHELOR OF CHEMICAL ENGINEERING
2011
Submitted By:
KAMAL BHARTI
Univ Roll no:CH7228Univ. Institute of Chemical Engineering & Tech.
Panjab University,Chandigarh
-
8/10/2019 Urea Kamal
2/92
2
ACKNOWLEDGEMENT
I would like to thank my Department authorities for giving me this
opportunity to work on this project which helped me in increasing my
knowledge as well as in giving me an opportunity to put my theoretical
knowledge to practical use.
I would also like to offer my sincere thanks to my project supervisor
Dr. Shantanu Basu for providing inspiration and encouragement throughout
my work. I have enjoyed free and informal discussion with him and his
valuable suggestions have gone a long way in the completion of my work.
Thanks to all the teachers and staff of University Institute Of
Chemical Engineering And Technology for their time to time guidance.
Kamal Bharti
-
8/10/2019 Urea Kamal
3/92
3
CERTIFICATE
This is to certify that Mr Kamal Bharti, Roll No.-CH-7228, a finalyear student of the University Institute of chemical Engineeringand Technology, Panjab University, Chandigarh has completed hisproject entitled MANUFACTURE OF UREA BY MITSUITOATSU PROCESS under my supervision.This report of theproject may be accepted for the evaluation as a part of therequirement of B.E. CHEMICAL degree.
DR. SHANTANUBASU
UICET,PU
TEACHER SIGNATURE
-
8/10/2019 Urea Kamal
4/92
4
TABLE OF CONTENTS
1. INTRODUCTION 5
2. MANUFACTURING OF UREA 6
3. IMPORTANCE OF UREA..6
4. PROPERTIES OF UREA 7
5. VARIOUS UREA SYNTHESIS PROCESS8
6. PROCESS SELECTION.9
7. PROCESS FLOW DIAGRAM10
8.
PROCESS DESCRIPTION11
9. MATERIAL BALANCE..15
10.ENERGY BALANCE..30
11.DESIGN38
(a)REACTOR DESIGN..42(b)HIGH PRESSURE DECOMPOSER DESIGN..54
12.
COST ESTIMATION61
13.GENERAL SITE CONSIDERATIONS..69
14.UTILITIES ...74
15.INSTRUMENT & CONTROL.77
16.INSTRUCTIONS FOR OPERATION.........82
17.STARTUP OF PLANT .83
18.SAFETY84
19.
ENVIRONMENTALCONSIDERATIONS..91
20.REFERENCES.92
-
8/10/2019 Urea Kamal
5/92
5
Introduction
Urea is synthetic origined nitrogenous material, NH2CO NH2. Its nitrogen content is 46.6
%( when pure). At room temperature urea is colorless, odorless and tasteless.
When it is dissolved in water it hydrolyzes very slowly to ammonia and carbon dioxide.
Urea today occupies the key position amongst the various solid nitrogenous fertilizers by
virtue of its highest content which allow a consumption saving in transportation and
distribution cost.
The process of urea synthesis is of immense importance as it was the first organic
compound to be synthesized from inorganic compound in laboratory. Wholer obtained
urea from ammonium cyanide in 1828. Today various manufacturing process use the
reaction between liquid ammonia and carbon dioxide gas to give ammonia carbonate
which on the sub sequent dehydration yield urea and water.
The technology and engineering if urea production has therefore undergone rapid
development in the last two decades so with the result that stream plants of 1500 MTPD
capacity and even higher have been designed and engineered.
The chemical fertilizer manufacturing in India started during the early 40s with only two
small plants, today it is the fourth producer of fertilizer and occupies the third position in
the fertilizer consumption in world.
-
8/10/2019 Urea Kamal
6/92
6
Manufacture of Urea
Urea is commercially produced by the direct dehydration of ammonium carbonate
(NH2COONH4) at elevated temperature and pressure. NH2COONH4is obtained by direct
reaction of NH4and CO2. The two reactions are usually carried out simultaneously in a
high pressure reactor.
H = -38000 cal/gmol
H = +7500 cal/gmol
Importance of Urea
1. Fertilizer grade urea is mainly used as fertilizer in the form of prills. 90% of urea
produced in India is used as fertilizer.
2. Technical grade urea is used in the manufacture of thermosetting resins.
3. Used in pharmaceutical industry. It promotes healing of wounds.
4. Feed grade urea is used for the purpose of animal feed as a protein supplement.
5. Used in manufacture of explosives
-
8/10/2019 Urea Kamal
7/92
7
Properties of Urea
S.No. Property Assigned value
1.
Formula weight 60.06
2. Melting point 132.7C
3. Boiling point Decomposes at atmospheric
pressure(< boiling)
4. Index of refraction 1.484 - 1.602
5. Crystalline form Tetragonal
6. Specific gravity 1.335
7. Bulk density 0.74 g/cm
Specific Heat of Urea:
Temperature (C) Specific Heat (cal/g C)
0 0.344
50 0.397
100 0.451
150 0.504
-
8/10/2019 Urea Kamal
8/92
8
Various urea synthesis processes
The basic reactions that are involved for the production of urea are same for all the
processes. The difference between the different processes is the way in which the
unconverted reactants are treated:
1. Once through process
In this process, the unconverted reactants after the decomposition are released
and are used for making other nitrogenous fertilizers like ammonium sulphate
and ammonium nitrate. One of the drawback of this type of urea process is
that, relatively large amount of ammonium salts accompany the production of
urea.2.
Partial recycle process
In this process, a part of unconverted reactant is recycled and the remaining
off gases NH3, CO2and H2O are used for making other nitrogenous fertilizers.
Since the demand for urea is more as compared to other nitrogenous fertilizers
because of its high nitrogen content, this process is obsolete these days.
3. Total recycle process
This is the most widely used process. It is sub divided into three types:
a)
Hot gas recycle Here the hot decomposed NH3 and CO2gases are
compressed and recycled. Since the corrosion problems are more in
this case it is also obsolete.
b) Gas separationIn this process, the off gases after the decomposition
of the carbonate are scrubbed with selective solvent. Then, the
separated NH3and CO2are mixed with made up reactants entering the
reactor. The advantage of this process is no water is recycled and the
conversion efficiency is high.
c) Solution recycle In this method, the decomposed gases NH3, CO2
and H2O are condensed to form aqueous ammonium carbamate which
is recycled to the reactor. This method is most widely used.
-
8/10/2019 Urea Kamal
9/92
9
Various advanced technologies
1. Mitsui Toatsu process
2. Stamicarbon process
3.
chemical process
4. Snam Progetti process
5. Inventa process
6. Montedison total recycle process
Process Selection
I am selecting MITSUI TOATSU total recycle process for urea manufacture.
In this greatly improved process, the various advanced techniques from research and
development are incorporated into the commercially proven total recycle improved
process.
This process is widely used because of certain advantages:
1.
Temperature in the reactor is controlled by the recycle stream which is recycled
back to the autoclave. Part of the heat evolved (reaction being exothermic) is used
for heating the recycle stream to bring its temperature to reactor temperature and
the rest is dissipated to the atmosphere.
2. The consumption of raw materials i.e. NH3and CO2per mega tonne (MT) of urea
is less compared to other process.
3. Biuret content in the final product is around 0.6% and the moisture content is
0.4%.
4. Simple operations.
5. Easier maintenance.
6. Efficiency is good.
-
8/10/2019 Urea Kamal
10/92
10
PROCESS FLOW DIAGRAM
-
8/10/2019 Urea Kamal
11/92
11
PROCESS DESCRIPTION
The raw material required for urea manufacture is NH3and CO2. NH3reacts with CO2to
form ammonium carbamate, which decomposes urea. The reactions which take place are:
(1)
. (2)
The reaction 1 can be easily carried to completion but reaction 2 usually has conversion
of only 50-70 %. Since both the reactions are reversible, therefore, the equilibrium
depends on temperature, pressure and concentration of various components.
Since removal of water favors the formation of urea in reaction 2, therefore, the molarratio of NH3to CO2is 4 and the molar ratio of H2O to CO2is 0.8.
-
8/10/2019 Urea Kamal
12/92
12
Synthesis section:
The suction temperature of CO2 is maintained at 35-37C and it is compressed to 230
kg/cm2in a four stage compressor and is injected to the reactor. NH 3is pressurized to a
pressure of 230 kg/cm2and is injected to the reactor through NH3preheated with which
maintains its temperature at 75-80C. The stream of ammonium carbonate solution
having temperature of about 95C from high pressure absorber is recycled to the reactor.
The maintained temperature in the reactor is 200C. The percent conversion is 60%.
Decomposition Section:
1. High pressure decomposer:
The effluents from the reactor which are at 120C flows to high pressure
decomposer which operates at 155C and 16 kg/cm2 pressure. The reactor
effluents flow down in high pressure decomposer which is conventional 1-1
exchanger which is heated by steam at a pressure of 13 kg/cm2. As a result,
ammonium carbamate is decomposed and NH3and CO
2are released. The vapors
from the high pressure decomposer are fed to the high pressure absorber and the
liquid from high pressure decomposer is fed to low pressure decomposer.
2. Low pressure decomposer:
The liquid from high process decomposer which operates at a temperature of
155C flows down in low pressure decomposer which operates at a temperature
of 130C and a pressure of 1.5 kg/cm2. As in case of high pressure decomposer,
steam is also used here but a pressure of 6 kg/cm 2. Most of the remaining
ammonium carbamate gets decomposed here along with the liberation of NH3.
The vapors from low pressure decomposer is fed to high pressure absorber
whereas the liquid (urea solution) to the separator.
-
8/10/2019 Urea Kamal
13/92
-
8/10/2019 Urea Kamal
14/92
14
crystallizer where the urea solution containing 35-40% urea crystals are taken out
from the bottom. It is further fed to centrifuge (i.e. crystals and mother liquor).
Biuret in feed urea solution remains in mother liquor because of the difference of
solubility and so a part of mother liquor is returned to reactor (via recovery
section) for preventing accumulation of biuret in mother liquor. Biuret in reactor
is decomposed to urea again.
Drying and Prilling:
Urea crystals obtained from centrifuge is sent to drier where the crystals are dried upto
0.3% moisture by passing hot air of about 120C. It is then conveyed pneumatically to
prilling tower. At the top of prilling tower, urea is separated from air with the help of
cyclone separator. Urea is then fed to remelter. The molten urea coming out of the melter
is fed to prilling bucket. The mother urea coming out of the prilling tower and encounters
a cold air flow which causes its solidification and subsequent cooling. The urea prills thus
obtained are fed to the rotary screen where oversize products are removed. After this the
urea prills are sent to product storage silos with the help of belt conveyors.
Selection of feed stock:
The basic raw materials needed for the production of urea is NH3 and CO2 which are
obtained from NH3 plant which is situated adjacent to urea plant. The feed stock for
manufacture of NH3and CO2can be naphtha, natural gas, heavy fuel oil, etc.
-
8/10/2019 Urea Kamal
15/92
15
MATERIAL BALANCE
-
8/10/2019 Urea Kamal
16/92
16
OVERALL MATERIAL BALANCE:
BASIS: 1500 MT of urea per day
1 day operation
The final composition of prilled urea is:
Urea = 99.1%
Water = 0.3%
Biuret = 0.6%
So the final product per day is:
Urea = 1486.50 MT
Water = 4.50MT
Biuret = 9.00MT
Biuret is formed according to the reaction:
Urea Biuret
(Mol. Wt: 60) (Mol. Wt.: 103)
Now Biuret in final product = 9.00MT
9.00MT of Biuret will be formed from = 60 x 2 x9.00/ 103
=10.48MT of Urea
-
8/10/2019 Urea Kamal
17/92
17
Therefore, total urea in the final product = 1486.50 + 10.48
=1497.00MT
Raw material used for manufacture of urea is NH3 and CO2. The reaction is:
Ammonia Carbon dioxide Ammonium Carbamate
(Mol.Wt. =70) (Mol. Wt. =44) (Mol.Wt. =78)
(Ammonium Carbamate) (Urea)
(Mol. Wt. = 78) (Mol.Wt. = 60)
Reaction 2 is spontaneous so it gets converted or completed very fast. While reaction 3 isslow and its conversion depends on the synthesis conditions which are 195C and 230
kg/cm2.
We take CO2to be the LIMITING COMPONENT
Molar feed ratio of NH3to CO2 = 4.0
Assuming conversion of ammonium carbamate to urea by reaction (3) be 60%.
Now, for 1497.00MT of urea, ammonium carbamate required will be
78 x 1497.00/ 60 x 100/60 = 3243.50MT
-
8/10/2019 Urea Kamal
18/92
18
For 3243.50MT ammonium carbamate CO2required is = 44 x 3243.50 / 78
= 1829.65MT
Since, molar ratio of NH3to CO2in feed is = 4.0
Therefore, NH3required is = 4 x1829.65 x 17 /44
= 2827.64MT
The composition weight percentage of input to autoclave is
CO2= 32.02 %
Urea = 8.01 %
NH3= 49.49 %
H2O = 10.48 %
Since, CO2in the input =1829.65MT
Therefore, total input is =1829.65/0.3202 =5714.08MT
So, in the input
CO2= 1829.65 MT
NH3= 5714.08 x .4949 = 2827.90 MT
Urea = 5714.08 x .0801 = 457.70 MT
H2O = 5714.08 x .1048 = 598.83 MT
Ammonium Carbamate leaving the reactor =3243.50 x 0.4
=1297.40 MT
-
8/10/2019 Urea Kamal
19/92
19
By reaction (3) H2O produced in reactor = 18 x 1497.00/60
= 449.10 MT
Total water coming out of the reactor = 598.83 + 449.10 MT
= 1047.93 MT
As CO2is the limiting component in the reactor, therefore NH3required for 1829.65 MT
of CO2 = 2 x 17 x1829.65/ 44
= 1415.82 MT
NH3coming out of the reactor = (2827.901413.82) MT
= 1414.08 MT
Urea coming out of the reactor = (Urea in input) + (Urea formed in the reactor)
= 457.70 + 1497.00
= 1954.70 MT
Therefore, composition of outlet from the reactor is:
Urea = 1954.70 MT
NH3 = 1414.08 MT
H2O = 1047.93 MT
Ammonium Carbamate = 1297.40 MT
-
8/10/2019 Urea Kamal
20/92
20
High Pressure Decomposer:
Assumption :90% of ammonium carbamate reverts back to give NH3and CO2and also
90% NH3and 15% of water goes out in the vapor stream to high pressure absorber.
Amount of ammonium carbamate decomposed = 1297.40 x .90
= 1167.66 MT
Amount of ammonium carbamate going to low pressure = 1297.40 x .10
Decomposer = 129.74 MT
1167.66 MT of ammonium carbamate decomposed will give NH3 = 2 x 17 x 1167.6/ 78
= 508.98 MT
Total weight of NH3in high pressure decomposer = 508.98 + 1414.08
= 1923.06 MT
NH3going out in vapor stream =1923.06 x 0.9
= 1730.75 MT
NH2in low pressure decomposer = 1923.06 x .10
= 192.30 MT
Also, ammonium carbamate decomposed will give CO2 = 44 x 1167.66 / 78
= 658.68 MT
All the CO2goes back to the vapor stream
CO2in the vapor stream = 658.68 MT
-
8/10/2019 Urea Kamal
21/92
21
Amount of water leaving in the vapor stream = 0.15 x 1047.93
= 157.19 MT
Amount of water in low pressure decomposer = 1047.93 x .85
= 890.74 MT
Low Pressure Decomposer
Assumption :Assuming that 85% of ammonium carbamate reverts back to NH3 and
CO2and 90% of NH3 and 15% H2O goes out in the vapor stream i.e. to high pressure
absorber.
Amount of ammonium carbamate decomposed = 129.74 x 0.85
=110.28 MT
Amount of ammonium carbamate going to separator = 129.74 x .15
= 19.46 MT
-
8/10/2019 Urea Kamal
22/92
22
Ammonium carbamate decomposed will give NH3 = 2 x 17 x 110.28/ 78
= 48.07 MT
Total amount of NH3in low pressure decomposer = 48.07 + 192.31
= 240.38 MT
Amount of NH3going in vapor stream = 240.38 x 0.90
= 216.34 MT
Amount of NH3going in gas separator = 240.38 x .10
= 24.04 MT
Also ammonium carbamate decomposed will give CO2 = 44 x 110.28 / 78
=62.21 MT of CO2
Amount of Water in vapor stream = 890.74 x .15
= 133.61 MT
Amount of Water going to gas separator = 890.74 x .85
= 757.13 MT
-
8/10/2019 Urea Kamal
23/92
23
GAS SEPERATOR
Assuming all the ammonium carbamate decomposed to give NH3and CO2. All the NH3
and CO2produced goes o the gas condenser and 15% of water goes to gas condenser.
Ammonium carbamate decomposed to give NH3 = 2 x 17 19.46 / 78
= 8.48 MT
Total ammonia in gas separator = 8.48 + 24.04
= 32.52 MT
Ammonium carbamate decomposed to give CO2 = 44 x 19.46 / 76
= 10.98 MT
-
8/10/2019 Urea Kamal
24/92
24
Crystallizer
In the crystallizer 80% of water is evaporator or vaporized
Amount of H2O vaporized = 0.8 x 643.56
= 514.85 MT
Amount of H2O left in urea solution = 0.2 x 643.56
= 128.71 MT
-
8/10/2019 Urea Kamal
25/92
-
8/10/2019 Urea Kamal
26/92
26
Drier
Assuming that 80% of water is removed. Also 0.6% of urea gets converted to biuret by
reaction (1)Water removed from the solution = 0.80 x 25.74
= 20.58 MT
Water left in the solution = 0.20 x 25.4
= 5.15 MT
Biuret formed = 0.006 x 1497.00
= 9.00 MT
Total feed to reactor is:
Urea = 457.70 MT
CO2 = 1829.65 MT
NH3 = 2827.90 MT
H2O = 598.83 MT
Recycle to reactor is:
Urea = 457.70 MT
CO2 = 731.87 MT
NH3 = 593.88 MT
H2O = 587.34 MT
-
8/10/2019 Urea Kamal
27/92
27
Gas Condenser
Assuming we add 80 MT of water to gas condenser.
-
8/10/2019 Urea Kamal
28/92
28
High pressure absorber
Assuming 30% of total NH3in high pressure absorber gets recycled to the reactor.
-
8/10/2019 Urea Kamal
29/92
29
-
8/10/2019 Urea Kamal
30/92
30
ENERGY BALANCE
-
8/10/2019 Urea Kamal
31/92
31
Basis:One day operation
In the reactor, the fresh NH3enters at 80C and 230 kg/cm2while CO2enters at 35 C
and 230 kg/cm2. The recycle stream returning from high pressure absorber enters the
reactor at 95C and 230 kg/cm2.
The effect of pressure is very significant in case of gases but is not appreciable in solids
and liquids and can be assumed to be negligible.
Mean specific heat of liquid NH3between 25 to 200C:
= ( Cpof liquid NH3at 25C + Cpof liquid NH3at 200C ) / 2
= (1.147 + 1.341) / 2
= 1.244 cal/gmC
= 1.244 x 17
= 21.148 cal/gm mol C
Mean specific heat of gaseous NH3is = Cpmean between 25 to 200C
T
= Cp dT / (T-To)
To
473
= (6.70 + 0.00630) T dT/ (473-298)298
= 11.56 cal/gmolC
Mean specific heat of H2O is = Cpmean between 25 and 200C
= (1.0 + 1.2) / 2
= 1.1 cal/gmC
= 1.1 x 18
= 19.80 cal/gmolC
-
8/10/2019 Urea Kamal
32/92
32
Mean specific heat of urea = Cpmean between 25 and 200C
= (0.370 + 0.555) / 2
= 0.4625 cal/gmC
= 0.4625 x 60
= 27.75 cal/gmolC
Mean specific heat of ammonium carbamate = Cpmean between 25 and 200C
= ( 0.410 + 0.62) / 2
= 0.515 cal/gmC
= 0.515 x 78
= 40.17 cal/gmolC
Mean specific heat of CO2 = Cpmean between 25 and 200C
= T
= (+T-/T2) dT / (T-To)
To
= {10.34(473-298) + (0.00274/2) (4732-2982) + 195500 (1/4731/298)}/ (473-298)
= 10.009 cal/gmolC
Cpmean of H2O vapor between 25 and 200C
T
= Cp dT / (T-To)To
= [8.22(473-298) + (0.00015/2) (47322982)] / (473298)
= 0.456 cal/g mol C
-
8/10/2019 Urea Kamal
33/92
33
Reactor
From material balance
In stream (1),
NH3 = 2827.90593.88
= 2234.02 MT
Also,
T1 = 80C
Therefore,
H1 = 2234.02 x 103x 1.244 x (80-25)
= 152.85 x 106Kcal
In stream (2),
CO2 = 1829.65731.87
= 1097.78 MT
Also,
T2 = 35C
Therefore,
H2 = 1097.78 x 103x 10.009 x (35-25) / 44
= 2.52 x 106Kcal
-
8/10/2019 Urea Kamal
34/92
34
In stream (3),
Urea = 457.70 MT
NH3 = 593.88 MT
CO2 = 731.87 MT
H2O = 587.34 MT
Also,
T3 = 95C
Therefore,
H3 = [(457.70 x 0.4625) + (593.88 x 11.56/17) + (731.87 x 10.01/44)
+ (587.34 x 1.1)] x 103x (95-25)
=99.97 x 106Kcal
In stream (4),
Urea = 1954.70 MT
NH3
= 1414.08 MT
H2O = 1047.93 MT
Amm.carbamate = 1297.40 MT
Also,
T4 = 120C
Therefore,
H4 = [(1954.70 x 0.4625) + (1414.08 x 11.56 / 17) + (1297.4 x 0.515)
+ (1047.93 x 1.1)] x 103x (120-25)
=251.70 x 106Kcal
-
8/10/2019 Urea Kamal
35/92
35
In the reactor two reactions progress,
Hr1= -38000 cal/gmol
Hr2= +7500 cal/gmol
Amount of Urea formed in reactor = 1954.70457.70= 1497.00 MT
= 24.95 ton mol
So Hr2 = 24.95 x 103x 7500
= 187.125 x 106 Kcal
Total amount of ammonium carbamate before it decomposes to urea:
= 24.95 + 1297.4/78
= 41.583 ton mol
Total heat of reaction (1) at 25C = 41.583 x (-38000) x 103
Hr1 = -1580.154 x 106Kcal
Total heat of reaction (2) at 25C
Htotal = Hr1+Hr2+ (H4- H1 - H2- H3)
= [-1580.154 + 187.125 + 251.70152.852.5299.97] x 106
= -1396.67 x 106Kcal/day
Since it came negative i.e. heat is released.
-
8/10/2019 Urea Kamal
36/92
36
High pressure decomposer
Now,
For stream (1)
H1 = 251.70 x 106Kcal ( from reactor energy balance)
T1 = 120C
For stream (2)NH3 = 1730.75 MT
CO2 = 658.68 MT
H2O = 157.19 MT
Also, T2 = 55C
H2 = [(658.68 x 10.01/44) + (157.19 x 0.456) + (1730.75 x 11.56/17)] x 103x (55-25)
= 39.92 x 106Kcal
For stream (3)
-
8/10/2019 Urea Kamal
37/92
37
NH3 = 192.31 MT
Urea = 1954.70 MT
H2O = 890.74 MT
Amm. Carbamate = 129.74 MT
T3 = 130C
H3 = [(1954.70 x 0.4625) + (890.74 x 1.1) + (192.31 x 11.56/17) + (129.74 x 0.515)] x 103x
(13025)
= 218.55 x 106Kcal
Now,
The reaction in progress in high pressure decomposer is
H = 38000 cal/gmol
Ammonium carbamate decomposed at 25 C = 1297.40129.74
= 1167.66 MT
= 14.97 ton mol
So,
Hr = 14.97 x 38000 x 103
= 568.86 x 106Kcal
Htotal = Hr+ H2+ H3- H1
= [568.86 + 39.92 + 218.55251.70] x 106
= 575.63 x 106Kcal/day
Therefore, total heat requirement in high pressure decomposer = 575.63 x 106Kcal/day
-
8/10/2019 Urea Kamal
38/92
38
REACTOR PROCESS
DESIGN
-
8/10/2019 Urea Kamal
39/92
39
The rate expression for urea formation is found from different mechanism involved. The
mechanism is as follows:
The formation of urea takes place according to reaction (5).
Hence its rate expression is:
Therefore,
-
8/10/2019 Urea Kamal
40/92
40
Similarly,
Also,
So,
Putting the value of CHO CNfrom (7) in (8), we get
Assuming k6to be very small and hence neglecting it, we have
From (6) and (9), we get
-
8/10/2019 Urea Kamal
41/92
41
Also,
NH2 COO NH4is an intermediate.
So,
Substituting in (10), we get
Substituting in the main rate expression, we have
Putting
Since the rate expression corresponds to stoichiometric equation the reaction iselementary.
-
8/10/2019 Urea Kamal
42/92
42
DESIGN OF REACTOR
-
8/10/2019 Urea Kamal
43/92
43
Where,
A represents CO2
B represents NH3
C represents Urea
D represents H2O
So,
CA= CAO(1-XA) / (1+AXA)
CB= CBO(1-XB) / (1+ BXB)
But,
CBOXB = 2 CAOXA
AndAXA BXB
= (2-3) / 3
= - 1/3
So, putting these conditions in general rate equation
-
8/10/2019 Urea Kamal
44/92
44
Where,
Feed to the reactor is on one day basis.
So,
= 1.1540 m3/min
Similarly,
-
8/10/2019 Urea Kamal
45/92
45
= 3.3859 m3/min
= 0.2464 m3/min
= 0.4301 m3/min
Therefore,
Total volumetric flow rate = 1.1540 + 3.3859 + 0.2464 + 0.4301
= 5.2164 m3/min
Now,
()
= 28.877 kmol/min
Therefore,
= 5.5358 Kmol/m3
Similarly,
()
= 115.519 kmol/min
Therefore,
= 22.1453 Kmol/m3
-
8/10/2019 Urea Kamal
46/92
46
Also,
= 4
The value of rate constant k for this reaction is k = 2.71 x 10-4(m3/Kmol)2min-1
Substituting these
values in equation
(1)
Now,
CSTR with recycle
For CSTR with recycle we have,
-
8/10/2019 Urea Kamal
47/92
47
Also,
Therefore,
Putting the value of rate equation in this equation, we get
Here CAO = 5.5358
So, Volumetric flow rate of Outlet
= 0.6984 m3/min
= 1.6931 m3/min
-
8/10/2019 Urea Kamal
48/92
48
= 1.0523 m3/min
= 0.7527 m3/min
Therefore,
Total volumetric flow rate in outlet = 0.6984 + 1.6931 + 1.0523 + 0.7527
=4.1965m3/min
Again,
Volumetric flow rate of recycle
= 0.4616 m3/min
= 0.7111 m3/min
= 0.2464 m3/min
= 0.4266 m3/min
Therefore,
Total volumetric flow rate in recycle = 0.4616 + 0.7111 + 0.2464 + 0.4266
= 1.8457 m3/mi
-
8/10/2019 Urea Kamal
49/92
49
The reactor used for manufacture of urea has recycle stream as well. The recycle ratio R
may be defined as:
Volumetric flow rate of product leaving the system after recycle = 4.19651.8457
= 2.3508 m3/min
Therefore,
= 0.7851
Also,
And
XAf= 0.6
Therefore,
( )
= 0.2639
Now putting these values in the equation we get
-
8/10/2019 Urea Kamal
50/92
50
where
Now, lets plot the graph between f(XA) and XA
XA 0 0.1 0.2 0.3 0.4 0.5 0.6
f(XA) 0.0625 0.0695 0.0784 0.090 0.106 0.1286 0.1633
-
8/10/2019 Urea Kamal
51/92
51
Therefore,
t = 214.82 x (Area of the rectangle shown)
= 214.82 x (0.6-0.2639)x0.16
= 11.55 min
But,
So,
V = t x V0
= 11.55 x 5.2164
= 60.25 m
3
Dimensions : any convenient L/D ratio can be chosen.
Let L/D = 4
Volume of reactor,
60.25 = D2x 4D / 4
D = 2.68 m
Length, L = 4D
=10.71m
Design and Selection of Head:
The heads may be ellipsoidal, dished conical, hemispherical, flat. Standard ellipsoidal
heads are somewhat stronger than dished heads of the same gage. Hemispherical heads
are also stronger than formed heads but they are costlier. So taking cost into
-
8/10/2019 Urea Kamal
52/92
52
consideration I have selected the ellipsoidal head for the autoclave. The thickness of
standard ellipsoidal head is given by thickness of standard ellipsoidal head is given by
where,
P = design pressure
D = average diameter of shell
S = allowable unit stress
e = efficiency of joint (say 80%)
therefore,
= 0.1743 m
Therefore,
Thickness of ellipsoidal head = 174.3 + 6 mm = 180.3 mm
For ellipsoidal head the inside depth is equal of inside dia of the shell. Therefore,
( )
So, the inside depth of ellipsoidal head is 39.9 cm.
-
8/10/2019 Urea Kamal
53/92
53
SPECIF ICATION SHEET
Equipment : Urea Autoclave
Plant : Urea Plant
Type : Plug Flow
Position : Vertical
No. of uni ts : 1
Service : synthesis of Urea from NH3and CO2
Operation : Continuous
DESIGN DATA
Operati on temperature : 200C
Operating Pressur e : 230 kg/cm2
Design Temperatur e : 200C
Capacity : 43.703 m3
Volumetri c F low rate : 4.1965 m3/min
I nternal Diameter : 2.68 m
Shell thickness : 0.1803 m
Height : 10.71 m
Types of top & bottom heads : Ellipsoidal
Materi al of construction : Carbon Steel 1020
Li ning Material : Titanium
-
8/10/2019 Urea Kamal
54/92
54
HIGH PRESSURE DECOMPOSER DESIGN
High pressure decomposer is employed for decomposing ammonium carbonate to liberate
NH3and CO2. In high pressure decomposer ammonium carbonate is heated by stream at
13 kgf/cm2 pressure. The effluents from the reactor which are at 120C flows to high
pressure decomposer which operates at 155C and 16 kgf/cm2 pressure, high pressure
decomposer is a reboiler which is conventional 1-1 heat exchanger, vertical thermosiphon
type.
Total heat duty = 575.63 x 106kcal/day (from energy balance)
= 23.984 x106kcal/hr
Amount of stream required can be calculated as:
Pressure of stream entering = 13 kgf.cm2
Temperature of stream entering = 187C
Latent heat of stream at this pressure = 470.743 kcal/kg
But,
Q = m x Latent Heat
Therefore,
23.984 x 106 = m x 470.743
m = 50.95 x 103kg/hr
= 849.15 kg/min
Therefore, steam requirement is 849.15 kg/min.
Selection of shell side and tube side fluids:The effluents from reactor can be passed on tube side whereas stream can be passed on
shell side. The advantage of passing stream on shell side is that the steam that condensing
can easily be removed by using a stream rap connected o shell. Secondly, the non
condensable gases in stream can be vented easily by providing a vent value in shell.
-
8/10/2019 Urea Kamal
55/92
55
Tube side => Effluents from reactor
Shell side => Stream
Stream Effluents from reactor
Temp in 187C 120C
Temp out 187C 155C
T1 = 187155
= 32C
T2 = 187120
= 67C
Evaluation of properties:
Average temp of effluents from reactor = (120+155)/2
= 137.5 C
1.Specific Heat:
Cpof NH3at 137.5C = 0.546 Kcal/kgC
Cpof H2O at 137.5C = 1.10 Kcal/kgC
Cpof Urea at 137.5C = 0.492 Kcal/kgC
Cpof Amm. Carbamate at 137.5C = 0.576 Kcal/kgC
Average value of specific heat of effluents = 0.594 Kcal/kgC
2. Viscosity:
Viscosity of urea = 3.25 cp
Viscosity of NH3 = 0.014 cp
Viscosity of H2O = 0.207 cp
Since, the viscosity of urea is more, the average viscosity can be taken as that of
urea.
Therefore,
-
8/10/2019 Urea Kamal
56/92
56
average viscosity of effluents = 3.25 cp
3. Density:
Density of water = 928.12 kg/cm3
Density of Urea = 1226 kg/cm3
Density of NH3 = 580 kg/cm3
Heat duty of reboiler = 23.984 x 106 Kcal/ hr
Assume overall heat transfer coefficient = 600 W/m2 oC
According
Q = U x A x LMTD
A = 984.6 m2
Assuming
Tube outer diameter = 20 mm
Inside diameter = 16 mm
Length = 4.83 mm
So surface area = 3.14 x D x L
= 0.303 m2
No. of tubes = (984.6 / 0.303)
= 3250 tubes
Assuming no. of passes = 4
So no. of tube/ passes = 3250 / 4
= 812
Cross section area of tubes = 3.14 x (16x10-2)2/4
= 2.1x10-4
So total flow area = 812 x 2.1x10-4
= 0.170 m2
Mass velocity of effluent
= (1414.08 + 1954.70 + 1047.93 +1297.40) x 103 / (24x3600)
-
8/10/2019 Urea Kamal
57/92
57
= 66.135 Kg/sec
Average density of effluent
= 911.37 Kg/m3
Mass velocity of effluent
= 66.135 / 0.170
= 389.03 Kg/m2/sec
So velocity = 389.03 / 911.37
= 0.4268 < 1 m/sec
So consider 8 tube passes
No. of tube/pass = 3250/8
= 406 tubes
So flow area = 406 x 2.1x10-4
= 0.0853 m2
Mass velocity = (66.135 / 0.0853)
= 775.32 kg/m2sec
Velocity = 775.32 / 911.37
= 0.851 m/sec
Finding Reynolds no.
avg = 3.25x10-3poise
= 3818.22
L/D = 302
So using graph Re v/s jHfor different L/D
-
8/10/2019 Urea Kamal
58/92
58
jH = 6.0x 10-3
To calculate Pr
Kcarb.= 0.138 w/moc Xcarb. = 0.22
Kwater= 0.68 w/moc Xwater = 0.18
Kurea = 0.28 w/moc Xurea = 0.26
Kammonia= 0.032 w/moc Xammonia = 0.24
So Kmix = KiXi
= 0.23 w/moc
Similarly
Cpmix = CpiXi
=2.4x103KJ/KgoC
Pr no. = Cp/K
= 34.64
So tube side coefficient
h D / k = jH*Re*Pr0.33
By putting all values, we get
h = 1269/10 w/m2 oc
Assuming shell side coefficient = 1600 w/m2 oc
Therefore ,
Overall heat transfer coefficient
(1/Uo) = (1/ho) + (do/dixhi) + (doln(do/di)/2kcu)
= 604.38 >600
so satisfactory.
So this is 1-8 type shell and tube heat exchanger having U = 605 w/m2 oc
To find tube side Pressure Drop:
Pt= NP{8 Jf(L/di)(/w)-m+2.5}ut
2/2
Where ut=tube side fluid velocity
NP=no of tube side passes
-
8/10/2019 Urea Kamal
59/92
59
Putting values,
Pt=8*{8*6.81*10-3(4.83/16*10-3)+2.5}911.37*0.851*0.851/2
Pt=50018.977Pa =50.018kPa or kN/m2
Shell Diameter:-
Bundle Diameter, Db=20(3250/0.0365)1/2.675
=1.1469m
Shell diameter from graph12.1=80+1.1469=81.1469m
Assume baffle cut=25%
Baffle spacing=Ds/5=1.469/5=0.299m
Tube Pitch=1.25do=1.25*20*10-3
=25mm
Shell Side area=As=(Pt-do/Pt)*Ds*Bs
=0.894m2
Mass velocity Gs=849.15/0.0894=9498.322kg/m2
Velocity=9498.322/s=21.93m/s
De=1.27/d
o(P
t2-0.785d
o2)
De=19.7485mm
Re=DeGs/ =179024
J f=3.2*10-2(from Graph)
Again For pressure drop,
Ps=8J f(Ds/De)(L/Bs) sus2/2(/w)
-0.14
=31234Pa=312.34kPa
Which is too high, it can be reduced by increasing baffle pitch .Doubling the pitch values,
reduces Pressure Drop by
Ps =312/4=78kPa.
-
8/10/2019 Urea Kamal
60/92
60
SPECIF ICATION SHEET
Equipment : High Pressure Decomposer
Plant : Urea Plant
Type : Fixed, Head
Position : Vertical
No. of uni ts : 1
DESIGN DATA
UNIT DATA SHELL SIDE TUBE SIDE
Fluid Steam Effluents from reactor
Temp. Inlet C 187 120
Temp. Outlet C 187 155
Operating pressure kg/cm2 13 16
No. of passes 1 1
Fouling factor
Pressure drop kPa 78 50.018
Density kg/m3 1226
Viscosity Cp 3.25
Specific heat kcal/kg C 0.594
Latent heat kcal/kg 470.743
CONTRUCTION:
Type of unit = Decomposer
Tube pitch = 1 triangular
Shell material = Carbon Steel
Diameter = 35 inch
Tube Material = Stainless Steel
No. of tubes = 3250
Outside Diameter = 1
-
8/10/2019 Urea Kamal
61/92
61
COST ESTIMATION
-
8/10/2019 Urea Kamal
62/92
62
Marshall & Swift index
For the capacity of 60000 ton/yr
Fixed capital investment in the year 1990 = 8 mn $
But we have a capacity of 1500 tonn/day
=360*1500 tonn/year
Marshall & Swift index in the year 1990 = 904
Marshall &Swift installment equipment index in the year 2008 = 1384
So Fixed capital investment in urea production plant of capacity 360000 tonn/yr
= C (Fe) Rx
Where ,
R = capacity of plant divided by the capacity of reference
X = power factor for plant capacity ratio
= 0.7
Fe = ratio of index
C = 8 mn$ *(1384/904)*(547500/60000)0.7
= 57.573 mn$
Estimation of capital investment cost(I) Direct Costs:
1. Installation costs = 10% of fixed capital
= $ 57.573 x 106x 0.10
= $ 5.757 x 106
2. Piping and instrumentation = 10 % of F.C.I.
= $ 57.573 x 10
6
x 0.10= $ 5.757 x 106
3. Electrical cost = 5 % of F.C.I.
= $ 57.573 x 106x 0.05
= $ 2.878 x 106
-
8/10/2019 Urea Kamal
63/92
63
4. Building cost = 10 % of F.C.I.
= $ 57.573 x 106x 0.10
= $ 5.757 x 106
5. Service facility = 5 % of F.C.I.
= $ 57.573 x 106x 0.05
= $ 2.878 x 106
6. Land cost = 5 % of F.C.I.
= $ 57.573 x 106x 0.05
= $ 2.878 x 106
Total direct cost = 1 + 2 + 3 + 4 + 5 + 6
= $ 25.906 x 106
(II) Indirect Costs:
1.
Design and Engg. Cost = 25 % of Direct cost
= $ 25.906 x 106x 0.25
= $ 6.476 x 106
2. Contractors feeCost = 10% of Direct cost.
= $ 25.906 x 106x 0.10
= $ 2.59 x 106
3. Contingency allowance = 10% of Direct cost.
= $ 25.906 x 106
x 0.10= $ 2.59 x 106
Total Indirect cost = 1 + 2 + 3
= $ 11.656 x 106
-
8/10/2019 Urea Kamal
64/92
64
Working Capital
Working Capital is the additional investment needed, over and above the fixed capital, to
start the plant and operate it to the point when income is earned.
It includes the cost of
1. Start up
2. Initial catalyst charges
3. Raw material and intermediates in the process.
4. Finished product inventories
5. Funds to cover outstanding accounts from customers.
Most of the working capital is recovered at the end of the project. The total investment
needed for a project is the sum total of the fixed and working capital.
Working Capital = 15 % of Total Capital Investment
= 0.15 x TCI
Now,
Total Capital Investment = total F.C.I. + W.C.I.
= F.C.I. + 0.15T.C.I.
Total Capital Investment = F.C.I. / 0.85
= 57.573 / 0.85
= $ 67.733 x 106
= Rs 338.66 x 107
Estimation of Total Product Cost
It includes direct cost, fixed charges and plant overhead cost.
Manufacturing cost = Direct cost + Fixed charges + plant overhead cost
(1.) Direct product cost
-
8/10/2019 Urea Kamal
65/92
65
(a) Raw material cost
Cost of ammonia = 280$/unit
Cost of carbon dioxide = 100$/ unit
Cost of ammonia used = 2827.90*280*360
= 285.05 mn$
Cost of carbon dioxide = 1829.65*100*360$
= 65.86mn$
So ,
Raw material cost = 285.05+65.86
= 350.91mn$
(b) Fixed charges:
Life span for plant = 50 years
(1.) Depreciation = Fixed capital investment/ life span
= 57.573/ 50
= 1.15mn$/yr
(2.) local taxes
Taking 1% of FCI = 0.5757 mn$
Insurance = 0.2878 mn$
So ,
Total fixed cost = 2.0135mn $
(c) Plant overhead cost:
= 5%of FCI
= 0.05*57.573 mn$
= 2.8786 mn$
So manufacturing cost
-
8/10/2019 Urea Kamal
66/92
66
= 355.80 mn$
General expenses = 15% of FCI
= 0.15*57.573
= 8.636 mn$
So ,
Total production cost = 364.436mn$
Cost of urea = 800 $/ton
Urea produced from reactor = 1954.70MT/day
= 360*1954.70MT/yr
Total income = 1954.70*360*800
= 562.95mn$
So ,
Profit = 562.95- 364.436
= 198.51 mn$
Taxes = 30% of gross earning
= 0.30*198.51
= 59.55mn$
So ,
Net profit = 138.95 mn$
And
Annual rate of return = 41.03%
-
8/10/2019 Urea Kamal
67/92
67
COST OF MAJOR EQUIPMENT
(1.) Cost of reactor (Plug flow with recycle)
Diameter = 2.68m
Height = 10.71m
From the graph
Equipment purchase cost = 80,000 $
For carbon steel,
Material factor (MF) = 1
Pressure factor (PF) = 2.2 (for pressure >60 bar)
So,
Purchase equipment cost for the year 2004
= 80000 $ *(MF * PF)
= 80000$ *(1*2.2)
= 176000$
So, purchase equipment cost for the year 2008
= 176000* 1384/ 1277.33
= 190697.28 $
(2.) Cost of heat exchanger
Type of heat exchanger: shell & tube type
No. of tube passes = 8
No. of shell passes = 1
From log-log graph,Cost = 98000 $
And,
For carbon steel,
Material factor = 1
Pressure factor = 1.3(for pressure up to 65 bar)
-
8/10/2019 Urea Kamal
68/92
68
So,
Purchased equipment cost of heat exchanger in 2004
= 98000$ * 1*1.3
= 127400 $
So in 2008,
= 127400*1384/ 1277.33
138039.19 $
-
8/10/2019 Urea Kamal
69/92
69
GENERAL SITE CONSIDERATIONS
PLANT LOCATION AND SITE SELECTION
The location of the plant can have a crucial effect on the profitability of a project, and the
scope for future expansion. Many factors must be considered when selecting a suitable
site. The principal factors to consider are:
1. Location, with respect to the marketing area.
2. Raw material supply.
3. Transport facilities.
4. Availability of labor.
5. Availability of utilities: water, fuel, power.
6. Availability of suitable land.
7. Environmental impact and effluent disposal.
8. Local community considerations.
9. Climate.
10. Political and strategic considerations.
Marketing areaFor materials that are produced in bulk quantities; such as cement, mineral acids, and
fertilizers, where the cost of the product per tone is relatively low and the cost of
transport a significant fraction of the sales price, the plant should be located close to the
primary market. This consideration will be less important for low volume production,
high-priced products; such as Pharmaceuticals. In an international market, there may be
an advantage to be gained by locating the plant within an area with preferential tariff
agreements; such as the European Community (EC).
Raw materialsThe availability and price of suitable raw materials will often determine the site location.
Plants producing bulk chemicals are best located close to the source of the major raw
material; where this is also close to the marketing area.
-
8/10/2019 Urea Kamal
70/92
70
Transport
The transport of materials and products to and from the plant will be an overriding
consideration in site selection. If practicable, a site should be selected that is close to at
least two major forms of transport: road, rail, waterway (canal or river), or a sea port.
Road transport is being increasingly used, and is suitable for local distribution from a
central warehouse. Rail transport will be cheaper for the long-distance transport of bulk
chemicals. Air transport is convenient and efficient for the movement of personnel and
essential equipment and supplies, and the proximity of the site to a major airport should
be considered.
Availability of labor
Labor will be needed for construction of the plant and its operation. Skilled construction
workers will usually be brought in from outside the site area, but there should be an
adequate pool of unskilled labor available locally; and labor suitable for training to
operate the plant. Skilled tradesmen will be needed for plant maintenance. Local trade
union customs and restrictive practices will have to be considered when assessing the
availability and suitability of the local labor for recruitment and training.
Utilities (services)Chemical processes invariably require large quantities of water for cooling and general
process use, and the plant must be located near a source of water of suitable quality.
Process water may be drawn from a river, from wells, or purchased from a local
authority. At some sites, the cooling water required can be taken from a river or lake, or
from the sea; at other locations cooling towers will be needed. Electrical power will be
needed at all sites. A competitively priced fuel must be available on site for steam and
power generation.
Environmental impact, and effluent disposalAll industrial processes produce waste products, and full consideration must be given to
the difficulties and cost of their disposal. The disposal of toxic and harmful effluents will
be covered by local regulations, and the appropriate authorities must be consulted during
-
8/10/2019 Urea Kamal
71/92
71
the initial site survey to determine the standards that must be met. An environmental
impact assessment should be made for each new project, or major modification or
addition to an existing process.
Local community considerationsThe proposed plant must fit in with and be acceptable to the local community. Full
consideration must be given to the safe location of the plant so that it does not impose a
significant additional risk to the community. On a new site, the local community must be
able to provide adequate facilities for the plant personnel: schools, banks, housing, and
recreational and cultural facilities.
Land (site considerations)Sufficient suitable land must be available for the proposed plant and for future expansion.
The land should ideally be flat, well drained and have suitable load-bearing
characteristics. A full site evaluation should be made to determine the need for piling or
other special foundations.
ClimateAdverse climatic conditions at a site will increase costs. Abnormally low temperatures
will require the provision of additional insulation and special heating for equipment and
pipe runs. Stronger structures will be needed at locations subject to high winds
(cyclone/hurricane areas) or earthquakes.
Political and strategic considerations
Capital grants, tax concessions, and other inducements are often given by governments to
direct new investment to preferred locations; such as areas of high unemployment. The
availability of such grants can be the overriding consideration in site selection.
-
8/10/2019 Urea Kamal
72/92
72
SITE LAYOUT
The process units and ancillary buildings should be laid out to give the most economical
flow of materials and personnel around the site. Hazardous processes must be located at a
safe distance from other buildings. Consideration must also be given to the future
expansion of the site. The ancillary buildings and services required on a site, in addition
to the main processing units (buildings), will include:
1. Storages for raw materials and products: tank farms and warehouses.
2. Maintenance workshops.
3. Stores, for maintenance and operating supplies.
4. Laboratories for process control.
5. Fire stations and other emergency services.6. Utilities: steam boilers, compressed air, power generation, refrigeration, transformer
stations.
7. Effluent disposal plant.
8. Offices for general administration.
9. Canteens and other amenity buildings, such as medical centres.
10. Car parks.
When roughing out the preliminary site layout, the process units will normally be sited
first and arranged to give a smooth flow of materials through the various processing
steps, from raw material to final product storage. Process units are normally spaced at
least 30 mapart; greater spacing may be needed for hazardous processes. The location of
the principal ancillary buildings should then be decided. They should be arranged so as to
minimize the time spent by personnel in travelling between buildings. Administration
offices and laboratories, in which a relatively large number of people will be working,
should be located well away from potentially hazardous processes. Control rooms will
normally be located adjacent to the processing units, but with potentially hazardous
processes may have to be sited at a safer distance. The sitting of the main process units
will determine the layout of the plant roads, pipe alleys and drains. Access roads will be
needed to each building for construction, and for operation and maintenance.
-
8/10/2019 Urea Kamal
73/92
73
Utility buildings should be sited to give the most economical run of pipes to and from the
process units. Cooling towers should be sited so that under the prevailing wind the plume
of condensate spray drifts away from the plant area and adjacent properties. The main
storage areas should be placed between the loading and unloading facilities and the
process units they serve. Storage tanks containing hazardous materials should be sited at
least 70 m (200 ft) from the site boundary.
A TYPICAL PALNT LAYOUT
-
8/10/2019 Urea Kamal
74/92
74
UTILITIES
The word "Utilities" is now generally used for the ancillary services needed in the
operation of any production process. These services will normally be supplied from acentral site facility; and will include:
1. Electricity.
2. Steam, for process heating.
3. Cooling water.
4. Water for general use.
5. Demineralised water.
6. Compressed air.
7. Inert-gas supplies.
8. Refrigeration.
9. Effluent disposal facilities
ELECTRICITYPower is required for chemical process, motor, lightening, pumps, compressor, & other
general & mechanical purposes. It may be purchased from local supply authority or
generated at plant by steam turbine, generator.
STEAMThe steam for process heating is usually generated in water tube boilers; using the most
economical fuel available. The process temperatures required can usually be obtained
with low-pressure steam, typically 2.5 bar (25 psig), and steam is distributed at a
relatively low mains pressure, typically around 8 bar (100 psig).
-
8/10/2019 Urea Kamal
75/92
75
COMBINED HEAT AND POWER (CO-GENERATION)The energy costs on a large site can be reduced if the electrical power required is
generated on site and the exhaust steam from the turbines used for process heating. The
overall thermal efficiency of such systems can be in the range 70 to 80 per cent;
compared with the 30 to 40 per cent obtained from a conventional power station, where
the heat in the exhaust steam is wasted in the condenser. Whether a combined heat and
power system scheme is worth considering for a particular site will depend on the size of
the site, the cost of fuel, the balance between the power and heating demands; and
particularly on the availability of, and cost of, standby supplies and the price paid for any
surplus power electricity generated.
COOLING WATERNatural and forced-draft cooling towers are generally used to provide the cooling water
required on a site; unless water can be drawn from a convenient river or lake in sufficient
quantity. Sea water, or brackish water, can be used at coastal sites, but if used directly
will necessitate the use of more expensive materials of construction for heat exchangers.
WATER FOR GENERAL USE
The water required for general purposes on a site will usually be taken from the local
mains supply, unless a cheaper source of suitable quality water is available from a river,
lake or well.
DEMINERALISED WATER
Demineralised water, from which all the minerals have been removed by ion-exchange, is
used where pure water is needed for process use, and as boiler feed-water. Mixed and
multiple-bed ion-exchange units are used; one resin converting the cations to hydrogen
and the other removing the acid radicals. Water with less than 1 part per million of
dissolved solids can be produced.
-
8/10/2019 Urea Kamal
76/92
76
REFRIGERATION
Refrigeration will be needed for processes that require temperatures below those that can
be economically obtained with cooling water. For temperatures down to around 10C
chilled water can be used. For lower temperatures, down to30C, salt brines (NaCl andCaCl2) are used to distribute the "refrigeration" round the site from a central refrigeration
machine. Vapor compression machines are normally used.
COMPRESSED AIR
Compressed air will be needed for general use, and for the pneumatic controllers that are
usually used for chemical process plant control. Air is normally distributed at a mainspressure of 6 bar (100 psig). Rotary and reciprocating single-stage or two-stage
compressors are used. Instrument air must be dry and clean (free from oil).
INERT GASES
Where large quantities of inert gas are required for the inert blanketing of tanks and for
purging this will usually be supplied from a central facility. Nitrogen is normally used,
and is manufactured on site in an air liquefaction plant, or purchased as liquid in tankers.
EFFLUENT DISPOSAL
Facilities will be required at all sites for the disposal of waste materials without creating a
public nuisance.
-
8/10/2019 Urea Kamal
77/92
77
INSTRUMENT AND PROCESS CONTROL
Instrumentation is the most important factor in ensuring safety and smooth working of
the plant. A separate control room is provided in modern plants where on panels
indicators and recorders are present.
Instruments are used in the industry to measure process variables such as temperature,
pressure, density, level specific heat, conductivity, humidity, flow rate, chemical
composition etc.
The primary objectives of the designer when specifying instrumentation and control
schemes are:
1. Safe plant operation:(a) To keep the process variables within known safe operating limits.
(b) To detect dangerous situations as they develop and to provide alarms and
automatic shut-down systems.
(c) To provide interlocks and alarms to prevent dangerous operating
procedures.
2. Production rate:To achieve the design product output.
3. Product quality:To maintain the product composition within the specified quality standards.
4. Cost:To operate at the lowest production cost, commensurate with the other objectives.
These are not separate objectives and must be considered together.
-
8/10/2019 Urea Kamal
78/92
78
TEMPERATURE CONTROL / MEASUREMENTS
Various instruments are used for e.g.
1. Thermocouple
2. Resistance Thermometers
3. Thermistors
4. Mercury in Glass Thermometers.
Controllers are used to maintain temperature within specified limits. Every temperature
control problems is essential one. The temperature lay involved in the measurement of
this variable is an important factor. Thermal element is usually placed in a well to protect
it and allow servicing of element without interrupting the process. The location of the
temperature element often has as much to do with the efficiency element often as other
parts of the control loops. Temperature bulb should always be located at point where the
coefficient of heat transfer will be as large as possible e.g. if vapors and liquid are at
same temperature, then bulb should be kept in liquid because of high heat transfer
coefficients.
PRESSURE CONTROL / MEASUREMENTS
It is quite necessary for most system handling vapours of gas. It can be measured by
using pressure gauges.
Self operated pressure regulation is often used in pressure control. It is installed directly
in the line the control sensing apparatus is paced about 10 diameters from the unit. This
location eliminates erroneous pressure caused by turbulence. Sudden change in velocity,
shock and vibrations difficulties often occur when self operated regulation are used with
liquids.
-
8/10/2019 Urea Kamal
79/92
79
LEVEL CONTROL / MEASUREMENT
The measurement of level can be defined as the determination of location of interface
with respect to a fixed plane. The main objective of a level control system is to maintain
the level of the liquid in a tank at the Act point value. The different is pressure transmitter
senses the pressure difference / a function of liquid level in the tank) and gives out an
electrical signal, which after signal conditioning is given to the P.I.D. controller. The
controller compares the measured variables with the set point and depending upon the
error, gives an output to the control valve. The control value, in turn controls the flow.
Due to the control of flow, the level is controlled to its set point.
FLOW CONTROL / MEASUREMENTS
It is defined as volume per unit time at specific temperature and pressure conditions. It is
generally measured by positive displacement of rate meters.
The process flow-sheet shows the arrangement of the major pieces of equipment and their
interconnection. It is a description of the nature of the process. The Piping and Instrument
diagram (P and I diagram) shows the engineering details of the equipment, instruments,
piping, valves and fittings; and their arrangement. It is often called the Engineering Flow-
sheet or Engineering Line Diagram.
The P and I diagram shows the arrangement of the process equipment, piping, pumps,
instruments, valves and other fittings. It should include:
1. All process equipment identified by an equipment number. The equipment should be
drawn roughly in proportion, and the location of nozzles shown.
2. All pipes, identified by a line number. The pipe size and material of construction
should be shown. The material may be included as part of the line identification number.
3. All valves control and block valves, with an identification number. The type and size
should be shown. The type may be shown by the symbol used for the valve or included in
the code used for the valve number.
4. Ancillary fittings that are part of the piping system, such as inline sight-glasses,
strainers and steam traps; with an identification number.
-
8/10/2019 Urea Kamal
80/92
80
5. Pumps, identified by a suitable code number.
6. All control loops and instruments, with an identification number.
REACTOR CONTROL
The schemes used for reactor control depend on the process and the type of reactor. If a
reliable online analyzers is available, and the reactor dynamics is suitable, the product
composition can be monitored and the reactor conditions and feed flows controlled
automatically to maintain the desired product compositions and yield. More often, the
operator is the final link in the control loop, adjusting the controller set points. Reactor
temperature will normally be controlled by regulating the flow of heating and cooling
medium. Pressure is usually held constant.
-
8/10/2019 Urea Kamal
81/92
81
-
8/10/2019 Urea Kamal
82/92
82
INSTRUCTIONS FOR OPERATION
Before starting, always make sure that the followings:
No visible damage is evident in the system.
All electrical switches are turned off.
All water valves are closed.
All valves are tightly closed.
Start up procedure.
Check the level in the tank.
Switch on the main supply.
Turn on the main pump.
Open valve for pump.
Start mechanical pump.
Open the steam valve.
Check the flow, temperature& pressure during the operation.
System shut down.
Reduce the flow of the feed & steam.
Reduce all flow rates & wait for pasture to drop.
Turn off the pump.
When the flow slow down close the valve tightly to avoid cavitations.
Disconnect the packing line.
-
8/10/2019 Urea Kamal
83/92
83
N START UP OF PLANT
The testing phase of the start up requires about 10 days. First of all the utility systemconsisting of high and low pressure steam, process and instrument air, cooling water and
electric power have to be tested. Pumps are greased and checked for absence of kindage.
After all utilities and moving systems are ready, water is introduced in the system instead
of feed and tightness of the plant is established on water testing. Instruments are checked
for response and accuracy. The feed is then introduced in place of water and is allowed
gradually to displace the water in the system.
After the process has been fairly well stabilized on hand control, it is then placed on
instrument control, and then the entire operation is brought under automatic process
control. Each step is so adjusted that it gives most efficient performance.
The first consideration must be given to the quality of products. The conversion of
carbamate to urea in the reactor is greatly affected by temperature and pressure in the
reactor. Hence skilled persons are required to maintain these constants at the required
conditions.
-
8/10/2019 Urea Kamal
84/92
84
SAFETY
General rules for the protection of personnel from moving machinery, hot equipment are
to be observed, pipes and large equipments containing steam at high temperature and
pressure and installed in the plant. Protection of the personnel from burns where blowing
out of these materials can occur should be provided.
Since the plant is an open air installation, hence the risks of poisoning and unnecessary
housing should be avoided. Storage of combustible material at the site should be avoided.
In the case of unconsciousness due to poisoning, artificial respiration should be applied.
Hand operated fire extinguishers, fire carpets and emergency showers should be placed
where ever possible. The extinguishers should be used against small fires and the firecarpets and the showers should be used when clothing has caught fire. The showers
should also be used against burns from chemicals. Eye washers should be installed
wherever necessary. Smoking should be forbidden in the plant.
In case of fire it is normal to use water to keep the surrounding cool, until the leak
resulting in the fire is shut off. All sparks should be avoided and welding should be
exercised keeping in view that no combustible material is in close vicinity.
For the protection of the personnel the following equipments should be available:
1.
Safety helmets and shoes which should be worn by persons when they are
working.
2. Goggles for protection against liquid and gases.
3. Gloves for protection against heat.
4. Respiration masks with filters for dust for protection against poisonous gases like
NH3, etc.
5. Ear stuffers or other devices for protection against noise.
Ammonia vapours have pungent smell and they are alkaline. Even a small concentration
of NH3 vapour or liquid may cause fatal damages. Persons employed in handling of
gaseous and liquid NH3should wear gloves and respiratory masks with special filters.
-
8/10/2019 Urea Kamal
85/92
-
8/10/2019 Urea Kamal
86/92
86
manufacturing processes are, to a greater or lesser extent, inherently unsafe, and
dangerous situations can develop if the process conditions deviate from the design values.
The safe operation of such processes depends on the design and provision of engineered
safety devices, and on good operating practices, to prevent a dangerous situation
developing, and to minimize the consequences of any incident that arises from the failure
of these safeguards.
The term "engineered safety" covers the provision in the design of control systems,
alarms, trips, pressure-relief devices, automatic shut-down systems, duplication of key
equipment services; and fire-fighting equipment, sprinkler systems and blast walls, to
contain any fire or explosion.
THE HAZARDS
Toxicity
Most of the materials used in the manufacture of chemicals are poisonous, to some
extent. The potential hazard will depend on the inherent toxicity of the material and the
frequency and duration of any exposure. It is usual to distinguish between the short-term
effects (acute) and the long-term effects (chronic). A highly toxic material that causes
immediate injury, such as phosgene or chlorine, would be classified as a safety hazard.
Whereas a material whose effect was only apparent after long Exposure at low
concentrations, for instance, carcinogenic materials, such as vinyl chloride, would be
classified as industrial health and hygiene hazards. The permissible limits and the
precautions to be taken to ensure the limits are met will be very different for these two
classes of toxic materials. Industrial hygiene is as much a matter of good operating
practice and control as of good design.
Control of substanceshazardous to health
The employer is required to carry out an assessment the flanged joints (liable to leak),
Ventilation: use open structures, or provide adequate to evaluate the risk to health, and
establish what precautions are needed to protect employees. A written record of the
assessment would be kept, and details made available to employees. The designer will be
-
8/10/2019 Urea Kamal
87/92
87
concerned more with the preventative aspects of the use of hazardous substances. Points
to consider are:
1. Substitution: of the processing route with one using less hazardous material or,
substitution of toxic process materials with non-toxic, or less toxic materials.
2. Containment: sound design of equipment and piping, to avoid leaks. For example,
specifying welded joints in preference to gasket
ventilation systems.
4. Disposal: provision of effective vent stacks to disperse material vented from pressure
relief devices; or use vent scrubbers.
5. Emergency equipment: escape routes, rescue equipment, respirators, safety showers,
eye baths,
In addition, good plant operating practice would include:
1. Written instruction in the use of the hazardous substances and the risks involved,
2. Adequate training of personnel.
3. Provision of protective clothing.
4. Good housekeeping and personal hygiene.
5. Monitoring of the environment to check exposure levels. Consider the installation
of permanent instruments fitted with alarms.
6. Regular medical check-ups on employees, to check for the chronic effects of toxic
materials.
Flammability
The term "flammable" is now more commonly used in the technical literature than
"inflammable" to describe materials that will burn, and will be used in this book. The
hazard caused by a flammable material depends on a number of factors:
1. The flash-point of the material.
2. The auto ignition temperature of the material.
3. The flammability limits of the material.
4. The energy released in combustion.
Explosions
-
8/10/2019 Urea Kamal
88/92
88
An explosion is the sudden, catastrophic, release of energy, causing a pressure wave
(blast wave). An explosion can occur without fire, such as the failure through over-
pressure of a steam boiler or an air receiver. When discussing the explosion of a
flammable mixture it is necessary to distinguish between detonation and deflagration. If a
mixture detonates the reaction zone propagates at supersonic velocity (approximately 300
m/s) and the principal heating mechanism in the mixture is shock compression. In a
deflagration the combustion process is the same as in the normal burning of a gas
mixture; the combustion zone propagates at subsonic velocity, and the pressure build-up
is slow. Whether detonation or deflagration occurs in a gas-air mixture depends on a
number of factors; including the concentration of the mixture and the source of ignition.
Unless confined or ignited by a high-intensity source (a detonator) most materials will
not detonate. However, the pressure wave (blast wave) caused by a deflagration can still
cause considerable damage. Certain materials, for example, acetylene, can decompose
explosively in the absence of oxygen; such materials are particularly hazardous.
Sources of ignition
Though precautions are normally taken to eliminate sources of ignition on chemical
plants, it is best to work on the principle that a leak of flammable material will ultimately
find an ignition source.
Electrical equipment
The sparking of electrical equipment, such as motors, is a major potential source of
ignition, and flame proof equipment is normally specified. Electrically operated
instruments, controllers and computer systems are also potential sources of ignition of
flammable mixtures.
Static electricity
The movement of any non-conducting material, powder, liquid or gas, can generate static
electricity, producing sparks. Precautions must be taken to ensure that all piping is
properly earthed (grounded) and that electrical continuity is maintained around flanges.
-
8/10/2019 Urea Kamal
89/92
89
Escaping steam, or other vapors and gases, can generate a static charge. Gases escaping
from a ruptured vessel can self-ignite from a static spark.
Process flames
Open flames from process furnaces and incinerators are obvious sources of ignition and
must be sited well away from plant containing flammable materials.
Miscellaneous sources
It is the usual practice on plants handling flammable materials to control the entry on to
the site of obvious sources of ignition; such as matches, cigarette lighters and battery-
operated equipment. The use of portable electrical equipment, welding, spark-producing
tools and the movement of petrol-driven vehicles would also be subject to strict control
Exhaust gases from diesel engines are also a potential source of ignition.
Pressure
Over-pressure, a pressure exceeding the system design pressure, is one of the most
serious hazards in chemical plant operation. Failure of a vessel, or the associated piping,
can precipitate a sequence of events that culminate in a disaster. Pressure vessels are
invariably fitted with some form of pressure-relief device, set at the design pressure, so
that (in theory) potential over-pressure is relieved in a controlled manner.
Temperature deviations
Excessively high temperature, over and above that for which the equipment was
designed, can cause structural failure and initiate a disaster. High temperatures can arise
from loss of control of reactors and heaters; and, externally, from open fires. In the design
of processes where high temperatures are a hazard, protection against high temperatures
is provided by:
1. Provision of high-temperature alarms and interlocks to shut down reactor feeds, or
heating systems, if the temperature exceeds critical limits.
2. Provision of emergency cooling systems for reactors, where heat continues to be
generated after shut-down; for instance, in some polymerization systems,
-
8/10/2019 Urea Kamal
90/92
90
3. Structural design of equipment to withstand the worst possible temperature excursion.
4. The selection of intrinsically safe heating systems for hazardous materials.
Steam, and other vapour heating systems, is intrinsically safe; as the temperature cannot
exceed the saturation temperature at the supply pressure. Other heating systems rely on
control of the heating rate to limit the maximum process temperature. Electrical heating
systems can be particularly hazardous.
Fire protection
To protect against structural failure, water-deluge systems are usually installed to keep
vessels and structural steelwork cool in a fire. The lower section of structural steel
columns are also often lagged with concrete or other suitable materials.
Noise
Excessive noise is a hazard to health and safety. Long exposure to high noise levels can
cause permanent damage to hearing. At lower levels, noise is a distraction and causes
fatigue.
The basic safety and fire protective measures that should be included in all chemical
process designs are listed below:-
1. Adequate, and secure, water supplies for fire fighting.
2. Correct structural design of vessels, piping, steel work.
3. Pressure-relief devices.
4. Corrosion-resistant materials, and/or adequate corrosion allowances.
5. Segregation of reactive materials.
6. Earthing of electrical equipment.
7. Safe location of auxiliary electrical equipment, transformers, switch gear.
8. Provision of back-up utility supplies and services.
9. Compliance with national codes and standards.
10. Fail-safe instrumentation.
11. Provision for access of emergency vehicles and the evacuation of personnel.
12. Adequate drainage for spills and fire-fighting water.
-
8/10/2019 Urea Kamal
91/92
91
ENVIRONMENTAL CONSIDERATIONS
All individuals and companies have a duty of care to their neighbors, and to the
environment in general. In the United Kingdom this is embodied in the Common Law. In
addition to this moral duty, stringent controls over the environment are being introduced
in the United Kingdom, the European Community, the United States, and in other
industrialized countries and developing countries. Vigilance is required in both the design
and operation of process plant to ensure that legal standards are met and that no harm is
done to the environment.
Consideration must be given to:
1. All emissions to land, air, water.
2. Waste management.
3. Smells.
4. Noise.
5. The visual impact.
6. Any other nuisances.
-
8/10/2019 Urea Kamal
92/92
REFERENCES
1. Sinnot, R.K, Coulson and Richardsons Chemical Engineering, vol-6, Fourth
edition, 2005
2. Perry, Robert H, Green, Don W., Chemical Engineers Handbook, 1999
3. McCabe, Warren L, Smith, Julian C, Harriott Peter Unit Operations of
Chemical Engineering, Sixth edition, 2001
4.
Eckman, Donald P., Industrial Instrumentation, 1991
5. Hesse, Herman C., Rushton, J.Henry, Process Equipment Design
6. Peters, Max S.,Timmerhaus,Klaus D. Process Design and Economics for
Chemical Engineers, Fourth edition , 1958
7. Levenspiel, O., Chemical Reaction Engineering., 2ndEd., John Wiley.
8. Hesse, H.C. and Rushton, J.H., Process Equipment Design, Niki D Van
Nostrand Company Inc.
9. Chapmon, Alan, J, Heat Transfer, 4thEd., Mc Millan.