Urban Transportation Strategy in Hyderabad...BRTS plan Planned Proposed BRTS for 2021 Legend B1 B2...

20
Urban Transportation Strategy in Hyderabad

Transcript of Urban Transportation Strategy in Hyderabad...BRTS plan Planned Proposed BRTS for 2021 Legend B1 B2...

Page 1: Urban Transportation Strategy in Hyderabad...BRTS plan Planned Proposed BRTS for 2021 Legend B1 B2 B3 B4 B5 B6 B7 B11 B10 B12 B9 B11 Code 2021 Proposed Corridors Length B2 Lakdikapul-Mehdipatnam-Gachiboli-

Urban Transportation Strategy in Hyderabad

Page 2: Urban Transportation Strategy in Hyderabad...BRTS plan Planned Proposed BRTS for 2021 Legend B1 B2 B3 B4 B5 B6 B7 B11 B10 B12 B9 B11 Code 2021 Proposed Corridors Length B2 Lakdikapul-Mehdipatnam-Gachiboli-

CTS : Existing Scenario• Population Size – 94 lakhs (GHMC: 66 lakhs, Outside

GHMC:28 lakhs)

• Salient Points on Travel Demand

o Total Person Trips – 1.12 crores (PCTR: 1.19)

o Total Person Trips by Vehicles – 89 lakhs

o Person km – 11.8 crores (Average TL: 13.25 km)

o Share of Bus Passenger Trips – about 36%

• Total Registered Vehicles 40 Lakhs,growth 11% p.a

2

Page 3: Urban Transportation Strategy in Hyderabad...BRTS plan Planned Proposed BRTS for 2021 Legend B1 B2 B3 B4 B5 B6 B7 B11 B10 B12 B9 B11 Code 2021 Proposed Corridors Length B2 Lakdikapul-Mehdipatnam-Gachiboli-

HMA Population Forecast (in million)

9.4m

7.6m

5.7m

19m

15m

12m

Doubling of Population Over Next 30 years - Adding a “London”

3

Page 4: Urban Transportation Strategy in Hyderabad...BRTS plan Planned Proposed BRTS for 2021 Legend B1 B2 B3 B4 B5 B6 B7 B11 B10 B12 B9 B11 Code 2021 Proposed Corridors Length B2 Lakdikapul-Mehdipatnam-Gachiboli-

Year MMTS Bus Metro Car 2W Auto Taxi Total Person Trips (millions/day)

2011 2.7% 43.0% 6.1% 36.4% 8.3% 3.6% 100% 8.9

2021 2.5% 26.6% 26.5% 2.5% 28.2% 8.4% 5.3% 100% 12.1

2031 2.6% 24.2% 31.1% 3.2% 26.1% 7.7% 5.2% 100% 16.5

2041 2.6% 21.7% 34.8% 3.9% 25.3% 6.8% 4.8% 100% 22.5

+36%

+85%

+153%

Study Objectives and Parameters• To evolve a long transportation plan for Hyderabad

Metropolitan region (2041) besides Capacity Building.

Page 5: Urban Transportation Strategy in Hyderabad...BRTS plan Planned Proposed BRTS for 2021 Legend B1 B2 B3 B4 B5 B6 B7 B11 B10 B12 B9 B11 Code 2021 Proposed Corridors Length B2 Lakdikapul-Mehdipatnam-Gachiboli-

2041 Public Transport Travel

2041 AM Peak Hour

2011 Public Transport Travel

Page 6: Urban Transportation Strategy in Hyderabad...BRTS plan Planned Proposed BRTS for 2021 Legend B1 B2 B3 B4 B5 B6 B7 B11 B10 B12 B9 B11 Code 2021 Proposed Corridors Length B2 Lakdikapul-Mehdipatnam-Gachiboli-

Transit Systems Proposed up to 2041

BRTSLength: 438 km

MMTSLength: 428 km

MetroLength: 417 km

6

Page 7: Urban Transportation Strategy in Hyderabad...BRTS plan Planned Proposed BRTS for 2021 Legend B1 B2 B3 B4 B5 B6 B7 B11 B10 B12 B9 B11 Code 2021 Proposed Corridors Length B2 Lakdikapul-Mehdipatnam-Gachiboli-

Metro rail plan

PlannedMetro Under Construction

Legend

PlannedMetro Under Construction

Proposed Metro for 2021

Legend

PlannedMetroUnder Construction

Proposed Metro for 2021

Proposed Metro for 2031

Legend

M1

M4M7

M8

M3

M6

M2

M9M14

M10

M13

M11

M12

M5

Code 2021 Proposed Corridors Length

M1 Miyapur - Patancheruvu 8.45

M2 Faluknama - Shamshabad Airport 15.98

M3 Nagole - LB Nagar 5.07

M6 L B Nagar-Owaisi Hospital-Aramghad 15

M8 Tarnaka - Keesara 18.11

M7 Balanagar Y Junction-Balanagar-Bowenpalli-JBS 9.53

M4 JNTU-Shilparamam-Financial Dist. 15.56

M5 L B Nagar-Vanastalipuran 3

M15

M5M17

M18

Code 2031 Proposed Corridors Length

M13Lakdikapul-Mehdipatnam-

Gachiboli- Lingampally- BHEL21.85

M11MGBS-Ramanthpur-Uppal-

Ghatkesar22.41

M14Kapra - Gandi Maisama -

Thumukunta -BHEL37.22

M12MGBS-Umdanagar -Shamsabad

Airport25.67

M5Vanastalipuram - Pedda

Amberpet9

M6 Aramghad - Rethibowli 10

M9 Patancheruvu - Sangareddy 24

M10 Bowenpalli-Medchal 16.66

Code 2041 Proposed Corridors Length

M5 Pedda Amberpet - Chotuppal 27

M17

Gachibowli - Shamshabad

(along the ORR) 22.62

M15 Owaisi Hospital-Begumpet 29.13

M18

Nanal Nagar - Langar House -

APPA Junction 10.27

PlannedMetro Under Construction

Proposed Metro upto 2031

Proposed Metro for 2041

Legend

Page 8: Urban Transportation Strategy in Hyderabad...BRTS plan Planned Proposed BRTS for 2021 Legend B1 B2 B3 B4 B5 B6 B7 B11 B10 B12 B9 B11 Code 2021 Proposed Corridors Length B2 Lakdikapul-Mehdipatnam-Gachiboli-

BRTS plan

PlannedProposed BRTS for 2021

Legend

B1

B2

B3

B4

B5

B6

B7

B11

B10

B12

B9

B11

Code 2021 Proposed Corridors Length

B2Lakdikapul-Mehdipatnam-Gachiboli-

Lingampally- BHEL22

B1 Aramghar-Rethibowli 10

B3MGBS-Umdanagar -Shamshabad

Airport26

Code 2031 Proposed Corridors Length

B4 JBS-Mulugu 39

B5 Pedda Amberpet-Choutuppal 27

B6 Owaisi Hosp.-Begampet 29

Code 2041 Proposed Corridors Length

B10 Biramal Guda-Aghapalli 29

B7 Bharat nagar-Narsapur 42

B9 Kapra-Kokapet 60

B11Outer Ring Road (Excluding

Gachibowli - Shamshabad Stretch)136

B12 Kuramalguda-Kothur 18

PlannedProposed BRTS for 2021

Proposed BRTS for 2031

Legend

PlannedProposed BRTS upto 2031

Proposed BRTS for 2041

Legend

Page 9: Urban Transportation Strategy in Hyderabad...BRTS plan Planned Proposed BRTS for 2021 Legend B1 B2 B3 B4 B5 B6 B7 B11 B10 B12 B9 B11 Code 2021 Proposed Corridors Length B2 Lakdikapul-Mehdipatnam-Gachiboli-

PlannedExisting/Planned MMTS

Proposed MMTS

Legend

MMTS plan

MT1

MT5

MT3

MT7

MT4

MT6MT2

MT9

MT11

MT10

MT8

MT12

MT13

MT16

MT14

MT15

Code 2021 Proposed Corridors Length

MT1 Falaknuma-Umdanagar-Airport 18

MT2 Tellapur-Patancheru 12

MT3 Secunderabad-Bollaram 14

MT4 Sanathnagar-Moula Ali 19

MT5 MoulaAli-Malkajgiri-Sitaphalmandi 10

MT6 Bollaram-Medchel 14

MT7 Moulaali-Ghatkesar 14

Code 2031 Proposed Corridors Length

MT9 Umdanagar-Shadnagar 35

MT10 Medchel-Topran 34

MT11 Telapur- Ravulapalli 21

MT8 Ghatkesar-Bhongir 26

Code 2041 Proposed Corridors Length

MT14 Shadnagar - Jedcherla 24

MT12 Topran - Ramayampet 21

MT15 Ravulapalli - Vikarabad 24

MT13 Bhongir-Jangaon 23

MT16 Bibinagar-Nalgonda 72

Page 10: Urban Transportation Strategy in Hyderabad...BRTS plan Planned Proposed BRTS for 2021 Legend B1 B2 B3 B4 B5 B6 B7 B11 B10 B12 B9 B11 Code 2021 Proposed Corridors Length B2 Lakdikapul-Mehdipatnam-Gachiboli-

Potential Right of Way Requirements

1992

SRDP

ROW(m)

Page 11: Urban Transportation Strategy in Hyderabad...BRTS plan Planned Proposed BRTS for 2021 Legend B1 B2 B3 B4 B5 B6 B7 B11 B10 B12 B9 B11 Code 2021 Proposed Corridors Length B2 Lakdikapul-Mehdipatnam-Gachiboli-

Hierarchical Road Network

Arterials

Sub-Arterials

Distributors/Collectors

Local/Access Roads

Page 12: Urban Transportation Strategy in Hyderabad...BRTS plan Planned Proposed BRTS for 2021 Legend B1 B2 B3 B4 B5 B6 B7 B11 B10 B12 B9 B11 Code 2021 Proposed Corridors Length B2 Lakdikapul-Mehdipatnam-Gachiboli-

Road Network Plan for 2041

Page 13: Urban Transportation Strategy in Hyderabad...BRTS plan Planned Proposed BRTS for 2021 Legend B1 B2 B3 B4 B5 B6 B7 B11 B10 B12 B9 B11 Code 2021 Proposed Corridors Length B2 Lakdikapul-Mehdipatnam-Gachiboli-

Regional Commuter Rail System

Page 14: Urban Transportation Strategy in Hyderabad...BRTS plan Planned Proposed BRTS for 2021 Legend B1 B2 B3 B4 B5 B6 B7 B11 B10 B12 B9 B11 Code 2021 Proposed Corridors Length B2 Lakdikapul-Mehdipatnam-Gachiboli-

Summary of Cost EstimatesAmount (INR Crores)

System 2021 2031 2041

Highway System 12,080 21,915 39,620

Metro System 24,810 63,630 84,520

MMTS 1,360 3,280

BRTS 935 2,490 6,415

Intra-city Bus System 2,190 3,265 4,750

Terminals 1,590 2,230 3,390

Traffic Management

Measures 5,945 8,985 11,390

Total 47,550 1,03,875 1,53,365

Page 15: Urban Transportation Strategy in Hyderabad...BRTS plan Planned Proposed BRTS for 2021 Legend B1 B2 B3 B4 B5 B6 B7 B11 B10 B12 B9 B11 Code 2021 Proposed Corridors Length B2 Lakdikapul-Mehdipatnam-Gachiboli-

Government Initiations

✓ Metro Rail corridors Extensions/ New corridors

✓ Hyderabad Road Development Corporation Ltd (HRDCL)

✓ Strategic Road Development Plan (SRDP)

✓ Charminar Pedestrianization Project

Page 16: Urban Transportation Strategy in Hyderabad...BRTS plan Planned Proposed BRTS for 2021 Legend B1 B2 B3 B4 B5 B6 B7 B11 B10 B12 B9 B11 Code 2021 Proposed Corridors Length B2 Lakdikapul-Mehdipatnam-Gachiboli-

An ISO 9001:2008 Certified Company

HRDCL PRORITY ROADS

16

Page 17: Urban Transportation Strategy in Hyderabad...BRTS plan Planned Proposed BRTS for 2021 Legend B1 B2 B3 B4 B5 B6 B7 B11 B10 B12 B9 B11 Code 2021 Proposed Corridors Length B2 Lakdikapul-Mehdipatnam-Gachiboli-

AS for Rs 2631Crs for 20 works

Phase-1

Page 18: Urban Transportation Strategy in Hyderabad...BRTS plan Planned Proposed BRTS for 2021 Legend B1 B2 B3 B4 B5 B6 B7 B11 B10 B12 B9 B11 Code 2021 Proposed Corridors Length B2 Lakdikapul-Mehdipatnam-Gachiboli-

Charminar Pedestrianization Project

Page 19: Urban Transportation Strategy in Hyderabad...BRTS plan Planned Proposed BRTS for 2021 Legend B1 B2 B3 B4 B5 B6 B7 B11 B10 B12 B9 B11 Code 2021 Proposed Corridors Length B2 Lakdikapul-Mehdipatnam-Gachiboli-

An ISO 9001:2008 Certified Company

Phase-1 Charminarto Gulzar Houze

CharminarPedestrianization Project

Phase-2 GulzarHouze to Madina

Page 20: Urban Transportation Strategy in Hyderabad...BRTS plan Planned Proposed BRTS for 2021 Legend B1 B2 B3 B4 B5 B6 B7 B11 B10 B12 B9 B11 Code 2021 Proposed Corridors Length B2 Lakdikapul-Mehdipatnam-Gachiboli-

Metro Corridor 1Proposed NGT line2.3km

Further routes for Ext

New Generation Tram for Hyderabad