  • Mohd Azharuddin Mat Sah

    Director, NKRA Urban Public Transport, NKEA Greater Kuala Lumpur / Klang Valley

    Performance Management and Delivery Unit (PEMANDU)

    Prime Ministers Department

    Urban Public Transport: Riding the Wave of GTP 2.0 for a Better Future

    Urban Transportation Forum 2014

    6th November 2014

  • 1

    Agenda

    Introduction

    UPT Achievements (GTP 1.0)

    UPT Initiatives (GTP 2.0)

    Future Expectations

  • 2

    National Transformation Policy: 5 Strategic Thrusts

    10th Malaysia Plan

    People First Performance

    Now

    POLITICAL

    TRANSFORMATION

    PROGRAMME

  • 3

    Relationship between ETP & GTP

    12 NKEAs + 6 SRIs

    Grow the economy

    Increase revenue

    Increase job / income

    7 NKRAs

    Spend the revenue based

    on rakyat needs

    Distribute the revenue

    (BR1M, RBI & LIH)

    1 2

    Economic Transformation

    ProgrammeGovernment Transformation

    Programme

    We are doing both

  • 4

    Introducing the UPT framework

    Reliable RAIL

    service with the

    right capacity and

    frequency

    Reliable BUS

    service that

    provides connection

    and covers

    suburban area

    Quality TAXI

    service that

    enhances door-to-

    door connectivity

    ENFORCEMENT : Optimized deployment of

    resources

    INTEGRATION : Improved quality and efficient to allow seamless journey

    and convenience

    TRAVEL DEMAND: Transport analytics, push/pull initiatives, profitability

    analysis & fare structure review

    reliability & frequency | connectivity & convenience | availability & capacity

    Watching brief for Regional Cities & Corridors

    25% PT modal share

    750k AM peak PT ridership

    75% of population residing within 400m of UPT nodes

    25% of GKL taxis at par with best-in-class ASEAN cities

  • 5

    LAB Methodology

    Our methodology to identify high-impact initiatives

    Workstream

    Brainstorming

    List of ideas identified > 30 ideas identified

    from 5 workstreams

    Grouped into 2 areas Continue & expand

    projects New ideas

    Initial

    Prioritization

    Initial prioritization based on Effectiveness Feasibility Realization time

    Final

    prioritization

    Final set of ideas then prioritized based on final figures and incorporating input from lab sponsor

    Business case

    development

    Detailed business case then developed for prioritized ideas to fine tune impact figures

    Ideas then syndicated with various stakeholders for input

    Definition: An intense problem solving environment within a dedicated physical workspace with a full

    time working team working in iterative manner towards delivering Big Fast Result ( BFR)

  • 6

    NKRA Governance

    YB Menteri

    Pengangkutan

    DMO Team

    MoT NKRA:

    Veejandran a/l Ramdas(Ketua Penyelaras)

    Mohd Aidi Mohd Hussin

    Stein Van Lutam

    Hazimi Mohd Ghazali

    Manorliza Abdul Patah

    Imran Yussof

    SPAD:

    Ahmad Faizal Baharudin

    Syed Imran Kifli Syed Jaafar

    Muhammad Hazimin Sulaiman

    Zakaria Md Tap

    PEMANDU NKRA UPT:

    Mohd Azharuddin Mat Sah(Pengarah NKRA UPT / NKEA GKL)

    Sharul Azwa Abd Rani

    Mohd Fairoze Mohd Hadli

    Adleen Fariza Kamaruddin

    Implementation Agencies

    YAB Timbalan

    Perdana Menteri

    KSU MoT

    TKSU MoT

    DMO Team

    MoT NKRA, SPAD &

    PEMANDU

    Provide overall strategic direction of UPT NKRA

    Oversee and monitor overall targets and project deliverables

    Serves as the highest forum to resolve implementation issues

  • 7

    Agenda

    Introduction

    UPT Achievements (GTP 1.0)

    UPT Initiatives (GTP 2.0)

    Future Expectations

  • 8

    NKRA Urban Pubic Transport

    Key results for UPT from 2010-2013

    Bus

    Rail

    Integration

    470 new RapidKL buses

    9 BET corridors

    1,549 new / refurbished bus stops

    Launched 2 out of 4 GO-KL bus routes

    Pasar Seni city bus terminus

    (HAB) begins operations

    58 Passenger Information System

    (PIS) has been installed at major bus

    stops

    ITT Bandar Tasik Selatan and IUTT Pudu Sentral begins operation

    6,800 additional parking bays completed within KL rail network

    Single ticket journey made available between LRT Kelana Jaya / Ampang lines

    Pedestrian linkages connecting to rail stations improves the connectivity

    35 four car-sets injected into LRT Kelana Jaya line. AM Peak headway is less than 2 minutes

    38 six car-sets injected into KTM Komuter service. AM Peak headway is reduced from 30 to 15 minutes

    35km long of LRT extension is under construction

    3,172 new taxi permits had been issued to individual permit holders in KV.

    Fleet of new taxi (Proton Exora) has been launched under the Teksi 1 Malaysia scheme. (TEKS1M)

    Taxi

  • 9

    Agenda

    Introduction

    UPT Achievements (GTP 1.0)

    UPT Initiatives (GTP 2.0)

    Future Expectations

  • 10

    32 75 % Population residing within

    400m of UPT nodes

    25 % taxis at par with best-in-class

    ASEAN cities

    1 750,000 AM Peak Ridership

    GTP 2.0 Initiatives

    Bus Rail

    LRT Extension

    Program

    CTSS

    Bus Network

    Revamp

    InitiativesContribution

    25% of best-

    in-class taxis

    Contribution

    Launch of New Taxi

    Business Model

    Centralized Taxi

    Service System

    (CTSS)

    Initiatives

    131 k 411 k

    339 k

    280 k

    Forecasted

    2012

    Bus Rail Estimated

    2015

    GTP 2.0

    Target

    230 k109k

    Estimated

    339,000

    additional

    ridership

    from GTP

    2.0 initiatives

    750 k

    These ideas will deliver our 2015 aspirations

  • 11

    2010 Existing Rail

    2013

    LRT Extensions

    KTM Upgrade

    +

    2013/

    2014

    LRT & Monorail

    Fleet

    Improvement

    +

    2016

    MRT1

    Freight Relief

    Line

    LRT3 (KL-KLang)

    Putrajaya

    Monorail

    MRT2 (Phase 1)

    MRT3 (Phase 1)

    KL Monorail

    Extension

    +

    2020

    MRT2 (Phase 2)

    MRT3 (Phase 2)

    +

    11SOURCE: SPAD GKL/KV Public Transport Master Plan

    Proposed Greater Kuala Lumpur Urban

    Rail Development Projects

  • 12SOURCE: Operator data, Lab analysis

    Length - 17 km

    No of stations 12 + 1 integrated with

    Ampang Line at Putra Heights

    No Park n Ride 5 (multi storey)

    Expected completion end of 2014

    Projected daily ridership 292,000

    Kelana Jaya

    Line Extension

    Length 17.7 km

    No of stations 12 + 1 integrated with

    Kelana Jaya Line at Putra Heights

    No Park n Ride 7 (multi storey)

    Expected completion end of 2014

    Projected daily ridership 247,000

    Ampang Line

    Extension

    Existing

    Sri Petaling Stn

    Existing

    Kelana Jaya Stn

    Stn 01

    Stn 02

    Stn 03

    Stn 04

    Stn 05

    Stn 06

    Stn 07

    Stn 08

    Stn 09

    Stn 10

    Stn 11

    Stn 12

    Stn 01

    Stn 02

    Stn 03

    Stn 04

    Stn 05

    Stn 06

    Stn 07

    Stn 08

    Stn 09

    Stn 10

    Stn 11

    Stn 12

    Stn

    13

    Sri

    Petaling

    Bandar

    Kinrara

    Puchong

    Putra

    Heights

    Kelana

    Jaya

    Subang

    Jaya

    USJ

    Putra

    Heights

    Am

    pa

    ng

    Lin

    e

    K. J

    aya

    Lin

    e

    RapidKL Line extension program will serve

    highly populated catchment area in Puchong & Subang Jaya

  • 13

    Phase 1 Operation: 1 Jan 2017 Phase 2 Operation: 1 July 2017

    Progress as of

    Q2 2014

    Late

    (%)

    Actual

    (%)

    Overall (elevated

    & Underground)

    45.87 47.63

    Overall (elevated) 36.02 37.20

    Overall

    (Underground)

    60.77 63.34

    384,000 (Yr 2017)

    31 (24

    elevated, 7

    u/grnd)

    Daily

    Ridership

    SBK Line 1- on track. Phase 1

    completion on 1 January 2017.

    MRT Line 2 has been approved

    51km (41.5km

    elevated, 9.5km

    u/grnd)

    No of

    StationsAlignment

    753,000 (Yr 2020) 40 (29 elevated,

    10 u/grnd, 1 at-

    grade)

    60.7km (48.2km

    elevated, 11.1km u/grnd,

    1.4km at-grade)

    KVMRT SBK Line

    KVMRT Line 2

    85 min

    Total Journey

    Time

    80 min

    Status

    Update

    KVMRT Sungai Buloh Kajang Line

    KVMRT Line 2 (North-South Line)

    Rail: Mass Rapid Transit (MRT)

    NKEA GKL / KV

  • 14

    Bus: Go-KL City Bus

    0

    5,000

    10,000

    15,000

    Q4 13Q3 13Q2 13Q1 13Q4 12

    GreenPurple

    GO KL currently carrying

    23,000 passengers per day

    Purple and Green Line Commenced operations on

    31st Aug 2012

    Purple Line

    ( Pasar Seni Bukit Bintang)

    Green Line

    (KLCC Bukit Bintang)

    16 buses are deployed daily

    5 minutes headway during

    peak hours and 10 minutes

    during non-peak

    Red and Blue Line Commenced operations on 1st

    May 2014

    Red Line

    (KL Sentral Jalan Tunku Abdul

    Rahman)

    Blue Line

    (Medan MARA Bukit Bintang)

    Expected ridership is 18,000

    per line

    5 minutes h