PRESENTER: Helena Itamba
Ministry of Mines and Energy
URANIUM MINING
PROJECTS
RAF 2011, Workshop on Application of United Nations Framework Classification, JHB, RSA, 10-14 November 2014
BACKGROUND
oSeveral uranium projects delayed due to depressed market conditions following the Fukushima incident;
oLHU mine reported record production following three years of operational los;
oRUL return to profitability due to implementation of several cost reduction exercises;
oAreva Namibia continued care and maintenance;
oConstruction of the Husab mine ongoing despite the adverse market conditions;
oSix licensed uranium mines.
LOCALITIES OF URANIUM MINES
GRADES (PPM)
ValenciaTrekkopje
Husab
EtangoMarenica Rossing Langer Heinrich
Tubas/Tumas/Omahola
Ida Dome0
100
200
300
400
500
600
0 100 200 300 400 500 600 700
Co
nta
ine
d m
eta
l (M
lb
s)
Grade (ppm)
Rossing Uranium Limited
Langer Heinrich Uranium
Trekkopje (Areva)
Valencia Swakop Uranium (Husab)
o Lower throughput lead to lower production volumes;
o Drilling completed on Z20, 142 holes
o Investigating economic methods on how to extract ore from Z20
o Temporary shut down of milling operation during December –January due to leach tank failure.
o July CNNC , overseas Uranium Holding acquired 25% stake;
o Construction and commissioning of stage 3 complete;
o Currently operating in excess of name plate capacity of 5.2 mlb;
o Stage 4: feasibility to increasing production up to 8.7Mlb U3O8 pa expansion to increase production capacity;
o No exploration activities during 2013.
o AREVA has decided to postpone the Trekkopje Project, which is not economically minable at the present time as a result of poor prevailing conditions in the uranium market.
o Care and maintenance phase since July 2013
o 48 employees 3km in length, 810m width, 36M t of uranium ore per year
o Consolidation of two neighbouring projects;
o Completed drilling program
o Metallurgical test results with higher recoveries
o Environmental Clearance for all aspects of mine construction, operation and closure granted
o Results of a positive engineering cost study for the Norasa Uranium processing plant released.
o Measured and Indicated Resource: 103 Mlbs at 197 ppm U3O8
o Proved and Probable Reserve: 79 Mlbs at 202 ppm U3O8
o Estimated Inferred Resource: 50Mt at 198ppm for 22 Mlbs of U3O8
o Pre-stripping has commenced
o The plan is to ensure that a Run-of-Mine (ROM) stockpile will be ready for processing on completion of the processing plant.
o Annual production capacity 15 Mlbs;
o LoM 20 years.
U3O8 ANNUAL PRODUCTION (ST)
0
1000
2000
3000
4000
5000
6000
2005 2006 2007 2008 2009 2010 2011 2012 2013
DRILLING AT VALENCIA EAST
SWAKOP URANIUM
Blasting Production process
ZHONGE RESOURCES oThe Mining Licence was
granted during December
2012;
oreserves of metal U is 40,800 ton, and the average grade
of U3O8 is 185ppm;
oconstruction of the project
was expected in 2015 and the
first product 2018;
oApplied for Mineral Deposit
Retention licence;
oMine construction currently
put on hold.
Advanced
Exploration Projects
BANNERMAN RESOURCES
o Completed Etango DFS and EISA;
o Environmental Approvals Granted
o 6-9 Mlbs U3O8 annual production over a 15 year LoM;
o Plans underway to construct a demonstration plant by 2015 which will be operated for one year.
Stage three crushing
Conventional Sulphuric Acid Heap Leach Plant
Reptile Uranium-
Deep Yellow
o Multiple deposits
o Pit optimisation and mining cost studies
o Comprehensive Metallurgical test work must still be conducted;
o 12 year LoM, 2.2 Mlbs production rate per annum ;
o Conventional acid leach with solvent extraction;
RESOURCES
Tubas Sand
Project
o Mineral
resource totals
24Mt at 170
ppm for 12.7
Mlbs U308 at
100 ppm U3O8
cut off;
Bulk sample trench
CHALLENGES o Low Uranium Price;
o Downsizing to contain cost which lead
to the retrenchment of workforce;
o Rising input costs;
o Uninterrupted supply of water and
electricity.