Lyme - Nexus · DOSSIER © NEXUS 81 juillet-août 2012 © NEXUS 81 juillet-août 2012.
Updates of 3E Nexus InitiativesUpdates of 3E Nexus Initiatives Ken Fukushi, Ph.D. Professor, IR3S,...
Transcript of Updates of 3E Nexus InitiativesUpdates of 3E Nexus Initiatives Ken Fukushi, Ph.D. Professor, IR3S,...
Updates of 3E Nexus Initiatives
KenFukushi,Ph.D.Professor,IR3S,TheUniversityofTokyo
3ENexusIni>a>veSecretariat
1
3ENexusAnnualMee>ngJanuary14-15,2016
JCM Meeting at COP21
2
0 5 10 15 20 25 30 35 40
AngolaBangladesh
BrazilCambodia
ChileChina
ColombiaCostaRicaEthiopia
IndiaIndonesia
Indonesia&Kenya
LaoPDRMalaysiaMexico
MongoliaMyanmar
PalauSouthAfrica
SriLankaThailandVietnamMoldovaMaldivesPhillipines
NumberofProjects
Coun
try
Country-wiseJCM(Demonstra:on,Planning,Feasibility/BOCM,REDD+andModel)Projectsin2009-2015
2009 2010 2011 2012 2013 2014 2015
3
0 2 4 6 8 10 12 14 16
AngolaBangladesh
BrazilCambodia
ChileChina
ColombiaCostaRicaEthiopia
IndiaIndonesia
Indonesia&MyanmarKenya
LaoPDRMalaysiaMexico
MongoliaMyanmar
PalauSouthAfrica
SriLankaThailandVietnam
NumberofProjects
Coun
try
Country-wiseFeasibilityStudiesofNewMechanism,JCM/BOCM,andJCMinFY2009-2015
2009 2010 2011 2012
4
0
2
4
6
8
10
12
CostaRica Ethiopia Kenya Palau SriLanka Maldives Bangladesh Cambodia LaoPDR Mongolia Myanmar Indonesia Vietnam Malaysia
Projects
Country
Country-wiseJCMProjectsin2014
StudyProgramme(PS/DS/FS/REDD+) FinancingProgramme
0
2
4
6
8
10
Bangladesh Cambodia Chile CostaRica Mongolia Myanmar Phillipines Vietnam LaoPDR Thailand Indonesia Ethiopia Mexico
Projects
Country
Country-wiseJCMProjectsin2015
StudyProgramme(PS/DS/FS/REDD+) FinancingProgramme
5
Sector-wise JCM Model Projects in 2014 & 2015
7;46%
6;40%
1;7%
1;7%
ModelProjectsin2014
EnergyEfficiencyImprovement RenewableEnergy
Transport WasteManagement/BiomassU>lisa>on
1;5%
13;72%
3;17%
1;6%
ModelProjectsin2015
BiomassU>lisa>on EnergyEfficiencyImprovement
RenewableEnergy WasteManagement/BiomassU>lisa>on
6
Promoting JCM project formulation
Mongolia: • 10 MV-scale Solar Power Generation for Stable Power Supply • Efficient improvement of Combined Heat and Power Plant by Thermal Insulation
Viet Nam:• Introduction of Energy-from Waste Project in Ho Chi Minh City • Energy Saving for Irrigation Facility by Introducing High-efficiency Pumps • 40MW-scale Hydro Power Generation in Lao Cai Province • Recovery and Utilization of Biogas from Mixed-treatment of Waste and Septage • Introduction of Co-generation System Using Bagasse in Sugar Factory • Anaerobic Digestion of Organic Waste for Biogas Utilization at Market • Eco-driving by Utilizing Digital Tachograph System
Bangladesh:• Waste Heat Recovery and Utilization in Textile and Garment Factories
Indonesia:• Installation of Combined Heat and Power System in Hotel • Waste Heat Recovery and Electricity Generation in Flat Glass Production Plant • Introduction of High Efficient Old Corrugated Cartons Process at Paper Factory • 3.7MW Run-of –river Hydro Power Generation in Sulawesi • Improvement of REDD+ implementation using IC Technology • Power Generation by Waster Heat Recovery in Cement Industry • Palm Waste Biomass Power Generation Project • Solar Power Hybrid System Installation to Existing Base Transceiver Stations in Off-grid Area • Energy Saving through Introduction of Regenerative Burners to the Aluminum Holding Furnace of the Automotive Components Manufacturer • Energy Saving for Textile Factory Facility Cooling by High Efficiency Centrifugal Chiller
Red: JCM Project Planning Study (PS) Black : JCM Feasibility Studies Green: JCM Model Projects Orange: REDD + Demonstration Study
Laos PDR:• Biomass Utilization of Cement Kiln
JCM Feasibility Studies/Model Projects /REDD + Demonstration Study/Project Planning(2014)
Source:MOEJ,Japan,2014 7
Kenya:• Expansion of geothermal project • Dissemination of SolarLantern
Myanmar:• Run-of-river Micro Hydro Power Generation
• Geothermal binary power generation
Mongolia: • Upgrading and Installation of Centralized Control System of High- Efficiency Heat Only Boiler • Energy-saving power transmission system • Highly Efficient Transmission and Coal Power Plant • Wind-Power Generation • 10MW-scale solar power generation for stable power supply • Energy conservation at cement plant• Improvement of thermal installation and water cleaning/air purge at power plants
Mexico:• CCS (Carbon dioxide Capture and Storage)
Djibouti / Rwanda:• Geothermal Power Generation
Viet Nam:• Integrated Energy Efficiency Improvement at Beer Factory • Highly Efficient Coal Power Plants (Ultra Super Critical) • Highly Efficient Air Conditioning • Highly Efficient Transformer • Water purification and sludge emission reduction • Vehicle-mounted terminal (digital tachograph) • Energy saving glass windows for buildings • Small-scale biomass power generation
Bangladesh:• Brick Production based on Non-Firing Solidification Technology • CCGT Power Generation • High-efficiency rice husk based cogeneration • Solar power generation with long-life storage battery in non-electrified regions
Indonesia:• Energy Efficient Refrigerants to Cold Chain Industry • Energy Saving for Air-Conditioning and Process Cooling at Textile Factory • Energy Savings at Convenience Stores • Mega-Solar Power Plants Using Thin-Film Solar Cells • Optimum Control of Plant Equipment • Wind-Power Generation • Energy-saving stores based on CO2 refrigerant • Forest conservation measures (REDD+) • Anaerobic treatment for wastewater from rubber plants• Solar power system at off-grid cell towers • Improvement of REDD+ implementation using IC technology
Red: JCM Model Projects Green: JCM Demonstration Projects Black : JCM Feasibility Studies
Thailand:• Energy saving in industrial park • Energy Savings through Building Energy Management System
• Bagasse-based Cogeneration at Sugar Mill
Laos:• Energy saving at beer plant • Forest conservation measures (REDD+) • Promotion of use of electric vehicles
Sri Lanka:・Sustainable biomass-based power generation
Maldives:• Air conditioners by using deep sea water
Example of JCM Feasibility Studies/Model Projects /Demonstration Projects (2010 to 2013)
Cambodia:• Small-scale Biomass Power Generation by Using Stirling Engines
India:• Energy Efficient Technologies for Integrated steel works • Efficient AirConditioners • Utilization of LED Lights at Office Buildings• High-Performance Industrial Furnaces to Aluminium Industry• Bagasse-based Power Generation including Waste Heat Utilization
Source:MOEJ,Japan,2014
8
Workshop on 3E Nexus and Development of Joint Crediting Mechanism (JCM) Projects for Implementing Intended Nationally
Determined Contributions
Date: December 15, 2015, 9:00~16:45
Venue: VNU Hanoi University of Science
StudyWorkshop,Vietnam
Time Descrip:on9:00–9:10 Welcomespeech Prof.Dr.PhanTuanNghia,
9:10–9:20 Introduc>onofWS Dr.NguyenTai9:20–9:40 Keynotespeech Prof.Dr.MaiTrongNhuan,
9:40–10:20 Keynotespeech Dr.LuongQuangHuy
10:20–10:40 Break10:40–11:10 JCMintroduc>on,Assoc.Prof.T.Matsuda
11:10–12:00 QandA12:00–13:30 Lunch13:30–14:00 VideolectureonJCMproposaldevelopment,Prof.K.Fukushi14:00–14:45 JCMsecretariatreport, Mr.LeNgocTuan
14:45–15:30 QandA15:30–16:30 Discussion16:30–16:45 Closing Prof.Dr.MaiTrongNhuan
9
Workshop on 3E Nexus and Development of Joint Crediting Mechanism (JCM) Projects toward a Sustainable Low-Carbon
Society in Indonesia
Date: December 17, 2016 9:00~16:45
Venue: Center for Environmental Studies, ITB
Studyworkshop,Indonesia
PUSAT STUDI LINGKUNGAN HIDUP INSTITUT TEKNOLOGI BANDUNG
Time Descrip:on9:00-9:10 Welcomenote,Prof.TjandraSe>adi9:10-9:30 Selfintroduc>on9:30-9:50 Introduc>onof3Enexus Dr.GeethaMohan9:50-10:30 JCMsecretaryreport,Mr.DickyEdwinHindarto10:30-10:50 Coffeebreak
10:50-11:0511:05-11:2011:20-11:3511:35-11:5011:50-12:20
LecturesonJCMandrelatedresearch• Prof.UdinHasanudin• Mrs.Luciawa>Sunarjo• Dr.RetnoGumilangDewi• Dr.Eng.ArieDiparezaSyafei• Q&A
12:20-13:30 Lunch13:30-14:15 JCMproposaldevelopment,Prof.K.Fukushi14:15-15:15 Discussion,15:15-15:30 Coffeebreak15:30-16:30 Discussion16:30-16:45 Closing Prof.Fukushi,Mr.DickyHindarto,Prof.Se>adi
10
Workshop on 3E Nexus and Development of Joint Crediting Mechanism (JCM) Projects toward a Sustainable Low-Carbon
Society in Bangladesh
Date: December 20, 2016 9:00~14:45
Venue: Asian Institute of Technology Conference Center
StudyWorkshop,Bangladesh
Time Descrip:on9:00-9:10 Welcomenote,Prof.C.Visvanathan9:10-9:25 Introduc>onofpar>cipants9:25-9:45 3Enexusintroduc>on,Dr.GeethaMohan9:45-10:15 JCMproposaldevelopmentandJCMprogram,Dr.Fujino10:15-11:00 QandA,discussion11:00-11:30 Coffeebreak11:30-12:10 JCMinBangladesh Prof.Dr.MdMafizurRahman
12:10-13:10 Lunch13:10-13:30 IDLCFinanceLimited Engr.MdMehbuboorRahman13:30-13:50 Mr.ShafiqulAlam13:50-14:50 Overalldiscusiion14:50-15:00 ClosingProf.Dr.MdMafizurRahman
11
For more information ContactAddress:IR3SCommileeSecretariatJapanIntegratedResearchSystemforSustainabilityScience(IR3S),TheUniversityofTokyo,7-3-1Hongo,Bunkyo-ku,Tokyo113-8654,Japan,Phone:+81-3-5841-1541and+81-3-5841-1544Fax:+81-3-5841-1549Email:[email protected]:www.ir3s.u-tokyo.ac.jp/3e-nexus/index.html
12