Resume Mecbar H. Mohammad Hasim 28-Y Baliwasan Grande, Zamboanga City E-Mail: [email protected] Tel no.: 062 992-2291(Philippines) Mobile No.: +966 530782297 (K.S.A.) CAREER HIGHLIGHTS Professional Civil Engineer (PRC Reg. # 0092088) 15 years of extensive experienced working in foreign-funded projects, world bank-funded projects, Middle East and local infrastructure projects both vertical and horizontal structures. PMP (Project Management Professional) certificate number KSPMPJED- Feb15-017. Knowledgeable in HEALTH, SAFETY AND ENVIRONMENT (HSE). OSHA certified, successfully passed 30 hour construction industry training in accordance with guideline established by the OSHA Training Institute and The National Safety Council (NSC) I.D. no. OSCI70919030. Completed Confined Space Entry Program course and is authorized to work in confined space within his area of responsibility, with certificate no. JSDP-WPS-I-13-0041. Work Permit Issuer, with certificate no. JSDP-CSEP-13-0059. Work Permit Receiver With on-site extensive experienced in; 1. Metro train project – Elevated Stations with post tensioned Concourse slab and basement, Viaduct, cut and cover, underground station, FSLM (Full Span Launching Method), PCB (Precast Concrete Beam Method), PSM (Precast Segmental Method), Portal Frame erection and BCM (Balance Cantilever Methods). 2. Piling works and Geotechnical investigation 3. Composite Steel Bridges 4. Building /School / University Construction 5. Storm Water Drainage Project (DAM, Unlined & Lined channels, Box Culvert, Gabions, Cross roads, rock lined channels, concrete channels and footbridges) 6. Bridges 7. Roads (Graveling, Asphalt and Concreting) 8. Ports 9. Culverts

Transcript of Updated as of DECEMBER 2016 CV Mecbar Mohammad Hasim H39973

Page 1: Updated as of DECEMBER 2016 CV Mecbar Mohammad Hasim H39973

ResumeMecbar H. Mohammad Hasim

28-Y Baliwasan Grande, Zamboanga CityE-Mail: [email protected]

Tel no.: 062 992-2291(Philippines)Mobile No.: +966 530782297 (K.S.A.)

CAREER HIGHLIGHTS

Professional Civil Engineer (PRC Reg. # 0092088) 15 years of extensive experienced working in foreign-funded projects, world bank-funded projects,

Middle East and local infrastructure projects both vertical and horizontal structures. PMP (Project Management Professional) certificate number KSPMPJED-Feb15-017. Knowledgeable in HEALTH, SAFETY AND ENVIRONMENT (HSE). OSHA certified, successfully passed 30 hour construction industry training in accordance with

guideline established by the OSHA Training Institute and The National Safety Council (NSC) I.D. no. OSCI70919030.

Completed Confined Space Entry Program course and is authorized to work in confined space within his area of responsibility, with certificate no. JSDP-WPS-I-13-0041.

Work Permit Issuer, with certificate no. JSDP-CSEP-13-0059. Work Permit Receiver With on-site extensive experienced in;

1. Metro train project – Elevated Stations with post tensioned Concourse slab and basement, Viaduct, cut and cover, underground station, FSLM (Full Span Launching Method), PCB (Precast Concrete Beam Method), PSM (Precast Segmental Method), Portal Frame erection and BCM (Balance Cantilever Methods).

2. Piling works and Geotechnical investigation3. Composite Steel Bridges4. Building /School / University Construction 5. Storm Water Drainage Project (DAM, Unlined & Lined channels, Box Culvert, Gabions,

Cross roads, rock lined channels, concrete channels and footbridges)6. Bridges 7. Roads (Graveling, Asphalt and Concreting)8. Ports 9. Culverts10. Warehouses and Solar Dryers11. Boat Landings12. Rock causeway13. Footbridges and Hanging bridges14. Water System 15. Drainage system16. Claddings and Glass Curtain walls17. Precast yard erection18. TTCP – Temporary Traffic Control Plan Implementation19. Utility Diversion Interface coordinators

Page 2: Updated as of DECEMBER 2016 CV Mecbar Mohammad Hasim H39973

Expert in Layouts and erection of external and internal building architectural finishes especially in Cladding, and Glass Curtain walls.

Installed 20,000 square meters of aluminum curtain wall and 28,000 square meters of aluminum cladding. Installation works includes installation of glass fins, doors, louvers and balustrade; stainless steel sword and fins; aluminum cladding, doors and louvers.

Proficient in basic computer applications, Microsoft Office products, including Word, Excel, Power point.

With training in AutoCAD 2D/3D and basic drafting. With construction management skills(Project Management, Construction Management, HSE

Management, Risk Management, planning and scheduling with on-site work exposure. 12 units earned in (MBA) Master in Business Administration. Good project management skills and experience, prepared schedule, oversee the planning scheduling

and implementation of the project, with strong interpersonal and good leadership skills, self motivated and good team player, and willing to work full time contract.

Knowledgeable in operating mechanical lift such as; DENKA LIFT, GENIE LIFT, MANLIFT, SCISSOR LIFT, CRADLES, and BUILDING MAINTENANCE UNIT BMU.

EMPLOYMENT HISTORY

1.) From: June 25, 2015 to Present

Employer: HILL INTERNATIONAL (Joint venture Hill International & Louis Berger)

Title: Resident Engineer (PMCM for Riyadh Metro Project)Employee Classification Code: Professional Staff

Project : RIYADH METRO PROJECT (RAMPED) Project Location : Riyadh, Kingdom of Saudi ArabiaConsultant : Joint Venture of Louis Berger Group and HILL INTERNATIONALMain Contractor : FASSST (Riyadh Metro Alliance) – FCC, FREYSSINET, ATKINS, ALSTOM,

SAMSUNG, STRUKTON, SETEC & TYPSAProject details:Package : 3 – Line 4, 5 & 6 Project Cost : $ 7.8 BillionElements : Total length 64.1 km., Bored Tunnel 13.3km, Cut & Cover 13.1 km, At Grade 8.1km,

Viaducts 29.6km, Stations 23 stations, Transfer station 2 nos., Trains 69 nos., Depots 2 nos. Park & Ride 7 nos.

Job Description:

Resident Engineer is responsible and accountable for all stages of construction for their allocated section of work. They will as a minimum ensure that construction works are undertaken in a safe and compliant manner, which aligns with approved designs and method of statements. Interfacing on a daily basis with FAST contractors and RAMPED on all project issues and progress.

Duties and Responsibilities;

Page 3: Updated as of DECEMBER 2016 CV Mecbar Mohammad Hasim H39973

1. Planning and managing works of all disciplines to ensure compliance with the relevant contract requirements specification and standards, safety cases etc.

2. Directly Supervised and designated works for QC inspectors, MEP inspectors, and directly involve in overall site offices management controls, approved time sheets and inspectors vacations.

3. Direct the site inspectors with respect to health and safety performance, Hazard & Risk identification and reporting.

4. Review and monitor site inspector’s performance to ensure works are being conducted to the approved methodology, specific method of statements, risk assessments and ITP’s (Inspection and Test Plans).

5. Review of construction/engineering methods, procedures, policies and ITP’s to ensure the Contractor is in compliance.

6. Review and final approval of daily I.R. inspection request submitted by the main Contractor.7. Review method of statements, shop drawings, material approvals, and variation orders, structural and

architectural designs.8. Conduct Weekly meetings, Kick-off meetings, weekly walk through and site audits.9. Responsible for producing the daily summary and verification reports (Inc. recording of site delays or site

issues). Liaison with site planners to review progress and report.10. Management of D & B Contractor and their subcontractors/suppliers to deliver the works safely and within

programme/budget targets.11. Responsible for the review of all documentation and the quality of the prepared engineering plans,

specification and shop drawings.12. Identifying site issues/defected work or non-compliance/approved materials and raising non-conformance

report (NCR) after consulting the Manager and QA Engineer assigned to the work place.13. Reviews and assesses possible contract changes with the commercial manager assigned to the site works

and reports accordingly to the Construction Manager.14. Plan and delegates work to the site Inspector or any other staff working directly for them. 15. Interface with the design team on the resolution of technical problems and ensure that all drawings are

approved and issued for construction with the latest revision.16. Monitor the implementation of the Contractor’s Quality control program and inspect the work executed

upon the inspection requests (IRs) issued by Contractor.17. Monitor all necessary license and permits are in place. 18. As directed assist or represent the Project Manager with local authorities or other organizations/outside

parties (i.e. MOT and utility companies) to resolve technical, environmental and safety issues. In addition act responsibly with regards to issues involving the public and immediate neighbors to the work.

2.) From: February 1, 2013 to June 24, 2015

Employer: AECOM ARABIA LTD.

Title: Construction Supervisor (PMT for ARAMCO JSDP Project)Employee Classification Code: Professional Staff

Project : Jeddah Storm Water Drainage Program (JSDP/ARAMCO)Project Location : Jeddah, Kingdom of Saudi ArabiaPackage name/no : Package 13, Wadi Quraa Muraygh Channels & Wadi muraygh DamConsultant : AECOM ARABIA LTD.Main Contractor : CCCC (China Communication Construction Company)

Project details:

Page 4: Updated as of DECEMBER 2016 CV Mecbar Mohammad Hasim H39973

Dam : 365 mtrs. Long, 11 mtrs high rock filled geo membrane system covered.Spillway : Reinforced Concrete spillway slab with 6.5-2m high wallsUnlined Channel : 8.91 Km. unlined trapezoidal channel excavated into existing groundLined Channel : 34.09 Km. line trapezoidal channel and vertical wall channelCulvert Crossings : 21 nos. RCBC

Job Description:

The Construction Supervisor will be responsible for the safe and successful delivery of the site works under his management, from site commencement to handover and completion. Over-all accountable in technical aspects, on-site supervision and construction management and administration of assigned location.

Duties and Responsibilities;

1. Represent the client (ARAMCO) with local authorities or other organizations/outside parties (i.e. MOT and utility companies) to resolve technical, environmental and safety issues.

2. Planning and managing works of all disciplines to ensure compliance with the relevant standards, safety cases, etc.

3. Review and understand the project scope and specification along with the drawings and method of statements for each work activity.

4. Responding to issues involving permanent or temporary construction works. Evaluating the issues, liaising, advising and implementing agreed remedial works to minimize adverse consequences to the ongoing works.

5. Identifying site issues/defected work or non-compliance/approved materials and raising non-conformance report (NCR). Also follow up the NCR on site once the close out action have been agreed.

6. Interfacing with the stakeholders of different utilities owners at site for diversion works for STC (Saudi Telecom Company), Mobily cables, S.E.C. (Saudi Electricity Company), NWC pipes, and other utilities encountered at site.

7. Monitor and conduct inspection on the completed works of diverted utilities duct bank, cable trays and other utilities. Ensuring that all were done as per the stakeholders approved designs.

8. Interface with the house owners which were affected by the project in preparation for demolition works.9. Evaluating, conduct site inspections and recording all demolished houses and preparing records, to

ensure all documents are available for owner’s claims.10. Responsible for ensuring delivery of health and safety on site by the Contractor and sub-contractors.11. Assisting in the construction verification process to monitor works, program and costs, produce daily

site report.12. Maintain daily contact with the site staff to ensure activities are coordinated. Attend the regular and

formal performance meetings with all parties to ensure that issues are being raised, addressed and formulate any report requested.

13. Conduct inspection on the raised (RFI) request for inspection by the main contractor, ensuring all works were according to the approved drawings. Reject and approve the raised request for inspection.

14. Ensure the implementation of all relevant Health & Safety and Fire Safety requirements.15. Monitor all necessary license and permits are in place.16. Ensure that materials used and stored are in compliance with contract requirements and specifications

the relevant rules and procedures.17. Conduct and approved final inspection for any defects at site listed in the punch lists.18. Conduct weekly meetings with the contractors.19. Verify progress quantities delivered at assigned areas by the main contractor.

Page 5: Updated as of DECEMBER 2016 CV Mecbar Mohammad Hasim H39973

3.) From: April 29, 2012 to January 31, 2013

Employer: AECOM ARABIA LTD.

Title: Construction Supervisor (PMT for ARAMCO JSDP Project)Employee Classification Code: Professional Staff

Project : Jeddah Storm Water Drainage Program (JSDP/ARAMCO)Project Location : Jeddah, Kingdom of Saudi ArabiaPackage no : Package 9, Eastern ChannelConsultant : AECOM ARABIA LTD.Main Contractor : SAPAC (Saudi Pan Kingdom Company LTD.)

Project details:

Channel Length : 24 kms. Trapezoidal lined channelCross Roads no. : 14 bridgesStart : March 28, 2012 and End: January 31, 2013Total Man Hour : 6,730,948 MHExcavation : 2,682,222 cu.m.Demolition : 499,913 sq.m.Riprap : 86,640 sq.m.Guardrail : 41,050 LMPlacement of concrete : Lean concrete; 63,216 cu.m. Reinforced Concrete; 221,258 cu.m.

Job Description:

The Construction Supervisor will be responsible for the safe and successful delivery of the site works under his management, from site commencement to handover and completion. Over-all accountable in technical aspects, on-site supervision and construction management and administration of assigned location.

Duties and Responsibilities;

20. Represent the client (ARAMCO) with local authorities or other organizations/outside parties (i.e. MOT and utility companies) to resolve technical, environmental and safety issues.

21. Planning and managing works of all disciplines to ensure compliance with the relevant standards, safety cases, etc.

22. Review and understand the project scope and specification along with the drawings and method of statements for each work activity.

23. Responding to issues involving permanent or temporary construction works. Evaluating the issues, liaising, advising and implementing agreed remedial works to minimize adverse consequences to the ongoing works.

24. Identifying site issues/defected work or non-compliance/approved materials and raising non-conformance report (NCR). Also follow up the NCR on site once the close out action have been agreed.

25. Interfacing with the stakeholders of different utilities owners at site for diversion works for STC (Saudi Telecom Company), Mobily cables, S.E.C. (Saudi Electricity Company), NWC pipes, and other utilities encountered at site.

26. Monitor and conduct inspection on the completed works of diverted utilities duct bank, cable trays and other utilities. Ensuring that all were done as per the stakeholders approved designs.

27. Interface with the house owners which were affected by the project in preparation for demolition works.

Page 6: Updated as of DECEMBER 2016 CV Mecbar Mohammad Hasim H39973

28. Evaluating, conduct site inspections and recording all demolished houses and preparing records, to ensure all documents are available for owner’s claims.

29. Responsible for ensuring delivery of health and safety on site by the Contractor and sub-contractors.30. Assisting in the construction verification process to monitor works, program and costs, produce daily

site report.31. Maintain daily contact with the site staff to ensure activities are coordinated. Attend the regular and

formal performance meetings with all parties to ensure that issues are being raised, addressed and formulate any report requested.

32. Conduct inspection on the raised (RFI) request for inspection by the main contractor, ensuring all works were according to the approved drawings. Reject and approve the raised request for inspection.

33. Ensure the implementation of all relevant Health & Safety and Fire Safety requirements.34. Monitor all necessary license and permits are in place.35. Ensure that materials used and stored are in compliance with contract requirements and specifications

the relevant rules and procedures.36. Conduct and approved final inspection for any defects at site listed in the punch lists.37. Conduct weekly meetings with the contractors.38. Verify progress quantities delivered at assigned areas by the main contractor.

4.) From: June 16, 2011 to April 29, 2012

Employer: Louis Berger Group Phils., Inc.(LBGI,INC.)Growth with Equity in Mindanao (GEM 3 Program) USAID funded Projects (United States Agency for International Development)

Title: Site Engineer/Resident EngineerEmployee Classification Code: Professional StaffUnit and Location: Infrastructure ConstructionSection: Regional Impact Project (RIP)

Project: R10 – Midasayap-Datu Piang National Highway Upgrading (Midsayap Section)Project Location: Midsayap, North Cotabato

Job Description:

The Site Engineer/Resident Engineer is responsible for the over-all technical aspects, on-site supervision and construction management and administration of assigned RIP construction projects.

Duties and Responsibilities;

1. Serves as GEM Contract Officer on-site technical representative for construction subcontracts, supervising and directing assigned subordinate GEM staff.

2. Provides overall technical administration of construction project subcontracts in accordance with the intent of projects, and plans, specification, schedules and contract documents.

3. Enforces compliance with all GEM construction subcontract conditions and requirements plans and specifications.

4. Reviews and provides supervision of subcontractor Quality Control Plans to assure compliance in accordance with subcontract terms and conditions, and take appropriate action as necessary to assure compliance.

5. Implements quality assurance plans to assure compliance with contracts conditions, requirements, plans and specifications and the USAID-approved GEM QA/QC Manual.

Page 7: Updated as of DECEMBER 2016 CV Mecbar Mohammad Hasim H39973

6. Ensure the quality of construction and materials and equipment installed by subcontractors fully meet the subcontract requirements, plans and specifications.

7. Recommends improvements in construction procedures, methods and materials which result in total quality project management improvements.

8. Conducts weekly project progress meetings with construction subcontractors and counterparts, and prepare weekly and monthly reports of construction progress in accordance with GEM management procedures, highlighting problems and delays, if any, and solutions or action taken to resolve such.

9. Review and verifies accuracy of subcontractor billing/estimates, and administratively approve and process for payment in accordance with established GEM procedures.

10. Provides project briefings and other reports as required to supervisors, as required.11. Assume a proactive role in identifying and reporting potential change orders, differing site conditions,

and problems with construction, plans and specifications (including cost impact), and reviews subcontractor claims and proposed change orders and contract extensions. In accordance with GEM Contracts Office procedures and guidelines, provide professional analysis and technical recommendations on subcontract change orders to GEM Contracts Office for action.

12. Takes a pro-active role in the resolution of any construction issues due to construction issues due to construction delays, design changes orders, right of way, counterpart issues, etc.

13. Monitors and assures compliance with environmental and safety standards per subcontract and GEM requirements.

14. Performs other project construction, development and implementation assignments as required, including re-assignment to other GEM Program regions.

5.) From: August 3, 2008 to February 28, 2011

Employer: ALUMATEC CO. LTD. Jeddah, K.S.A.

Project name: King Abdullah University of Science and Technology (KAUST) Construction Client Representative: Saudi ARAMCO (www.saudiaramco.com)General Contractor: Saudi Oger (www.saudioger.com)

Company: Aluminium Manufacturers Co. Ltd. (ALUMATEC)Main Office: 12345 Al-khomra District, Warehouse City Saudi ArabiaPostal Address: 17916 – Jeddah 21494 – Kingdom of Saudi ArabiaTel.: +966 02 6351766Fax: +966 02 6356787Website: www.alumatecsystem.com – Email: [email protected]

Position Held: SITE MANAGER / For Bldg. 16 & 19 (Administration and Conference bldgs.) & Bldg. 15 Mosque, Bldg.1, Bldg.9, Bldg.14, Bldg.18, Bldg. 20, Bldg. 7.

Project Description:

Installation of 20,000 square meters of aluminum curtain wall and 28,000 square meters of aluminum cladding. Installation works includes installation of glass fins, doors, louvers and balustrade; stainless steel sword and fins; aluminum cladding, doors and louvers.

Duties and Responsibilities:

Page 8: Updated as of DECEMBER 2016 CV Mecbar Mohammad Hasim H39973

1. Site supervision and Monitoring.2. Planning and scheduling.3. Instructed all site foreman of respective building assigned to them before installation of Glass curtain

walls, internal glass facades, glass fins, glass louvers, aluminum frames, aluminum doors with glass, frameless door glasses, frameless glass, frames and glasses support, claddings supports, stainless fins, aluminum cladding and others architectural internal and external glass walls.

4. Prepared mechanical equipments (DENKA LIFT, GENIE LIFT, MANLIFT, SCISSOR LIFT, CRADLES, and BUILDING MAINTENANCE UNIT BMU AND SCAFFOLDINGS) to be utilized in installation of glass curtain wall.

5. Prepared manpower and equipment distributions for all ALUMATEC subcontracted buildings.6. Lay outing and surveying of all finish structural openings for curtain walls installation.7. Provided reference levels, checked grid lines before installation of glass curtain walls and cladding.8. Checked and Control quality for all completed structures.9. Conducted surveys and prepared steel and aluminum structures for erection of curtain walls.10. Prepared weekly accomplishment report.11. Quality Control/Quality Assurance.12. Acted as Safety Engineer at site, ensuring that all workers are wearing proper safety gadgets and

ensuring the safety of the workers during working hours.13. Checked installed scaffoldings are properly supported and erected.14. Requested and prepared material list for deliveries to the project site.15. Quantity surveying.16. Prepared drawings and attachments for RFI (request for inspection) and conducted inspections with

consultants for all completed works. 17. Coordinated with general contractors and consultants for all equipments and materials needed at site for

erection, project site preparation and resolved all site encountered problems.18. Receive work permits for all works done by ALUMATEC site activities.

6.) From: January 1, 2008 to July 31, 2008

Employer: Louis Berger Group Phils., Inc., PhilippinesGrowth with Equity in Mindanao (GEM 3 Program) USAID funded Projects (United States Agency for International Development)

Main Office: Unit 3, 12/F ExportBank Plaza, Sen. Gil Puyat corner Don Chino Roces avenue, Makati City 1200 Philippines TEL:(02) 812-1647 EMAIL: [email protected] FAX: (632) 812-5665 WEBSITE: www.bergerphilipines.comSatellite Office: 4th Floor VHW Building, Veterans Avenue Zamboanga City, 7000 Philippines TEL :( 062) 992-3404 FAX :( 062) 992-7133

Position Held: PORTFOLIO MANAGER-ZAMBOANGA CITY/BASILAN PROVINCE Growth with Equity in Mindanao 2 program USAID Grant No. 492-C-00-08-00001-00

Project Description:

Page 9: Updated as of DECEMBER 2016 CV Mecbar Mohammad Hasim H39973

The Louis Berger Group, Inc. (LBGI) is the prime contractor of United States for International Development (USAID) in the implementation of the Growth with Equity in Mindanao (GEM 3 Program), undertake the implementation of up to 1000 Barangay Infrastructure Projects (BIP) such as water systems, warehouses, solar dryers, boat landings, trading centers, culverts, bridges and roadway upgrades or repairs. The majority of these projects are constructed in the conflict-affected areas of Mindanao, Philippines.

Duties and Responsibilities:

1. Project Generation and Project identification.2. Brief the Local Government Unit (LGU’s) about GEM Program, particularly the BIP component, and come

up with a long list of projects culled from the Annual Investment Plans (AIPs) of the province and/or Municipality.

3. Ensure that required counterpart activities will be incorporated in the local budget and will be appropriately funded.

4. Conducted project screening, proponent screening and beneficiary screening to ensure that the project is eligible and ensure that the projects are provided to the target beneficiaries of the GEM Program.

5. Prepares Project information Form, 1-page profile of the project, and project profiles for Area Manager’s approval and USAID Concurrence.

6. Requested the Design Coordinator to start the design and production activities upon USAID concurrence of the project.

7. Assist the design team for site visit, conducted appropriate surveys and actual lay-out, and prepare design concept and preliminary drawings in coordination with the representative from the environmental team.

8. Initiated preliminary discussions on possible counterpart works with the proponent.9. Reviewed project package (drawings, cost estimates, and specs) taking into account availability of budget

for the portfolio and proposed counterpart.10. Prepare the Memorandum of Agreement (MOA).11. Prepare a 2-page profile of the project after the Plans and the counterpart items are finalized and a request

to bid shall be transmitted to USAID.12. Responsible for overseeing the design and production of each project.

7.) From: January 3, 2006 to December 31, 2007

Employer: Louis Berger Group Phils. Inc., PhillipinesGrowth with Equity in Mindanao (GEM 2 Program) USAID funded Projects (United States Agency for International Development)

Main Office: Unit 3, 12/F ExportBank Plaza, Sen. Gil Puyat corner Don Chino Roces avenue, Makati City 1200 Philippines TEL:(02) 812-1647 EMAIL: [email protected] FAX: (632) 812-5665 WEBSITE:www.berger philipines.comSatellite Office: 4th Floor VHW Building, Veterans Avenue Zamboanga City, 7000 Philippines TEL :( 062) 992-3404 FAX :( 062) 992-7133

Position Held: AREA CONSTRUCTION ENGINEER-Western Mindanao Growth with Equity in Mindanao 2 program USAID Grant No. 492-C-00-08-00001-00

Project Description:

Page 10: Updated as of DECEMBER 2016 CV Mecbar Mohammad Hasim H39973

The Louis Berger Group, Inc. (LBGI) is the prime contractor of United States for International Development (USAID) in the implementation of the Growth with Equity in Mindanao (GEM 2 Program), undertake the Implementation of up to 800 Community Infrastructure Projects (CIP) such as water systems, warehouses, Solar dryers, boat landings, trading centers, culverts, bridges and roadway upgrades or repairs. The majority of These projects are constructed in the conflict-affected areas of Mindanao, Philippines.

Duties and Responsibilities:

1. Directly oversee overall project implementation by the contractors.2. Check and reviewed as-staked and as-built plans, quantity computations and estimates.3. Checked and reviewed quantity computations submitted by contractor for payment to ensure that pay

items are completed and paid for according to the pay limits specified in the contract.4. Familiarized with the conditions of contracts, specifications, methods of measurement, bill of quantities,

drawings and other documents related to the project.5. Prepare monthly progress reports for submission to the project management office. 6. Supervised the field engineers/construction inspectors and monitored progress.7. Checked and supervised Pre-casting of concrete piles and beams.8. Evaluate & check billings and attachments submitted by the contractor.9. Prepare shop drawings and quantity estimates for revised works.10. Checked and reviewed field reports submitted by the construction inspectors.11. Prepared weekly reports to be submitted to Project Management Office. 12. Conducted site inspections, final inspection and evaluate variation orders, time suspension, and time

extension requested by contractors.13. Ensured that workmanship is in accordance with specifications and sound engineering/professional

practice, and ensured that materials used are in accordance with specifications.14. Conducted pre-construction meeting with beneficiary community local government unit, and contractor.15. Check and reviewed submitted construction schedules, manpower, and equipment schedules by the

contractors.16. Ensured that contractor conform to QA/QC requirements for certain type of projects.17. Supervised contractor to comply with the QA/QC Program, strictly adhering to standard specification and

high quality of workmanship and engineering.18. Reviewed and revised construction drawings as may be necessary and provided clarifications or

explanations on the designs and drawings to the contractor.19. Gave necessary assistance to solve any contractual dispute and sorted out issues requiring external

interdepartmental coordination to ensure the successful implementation of the project works.

PROJECTS SUPERVISED AND MONITORED as Area Engineer;CIP No. Project Title Location

C-007 Tungbato Seaweed Warehouse and Solar Dryer Construction Zamboanga City

C-211 Poblacion Tuburan Port Rehabilitation Municipality of Tuburan

C-020 Niog-Niog Seaweed Warehouse and Solar Dryer Construction Zamboanga City

C-192 Buanza Water Supply System (Spring Development) Municipality of Indanan

C-058 Wanni Piyanjihan Community Center Construction

Municipality of ParangSulu

C-059 Piyahan Community Center Construction Municipality of ParangSulu

Page 11: Updated as of DECEMBER 2016 CV Mecbar Mohammad Hasim H39973

C-072 Silangkan Community Center Construction Municipality of ParangSulu

C-154 Anuling Water System (Spring Development) Municipality of Patikul

C-122 Likobong Seaweed Warehouse and Solar Dryer Construction Municipality of Luuk

C-127 Kud Seaweed Solar Dryer Construction Municipality of Luuk

C-128 Mantas Seaweed Solar Dryer (2 units) Construction Municipality of Luuk

C-126 Baiwak Seaweed Solar Dryer Construction Municipality of Luuk

C-243 Sengal Footbridge Construction Municipality of Lamitan

C-222 Bohelebung Boat Landing Construction Municipality of Tipo-Tipo

C-217 Lamitan Trading Center Construction Municipality of Lamitan

C-253 Sumisip Water Supply System (Spring Development) Construction Municipality of Sumisip

C-232 Libug Box Culvert Construction Municipality of Sumisip

C-234 Luuk Bait Boat Landing Rehabilitation Municipality of Sumisip

C-233 Lower Benembengan Box Culvert Construction Municipality of Sumisip

C-235 Basilan State College Road Transport Shed Municipality of Lamitan

C-237 Limo-ok Road Transport Shed Construction Municipality of Lamitan

C-611 Puh-Puh Seaweed Warehouse and Solar Dryer Construction Municipality of Luuk

C-229 Tambulig Buton Seaweed Solar Dryer Construction Municipality of Sumisip

C-226 Sulloh Seaweed Solar Dryer Construction Municipality of Sumisip

C-227 Saluping Seaweed Solar Dryer Construction Municipality of Sumisip

C-228 Tong-Umus Seaweed Solar Dryer Construction Municipality of Sumisip

C-249 Carbon Boat Landing Rehabilitation Isabela City

C-307 Isabela Drainage Canal Upgrading Isabela City

C-644 Tulay Rockcauseway Upgrading Municipality of Jolo

C-340 Diki Footbridge Upgrading (60 ln m) Isabela City

C-363 Carbon Footbridge Upgrading (70 ln m) Isabela City

C-341 Bukut Umos Seaweed Solar Dryer Construction (1 unit) Municipality of Sumisip

C-325 Kampurnah Boat Landing Upgrading Isabela City

Page 12: Updated as of DECEMBER 2016 CV Mecbar Mohammad Hasim H39973

C-338 Tampalan Footbridge Upgrading Isabela City

C-760 Jolo Drainage System Construction (500 m concrete-lined canal) Municipality of Jolo

C-761 Alat Drainage System Construction (2 units of 410m concrete-lined canals) Municipality of Jolo

C-614 Bay Laud Seaweed Solar Dryer Construction (2 units) Municipality of Luuk

C-612 Kudkud Seaweed Solar Dryer Construction (2 units) Municipality of Luuk

C-365 Badjao Community Footbridge Construction Zamboanga City

C-613 Duholbato Seaweed Solar Dryer Construction (1 unit) Municipality of Luuk

C-756 Malakas Drainage System Construction (220 ln m concrete-lined, covered canal) Municipality of Lamitan

C-757 Maganda Drainage System Construction (500 ln m concrete-lined canal) Municipality of Lamitan

C-663 Panunsulan Rubber Consolidation Shed Construction Isabela City

C-750 Duhol Tandu Stilt-type Seaweed Solar Dryer Municipality of Patikul

C-762 Dapdap Stilt-type Seaweed Solar Dryer Municipality of Parang

C-763 Kanaway Stilt-type Seaweed Solar Dryer Municipality of Parang

C-691 Takut-Takut - Tulay Drainage System Construction Municipality of Jolo

C-600 Jolo Community Center Construction Municipality of Jolo

C-666 Alat-Tulay Drainage System Construction Municipality of Jolo

C-672 Balatanay Boat Landing Construction Isabela City

C-655 Panigayan Boat Landing Construction Isabela City

C-654 Lampinigan Boat Landing Construction Isabela City

C-671 Tulay Causeway (Main Channel Outlet) Upgrading Municipality of Jolo

C-692 Lower Kasulutan Drainage Canal Construction Municipality of Jolo

C-673 Taglibi Boat Landing Construction Municipality of Patikul

C-706 Km. 2 Drainage Construction Municipality of Indanan

C-695 Sionogan Boat Landing Construction Municipality of Indanan

C-696 Sitio Jambatan Pier Head Construction Municipality of Parang

C-681 Laling Hassan Drainage Upgrading Municipality of Parang

C-500 Kumalarang Trading Center Construction Isabela City

Page 13: Updated as of DECEMBER 2016 CV Mecbar Mohammad Hasim H39973

C-499 Maligue Community Center Construction Isabela City

C-739 Sumagdang Box Culvert Construction Isabela City

C-497 Lukbuton Community Center Construction Isabela City

C-707 BusBus-Gandasuli By-pass Road Concreting (122 ln m) Jolo-Patikul

C-745 Siasi Boat Landing Municipality of Siasi

C-601 East Kungtad Commmunity Center Construction Municipality of Siasi

C-749 Jolo Port Passenger Covered Walkway Construction Municipality of Jolo

8.) From: January 3, 2005 to January 2, 2006

Employer: Louis Berger Group Phils., Inc., PhillipinesGrowth with Equity in Mindanao (GEM 2 Program) USAID funded Projects (United States Agency for International Development)

Main Office: Unit 3, 12/F ExportBank Plaza, Sen. Gil Puyat corner Don Chino Roces avenue, Makati City 1200 Philippines TEL:(02) 812-1647 EMAIL: [email protected] FAX: (632) 812-5665 WEBSITE: www.bergerphilipines.comSatellite Office: 4th Floor VHW Building, Veterans Avenue Zamboanga City, 7000 Philippines TEL :( 062) 992-3404 FAX :( 062) 992-7133

Position Held: ASSISTANT AREA CONSTRUCTION ENGINEER Growth with Equity in Mindanao 2 program USAID Grant No. 492-C-00-02-00018-00 Western Mindanao, Philippines

Project Description:

The Louis Berger Group, Inc.(LBGI) is the prime contractor of United States for International Development (USAID) in the implementation of the Growth with Equity in Mindanao (GEM 2 Program), under the Mid-Scale Infrastructure Projects(MSIP) the Infrastructure projects are high-impact, high visibility economic infrastructure projects. The costs range from $ 50T to $ 1 million per Project, such as Road upgrades, Port upgrades and Bridges construction.

Duties and Responsibilities:

1. In-charge of the administrative section of the office.2. Prepared & processed billings requested by the contractors and submitted to PMO-Davao Office for both

CIP & MSIP.3. Checked and reviewed quantity computations submitted by contractor for payment to ensure that pay items

are completed and paid for according to the pay limits specified in the contract.4. Consolidated all CIP/MSIP bi-monthly reports from the field inspectors.

Page 14: Updated as of DECEMBER 2016 CV Mecbar Mohammad Hasim H39973

5. Prepared bi-monthly reports for CIP/MSIP and submitted to Chief Civil Engineer, Area Engineers, and PMO-Davao Office.

6. Conducted pre-construction meeting with beneficiary community and LGU representative for CIP, and the contractor.

7. Assisted the Area Engineers in preparing variation order, suspension order, resumption order, Time Extension and Other project documents.

8. Progress Monitoring for CIP & MSIP.9. Reviewed plans and specification of newly proposed projects.10. Reviewed Pert-CPM and evaluate billings submitted by the contractors.11. Evaluated & prepared Variation Orders requested by the contractors before endorsing to PMO.

9.) From: July 7, 2003 to January 2, 2005

Employer: Louis Berger Group Phils., Inc., PhilippinesGrowth with Equity in Mindanao (GEM 2 Program) USAID funded Projects (United States Agency for International Development)

Main Office: Unit 3, 12/F Export Bank Plaza, Sen. Gil Puyat corner Don Chino Roces avenue, Makati City 1200 Philippines TEL:(02) 812-1647 EMAIL: [email protected] FAX: (632) 812-5665 WEBSITE: www.bergerphilipines.comSatellite Office: 4th Floor VHW Building, Veterans Avenue Zamboanga City, 7000 Philippines TEL :( 062) 992-3404 FAX :( 062) 992-7133

Position Held: CONSTRUCTION INSPECTOR/SR. FIELD ENGINEER Growth with Equity in Mindanao 2 program USAID Grant No. 492-C-00-02-00018-00

Western Mindanao, Philippines

Project Description:

The Louis Berger Group, Inc.(LBGI) is the prime contractor of United States for International Development (USAID) in the implementation of the Growth with Equity in Mindanao (GEM 2 Program), under the Mid-Scale Infrastructure Projects(MSIP) the Infrastructure projects are high-impact, high visibility economic infrastructure projects. The costs range from $ 50T to $ 1 million per Project, such as Road upgrades, Port upgrades and Bridges construction.

Duties and Responsibilities:

1. Directly oversee overall project implementation by the Contractor;2. Inspected the site during the undertaking of all project activities and reported to the GEM area engineer.3. Ensured that materials used in the project are in accordance with the specifications;4. Ensured that workmanship is in accordance with specifications and sound engineering/ professional practice;5. Monitored the contractor's performance and assessed his strength and weaknesses;6. Reviewed and evaluated submitted payment request as against the actual physical accomplishment at the site

Page 15: Updated as of DECEMBER 2016 CV Mecbar Mohammad Hasim H39973

7.Submitted weekly progress report to the Area Engineer, to be submitted to PMO- Davao Office;

8. Reported to the GEM-Area Office any problems, irregularities and unusual events that occurred during the project implementation and gave recommendation for its solution.9. Organized & participated in sites meetings, reviewed inspection schedule, and checklists.10. Coordinated authority approval.11. Provided levels and layouts for work items where dimensional accuracy has a direct bearing on the quality and performance of the finished work and ensured conformity with the quality requirements stipulated in the contract.12. Maintained proper inventories and accounts for all dismantled materials, particularly for those materials which are to be re-used in the works.13. Maintained the work site in a neat, orderly, and safe manner by giving advice to contractor.14. Assessed the adequacy of the inputs such as materials, labor, and equipment provided by the contractor as well as the proposed construction methods.15. Provided continuous on-site supervision during construction and ensuring the safety of works.

PROJECTS COMPLETED:

July 22, 2003 – September 19, 2003 Assigned as Construction Inspector of C-007 Tungbato Seaweed warehouse and Solar Dryer

Construction, project cost Php 737, 198.91, located at Bgy. Tungbato, Zamboanga City, Philippines

September 4, 2003 – December 12, 2003 Assigned as Construction Inspector of C-020 Niog-Niog Seaweed Warehouse and Solar Dryer

Construction, project cost Php 922,046.60, located at Bgy. Niog-Niog, Zamboanga City, Philippines

December 16, 2003 – April 15, 2004 Assigned as Construction Inspector of C-058 Wanni Piyanjihan Community Center Constrcution,

project cost Php 671,350.37, located at Bgy. Wanni Piyanjihan, Parang Sulu Province

January 21, 2004 – March 31, 2004 Assigned as Construction Inspector of C-059 Piyahan Community Center Construction, project cost

Php 672,673.56, located at Bgy. Piyahan, Parang, Sulu Province

March 22, 2004 – July 30, 2004 Assigned as Construction Inspector of C-072 Silangkan Community Center Construction, project cost

Php 629,684.84, located at Bgy. Silangkan, Parang, Sulu Province

June 17, 2004 – September 12, 2004 Assigned as Construction Inspector of C-128 Mantas Seaweed Solar Dryer(2units) Construction,

project cost Php 814,772.94, located at Bgy. Niangkaan, Luuk, Sulu Province

July 15, 2004 – October 5, 2004 Assigned as Construction Inspector of C-154 Anuling Water System Spring Development, project cost

Php 857,561.74, located at Bgy. Anuling, Jolo, Sulu Province.

September 30, 2004 – January 7, 2005 Assigned as Construction Inspector of C-192 Buanza Water System Spring Development, project cost

Php 2,612,881.47, located at Bgy. Buanza, Indanan, Sulu Province

May 28, 2005 – August 15, 2006 Assigned as Construction Inspector of C-222 Bohelebung Boat Landing Construction, project cost Php

Page 16: Updated as of DECEMBER 2016 CV Mecbar Mohammad Hasim H39973

1,873,994.16, located at Bgy. Bohelebung, Basilan Province

May 7, 2005 – June 3, 2006 Assigned as Construction Inspector of C-234 Luuk Bait Boat Landing Construction, project cost Php

1,883,605.99, located at Bgy. Luuk Bait, Sumisip, Basilan Province

10.) From: September 2, 2002 to July 1, 2003

Employer: Special Zone for Peace and Development (SZOPAD SOCIAL FUND) WORLD BANK-FUNDED PROJECT

Position Held: EXTERNAL SUPERVISOR

Project Description:

Special Zone for Peace And Development is a World bank-funded project and it is under of the office of the president of the Philippines and the program is specifically funding a Infrastructure projects such as warehouses, drainage, water systems, roads, school buildings, health centers, Waiting sheds, barangay halls and granted to the conflict affected area in Mindanao, Philippines.

Duties and Responsibilities:

1. Conducted pre-construction meeting in all handled projects with beneficiary community and LGU representative.

2. Directly overseen overall project implementation by the contractor.3. Inspected work accomplished by the contractor, checked and submitted the payment request to the

Supervision Department.4. Ensured that materials used in the project are in accordance with approved plan & specification.5. Ensured that workmanship is in accordance with specification and sound engineering practice.6. Reported to the supervision department any problems, irregularities & unusual events that occurred during

project implementation and gave recommendations for its solutions.7. Assisted the contractor in preparing activity bar chart and ensured that this is submitted to the supervision

department before any progress billing disbursement is made to the contractor.8. Monitored and evaluated the performance of the contractor and assessed his strengths & weaknesses.

Project completed:

September 3, 2002 – November 3, 2002 Assigned as External Supervisor of P13-00015 Home Economics Building Construction, located at

Bgy. Caracol, Salug, Zamboanga Del Norte

September 20, 2002 – October 10, 2002 Assigned as External Supervisor of P13-00162 Proposed Construction of Dug well with Jetmatic

Pump, located at Sitio Salug, Osukan, Labason, Zamboanga Del Norte

January 2, 2003 – June 12, 2003 Assigned as External Supervisor of P13-00278 Construction of Barangay Health Center (Steel Truss),

located at Dumalogdog, Sindangan, Zamboanga Del Norte

March 24, 2003 – July 1, 2003 Assigned as External Supervisor of P13-00279 Construction of Barangay Health Center (Steel Truss)

Page 17: Updated as of DECEMBER 2016 CV Mecbar Mohammad Hasim H39973

with components, located at Bgy. Dinasan, Sindangan, Zamboanga Del Norte

January 2, 2003 – April 30, 2003 Assigned as External Supervisor of P13-00281 Construction of Two-Classroom Building with Latrine

and Deep Well and Bgy. Health Center Equipment, located at Bgy. Bago, Sindangan, Zamboanga Del Norte

11.) From: February 1, 2002 to May 2002

Employer: ALSALLOUM CONSTRUCTION & TRADING

Position Held: OFFICE ENGINEER

Duties and Responsibilities:

1. Prepared plans, quantity and cost estimates.2. Prepared bid documents and participated in biddings.3. Represented technical matters for and in behalf of company.

12.) From: December 2001 to January 31, 2002

Self-employed: Sub contracted construction of residential houses

Position Held: Project Engineer

Duties and Responsibilities:

1. Directly supervised and monitored construction activities.2. Supervised skilled workers.3. Quantity computations and estimates of needed materials.

PERSONAL DATA

1. NAME : Mecbar H. Mohammad Hasim

2. DATE OF BIRTH : 12 September 1979

3. NATIONALITY : Filipino

4. EDUCATION : Bachelor of Science in Civil EngineeringWestern Mindanao State University

Zamboanga City, March 29, 2001

: Master in Business Administration (MBA)12 units, Zamboanga City, 2003-2004

Page 18: Updated as of DECEMBER 2016 CV Mecbar Mohammad Hasim H39973

5. AWARDED RECEIVED : Awarded a Certificate of Recognition for being top 10 in fourth year level in terms of exemplary academic performance. Given this 12th day of August 2000 at Hotel Salwa, Philippines

6. PASSPORT NUMBER : EB4961286 DATE OF ISSUE : March 16, 2012 EXPIRATION DATE : March 15, 2017

7. LANGUAGES & DEGREE OF PROFICIENCY : Languages Read Write Speak

English Excellent Excellent Excellent Filipino Excellent Excellent Excellent

Visayan Excellent Excellent ExcellentChavacano Excellent Excellent Excellent

Tausog Excellent Excellent ExcellentArabic Fair No Good

8. MEMBERSHIP OF PROFESSIONAL SOCIETIES : Philippine Institute of Civil Engineers

9. BOARD LICENSUREEXAMINATION : Passed the Civil Engineers Licensure Examination Given by the

Board of Civil Engineering on November 18-19, 2001. PRC Reg. # 0092088

10. TRAININGS AND SEMINARS: AutoCAD (2D/3D), Senard ITCZamboanga City, Philippines, March 10-April 9, 2005

: Construction Safety and Health Course for Site Safety Officer, Held last July 2-6, 2007 at Zamboanga City Conference Rm., In compliance with the labor code of the Philippines (Presidential Decree No.442)

: HEALTH, SAFETY AND ENVIRONMENT (HSE) SEMINAR AND WORKSHOP, Held last February 7, 2010 at KAUST (King Abdulla University Science & Technology). Passed the examination given for qualified receiver of permit to work with perfect score.

: OSHA CERTIFIED, successfully passed 30-hour construction industry training in accordance with guideline established by the OSHA training institute and the national Safety Councils (NSC) I.D. no. OSCI70919030.

: Confined Space Entry, Completed confined space entry program course and is authorized to work in confined space within his area of responsibility with certificate no. JSDP-CSEP-13-0059.

Page 19: Updated as of DECEMBER 2016 CV Mecbar Mohammad Hasim H39973

: Work Permit Issuer, Completed work permit issuer’s course and is authorized to issue the work permits within his area of responsibility with certificate no. JSDP-WPS-13-0041.

: PMP (Project Management Professional) certificate number KSPMPJED-Feb15-017. Successfully completed the training given by Knowledge Square held in Golden Tulip Hotel, Jeddah, K.S.A.

I hereby certify that the above facts are true and correct to the best of my knowledge and belief.

Engr. Mecbar H. Mohammad Hasim, CE