Update on the Natural Energy Laboratory of Hawaii ... · Printing: This poster is 48” wide by...
Transcript of Update on the Natural Energy Laboratory of Hawaii ... · Printing: This poster is 48” wide by...
![Page 1: Update on the Natural Energy Laboratory of Hawaii ... · Printing: This poster is 48” wide by 36” high. It’s designed to be printed on a large Customizing the Content: The placeholders](https://reader035.fdocuments.net/reader035/viewer/2022070618/5e12fe18dd0bb750012197f5/html5/thumbnails/1.jpg)
Printing:This poster is 48” wide by 36” high. It’s designed to be printed on a large
Customizing the Content:The placeholders in this formatted for you. placeholders to add text, or click an icon to add a table, chart, SmartArt graphic, picture or multimedia file.
Tfrom text, just click the Bullets button on the Home tab.
If you need more placeholders for titles, make a copy of what you need and drag it into place. PowerPoint’s Smart Guides will help you align it with everything else.
Want to use your own pictures instead of ours? No problem! Just rightChange Picture. Maintain the proportion of pictures as you resize by dragging a corner.
Update on the Natural Energy Laboratory of Hawaii Authority ESS ProjectsLaurence Sombardier, Gregory Barbour, Keith OlsonNatural Energy Laboratory of Hawaii Authority (NELHA)
NELHA ESS TEST BEDNew Projects:
MICROGRID DEVELOPMENT
Research Campus Microgrid progress and additions:
- 168 kW PV;
- electrical meters;
- SCADA visualization; and
- energy storage systems.
OBJECTIVES OF NELHA TEST BED• State of Hawaii Goal: 100% Clean Energy by 2045.
• Test Small and large scale ESS systems on Hawaii grid to provide enhancements to resiliency, circuit level frequency, voltage and VAR support, renewable energy dispatching capabilities.
• Test ESS in tropical and marine environments.
• Microgrid development.
• Facilitate development of new clean energy technologies.
GRID SCALE -UET 100KW ESS
• 100kW/500kWh modular ReFlexTM ESS.
• Advanced vanadium flow technology.
• System will be owned by local utility, Hawaii Electric Light Company.
• Project is in planning and design stage.
Planned ESS location at NELHA Gateway Center
OUR PARTNERS
ACKNOWLEDGEMENTS
▪ Sandia National Laboratories, Daniel Borneo, ESS Demonstration Program
▪ Ulupono Initiative, Kyle Datta, General Partner
▪ Hawaii Electric Light Company, Jay Ignacio, President
▪ Hawaii Electric Light Company, Bryant Komo, Project Manager
▪ County of Hawaii, Will Rolston, Energy Coordinator
Special Mahalo to Dr. Imre Gyuk from DOE Office of Electricity without whom the NELHA ESS projects would not be possible.
UET ESS
Milestones Date
MOU Execution between NELHA, Ulupono Initiative, Hawaii Electric Light Company
May 8, 2017
Lease Execution July 27, 2017
Permits and Approvals (except County) August 31, 2017
Design Drawings and Specifications September 30, 2017
Installation Drawings and Commissioning Plan Q4 2017
Complete ESS Commissioning Q2 2018
Company Description Install
UltraFlex – 11kWh, 25kW peak powerhttp://www.ecoult.com/
Q4 2017
Inverter and power management demo at Gatewayhttp://apparent.com/
Q4 2017
Energy management software and lithium ion batteries (36 kW, 72 kWh)http://www.stem.com/
Q1 2018
New NELHA Research Campus microgrid SCADA page
PV
- 36 kW (installed)
- 168 kW (in progress)
OTEC (105 kW)
R&D tower
Intermittent
OTHER
- Utility
- 1 MW Genset (Diesel –evaluating conversion to methane)
Fuels
- Hydrogen
- Bio fuels from algae
Energy Storage
- Aquion (installed)
- Ecoult (in progress)
- STEM (in progress)
Campus Load130 to 220 kW
Campus Microgrid