Update on Rail Projects · 2019-05-16 · Carriage & Wagon WAGON TYPE DESCRIPTION TOTAL NUMBER...
Transcript of Update on Rail Projects · 2019-05-16 · Carriage & Wagon WAGON TYPE DESCRIPTION TOTAL NUMBER...
![Page 1: Update on Rail Projects · 2019-05-16 · Carriage & Wagon WAGON TYPE DESCRIPTION TOTAL NUMBER GOODS BCV Covered Van 88 General goods BOH Coal Hoppers 35 Coal BPT Petroleum Tankers](https://reader033.fdocuments.net/reader033/viewer/2022042414/5f2e7e5e5aa40836246461dd/html5/thumbnails/1.jpg)
Update on Rail Projects
Boineelo Shubane
Acting Director Engineering
![Page 2: Update on Rail Projects · 2019-05-16 · Carriage & Wagon WAGON TYPE DESCRIPTION TOTAL NUMBER GOODS BCV Covered Van 88 General goods BOH Coal Hoppers 35 Coal BPT Petroleum Tankers](https://reader033.fdocuments.net/reader033/viewer/2022042414/5f2e7e5e5aa40836246461dd/html5/thumbnails/2.jpg)
Background
Botswana Railways (BR) is agovernment enterprise establishedthrough an act of parliament (BR Act1986; Amended in 2004)
Mandated to provide transportation ofgoods and passengers withinBotswana, efficiently, safely and cost-effectively, along sound commerciallines.
Amendment of the Act provides for BRto form Joint Ventures, Subsidiarycompanies and to exploit otherbusiness opportunities
![Page 3: Update on Rail Projects · 2019-05-16 · Carriage & Wagon WAGON TYPE DESCRIPTION TOTAL NUMBER GOODS BCV Covered Van 88 General goods BOH Coal Hoppers 35 Coal BPT Petroleum Tankers](https://reader033.fdocuments.net/reader033/viewer/2022042414/5f2e7e5e5aa40836246461dd/html5/thumbnails/3.jpg)
Current Infrastructure
Track Infrastructure• Total network 900 km
• Mainline 640 km
• Cape gauge (1067 mm)
• Capacity: 4.5 million tons per annum
• Branch lines 260 km
• Sua branch line 174 km
• Selibe-Phikwe branch line 56 km
• Morupule branch line 16 km
• Tshele branch line (heavy haul) 14 km
![Page 4: Update on Rail Projects · 2019-05-16 · Carriage & Wagon WAGON TYPE DESCRIPTION TOTAL NUMBER GOODS BCV Covered Van 88 General goods BOH Coal Hoppers 35 Coal BPT Petroleum Tankers](https://reader033.fdocuments.net/reader033/viewer/2022042414/5f2e7e5e5aa40836246461dd/html5/thumbnails/4.jpg)
Continued…
Motive Power
LOCO ROAD ID # IN FLEET HORSEPOWER
BD 1 4 2150
BD 2 20 2250
BD 3 10 1800
BD 5 8 3300
BD 6 3 3300
45
![Page 5: Update on Rail Projects · 2019-05-16 · Carriage & Wagon WAGON TYPE DESCRIPTION TOTAL NUMBER GOODS BCV Covered Van 88 General goods BOH Coal Hoppers 35 Coal BPT Petroleum Tankers](https://reader033.fdocuments.net/reader033/viewer/2022042414/5f2e7e5e5aa40836246461dd/html5/thumbnails/5.jpg)
Continued…Carriage & Wagon
WAGON TYPE DESCRIPTION TOTAL NUMBER GOODS
BCV Covered Van 88 General goods
BOH Coal Hoppers 35 Coal
BPT Petroleum Tankers 79 Diesel/Petrol
BHS High Sided 197 General Goods
BDS Drop sided 284 General Goods
BSA Soda Ash 128 Soda Ash
BSO-1 Salt Wagons 290 Salt/coal
BOH-1 Open Hoppers 34 Coal
BDS-1 Drop sided 34 General goods
BHS-1 High Sided 204 Salt/coal
![Page 6: Update on Rail Projects · 2019-05-16 · Carriage & Wagon WAGON TYPE DESCRIPTION TOTAL NUMBER GOODS BCV Covered Van 88 General goods BOH Coal Hoppers 35 Coal BPT Petroleum Tankers](https://reader033.fdocuments.net/reader033/viewer/2022042414/5f2e7e5e5aa40836246461dd/html5/thumbnails/6.jpg)
Development Projects
Mosetse-Kazungula Rail Line
B O T S W A N A
Mosetse-Kazungula: 367 km- Provides a line from Mosetse, connecting to Zambia and beyond
through the Kazungula bridge.
- Rail line is part of the North South Corridor (NSC)
Project Benefits
- Gate-way to North African markets promoting inter regional trade
- Connects North African region to maritime ports in South Africa
- Reduction of haulage traffic on roads
- Opportunity for tourism industry – Tourist trains
- Alternative transport mode for Agricultural products from Pandamatenga Farms in Botswana
Project Characteristics
Project Status
- Feasibility study tender floating
![Page 7: Update on Rail Projects · 2019-05-16 · Carriage & Wagon WAGON TYPE DESCRIPTION TOTAL NUMBER GOODS BCV Covered Van 88 General goods BOH Coal Hoppers 35 Coal BPT Petroleum Tankers](https://reader033.fdocuments.net/reader033/viewer/2022042414/5f2e7e5e5aa40836246461dd/html5/thumbnails/7.jpg)
Development ProjectsMmamabula-Lephalale Rail Line
B O T S W A N A
Mmamabula-Lephalale: 56 km
Project Benefits
Project Status
Project Characteristics
- Over 200 billion tons coal deposits found in Botswana (at least two thirds of Africa’s coal resource)
- Project aims to link these coal deposits to South African heavy haul lines ( Limpopo Province)
- Line connects Mmamabula/Dibete in Botswana to Lephalale in South Africa
- Need to build a bridge across Limpopo River
- Feasibility study tender floating
- Gate way to South African ports for the coal market
- Shortest route for NSC if coupled with Mosetse-Kazungula line
- Employment opportunities for region.
- Alternative route into South Africa from BR line, which is a single line with a capacity of 4.5 million tons per annum.
![Page 8: Update on Rail Projects · 2019-05-16 · Carriage & Wagon WAGON TYPE DESCRIPTION TOTAL NUMBER GOODS BCV Covered Van 88 General goods BOH Coal Hoppers 35 Coal BPT Petroleum Tankers](https://reader033.fdocuments.net/reader033/viewer/2022042414/5f2e7e5e5aa40836246461dd/html5/thumbnails/8.jpg)
Projects cont… Rail lines comparison
![Page 9: Update on Rail Projects · 2019-05-16 · Carriage & Wagon WAGON TYPE DESCRIPTION TOTAL NUMBER GOODS BCV Covered Van 88 General goods BOH Coal Hoppers 35 Coal BPT Petroleum Tankers](https://reader033.fdocuments.net/reader033/viewer/2022042414/5f2e7e5e5aa40836246461dd/html5/thumbnails/9.jpg)
Development Projects Ponte Techobanine Rail Line
1,100 kmProject Benefits
Project Characteristics
- Botswana, Zimbabwe and Mozambique governments intend to construct an alternative route to the deep sea port of Techobanine.
- The project is aimed at assisting Botswana to evacuate the coal resources to the port
- The missing link will take off from Selibe Phikwe in Botswana and connect to Rutenga in Zimbabwe and proceed to Techobanine through the Chicualacuala line.
- First 600 km to Rutenga is a new line while the rest of the line is an upgrade to a heavy haul line.
- The line will facilitate export of coal from Botswana
- Alternative route for Botswana on import of petroleum products
- Line forms part of the NSC if coupled with Mosetse-Kazungula rail line
![Page 10: Update on Rail Projects · 2019-05-16 · Carriage & Wagon WAGON TYPE DESCRIPTION TOTAL NUMBER GOODS BCV Covered Van 88 General goods BOH Coal Hoppers 35 Coal BPT Petroleum Tankers](https://reader033.fdocuments.net/reader033/viewer/2022042414/5f2e7e5e5aa40836246461dd/html5/thumbnails/10.jpg)
Ponte Techobanine Rail Line
Project Status
- Discussions between the three states are on-going
![Page 11: Update on Rail Projects · 2019-05-16 · Carriage & Wagon WAGON TYPE DESCRIPTION TOTAL NUMBER GOODS BCV Covered Van 88 General goods BOH Coal Hoppers 35 Coal BPT Petroleum Tankers](https://reader033.fdocuments.net/reader033/viewer/2022042414/5f2e7e5e5aa40836246461dd/html5/thumbnails/11.jpg)
Development Projects Rolling Stock Maintenance & Refurbishment Facility
Project Benefits
Project Status
Project Characteristics
- The purpose of the facility is to undertake running maintenance, out of course repairs as well refurbishment programs for rolling stock
- The project is also aimed to help eliminate maintenance backlog
- The estimated required area 34,000 m2
- Acquisition of land to be concluded this month
- PMO working on a business plan
- Maintenance cost reduction
- Improved asset/equipment availability
- Employment creation
- Skills development/transfer
![Page 12: Update on Rail Projects · 2019-05-16 · Carriage & Wagon WAGON TYPE DESCRIPTION TOTAL NUMBER GOODS BCV Covered Van 88 General goods BOH Coal Hoppers 35 Coal BPT Petroleum Tankers](https://reader033.fdocuments.net/reader033/viewer/2022042414/5f2e7e5e5aa40836246461dd/html5/thumbnails/12.jpg)
Thank you