Update of master schedule and report from SLAC

G. Riddone2008.10.08

Page 2: Update of master schedule and report from SLAC G. Riddone 2008.10.08.

Master Schedule

• See EDMS#844300, v3- Status- Master schedule by test station and by types- Rf components

Page 3: Update of master schedule and report from SLAC G. Riddone 2008.10.08.

T18 - Alignment

• Optical measurement (from two sides) ex. T18#4 (OD 45 mm)

Page 4: Update of master schedule and report from SLAC G. Riddone 2008.10.08.

T18 - Bonding

T18_vg2.4_disk_4Before bonding- OD 45 mm- 2 tuning holes per cell only

Then - Brazing of the couplers- Brazing of the studs

Page 5: Update of master schedule and report from SLAC G. Riddone 2008.10.08.

Tuning C10 – KEK drawing

Page 6: Update of master schedule and report from SLAC G. Riddone 2008.10.08.

Tuning C10

2. stud: the disk is systematically equipped with studs3. The tube ends at the tread part of the stud. TK of the tube is not defined

Page 7: Update of master schedule and report from SLAC G. Riddone 2008.10.08.

Tuning C10

Test set-up for tuningPosition for “pulling”

Sliding hammer to push and pullDisks with

tuning studs

Page 8: Update of master schedule and report from SLAC G. Riddone 2008.10.08.

Structure cell with 45° WG

Page 9: Update of master schedule and report from SLAC G. Riddone 2008.10.08.

Symmetrical disk

No tuning was implemented

Page 10: Update of master schedule and report from SLAC G. Riddone 2008.10.08.

NLCTA – T18 reverse and T26