Rail Spur at Bayport Terminal

Construction of approximately 6500 track feet of rail at the Bayport Terminal. This rail will cross State Highway (SH) 146 and connect the existing rail from Strang Rail line to within 900 feet of the Container Freight Station (CFS) Road in the Bayport Intermodal Facility. This project will also include clearing, grubbing, drainage, rail crossings, signalization, and perhaps a sound wall, if required.

Construction Time Frame NIGP Codes Small Business Opportunities PHA Contact

4th Qtr. 2017 - 4th Qtr. 2018 912239097696148

• Clearing Brush• Storm Water Controls• Flagman• Traffic Controls• Surveying• Photography• Material Testing• Rail Roads

Brenda Trevino [email protected]

Bayport West Empty Container Yard Security

Provide security CTV cameras, conduits, manholes and network connections.

Construction Time Frame NIGP Codes Small Business Opportunities PHA Contact

3rd Qtr. 2018 91316990002850091438

• Security• Conduit• Photography• Electrical

Alvin Jackson [email protected]

Bayport - Construct Container Yard 7

Construction of approximately 47 acres of reinforced and roller compacted 18-inch concrete pavement, including the construction of a storm water collection system, water and sanitary sewer mains, high mast lighting and telecommunication conduit.

Construction Time Frame NIGP Codes Small Business Opportunities PHA Contact

1st. Qtr. 2018 – 4th Qtr. 2019 91316990002850091438

• Concrete• Grading• Storm Drainage Structures• Electrical Work

Barbara H. Smith [email protected]

Bayport - Container Yard 7 Security

Provide security CTV cameras, conduits, manholes and network connections.

Construction Time Frame NIGP Codes Small Business Opportunities PHA Contact

2nd. Qtr. 2019 – 4th Qtr. 2019 91316990002850091438

• Security• Conduit• Photography• Electrical

Alvin Jackson [email protected]

Wharf 3 Telecom Pre-Outage at BCT

The projects consists of the installation of two new communications pathways in the terminal which will enable all signals to bypass the C3 Amenities building which will be demolished during the rehabilitation of the wharf 3.

Construction Time Frame NIGP Codes Small Business Opportunities PHA Contact

4th Qtr. 2017 - 1st Qtr. 2018 91316914382850099000

83828838298383383834

• Telecommunications Equipment• Fiber Optics Cables• Network Programming• Conduits and Inner ducts

Bill Aguirre [email protected]

Demolition of 2 Wharf Cranes and Moving a Crane at BCT

Two wharf cranes will be demolished, dismantling the cranes in a safe manner, and transporting the pieces off site for disposal or salvage. A third crane to be moved 1000ft from its current position at Barbours Cut.

Construction Time Frame NIGP Codes Small Business Opportunities PHA Contact

2nd Qtr. 2018 – 3rd Qtr. 2018 929009675090976

• Photography• Fuel Supply

Alvin Jackson [email protected]

Barbours Cut - Rehabilitation of Wharf 3

The wharf will be upgraded in order to support 100 feet gauge dock cranes and to accommodate larger ships. This project consists of the upgrade of 1000 feet of wharf, a new stevedore support building, structural elements, high mast pole lighting, and electrical infrastructure required to power three new dock cranes.

Construction Time Frame NIGP Codes Small Business Opportunities PHA Contact

3rd Qtr. 2018 - 4th Qtr. 2019 90976 91430 91438 9147990976 91223 91485 90924

• Material Testing• Surveying • Storm Water Controls• Photography• Chain Link Fence• Security• Electrical• Signs and Paint Striping

Bill Aguirre [email protected]

Barbours Cut - Lash Dock Demolition

The project consists of the demolition of the Lash Dock located at the East End of Barbours Cut Terminal. The work includes the removal of all concrete structures such as decks and piles and dredging.

Construction Time Frame NIGP Codes Small Business Opportunities PHA Contact

1st Qtr. 2018 - 2nd Qtr. 2018 90976 912239124091244

• Photography• Demolition of Structures• Concrete Traffic Barriers• Barge Services

Bill Aguirre [email protected]

Barbours Cut and Bayport - Bi-Annual Fender System Maintenance - 2018

An “on-call” contract to remove and replace parts of the wharf fender system.

Construction Time Frame NIGP Codes Small Business Opportunities PHA Contact

1st Qtr. 2018 - 4th Qtr. 2018 237310 • Metal Fabrication• Storm Water Controls• Photography

Brenda Trevino [email protected]

Install Fender System at Wharf Nos. 1 & 2 at CARE Terminal

Project will remove the existing fenders and install new fenders at Wharf 1 & 2 at the CARE Terminal.

Construction Time Frame NIGP Codes Small Business Opportunities PHA Contact

4th Qtr. 2017 - 1st Qtr. 2018 Wharf 12nd Qtr. 2018 - 3rd Qtr. 2018 Wharf 2

914849122391438

• Fender Replacement• Pile Diving

Alvin Jackson [email protected]

Drainage System at Volkswagen Yard at Turning Basin Terminal

Improvement of existing drainage system tied to IH-610 feeder road at the Volkswagen yard at the Turning Basin terminal.Project 1: TxDot construction of drainage improvements to the 610 feeder road. (Procured by TxDot)Project 2: PHA construction of drainage improvements to the Volkswagen Yard.

Project 2 Construction Time Frame Project 2 NIGP Codes Project 2 Small Business Opportunities PHA Contact

1st Qtr. 2018 - 4th Qtr. 2018 9136091223

• Storm Drainage Structures• Grading• Concrete

Brenda Trevino [email protected]

PROJECT 2 PROJECT 1

Rehabilitation of Transit Shed Floor at Wharf No. 46 at Turning Basin Terminal

Repair of top floor slab of the transit shed.

Construction Time Frame NIGP Codes Small Business Opportunities PHA Contact

4th Qtr. 2017 - 4th Qtr. 2018 9136091430

• Concrete and Rebar• Storm Drainage Structures• Compaction Grouting / Mud Jacking

Barbara H. Smith [email protected]

Replace Water Line Under Various Docks at Turning Basin Terminal

Replaces the existing water line along with attachments at various wharves at Turning Basin Terminal.

Construction Time Frame NIGP Codes Small Business Opportunities PHA Contact

4th Qtr. 2017 - 2nd Qtr. 2018 91360 • Waterline Pipes and Attachments Alvin Jackson [email protected]

Turning Basin South Repairs at Wharf 1

Structural concrete repairs of columns, caps, strut beams and top deck.

Construction Time Frame NIGP Codes Small Business Opportunities PHA Contact

4th Qtr. 2017 - 2nd Qtr. 2018 9148491223914389097691430

• Structural Concrete Repair Eddy Kharrazi [email protected]

Annual Concrete Replacement at Turning Basin Terminal 2018

The removal and replacement of deteriorating and or damaged existing concrete pavement throughout the facility for 2018.

Construction Time Frame NIGP Codes Small Business Opportunities PHA Contact

1st Qtr. 2018 - 4th Ort. 2018 91430 • Concrete Pavement Barbara H. Smith [email protected]

Turning Basin - Rehabilitation and Repair of Wharf 9

Structural concrete repair, fender replacement, and geotechnical rehabilitation.

Construction Time Frame NIGP Codes Small Business Opportunities PHA Contact

4th Qtr. 2017 - 3rd Qtr. 2018 9148491223914389097691430

• Structural Concrete Repair• Fender Replacement• Pile Diving

Eddy Kharrazi [email protected]

Manchester - Rehabilitation and Repair of Wharf 2

Structural concrete repair, fender replacement, pile replacement, and geotechnical rehabilitation.

Construction Time Frame NIGP Codes Small Business Opportunities PHA Contact

4th Qtr. 2017 - 3rd Qtr. 2018 9148491223914389097691430

• Structural Concrete Repair• Fender Replacement• Pile Diving

Eddy Kharrazi [email protected]