SSC JE - 2019 (Timings 5 pm to 6 pm)
1. Power System complete Syllabus batch (30 to 40 days)
2. Mock Tests for SSC JE 2019 with Video solution (30 days to 40 days)
From 8th of June
From 13th of June
SSC JE - 2020 (Timings 7 pm to 8 pm)
1. Electrical Machine complete syllabus batch Now with MCQs also
2. Basic Electronics Complete syllabus batch
Special Free Session โ 3 PMSubject โ All subject mix MCQs
SSC JE โ 5 PM (Under SSC Subscription)Subject โ BEE (Basic Electrical Engineering)
UPPSC AE โ 7 PM (Under UPPSC subscription)Subject โ Control System
SSC JE โ 10 PM Crash course of SSC JE with MCQs
@ashishsoniwifistudy
True energy = WT = PรT = V.I Cosฯรtโฆโฆโฆโฆkwhr
Mechanisms: -
(1) Driving mechanism โ P.C., C.C.
(2) Braking mechanism - Permanent magnet
(3) Rotating mechanism โ R.D.
(4) Recording/registering mechanism โ RGT
Energy Meter
S.R. = Shading ring
S.L. = Shading loop
R.D. = Rotating Disc
C.C. = Current coil
P.C. = Potential coil
RGT = Reduced gear train
PM = Permanent Magnet
S = Spindle
Driving Mechanism: -
โข Energy Meter consisting of p.c. and c.c. . P.C. is connected across the load for measurement of vtg and C.C. is connected in series to the load for measurement of current.
โข By using driving Mechanism driving torque is produced on the rotating disc due to interaction, of fluxes produced due to p.c. and c.c. coil, currents.
Note: -
โข P.C of the energy meter must be highly inductive is required so that error in the measurement of energy is minimized.
โข Driving torque is proportional to the power consumed by the load.
Driving Torque (๐๐): -
๐๐ โ [๐๐ ๐ข๐ ๐๐จ๐ฌโ ๐๐ ๐ข๐ โ๐๐ ๐ข๐ ๐๐จ๐ฌโ ๐๐ ๐ข๐]
๐๐ โ ๐๐ {[๐๐จ๐ฌ ๐๐ + ฮฑ โ ๐ซ โ๐ โ ๐๐จ๐ฌ ๐๐ยฐ + ฮฑ + ๐ซ โ๐ }
๐๐ โ ๐๐[๐ ๐ฌ๐ข๐ง ๐๐ + ฮฑ . ๐ฌ๐ข๐ง(๐ซ โ ๐)]
๐๐ โ ๐ ๐๐จ๐ฌฮฑ. [๐๐ ๐ฌ๐ข๐ง(๐ซ โ ๐)]
๐ ๐๐จ๐ฌฮฑ = ๐๐จ๐ง๐ฌ๐ญ๐๐ง๐ญ
๐๐ โ ๐๐ ๐ฌ๐ข๐ง(๐ซ โ ๐)
๐๐ = ๐๐ ๐๐จ๐ฌ.๐
๐๐ = ๐๐ ๐ฌ๐ข๐ง(๐ซ โ ๐)
Error in Power: -
๐๐ โ ๐๐ = ๐๐ [๐ฌ๐ข๐ง ๐ซ โ ๐ โ ๐๐จ๐ฌ๐]
If ๐ซ = ๐๐ยฐ โ ๐๐ โ ๐๐ = ๐ โ ๐.๐. ๐ข๐ฌ ๐จ๐ ๐๐ข๐ ๐ก๐ฅ๐ฒ ๐ข๐ง๐๐ฎ๐๐ญ๐ข๐ฏ๐
โข As the p.f. is reduced then the error is increased if the potential coil is not highly inductive.
Lag/Quadrature/p.f. correction coil/shading ring Compensation: -
โข Lag coil or shading ring is kept below the potential coil for improving the p.f. of the potential coil, so that 90ยฐ phase displacement can be maintained between potential coil voltage and flux.
โข Variable resistor is used in case of lag coil for adjustment of the angle.
โข The position of shading ring is used for adjustment of the angle. Shading ring is made of copper.
Rotating Mechanism: -
โข A low weight aluminum disc is used as a rotating disc for reducing friction.
Braking Mechanism: -
๐๐ โ ๐
๐ = speed of disc
โข Speed correction
โข By adjusting the position of P.M. speed of the disc is adjusted.
๐ โ๐
๐
Registering or recording mechanism:-
โข Reduced gear teeth mechanism is used for registering of energy consumed by the load during certain period of time. This energy is cumulatively add-up and hence energy meter is a integrating instrument.
Errors and compensation in energy meter: -
Friction and light load compensation: -
โข For compensation of fiction and light load energy measurements, shading loop is used the position of the shading loop can be adjustable along the spindle.
Creepy: -
โข If the friction is overcompensated by placing the shading loop very closer to the potential coil then rotating disc rotates very slowly an record the energy without any load current and with potential coil only excited this is called creepy this produces error in the measurement of energy.
โข For reducing creeping two holes or/slots are made on the rotating disc and these experiences opposing torque so that disc rotation stops.
โข By placing small iron piece on the rotating disc creeping is minimized because this iron piece is attracted by permanent magnet.
Over voltage & over load compensations: -
โข Saturable shunt magnet is placed between center and side limbs of shunt magnet for diverting the access Flux due to over voltage
โข The saturable series magnet is placed between the limbs of series magnet for diverting access Flux due to over local current.
Formulae: -
(1) Energy meter constant = K =๐๐จ ๐๐จ ๐ซ๐๐ฏ.๐จ๐ ๐๐ข๐ฌ๐
๐๐ฐ๐ก๐ซ
K =๐
๐ฉ.๐ญ.
(2) Energy measured = ๐๐ฆ =๐๐จ๐ญ๐๐ฅ ๐ง๐ฎ๐ฆ๐๐๐ซ ๐จ๐ ๐๐๐ฏ๐จ๐ฅ๐ฎ๐ญ๐ข๐จ๐ง๐ฌ ๐๐ฌ ๐ฉ๐๐ซ ๐ฅ๐จ๐๐
๐
(3) True energy = ๐๐ =๐๐๐๐จ๐ฌ๐
๐๐๐๐ร
๐ญ
๐๐๐๐โฆโฆโฆโฆโฆ..kwhr
Where,
I = current in A
Half load = I/2
Full load =I
V=voltage in Volts
T= time in sec.
% ฮตr = ๐๐ฆโ๐๐
๐๐ร ๐๐๐
If ฮตr = Positive โ Disc runs fast
If ฮตr = Negative โ Disc Runs slow
Testing of energy meter and wattmeter: -
Normal loading: -
Testing time = t= 5 hours
Energy consumed = ๐. ๐ ร ๐ = ๐๐ kwhr = 23 units
1 unit = 10 /-
Cost of testing = ๐๐ ร ๐๐ = ๐๐๐ /-
Phantom loading/fictitious loading: -
๐ = ๐๐ = ๐๐ ร ๐๐ = ๐๐๐๐ฐ = ๐. ๐ kw
๐ญ = ๐ hours
โข Energy = ๐. ๐ ร ๐ = ๐ kwhr
Cost of testing = ๐ ร ๐๐ = ๐๐/โ
โข Phantom or fictitious loading is used for testing of energy meter and wattmeter.
โข By using this method the cost of calibration is minimized because the power loss is reduced.
โข Normal supply voltage is applied to the p.c. and small voltage source with variable resistor is connected to the c.c.
โข By adjusting this variable resistor rated current is passing through the C.C.
โข Energy meter works on the principal of electromagnetic induction.
1. Magnitude of flux in an energy meter varies _____.a) due to abnormal currents and voltagesb) due to high resistance and inductance valuesc) due to change in the transformer turnsd) due to the induced e.m.f in the windings
2. Energy meter creeps _____a) due to change in supplyb) due to reversal in polarity of voltagec) due to asymmetry in magnetic circuitd) due to turns ratio of transformer
3. Supply voltage in an energy meter is ____a) constant alwaysb) zero alwaysc) depends on the loadd) can fluctuate
4. How is the flux of shunt coil related to voltage?a) flux is proportional to square of voltageb) directly proportionalc) inversely proportionald) independent of each other
5. Creeping is avoided by____a) reversing the polarity of the voltageb) drilling two diametrically opposite holesc) holding the discd) increasing the friction
6. In some energy meters, creeping can be avoided by _____a) attaching small gold piecesb) attaching small aluminium piecesc) attaching small iron piecesd) attaching small zinc pieces
7. measurement of energy involves_____a) inductance and capacitance measurementb) power consumption and time durationc) resistance measurement and voltage dropd) current consumption and voltage drop
8. An energy meter, having meter constant of 1200 rev/kWh,makes 20 revolutions in 30 seconds for a constant load. Theload, in kW, is ______. [2016: 2 Marks, Set-2]
SSC JE-2019
Benefits
Electrical Engineering by ASHISH SIR
Personalized Learning: -
Electrical Engineering by ASHISH SIR
Regular PDF update
Electrical Engineering by ASHISH SIR
Electrical Engineering by ASHISH SIR
Electrical Engineering by ASHISH SIR
Electrical Engineering by ASHISH SIR
Electrical Engineering by ASHISH SIR
Electrical Engineering by ASHISH SIR
Electrical Engineering by ASHISH SIR
(28) In a steam power plantโฆโฆโฆโฆheats the feed water on its way to the boiler by delivering heat from the flue gases: -
(A) Superheater (B) Economizer
(B) Preheater (D) Turbine
(29) Power generation of thermal power plants is based on: -
(A) Rankine cycle
(B) Otto cycle
(C) Diesel cycle
(D) Carnot cycle