U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 · 2015. 1. 6. · U.P. - SSA - RTE- ANNUAL...

533
U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin. I ACCESS 1 Opening of New Schools 1.01 Upgradation of EGS to PS Centres / School 1.02 New PS School Not recommended 1.03 Upgradation of PS to UPS / New UPS School Not recommended 1.04 Composite Schools (for Urban Areas) School 1.05 Residential Schools for specific category children (For 100 children) 1.06 Residential Hostel (for specific category of children) (For 50 children) Not recommended 1.07 Integration of Class V with Primary Schools 1.08 Integration of Class VIII with Upper Primary Schools 2 Residential Schools for specific category of children (For 100 Children) Total - Residential Schools (For 100 children) 3 Residential Hostel for specific category of children (For 50 Children) Non-recurring (one time grant) 3.01 Furniture / Equipment (including kitchen equipment) 2.00000 3.02 TLM and equipment including library books 3.00000 3.03 Bedding 0.37500 Sub Total Non-recurring Recurring 3.04 Maintenance per child per month @ Rs. 900/- 9.00000 3.05 Stipend per child per month @ Rs.50/- 0.60000 3.06 Supplementary TLM, Stationery and other educational material 0.50000 3.07 Salaries 7.20000 3.07.1 Additonal salary of Rs.3 lakh p.a for additonal enrollment of over and above 50 children but up to 100 children for providng part time teachers, Assistant cook etc. 3.00000 3.08 Vocational training / specific skill training 0.50000 3.09 Electricity / water charges 0.50000 3.10 Medical care/contingencies @ Rs.750/- per child 0.62500 3.11 Maintenance 0.37500 3.12 Miscellaneous 0.37500 3.13 Preparatory camps 0.15000 3.14 P.T.A / school functions 0.15000 3.15 Provision of Rent 5.00000 3.16 Capacity Building 0.25000 Sub Total Recurring Total - Residential Schools (For 50 children) 4 Transport/Escort Facility 4.01 Children in remote habitations with sparse populations where opening of schools is unviable Child 0.03000 4.02 Urban deprived children/children without adult protection in urban areas where schools are not opened because availability of land is a problem Child 0.03000 Sub Total 5 Special Training for mainstreaming of Out-of- School Children 5.01 Residential (Fresh) (a) 12 months Child 0.20000 (b) 9 months Child (c) 6 months Child 0.10000 (d) 3 months Child 0.05000 Sub Total 5.02 Residential (Continuing from prevous year) (a) 12 months Child 0.20000 (b) 9 months Child 0.15000 (c) 6 months Child 0.10000 (d) 3 months Child Sub Total 5.03 Non-Residential (Fresh) (a) 12 months Child 0.06000 (b) 9 months 0.04500 (c) 6 months (i) Special Training (by Special Instructors-NRBC)- (1-5) Child 0.03000 22153 664.59000 22153 664.59000 (ii) Special Training (by Special Instructors-NRBC)- (6-8) Child 0.03000 18416 552.48000 18416 552.48000 (d) 3 months Child 0.01500 Sub Total 40569 1217.07000 40569 1217.07000 5.04 Non-Residential (Continuing from previous year) (a) 12 months Child 0.06000 (b) 9 months 0.04500 (c) 6 months Child (i) Special Training (by Special Instructors-NRBC)- (1-5) Child 0.03000 (ii) Special Training (by Special Instructors-NRBC)- (6-8) Child 0.03000 (d) 3 months Child 0.01500 Sub Total 5.05 Madarsas/ Maktab (a) 12 months Child 0.06000 ( ` ` ` In Lakhs) Consolidate : Uttar Pradesh Remarks Physical Unit S. No. Activity Outlay Recommendation for 2014-15 Spill Over Recommended as proposed Deferred liability of 2014-15 Fresh Recommended Total Recommended Not recommended Not recommended Not recommended Not recommended Arti:SSA-AWPB-2014-15-PABMinits:UP:16-06-2014 1 / 533

Transcript of U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 · 2015. 1. 6. · U.P. - SSA - RTE- ANNUAL...

Page 1: U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 · 2015. 1. 6. · U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15

Phy. Fin. Phy. Fin.Unit

CostPhy. Fin. Phy. Fin.

I ACCESS

1 Opening of New Schools

1.01 Upgradation of EGS to PSCentres /

School

1.02 New PS SchoolNot recommended

1.03 Upgradation of PS to UPS / New UPS School Not recommended

1.04 Composite Schools (for Urban Areas) School

1.05Residential Schools for specific category children (For 100

children)

1.06Residential Hostel (for specific category of children) (For

50 children)

Not recommended

1.07 Integration of Class V with Primary Schools

1.08 Integration of Class VIII with Upper Primary Schools

2Residential Schools for specific category of

children (For 100 Children)

Total - Residential Schools (For 100 children)

3Residential Hostel for specific category of children

(For 50 Children)

Non-recurring (one time grant)

3.01 Furniture / Equipment (including kitchen equipment) 2.00000

3.02 TLM and equipment including library books 3.000003.03 Bedding 0.37500

Sub Total Non-recurring

Recurring

3.04 Maintenance per child per month @ Rs. 900/- 9.000003.05 Stipend per child per month @ Rs.50/- 0.60000

3.06Supplementary TLM, Stationery and other educational

material0.50000

3.07 Salaries 7.20000

3.07.1

Additonal salary of Rs.3 lakh p.a for additonal enrollment

of over and above 50 children but up to 100 children for

providng part time teachers, Assistant cook etc.3.00000

3.08 Vocational training / specific skill training 0.500003.09 Electricity / water charges 0.50000

3.10 Medical care/contingencies @ Rs.750/- per child 0.62500

3.11 Maintenance 0.375003.12 Miscellaneous 0.375003.13 Preparatory camps 0.150003.14 P.T.A / school functions 0.150003.15 Provision of Rent 5.000003.16 Capacity Building 0.25000

Sub Total Recurring

Total - Residential Schools (For 50 children)

4 Transport/Escort Facility

4.01Children in remote habitations with sparse populations

where opening of schools is unviableChild 0.03000

4.02

Urban deprived children/children without adult protection

in urban areas where schools are not opened because

availability of land is a problem

Child 0.03000

Sub Total

5Special Training for mainstreaming of Out-of-

School Children

5.01 Residential (Fresh)

(a) 12 months Child 0.20000(b) 9 months Child

(c) 6 months Child 0.10000(d) 3 months Child 0.05000

Sub Total

5.02 Residential (Continuing from prevous year)

(a) 12 months Child 0.20000(b) 9 months Child 0.15000(c) 6 months Child 0.10000(d) 3 months Child

Sub Total

5.03 Non-Residential (Fresh)

(a) 12 months Child 0.06000(b) 9 months 0.04500(c) 6 months

(i) Special Training (by Special Instructors-NRBC)- (1-5) Child 0.03000 22153 664.59000 22153 664.59000

(ii) Special Training (by Special Instructors-NRBC)- (6-8) Child 0.03000 18416 552.48000 18416 552.48000

(d) 3 months Child 0.01500Sub Total 40569 1217.07000 40569 1217.07000

5.04 Non-Residential (Continuing from previous year)

(a) 12 months Child 0.06000(b) 9 months 0.04500(c) 6 months Child

(i) Special Training (by Special Instructors-NRBC)- (1-5) Child 0.03000

(ii) Special Training (by Special Instructors-NRBC)- (6-8) Child 0.03000

(d) 3 months Child 0.01500Sub Total

5.05 Madarsas/ Maktab

(a) 12 months Child 0.06000

( `̀̀̀ In Lakhs)Consolidate : Uttar Pradesh

RemarksPhysical

UnitS. No. Activity

Outlay Recommendation for 2014-15

Spill Over

Recommended as

proposed

Deferred

liability of

2014-15

Fresh Recommended Total Recommended

Not recommended

Not recommended

Not recommended

Not recommended

Arti:SSA-AWPB-2014-15-PABMinits:UP:16-06-2014 1 / 533

Page 2: U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 · 2015. 1. 6. · U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15

Phy. Fin. Phy. Fin.Unit

CostPhy. Fin. Phy. Fin.

( `̀̀̀ In Lakhs)Consolidate : Uttar Pradesh

RemarksPhysical

UnitS. No. Activity

Outlay Recommendation for 2014-15

Spill Over

Deferred

liability of

2014-15

Fresh Recommended Total Recommended

(b) 9 months Child 0.04500(c) 6 months (Non Residencial) Child 0.03000(d) 3 months Child 0.01500

Sub Total

5.06 Seasons Hostel

(a) 12 months Child 0.20000(b) 9 months Child 0.15000(c) 6 months Child 0.10000(d) 3 months Child 0.05000

Sub Total

Total (Special Training) 40569 1217.07000 40569 1217.070005(B) House Hold Survey (HHS)

5(B).01 House Hold Survey through SMC House Hold 0.00001Sub Total

II RETENTION

6 Free Text Book

6.01Free Text Book (PS) for Parishadiya & Aided Primary

Schools (Workbooks not included)Child 0.00120 9646353 11575.62360 9646353 11575.62360

Recommended as

proposed @ Rs. 120 per

child

6.01a

Free Text Book (PS) for 25% children of Class-1 in Private

Recognised Primary Schools of other Boards (Workbooks

not included)

Child 0.00150Not recommended

6.02 Free Brail Books (PS) 0.00150 6401 9.60150 6401 9.60150Recommended as

proposed

6.03 Free Large Print Books (PS) 0.00150

6.04Free Text Book (UPS) (Workbooks not included) (Including

KGBV Girls)Child 0.00200 4185590 8371.18000 4185590 8371.18000

Fresh recommended as

proposed and Deferred

liablity not recommended.

6.05 Free Brail Books (UPS) 0.00250 1714 4.28500 1714 4.28500Recommended as

proposed

6.06 Free Large Print Books (PS) 0.00250

Sub Total 13840058 19960.69010 13840058 19960.69010

7 Provision of 2 set of Uniforms

7.01 All Girls (Including KGBV Girls) Child 0.00400 10503029 42012.11600 10503029 42012.116007.02 SC Boys Child 0.00400 3090006 12360.02400 3090006 12360.024007.03 ST Boys Child 0.00400 70678 282.71200 70678 282.712007.04 BPL Boys Child 0.00400 3968118 15872.47200 3968118 15872.47200

7.05Free Uniform for 25% children of Class-1 in Private

Recognised Primary Schools of other Boards Child 0.00400

Sub Total 17631831 70527.32400 17631831 70527.324007(A) Fee Reimbursement

7(A).01

Fee Reimbursement for Admission of children of

Disadvantaged Group & Weaker Section upto 25% of

seats in Class-1 of Private Unaided Recognised Schools

Child 0.05400

Not recommended

Sub Total

8 Teaching Learning Equipment (TLE)

8.01 TLE - New Primary School 15 789.10 0.20000 15 789.10000

8.02 TLE - New Upper Primary School 7 273.40 0.50000 7 273.40000

Sub Total 22 1062.50 22 1062.50000III ENHANCING QUALITY

9 New Teachers Salary

9.01 Primary Teachers (Regular) (Asstt. Teacher) Teacher 0.91500

9.01aHead Teacher for Primary (if the number of children

exceeds 150 in a school)Teacher

9.02 Primary Teachers (Contract) (S.M.) Teacher

9.03 Subject specific Upper Primary Teachers (Regular)

(a) Science and Mathematics Teacher 1.26000(b) Social Studies Teacher 1.26000(c) Languages Teacher 1.26000

9.03aUpper Primary teachers for schools sanctioned in previous

years

(i) Upper Primary Teachers (Regular) Teacher

(ii) Head Teacher for Upper Primary Teacher

9.03bHead Teacher for Upper Primary (if the number of

children exceeds 100 in a school)Teacher

9.04 Subject specific Upper Primary Teachers (Contract)

(a) Science and Mathematics Teacher

(b) Social Studies Teacher

(c) Languages Teacher

9.05 UP teachers for integration of Class VIII

Sub Total (9.01 to 9.05)

Add.Teacher against PTR

9.06 New Additional Teachers - PS (Regular) Teacher

9.07 New Additional Teachers - PS (Para) (S.M.) Teacher

9.08Head Teacher for primary (if the number of children

exceeds 150 in a school)

9.09 Subject specific New Additional Teachers-UPS (Regular)

(a) Science and Mathematics Teacher

(b) Social Studies Teacher

(c) Languages Teacher

9.10 Subject specific New Additional Teachers - UPS (Contract)

(a) Science and Mathematics Teacher

(b) Social Studies Teacher

(c) Languages Teacher

9.11Head Teacher for upper primary (if the number of

children exceeds 100 in a school)Teacher

Fresh proposal not

recommended and

deferred liablity

recommended as the

construction is reported to

be completed

Unit cost reduced as per

norms

Arti:SSA-AWPB-2014-15-PABMinits:UP:16-06-2014 2 / 533

Page 3: U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 · 2015. 1. 6. · U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15

Phy. Fin. Phy. Fin.Unit

CostPhy. Fin. Phy. Fin.

( `̀̀̀ In Lakhs)Consolidate : Uttar Pradesh

RemarksPhysical

UnitS. No. Activity

Outlay Recommendation for 2014-15

Spill Over

Deferred

liability of

2014-15

Fresh Recommended Total Recommended

9.12Part Time Instructors (if the number of children exceeds

100 in a school)

(a) Art Education Teacher

(b) Health and Physical Education Teacher

(c) Work Education Teacher

Sub Total (9.06 to 9.12)

Total (New Teacher's Salary-9.01 to 9.12)

Teachers Salary (Recurring-sanctioned earlier)

Primary teachers

9.13 Primary Teachers ( Regular)-Existing, in position Teacher 3.66000 29062 106366.92000 29062 106366.92000

Recommended as

proposed and proposed

committed liablity for 2013-

14 not recommended

9.14 Primary Teachers (Contract)-Existing, in position Teacher 0.55000

9.14(a) Primary Teachers (Contract)-under Training Teacher 0.38500 92084 35452.34000 92084 35452.34000

Recommended @ Rs. 3500

per month in the absence

of Govt.Order and

deferred liablity not

recommended

9.14(b)Primary Teacher (Para Teachers Equal to 9.14(a)

upgraded as Teachers)Teacher 0.38500 60466 23279.41000 60466 23279.41000

These teachers completed

BTC. Govt. order for

regularisation awaited,

hence recommended @

Rs. 3500 per month for 11

month.

9.14(c) Primary Teachers (Para)- Vacant Teacher 0.05000

9.15 Primary Teachers (Vacant) Teacher 0.30500vacant position, salary to

be paid on joining.

9.16Head Teacher for Primary (if the number of children

exceeds 150)Teacher 5.04000 16153 81411.12000 16153 81411.12000

Recommended as

proposed and proposed

committed liablity for 2013-

14 not recommended

9.16(b)Head Teacher for Primary (if the number of children

exceeds 150) VacantTeacher 0.42000

vacant position, salary to

be paid on joining.

Additional teachers

9.17Additional Teachers - PS (Special BTC-Regular) in

positionTeacher 0.30500

9.18Additional Teachers - PS (Special BTC Under Training )

(@ Rs. 7300/- per head per month)Teacher 0.87600

Vacant position, Salary to

be paid on joining.

9.19 Additional Teachers - PS (Vacant) Teacher

9.20 Others in position Teacher

Upper Primary teachers

9.21 UP Teachers (Regular)-Existing Teacher 5.04000 54760 275990.40000 54760 275990.40000

Recommended as

proposed and proposed

committed liablity for 2013-

14 not recommended

9.22 UP Teachers (Contract)-Existing

9.23 UP Teachers (Vacant) Teacher 1.26000Vacant position, Salary to

be paid on joining.

9.24Head Teacher for Upper Primary (if the number of

children exceeds 100)-ExistingTeacher 5.34000 21052 112417.68000 21052 112417.68000

Recommended as

proposed and proposed

committed liablity for 2013-

14 not recommended

9.24a Head Teacher for Upper Primary (Vacant) Teacher 1.33500Vacant position, Salary to

be paid on joining.

9.25 Subject specific Upper Primary Teachers (Regular)

(a) Science and Mathematics

(b) Social Studies

(c) Languages

9.26 Subject specific Upper Primary Teachers (Contract)

(a) Science and Mathematics

(b) Social Studies

(c) Languages

9.27 Additional Teachers - UPS (Regular)

9.28 Additional Teachers - UPS (Contract)

9.29 Additional Teachers - UPS (Vacant)

9.30 Subject specific Additional Teachers-UPS (Regular)

(a) Science and Mathematics

(b) Social Studies

(c) Languages

9.31 Subject specific Additional Teachers - UPS (Contract)

(a) Science and Mathematics

(b) Social Studies

(c) Languages

9.32 Part Time Instructors in position

(a) Art Education 0.77000 10916 8405.32000 10916 8405.32000

(b) Health and Physical Education 0.77000 11099 8546.23000 11099 8546.23000

(c) Work Education 0.77000 9238 7113.26000 9238 7113.26000

9.32(A) Part Time Instructors Vacant

Fresh proposal is

recommended as

proposed and deferred

liablity is not

recommended.

Arti:SSA-AWPB-2014-15-PABMinits:UP:16-06-2014 3 / 533

Page 4: U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 · 2015. 1. 6. · U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15

Phy. Fin. Phy. Fin.Unit

CostPhy. Fin. Phy. Fin.

( `̀̀̀ In Lakhs)Consolidate : Uttar Pradesh

RemarksPhysical

UnitS. No. Activity

Outlay Recommendation for 2014-15

Spill Over

Deferred

liability of

2014-15

Fresh Recommended Total Recommended

(a) Art Education 0.42000

(b) Health and Physical Education 0.42000

(c) Work Education 0.42000

9.33

Others-Incentive to Teachers in Schools Located in

Naxal Affected Areas (@ Rs.1500/- per teachers per

month)

Sub Total (9.13 to 9.33) 304830 658982.68000 304830 658982.68000

TOTAL

(New Teachers Salary +Teachers Salary Recurring)304830 658982.68000 304830 658982.68000

10 Teachers Training

(a) Teachers

10.01Refresher In-service Teachers' Training at BRC level and

above - 10 days (@ Rs.200/- per head per day)

Teacher

(Target &

Ach.-13-14 in

Mandays)

Not recommended

10.01(a) Continuous and Comprehensive Evauation [PS + UPS) Teacher 0.01300 107474 1397.16200 107474 1397.16200

CCE and early reading for

class I and II

recommended for 13 days

NR.

10.01(b) Eary Reading and Numeracy Skills [PS] Teacher 0.00500 107474 537.37000 107474 537.37000

CCE recommended for

classes III-V

recommended for 5 days

NR

10.01(c) Science [UPS] Teacher 0.00800 51321 410.56800 51321 410.56800Recommended 8 days NR

training

10.01(d) CWSN Teacher 0.00400 Not recommended

10.02

One day monthly cluster level meetings and peer group

training sessions for 10 months for all teachers each year

at CRC level - 10 days (@ Rs.100/- per head per day)

Teacher 0.01000

10.03(a)Induction Training for Newly Recruited Teachers for 6

Months (Special BTC)- @Rs.2000/- per head per yearTeacher 0.02000

10.03(b)5 Days Training for Part Time Instructors @ Rs. 200/- per

head per day) Teacher 0.01000

Not recommended

10.04Training of untrained Teachers to acquire professional

qualifications over a two year period.Teacher 0.04700 66150 3109.05000 66150 3109.05000

(b) Head Teachers

10.05Refresher Residencial In-service for 10 days at BRC level

and above

Head

Teacher

(c) Resource Persons

10.06

Refresher Training for all Resource Persons,Master

Trainers, BRC & CRC faculty and Coordinators for 5 days

each year (@ Rs.200/- per head per day)

Resource

Person 0.00300 10560 31.68000 10560 31.68000

Recommended for 10560

RPs for 3 day NR Training

Sub Total 342979 5485.83000 342979 5485.83000

11Academic Support through Block Resource Centre

(BRC)/ URC

11.01 Salary of Faculty and Staff

(a) 5 RPs at BRC for subject specific training in position RP 4400 4400

(b) 2 RPs for CWSN in position RP

(b-i) 1 CWSN Resource Person RP 1.10000 1710 1881.00000 1710 1881.00000Recommended as

proposed

(b-ii) 1 Physiotherapist (Resource person for IE) RP

(c) 1 MIS Coordinator in position RP 1.86000

(d) 1 Datra Entry Operator in position RP 672 1169.28000 672 1169.28000

(e) 1 Accountant-cum-support staff in position RP 1.80000 747 1344.60000 747 1344.6000011.02 Furniture Grant BRC/ URC 1.00000

11.03Replacement of furniture, computer, TLE etc ( Once in 5

years)BRC/ URC 1.00000

11.04 Contingency Grant BRC/ URC 0.50000 880 440.00000 880 440.0000011.05 Meeting, TA BRC/ URC 0.30000 880 264.00000 880 264.0000011.06 TLM Grant BRC/ URC 0.1000011.07 Maintenance Grant BRC/ URC 0.10000

Sub Total 880 5098.88000 880 5098.88000

12Academic Support through Cluster Resource

Centres (CRC/UERC)

12.01Salary of Cluster Coordinator (on an average of one

Resource Person per 18 schools in a block)RP

12.02 Furniture Grant CRC/ UERC 0.10000

12.03Replacement of furniture, computer, TLE etc. once in 5

yearsCRC/ UERC 0.10000

12.04 Contingency Grant CRC/UERC 0.10000 8249 824.90000 8249 824.90000

12.05 Meeting, TA CRC/UERC 0.12000 8249 989.88000 8249 989.8800012.06 TLM Grant CRC/UERC 0.0300012.07 Maintenance Grant CRC/UERC 0.02000

Sub Total 16498 1814.78000 16498 1814.78000

13Computer Aided Education in upper primary

schools under Innovation

13.01 Computer Aided Education in upper primary schools District 0.01200 3600 43.20000 3600 43.20000

Sub Total 3600 43.20000 3600 43.2000014 Libraries in Schools

14.01 (a) Primary School (per school) School 0.0300014.02 (b) Upper Primary School (per school) School 0.10000

Sub Total

IV ANNUAL GRANTS

15 Teachers' Grant

Not recommended

Recommended as

proposed

Recommended as

proposed

Recommended for persons

in position for 12 months.

Vacant position, Salary to

be paid on joining.

Arti:SSA-AWPB-2014-15-PABMinits:UP:16-06-2014 4 / 533

Page 5: U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 · 2015. 1. 6. · U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15

Phy. Fin. Phy. Fin.Unit

CostPhy. Fin. Phy. Fin.

( `̀̀̀ In Lakhs)Consolidate : Uttar Pradesh

RemarksPhysical

UnitS. No. Activity

Outlay Recommendation for 2014-15

Spill Over

Deferred

liability of

2014-15

Fresh Recommended Total Recommended

15.01 Primary Teachers Teacher 0.00500

15.02 Upper Primary Teachers Teacher 0.00500 51321 256.60500 51321 256.60500Recommended for Science

Teacher UPS

Sub Total 51321 256.60500 51321 256.6050016 School Grant

16.01 Primary School School 0.05000 115103 5755.15000 115103 5755.1500016.02 Upper Primary School School 0.07000 53250 3727.50000 53250 3727.50000

Sub Total 168353 9482.65000 168353 9482.65000

17 Research, Evaluation, Monitoring & Supervision

17.01 REMS Activities School 0.00103 168353 173.17000 168353 173.1700017.02 Monitoring & Supervision School 0.00078 168353 132.00000 168353 132.00000

17.03 House Hold Survey (Urban) in Million Plus Cities District 35.00000Not recommended

Sub Total 336706 305.17000 336706 305.1700018 Maintenance Grant

18.01 Maintenance in School having upto3 Classrooms School 0.07500 35312 2648.40000 35312 2648.40000

18.01a Maintenance in School having more than 3 Classrooms School 0.07500 123674 9275.55000 123674 9275.55000

Sub Total 158986 11923.95000 158986 11923.95000

V BRIDGING GENDER AND SOCIAL CATEGORY GAPS

19 Interventions for CWSN (IE)

19.01 Provision for Inclusive Education Child 0.01700 289642 4923.87280 289642 4923.87280

CWSN taken as per DISE

and unit cost reduced for

eligible activities.

Sub Total 289642 4923.87280 289642 4923.87280

20 Innovativation Head up to Rs.50 Lakh per district

20.01 Girls Education District 0.70000 632 442.40000 632 442.40000

Recommended for 632

Blocks in 75 districts.

Deferred liablity not

recommended as not

indicated in the PAB

minutes - 2013-14

20.02 ECCE District

20.03 Intervention for SC / ST children District Not recommended

20.04 Intervention for Minority Community children District 40.25000 40.25000Recommended in 8

districts

20.05 Intervention for Urban Deprived children District 10.00000Sub Total 632 482.65000 632 482.65000

21 SMC/PRI Training

21.01Residential for 6 Resource Person per Block (3 days) (@

Rs.500/-)Blocks 0.09000

Not recommended

21.02Non-residential (3 days training of 6 SMC members) (@

Rs.100/-)SMC 0.01800 160164 2882.95200 160164 2882.95200

Recommended as

proposed for 6 members

from each SMC

21.02(a)Non-residential (3 days training of 3 Members of

PRI/VECs/LA) (@ Rs.100/-)VEC/WEC 0.00900

Not recommended

21.03Seminar/Orientation of SMC Women members and

President/Vice President (@ Rs. 50,000/- per block)Blocks 0.50000

Not recommended

Sub Total 160164 2882.95200 160164 2882.95200VI SCHOOL INFRASTRUCTURE

22 Civil Works

22.01 Primary School (Plain) (New) School 2 543.04 13.15500 2 543.04459

Fresh work not

recommended. Spillover

recommended as

proposed and deferred

liability is not

recommended.

22.02 Primary School (Hilly/Rocky) (New) School 13.27500Fresh work not

recommended.

22.03 Upper Primary (Plain) (New) School 61.67 20.65500 61.67147

Fresh work not

recommended. . Spillover

recommended as

proposed and deferred

liability is not

recommended.

22.04 Upper Primary School (Hilly/Rocky) (New) School 1.30 20.77500 1.30154

Fresh work not

recommended. Spillover

recommended as

proposed

22.04a Composite Schools for Urban Areas (Class I-VIII) School 450.45 41.04000 450.45140

Spillover recommended as

proposed and deferred

liability is not

recommended.22.05 ACR in lieu of upgraded Upper Primary School Rooms

22.06 Additional class rooms for adding Class VIII Rooms

22.07 Building Less (Pry) School 9.7500022.08 Building Less (UP) School 18.5900022.09 Dilapidated Building (Pry) School 9.75000

22.10 Dilapidated Building (UP) School 18.59000

22.11 Additional Class Room (Rural) ( PS+UPS) Rooms 74 52.26 3.45000 6429 22180.05000 6503 22232.31000

22.12 Additional Class Room (Urban) Rooms 3.45000 46 158.70000 46 158.70000

22.13 Additional Class Room (Hill Area)

Spillover recommended as

proposed and Fresh work

recommended for 1526

rooms.

Not recommended

Not a priority item, hence

not recommended

Recommended as

proposed

Recommended as

proposed

Arti:SSA-AWPB-2014-15-PABMinits:UP:16-06-2014 5 / 533

Page 6: U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 · 2015. 1. 6. · U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15

Phy. Fin. Phy. Fin.Unit

CostPhy. Fin. Phy. Fin.

( `̀̀̀ In Lakhs)Consolidate : Uttar Pradesh

RemarksPhysical

UnitS. No. Activity

Outlay Recommendation for 2014-15

Spill Over

Deferred

liability of

2014-15

Fresh Recommended Total Recommended

22.14 Toilet/Urinals (PS & UPS) School 0.70000 2047 1432.90000 2047 1432.90000

Fresh work approved and

deferred liability is not

recommended.

22.15 Separate Girls Toilet (Rural+Urban) School 0.70000 1271 889.70000 1271 889.70000

Fresh work recommended

as proposed and deferred

liability is not

recommended.

22.16 CWSN friendly Toilets School 0.50000Fresh work not

recommended.

22.17 Drinking Water Facility (for Urban Area Only) School 0.15000 46 6.90000 46 6.9000022.17a Drinking Water Facility (Plain PS & UPS) School 0.15000 2891 433.65000 2891 433.6500022.17b Drinking Water Facility (Hilly/Rocky PS & UPS) School 0.15000 320 48.00000 320 48.0000022.18a Boundary Wall PS (Total in Meters x .01105) 0.01749

22.18b Boundary Wall PS (For Gate) @Rs. 7000 x no. of P.S. School 0.07800

22.18c Boundary Wall UPS (Total in Meters x .01105) 0.01749

22.18d Boundary Wall UPS (For Gate) @Rs. 7000 x no. of UPS School 0.07800

22.19a Electrification in P.S./ Electrical Equipment School 0.11000

22.19b Electrification in U. P.S./ Electrical Equipment School 0.11000

22.20 Office-cum-store-cum-Head Teacher's room (Primary) Rooms

22.21Office-cum-store-cum-Head Teacher's room (Upper

Primary)Rooms

22.22 Augumentation of training facility in BRC (one time) BRC/ URC 5.00000

Not a priority item, hence

not recommended

22.23 Child friendly Elements School 0.25000

Not a priority item, hence

not recommended

22.24 Ramps with Handrails (Barrier Free Elements) School 0.06000 2783 166.98000 2783 166.98000Recommended as

proposed

22.25 Handrails in existing Ramps School 0.0100022.26 Whole School Develoipment School

22.27 Retro-fitting and repairs School

22.28Residential Schools for specific category of

children(a) Construction of Building including boundary wall,

Water and sanitation facilities, electric installation (For 100

children)

Building 65.86000

(b) Construction of residential hostel Building 65.86000(c) Refurnishing unused old buildings Building

22.29

Construction of Hostel in existing Govt UPS including

boundary wall, Water and sanitation facilities, electric

installation etc. (For 50 children)7.00000

Not recommended

22.30Furniture for Govt. UPS (per child) (@ Rs.500/- per child

enrolled)Child 0.00500

22.31 Major Repairs for Primary School School 0.30000 Not recommended

22.32 Majr Repairs for Upper Primary School School 0.30000 Not recommended

22.33Others (Difference of Civil Wrks sanctioned in

pre.yr.)

22.33a Others (Overhead Tank PS) School 0.12000

22.33b Others (Overhead Tank UPS) School 0.12000

Sub Total (Civil Works) 76 1108.73 15833 25316.88000 15909 26425.60900VII PROJECT MANAGEMENT COST

23 Management

23.01 Management up to 3.5%

(a) Project Management and MIS

(i) DPO ( Salary, Contigency, Consumables, POL, TA &

Computer etc)District 75 8748.13980 75 8748.13980

(ii) EMIS Cell District 75 1173.75950 75 1173.75950Recommended as

proposed

Sub Total (a) 75 75 75 9921.89930 75 9921.89930(b) Training of Educational Administrators District

(c) School Mapping and Social Mapping District

Sub Total (23.01)

23.02 Learning Enhancement Prog. (LEP) (P & UP) (up to 2%) District 1267.11215 1267.11215

23.03 Community Mobilization (up to 0.5%) District 75 3322.25000 75 3322.25000Sub Total (Management) 75 4589.36215 75 4589.36215Total Management Cost 14511.26145 14511.26145

Total of SSA (Districs) 76 1108.73 22 1062.50 33362882 833216.44535 33362980 835387.67435

24 State Component

24.01 Management 2903.42000 2903.42000

Also inclueds an amount of

Rs. 262 towards

consultancy and

workshops with othe State

level organisations as per

need

24.02 REMS 168353 692.17000 168353 692.17000

24.03 Support to SCERT, SIE, SIEMAT & Other Institutions

Sub Total 168353 3595.59000 168353 3595.59000

STATE SSA TOTAL 76 1108.73 22 1062.50 33531235 836812.03535 33531333 838983.26435

25KGBV Financial Provision (give separate costing

sheets for different Models)Hostel

Fresh work not

recommended and

deferred liability for

Boundary wall not

recommended.

Not recommended

It is not a priority item,

hence not recommended.

Fresh work not

recommended and

deferred liability is not

recommended.

Arti:SSA-AWPB-2014-15-PABMinits:UP:16-06-2014 6 / 533

Page 7: U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 · 2015. 1. 6. · U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15

Phy. Fin. Phy. Fin.Unit

CostPhy. Fin. Phy. Fin.

( `̀̀̀ In Lakhs)Consolidate : Uttar Pradesh

RemarksPhysical

UnitS. No. Activity

Outlay Recommendation for 2014-15

Spill Over

Deferred

liability of

2014-15

Fresh Recommended Total Recommended

ANon Recurring One Time Grant (Only committed

liabilities) (Model-I)

25.01 Construction of Building (New)

25.02 Construction of Building KGBV sanctioned earlier 520.31 520.31010

Spillover recommended as

proposed

25.02(a) Additional Class Room Rooms 3.45000

25.02(b) Guard Room Rooms 1.32000

25.02(c) Boundary Wall School 5.02000

25.03 Boudary Wall (Spillover only) 112.795 112.79500Spillover recommended as

proposed

25.04

Boring/Handpump (Spillover only) (minimum rates

prescribed by State Drinking Water Department subject to

a ceiling of Rs. 1.00 lakhs)102.92 102.91500

Spillover recommended as

proposed

25.05 Electricity /Water charges (Spillover only)

Spillover recommended as

proposed

25.05(a) Solar Water Heater & Solar Light 2.97000

25.06 Furniture/Equipment (including Kitchen equipment) 3.00000

Spillover recommended as

proposed

25.07 TLM and equipment including library books 3.50000Spillover recommended as

proposed

25.08 Bedding (New) 0.75000

25.09 Replacement of Bedding (once in 3 Year) 10 0.75000 524 393.00000 534 393.00000Spillover recommended as

proposed

Subtotal Non Recurring 736.02 393.00000 1129.02010B Recurring Cost Per Annum (Model-I)

25.10 Maintenance per girl student per month @ Rs. 1500/- 18.00000 734 13212.00000 734 13212.00000

25.11 Stipend for girl student per month @ Rs. 100/- 1.20000 734 880.80000 734 880.80000

25.12Supplementary TLM, stationery and other educational

material @ Rs.1000/- per annum1.00000 734 734.00000 734 734.00000

25.13 Salaries

25.13.1 Additional Salaries:

(a) 1 Warden @ Rs. 25,000/- per month 3.00000 734 2202.00000 734 2202.00000

(b)4 Full time teachers as per RTE norms @ Rs. 20,000/- per

month per teacher9.60000 734 7046.40000 734 7046.40000

(c)

1 Urdu Teachers (only for blocks with muslim population

above 20% and select urban areas), if required @ Rs.

12,000/- per month per teacher1.44000 734 1056.96000 734 1056.96000

(d)3 part time teachers @ Rs. 5,000/- per month per teacher

1.80000 734 1321.20000 734 1321.20000

(e)1 Full time Accountant @ Rs. 10,000/- per month

1.20000 734 880.80000 734 880.80000

(f)2 Support Staff – (Accountant/ Assistant, Peon,

Chowkidar) @ Rs. 5,000/- per month per staff 1.20000 734 880.80000 734 880.80000

(g) 1 Head cook @ Rs. 6,000/- per month 0.72000 734 528.48000 734 528.48000

(h)2 Asstt. Cooks @ Rs. 4,500/- per month per cook

1.08000 734 792.72000 734 792.72000

25.14 Specific skill training @ Rs.1000/- per child per annum 1.00000 734 734.00000 734 734.00000

25.15 Electricity/water charges @ Rs.1000/- per child per annum 1.00000 734 734.00000 734 734.00000

25.16Medical care/contingencies @ Rs. 1250 per child per

annum1.25000 734 917.50000 734 917.50000

25.17 Maintenance @ Rs.750/- per child per annum 0.75000 734 550.50000 734 550.50000

25.18Miscellaneous (Educational Tour/ Exposure Visit / Sports

Material etc.) @ Rs.750/- per child per annum0.75000 734 550.50000 734 550.50000

25.19 Preparatory camps @ Rs.200/- per child per annum 0.20000 734 146.80000 734 146.80000

25.20 PTAs/school functions @ Rs.200/- per child per annum 0.20000 734 146.80000 734 146.80000

25.21 Provision of Rent @ Rs.6000/- per annum 6.0000025.21a Provision of Rent (6 months) 3.6000025.21b Provision of Rent (3 months) 1.8000025.21c Rent (Previous Year (2007-2012) 9 9 Not recommended

25.22 Capacity building 0.50000 734 367.00000 734 367.00000

25.22(a)Physical/ Self Defence Training @ Rs.200/- per child per

annum0.20000 734 146.80000 734 146.80000

Subtotal Recurring 734 33830.06000 734 33830.06000Subtotal (Model-I) 736.02 734 34223.06000 734 34959.08010

CNon Recurring One Time Grant (Only committed

liabilities) (Model-II)

25.23 Construction of Building (New)

25.24 Construction of Building KGBV sanctioned earlier

25.24(a) Additional Class Room Rooms 3.4500025.24(b) Guard Room Rooms 1.32000

25.24(c) Boundary Wall School 5.02000

25.25 Boudary Wall (Spillover only) 3.58 3.5810025.26 Boring/Handpump (Spillover only) 3.66 3.6620025.27 Electricity /Water charges (Spillover only)

25.27(a) Solar Water Heater & Solar Light 2.97000

25.28 Furniture/Equipment (including Kitchen equipment) 2.00000

25.29 TLM and equipment including library books 3.0000025.30 Bedding (New) 0.3750025.31 Replacement of Bedding (once in 3 Year) 0.37500 9 3.37500 9 3.37500

Subtotal Non Recurring 7.24 9 3.37500 9 10.61800D Recurring Cost Per Annum (Model-II)

25.32 Maintenance per girl student per month @ Rs. 1500/- 9.00000 12 108.00000 12 108.00000

Recommended as

proposed

Recommended as

proposed

Recommended as

proposed

Recommended as

proposed

Recommended as

proposed

Arti:SSA-AWPB-2014-15-PABMinits:UP:16-06-2014 7 / 533

Page 8: U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 · 2015. 1. 6. · U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15

Phy. Fin. Phy. Fin.Unit

CostPhy. Fin. Phy. Fin.

( `̀̀̀ In Lakhs)Consolidate : Uttar Pradesh

RemarksPhysical

UnitS. No. Activity

Outlay Recommendation for 2014-15

Spill Over

Deferred

liability of

2014-15

Fresh Recommended Total Recommended

25.33 Stipend for girl student per month @ Rs. 100/- 0.60000 12 7.20000 12 7.20000

25.34Supplementary TLM, stationery and other educational

material @ Rs.1000/- per annum0.50000 12 6.00000 12 6.00000

25.35 Salaries

(a)1 Warden @ Rs. 25,000/- per month

3.00000 12 36.00000 12 36.00000

(b)

3 Full time teachers as per RTE norms @ Rs. 20,000/- per

month per teacher 7.20000 12 86.40000 12 86.40000

(c)

3 part time teachers @ Rs. 5,000/- per month per teacher

1.80000 12 21.60000 12 21.60000

(d)1 Full time Accountant @ Rs. 10,000/- per month

1.20000 12 14.40000 12 14.40000

(e)2 Support Staff – (Accountant/ Assistant, Peon,

Chowkidar) @ Rs. 5,000/- per month per staff 1.20000 12 14.40000 12 14.40000

(f)1 Head cook @ Rs. 6,000/- per month

0.72000 12 8.64000 12 8.64000

(g)1 Asstt. Cooks @ Rs. 4,500/- per month per cook

0.54000 12 6.48000 12 6.48000

25.36 Specific skill training @ Rs.1000/- per child per annum 0.50000 12 6.00000 12 6.00000

25.37 Electricity/water charges @ Rs.1000/- per child per annum 0.50000 12 6.00000 12 6.00000

25.38Medical care/contingencies @ Rs. 1250 per child per

annum0.62500 12 7.50000 12 7.50000

25.39 Maintenance @ Rs.750/- per child per annum 0.37500 12 4.50000 12 4.50000

25.40Miscellaneous (Educational Tour/ Exposure Visit / Sports

Material etc.) @ Rs.750/- per child per annum0.37500 12 4.50000 12 4.50000

25.41 Preparatory camps @ Rs.300/- per child per annum 0.15000 12 1.80000 12 1.80000

25.42 PTAs/school functions @ Rs.300/- per child per annum 0.15000 12 1.80000 12 1.80000

25.43 Provision of Rent @ Rs.10000/- per annum 5.0000025.43a Provision of Rent (6 months) 3.6000025.43b Provision of Rent (3 months) 1.80000

25.43c Rent (Previous Year (2007-2012)

25.44 Capacity building 0.25000 12 3.00000 12 3.00000

25.44(a)Physical/ Self Defence Training @ Rs.200/- per child per

annum0.10000 12 1.20000 12 1.20000

Subtotal Recurring 228 345.42000 228 345.42000Subtotal (Model-II) 7.24 237 348.79500 237 356.03800

Total (KGBV) 743.26 34571.85500 971 35315.11810

DISTRICT GRAND TOTAL (SSA+KGBV) 1851.99 1062.50 871383.89035 874298.38245

Recommended as

proposed

Recommended as

proposed

Arti:SSA-AWPB-2014-15-PABMinits:UP:16-06-2014 8 / 533

Page 9: U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 · 2015. 1. 6. · U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15

Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

I ACCESS

1 Opening of New Schools

1.01 Upgradation of EGS to PSCentres /

School1.02 New PS School 2

1.03 Upgradation of PS to UPS / New UPS School

1.04 Composite Schools (for Urban Areas) School

1.05Residential Schools for specific category children

(For 100 children)

1.06Residential Hostel (for specific category of

children) (For 50 children)

1.07 Integration of Class V with Primary Schools

1.08Integration of Class VIII with Upper Primary

Schools

2Residential Schools for specific category

of children (For 100 Children)

Total - Residential Schools (For 100

children)

3Residential Hostel for specific category of

children (For 50 Children)

Total - Residential Schools (For 50

children)4 Transport/Escort Facility

4.01

Children in remote habitations with sparse

populations where opening of schools is

unviable

Child 0.03000

4.02

Urban deprived children/children without adult

protection in urban areas where schools are not

opened because availability of land is a problem

Child 0.03000

Sub Total

5Special Training for mainstreaming of Out-

of-School Children

5.03 Non-Residential (Fresh)(a) 12 months Child 0.06000(b) 9 months 0.04500(c) 6 months

(i)Special Training (by Special Instructors-NRBC)-

(1-5) Child 0.03000 205 6.150 205 6.15000

(ii) Special Training (by Special Instructors-NRBC)-

(6-8) Child 0.03000 207 6.210 207 6.21000

(d) 3 months Child 0.01500Sub Total 412 12.360 412 12.36000

Total (Special Training) 412 12.360 412 12.3605(B) House Hold Survey (HHS)

5(B).01 House Hold Survey through SMCHouse

Hold0.00001

Sub TotalII RETENTION6 Free Text Book

6.01Free Text Book (PS) for Parishadiya & Aided

Primary Schools (Workbooks not included)Child 0.00120 118657 142.388 118657 142.38840

6.01a

Free Text Book (PS) for 25% children of Class-1

in Private Recognised Primary Schools of other

Boards (Workbooks not included)

Child 0.00150

6.02 Free Brail Books (PS) 0.00150 140 0.210 140 0.21000

6.03 Free Large Print Books (PS) 0.00150

6.04Free Text Book (UPS) (Workbooks not included)

(Including KGBV Girls)Child 0.00200 69189 138.378 69189 138.37800

6.05 Free Brail Books (UPS) 0.00250 55 0.138 55 0.13750

6.06 Free Large Print Books (PS) 0.00250Sub Total 188041 281.114 188041 281.114

7 Provision of 2 set of Uniforms

7.01 All Girls (Including KGBV Girls) Child 0.00400 148074 592.296 148074 592.29600

7.02 SC Boys Child 0.00400 39737 158.948 39737 158.94800

7.03 ST Boys Child 0.00400 35 0.140 35 0.14000

7.04 BPL Boys Child 0.00400 53397 213.588 53397 213.58800

7.05

Free Uniform for 25% children of Class-1 in

Private Recognised Primary Schools of other

Boards

Child0.00400

Sub Total 241243 964.972 241243 964.9727(A) Fee Reimbursement

7(A).01

Fee Reimbursement for Admission of children of

Disadvantaged Group & Weaker Section upto

25% of seats in Class-1 of Private Unaided

Recognised Schools

Child 0.05400

Sub Total

8 Teaching Learning Equipment (TLE)

8.01 TLE - New Primary School 1.60000 0.20000 1.600008.02 TLE - New Upper Primary School 2.00000 0.50000 2.00000

Name of District : Varanasi -75

ActivityS. No.Physical

UnitRemarks

Outlay Recommendation for 2014-15

Spill OverDeferred laibility of

2014-15Fresh Recommended Total Recommended

Arti:SSA-AWPB-2014-15-PABMinits:Varanasi:16-06-2014 9 / 533

Page 10: U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 · 2015. 1. 6. · U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15

Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

Name of District : Varanasi -75

ActivityS. No.Physical

UnitRemarks

Outlay Recommendation for 2014-15

Spill OverDeferred laibility of

2014-15Fresh Recommended Total Recommended

Sub Total 3.60000 3.60000III ENHANCING QUALITY9 New Teachers Salary

9.01 Primary Teachers (Regular) (Asstt. Teacher) Teacher 0.91500

9.01aHead Teacher for Primary (if the number of

children exceeds 150 in a school)Teacher

9.02 Primary Teachers (Contract) (S.M.) Teacher

9.03Subject specific Upper Primary Teachers

(Regular) (a) Science and Mathematics Teacher 1.26000(b) Social Studies Teacher 1.26000(c) Languages Teacher 1.26000

Sub Total (9.01 to 9.05)Add.Teacher against PTR

Sub Total (9.06 to 9.12)

Total (New Teacher's Salary-9.01 to 9.12)

Teachers Salary (Recurring-sanctioned

earlier)Primary teachers

9.13 Primary Teachers ( Regular)-Existing, in position Teacher 3.66000 1451 5310.660 1451 5310.66000

9.14 Primary Teachers (Contract)- in position Teacher 0.55000

9.14(a) Primary Teachers (Contract)-under Training Teacher 0.38500 898 345.730 898 345.73000

9.14(b)Primary Teacher (Para Teachers Equal to

9.14(a) upgraded as Teachers)Teacher 0.38500 677 260.645 677 260.64500

9.14(c) Primary Teachers (Para)- Vacant Teacher9.15 Primary Teachers (Vacant) Teacher 0.30500

9.16Head Teacher for Primary (if the number of

children exceeds 150)Teacher 5.04000 148 745.920 148 745.92000

9.16(b)Head Teacher for Primary (if the number of

children exceeds 150) VacantTeacher 0.42000

Additional teachers

9.17Additional Teachers - PS (Special BTC-

Regular) in positionTeacher 0.30500

9.18Additional Teachers - PS (Special BTC Under

Training)Teacher 0.87600

9.19 Additional Teachers - PS (Vacant) Teacher9.20 Others in position Teacher

Upper Primary teachers

9.21 UP Teachers (Regular)-Existing Teacher 5.04000 602 3034.080 602 3034.08000

9.22 UP Teachers (Contract)-Existing9.23 UP Teachers (Vacant) Teacher 1.26000

9.24Head Teacher for Upper Primary (if the number

of children exceeds 100)-ExistingTeacher 5.34000 164 875.760 164 875.76000

9.24a Head Teacher for Upper Primary (Vacant) Teacher 1.33500

9.25Subject specific Upper Primary Teachers

(Regular)(a) Science and Mathematics(b) Social Studies(c) Languages

9.32 Part Time Instructors in position(a) Art Education 0.77000 196 150.920 196 150.92000(b) Health and Physical Education 0.77000 208 160.160 208 160.16000(c) Work Education 0.77000 180 138.600 180 138.60000

9.32(A) Part Time Instructors Vacant(a) Art Education 0.42000(b) Health and Physical Education 0.42000(c) Work Education 0.42000

9.33

Others-Incentive to Teachers in Schools

Located in Naxal Affected Areas (@

Rs.1500/- per teachers per month)

Sub Total (9.13 to 9.33) 4524 11022.475 4524 11022.48TOTAL

(New Teachers Salary +Teachers Salary

Recurring)

4524 11022.475 4524 11022.47500

10 Teachers Training(a) Teachers

10.01

Refresher In-service Teachers' Training at BRC

level and above - 10 days (@ Rs.200/- per

head per day)

Teacher

(Target &

Ach.-13-14

in

Mandays)

0.00600

10.01(a)Continuous and Comprehensive Evauation [PS +

UPS)Teacher 0.01300 1067 13.871 1067 13.87100

10.01(b) Eary Reading and Numeracy Skills [PS] Teacher 0.00500 1067 5.335 1067 5.33500

10.01(c) Science [UPS] Teacher 0.00800 566 4.528 566 4.52800Recommended as

proposed

10.01(d) CWSN Teacher 0.00400

Arti:SSA-AWPB-2014-15-PABMinits:Varanasi:16-06-2014 10 / 533

Page 11: U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 · 2015. 1. 6. · U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15

Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

Name of District : Varanasi -75

ActivityS. No.Physical

UnitRemarks

Outlay Recommendation for 2014-15

Spill OverDeferred laibility of

2014-15Fresh Recommended Total Recommended

10.02

One day monthly cluster level meetings and

peer group training sessions for 10 months for

all teachers each year at CRC level - 10 days (@

Rs.100/- per head per day)

Teacher 0.01000

10.03(a)

Induction Training for Newly Recruited Teachers

for 6 Months (Special BTC)- @Rs.2000/- per

head per year

Teacher 0.02000

10.03(b)5 Days Training for Part Time Instructors @ Rs.

200/- per head per day) Teacher 0.01000

10.04

Training of untrained Teachers to acquire

professional qualifications over a two year

period.

Teacher 0.04700 924 43.428 924 43.42800

(b) Head Teachers

10.05Refresher Residencial In-service for 10 days at

BRC level and above

Head

Teacher(c) Resource Persons

10.06

Refresher Training for all Resource

Persons,Master Trainers, BRC & CRC faculty

and Coordinators for 5 days each year (@

Rs.200/- per head per day)

Resource

Person 0.00300 108 0.324 108 0.32400

Sub Total 3732 67.486 3732 67.486

11Academic Support through Block Resource

Centre (BRC)/ URC

11.01 Salary of Faculty and Staff

(a) 5 RPs at BRC for subject specific training in

positionRP 45 45

(b) 2 RPs for CWSN in position RP(b-i) 1 CWSN Resource Person RP 1.10000 18 19.800 18 19.80000

(b-ii) 1 Physiotherapist (Resource person for IE) RP

(c) 1 MIS Coordinator in position RP 1.86000

(d) 1 Datra Entry Operator in position RP 1.74000 6 10.440 6 10.44000

(e) 1 Accountant-cum-support staff in position RP 1.80000 8 14.400 8 14.40000

11.02 Furniture Grant BRC/ URC 1.00000

11.03Replacement of furniture, computer, TLE etc (

Once in 5 years)BRC/ URC 1.00000

11.04 Contingency Grant BRC/ URC 0.50000 9 4.500 9 4.50000

11.05 Meeting, TA BRC/ URC 0.30000 9 2.700 9 2.70000

11.06 TLM Grant BRC/ URC 0.10000

11.07 Maintenance Grant BRC/ URC 0.10000

Sub Total 9 51.840 9 51.84000

12Academic Support through Cluster

Resource Centres (CRC/UERC)

12.01Salary of Cluster Coordinator (on an average of

one Resource Person per 18 schools in a block)RP

12.02 Furniture GrantCRC/

UERC0.10000

12.03Replacement of furniture, computer, TLE etc.

once in 5 years

CRC/

UERC0.10000

12.04 Contingency Grant CRC/UERC 0.10000 110 11.000 110 11.00000

12.05 Meeting, TA CRC/UERC 0.12000 110 13.200 110 13.20000

12.06 TLM Grant CRC/UERC 0.03000

12.07Maintenance Grant

CRC/UERC 0.02000

Sub Total 220 24.200 220 24.20000

13Computer Aided Education in upper

primary schools under Innovation

13.01Computer Aided Education in upper primary

schoolsDistrict 0.01200 48 0.576 48 0.57600

Sub Total 48 0.576 48 0.5760014 Libraries in Schools14.01 (a) Primary School (per school) School 0.03000

14.02 (b) Upper Primary School (per school) School 0.10000

Sub TotalIV ANNUAL GRANTS15 Teachers' Grant15.01 Primary Teachers Teacher 0.0050015.02 Upper Primary Teachers Teacher 0.00500 566 2.830 566 2.83000

Sub Total 566 2.830 566 2.8300016 School Grant16.01 Primary School School 0.05000 1070 53.500 1070 53.5000016.02 Upper Primary School School 0.07000 560 39.200 560 39.20000

Arti:SSA-AWPB-2014-15-PABMinits:Varanasi:16-06-2014 11 / 533

Page 12: U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 · 2015. 1. 6. · U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15

Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

Name of District : Varanasi -75

ActivityS. No.Physical

UnitRemarks

Outlay Recommendation for 2014-15

Spill OverDeferred laibility of

2014-15Fresh Recommended Total Recommended

Sub Total 1630 92.700 1630 92.70000

17Research, Evaluation, Monitoring &

Supervision

17.01 REMS Activities School 0.00103 1630 1.677 1630 1.67664

17.02 Monitoring & Supervision School 0.00078 1630 1.278 1630 1.27803

17.03 House Hold Survey (Urban) in Million Plus Cities District 35.00000

Sub Total 3260 2.955 3260 2.9546718 Maintenance Grant

18.01 Maintenance in School having upto3 Classrooms School 0.07500 202 15.150 202 15.15000

18.01a Maintenance Grant School 0.07500 1171 87.825 1171 87.82500Sub Total 1373 102.975 1373 102.97500

VBRIDGING GENDER AND SOCIAL

CATEGORY GAPS

19 Interventions for CWSN (IE)

19.01 Provision for Inclusive Education Child 0.02000 4839 96.780 4839 96.78000

Sub Total 4839 96.780 4839 96.78000

20Innovativation Head up to Rs.50 Lakh per

district

20.01 Girls Education District 0.70000 8 5.600 8 5.60000

20.02 ECCE District20.03 Intervention for SC / ST children District

20.04 Intervention for Minority Community children District

20.05 Intervention for Urban Deprived children District 10.00000

Sub Total 8 5.600 8 5.6000021 SMC/PRI Training

21.01Residential for 6 Resource Person per Block (3

days) (@ Rs.500/-)Blocks 0.09000

21.02Non-residential (3 days training of 6 SMC

members) (@ Rs.100/-)SMC 0.01800 1373 24.714 1373 24.71400

21.02(a)Non-residential (3 days training of 3 Members of

PRI/VECs/LA) (@ Rs.100/-)VEC/ WEC 0.00900

21.03

Seminar/Orientation of SMC Women members

and President/Vice President (@ Rs. 50,000/-

per block)

Blocks 0.50000

Sub Total 1373 24.714 1373 24.71400VI SCHOOL INFRASTRUCTURE22 Civil Works22.01 Primary School (Plain) (New) School 2 3.44 13.15500 2 3.4440022.02 Primary School (Hilly/Rocky) (New) School 13.2750022.03 Upper Primary (Plain) (New) School 20.65500

22.04 Upper Primary School (Hilly/Rocky) (New) School 20.77500

22.04aComposite Schools for Urban Areas (Class I-

VIII)School 41.04000

22.05 ACR in lieu of upgraded Upper Primary School Rooms

22.06 Additional class rooms for adding Class VIII Rooms

22.07 Building Less (Pry) School 9.7500022.08 Building Less (UP) School 18.5900022.09 Dilapidated Building (Pry) School 9.7500022.10 Dilapidated Building (UP) School 18.59000

22.11 Additional Class Room (Rural) ( PS+UPS) Rooms 3.45000 24 82.800 24 82.80000

22.12 Additional Class Room (Urban) Rooms 3.45000 5 17.250 5 17.2500022.13 Additional Class Room (Hill Area)22.14 Toilet/Urinals (PS & UPS) School 0.7000022.15 Separate Girls Toilet (Rural+Urban) School 0.7000022.16 CWSN friendly Toilets School 0.50000

22.17 Drinking Water Facility (for Urban Area Only)) School 0.15000

22.17a Drinking Water Facility (Plain PS & UPS) School 0.15000

22.17b Drinking Water Facility (Hilly/Rocky PS & UPS) School 0.15000

22.18a Boundary Wall PS (Total in Meters x .01105) 0.01749

22.18bBoundary Wall PS (For Gate) @Rs. 7000 x no. of

P.S.School 0.07800

22.18c Boundary Wall UPS (Total in Meters x .01105) 0.01749

22.18dBoundary Wall UPS (For Gate) @Rs. 7000 x no.

of UPSSchool 0.07800

22.19a Electrification in P.S./ Electrical Equipment School 0.11000

22.19b Electrification in U. P.S./ Electrical Equipment School 0.11000

22.20Office-cum-store-cum-Head Teacher's room

(Primary)Rooms

22.21Office-cum-store-cum-Head Teacher's room

(Upper Primary)Rooms

22.22Augumentation of training facility in BRC (one

time)BRC/ URC 5.00000

22.23 Child friendly Elements School 0.25000

22.24 Ramps with Handrails (Barrier Free Elements) School 0.06000

Arti:SSA-AWPB-2014-15-PABMinits:Varanasi:16-06-2014 12 / 533

Page 13: U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 · 2015. 1. 6. · U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15

Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

Name of District : Varanasi -75

ActivityS. No.Physical

UnitRemarks

Outlay Recommendation for 2014-15

Spill OverDeferred laibility of

2014-15Fresh Recommended Total Recommended

22.25 Handrails in existing Ramps School 0.0100022.26 Whole School Develoipment School22.27 Retro-fitting and repairs School

22.28Residential Schools for specific category

of children

(a) Construction of Building including boundary

wall, Water and sanitation facilities, electric

installation (For 100 children)

Building 65.86000

(b) Construction of residential hostel Building 65.86000

(c) Refurnishing unused old buildings Building

22.29

Construction of Hostel in existing Govt UPS

including boundary wall, Water and sanitation

facilities, electric installation etc. (For 50

children)

7.00000

22.30Furniture for Govt. UPS (per child) (@ Rs.500/-

per child enrolled)Child 0.00500

22.31 Major Repairs for Primary School School 0.30000

22.32 Majr Repairs for Upper Primary School School 0.30000

22.33Others (Difference of Civil Wrks

sanctioned in pre.yr.)22.33a Others (Overhead Tank PS) School 0.1200022.33b Others (Overhead Tank UPS) School 0.12000

Sub Total (Civil WOrks) 2 3.44 29 100.050 31 103.49VII PROJECT MANAGEMENT COST23 Management23.01 Management up to 3.5%

(a) Project Management and MIS

(i) DPO ( Salary, Contigency, Consumables,

POL, TA & Computer etc)District 1 121.247 1 121.24740

(ii) EMIS Cell District 1 12.671 1 12.67050Sub Total (a) 1 1 1 133.918 1 133.918

(b) Training of Educational Administrators District

(c) School Mapping and Social Mapping District

Sub Total (23.01)

23.02Learning Enhancement Prog. (LEP) (P & UP) (up

to 2%)District 14.742 14.74230

23.03 Community Mobilization (up to 0.5%) District 1 45.850 1 45.85000

Sub Total (Management) 1 60.592 1 60.59230Total Management Cost 194.510 194.51020Total of SSA (Districs) 2 3.444 3.600 451307 13048.137 451309 13055.181

24 State Component23.01 Management23.02 REMS 0.0044923.03 SIEMAT

Sub Total

STATE SSA TOTAL 2 3.44400 3.60000 451307 13048.137 451309 13055.18077

25

KGBV Financial Provision (give

separate costing sheets for different

Models)

Hostel

ANon Recurring One Time Grant (Only

committed liabilities) (Model-I)

25.01 Construction of Building (New)

25.02 Construction of Building KGBV sanctioned earlier 6.31000 6.31000

25.02(a) Additional Class Room Rooms 3.45000

25.02(b) Guard Room Rooms 1.32000

25.02(c) Boundary Wall School 5.0200025.03 Boudary Wall (Spillover only) 1.50000 1.50000

25.04

Boring/Handpump (Spillover only)

(minimum rates prescribed by State Drinking

Water Department subject to a ceiling of Rs.

1.00 lakhs)

0.02000 0.02000

25.05 Electricity /Water charges (Spillover only)

25.05(a) Solar Water Heater & Solar Light 2.97000

25.06Furniture/Equipment (including Kitchen

equipment)3.00000

25.07 TLM and equipment including library books 3.50000

25.08 Bedding (New) 0.75000

25.09 Replacement of Bedding (once in 3 Year) 1 0.75000 2 1.500 3 1.50000

Subtotal Non Recurring 7.83000 1.500 9.33000

B Recurring Cost Per Annum (Model-I)

25.10Maintenance per girl student per month @ Rs.

1500/-18.00000 6 108.000 6 108.00000

25.11 Stipend for girl student per month @ Rs. 100/- 1.20000 6 7.200 6 7.20000

25.12Supplementary TLM, stationery and other

educational material @ Rs.1000/- per annum1.00000 6 6.000 6 6.00000

Arti:SSA-AWPB-2014-15-PABMinits:Varanasi:16-06-2014 13 / 533

Page 14: U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 · 2015. 1. 6. · U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15

Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

Name of District : Varanasi -75

ActivityS. No.Physical

UnitRemarks

Outlay Recommendation for 2014-15

Spill OverDeferred laibility of

2014-15Fresh Recommended Total Recommended

25.13 Salaries

25.13.1 Additional Salaries:

(a) 1 Warden @ Rs. 25,000/- per month 3.00000 6 18.00000 6 18.00000

(b)4 Full time teachers as per RTE norms @ Rs.

20,000/- per month per teacher 9.60000 6 57.60000 6 57.60000

(c)

1 Urdu Teachers (only for blocks with muslim

population above 20% and select urban areas), if

required @ Rs. 12,000/- per month per teacher 1.44000 6 8.64000 6 8.64000

(d)3 part time teachers @ Rs. 5,000/- per month per

teacher 1.80000 6 10.80000 6 10.80000

(e)1 Full time Accountant @ Rs. 10,000/- per month

1.20000 6 7.20000 6 7.20000

(f)

2 Support Staff – (Accountant/ Assistant, Peon,

Chowkidar) @ Rs. 5,000/- per month per staff 1.20000 6 7.20000 6 7.20000

(g) 1 Head cook @ Rs. 6,000/- per month 0.72000 6 4.32000 6 4.32000

(h)2 Asstt. Cooks @ Rs. 4,500/- per month per cook

1.08000 6 6.48000 6 6.48000

25.14Specific skill training @ Rs.1000/- per child per

annum1.00000 6 6.000 6 6.00000

25.15Electricity/water charges @ Rs.1000/- per child

per annum1.00000 6 6.000 6 6.00000

25.16Medical care/contingencies @ Rs. 1250 per child

per annum1.25000 6 7.500 6 7.50000

25.17 Maintenance @ Rs.750/- per child per annum 0.75000 6 4.500 6 4.50000

25.18

Miscellaneous (Educational Tour/ Exposure Visit

/ Sports Material etc.) @ Rs.750/- per child per

annum

0.75000 6 4.500 6 4.50000

25.19Preparatory camps @ Rs.200/- per child per

annum0.20000 6 1.200 6 1.20000

25.20PTAs/school functions @ Rs.200/- per child per

annum0.20000 6 1.200 6 1.20000

25.21 Provision of Rent @ Rs.6000/- per annum 6.00000

25.21a Provision of Rent (6 months) 3.6000025.21b Provision of Rent (3 months) 1.8000025.21c Rent (Previous Year (2007-2012)

25.22 Capacity building 0.50000 6 3.000 6 3.00000

25.22(a)Physical/ Self Defence Training @ Rs.200/- per

child per annum0.20000 6 1.200 6 1.20000

Subtotal Recurring 6 276.540 6 276.54000

Subtotal (Model-I) 7.83000 6 278.040 6 285.87000

CNon Recurring One Time Grant (Only

committed liabilities) (Model-II)

25.23 Construction of Building (New)

25.24 Construction of Building KGBV sanctioned earlier

25.24(a) Additional Class Room Rooms 3.45000

25.24(b) Guard Room Rooms 1.32000

25.24(c) Boundary Wall School 5.0200025.25 Boudary Wall (Spillover only)25.26 Boring/Handpump (Spillover only)

25.27 Electricity /Water charges (Spillover only)

25.27(a) Solar Water Heater & Solar Light 2.97000

25.28Furniture/Equipment (including Kitchen

equipment)2.00000

25.29 TLM and equipment including library books 3.00000

25.30 Bedding (New) 0.37500

25.31 Replacement of Bedding (once in 3 Year) 0.37500

Subtotal Non Recurring

D Recurring Cost Per Annum (Model-II)

25.32Maintenance per girl student per month @ Rs.

1500/-9.00000

25.33 Stipend for girl student per month @ Rs. 100/- 0.60000

25.34Supplementary TLM, stationery and other

educational material @ Rs.1000/- per annum0.50000

25.35 Salaries(a) 1 Warden @ Rs. 25,000/- per month 3.00000

(b)3 Full time teachers as per RTE norms @ Rs.

20,000/- per month per teacher 7.20000

(c) 3 part time teachers @ Rs. 5,000/- per month per

teacher 1.80000

(d)1 Full time Accountant @ Rs. 10,000/- per month

1.20000

Arti:SSA-AWPB-2014-15-PABMinits:Varanasi:16-06-2014 14 / 533

Page 15: U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 · 2015. 1. 6. · U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15

Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

Name of District : Varanasi -75

ActivityS. No.Physical

UnitRemarks

Outlay Recommendation for 2014-15

Spill OverDeferred laibility of

2014-15Fresh Recommended Total Recommended

(e)

2 Support Staff – (Accountant/ Assistant, Peon,

Chowkidar) @ Rs. 5,000/- per month per staff 1.20000

(f) 1 Head cook @ Rs. 6,000/- per month 0.72000

(g)1 Asstt. Cooks @ Rs. 4,500/- per month per cook

0.54000

25.36Specific skill training @ Rs.1000/- per child per

annum0.50000

25.37Electricity/water charges @ Rs.1000/- per child

per annum0.50000

25.38Medical care/contingencies @ Rs. 1250 per child

per annum0.62500

25.39 Maintenance @ Rs.750/- per child per annum 0.37500

25.40

Miscellaneous (Educational Tour/ Exposure Visit

/ Sports Material etc.) @ Rs.750/- per child per

annum

0.37500

25.41Preparatory camps @ Rs.300/- per child per

annum0.15000

25.42PTAs/school functions @ Rs.300/- per child per

annum0.15000

25.43 Provision of Rent @ Rs.10000/- per annum 5.00000

25.43a Provision of Rent (6 months) 3.6000025.43b Provision of Rent (3 months) 1.8000025.43c Rent (Previous Year (2007-2012)25.44 Capacity building 0.25000

25.44(a)Physical/ Self Defence Training @ Rs.200/- per

child per annum0.10000

Subtotal Recurring

Subtotal (Model-II) Total (KGBV) 7.830 6 278.040 6 285.870

DISTRICT GRAND TOTAL (SSA+KGBV) 2 11.274 3.600 451313 13326.177 451315 13341.051

Arti:SSA-AWPB-2014-15-PABMinits:Varanasi:16-06-2014 15 / 533

Page 16: U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 · 2015. 1. 6. · U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15

Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

I ACCESS

1 Opening of New Schools

1.01 Upgradation of EGS to PSCentres /

School1.02 New PS School

1.03 Upgradation of PS to UPS / New UPS School

1.04 Composite Schools (for Urban Areas) School

1.05Residential Schools for specific category children

(For 100 children)

1.06Residential Hostel (for specific category of

children) (For 50 children)

1.07 Integration of Class V with Primary Schools

1.08Integration of Class VIII with Upper Primary

Schools

2Residential Schools for specific category

of children (For 100 Children)

Total - Residential Schools (For 100

children)

3Residential Hostel for specific category of

children (For 50 Children)

Total - Residential Schools (For 50

children)4 Transport/Escort Facility

4.01

Children in remote habitations with sparse

populations where opening of schools is

unviable

Child 0.03000

4.02

Urban deprived children/children without adult

protection in urban areas where schools are not

opened because availability of land is a problem

Child 0.03000

Sub Total

5Special Training for mainstreaming of Out-

of-School Children

5.03 Non-Residential (Fresh)(a) 12 months Child 0.06000(b) 9 months 0.04500(c) 6 months

(i)Special Training (by Special Instructors-NRBC)-

(1-5) Child 0.03000 58 1.740 58 1.74000

(ii) Special Training (by Special Instructors-NRBC)-

(6-8) Child 0.03000 74 2.220 74 2.22000

(d) 3 months Child 0.01500Sub Total 132 3.960 132 3.96000

Total (Special Training) 132 3.960 132 3.9605(B) House Hold Survey (HHS)

5(B).01 House Hold Survey through SMCHouse

Hold0.00001

Sub TotalII RETENTION6 Free Text Book

6.01Free Text Book (PS) for Parishadiya & Aided

Primary Schools (Workbooks not included)Child 0.00120 165100 198.120 165100 198.12000

6.01a

Free Text Book (PS) for 25% children of Class-1

in Private Recognised Primary Schools of other

Boards (Workbooks not included)

Child 0.00150

6.02 Free Brail Books (PS) 0.00150 99 0.149 99 0.14850

6.03 Free Large Print Books (PS) 0.00150

6.04Free Text Book (UPS) (Workbooks not included)

(Including KGBV Girls)Child 0.00200 61179 122.358 61179 122.35800

6.05 Free Brail Books (UPS) 0.00250 16 0.040 16 0.04000

6.06 Free Large Print Books (PS) 0.00250Sub Total 226394 320.667 226394 320.667

7 Provision of 2 set of Uniforms

7.01 All Girls (Including KGBV Girls) Child 0.00400 155993 623.972 155993 623.97200

7.02 SC Boys Child 0.00400 70286 281.144 70286 281.14400

7.03 ST Boys Child 0.00400

7.04 BPL Boys Child 0.00400 71704 286.816 71704 286.81600

7.05

Free Uniform for 25% children of Class-1 in

Private Recognised Primary Schools of other

Boards

Child0.00400

Sub Total 297983 1191.932 297983 1191.9327(A) Fee Reimbursement

7(A).01

Fee Reimbursement for Admission of children of

Disadvantaged Group & Weaker Section upto

25% of seats in Class-1 of Private Unaided

Recognised Schools

Child 0.05400

Sub Total

Physical

UnitActivity

Name of District : Unnao -74

S. No. Remarks

Outlay Recommendation for 2014-15

Spill OverDeferred laibility of

2014-15Fresh Recommended Total Recommended

Arti:SSA-AWPB-2014-15-PABMinits:Unnao:16-06-2014 16 / 533

Page 17: U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 · 2015. 1. 6. · U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15

Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

Physical

UnitActivity

Name of District : Unnao -74

S. No. Remarks

Outlay Recommendation for 2014-15

Spill OverDeferred laibility of

2014-15Fresh Recommended Total Recommended

8 Teaching Learning Equipment (TLE)

8.01 TLE - New Primary School 23.20000 0.20000 23.200008.02 TLE - New Upper Primary School 10.00000 0.50000 10.00000

Sub Total 33.20000 33.20000III ENHANCING QUALITY9 New Teachers Salary

9.01 Primary Teachers (Regular) (Asstt. Teacher) Teacher 0.91500

9.01aHead Teacher for Primary (if the number of

children exceeds 150 in a school)Teacher

9.02 Primary Teachers (Contract) (S.M.) Teacher

9.03Subject specific Upper Primary Teachers

(Regular) (a) Science and Mathematics Teacher 1.26000(b) Social Studies Teacher 1.26000(c) Languages Teacher 1.26000

Sub Total (9.01 to 9.05)Add.Teacher against PTR

Sub Total (9.06 to 9.12)

Total (New Teacher's Salary-9.01 to 9.12)

Teachers Salary (Recurring-sanctioned

earlier)Primary teachers

9.13 Primary Teachers ( Regular)-Existing, in position Teacher 3.66000 146 534.360 146 534.36000

9.14Primary Teachers (Contract)-Existing, in

positionTeacher 0.55000

9.14(a) Primary Teachers (Contract)-under Training Teacher 0.38500 2109 811.965 2109 811.96500

9.14(b)Primary Teacher (Para Teachers Equal to

9.14(a) upgraded as Teachers)0.38500 1076 414.260 1076 414.26000

9.14(c) Primary Teachers (Para)- Vacant Teacher9.15 Primary Teachers (Vacant) Teacher 0.30500

9.16Head Teacher for Primary (if the number of

children exceeds 150)Teacher 5.04000 319 1607.760 319 1607.76000

9.16(b)Head Teacher for Primary (if the number of

children exceeds 150) VacantTeacher 0.42000

Additional teachers

9.17Additional Teachers - PS (Special BTC-

Regular) in positionTeacher 0.30500

9.18Additional Teachers - PS (Special BTC Under

Training)Teacher 0.87600

9.19 Additional Teachers - PS (Vacant) Teacher

9.20Others in position (Para Teachers upgraded

as Teachers)Teacher

Upper Primary teachers

9.21 UP Teachers (Regular)-Existing Teacher 5.04000 1150 5796.000 1150 5796.00000

9.22 UP Teachers (Contract)-Existing9.23 UP Teachers (Vacant) Teacher 1.26000

9.24Head Teacher for Upper Primary (if the number

of children exceeds 100)-ExistingTeacher 5.34000 344 1836.960 344 1836.96000

9.24a Head Teacher for Upper Primary (Vacant) Teacher 1.33500

9.25Subject specific Upper Primary Teachers

(Regular)(a) Science and Mathematics(b) Social Studies(c) Languages

9.32 Part Time Instructors in position(a) Art Education 0.77000 194 149.380 194 149.38000(b) Health and Physical Education 0.77000 189 145.530 189 145.53000(c) Work Education 0.77000 144 110.880 144 110.88000

9.32(A) Part Time Instructors Vacant(a) Art Education 0.42000(b) Health and Physical Education 0.42000(c) Work Education 0.42000

9.33

Others-Incentive to Teachers in Schools

Located in Naxal Affected Areas (@

Rs.1500/- per teachers per month)

Sub Total (9.13 to 9.33) 5671 11407.095 5671 11407.10TOTAL

(New Teachers Salary +Teachers Salary

Recurring)

5671 11407.095 5671 11407.09500

10 Teachers Training(a) Teachers

10.01

Refresher In-service Teachers' Training at BRC

level and above - 10 days (@ Rs.200/- per head

per day)

Teacher

(Target &

Ach.-13-14

in

Mandays)

0.00600

Arti:SSA-AWPB-2014-15-PABMinits:Unnao:16-06-2014 17 / 533

Page 18: U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 · 2015. 1. 6. · U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15

Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

Physical

UnitActivity

Name of District : Unnao -74

S. No. Remarks

Outlay Recommendation for 2014-15

Spill OverDeferred laibility of

2014-15Fresh Recommended Total Recommended

10.01(a)Continuous and Comprehensive Evauation [PS +

UPS)Teacher 0.01300 2188 28.444 2188 28.44400

10.01(b) Eary Reading and Numeracy Skills [PS] Teacher 0.00500 2188 10.940 2188 10.94000

10.01(c) Science [UPS] Teacher 0.00800 943 7.544 943 7.54400Recommended as

proposed

10.01(d) CWSN Teacher 0.00400

10.02

One day monthly cluster level meetings and

peer group training sessions for 10 months for

all teachers each year at CRC level - 10 days (@

Rs.100/- per head per day)

Teacher 0.01000

10.03(a)

Induction Training for Newly Recruited Teachers

for 6 Months (Special BTC)- @Rs.2000/- per

head per year

Teacher 0.02000

10.03(b)5 Days Training for Part Time Instructors @ Rs.

200/- per head per day) Teacher 0.01000

10.04

Training of untrained Teachers to acquire

professional qualifications over a two year

period.

Teacher 0.04700 1730 81.310 1730 81.31000

(b) Head Teachers

10.05Refresher Residencial In-service for 10 days at

BRC level and above

Head

Teacher(c) Resource Persons

10.06

Refresher Training for all Resource

Persons,Master Trainers, BRC & CRC faculty

and Coordinators for 5 days each year (@

Rs.200/- per head per day)

Resource

Person 0.00300 204 0.612 204 0.61200

Sub Total 7253 128.850 7253 128.850

11Academic Support through Block Resource

Centre (BRC)/ URC

11.01 Salary of Faculty and Staff

(a) 5 RPs at BRC for subject specific training in

positionRP 85 85

(b) 2 RPs for CWSN in position RP(b-i) 1 CWSN Resource Person RP 1.10000 32 35.200 32 35.20000

(b-ii) 1 Physiotherapist (Resource person for IE) RP

(c) 1 MIS Coordinator in position RP 1.86000

(d) 1 Datra Entry Operator in position RP 1.74000

(e) 1 Accountant-cum-support staff in position RP 1.80000 8 14.400 8 14.40000

11.02 Furniture Grant BRC/ URC 1.00000

11.03Replacement of furniture, computer, TLE etc (

Once in 5 years)BRC/ URC 1.00000

11.04 Contingency Grant BRC/ URC 0.50000 17 8.500 17 8.50000

11.05 Meeting, TA BRC/ URC 0.30000 17 5.100 17 5.10000

11.06 TLM Grant BRC/ URC 0.10000

11.07 Maintenance Grant BRC/ URC 0.10000

Sub Total 17 63.200 17 63.20000

12Academic Support through Cluster

Resource Centres (CRC/UERC)

12.01Salary of Cluster Coordinator (on an average of

one Resource Person per 18 schools in a block)RP

12.02 Furniture Grant CRC/ UERC 0.10000

12.03Replacement of furniture, computer, TLE etc.

once in 5 yearsCRC/ UERC 0.10000

12.04 Contingency Grant CRC/UERC 0.10000 175 17.500 175 17.50000

12.05 Meeting, TA CRC/UERC 0.12000 175 21.000 175 21.00000

12.06 TLM Grant CRC/UERC 0.03000

12.07Maintenance Grant

CRC/UERC 0.02000

Sub Total 350 38.500 350 38.50000

13Computer Aided Education in upper

primary schools under Innovation

13.01Computer Aided Education in upper primary

schoolsDistrict 0.01200 48 0.576 48 0.57600

Sub Total 48 0.576 48 0.5760014 Libraries in Schools

Arti:SSA-AWPB-2014-15-PABMinits:Unnao:16-06-2014 18 / 533

Page 19: U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 · 2015. 1. 6. · U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15

Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

Physical

UnitActivity

Name of District : Unnao -74

S. No. Remarks

Outlay Recommendation for 2014-15

Spill OverDeferred laibility of

2014-15Fresh Recommended Total Recommended

14.01 (a) Primary School (per school) School 0.03000

14.02 (b) Upper Primary School (per school) School 0.10000

Sub TotalIV ANNUAL GRANTS15 Teachers' Grant15.01 Primary Teachers Teacher 0.0050015.02 Upper Primary Teachers Teacher 0.00500 943 4.715 943 4.71500

Sub Total 943 4.715 943 4.7150016 School Grant16.01 Primary School School 0.05000 2309 115.450 2309 115.4500016.02 Upper Primary School School 0.07000 930 65.100 930 65.10000

Sub Total 3239 180.550 3239 180.55000

17Research, Evaluation, Monitoring &

Supervision

17.01 REMS Activities School 0.00103 3239 3.332 3239 3.33168

17.02 Monitoring & Supervision School 0.00078 3239 2.540 3239 2.53959

17.03 House Hold Survey (Urban) in Million Plus Cities District 35.00000

Sub Total 6478 5.871 6478 5.8712718 Maintenance Grant

18.01 Maintenance in School having upto3 Classrooms School 0.07500 810 60.750 810 60.75000

18.01a Maintenance Grant School 0.07500 2342 175.650 2342 175.65000Sub Total 3152 236.400 3152 236.40000

VBRIDGING GENDER AND SOCIAL

CATEGORY GAPS

19 Interventions for CWSN (IE)

19.01 Provision for Inclusive Education Child 0.01800 5018 90.324 5018 90.32400

Sub Total 5018 90.324 5018 90.32400

20Innovativation Head up to Rs.50 Lakh per

district

20.01 Girls Education District 0.70000 7 4.900 7 4.90000

20.02 ECCE District20.03 Intervention for SC / ST children District

20.04 Intervention for Minority Community children District

20.05 Intervention for Urban Deprived children District 10.00000

Sub Total 7 4.900 7 4.9000021 SMC/PRI Training

21.01Residential for 6 Resource Person per Block (3

days) (@ Rs.500/-)Blocks 0.09000

21.02Non-residential (3 days training of 6 SMC

members) (@ Rs.100/-)SMC 0.01800 3157 56.826 3157 56.82600

21.02(a)Non-residential (3 days training of 3 Members of

PRI/VECs/LA) (@ Rs.100/-)VEC/ WEC 0.00900

21.03

Seminar/Orientation of SMC Women members

and President/Vice President (@ Rs. 50,000/-

per block)

Blocks 0.50000

Sub Total 3157 56.826 3157 56.82600VI SCHOOL INFRASTRUCTURE22 Civil Works22.01 Primary School (Plain) (New) School 13.1550022.02 Primary School (Hilly/Rocky) (New) School 13.2750022.03 Upper Primary (Plain) (New) School 20.65500

22.04 Upper Primary School (Hilly/Rocky) (New) School 20.77500

22.04aComposite Schools for Urban Areas (Class I-

VIII)School 41.04000

22.05 ACR in lieu of upgraded Upper Primary School Rooms

22.06 Additional class rooms for adding Class VIII Rooms

22.07 Building Less (Pry) School 9.7500022.08 Building Less (UP) School 18.5900022.09 Dilapidated Building (Pry) School 9.7500022.10 Dilapidated Building (UP) School 18.59000

22.11 Additional Class Room (Rural) ( PS+UPS) Rooms 3.45000 26 89.700 26 89.70000

22.12 Additional Class Room (Urban) Rooms 3.4500022.13 Additional Class Room (Hill Area)22.14 Toilet/Urinals (PS & UPS) School 0.7000022.15 Separate Girls Toilet (Rural+Urban) School 0.7000022.16 CWSN friendly Toilets School 0.50000

22.17 Drinking Water Facility (for Urban Area Only)) School 0.15000

22.17a Drinking Water Facility (Plain PS & UPS) School 0.15000 26 3.900 26 3.90000

22.17b Drinking Water Facility (Hilly/Rocky PS & UPS) School 0.15000

22.18a Boundary Wall PS (Total in Meters x .01105) 0.01749

22.18bBoundary Wall PS (For Gate) @Rs. 7000 x no. of

P.S.School 0.07800

Arti:SSA-AWPB-2014-15-PABMinits:Unnao:16-06-2014 19 / 533

Page 20: U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 · 2015. 1. 6. · U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15

Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

Physical

UnitActivity

Name of District : Unnao -74

S. No. Remarks

Outlay Recommendation for 2014-15

Spill OverDeferred laibility of

2014-15Fresh Recommended Total Recommended

22.18c Boundary Wall UPS (Total in Meters x .01105) 0.01749

22.18dBoundary Wall UPS (For Gate) @Rs. 7000 x no.

of UPSSchool 0.07800

22.19a Electrification in P.S./ Electrical Equipment School 0.11000

22.19b Electrification in U. P.S./ Electrical Equipment School 0.11000

22.20Office-cum-store-cum-Head Teacher's room

(Primary)Rooms

22.21Office-cum-store-cum-Head Teacher's room

(Upper Primary)Rooms

22.22Augumentation of training facility in BRC (one

time)BRC/ URC 5.00000

22.23 Child friendly Elements School 0.25000

22.24 Ramps with Handrails (Barrier Free Elements) School 0.06000

22.25 Handrails in existing Ramps School 0.0100022.26 Whole School Develoipment School22.27 Retro-fitting and repairs School

22.28Residential Schools for specific category

of children

(a) Construction of Building including boundary

wall, Water and sanitation facilities, electric

installation (For 100 children)

Building 65.86000

(b) Construction of residential hostel Building 65.86000

(c) Refurnishing unused old buildings Building

22.29

Construction of Hostel in existing Govt UPS

including boundary wall, Water and sanitation

facilities, electric installation etc. (For 50

children)

7.00000

22.30Furniture for Govt. UPS (per child) (@ Rs.500/-

per child enrolled)Child 0.00500

22.31 Major Repairs for Primary School School 0.30000

22.32 Majr Repairs for Upper Primary School School 0.30000

22.33Others (Difference of Civil Wrks

sanctioned in pre.yr.)22.33a Others (Overhead Tank PS) School 0.1200022.33b Others (Overhead Tank UPS) School 0.12000

Sub Total (Civil WOrks) 52 93.600 52 93.60VII PROJECT MANAGEMENT COST23 Management23.01 Management up to 3.5%

(a) Project Management and MIS

(i) DPO ( Salary, Contigency, Consumables,

POL, TA & Computer etc)District 1 117.627 1 117.62690

(ii) EMIS Cell District 1 20.726 1 20.72600Sub Total (a) 1 1 1 138.353 1 138.353

(b) Training of Educational Administrators District

(c) School Mapping and Social Mapping District

Sub Total (23.01)

23.02Learning Enhancement Prog. (LEP) (P & UP) (up

to 2%)District 22.859 22.85895

23.03 Community Mobilization (up to 0.5%) District 1 60.000 1 60.00000

Sub Total (Management) 1 82.859 1 82.85895Total Management Cost 221.212 221.21185Total of SSA (Districs) 33.200 559894 14049.178 559894 14082.378

24 State Component23.01 Management23.02 REMS 0.0044923.03 SIEMAT

Sub Total

STATE SSA TOTAL 33.20000 559894 14049.178 559894 14082.37762

25

KGBV Financial Provision (give

separate costing sheets for different

Models)

Hostel

ANon Recurring One Time Grant (Only

committed liabilities) (Model-I)

25.01 Construction of Building (New)

25.02 Construction of Building KGBV sanctioned earlier

25.02(a) Additional Class Room Rooms 3.45000

25.02(b) Guard Room Rooms 1.32000

25.02(c) Boundary Wall School 5.0200025.03 Boudary Wall (Spillover only)

25.04

Boring/Handpump (Spillover only)

(minimum rates prescribed by State Drinking

Water Department subject to a ceiling of Rs.

1.00 lakhs)

Arti:SSA-AWPB-2014-15-PABMinits:Unnao:16-06-2014 20 / 533

Page 21: U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 · 2015. 1. 6. · U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15

Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

Physical

UnitActivity

Name of District : Unnao -74

S. No. Remarks

Outlay Recommendation for 2014-15

Spill OverDeferred laibility of

2014-15Fresh Recommended Total Recommended

25.05 Electricity /Water charges (Spillover only)

25.05(a) Solar Water Heater & Solar Light 2.97000

25.06Furniture/Equipment (including Kitchen

equipment)3.00000

25.07 TLM and equipment including library books 3.50000

25.08 Bedding (New) 0.75000

25.09 Replacement of Bedding (once in 3 Year) 0.75000 12 9.000 12 9.00000

Subtotal Non Recurring 9.000 9.00000

B Recurring Cost Per Annum (Model-I)

25.10Maintenance per girl student per month @ Rs.

1500/-18.00000 13 234.000 13 234.00000

25.11 Stipend for girl student per month @ Rs. 100/- 1.20000 13 15.600 13 15.60000

25.12Supplementary TLM, stationery and other

educational material @ Rs.1000/- per annum1.00000 13 13.000 13 13.00000

25.13 Salaries

25.13.1 Additional Salaries:

(a) 1 Warden @ Rs. 25,000/- per month 3.00000 13 39.00000 13 39.00000

(b)4 Full time teachers as per RTE norms @ Rs.

20,000/- per month per teacher 9.60000 13 124.80000 13 124.80000

(c)

1 Urdu Teachers (only for blocks with muslim

population above 20% and select urban areas), if

required @ Rs. 12,000/- per month per teacher 1.44000 13 18.72000 13 18.72000

(d)3 part time teachers @ Rs. 5,000/- per month per

teacher 1.80000 13 23.40000 13 23.40000

(e)1 Full time Accountant @ Rs. 10,000/- per month

1.20000 13 15.60000 13 15.60000

(f)

2 Support Staff – (Accountant/ Assistant, Peon,

Chowkidar) @ Rs. 5,000/- per month per staff 1.20000 13 15.60000 13 15.60000

(g) 1 Head cook @ Rs. 6,000/- per month 0.72000 13 9.36000 13 9.36000

(h)2 Asstt. Cooks @ Rs. 4,500/- per month per cook

1.08000 13 14.04000 13 14.04000

25.14Specific skill training @ Rs.1000/- per child per

annum1.00000 13 13.000 13 13.00000

25.15Electricity/water charges @ Rs.1000/- per child

per annum1.00000 13 13.000 13 13.00000

25.16Medical care/contingencies @ Rs. 1250 per child

per annum1.25000 13 16.250 13 16.25000

25.17 Maintenance @ Rs.750/- per child per annum 0.75000 13 9.750 13 9.75000

25.18

Miscellaneous (Educational Tour/ Exposure Visit

/ Sports Material etc.) @ Rs.750/- per child per

annum

0.75000 13 9.750 13 9.75000

25.19Preparatory camps @ Rs.200/- per child per

annum0.20000 13 2.600 13 2.60000

25.20PTAs/school functions @ Rs.200/- per child per

annum0.20000 13 2.600 13 2.60000

25.21 Provision of Rent @ Rs.6000/- per annum 6.00000

25.21a Provision of Rent (6 months) 3.6000025.21b Provision of Rent (3 months) 1.8000025.21c Rent (Previous Year (2007-2012)

25.22 Capacity building 0.50000 13 6.500 13 6.50000

25.22(a)Physical/ Self Defence Training @ Rs.200/- per

child per annum0.20000 13 2.600 13 2.60000

Subtotal Recurring 13 599.170 13 599.17000

Subtotal (Model-I) 13 608.170 13 608.17000

CNon Recurring One Time Grant (Only

committed liabilities) (Model-II)

25.23 Construction of Building (New)

25.24 Construction of Building KGBV sanctioned earlier

25.24(a) Additional Class Room Rooms 3.45000

25.24(b) Guard Room Rooms 1.32000

25.24(c) Boundary Wall School 5.0200025.25 Boudary Wall (Spillover only)25.26 Boring/Handpump (Spillover only)

25.27 Electricity /Water charges (Spillover only)

25.27(a) Solar Water Heater & Solar Light 2.97000

25.28Furniture/Equipment (including Kitchen

equipment)2.00000

25.29 TLM and equipment including library books 3.00000

Arti:SSA-AWPB-2014-15-PABMinits:Unnao:16-06-2014 21 / 533

Page 22: U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 · 2015. 1. 6. · U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15

Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

Physical

UnitActivity

Name of District : Unnao -74

S. No. Remarks

Outlay Recommendation for 2014-15

Spill OverDeferred laibility of

2014-15Fresh Recommended Total Recommended

25.30 Bedding (New) 0.37500

25.31 Replacement of Bedding (once in 3 Year) 0.37500

Subtotal Non Recurring

D Recurring Cost Per Annum (Model-II)

25.32Maintenance per girl student per month @ Rs.

1500/-9.00000

25.33 Stipend for girl student per month @ Rs. 100/- 0.60000

25.34Supplementary TLM, stationery and other

educational material @ Rs.1000/- per annum0.50000

25.35 Salaries(a) 1 Warden @ Rs. 25,000/- per month 3.00000

(b)3 Full time teachers as per RTE norms @ Rs.

20,000/- per month per teacher 7.20000

(c) 3 part time teachers @ Rs. 5,000/- per month per

teacher 1.80000

(d)1 Full time Accountant @ Rs. 10,000/- per month

1.20000

(e)

2 Support Staff – (Accountant/ Assistant, Peon,

Chowkidar) @ Rs. 5,000/- per month per staff 1.20000

(f) 1 Head cook @ Rs. 6,000/- per month 0.72000

(g)1 Asstt. Cooks @ Rs. 4,500/- per month per cook

0.54000

25.36Specific skill training @ Rs.1000/- per child per

annum0.50000

25.37Electricity/water charges @ Rs.1000/- per child

per annum0.50000

25.38Medical care/contingencies @ Rs. 1250 per child

per annum0.62500

25.39 Maintenance @ Rs.750/- per child per annum 0.37500

25.40

Miscellaneous (Educational Tour/ Exposure Visit

/ Sports Material etc.) @ Rs.750/- per child per

annum

0.37500

25.41Preparatory camps @ Rs.300/- per child per

annum0.15000

25.42PTAs/school functions @ Rs.300/- per child per

annum0.15000

25.43 Provision of Rent @ Rs.10000/- per annum 5.00000

25.43a Provision of Rent (6 months) 3.6000025.43b Provision of Rent (3 months) 1.8000025.43c Rent (Previous Year (2007-2012)25.44 Capacity building 0.25000

25.44(a)Physical/ Self Defence Training @ Rs.200/- per

child per annum0.10000

Subtotal Recurring

Subtotal (Model-II) Total (KGBV) 13 608.170 13 608.170

DISTRICT GRAND TOTAL (SSA+KGBV) 33.200 559907 14657.348 559907 14690.548

Arti:SSA-AWPB-2014-15-PABMinits:Unnao:16-06-2014 22 / 533

Page 23: U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 · 2015. 1. 6. · U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15

Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

I ACCESS

1 Opening of New Schools

1.01 Upgradation of EGS to PSCentres /

School1.02 New PS School

1.03 Upgradation of PS to UPS / New UPS School

1.04 Composite Schools (for Urban Areas) School

1.05Residential Schools for specific category children

(For 100 children)

1.06Residential Hostel (for specific category of

children) (For 50 children)

1.07 Integration of Class V with Primary Schools

1.08Integration of Class VIII with Upper Primary

Schools

2Residential Schools for specific category

of children (For 100 Children)

Total - Residential Schools (For 100

children)

3Residential Hostel for specific category of

children (For 50 Children)

Total - Residential Schools (For 50

children)4 Transport/Escort Facility

4.01

Children in remote habitations with sparse

populations where opening of schools is

unviable

Child 0.03000

4.02

Urban deprived children/children without adult

protection in urban areas where schools are not

opened because availability of land is a problem

Child 0.03000

Sub Total

5Special Training for mainstreaming of Out-

of-School Children

5.03 Non-Residential (Fresh)(a) 12 months Child 0.06000(b) 9 months 0.04500(c) 6 months

(i)Special Training (by Special Instructors-NRBC)-

(1-5) Child 0.03000 47 1.410 47 1.41000

(ii) Special Training (by Special Instructors-NRBC)-

(6-8) Child 0.03000 61 1.830 61 1.83000

(d) 3 months Child 0.01500Sub Total 108 3.240 108 3.24000

Total (Special Training) 108 3.240 108 3.2405(B) House Hold Survey (HHS)

5(B).01 House Hold Survey through SMCHouse

Hold0.00001

Sub TotalII RETENTION6 Free Text Book

6.01Free Text Book (PS) for Parishadiya & Aided

Primary Schools (Workbooks not included)Child 0.00120 145470 174.564 145470 174.56400

6.01a

Free Text Book (PS) for 25% children of Class-1

in Private Recognised Primary Schools of other

Boards (Workbooks not included)

Child 0.00150

6.02 Free Brail Books (PS) 0.00150 97 0.146 97 0.14550

6.03 Free Large Print Books (PS) 0.00150

6.04Free Text Book (UPS) (Workbooks not included)

(Including KGBV Girls)Child 0.00200 67558 135.116 67558 135.11600

6.05 Free Brail Books (UPS) 0.00250 48 0.120 48 0.12000

6.06 Free Large Print Books (PS) 0.00250Sub Total 213173 309.946 213173 309.946

7 Provision of 2 set of Uniforms

7.01 All Girls (Including KGBV Girls) Child 0.00400 159455 637.820 159455 637.82000

7.02 SC Boys Child 0.00400 53537 214.148 53537 214.14800

7.03 ST Boys Child 0.00400

7.04 BPL Boys Child 0.00400 86030 344.120 86030 344.12000

7.05

Free Uniform for 25% children of Class-1 in

Private Recognised Primary Schools of other

Boards

Child0.00400

Sub Total 299022 1196.088 299022 1196.0887(A) Fee Reimbursement

7(A).01

Fee Reimbursement for Admission of children of

Disadvantaged Group & Weaker Section upto

25% of seats in Class-1 of Private Unaided

Recognised Schools

Child 0.05400

Sub Total

8 Teaching Learning Equipment (TLE)

8.01 TLE - New Primary School 33.00000 0.20000 33.000008.02 TLE - New Upper Primary School 4.50000 0.50000 4.50000

Name of District : Sultanpur -73

ActivityS. No.Physical

UnitRemarks

Outlay Recommendation for 2014-15

Spill OverDeferred laibility of

2014-15Fresh Recommended Total Recommended

Arti:SSA-AWPB-2014-15-PABMinits:Sultanpur:16-06-2014 23 / 533

Page 24: U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 · 2015. 1. 6. · U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15

Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

Name of District : Sultanpur -73

ActivityS. No.Physical

UnitRemarks

Outlay Recommendation for 2014-15

Spill OverDeferred laibility of

2014-15Fresh Recommended Total Recommended

Sub Total 37.50000 37.50000III ENHANCING QUALITY9 New Teachers Salary

9.01 Primary Teachers (Regular) (Asstt. Teacher) Teacher 0.91500

9.01aHead Teacher for Primary (if the number of

children exceeds 150 in a school)Teacher

9.02 Primary Teachers (Contract) (S.M.) Teacher

9.03Subject specific Upper Primary Teachers

(Regular) (a) Science and Mathematics Teacher 1.26000(b) Social Studies Teacher 1.26000(c) Languages Teacher 1.26000

Sub Total (9.01 to 9.05)Add.Teacher against PTR

Sub Total (9.06 to 9.12)

Total (New Teacher's Salary-9.01 to 9.12)

Teachers Salary (Recurring-sanctioned

earlier)Primary teachers

9.13 Primary Teachers ( Regular)-Existing, in position Teacher 3.66000 694 2540.040 694 2540.04000

9.14Primary Teachers (Contract)-Existing, in

positionTeacher 0.55000

9.14(a) Primary Teachers (Contract)-under Training Teacher 0.38500 1080 415.800 1080 415.80000

9.14(b)Primary Teacher (Para Teachers Equal to

9.14(a) upgraded as Teachers)0.38500 988 380.380 988 380.38000

9.14(c) Primary Teachers (Para)- Vacant Teacher9.15 Primary Teachers (Vacant) Teacher 0.30500

9.16Head Teacher for Primary (if the number of

children exceeds 150)Teacher 5.04000 94 473.760 94 473.76000

9.16(b)Head Teacher for Primary (if the number of

children exceeds 150) VacantTeacher 0.42000

Additional teachers

9.17Additional Teachers - PS (Special BTC-

Regular) in positionTeacher 0.30500

9.18Additional Teachers - PS (Special BTC Under

Training)Teacher 0.87600

9.19 Additional Teachers - PS (Vacant) Teacher

9.20Others in position (Para Teachers upgraded

as Teachers)Teacher

Upper Primary teachers

9.21 UP Teachers (Regular)-Existing Teacher 5.04000 1232 6209.280 1232 6209.28000

9.22 UP Teachers (Contract)-Existing9.23 UP Teachers (Vacant) Teacher 1.26000

9.24Head Teacher for Upper Primary (if the number

of children exceeds 100)-ExistingTeacher 5.34000 438 2338.920 438 2338.92000

9.24a Head Teacher for Upper Primary (Vacant) Teacher 1.33500

9.25Subject specific Upper Primary Teachers

(Regular)(a) Science and Mathematics(b) Social Studies(c) Languages

9.32 Part Time Instructors in position(a) Art Education 0.77000 192 147.840 192 147.84000(b) Health and Physical Education 0.77000 229 176.330 229 176.33000(c) Work Education 0.77000 131 100.870 131 100.87000

9.32(A) Part Time Instructors Vacant(a) Art Education 0.42000(b) Health and Physical Education 0.42000(c) Work Education 0.42000

9.33

Others-Incentive to Teachers in Schools

Located in Naxal Affected Areas (@

Rs.1500/- per teachers per month)

Sub Total (9.13 to 9.33) 5078 12783.220 5078 12783.22TOTAL

(New Teachers Salary +Teachers Salary

Recurring)

5078 12783.220 5078 12783.22000

10 Teachers Training(a) Teachers

10.01

Refresher In-service Teachers' Training at BRC

level and above - 10 days (@ Rs.200/- per

head per day)

Teacher

(Target &

Ach.-13-14

in

Mandays)

0.00600

10.01(a)Continuous and Comprehensive Evauation [PS +

UPS)Teacher 0.01300 1601 20.813 1601 20.81300

10.01(b) Eary Reading and Numeracy Skills [PS] Teacher 0.00500 1601 8.005 1601 8.00500

10.01(c) Science [UPS] Teacher 0.00800 752 6.016 752 6.01600Recommended as

proposed

10.01(d) CWSN Teacher 0.00400

Arti:SSA-AWPB-2014-15-PABMinits:Sultanpur:16-06-2014 24 / 533

Page 25: U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 · 2015. 1. 6. · U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15

Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

Name of District : Sultanpur -73

ActivityS. No.Physical

UnitRemarks

Outlay Recommendation for 2014-15

Spill OverDeferred laibility of

2014-15Fresh Recommended Total Recommended

10.02

One day monthly cluster level meetings and

peer group training sessions for 10 months for

all teachers each year at CRC level - 10 days (@

Rs.100/- per head per day)

Teacher 0.01000

10.03(a)

Induction Training for Newly Recruited Teachers

for 6 Months (Special BTC)- @Rs.2000/- per

head per year

Teacher 0.02000

10.03(b)5 Days Training for Part Time Instructors @ Rs.

200/- per head per day) Teacher 0.01000

10.04

Training of untrained Teachers to acquire

professional qualifications over a two year

period.

Teacher 0.04700 1006 47.282 1006 47.28200

(b) Head Teachers

10.05Refresher Residencial In-service for 10 days at

BRC level and above

Head

Teacher(c) Resource Persons

10.06

Refresher Training for all Resource

Persons,Master Trainers, BRC & CRC faculty

and Coordinators for 5 days each year (@

Rs.200/- per head per day)

Resource

Person 0.00300 180 0.540 180 0.54000

Sub Total 5140 82.656 5140 82.656

11Academic Support through Block Resource

Centre (BRC)/ URC

11.01 Salary of Faculty and Staff

(a) 5 RPs at BRC for subject specific training in

positionRP 75 75

(b) 2 RPs for CWSN in position RP(b-i) 1 CWSN Resource Person RP 1.10000 30 33.000 30 33.00000

(b-ii) 1 Physiotherapist (Resource person for IE) RP

(c) 1 MIS Coordinator in position RP 1.86000

(d) 1 Datra Entry Operator in position RP 1.74000 10 17.400 10 17.40000

(e) 1 Accountant-cum-support staff in position RP 1.80000 15 27.000 15 27.00000

11.02 Furniture Grant BRC/ URC 1.00000

11.03Replacement of furniture, computer, TLE etc (

Once in 5 years)BRC/ URC 1.00000

11.04 Contingency Grant BRC/ URC 0.50000 15 7.500 15 7.50000

11.05 Meeting, TA BRC/ URC 0.30000 15 4.500 15 4.50000

11.06 TLM Grant BRC/ URC 0.10000

11.07 Maintenance Grant BRC/ URC 0.10000

Sub Total 15 89.400 15 89.40000

12Academic Support through Cluster

Resource Centres (CRC/UERC)

12.01Salary of Cluster Coordinator (on an average of

one Resource Person per 18 schools in a block)RP

12.02 Furniture GrantCRC/

UERC0.10000

12.03Replacement of furniture, computer, TLE etc.

once in 5 years

CRC/

UERC0.10000

12.04 Contingency Grant CRC/UERC 0.10000 114 11.400 114 11.40000

12.05 Meeting, TA CRC/UERC 0.12000 114 13.680 114 13.68000

12.06 TLM Grant CRC/UERC 0.03000

12.07Maintenance Grant

CRC/UERC 0.02000

Sub Total 228 25.080 228 25.08000

13Computer Aided Education in upper

primary schools under Innovation

13.01Computer Aided Education in upper primary

schoolsDistrict 0.01200 48 0.576 48 0.57600

Sub Total 48 0.576 48 0.5760014 Libraries in Schools14.01 (a) Primary School (per school) School 0.03000

14.02 (b) Upper Primary School (per school) School 0.10000

Sub TotalIV ANNUAL GRANTS15 Teachers' Grant15.01 Primary Teachers Teacher 0.0050015.02 Upper Primary Teachers Teacher 0.00500 752 3.760 752 3.76000

Sub Total 752 3.760 752 3.7600016 School Grant16.01 Primary School School 0.05000 1786 89.300 1786 89.3000016.02 Upper Primary School School 0.07000 740 51.800 740 51.80000

Sub Total 2526 141.100 2526 141.10000

Arti:SSA-AWPB-2014-15-PABMinits:Sultanpur:16-06-2014 25 / 533

Page 26: U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 · 2015. 1. 6. · U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15

Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

Name of District : Sultanpur -73

ActivityS. No.Physical

UnitRemarks

Outlay Recommendation for 2014-15

Spill OverDeferred laibility of

2014-15Fresh Recommended Total Recommended

17Research, Evaluation, Monitoring &

Supervision

17.01 REMS Activities School 0.00103 2526 2.598 2526 2.59828

17.02 Monitoring & Supervision School 0.00078 2526 1.981 2526 1.98055

17.03 House Hold Survey (Urban) in Million Plus Cities District 35.00000

Sub Total 5052 4.579 5052 4.5788318 Maintenance Grant

18.01 Maintenance in School having upto3 Classrooms School 0.07500 301 22.575 301 22.57500

18.01a Maintenance Grant School 0.07500 1753 131.475 1753 131.47500Sub Total 2054 154.050 2054 154.05000

VBRIDGING GENDER AND SOCIAL

CATEGORY GAPS

19 Interventions for CWSN (IE)

19.01 Provision for Inclusive Education Child 0.01000 8345 83.450 8345 83.45000

Sub Total 8345 83.450 8345 83.45000

20Innovativation Head up to Rs.50 Lakh per

district

20.01 Girls Education District 0.70000 10 7.000 10 7.00000

20.02 ECCE District20.03 Intervention for SC / ST children District

20.04 Intervention for Minority Community children District

20.05 Intervention for Urban Deprived children District 10.00000

Sub Total 10 7.000 10 7.0000021 SMC/PRI Training

21.01Residential for 6 Resource Person per Block (3

days) (@ Rs.500/-)Blocks 0.09000

21.02Non-residential (3 days training of 6 SMC

members) (@ Rs.100/-)SMC 0.01800 2411 43.398 2411 43.39800

21.02(a)Non-residential (3 days training of 3 Members of

PRI/VECs/LA) (@ Rs.100/-)VEC/ WEC 0.00900

21.03

Seminar/Orientation of SMC Women members

and President/Vice President (@ Rs. 50,000/-

per block)

Blocks 0.50000

Sub Total 2411 43.398 2411 43.39800VI SCHOOL INFRASTRUCTURE22 Civil Works22.01 Primary School (Plain) (New) School 182.28110 13.15500 182.2811022.02 Primary School (Hilly/Rocky) (New) School 13.2750022.03 Upper Primary (Plain) (New) School 20.65500

22.04 Upper Primary School (Hilly/Rocky) (New) School 20.77500

22.04aComposite Schools for Urban Areas (Class I-

VIII)School 41.04000

22.05 ACR in lieu of upgraded Upper Primary School Rooms

22.06 Additional class rooms for adding Class VIII Rooms

22.07 Building Less (Pry) School 9.7500022.08 Building Less (UP) School 18.5900022.09 Dilapidated Building (Pry) School 9.7500022.10 Dilapidated Building (UP) School 18.59000

22.11 Additional Class Room (Rural) ( PS+UPS) Rooms 3.45000

22.12 Additional Class Room (Urban) Rooms 3.4500022.13 Additional Class Room (Hill Area)22.14 Toilet/Urinals (PS & UPS) School 0.7000022.15 Separate Girls Toilet (Rural+Urban) School 0.7000022.16 CWSN friendly Toilets School 0.50000

22.17 Drinking Water Facility (for Urban Area Only)) School 0.15000 1 0.150 1 0.15000

22.17a Drinking Water Facility (Plain PS & UPS) School 0.15000 131 19.650 131 19.65000

22.17b Drinking Water Facility (Hilly/Rocky PS & UPS) School 0.15000

22.18a Boundary Wall PS (Total in Meters x .01105) 0.01749

22.18bBoundary Wall PS (For Gate) @Rs. 7000 x no. of

P.S.School 0.07800

22.18c Boundary Wall UPS (Total in Meters x .01105) 0.01749

22.18dBoundary Wall UPS (For Gate) @Rs. 7000 x no.

of UPSSchool 0.07800

22.19a Electrification in P.S./ Electrical Equipment School 0.11000

22.19b Electrification in U. P.S./ Electrical Equipment School 0.11000

22.20Office-cum-store-cum-Head Teacher's room

(Primary)Rooms

22.21Office-cum-store-cum-Head Teacher's room

(Upper Primary)Rooms

22.22Augumentation of training facility in BRC (one

time)BRC/ URC 5.00000

22.23 Child friendly Elements School 0.25000

22.24 Ramps with Handrails (Barrier Free Elements) School 0.06000 428 25.680 428 25.68000

22.25 Handrails in existing Ramps School 0.01000

Arti:SSA-AWPB-2014-15-PABMinits:Sultanpur:16-06-2014 26 / 533

Page 27: U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 · 2015. 1. 6. · U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15

Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

Name of District : Sultanpur -73

ActivityS. No.Physical

UnitRemarks

Outlay Recommendation for 2014-15

Spill OverDeferred laibility of

2014-15Fresh Recommended Total Recommended

22.26 Whole School Develoipment School22.27 Retro-fitting and repairs School

22.28Residential Schools for specific category

of children

(a) Construction of Building including boundary

wall, Water and sanitation facilities, electric

installation (For 100 children)

Building 65.86000

(b) Construction of residential hostel Building 65.86000

(c) Refurnishing unused old buildings Building

22.29

Construction of Hostel in existing Govt UPS

including boundary wall, Water and sanitation

facilities, electric installation etc. (For 50

children)

7.00000

22.30Furniture for Govt. UPS (per child) (@ Rs.500/-

per child enrolled)Child 0.00500

22.31 Major Repairs for Primary School School 0.30000

22.32 Majr Repairs for Upper Primary School School 0.30000

22.33Others (Difference of Civil Wrks

sanctioned in pre.yr.)22.33a Others (Overhead Tank PS) School 0.1200022.33b Others (Overhead Tank UPS) School 0.12000

Sub Total (Civil WOrks) 182.28 560 45.480 560 227.76VII PROJECT MANAGEMENT COST23 Management23.01 Management up to 3.5%

(a) Project Management and MIS

(i) DPO ( Salary, Contigency, Consumables,

POL, TA & Computer etc)District 1 107.369 1 107.36920

(ii) EMIS Cell District 1 17.623 1 17.62250Sub Total (a) 1 1 1 124.992 1 124.992

(b) Training of Educational Administrators District

(c) School Mapping and Social Mapping District

Sub Total (23.01)

23.02Learning Enhancement Prog. (LEP) (P & UP) (up

to 2%)District 19.581 19.58140

23.03 Community Mobilization (up to 0.5%) District 1 45.850 1 45.85000

Sub Total (Management) 1 65.431 1 65.43140Total Management Cost 190.423 190.42310Total of SSA (Districs) 182.281 37.500 544522 15163.445 544522 15383.227

24 State Component23.01 Management23.02 REMS 0.0044923.03 SIEMAT

Sub Total

STATE SSA TOTAL 182.28110 37.50000 544522 15163.445 544522 15383.22653

25

KGBV Financial Provision (give

separate costing sheets for different

Models)

Hostel

ANon Recurring One Time Grant (Only

committed liabilities) (Model-I)

25.01 Construction of Building (New)

25.02 Construction of Building KGBV sanctioned earlier 3.20000 3.20000

25.02(a) Additional Class Room Rooms 3.45000

25.02(b) Guard Room Rooms 1.32000

25.02(c) Boundary Wall School 5.0200025.03 Boudary Wall (Spillover only) 3.00000 3.00000

25.04

Boring/Handpump (Spillover only)

(minimum rates prescribed by State Drinking

Water Department subject to a ceiling of Rs.

1.00 lakhs)

2.00000 2.00000

25.05 Electricity /Water charges (Spillover only)

25.05(a) Solar Water Heater & Solar Light 2.97000

25.06Furniture/Equipment (including Kitchen

equipment)3.00000

25.07 TLM and equipment including library books 3.50000

25.08 Bedding (New) 0.75000

25.09 Replacement of Bedding (once in 3 Year) 0.75000 10 7.500 10 7.50000

Subtotal Non Recurring 8.20000 7.500 15.70000

B Recurring Cost Per Annum (Model-I)

25.10Maintenance per girl student per month @ Rs.

1500/-18.00000 10 180.000 10 180.00000

25.11 Stipend for girl student per month @ Rs. 100/- 1.20000 10 12.000 10 12.00000

25.12Supplementary TLM, stationery and other

educational material @ Rs.1000/- per annum1.00000 10 10.000 10 10.00000

25.13 Salaries

Arti:SSA-AWPB-2014-15-PABMinits:Sultanpur:16-06-2014 27 / 533

Page 28: U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 · 2015. 1. 6. · U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15

Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

Name of District : Sultanpur -73

ActivityS. No.Physical

UnitRemarks

Outlay Recommendation for 2014-15

Spill OverDeferred laibility of

2014-15Fresh Recommended Total Recommended

25.13.1 Additional Salaries:

(a) 1 Warden @ Rs. 25,000/- per month 3.00000 10 30.00000 10 30.00000

(b)4 Full time teachers as per RTE norms @ Rs.

20,000/- per month per teacher 9.60000 10 96.00000 10 96.00000

(c)

1 Urdu Teachers (only for blocks with muslim

population above 20% and select urban areas), if

required @ Rs. 12,000/- per month per teacher 1.44000 10 14.40000 10 14.40000

(d)3 part time teachers @ Rs. 5,000/- per month per

teacher 1.80000 10 18.00000 10 18.00000

(e)1 Full time Accountant @ Rs. 10,000/- per month

1.20000 10 12.00000 10 12.00000

(f)

2 Support Staff – (Accountant/ Assistant, Peon,

Chowkidar) @ Rs. 5,000/- per month per staff 1.20000 10 12.00000 10 12.00000

(g) 1 Head cook @ Rs. 6,000/- per month 0.72000 10 7.20000 10 7.20000

(h)2 Asstt. Cooks @ Rs. 4,500/- per month per cook

1.08000 10 10.80000 10 10.80000

25.14Specific skill training @ Rs.1000/- per child per

annum1.00000 10 10.000 10 10.00000

25.15Electricity/water charges @ Rs.1000/- per child

per annum1.00000 10 10.000 10 10.00000

25.16Medical care/contingencies @ Rs. 1250 per child

per annum1.25000 10 12.500 10 12.50000

25.17 Maintenance @ Rs.750/- per child per annum 0.75000 10 7.500 10 7.50000

25.18

Miscellaneous (Educational Tour/ Exposure Visit

/ Sports Material etc.) @ Rs.750/- per child per

annum

0.75000 10 7.500 10 7.50000

25.19Preparatory camps @ Rs.200/- per child per

annum0.20000 10 2.000 10 2.00000

25.20PTAs/school functions @ Rs.200/- per child per

annum0.20000 10 2.000 10 2.00000

25.21 Provision of Rent @ Rs.6000/- per annum 6.00000

25.21a Provision of Rent (6 months) 3.6000025.21b Provision of Rent (3 months) 1.8000025.21c Rent (Previous Year (2007-2012)

25.22 Capacity building 0.50000 10 5.000 10 5.00000

25.22(a)Physical/ Self Defence Training @ Rs.200/- per

child per annum0.20000 10 2.000 10 2.00000

Subtotal Recurring 10 460.900 10 460.90000

Subtotal (Model-I) 8.20000 10 468.400 10 476.60000

CNon Recurring One Time Grant (Only

committed liabilities) (Model-II)

25.23 Construction of Building (New)

25.24 Construction of Building KGBV sanctioned earlier

25.24(a) Additional Class Room Rooms 3.45000

25.24(b) Guard Room Rooms 1.32000

25.24(c) Boundary Wall School 5.0200025.25 Boudary Wall (Spillover only) 3.00000 3.0000025.26 Boring/Handpump (Spillover only) 2.00000 2.00000

25.27 Electricity /Water charges (Spillover only)

25.27(a) Solar Water Heater & Solar Light 2.97000

25.28Furniture/Equipment (including Kitchen

equipment)2.00000

25.29 TLM and equipment including library books 3.00000

25.30 Bedding (New) 0.37500

25.31 Replacement of Bedding (once in 3 Year) 0.37500 2 0.750 2 0.75000

Subtotal Non Recurring 5.00000 2.00 0.750 2.00 5.75000

D Recurring Cost Per Annum (Model-II)

25.32Maintenance per girl student per month @ Rs.

1500/-9.00000 2 18.000 2 18.00000

25.33 Stipend for girl student per month @ Rs. 100/- 0.60000 2 1.200 2 1.20000

25.34Supplementary TLM, stationery and other

educational material @ Rs.1000/- per annum0.50000 2 1.000 2 1.00000

25.35 Salaries(a) 1 Warden @ Rs. 25,000/- per month 3.00000 2 6.000 2 6.00000

(b)3 Full time teachers as per RTE norms @ Rs.

20,000/- per month per teacher 7.20000 2 14.400 2 14.40000

(c) 3 part time teachers @ Rs. 5,000/- per month per

teacher 1.80000 2 3.600 2 3.60000

(d)1 Full time Accountant @ Rs. 10,000/- per month

1.20000 2 2.400 2 2.40000

(e)

2 Support Staff – (Accountant/ Assistant, Peon,

Chowkidar) @ Rs. 5,000/- per month per staff 1.20000 2 2.400 2 2.40000

Arti:SSA-AWPB-2014-15-PABMinits:Sultanpur:16-06-2014 28 / 533

Page 29: U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 · 2015. 1. 6. · U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15

Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

Name of District : Sultanpur -73

ActivityS. No.Physical

UnitRemarks

Outlay Recommendation for 2014-15

Spill OverDeferred laibility of

2014-15Fresh Recommended Total Recommended

(f) 1 Head cook @ Rs. 6,000/- per month 0.72000 2 1.440 2 1.44000

(g)1 Asstt. Cooks @ Rs. 4,500/- per month per cook

0.54000 2 1.080 2 1.08000

25.36Specific skill training @ Rs.1000/- per child per

annum0.50000 2 1.000 2 1.00000

25.37Electricity/water charges @ Rs.1000/- per child

per annum0.50000 2 1.000 2 1.00000

25.38Medical care/contingencies @ Rs. 1250 per child

per annum0.62500 2 1.250 2 1.25000

25.39 Maintenance @ Rs.750/- per child per annum 0.37500 2 0.750 2 0.75000

25.40

Miscellaneous (Educational Tour/ Exposure Visit

/ Sports Material etc.) @ Rs.750/- per child per

annum

0.37500 2 0.750 2 0.75000

25.41Preparatory camps @ Rs.300/- per child per

annum0.15000 2 0.300 2 0.30000

25.42PTAs/school functions @ Rs.300/- per child per

annum0.15000 2 0.300 2 0.30000

25.43 Provision of Rent @ Rs.10000/- per annum 5.00000

25.43a Provision of Rent (6 months) 3.6000025.43b Provision of Rent (3 months) 1.8000025.43c Rent (Previous Year (2007-2012)25.44 Capacity building 0.25000 2 0.500 2 0.50000

25.44(a)Physical/ Self Defence Training @ Rs.200/- per

child per annum0.10000 2 0.200 2 0.20000

Subtotal Recurring 38.00 57.570 38.00 57.57000

Subtotal (Model-II) 5.00000 40.00 58.320 40.00 63.32000

Total (KGBV) 13.200 50 526.720 50 539.920

DISTRICT GRAND TOTAL (SSA+KGBV) 195.481 37.500 544572 15690.165 544572 15923.147

Arti:SSA-AWPB-2014-15-PABMinits:Sultanpur:16-06-2014 29 / 533

Page 30: U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 · 2015. 1. 6. · U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15

Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

I ACCESS

1 Opening of New Schools

1.01 Upgradation of EGS to PSCentres /

School1.02 New PS School

1.03 Upgradation of PS to UPS / New UPS School

1.04 Composite Schools (for Urban Areas) School

1.05Residential Schools for specific category children

(For 100 children)

1.06Residential Hostel (for specific category of

children) (For 50 children)

1.07 Integration of Class V with Primary Schools

1.08Integration of Class VIII with Upper Primary

Schools

2Residential Schools for specific category

of children (For 100 Children)

Total - Residential Schools (For 100

children)

3Residential Hostel for specific category of

children (For 50 Children)

Total - Residential Schools (For 50

children)4 Transport/Escort Facility

4.01

Children in remote habitations with sparse

populations where opening of schools is

unviable

Child 0.03000

4.02

Urban deprived children/children without adult

protection in urban areas where schools are not

opened because availability of land is a problem

Child 0.03000

Sub Total

5Special Training for mainstreaming of Out-

of-School Children

5.03 Non-Residential (Fresh)(a) 12 months Child 0.06000(b) 9 months 0.04500(c) 6 months

(i)Special Training (by Special Instructors-NRBC)-

(1-5) Child 0.03000 100 3.000 100 3.00000

(ii) Special Training (by Special Instructors-NRBC)-

(6-8) Child 0.03000 43 1.290 43 1.29000

(d) 3 months Child 0.01500Sub Total 143 4.290 143 4.29000

Total (Special Training) 143 4.290 143 4.2905(B) House Hold Survey (HHS)

5(B).01 House Hold Survey through SMCHouse

Hold0.00001

Sub TotalII RETENTION6 Free Text Book

6.01Free Text Book (PS) for Parishadiya & Aided

Primary Schools (Workbooks not included)Child 0.00120 67450 80.940 67450 80.94000

6.01a

Free Text Book (PS) for 25% children of Class-1

in Private Recognised Primary Schools of other

Boards (Workbooks not included)

Child 0.00150

6.02 Free Brail Books (PS) 0.00150 41 0.062 41 0.06150

6.03 Free Large Print Books (PS) 0.00150

6.04Free Text Book (UPS) (Workbooks not included)

(Including KGBV Girls)Child 0.00200 22202 44.404 22202 44.40400

6.05 Free Brail Books (UPS) 0.00250 5 0.013 5 0.01250

6.06 Free Large Print Books (PS) 0.00250Sub Total 89698 125.418 89698 125.418

7 Provision of 2 set of Uniforms

7.01 All Girls (Including KGBV Girls) Child 0.00400 71225 284.900 71225 284.90000

7.02 SC Boys Child 0.00400 17705 70.820 17705 70.82000

7.03 ST Boys Child 0.00400 623 2.492 623 2.49200

7.04 BPL Boys Child 0.00400 54863 219.452 54863 219.45200

7.05

Free Uniform for 25% children of Class-1 in

Private Recognised Primary Schools of other

Boards

Child0.00400

Sub Total 144416 577.664 144416 577.6647(A) Fee Reimbursement

7(A).01

Fee Reimbursement for Admission of children of

Disadvantaged Group & Weaker Section upto

25% of seats in Class-1 of Private Unaided

Recognised Schools

Child 0.05400

Sub Total

8 Teaching Learning Equipment (TLE)

8.01 TLE - New Primary School 0.40000 0.20000 0.400008.02 TLE - New Upper Primary School 1.00000 0.50000 1.00000

Name of District : Srawasti -72

ActivityS. No.Physical

UnitRemarks

Outlay Recommendation for 2014-15

Spill OverDeferred laibility of

2014-15Fresh Recommended Total Recommended

Arti:SSA-AWPB-2014-15-PABMinits:Shrawasti:16-06-2014 30 / 533

Page 31: U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 · 2015. 1. 6. · U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15

Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

Name of District : Srawasti -72

ActivityS. No.Physical

UnitRemarks

Outlay Recommendation for 2014-15

Spill OverDeferred laibility of

2014-15Fresh Recommended Total Recommended

Sub Total 1.40000 1.40000III ENHANCING QUALITY9 New Teachers Salary

9.01 Primary Teachers (Regular) (Asstt. Teacher) Teacher 0.91500

9.01aHead Teacher for Primary (if the number of

children exceeds 150 in a school)Teacher

9.02 Primary Teachers (Contract) (S.M.) Teacher

9.03Subject specific Upper Primary Teachers

(Regular) (a) Science and Mathematics Teacher 1.26000(b) Social Studies Teacher 1.26000(c) Languages Teacher 1.26000

Sub Total (9.01 to 9.05)Add.Teacher against PTR

Sub Total (9.06 to 9.12)

Total (New Teacher's Salary-9.01 to 9.12)

Teachers Salary (Recurring-sanctioned

earlier)Primary teachers

9.13 Primary Teachers ( Regular)-Existing, in position Teacher 3.66000 252 922.320 252 922.32000

9.14Primary Teachers (Contract)-Existing, in

positionTeacher 0.55000

9.14(a) Primary Teachers (Contract)-under Training Teacher 0.38500 751 289.135 751 289.13500

9.14(b)Primary Teacher (Para Teachers Equal to

9.14(a) upgraded as Teachers)0.38500 335 128.975 335 128.97500

9.14(c) Primary Teachers (Para)- Vacant Teacher9.15 Primary Teachers (Vacant) Teacher 0.30500

9.16Head Teacher for Primary (if the number of

children exceeds 150)Teacher 5.04000 159 801.360 159 801.36000

9.16(b)Head Teacher for Primary (if the number of

children exceeds 150) VacantTeacher 0.42000

Additional teachers

9.17Additional Teachers - PS (Special BTC-

Regular) in positionTeacher 0.30500

9.18Additional Teachers - PS (Special BTC Under

Training)Teacher 0.87600

9.19 Additional Teachers - PS (Vacant) Teacher

9.20Others in position (Para Teachers upgraded

as Teachers)Teacher

Upper Primary teachers

9.21 UP Teachers (Regular)-Existing Teacher 5.04000 296 1491.840 296 1491.84000

9.22 UP Teachers (Contract)-Existing9.23 UP Teachers (Vacant) Teacher 1.26000

9.24Head Teacher for Upper Primary (if the number

of children exceeds 100)-ExistingTeacher 5.34000 320 1708.800 320 1708.80000

9.24a Head Teacher for Upper Primary (Vacant) Teacher 1.33500

9.25Subject specific Upper Primary Teachers

(Regular)(a) Science and Mathematics(b) Social Studies(c) Languages

9.32 Part Time Instructors in position(a) Art Education 0.77000 40 30.800 40 30.80000(b) Health and Physical Education 0.77000 34 26.180 34 26.18000(c) Work Education 0.77000 37 28.490 37 28.49000

9.32(A) Part Time Instructors Vacant(a) Art Education 0.42000(b) Health and Physical Education 0.42000(c) Work Education 0.42000

9.33

Others-Incentive to Teachers in Schools

Located in Naxal Affected Areas (@

Rs.1500/- per teachers per month)

Sub Total (9.13 to 9.33) 2224 5427.900 2224 5427.90TOTAL

(New Teachers Salary +Teachers Salary

Recurring)

2224 5427.900 2224 5427.90000

10 Teachers Training(a) Teachers

10.01

Refresher In-service Teachers' Training at BRC

level and above - 10 days (@ Rs.200/- per

head per day)

Teacher

(Target &

Ach.-13-14

in

Mandays)

0.00600

10.01(a)Continuous and Comprehensive Evauation [PS +

UPS)Teacher 0.01300 715 9.295 715 9.29500

10.01(b) Eary Reading and Numeracy Skills [PS] Teacher 0.00500 715 3.575 715 3.57500

10.01(c) Science [UPS] Teacher 0.00800 413 3.304 413 3.30400Recommended as

proposed

10.01(d) CWSN Teacher 0.00400

Arti:SSA-AWPB-2014-15-PABMinits:Shrawasti:16-06-2014 31 / 533

Page 32: U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 · 2015. 1. 6. · U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15

Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

Name of District : Srawasti -72

ActivityS. No.Physical

UnitRemarks

Outlay Recommendation for 2014-15

Spill OverDeferred laibility of

2014-15Fresh Recommended Total Recommended

10.02

One day monthly cluster level meetings and

peer group training sessions for 10 months for

all teachers each year at CRC level - 10 days (@

Rs.100/- per head per day)

Teacher 0.01000

10.03(a)

Induction Training for Newly Recruited Teachers

for 6 Months (Special BTC)- @Rs.2000/- per

head per year

Teacher 0.02000

10.03(b)5 Days Training for Part Time Instructors @ Rs.

200/- per head per day) Teacher 0.01000

10.04

Training of untrained Teachers to acquire

professional qualifications over a two year

period.

Teacher 0.04700 350 16.450 350 16.45000

(b) Head Teachers

10.05Refresher Residencial In-service for 10 days at

BRC level and above

Head

Teacher(c) Resource Persons

10.06

Refresher Training for all Resource

Persons,Master Trainers, BRC & CRC faculty

and Coordinators for 5 days each year (@

Rs.200/- per head per day)

Resource

Person 0.00300 60 0.180 60 0.18000

Sub Total 2253 32.804 2253 32.804

11Academic Support through Block Resource

Centre (BRC)/ URC

11.01 Salary of Faculty and Staff

(a) 5 RPs at BRC for subject specific training in

positionRP 25 25

(b) 2 RPs for CWSN in position RP(b-i) 1 CWSN Resource Person RP 1.10000 10 11.000 10 11.00000

(b-ii) 1 Physiotherapist (Resource person for IE) RP

(c) 1 MIS Coordinator in position RP 1.86000

(d) 1 Datra Entry Operator in position RP 1.74000 5 8.700 5 8.70000

(e) 1 Accountant-cum-support staff in position RP 1.80000 5 9.000 5 9.00000

11.02 Furniture Grant BRC/ URC 1.00000

11.03Replacement of furniture, computer, TLE etc (

Once in 5 years)BRC/ URC 1.00000

11.04 Contingency Grant BRC/ URC 0.50000 5 2.500 5 2.50000

11.05 Meeting, TA BRC/ URC 0.30000 5 1.500 5 1.50000

11.06 TLM Grant BRC/ URC 0.10000

11.07 Maintenance Grant BRC/ URC 0.10000

Sub Total 5 32.700 5 32.70000

12Academic Support through Cluster

Resource Centres (CRC/UERC)

12.01Salary of Cluster Coordinator (on an average of

one Resource Person per 18 schools in a block)RP

12.02 Furniture GrantCRC/

UERC0.10000

12.03Replacement of furniture, computer, TLE etc.

once in 5 years

CRC/

UERC0.10000

12.04 Contingency Grant CRC/UERC 0.10000 54 5.400 54 5.40000

12.05 Meeting, TA CRC/UERC 0.12000 54 6.480 54 6.48000

12.06 TLM Grant CRC/UERC 0.03000

12.07Maintenance Grant

CRC/UERC 0.02000

Sub Total 108 11.880 108 11.88000

13Computer Aided Education in upper

primary schools under Innovation

13.01Computer Aided Education in upper primary

schoolsDistrict 0.01200 48 0.576 48 0.57600

Sub Total 48 0.576 48 0.5760014 Libraries in Schools14.01 (a) Primary School (per school) School 0.03000

14.02 (b) Upper Primary School (per school) School 0.10000

Sub TotalIV ANNUAL GRANTS15 Teachers' Grant15.01 Primary Teachers Teacher 0.0050015.02 Upper Primary Teachers Teacher 0.00500 413 2.065 413 2.06500

Sub Total 413 2.065 413 2.0650016 School Grant16.01 Primary School School 0.05000 889 44.450 889 44.4500016.02 Upper Primary School School 0.07000 408 28.560 408 28.56000

Sub Total 1297 73.010 1297 73.01000

Arti:SSA-AWPB-2014-15-PABMinits:Shrawasti:16-06-2014 32 / 533

Page 33: U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 · 2015. 1. 6. · U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15

Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

Name of District : Srawasti -72

ActivityS. No.Physical

UnitRemarks

Outlay Recommendation for 2014-15

Spill OverDeferred laibility of

2014-15Fresh Recommended Total Recommended

17Research, Evaluation, Monitoring &

Supervision

17.01 REMS Activities School 0.00103 1297 1.334 1297 1.33411

17.02 Monitoring & Supervision School 0.00078 1297 1.017 1297 1.01693

17.03 House Hold Survey (Urban) in Million Plus Cities District 35.00000

Sub Total 2594 2.351 2594 2.3510518 Maintenance Grant

18.01 Maintenance in School having upto3 Classrooms School 0.07500 117 8.775 117 8.77500

18.01a Maintenance Grant School 0.07500 1169 87.675 1169 87.67500Sub Total 1286 96.450 1286 96.45000

VBRIDGING GENDER AND SOCIAL

CATEGORY GAPS

19 Interventions for CWSN (IE)

19.01 Provision for Inclusive Education Child 0.03000 1875 56.250 1875 56.25000

Sub Total 1875 56.250 1875 56.25000

20Innovativation Head up to Rs.50 Lakh per

district

20.01 Girls Education District 0.70000 10 7.000 10 7.00000

20.02 ECCE District20.03 Intervention for SC / ST children District

20.04 Intervention for Minority Community children District 2.700 2.70000

20.05 Intervention for Urban Deprived children District 10.00000

Sub Total 10 9.700 10 9.7000021 SMC/PRI Training

21.01Residential for 6 Resource Person per Block (3

days) (@ Rs.500/-)Blocks 0.09000

21.02Non-residential (3 days training of 6 SMC

members) (@ Rs.100/-)SMC 0.01800 1284 23.112 1284 23.11200

21.02(a)Non-residential (3 days training of 3 Members of

PRI/VECs/LA) (@ Rs.100/-)VEC/ WEC 0.00900

21.03

Seminar/Orientation of SMC Women members

and President/Vice President (@ Rs. 50,000/-

per block)

Blocks 0.50000

Sub Total 1284 23.112 1284 23.11200VI SCHOOL INFRASTRUCTURE22 Civil Works22.01 Primary School (Plain) (New) School 13.1550022.02 Primary School (Hilly/Rocky) (New) School 13.2750022.03 Upper Primary (Plain) (New) School 20.65500

22.04 Upper Primary School (Hilly/Rocky) (New) School 20.77500

22.04aComposite Schools for Urban Areas (Class I-

VIII)School 41.04000

22.05 ACR in lieu of upgraded Upper Primary School Rooms

22.06 Additional class rooms for adding Class VIII Rooms

22.07 Building Less (Pry) School 9.7500022.08 Building Less (UP) School 18.5900022.09 Dilapidated Building (Pry) School 9.7500022.10 Dilapidated Building (UP) School 18.59000

22.11 Additional Class Room (Rural) ( PS+UPS) Rooms 3.45000 42 144.900 42 144.90000

22.12 Additional Class Room (Urban) Rooms 3.4500022.13 Additional Class Room (Hill Area)22.14 Toilet/Urinals (PS & UPS) School 0.70000 75 52.500 75 52.5000022.15 Separate Girls Toilet (Rural+Urban) School 0.7000022.16 CWSN friendly Toilets School 0.50000

22.17 Drinking Water Facility (for Urban Area Only)) School 0.15000

22.17a Drinking Water Facility (Plain PS & UPS) School 0.15000 42 6.300 42 6.30000

22.17b Drinking Water Facility (Hilly/Rocky PS & UPS) School 0.15000

22.18a Boundary Wall PS (Total in Meters x .01105) 0.01749

22.18bBoundary Wall PS (For Gate) @Rs. 7000 x no. of

P.S.School 0.07800

22.18c Boundary Wall UPS (Total in Meters x .01105) 0.01749

22.18dBoundary Wall UPS (For Gate) @Rs. 7000 x no.

of UPSSchool 0.07800

22.19a Electrification in P.S./ Electrical Equipment School 0.11000

22.19b Electrification in U. P.S./ Electrical Equipment School 0.11000

22.20Office-cum-store-cum-Head Teacher's room

(Primary)Rooms

22.21Office-cum-store-cum-Head Teacher's room

(Upper Primary)Rooms

22.22Augumentation of training facility in BRC (one

time)BRC/ URC 5.00000

22.23 Child friendly Elements School 0.25000

22.24 Ramps with Handrails (Barrier Free Elements) School 0.06000 125 7.500 125 7.50000

22.25 Handrails in existing Ramps School 0.01000

Arti:SSA-AWPB-2014-15-PABMinits:Shrawasti:16-06-2014 33 / 533

Page 34: U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 · 2015. 1. 6. · U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15

Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

Name of District : Srawasti -72

ActivityS. No.Physical

UnitRemarks

Outlay Recommendation for 2014-15

Spill OverDeferred laibility of

2014-15Fresh Recommended Total Recommended

22.26 Whole School Develoipment School22.27 Retro-fitting and repairs School

22.28Residential Schools for specific category

of children

(a) Construction of Building including boundary

wall, Water and sanitation facilities, electric

installation (For 100 children)

Building 65.86000

(b) Construction of residential hostel Building 65.86000

(c) Refurnishing unused old buildings Building

22.29

Construction of Hostel in existing Govt UPS

including boundary wall, Water and sanitation

facilities, electric installation etc. (For 50

children)

7.00000

22.30Furniture for Govt. UPS (per child) (@ Rs.500/-

per child enrolled)Child 0.00500

22.31 Major Repairs for Primary School School 0.30000

22.32 Majr Repairs for Upper Primary School School 0.30000

22.33Others (Difference of Civil Wrks

sanctioned in pre.yr.)22.33a Others (Overhead Tank PS) School 0.1200022.33b Others (Overhead Tank UPS) School 0.12000

Sub Total (Civil WOrks) 284 211.200 284 211.20VII PROJECT MANAGEMENT COST23 Management23.01 Management up to 3.5%

(a) Project Management and MIS

(i) DPO ( Salary, Contigency, Consumables,

POL, TA & Computer etc)District 1 122.044 1 122.04380

(ii) EMIS Cell District 1 8.844 1 8.84400Sub Total (a) 1 1 1 130.888 1 130.888

(b) Training of Educational Administrators District

(c) School Mapping and Social Mapping District

Sub Total (23.01)

23.02Learning Enhancement Prog. (LEP) (P & UP) (up

to 2%)District 8.928 8.92760

23.03 Community Mobilization (up to 0.5%) District 1 32.000 1 32.00000

Sub Total (Management) 1 40.928 1 40.92760Total Management Cost 171.815 171.81540Total of SSA (Districs) 1.400 247938 6859.185 247938 6860.585

24 State Component23.01 Management23.02 REMS 0.0044923.03 SIEMAT

Sub Total

STATE SSA TOTAL 1.40000 247938 6859.185 247938 6860.58545

25

KGBV Financial Provision (give

separate costing sheets for different

Models)

Hostel

ANon Recurring One Time Grant (Only

committed liabilities) (Model-I)

25.01 Construction of Building (New)

25.02 Construction of Building KGBV sanctioned earlier

25.02(a) Additional Class Room Rooms 3.45000

25.02(b) Guard Room Rooms 1.32000

25.02(c) Boundary Wall School 5.0200025.03 Boudary Wall (Spillover only)

25.04

Boring/Handpump (Spillover only)

(minimum rates prescribed by State Drinking

Water Department subject to a ceiling of Rs.

1.00 lakhs)

25.05 Electricity /Water charges (Spillover only)

25.05(a) Solar Water Heater & Solar Light 2.97000

25.06Furniture/Equipment (including Kitchen

equipment)3.00000

25.07 TLM and equipment including library books 3.50000

25.08 Bedding (New) 0.75000

25.09 Replacement of Bedding (once in 3 Year) 0.75000 5 3.750 5 3.75000

Subtotal Non Recurring 3.750 3.75000

B Recurring Cost Per Annum (Model-I)

25.10Maintenance per girl student per month @ Rs.

1500/-18.00000 5 90.000 5 90.00000

25.11 Stipend for girl student per month @ Rs. 100/- 1.20000 5 6.000 5 6.00000

25.12Supplementary TLM, stationery and other

educational material @ Rs.1000/- per annum1.00000 5 5.000 5 5.00000

25.13 Salaries

Arti:SSA-AWPB-2014-15-PABMinits:Shrawasti:16-06-2014 34 / 533

Page 35: U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 · 2015. 1. 6. · U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15

Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

Name of District : Srawasti -72

ActivityS. No.Physical

UnitRemarks

Outlay Recommendation for 2014-15

Spill OverDeferred laibility of

2014-15Fresh Recommended Total Recommended

25.13.1 Additional Salaries:

(a) 1 Warden @ Rs. 25,000/- per month 3.00000 5 15.00000 5 15.00000

(b)4 Full time teachers as per RTE norms @ Rs.

20,000/- per month per teacher 9.60000 5 48.00000 5 48.00000

(c)

1 Urdu Teachers (only for blocks with muslim

population above 20% and select urban areas), if

required @ Rs. 12,000/- per month per teacher 1.44000 5 7.20000 5 7.20000

(d)3 part time teachers @ Rs. 5,000/- per month per

teacher 1.80000 5 9.00000 5 9.00000

(e)1 Full time Accountant @ Rs. 10,000/- per month

1.20000 5 6.00000 5 6.00000

(f)

2 Support Staff – (Accountant/ Assistant, Peon,

Chowkidar) @ Rs. 5,000/- per month per staff 1.20000 5 6.00000 5 6.00000

(g) 1 Head cook @ Rs. 6,000/- per month 0.72000 5 3.60000 5 3.60000

(h)2 Asstt. Cooks @ Rs. 4,500/- per month per cook

1.08000 5 5.40000 5 5.40000

25.14Specific skill training @ Rs.1000/- per child per

annum1.00000 5 5.000 5 5.00000

25.15Electricity/water charges @ Rs.1000/- per child

per annum1.00000 5 5.000 5 5.00000

25.16Medical care/contingencies @ Rs. 1250 per child

per annum1.25000 5 6.250 5 6.25000

25.17 Maintenance @ Rs.750/- per child per annum 0.75000 5 3.750 5 3.75000

25.18

Miscellaneous (Educational Tour/ Exposure Visit

/ Sports Material etc.) @ Rs.750/- per child per

annum

0.75000 5 3.750 5 3.75000

25.19Preparatory camps @ Rs.200/- per child per

annum0.20000 5 1.000 5 1.00000

25.20PTAs/school functions @ Rs.200/- per child per

annum0.20000 5 1.000 5 1.00000

25.21 Provision of Rent @ Rs.6000/- per annum 6.00000

25.21a Provision of Rent (6 months) 3.6000025.21b Provision of Rent (3 months) 1.8000025.21c Rent (Previous Year (2007-2012)

25.22 Capacity building 0.50000 5 2.500 5 2.50000

25.22(a)Physical/ Self Defence Training @ Rs.200/- per

child per annum0.20000 5 1.000 5 1.00000

Subtotal Recurring 5 230.450 5 230.45000

Subtotal (Model-I) 5 234.200 5 234.20000

CNon Recurring One Time Grant (Only

committed liabilities) (Model-II)

25.23 Construction of Building (New)

25.24 Construction of Building KGBV sanctioned earlier

25.24(a) Additional Class Room Rooms 3.45000

25.24(b) Guard Room Rooms 1.32000

25.24(c) Boundary Wall School 5.0200025.25 Boudary Wall (Spillover only)25.26 Boring/Handpump (Spillover only)

25.27 Electricity /Water charges (Spillover only)

25.27(a) Solar Water Heater & Solar Light 2.97000

25.28Furniture/Equipment (including Kitchen

equipment)2.00000

25.29 TLM and equipment including library books 3.00000

25.30 Bedding (New) 0.37500

25.31 Replacement of Bedding (once in 3 Year) 0.37500

Subtotal Non Recurring

D Recurring Cost Per Annum (Model-II)

25.32Maintenance per girl student per month @ Rs.

1500/-9.00000

25.33 Stipend for girl student per month @ Rs. 100/- 0.60000

25.34Supplementary TLM, stationery and other

educational material @ Rs.1000/- per annum0.50000

25.35 Salaries(a) 1 Warden @ Rs. 25,000/- per month 3.00000

(b)3 Full time teachers as per RTE norms @ Rs.

20,000/- per month per teacher 7.20000

(c) 3 part time teachers @ Rs. 5,000/- per month per

teacher 1.80000

(d)1 Full time Accountant @ Rs. 10,000/- per month

1.20000

(e)

2 Support Staff – (Accountant/ Assistant, Peon,

Chowkidar) @ Rs. 5,000/- per month per staff 1.20000

Arti:SSA-AWPB-2014-15-PABMinits:Shrawasti:16-06-2014 35 / 533

Page 36: U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 · 2015. 1. 6. · U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15

Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

Name of District : Srawasti -72

ActivityS. No.Physical

UnitRemarks

Outlay Recommendation for 2014-15

Spill OverDeferred laibility of

2014-15Fresh Recommended Total Recommended

(f) 1 Head cook @ Rs. 6,000/- per month 0.72000

(g)1 Asstt. Cooks @ Rs. 4,500/- per month per cook

0.54000

25.36Specific skill training @ Rs.1000/- per child per

annum0.50000

25.37Electricity/water charges @ Rs.1000/- per child

per annum0.50000

25.38Medical care/contingencies @ Rs. 1250 per child

per annum0.62500

25.39 Maintenance @ Rs.750/- per child per annum 0.37500

25.40

Miscellaneous (Educational Tour/ Exposure Visit

/ Sports Material etc.) @ Rs.750/- per child per

annum

0.37500

25.41Preparatory camps @ Rs.300/- per child per

annum0.15000

25.42PTAs/school functions @ Rs.300/- per child per

annum0.15000

25.43 Provision of Rent @ Rs.10000/- per annum 5.00000

25.43a Provision of Rent (6 months) 3.6000025.43b Provision of Rent (3 months) 1.8000025.43c Rent (Previous Year (2007-2012)25.44 Capacity building 0.25000

25.44(a)Physical/ Self Defence Training @ Rs.200/- per

child per annum0.10000

Subtotal Recurring

Subtotal (Model-II) Total (KGBV) 5 234.200 5 234.200

DISTRICT GRAND TOTAL (SSA+KGBV) 1.400 247943 7093.385 247943 7094.785

Arti:SSA-AWPB-2014-15-PABMinits:Shrawasti:16-06-2014 36 / 533

Page 37: U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 · 2015. 1. 6. · U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15

Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

I ACCESS

1 Opening of New Schools

1.01 Upgradation of EGS to PSCentres /

School1.02 New PS School

1.03 Upgradation of PS to UPS / New UPS School

1.04 Composite Schools (for Urban Areas) School

1.05Residential Schools for specific category children

(For 100 children)

1.06Residential Hostel (for specific category of

children) (For 50 children)

1.07 Integration of Class V with Primary Schools

1.08Integration of Class VIII with Upper Primary

Schools

2Residential Schools for specific category

of children (For 100 Children)

Total - Residential Schools (For 100

children)

3Residential Hostel for specific category of

children (For 50 Children)

Total - Residential Schools (For 50

children)4 Transport/Escort Facility

4.01

Children in remote habitations with sparse

populations where opening of schools is

unviable

Child 0.03000

4.02

Urban deprived children/children without adult

protection in urban areas where schools are not

opened because availability of land is a problem

Child 0.03000

Sub Total

5Special Training for mainstreaming of Out-

of-School Children

5.03 Non-Residential (Fresh)(a) 12 months Child 0.06000(b) 9 months 0.04500(c) 6 months

(i)Special Training (by Special Instructors-NRBC)-

(1-5) Child 0.03000 860 25.800 860 25.80000

(ii) Special Training (by Special Instructors-NRBC)-

(6-8) Child 0.03000 672 20.160 672 20.16000

(d) 3 months Child 0.01500Sub Total 1532 45.960 1532 45.96000

Total (Special Training) 1532 45.960 1532 45.9605(B) House Hold Survey (HHS)

5(B).01 House Hold Survey through SMCHouse

Hold0.00001

Sub TotalII RETENTION6 Free Text Book

6.01Free Text Book (PS) for Parishadiya & Aided

Primary Schools (Workbooks not included)Child 0.00120 155457 186.548 155457 186.54840

6.01a

Free Text Book (PS) for 25% children of Class-1

in Private Recognised Primary Schools of other

Boards (Workbooks not included)

Child 0.00150

6.02 Free Brail Books (PS) 0.00150 36 0.054 36 0.05400

6.03 Free Large Print Books (PS) 0.00150

6.04Free Text Book (UPS) (Workbooks not included)

(Including KGBV Girls)Child 0.00200 53562 107.124 53562 107.12400

6.05 Free Brail Books (UPS) 0.00250 13 0.033 13 0.03250

6.06 Free Large Print Books (PS) 0.00250Sub Total 209068 293.759 209068 293.759

7 Provision of 2 set of Uniforms

7.01 All Girls (Including KGBV Girls) Child 0.00400 130337 521.348 130337 521.34800

7.02 SC Boys Child 0.00400 37411 149.644 37411 149.64400

7.03 ST Boys Child 0.00400 39806 159.224 39806 159.22400

7.04 BPL Boys Child 0.00400 40608 162.432 40608 162.43200

7.05

Free Uniform for 25% children of Class-1 in

Private Recognised Primary Schools of other

Boards

Child0.00400

Sub Total 248162 992.648 248162 992.6487(A) Fee Reimbursement

7(A).01

Fee Reimbursement for Admission of children of

Disadvantaged Group & Weaker Section upto

25% of seats in Class-1 of Private Unaided

Recognised Schools

Child 0.05400

Sub Total

8 Teaching Learning Equipment (TLE)

8.01 TLE - New Primary School 0.40000 0.20000 0.400008.02 TLE - New Upper Primary School 1.00000 0.50000 1.00000

Name of District : Sonebhadra -71

ActivityS. No.Physical

UnitRemarks

Outlay Recommendation for 2014-15

Spill OverDeferred laibility of

2014-15Fresh Recommended Total Recommended

Arti:SSA-AWPB-2014-15-PABMinits:Sonebhadra:16-06-2014 37 / 533

Page 38: U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 · 2015. 1. 6. · U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15

Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

Name of District : Sonebhadra -71

ActivityS. No.Physical

UnitRemarks

Outlay Recommendation for 2014-15

Spill OverDeferred laibility of

2014-15Fresh Recommended Total Recommended

Sub Total 1.40000 1.40000III ENHANCING QUALITY9 New Teachers Salary

9.01 Primary Teachers (Regular) (Asstt. Teacher) Teacher 0.91500

9.01aHead Teacher for Primary (if the number of

children exceeds 150 in a school)Teacher

9.02 Primary Teachers (Contract) (S.M.) Teacher

9.03Subject specific Upper Primary Teachers

(Regular) (a) Science and Mathematics Teacher 1.26000(b) Social Studies Teacher 1.26000(c) Languages Teacher 1.26000

Sub Total (9.01 to 9.05)Add.Teacher against PTR

Sub Total (9.06 to 9.12)

Total (New Teacher's Salary-9.01 to 9.12)

Teachers Salary (Recurring-sanctioned

earlier)Primary teachers

9.13 Primary Teachers ( Regular)-Existing, in position Teacher 3.66000 50 183.000 50 183.00000

9.14Primary Teachers (Contract)-Existing, in

positionTeacher 0.55000

9.14(a) Primary Teachers (Contract)-under Training Teacher 0.38500 1899 731.115 1899 731.11500

9.14(b)Primary Teacher (Para Teachers Equal to

9.14(a) upgraded as Teachers)0.38500 556 214.060 556 214.06000

9.14(c) Primary Teachers (Para)- Vacant Teacher9.15 Primary Teachers (Vacant) Teacher 0.30500

9.16Head Teacher for Primary (if the number of

children exceeds 150)Teacher 5.04000 323 1627.920 323 1627.92000

9.16(b)Head Teacher for Primary (if the number of

children exceeds 150) VacantTeacher 0.42000

Additional teachers

9.17Additional Teachers - PS (Special BTC-

Regular) in positionTeacher 0.30500

9.18Additional Teachers - PS (Special BTC Under

Training)Teacher 0.87600

9.19 Additional Teachers - PS (Vacant) Teacher

9.20Others in position (Para Teachers upgraded

as Teachers)Teacher

Upper Primary teachers

9.21 UP Teachers (Regular)-Existing Teacher 5.04000 340 1713.600 340 1713.60000

9.22 UP Teachers (Contract)-Existing9.23 UP Teachers (Vacant) Teacher 1.26000

9.24Head Teacher for Upper Primary (if the number

of children exceeds 100)-ExistingTeacher 5.34000 485 2589.900 485 2589.90000

9.24a Head Teacher for Upper Primary (Vacant) Teacher 1.33500

9.25Subject specific Upper Primary Teachers

(Regular)(a) Science and Mathematics(b) Social Studies(c) Languages

9.32 Part Time Instructors in position(a) Art Education 0.77000 187 143.990 187 143.99000(b) Health and Physical Education 0.77000 106 81.620 106 81.62000(c) Work Education 0.77000 163 125.510 163 125.51000

9.32(A) Part Time Instructors Vacant(a) Art Education 0.42000(b) Health and Physical Education 0.42000(c) Work Education 0.42000

9.33

Others-Incentive to Teachers in Schools

Located in Naxal Affected Areas (@

Rs.1500/- per teachers per month)

Sub Total (9.13 to 9.33) 4109 7410.715 4109 7410.72TOTAL

(New Teachers Salary +Teachers Salary

Recurring)

4109 7410.715 4109 7410.71500

10 Teachers Training(a) Teachers

10.01

Refresher In-service Teachers' Training at BRC

level and above - 10 days (@ Rs.200/- per

head per day)

Teacher

(Target &

Ach.-13-14

in

Mandays)

0.00600

10.01(a)Continuous and Comprehensive Evauation [PS +

UPS)Teacher 0.01300 1331 17.303 1331 17.30300

10.01(b) Eary Reading and Numeracy Skills [PS] Teacher 0.00500 1331 6.655 1331 6.65500

10.01(c) Science [UPS] Teacher 0.00800 688 5.504 688 5.50400Recommended as

proposed

10.01(d) CWSN Teacher 0.00400

Arti:SSA-AWPB-2014-15-PABMinits:Sonebhadra:16-06-2014 38 / 533

Page 39: U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 · 2015. 1. 6. · U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15

Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

Name of District : Sonebhadra -71

ActivityS. No.Physical

UnitRemarks

Outlay Recommendation for 2014-15

Spill OverDeferred laibility of

2014-15Fresh Recommended Total Recommended

10.02

One day monthly cluster level meetings and

peer group training sessions for 10 months for

all teachers each year at CRC level - 10 days (@

Rs.100/- per head per day)

Teacher 0.01000

10.03(a)

Induction Training for Newly Recruited Teachers

for 6 Months (Special BTC)- @Rs.2000/- per

head per year

Teacher 0.02000

10.03(b)5 Days Training for Part Time Instructors @ Rs.

200/- per head per day) Teacher 0.01000

10.04

Training of untrained Teachers to acquire

professional qualifications over a two year

period.

Teacher 0.04700 1039 48.833 1039 48.83300

(b) Head Teachers

10.05Refresher Residencial In-service for 10 days at

BRC level and above

Head

Teacher(c) Resource Persons

10.06

Refresher Training for all Resource

Persons,Master Trainers, BRC & CRC faculty

and Coordinators for 5 days each year (@

Rs.200/- per head per day)

Resource

Person 0.00300 96 0.288 96 0.28800

Sub Total 4485 78.583 4485 78.583

11Academic Support through Block Resource

Centre (BRC)/ URC

11.01 Salary of Faculty and Staff

(a) 5 RPs at BRC for subject specific training in

positionRP 40 40

(b) 2 RPs for CWSN in position RP(b-i) 1 CWSN Resource Person RP 1.10000 16 17.600 16 17.60000

(b-ii) 1 Physiotherapist (Resource person for IE) RP

(c) 1 MIS Coordinator in position RP 1.86000

(d) 1 Datra Entry Operator in position RP 1.74000 8 13.920 8 13.92000

(e) 1 Accountant-cum-support staff in position RP 1.80000 8 14.400 8 14.40000

11.02 Furniture Grant BRC/ URC 1.00000

11.03Replacement of furniture, computer, TLE etc (

Once in 5 years)BRC/ URC 1.00000

11.04 Contingency Grant BRC/ URC 0.50000 8 4.000 8 4.00000

11.05 Meeting, TA BRC/ URC 0.30000 8 2.400 8 2.40000

11.06 TLM Grant BRC/ URC 0.10000

11.07 Maintenance Grant BRC/ URC 0.10000

Sub Total 8 52.320 8 52.32000

12Academic Support through Cluster

Resource Centres (CRC/UERC)

12.01Salary of Cluster Coordinator (on an average of

one Resource Person per 18 schools in a block)RP

12.02 Furniture GrantCRC/

UERC0.10000

12.03Replacement of furniture, computer, TLE etc.

once in 5 years

CRC/

UERC0.10000

12.04 Contingency Grant CRC/UERC 0.10000 68 6.800 68 6.80000

12.05 Meeting, TA CRC/UERC 0.12000 68 8.160 68 8.16000

12.06 TLM Grant CRC/UERC 0.03000

12.07Maintenance Grant

CRC/UERC 0.02000

Sub Total 136 14.960 136 14.96000

13Computer Aided Education in upper

primary schools under Innovation

13.01Computer Aided Education in upper primary

schoolsDistrict 0.01200 48 0.576 48 0.57600

Sub Total 48 0.576 48 0.5760014 Libraries in Schools14.01 (a) Primary School (per school) School 0.03000

14.02 (b) Upper Primary School (per school) School 0.10000

Sub TotalIV ANNUAL GRANTS15 Teachers' Grant15.01 Primary Teachers Teacher 0.0050015.02 Upper Primary Teachers Teacher 0.00500 688 3.440 688 3.44000

Sub Total 688 3.440 688 3.4400016 School Grant16.01 Primary School School 0.05000 1823 91.150 1823 91.1500016.02 Upper Primary School School 0.07000 679 47.530 679 47.53000

Sub Total 2502 138.680 2502 138.68000

Arti:SSA-AWPB-2014-15-PABMinits:Sonebhadra:16-06-2014 39 / 533

Page 40: U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 · 2015. 1. 6. · U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15

Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

Name of District : Sonebhadra -71

ActivityS. No.Physical

UnitRemarks

Outlay Recommendation for 2014-15

Spill OverDeferred laibility of

2014-15Fresh Recommended Total Recommended

17Research, Evaluation, Monitoring &

Supervision

17.01 REMS Activities School 0.00103 2502 2.574 2502 2.57359

17.02 Monitoring & Supervision School 0.00078 2502 1.962 2502 1.96174

17.03 House Hold Survey (Urban) in Million Plus Cities District 35.00000

Sub Total 5004 4.535 5004 4.5353218 Maintenance Grant

18.01 Maintenance in School having upto3 Classrooms School 0.07500 982 73.650 982 73.65000

18.01a Maintenance Grant School 0.07500 1490 111.750 1490 111.75000Sub Total 2472 185.400 2472 185.40000

VBRIDGING GENDER AND SOCIAL

CATEGORY GAPS

19 Interventions for CWSN (IE)

19.01 Provision for Inclusive Education Child 0.03000 804 24.120 804 24.12000

Sub Total 804 24.120 804 24.12000

20Innovativation Head up to Rs.50 Lakh per

district

20.01 Girls Education District 0.70000 8 5.600 8 5.60000

20.02 ECCE District20.03 Intervention for SC / ST children District

20.04 Intervention for Minority Community children District

20.05 Intervention for Urban Deprived children District 10.00000

Sub Total 8 5.600 8 5.6000021 SMC/PRI Training

21.01Residential for 6 Resource Person per Block (3

days) (@ Rs.500/-)Blocks 0.09000

21.02Non-residential (3 days training of 6 SMC

members) (@ Rs.100/-)SMC 0.01800 2473 44.514 2473 44.51400

21.02(a)Non-residential (3 days training of 3 Members of

PRI/VECs/LA) (@ Rs.100/-)VEC/ WEC 0.00900

21.03

Seminar/Orientation of SMC Women members

and President/Vice President (@ Rs. 50,000/-

per block)

Blocks 0.50000

Sub Total 2473 44.514 2473 44.51400VI SCHOOL INFRASTRUCTURE22 Civil Works22.01 Primary School (Plain) (New) School 13.1550022.02 Primary School (Hilly/Rocky) (New) School 13.2750022.03 Upper Primary (Plain) (New) School 20.65500

22.04 Upper Primary School (Hilly/Rocky) (New) School 20.77500

22.04aComposite Schools for Urban Areas (Class I-

VIII)School 41.04000

22.05 ACR in lieu of upgraded Upper Primary School Rooms

22.06 Additional class rooms for adding Class VIII Rooms

22.07 Building Less (Pry) School 9.7500022.08 Building Less (UP) School 18.5900022.09 Dilapidated Building (Pry) School 9.7500022.10 Dilapidated Building (UP) School 18.59000

22.11 Additional Class Room (Rural) ( PS+UPS) Rooms 3.45000 161 555.450 161 555.45000

22.12 Additional Class Room (Urban) Rooms 3.4500022.13 Additional Class Room (Hill Area)22.14 Toilet/Urinals (PS & UPS) School 0.7000022.15 Separate Girls Toilet (Rural+Urban) School 0.7000022.16 CWSN friendly Toilets School 0.50000

22.17 Drinking Water Facility (for Urban Area Only)) School 0.15000

22.17a Drinking Water Facility (Plain PS & UPS) School 0.15000

22.17b Drinking Water Facility (Hilly/Rocky PS & UPS) School 0.15000

22.18a Boundary Wall PS (Total in Meters x .01105) 0.01749

22.18bBoundary Wall PS (For Gate) @Rs. 7000 x no. of

P.S.School 0.07800

22.18c Boundary Wall UPS (Total in Meters x .01105) 0.01749

22.18dBoundary Wall UPS (For Gate) @Rs. 7000 x no.

of UPSSchool 0.07800

22.19a Electrification in P.S./ Electrical Equipment School 0.11000

22.19b Electrification in U. P.S./ Electrical Equipment School 0.11000

22.20Office-cum-store-cum-Head Teacher's room

(Primary)Rooms

22.21Office-cum-store-cum-Head Teacher's room

(Upper Primary)Rooms

22.22Augumentation of training facility in BRC (one

time)BRC/ URC 5.00000

22.23 Child friendly Elements School 0.25000

22.24 Ramps with Handrails (Barrier Free Elements) School 0.06000

22.25 Handrails in existing Ramps School 0.01000

Arti:SSA-AWPB-2014-15-PABMinits:Sonebhadra:16-06-2014 40 / 533

Page 41: U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 · 2015. 1. 6. · U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15

Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

Name of District : Sonebhadra -71

ActivityS. No.Physical

UnitRemarks

Outlay Recommendation for 2014-15

Spill OverDeferred laibility of

2014-15Fresh Recommended Total Recommended

22.26 Whole School Develoipment School22.27 Retro-fitting and repairs School

22.28Residential Schools for specific category

of children

(a) Construction of Building including boundary

wall, Water and sanitation facilities, electric

installation (For 100 children)

Building 65.86000

(b) Construction of residential hostel Building 65.86000

(c) Refurnishing unused old buildings Building

22.29

Construction of Hostel in existing Govt UPS

including boundary wall, Water and sanitation

facilities, electric installation etc. (For 50

children)

7.00000

22.30Furniture for Govt. UPS (per child) (@ Rs.500/-

per child enrolled)Child 0.00500

22.31 Major Repairs for Primary School School 0.30000

22.32 Majr Repairs for Upper Primary School School 0.30000

22.33Others (Difference of Civil Wrks

sanctioned in pre.yr.)22.33a Others (Overhead Tank PS) School 0.1200022.33b Others (Overhead Tank UPS) School 0.12000

Sub Total (Civil WOrks) 161 555.450 161 555.45VII PROJECT MANAGEMENT COST23 Management23.01 Management up to 3.5%

(a) Project Management and MIS

(i) DPO ( Salary, Contigency, Consumables,

POL, TA & Computer etc)District 1 119.985 1 119.98450

(ii) EMIS Cell District 1 12.606 1 12.60600Sub Total (a) 1 1 1 132.591 1 132.591

(b) Training of Educational Administrators District

(c) School Mapping and Social Mapping District

Sub Total (23.01)

23.02Learning Enhancement Prog. (LEP) (P & UP) (up

to 2%)District 19.566 19.56595

23.03 Community Mobilization (up to 0.5%) District 1 45.000 1 45.00000

Sub Total (Management) 1 64.566 1 64.56595Total Management Cost 197.156 197.15645Total of SSA (Districs) 1.400 481660 10048.417 481660 10049.817

24 State Component23.01 Management23.02 REMS 0.0044923.03 SIEMAT

Sub Total

STATE SSA TOTAL 1.40000 481660 10048.417 481660 10049.81667

25

KGBV Financial Provision (give

separate costing sheets for different

Models)

Hostel

ANon Recurring One Time Grant (Only

committed liabilities) (Model-I)

25.01 Construction of Building (New)

25.02 Construction of Building KGBV sanctioned earlier

25.02(a) Additional Class Room Rooms 3.45000

25.02(b) Guard Room Rooms 1.32000

25.02(c) Boundary Wall School 5.0200025.03 Boudary Wall (Spillover only)

25.04

Boring/Handpump (Spillover only)

(minimum rates prescribed by State Drinking

Water Department subject to a ceiling of Rs.

1.00 lakhs)

25.05 Electricity /Water charges (Spillover only)

25.05(a) Solar Water Heater & Solar Light 2.97000

25.06Furniture/Equipment (including Kitchen

equipment)3.00000

25.07 TLM and equipment including library books 3.50000

25.08 Bedding (New) 0.75000

25.09 Replacement of Bedding (once in 3 Year) 0.75000 9 6.750 9 6.75000

Subtotal Non Recurring 6.750 6.75000

B Recurring Cost Per Annum (Model-I)

25.10Maintenance per girl student per month @ Rs.

1500/-18.00000 9 162.000 9 162.00000

25.11 Stipend for girl student per month @ Rs. 100/- 1.20000 9 10.800 9 10.80000

25.12Supplementary TLM, stationery and other

educational material @ Rs.1000/- per annum1.00000 9 9.000 9 9.00000

25.13 Salaries

Arti:SSA-AWPB-2014-15-PABMinits:Sonebhadra:16-06-2014 41 / 533

Page 42: U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 · 2015. 1. 6. · U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15

Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

Name of District : Sonebhadra -71

ActivityS. No.Physical

UnitRemarks

Outlay Recommendation for 2014-15

Spill OverDeferred laibility of

2014-15Fresh Recommended Total Recommended

25.13.1 Additional Salaries:

(a) 1 Warden @ Rs. 25,000/- per month 3.00000 9 27.00000 9 27.00000

(b)4 Full time teachers as per RTE norms @ Rs.

20,000/- per month per teacher 9.60000 9 86.40000 9 86.40000

(c)

1 Urdu Teachers (only for blocks with muslim

population above 20% and select urban areas), if

required @ Rs. 12,000/- per month per teacher 1.44000 9 12.96000 9 12.96000

(d)3 part time teachers @ Rs. 5,000/- per month per

teacher 1.80000 9 16.20000 9 16.20000

(e)1 Full time Accountant @ Rs. 10,000/- per month

1.20000 9 10.80000 9 10.80000

(f)

2 Support Staff – (Accountant/ Assistant, Peon,

Chowkidar) @ Rs. 5,000/- per month per staff 1.20000 9 10.80000 9 10.80000

(g) 1 Head cook @ Rs. 6,000/- per month 0.72000 9 6.48000 9 6.48000

(h)2 Asstt. Cooks @ Rs. 4,500/- per month per cook

1.08000 9 9.72000 9 9.72000

25.14Specific skill training @ Rs.1000/- per child per

annum1.00000 9 9.000 9 9.00000

25.15Electricity/water charges @ Rs.1000/- per child

per annum1.00000 9 9.000 9 9.00000

25.16Medical care/contingencies @ Rs. 1250 per child

per annum1.25000 9 11.250 9 11.25000

25.17 Maintenance @ Rs.750/- per child per annum 0.75000 9 6.750 9 6.75000

25.18

Miscellaneous (Educational Tour/ Exposure Visit

/ Sports Material etc.) @ Rs.750/- per child per

annum

0.75000 9 6.750 9 6.75000

25.19Preparatory camps @ Rs.200/- per child per

annum0.20000 9 1.800 9 1.80000

25.20PTAs/school functions @ Rs.200/- per child per

annum0.20000 9 1.800 9 1.80000

25.21 Provision of Rent @ Rs.6000/- per annum 6.00000

25.21a Provision of Rent (6 months) 3.6000025.21b Provision of Rent (3 months) 1.8000025.21c Rent (Previous Year (2007-2012) 6 6

25.22 Capacity building 0.50000 9 4.500 9 4.50000

25.22(a)Physical/ Self Defence Training @ Rs.200/- per

child per annum0.20000 9 1.800 9 1.80000

Subtotal Recurring 9 414.810 9 414.81000

Subtotal (Model-I) 9 421.560 9 421.56000

CNon Recurring One Time Grant (Only

committed liabilities) (Model-II)

25.23 Construction of Building (New)

25.24 Construction of Building KGBV sanctioned earlier

25.24(a) Additional Class Room Rooms 3.45000

25.24(b) Guard Room Rooms 1.32000

25.24(c) Boundary Wall School 5.0200025.25 Boudary Wall (Spillover only)25.26 Boring/Handpump (Spillover only)

25.27 Electricity /Water charges (Spillover only)

25.27(a) Solar Water Heater & Solar Light 2.97000

25.28Furniture/Equipment (including Kitchen

equipment)2.00000

25.29 TLM and equipment including library books 3.00000

25.30 Bedding (New) 0.37500

25.31 Replacement of Bedding (once in 3 Year) 0.37500

Subtotal Non Recurring

D Recurring Cost Per Annum (Model-II)

25.32Maintenance per girl student per month @ Rs.

1500/-9.00000

25.33 Stipend for girl student per month @ Rs. 100/- 0.60000

25.34Supplementary TLM, stationery and other

educational material @ Rs.1000/- per annum0.50000

25.35 Salaries(a) 1 Warden @ Rs. 25,000/- per month 3.00000

(b)3 Full time teachers as per RTE norms @ Rs.

20,000/- per month per teacher 7.20000

(c) 3 part time teachers @ Rs. 5,000/- per month per

teacher 1.80000

(d)1 Full time Accountant @ Rs. 10,000/- per month

1.20000

(e)

2 Support Staff – (Accountant/ Assistant, Peon,

Chowkidar) @ Rs. 5,000/- per month per staff 1.20000

Arti:SSA-AWPB-2014-15-PABMinits:Sonebhadra:16-06-2014 42 / 533

Page 43: U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 · 2015. 1. 6. · U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15

Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

Name of District : Sonebhadra -71

ActivityS. No.Physical

UnitRemarks

Outlay Recommendation for 2014-15

Spill OverDeferred laibility of

2014-15Fresh Recommended Total Recommended

(f) 1 Head cook @ Rs. 6,000/- per month 0.72000

(g)1 Asstt. Cooks @ Rs. 4,500/- per month per cook

0.54000

25.36Specific skill training @ Rs.1000/- per child per

annum0.50000

25.37Electricity/water charges @ Rs.1000/- per child

per annum0.50000

25.38Medical care/contingencies @ Rs. 1250 per child

per annum0.62500

25.39 Maintenance @ Rs.750/- per child per annum 0.37500

25.40

Miscellaneous (Educational Tour/ Exposure Visit

/ Sports Material etc.) @ Rs.750/- per child per

annum

0.37500

25.41Preparatory camps @ Rs.300/- per child per

annum0.15000

25.42PTAs/school functions @ Rs.300/- per child per

annum0.15000

25.43 Provision of Rent @ Rs.10000/- per annum 5.00000

25.43a Provision of Rent (6 months) 3.6000025.43b Provision of Rent (3 months) 1.8000025.43c Rent (Previous Year (2007-2012)25.44 Capacity building 0.25000

25.44(a)Physical/ Self Defence Training @ Rs.200/- per

child per annum0.10000

Subtotal Recurring

Subtotal (Model-II) Total (KGBV) 9 421.560 9 421.560

DISTRICT GRAND TOTAL (SSA+KGBV) 1.400 481669 10469.977 481669 10471.377

Arti:SSA-AWPB-2014-15-PABMinits:Sonebhadra:16-06-2014 43 / 533

Page 44: U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 · 2015. 1. 6. · U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15

Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

I ACCESS

1 Opening of New Schools

1.01 Upgradation of EGS to PSCentres /

School1.02 New PS School

1.03 Upgradation of PS to UPS / New UPS School

1.04 Composite Schools (for Urban Areas) School

1.05Residential Schools for specific category children

(For 100 children)

1.06Residential Hostel (for specific category of

children) (For 50 children)

1.07 Integration of Class V with Primary Schools

1.08Integration of Class VIII with Upper Primary

Schools

2Residential Schools for specific category

of children (For 100 Children)

Total - Residential Schools (For 100

children)

3Residential Hostel for specific category of

children (For 50 Children)

Total - Residential Schools (For 50

children)4 Transport/Escort Facility

4.01

Children in remote habitations with sparse

populations where opening of schools is

unviable

Child 0.03000

4.02

Urban deprived children/children without adult

protection in urban areas where schools are not

opened because availability of land is a problem

Child 0.03000

Sub Total

5Special Training for mainstreaming of Out-

of-School Children

5.03 Non-Residential (Fresh)(a) 12 months Child 0.06000(b) 9 months 0.04500(c) 6 months

(i)Special Training (by Special Instructors-NRBC)-

(1-5) Child 0.03000 572 17.160 572 17.16000

(ii) Special Training (by Special Instructors-NRBC)-

(6-8) Child 0.03000 384 11.520 384 11.52000

(d) 3 months Child 0.01500Sub Total 956 28.680 956 28.68000

Total (Special Training) 956 28.680 956 28.6805(B) House Hold Survey (HHS)

5(B).01 House Hold Survey through SMCHouse

Hold0.00001

Sub TotalII RETENTION6 Free Text Book

6.01Free Text Book (PS) for Parishadiya & Aided

Primary Schools (Workbooks not included)Child 0.00120 296968 356.362 296968 356.36160

6.01a

Free Text Book (PS) for 25% children of Class-1

in Private Recognised Primary Schools of other

Boards (Workbooks not included)

Child 0.00150

6.02 Free Brail Books (PS) 0.00150 247 0.371 247 0.37050

6.03 Free Large Print Books (PS) 0.00150

6.04Free Text Book (UPS) (Workbooks not included)

(Including KGBV Girls)Child 0.00200 116943 233.886 116943 233.88600

6.05 Free Brail Books (UPS) 0.00250 25 0.063 25 0.06250

6.06 Free Large Print Books (PS) 0.00250Sub Total 414183 590.681 414183 590.681

7 Provision of 2 set of Uniforms

7.01 All Girls (Including KGBV Girls) Child 0.00400 290401 1161.604 290401 1161.60400

7.02 SC Boys Child 0.00400 123510 494.040 123510 494.04000

7.03 ST Boys Child 0.00400

7.04 BPL Boys Child 0.00400 130283 521.132 130283 521.13200

7.05

Free Uniform for 25% children of Class-1 in

Private Recognised Primary Schools of other

Boards

Child0.00400

Sub Total 544194 2176.776 544194 2176.7767(A) Fee Reimbursement

7(A).01

Fee Reimbursement for Admission of children of

Disadvantaged Group & Weaker Section upto

25% of seats in Class-1 of Private Unaided

Recognised Schools

Child 0.05400

Sub Total

8 Teaching Learning Equipment (TLE)

8.01 TLE - New Primary School 3.80000 0.20000 3.800008.02 TLE - New Upper Primary School 7.50000 0.50000 7.50000

Name of District : Sitapur -70

ActivityS. No.Physical

UnitRemarks

Outlay Recommendation for 2014-15

Spill OverDeferred laibility of

2014-15Fresh Recommended Total Recommended

Arti:SSA-AWPB-2014-15-PABMinits:Sitapur:16-06-2014 44 / 533

Page 45: U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 · 2015. 1. 6. · U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15

Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

Name of District : Sitapur -70

ActivityS. No.Physical

UnitRemarks

Outlay Recommendation for 2014-15

Spill OverDeferred laibility of

2014-15Fresh Recommended Total Recommended

Sub Total 11.30000 11.30000III ENHANCING QUALITY9 New Teachers Salary

9.01 Primary Teachers (Regular) (Asstt. Teacher) Teacher 0.91500

9.01aHead Teacher for Primary (if the number of

children exceeds 150 in a school)Teacher

9.02 Primary Teachers (Contract) (S.M.) Teacher

9.03Subject specific Upper Primary Teachers

(Regular) (a) Science and Mathematics Teacher 1.26000(b) Social Studies Teacher 1.26000(c) Languages Teacher 1.26000

Sub Total (9.01 to 9.05)Add.Teacher against PTR

Sub Total (9.06 to 9.12)

Total (New Teacher's Salary-9.01 to 9.12)

Teachers Salary (Recurring-sanctioned

earlier)Primary teachers

9.13 Primary Teachers ( Regular)-Existing, in position Teacher 3.66000 1094 4004.040 1094 4004.04000

9.14Primary Teachers (Contract)-Existing, in

positionTeacher 0.55000

9.14(a) Primary Teachers (Contract)-under Training Teacher 0.38500 1531 589.435 1531 589.43500

9.14(b)Primary Teacher (Para Teachers Equal to

9.14(a) upgraded as Teachers)0.38500 1365 525.525 1365 525.52500

9.14(c) Primary Teachers (Para)- Vacant Teacher9.15 Primary Teachers (Vacant) Teacher 0.30500

9.16Head Teacher for Primary (if the number of

children exceeds 150)Teacher 5.04000 380 1915.200 380 1915.20000

9.16(b)Head Teacher for Primary (if the number of

children exceeds 150) VacantTeacher 0.42000

Additional teachers

9.17Additional Teachers - PS (Special BTC-

Regular) in positionTeacher 0.30500

9.18Additional Teachers - PS (Special BTC Under

Training)Teacher 0.87600

9.19 Additional Teachers - PS (Vacant) Teacher

9.20Others in position (Para Teachers upgraded

as Teachers)Teacher

Upper Primary teachers

9.21 UP Teachers (Regular)-Existing Teacher 5.04000 774 3900.960 774 3900.96000

9.22 UP Teachers (Contract)-Existing9.23 UP Teachers (Vacant) Teacher 1.26000

9.24Head Teacher for Upper Primary (if the number

of children exceeds 100)-ExistingTeacher 5.34000 667 3561.780 667 3561.78000

9.24a Head Teacher for Upper Primary (Vacant) Teacher 1.33500

9.25Subject specific Upper Primary Teachers

(Regular)(a) Science and Mathematics(b) Social Studies(c) Languages

9.32 Part Time Instructors in position(a) Art Education 0.77000 462 355.740 462 355.74000(b) Health and Physical Education 0.77000 204 157.080 204 157.08000(c) Work Education 0.77000 271 208.670 271 208.67000

9.32(A) Part Time Instructors Vacant(a) Art Education 0.42000(b) Health and Physical Education 0.42000(c) Work Education 0.42000

9.33

Others-Incentive to Teachers in Schools

Located in Naxal Affected Areas (@

Rs.1500/- per teachers per month)

Sub Total (9.13 to 9.33) 6748 15218.430 6748 15218.43TOTAL

(New Teachers Salary +Teachers Salary

Recurring)

6748 15218.430 6748 15218.43000

10 Teachers Training(a) Teachers

10.01

Refresher In-service Teachers' Training at BRC

level and above - 10 days (@ Rs.200/- per

head per day)

Teacher

(Target &

Ach.-13-14

in

Mandays)

0.00600

10.01(a)Continuous and Comprehensive Evauation [PS +

UPS)Teacher 0.01300 2819 36.647 2819 36.64700

10.01(b) Eary Reading and Numeracy Skills [PS] Teacher 0.00500 2819 14.095 2819 14.09500

10.01(c) Science [UPS] Teacher 0.00800 1327 10.616 1327 10.61600Recommended as

proposed

10.01(d) CWSN Teacher 0.00400

Arti:SSA-AWPB-2014-15-PABMinits:Sitapur:16-06-2014 45 / 533

Page 46: U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 · 2015. 1. 6. · U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15

Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

Name of District : Sitapur -70

ActivityS. No.Physical

UnitRemarks

Outlay Recommendation for 2014-15

Spill OverDeferred laibility of

2014-15Fresh Recommended Total Recommended

10.02

One day monthly cluster level meetings and

peer group training sessions for 10 months for

all teachers each year at CRC level - 10 days (@

Rs.100/- per head per day)

Teacher 0.01000

10.03(a)

Induction Training for Newly Recruited Teachers

for 6 Months (Special BTC)- @Rs.2000/- per

head per year

Teacher 0.02000

10.03(b)5 Days Training for Part Time Instructors @ Rs.

200/- per head per day) Teacher 0.01000

10.04

Training of untrained Teachers to acquire

professional qualifications over a two year

period.

Teacher 0.04700 1894 89.018 1894 89.01800

(b) Head Teachers

10.05Refresher Residencial In-service for 10 days at

BRC level and above

Head

Teacher(c) Resource Persons

10.06

Refresher Training for all Resource

Persons,Master Trainers, BRC & CRC faculty

and Coordinators for 5 days each year (@

Rs.200/- per head per day)

Resource

Person 0.00300 240 0.720 240 0.72000

Sub Total 9099 151.096 9099 151.096

11Academic Support through Block Resource

Centre (BRC)/ URC

11.01 Salary of Faculty and Staff

(a) 5 RPs at BRC for subject specific training in

positionRP 100 100

(b) 2 RPs for CWSN in position RP(b-i) 1 CWSN Resource Person RP 1.10000 40 44.000 40 44.00000

(b-ii) 1 Physiotherapist (Resource person for IE) RP

(c) 1 MIS Coordinator in position RP 1.86000

(d) 1 Datra Entry Operator in position RP 1.74000 20 34.800 20 34.80000

(e) 1 Accountant-cum-support staff in position RP 1.80000 20 36.000 20 36.00000

11.02 Furniture Grant BRC/ URC 1.00000

11.03Replacement of furniture, computer, TLE etc (

Once in 5 years)BRC/ URC 1.00000

11.04 Contingency Grant BRC/ URC 0.50000 20 10.000 20 10.00000

11.05 Meeting, TA BRC/ URC 0.30000 20 6.000 20 6.00000

11.06 TLM Grant BRC/ URC 0.10000

11.07 Maintenance Grant BRC/ URC 0.10000

Sub Total 20 130.800 20 130.80000

12Academic Support through Cluster

Resource Centres (CRC/UERC)

12.01Salary of Cluster Coordinator (on an average of

one Resource Person per 18 schools in a block)RP

12.02 Furniture GrantCRC/

UERC0.10000

12.03Replacement of furniture, computer, TLE etc.

once in 5 years

CRC/

UERC0.10000

12.04 Contingency Grant CRC/UERC 0.10000 220 22.000 220 22.00000

12.05 Meeting, TA CRC/UERC 0.12000 220 26.400 220 26.40000

12.06 TLM Grant CRC/UERC 0.03000

12.07Maintenance Grant

CRC/UERC 0.02000

Sub Total 440 48.400 440 48.40000

13Computer Aided Education in upper

primary schools under Innovation

13.01Computer Aided Education in upper primary

schoolsDistrict 0.01200 48 0.576 48 0.57600

Sub Total 48 0.576 48 0.5760014 Libraries in Schools14.01 (a) Primary School (per school) School 0.03000

14.02 (b) Upper Primary School (per school) School 0.10000

Sub TotalIV ANNUAL GRANTS15 Teachers' Grant15.01 Primary Teachers Teacher 0.0050015.02 Upper Primary Teachers Teacher 0.00500 1327 6.635 1327 6.63500

Sub Total 1327 6.635 1327 6.6350016 School Grant16.01 Primary School School 0.05000 3019 150.950 3019 150.9500016.02 Upper Primary School School 0.07000 1331 93.170 1331 93.17000

Sub Total 4350 244.120 4350 244.12000

Arti:SSA-AWPB-2014-15-PABMinits:Sitapur:16-06-2014 46 / 533

Page 47: U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 · 2015. 1. 6. · U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15

Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

Name of District : Sitapur -70

ActivityS. No.Physical

UnitRemarks

Outlay Recommendation for 2014-15

Spill OverDeferred laibility of

2014-15Fresh Recommended Total Recommended

17Research, Evaluation, Monitoring &

Supervision

17.01 REMS Activities School 0.00103 4350 4.474 4350 4.47446

17.02 Monitoring & Supervision School 0.00078 4350 3.411 4350 3.41069

17.03 House Hold Survey (Urban) in Million Plus Cities District 35.00000

Sub Total 8700 7.885 8700 7.8851618 Maintenance Grant

18.01 Maintenance in School having upto3 Classrooms School 0.07500 328 24.600 328 24.60000

18.01a Maintenance Grant School 0.07500 3869 290.175 3869 290.17500Sub Total 4197 314.775 4197 314.77500

VBRIDGING GENDER AND SOCIAL

CATEGORY GAPS

19 Interventions for CWSN (IE)

19.01 Provision for Inclusive Education Child 0.01000 13398 133.980 13398 133.98000

Sub Total 13398 133.980 13398 133.98000

20Innovativation Head up to Rs.50 Lakh per

district

20.01 Girls Education District 0.70000 10 7.000 10 7.00000

20.02 ECCE District20.03 Intervention for SC / ST children District

20.04 Intervention for Minority Community children District

20.05 Intervention for Urban Deprived children District 10.00000

Sub Total 10 7.000 10 7.0000021 SMC/PRI Training

21.01Residential for 6 Resource Person per Block (3

days) (@ Rs.500/-)Blocks 0.09000

21.02Non-residential (3 days training of 6 SMC

members) (@ Rs.100/-)SMC 0.01800 4197 75.546 4197 75.54600

21.02(a)Non-residential (3 days training of 3 Members of

PRI/VECs/LA) (@ Rs.100/-)VEC/ WEC 0.00900

21.03

Seminar/Orientation of SMC Women members

and President/Vice President (@ Rs. 50,000/-

per block)

Blocks 0.50000

Sub Total 4197 75.546 4197 75.54600VI SCHOOL INFRASTRUCTURE22 Civil Works22.01 Primary School (Plain) (New) School 13.1550022.02 Primary School (Hilly/Rocky) (New) School 13.2750022.03 Upper Primary (Plain) (New) School 20.65500

22.04 Upper Primary School (Hilly/Rocky) (New) School 20.77500

22.04aComposite Schools for Urban Areas (Class I-

VIII)School 41.04000

22.05 ACR in lieu of upgraded Upper Primary School Rooms

22.06 Additional class rooms for adding Class VIII Rooms

22.07 Building Less (Pry) School 9.7500022.08 Building Less (UP) School 18.5900022.09 Dilapidated Building (Pry) School 9.7500022.10 Dilapidated Building (UP) School 18.59000

22.11 Additional Class Room (Rural) ( PS+UPS) Rooms 3.45000 623 2149.350 623 2149.35000

22.12 Additional Class Room (Urban) Rooms 3.4500022.13 Additional Class Room (Hill Area)22.14 Toilet/Urinals (PS & UPS) School 0.7000022.15 Separate Girls Toilet (Rural+Urban) School 0.7000022.16 CWSN friendly Toilets School 0.50000

22.17 Drinking Water Facility (for Urban Area Only)) School 0.15000

22.17a Drinking Water Facility (Plain PS & UPS) School 0.15000

22.17b Drinking Water Facility (Hilly/Rocky PS & UPS) School 0.15000

22.18a Boundary Wall PS (Total in Meters x .01105) 0.01749

22.18bBoundary Wall PS (For Gate) @Rs. 7000 x no. of

P.S.School 0.07800

22.18c Boundary Wall UPS (Total in Meters x .01105) 0.01749

22.18dBoundary Wall UPS (For Gate) @Rs. 7000 x no.

of UPSSchool 0.07800

22.19a Electrification in P.S./ Electrical Equipment School 0.11000

22.19b Electrification in U. P.S./ Electrical Equipment School 0.11000

22.20Office-cum-store-cum-Head Teacher's room

(Primary)Rooms

22.21Office-cum-store-cum-Head Teacher's room

(Upper Primary)Rooms

22.22Augumentation of training facility in BRC (one

time)BRC/ URC 5.00000

22.23 Child friendly Elements School 0.25000

22.24 Ramps with Handrails (Barrier Free Elements) School 0.06000

22.25 Handrails in existing Ramps School 0.01000

Arti:SSA-AWPB-2014-15-PABMinits:Sitapur:16-06-2014 47 / 533

Page 48: U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 · 2015. 1. 6. · U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15

Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

Name of District : Sitapur -70

ActivityS. No.Physical

UnitRemarks

Outlay Recommendation for 2014-15

Spill OverDeferred laibility of

2014-15Fresh Recommended Total Recommended

22.26 Whole School Develoipment School22.27 Retro-fitting and repairs School

22.28Residential Schools for specific category

of children

(a) Construction of Building including boundary

wall, Water and sanitation facilities, electric

installation (For 100 children)

Building 65.86000

(b) Construction of residential hostel Building 65.86000

(c) Refurnishing unused old buildings Building

22.29

Construction of Hostel in existing Govt UPS

including boundary wall, Water and sanitation

facilities, electric installation etc. (For 50

children)

7.00000

22.30Furniture for Govt. UPS (per child) (@ Rs.500/-

per child enrolled)Child 0.00500

22.31 Major Repairs for Primary School School 0.30000

22.32 Majr Repairs for Upper Primary School School 0.30000

22.33Others (Difference of Civil Wrks

sanctioned in pre.yr.)22.33a Others (Overhead Tank PS) School 0.1200022.33b Others (Overhead Tank UPS) School 0.12000

Sub Total (Civil WOrks) 623 2149.350 623 2149.35VII PROJECT MANAGEMENT COST23 Management23.01 Management up to 3.5%

(a) Project Management and MIS

(i) DPO ( Salary, Contigency, Consumables,

POL, TA & Computer etc)District 1 135.599 1 135.59870

(ii) EMIS Cell District 1 23.380 1 23.37950Sub Total (a) 1 1 1 158.978 1 158.978

(b) Training of Educational Administrators District

(c) School Mapping and Social Mapping District

Sub Total (23.01)

23.02Learning Enhancement Prog. (LEP) (P & UP) (up

to 2%)District 35.791 35.79055

23.03 Community Mobilization (up to 0.5%) District 1 60.000 1 60.00000

Sub Total (Management) 1 95.791 1 95.79055Total Management Cost 254.769 254.76875Total of SSA (Districs) 11.300 1012490 21539.499 1012490 21550.799

24 State Component23.01 Management23.02 REMS 0.0044923.03 SIEMAT

Sub Total

STATE SSA TOTAL 11.30000 1012490 21539.499 1012490 21550.79851

25

KGBV Financial Provision (give

separate costing sheets for different

Models)

Hostel

ANon Recurring One Time Grant (Only

committed liabilities) (Model-I)

25.01 Construction of Building (New)

25.02 Construction of Building KGBV sanctioned earlier 0.40000 0.40000

25.02(a) Additional Class Room Rooms 3.45000

25.02(b) Guard Room Rooms 1.32000

25.02(c) Boundary Wall School 5.0200025.03 Boudary Wall (Spillover only) 0.30000 0.30000

25.04

Boring/Handpump (Spillover only)

(minimum rates prescribed by State Drinking

Water Department subject to a ceiling of Rs.

1.00 lakhs)

25.05 Electricity /Water charges (Spillover only)

25.05(a) Solar Water Heater & Solar Light 2.97000

25.06Furniture/Equipment (including Kitchen

equipment)3.00000

25.07 TLM and equipment including library books 3.50000

25.08 Bedding (New) 0.75000

25.09 Replacement of Bedding (once in 3 Year) 0.75000 17 12.750 17 12.75000

Subtotal Non Recurring 0.70000 12.750 13.45000

B Recurring Cost Per Annum (Model-I)

25.10Maintenance per girl student per month @ Rs.

1500/-18.00000 20 360.000 20 360.00000

25.11 Stipend for girl student per month @ Rs. 100/- 1.20000 20 24.000 20 24.00000

25.12Supplementary TLM, stationery and other

educational material @ Rs.1000/- per annum1.00000 20 20.000 20 20.00000

25.13 Salaries

Arti:SSA-AWPB-2014-15-PABMinits:Sitapur:16-06-2014 48 / 533

Page 49: U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 · 2015. 1. 6. · U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15

Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

Name of District : Sitapur -70

ActivityS. No.Physical

UnitRemarks

Outlay Recommendation for 2014-15

Spill OverDeferred laibility of

2014-15Fresh Recommended Total Recommended

25.13.1 Additional Salaries:

(a) 1 Warden @ Rs. 25,000/- per month 3.00000 20 60.00000 20 60.00000

(b)4 Full time teachers as per RTE norms @ Rs.

20,000/- per month per teacher 9.60000 20 192.00000 20 192.00000

(c)

1 Urdu Teachers (only for blocks with muslim

population above 20% and select urban areas), if

required @ Rs. 12,000/- per month per teacher 1.44000 20 28.80000 20 28.80000

(d)3 part time teachers @ Rs. 5,000/- per month per

teacher 1.80000 20 36.00000 20 36.00000

(e)1 Full time Accountant @ Rs. 10,000/- per month

1.20000 20 24.00000 20 24.00000

(f)

2 Support Staff – (Accountant/ Assistant, Peon,

Chowkidar) @ Rs. 5,000/- per month per staff 1.20000 20 24.00000 20 24.00000

(g) 1 Head cook @ Rs. 6,000/- per month 0.72000 20 14.40000 20 14.40000

(h)2 Asstt. Cooks @ Rs. 4,500/- per month per cook

1.08000 20 21.60000 20 21.60000

25.14Specific skill training @ Rs.1000/- per child per

annum1.00000 20 20.000 20 20.00000

25.15Electricity/water charges @ Rs.1000/- per child

per annum1.00000 20 20.000 20 20.00000

25.16Medical care/contingencies @ Rs. 1250 per child

per annum1.25000 20 25.000 20 25.00000

25.17 Maintenance @ Rs.750/- per child per annum 0.75000 20 15.000 20 15.00000

25.18

Miscellaneous (Educational Tour/ Exposure Visit

/ Sports Material etc.) @ Rs.750/- per child per

annum

0.75000 20 15.000 20 15.00000

25.19Preparatory camps @ Rs.200/- per child per

annum0.20000 20 4.000 20 4.00000

25.20PTAs/school functions @ Rs.200/- per child per

annum0.20000 20 4.000 20 4.00000

25.21 Provision of Rent @ Rs.6000/- per annum 6.00000

25.21a Provision of Rent (6 months) 3.6000025.21b Provision of Rent (3 months) 1.8000025.21c Rent (Previous Year (2007-2012)

25.22 Capacity building 0.50000 20 10.000 20 10.00000

25.22(a)Physical/ Self Defence Training @ Rs.200/- per

child per annum0.20000 20 4.000 20 4.00000

Subtotal Recurring 20 921.800 20 921.80000

Subtotal (Model-I) 0.70000 20 934.550 20 935.25000

CNon Recurring One Time Grant (Only

committed liabilities) (Model-II)

25.23 Construction of Building (New)

25.24 Construction of Building KGBV sanctioned earlier

25.24(a) Additional Class Room Rooms 3.45000

25.24(b) Guard Room Rooms 1.32000

25.24(c) Boundary Wall School 5.0200025.25 Boudary Wall (Spillover only)25.26 Boring/Handpump (Spillover only)

25.27 Electricity /Water charges (Spillover only)

25.27(a) Solar Water Heater & Solar Light 2.97000

25.28Furniture/Equipment (including Kitchen

equipment)2.00000

25.29 TLM and equipment including library books 3.00000

25.30 Bedding (New) 0.37500

25.31 Replacement of Bedding (once in 3 Year) 0.37500

Subtotal Non Recurring

D Recurring Cost Per Annum (Model-II)

25.32Maintenance per girl student per month @ Rs.

1500/-9.00000

25.33 Stipend for girl student per month @ Rs. 100/- 0.60000

25.34Supplementary TLM, stationery and other

educational material @ Rs.1000/- per annum0.50000

25.35 Salaries(a) 1 Warden @ Rs. 25,000/- per month 3.00000

(b)3 Full time teachers as per RTE norms @ Rs.

20,000/- per month per teacher 7.20000

(c) 3 part time teachers @ Rs. 5,000/- per month per

teacher 1.80000

(d)1 Full time Accountant @ Rs. 10,000/- per month

1.20000

(e)

2 Support Staff – (Accountant/ Assistant, Peon,

Chowkidar) @ Rs. 5,000/- per month per staff 1.20000

Arti:SSA-AWPB-2014-15-PABMinits:Sitapur:16-06-2014 49 / 533

Page 50: U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 · 2015. 1. 6. · U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15

Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

Name of District : Sitapur -70

ActivityS. No.Physical

UnitRemarks

Outlay Recommendation for 2014-15

Spill OverDeferred laibility of

2014-15Fresh Recommended Total Recommended

(f) 1 Head cook @ Rs. 6,000/- per month 0.72000

(g)1 Asstt. Cooks @ Rs. 4,500/- per month per cook

0.54000

25.36Specific skill training @ Rs.1000/- per child per

annum0.50000

25.37Electricity/water charges @ Rs.1000/- per child

per annum0.50000

25.38Medical care/contingencies @ Rs. 1250 per child

per annum0.62500

25.39 Maintenance @ Rs.750/- per child per annum 0.37500

25.40

Miscellaneous (Educational Tour/ Exposure Visit

/ Sports Material etc.) @ Rs.750/- per child per

annum

0.37500

25.41Preparatory camps @ Rs.300/- per child per

annum0.15000

25.42PTAs/school functions @ Rs.300/- per child per

annum0.15000

25.43 Provision of Rent @ Rs.10000/- per annum 5.00000

25.43a Provision of Rent (6 months) 3.6000025.43b Provision of Rent (3 months) 1.8000025.43c Rent (Previous Year (2007-2012)25.44 Capacity building 0.25000

25.44(a)Physical/ Self Defence Training @ Rs.200/- per

child per annum0.10000

Subtotal Recurring

Subtotal (Model-II) Total (KGBV) 0.700 20 934.550 20 935.250

DISTRICT GRAND TOTAL (SSA+KGBV) 0.700 11.300 1012510 22474.049 1012510 22486.049

Arti:SSA-AWPB-2014-15-PABMinits:Sitapur:16-06-2014 50 / 533

Page 51: U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 · 2015. 1. 6. · U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15

Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

I ACCESS

1 Opening of New Schools

1.01 Upgradation of EGS to PSCentres /

School1.02 New PS School

1.03 Upgradation of PS to UPS / New UPS School

1.04 Composite Schools (for Urban Areas) School

1.05Residential Schools for specific category children

(For 100 children)

1.06Residential Hostel (for specific category of

children) (For 50 children)

1.07 Integration of Class V with Primary Schools

1.08Integration of Class VIII with Upper Primary

Schools

2Residential Schools for specific category

of children (For 100 Children)

Total - Residential Schools (For 100

children)

3Residential Hostel for specific category of

children (For 50 Children)

Total - Residential Schools (For 50

children)4 Transport/Escort Facility

4.01

Children in remote habitations with sparse

populations where opening of schools is

unviable

Child 0.03000

4.02

Urban deprived children/children without adult

protection in urban areas where schools are not

opened because availability of land is a problem

Child 0.03000

Sub Total

5Special Training for mainstreaming of Out-

of-School Children

5.03 Non-Residential (Fresh)(a) 12 months Child 0.06000(b) 9 months 0.04500(c) 6 months

(i)Special Training (by Special Instructors-NRBC)-

(1-5) Child 0.03000 583 17.490 583 17.49000

(ii) Special Training (by Special Instructors-NRBC)-

(6-8) Child 0.03000 559 16.770 559 16.77000

(d) 3 months Child 0.01500Sub Total 1142 34.260 1142 34.26000

Total (Special Training) 1142 34.260 1142 34.2605(B) House Hold Survey (HHS)

5(B).01 House Hold Survey through SMCHouse

Hold0.00001

Sub TotalII RETENTION6 Free Text Book

6.01Free Text Book (PS) for Parishadiya & Aided

Primary Schools (Workbooks not included)Child 0.00120 175953 211.144 175953 211.14360

6.01a

Free Text Book (PS) for 25% children of Class-1

in Private Recognised Primary Schools of other

Boards (Workbooks not included)

Child 0.00150

6.02 Free Brail Books (PS) 0.00150 156 0.234 156 0.23400

6.03 Free Large Print Books (PS) 0.00150

6.04Free Text Book (UPS) (Workbooks not included)

(Including KGBV Girls)Child 0.00200 56628 113.256 56628 113.25600

6.05 Free Brail Books (UPS) 0.00250 38 0.095 38 0.09500

6.06 Free Large Print Books (PS) 0.00250Sub Total 232775 324.729 232775 324.729

7 Provision of 2 set of Uniforms

7.01 All Girls (Including KGBV Girls) Child 0.00400 187861 751.444 187861 751.44400

7.02 SC Boys Child 0.00400 44706 178.824 44706 178.82400

7.03 ST Boys Child 0.00400 14 0.056 14 0.05600

7.04 BPL Boys Child 0.00400 97887 391.548 97887 391.54800

7.05

Free Uniform for 25% children of Class-1 in

Private Recognised Primary Schools of other

Boards

Child0.00400

Sub Total 330468 1321.872 330468 1321.8727(A) Fee Reimbursement

7(A).01

Fee Reimbursement for Admission of children of

Disadvantaged Group & Weaker Section upto

25% of seats in Class-1 of Private Unaided

Recognised Schools

Child 0.05400

Sub Total

8 Teaching Learning Equipment (TLE)

8.01 TLE - New Primary School 16.20000 0.20000 16.200008.02 TLE - New Upper Primary School 22.00000 0.50000 22.00000

Name of District : Siddharth Nagar -69

ActivityS. No.Physical

UnitRemarks

Outlay Recommendation for 2014-15

Spill OverDeferred laibility of

2014-15Fresh Recommended Total Recommended

Arti:SSA-AWPB-2014-15-PABMinits:SidharthNagar:16-06-2014 51 / 533

Page 52: U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 · 2015. 1. 6. · U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15

Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

Name of District : Siddharth Nagar -69

ActivityS. No.Physical

UnitRemarks

Outlay Recommendation for 2014-15

Spill OverDeferred laibility of

2014-15Fresh Recommended Total Recommended

Sub Total 38.20000 38.20000III ENHANCING QUALITY9 New Teachers Salary

9.01 Primary Teachers (Regular) (Asstt. Teacher) Teacher 0.91500

9.01aHead Teacher for Primary (if the number of

children exceeds 150 in a school)Teacher

9.02 Primary Teachers (Contract) (S.M.) Teacher

9.03Subject specific Upper Primary Teachers

(Regular) (a) Science and Mathematics Teacher 1.26000(b) Social Studies Teacher 1.26000(c) Languages Teacher 1.26000

Sub Total (9.01 to 9.05)Add.Teacher against PTR

Sub Total (9.06 to 9.12)

Total (New Teacher's Salary-9.01 to 9.12)

Teachers Salary (Recurring-sanctioned

earlier)Primary teachers

9.13 Primary Teachers ( Regular)-Existing, in position Teacher 3.66000 219 801.540 219 801.54000

9.14Primary Teachers (Contract)-Existing, in

positionTeacher 0.55000

9.14(a) Primary Teachers (Contract)-under Training Teacher 0.38500 1426 549.010 1426 549.01000

9.14(b)Primary Teacher (Para Teachers Equal to

9.14(a) upgraded as Teachers)0.38500 918 353.430 918 353.43000

9.14(c) Primary Teachers (Para)- Vacant Teacher9.15 Primary Teachers (Vacant) Teacher 0.30500

9.16Head Teacher for Primary (if the number of

children exceeds 150)Teacher 5.04000 355 1789.200 355 1789.20000

9.16(b)Head Teacher for Primary (if the number of

children exceeds 150) VacantTeacher 0.42000

Additional teachers

9.17Additional Teachers - PS (Special BTC-

Regular) in positionTeacher 0.30500

9.18Additional Teachers - PS (Special BTC Under

Training)Teacher 0.87600

9.19 Additional Teachers - PS (Vacant) Teacher

9.20Others in position (Para Teachers upgraded

as Teachers)Teacher

Upper Primary teachers

9.21 UP Teachers (Regular)-Existing Teacher 5.04000 544 2741.760 544 2741.76000

9.22 UP Teachers (Contract)-Existing9.23 UP Teachers (Vacant) Teacher 1.26000

9.24Head Teacher for Upper Primary (if the number

of children exceeds 100)-ExistingTeacher 5.34000 344 1836.960 344 1836.96000

9.24a Head Teacher for Upper Primary (Vacant) Teacher 1.33500

9.25Subject specific Upper Primary Teachers

(Regular)(a) Science and Mathematics(b) Social Studies(c) Languages

9.32 Part Time Instructors in position(a) Art Education 0.77000 118 90.860 118 90.86000(b) Health and Physical Education 0.77000 86 66.220 86 66.22000(c) Work Education 0.77000 96 73.920 96 73.92000

9.32(A) Part Time Instructors Vacant(a) Art Education 0.42000(b) Health and Physical Education 0.42000(c) Work Education 0.42000

9.33

Others-Incentive to Teachers in Schools

Located in Naxal Affected Areas (@

Rs.1500/- per teachers per month)

Sub Total (9.13 to 9.33) 4106 8302.900 4106 8302.90TOTAL

(New Teachers Salary +Teachers Salary

Recurring)

4106 8302.900 4106 8302.90000

10 Teachers Training(a) Teachers

10.01

Refresher In-service Teachers' Training at BRC

level and above - 10 days (@ Rs.200/- per

head per day)

Teacher

(Target &

Ach.-13-14

in

Mandays)

0.00600

10.01(a)Continuous and Comprehensive Evauation [PS +

UPS)Teacher 0.01300 1692 21.996 1692 21.99600

10.01(b) Eary Reading and Numeracy Skills [PS] Teacher 0.00500 1692 8.460 1692 8.46000

10.01(c) Science [UPS] Teacher 0.00800 443 3.544 443 3.54400Recommended as

proposed

10.01(d) CWSN Teacher 0.00400

Arti:SSA-AWPB-2014-15-PABMinits:SidharthNagar:16-06-2014 52 / 533

Page 53: U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 · 2015. 1. 6. · U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15

Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

Name of District : Siddharth Nagar -69

ActivityS. No.Physical

UnitRemarks

Outlay Recommendation for 2014-15

Spill OverDeferred laibility of

2014-15Fresh Recommended Total Recommended

10.02

One day monthly cluster level meetings and

peer group training sessions for 10 months for

all teachers each year at CRC level - 10 days (@

Rs.100/- per head per day)

Teacher 0.01000

10.03(a)

Induction Training for Newly Recruited Teachers

for 6 Months (Special BTC)- @Rs.2000/- per

head per year

Teacher 0.02000

10.03(b)5 Days Training for Part Time Instructors @ Rs.

200/- per head per day) Teacher 0.01000

10.04

Training of untrained Teachers to acquire

professional qualifications over a two year

period.

Teacher 0.04700 1014 47.658 1014 47.65800

(b) Head Teachers

10.05Refresher Residencial In-service for 10 days at

BRC level and above

Head

Teacher(c) Resource Persons

10.06

Refresher Training for all Resource

Persons,Master Trainers, BRC & CRC faculty

and Coordinators for 5 days each year (@

Rs.200/- per head per day)

Resource

Person 0.00300 168 0.504 168 0.50400

Sub Total 5009 82.162 5009 82.162

11Academic Support through Block Resource

Centre (BRC)/ URC

11.01 Salary of Faculty and Staff

(a) 5 RPs at BRC for subject specific training in

positionRP 70 70

(b) 2 RPs for CWSN in position RP(b-i) 1 CWSN Resource Person RP 1.10000 28 30.800 28 30.80000

(b-ii) 1 Physiotherapist (Resource person for IE) RP

(c) 1 MIS Coordinator in position RP 1.86000

(d) 1 Datra Entry Operator in position RP 1.74000 13 22.620 13 22.62000

(e) 1 Accountant-cum-support staff in position RP 1.80000 14 25.200 14 25.20000

11.02 Furniture Grant BRC/ URC 1.00000

11.03Replacement of furniture, computer, TLE etc (

Once in 5 years)BRC/ URC 1.00000

11.04 Contingency Grant BRC/ URC 0.50000 14 7.000 14 7.00000

11.05 Meeting, TA BRC/ URC 0.30000 14 4.200 14 4.20000

11.06 TLM Grant BRC/ URC 0.10000

11.07 Maintenance Grant BRC/ URC 0.10000

Sub Total 14 89.820 14 89.82000

12Academic Support through Cluster

Resource Centres (CRC/UERC)

12.01Salary of Cluster Coordinator (on an average of

one Resource Person per 18 schools in a block)RP

12.02 Furniture GrantCRC/

UERC0.10000

12.03Replacement of furniture, computer, TLE etc.

once in 5 years

CRC/

UERC0.10000

12.04 Contingency Grant CRC/UERC 0.10000 154 15.400 154 15.40000

12.05 Meeting, TA CRC/UERC 0.12000 154 18.480 154 18.48000

12.06 TLM Grant CRC/UERC 0.03000

12.07Maintenance Grant

CRC/UERC 0.02000

Sub Total 308 33.880 308 33.88000

13Computer Aided Education in upper

primary schools under Innovation

13.01Computer Aided Education in upper primary

schoolsDistrict 0.01200 48 0.576 48 0.57600

Sub Total 48 0.576 48 0.5760014 Libraries in Schools14.01 (a) Primary School (per school) School 0.03000

14.02 (b) Upper Primary School (per school) School 0.10000

Sub TotalIV ANNUAL GRANTS15 Teachers' Grant15.01 Primary Teachers Teacher 0.0050015.02 Upper Primary Teachers Teacher 0.00500 443 2.215 443 2.21500

Sub Total 443 2.215 443 2.2150016 School Grant16.01 Primary School School 0.05000 1925 96.250 1925 96.2500016.02 Upper Primary School School 0.07000 824 57.680 824 57.68000

Sub Total 2749 153.930 2749 153.93000

Arti:SSA-AWPB-2014-15-PABMinits:SidharthNagar:16-06-2014 53 / 533

Page 54: U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 · 2015. 1. 6. · U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15

Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

Name of District : Siddharth Nagar -69

ActivityS. No.Physical

UnitRemarks

Outlay Recommendation for 2014-15

Spill OverDeferred laibility of

2014-15Fresh Recommended Total Recommended

17Research, Evaluation, Monitoring &

Supervision

17.01 REMS Activities School 0.00103 2749 2.828 2749 2.82766

17.02 Monitoring & Supervision School 0.00078 2749 2.155 2749 2.15540

17.03 House Hold Survey (Urban) in Million Plus Cities District 35.00000

Sub Total 5498 4.983 5498 4.9830618 Maintenance Grant

18.01 Maintenance in School having upto3 Classrooms School 0.07500 633 47.475 633 47.47500

18.01a Maintenance Grant School 0.07500 2043 153.225 2043 153.22500Sub Total 2676 200.700 2676 200.70000

VBRIDGING GENDER AND SOCIAL

CATEGORY GAPS

19 Interventions for CWSN (IE)

19.01 Provision for Inclusive Education Child 0.01300 5375 69.875 5375 69.87500

Sub Total 5375 69.875 5375 69.87500

20Innovativation Head up to Rs.50 Lakh per

district

20.01 Girls Education District 0.70000 7 4.900 7 4.90000

20.02 ECCE District20.03 Intervention for SC / ST children District

20.04 Intervention for Minority Community children District 7.700 7.70000

20.05 Intervention for Urban Deprived children District 10.00000

Sub Total 7 12.600 7 12.6000021 SMC/PRI Training

21.01Residential for 6 Resource Person per Block (3

days) (@ Rs.500/-)Blocks 0.09000

21.02Non-residential (3 days training of 6 SMC

members) (@ Rs.100/-)SMC 0.01800 2676 48.168 2676 48.16800

21.02(a)Non-residential (3 days training of 3 Members of

PRI/VECs/LA) (@ Rs.100/-)VEC/ WEC 0.00900

21.03

Seminar/Orientation of SMC Women members

and President/Vice President (@ Rs. 50,000/-

per block)

Blocks 0.50000

Sub Total 2676 48.168 2676 48.16800VI SCHOOL INFRASTRUCTURE22 Civil Works22.01 Primary School (Plain) (New) School 13.1550022.02 Primary School (Hilly/Rocky) (New) School 13.2750022.03 Upper Primary (Plain) (New) School 20.65500

22.04 Upper Primary School (Hilly/Rocky) (New) School 20.77500

22.04aComposite Schools for Urban Areas (Class I-

VIII)School 41.04000

22.05 ACR in lieu of upgraded Upper Primary School Rooms

22.06 Additional class rooms for adding Class VIII Rooms

22.07 Building Less (Pry) School 9.7500022.08 Building Less (UP) School 18.5900022.09 Dilapidated Building (Pry) School 9.7500022.10 Dilapidated Building (UP) School 18.59000

22.11 Additional Class Room (Rural) ( PS+UPS) Rooms 3.45000

22.12 Additional Class Room (Urban) Rooms 3.4500022.13 Additional Class Room (Hill Area)22.14 Toilet/Urinals (PS & UPS) School 0.7000022.15 Separate Girls Toilet (Rural+Urban) School 0.7000022.16 CWSN friendly Toilets School 0.50000

22.17 Drinking Water Facility (for Urban Area Only)) School 0.15000

22.17a Drinking Water Facility (Plain PS & UPS) School 0.15000

22.17b Drinking Water Facility (Hilly/Rocky PS & UPS) School 0.15000

22.18a Boundary Wall PS (Total in Meters x .01105) 0.01749

22.18bBoundary Wall PS (For Gate) @Rs. 7000 x no. of

P.S.School 0.07800

22.18c Boundary Wall UPS (Total in Meters x .01105) 0.01749

22.18dBoundary Wall UPS (For Gate) @Rs. 7000 x no.

of UPSSchool 0.07800

22.19a Electrification in P.S./ Electrical Equipment School 0.11000

22.19b Electrification in U. P.S./ Electrical Equipment School 0.11000

22.20Office-cum-store-cum-Head Teacher's room

(Primary)Rooms

22.21Office-cum-store-cum-Head Teacher's room

(Upper Primary)Rooms

22.22Augumentation of training facility in BRC (one

time)BRC/ URC 5.00000

22.23 Child friendly Elements School 0.25000

22.24 Ramps with Handrails (Barrier Free Elements) School 0.06000

22.25 Handrails in existing Ramps School 0.01000

Arti:SSA-AWPB-2014-15-PABMinits:SidharthNagar:16-06-2014 54 / 533

Page 55: U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 · 2015. 1. 6. · U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15

Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

Name of District : Siddharth Nagar -69

ActivityS. No.Physical

UnitRemarks

Outlay Recommendation for 2014-15

Spill OverDeferred laibility of

2014-15Fresh Recommended Total Recommended

22.26 Whole School Develoipment School22.27 Retro-fitting and repairs School

22.28Residential Schools for specific category

of children

(a) Construction of Building including boundary

wall, Water and sanitation facilities, electric

installation (For 100 children)

Building 65.86000

(b) Construction of residential hostel Building 65.86000

(c) Refurnishing unused old buildings Building

22.29

Construction of Hostel in existing Govt UPS

including boundary wall, Water and sanitation

facilities, electric installation etc. (For 50

children)

7.00000

22.30Furniture for Govt. UPS (per child) (@ Rs.500/-

per child enrolled)Child 0.00500

22.31 Major Repairs for Primary School School 0.30000

22.32 Majr Repairs for Upper Primary School School 0.30000

22.33Others (Difference of Civil Wrks

sanctioned in pre.yr.)22.33a Others (Overhead Tank PS) School 0.1200022.33b Others (Overhead Tank UPS) School 0.12000

Sub Total (Civil WOrks)VII PROJECT MANAGEMENT COST23 Management23.01 Management up to 3.5%

(a) Project Management and MIS

(i) DPO ( Salary, Contigency, Consumables,

POL, TA & Computer etc)District 1 121.763 1 121.76320

(ii) EMIS Cell District 1 16.460 1 16.46000Sub Total (a) 1 1 1 138.223 1 138.223

(b) Training of Educational Administrators District

(c) School Mapping and Social Mapping District

Sub Total (23.01)

23.02Learning Enhancement Prog. (LEP) (P & UP) (up

to 2%)District 21.254 21.25405

23.03 Community Mobilization (up to 0.5%) District 1 53.000 1 53.00000

Sub Total (Management) 1 74.254 1 74.25405Total Management Cost 212.477 212.47725Total of SSA (Districs) 38.200 593294 10895.147 593294 10933.347

24 State Component23.01 Management23.02 REMS 0.0044923.03 SIEMAT

Sub Total

STATE SSA TOTAL 38.20000 593294 10895.147 593294 10933.34691

25

KGBV Financial Provision (give

separate costing sheets for different

Models)

Hostel

ANon Recurring One Time Grant (Only

committed liabilities) (Model-I)

25.01 Construction of Building (New)

25.02 Construction of Building KGBV sanctioned earlier

25.02(a) Additional Class Room Rooms 3.45000

25.02(b) Guard Room Rooms 1.32000

25.02(c) Boundary Wall School 5.0200025.03 Boudary Wall (Spillover only)

25.04

Boring/Handpump (Spillover only)

(minimum rates prescribed by State Drinking

Water Department subject to a ceiling of Rs.

1.00 lakhs)

25.05 Electricity /Water charges (Spillover only)

25.05(a) Solar Water Heater & Solar Light 2.97000

25.06Furniture/Equipment (including Kitchen

equipment)3.00000

25.07 TLM and equipment including library books 3.50000

25.08 Bedding (New) 0.75000

25.09 Replacement of Bedding (once in 3 Year) 0.75000 12 9.000 12 9.00000

Subtotal Non Recurring 9.000 9.00000

B Recurring Cost Per Annum (Model-I)

25.10Maintenance per girl student per month @ Rs.

1500/-18.00000 13 234.000 13 234.00000

25.11 Stipend for girl student per month @ Rs. 100/- 1.20000 13 15.600 13 15.60000

25.12Supplementary TLM, stationery and other

educational material @ Rs.1000/- per annum1.00000 13 13.000 13 13.00000

25.13 Salaries

Arti:SSA-AWPB-2014-15-PABMinits:SidharthNagar:16-06-2014 55 / 533

Page 56: U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 · 2015. 1. 6. · U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15

Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

Name of District : Siddharth Nagar -69

ActivityS. No.Physical

UnitRemarks

Outlay Recommendation for 2014-15

Spill OverDeferred laibility of

2014-15Fresh Recommended Total Recommended

25.13.1 Additional Salaries:

(a) 1 Warden @ Rs. 25,000/- per month 3.00000 13 39.00000 13 39.00000

(b)4 Full time teachers as per RTE norms @ Rs.

20,000/- per month per teacher 9.60000 13 124.80000 13 124.80000

(c)

1 Urdu Teachers (only for blocks with muslim

population above 20% and select urban areas), if

required @ Rs. 12,000/- per month per teacher 1.44000 13 18.72000 13 18.72000

(d)3 part time teachers @ Rs. 5,000/- per month per

teacher 1.80000 13 23.40000 13 23.40000

(e)1 Full time Accountant @ Rs. 10,000/- per month

1.20000 13 15.60000 13 15.60000

(f)

2 Support Staff – (Accountant/ Assistant, Peon,

Chowkidar) @ Rs. 5,000/- per month per staff 1.20000 13 15.60000 13 15.60000

(g) 1 Head cook @ Rs. 6,000/- per month 0.72000 13 9.36000 13 9.36000

(h)2 Asstt. Cooks @ Rs. 4,500/- per month per cook

1.08000 13 14.04000 13 14.04000

25.14Specific skill training @ Rs.1000/- per child per

annum1.00000 13 13.000 13 13.00000

25.15Electricity/water charges @ Rs.1000/- per child

per annum1.00000 13 13.000 13 13.00000

25.16Medical care/contingencies @ Rs. 1250 per child

per annum1.25000 13 16.250 13 16.25000

25.17 Maintenance @ Rs.750/- per child per annum 0.75000 13 9.750 13 9.75000

25.18

Miscellaneous (Educational Tour/ Exposure Visit

/ Sports Material etc.) @ Rs.750/- per child per

annum

0.75000 13 9.750 13 9.75000

25.19Preparatory camps @ Rs.200/- per child per

annum0.20000 13 2.600 13 2.60000

25.20PTAs/school functions @ Rs.200/- per child per

annum0.20000 13 2.600 13 2.60000

25.21 Provision of Rent @ Rs.6000/- per annum 6.00000

25.21a Provision of Rent (6 months) 3.6000025.21b Provision of Rent (3 months) 1.8000025.21c Rent (Previous Year (2007-2012)

25.22 Capacity building 0.50000 13 6.500 13 6.50000

25.22(a)Physical/ Self Defence Training @ Rs.200/- per

child per annum0.20000 13 2.600 13 2.60000

Subtotal Recurring 13 599.170 13 599.17000

Subtotal (Model-I) 13 608.170 13 608.17000

CNon Recurring One Time Grant (Only

committed liabilities) (Model-II)

25.23 Construction of Building (New)

25.24 Construction of Building KGBV sanctioned earlier

25.24(a) Additional Class Room Rooms 3.45000

25.24(b) Guard Room Rooms 1.32000

25.24(c) Boundary Wall School 5.0200025.25 Boudary Wall (Spillover only)25.26 Boring/Handpump (Spillover only)

25.27 Electricity /Water charges (Spillover only)

25.27(a) Solar Water Heater & Solar Light 2.97000

25.28Furniture/Equipment (including Kitchen

equipment)2.00000

25.29 TLM and equipment including library books 3.00000

25.30 Bedding (New) 0.37500

25.31 Replacement of Bedding (once in 3 Year) 0.37500

Subtotal Non Recurring

D Recurring Cost Per Annum (Model-II)

25.32Maintenance per girl student per month @ Rs.

1500/-9.00000

25.33 Stipend for girl student per month @ Rs. 100/- 0.60000

25.34Supplementary TLM, stationery and other

educational material @ Rs.1000/- per annum0.50000

25.35 Salaries(a) 1 Warden @ Rs. 25,000/- per month 3.00000

(b)3 Full time teachers as per RTE norms @ Rs.

20,000/- per month per teacher 7.20000

(c) 3 part time teachers @ Rs. 5,000/- per month per

teacher 1.80000

(d)1 Full time Accountant @ Rs. 10,000/- per month

1.20000

(e)

2 Support Staff – (Accountant/ Assistant, Peon,

Chowkidar) @ Rs. 5,000/- per month per staff 1.20000

Arti:SSA-AWPB-2014-15-PABMinits:SidharthNagar:16-06-2014 56 / 533

Page 57: U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 · 2015. 1. 6. · U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15

Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

Name of District : Siddharth Nagar -69

ActivityS. No.Physical

UnitRemarks

Outlay Recommendation for 2014-15

Spill OverDeferred laibility of

2014-15Fresh Recommended Total Recommended

(f) 1 Head cook @ Rs. 6,000/- per month 0.72000

(g)1 Asstt. Cooks @ Rs. 4,500/- per month per cook

0.54000

25.36Specific skill training @ Rs.1000/- per child per

annum0.50000

25.37Electricity/water charges @ Rs.1000/- per child

per annum0.50000

25.38Medical care/contingencies @ Rs. 1250 per child

per annum0.62500

25.39 Maintenance @ Rs.750/- per child per annum 0.37500

25.40

Miscellaneous (Educational Tour/ Exposure Visit

/ Sports Material etc.) @ Rs.750/- per child per

annum

0.37500

25.41Preparatory camps @ Rs.300/- per child per

annum0.15000

25.42PTAs/school functions @ Rs.300/- per child per

annum0.15000

25.43 Provision of Rent @ Rs.10000/- per annum 5.00000

25.43a Provision of Rent (6 months) 3.6000025.43b Provision of Rent (3 months) 1.8000025.43c Rent (Previous Year (2007-2012)25.44 Capacity building 0.25000

25.44(a)Physical/ Self Defence Training @ Rs.200/- per

child per annum0.10000

Subtotal Recurring

Subtotal (Model-II) Total (KGBV) 13 608.170 13 608.170

DISTRICT GRAND TOTAL (SSA+KGBV) 38.200 593307 11503.317 593307 11541.517

Arti:SSA-AWPB-2014-15-PABMinits:SidharthNagar:16-06-2014 57 / 533

Page 58: U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 · 2015. 1. 6. · U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15

Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

I ACCESS

1 Opening of New Schools

1.01 Upgradation of EGS to PSCentres /

School1.02 New PS School

1.03 Upgradation of PS to UPS / New UPS School

1.04 Composite Schools (for Urban Areas) School

1.05Residential Schools for specific category children

(For 100 children)

1.06Residential Hostel (for specific category of

children) (For 50 children)

1.07 Integration of Class V with Primary Schools

1.08Integration of Class VIII with Upper Primary

Schools

2Residential Schools for specific category

of children (For 100 Children)

Total - Residential Schools (For 100

children)

3Residential Hostel for specific category of

children (For 50 Children)

Total - Residential Schools (For 50

children)4 Transport/Escort Facility

4.01

Children in remote habitations with sparse

populations where opening of schools is

unviable

Child 0.03000

4.02

Urban deprived children/children without adult

protection in urban areas where schools are not

opened because availability of land is a problem

Child 0.03000

Sub Total

5Special Training for mainstreaming of Out-

of-School Children

5.03 Non-Residential (Fresh)(a) 12 months Child 0.06000(b) 9 months 0.04500(c) 6 months

(i)Special Training (by Special Instructors-NRBC)-

(1-5) Child 0.03000 334 10.020 334 10.02000

(ii) Special Training (by Special Instructors-NRBC)-

(6-8) Child 0.03000 338 10.140 338 10.14000

(d) 3 months Child 0.01500Sub Total 672 20.160 672 20.16000

Total (Special Training) 672 20.160 672 20.1605(B) House Hold Survey (HHS)

5(B).01 House Hold Survey through SMCHouse

Hold0.00001

Sub TotalII RETENTION6 Free Text Book

6.01Free Text Book (PS) for Parishadiya & Aided

Primary Schools (Workbooks not included)Child 0.00120 176758 212.110 176758 212.10960

6.01a

Free Text Book (PS) for 25% children of Class-1

in Private Recognised Primary Schools of other

Boards (Workbooks not included)

Child 0.00150

6.02 Free Brail Books (PS) 0.00150 180 0.270 180 0.27000

6.03 Free Large Print Books (PS) 0.00150

6.04Free Text Book (UPS) (Workbooks not included)

(Including KGBV Girls)Child 0.00200 80288 160.576 80288 160.57600

6.05 Free Brail Books (UPS) 0.00250 68 0.170 68 0.17000

6.06 Free Large Print Books (PS) 0.00250Sub Total 257294 373.126 257294 373.126

7 Provision of 2 set of Uniforms

7.01 All Girls (Including KGBV Girls) Child 0.00400 209260 837.040 209260 837.04000

7.02 SC Boys Child 0.00400 47786 191.144 47786 191.14400

7.03 ST Boys Child 0.00400

7.04 BPL Boys Child 0.00400 58579 234.316 58579 234.31600

7.05

Free Uniform for 25% children of Class-1 in

Private Recognised Primary Schools of other

Boards

Child0.00400

Sub Total 315625 1262.500 315625 1262.5007(A) Fee Reimbursement

7(A).01

Fee Reimbursement for Admission of children of

Disadvantaged Group & Weaker Section upto

25% of seats in Class-1 of Private Unaided

Recognised Schools

Child 0.05400

Sub Total

8 Teaching Learning Equipment (TLE)

8.01 TLE - New Primary School 0.40000 0.20000 0.400008.02 TLE - New Upper Primary School 1.00000 0.50000 1.00000

Name of District : Shahjahanpur -68

ActivityS. No.Physical

UnitRemarks

Outlay Recommendation for 2014-15

Spill OverDeferred laibility of

2014-15Fresh Recommended Total Recommended

Arti:SSA-AWPB-2014-15-PABMinits:Shahjahanpur:16-06-2014 58 / 533

Page 59: U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 · 2015. 1. 6. · U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15

Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

Name of District : Shahjahanpur -68

ActivityS. No.Physical

UnitRemarks

Outlay Recommendation for 2014-15

Spill OverDeferred laibility of

2014-15Fresh Recommended Total Recommended

Sub Total 1.40000 1.40000III ENHANCING QUALITY9 New Teachers Salary

9.01 Primary Teachers (Regular) (Asstt. Teacher) Teacher 0.91500

9.01aHead Teacher for Primary (if the number of

children exceeds 150 in a school)Teacher

9.02 Primary Teachers (Contract) (S.M.) Teacher

9.03Subject specific Upper Primary Teachers

(Regular) (a) Science and Mathematics Teacher 1.26000(b) Social Studies Teacher 1.26000(c) Languages Teacher 1.26000

Sub Total (9.01 to 9.05)Add.Teacher against PTR

Sub Total (9.06 to 9.12)

Total (New Teacher's Salary-9.01 to 9.12)

Teachers Salary (Recurring-sanctioned

earlier)Primary teachers

9.13 Primary Teachers ( Regular)-Existing, in position Teacher 3.66000 217 794.220 217 794.22000

9.14Primary Teachers (Contract)-Existing, in

positionTeacher 0.55000

9.14(a) Primary Teachers (Contract)-under Training Teacher 0.38500 2291 882.035 2291 882.03500

9.14(b)Primary Teacher (Para Teachers Equal to

9.14(a) upgraded as Teachers)0.38500 1078 415.030 1078 415.03000

9.14(c) Primary Teachers (Para)- Vacant Teacher9.15 Primary Teachers (Vacant) Teacher 0.30500

9.16Head Teacher for Primary (if the number of

children exceeds 150)Teacher 5.04000 245 1234.800 245 1234.80000

9.16(b)Head Teacher for Primary (if the number of

children exceeds 150) VacantTeacher 0.42000

Additional teachers

9.17Additional Teachers - PS (Special BTC-

Regular) in positionTeacher 0.30500

9.18Additional Teachers - PS (Special BTC Under

Training)Teacher 0.87600

9.19 Additional Teachers - PS (Vacant) Teacher

9.20Others in position (Para Teachers upgraded

as Teachers)Teacher

Upper Primary teachers

9.21 UP Teachers (Regular)-Existing Teacher 5.04000 757 3815.280 757 3815.28000

9.22 UP Teachers (Contract)-Existing9.23 UP Teachers (Vacant) Teacher 1.26000

9.24Head Teacher for Upper Primary (if the number

of children exceeds 100)-ExistingTeacher 5.34000 422 2253.480 422 2253.48000

9.24a Head Teacher for Upper Primary (Vacant) Teacher 1.33500

9.25Subject specific Upper Primary Teachers

(Regular)(a) Science and Mathematics(b) Social Studies(c) Languages

9.32 Part Time Instructors in position(a) Art Education 0.77000 272 209.440 272 209.44000(b) Health and Physical Education 0.77000 221 170.170 221 170.17000(c) Work Education 0.77000 208 160.160 208 160.16000

9.32(A) Part Time Instructors Vacant(a) Art Education 0.42000(b) Health and Physical Education 0.42000(c) Work Education 0.42000

9.33

Others-Incentive to Teachers in Schools

Located in Naxal Affected Areas (@

Rs.1500/- per teachers per month)

Sub Total (9.13 to 9.33) 5711 9934.615 5711 9934.62TOTAL

(New Teachers Salary +Teachers Salary

Recurring)

5711 9934.615 5711 9934.61500

10 Teachers Training(a) Teachers

10.01

Refresher In-service Teachers' Training at BRC

level and above - 10 days (@ Rs.200/- per

head per day)

Teacher

(Target &

Ach.-13-14

in

Mandays)

0.00600

10.01(a)Continuous and Comprehensive Evauation [PS +

UPS)Teacher 0.01300 2108 27.404 2108 27.40400

10.01(b) Eary Reading and Numeracy Skills [PS] Teacher 0.00500 2108 10.540 2108 10.54000

10.01(c) Science [UPS] Teacher 0.00800 994 7.952 994 7.95200Recommended as

proposed

10.01(d) CWSN Teacher 0.00400

Arti:SSA-AWPB-2014-15-PABMinits:Shahjahanpur:16-06-2014 59 / 533

Page 60: U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 · 2015. 1. 6. · U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15

Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

Name of District : Shahjahanpur -68

ActivityS. No.Physical

UnitRemarks

Outlay Recommendation for 2014-15

Spill OverDeferred laibility of

2014-15Fresh Recommended Total Recommended

10.02

One day monthly cluster level meetings and

peer group training sessions for 10 months for

all teachers each year at CRC level - 10 days (@

Rs.100/- per head per day)

Teacher 0.01000

10.03(a)

Induction Training for Newly Recruited Teachers

for 6 Months (Special BTC)- @Rs.2000/- per

head per year

Teacher 0.02000

10.03(b)5 Days Training for Part Time Instructors @ Rs.

200/- per head per day) Teacher 0.01000

10.04

Training of untrained Teachers to acquire

professional qualifications over a two year

period.

Teacher 0.04700 1781 83.707 1781 83.70700

(b) Head Teachers

10.05Refresher Residencial In-service for 10 days at

BRC level and above

Head

Teacher(c) Resource Persons

10.06

Refresher Training for all Resource

Persons,Master Trainers, BRC & CRC faculty

and Coordinators for 5 days each year (@

Rs.200/- per head per day)

Resource

Person 0.00300 192 0.576 192 0.57600

Sub Total 7183 130.179 7183 130.179

11Academic Support through Block Resource

Centre (BRC)/ URC

11.01 Salary of Faculty and Staff

(a) 5 RPs at BRC for subject specific training in

positionRP 80 80

(b) 2 RPs for CWSN in position RP(b-i) 1 CWSN Resource Person RP 1.10000 32 35.200 32 35.20000

(b-ii) 1 Physiotherapist (Resource person for IE) RP

(c) 1 MIS Coordinator in position RP 1.86000

(d) 1 Datra Entry Operator in position RP 1.74000 16 27.840 16 27.84000

(e) 1 Accountant-cum-support staff in position RP 1.80000 16 28.800 16 28.80000

11.02 Furniture Grant BRC/ URC 1.00000

11.03Replacement of furniture, computer, TLE etc (

Once in 5 years)BRC/ URC 1.00000

11.04 Contingency Grant BRC/ URC 0.50000 16 8.000 16 8.00000

11.05 Meeting, TA BRC/ URC 0.30000 16 4.800 16 4.80000

11.06 TLM Grant BRC/ URC 0.10000

11.07 Maintenance Grant BRC/ URC 0.10000

Sub Total 16 104.640 16 104.64000

12Academic Support through Cluster

Resource Centres (CRC/UERC)

12.01Salary of Cluster Coordinator (on an average of

one Resource Person per 18 schools in a block)RP

12.02 Furniture GrantCRC/

UERC0.10000

12.03Replacement of furniture, computer, TLE etc.

once in 5 years

CRC/

UERC0.10000

12.04 Contingency Grant CRC/UERC 0.10000 123 12.300 123 12.30000

12.05 Meeting, TA CRC/UERC 0.12000 123 14.760 123 14.76000

12.06 TLM Grant CRC/UERC 0.03000

12.07Maintenance Grant

CRC/UERC 0.02000

Sub Total 246 27.060 246 27.06000

13Computer Aided Education in upper

primary schools under Innovation

13.01Computer Aided Education in upper primary

schoolsDistrict 0.01200 48 0.576 48 0.57600

Sub Total 48 0.576 48 0.5760014 Libraries in Schools14.01 (a) Primary School (per school) School 0.03000

14.02 (b) Upper Primary School (per school) School 0.10000

Sub TotalIV ANNUAL GRANTS15 Teachers' Grant15.01 Primary Teachers Teacher 0.0050015.02 Upper Primary Teachers Teacher 0.00500 994 4.970 994 4.97000

Sub Total 994 4.970 994 4.9700016 School Grant16.01 Primary School School 0.05000 2310 115.500 2310 115.5000016.02 Upper Primary School School 0.07000 978 68.460 978 68.46000

Sub Total 3288 183.960 3288 183.96000

Arti:SSA-AWPB-2014-15-PABMinits:Shahjahanpur:16-06-2014 60 / 533

Page 61: U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 · 2015. 1. 6. · U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15

Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

Name of District : Shahjahanpur -68

ActivityS. No.Physical

UnitRemarks

Outlay Recommendation for 2014-15

Spill OverDeferred laibility of

2014-15Fresh Recommended Total Recommended

17Research, Evaluation, Monitoring &

Supervision

17.01 REMS Activities School 0.00103 3288 3.382 3288 3.38208

17.02 Monitoring & Supervision School 0.00078 3288 2.578 3288 2.57801

17.03 House Hold Survey (Urban) in Million Plus Cities District 35.00000

Sub Total 6576 5.960 6576 5.9600918 Maintenance Grant

18.01 Maintenance in School having upto3 Classrooms School 0.07500 809 60.675 809 60.67500

18.01a Maintenance Grant School 0.07500 2391 179.325 2391 179.32500Sub Total 3200 240.000 3200 240.00000

VBRIDGING GENDER AND SOCIAL

CATEGORY GAPS

19 Interventions for CWSN (IE)

19.01 Provision for Inclusive Education Child 0.01800 6440 115.920 6440 115.92000

Sub Total 6440 115.920 6440 115.92000

20Innovativation Head up to Rs.50 Lakh per

district

20.01 Girls Education District 0.70000 10 7.000 10 7.00000

20.02 ECCE District20.03 Intervention for SC / ST children District

20.04 Intervention for Minority Community children District

20.05 Intervention for Urban Deprived children District 10.00000

Sub Total 10 7.000 10 7.0000021 SMC/PRI Training

21.01Residential for 6 Resource Person per Block (3

days) (@ Rs.500/-)Blocks 0.09000

21.02Non-residential (3 days training of 6 SMC

members) (@ Rs.100/-)SMC 0.01800 3205 57.690 3205 57.69000

21.02(a)Non-residential (3 days training of 3 Members of

PRI/VECs/LA) (@ Rs.100/-)VEC/ WEC 0.00900

21.03

Seminar/Orientation of SMC Women members

and President/Vice President (@ Rs. 50,000/-

per block)

Blocks 0.50000

Sub Total 3205 57.690 3205 57.69000VI SCHOOL INFRASTRUCTURE22 Civil Works22.01 Primary School (Plain) (New) School 13.1550022.02 Primary School (Hilly/Rocky) (New) School 13.2750022.03 Upper Primary (Plain) (New) School 20.65500

22.04 Upper Primary School (Hilly/Rocky) (New) School 20.77500

22.04aComposite Schools for Urban Areas (Class I-

VIII)School 41.04000

22.05 ACR in lieu of upgraded Upper Primary School Rooms

22.06 Additional class rooms for adding Class VIII Rooms

22.07 Building Less (Pry) School 9.7500022.08 Building Less (UP) School 18.5900022.09 Dilapidated Building (Pry) School 9.7500022.10 Dilapidated Building (UP) School 18.59000

22.11 Additional Class Room (Rural) ( PS+UPS) Rooms 3.45000 164 565.800 164 565.80000

22.12 Additional Class Room (Urban) Rooms 3.45000 1 3.450 1 3.4500022.13 Additional Class Room (Hill Area)22.14 Toilet/Urinals (PS & UPS) School 0.7000022.15 Separate Girls Toilet (Rural+Urban) School 0.7000022.16 CWSN friendly Toilets School 0.50000

22.17 Drinking Water Facility (for Urban Area Only)) School 0.15000 3 0.450 3 0.45000

22.17a Drinking Water Facility (Plain PS & UPS) School 0.15000 27 4.050 27 4.05000

22.17b Drinking Water Facility (Hilly/Rocky PS & UPS) School 0.15000

22.18a Boundary Wall PS (Total in Meters x .01105) 0.01749

22.18bBoundary Wall PS (For Gate) @Rs. 7000 x no. of

P.S.School 0.07800

22.18c Boundary Wall UPS (Total in Meters x .01105) 0.01749

22.18dBoundary Wall UPS (For Gate) @Rs. 7000 x no.

of UPSSchool 0.07800

22.19a Electrification in P.S./ Electrical Equipment School 0.11000

22.19b Electrification in U. P.S./ Electrical Equipment School 0.11000

22.20Office-cum-store-cum-Head Teacher's room

(Primary)Rooms

22.21Office-cum-store-cum-Head Teacher's room

(Upper Primary)Rooms

22.22Augumentation of training facility in BRC (one

time)BRC/ URC 5.00000

22.23 Child friendly Elements School 0.25000

22.24 Ramps with Handrails (Barrier Free Elements) School 0.06000

22.25 Handrails in existing Ramps School 0.01000

Arti:SSA-AWPB-2014-15-PABMinits:Shahjahanpur:16-06-2014 61 / 533

Page 62: U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 · 2015. 1. 6. · U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15

Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

Name of District : Shahjahanpur -68

ActivityS. No.Physical

UnitRemarks

Outlay Recommendation for 2014-15

Spill OverDeferred laibility of

2014-15Fresh Recommended Total Recommended

22.26 Whole School Develoipment School22.27 Retro-fitting and repairs School

22.28Residential Schools for specific category

of children

(a) Construction of Building including boundary

wall, Water and sanitation facilities, electric

installation (For 100 children)

Building 65.86000

(b) Construction of residential hostel Building 65.86000

(c) Refurnishing unused old buildings Building

22.29

Construction of Hostel in existing Govt UPS

including boundary wall, Water and sanitation

facilities, electric installation etc. (For 50

children)

7.00000

22.30Furniture for Govt. UPS (per child) (@ Rs.500/-

per child enrolled)Child 0.00500

22.31 Major Repairs for Primary School School 0.30000

22.32 Majr Repairs for Upper Primary School School 0.30000

22.33Others (Difference of Civil Wrks

sanctioned in pre.yr.)22.33a Others (Overhead Tank PS) School 0.1200022.33b Others (Overhead Tank UPS) School 0.12000

Sub Total (Civil WOrks) 195 573.750 195 573.75VII PROJECT MANAGEMENT COST23 Management23.01 Management up to 3.5%

(a) Project Management and MIS

(i) DPO ( Salary, Contigency, Consumables,

POL, TA & Computer etc)District 1 118.180 1 118.18030

(ii) EMIS Cell District 1 19.994 1 19.99400Sub Total (a) 1 1 1 138.174 1 138.174

(b) Training of Educational Administrators District

(c) School Mapping and Social Mapping District

Sub Total (23.01)

23.02Learning Enhancement Prog. (LEP) (P & UP) (up

to 2%)District 24.402 24.40230

23.03 Community Mobilization (up to 0.5%) District 1 60.000 1 60.00000

Sub Total (Management) 1 84.402 1 84.40230Total Management Cost 222.577 222.57660Total of SSA (Districs) 1.400 610703 13264.682 610703 13266.082

24 State Component23.01 Management23.02 REMS 0.0044923.03 SIEMAT

Sub Total

STATE SSA TOTAL 1.40000 610703 13264.682 610703 13266.08229

25

KGBV Financial Provision (give

separate costing sheets for different

Models)

Hostel

ANon Recurring One Time Grant (Only

committed liabilities) (Model-I)

25.01 Construction of Building (New)

25.02 Construction of Building KGBV sanctioned earlier 0.00000 0.00000

25.02(a) Additional Class Room Rooms 3.45000

25.02(b) Guard Room Rooms 1.32000

25.02(c) Boundary Wall School 5.0200025.03 Boudary Wall (Spillover only)

25.04

Boring/Handpump (Spillover only)

(minimum rates prescribed by State Drinking

Water Department subject to a ceiling of Rs.

1.00 lakhs)

25.05 Electricity /Water charges (Spillover only)

25.05(a) Solar Water Heater & Solar Light 2.97000

25.06Furniture/Equipment (including Kitchen

equipment)3.00000

25.07 TLM and equipment including library books 3.50000

25.08 Bedding (New) 0.75000

25.09 Replacement of Bedding (once in 3 Year) 0.75000

Subtotal Non Recurring 0.00000 0.00000

B Recurring Cost Per Annum (Model-I)

25.10Maintenance per girl student per month @ Rs.

1500/-18.00000 16 288.000 16 288.00000

25.11 Stipend for girl student per month @ Rs. 100/- 1.20000 16 19.200 16 19.20000

25.12Supplementary TLM, stationery and other

educational material @ Rs.1000/- per annum1.00000 16 16.000 16 16.00000

25.13 Salaries

Arti:SSA-AWPB-2014-15-PABMinits:Shahjahanpur:16-06-2014 62 / 533

Page 63: U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 · 2015. 1. 6. · U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15

Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

Name of District : Shahjahanpur -68

ActivityS. No.Physical

UnitRemarks

Outlay Recommendation for 2014-15

Spill OverDeferred laibility of

2014-15Fresh Recommended Total Recommended

25.13.1 Additional Salaries:

(a) 1 Warden @ Rs. 25,000/- per month 3.00000 16 48.00000 16 48.00000

(b)4 Full time teachers as per RTE norms @ Rs.

20,000/- per month per teacher 9.60000 16 153.60000 16 153.60000

(c)

1 Urdu Teachers (only for blocks with muslim

population above 20% and select urban areas), if

required @ Rs. 12,000/- per month per teacher 1.44000 16 23.04000 16 23.04000

(d)3 part time teachers @ Rs. 5,000/- per month per

teacher 1.80000 16 28.80000 16 28.80000

(e)1 Full time Accountant @ Rs. 10,000/- per month

1.20000 16 19.20000 16 19.20000

(f)

2 Support Staff – (Accountant/ Assistant, Peon,

Chowkidar) @ Rs. 5,000/- per month per staff 1.20000 16 19.20000 16 19.20000

(g) 1 Head cook @ Rs. 6,000/- per month 0.72000 16 11.52000 16 11.52000

(h)2 Asstt. Cooks @ Rs. 4,500/- per month per cook

1.08000 16 17.28000 16 17.28000

25.14Specific skill training @ Rs.1000/- per child per

annum1.00000 16 16.000 16 16.00000

25.15Electricity/water charges @ Rs.1000/- per child

per annum1.00000 16 16.000 16 16.00000

25.16Medical care/contingencies @ Rs. 1250 per child

per annum1.25000 16 20.000 16 20.00000

25.17 Maintenance @ Rs.750/- per child per annum 0.75000 16 12.000 16 12.00000

25.18

Miscellaneous (Educational Tour/ Exposure Visit

/ Sports Material etc.) @ Rs.750/- per child per

annum

0.75000 16 12.000 16 12.00000

25.19Preparatory camps @ Rs.200/- per child per

annum0.20000 16 3.200 16 3.20000

25.20PTAs/school functions @ Rs.200/- per child per

annum0.20000 16 3.200 16 3.20000

25.21 Provision of Rent @ Rs.6000/- per annum 6.00000

25.21a Provision of Rent (6 months) 3.6000025.21b Provision of Rent (3 months) 1.8000025.21c Rent (Previous Year (2007-2012) 2 2

25.22 Capacity building 0.50000 16 8.000 16 8.00000

25.22(a)Physical/ Self Defence Training @ Rs.200/- per

child per annum0.20000 16 3.200 16 3.20000

Subtotal Recurring 16 737.440 16 737.44000

Subtotal (Model-I) 0.00000 16 737.440 16 737.44000

CNon Recurring One Time Grant (Only

committed liabilities) (Model-II)

25.23 Construction of Building (New)

25.24 Construction of Building KGBV sanctioned earlier

25.24(a) Additional Class Room Rooms 3.45000

25.24(b) Guard Room Rooms 1.32000

25.24(c) Boundary Wall School 5.0200025.25 Boudary Wall (Spillover only)25.26 Boring/Handpump (Spillover only)

25.27 Electricity /Water charges (Spillover only)

25.27(a) Solar Water Heater & Solar Light 2.97000

25.28Furniture/Equipment (including Kitchen

equipment)2.00000

25.29 TLM and equipment including library books 3.00000

25.30 Bedding (New) 0.37500

25.31 Replacement of Bedding (once in 3 Year) 0.37500

Subtotal Non Recurring

D Recurring Cost Per Annum (Model-II)

25.32Maintenance per girl student per month @ Rs.

1500/-9.00000

25.33 Stipend for girl student per month @ Rs. 100/- 0.60000

25.34Supplementary TLM, stationery and other

educational material @ Rs.1000/- per annum0.50000

25.35 Salaries(a) 1 Warden @ Rs. 25,000/- per month 3.00000

(b)3 Full time teachers as per RTE norms @ Rs.

20,000/- per month per teacher 7.20000

(c) 3 part time teachers @ Rs. 5,000/- per month per

teacher 1.80000

(d)1 Full time Accountant @ Rs. 10,000/- per month

1.20000

(e)

2 Support Staff – (Accountant/ Assistant, Peon,

Chowkidar) @ Rs. 5,000/- per month per staff 1.20000

Arti:SSA-AWPB-2014-15-PABMinits:Shahjahanpur:16-06-2014 63 / 533

Page 64: U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 · 2015. 1. 6. · U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15

Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

Name of District : Shahjahanpur -68

ActivityS. No.Physical

UnitRemarks

Outlay Recommendation for 2014-15

Spill OverDeferred laibility of

2014-15Fresh Recommended Total Recommended

(f) 1 Head cook @ Rs. 6,000/- per month 0.72000

(g)1 Asstt. Cooks @ Rs. 4,500/- per month per cook

0.54000

25.36Specific skill training @ Rs.1000/- per child per

annum0.50000

25.37Electricity/water charges @ Rs.1000/- per child

per annum0.50000

25.38Medical care/contingencies @ Rs. 1250 per child

per annum0.62500

25.39 Maintenance @ Rs.750/- per child per annum 0.37500

25.40

Miscellaneous (Educational Tour/ Exposure Visit

/ Sports Material etc.) @ Rs.750/- per child per

annum

0.37500

25.41Preparatory camps @ Rs.300/- per child per

annum0.15000

25.42PTAs/school functions @ Rs.300/- per child per

annum0.15000

25.43 Provision of Rent @ Rs.10000/- per annum 5.00000

25.43a Provision of Rent (6 months) 3.6000025.43b Provision of Rent (3 months) 1.8000025.43c Rent (Previous Year (2007-2012)25.44 Capacity building 0.25000

25.44(a)Physical/ Self Defence Training @ Rs.200/- per

child per annum0.10000

Subtotal Recurring

Subtotal (Model-II) Total (KGBV) 0.000 16 737.440 16 737.440

DISTRICT GRAND TOTAL (SSA+KGBV) 0.000 1.400 610719 14002.122 610719 14003.522

Arti:SSA-AWPB-2014-15-PABMinits:Shahjahanpur:16-06-2014 64 / 533

Page 65: U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 · 2015. 1. 6. · U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15

Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

I ACCESS

1 Opening of New Schools

1.01 Upgradation of EGS to PSCentres /

School1.02 New PS School

1.03 Upgradation of PS to UPS / New UPS School

1.04 Composite Schools (for Urban Areas) School

1.05Residential Schools for specific category children

(For 100 children)

1.06Residential Hostel (for specific category of

children) (For 50 children)

1.07 Integration of Class V with Primary Schools

1.08Integration of Class VIII with Upper Primary

Schools

2Residential Schools for specific category

of children (For 100 Children)

Total - Residential Schools (For 100

children)

3Residential Hostel for specific category of

children (For 50 Children)

Total - Residential Schools (For 50

children)4 Transport/Escort Facility

4.01

Children in remote habitations with sparse

populations where opening of schools is

unviable

Child 0.03000

4.02

Urban deprived children/children without adult

protection in urban areas where schools are not

opened because availability of land is a problem

Child 0.03000

Sub Total

5Special Training for mainstreaming of Out-

of-School Children

5.03 Non-Residential (Fresh)(a) 12 months Child 0.06000(b) 9 months 0.04500(c) 6 months

(i)Special Training (by Special Instructors-NRBC)-

(1-5) Child 0.03000 45 1.350 45 1.35000

(ii) Special Training (by Special Instructors-NRBC)-

(6-8) Child 0.03000 58 1.740 58 1.74000

(d) 3 months Child 0.01500Sub Total 103 3.090 103 3.09000

Total (Special Training) 103 3.090 103 3.0905(B) House Hold Survey (HHS)

5(B).01 House Hold Survey through SMCHouse

Hold0.00001

Sub TotalII RETENTION6 Free Text Book

6.01Free Text Book (PS) for Parishadiya & Aided

Primary Schools (Workbooks not included)Child 0.00120 83564 100.277 83564 100.27680

6.01a

Free Text Book (PS) for 25% children of Class-1

in Private Recognised Primary Schools of other

Boards (Workbooks not included)

Child 0.00150

6.02 Free Brail Books (PS) 0.00150 50 0.075 50 0.07500

6.03 Free Large Print Books (PS) 0.00150

6.04Free Text Book (UPS) (Workbooks not included)

(Including KGBV Girls)Child 0.00200 37806 75.612 37806 75.61200

6.05 Free Brail Books (UPS) 0.00250 17 0.043 17 0.04250

6.06 Free Large Print Books (PS) 0.00250Sub Total 121437 176.006 121437 176.006

7 Provision of 2 set of Uniforms

7.01 All Girls (Including KGBV Girls) Child 0.00400 96828 387.312 96828 387.31200

7.02 SC Boys Child 0.00400 29567 118.268 29567 118.26800

7.03 ST Boys Child 0.00400

7.04 BPL Boys Child 0.00400 48508 194.032 48508 194.03200

7.05

Free Uniform for 25% children of Class-1 in

Private Recognised Primary Schools of other

Boards

Child0.00400

Sub Total 174903 699.612 174903 699.6127(A) Fee Reimbursement

7(A).01

Fee Reimbursement for Admission of children of

Disadvantaged Group & Weaker Section upto

25% of seats in Class-1 of Private Unaided

Recognised Schools

Child 0.05400

Sub Total

8 Teaching Learning Equipment (TLE)

8.01 TLE - New Primary School 0.20000 0.20000 0.200008.02 TLE - New Upper Primary School 0.50000 0.50000 0.50000

Name of District : SK Nagar -67

ActivityS. No.Physical

UnitRemarks

Outlay Recommendation for 2014-15

Spill OverDeferred laibility of

2014-15Fresh Recommended Total Recommended

Arti:SSA-AWPB-2014-15-PABMinits:SKNagar:16-06-2014 65 / 533

Page 66: U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 · 2015. 1. 6. · U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15

Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

Name of District : SK Nagar -67

ActivityS. No.Physical

UnitRemarks

Outlay Recommendation for 2014-15

Spill OverDeferred laibility of

2014-15Fresh Recommended Total Recommended

Sub Total 0.70000 0.70000III ENHANCING QUALITY9 New Teachers Salary

9.01 Primary Teachers (Regular) (Asstt. Teacher) Teacher 0.91500

9.01aHead Teacher for Primary (if the number of

children exceeds 150 in a school)Teacher

9.02 Primary Teachers (Contract) (S.M.) Teacher

9.03Subject specific Upper Primary Teachers

(Regular) (a) Science and Mathematics Teacher 1.26000(b) Social Studies Teacher 1.26000(c) Languages Teacher 1.26000

Sub Total (9.01 to 9.05)Add.Teacher against PTR

Sub Total (9.06 to 9.12)

Total (New Teacher's Salary-9.01 to 9.12)

Teachers Salary (Recurring-sanctioned

earlier)Primary teachers

9.13 Primary Teachers ( Regular)-Existing, in position Teacher 3.66000 332 1215.120 332 1215.12000

9.14Primary Teachers (Contract)-Existing, in

positionTeacher 0.55000

9.14(a) Primary Teachers (Contract)-under Training Teacher 0.38500 877 337.645 877 337.64500

9.14(b)Primary Teacher (Para Teachers Equal to

9.14(a) upgraded as Teachers)0.38500 557 214.445 557 214.44500

9.14(c) Primary Teachers (Para)- Vacant Teacher9.15 Primary Teachers (Vacant) Teacher 0.30500

9.16Head Teacher for Primary (if the number of

children exceeds 150)Teacher 5.04000 222 1118.880 222 1118.88000

9.16(b)Head Teacher for Primary (if the number of

children exceeds 150) VacantTeacher 0.42000

Additional teachers

9.17Additional Teachers - PS (Special BTC-

Regular) in positionTeacher 0.30500

9.18Additional Teachers - PS (Special BTC Under

Training)Teacher 0.87600

9.19 Additional Teachers - PS (Vacant) Teacher

9.20Others in position (Para Teachers upgraded

as Teachers)Teacher

Upper Primary teachers

9.21 UP Teachers (Regular)-Existing Teacher 5.04000 579 2918.160 579 2918.16000

9.22 UP Teachers (Contract)-Existing9.23 UP Teachers (Vacant) Teacher 1.26000

9.24Head Teacher for Upper Primary (if the number

of children exceeds 100)-ExistingTeacher 5.34000 115 614.100 115 614.10000

9.24a Head Teacher for Upper Primary (Vacant) Teacher 1.33500

9.25Subject specific Upper Primary Teachers

(Regular)(a) Science and Mathematics(b) Social Studies(c) Languages

9.32 Part Time Instructors in position(a) Art Education 0.77000 70 53.900 70 53.90000(b) Health and Physical Education 0.77000 89 68.530 89 68.53000(c) Work Education 0.77000 85 65.450 85 65.45000

9.32(A) Part Time Instructors Vacant(a) Art Education 0.42000(b) Health and Physical Education 0.42000(c) Work Education 0.42000

9.33

Others-Incentive to Teachers in Schools

Located in Naxal Affected Areas (@

Rs.1500/- per teachers per month)

Sub Total (9.13 to 9.33) 2926 6606.230 2926 6606.23TOTAL

(New Teachers Salary +Teachers Salary

Recurring)

2926 6606.230 2926 6606.23000

10 Teachers Training(a) Teachers

10.01

Refresher In-service Teachers' Training at BRC

level and above - 10 days (@ Rs.200/- per

head per day)

Teacher

(Target &

Ach.-13-14

in

Mandays)

0.00600

10.01(a)Continuous and Comprehensive Evauation [PS +

UPS)Teacher 0.01300 965 12.545 965 12.54500

10.01(b) Eary Reading and Numeracy Skills [PS] Teacher 0.00500 965 4.825 965 4.82500

10.01(c) Science [UPS] Teacher 0.00800 485 3.880 485 3.88000Recommended as

proposed

10.01(d) CWSN Teacher 0.00400

Arti:SSA-AWPB-2014-15-PABMinits:SKNagar:16-06-2014 66 / 533

Page 67: U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 · 2015. 1. 6. · U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15

Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

Name of District : SK Nagar -67

ActivityS. No.Physical

UnitRemarks

Outlay Recommendation for 2014-15

Spill OverDeferred laibility of

2014-15Fresh Recommended Total Recommended

10.02

One day monthly cluster level meetings and

peer group training sessions for 10 months for

all teachers each year at CRC level - 10 days (@

Rs.100/- per head per day)

Teacher 0.01000

10.03(a)

Induction Training for Newly Recruited Teachers

for 6 Months (Special BTC)- @Rs.2000/- per

head per year

Teacher 0.02000

10.03(b)5 Days Training for Part Time Instructors @ Rs.

200/- per head per day) Teacher 0.01000

10.04

Training of untrained Teachers to acquire

professional qualifications over a two year

period.

Teacher 0.04700 626 29.422 626 29.42200

(b) Head Teachers

10.05Refresher Residencial In-service for 10 days at

BRC level and above

Head

Teacher(c) Resource Persons

10.06

Refresher Training for all Resource

Persons,Master Trainers, BRC & CRC faculty

and Coordinators for 5 days each year (@

Rs.200/- per head per day)

Resource

Person 0.00300 108 0.324 108 0.32400

Sub Total 3149 50.996 3149 50.996

11Academic Support through Block Resource

Centre (BRC)/ URC

11.01 Salary of Faculty and Staff

(a) 5 RPs at BRC for subject specific training in

positionRP 45 45

(b) 2 RPs for CWSN in position RP(b-i) 1 CWSN Resource Person RP 1.10000 18 19.800 18 19.80000

(b-ii) 1 Physiotherapist (Resource person for IE) RP

(c) 1 MIS Coordinator in position RP 1.86000

(d) 1 Datra Entry Operator in position RP 1.74000 6 10.440 6 10.44000

(e) 1 Accountant-cum-support staff in position RP 1.80000 9 16.200 9 16.20000

11.02 Furniture Grant BRC/ URC 1.00000

11.03Replacement of furniture, computer, TLE etc (

Once in 5 years)BRC/ URC 1.00000

11.04 Contingency Grant BRC/ URC 0.50000 9 4.500 9 4.50000

11.05 Meeting, TA BRC/ URC 0.30000 9 2.700 9 2.70000

11.06 TLM Grant BRC/ URC 0.10000

11.07 Maintenance Grant BRC/ URC 0.10000

Sub Total 9 53.640 9 53.64000

12Academic Support through Cluster

Resource Centres (CRC/UERC)

12.01Salary of Cluster Coordinator (on an average of

one Resource Person per 18 schools in a block)RP

12.02 Furniture GrantCRC/

UERC0.10000

12.03Replacement of furniture, computer, TLE etc.

once in 5 years

CRC/

UERC0.10000

12.04 Contingency Grant CRC/UERC 0.10000 85 8.500 85 8.50000

12.05 Meeting, TA CRC/UERC 0.12000 85 10.200 85 10.20000

12.06 TLM Grant CRC/UERC 0.03000

12.07Maintenance Grant

CRC/UERC 0.02000

Sub Total 170 18.700 170 18.70000

13Computer Aided Education in upper

primary schools under Innovation

13.01Computer Aided Education in upper primary

schoolsDistrict 0.01200 48 0.576 48 0.57600

Sub Total 48 0.576 48 0.5760014 Libraries in Schools14.01 (a) Primary School (per school) School 0.03000

14.02 (b) Upper Primary School (per school) School 0.10000

Sub TotalIV ANNUAL GRANTS15 Teachers' Grant15.01 Primary Teachers Teacher 0.0050015.02 Upper Primary Teachers Teacher 0.00500 485 2.425 485 2.42500

Sub Total 485 2.425 485 2.4250016 School Grant16.01 Primary School School 0.05000 1087 54.350 1087 54.3500016.02 Upper Primary School School 0.07000 478 33.460 478 33.46000

Sub Total 1565 87.810 1565 87.81000

Arti:SSA-AWPB-2014-15-PABMinits:SKNagar:16-06-2014 67 / 533

Page 68: U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 · 2015. 1. 6. · U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15

Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

Name of District : SK Nagar -67

ActivityS. No.Physical

UnitRemarks

Outlay Recommendation for 2014-15

Spill OverDeferred laibility of

2014-15Fresh Recommended Total Recommended

17Research, Evaluation, Monitoring &

Supervision

17.01 REMS Activities School 0.00103 1565 1.610 1565 1.60978

17.02 Monitoring & Supervision School 0.00078 1565 1.227 1565 1.22706

17.03 House Hold Survey (Urban) in Million Plus Cities District 35.00000

Sub Total 3130 2.837 3130 2.8368418 Maintenance Grant

18.01 Maintenance in School having upto3 Classrooms School 0.07500 142 10.650 142 10.65000

18.01a Maintenance Grant School 0.07500 1392 104.400 1392 104.40000Sub Total 1534 115.050 1534 115.05000

VBRIDGING GENDER AND SOCIAL

CATEGORY GAPS

19 Interventions for CWSN (IE)

19.01 Provision for Inclusive Education Child 0.03000 1430 42.900 1430 42.90000

Sub Total 1430 42.900 1430 42.90000

20Innovativation Head up to Rs.50 Lakh per

district

20.01 Girls Education District 0.70000 10 7.000 10 7.00000

20.02 ECCE District20.03 Intervention for SC / ST children District

20.04 Intervention for Minority Community children District

20.05 Intervention for Urban Deprived children District 10.00000

Sub Total 10 7.000 10 7.0000021 SMC/PRI Training

21.01Residential for 6 Resource Person per Block (3

days) (@ Rs.500/-)Blocks 0.09000

21.02Non-residential (3 days training of 6 SMC

members) (@ Rs.100/-)SMC 0.01800 1537 27.666 1537 27.66600

21.02(a)Non-residential (3 days training of 3 Members of

PRI/VECs/LA) (@ Rs.100/-)VEC/ WEC 0.00900

21.03

Seminar/Orientation of SMC Women members

and President/Vice President (@ Rs. 50,000/-

per block)

Blocks 0.50000

Sub Total 1537 27.666 1537 27.66600VI SCHOOL INFRASTRUCTURE22 Civil Works22.01 Primary School (Plain) (New) School 30.04700 13.15500 30.0470022.02 Primary School (Hilly/Rocky) (New) School 13.2750022.03 Upper Primary (Plain) (New) School 0.08000 20.65500 0.08000

22.04 Upper Primary School (Hilly/Rocky) (New) School 20.77500

22.04aComposite Schools for Urban Areas (Class I-

VIII)School 41.04000

22.05 ACR in lieu of upgraded Upper Primary School Rooms

22.06 Additional class rooms for adding Class VIII Rooms

22.07 Building Less (Pry) School 9.7500022.08 Building Less (UP) School 18.5900022.09 Dilapidated Building (Pry) School 9.7500022.10 Dilapidated Building (UP) School 18.59000

22.11 Additional Class Room (Rural) ( PS+UPS) Rooms 3.45000 350 1207.500 350 1207.50000

22.12 Additional Class Room (Urban) Rooms 3.4500022.13 Additional Class Room (Hill Area)22.14 Toilet/Urinals (PS & UPS) School 0.7000022.15 Separate Girls Toilet (Rural+Urban) School 0.7000022.16 CWSN friendly Toilets School 0.50000

22.17 Drinking Water Facility (for Urban Area Only)) School 0.15000

22.17a Drinking Water Facility (Plain PS & UPS) School 0.15000 169 25.350 169 25.35000

22.17b Drinking Water Facility (Hilly/Rocky PS & UPS) School 0.15000

22.18a Boundary Wall PS (Total in Meters x .01105) 0.01749

22.18bBoundary Wall PS (For Gate) @Rs. 7000 x no. of

P.S.School 0.07800

22.18c Boundary Wall UPS (Total in Meters x .01105) 0.01749

22.18dBoundary Wall UPS (For Gate) @Rs. 7000 x no.

of UPSSchool 0.07800

22.19a Electrification in P.S./ Electrical Equipment School 0.11000

22.19b Electrification in U. P.S./ Electrical Equipment School 0.11000

22.20Office-cum-store-cum-Head Teacher's room

(Primary)Rooms

22.21Office-cum-store-cum-Head Teacher's room

(Upper Primary)Rooms

22.22Augumentation of training facility in BRC (one

time)BRC/ URC 5.00000

22.23 Child friendly Elements School 0.25000

22.24 Ramps with Handrails (Barrier Free Elements) School 0.06000

22.25 Handrails in existing Ramps School 0.01000

Arti:SSA-AWPB-2014-15-PABMinits:SKNagar:16-06-2014 68 / 533

Page 69: U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 · 2015. 1. 6. · U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15

Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

Name of District : SK Nagar -67

ActivityS. No.Physical

UnitRemarks

Outlay Recommendation for 2014-15

Spill OverDeferred laibility of

2014-15Fresh Recommended Total Recommended

22.26 Whole School Develoipment School22.27 Retro-fitting and repairs School

22.28Residential Schools for specific category

of children

(a) Construction of Building including boundary

wall, Water and sanitation facilities, electric

installation (For 100 children)

Building 65.86000

(b) Construction of residential hostel Building 65.86000

(c) Refurnishing unused old buildings Building

22.29

Construction of Hostel in existing Govt UPS

including boundary wall, Water and sanitation

facilities, electric installation etc. (For 50

children)

7.00000

22.30Furniture for Govt. UPS (per child) (@ Rs.500/-

per child enrolled)Child 0.00500

22.31 Major Repairs for Primary School School 0.30000

22.32 Majr Repairs for Upper Primary School School 0.30000

22.33Others (Difference of Civil Wrks

sanctioned in pre.yr.)22.33a Others (Overhead Tank PS) School 0.1200022.33b Others (Overhead Tank UPS) School 0.12000

Sub Total (Civil WOrks) 30.13 519 1232.850 519 1262.98VII PROJECT MANAGEMENT COST23 Management23.01 Management up to 3.5%

(a) Project Management and MIS

(i) DPO ( Salary, Contigency, Consumables,

POL, TA & Computer etc)District 1 96.987 1 96.98680

(ii) EMIS Cell District 1 11.985 1 11.98500Sub Total (a) 1 1 1 108.972 1 108.972

(b) Training of Educational Administrators District

(c) School Mapping and Social Mapping District

Sub Total (23.01)

23.02Learning Enhancement Prog. (LEP) (P & UP) (up

to 2%)District 11.504 11.50350

23.03 Community Mobilization (up to 0.5%) District 1 40.000 1 40.00000

Sub Total (Management) 1 51.504 1 51.50350Total Management Cost 160.475 160.47530Total of SSA (Districs) 30.127 0.700 312955 9287.863 312955 9318.690

24 State Component23.01 Management23.02 REMS 0.0044923.03 SIEMAT

Sub Total

STATE SSA TOTAL 30.12700 0.70000 312955 9287.863 312955 9318.69044

25

KGBV Financial Provision (give

separate costing sheets for different

Models)

Hostel

ANon Recurring One Time Grant (Only

committed liabilities) (Model-I)

25.01 Construction of Building (New)

25.02 Construction of Building KGBV sanctioned earlier 0.00010 0.00010

25.02(a) Additional Class Room Rooms 3.45000

25.02(b) Guard Room Rooms 1.32000

25.02(c) Boundary Wall School 5.0200025.03 Boudary Wall (Spillover only)

25.04

Boring/Handpump (Spillover only)

(minimum rates prescribed by State Drinking

Water Department subject to a ceiling of Rs.

1.00 lakhs)

25.05 Electricity /Water charges (Spillover only)

25.05(a) Solar Water Heater & Solar Light 2.97000

25.06Furniture/Equipment (including Kitchen

equipment)3.00000

25.07 TLM and equipment including library books 3.50000

25.08 Bedding (New) 0.75000

25.09 Replacement of Bedding (once in 3 Year) 0.75000 5 3.750 5 3.75000

Subtotal Non Recurring 0.00010 3.750 3.75010

B Recurring Cost Per Annum (Model-I)

25.10Maintenance per girl student per month @ Rs.

1500/-18.00000 7 126.000 7 126.00000

25.11 Stipend for girl student per month @ Rs. 100/- 1.20000 7 8.400 7 8.40000

25.12Supplementary TLM, stationery and other

educational material @ Rs.1000/- per annum1.00000 7 7.000 7 7.00000

25.13 Salaries

Arti:SSA-AWPB-2014-15-PABMinits:SKNagar:16-06-2014 69 / 533

Page 70: U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 · 2015. 1. 6. · U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15

Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

Name of District : SK Nagar -67

ActivityS. No.Physical

UnitRemarks

Outlay Recommendation for 2014-15

Spill OverDeferred laibility of

2014-15Fresh Recommended Total Recommended

25.13.1 Additional Salaries:

(a) 1 Warden @ Rs. 25,000/- per month 3.00000 7 21.00000 7 21.00000

(b)4 Full time teachers as per RTE norms @ Rs.

20,000/- per month per teacher 9.60000 7 67.20000 7 67.20000

(c)

1 Urdu Teachers (only for blocks with muslim

population above 20% and select urban areas), if

required @ Rs. 12,000/- per month per teacher 1.44000 7 10.08000 7 10.08000

(d)3 part time teachers @ Rs. 5,000/- per month per

teacher 1.80000 7 12.60000 7 12.60000

(e)1 Full time Accountant @ Rs. 10,000/- per month

1.20000 7 8.40000 7 8.40000

(f)

2 Support Staff – (Accountant/ Assistant, Peon,

Chowkidar) @ Rs. 5,000/- per month per staff 1.20000 7 8.40000 7 8.40000

(g) 1 Head cook @ Rs. 6,000/- per month 0.72000 7 5.04000 7 5.04000

(h)2 Asstt. Cooks @ Rs. 4,500/- per month per cook

1.08000 7 7.56000 7 7.56000

25.14Specific skill training @ Rs.1000/- per child per

annum1.00000 7 7.000 7 7.00000

25.15Electricity/water charges @ Rs.1000/- per child

per annum1.00000 7 7.000 7 7.00000

25.16Medical care/contingencies @ Rs. 1250 per child

per annum1.25000 7 8.750 7 8.75000

25.17 Maintenance @ Rs.750/- per child per annum 0.75000 7 5.250 7 5.25000

25.18

Miscellaneous (Educational Tour/ Exposure Visit

/ Sports Material etc.) @ Rs.750/- per child per

annum

0.75000 7 5.250 7 5.25000

25.19Preparatory camps @ Rs.200/- per child per

annum0.20000 7 1.400 7 1.40000

25.20PTAs/school functions @ Rs.200/- per child per

annum0.20000 7 1.400 7 1.40000

25.21 Provision of Rent @ Rs.6000/- per annum 6.00000

25.21a Provision of Rent (6 months) 3.6000025.21b Provision of Rent (3 months) 1.8000025.21c Rent (Previous Year (2007-2012)

25.22 Capacity building 0.50000 7 3.500 7 3.50000

25.22(a)Physical/ Self Defence Training @ Rs.200/- per

child per annum0.20000 7 1.400 7 1.40000

Subtotal Recurring 7 322.630 7 322.63000

Subtotal (Model-I) 0.00010 7 326.380 7 326.38010

CNon Recurring One Time Grant (Only

committed liabilities) (Model-II)

25.23 Construction of Building (New)

25.24 Construction of Building KGBV sanctioned earlier

25.24(a) Additional Class Room Rooms 3.45000

25.24(b) Guard Room Rooms 1.32000

25.24(c) Boundary Wall School 5.0200025.25 Boudary Wall (Spillover only)25.26 Boring/Handpump (Spillover only)

25.27 Electricity /Water charges (Spillover only)

25.27(a) Solar Water Heater & Solar Light 2.97000

25.28Furniture/Equipment (including Kitchen

equipment)2.00000

25.29 TLM and equipment including library books 3.00000

25.30 Bedding (New) 0.37500

25.31 Replacement of Bedding (once in 3 Year) 0.37500

Subtotal Non Recurring

D Recurring Cost Per Annum (Model-II)

25.32Maintenance per girl student per month @ Rs.

1500/-9.00000

25.33 Stipend for girl student per month @ Rs. 100/- 0.60000

25.34Supplementary TLM, stationery and other

educational material @ Rs.1000/- per annum0.50000

25.35 Salaries(a) 1 Warden @ Rs. 25,000/- per month 3.00000

(b)3 Full time teachers as per RTE norms @ Rs.

20,000/- per month per teacher 7.20000

(c) 3 part time teachers @ Rs. 5,000/- per month per

teacher 1.80000

(d)1 Full time Accountant @ Rs. 10,000/- per month

1.20000

(e)

2 Support Staff – (Accountant/ Assistant, Peon,

Chowkidar) @ Rs. 5,000/- per month per staff 1.20000

Arti:SSA-AWPB-2014-15-PABMinits:SKNagar:16-06-2014 70 / 533

Page 71: U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 · 2015. 1. 6. · U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15

Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

Name of District : SK Nagar -67

ActivityS. No.Physical

UnitRemarks

Outlay Recommendation for 2014-15

Spill OverDeferred laibility of

2014-15Fresh Recommended Total Recommended

(f) 1 Head cook @ Rs. 6,000/- per month 0.72000

(g)1 Asstt. Cooks @ Rs. 4,500/- per month per cook

0.54000

25.36Specific skill training @ Rs.1000/- per child per

annum0.50000

25.37Electricity/water charges @ Rs.1000/- per child

per annum0.50000

25.38Medical care/contingencies @ Rs. 1250 per child

per annum0.62500

25.39 Maintenance @ Rs.750/- per child per annum 0.37500

25.40

Miscellaneous (Educational Tour/ Exposure Visit

/ Sports Material etc.) @ Rs.750/- per child per

annum

0.37500

25.41Preparatory camps @ Rs.300/- per child per

annum0.15000

25.42PTAs/school functions @ Rs.300/- per child per

annum0.15000

25.43 Provision of Rent @ Rs.10000/- per annum 5.00000

25.43a Provision of Rent (6 months) 3.6000025.43b Provision of Rent (3 months) 1.8000025.43c Rent (Previous Year (2007-2012)25.44 Capacity building 0.25000

25.44(a)Physical/ Self Defence Training @ Rs.200/- per

child per annum0.10000

Subtotal Recurring

Subtotal (Model-II) Total (KGBV) 0.000 7 326.380 7 326.380

DISTRICT GRAND TOTAL (SSA+KGBV) 30.127 0.700 312962 9614.243 312962 9645.071

Arti:SSA-AWPB-2014-15-PABMinits:SKNagar:16-06-2014 71 / 533

Page 72: U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 · 2015. 1. 6. · U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15

Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

I ACCESS

1 Opening of New Schools

1.01 Upgradation of EGS to PSCentres /

School1.02 New PS School

1.03 Upgradation of PS to UPS / New UPS School

1.04 Composite Schools (for Urban Areas) School

1.05Residential Schools for specific category children

(For 100 children)

1.06Residential Hostel (for specific category of

children) (For 50 children)

1.07 Integration of Class V with Primary Schools

1.08Integration of Class VIII with Upper Primary

Schools

2Residential Schools for specific category

of children (For 100 Children)

Total - Residential Schools (For 100

children)

3Residential Hostel for specific category of

children (For 50 Children)

Total - Residential Schools (For 50

children)4 Transport/Escort Facility

4.01

Children in remote habitations with sparse

populations where opening of schools is

unviable

Child 0.03000

4.02

Urban deprived children/children without adult

protection in urban areas where schools are not

opened because availability of land is a problem

Child 0.03000

Sub Total

5Special Training for mainstreaming of Out-

of-School Children

5.03 Non-Residential (Fresh)(a) 12 months Child 0.06000(b) 9 months 0.04500(c) 6 months

(i)Special Training (by Special Instructors-NRBC)-

(1-5) Child 0.03000 225 6.750 225 6.75000

(ii) Special Training (by Special Instructors-NRBC)-

(6-8) Child 0.03000 340 10.200 340 10.20000

(d) 3 months Child 0.01500Sub Total 565 16.950 565 16.95000

Total (Special Training) 565 16.950 565 16.9505(B) House Hold Survey (HHS)

5(B).01 House Hold Survey through SMCHouse

Hold0.00001

Sub TotalII RETENTION6 Free Text Book

6.01Free Text Book (PS) for Parishadiya & Aided

Primary Schools (Workbooks not included)Child 0.00120 99284 119.141 99284 119.14080

6.01a

Free Text Book (PS) for 25% children of Class-1

in Private Recognised Primary Schools of other

Boards (Workbooks not included)

Child 0.00150

6.02 Free Brail Books (PS) 0.00150 60 0.090 60 0.09000

6.03 Free Large Print Books (PS) 0.00150

6.04Free Text Book (UPS) (Workbooks not included)

(Including KGBV Girls)Child 0.00200 51826 103.652 51826 103.65200

6.05 Free Brail Books (UPS) 0.00250 10 0.025 10 0.02500

6.06 Free Large Print Books (PS) 0.00250Sub Total 151180 222.908 151180 222.908

7 Provision of 2 set of Uniforms

7.01 All Girls (Including KGBV Girls) Child 0.00400 114743 458.972 114743 458.97200

7.02 SC Boys Child 0.00400 16574 66.296 16574 66.29600

7.03 ST Boys Child 0.00400

7.04 BPL Boys Child 0.00400 23709 94.836 23709 94.83600

7.05

Free Uniform for 25% children of Class-1 in

Private Recognised Primary Schools of other

Boards

Child0.00400

Sub Total 155026 620.104 155026 620.1047(A) Fee Reimbursement

7(A).01

Fee Reimbursement for Admission of children of

Disadvantaged Group & Weaker Section upto

25% of seats in Class-1 of Private Unaided

Recognised Schools

Child 0.05400

Sub Total

8 Teaching Learning Equipment (TLE)

8.01 TLE - New Primary School 0.80000 0.20000 0.800008.02 TLE - New Upper Primary School 3.50000 0.50000 3.50000

Name of District : Saharanpur -66

ActivityS. No.Physical

UnitRemarks

Outlay Recommendation for 2014-15

Spill OverDeferred laibility of

2014-15Fresh Recommended Total Recommended

Arti:SSA-AWPB-2014-15-PABMinits:Saharanpur:16-06-2014 72 / 533

Page 73: U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 · 2015. 1. 6. · U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15

Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

Name of District : Saharanpur -66

ActivityS. No.Physical

UnitRemarks

Outlay Recommendation for 2014-15

Spill OverDeferred laibility of

2014-15Fresh Recommended Total Recommended

Sub Total 4.30000 4.30000III ENHANCING QUALITY9 New Teachers Salary

9.01 Primary Teachers (Regular) (Asstt. Teacher) Teacher 0.91500

9.01aHead Teacher for Primary (if the number of

children exceeds 150 in a school)Teacher

9.02 Primary Teachers (Contract) (S.M.) Teacher

9.03Subject specific Upper Primary Teachers

(Regular) (a) Science and Mathematics Teacher 1.26000(b) Social Studies Teacher 1.26000(c) Languages Teacher 1.26000

Sub Total (9.01 to 9.05)Add.Teacher against PTR

Sub Total (9.06 to 9.12)

Total (New Teacher's Salary-9.01 to 9.12)

Teachers Salary (Recurring-sanctioned

earlier)Primary teachers

9.13 Primary Teachers ( Regular)-Existing, in position Teacher 3.66000 440 1610.400 440 1610.40000

9.14Primary Teachers (Contract)-Existing, in

positionTeacher 0.55000

9.14(a) Primary Teachers (Contract)-under Training Teacher 0.38500 1194 459.690 1194 459.69000

9.14(b)Primary Teacher (Para Teachers Equal to

9.14(a) upgraded as Teachers)0.38500 840 323.400 840 323.40000

9.14(c) Primary Teachers (Para)- Vacant Teacher9.15 Primary Teachers (Vacant) Teacher 0.30500

9.16Head Teacher for Primary (if the number of

children exceeds 150)Teacher 5.04000 104 524.160 104 524.16000

9.16(b)Head Teacher for Primary (if the number of

children exceeds 150) VacantTeacher 0.42000

Additional teachers

9.17Additional Teachers - PS (Special BTC-

Regular) in positionTeacher 0.30500

9.18Additional Teachers - PS (Special BTC Under

Training)Teacher 0.87600

9.19 Additional Teachers - PS (Vacant) Teacher

9.20Others in position (Para Teachers upgraded

as Teachers)Teacher

Upper Primary teachers

9.21 UP Teachers (Regular)-Existing Teacher 5.04000 689 3472.560 689 3472.56000

9.22 UP Teachers (Contract)-Existing9.23 UP Teachers (Vacant) Teacher 1.26000

9.24Head Teacher for Upper Primary (if the number

of children exceeds 100)-ExistingTeacher 5.34000 208 1110.720 208 1110.72000

9.24a Head Teacher for Upper Primary (Vacant) Teacher 1.33500

9.25Subject specific Upper Primary Teachers

(Regular)(a) Science and Mathematics(b) Social Studies(c) Languages

9.32 Part Time Instructors in position(a) Art Education 0.77000 110 84.700 110 84.70000(b) Health and Physical Education 0.77000 117 90.090 117 90.09000(c) Work Education 0.77000 109 83.930 109 83.93000

9.32(A) Part Time Instructors Vacant(a) Art Education 0.42000(b) Health and Physical Education 0.42000(c) Work Education 0.42000

9.33

Others-Incentive to Teachers in Schools

Located in Naxal Affected Areas (@

Rs.1500/- per teachers per month)

Sub Total (9.13 to 9.33) 3811 7759.650 3811 7759.65TOTAL

(New Teachers Salary +Teachers Salary

Recurring)

3811 7759.650 3811 7759.65000

10 Teachers Training(a) Teachers

10.01

Refresher In-service Teachers' Training at BRC

level and above - 10 days (@ Rs.200/- per

head per day)

Teacher

(Target &

Ach.-13-14

in

Mandays)

0.00600

10.01(a)Continuous and Comprehensive Evauation [PS +

UPS)Teacher 0.01300 1340 17.420 1340 17.42000

10.01(b) Eary Reading and Numeracy Skills [PS] Teacher 0.00500 1340 6.700 1340 6.70000

10.01(c) Science [UPS] Teacher 0.00800 710 5.680 710 5.68000Recommended as

proposed

10.01(d) CWSN Teacher 0.00400

Arti:SSA-AWPB-2014-15-PABMinits:Saharanpur:16-06-2014 73 / 533

Page 74: U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 · 2015. 1. 6. · U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15

Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

Name of District : Saharanpur -66

ActivityS. No.Physical

UnitRemarks

Outlay Recommendation for 2014-15

Spill OverDeferred laibility of

2014-15Fresh Recommended Total Recommended

10.02

One day monthly cluster level meetings and

peer group training sessions for 10 months for

all teachers each year at CRC level - 10 days (@

Rs.100/- per head per day)

Teacher 0.01000

10.03(a)

Induction Training for Newly Recruited Teachers

for 6 Months (Special BTC)- @Rs.2000/- per

head per year

Teacher 0.02000

10.03(b)5 Days Training for Part Time Instructors @ Rs.

200/- per head per day) Teacher 0.01000

10.04

Training of untrained Teachers to acquire

professional qualifications over a two year

period.

Teacher 0.04700 1299 61.053 1299 61.05300

(b) Head Teachers

10.05Refresher Residencial In-service for 10 days at

BRC level and above

Head

Teacher(c) Resource Persons

10.06

Refresher Training for all Resource

Persons,Master Trainers, BRC & CRC faculty

and Coordinators for 5 days each year (@

Rs.200/- per head per day)

Resource

Person 0.00300 144 0.432 144 0.43200

Sub Total 4833 91.285 4833 91.285

11Academic Support through Block Resource

Centre (BRC)/ URC

11.01 Salary of Faculty and Staff

(a) 5 RPs at BRC for subject specific training in

positionRP 60 60

(b) 2 RPs for CWSN in position RP(b-i) 1 CWSN Resource Person RP 1.10000 22 24.200 22 24.20000

(b-ii) 1 Physiotherapist (Resource person for IE) RP

(c) 1 MIS Coordinator in position RP 1.86000

(d) 1 Datra Entry Operator in position RP 1.74000 12 20.880 12 20.88000

(e) 1 Accountant-cum-support staff in position RP 1.80000 12 21.600 12 21.60000

11.02 Furniture Grant BRC/ URC 1.00000

11.03Replacement of furniture, computer, TLE etc (

Once in 5 years)BRC/ URC 1.00000

11.04 Contingency Grant BRC/ URC 0.50000 12 6.000 12 6.00000

11.05 Meeting, TA BRC/ URC 0.30000 12 3.600 12 3.60000

11.06 TLM Grant BRC/ URC 0.10000

11.07 Maintenance Grant BRC/ URC 0.10000

Sub Total 12 76.280 12 76.28000

12Academic Support through Cluster

Resource Centres (CRC/UERC)

12.01Salary of Cluster Coordinator (on an average of

one Resource Person per 18 schools in a block)RP

12.02 Furniture GrantCRC/

UERC0.10000

12.03Replacement of furniture, computer, TLE etc.

once in 5 years

CRC/

UERC0.10000

12.04 Contingency Grant CRC/UERC 0.10000 115 11.500 115 11.50000

12.05 Meeting, TA CRC/UERC 0.12000 115 13.800 115 13.80000

12.06 TLM Grant CRC/UERC 0.03000

12.07Maintenance Grant

CRC/UERC 0.02000

Sub Total 230 25.300 230 25.30000

13Computer Aided Education in upper

primary schools under Innovation

13.01Computer Aided Education in upper primary

schoolsDistrict 0.01200 48 0.576 48 0.57600

Sub Total 48 0.576 48 0.5760014 Libraries in Schools14.01 (a) Primary School (per school) School 0.03000

14.02 (b) Upper Primary School (per school) School 0.10000

Sub TotalIV ANNUAL GRANTS15 Teachers' Grant15.01 Primary Teachers Teacher 0.0050015.02 Upper Primary Teachers Teacher 0.00500 710 3.550 710 3.55000

Sub Total 710 3.550 710 3.5500016 School Grant16.01 Primary School School 0.05000 1369 68.450 1369 68.4500016.02 Upper Primary School School 0.07000 708 49.560 708 49.56000

Sub Total 2077 118.010 2077 118.01000

Arti:SSA-AWPB-2014-15-PABMinits:Saharanpur:16-06-2014 74 / 533

Page 75: U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 · 2015. 1. 6. · U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15

Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

Name of District : Saharanpur -66

ActivityS. No.Physical

UnitRemarks

Outlay Recommendation for 2014-15

Spill OverDeferred laibility of

2014-15Fresh Recommended Total Recommended

17Research, Evaluation, Monitoring &

Supervision

17.01 REMS Activities School 0.00103 2077 2.136 2077 2.13643

17.02 Monitoring & Supervision School 0.00078 2077 1.629 2077 1.62851

17.03 House Hold Survey (Urban) in Million Plus Cities District 35.00000

Sub Total 4154 3.765 4154 3.7649318 Maintenance Grant

18.01 Maintenance in School having upto3 Classrooms School 0.07500 751 56.325 751 56.32500

18.01a Maintenance Grant School 0.07500 1102 82.650 1102 82.65000Sub Total 1853 138.975 1853 138.97500

VBRIDGING GENDER AND SOCIAL

CATEGORY GAPS

19 Interventions for CWSN (IE)

19.01 Provision for Inclusive Education Child 0.01800 4181 75.258 4181 75.25800

Sub Total 4181 75.258 4181 75.25800

20Innovativation Head up to Rs.50 Lakh per

district

20.01 Girls Education District 0.70000 9 6.300 9 6.30000

20.02 ECCE District20.03 Intervention for SC / ST children District

20.04 Intervention for Minority Community children District 5.750 5.75000

20.05 Intervention for Urban Deprived children District 10.00000

Sub Total 9 12.050 9 12.0500021 SMC/PRI Training

21.01Residential for 6 Resource Person per Block (3

days) (@ Rs.500/-)Blocks 0.09000

21.02Non-residential (3 days training of 6 SMC

members) (@ Rs.100/-)SMC 0.01800 1938 34.884 1938 34.88400

21.02(a)Non-residential (3 days training of 3 Members of

PRI/VECs/LA) (@ Rs.100/-)VEC/ WEC 0.00900

21.03

Seminar/Orientation of SMC Women members

and President/Vice President (@ Rs. 50,000/-

per block)

Blocks 0.50000

Sub Total 1938 34.884 1938 34.88400VI SCHOOL INFRASTRUCTURE22 Civil Works22.01 Primary School (Plain) (New) School 13.1550022.02 Primary School (Hilly/Rocky) (New) School 13.2750022.03 Upper Primary (Plain) (New) School 20.65500

22.04 Upper Primary School (Hilly/Rocky) (New) School 20.77500

22.04aComposite Schools for Urban Areas (Class I-

VIII)School 41.04000

22.05 ACR in lieu of upgraded Upper Primary School Rooms

22.06 Additional class rooms for adding Class VIII Rooms

22.07 Building Less (Pry) School 9.7500022.08 Building Less (UP) School 18.5900022.09 Dilapidated Building (Pry) School 9.7500022.10 Dilapidated Building (UP) School 18.59000

22.11 Additional Class Room (Rural) ( PS+UPS) Rooms 3.45000

22.12 Additional Class Room (Urban) Rooms 3.4500022.13 Additional Class Room (Hill Area)22.14 Toilet/Urinals (PS & UPS) School 0.7000022.15 Separate Girls Toilet (Rural+Urban) School 0.7000022.16 CWSN friendly Toilets School 0.50000

22.17 Drinking Water Facility (for Urban Area Only)) School 0.15000

22.17a Drinking Water Facility (Plain PS & UPS) School 0.15000

22.17b Drinking Water Facility (Hilly/Rocky PS & UPS) School 0.15000

22.18a Boundary Wall PS (Total in Meters x .01105) 0.01749

22.18bBoundary Wall PS (For Gate) @Rs. 7000 x no. of

P.S.School 0.07800

22.18c Boundary Wall UPS (Total in Meters x .01105) 0.01749

22.18dBoundary Wall UPS (For Gate) @Rs. 7000 x no.

of UPSSchool 0.07800

22.19a Electrification in P.S./ Electrical Equipment School 0.11000

22.19b Electrification in U. P.S./ Electrical Equipment School 0.11000

22.20Office-cum-store-cum-Head Teacher's room

(Primary)Rooms

22.21Office-cum-store-cum-Head Teacher's room

(Upper Primary)Rooms

22.22Augumentation of training facility in BRC (one

time)BRC/ URC 5.00000

22.23 Child friendly Elements School 0.25000

22.24 Ramps with Handrails (Barrier Free Elements) School 0.06000

22.25 Handrails in existing Ramps School 0.01000

Arti:SSA-AWPB-2014-15-PABMinits:Saharanpur:16-06-2014 75 / 533

Page 76: U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 · 2015. 1. 6. · U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15

Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

Name of District : Saharanpur -66

ActivityS. No.Physical

UnitRemarks

Outlay Recommendation for 2014-15

Spill OverDeferred laibility of

2014-15Fresh Recommended Total Recommended

22.26 Whole School Develoipment School22.27 Retro-fitting and repairs School

22.28Residential Schools for specific category

of children

(a) Construction of Building including boundary

wall, Water and sanitation facilities, electric

installation (For 100 children)

Building 65.86000

(b) Construction of residential hostel Building 65.86000

(c) Refurnishing unused old buildings Building

22.29

Construction of Hostel in existing Govt UPS

including boundary wall, Water and sanitation

facilities, electric installation etc. (For 50

children)

7.00000

22.30Furniture for Govt. UPS (per child) (@ Rs.500/-

per child enrolled)Child 0.00500

22.31 Major Repairs for Primary School School 0.30000

22.32 Majr Repairs for Upper Primary School School 0.30000

22.33Others (Difference of Civil Wrks

sanctioned in pre.yr.)22.33a Others (Overhead Tank PS) School 0.1200022.33b Others (Overhead Tank UPS) School 0.12000

Sub Total (Civil WOrks)VII PROJECT MANAGEMENT COST23 Management23.01 Management up to 3.5%

(a) Project Management and MIS

(i) DPO ( Salary, Contigency, Consumables,

POL, TA & Computer etc)District 1 109.033 1 109.03340

(ii) EMIS Cell District 1 17.380 1 17.37950Sub Total (a) 1 1 1 126.413 1 126.413

(b) Training of Educational Administrators District

(c) School Mapping and Social Mapping District

Sub Total (23.01)

23.02Learning Enhancement Prog. (LEP) (P & UP) (up

to 2%)District 14.401 14.40050

23.03 Community Mobilization (up to 0.5%) District 1 45.000 1 45.00000

Sub Total (Management) 1 59.401 1 59.40050Total Management Cost 185.813 185.81340Total of SSA (Districs) 4.300 330627 9385.358 330627 9389.658

24 State Component23.01 Management23.02 REMS 0.0044923.03 SIEMAT

Sub Total

STATE SSA TOTAL 4.30000 330627 9385.358 330627 9389.65813

25

KGBV Financial Provision (give

separate costing sheets for different

Models)

Hostel

ANon Recurring One Time Grant (Only

committed liabilities) (Model-I)

25.01 Construction of Building (New)

25.02 Construction of Building KGBV sanctioned earlier

25.02(a) Additional Class Room Rooms 3.45000

25.02(b) Guard Room Rooms 1.32000

25.02(c) Boundary Wall School 5.0200025.03 Boudary Wall (Spillover only)

25.04

Boring/Handpump (Spillover only)

(minimum rates prescribed by State Drinking

Water Department subject to a ceiling of Rs.

1.00 lakhs)

25.05 Electricity /Water charges (Spillover only)

25.05(a) Solar Water Heater & Solar Light 2.97000

25.06Furniture/Equipment (including Kitchen

equipment)3.00000

25.07 TLM and equipment including library books 3.50000

25.08 Bedding (New) 0.75000

25.09 Replacement of Bedding (once in 3 Year) 2 0.75000 2

Subtotal Non Recurring

B Recurring Cost Per Annum (Model-I)

25.10Maintenance per girl student per month @ Rs.

1500/-18.00000 9 162.000 9 162.00000

25.11 Stipend for girl student per month @ Rs. 100/- 1.20000 9 10.800 9 10.80000

25.12Supplementary TLM, stationery and other

educational material @ Rs.1000/- per annum1.00000 9 9.000 9 9.00000

25.13 Salaries

Arti:SSA-AWPB-2014-15-PABMinits:Saharanpur:16-06-2014 76 / 533

Page 77: U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 · 2015. 1. 6. · U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15

Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

Name of District : Saharanpur -66

ActivityS. No.Physical

UnitRemarks

Outlay Recommendation for 2014-15

Spill OverDeferred laibility of

2014-15Fresh Recommended Total Recommended

25.13.1 Additional Salaries:

(a) 1 Warden @ Rs. 25,000/- per month 3.00000 9 27.00000 9 27.00000

(b)4 Full time teachers as per RTE norms @ Rs.

20,000/- per month per teacher 9.60000 9 86.40000 9 86.40000

(c)

1 Urdu Teachers (only for blocks with muslim

population above 20% and select urban areas), if

required @ Rs. 12,000/- per month per teacher 1.44000 9 12.96000 9 12.96000

(d)3 part time teachers @ Rs. 5,000/- per month per

teacher 1.80000 9 16.20000 9 16.20000

(e)1 Full time Accountant @ Rs. 10,000/- per month

1.20000 9 10.80000 9 10.80000

(f)

2 Support Staff – (Accountant/ Assistant, Peon,

Chowkidar) @ Rs. 5,000/- per month per staff 1.20000 9 10.80000 9 10.80000

(g) 1 Head cook @ Rs. 6,000/- per month 0.72000 9 6.48000 9 6.48000

(h)2 Asstt. Cooks @ Rs. 4,500/- per month per cook

1.08000 9 9.72000 9 9.72000

25.14Specific skill training @ Rs.1000/- per child per

annum1.00000 9 9.000 9 9.00000

25.15Electricity/water charges @ Rs.1000/- per child

per annum1.00000 9 9.000 9 9.00000

25.16Medical care/contingencies @ Rs. 1250 per child

per annum1.25000 9 11.250 9 11.25000

25.17 Maintenance @ Rs.750/- per child per annum 0.75000 9 6.750 9 6.75000

25.18

Miscellaneous (Educational Tour/ Exposure Visit

/ Sports Material etc.) @ Rs.750/- per child per

annum

0.75000 9 6.750 9 6.75000

25.19Preparatory camps @ Rs.200/- per child per

annum0.20000 9 1.800 9 1.80000

25.20PTAs/school functions @ Rs.200/- per child per

annum0.20000 9 1.800 9 1.80000

25.21 Provision of Rent @ Rs.6000/- per annum 6.00000

25.21a Provision of Rent (6 months) 3.6000025.21b Provision of Rent (3 months) 1.8000025.21c Rent (Previous Year (2007-2012)

25.22 Capacity building 0.50000 9 4.500 9 4.50000

25.22(a)Physical/ Self Defence Training @ Rs.200/- per

child per annum0.20000 9 1.800 9 1.80000

Subtotal Recurring 9 414.810 9 414.81000

Subtotal (Model-I) 9 414.810 9 414.81000

CNon Recurring One Time Grant (Only

committed liabilities) (Model-II)

25.23 Construction of Building (New)

25.24 Construction of Building KGBV sanctioned earlier

25.24(a) Additional Class Room Rooms 3.45000

25.24(b) Guard Room Rooms 1.32000

25.24(c) Boundary Wall School 5.0200025.25 Boudary Wall (Spillover only)25.26 Boring/Handpump (Spillover only)

25.27 Electricity /Water charges (Spillover only)

25.27(a) Solar Water Heater & Solar Light 2.97000

25.28Furniture/Equipment (including Kitchen

equipment)2.00000

25.29 TLM and equipment including library books 3.00000

25.30 Bedding (New) 0.37500

25.31 Replacement of Bedding (once in 3 Year) 0.37500

Subtotal Non Recurring

D Recurring Cost Per Annum (Model-II)

25.32Maintenance per girl student per month @ Rs.

1500/-9.00000

25.33 Stipend for girl student per month @ Rs. 100/- 0.60000

25.34Supplementary TLM, stationery and other

educational material @ Rs.1000/- per annum0.50000

25.35 Salaries(a) 1 Warden @ Rs. 25,000/- per month 3.00000

(b)3 Full time teachers as per RTE norms @ Rs.

20,000/- per month per teacher 7.20000

(c) 3 part time teachers @ Rs. 5,000/- per month per

teacher 1.80000

(d)1 Full time Accountant @ Rs. 10,000/- per month

1.20000

(e)

2 Support Staff – (Accountant/ Assistant, Peon,

Chowkidar) @ Rs. 5,000/- per month per staff 1.20000

Arti:SSA-AWPB-2014-15-PABMinits:Saharanpur:16-06-2014 77 / 533

Page 78: U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 · 2015. 1. 6. · U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15

Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

Name of District : Saharanpur -66

ActivityS. No.Physical

UnitRemarks

Outlay Recommendation for 2014-15

Spill OverDeferred laibility of

2014-15Fresh Recommended Total Recommended

(f) 1 Head cook @ Rs. 6,000/- per month 0.72000

(g)1 Asstt. Cooks @ Rs. 4,500/- per month per cook

0.54000

25.36Specific skill training @ Rs.1000/- per child per

annum0.50000

25.37Electricity/water charges @ Rs.1000/- per child

per annum0.50000

25.38Medical care/contingencies @ Rs. 1250 per child

per annum0.62500

25.39 Maintenance @ Rs.750/- per child per annum 0.37500

25.40

Miscellaneous (Educational Tour/ Exposure Visit

/ Sports Material etc.) @ Rs.750/- per child per

annum

0.37500

25.41Preparatory camps @ Rs.300/- per child per

annum0.15000

25.42PTAs/school functions @ Rs.300/- per child per

annum0.15000

25.43 Provision of Rent @ Rs.10000/- per annum 5.00000

25.43a Provision of Rent (6 months) 3.6000025.43b Provision of Rent (3 months) 1.8000025.43c Rent (Previous Year (2007-2012)25.44 Capacity building 0.25000

25.44(a)Physical/ Self Defence Training @ Rs.200/- per

child per annum0.10000

Subtotal Recurring

Subtotal (Model-II) Total (KGBV) 9 414.810 9 414.810

DISTRICT GRAND TOTAL (SSA+KGBV) 4.300 330636 9800.168 330636 9804.468

Arti:SSA-AWPB-2014-15-PABMinits:Saharanpur:16-06-2014 78 / 533

Page 79: U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 · 2015. 1. 6. · U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15

Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

I ACCESS

1 Opening of New Schools

1.01 Upgradation of EGS to PSCentres /

School1.02 New PS School

1.03 Upgradation of PS to UPS / New UPS School

1.04 Composite Schools (for Urban Areas) School

1.05Residential Schools for specific category children

(For 100 children)

1.06Residential Hostel (for specific category of

children) (For 50 children)

1.07 Integration of Class V with Primary Schools

1.08Integration of Class VIII with Upper Primary

Schools

2Residential Schools for specific category

of children (For 100 Children)

Total - Residential Schools (For 100

children)

3Residential Hostel for specific category of

children (For 50 Children)

Total - Residential Schools (For 50

children)4 Transport/Escort Facility

4.01

Children in remote habitations with sparse

populations where opening of schools is

unviable

Child 0.03000

4.02

Urban deprived children/children without adult

protection in urban areas where schools are not

opened because availability of land is a problem

Child 0.03000

Sub Total

5Special Training for mainstreaming of Out-

of-School Children

5.03 Non-Residential (Fresh)(a) 12 months Child 0.06000(b) 9 months 0.04500(c) 6 months

(i)Special Training (by Special Instructors-NRBC)-

(1-5) Child 0.03000 372 11.160 372 11.16000

(ii) Special Training (by Special Instructors-NRBC)-

(6-8) Child 0.03000 268 8.040 268 8.04000

(d) 3 months Child 0.01500Sub Total 640 19.200 640 19.20000

Total (Special Training) 640 19.200 640 19.2005(B) House Hold Survey (HHS)

5(B).01 House Hold Survey through SMCHouse

Hold0.00001

Sub TotalII RETENTION6 Free Text Book

6.01Free Text Book (PS) for Parishadiya & Aided

Primary Schools (Workbooks not included)Child 0.00120 94573 113.488 94573 113.48760

6.01a

Free Text Book (PS) for 25% children of Class-1

in Private Recognised Primary Schools of other

Boards (Workbooks not included)

Child 0.00150

6.02 Free Brail Books (PS) 0.00150 101 0.152 101 0.15150

6.03 Free Large Print Books (PS) 0.00150

6.04Free Text Book (UPS) (Workbooks not included)

(Including KGBV Girls)Child 0.00200 38892 77.784 38892 77.78400

6.05 Free Brail Books (UPS) 0.00250 15 0.038 15 0.03750

6.06 Free Large Print Books (PS) 0.00250Sub Total 133581 191.461 133581 191.461

7 Provision of 2 set of Uniforms

7.01 All Girls (Including KGBV Girls) Child 0.00400 112740 450.960 112740 450.96000

7.02 SC Boys Child 0.00400 20725 82.900 20725 82.90000

7.03 ST Boys Child 0.00400

7.04 BPL Boys Child 0.00400 35376 141.504 35376 141.50400

7.05

Free Uniform for 25% children of Class-1 in

Private Recognised Primary Schools of other

Boards

Child0.00400

Sub Total 168841 675.364 168841 675.3647(A) Fee Reimbursement

7(A).01

Fee Reimbursement for Admission of children of

Disadvantaged Group & Weaker Section upto

25% of seats in Class-1 of Private Unaided

Recognised Schools

Child 0.05400

Sub Total

8 Teaching Learning Equipment (TLE)

8.01 TLE - New Primary School 4.80000 0.20000 4.800008.02 TLE - New Upper Primary School 1.50000 0.50000 1.50000

Name of District : Rampur -65

ActivityS. No.Physical

UnitRemarks

Outlay Recommendation for 2014-15

Spill OverDeferred laibility of

2014-15Fresh Recommended Total Recommended

Arti:SSA-AWPB-2014-15-PABMinits:Rampur:16-06-2014 79 / 533

Page 80: U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 · 2015. 1. 6. · U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15

Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

Name of District : Rampur -65

ActivityS. No.Physical

UnitRemarks

Outlay Recommendation for 2014-15

Spill OverDeferred laibility of

2014-15Fresh Recommended Total Recommended

Sub Total 6.30000 6.30000III ENHANCING QUALITY9 New Teachers Salary

9.01 Primary Teachers (Regular) (Asstt. Teacher) Teacher 0.91500

9.01aHead Teacher for Primary (if the number of

children exceeds 150 in a school)Teacher

9.02 Primary Teachers (Contract) (S.M.) Teacher

9.03Subject specific Upper Primary Teachers

(Regular) (a) Science and Mathematics Teacher 1.26000(b) Social Studies Teacher 1.26000(c) Languages Teacher 1.26000

Sub Total (9.01 to 9.05)Add.Teacher against PTR

Sub Total (9.06 to 9.12)

Total (New Teacher's Salary-9.01 to 9.12)

Teachers Salary (Recurring-sanctioned

earlier)Primary teachers

9.13 Primary Teachers ( Regular)-Existing, in position Teacher 3.66000 595 2177.700 595 2177.70000

9.14Primary Teachers (Contract)-Existing, in

positionTeacher 0.55000

9.14(a) Primary Teachers (Contract)-under Training Teacher 0.38500 1586 610.610 1586 610.61000

9.14(b)Primary Teacher (Para Teachers Equal to

9.14(a) upgraded as Teachers)0.38500 489 188.265 489 188.26500

9.14(c) Primary Teachers (Para)- Vacant Teacher9.15 Primary Teachers (Vacant) Teacher 0.30500

9.16Head Teacher for Primary (if the number of

children exceeds 150)Teacher 5.04000 175 882.000 175 882.00000

9.16(b)Head Teacher for Primary (if the number of

children exceeds 150) VacantTeacher 0.42000

Additional teachers

9.17Additional Teachers - PS (Special BTC-

Regular) in positionTeacher 0.30500

9.18Additional Teachers - PS (Special BTC Under

Training)Teacher 0.87600

9.19 Additional Teachers - PS (Vacant) Teacher

9.20Others in position (Para Teachers upgraded

as Teachers)Teacher

Upper Primary teachers

9.21 UP Teachers (Regular)-Existing Teacher 5.04000 536 2701.440 536 2701.44000

9.22 UP Teachers (Contract)-Existing9.23 UP Teachers (Vacant) Teacher 1.26000

9.24Head Teacher for Upper Primary (if the number

of children exceeds 100)-ExistingTeacher 5.34000 352 1879.680 352 1879.68000

9.24a Head Teacher for Upper Primary (Vacant) Teacher 1.33500

9.25Subject specific Upper Primary Teachers

(Regular)(a) Science and Mathematics(b) Social Studies(c) Languages

9.32 Part Time Instructors in position(a) Art Education 0.77000 50 38.500 50 38.50000(b) Health and Physical Education 0.77000 79 60.830 79 60.83000(c) Work Education 0.77000 54 41.580 54 41.58000

9.32(A) Part Time Instructors Vacant(a) Art Education 0.42000(b) Health and Physical Education 0.42000(c) Work Education 0.42000

9.33

Others-Incentive to Teachers in Schools

Located in Naxal Affected Areas (@

Rs.1500/- per teachers per month)

Sub Total (9.13 to 9.33) 3916 8580.605 3916 8580.61TOTAL

(New Teachers Salary +Teachers Salary

Recurring)

3916 8580.605 3916 8580.60500

10 Teachers Training(a) Teachers

10.01

Refresher In-service Teachers' Training at BRC

level and above - 10 days (@ Rs.200/- per

head per day)

Teacher

(Target &

Ach.-13-14

in

Mandays)

0.00600

10.01(a)Continuous and Comprehensive Evauation [PS +

UPS)Teacher 0.01300 1286 16.718 1286 16.71800

10.01(b) Eary Reading and Numeracy Skills [PS] Teacher 0.00500 1286 6.430 1286 6.43000

10.01(c) Science [UPS] Teacher 0.00800 717 5.736 717 5.73600Recommended as

proposed

10.01(d) CWSN Teacher 0.00400

Arti:SSA-AWPB-2014-15-PABMinits:Rampur:16-06-2014 80 / 533

Page 81: U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 · 2015. 1. 6. · U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15

Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

Name of District : Rampur -65

ActivityS. No.Physical

UnitRemarks

Outlay Recommendation for 2014-15

Spill OverDeferred laibility of

2014-15Fresh Recommended Total Recommended

10.02

One day monthly cluster level meetings and

peer group training sessions for 10 months for

all teachers each year at CRC level - 10 days (@

Rs.100/- per head per day)

Teacher 0.01000

10.03(a)

Induction Training for Newly Recruited Teachers

for 6 Months (Special BTC)- @Rs.2000/- per

head per year

Teacher 0.02000

10.03(b)5 Days Training for Part Time Instructors @ Rs.

200/- per head per day) Teacher 0.01000

10.04

Training of untrained Teachers to acquire

professional qualifications over a two year

period.

Teacher 0.04700 1266 59.502 1266 59.50200

(b) Head Teachers

10.05Refresher Residencial In-service for 10 days at

BRC level and above

Head

Teacher(c) Resource Persons

10.06

Refresher Training for all Resource

Persons,Master Trainers, BRC & CRC faculty

and Coordinators for 5 days each year (@

Rs.200/- per head per day)

Resource

Person 0.00300 84 0.252 84 0.25200

Sub Total 4639 88.638 4639 88.638

11Academic Support through Block Resource

Centre (BRC)/ URC

11.01 Salary of Faculty and Staff

(a) 5 RPs at BRC for subject specific training in

positionRP 35 35

(b) 2 RPs for CWSN in position RP(b-i) 1 CWSN Resource Person RP 1.10000 14 15.400 14 15.40000

(b-ii) 1 Physiotherapist (Resource person for IE) RP

(c) 1 MIS Coordinator in position RP 1.86000

(d) 1 Datra Entry Operator in position RP 1.74000 7 12.180 7 12.18000

(e) 1 Accountant-cum-support staff in position RP 1.80000 7 12.600 7 12.60000

11.02 Furniture Grant BRC/ URC 1.00000

11.03Replacement of furniture, computer, TLE etc (

Once in 5 years)BRC/ URC 1.00000

11.04 Contingency Grant BRC/ URC 0.50000 7 3.500 7 3.50000

11.05 Meeting, TA BRC/ URC 0.30000 7 2.100 7 2.10000

11.06 TLM Grant BRC/ URC 0.10000

11.07 Maintenance Grant BRC/ URC 0.10000

Sub Total 7 45.780 7 45.78000

12Academic Support through Cluster

Resource Centres (CRC/UERC)

12.01Salary of Cluster Coordinator (on an average of

one Resource Person per 18 schools in a block)RP

12.02 Furniture GrantCRC/

UERC0.10000

12.03Replacement of furniture, computer, TLE etc.

once in 5 years

CRC/

UERC0.10000

12.04 Contingency Grant CRC/UERC 0.10000 76 7.600 76 7.60000

12.05 Meeting, TA CRC/UERC 0.12000 76 9.120 76 9.12000

12.06 TLM Grant CRC/UERC 0.03000

12.07Maintenance Grant

CRC/UERC 0.02000

Sub Total 152 16.720 152 16.72000

13Computer Aided Education in upper

primary schools under Innovation

13.01Computer Aided Education in upper primary

schoolsDistrict 0.01200 48 0.576 48 0.57600

Sub Total 48 0.576 48 0.5760014 Libraries in Schools14.01 (a) Primary School (per school) School 0.03000

14.02 (b) Upper Primary School (per school) School 0.10000

Sub TotalIV ANNUAL GRANTS15 Teachers' Grant15.01 Primary Teachers Teacher 0.0050015.02 Upper Primary Teachers Teacher 0.00500 717 3.585 717 3.58500

Sub Total 717 3.585 717 3.5850016 School Grant16.01 Primary School School 0.05000 1344 67.200 1344 67.2000016.02 Upper Primary School School 0.07000 717 50.190 717 50.19000

Sub Total 2061 117.390 2061 117.39000

Arti:SSA-AWPB-2014-15-PABMinits:Rampur:16-06-2014 81 / 533

Page 82: U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 · 2015. 1. 6. · U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15

Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

Name of District : Rampur -65

ActivityS. No.Physical

UnitRemarks

Outlay Recommendation for 2014-15

Spill OverDeferred laibility of

2014-15Fresh Recommended Total Recommended

17Research, Evaluation, Monitoring &

Supervision

17.01 REMS Activities School 0.00103 2061 2.120 2061 2.11997

17.02 Monitoring & Supervision School 0.00078 2061 1.616 2061 1.61596

17.03 House Hold Survey (Urban) in Million Plus Cities District 35.00000

Sub Total 4122 3.736 4122 3.7359318 Maintenance Grant

18.01 Maintenance in School having upto3 Classrooms School 0.07500 309 23.175 309 23.17500

18.01a Maintenance Grant School 0.07500 1636 122.700 1636 122.70000Sub Total 1945 145.875 1945 145.87500

VBRIDGING GENDER AND SOCIAL

CATEGORY GAPS

19 Interventions for CWSN (IE)

19.01 Provision for Inclusive Education Child 0.01900 4136 78.584 4136 78.58400

Sub Total 4136 78.584 4136 78.58400

20Innovativation Head up to Rs.50 Lakh per

district

20.01 Girls Education District 0.70000 7 4.900 7 4.90000

20.02 ECCE District20.03 Intervention for SC / ST children District

20.04 Intervention for Minority Community children District 3.800 3.80000

20.05 Intervention for Urban Deprived children District 10.00000

Sub Total 7 8.700 7 8.7000021 SMC/PRI Training

21.01Residential for 6 Resource Person per Block (3

days) (@ Rs.500/-)Blocks 0.09000

21.02Non-residential (3 days training of 6 SMC

members) (@ Rs.100/-)SMC 0.01800 1976 35.568 1976 35.56800

21.02(a)Non-residential (3 days training of 3 Members of

PRI/VECs/LA) (@ Rs.100/-)VEC/ WEC 0.00900

21.03

Seminar/Orientation of SMC Women members

and President/Vice President (@ Rs. 50,000/-

per block)

Blocks 0.50000

Sub Total 1976 35.568 1976 35.56800VI SCHOOL INFRASTRUCTURE22 Civil Works22.01 Primary School (Plain) (New) School 25.30710 13.15500 25.3071022.02 Primary School (Hilly/Rocky) (New) School 13.2750022.03 Upper Primary (Plain) (New) School 20.65500

22.04 Upper Primary School (Hilly/Rocky) (New) School 20.77500

22.04aComposite Schools for Urban Areas (Class I-

VIII)School 41.04000

22.05 ACR in lieu of upgraded Upper Primary School Rooms

22.06 Additional class rooms for adding Class VIII Rooms

22.07 Building Less (Pry) School 9.7500022.08 Building Less (UP) School 18.5900022.09 Dilapidated Building (Pry) School 9.7500022.10 Dilapidated Building (UP) School 18.59000

22.11 Additional Class Room (Rural) ( PS+UPS) Rooms 3.45000

22.12 Additional Class Room (Urban) Rooms 3.4500022.13 Additional Class Room (Hill Area)22.14 Toilet/Urinals (PS & UPS) School 0.7000022.15 Separate Girls Toilet (Rural+Urban) School 0.7000022.16 CWSN friendly Toilets School 0.50000

22.17 Drinking Water Facility (for Urban Area Only)) School 0.15000

22.17a Drinking Water Facility (Plain PS & UPS) School 0.15000

22.17b Drinking Water Facility (Hilly/Rocky PS & UPS) School 0.15000

22.18a Boundary Wall PS (Total in Meters x .01105) 0.01749

22.18bBoundary Wall PS (For Gate) @Rs. 7000 x no. of

P.S.School 0.07800

22.18c Boundary Wall UPS (Total in Meters x .01105) 0.01749

22.18dBoundary Wall UPS (For Gate) @Rs. 7000 x no.

of UPSSchool 0.07800

22.19a Electrification in P.S./ Electrical Equipment School 0.11000

22.19b Electrification in U. P.S./ Electrical Equipment School 0.11000

22.20Office-cum-store-cum-Head Teacher's room

(Primary)Rooms

22.21Office-cum-store-cum-Head Teacher's room

(Upper Primary)Rooms

22.22Augumentation of training facility in BRC (one

time)BRC/ URC 5.00000

22.23 Child friendly Elements School 0.25000

22.24 Ramps with Handrails (Barrier Free Elements) School 0.06000

22.25 Handrails in existing Ramps School 0.01000

Arti:SSA-AWPB-2014-15-PABMinits:Rampur:16-06-2014 82 / 533

Page 83: U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 · 2015. 1. 6. · U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15

Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

Name of District : Rampur -65

ActivityS. No.Physical

UnitRemarks

Outlay Recommendation for 2014-15

Spill OverDeferred laibility of

2014-15Fresh Recommended Total Recommended

22.26 Whole School Develoipment School22.27 Retro-fitting and repairs School

22.28Residential Schools for specific category

of children

(a) Construction of Building including boundary

wall, Water and sanitation facilities, electric

installation (For 100 children)

Building 65.86000

(b) Construction of residential hostel Building 65.86000

(c) Refurnishing unused old buildings Building

22.29

Construction of Hostel in existing Govt UPS

including boundary wall, Water and sanitation

facilities, electric installation etc. (For 50

children)

7.00000

22.30Furniture for Govt. UPS (per child) (@ Rs.500/-

per child enrolled)Child 0.00500

22.31 Major Repairs for Primary School School 0.30000

22.32 Majr Repairs for Upper Primary School School 0.30000

22.33Others (Difference of Civil Wrks

sanctioned in pre.yr.)22.33a Others (Overhead Tank PS) School 0.1200022.33b Others (Overhead Tank UPS) School 0.12000

Sub Total (Civil WOrks) 25.31 25.31VII PROJECT MANAGEMENT COST23 Management23.01 Management up to 3.5%

(a) Project Management and MIS

(i) DPO ( Salary, Contigency, Consumables,

POL, TA & Computer etc)District 1 113.273 1 113.27310

(ii) EMIS Cell District 1 12.359 1 12.35850Sub Total (a) 1 1 1 125.632 1 125.632

(b) Training of Educational Administrators District

(c) School Mapping and Social Mapping District

Sub Total (23.01)

23.02Learning Enhancement Prog. (LEP) (P & UP) (up

to 2%)District 13.393 13.39325

23.03 Community Mobilization (up to 0.5%) District 1 50.000 1 50.00000

Sub Total (Management) 1 63.393 1 63.39325Total Management Cost 189.025 189.02485Total of SSA (Districs) 25.307 6.300 326788 10200.806 326788 10232.413

24 State Component23.01 Management23.02 REMS 0.0044923.03 SIEMAT

Sub Total

STATE SSA TOTAL 25.30710 6.30000 326788 10200.806 326788 10232.41348

25

KGBV Financial Provision (give

separate costing sheets for different

Models)

Hostel

ANon Recurring One Time Grant (Only

committed liabilities) (Model-I)

25.01 Construction of Building (New)

25.02 Construction of Building KGBV sanctioned earlier

25.02(a) Additional Class Room Rooms 3.45000

25.02(b) Guard Room Rooms 1.32000

25.02(c) Boundary Wall School 5.0200025.03 Boudary Wall (Spillover only) 10.50000 10.50000

25.04

Boring/Handpump (Spillover only)

(minimum rates prescribed by State Drinking

Water Department subject to a ceiling of Rs.

1.00 lakhs)

25.05 Electricity /Water charges (Spillover only)

25.05(a) Solar Water Heater & Solar Light 2.97000

25.06Furniture/Equipment (including Kitchen

equipment)3.00000

25.07 TLM and equipment including library books 3.50000

25.08 Bedding (New) 0.75000

25.09 Replacement of Bedding (once in 3 Year) 0.75000 7 5.250 7 5.25000

Subtotal Non Recurring 10.50000 5.250 15.75000

B Recurring Cost Per Annum (Model-I)

25.10Maintenance per girl student per month @ Rs.

1500/-18.00000 7 126.000 7 126.00000

25.11 Stipend for girl student per month @ Rs. 100/- 1.20000 7 8.400 7 8.40000

25.12Supplementary TLM, stationery and other

educational material @ Rs.1000/- per annum1.00000 7 7.000 7 7.00000

25.13 Salaries

Arti:SSA-AWPB-2014-15-PABMinits:Rampur:16-06-2014 83 / 533

Page 84: U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 · 2015. 1. 6. · U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15

Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

Name of District : Rampur -65

ActivityS. No.Physical

UnitRemarks

Outlay Recommendation for 2014-15

Spill OverDeferred laibility of

2014-15Fresh Recommended Total Recommended

25.13.1 Additional Salaries:

(a) 1 Warden @ Rs. 25,000/- per month 3.00000 7 21.00000 7 21.00000

(b)4 Full time teachers as per RTE norms @ Rs.

20,000/- per month per teacher 9.60000 7 67.20000 7 67.20000

(c)

1 Urdu Teachers (only for blocks with muslim

population above 20% and select urban areas), if

required @ Rs. 12,000/- per month per teacher 1.44000 7 10.08000 7 10.08000

(d)3 part time teachers @ Rs. 5,000/- per month per

teacher 1.80000 7 12.60000 7 12.60000

(e)1 Full time Accountant @ Rs. 10,000/- per month

1.20000 7 8.40000 7 8.40000

(f)

2 Support Staff – (Accountant/ Assistant, Peon,

Chowkidar) @ Rs. 5,000/- per month per staff 1.20000 7 8.40000 7 8.40000

(g) 1 Head cook @ Rs. 6,000/- per month 0.72000 7 5.04000 7 5.04000

(h)2 Asstt. Cooks @ Rs. 4,500/- per month per cook

1.08000 7 7.56000 7 7.56000

25.14Specific skill training @ Rs.1000/- per child per

annum1.00000 7 7.000 7 7.00000

25.15Electricity/water charges @ Rs.1000/- per child

per annum1.00000 7 7.000 7 7.00000

25.16Medical care/contingencies @ Rs. 1250 per child

per annum1.25000 7 8.750 7 8.75000

25.17 Maintenance @ Rs.750/- per child per annum 0.75000 7 5.250 7 5.25000

25.18

Miscellaneous (Educational Tour/ Exposure Visit

/ Sports Material etc.) @ Rs.750/- per child per

annum

0.75000 7 5.250 7 5.25000

25.19Preparatory camps @ Rs.200/- per child per

annum0.20000 7 1.400 7 1.40000

25.20PTAs/school functions @ Rs.200/- per child per

annum0.20000 7 1.400 7 1.40000

25.21 Provision of Rent @ Rs.6000/- per annum 6.00000

25.21a Provision of Rent (6 months) 3.6000025.21b Provision of Rent (3 months) 1.8000025.21c Rent (Previous Year (2007-2012)

25.22 Capacity building 0.50000 7 3.500 7 3.50000

25.22(a)Physical/ Self Defence Training @ Rs.200/- per

child per annum0.20000 7 1.400 7 1.40000

Subtotal Recurring 7 322.630 7 322.63000

Subtotal (Model-I) 10.50000 7 327.880 7 338.38000

CNon Recurring One Time Grant (Only

committed liabilities) (Model-II)

25.23 Construction of Building (New)

25.24 Construction of Building KGBV sanctioned earlier

25.24(a) Additional Class Room Rooms 3.45000

25.24(b) Guard Room Rooms 1.32000

25.24(c) Boundary Wall School 5.0200025.25 Boudary Wall (Spillover only)25.26 Boring/Handpump (Spillover only)

25.27 Electricity /Water charges (Spillover only)

25.27(a) Solar Water Heater & Solar Light 2.97000

25.28Furniture/Equipment (including Kitchen

equipment)2.00000

25.29 TLM and equipment including library books 3.00000

25.30 Bedding (New) 0.37500

25.31 Replacement of Bedding (once in 3 Year) 0.37500

Subtotal Non Recurring

D Recurring Cost Per Annum (Model-II)

25.32Maintenance per girl student per month @ Rs.

1500/-9.00000

25.33 Stipend for girl student per month @ Rs. 100/- 0.60000

25.34Supplementary TLM, stationery and other

educational material @ Rs.1000/- per annum0.50000

25.35 Salaries(a) 1 Warden @ Rs. 25,000/- per month 3.00000

(b)3 Full time teachers as per RTE norms @ Rs.

20,000/- per month per teacher 7.20000

(c) 3 part time teachers @ Rs. 5,000/- per month per

teacher 1.80000

(d)1 Full time Accountant @ Rs. 10,000/- per month

1.20000

(e)

2 Support Staff – (Accountant/ Assistant, Peon,

Chowkidar) @ Rs. 5,000/- per month per staff 1.20000

Arti:SSA-AWPB-2014-15-PABMinits:Rampur:16-06-2014 84 / 533

Page 85: U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 · 2015. 1. 6. · U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15

Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

Name of District : Rampur -65

ActivityS. No.Physical

UnitRemarks

Outlay Recommendation for 2014-15

Spill OverDeferred laibility of

2014-15Fresh Recommended Total Recommended

(f) 1 Head cook @ Rs. 6,000/- per month 0.72000

(g)1 Asstt. Cooks @ Rs. 4,500/- per month per cook

0.54000

25.36Specific skill training @ Rs.1000/- per child per

annum0.50000

25.37Electricity/water charges @ Rs.1000/- per child

per annum0.50000

25.38Medical care/contingencies @ Rs. 1250 per child

per annum0.62500

25.39 Maintenance @ Rs.750/- per child per annum 0.37500

25.40

Miscellaneous (Educational Tour/ Exposure Visit

/ Sports Material etc.) @ Rs.750/- per child per

annum

0.37500

25.41Preparatory camps @ Rs.300/- per child per

annum0.15000

25.42PTAs/school functions @ Rs.300/- per child per

annum0.15000

25.43 Provision of Rent @ Rs.10000/- per annum 5.00000

25.43a Provision of Rent (6 months) 3.6000025.43b Provision of Rent (3 months) 1.8000025.43c Rent (Previous Year (2007-2012)25.44 Capacity building 0.25000

25.44(a)Physical/ Self Defence Training @ Rs.200/- per

child per annum0.10000

Subtotal Recurring

Subtotal (Model-II) Total (KGBV) 10.500 7 327.880 7 338.380

DISTRICT GRAND TOTAL (SSA+KGBV) 35.807 6.300 326795 10528.686 326795 10570.793

Arti:SSA-AWPB-2014-15-PABMinits:Rampur:16-06-2014 85 / 533

Page 86: U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 · 2015. 1. 6. · U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15

Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

I ACCESS

1 Opening of New Schools

1.01 Upgradation of EGS to PSCentres /

School1.02 New PS School

1.03 Upgradation of PS to UPS / New UPS School

1.04 Composite Schools (for Urban Areas) School

1.05Residential Schools for specific category children

(For 100 children)

1.06Residential Hostel (for specific category of

children) (For 50 children)

1.07 Integration of Class V with Primary Schools

1.08Integration of Class VIII with Upper Primary

Schools

2Residential Schools for specific category

of children (For 100 Children)

Total - Residential Schools (For 100

children)

3Residential Hostel for specific category of

children (For 50 Children)

Total - Residential Schools (For 50

children)4 Transport/Escort Facility

4.01

Children in remote habitations with sparse

populations where opening of schools is

unviable

Child 0.03000

4.02

Urban deprived children/children without adult

protection in urban areas where schools are not

opened because availability of land is a problem

Child 0.03000

Sub Total

5Special Training for mainstreaming of Out-

of-School Children

5.03 Non-Residential (Fresh)(a) 12 months Child 0.06000(b) 9 months 0.04500(c) 6 months

(i)Special Training (by Special Instructors-NRBC)-

(1-5) Child 0.03000 237 7.110 237 7.11000

(ii) Special Training (by Special Instructors-NRBC)-

(6-8) Child 0.03000 498 14.940 498 14.94000

(d) 3 months Child 0.01500Sub Total 735 22.050 735 22.05000

Total (Special Training) 735 22.050 735 22.0505(B) House Hold Survey (HHS)

5(B).01 House Hold Survey through SMCHouse

Hold0.00001

Sub TotalII RETENTION6 Free Text Book

6.01Free Text Book (PS) for Parishadiya & Aided

Primary Schools (Workbooks not included)Child 0.00120 151105 181.326 151105 181.32600

6.01a

Free Text Book (PS) for 25% children of Class-1

in Private Recognised Primary Schools of other

Boards (Workbooks not included)

Child 0.00150

6.02 Free Brail Books (PS) 0.00150 51 0.077 51 0.07650

6.03 Free Large Print Books (PS) 0.00150

6.04Free Text Book (UPS) (Workbooks not included)

(Including KGBV Girls)Child 0.00200 68637 137.274 68637 137.27400

6.05 Free Brail Books (UPS) 0.00250 15 0.038 15 0.03750

6.06 Free Large Print Books (PS) 0.00250Sub Total 219808 318.714 219808 318.714

7 Provision of 2 set of Uniforms

7.01 All Girls (Including KGBV Girls) Child 0.00400 152695 610.780 152695 610.78000

7.02 SC Boys Child 0.00400 67047 268.188 67047 268.18800

7.03 ST Boys Child 0.00400

7.04 BPL Boys Child 0.00400 67689 270.756 67689 270.75600

7.05

Free Uniform for 25% children of Class-1 in

Private Recognised Primary Schools of other

Boards

Child0.00400

Sub Total 287431 1149.724 287431 1149.7247(A) Fee Reimbursement

7(A).01

Fee Reimbursement for Admission of children of

Disadvantaged Group & Weaker Section upto

25% of seats in Class-1 of Private Unaided

Recognised Schools

Child 0.05400

Sub Total

8 Teaching Learning Equipment (TLE)

8.01 TLE - New Primary School 107.60000 0.20000 107.600008.02 TLE - New Upper Primary School 14.00000 0.50000 14.00000

Name of District : RailBareilly -64

ActivityS. No.Physical

UnitRemarks

Outlay Recommendation for 2014-15

Spill OverDeferred laibility of

2014-15Fresh Recommended Total Recommended

Arti:SSA-AWPB-2014-15-PABMinits:RaeBareilly:16-06-2014 86 / 533

Page 87: U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 · 2015. 1. 6. · U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15

Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

Name of District : RailBareilly -64

ActivityS. No.Physical

UnitRemarks

Outlay Recommendation for 2014-15

Spill OverDeferred laibility of

2014-15Fresh Recommended Total Recommended

Sub Total 121.60000 121.60000III ENHANCING QUALITY9 New Teachers Salary

9.01 Primary Teachers (Regular) (Asstt. Teacher) Teacher 0.91500

9.01aHead Teacher for Primary (if the number of

children exceeds 150 in a school)Teacher

9.02 Primary Teachers (Contract) (S.M.) Teacher

9.03Subject specific Upper Primary Teachers

(Regular) (a) Science and Mathematics Teacher 1.26000(b) Social Studies Teacher 1.26000(c) Languages Teacher 1.26000

Sub Total (9.01 to 9.05)Add.Teacher against PTR

Sub Total (9.06 to 9.12)

Total (New Teacher's Salary-9.01 to 9.12)

Teachers Salary (Recurring-sanctioned

earlier)Primary teachers

9.13 Primary Teachers ( Regular)-Existing, in position Teacher 3.66000 297 1087.020 297 1087.02000

9.14Primary Teachers (Contract)-Existing, in

positionTeacher 0.55000

9.14(a) Primary Teachers (Contract)-under Training Teacher 0.38500 1091 420.035 1091 420.03500

9.14(b)Primary Teacher (Para Teachers Equal to

9.14(a) upgraded as Teachers)0.38500 1269 488.565 1269 488.56500

9.14(c) Primary Teachers (Para)- Vacant Teacher9.15 Primary Teachers (Vacant) Teacher 0.30500

9.16Head Teacher for Primary (if the number of

children exceeds 150)Teacher 5.04000 232 1169.280 232 1169.28000

9.16(b)Head Teacher for Primary (if the number of

children exceeds 150) VacantTeacher 0.42000

Additional teachers

9.17Additional Teachers - PS (Special BTC-

Regular) in positionTeacher 0.30500

9.18Additional Teachers - PS (Special BTC Under

Training)Teacher 0.87600

9.19 Additional Teachers - PS (Vacant) Teacher

9.20Others in position (Para Teachers upgraded

as Teachers)Teacher

Upper Primary teachers

9.21 UP Teachers (Regular)-Existing Teacher 5.04000 1064 5362.560 1064 5362.56000

9.22 UP Teachers (Contract)-Existing9.23 UP Teachers (Vacant) Teacher 1.26000

9.24Head Teacher for Upper Primary (if the number

of children exceeds 100)-ExistingTeacher 5.34000 366 1954.440 366 1954.44000

9.24a Head Teacher for Upper Primary (Vacant) Teacher 1.33500

9.25Subject specific Upper Primary Teachers

(Regular)(a) Science and Mathematics(b) Social Studies(c) Languages

9.32 Part Time Instructors in position(a) Art Education 0.77000 217 167.090 217 167.09000(b) Health and Physical Education 0.77000 259 199.430 259 199.43000(c) Work Education 0.77000 184 141.680 184 141.68000

9.32(A) Part Time Instructors Vacant(a) Art Education 0.42000(b) Health and Physical Education 0.42000(c) Work Education 0.42000

9.33

Others-Incentive to Teachers in Schools

Located in Naxal Affected Areas (@

Rs.1500/- per teachers per month)

Sub Total (9.13 to 9.33) 4979 10990.100 4979 10990.10TOTAL

(New Teachers Salary +Teachers Salary

Recurring)

4979 10990.100 4979 10990.10000

10 Teachers Training(a) Teachers

10.01

Refresher In-service Teachers' Training at BRC

level and above - 10 days (@ Rs.200/- per

head per day)

Teacher

(Target &

Ach.-13-14

in

Mandays)

0.00600

10.01(a)Continuous and Comprehensive Evauation [PS +

UPS)Teacher 0.01300 1829 23.777 1829 23.77700

10.01(b) Eary Reading and Numeracy Skills [PS] Teacher 0.00500 1829 9.145 1829 9.14500

10.01(c) Science [UPS] Teacher 0.00800 765 6.120 765 6.12000Recommended as

proposed

10.01(d) CWSN Teacher 0.00400

Arti:SSA-AWPB-2014-15-PABMinits:RaeBareilly:16-06-2014 87 / 533

Page 88: U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 · 2015. 1. 6. · U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15

Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

Name of District : RailBareilly -64

ActivityS. No.Physical

UnitRemarks

Outlay Recommendation for 2014-15

Spill OverDeferred laibility of

2014-15Fresh Recommended Total Recommended

10.02

One day monthly cluster level meetings and

peer group training sessions for 10 months for

all teachers each year at CRC level - 10 days (@

Rs.100/- per head per day)

Teacher 0.01000

10.03(a)

Induction Training for Newly Recruited Teachers

for 6 Months (Special BTC)- @Rs.2000/- per

head per year

Teacher 0.02000

10.03(b)5 Days Training for Part Time Instructors @ Rs.

200/- per head per day) Teacher 0.01000

10.04

Training of untrained Teachers to acquire

professional qualifications over a two year

period.

Teacher 0.04700 1038 48.786 1038 48.78600

(b) Head Teachers

10.05Refresher Residencial In-service for 10 days at

BRC level and above

Head

Teacher(c) Resource Persons

10.06

Refresher Training for all Resource

Persons,Master Trainers, BRC & CRC faculty

and Coordinators for 5 days each year (@

Rs.200/- per head per day)

Resource

Person 0.00300 228 0.684 228 0.68400

Sub Total 5689 88.512 5689 88.512

11Academic Support through Block Resource

Centre (BRC)/ URC

11.01 Salary of Faculty and Staff

(a) 5 RPs at BRC for subject specific training in

positionRP 95 95

(b) 2 RPs for CWSN in position RP(b-i) 1 CWSN Resource Person RP 1.10000 38 41.800 38 41.80000

(b-ii) 1 Physiotherapist (Resource person for IE) RP

(c) 1 MIS Coordinator in position RP 1.86000

(d) 1 Datra Entry Operator in position RP 1.74000

(e) 1 Accountant-cum-support staff in position RP 1.80000 16 28.800 16 28.80000

11.02 Furniture Grant BRC/ URC 1.00000

11.03Replacement of furniture, computer, TLE etc (

Once in 5 years)BRC/ URC 1.00000

11.04 Contingency Grant BRC/ URC 0.50000 19 9.500 19 9.50000

11.05 Meeting, TA BRC/ URC 0.30000 19 5.700 19 5.70000

11.06 TLM Grant BRC/ URC 0.10000

11.07 Maintenance Grant BRC/ URC 0.10000

Sub Total 19 85.800 19 85.80000

12Academic Support through Cluster

Resource Centres (CRC/UERC)

12.01Salary of Cluster Coordinator (on an average of

one Resource Person per 18 schools in a block)RP

12.02 Furniture GrantCRC/

UERC0.10000

12.03Replacement of furniture, computer, TLE etc.

once in 5 years

CRC/

UERC0.10000

12.04 Contingency Grant CRC/UERC 0.10000 156 15.600 156 15.60000

12.05 Meeting, TA CRC/UERC 0.12000 156 18.720 156 18.72000

12.06 TLM Grant CRC/UERC 0.03000

12.07Maintenance Grant

CRC/UERC 0.02000

Sub Total 312 34.320 312 34.32000

13Computer Aided Education in upper

primary schools under Innovation

13.01Computer Aided Education in upper primary

schoolsDistrict 0.01200 48 0.576 48 0.57600

Sub Total 48 0.576 48 0.5760014 Libraries in Schools14.01 (a) Primary School (per school) School 0.03000

14.02 (b) Upper Primary School (per school) School 0.10000

Sub TotalIV ANNUAL GRANTS15 Teachers' Grant15.01 Primary Teachers Teacher 0.0050015.02 Upper Primary Teachers Teacher 0.00500 765 3.825 765 3.82500

Arti:SSA-AWPB-2014-15-PABMinits:RaeBareilly:16-06-2014 88 / 533

Page 89: U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 · 2015. 1. 6. · U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15

Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

Name of District : RailBareilly -64

ActivityS. No.Physical

UnitRemarks

Outlay Recommendation for 2014-15

Spill OverDeferred laibility of

2014-15Fresh Recommended Total Recommended

Sub Total 765 3.825 765 3.8250016 School Grant16.01 Primary School School 0.05000 2171 108.550 2171 108.5500016.02 Upper Primary School School 0.07000 765 53.550 765 53.55000

Sub Total 2936 162.100 2936 162.10000

17Research, Evaluation, Monitoring &

Supervision

17.01 REMS Activities School 0.00103 2936 3.020 2936 3.02001

17.02 Monitoring & Supervision School 0.00078 2936 2.302 2936 2.30202

17.03 House Hold Survey (Urban) in Million Plus Cities District 35.00000

Sub Total 5872 5.322 5872 5.3220318 Maintenance Grant

18.01 Maintenance in School having upto3 Classrooms School 0.07500 1244 93.300 1244 93.30000

18.01a Maintenance Grant School 0.07500 1572 117.900 1572 117.90000Sub Total 2816 211.200 2816 211.20000

VBRIDGING GENDER AND SOCIAL

CATEGORY GAPS

19 Interventions for CWSN (IE)

19.01 Provision for Inclusive Education Child 0.02900 1985 57.565 1985 57.56500

Sub Total 1985 57.565 1985 57.56500

20Innovativation Head up to Rs.50 Lakh per

district

20.01 Girls Education District 0.70000 8 5.600 8 5.60000

20.02 ECCE District20.03 Intervention for SC / ST children District

20.04 Intervention for Minority Community children District

20.05 Intervention for Urban Deprived children District 10.00000

Sub Total 8 5.600 8 5.6000021 SMC/PRI Training

21.01Residential for 6 Resource Person per Block (3

days) (@ Rs.500/-)Blocks 0.09000

21.02Non-residential (3 days training of 6 SMC

members) (@ Rs.100/-)SMC 0.01800 2816 50.688 2816 50.68800

21.02(a)Non-residential (3 days training of 3 Members of

PRI/VECs/LA) (@ Rs.100/-)VEC/ WEC 0.00900

21.03

Seminar/Orientation of SMC Women members

and President/Vice President (@ Rs. 50,000/-

per block)

Blocks 0.50000

Sub Total 2816 50.688 2816 50.68800VI SCHOOL INFRASTRUCTURE22 Civil Works22.01 Primary School (Plain) (New) School 13.1550022.02 Primary School (Hilly/Rocky) (New) School 13.2750022.03 Upper Primary (Plain) (New) School 20.65500

22.04 Upper Primary School (Hilly/Rocky) (New) School 20.77500

22.04aComposite Schools for Urban Areas (Class I-

VIII)School 41.04000

22.05 ACR in lieu of upgraded Upper Primary School Rooms

22.06 Additional class rooms for adding Class VIII Rooms

22.07 Building Less (Pry) School 9.7500022.08 Building Less (UP) School 18.5900022.09 Dilapidated Building (Pry) School 9.7500022.10 Dilapidated Building (UP) School 18.59000

22.11 Additional Class Room (Rural) ( PS+UPS) Rooms 3.45000 636 2194.200 636 2194.20000

22.12 Additional Class Room (Urban) Rooms 3.4500022.13 Additional Class Room (Hill Area)22.14 Toilet/Urinals (PS & UPS) School 0.70000 379 265.300 379 265.3000022.15 Separate Girls Toilet (Rural+Urban) School 0.70000 423 296.100 423 296.1000022.16 CWSN friendly Toilets School 0.50000

22.17 Drinking Water Facility (for Urban Area Only)) School 0.15000

22.17a Drinking Water Facility (Plain PS & UPS) School 0.15000

22.17b Drinking Water Facility (Hilly/Rocky PS & UPS) School 0.15000

22.18a Boundary Wall PS (Total in Meters x .01105) 0.01749

22.18bBoundary Wall PS (For Gate) @Rs. 7000 x no. of

P.S.School 0.07800

22.18c Boundary Wall UPS (Total in Meters x .01105) 0.01749

22.18dBoundary Wall UPS (For Gate) @Rs. 7000 x no.

of UPSSchool 0.07800

22.19a Electrification in P.S./ Electrical Equipment School 0.11000

22.19b Electrification in U. P.S./ Electrical Equipment School 0.11000

22.20Office-cum-store-cum-Head Teacher's room

(Primary)Rooms

22.21Office-cum-store-cum-Head Teacher's room

(Upper Primary)Rooms

Arti:SSA-AWPB-2014-15-PABMinits:RaeBareilly:16-06-2014 89 / 533

Page 90: U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 · 2015. 1. 6. · U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15

Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

Name of District : RailBareilly -64

ActivityS. No.Physical

UnitRemarks

Outlay Recommendation for 2014-15

Spill OverDeferred laibility of

2014-15Fresh Recommended Total Recommended

22.22Augumentation of training facility in BRC (one

time)BRC/ URC 5.00000

22.23 Child friendly Elements School 0.25000

22.24 Ramps with Handrails (Barrier Free Elements) School 0.06000 543 32.580 543 32.58000

22.25 Handrails in existing Ramps School 0.0100022.26 Whole School Develoipment School22.27 Retro-fitting and repairs School

22.28Residential Schools for specific category

of children

(a) Construction of Building including boundary

wall, Water and sanitation facilities, electric

installation (For 100 children)

Building 65.86000

(b) Construction of residential hostel Building 65.86000

(c) Refurnishing unused old buildings Building

22.29

Construction of Hostel in existing Govt UPS

including boundary wall, Water and sanitation

facilities, electric installation etc. (For 50

children)

7.00000

22.30Furniture for Govt. UPS (per child) (@ Rs.500/-

per child enrolled)Child 0.00500

22.31 Major Repairs for Primary School School 0.30000

22.32 Majr Repairs for Upper Primary School School 0.30000

22.33Others (Difference of Civil Wrks

sanctioned in pre.yr.)22.33a Others (Overhead Tank PS) School 0.1200022.33b Others (Overhead Tank UPS) School 0.12000

Sub Total (Civil WOrks) 1981 2788.180 1981 2788.18VII PROJECT MANAGEMENT COST23 Management23.01 Management up to 3.5%

(a) Project Management and MIS

(i) DPO ( Salary, Contigency, Consumables,

POL, TA & Computer etc)District 1 123.861 1 123.86090

(ii) EMIS Cell District 1 20.546 1 20.54600Sub Total (a) 1 1 1 144.407 1 144.407

(b) Training of Educational Administrators District

(c) School Mapping and Social Mapping District

Sub Total (23.01)

23.02Learning Enhancement Prog. (LEP) (P & UP) (up

to 2%)District 21.842 21.84210

23.03 Community Mobilization (up to 0.5%) District 1 60.000 1 60.00000

Sub Total (Management) 1 81.842 1 81.84210Total Management Cost 226.249 226.24900Total of SSA (Districs) 121.600 538200 16200.525 538200 16322.125

24 State Component23.01 Management23.02 REMS 0.0044923.03 SIEMAT

Sub Total

STATE SSA TOTAL ###### 538200 16200.525 538200 16322.12503

25

KGBV Financial Provision (give

separate costing sheets for different

Models)

Hostel

ANon Recurring One Time Grant (Only

committed liabilities) (Model-I)

25.01 Construction of Building (New)

25.02 Construction of Building KGBV sanctioned earlier 0.00000 0.00000

25.02(a) Additional Class Room Rooms 3.45000

25.02(b) Guard Room Rooms 1.32000

25.02(c) Boundary Wall School 5.0200025.03 Boudary Wall (Spillover only)

25.04

Boring/Handpump (Spillover only)

(minimum rates prescribed by State Drinking

Water Department subject to a ceiling of Rs.

1.00 lakhs)

25.05 Electricity /Water charges (Spillover only)

25.05(a) Solar Water Heater & Solar Light 2.97000

25.06Furniture/Equipment (including Kitchen

equipment)3.00000

25.07 TLM and equipment including library books 3.50000

25.08 Bedding (New) 0.75000

25.09 Replacement of Bedding (once in 3 Year) 0.75000 13 9.750 13 9.75000

Subtotal Non Recurring 0.00000 9.750 9.75000

B Recurring Cost Per Annum (Model-I)

25.10Maintenance per girl student per month @ Rs.

1500/-18.00000 16 288.000 16 288.00000

Arti:SSA-AWPB-2014-15-PABMinits:RaeBareilly:16-06-2014 90 / 533

Page 91: U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 · 2015. 1. 6. · U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15

Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

Name of District : RailBareilly -64

ActivityS. No.Physical

UnitRemarks

Outlay Recommendation for 2014-15

Spill OverDeferred laibility of

2014-15Fresh Recommended Total Recommended

25.11 Stipend for girl student per month @ Rs. 100/- 1.20000 16 19.200 16 19.20000

25.12Supplementary TLM, stationery and other

educational material @ Rs.1000/- per annum1.00000 16 16.000 16 16.00000

25.13 Salaries

25.13.1 Additional Salaries:

(a) 1 Warden @ Rs. 25,000/- per month 3.00000 16 48.00000 16 48.00000

(b)4 Full time teachers as per RTE norms @ Rs.

20,000/- per month per teacher 9.60000 16 153.60000 16 153.60000

(c)

1 Urdu Teachers (only for blocks with muslim

population above 20% and select urban areas), if

required @ Rs. 12,000/- per month per teacher 1.44000 16 23.04000 16 23.04000

(d)3 part time teachers @ Rs. 5,000/- per month per

teacher 1.80000 16 28.80000 16 28.80000

(e)1 Full time Accountant @ Rs. 10,000/- per month

1.20000 16 19.20000 16 19.20000

(f)

2 Support Staff – (Accountant/ Assistant, Peon,

Chowkidar) @ Rs. 5,000/- per month per staff 1.20000 16 19.20000 16 19.20000

(g) 1 Head cook @ Rs. 6,000/- per month 0.72000 16 11.52000 16 11.52000

(h)2 Asstt. Cooks @ Rs. 4,500/- per month per cook

1.08000 16 17.28000 16 17.28000

25.14Specific skill training @ Rs.1000/- per child per

annum1.00000 16 16.000 16 16.00000

25.15Electricity/water charges @ Rs.1000/- per child

per annum1.00000 16 16.000 16 16.00000

25.16Medical care/contingencies @ Rs. 1250 per child

per annum1.25000 16 20.000 16 20.00000

25.17 Maintenance @ Rs.750/- per child per annum 0.75000 16 12.000 16 12.00000

25.18

Miscellaneous (Educational Tour/ Exposure Visit

/ Sports Material etc.) @ Rs.750/- per child per

annum

0.75000 16 12.000 16 12.00000

25.19Preparatory camps @ Rs.200/- per child per

annum0.20000 16 3.200 16 3.20000

25.20PTAs/school functions @ Rs.200/- per child per

annum0.20000 16 3.200 16 3.20000

25.21 Provision of Rent @ Rs.6000/- per annum 6.00000

25.21a Provision of Rent (6 months) 3.6000025.21b Provision of Rent (3 months) 1.8000025.21c Rent (Previous Year (2007-2012)

25.22 Capacity building 0.50000 16 8.000 16 8.00000

25.22(a)Physical/ Self Defence Training @ Rs.200/- per

child per annum0.20000 16 3.200 16 3.20000

Subtotal Recurring 16 737.440 16 737.44000

Subtotal (Model-I) 0.00000 16 747.190 16 747.19000

CNon Recurring One Time Grant (Only

committed liabilities) (Model-II)

25.23 Construction of Building (New)

25.24 Construction of Building KGBV sanctioned earlier

25.24(a) Additional Class Room Rooms 3.45000

25.24(b) Guard Room Rooms 1.32000

25.24(c) Boundary Wall School 5.0200025.25 Boudary Wall (Spillover only)25.26 Boring/Handpump (Spillover only)

25.27 Electricity /Water charges (Spillover only)

25.27(a) Solar Water Heater & Solar Light 2.97000

25.28Furniture/Equipment (including Kitchen

equipment)2.00000

25.29 TLM and equipment including library books 3.00000

25.30 Bedding (New) 0.37500

25.31 Replacement of Bedding (once in 3 Year) 0.37500

Subtotal Non Recurring

D Recurring Cost Per Annum (Model-II)

25.32Maintenance per girl student per month @ Rs.

1500/-9.00000

25.33 Stipend for girl student per month @ Rs. 100/- 0.60000

25.34Supplementary TLM, stationery and other

educational material @ Rs.1000/- per annum0.50000

25.35 Salaries(a) 1 Warden @ Rs. 25,000/- per month 3.00000

(b)3 Full time teachers as per RTE norms @ Rs.

20,000/- per month per teacher 7.20000

Arti:SSA-AWPB-2014-15-PABMinits:RaeBareilly:16-06-2014 91 / 533

Page 92: U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 · 2015. 1. 6. · U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15

Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

Name of District : RailBareilly -64

ActivityS. No.Physical

UnitRemarks

Outlay Recommendation for 2014-15

Spill OverDeferred laibility of

2014-15Fresh Recommended Total Recommended

(c) 3 part time teachers @ Rs. 5,000/- per month per

teacher 1.80000

(d)1 Full time Accountant @ Rs. 10,000/- per month

1.20000

(e)

2 Support Staff – (Accountant/ Assistant, Peon,

Chowkidar) @ Rs. 5,000/- per month per staff 1.20000

(f) 1 Head cook @ Rs. 6,000/- per month 0.72000

(g)1 Asstt. Cooks @ Rs. 4,500/- per month per cook

0.54000

25.36Specific skill training @ Rs.1000/- per child per

annum0.50000

25.37Electricity/water charges @ Rs.1000/- per child

per annum0.50000

25.38Medical care/contingencies @ Rs. 1250 per child

per annum0.62500

25.39 Maintenance @ Rs.750/- per child per annum 0.37500

25.40

Miscellaneous (Educational Tour/ Exposure Visit

/ Sports Material etc.) @ Rs.750/- per child per

annum

0.37500

25.41Preparatory camps @ Rs.300/- per child per

annum0.15000

25.42PTAs/school functions @ Rs.300/- per child per

annum0.15000

25.43 Provision of Rent @ Rs.10000/- per annum 5.00000

25.43a Provision of Rent (6 months) 3.6000025.43b Provision of Rent (3 months) 1.8000025.43c Rent (Previous Year (2007-2012)25.44 Capacity building 0.25000

25.44(a)Physical/ Self Defence Training @ Rs.200/- per

child per annum0.10000

Subtotal Recurring

Subtotal (Model-II) Total (KGBV) 0.000 16 747.190 16 747.190

DISTRICT GRAND TOTAL (SSA+KGBV) 0.000 121.600 538216 16947.715 538216 17069.315

Arti:SSA-AWPB-2014-15-PABMinits:RaeBareilly:16-06-2014 92 / 533

Page 93: U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 · 2015. 1. 6. · U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15

Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

I ACCESS

1 Opening of New Schools

1.01 Upgradation of EGS to PSCentres /

School1.02 New PS School

1.03 Upgradation of PS to UPS / New UPS School

1.04 Composite Schools (for Urban Areas) School

1.05Residential Schools for specific category children

(For 100 children)

1.06Residential Hostel (for specific category of

children) (For 50 children)

1.07 Integration of Class V with Primary Schools

1.08Integration of Class VIII with Upper Primary

Schools

2Residential Schools for specific category

of children (For 100 Children)

Total - Residential Schools (For 100

children)

3Residential Hostel for specific category of

children (For 50 Children)

Total - Residential Schools (For 50

children)4 Transport/Escort Facility

4.01

Children in remote habitations with sparse

populations where opening of schools is

unviable

Child 0.03000

4.02

Urban deprived children/children without adult

protection in urban areas where schools are not

opened because availability of land is a problem

Child 0.03000

Sub Total

5Special Training for mainstreaming of Out-

of-School Children

5.03 Non-Residential (Fresh)(a) 12 months Child 0.06000(b) 9 months 0.04500(c) 6 months

(i)Special Training (by Special Instructors-NRBC)-

(1-5) Child 0.03000 99 2.970 99 2.97000

(ii) Special Training (by Special Instructors-NRBC)-

(6-8) Child 0.03000 87 2.610 87 2.61000

(d) 3 months Child 0.01500Sub Total 186 5.580 186 5.58000

Total (Special Training) 186 5.580 186 5.5805(B) House Hold Survey (HHS)

5(B).01 House Hold Survey through SMCHouse

Hold0.00001

Sub TotalII RETENTION6 Free Text Book

6.01Free Text Book (PS) for Parishadiya & Aided

Primary Schools (Workbooks not included)Child 0.00120 148497 178.196 148497 178.19640

6.01a

Free Text Book (PS) for 25% children of Class-1

in Private Recognised Primary Schools of other

Boards (Workbooks not included)

Child 0.00150

6.02 Free Brail Books (PS) 0.00150 57 0.086 57 0.08550

6.03 Free Large Print Books (PS) 0.00150

6.04Free Text Book (UPS) (Workbooks not included)

(Including KGBV Girls)Child 0.00200 71450 142.900 71450 142.90000

6.05 Free Brail Books (UPS) 0.00250 20 0.050 20 0.05000

6.06 Free Large Print Books (PS) 0.00250Sub Total 220024 321.232 220024 321.232

7 Provision of 2 set of Uniforms

7.01 All Girls (Including KGBV Girls) Child 0.00400 166230 664.920 166230 664.92000

7.02 SC Boys Child 0.00400 56305 225.220 56305 225.22000

7.03 ST Boys Child 0.00400

7.04 BPL Boys Child 0.00400 54102 216.408 54102 216.40800

7.05

Free Uniform for 25% children of Class-1 in

Private Recognised Primary Schools of other

Boards

Child0.00400

Sub Total 276637 1106.548 276637 1106.5487(A) Fee Reimbursement

7(A).01

Fee Reimbursement for Admission of children of

Disadvantaged Group & Weaker Section upto

25% of seats in Class-1 of Private Unaided

Recognised Schools

Child 0.05400

Sub Total

8 Teaching Learning Equipment (TLE)

8.01 TLE - New Primary School 66.20000 0.20000 66.200008.02 TLE - New Upper Primary School 5.50000 0.50000 5.50000

Name of District : Pratapgarh -63

ActivityS. No.Physical

UnitRemarks

Outlay Recommendation for 2014-15

Spill OverDeferred laibility of

2014-15Fresh Recommended Total Recommended

Arti:SSA-AWPB-2014-15-PABMinits:Pratapgarh:16-06-2014 93 / 533

Page 94: U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 · 2015. 1. 6. · U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15

Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

Name of District : Pratapgarh -63

ActivityS. No.Physical

UnitRemarks

Outlay Recommendation for 2014-15

Spill OverDeferred laibility of

2014-15Fresh Recommended Total Recommended

Sub Total 71.70000 71.70000III ENHANCING QUALITY9 New Teachers Salary

9.01 Primary Teachers (Regular) (Asstt. Teacher) Teacher 0.91500

9.01aHead Teacher for Primary (if the number of

children exceeds 150 in a school)Teacher

9.02 Primary Teachers (Contract) (S.M.) Teacher

9.03Subject specific Upper Primary Teachers

(Regular) (a) Science and Mathematics Teacher 1.26000(b) Social Studies Teacher 1.26000(c) Languages Teacher 1.26000

Sub Total (9.01 to 9.05)Add.Teacher against PTR

Sub Total (9.06 to 9.12)

Total (New Teacher's Salary-9.01 to 9.12)

Teachers Salary (Recurring-sanctioned

earlier)Primary teachers

9.13 Primary Teachers ( Regular)-Existing, in position Teacher 3.66000 171 625.860 171 625.86000

9.14Primary Teachers (Contract)-Existing, in

positionTeacher 0.55000

9.14(a) Primary Teachers (Contract)-under Training Teacher 0.38500 1337 514.745 1337 514.74500

9.14(b)Primary Teacher (Para Teachers Equal to

9.14(a) upgraded as Teachers)0.38500 1149 442.365 1149 442.36500

9.14(c) Primary Teachers (Para)- Vacant Teacher9.15 Primary Teachers (Vacant) Teacher 0.30500

9.16Head Teacher for Primary (if the number of

children exceeds 150)Teacher 5.04000 235 1184.400 235 1184.40000

9.16(b)Head Teacher for Primary (if the number of

children exceeds 150) VacantTeacher 0.42000

Additional teachers

9.17Additional Teachers - PS (Special BTC-

Regular) in positionTeacher 0.30500

9.18Additional Teachers - PS (Special BTC Under

Training)Teacher 0.87600

9.19 Additional Teachers - PS (Vacant) Teacher

9.20Others in position (Para Teachers upgraded

as Teachers)Teacher

Upper Primary teachers

9.21 UP Teachers (Regular)-Existing Teacher 5.04000 917 4621.680 917 4621.68000

9.22 UP Teachers (Contract)-Existing9.23 UP Teachers (Vacant) Teacher 1.26000

9.24Head Teacher for Upper Primary (if the number

of children exceeds 100)-ExistingTeacher 5.34000 122 651.480 122 651.48000

9.24a Head Teacher for Upper Primary (Vacant) Teacher 1.33500

9.25Subject specific Upper Primary Teachers

(Regular)(a) Science and Mathematics(b) Social Studies(c) Languages

9.32 Part Time Instructors in position(a) Art Education 0.77000 165 127.050 165 127.05000(b) Health and Physical Education 0.77000 186 143.220 186 143.22000(c) Work Education 0.77000 138 106.260 138 106.26000

9.32(A) Part Time Instructors Vacant(a) Art Education 0.42000(b) Health and Physical Education 0.42000(c) Work Education 0.42000

9.33

Others-Incentive to Teachers in Schools

Located in Naxal Affected Areas (@

Rs.1500/- per teachers per month)

Sub Total (9.13 to 9.33) 4420 8417.060 4420 8417.06TOTAL

(New Teachers Salary +Teachers Salary

Recurring)

4420 8417.060 4420 8417.06000

10 Teachers Training(a) Teachers

10.01

Refresher In-service Teachers' Training at BRC

level and above - 10 days (@ Rs.200/- per

head per day)

Teacher

(Target &

Ach.-13-14

in

Mandays)

0.00600

10.01(a)Continuous and Comprehensive Evauation [PS +

UPS)Teacher 0.01300 1968 25.584 1968 25.58400

10.01(b) Eary Reading and Numeracy Skills [PS] Teacher 0.00500 1968 9.840 1968 9.84000

10.01(c) Science [UPS] Teacher 0.00800 841 6.728 841 6.72800Recommended as

proposed

10.01(d) CWSN Teacher 0.00400

Arti:SSA-AWPB-2014-15-PABMinits:Pratapgarh:16-06-2014 94 / 533

Page 95: U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 · 2015. 1. 6. · U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15

Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

Name of District : Pratapgarh -63

ActivityS. No.Physical

UnitRemarks

Outlay Recommendation for 2014-15

Spill OverDeferred laibility of

2014-15Fresh Recommended Total Recommended

10.02

One day monthly cluster level meetings and

peer group training sessions for 10 months for

all teachers each year at CRC level - 10 days (@

Rs.100/- per head per day)

Teacher 0.01000

10.03(a)

Induction Training for Newly Recruited Teachers

for 6 Months (Special BTC)- @Rs.2000/- per

head per year

Teacher 0.02000

10.03(b)5 Days Training for Part Time Instructors @ Rs.

200/- per head per day) Teacher 0.01000

10.04

Training of untrained Teachers to acquire

professional qualifications over a two year

period.

Teacher 0.04700 1195 56.165 1195 56.16500

(b) Head Teachers

10.05Refresher Residencial In-service for 10 days at

BRC level and above

Head

Teacher(c) Resource Persons

10.06

Refresher Training for all Resource

Persons,Master Trainers, BRC & CRC faculty

and Coordinators for 5 days each year (@

Rs.200/- per head per day)

Resource

Person 0.00300 216 0.648 216 0.64800

Sub Total 6188 98.965 6188 98.965

11Academic Support through Block Resource

Centre (BRC)/ URC

11.01 Salary of Faculty and Staff

(a) 5 RPs at BRC for subject specific training in

positionRP 90 90

(b) 2 RPs for CWSN in position RP(b-i) 1 CWSN Resource Person RP 1.10000 36 39.600 36 39.60000

(b-ii) 1 Physiotherapist (Resource person for IE) RP

(c) 1 MIS Coordinator in position RP 1.86000

(d) 1 Datra Entry Operator in position RP 1.74000 18 31.320 18 31.32000

(e) 1 Accountant-cum-support staff in position RP 1.80000 18 32.400 18 32.40000

11.02 Furniture Grant BRC/ URC 1.00000

11.03Replacement of furniture, computer, TLE etc (

Once in 5 years)BRC/ URC 1.00000

11.04 Contingency Grant BRC/ URC 0.50000 18 9.000 18 9.00000

11.05 Meeting, TA BRC/ URC 0.30000 18 5.400 18 5.40000

11.06 TLM Grant BRC/ URC 0.10000

11.07 Maintenance Grant BRC/ URC 0.10000

Sub Total 18 117.720 18 117.72000

12Academic Support through Cluster

Resource Centres (CRC/UERC)

12.01Salary of Cluster Coordinator (on an average of

one Resource Person per 18 schools in a block)RP

12.02 Furniture GrantCRC/

UERC0.10000

12.03Replacement of furniture, computer, TLE etc.

once in 5 years

CRC/

UERC0.10000

12.04 Contingency Grant CRC/UERC 0.10000 172 17.200 172 17.20000

12.05 Meeting, TA CRC/UERC 0.12000 172 20.640 172 20.64000

12.06 TLM Grant CRC/UERC 0.03000

12.07Maintenance Grant

CRC/UERC 0.02000

Sub Total 344 37.840 344 37.84000

13Computer Aided Education in upper

primary schools under Innovation

13.01Computer Aided Education in upper primary

schoolsDistrict 0.01200 48 0.576 48 0.57600

Sub Total 48 0.576 48 0.5760014 Libraries in Schools14.01 (a) Primary School (per school) School 0.03000

14.02 (b) Upper Primary School (per school) School 0.10000

Sub TotalIV ANNUAL GRANTS15 Teachers' Grant15.01 Primary Teachers Teacher 0.0050015.02 Upper Primary Teachers Teacher 0.00500 841 4.205 841 4.20500

Sub Total 841 4.205 841 4.2050016 School Grant16.01 Primary School School 0.05000 2063 103.150 2063 103.1500016.02 Upper Primary School School 0.07000 921 64.470 921 64.47000

Sub Total 2984 167.620 2984 167.62000

Arti:SSA-AWPB-2014-15-PABMinits:Pratapgarh:16-06-2014 95 / 533

Page 96: U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 · 2015. 1. 6. · U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15

Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

Name of District : Pratapgarh -63

ActivityS. No.Physical

UnitRemarks

Outlay Recommendation for 2014-15

Spill OverDeferred laibility of

2014-15Fresh Recommended Total Recommended

17Research, Evaluation, Monitoring &

Supervision

17.01 REMS Activities School 0.00103 2984 3.069 2984 3.06938

17.02 Monitoring & Supervision School 0.00078 2984 2.340 2984 2.33966

17.03 House Hold Survey (Urban) in Million Plus Cities District 35.00000

Sub Total 5968 5.409 5968 5.4090418 Maintenance Grant

18.01 Maintenance in School having upto3 Classrooms School 0.07500 314 23.550 314 23.55000

18.01a Maintenance Grant School 0.07500 2423 181.725 2423 181.72500Sub Total 2737 205.275 2737 205.27500

VBRIDGING GENDER AND SOCIAL

CATEGORY GAPS

19 Interventions for CWSN (IE)

19.01 Provision for Inclusive Education Child 0.01500 6085 91.275 6085 91.27500

Sub Total 6085 91.275 6085 91.27500

20Innovativation Head up to Rs.50 Lakh per

district

20.01 Girls Education District 0.70000 5 3.500 5 3.50000

20.02 ECCE District20.03 Intervention for SC / ST children District

20.04 Intervention for Minority Community children District

20.05 Intervention for Urban Deprived children District 10.00000

Sub Total 5 3.500 5 3.5000021 SMC/PRI Training

21.01Residential for 6 Resource Person per Block (3

days) (@ Rs.500/-)Blocks 0.09000

21.02Non-residential (3 days training of 6 SMC

members) (@ Rs.100/-)SMC 0.01800 2803 50.454 2803 50.45400

21.02(a)Non-residential (3 days training of 3 Members of

PRI/VECs/LA) (@ Rs.100/-)VEC/ WEC 0.00900

21.03

Seminar/Orientation of SMC Women members

and President/Vice President (@ Rs. 50,000/-

per block)

Blocks 0.50000

Sub Total 2803 50.454 2803 50.45400VI SCHOOL INFRASTRUCTURE22 Civil Works22.01 Primary School (Plain) (New) School 13.1550022.02 Primary School (Hilly/Rocky) (New) School 13.2750022.03 Upper Primary (Plain) (New) School 20.65500

22.04 Upper Primary School (Hilly/Rocky) (New) School 20.77500

22.04aComposite Schools for Urban Areas (Class I-

VIII)School 41.04000

22.05 ACR in lieu of upgraded Upper Primary School Rooms

22.06 Additional class rooms for adding Class VIII Rooms

22.07 Building Less (Pry) School 9.7500022.08 Building Less (UP) School 18.5900022.09 Dilapidated Building (Pry) School 9.7500022.10 Dilapidated Building (UP) School 18.59000

22.11 Additional Class Room (Rural) ( PS+UPS) Rooms 3.45000 209 721.050 209 721.05000

22.12 Additional Class Room (Urban) Rooms 3.4500022.13 Additional Class Room (Hill Area)22.14 Toilet/Urinals (PS & UPS) School 0.7000022.15 Separate Girls Toilet (Rural+Urban) School 0.7000022.16 CWSN friendly Toilets School 0.50000

22.17 Drinking Water Facility (for Urban Area Only)) School 0.15000

22.17a Drinking Water Facility (Plain PS & UPS) School 0.15000

22.17b Drinking Water Facility (Hilly/Rocky PS & UPS) School 0.15000

22.18a Boundary Wall PS (Total in Meters x .01105) 0.01749

22.18bBoundary Wall PS (For Gate) @Rs. 7000 x no. of

P.S.School 0.07800

22.18c Boundary Wall UPS (Total in Meters x .01105) 0.01749

22.18dBoundary Wall UPS (For Gate) @Rs. 7000 x no.

of UPSSchool 0.07800

22.19a Electrification in P.S./ Electrical Equipment School 0.11000

22.19b Electrification in U. P.S./ Electrical Equipment School 0.11000

22.20Office-cum-store-cum-Head Teacher's room

(Primary)Rooms

22.21Office-cum-store-cum-Head Teacher's room

(Upper Primary)Rooms

22.22Augumentation of training facility in BRC (one

time)BRC/ URC 5.00000

22.23 Child friendly Elements School 0.25000

22.24 Ramps with Handrails (Barrier Free Elements) School 0.06000

22.25 Handrails in existing Ramps School 0.01000

Arti:SSA-AWPB-2014-15-PABMinits:Pratapgarh:16-06-2014 96 / 533

Page 97: U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 · 2015. 1. 6. · U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15

Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

Name of District : Pratapgarh -63

ActivityS. No.Physical

UnitRemarks

Outlay Recommendation for 2014-15

Spill OverDeferred laibility of

2014-15Fresh Recommended Total Recommended

22.26 Whole School Develoipment School22.27 Retro-fitting and repairs School

22.28Residential Schools for specific category

of children

(a) Construction of Building including boundary

wall, Water and sanitation facilities, electric

installation (For 100 children)

Building 65.86000

(b) Construction of residential hostel Building 65.86000

(c) Refurnishing unused old buildings Building

22.29

Construction of Hostel in existing Govt UPS

including boundary wall, Water and sanitation

facilities, electric installation etc. (For 50

children)

7.00000

22.30Furniture for Govt. UPS (per child) (@ Rs.500/-

per child enrolled)Child 0.00500

22.31 Major Repairs for Primary School School 0.30000

22.32 Majr Repairs for Upper Primary School School 0.30000

22.33Others (Difference of Civil Wrks

sanctioned in pre.yr.)22.33a Others (Overhead Tank PS) School 0.1200022.33b Others (Overhead Tank UPS) School 0.12000

Sub Total (Civil WOrks) 209 721.050 209 721.05VII PROJECT MANAGEMENT COST23 Management23.01 Management up to 3.5%

(a) Project Management and MIS

(i) DPO ( Salary, Contigency, Consumables,

POL, TA & Computer etc)District 1 132.623 1 132.62320

(ii) EMIS Cell District 1 20.960 1 20.96000Sub Total (a) 1 1 1 153.583 1 153.583

(b) Training of Educational Administrators District

(c) School Mapping and Social Mapping District

Sub Total (23.01)

23.02Learning Enhancement Prog. (LEP) (P & UP) (up

to 2%)District 21.312 21.31235

23.03 Community Mobilization (up to 0.5%) District 1 45.850 1 45.85000

Sub Total (Management) 1 67.162 1 67.16235Total Management Cost 220.746 220.74555Total of SSA (Districs) 71.700 529497 11575.054 529497 11646.754

24 State Component23.01 Management23.02 REMS 0.0044923.03 SIEMAT

Sub Total

STATE SSA TOTAL 71.70000 529497 11575.054 529497 11646.75449

25

KGBV Financial Provision (give

separate costing sheets for different

Models)

Hostel

ANon Recurring One Time Grant (Only

committed liabilities) (Model-I)

25.01 Construction of Building (New)

25.02 Construction of Building KGBV sanctioned earlier 118.85000 118.85000

25.02(a) Additional Class Room Rooms 3.45000

25.02(b) Guard Room Rooms 1.32000

25.02(c) Boundary Wall School 5.0200025.03 Boudary Wall (Spillover only)

25.04

Boring/Handpump (Spillover only)

(minimum rates prescribed by State Drinking

Water Department subject to a ceiling of Rs.

1.00 lakhs)

25.05 Electricity /Water charges (Spillover only)

25.05(a) Solar Water Heater & Solar Light 2.97000

25.06Furniture/Equipment (including Kitchen

equipment)3.00000

25.07 TLM and equipment including library books 3.50000

25.08 Bedding (New) 0.75000

25.09 Replacement of Bedding (once in 3 Year) 1 0.75000 10 7.500 11 7.50000

Subtotal Non Recurring 118.85000 7.500 126.35000

B Recurring Cost Per Annum (Model-I)

25.10Maintenance per girl student per month @ Rs.

1500/-18.00000 15 270.000 15 270.00000

25.11 Stipend for girl student per month @ Rs. 100/- 1.20000 15 18.000 15 18.00000

25.12Supplementary TLM, stationery and other

educational material @ Rs.1000/- per annum1.00000 15 15.000 15 15.00000

25.13 Salaries

Arti:SSA-AWPB-2014-15-PABMinits:Pratapgarh:16-06-2014 97 / 533

Page 98: U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 · 2015. 1. 6. · U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15

Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

Name of District : Pratapgarh -63

ActivityS. No.Physical

UnitRemarks

Outlay Recommendation for 2014-15

Spill OverDeferred laibility of

2014-15Fresh Recommended Total Recommended

25.13.1 Additional Salaries:

(a) 1 Warden @ Rs. 25,000/- per month 3.00000 15 45.00000 15 45.00000

(b)4 Full time teachers as per RTE norms @ Rs.

20,000/- per month per teacher 9.60000 15 144.00000 15 144.00000

(c)

1 Urdu Teachers (only for blocks with muslim

population above 20% and select urban areas), if

required @ Rs. 12,000/- per month per teacher 1.44000 15 21.60000 15 21.60000

(d)3 part time teachers @ Rs. 5,000/- per month per

teacher 1.80000 15 27.00000 15 27.00000

(e)1 Full time Accountant @ Rs. 10,000/- per month

1.20000 15 18.00000 15 18.00000

(f)

2 Support Staff – (Accountant/ Assistant, Peon,

Chowkidar) @ Rs. 5,000/- per month per staff 1.20000 15 18.00000 15 18.00000

(g) 1 Head cook @ Rs. 6,000/- per month 0.72000 15 10.80000 15 10.80000

(h)2 Asstt. Cooks @ Rs. 4,500/- per month per cook

1.08000 15 16.20000 15 16.20000

25.14Specific skill training @ Rs.1000/- per child per

annum1.00000 15 15.000 15 15.00000

25.15Electricity/water charges @ Rs.1000/- per child

per annum1.00000 15 15.000 15 15.00000

25.16Medical care/contingencies @ Rs. 1250 per child

per annum1.25000 15 18.750 15 18.75000

25.17 Maintenance @ Rs.750/- per child per annum 0.75000 15 11.250 15 11.25000

25.18

Miscellaneous (Educational Tour/ Exposure Visit

/ Sports Material etc.) @ Rs.750/- per child per

annum

0.75000 15 11.250 15 11.25000

25.19Preparatory camps @ Rs.200/- per child per

annum0.20000 15 3.000 15 3.00000

25.20PTAs/school functions @ Rs.200/- per child per

annum0.20000 15 3.000 15 3.00000

25.21 Provision of Rent @ Rs.6000/- per annum 6.00000

25.21a Provision of Rent (6 months) 3.6000025.21b Provision of Rent (3 months) 1.8000025.21c Rent (Previous Year (2007-2012)

25.22 Capacity building 0.50000 15 7.500 15 7.50000

25.22(a)Physical/ Self Defence Training @ Rs.200/- per

child per annum0.20000 15 3.000 15 3.00000

Subtotal Recurring 15 691.350 15 691.35000

Subtotal (Model-I) 118.85000 15 698.850 15 817.70000

CNon Recurring One Time Grant (Only

committed liabilities) (Model-II)

25.23 Construction of Building (New)

25.24 Construction of Building KGBV sanctioned earlier

25.24(a) Additional Class Room Rooms 3.45000

25.24(b) Guard Room Rooms 1.32000

25.24(c) Boundary Wall School 5.0200025.25 Boudary Wall (Spillover only)25.26 Boring/Handpump (Spillover only)

25.27 Electricity /Water charges (Spillover only)

25.27(a) Solar Water Heater & Solar Light 2.97000

25.28Furniture/Equipment (including Kitchen

equipment)2.00000

25.29 TLM and equipment including library books 3.00000

25.30 Bedding (New) 0.37500

25.31 Replacement of Bedding (once in 3 Year) 0.37500

Subtotal Non Recurring

D Recurring Cost Per Annum (Model-II)

25.32Maintenance per girl student per month @ Rs.

1500/-9.00000

25.33 Stipend for girl student per month @ Rs. 100/- 0.60000

25.34Supplementary TLM, stationery and other

educational material @ Rs.1000/- per annum0.50000

25.35 Salaries(a) 1 Warden @ Rs. 25,000/- per month 3.00000

(b)3 Full time teachers as per RTE norms @ Rs.

20,000/- per month per teacher 7.20000

(c) 3 part time teachers @ Rs. 5,000/- per month per

teacher 1.80000

(d)1 Full time Accountant @ Rs. 10,000/- per month

1.20000

(e)

2 Support Staff – (Accountant/ Assistant, Peon,

Chowkidar) @ Rs. 5,000/- per month per staff 1.20000

Arti:SSA-AWPB-2014-15-PABMinits:Pratapgarh:16-06-2014 98 / 533

Page 99: U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 · 2015. 1. 6. · U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15

Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

Name of District : Pratapgarh -63

ActivityS. No.Physical

UnitRemarks

Outlay Recommendation for 2014-15

Spill OverDeferred laibility of

2014-15Fresh Recommended Total Recommended

(f) 1 Head cook @ Rs. 6,000/- per month 0.72000

(g)1 Asstt. Cooks @ Rs. 4,500/- per month per cook

0.54000

25.36Specific skill training @ Rs.1000/- per child per

annum0.50000

25.37Electricity/water charges @ Rs.1000/- per child

per annum0.50000

25.38Medical care/contingencies @ Rs. 1250 per child

per annum0.62500

25.39 Maintenance @ Rs.750/- per child per annum 0.37500

25.40

Miscellaneous (Educational Tour/ Exposure Visit

/ Sports Material etc.) @ Rs.750/- per child per

annum

0.37500

25.41Preparatory camps @ Rs.300/- per child per

annum0.15000

25.42PTAs/school functions @ Rs.300/- per child per

annum0.15000

25.43 Provision of Rent @ Rs.10000/- per annum 5.00000

25.43a Provision of Rent (6 months) 3.6000025.43b Provision of Rent (3 months) 1.8000025.43c Rent (Previous Year (2007-2012)25.44 Capacity building 0.25000

25.44(a)Physical/ Self Defence Training @ Rs.200/- per

child per annum0.10000

Subtotal Recurring

Subtotal (Model-II) Total (KGBV) 118.850 15 698.850 15 817.700

DISTRICT GRAND TOTAL (SSA+KGBV) 118.850 71.700 529512 12273.904 529512 12464.454

Arti:SSA-AWPB-2014-15-PABMinits:Pratapgarh:16-06-2014 99 / 533

Page 100: U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 · 2015. 1. 6. · U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15

Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

I ACCESS

1 Opening of New Schools

1.01 Upgradation of EGS to PSCentres /

School1.02 New PS School

1.03 Upgradation of PS to UPS / New UPS School

1.04 Composite Schools (for Urban Areas) School

1.05Residential Schools for specific category children

(For 100 children)

1.06Residential Hostel (for specific category of

children) (For 50 children)

1.07 Integration of Class V with Primary Schools

1.08Integration of Class VIII with Upper Primary

Schools

2Residential Schools for specific category

of children (For 100 Children)

Total - Residential Schools (For 100

children)

3Residential Hostel for specific category of

children (For 50 Children)

Total - Residential Schools (For 50

children)4 Transport/Escort Facility

4.01

Children in remote habitations with sparse

populations where opening of schools is

unviable

Child 0.03000

4.02

Urban deprived children/children without adult

protection in urban areas where schools are not

opened because availability of land is a problem

Child 0.03000

Sub Total

5Special Training for mainstreaming of Out-

of-School Children

5.03 Non-Residential (Fresh)(a) 12 months Child 0.06000(b) 9 months 0.04500(c) 6 months

(i)Special Training (by Special Instructors-NRBC)-

(1-5) Child 0.03000 439 13.170 439 13.17000

(ii) Special Training (by Special Instructors-NRBC)-

(6-8) Child 0.03000 193 5.790 193 5.79000

(d) 3 months Child 0.01500Sub Total 632 18.960 632 18.96000

Total (Special Training) 632 18.960 632 18.9605(B) House Hold Survey (HHS)

5(B).01 House Hold Survey through SMCHouse

Hold0.00001

Sub TotalII RETENTION6 Free Text Book

6.01Free Text Book (PS) for Parishadiya & Aided

Primary Schools (Workbooks not included)Child 0.00120 34855 41.826 34855 41.82600

6.01a

Free Text Book (PS) for 25% children of Class-1

in Private Recognised Primary Schools of other

Boards (Workbooks not included)

Child 0.00150

6.02 Free Brail Books (PS) 0.00150 52 0.078 52 0.07800

6.03 Free Large Print Books (PS) 0.00150

6.04Free Text Book (UPS) (Workbooks not included)

(Including KGBV Girls)Child 0.00200 13797 27.594 13797 27.59400

6.05 Free Brail Books (UPS) 0.00250 9 0.023 9 0.02250

6.06 Free Large Print Books (PS) 0.00250Sub Total 48713 69.521 48713 69.521

7 Provision of 2 set of Uniforms

7.01 All Girls (Including KGBV Girls) Child 0.00400 41429 165.716 41429 165.71600

7.02 SC Boys Child 0.00400 7223 28.892 7223 28.89200

7.03 ST Boys Child 0.00400

7.04 BPL Boys Child 0.00400 5610 22.440 5610 22.44000

7.05

Free Uniform for 25% children of Class-1 in

Private Recognised Primary Schools of other

Boards

Child0.00400

Sub Total 54262 217.048 54262 217.0487(A) Fee Reimbursement

7(A).01

Fee Reimbursement for Admission of children of

Disadvantaged Group & Weaker Section upto

25% of seats in Class-1 of Private Unaided

Recognised Schools

Child 0.05400

Sub Total

8 Teaching Learning Equipment (TLE)

8.01 TLE - New Primary School 0.200008.02 TLE - New Upper Primary School 0.50000

Name of District : Prabuddha Nagar

(Shamli) -62

S. No. ActivityPhysical

UnitRemarks

Outlay Recommendation for 2014-15

Spill OverDeferred laibility of

2014-15Fresh Recommended Total Recommended

Arti:SSA-AWPB-2014-15-PABMinits:PrabuddhaNagar(Shamli):16-06-2014 100 / 533

Page 101: U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 · 2015. 1. 6. · U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15

Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

Name of District : Prabuddha Nagar

(Shamli) -62

S. No. ActivityPhysical

UnitRemarks

Outlay Recommendation for 2014-15

Spill OverDeferred laibility of

2014-15Fresh Recommended Total Recommended

Sub TotalIII ENHANCING QUALITY9 New Teachers Salary

9.01 Primary Teachers (Regular) (Asstt. Teacher) Teacher 0.91500

9.01aHead Teacher for Primary (if the number of

children exceeds 150 in a school)Teacher

9.02 Primary Teachers (Contract) (S.M.) Teacher

9.03Subject specific Upper Primary Teachers

(Regular) (a) Science and Mathematics Teacher 1.26000(b) Social Studies Teacher 1.26000(c) Languages Teacher 1.26000

Sub Total (9.01 to 9.05)Add.Teacher against PTR

Sub Total (9.06 to 9.12)

Total (New Teacher's Salary-9.01 to 9.12)

Teachers Salary (Recurring-sanctioned

earlier)Primary teachers

9.13 Primary Teachers ( Regular)-Existing, in position Teacher 3.66000 450 1647.000 450 1647.00000

9.14Primary Teachers (Contract)-Existing, in

positionTeacher 0.55000

9.14(a) Primary Teachers (Contract)-under Training Teacher 0.38500 410 157.850 410 157.85000

9.14(b)Primary Teacher (Para Teachers Equal to

9.14(a) upgraded as Teachers)0.38500 371 142.835 371 142.83500

9.14(c) Primary Teachers (Para)- Vacant Teacher9.15 Primary Teachers (Vacant) Teacher 0.30500

9.16Head Teacher for Primary (if the number of

children exceeds 150)Teacher 5.04000

9.16(b)Head Teacher for Primary (if the number of

children exceeds 150) VacantTeacher 0.42000

Additional teachers

9.17Additional Teachers - PS (Special BTC-

Regular) in positionTeacher 0.30500

9.18Additional Teachers - PS (Special BTC Under

Training)Teacher 0.87600

9.19 Additional Teachers - PS (Vacant) Teacher

9.20Others in position (Para Teachers upgraded

as Teachers)Teacher

Upper Primary teachers

9.21 UP Teachers (Regular)-Existing Teacher 5.04000 72 362.880 72 362.88000

9.22 UP Teachers (Contract)-Existing9.23 UP Teachers (Vacant) Teacher 1.26000

9.24Head Teacher for Upper Primary (if the number

of children exceeds 100)-ExistingTeacher 5.34000 62 331.080 62 331.08000

9.24a Head Teacher for Upper Primary (Vacant) Teacher 1.33500

9.25Subject specific Upper Primary Teachers

(Regular)(a) Science and Mathematics(b) Social Studies(c) Languages

9.32 Part Time Instructors in position(a) Art Education 0.77000 39 30.030 39 30.03000(b) Health and Physical Education 0.77000 38 29.260 38 29.26000(c) Work Education 0.77000 33 25.410 33 25.41000

9.32(A) Part Time Instructors Vacant(a) Art Education 0.42000(b) Health and Physical Education 0.42000(c) Work Education 0.42000

9.33

Others-Incentive to Teachers in Schools

Located in Naxal Affected Areas (@

Rs.1500/- per teachers per month)

Sub Total (9.13 to 9.33) 1475 2726.345 1475 2726.35TOTAL

(New Teachers Salary +Teachers Salary

Recurring)

1475 2726.345 1475 2726.34500

10 Teachers Training(a) Teachers

10.01

Refresher In-service Teachers' Training at BRC

level and above - 10 days (@ Rs.200/- per

head per day)

Teacher

(Target &

Ach.-13-14

in

Mandays)

0.00600

10.01(a)Continuous and Comprehensive Evauation [PS +

UPS)Teacher 0.01300 508 6.604 508 6.60400

10.01(b) Eary Reading and Numeracy Skills [PS] Teacher 0.00500 508 2.540 508 2.54000

10.01(c) Science [UPS] Teacher 0.00800 223 1.784 223 1.78400Recommended as

proposed

10.01(d) CWSN Teacher 0.00400

Arti:SSA-AWPB-2014-15-PABMinits:PrabuddhaNagar(Shamli):16-06-2014 101 / 533

Page 102: U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 · 2015. 1. 6. · U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15

Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

Name of District : Prabuddha Nagar

(Shamli) -62

S. No. ActivityPhysical

UnitRemarks

Outlay Recommendation for 2014-15

Spill OverDeferred laibility of

2014-15Fresh Recommended Total Recommended

10.02

One day monthly cluster level meetings and

peer group training sessions for 10 months for

all teachers each year at CRC level - 10 days (@

Rs.100/- per head per day)

Teacher 0.01000

10.03(a)

Induction Training for Newly Recruited Teachers

for 6 Months (Special BTC)- @Rs.2000/- per

head per year

Teacher 0.02000

10.03(b)5 Days Training for Part Time Instructors @ Rs.

200/- per head per day) Teacher 0.01000

10.04

Training of untrained Teachers to acquire

professional qualifications over a two year

period.

Teacher 0.04700

(b) Head Teachers

10.05Refresher Residencial In-service for 10 days at

BRC level and above

Head

Teacher(c) Resource Persons

10.06

Refresher Training for all Resource

Persons,Master Trainers, BRC & CRC faculty

and Coordinators for 5 days each year (@

Rs.200/- per head per day)

Resource

Person 0.00300 60 0.180 60 0.18000

Sub Total 1299 11.108 1299 11.108

11Academic Support through Block Resource

Centre (BRC)/ URC

11.01 Salary of Faculty and Staff

(a) 5 RPs at BRC for subject specific training in

positionRP 25 25

(b) 2 RPs for CWSN in position RP(b-i) 1 CWSN Resource Person RP 1.10000 10 11.000 10 11.00000

(b-ii) 1 Physiotherapist (Resource person for IE) RP

(c) 1 MIS Coordinator in position RP 1.86000

(d) 1 Datra Entry Operator in position RP 1.74000

(e) 1 Accountant-cum-support staff in position RP 1.80000 5 9.000 5 9.00000

11.02 Furniture Grant BRC/ URC 1.00000

11.03Replacement of furniture, computer, TLE etc (

Once in 5 years)BRC/ URC 1.00000

11.04 Contingency Grant BRC/ URC 0.50000 5 2.500 5 2.50000

11.05 Meeting, TA BRC/ URC 0.30000 5 1.500 5 1.50000

11.06 TLM Grant BRC/ URC 0.10000

11.07 Maintenance Grant BRC/ URC 0.10000

Sub Total 5 24.000 5 24.00000

12Academic Support through Cluster

Resource Centres (CRC/UERC)

12.01Salary of Cluster Coordinator (on an average of

one Resource Person per 18 schools in a block)RP

12.02 Furniture GrantCRC/

UERC0.10000

12.03Replacement of furniture, computer, TLE etc.

once in 5 years

CRC/

UERC0.10000

12.04 Contingency Grant CRC/UERC 0.10000 39 3.900 39 3.90000

12.05 Meeting, TA CRC/UERC 0.12000 39 4.680 39 4.68000

12.06 TLM Grant CRC/UERC 0.03000

12.07Maintenance Grant

CRC/UERC 0.02000

Sub Total 78 8.580 78 8.58000

13Computer Aided Education in upper

primary schools under Innovation

13.01Computer Aided Education in upper primary

schoolsDistrict 0.01200 48 0.576 48 0.57600

Sub Total 48 0.576 48 0.5760014 Libraries in Schools14.01 (a) Primary School (per school) School 0.03000

14.02 (b) Upper Primary School (per school) School 0.10000

Sub TotalIV ANNUAL GRANTS15 Teachers' Grant15.01 Primary Teachers Teacher 0.0050015.02 Upper Primary Teachers Teacher 0.00500 223 1.115 223 1.11500

Sub Total 223 1.115 223 1.1150016 School Grant16.01 Primary School School 0.05000 518 25.900 518 25.9000016.02 Upper Primary School School 0.07000 247 17.290 247 17.29000

Sub Total 765 43.190 765 43.19000

Arti:SSA-AWPB-2014-15-PABMinits:PrabuddhaNagar(Shamli):16-06-2014 102 / 533

Page 103: U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 · 2015. 1. 6. · U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15

Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

Name of District : Prabuddha Nagar

(Shamli) -62

S. No. ActivityPhysical

UnitRemarks

Outlay Recommendation for 2014-15

Spill OverDeferred laibility of

2014-15Fresh Recommended Total Recommended

17Research, Evaluation, Monitoring &

Supervision

17.01 REMS Activities School 0.00103 765 0.787 765 0.78689

17.02 Monitoring & Supervision School 0.00078 765 0.600 765 0.59981

17.03 House Hold Survey (Urban) in Million Plus Cities District 35.00000

Sub Total 1530 1.387 1530 1.3867018 Maintenance Grant

18.01 Maintenance in School having upto3 Classrooms School 0.07500 222 16.650 222 16.65000

18.01a Maintenance Grant School 0.07500 497 37.275 497 37.27500Sub Total 719 53.925 719 53.92500

VBRIDGING GENDER AND SOCIAL

CATEGORY GAPS

19 Interventions for CWSN (IE)

19.01 Provision for Inclusive Education Child 0.03000 586 17.580 586 17.58000

Sub Total 586 17.580 586 17.58000

20Innovativation Head up to Rs.50 Lakh per

district

20.01 Girls Education District 0.70000 7 4.900 7 4.90000

20.02 ECCE District20.03 Intervention for SC / ST children District

20.04 Intervention for Minority Community children District

20.05 Intervention for Urban Deprived children District 10.00000

Sub Total 7 4.900 7 4.9000021 SMC/PRI Training

21.01Residential for 6 Resource Person per Block (3

days) (@ Rs.500/-)Blocks 0.09000

21.02Non-residential (3 days training of 6 SMC

members) (@ Rs.100/-)SMC 0.01800 723 13.014 723 13.01400

21.02(a)Non-residential (3 days training of 3 Members of

PRI/VECs/LA) (@ Rs.100/-)VEC/ WEC 0.00900

21.03

Seminar/Orientation of SMC Women members

and President/Vice President (@ Rs. 50,000/-

per block)

Blocks 0.50000

Sub Total 723 13.014 723 13.01400VI SCHOOL INFRASTRUCTURE22 Civil Works22.01 Primary School (Plain) (New) School 13.1550022.02 Primary School (Hilly/Rocky) (New) School 13.2750022.03 Upper Primary (Plain) (New) School 20.65500

22.04 Upper Primary School (Hilly/Rocky) (New) School 20.77500

22.04aComposite Schools for Urban Areas (Class I-

VIII)School 41.04000

22.05 ACR in lieu of upgraded Upper Primary School Rooms

22.06 Additional class rooms for adding Class VIII Rooms

22.07 Building Less (Pry) School 9.7500022.08 Building Less (UP) School 18.5900022.09 Dilapidated Building (Pry) School 9.7500022.10 Dilapidated Building (UP) School 18.59000

22.11 Additional Class Room (Rural) ( PS+UPS) Rooms 3.45000

22.12 Additional Class Room (Urban) Rooms 3.4500022.13 Additional Class Room (Hill Area)22.14 Toilet/Urinals (PS & UPS) School 0.7000022.15 Separate Girls Toilet (Rural+Urban) School 0.7000022.16 CWSN friendly Toilets School 0.50000

22.17 Drinking Water Facility (for Urban Area Only)) School 0.15000

22.17a Drinking Water Facility (Plain PS & UPS) School 0.15000

22.17b Drinking Water Facility (Hilly/Rocky PS & UPS) School 0.15000

22.18a Boundary Wall PS (Total in Meters x .01105) 0.01749

22.18bBoundary Wall PS (For Gate) @Rs. 7000 x no. of

P.S.School 0.07800

22.18c Boundary Wall UPS (Total in Meters x .01105) 0.01749

22.18dBoundary Wall UPS (For Gate) @Rs. 7000 x no.

of UPSSchool 0.07800

22.19a Electrification in P.S./ Electrical Equipment School 0.11000

22.19b Electrification in U. P.S./ Electrical Equipment School 0.11000

22.20Office-cum-store-cum-Head Teacher's room

(Primary)Rooms

22.21Office-cum-store-cum-Head Teacher's room

(Upper Primary)Rooms

22.22Augumentation of training facility in BRC (one

time)BRC/ URC 5.00000

22.23 Child friendly Elements School 0.25000

22.24 Ramps with Handrails (Barrier Free Elements) School 0.06000

22.25 Handrails in existing Ramps School 0.01000

Arti:SSA-AWPB-2014-15-PABMinits:PrabuddhaNagar(Shamli):16-06-2014 103 / 533

Page 104: U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 · 2015. 1. 6. · U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15

Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

Name of District : Prabuddha Nagar

(Shamli) -62

S. No. ActivityPhysical

UnitRemarks

Outlay Recommendation for 2014-15

Spill OverDeferred laibility of

2014-15Fresh Recommended Total Recommended

22.26 Whole School Develoipment School22.27 Retro-fitting and repairs School

22.28Residential Schools for specific category

of children

(a) Construction of Building including boundary

wall, Water and sanitation facilities, electric

installation (For 100 children)

Building 65.86000

(b) Construction of residential hostel Building 65.86000

(c) Refurnishing unused old buildings Building

22.29

Construction of Hostel in existing Govt UPS

including boundary wall, Water and sanitation

facilities, electric installation etc. (For 50

children)

7.00000

22.30Furniture for Govt. UPS (per child) (@ Rs.500/-

per child enrolled)Child 0.00500

22.31 Major Repairs for Primary School School 0.30000

22.32 Majr Repairs for Upper Primary School School 0.30000

22.33Others (Difference of Civil Wrks

sanctioned in pre.yr.)22.33a Others (Overhead Tank PS) School 0.1200022.33b Others (Overhead Tank UPS) School 0.12000

Sub Total (Civil WOrks)VII PROJECT MANAGEMENT COST23 Management23.01 Management up to 3.5%

(a) Project Management and MIS

(i) DPO ( Salary, Contigency, Consumables,

POL, TA & Computer etc)District 1 105.033 1 105.03280

(ii) EMIS Cell District 1 8.550 1 8.55000Sub Total (a) 1 1 1 113.583 1 113.583

(b) Training of Educational Administrators District

(c) School Mapping and Social Mapping District

Sub Total (23.01)

23.02Learning Enhancement Prog. (LEP) (P & UP) (up

to 2%)District 5.023 5.02260

23.03 Community Mobilization (up to 0.5%) District 1 16.000 1 16.00000

Sub Total (Management) 1 21.023 1 21.02260Total Management Cost 134.605 134.60540Total of SSA (Districs) 111065 3345.854 111065 3345.854

24 State Component23.01 Management23.02 REMS 0.0044923.03 SIEMAT

Sub Total

STATE SSA TOTAL 111065 3345.854 111065 3345.85360

25

KGBV Financial Provision (give

separate costing sheets for different

Models)

Hostel

ANon Recurring One Time Grant (Only

committed liabilities) (Model-I)

25.01 Construction of Building (New)

25.02 Construction of Building KGBV sanctioned earlier

25.02(a) Additional Class Room Rooms 3.45000

25.02(b) Guard Room Rooms 1.32000

25.02(c) Boundary Wall School 5.0200025.03 Boudary Wall (Spillover only) -0.58100 -0.58100

25.04

Boring/Handpump (Spillover only)

(minimum rates prescribed by State Drinking

Water Department subject to a ceiling of Rs.

1.00 lakhs)

2.33100 2.33100

25.05 Electricity /Water charges (Spillover only)

25.05(a) Solar Water Heater & Solar Light 2.97000

25.06Furniture/Equipment (including Kitchen

equipment)3.00000

25.07 TLM and equipment including library books 3.50000

25.08 Bedding (New) 0.75000

25.09 Replacement of Bedding (once in 3 Year) 0.75000 3 2.250 3 2.25000

Subtotal Non Recurring 1.75000 2.250 4.00000

B Recurring Cost Per Annum (Model-I)

25.10Maintenance per girl student per month @ Rs.

1500/-18.00000 3 54.000 3 54.00000

25.11 Stipend for girl student per month @ Rs. 100/- 1.20000 3 3.600 3 3.60000

25.12Supplementary TLM, stationery and other

educational material @ Rs.1000/- per annum1.00000 3 3.000 3 3.00000

25.13 Salaries

Arti:SSA-AWPB-2014-15-PABMinits:PrabuddhaNagar(Shamli):16-06-2014 104 / 533

Page 105: U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 · 2015. 1. 6. · U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15

Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

Name of District : Prabuddha Nagar

(Shamli) -62

S. No. ActivityPhysical

UnitRemarks

Outlay Recommendation for 2014-15

Spill OverDeferred laibility of

2014-15Fresh Recommended Total Recommended

25.13.1 Additional Salaries:

(a) 1 Warden @ Rs. 25,000/- per month 3.00000 3 9.00000 3 9.00000

(b)4 Full time teachers as per RTE norms @ Rs.

20,000/- per month per teacher 9.60000 3 28.80000 3 28.80000

(c)

1 Urdu Teachers (only for blocks with muslim

population above 20% and select urban areas), if

required @ Rs. 12,000/- per month per teacher 1.44000 3 4.32000 3 4.32000

(d)3 part time teachers @ Rs. 5,000/- per month per

teacher 1.80000 3 5.40000 3 5.40000

(e)1 Full time Accountant @ Rs. 10,000/- per month

1.20000 3 3.60000 3 3.60000

(f)

2 Support Staff – (Accountant/ Assistant, Peon,

Chowkidar) @ Rs. 5,000/- per month per staff 1.20000 3 3.60000 3 3.60000

(g) 1 Head cook @ Rs. 6,000/- per month 0.72000 3 2.16000 3 2.16000

(h)2 Asstt. Cooks @ Rs. 4,500/- per month per cook

1.08000 3 3.24000 3 3.24000

25.14Specific skill training @ Rs.1000/- per child per

annum1.00000 3 3.000 3 3.00000

25.15Electricity/water charges @ Rs.1000/- per child

per annum1.00000 3 3.000 3 3.00000

25.16Medical care/contingencies @ Rs. 1250 per child

per annum1.25000 3 3.750 3 3.75000

25.17 Maintenance @ Rs.750/- per child per annum 0.75000 3 2.250 3 2.25000

25.18

Miscellaneous (Educational Tour/ Exposure Visit

/ Sports Material etc.) @ Rs.750/- per child per

annum

0.75000 3 2.250 3 2.25000

25.19Preparatory camps @ Rs.200/- per child per

annum0.20000 3 0.600 3 0.60000

25.20PTAs/school functions @ Rs.200/- per child per

annum0.20000 3 0.600 3 0.60000

25.21 Provision of Rent @ Rs.6000/- per annum 6.00000

25.21a Provision of Rent (6 months) 3.6000025.21b Provision of Rent (3 months) 1.8000025.21c Rent (Previous Year (2007-2012)

25.22 Capacity building 0.50000 3 1.500 3 1.50000

25.22(a)Physical/ Self Defence Training @ Rs.200/- per

child per annum0.20000 3 0.600 3 0.60000

Subtotal Recurring 3 138.270 3 138.27000

Subtotal (Model-I) 1.75000 3 140.520 3 142.27000

CNon Recurring One Time Grant (Only

committed liabilities) (Model-II)

25.23 Construction of Building (New)

25.24 Construction of Building KGBV sanctioned earlier

25.24(a) Additional Class Room Rooms 3.45000

25.24(b) Guard Room Rooms 1.32000

25.24(c) Boundary Wall School 5.0200025.25 Boudary Wall (Spillover only) 0.58100 0.5810025.26 Boring/Handpump (Spillover only)

25.27 Electricity /Water charges (Spillover only)

25.27(a) Solar Water Heater & Solar Light 2.97000

25.28Furniture/Equipment (including Kitchen

equipment)2.00000

25.29 TLM and equipment including library books 3.00000

25.30 Bedding (New) 0.37500

25.31 Replacement of Bedding (once in 3 Year) 0.37500

Subtotal Non Recurring 0.58100 0.58100

D Recurring Cost Per Annum (Model-II)

25.32Maintenance per girl student per month @ Rs.

1500/-9.00000 1 9.000 1 9.00000

25.33 Stipend for girl student per month @ Rs. 100/- 0.60000 1 0.600 1 0.60000

25.34Supplementary TLM, stationery and other

educational material @ Rs.1000/- per annum0.50000 1 0.500 1 0.50000

25.35 Salaries(a) 1 Warden @ Rs. 25,000/- per month 3.00000 1 3.000 1 3.00000

(b)3 Full time teachers as per RTE norms @ Rs.

20,000/- per month per teacher 7.20000 1 7.200 1 7.20000

(c) 3 part time teachers @ Rs. 5,000/- per month per

teacher 1.80000 1 1.800 1 1.80000

(d)1 Full time Accountant @ Rs. 10,000/- per month

1.20000 1 1.200 1 1.20000

(e)

2 Support Staff – (Accountant/ Assistant, Peon,

Chowkidar) @ Rs. 5,000/- per month per staff 1.20000 1 1.200 1 1.20000

Arti:SSA-AWPB-2014-15-PABMinits:PrabuddhaNagar(Shamli):16-06-2014 105 / 533

Page 106: U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 · 2015. 1. 6. · U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15

Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

Name of District : Prabuddha Nagar

(Shamli) -62

S. No. ActivityPhysical

UnitRemarks

Outlay Recommendation for 2014-15

Spill OverDeferred laibility of

2014-15Fresh Recommended Total Recommended

(f) 1 Head cook @ Rs. 6,000/- per month 0.72000 1 0.720 1 0.72000

(g)1 Asstt. Cooks @ Rs. 4,500/- per month per cook

0.54000 1 0.540 1 0.54000

25.36Specific skill training @ Rs.1000/- per child per

annum0.50000 1 0.500 1 0.50000

25.37Electricity/water charges @ Rs.1000/- per child

per annum0.50000 1 0.500 1 0.50000

25.38Medical care/contingencies @ Rs. 1250 per child

per annum0.62500 1 0.625 1 0.62500

25.39 Maintenance @ Rs.750/- per child per annum 0.37500 1 0.375 1 0.37500

25.40

Miscellaneous (Educational Tour/ Exposure Visit

/ Sports Material etc.) @ Rs.750/- per child per

annum

0.37500 1 0.375 1 0.37500

25.41Preparatory camps @ Rs.300/- per child per

annum0.15000 1 0.150 1 0.15000

25.42PTAs/school functions @ Rs.300/- per child per

annum0.15000 1 0.150 1 0.15000

25.43 Provision of Rent @ Rs.10000/- per annum 5.00000

25.43a Provision of Rent (6 months) 3.6000025.43b Provision of Rent (3 months) 1.8000025.43c Rent (Previous Year (2007-2012)25.44 Capacity building 0.25000 1 0.250 1 0.25000

25.44(a)Physical/ Self Defence Training @ Rs.200/- per

child per annum0.10000 1 0.100 1 0.10000

Subtotal Recurring 19.00 28.785 19.00 28.78500

Subtotal (Model-II) 0.58100 19.00 28.785 19.00 29.36600

Total (KGBV) 2.331 22 169.305 22 171.636

DISTRICT GRAND TOTAL (SSA+KGBV) 2.331 111087 3515.159 111087 3517.490

Arti:SSA-AWPB-2014-15-PABMinits:PrabuddhaNagar(Shamli):16-06-2014 106 / 533

Page 107: U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 · 2015. 1. 6. · U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15

Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

I ACCESS

1 Opening of New Schools

1.01 Upgradation of EGS to PSCentres /

School1.02 New PS School

1.03 Upgradation of PS to UPS / New UPS School

1.04 Composite Schools (for Urban Areas) School

1.05Residential Schools for specific category children

(For 100 children)

1.06Residential Hostel (for specific category of

children) (For 50 children)

1.07 Integration of Class V with Primary Schools

1.08Integration of Class VIII with Upper Primary

Schools

2Residential Schools for specific category

of children (For 100 Children)

Total - Residential Schools (For 100

children)

3Residential Hostel for specific category of

children (For 50 Children)

Total - Residential Schools (For 50

children)4 Transport/Escort Facility

4.01

Children in remote habitations with sparse

populations where opening of schools is

unviable

Child 0.03000

4.02

Urban deprived children/children without adult

protection in urban areas where schools are not

opened because availability of land is a problem

Child 0.03000

Sub Total

5Special Training for mainstreaming of Out-

of-School Children

5.03 Non-Residential (Fresh)(a) 12 months Child 0.06000(b) 9 months 0.04500(c) 6 months

(i)Special Training (by Special Instructors-NRBC)-

(1-5) Child 0.03000 342 10.260 342 10.26000

(ii) Special Training (by Special Instructors-NRBC)-

(6-8) Child 0.03000 45 1.350 45 1.35000

(d) 3 months Child 0.01500Sub Total 387 11.610 387 11.61000

Total (Special Training) 387 11.610 387 11.6105(B) House Hold Survey (HHS)

5(B).01 House Hold Survey through SMCHouse

Hold0.00001

Sub TotalII RETENTION6 Free Text Book

6.01Free Text Book (PS) for Parishadiya & Aided

Primary Schools (Workbooks not included)Child 0.00120 97032 116.438 97032 116.43840

6.01a

Free Text Book (PS) for 25% children of Class-1

in Private Recognised Primary Schools of other

Boards (Workbooks not included)

Child 0.00150

6.02 Free Brail Books (PS) 0.00150 103 0.155 103 0.15450

6.03 Free Large Print Books (PS) 0.00150

6.04Free Text Book (UPS) (Workbooks not included)

(Including KGBV Girls)Child 0.00200 49978 99.956 49978 99.95600

6.05 Free Brail Books (UPS) 0.00250 60 0.150 60 0.15000

6.06 Free Large Print Books (PS) 0.00250Sub Total 147173 216.699 147173 216.699

7 Provision of 2 set of Uniforms

7.01 All Girls (Including KGBV Girls) Child 0.00400 117298 469.192 117298 469.19200

7.02 SC Boys Child 0.00400 29646 118.584 29646 118.58400

7.03 ST Boys Child 0.00400 66 0.264 66 0.26400

7.04 BPL Boys Child 0.00400 47098 188.392 47098 188.39200

7.05

Free Uniform for 25% children of Class-1 in

Private Recognised Primary Schools of other

Boards

Child0.00400

Sub Total 194108 776.432 194108 776.4327(A) Fee Reimbursement

7(A).01

Fee Reimbursement for Admission of children of

Disadvantaged Group & Weaker Section upto

25% of seats in Class-1 of Private Unaided

Recognised Schools

Child 0.05400

Sub Total

8 Teaching Learning Equipment (TLE)

8.01 TLE - New Primary School 0.20000 0.20000 0.200008.02 TLE - New Upper Primary School 1.00000 0.50000 1.00000

Name of District : Pilibhit -61

ActivityS. No.Physical

UnitRemarks

Outlay Recommendation for 2014-15

Spill OverDeferred laibility of

2014-15Fresh Recommended Total Recommended

Arti:SSA-AWPB-2014-15-PABMinits:Pilibhit:16-06-2014 107 / 533

Page 108: U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 · 2015. 1. 6. · U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15

Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

Name of District : Pilibhit -61

ActivityS. No.Physical

UnitRemarks

Outlay Recommendation for 2014-15

Spill OverDeferred laibility of

2014-15Fresh Recommended Total Recommended

Sub Total 1.20000 1.20000III ENHANCING QUALITY9 New Teachers Salary

9.01 Primary Teachers (Regular) (Asstt. Teacher) Teacher 0.91500

9.01aHead Teacher for Primary (if the number of

children exceeds 150 in a school)Teacher

9.02 Primary Teachers (Contract) (S.M.) Teacher

9.03Subject specific Upper Primary Teachers

(Regular) (a) Science and Mathematics Teacher 1.26000(b) Social Studies Teacher 1.26000(c) Languages Teacher 1.26000

Sub Total (9.01 to 9.05)Add.Teacher against PTR

Sub Total (9.06 to 9.12)

Total (New Teacher's Salary-9.01 to 9.12)

Teachers Salary (Recurring-sanctioned

earlier)Primary teachers

9.13 Primary Teachers ( Regular)-Existing, in position Teacher 3.66000 116 424.560 116 424.56000

9.14Primary Teachers (Contract)-Existing, in

positionTeacher 0.55000

9.14(a) Primary Teachers (Contract)-under Training Teacher 0.38500 1204 463.540 1204 463.54000

9.14(b)Primary Teacher (Para Teachers Equal to

9.14(a) upgraded as Teachers)0.38500 547 210.595 547 210.59500

9.14(c) Primary Teachers (Para)- Vacant Teacher9.15 Primary Teachers (Vacant) Teacher 0.30500

9.16Head Teacher for Primary (if the number of

children exceeds 150)Teacher 5.04000 127 640.080 127 640.08000

9.16(b)Head Teacher for Primary (if the number of

children exceeds 150) VacantTeacher 0.42000

Additional teachers

9.17Additional Teachers - PS (Special BTC-

Regular) in positionTeacher 0.30500

9.18Additional Teachers - PS (Special BTC Under

Training)Teacher 0.87600

9.19 Additional Teachers - PS (Vacant) Teacher

9.20Others in position (Para Teachers upgraded

as Teachers)Teacher

Upper Primary teachers

9.21 UP Teachers (Regular)-Existing Teacher 5.04000 690 3477.600 690 3477.60000

9.22 UP Teachers (Contract)-Existing9.23 UP Teachers (Vacant) Teacher 1.26000

9.24Head Teacher for Upper Primary (if the number

of children exceeds 100)-ExistingTeacher 5.34000 246 1313.640 246 1313.64000

9.24a Head Teacher for Upper Primary (Vacant) Teacher 1.33500

9.25Subject specific Upper Primary Teachers

(Regular)(a) Science and Mathematics(b) Social Studies(c) Languages

9.32 Part Time Instructors in position(a) Art Education 0.77000 265 204.050 265 204.05000(b) Health and Physical Education 0.77000 245 188.650 245 188.65000(c) Work Education 0.77000 232 178.640 232 178.64000

9.32(A) Part Time Instructors Vacant(a) Art Education 0.42000(b) Health and Physical Education 0.42000(c) Work Education 0.42000

9.33

Others-Incentive to Teachers in Schools

Located in Naxal Affected Areas (@

Rs.1500/- per teachers per month)

Sub Total (9.13 to 9.33) 3672 7101.355 3672 7101.36TOTAL

(New Teachers Salary +Teachers Salary

Recurring)

3672 7101.355 3672 7101.35500

10 Teachers Training(a) Teachers

10.01

Refresher In-service Teachers' Training at BRC

level and above - 10 days (@ Rs.200/- per

head per day)

Teacher

(Target &

Ach.-13-14

in

Mandays)

0.00600

10.01(a)Continuous and Comprehensive Evauation [PS +

UPS)Teacher 0.01300 1078 14.014 1078 14.01400

10.01(b) Eary Reading and Numeracy Skills [PS] Teacher 0.00500 1078 5.390 1078 5.39000

10.01(c) Science [UPS] Teacher 0.00800 579 4.632 579 4.63200Recommended as

proposed

10.01(d) CWSN Teacher 0.00400

Arti:SSA-AWPB-2014-15-PABMinits:Pilibhit:16-06-2014 108 / 533

Page 109: U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 · 2015. 1. 6. · U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15

Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

Name of District : Pilibhit -61

ActivityS. No.Physical

UnitRemarks

Outlay Recommendation for 2014-15

Spill OverDeferred laibility of

2014-15Fresh Recommended Total Recommended

10.02

One day monthly cluster level meetings and

peer group training sessions for 10 months for

all teachers each year at CRC level - 10 days (@

Rs.100/- per head per day)

Teacher 0.01000

10.03(a)

Induction Training for Newly Recruited Teachers

for 6 Months (Special BTC)- @Rs.2000/- per

head per year

Teacher 0.02000

10.03(b)5 Days Training for Part Time Instructors @ Rs.

200/- per head per day) Teacher 0.01000

10.04

Training of untrained Teachers to acquire

professional qualifications over a two year

period.

Teacher 0.04700 932 43.804 932 43.80400

(b) Head Teachers

10.05Refresher Residencial In-service for 10 days at

BRC level and above

Head

Teacher(c) Resource Persons

10.06

Refresher Training for all Resource

Persons,Master Trainers, BRC & CRC faculty

and Coordinators for 5 days each year (@

Rs.200/- per head per day)

Resource

Person 0.00300 96 0.288 96 0.28800

Sub Total 3763 68.128 3763 68.128

11Academic Support through Block Resource

Centre (BRC)/ URC

11.01 Salary of Faculty and Staff

(a) 5 RPs at BRC for subject specific training in

positionRP 40 40

(b) 2 RPs for CWSN in position RP(b-i) 1 CWSN Resource Person RP 1.10000 16 17.600 16 17.60000

(b-ii) 1 Physiotherapist (Resource person for IE) RP

(c) 1 MIS Coordinator in position RP 1.86000

(d) 1 Datra Entry Operator in position RP 1.74000 8 13.920 8 13.92000

(e) 1 Accountant-cum-support staff in position RP 1.80000 8 14.400 8 14.40000

11.02 Furniture Grant BRC/ URC 1.00000

11.03Replacement of furniture, computer, TLE etc (

Once in 5 years)BRC/ URC 1.00000

11.04 Contingency Grant BRC/ URC 0.50000 8 4.000 8 4.00000

11.05 Meeting, TA BRC/ URC 0.30000 8 2.400 8 2.40000

11.06 TLM Grant BRC/ URC 0.10000

11.07 Maintenance Grant BRC/ URC 0.10000

Sub Total 8 52.320 8 52.32000

12Academic Support through Cluster

Resource Centres (CRC/UERC)

12.01Salary of Cluster Coordinator (on an average of

one Resource Person per 18 schools in a block)RP

12.02 Furniture GrantCRC/

UERC0.10000

12.03Replacement of furniture, computer, TLE etc.

once in 5 years

CRC/

UERC0.10000

12.04 Contingency Grant CRC/UERC 0.10000 79 7.900 79 7.90000

12.05 Meeting, TA CRC/UERC 0.12000 79 9.480 79 9.48000

12.06 TLM Grant CRC/UERC 0.03000

12.07Maintenance Grant

CRC/UERC 0.02000

Sub Total 158 17.380 158 17.38000

13Computer Aided Education in upper

primary schools under Innovation

13.01Computer Aided Education in upper primary

schoolsDistrict 0.01200 48 0.576 48 0.57600

Sub Total 48 0.576 48 0.5760014 Libraries in Schools14.01 (a) Primary School (per school) School 0.03000

14.02 (b) Upper Primary School (per school) School 0.10000

Sub TotalIV ANNUAL GRANTS15 Teachers' Grant15.01 Primary Teachers Teacher 0.0050015.02 Upper Primary Teachers Teacher 0.00500 579 2.895 579 2.89500

Sub Total 579 2.895 579 2.8950016 School Grant16.01 Primary School School 0.05000 1230 61.500 1230 61.5000016.02 Upper Primary School School 0.07000 616 43.120 616 43.12000

Sub Total 1846 104.620 1846 104.62000

Arti:SSA-AWPB-2014-15-PABMinits:Pilibhit:16-06-2014 109 / 533

Page 110: U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 · 2015. 1. 6. · U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15

Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

Name of District : Pilibhit -61

ActivityS. No.Physical

UnitRemarks

Outlay Recommendation for 2014-15

Spill OverDeferred laibility of

2014-15Fresh Recommended Total Recommended

17Research, Evaluation, Monitoring &

Supervision

17.01 REMS Activities School 0.00103 1846 1.899 1846 1.89882

17.02 Monitoring & Supervision School 0.00078 1846 1.447 1846 1.44739

17.03 House Hold Survey (Urban) in Million Plus Cities District 35.00000

Sub Total 3692 3.346 3692 3.3462118 Maintenance Grant

18.01 Maintenance in School having upto3 Classrooms School 0.07500 198 14.850 198 14.85000

18.01a Maintenance Grant School 0.07500 1605 120.375 1605 120.37500Sub Total 1803 135.225 1803 135.22500

VBRIDGING GENDER AND SOCIAL

CATEGORY GAPS

19 Interventions for CWSN (IE)

19.01 Provision for Inclusive Education Child 0.02500 3505 87.625 3505 87.62500

Sub Total 3505 87.625 3505 87.62500

20Innovativation Head up to Rs.50 Lakh per

district

20.01 Girls Education District 0.70000 7 4.900 7 4.90000

20.02 ECCE District20.03 Intervention for SC / ST children District

20.04 Intervention for Minority Community children District

20.05 Intervention for Urban Deprived children District 10.00000

Sub Total 7 4.900 7 4.9000021 SMC/PRI Training

21.01Residential for 6 Resource Person per Block (3

days) (@ Rs.500/-)Blocks 0.09000

21.02Non-residential (3 days training of 6 SMC

members) (@ Rs.100/-)SMC 0.01800 1810 32.580 1810 32.58000

21.02(a)Non-residential (3 days training of 3 Members of

PRI/VECs/LA) (@ Rs.100/-)VEC/ WEC 0.00900

21.03

Seminar/Orientation of SMC Women members

and President/Vice President (@ Rs. 50,000/-

per block)

Blocks 0.50000

Sub Total 1810 32.580 1810 32.58000VI SCHOOL INFRASTRUCTURE22 Civil Works22.01 Primary School (Plain) (New) School 13.1550022.02 Primary School (Hilly/Rocky) (New) School 13.2750022.03 Upper Primary (Plain) (New) School 20.65500

22.04 Upper Primary School (Hilly/Rocky) (New) School 20.77500

22.04aComposite Schools for Urban Areas (Class I-

VIII)School 41.04000

22.05 ACR in lieu of upgraded Upper Primary School Rooms

22.06 Additional class rooms for adding Class VIII Rooms

22.07 Building Less (Pry) School 9.7500022.08 Building Less (UP) School 18.5900022.09 Dilapidated Building (Pry) School 9.7500022.10 Dilapidated Building (UP) School 18.59000

22.11 Additional Class Room (Rural) ( PS+UPS) Rooms 3.45000 82 282.900 82 282.90000

22.12 Additional Class Room (Urban) Rooms 3.4500022.13 Additional Class Room (Hill Area)22.14 Toilet/Urinals (PS & UPS) School 0.7000022.15 Separate Girls Toilet (Rural+Urban) School 0.70000 16 11.200 16 11.2000022.16 CWSN friendly Toilets School 0.50000

22.17 Drinking Water Facility (for Urban Area Only)) School 0.15000

22.17a Drinking Water Facility (Plain PS & UPS) School 0.15000

22.17b Drinking Water Facility (Hilly/Rocky PS & UPS) School 0.15000

22.18a Boundary Wall PS (Total in Meters x .01105) 0.01749

22.18bBoundary Wall PS (For Gate) @Rs. 7000 x no. of

P.S.School 0.07800

22.18c Boundary Wall UPS (Total in Meters x .01105) 0.01749

22.18dBoundary Wall UPS (For Gate) @Rs. 7000 x no.

of UPSSchool 0.07800

22.19a Electrification in P.S./ Electrical Equipment School 0.11000

22.19b Electrification in U. P.S./ Electrical Equipment School 0.11000

22.20Office-cum-store-cum-Head Teacher's room

(Primary)Rooms

22.21Office-cum-store-cum-Head Teacher's room

(Upper Primary)Rooms

22.22Augumentation of training facility in BRC (one

time)BRC/ URC 5.00000

22.23 Child friendly Elements School 0.25000

22.24 Ramps with Handrails (Barrier Free Elements) School 0.06000

22.25 Handrails in existing Ramps School 0.01000

Arti:SSA-AWPB-2014-15-PABMinits:Pilibhit:16-06-2014 110 / 533

Page 111: U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 · 2015. 1. 6. · U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15

Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

Name of District : Pilibhit -61

ActivityS. No.Physical

UnitRemarks

Outlay Recommendation for 2014-15

Spill OverDeferred laibility of

2014-15Fresh Recommended Total Recommended

22.26 Whole School Develoipment School22.27 Retro-fitting and repairs School

22.28Residential Schools for specific category

of children

(a) Construction of Building including boundary

wall, Water and sanitation facilities, electric

installation (For 100 children)

Building 65.86000

(b) Construction of residential hostel Building 65.86000

(c) Refurnishing unused old buildings Building

22.29

Construction of Hostel in existing Govt UPS

including boundary wall, Water and sanitation

facilities, electric installation etc. (For 50

children)

7.00000

22.30Furniture for Govt. UPS (per child) (@ Rs.500/-

per child enrolled)Child 0.00500

22.31 Major Repairs for Primary School School 0.30000

22.32 Majr Repairs for Upper Primary School School 0.30000

22.33Others (Difference of Civil Wrks

sanctioned in pre.yr.)22.33a Others (Overhead Tank PS) School 0.1200022.33b Others (Overhead Tank UPS) School 0.12000

Sub Total (Civil WOrks) 98 294.100 98 294.10VII PROJECT MANAGEMENT COST23 Management23.01 Management up to 3.5%

(a) Project Management and MIS

(i) DPO ( Salary, Contigency, Consumables,

POL, TA & Computer etc)District 1 106.271 1 106.27120

(ii) EMIS Cell District 1 12.386 1 12.38550Sub Total (a) 1 1 1 118.657 1 118.657

(b) Training of Educational Administrators District

(c) School Mapping and Social Mapping District

Sub Total (23.01)

23.02Learning Enhancement Prog. (LEP) (P & UP) (up

to 2%)District 13.501 13.50050

23.03 Community Mobilization (up to 0.5%) District 1 42.000 1 42.00000

Sub Total (Management) 1 55.501 1 55.50050Total Management Cost 174.157 174.15720Total of SSA (Districs) 1.200 362657 9083.948 362657 9085.148

24 State Component23.01 Management23.02 REMS 0.0044923.03 SIEMAT

Sub Total

STATE SSA TOTAL 1.20000 362657 9083.948 362657 9085.14831

25

KGBV Financial Provision (give

separate costing sheets for different

Models)

Hostel

ANon Recurring One Time Grant (Only

committed liabilities) (Model-I)

25.01 Construction of Building (New)

25.02 Construction of Building KGBV sanctioned earlier 1.20000 1.20000

25.02(a) Additional Class Room Rooms 3.45000

25.02(b) Guard Room Rooms 1.32000

25.02(c) Boundary Wall School 5.0200025.03 Boudary Wall (Spillover only)

25.04

Boring/Handpump (Spillover only)

(minimum rates prescribed by State Drinking

Water Department subject to a ceiling of Rs.

1.00 lakhs)

25.05 Electricity /Water charges (Spillover only)

25.05(a) Solar Water Heater & Solar Light 2.97000

25.06Furniture/Equipment (including Kitchen

equipment)3.00000

25.07 TLM and equipment including library books 3.50000

25.08 Bedding (New) 0.75000

25.09 Replacement of Bedding (once in 3 Year) 0.75000 8 6.000 8 6.00000

Subtotal Non Recurring 1.20000 6.000 7.20000

B Recurring Cost Per Annum (Model-I)

25.10Maintenance per girl student per month @ Rs.

1500/-18.00000 9 162.000 9 162.00000

25.11 Stipend for girl student per month @ Rs. 100/- 1.20000 9 10.800 9 10.80000

25.12Supplementary TLM, stationery and other

educational material @ Rs.1000/- per annum1.00000 9 9.000 9 9.00000

25.13 Salaries

Arti:SSA-AWPB-2014-15-PABMinits:Pilibhit:16-06-2014 111 / 533

Page 112: U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 · 2015. 1. 6. · U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15

Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

Name of District : Pilibhit -61

ActivityS. No.Physical

UnitRemarks

Outlay Recommendation for 2014-15

Spill OverDeferred laibility of

2014-15Fresh Recommended Total Recommended

25.13.1 Additional Salaries:

(a) 1 Warden @ Rs. 25,000/- per month 3.00000 9 27.00000 9 27.00000

(b)4 Full time teachers as per RTE norms @ Rs.

20,000/- per month per teacher 9.60000 9 86.40000 9 86.40000

(c)

1 Urdu Teachers (only for blocks with muslim

population above 20% and select urban areas), if

required @ Rs. 12,000/- per month per teacher 1.44000 9 12.96000 9 12.96000

(d)3 part time teachers @ Rs. 5,000/- per month per

teacher 1.80000 9 16.20000 9 16.20000

(e)1 Full time Accountant @ Rs. 10,000/- per month

1.20000 9 10.80000 9 10.80000

(f)

2 Support Staff – (Accountant/ Assistant, Peon,

Chowkidar) @ Rs. 5,000/- per month per staff 1.20000 9 10.80000 9 10.80000

(g) 1 Head cook @ Rs. 6,000/- per month 0.72000 9 6.48000 9 6.48000

(h)2 Asstt. Cooks @ Rs. 4,500/- per month per cook

1.08000 9 9.72000 9 9.72000

25.14Specific skill training @ Rs.1000/- per child per

annum1.00000 9 9.000 9 9.00000

25.15Electricity/water charges @ Rs.1000/- per child

per annum1.00000 9 9.000 9 9.00000

25.16Medical care/contingencies @ Rs. 1250 per child

per annum1.25000 9 11.250 9 11.25000

25.17 Maintenance @ Rs.750/- per child per annum 0.75000 9 6.750 9 6.75000

25.18

Miscellaneous (Educational Tour/ Exposure Visit

/ Sports Material etc.) @ Rs.750/- per child per

annum

0.75000 9 6.750 9 6.75000

25.19Preparatory camps @ Rs.200/- per child per

annum0.20000 9 1.800 9 1.80000

25.20PTAs/school functions @ Rs.200/- per child per

annum0.20000 9 1.800 9 1.80000

25.21 Provision of Rent @ Rs.6000/- per annum 6.00000

25.21a Provision of Rent (6 months) 3.6000025.21b Provision of Rent (3 months) 1.8000025.21c Rent (Previous Year (2007-2012)

25.22 Capacity building 0.50000 9 4.500 9 4.50000

25.22(a)Physical/ Self Defence Training @ Rs.200/- per

child per annum0.20000 9 1.800 9 1.80000

Subtotal Recurring 9 414.810 9 414.81000

Subtotal (Model-I) 1.20000 9 420.810 9 422.01000

CNon Recurring One Time Grant (Only

committed liabilities) (Model-II)

25.23 Construction of Building (New)

25.24 Construction of Building KGBV sanctioned earlier

25.24(a) Additional Class Room Rooms 3.45000

25.24(b) Guard Room Rooms 1.32000

25.24(c) Boundary Wall School 5.0200025.25 Boudary Wall (Spillover only)25.26 Boring/Handpump (Spillover only)

25.27 Electricity /Water charges (Spillover only)

25.27(a) Solar Water Heater & Solar Light 2.97000

25.28Furniture/Equipment (including Kitchen

equipment)2.00000

25.29 TLM and equipment including library books 3.00000

25.30 Bedding (New) 0.37500

25.31 Replacement of Bedding (once in 3 Year) 0.37500

Subtotal Non Recurring

D Recurring Cost Per Annum (Model-II)

25.32Maintenance per girl student per month @ Rs.

1500/-9.00000

25.33 Stipend for girl student per month @ Rs. 100/- 0.60000

25.34Supplementary TLM, stationery and other

educational material @ Rs.1000/- per annum0.50000

25.35 Salaries(a) 1 Warden @ Rs. 25,000/- per month 3.00000

(b)3 Full time teachers as per RTE norms @ Rs.

20,000/- per month per teacher 7.20000

(c) 3 part time teachers @ Rs. 5,000/- per month per

teacher 1.80000

(d)1 Full time Accountant @ Rs. 10,000/- per month

1.20000

(e)

2 Support Staff – (Accountant/ Assistant, Peon,

Chowkidar) @ Rs. 5,000/- per month per staff 1.20000

Arti:SSA-AWPB-2014-15-PABMinits:Pilibhit:16-06-2014 112 / 533

Page 113: U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 · 2015. 1. 6. · U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15

Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

Name of District : Pilibhit -61

ActivityS. No.Physical

UnitRemarks

Outlay Recommendation for 2014-15

Spill OverDeferred laibility of

2014-15Fresh Recommended Total Recommended

(f) 1 Head cook @ Rs. 6,000/- per month 0.72000

(g)1 Asstt. Cooks @ Rs. 4,500/- per month per cook

0.54000

25.36Specific skill training @ Rs.1000/- per child per

annum0.50000

25.37Electricity/water charges @ Rs.1000/- per child

per annum0.50000

25.38Medical care/contingencies @ Rs. 1250 per child

per annum0.62500

25.39 Maintenance @ Rs.750/- per child per annum 0.37500

25.40

Miscellaneous (Educational Tour/ Exposure Visit

/ Sports Material etc.) @ Rs.750/- per child per

annum

0.37500

25.41Preparatory camps @ Rs.300/- per child per

annum0.15000

25.42PTAs/school functions @ Rs.300/- per child per

annum0.15000

25.43 Provision of Rent @ Rs.10000/- per annum 5.00000

25.43a Provision of Rent (6 months) 3.6000025.43b Provision of Rent (3 months) 1.8000025.43c Rent (Previous Year (2007-2012)25.44 Capacity building 0.25000

25.44(a)Physical/ Self Defence Training @ Rs.200/- per

child per annum0.10000

Subtotal Recurring

Subtotal (Model-II) Total (KGBV) 1.200 9 420.810 9 422.010

DISTRICT GRAND TOTAL (SSA+KGBV) 1.200 1.200 362666 9504.758 362666 9507.158

Arti:SSA-AWPB-2014-15-PABMinits:Pilibhit:16-06-2014 113 / 533

Page 114: U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 · 2015. 1. 6. · U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15

Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

I ACCESS1 Opening of New Schools

1.01 Upgradation of EGS to PSCentres /

School1.02 New PS School

1.03 Upgradation of PS to UPS / New UPS School

1.04 Composite Schools (for Urban Areas) School

1.05Residential Schools for specific category children

(For 100 children)

1.06Residential Hostel (for specific category of

children) (For 50 children)

1.07 Integration of Class V with Primary Schools

1.08Integration of Class VIII with Upper Primary

Schools

2Residential Schools for specific category

of children (For 100 Children)

Total - Residential Schools (For 100

children)

3Residential Hostel for specific category of

children (For 50 Children)

Total - Residential Schools (For 50

children)4 Transport/Escort Facility

4.01

Children in remote habitations with sparse

populations where opening of schools is

unviable

Child 0.03000

4.02

Urban deprived children/children without adult

protection in urban areas where schools are not

opened because availability of land is a problem

Child 0.03000

Sub Total

5Special Training for mainstreaming of Out-

of-School Children

5.03 Non-Residential (Fresh)(a) 12 months Child 0.06000(b) 9 months 0.04500(c) 6 months

(i)Special Training (by Special Instructors-NRBC)-

(1-5) Child 0.03000 209 6.270 209 6.27000

(ii) Special Training (by Special Instructors-NRBC)-

(6-8) Child 0.03000 223 6.690 223 6.69000

(d) 3 months Child 0.01500Sub Total 432 12.960 432 12.96000

Total (Special Training) 432 12.960 432 12.9605(B) House Hold Survey (HHS)

5(B).01 House Hold Survey through SMCHouse

Hold0.00001

Sub TotalII RETENTION6 Free Text Book

6.01Free Text Book (PS) for Parishadiya & Aided

Primary Schools (Workbooks not included)Child 0.00120 30731 36.877 30731 36.87720

6.01a

Free Text Book (PS) for 25% children of Class-1

in Private Recognised Primary Schools of other

Boards (Workbooks not included)

Child 0.00150

6.02 Free Brail Books (PS) 0.00150 22 0.033 22 0.03300

6.03 Free Large Print Books (PS) 0.00150

6.04Free Text Book (UPS) (Workbooks not included)

(Including KGBV Girls)Child 0.00200 23627 47.254 23627 47.25400

6.05 Free Brail Books (UPS) 0.00250 3 0.008 3 0.00750

6.06 Free Large Print Books (PS) 0.00250Sub Total 54383 84.172 54383 84.172

7 Provision of 2 set of Uniforms

7.01 All Girls (Including KGBV Girls) Child 0.00400 37077 148.308 37077 148.30800

7.02 SC Boys Child 0.00400 11934 47.736 11934 47.73600

7.03 ST Boys Child 0.00400

7.04 BPL Boys Child 0.00400 13854 55.416 13854 55.41600

7.05

Free Uniform for 25% children of Class-1 in

Private Recognised Primary Schools of other

Boards

Child0.00400

Sub Total 62865 251.460 62865 251.4607(A) Fee Reimbursement

Remarks

Outlay Recommendation for 2014-15

Spill OverDeferred laibility

of 2014-15Fresh Recommended Total Recommended

Name of District :Panchsheel Nagar

(Hapur) -60

S. No. ActivityPhysical

Unit

Arti:SSA-AWPB-2014-15-PABMinits:PanchsheelNagar(Hapur):16-06-2014 114 / 533

Page 115: U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 · 2015. 1. 6. · U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15

Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

Remarks

Outlay Recommendation for 2014-15

Spill OverDeferred laibility

of 2014-15Fresh Recommended Total Recommended

Name of District :Panchsheel Nagar

(Hapur) -60

S. No. ActivityPhysical

Unit

7(A).01

Fee Reimbursement for Admission of children of

Disadvantaged Group & Weaker Section upto

25% of seats in Class-1 of Private Unaided

Recognised Schools

Child 0.05400

Sub Total

8 Teaching Learning Equipment (TLE)

8.01 TLE - New Primary School 0.200008.02 TLE - New Upper Primary School 0.50000

Sub TotalIII ENHANCING QUALITY9 New Teachers Salary

9.01 Primary Teachers (Regular) (Asstt. Teacher) Teacher 0.91500

9.01aHead Teacher for Primary (if the number of

children exceeds 150 in a school)Teacher

9.02 Primary Teachers (Contract) (S.M.) Teacher

9.03Subject specific Upper Primary Teachers

(Regular) (a) Science and Mathematics Teacher 1.26000(b) Social Studies Teacher 1.26000(c) Languages Teacher 1.26000

Sub Total (9.01 to 9.05)Add.Teacher against PTR

Sub Total (9.06 to 9.12)

Total (New Teacher's Salary-9.01 to 9.12)

Teachers Salary (Recurring-sanctioned

earlier)Primary teachers

9.13 Primary Teachers ( Regular)-Existing, in position Teacher 3.66000 310 1134.600 310 1134.60000

9.14Primary Teachers (Contract)-Existing, in

positionTeacher 0.55000

9.14(a) Primary Teachers (Contract)-under Training Teacher 0.38500 335 128.975 335 128.97500

9.14(b)Primary Teacher (Para Teachers Equal to

9.14(a) upgraded as Teachers)0.38500 371 142.835 371 142.83500

9.14(c) Primary Teachers (Para)- Vacant Teacher9.15 Primary Teachers (Vacant) Teacher 0.30500

9.16Head Teacher for Primary (if the number of

children exceeds 150)Teacher 5.04000 18 90.720 18 90.72000

9.16(b)Head Teacher for Primary (if the number of

children exceeds 150) VacantTeacher 0.42000

Additional teachers

9.17Additional Teachers - PS (Special BTC-

Regular) in positionTeacher 0.30500

9.18Additional Teachers - PS (Special BTC Under

Training)Teacher 0.87600

9.19 Additional Teachers - PS (Vacant) Teacher

9.20Others in position (Para Teachers upgraded

as Teachers)Teacher

Upper Primary teachers

9.21 UP Teachers (Regular)-Existing Teacher 5.04000 184 927.360 184 927.36000

9.22 UP Teachers (Contract)-Existing9.23 UP Teachers (Vacant) Teacher 1.26000

9.24Head Teacher for Upper Primary (if the number

of children exceeds 100)-ExistingTeacher 5.34000 87 464.580 87 464.58000

9.24a Head Teacher for Upper Primary (Vacant) Teacher 1.33500

9.25Subject specific Upper Primary Teachers

(Regular)(a) Science and Mathematics(b) Social Studies(c) Languages

9.32 Part Time Instructors in position(a) Art Education 0.77000 11 8.470 11 8.47000(b) Health and Physical Education 0.77000 11 8.470 11 8.47000(c) Work Education 0.77000 10 7.700 10 7.70000

9.32(A) Part Time Instructors Vacant(a) Art Education 0.42000(b) Health and Physical Education 0.42000(c) Work Education 0.42000

9.33

Others-Incentive to Teachers in Schools

Located in Naxal Affected Areas (@

Rs.1500/- per teachers per month)

Sub Total (9.13 to 9.33) 1337 2913.710 1337 2913.71TOTAL

(New Teachers Salary +Teachers Salary

Recurring)

1337 2913.710 1337 2913.71000

Arti:SSA-AWPB-2014-15-PABMinits:PanchsheelNagar(Hapur):16-06-2014 115 / 533

Page 116: U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 · 2015. 1. 6. · U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15

Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

Remarks

Outlay Recommendation for 2014-15

Spill OverDeferred laibility

of 2014-15Fresh Recommended Total Recommended

Name of District :Panchsheel Nagar

(Hapur) -60

S. No. ActivityPhysical

Unit

10 Teachers Training(a) Teachers

10.01

Refresher In-service Teachers' Training at BRC

level and above - 10 days (@ Rs.200/- per head

per day)

Teacher

(Target &

Ach.-13-14

in

Mandays)

0.00600

10.01(a)Continuous and Comprehensive Evauation [PS +

UPS)Teacher 0.01300 425 5.525 425 5.52500

10.01(b) Eary Reading and Numeracy Skills [PS] Teacher 0.00500 425 2.125 425 2.12500

10.01(c) Science [UPS] Teacher 0.00800 232 1.856 232 1.85600Recommended as

proposed

10.01(d) CWSN Teacher 0.00400

10.02

One day monthly cluster level meetings and

peer group training sessions for 10 months for

all teachers each year at CRC level - 10 days (@

Rs.100/- per head per day)

Teacher 0.01000

10.03(a)

Induction Training for Newly Recruited Teachers

for 6 Months (Special BTC)- @Rs.2000/- per

head per year

Teacher 0.02000

10.03(b)5 Days Training for Part Time Instructors @ Rs.

200/- per head per day) Teacher 0.01000

10.04

Training of untrained Teachers to acquire

professional qualifications over a two year

period.

Teacher 0.04700

(b) Head Teachers

10.05Refresher Residencial In-service for 10 days at

BRC level and above

Head

Teacher(c) Resource Persons

10.06

Refresher Training for all Resource

Persons,Master Trainers, BRC & CRC faculty

and Coordinators for 5 days each year (@

Rs.200/- per head per day)

Resource

Person 0.00300 48 0.144 48 0.14400

Sub Total 1130 9.650 1130 9.650

11Academic Support through Block Resource

Centre (BRC)/ URC

11.01 Salary of Faculty and Staff

(a) 5 RPs at BRC for subject specific training in

positionRP 20 20

(b) 2 RPs for CWSN in position RP(b-i) 1 CWSN Resource Person RP 1.10000 8 8.800 8 8.80000

(b-ii) 1 Physiotherapist (Resource person for IE) RP

(c) 1 MIS Coordinator in position RP 1.86000

(d) 1 Datra Entry Operator in position RP 1.74000

(e) 1 Accountant-cum-support staff in position RP 1.80000 4 7.200 4 7.20000

11.02 Furniture Grant BRC/ URC 1.00000

11.03Replacement of furniture, computer, TLE etc (

Once in 5 years)BRC/ URC 1.00000

11.04 Contingency Grant BRC/ URC 0.50000 4 2.000 4 2.00000

11.05 Meeting, TA BRC/ URC 0.30000 4 1.200 4 1.20000

11.06 TLM Grant BRC/ URC 0.10000

11.07 Maintenance Grant BRC/ URC 0.10000

Sub Total 4 19.200 4 19.20000

12Academic Support through Cluster

Resource Centres (CRC/UERC)

12.01Salary of Cluster Coordinator (on an average of

one Resource Person per 18 schools in a block)RP

12.02 Furniture GrantCRC/

UERC0.10000

12.03Replacement of furniture, computer, TLE etc.

once in 5 years

CRC/

UERC0.10000

12.04 Contingency Grant CRC/UERC 0.10000 49 4.900 49 4.90000

12.05 Meeting, TA CRC/UERC 0.12000 49 5.880 49 5.88000

12.06 TLM Grant CRC/UERC 0.03000

Arti:SSA-AWPB-2014-15-PABMinits:PanchsheelNagar(Hapur):16-06-2014 116 / 533

Page 117: U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 · 2015. 1. 6. · U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15

Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

Remarks

Outlay Recommendation for 2014-15

Spill OverDeferred laibility

of 2014-15Fresh Recommended Total Recommended

Name of District :Panchsheel Nagar

(Hapur) -60

S. No. ActivityPhysical

Unit

12.07Maintenance Grant

CRC/UERC 0.02000

Sub Total 98 10.780 98 10.78000

13Computer Aided Education in upper

primary schools under Innovation

13.01Computer Aided Education in upper primary

schoolsDistrict 0.01200 48 0.576 48 0.57600

Sub Total 48 0.576 48 0.5760014 Libraries in Schools14.01 (a) Primary School (per school) School 0.03000

14.02 (b) Upper Primary School (per school) School 0.10000

Sub TotalIV ANNUAL GRANTS15 Teachers' Grant15.01 Primary Teachers Teacher 0.0050015.02 Upper Primary Teachers Teacher 0.00500 232 1.160 232 1.16000

Sub Total 232 1.160 232 1.1600016 School Grant16.01 Primary School School 0.05000 430 21.500 430 21.5000016.02 Upper Primary School School 0.07000 227 15.890 227 15.89000

Sub Total 657 37.390 657 37.39000

17Research, Evaluation, Monitoring &

Supervision

17.01 REMS Activities School 0.00103 657 0.676 657 0.67580

17.02 Monitoring & Supervision School 0.00078 657 0.515 657 0.51513

17.03 House Hold Survey (Urban) in Million Plus Cities District 35.00000

Sub Total 1314 1.191 1314 1.1909318 Maintenance Grant

18.01 Maintenance in School having upto3 Classrooms School 0.07500 76 5.700 76 5.70000

18.01a Maintenance Grant School 0.07500 559 41.925 559 41.92500Sub Total 635 47.625 635 47.62500

VBRIDGING GENDER AND SOCIAL

CATEGORY GAPS

19 Interventions for CWSN (IE)

19.01 Provision for Inclusive Education Child 0.03000 1096 32.880 1096 32.88000

Sub Total 1096 32.880 1096 32.88000

20Innovativation Head up to Rs.50 Lakh per

district

20.01 Girls Education District 0.70000 6 4.200 6 4.20000

20.02 ECCE District20.03 Intervention for SC / ST children District

20.04 Intervention for Minority Community children District

20.05 Intervention for Urban Deprived children District 10.00000

Sub Total 6 4.200 6 4.2000021 SMC/PRI Training

21.01Residential for 6 Resource Person per Block (3

days) (@ Rs.500/-)Blocks 0.09000

21.02Non-residential (3 days training of 6 SMC

members) (@ Rs.100/-)SMC 0.01800 640 11.520 640 11.52000

21.02(a)Non-residential (3 days training of 3 Members of

PRI/VECs/LA) (@ Rs.100/-)VEC/ WEC 0.00900

21.03

Seminar/Orientation of SMC Women members

and President/Vice President (@ Rs. 50,000/-

per block)

Blocks 0.50000

Sub Total 640 11.520 640 11.52000VI SCHOOL INFRASTRUCTURE22 Civil Works22.01 Primary School (Plain) (New) School 13.1550022.02 Primary School (Hilly/Rocky) (New) School 13.2750022.03 Upper Primary (Plain) (New) School 20.65500

22.04 Upper Primary School (Hilly/Rocky) (New) School 20.77500

22.04aComposite Schools for Urban Areas (Class I-

VIII)School 41.04000

22.05 ACR in lieu of upgraded Upper Primary School Rooms

22.06 Additional class rooms for adding Class VIII Rooms

22.07 Building Less (Pry) School 9.7500022.08 Building Less (UP) School 18.5900022.09 Dilapidated Building (Pry) School 9.7500022.10 Dilapidated Building (UP) School 18.59000

22.11 Additional Class Room (Rural) ( PS+UPS) Rooms 3.45000

22.12 Additional Class Room (Urban) Rooms 3.4500022.13 Additional Class Room (Hill Area)22.14 Toilet/Urinals (PS & UPS) School 0.70000 20 14.000 20 14.00000

Arti:SSA-AWPB-2014-15-PABMinits:PanchsheelNagar(Hapur):16-06-2014 117 / 533

Page 118: U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 · 2015. 1. 6. · U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15

Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

Remarks

Outlay Recommendation for 2014-15

Spill OverDeferred laibility

of 2014-15Fresh Recommended Total Recommended

Name of District :Panchsheel Nagar

(Hapur) -60

S. No. ActivityPhysical

Unit

22.15 Separate Girls Toilet (Rural+Urban) School 0.7000022.16 CWSN friendly Toilets School 0.50000

22.17 Drinking Water Facility (for Urban Area Only)) School 0.15000

22.17a Drinking Water Facility (Plain PS & UPS) School 0.15000 27 4.050 27 4.05000

22.17b Drinking Water Facility (Hilly/Rocky PS & UPS) School 0.15000

22.18a Boundary Wall PS (Total in Meters x .01105) 0.01749

22.18bBoundary Wall PS (For Gate) @Rs. 7000 x no. of

P.S.School 0.07800

22.18c Boundary Wall UPS (Total in Meters x .01105) 0.01749

22.18dBoundary Wall UPS (For Gate) @Rs. 7000 x no.

of UPSSchool 0.07800

22.19a Electrification in P.S./ Electrical Equipment School 0.11000

22.19b Electrification in U. P.S./ Electrical Equipment School 0.11000

22.20Office-cum-store-cum-Head Teacher's room

(Primary)Rooms

22.21Office-cum-store-cum-Head Teacher's room

(Upper Primary)Rooms

22.22Augumentation of training facility in BRC (one

time)BRC/ URC 5.00000

22.23 Child friendly Elements School 0.25000

22.24 Ramps with Handrails (Barrier Free Elements) School 0.06000 58 3.480 58 3.48000

22.25 Handrails in existing Ramps School 0.0100022.26 Whole School Develoipment School22.27 Retro-fitting and repairs School

22.28Residential Schools for specific category

of children

(a) Construction of Building including boundary

wall, Water and sanitation facilities, electric

installation (For 100 children)

Building 65.86000

(b) Construction of residential hostel Building 65.86000

(c) Refurnishing unused old buildings Building

22.29

Construction of Hostel in existing Govt UPS

including boundary wall, Water and sanitation

facilities, electric installation etc. (For 50

children)

7.00000

22.30Furniture for Govt. UPS (per child) (@ Rs.500/-

per child enrolled)Child 0.00500

22.31 Major Repairs for Primary School School 0.30000

22.32 Majr Repairs for Upper Primary School School 0.30000

22.33Others (Difference of Civil Wrks

sanctioned in pre.yr.)22.33a Others (Overhead Tank PS) School 0.1200022.33b Others (Overhead Tank UPS) School 0.12000

Sub Total (Civil WOrks) 105 21.530 105 21.53VII PROJECT MANAGEMENT COST23 Management23.01 Management up to 3.5%

(a) Project Management and MIS

(i) DPO ( Salary, Contigency, Consumables,

POL, TA & Computer etc)District 1 118.295 1 118.29460

(ii) EMIS Cell District 1 7.962 1 7.96200Sub Total (a) 1 1 1 126.257 1 126.257

(b) Training of Educational Administrators District

(c) School Mapping and Social Mapping District

Sub Total (23.01)

23.02Learning Enhancement Prog. (LEP) (P & UP) (up

to 2%)District 4.868 4.86790

23.03 Community Mobilization (up to 0.5%) District 1 17.000 1 17.00000

Sub Total (Management) 1 21.868 1 21.86790Total Management Cost 148.125 148.12450Total of SSA (Districs) 124982 3608.128 124982 3608.128

24 State Component23.01 Management23.02 REMS 0.0044923.03 SIEMAT

Sub Total

STATE SSA TOTAL 124982 3608.128 124982 3608.12813

25

KGBV Financial Provision (give

separate costing sheets for different

Models)

Hostel

Arti:SSA-AWPB-2014-15-PABMinits:PanchsheelNagar(Hapur):16-06-2014 118 / 533

Page 119: U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 · 2015. 1. 6. · U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15

Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

Remarks

Outlay Recommendation for 2014-15

Spill OverDeferred laibility

of 2014-15Fresh Recommended Total Recommended

Name of District :Panchsheel Nagar

(Hapur) -60

S. No. ActivityPhysical

Unit

ANon Recurring One Time Grant (Only

committed liabilities) (Model-I)

25.01 Construction of Building (New)

25.02 Construction of Building KGBV sanctioned earlier

25.02(a) Additional Class Room Rooms 3.45000

25.02(b) Guard Room Rooms 1.32000

25.02(c) Boundary Wall School 5.0200025.03 Boudary Wall (Spillover only)

25.04

Boring/Handpump (Spillover only)

(minimum rates prescribed by State Drinking

Water Department subject to a ceiling of Rs.

1.00 lakhs)

25.05 Electricity /Water charges (Spillover only)

25.05(a) Solar Water Heater & Solar Light 2.97000

25.06Furniture/Equipment (including Kitchen

equipment)3.00000

25.07 TLM and equipment including library books 3.50000

25.08 Bedding (New) 0.75000

25.09 Replacement of Bedding (once in 3 Year) 0.75000 4 3.000 4 3.00000

Subtotal Non Recurring 3.000 3.00000

B Recurring Cost Per Annum (Model-I)

25.10Maintenance per girl student per month @ Rs.

1500/-18.00000 5 90.000 5 90.00000

25.11 Stipend for girl student per month @ Rs. 100/- 1.20000 5 6.000 5 6.00000

25.12Supplementary TLM, stationery and other

educational material @ Rs.1000/- per annum1.00000 5 5.000 5 5.00000

25.13 Salaries

25.13.1 Additional Salaries:

(a) 1 Warden @ Rs. 25,000/- per month 3.00000 5 15.00000 5 15.00000

(b)4 Full time teachers as per RTE norms @ Rs.

20,000/- per month per teacher 9.60000 5 48.00000 5 48.00000

(c)

1 Urdu Teachers (only for blocks with muslim

population above 20% and select urban areas), if

required @ Rs. 12,000/- per month per teacher 1.44000 5 7.20000 5 7.20000

(d)3 part time teachers @ Rs. 5,000/- per month per

teacher 1.80000 5 9.00000 5 9.00000

(e)1 Full time Accountant @ Rs. 10,000/- per month

1.20000 5 6.00000 5 6.00000

(f)

2 Support Staff – (Accountant/ Assistant, Peon,

Chowkidar) @ Rs. 5,000/- per month per staff 1.20000 5 6.00000 5 6.00000

(g) 1 Head cook @ Rs. 6,000/- per month 0.72000 5 3.60000 5 3.60000

(h)2 Asstt. Cooks @ Rs. 4,500/- per month per cook

1.08000 5 5.40000 5 5.40000

25.14Specific skill training @ Rs.1000/- per child per

annum1.00000 5 5.000 5 5.00000

25.15Electricity/water charges @ Rs.1000/- per child

per annum1.00000 5 5.000 5 5.00000

25.16Medical care/contingencies @ Rs. 1250 per child

per annum1.25000 5 6.250 5 6.25000

25.17 Maintenance @ Rs.750/- per child per annum 0.75000 5 3.750 5 3.75000

25.18

Miscellaneous (Educational Tour/ Exposure Visit

/ Sports Material etc.) @ Rs.750/- per child per

annum

0.75000 5 3.750 5 3.75000

25.19Preparatory camps @ Rs.200/- per child per

annum0.20000 5 1.000 5 1.00000

25.20PTAs/school functions @ Rs.200/- per child per

annum0.20000 5 1.000 5 1.00000

25.21 Provision of Rent @ Rs.6000/- per annum 6.00000

25.21a Provision of Rent (6 months) 3.6000025.21b Provision of Rent (3 months) 1.8000025.21c Rent (Previous Year (2007-2012)

25.22 Capacity building 0.50000 5 2.500 5 2.50000

25.22(a)Physical/ Self Defence Training @ Rs.200/- per

child per annum0.20000 5 1.000 5 1.00000

Subtotal Recurring 5 230.450 5 230.45000

Subtotal (Model-I) 5 233.450 5 233.45000

Arti:SSA-AWPB-2014-15-PABMinits:PanchsheelNagar(Hapur):16-06-2014 119 / 533

Page 120: U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 · 2015. 1. 6. · U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15

Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

Remarks

Outlay Recommendation for 2014-15

Spill OverDeferred laibility

of 2014-15Fresh Recommended Total Recommended

Name of District :Panchsheel Nagar

(Hapur) -60

S. No. ActivityPhysical

Unit

CNon Recurring One Time Grant (Only

committed liabilities) (Model-II)

25.23 Construction of Building (New)

25.24 Construction of Building KGBV sanctioned earlier

25.24(a) Additional Class Room Rooms 3.45000

25.24(b) Guard Room Rooms 1.32000

25.24(c) Boundary Wall School 5.0200025.25 Boudary Wall (Spillover only)25.26 Boring/Handpump (Spillover only)

25.27 Electricity /Water charges (Spillover only)

25.27(a) Solar Water Heater & Solar Light 2.97000

25.28Furniture/Equipment (including Kitchen

equipment)2.00000

25.29 TLM and equipment including library books 3.00000

25.30 Bedding (New) 0.37500

25.31 Replacement of Bedding (once in 3 Year) 0.37500

Subtotal Non Recurring

D Recurring Cost Per Annum (Model-II)

25.32Maintenance per girl student per month @ Rs.

1500/-9.00000

25.33 Stipend for girl student per month @ Rs. 100/- 0.60000

25.34Supplementary TLM, stationery and other

educational material @ Rs.1000/- per annum0.50000

25.35 Salaries(a) 1 Warden @ Rs. 25,000/- per month 3.00000

(b)3 Full time teachers as per RTE norms @ Rs.

20,000/- per month per teacher 7.20000

(c) 3 part time teachers @ Rs. 5,000/- per month per

teacher1.80000

(d)1 Full time Accountant @ Rs. 10,000/- per month

1.20000

(e)

2 Support Staff – (Accountant/ Assistant, Peon,

Chowkidar) @ Rs. 5,000/- per month per staff 1.20000

(f) 1 Head cook @ Rs. 6,000/- per month 0.72000

(g)1 Asstt. Cooks @ Rs. 4,500/- per month per cook

0.54000

25.36Specific skill training @ Rs.1000/- per child per

annum0.50000

25.37Electricity/water charges @ Rs.1000/- per child

per annum0.50000

25.38Medical care/contingencies @ Rs. 1250 per child

per annum0.62500

25.39 Maintenance @ Rs.750/- per child per annum 0.37500

25.40

Miscellaneous (Educational Tour/ Exposure Visit

/ Sports Material etc.) @ Rs.750/- per child per

annum

0.37500

25.41Preparatory camps @ Rs.300/- per child per

annum0.15000

25.42PTAs/school functions @ Rs.300/- per child per

annum0.15000

25.43 Provision of Rent @ Rs.10000/- per annum 5.00000

25.43a Provision of Rent (6 months) 3.6000025.43b Provision of Rent (3 months) 1.8000025.43c Rent (Previous Year (2007-2012)25.44 Capacity building 0.25000

25.44(a)Physical/ Self Defence Training @ Rs.200/- per

child per annum0.10000

Subtotal Recurring

Subtotal (Model-II) Total (KGBV) 5 233.450 5 233.450

DISTRICT GRAND TOTAL (SSA+KGBV) 124987 3841.578 124987 3841.578

Arti:SSA-AWPB-2014-15-PABMinits:PanchsheelNagar(Hapur):16-06-2014 120 / 533

Page 121: U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 · 2015. 1. 6. · U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15

Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

I ACCESS

1 Opening of New Schools

1.01 Upgradation of EGS to PSCentres /

School1.02 New PS School

1.03 Upgradation of PS to UPS / New UPS School

1.04 Composite Schools (for Urban Areas) School

1.05Residential Schools for specific category children

(For 100 children)

1.06Residential Hostel (for specific category of

children) (For 50 children)

1.07 Integration of Class V with Primary Schools

1.08Integration of Class VIII with Upper Primary

Schools

2Residential Schools for specific category

of children (For 100 Children)

Total - Residential Schools (For 100

children)

3Residential Hostel for specific category of

children (For 50 Children)

Total - Residential Schools (For 50

children)4 Transport/Escort Facility

4.01

Children in remote habitations with sparse

populations where opening of schools is

unviable

Child 0.03000

4.02

Urban deprived children/children without adult

protection in urban areas where schools are not

opened because availability of land is a problem

Child 0.03000

Sub Total

5Special Training for mainstreaming of Out-

of-School Children

5.03 Non-Residential (Fresh)(a) 12 months Child 0.06000(b) 9 months 0.04500(c) 6 months

(i)Special Training (by Special Instructors-NRBC)-

(1-5) Child 0.03000 1102 33.060 1102 33.06000

(ii) Special Training (by Special Instructors-NRBC)-

(6-8) Child 0.03000 533 15.990 533 15.99000

(d) 3 months Child 0.01500Sub Total 1635 49.050 1635 49.05000

Total (Special Training) 1635 49.050 1635 49.0505(B) House Hold Survey (HHS)

5(B).01 House Hold Survey through SMCHouse

Hold0.00001

Sub TotalII RETENTION6 Free Text Book

6.01Free Text Book (PS) for Parishadiya & Aided

Primary Schools (Workbooks not included)Child 0.00120 80219 96.263 80219 96.26280

6.01a

Free Text Book (PS) for 25% children of Class-1

in Private Recognised Primary Schools of other

Boards (Workbooks not included)

Child 0.00150

6.02 Free Brail Books (PS) 0.00150 103 0.155 103 0.15450

6.03 Free Large Print Books (PS) 0.00150

6.04Free Text Book (UPS) (Workbooks not included)

(Including KGBV Girls)Child 0.00200 40619 81.238 40619 81.23800

6.05 Free Brail Books (UPS) 0.00250 15 0.038 15 0.03750

6.06 Free Large Print Books (PS) 0.00250Sub Total 120956 177.693 120956 177.693

7 Provision of 2 set of Uniforms

7.01 All Girls (Including KGBV Girls) Child 0.00400 97546 390.184 97546 390.18400

7.02 SC Boys Child 0.00400 23292 93.168 23292 93.16800

7.03 ST Boys Child 0.00400

7.04 BPL Boys Child 0.00400 9369 37.476 9369 37.47600

7.05

Free Uniform for 25% children of Class-1 in

Private Recognised Primary Schools of other

Boards

Child0.00400

Sub Total 130207 520.828 130207 520.8287(A) Fee Reimbursement

7(A).01

Fee Reimbursement for Admission of children of

Disadvantaged Group & Weaker Section upto

25% of seats in Class-1 of Private Unaided

Recognised Schools

Child 0.05400

Sub Total

8 Teaching Learning Equipment (TLE)

8.01 TLE - New Primary School 3.80000 0.20000 3.800008.02 TLE - New Upper Primary School 0.80000 0.50000 0.80000

Name of District :Muzaffar Nagar -59

ActivityS. No.Physical

UnitRemarks

Outlay Recommendation for 2014-15

Spill OverDeferred laibility of

2014-15Fresh Recommended Total Recommended

Arti:SSA-AWPB-2014-15-PABMinits:MuzaffarNagar:16-06-2014 121 / 533

Page 122: U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 · 2015. 1. 6. · U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15

Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

Name of District :Muzaffar Nagar -59

ActivityS. No.Physical

UnitRemarks

Outlay Recommendation for 2014-15

Spill OverDeferred laibility of

2014-15Fresh Recommended Total Recommended

Sub Total 4.60000 4.60000III ENHANCING QUALITY9 New Teachers Salary

9.01 Primary Teachers (Regular) (Asstt. Teacher) Teacher 0.91500

9.01aHead Teacher for Primary (if the number of

children exceeds 150 in a school)Teacher

9.02 Primary Teachers (Contract) (S.M.) Teacher

9.03Subject specific Upper Primary Teachers

(Regular) (a) Science and Mathematics Teacher 1.26000(b) Social Studies Teacher 1.26000(c) Languages Teacher 1.26000

Sub Total (9.01 to 9.05)Add.Teacher against PTR

Sub Total (9.06 to 9.12)

Total (New Teacher's Salary-9.01 to 9.12)

Teachers Salary (Recurring-sanctioned

earlier)Primary teachers

9.13 Primary Teachers ( Regular)-Existing, in position Teacher 3.66000 542 1983.720 542 1983.72000

9.14Primary Teachers (Contract)-Existing, in

positionTeacher 0.55000

9.14(a) Primary Teachers (Contract)-under Training Teacher 0.38500 677 260.645 677 260.64500

9.14(b)Primary Teacher (Para Teachers Equal to

9.14(a) upgraded as Teachers)0.38500 615 236.775 615 236.77500

9.14(c) Primary Teachers (Para)- Vacant Teacher9.15 Primary Teachers (Vacant) Teacher 0.30500

9.16Head Teacher for Primary (if the number of

children exceeds 150)Teacher 5.04000 19 95.760 19 95.76000

9.16(b)Head Teacher for Primary (if the number of

children exceeds 150) VacantTeacher 0.42000

Additional teachers

9.17Additional Teachers - PS (Special BTC-

Regular) in positionTeacher 0.30500

9.18Additional Teachers - PS (Special BTC Under

Training)Teacher 0.87600

9.19 Additional Teachers - PS (Vacant) Teacher

9.20Others in position (Para Teachers upgraded

as Teachers)Teacher

Upper Primary teachers

9.21 UP Teachers (Regular)-Existing Teacher 5.04000 410 2066.400 410 2066.40000

9.22 UP Teachers (Contract)-Existing9.23 UP Teachers (Vacant) Teacher 1.26000

9.24Head Teacher for Upper Primary (if the number

of children exceeds 100)-ExistingTeacher 5.34000 126 672.840 126 672.84000

9.24a Head Teacher for Upper Primary (Vacant) Teacher 1.33500

9.25Subject specific Upper Primary Teachers

(Regular)(a) Science and Mathematics(b) Social Studies(c) Languages

9.32 Part Time Instructors in position(a) Art Education 0.77000 69 53.130 69 53.13000(b) Health and Physical Education 0.77000 77 59.290 77 59.29000(c) Work Education 0.77000 57 43.890 57 43.89000

9.32(A) Part Time Instructors Vacant(a) Art Education 0.42000(b) Health and Physical Education 0.42000(c) Work Education 0.42000

9.33

Others-Incentive to Teachers in Schools

Located in Naxal Affected Areas (@

Rs.1500/- per teachers per month)

Sub Total (9.13 to 9.33) 2592 5472.450 2592 5472.45TOTAL

(New Teachers Salary +Teachers Salary

Recurring)

2592 5472.450 2592 5472.45000

10 Teachers Training(a) Teachers

10.01

Refresher In-service Teachers' Training at BRC

level and above - 10 days (@ Rs.200/- per

head per day)

Teacher

(Target &

Ach.-13-14

in

Mandays)

0.00600

10.01(a)Continuous and Comprehensive Evauation [PS +

UPS)Teacher 0.01300 900 11.700 900 11.70000

10.01(b) Eary Reading and Numeracy Skills [PS] Teacher 0.00500 900 4.500 900 4.50000

10.01(c) Science [UPS] Teacher 0.00800 498 3.984 498 3.98400Recommended as

proposed

10.01(d) CWSN Teacher 0.00400

Arti:SSA-AWPB-2014-15-PABMinits:MuzaffarNagar:16-06-2014 122 / 533

Page 123: U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 · 2015. 1. 6. · U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15

Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

Name of District :Muzaffar Nagar -59

ActivityS. No.Physical

UnitRemarks

Outlay Recommendation for 2014-15

Spill OverDeferred laibility of

2014-15Fresh Recommended Total Recommended

10.02

One day monthly cluster level meetings and

peer group training sessions for 10 months for

all teachers each year at CRC level - 10 days (@

Rs.100/- per head per day)

Teacher 0.01000

10.03(a)

Induction Training for Newly Recruited Teachers

for 6 Months (Special BTC)- @Rs.2000/- per

head per year

Teacher 0.02000

10.03(b)5 Days Training for Part Time Instructors @ Rs.

200/- per head per day) Teacher 0.01000

10.04

Training of untrained Teachers to acquire

professional qualifications over a two year

period.

Teacher 0.04700 955 44.885 955 44.88500

(b) Head Teachers

10.05Refresher Residencial In-service for 10 days at

BRC level and above

Head

Teacher(c) Resource Persons

10.06

Refresher Training for all Resource

Persons,Master Trainers, BRC & CRC faculty

and Coordinators for 5 days each year (@

Rs.200/- per head per day)

Resource

Person 0.00300 120 0.360 120 0.36000

Sub Total 3373 65.429 3373 65.429

11Academic Support through Block Resource

Centre (BRC)/ URC

11.01 Salary of Faculty and Staff

(a) 5 RPs at BRC for subject specific training in

positionRP 50 50

(b) 2 RPs for CWSN in position RP(b-i) 1 CWSN Resource Person RP 1.10000 18 19.800 18 19.80000

(b-ii) 1 Physiotherapist (Resource person for IE) RP

(c) 1 MIS Coordinator in position RP 1.86000

(d) 1 Datra Entry Operator in position RP 1.74000 15 26.100 15 26.10000

(e) 1 Accountant-cum-support staff in position RP 1.80000 10 18.000 10 18.00000

11.02 Furniture Grant BRC/ URC 1.00000

11.03Replacement of furniture, computer, TLE etc (

Once in 5 years)BRC/ URC 1.00000

11.04 Contingency Grant BRC/ URC 0.50000 10 5.000 10 5.00000

11.05 Meeting, TA BRC/ URC 0.30000 10 3.000 10 3.00000

11.06 TLM Grant BRC/ URC 0.10000

11.07 Maintenance Grant BRC/ URC 0.10000

Sub Total 10 71.900 10 71.90000

12Academic Support through Cluster

Resource Centres (CRC/UERC)

12.01Salary of Cluster Coordinator (on an average of

one Resource Person per 18 schools in a block)RP

12.02 Furniture GrantCRC/

UERC0.10000

12.03Replacement of furniture, computer, TLE etc.

once in 5 years

CRC/

UERC0.10000

12.04 Contingency Grant CRC/UERC 0.10000 75 7.500 75 7.50000

12.05 Meeting, TA CRC/UERC 0.12000 75 9.000 75 9.00000

12.06 TLM Grant CRC/UERC 0.03000

12.07Maintenance Grant

CRC/UERC 0.02000

Sub Total 150 16.500 150 16.50000

13Computer Aided Education in upper

primary schools under Innovation

13.01Computer Aided Education in upper primary

schoolsDistrict 0.01200 48 0.576 48 0.57600

Sub Total 48 0.576 48 0.5760014 Libraries in Schools14.01 (a) Primary School (per school) School 0.03000

14.02 (b) Upper Primary School (per school) School 0.10000

Sub TotalIV ANNUAL GRANTS15 Teachers' Grant15.01 Primary Teachers Teacher 0.0050015.02 Upper Primary Teachers Teacher 0.00500 498 2.490 498 2.49000

Sub Total 498 2.490 498 2.4900016 School Grant16.01 Primary School School 0.05000 911 45.550 911 45.5500016.02 Upper Primary School School 0.07000 498 34.860 498 34.86000

Sub Total 1409 80.410 1409 80.41000

Arti:SSA-AWPB-2014-15-PABMinits:MuzaffarNagar:16-06-2014 123 / 533

Page 124: U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 · 2015. 1. 6. · U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15

Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

Name of District :Muzaffar Nagar -59

ActivityS. No.Physical

UnitRemarks

Outlay Recommendation for 2014-15

Spill OverDeferred laibility of

2014-15Fresh Recommended Total Recommended

17Research, Evaluation, Monitoring &

Supervision

17.01 REMS Activities School 0.00103 1409 1.449 1409 1.44932

17.02 Monitoring & Supervision School 0.00078 1409 1.105 1409 1.10475

17.03 House Hold Survey (Urban) in Million Plus Cities District 35.00000

Sub Total 2818 2.554 2818 2.5540718 Maintenance Grant

18.01 Maintenance in School having upto3 Classrooms School 0.07500 305 22.875 305 22.87500

18.01a Maintenance Grant School 0.07500 1066 79.950 1066 79.95000Sub Total 1371 102.825 1371 102.82500

VBRIDGING GENDER AND SOCIAL

CATEGORY GAPS

19 Interventions for CWSN (IE)

19.01 Provision for Inclusive Education Child 0.03000 1944 58.320 1944 58.32000

Sub Total 1944 58.320 1944 58.32000

20Innovativation Head up to Rs.50 Lakh per

district

20.01 Girls Education District 0.70000 10 7.000 10 7.00000

20.02 ECCE District20.03 Intervention for SC / ST children District

20.04 Intervention for Minority Community children District

20.05 Intervention for Urban Deprived children District 10.00000

Sub Total 10 7.000 10 7.0000021 SMC/PRI Training

21.01Residential for 6 Resource Person per Block (3

days) (@ Rs.500/-)Blocks 0.09000

21.02Non-residential (3 days training of 6 SMC

members) (@ Rs.100/-)SMC 0.01800 1300 23.400 1300 23.40000

21.02(a)Non-residential (3 days training of 3 Members of

PRI/VECs/LA) (@ Rs.100/-)VEC/ WEC 0.00900

21.03

Seminar/Orientation of SMC Women members

and President/Vice President (@ Rs. 50,000/-

per block)

Blocks 0.50000

Sub Total 1300 23.400 1300 23.40000VI SCHOOL INFRASTRUCTURE22 Civil Works22.01 Primary School (Plain) (New) School 13.1550022.02 Primary School (Hilly/Rocky) (New) School 13.2750022.03 Upper Primary (Plain) (New) School 20.65500

22.04 Upper Primary School (Hilly/Rocky) (New) School 20.77500

22.04aComposite Schools for Urban Areas (Class I-

VIII)School 41.04000

22.05 ACR in lieu of upgraded Upper Primary School Rooms

22.06 Additional class rooms for adding Class VIII Rooms

22.07 Building Less (Pry) School 9.7500022.08 Building Less (UP) School 18.5900022.09 Dilapidated Building (Pry) School 9.7500022.10 Dilapidated Building (UP) School 18.59000

22.11 Additional Class Room (Rural) ( PS+UPS) Rooms 3.45000 261 900.450 261 900.45000

22.12 Additional Class Room (Urban) Rooms 3.4500022.13 Additional Class Room (Hill Area)22.14 Toilet/Urinals (PS & UPS) School 0.7000022.15 Separate Girls Toilet (Rural+Urban) School 0.7000022.16 CWSN friendly Toilets School 0.50000

22.17 Drinking Water Facility (for Urban Area Only)) School 0.15000

22.17a Drinking Water Facility (Plain PS & UPS) School 0.15000

22.17b Drinking Water Facility (Hilly/Rocky PS & UPS) School 0.15000

22.18a Boundary Wall PS (Total in Meters x .01105) 0.01749

22.18bBoundary Wall PS (For Gate) @Rs. 7000 x no. of

P.S.School 0.07800

22.18c Boundary Wall UPS (Total in Meters x .01105) 0.01749

22.18dBoundary Wall UPS (For Gate) @Rs. 7000 x no.

of UPSSchool 0.07800

22.19a Electrification in P.S./ Electrical Equipment School 0.11000

22.19b Electrification in U. P.S./ Electrical Equipment School 0.11000

22.20Office-cum-store-cum-Head Teacher's room

(Primary)Rooms

22.21Office-cum-store-cum-Head Teacher's room

(Upper Primary)Rooms

22.22Augumentation of training facility in BRC (one

time)BRC/ URC 5.00000

22.23 Child friendly Elements School 0.25000

22.24 Ramps with Handrails (Barrier Free Elements) School 0.06000

22.25 Handrails in existing Ramps School 0.01000

Arti:SSA-AWPB-2014-15-PABMinits:MuzaffarNagar:16-06-2014 124 / 533

Page 125: U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 · 2015. 1. 6. · U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15

Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

Name of District :Muzaffar Nagar -59

ActivityS. No.Physical

UnitRemarks

Outlay Recommendation for 2014-15

Spill OverDeferred laibility of

2014-15Fresh Recommended Total Recommended

22.26 Whole School Develoipment School22.27 Retro-fitting and repairs School

22.28Residential Schools for specific category

of children

(a) Construction of Building including boundary

wall, Water and sanitation facilities, electric

installation (For 100 children)

Building 65.86000

(b) Construction of residential hostel Building 65.86000

(c) Refurnishing unused old buildings Building

22.29

Construction of Hostel in existing Govt UPS

including boundary wall, Water and sanitation

facilities, electric installation etc. (For 50

children)

7.00000

22.30Furniture for Govt. UPS (per child) (@ Rs.500/-

per child enrolled)Child 0.00500

22.31 Major Repairs for Primary School School 0.30000

22.32 Majr Repairs for Upper Primary School School 0.30000

22.33Others (Difference of Civil Wrks

sanctioned in pre.yr.)22.33a Others (Overhead Tank PS) School 0.1200022.33b Others (Overhead Tank UPS) School 0.12000

Sub Total (Civil WOrks) 261 900.450 261 900.45VII PROJECT MANAGEMENT COST23 Management23.01 Management up to 3.5%

(a) Project Management and MIS

(i) DPO ( Salary, Contigency, Consumables,

POL, TA & Computer etc)District 1 108.430 1 108.42950

(ii) EMIS Cell District 1 14.250 1 14.25000Sub Total (a) 1 1 1 122.680 1 122.680

(b) Training of Educational Administrators District

(c) School Mapping and Social Mapping District

Sub Total (23.01)

23.02Learning Enhancement Prog. (LEP) (P & UP) (up

to 2%)District 10.597 10.59690

23.03 Community Mobilization (up to 0.5%) District 1 32.000 1 32.00000

Sub Total (Management) 1 42.597 1 42.59690Total Management Cost 165.276 165.27640Total of SSA (Districs) 4.600 268582 7717.151 268582 7721.751

24 State Component23.01 Management23.02 REMS 0.0044923.03 SIEMAT

Sub Total

STATE SSA TOTAL 4.60000 268582 7717.151 268582 7721.75127

25

KGBV Financial Provision (give

separate costing sheets for different

Models)

Hostel

ANon Recurring One Time Grant (Only

committed liabilities) (Model-I)

25.01 Construction of Building (New)

25.02 Construction of Building KGBV sanctioned earlier

25.02(a) Additional Class Room Rooms 3.45000

25.02(b) Guard Room Rooms 1.32000

25.02(c) Boundary Wall School 5.0200025.03 Boudary Wall (Spillover only) 0.19000 0.19000

25.04

Boring/Handpump (Spillover only)

(minimum rates prescribed by State Drinking

Water Department subject to a ceiling of Rs.

1.00 lakhs)

1.74700 1.74700

25.05 Electricity /Water charges (Spillover only)

25.05(a) Solar Water Heater & Solar Light 2.97000

25.06Furniture/Equipment (including Kitchen

equipment)3.00000

25.07 TLM and equipment including library books 3.50000

25.08 Bedding (New) 0.75000

25.09 Replacement of Bedding (once in 3 Year) 0.75000 4 3.000 4 3.00000

Subtotal Non Recurring 1.93700 3.000 4.93700

B Recurring Cost Per Annum (Model-I)

25.10Maintenance per girl student per month @ Rs.

1500/-18.00000 4 72.000 4 72.00000

25.11 Stipend for girl student per month @ Rs. 100/- 1.20000 4 4.800 4 4.80000

25.12Supplementary TLM, stationery and other

educational material @ Rs.1000/- per annum1.00000 4 4.000 4 4.00000

25.13 Salaries

Arti:SSA-AWPB-2014-15-PABMinits:MuzaffarNagar:16-06-2014 125 / 533

Page 126: U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 · 2015. 1. 6. · U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15

Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

Name of District :Muzaffar Nagar -59

ActivityS. No.Physical

UnitRemarks

Outlay Recommendation for 2014-15

Spill OverDeferred laibility of

2014-15Fresh Recommended Total Recommended

25.13.1 Additional Salaries:

(a) 1 Warden @ Rs. 25,000/- per month 3.00000 4 12.00000 4 12.00000

(b)4 Full time teachers as per RTE norms @ Rs.

20,000/- per month per teacher 9.60000 4 38.40000 4 38.40000

(c)

1 Urdu Teachers (only for blocks with muslim

population above 20% and select urban areas), if

required @ Rs. 12,000/- per month per teacher 1.44000 4 5.76000 4 5.76000

(d)3 part time teachers @ Rs. 5,000/- per month per

teacher 1.80000 4 7.20000 4 7.20000

(e)1 Full time Accountant @ Rs. 10,000/- per month

1.20000 4 4.80000 4 4.80000

(f)

2 Support Staff – (Accountant/ Assistant, Peon,

Chowkidar) @ Rs. 5,000/- per month per staff 1.20000 4 4.80000 4 4.80000

(g) 1 Head cook @ Rs. 6,000/- per month 0.72000 4 2.88000 4 2.88000

(h)2 Asstt. Cooks @ Rs. 4,500/- per month per cook

1.08000 4 4.32000 4 4.32000

25.14Specific skill training @ Rs.1000/- per child per

annum1.00000 4 4.000 4 4.00000

25.15Electricity/water charges @ Rs.1000/- per child

per annum1.00000 4 4.000 4 4.00000

25.16Medical care/contingencies @ Rs. 1250 per child

per annum1.25000 4 5.000 4 5.00000

25.17 Maintenance @ Rs.750/- per child per annum 0.75000 4 3.000 4 3.00000

25.18

Miscellaneous (Educational Tour/ Exposure Visit

/ Sports Material etc.) @ Rs.750/- per child per

annum

0.75000 4 3.000 4 3.00000

25.19Preparatory camps @ Rs.200/- per child per

annum0.20000 4 0.800 4 0.80000

25.20PTAs/school functions @ Rs.200/- per child per

annum0.20000 4 0.800 4 0.80000

25.21 Provision of Rent @ Rs.6000/- per annum 6.00000

25.21a Provision of Rent (6 months) 3.6000025.21b Provision of Rent (3 months) 1.8000025.21c Rent (Previous Year (2007-2012)

25.22 Capacity building 0.50000 4 2.000 4 2.00000

25.22(a)Physical/ Self Defence Training @ Rs.200/- per

child per annum0.20000 4 0.800 4 0.80000

Subtotal Recurring 4 184.360 4 184.36000

Subtotal (Model-I) 1.93700 4 187.360 4 189.29700

CNon Recurring One Time Grant (Only

committed liabilities) (Model-II)

25.23 Construction of Building (New)

25.24 Construction of Building KGBV sanctioned earlier

25.24(a) Additional Class Room Rooms 3.45000

25.24(b) Guard Room Rooms 1.32000

25.24(c) Boundary Wall School 5.0200025.25 Boudary Wall (Spillover only)25.26 Boring/Handpump (Spillover only) 1.66200 1.66200

25.27 Electricity /Water charges (Spillover only)

25.27(a) Solar Water Heater & Solar Light 2.97000

25.28Furniture/Equipment (including Kitchen

equipment)2.00000

25.29 TLM and equipment including library books 3.00000

25.30 Bedding (New) 0.37500

25.31 Replacement of Bedding (once in 3 Year) 0.37500 4 1.500 4 1.50000

Subtotal Non Recurring 1.66200 4.00 1.500 4.00 3.16200

D Recurring Cost Per Annum (Model-II)

25.32Maintenance per girl student per month @ Rs.

1500/-9.00000 4 36.000 4 36.00000

25.33 Stipend for girl student per month @ Rs. 100/- 0.60000 4 2.400 4 2.40000

25.34Supplementary TLM, stationery and other

educational material @ Rs.1000/- per annum0.50000 4 2.000 4 2.00000

25.35 Salaries(a) 1 Warden @ Rs. 25,000/- per month 3.00000 4 12.000 4 12.00000

(b)3 Full time teachers as per RTE norms @ Rs.

20,000/- per month per teacher 7.20000 4 28.800 4 28.80000

(c) 3 part time teachers @ Rs. 5,000/- per month per

teacher 1.80000 4 7.200 4 7.20000

(d)1 Full time Accountant @ Rs. 10,000/- per month

1.20000 4 4.800 4 4.80000

(e)

2 Support Staff – (Accountant/ Assistant, Peon,

Chowkidar) @ Rs. 5,000/- per month per staff 1.20000 4 4.800 4 4.80000

Arti:SSA-AWPB-2014-15-PABMinits:MuzaffarNagar:16-06-2014 126 / 533

Page 127: U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 · 2015. 1. 6. · U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15

Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

Name of District :Muzaffar Nagar -59

ActivityS. No.Physical

UnitRemarks

Outlay Recommendation for 2014-15

Spill OverDeferred laibility of

2014-15Fresh Recommended Total Recommended

(f) 1 Head cook @ Rs. 6,000/- per month 0.72000 4 2.880 4 2.88000

(g)1 Asstt. Cooks @ Rs. 4,500/- per month per cook

0.54000 4 2.160 4 2.16000

25.36Specific skill training @ Rs.1000/- per child per

annum0.50000 4 2.000 4 2.00000

25.37Electricity/water charges @ Rs.1000/- per child

per annum0.50000 4 2.000 4 2.00000

25.38Medical care/contingencies @ Rs. 1250 per child

per annum0.62500 4 2.500 4 2.50000

25.39 Maintenance @ Rs.750/- per child per annum 0.37500 4 1.500 4 1.50000

25.40

Miscellaneous (Educational Tour/ Exposure Visit

/ Sports Material etc.) @ Rs.750/- per child per

annum

0.37500 4 1.500 4 1.50000

25.41Preparatory camps @ Rs.300/- per child per

annum0.15000 4 0.600 4 0.60000

25.42PTAs/school functions @ Rs.300/- per child per

annum0.15000 4 0.600 4 0.60000

25.43 Provision of Rent @ Rs.10000/- per annum 5.00000

25.43a Provision of Rent (6 months) 3.6000025.43b Provision of Rent (3 months) 1.8000025.43c Rent (Previous Year (2007-2012)25.44 Capacity building 0.25000 4 1.000 4 1.00000

25.44(a)Physical/ Self Defence Training @ Rs.200/- per

child per annum0.10000 4 0.400 4 0.40000

Subtotal Recurring 76.00 115.140 76.00 115.14000

Subtotal (Model-II) 1.66200 80.00 116.640 80.00 118.30200

Total (KGBV) 3.599 84 304.000 84 307.599

DISTRICT GRAND TOTAL (SSA+KGBV) 3.599 4.600 268666 8021.151 268666 8029.350

Arti:SSA-AWPB-2014-15-PABMinits:MuzaffarNagar:16-06-2014 127 / 533

Page 128: U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 · 2015. 1. 6. · U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15

Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

I ACCESS

1 Opening of New Schools

1.01 Upgradation of EGS to PSCentres /

School1.02 New PS School

1.03 Upgradation of PS to UPS / New UPS School

1.04 Composite Schools (for Urban Areas) School

1.05Residential Schools for specific category children

(For 100 children)

1.06Residential Hostel (for specific category of

children) (For 50 children)

1.07 Integration of Class V with Primary Schools

1.08Integration of Class VIII with Upper Primary

Schools

2Residential Schools for specific category

of children (For 100 Children)

Total - Residential Schools (For 100

children)

3Residential Hostel for specific category of

children (For 50 Children)

Total - Residential Schools (For 50

children)4 Transport/Escort Facility

4.01

Children in remote habitations with sparse

populations where opening of schools is

unviable

Child 0.03000

4.02

Urban deprived children/children without adult

protection in urban areas where schools are not

opened because availability of land is a problem

Child 0.03000

Sub Total

5Special Training for mainstreaming of Out-

of-School Children

5.03 Non-Residential (Fresh)(a) 12 months Child 0.06000(b) 9 months 0.04500(c) 6 months

(i)Special Training (by Special Instructors-NRBC)-

(1-5) Child 0.03000 214 6.420 214 6.42000

(ii) Special Training (by Special Instructors-NRBC)-

(6-8) Child 0.03000 302 9.060 302 9.06000

(d) 3 months Child 0.01500Sub Total 516 15.480 516 15.48000

Total (Special Training) 516 15.480 516 15.4805(B) House Hold Survey (HHS)

5(B).01 House Hold Survey through SMCHouse

Hold0.00001

Sub TotalII RETENTION6 Free Text Book

6.01Free Text Book (PS) for Parishadiya & Aided

Primary Schools (Workbooks not included)Child 0.00120 110806 132.967 110806 132.96720

6.01a

Free Text Book (PS) for 25% children of Class-1

in Private Recognised Primary Schools of other

Boards (Workbooks not included)

Child 0.00150

6.02 Free Brail Books (PS) 0.00150 192 0.288 192 0.28800

6.03 Free Large Print Books (PS) 0.00150

6.04Free Text Book (UPS) (Workbooks not included)

(Including KGBV Girls)Child 0.00200 31510 63.020 31510 63.02000

6.05 Free Brail Books (UPS) 0.00250 78 0.195 78 0.19500

6.06 Free Large Print Books (PS) 0.00250Sub Total 142586 196.470 142586 196.470

7 Provision of 2 set of Uniforms

7.01 All Girls (Including KGBV Girls) Child 0.00400 122693 490.772 122693 490.77200

7.02 SC Boys Child 0.00400 21217 84.868 21217 84.86800

7.03 ST Boys Child 0.00400

7.04 BPL Boys Child 0.00400 17502 70.008 17502 70.00800

7.05

Free Uniform for 25% children of Class-1 in

Private Recognised Primary Schools of other

Boards

Child0.00400

Sub Total 161412 645.648 161412 645.6487(A) Fee Reimbursement

7(A).01

Fee Reimbursement for Admission of children of

Disadvantaged Group & Weaker Section upto

25% of seats in Class-1 of Private Unaided

Recognised Schools

Child 0.05400

Sub Total

8 Teaching Learning Equipment (TLE)

8.01 TLE - New Primary School 0.60000 0.20000 0.600008.02 TLE - New Upper Primary School 1.50000 0.50000 1.50000

Name of District : Moradabad -58

ActivityS. No.Physical

UnitRemarks

Outlay Recommendation for 2014-15

Spill OverDeferred laibility of

2014-15Fresh Recommended Total Recommended

Arti:SSA-AWPB-2014-15-PABMinits:Moradabad:16-06-2014 128 / 533

Page 129: U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 · 2015. 1. 6. · U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15

Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

Name of District : Moradabad -58

ActivityS. No.Physical

UnitRemarks

Outlay Recommendation for 2014-15

Spill OverDeferred laibility of

2014-15Fresh Recommended Total Recommended

Sub Total 2.10000 2.10000III ENHANCING QUALITY9 New Teachers Salary

9.01 Primary Teachers (Regular) (Asstt. Teacher) Teacher 0.91500

9.01aHead Teacher for Primary (if the number of

children exceeds 150 in a school)Teacher

9.02 Primary Teachers (Contract) (S.M.) Teacher

9.03Subject specific Upper Primary Teachers

(Regular) (a) Science and Mathematics Teacher 1.26000(b) Social Studies Teacher 1.26000(c) Languages Teacher 1.26000

Sub Total (9.01 to 9.05)Add.Teacher against PTR

Sub Total (9.06 to 9.12)

Total (New Teacher's Salary-9.01 to 9.12)

Teachers Salary (Recurring-sanctioned

earlier)Primary teachers

9.13 Primary Teachers ( Regular)-Existing, in position Teacher 3.66000 192 702.720 192 702.72000

9.14Primary Teachers (Contract)-Existing, in

positionTeacher 0.55000

9.14(a) Primary Teachers (Contract)-under Training Teacher 0.38500 1420 546.700 1420 546.70000

9.14(b)Primary Teacher (Para Teachers Equal to

9.14(a) upgraded as Teachers)0.38500 541 208.285 541 208.28500

9.14(c) Primary Teachers (Para)- Vacant Teacher9.15 Primary Teachers (Vacant) Teacher 0.30500

9.16Head Teacher for Primary (if the number of

children exceeds 150)Teacher 5.04000 154 776.160 154 776.16000

9.16(b)Head Teacher for Primary (if the number of

children exceeds 150) VacantTeacher 0.42000

Additional teachers

9.17Additional Teachers - PS (Special BTC-

Regular) in positionTeacher 0.30500

9.18Additional Teachers - PS (Special BTC Under

Training)Teacher 0.87600

9.19 Additional Teachers - PS (Vacant) Teacher

9.20Others in position (Para Teachers upgraded

as Teachers)Teacher

Upper Primary teachers

9.21 UP Teachers (Regular)-Existing Teacher 5.04000 491 2474.640 491 2474.64000

9.22 UP Teachers (Contract)-Existing9.23 UP Teachers (Vacant) Teacher 1.26000

9.24Head Teacher for Upper Primary (if the number

of children exceeds 100)-ExistingTeacher 5.34000 266 1420.440 266 1420.44000

9.24a Head Teacher for Upper Primary (Vacant) Teacher 1.33500

9.25Subject specific Upper Primary Teachers

(Regular)(a) Science and Mathematics(b) Social Studies(c) Languages

9.32 Part Time Instructors in position(a) Art Education 0.77000 85 65.450 85 65.45000(b) Health and Physical Education 0.77000 106 81.620 106 81.62000(c) Work Education 0.77000 83 63.910 83 63.91000

9.32(A) Part Time Instructors Vacant(a) Art Education 0.42000(b) Health and Physical Education 0.42000(c) Work Education 0.42000

9.33

Others-Incentive to Teachers in Schools

Located in Naxal Affected Areas (@

Rs.1500/- per teachers per month)

Sub Total (9.13 to 9.33) 3338 6339.925 3338 6339.93TOTAL

(New Teachers Salary +Teachers Salary

Recurring)

3338 6339.925 3338 6339.92500

10 Teachers Training(a) Teachers

10.01

Refresher In-service Teachers' Training at BRC

level and above - 10 days (@ Rs.200/- per

head per day)

Teacher

(Target &

Ach.-13-14

in

Mandays)

0.00600

10.01(a)Continuous and Comprehensive Evauation [PS +

UPS)Teacher 0.01300 1178 15.314 1178 15.31400

10.01(b) Eary Reading and Numeracy Skills [PS] Teacher 0.00500 1178 5.890 1178 5.89000

10.01(c) Science [UPS] Teacher 0.00800 583 4.664 583 4.66400Recommended as

proposed

10.01(d) CWSN Teacher 0.00400

Arti:SSA-AWPB-2014-15-PABMinits:Moradabad:16-06-2014 129 / 533

Page 130: U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 · 2015. 1. 6. · U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15

Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

Name of District : Moradabad -58

ActivityS. No.Physical

UnitRemarks

Outlay Recommendation for 2014-15

Spill OverDeferred laibility of

2014-15Fresh Recommended Total Recommended

10.02

One day monthly cluster level meetings and

peer group training sessions for 10 months for

all teachers each year at CRC level - 10 days (@

Rs.100/- per head per day)

Teacher 0.01000

10.03(a)

Induction Training for Newly Recruited Teachers

for 6 Months (Special BTC)- @Rs.2000/- per

head per year

Teacher 0.02000

10.03(b)5 Days Training for Part Time Instructors @ Rs.

200/- per head per day) Teacher 0.01000

10.04

Training of untrained Teachers to acquire

professional qualifications over a two year

period.

Teacher 0.04700 1181 55.507 1181 55.50700

(b) Head Teachers

10.05Refresher Residencial In-service for 10 days at

BRC level and above

Head

Teacher(c) Resource Persons

10.06

Refresher Training for all Resource

Persons,Master Trainers, BRC & CRC faculty

and Coordinators for 5 days each year (@

Rs.200/- per head per day)

Resource

Person 0.00300 108 0.324 108 0.32400

Sub Total 4228 81.699 4228 81.699

11Academic Support through Block Resource

Centre (BRC)/ URC

11.01 Salary of Faculty and Staff

(a) 5 RPs at BRC for subject specific training in

positionRP 45 45

(b) 2 RPs for CWSN in position RP(b-i) 1 CWSN Resource Person RP 1.10000 18 19.800 18 19.80000

(b-ii) 1 Physiotherapist (Resource person for IE) RP

(c) 1 MIS Coordinator in position RP 1.86000

(d) 1 Datra Entry Operator in position RP 1.74000 14 24.360 14 24.36000

(e) 1 Accountant-cum-support staff in position RP 1.80000 8 14.400 8 14.40000

11.02 Furniture Grant BRC/ URC 1.00000

11.03Replacement of furniture, computer, TLE etc (

Once in 5 years)BRC/ URC 1.00000

11.04 Contingency Grant BRC/ URC 0.50000 9 4.500 9 4.50000

11.05 Meeting, TA BRC/ URC 0.30000 9 2.700 9 2.70000

11.06 TLM Grant BRC/ URC 0.10000

11.07 Maintenance Grant BRC/ URC 0.10000

Sub Total 9 65.760 9 65.76000

12Academic Support through Cluster

Resource Centres (CRC/UERC)

12.01Salary of Cluster Coordinator (on an average of

one Resource Person per 18 schools in a block)RP

12.02 Furniture GrantCRC/

UERC0.10000

12.03Replacement of furniture, computer, TLE etc.

once in 5 years

CRC/

UERC0.10000

12.04 Contingency Grant CRC/UERC 0.10000 59 5.900 59 5.90000

12.05 Meeting, TA CRC/UERC 0.12000 59 7.080 59 7.08000

12.06 TLM Grant CRC/UERC 0.03000

12.07Maintenance Grant

CRC/UERC 0.02000

Sub Total 118 12.980 118 12.98000

13Computer Aided Education in upper

primary schools under Innovation

13.01Computer Aided Education in upper primary

schoolsDistrict 0.01200 48 0.576 48 0.57600

Sub Total 48 0.576 48 0.5760014 Libraries in Schools14.01 (a) Primary School (per school) School 0.03000

14.02 (b) Upper Primary School (per school) School 0.10000

Sub TotalIV ANNUAL GRANTS15 Teachers' Grant15.01 Primary Teachers Teacher 0.0050015.02 Upper Primary Teachers Teacher 0.00500 583 2.915 583 2.91500

Sub Total 583 2.915 583 2.9150016 School Grant16.01 Primary School School 0.05000 1212 60.600 1212 60.6000016.02 Upper Primary School School 0.07000 574 40.180 574 40.18000

Sub Total 1786 100.780 1786 100.78000

Arti:SSA-AWPB-2014-15-PABMinits:Moradabad:16-06-2014 130 / 533

Page 131: U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 · 2015. 1. 6. · U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15

Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

Name of District : Moradabad -58

ActivityS. No.Physical

UnitRemarks

Outlay Recommendation for 2014-15

Spill OverDeferred laibility of

2014-15Fresh Recommended Total Recommended

17Research, Evaluation, Monitoring &

Supervision

17.01 REMS Activities School 0.00103 1786 1.837 1786 1.83710

17.02 Monitoring & Supervision School 0.00078 1786 1.400 1786 1.40034

17.03 House Hold Survey (Urban) in Million Plus Cities District 35.00000

Sub Total 3572 3.237 3572 3.2374518 Maintenance Grant

18.01 Maintenance in School having upto3 Classrooms School 0.07500 257 19.275 257 19.27500

18.01a Maintenance Grant School 0.07500 1481 111.075 1481 111.07500Sub Total 1738 130.350 1738 130.35000

VBRIDGING GENDER AND SOCIAL

CATEGORY GAPS

19 Interventions for CWSN (IE)

19.01 Provision for Inclusive Education Child 0.02500 3624 90.600 3624 90.60000

Sub Total 3624 90.600 3624 90.60000

20Innovativation Head up to Rs.50 Lakh per

district

20.01 Girls Education District 0.70000 9 6.300 9 6.30000

20.02 ECCE District20.03 Intervention for SC / ST children District

20.04 Intervention for Minority Community children District

20.05 Intervention for Urban Deprived children District 10.00000

Sub Total 9 6.300 9 6.3000021 SMC/PRI Training

21.01Residential for 6 Resource Person per Block (3

days) (@ Rs.500/-)Blocks 0.09000

21.02Non-residential (3 days training of 6 SMC

members) (@ Rs.100/-)SMC 0.01800 1742 31.356 1742 31.35600

21.02(a)Non-residential (3 days training of 3 Members of

PRI/VECs/LA) (@ Rs.100/-)VEC/ WEC 0.00900

21.03

Seminar/Orientation of SMC Women members

and President/Vice President (@ Rs. 50,000/-

per block)

Blocks 0.50000

Sub Total 1742 31.356 1742 31.35600VI SCHOOL INFRASTRUCTURE22 Civil Works22.01 Primary School (Plain) (New) School 13.1550022.02 Primary School (Hilly/Rocky) (New) School 13.2750022.03 Upper Primary (Plain) (New) School 20.65500

22.04 Upper Primary School (Hilly/Rocky) (New) School 20.77500

22.04aComposite Schools for Urban Areas (Class I-

VIII)School 82.08 41.04000 82.08300

22.05 ACR in lieu of upgraded Upper Primary School Rooms

22.06 Additional class rooms for adding Class VIII Rooms

22.07 Building Less (Pry) School 9.7500022.08 Building Less (UP) School 18.5900022.09 Dilapidated Building (Pry) School 9.7500022.10 Dilapidated Building (UP) School 18.59000

22.11 Additional Class Room (Rural) ( PS+UPS) Rooms 3.45000

22.12 Additional Class Room (Urban) Rooms 3.4500022.13 Additional Class Room (Hill Area)22.14 Toilet/Urinals (PS & UPS) School 0.7000022.15 Separate Girls Toilet (Rural+Urban) School 0.7000022.16 CWSN friendly Toilets School 0.50000

22.17 Drinking Water Facility (for Urban Area Only)) School 0.15000

22.17a Drinking Water Facility (Plain PS & UPS) School 0.15000

22.17b Drinking Water Facility (Hilly/Rocky PS & UPS) School 0.15000

22.18a Boundary Wall PS (Total in Meters x .01105) 0.01749

22.18bBoundary Wall PS (For Gate) @Rs. 7000 x no. of

P.S.School 0.07800

22.18c Boundary Wall UPS (Total in Meters x .01105) 0.01749

22.18dBoundary Wall UPS (For Gate) @Rs. 7000 x no.

of UPSSchool 0.07800

22.19a Electrification in P.S./ Electrical Equipment School 0.11000

22.19b Electrification in U. P.S./ Electrical Equipment School 0.11000

22.20Office-cum-store-cum-Head Teacher's room

(Primary)Rooms

22.21Office-cum-store-cum-Head Teacher's room

(Upper Primary)Rooms

22.22Augumentation of training facility in BRC (one

time)BRC/ URC 5.00000

22.23 Child friendly Elements School 0.25000

22.24 Ramps with Handrails (Barrier Free Elements) School 0.06000

22.25 Handrails in existing Ramps School 0.01000

Arti:SSA-AWPB-2014-15-PABMinits:Moradabad:16-06-2014 131 / 533

Page 132: U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 · 2015. 1. 6. · U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15

Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

Name of District : Moradabad -58

ActivityS. No.Physical

UnitRemarks

Outlay Recommendation for 2014-15

Spill OverDeferred laibility of

2014-15Fresh Recommended Total Recommended

22.26 Whole School Develoipment School22.27 Retro-fitting and repairs School

22.28Residential Schools for specific category

of children

(a) Construction of Building including boundary

wall, Water and sanitation facilities, electric

installation (For 100 children)

Building 65.86000

(b) Construction of residential hostel Building 65.86000

(c) Refurnishing unused old buildings Building

22.29

Construction of Hostel in existing Govt UPS

including boundary wall, Water and sanitation

facilities, electric installation etc. (For 50

children)

7.00000

22.30Furniture for Govt. UPS (per child) (@ Rs.500/-

per child enrolled)Child 0.00500

22.31 Major Repairs for Primary School School 0.30000

22.32 Majr Repairs for Upper Primary School School 0.30000

22.33Others (Difference of Civil Wrks

sanctioned in pre.yr.)22.33a Others (Overhead Tank PS) School 0.1200022.33b Others (Overhead Tank UPS) School 0.12000

Sub Total (Civil WOrks) 82.08 82.08VII PROJECT MANAGEMENT COST23 Management23.01 Management up to 3.5%

(a) Project Management and MIS

(i) DPO ( Salary, Contigency, Consumables,

POL, TA & Computer etc)District 1 134.834 1 134.83430

(ii) EMIS Cell District 1 14.117 1 14.11650Sub Total (a) 1 1 1 148.951 1 148.951

(b) Training of Educational Administrators District

(c) School Mapping and Social Mapping District

Sub Total (23.01)

23.02Learning Enhancement Prog. (LEP) (P & UP) (up

to 2%)District 13.176 13.17580

23.03 Community Mobilization (up to 0.5%) District 1 38.000 1 38.00000

Sub Total (Management) 1 51.176 1 51.17580Total Management Cost 200.127 200.12660Total of SSA (Districs) 82.083 2.100 325309 7924.203 325309 8008.386

24 State Component23.01 Management23.02 REMS 0.0044923.03 SIEMAT

Sub Total

STATE SSA TOTAL 82.08300 2.10000 325309 7924.203 325309 8008.38625

25

KGBV Financial Provision (give

separate costing sheets for different

Models)

Hostel

ANon Recurring One Time Grant (Only

committed liabilities) (Model-I)

25.01 Construction of Building (New)

25.02 Construction of Building KGBV sanctioned earlier

25.02(a) Additional Class Room Rooms 3.45000

25.02(b) Guard Room Rooms 1.32000

25.02(c) Boundary Wall School 5.0200025.03 Boudary Wall (Spillover only)

25.04

Boring/Handpump (Spillover only)

(minimum rates prescribed by State Drinking

Water Department subject to a ceiling of Rs.

1.00 lakhs)

25.05 Electricity /Water charges (Spillover only)

25.05(a) Solar Water Heater & Solar Light 2.97000

25.06Furniture/Equipment (including Kitchen

equipment)3.00000

25.07 TLM and equipment including library books 3.50000

25.08 Bedding (New) 0.75000

25.09 Replacement of Bedding (once in 3 Year) 0.75000

Subtotal Non Recurring

B Recurring Cost Per Annum (Model-I)

25.10Maintenance per girl student per month @ Rs.

1500/-18.00000 9 162.000 9 162.00000

25.11 Stipend for girl student per month @ Rs. 100/- 1.20000 9 10.800 9 10.80000

25.12Supplementary TLM, stationery and other

educational material @ Rs.1000/- per annum1.00000 9 9.000 9 9.00000

25.13 Salaries

Arti:SSA-AWPB-2014-15-PABMinits:Moradabad:16-06-2014 132 / 533

Page 133: U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 · 2015. 1. 6. · U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15

Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

Name of District : Moradabad -58

ActivityS. No.Physical

UnitRemarks

Outlay Recommendation for 2014-15

Spill OverDeferred laibility of

2014-15Fresh Recommended Total Recommended

25.13.1 Additional Salaries:

(a) 1 Warden @ Rs. 25,000/- per month 3.00000 9 27.00000 9 27.00000

(b)4 Full time teachers as per RTE norms @ Rs.

20,000/- per month per teacher 9.60000 9 86.40000 9 86.40000

(c)

1 Urdu Teachers (only for blocks with muslim

population above 20% and select urban areas), if

required @ Rs. 12,000/- per month per teacher 1.44000 9 12.96000 9 12.96000

(d)3 part time teachers @ Rs. 5,000/- per month per

teacher 1.80000 9 16.20000 9 16.20000

(e)1 Full time Accountant @ Rs. 10,000/- per month

1.20000 9 10.80000 9 10.80000

(f)

2 Support Staff – (Accountant/ Assistant, Peon,

Chowkidar) @ Rs. 5,000/- per month per staff 1.20000 9 10.80000 9 10.80000

(g) 1 Head cook @ Rs. 6,000/- per month 0.72000 9 6.48000 9 6.48000

(h)2 Asstt. Cooks @ Rs. 4,500/- per month per cook

1.08000 9 9.72000 9 9.72000

25.14Specific skill training @ Rs.1000/- per child per

annum1.00000 9 9.000 9 9.00000

25.15Electricity/water charges @ Rs.1000/- per child

per annum1.00000 9 9.000 9 9.00000

25.16Medical care/contingencies @ Rs. 1250 per child

per annum1.25000 9 11.250 9 11.25000

25.17 Maintenance @ Rs.750/- per child per annum 0.75000 9 6.750 9 6.75000

25.18

Miscellaneous (Educational Tour/ Exposure Visit

/ Sports Material etc.) @ Rs.750/- per child per

annum

0.75000 9 6.750 9 6.75000

25.19Preparatory camps @ Rs.200/- per child per

annum0.20000 9 1.800 9 1.80000

25.20PTAs/school functions @ Rs.200/- per child per

annum0.20000 9 1.800 9 1.80000

25.21 Provision of Rent @ Rs.6000/- per annum 6.00000

25.21a Provision of Rent (6 months) 3.6000025.21b Provision of Rent (3 months) 1.8000025.21c Rent (Previous Year (2007-2012)

25.22 Capacity building 0.50000 9 4.500 9 4.50000

25.22(a)Physical/ Self Defence Training @ Rs.200/- per

child per annum0.20000 9 1.800 9 1.80000

Subtotal Recurring 9 414.810 9 414.81000

Subtotal (Model-I) 9 414.810 9 414.81000

CNon Recurring One Time Grant (Only

committed liabilities) (Model-II)

25.23 Construction of Building (New)

25.24 Construction of Building KGBV sanctioned earlier

25.24(a) Additional Class Room Rooms 3.45000

25.24(b) Guard Room Rooms 1.32000

25.24(c) Boundary Wall School 5.0200025.25 Boudary Wall (Spillover only)25.26 Boring/Handpump (Spillover only)

25.27 Electricity /Water charges (Spillover only)

25.27(a) Solar Water Heater & Solar Light 2.97000

25.28Furniture/Equipment (including Kitchen

equipment)2.00000

25.29 TLM and equipment including library books 3.00000

25.30 Bedding (New) 0.37500

25.31 Replacement of Bedding (once in 3 Year) 0.37500

Subtotal Non Recurring

D Recurring Cost Per Annum (Model-II)

25.32Maintenance per girl student per month @ Rs.

1500/-9.00000

25.33 Stipend for girl student per month @ Rs. 100/- 0.60000

25.34Supplementary TLM, stationery and other

educational material @ Rs.1000/- per annum0.50000

25.35 Salaries(a) 1 Warden @ Rs. 25,000/- per month 3.00000

(b)3 Full time teachers as per RTE norms @ Rs.

20,000/- per month per teacher 7.20000

(c) 3 part time teachers @ Rs. 5,000/- per month per

teacher 1.80000

(d)1 Full time Accountant @ Rs. 10,000/- per month

1.20000

(e)

2 Support Staff – (Accountant/ Assistant, Peon,

Chowkidar) @ Rs. 5,000/- per month per staff 1.20000

Arti:SSA-AWPB-2014-15-PABMinits:Moradabad:16-06-2014 133 / 533

Page 134: U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 · 2015. 1. 6. · U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15

Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

Name of District : Moradabad -58

ActivityS. No.Physical

UnitRemarks

Outlay Recommendation for 2014-15

Spill OverDeferred laibility of

2014-15Fresh Recommended Total Recommended

(f) 1 Head cook @ Rs. 6,000/- per month 0.72000

(g)1 Asstt. Cooks @ Rs. 4,500/- per month per cook

0.54000

25.36Specific skill training @ Rs.1000/- per child per

annum0.50000

25.37Electricity/water charges @ Rs.1000/- per child

per annum0.50000

25.38Medical care/contingencies @ Rs. 1250 per child

per annum0.62500

25.39 Maintenance @ Rs.750/- per child per annum 0.37500

25.40

Miscellaneous (Educational Tour/ Exposure Visit

/ Sports Material etc.) @ Rs.750/- per child per

annum

0.37500

25.41Preparatory camps @ Rs.300/- per child per

annum0.15000

25.42PTAs/school functions @ Rs.300/- per child per

annum0.15000

25.43 Provision of Rent @ Rs.10000/- per annum 5.00000

25.43a Provision of Rent (6 months) 3.6000025.43b Provision of Rent (3 months) 1.8000025.43c Rent (Previous Year (2007-2012)25.44 Capacity building 0.25000

25.44(a)Physical/ Self Defence Training @ Rs.200/- per

child per annum0.10000

Subtotal Recurring

Subtotal (Model-II) Total (KGBV) 9 414.810 9 414.810

DISTRICT GRAND TOTAL (SSA+KGBV) 82.083 2.100 325318 8339.013 325318 8423.196

Arti:SSA-AWPB-2014-15-PABMinits:Moradabad:16-06-2014 134 / 533

Page 135: U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 · 2015. 1. 6. · U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15

Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

I ACCESS

1 Opening of New Schools

1.01 Upgradation of EGS to PSCentres /

School1.02 New PS School

1.03 Upgradation of PS to UPS / New UPS School

1.04 Composite Schools (for Urban Areas) School

1.05Residential Schools for specific category children

(For 100 children)

1.06Residential Hostel (for specific category of

children) (For 50 children)

1.07 Integration of Class V with Primary Schools

1.08Integration of Class VIII with Upper Primary

Schools

2Residential Schools for specific category

of children (For 100 Children)

Total - Residential Schools (For 100

children)

3Residential Hostel for specific category of

children (For 50 Children)

Total - Residential Schools (For 50

children)4 Transport/Escort Facility

4.01

Children in remote habitations with sparse

populations where opening of schools is

unviable

Child 0.03000

4.02

Urban deprived children/children without adult

protection in urban areas where schools are not

opened because availability of land is a problem

Child 0.03000

Sub Total

5Special Training for mainstreaming of Out-

of-School Children

5.03 Non-Residential (Fresh)(a) 12 months Child 0.06000(b) 9 months 0.04500(c) 6 months

(i)Special Training (by Special Instructors-NRBC)-

(1-5) Child 0.03000 30 0.900 30 0.90000

(ii) Special Training (by Special Instructors-NRBC)-

(6-8) Child 0.03000 32 0.960 32 0.96000

(d) 3 months Child 0.01500Sub Total 62 1.860 62 1.86000

Total (Special Training) 62 1.860 62 1.8605(B) House Hold Survey (HHS)

5(B).01 House Hold Survey through SMCHouse

Hold0.00001

Sub TotalII RETENTION6 Free Text Book

6.01Free Text Book (PS) for Parishadiya & Aided

Primary Schools (Workbooks not included)Child 0.00120 164235 197.082 164235 197.08200

6.01a

Free Text Book (PS) for 25% children of Class-1

in Private Recognised Primary Schools of other

Boards (Workbooks not included)

Child 0.00150

6.02 Free Brail Books (PS) 0.00150 29 0.044 29 0.04350

6.03 Free Large Print Books (PS) 0.00150

6.04Free Text Book (UPS) (Workbooks not included)

(Including KGBV Girls)Child 0.00200 67836 135.672 67836 135.67200

6.05 Free Brail Books (UPS) 0.00250 6 0.015 6 0.01500

6.06 Free Large Print Books (PS) 0.00250Sub Total 232106 332.813 232106 332.813

7 Provision of 2 set of Uniforms

7.01 All Girls (Including KGBV Girls) Child 0.00400 170037 680.148 170037 680.14800

7.02 SC Boys Child 0.00400 65517 262.068 65517 262.06800

7.03 ST Boys Child 0.00400 68 0.272 68 0.27200

7.04 BPL Boys Child 0.00400 88050 352.200 88050 352.20000

7.05

Free Uniform for 25% children of Class-1 in

Private Recognised Primary Schools of other

Boards

Child0.00400

Sub Total 323672 1294.688 323672 1294.6887(A) Fee Reimbursement

7(A).01

Fee Reimbursement for Admission of children of

Disadvantaged Group & Weaker Section upto

25% of seats in Class-1 of Private Unaided

Recognised Schools

Child 0.05400

Sub Total

8 Teaching Learning Equipment (TLE)

8.01 TLE - New Primary School 1.20000 0.20000 1.200008.02 TLE - New Upper Primary School 3.50000 0.50000 3.50000

Name of District : Mirzapur -57

ActivityS. No.Physical

UnitRemarks

Outlay Recommendation for 2014-15

Spill OverDeferred laibility of

2014-15Fresh Recommended Total Recommended

Arti:SSA-AWPB-2014-15-PABMinits:Mirzapur:16-06-2014 135 / 533

Page 136: U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 · 2015. 1. 6. · U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15

Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

Name of District : Mirzapur -57

ActivityS. No.Physical

UnitRemarks

Outlay Recommendation for 2014-15

Spill OverDeferred laibility of

2014-15Fresh Recommended Total Recommended

Sub Total 4.70000 4.70000III ENHANCING QUALITY9 New Teachers Salary

9.01 Primary Teachers (Regular) (Asstt. Teacher) Teacher 0.91500

9.01aHead Teacher for Primary (if the number of

children exceeds 150 in a school)Teacher

9.02 Primary Teachers (Contract) (S.M.) Teacher

9.03Subject specific Upper Primary Teachers

(Regular) (a) Science and Mathematics Teacher 1.26000(b) Social Studies Teacher 1.26000(c) Languages Teacher 1.26000

Sub Total (9.01 to 9.05)Add.Teacher against PTR

Sub Total (9.06 to 9.12)

Total (New Teacher's Salary-9.01 to 9.12)

Teachers Salary (Recurring-sanctioned

earlier)Primary teachers

9.13 Primary Teachers ( Regular)-Existing, in position Teacher 3.66000 214 783.240 214 783.24000

9.14Primary Teachers (Contract)-Existing, in

positionTeacher 0.55000

9.14(a) Primary Teachers (Contract)-under Training Teacher 0.38500 1089 419.265 1089 419.26500

9.14(b)Primary Teacher (Para Teachers Equal to

9.14(a) upgraded as Teachers)0.38500 1429 550.165 1429 550.16500

9.14(c) Primary Teachers (Para)- Vacant Teacher9.15 Primary Teachers (Vacant) Teacher 0.30500

9.16Head Teacher for Primary (if the number of

children exceeds 150)Teacher 5.04000 248 1249.920 248 1249.92000

9.16(b)Head Teacher for Primary (if the number of

children exceeds 150) VacantTeacher 0.42000

Additional teachers

9.17Additional Teachers - PS (Special BTC-

Regular) in positionTeacher 0.30500

9.18Additional Teachers - PS (Special BTC Under

Training)Teacher 0.87600

9.19 Additional Teachers - PS (Vacant) Teacher

9.20Others in position (Para Teachers upgraded

as Teachers)Teacher

Upper Primary teachers

9.21 UP Teachers (Regular)-Existing Teacher 5.04000 789 3976.560 789 3976.56000

9.22 UP Teachers (Contract)-Existing9.23 UP Teachers (Vacant) Teacher 1.26000

9.24Head Teacher for Upper Primary (if the number

of children exceeds 100)-ExistingTeacher 5.34000 38 202.920 38 202.92000

9.24a Head Teacher for Upper Primary (Vacant) Teacher 1.33500

9.25Subject specific Upper Primary Teachers

(Regular)(a) Science and Mathematics(b) Social Studies(c) Languages

9.32 Part Time Instructors in position(a) Art Education 0.77000 189 145.530 189 145.53000(b) Health and Physical Education 0.77000 217 167.090 217 167.09000(c) Work Education 0.77000 171 131.670 171 131.67000

9.32(A) Part Time Instructors Vacant(a) Art Education 0.42000(b) Health and Physical Education 0.42000(c) Work Education 0.42000

9.33

Others-Incentive to Teachers in Schools

Located in Naxal Affected Areas (@

Rs.1500/- per teachers per month)

Sub Total (9.13 to 9.33) 4384 7626.360 4384 7626.36TOTAL

(New Teachers Salary +Teachers Salary

Recurring)

4384 7626.360 4384 7626.36000

10 Teachers Training(a) Teachers

10.01

Refresher In-service Teachers' Training at BRC

level and above - 10 days (@ Rs.200/- per

head per day)

Teacher

(Target &

Ach.-13-14

in

Mandays)

0.00600

10.01(a)Continuous and Comprehensive Evauation [PS +

UPS)Teacher 0.01300 1441 18.733 1441 18.73300

10.01(b) Eary Reading and Numeracy Skills [PS] Teacher 0.00500 1441 7.205 1441 7.20500

10.01(c) Science [UPS] Teacher 0.00800 685 5.480 685 5.48000Recommended as

proposed

10.01(d) CWSN Teacher 0.00400

Arti:SSA-AWPB-2014-15-PABMinits:Mirzapur:16-06-2014 136 / 533

Page 137: U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 · 2015. 1. 6. · U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15

Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

Name of District : Mirzapur -57

ActivityS. No.Physical

UnitRemarks

Outlay Recommendation for 2014-15

Spill OverDeferred laibility of

2014-15Fresh Recommended Total Recommended

10.02

One day monthly cluster level meetings and

peer group training sessions for 10 months for

all teachers each year at CRC level - 10 days (@

Rs.100/- per head per day)

Teacher 0.01000

10.03(a)

Induction Training for Newly Recruited Teachers

for 6 Months (Special BTC)- @Rs.2000/- per

head per year

Teacher 0.02000

10.03(b)5 Days Training for Part Time Instructors @ Rs.

200/- per head per day) Teacher 0.01000

10.04

Training of untrained Teachers to acquire

professional qualifications over a two year

period.

Teacher 0.04700 902 42.394 902 42.39400

(b) Head Teachers

10.05Refresher Residencial In-service for 10 days at

BRC level and above

Head

Teacher(c) Resource Persons

10.06

Refresher Training for all Resource

Persons,Master Trainers, BRC & CRC faculty

and Coordinators for 5 days each year (@

Rs.200/- per head per day)

Resource

Person 0.00300 156 0.468 156 0.46800

Sub Total 4625 74.280 4625 74.280

11Academic Support through Block Resource

Centre (BRC)/ URC

11.01 Salary of Faculty and Staff

(a) 5 RPs at BRC for subject specific training in

positionRP 65 65

(b) 2 RPs for CWSN in position RP(b-i) 1 CWSN Resource Person RP 1.10000 26 28.600 26 28.60000

(b-ii) 1 Physiotherapist (Resource person for IE) RP

(c) 1 MIS Coordinator in position RP 1.86000

(d) 1 Datra Entry Operator in position RP 1.74000 7 12.180 7 12.18000

(e) 1 Accountant-cum-support staff in position RP 1.80000 8 14.400 8 14.40000

11.02 Furniture Grant BRC/ URC 1.00000

11.03Replacement of furniture, computer, TLE etc (

Once in 5 years)BRC/ URC 1.00000

11.04 Contingency Grant BRC/ URC 0.50000 13 6.500 13 6.50000

11.05 Meeting, TA BRC/ URC 0.30000 13 3.900 13 3.90000

11.06 TLM Grant BRC/ URC 0.10000

11.07 Maintenance Grant BRC/ URC 0.10000

Sub Total 13 65.580 13 65.58000

12Academic Support through Cluster

Resource Centres (CRC/UERC)

12.01Salary of Cluster Coordinator (on an average of

one Resource Person per 18 schools in a block)RP

12.02 Furniture GrantCRC/

UERC0.10000

12.03Replacement of furniture, computer, TLE etc.

once in 5 years

CRC/

UERC0.10000

12.04 Contingency Grant CRC/UERC 0.10000 106 10.600 106 10.60000

12.05 Meeting, TA CRC/UERC 0.12000 106 12.720 106 12.72000

12.06 TLM Grant CRC/UERC 0.03000

12.07Maintenance Grant

CRC/UERC 0.02000

Sub Total 212 23.320 212 23.32000

13Computer Aided Education in upper

primary schools under Innovation

13.01Computer Aided Education in upper primary

schoolsDistrict 0.01200 48 0.576 48 0.57600

Sub Total 48 0.576 48 0.5760014 Libraries in Schools14.01 (a) Primary School (per school) School 0.03000

14.02 (b) Upper Primary School (per school) School 0.10000

Sub TotalIV ANNUAL GRANTS15 Teachers' Grant15.01 Primary Teachers Teacher 0.0050015.02 Upper Primary Teachers Teacher 0.00500 685 3.425 685 3.42500

Sub Total 685 3.425 685 3.4250016 School Grant16.01 Primary School School 0.05000 1621 81.050 1621 81.0500016.02 Upper Primary School School 0.07000 678 47.460 678 47.46000

Sub Total 2299 128.510 2299 128.51000

Arti:SSA-AWPB-2014-15-PABMinits:Mirzapur:16-06-2014 137 / 533

Page 138: U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 · 2015. 1. 6. · U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15

Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

Name of District : Mirzapur -57

ActivityS. No.Physical

UnitRemarks

Outlay Recommendation for 2014-15

Spill OverDeferred laibility of

2014-15Fresh Recommended Total Recommended

17Research, Evaluation, Monitoring &

Supervision

17.01 REMS Activities School 0.00103 2299 2.365 2299 2.36478

17.02 Monitoring & Supervision School 0.00078 2299 1.803 2299 1.80257

17.03 House Hold Survey (Urban) in Million Plus Cities District 35.00000

Sub Total 4598 4.167 4598 4.1673518 Maintenance Grant

18.01 Maintenance in School having upto3 Classrooms School 0.07500 483 36.225 483 36.22500

18.01a Maintenance Grant School 0.07500 1783 133.725 1783 133.72500Sub Total 2266 169.950 2266 169.95000

VBRIDGING GENDER AND SOCIAL

CATEGORY GAPS

19 Interventions for CWSN (IE)

19.01 Provision for Inclusive Education Child 0.02960 2298 68.021 2298 68.02080

Sub Total 2298 68.021 2298 68.02080

20Innovativation Head up to Rs.50 Lakh per

district

20.01 Girls Education District 0.70000 10 7.000 10 7.00000

20.02 ECCE District20.03 Intervention for SC / ST children District

20.04 Intervention for Minority Community children District

20.05 Intervention for Urban Deprived children District 10.00000

Sub Total 10 7.000 10 7.0000021 SMC/PRI Training

21.01Residential for 6 Resource Person per Block (3

days) (@ Rs.500/-)Blocks 0.09000

21.02Non-residential (3 days training of 6 SMC

members) (@ Rs.100/-)SMC 0.01800 2220 39.960 2220 39.96000

21.02(a)Non-residential (3 days training of 3 Members of

PRI/VECs/LA) (@ Rs.100/-)VEC/ WEC 0.00900

21.03

Seminar/Orientation of SMC Women members

and President/Vice President (@ Rs. 50,000/-

per block)

Blocks 0.50000

Sub Total 2220 39.960 2220 39.96000VI SCHOOL INFRASTRUCTURE22 Civil Works22.01 Primary School (Plain) (New) School 13.1550022.02 Primary School (Hilly/Rocky) (New) School 13.2750022.03 Upper Primary (Plain) (New) School 20.65500

22.04 Upper Primary School (Hilly/Rocky) (New) School 1.14690 20.77500 1.14690

22.04aComposite Schools for Urban Areas (Class I-

VIII)School 35.62400 41.04000 35.62400

22.05 ACR in lieu of upgraded Upper Primary School Rooms

22.06 Additional class rooms for adding Class VIII Rooms

22.07 Building Less (Pry) School 9.7500022.08 Building Less (UP) School 18.5900022.09 Dilapidated Building (Pry) School 9.7500022.10 Dilapidated Building (UP) School 18.59000

22.11 Additional Class Room (Rural) ( PS+UPS) Rooms 3.45000 116 400.200 116 400.20000

22.12 Additional Class Room (Urban) Rooms 3.4500022.13 Additional Class Room (Hill Area)22.14 Toilet/Urinals (PS & UPS) School 0.7000022.15 Separate Girls Toilet (Rural+Urban) School 0.7000022.16 CWSN friendly Toilets School 0.50000

22.17 Drinking Water Facility (for Urban Area Only)) School 0.15000

22.17a Drinking Water Facility (Plain PS & UPS) School 0.15000

22.17b Drinking Water Facility (Hilly/Rocky PS & UPS) School 0.15000 32 4.800 32 4.80000

22.18a Boundary Wall PS (Total in Meters x .01105) 0.01749

22.18bBoundary Wall PS (For Gate) @Rs. 7000 x no. of

P.S.School 0.07800

22.18c Boundary Wall UPS (Total in Meters x .01105) 0.01749

22.18dBoundary Wall UPS (For Gate) @Rs. 7000 x no.

of UPSSchool 0.07800

22.19a Electrification in P.S./ Electrical Equipment School 0.11000

22.19b Electrification in U. P.S./ Electrical Equipment School 0.11000

22.20Office-cum-store-cum-Head Teacher's room

(Primary)Rooms

22.21Office-cum-store-cum-Head Teacher's room

(Upper Primary)Rooms

22.22Augumentation of training facility in BRC (one

time)BRC/ URC 5.00000

22.23 Child friendly Elements School 0.25000

22.24 Ramps with Handrails (Barrier Free Elements) School 0.06000 196 11.760 196 11.76000

22.25 Handrails in existing Ramps School 0.01000

Arti:SSA-AWPB-2014-15-PABMinits:Mirzapur:16-06-2014 138 / 533

Page 139: U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 · 2015. 1. 6. · U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15

Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

Name of District : Mirzapur -57

ActivityS. No.Physical

UnitRemarks

Outlay Recommendation for 2014-15

Spill OverDeferred laibility of

2014-15Fresh Recommended Total Recommended

22.26 Whole School Develoipment School22.27 Retro-fitting and repairs School

22.28Residential Schools for specific category

of children

(a) Construction of Building including boundary

wall, Water and sanitation facilities, electric

installation (For 100 children)

Building 65.86000

(b) Construction of residential hostel Building 65.86000

(c) Refurnishing unused old buildings Building

22.29

Construction of Hostel in existing Govt UPS

including boundary wall, Water and sanitation

facilities, electric installation etc. (For 50

children)

7.00000

22.30Furniture for Govt. UPS (per child) (@ Rs.500/-

per child enrolled)Child 0.00500

22.31 Major Repairs for Primary School School 0.30000

22.32 Majr Repairs for Upper Primary School School 0.30000

22.33Others (Difference of Civil Wrks

sanctioned in pre.yr.)22.33a Others (Overhead Tank PS) School 0.1200022.33b Others (Overhead Tank UPS) School 0.12000

Sub Total (Civil WOrks) 36.77 344 416.760 344 453.53VII PROJECT MANAGEMENT COST23 Management23.01 Management up to 3.5%

(a) Project Management and MIS

(i) DPO ( Salary, Contigency, Consumables,

POL, TA & Computer etc)District 1 116.978 1 116.97790

(ii) EMIS Cell District 1 16.010 1 16.01000Sub Total (a) 1 1 1 132.988 1 132.988

(b) Training of Educational Administrators District

(c) School Mapping and Social Mapping District

Sub Total (23.01)

23.02Learning Enhancement Prog. (LEP) (P & UP) (up

to 2%)District 19.709 19.70855

23.03 Community Mobilization (up to 0.5%) District 1 50.000 1 50.00000

Sub Total (Management) 1 69.709 1 69.70855Total Management Cost 202.696 202.69645Total of SSA (Districs) 36.771 4.700 579842 10459.966 579842 10501.437

24 State Component23.01 Management23.02 REMS 0.0044923.03 SIEMAT

Sub Total

STATE SSA TOTAL 36.77090 4.70000 579842 10459.966 579842 10501.43700

25

KGBV Financial Provision (give

separate costing sheets for different

Models)

Hostel

ANon Recurring One Time Grant (Only

committed liabilities) (Model-I)

25.01 Construction of Building (New)

25.02 Construction of Building KGBV sanctioned earlier

25.02(a) Additional Class Room Rooms 3.45000

25.02(b) Guard Room Rooms 1.32000

25.02(c) Boundary Wall School 5.0200025.03 Boudary Wall (Spillover only) 7.50000 7.50000

25.04

Boring/Handpump (Spillover only)

(minimum rates prescribed by State Drinking

Water Department subject to a ceiling of Rs.

1.00 lakhs)

5.00000 5.00000

25.05 Electricity /Water charges (Spillover only)

25.05(a) Solar Water Heater & Solar Light 2.97000

25.06Furniture/Equipment (including Kitchen

equipment)3.00000

25.07 TLM and equipment including library books 3.50000

25.08 Bedding (New) 0.75000

25.09 Replacement of Bedding (once in 3 Year) 0.75000 10 7.500 10 7.50000

Subtotal Non Recurring 12.50000 7.500 20.00000

B Recurring Cost Per Annum (Model-I)

25.10Maintenance per girl student per month @ Rs.

1500/-18.00000 10 180.000 10 180.00000

25.11 Stipend for girl student per month @ Rs. 100/- 1.20000 10 12.000 10 12.00000

25.12Supplementary TLM, stationery and other

educational material @ Rs.1000/- per annum1.00000 10 10.000 10 10.00000

25.13 Salaries

Arti:SSA-AWPB-2014-15-PABMinits:Mirzapur:16-06-2014 139 / 533

Page 140: U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 · 2015. 1. 6. · U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15

Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

Name of District : Mirzapur -57

ActivityS. No.Physical

UnitRemarks

Outlay Recommendation for 2014-15

Spill OverDeferred laibility of

2014-15Fresh Recommended Total Recommended

25.13.1 Additional Salaries:

(a) 1 Warden @ Rs. 25,000/- per month 3.00000 10 30.00000 10 30.00000

(b)4 Full time teachers as per RTE norms @ Rs.

20,000/- per month per teacher 9.60000 10 96.00000 10 96.00000

(c)

1 Urdu Teachers (only for blocks with muslim

population above 20% and select urban areas), if

required @ Rs. 12,000/- per month per teacher 1.44000 10 14.40000 10 14.40000

(d)3 part time teachers @ Rs. 5,000/- per month per

teacher 1.80000 10 18.00000 10 18.00000

(e)1 Full time Accountant @ Rs. 10,000/- per month

1.20000 10 12.00000 10 12.00000

(f)

2 Support Staff – (Accountant/ Assistant, Peon,

Chowkidar) @ Rs. 5,000/- per month per staff 1.20000 10 12.00000 10 12.00000

(g) 1 Head cook @ Rs. 6,000/- per month 0.72000 10 7.20000 10 7.20000

(h)2 Asstt. Cooks @ Rs. 4,500/- per month per cook

1.08000 10 10.80000 10 10.80000

25.14Specific skill training @ Rs.1000/- per child per

annum1.00000 10 10.000 10 10.00000

25.15Electricity/water charges @ Rs.1000/- per child

per annum1.00000 10 10.000 10 10.00000

25.16Medical care/contingencies @ Rs. 1250 per child

per annum1.25000 10 12.500 10 12.50000

25.17 Maintenance @ Rs.750/- per child per annum 0.75000 10 7.500 10 7.50000

25.18

Miscellaneous (Educational Tour/ Exposure Visit

/ Sports Material etc.) @ Rs.750/- per child per

annum

0.75000 10 7.500 10 7.50000

25.19Preparatory camps @ Rs.200/- per child per

annum0.20000 10 2.000 10 2.00000

25.20PTAs/school functions @ Rs.200/- per child per

annum0.20000 10 2.000 10 2.00000

25.21 Provision of Rent @ Rs.6000/- per annum 6.00000

25.21a Provision of Rent (6 months) 3.6000025.21b Provision of Rent (3 months) 1.8000025.21c Rent (Previous Year (2007-2012)

25.22 Capacity building 0.50000 10 5.000 10 5.00000

25.22(a)Physical/ Self Defence Training @ Rs.200/- per

child per annum0.20000 10 2.000 10 2.00000

Subtotal Recurring 10 460.900 10 460.90000

Subtotal (Model-I) 12.50000 10 468.400 10 480.90000

CNon Recurring One Time Grant (Only

committed liabilities) (Model-II)

25.23 Construction of Building (New)

25.24 Construction of Building KGBV sanctioned earlier

25.24(a) Additional Class Room Rooms 3.45000

25.24(b) Guard Room Rooms 1.32000

25.24(c) Boundary Wall School 5.0200025.25 Boudary Wall (Spillover only)25.26 Boring/Handpump (Spillover only)

25.27 Electricity /Water charges (Spillover only)

25.27(a) Solar Water Heater & Solar Light 2.97000

25.28Furniture/Equipment (including Kitchen

equipment)2.00000

25.29 TLM and equipment including library books 3.00000

25.30 Bedding (New) 0.37500

25.31 Replacement of Bedding (once in 3 Year) 0.37500

Subtotal Non Recurring

D Recurring Cost Per Annum (Model-II)

25.32Maintenance per girl student per month @ Rs.

1500/-9.00000

25.33 Stipend for girl student per month @ Rs. 100/- 0.60000

25.34Supplementary TLM, stationery and other

educational material @ Rs.1000/- per annum0.50000

25.35 Salaries(a) 1 Warden @ Rs. 25,000/- per month 3.00000

(b)3 Full time teachers as per RTE norms @ Rs.

20,000/- per month per teacher 7.20000

(c) 3 part time teachers @ Rs. 5,000/- per month per

teacher 1.80000

(d)1 Full time Accountant @ Rs. 10,000/- per month

1.20000

(e)

2 Support Staff – (Accountant/ Assistant, Peon,

Chowkidar) @ Rs. 5,000/- per month per staff 1.20000

Arti:SSA-AWPB-2014-15-PABMinits:Mirzapur:16-06-2014 140 / 533

Page 141: U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 · 2015. 1. 6. · U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15

Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

Name of District : Mirzapur -57

ActivityS. No.Physical

UnitRemarks

Outlay Recommendation for 2014-15

Spill OverDeferred laibility of

2014-15Fresh Recommended Total Recommended

(f) 1 Head cook @ Rs. 6,000/- per month 0.72000

(g)1 Asstt. Cooks @ Rs. 4,500/- per month per cook

0.54000

25.36Specific skill training @ Rs.1000/- per child per

annum0.50000

25.37Electricity/water charges @ Rs.1000/- per child

per annum0.50000

25.38Medical care/contingencies @ Rs. 1250 per child

per annum0.62500

25.39 Maintenance @ Rs.750/- per child per annum 0.37500

25.40

Miscellaneous (Educational Tour/ Exposure Visit

/ Sports Material etc.) @ Rs.750/- per child per

annum

0.37500

25.41Preparatory camps @ Rs.300/- per child per

annum0.15000

25.42PTAs/school functions @ Rs.300/- per child per

annum0.15000

25.43 Provision of Rent @ Rs.10000/- per annum 5.00000

25.43a Provision of Rent (6 months) 3.6000025.43b Provision of Rent (3 months) 1.8000025.43c Rent (Previous Year (2007-2012)25.44 Capacity building 0.25000

25.44(a)Physical/ Self Defence Training @ Rs.200/- per

child per annum0.10000

Subtotal Recurring

Subtotal (Model-II) Total (KGBV) 12.500 10 468.400 10 480.900

DISTRICT GRAND TOTAL (SSA+KGBV) 49.271 4.700 579852 10928.366 579852 10982.337

Arti:SSA-AWPB-2014-15-PABMinits:Mirzapur:16-06-2014 141 / 533

Page 142: U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 · 2015. 1. 6. · U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15

Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

I ACCESS

1 Opening of New Schools

1.01 Upgradation of EGS to PSCentres /

School1.02 New PS School

1.03 Upgradation of PS to UPS / New UPS School

1.04 Composite Schools (for Urban Areas) School

1.05Residential Schools for specific category children

(For 100 children)

1.06Residential Hostel (for specific category of

children) (For 50 children)

1.07 Integration of Class V with Primary Schools

1.08Integration of Class VIII with Upper Primary

Schools

2Residential Schools for specific category

of children (For 100 Children)

Total - Residential Schools (For 100

children)

3Residential Hostel for specific category of

children (For 50 Children)

Total - Residential Schools (For 50

children)4 Transport/Escort Facility

4.01

Children in remote habitations with sparse

populations where opening of schools is

unviable

Child 0.03000

4.02

Urban deprived children/children without adult

protection in urban areas where schools are not

opened because availability of land is a problem

Child 0.03000

Sub Total

5Special Training for mainstreaming of Out-

of-School Children

5.03 Non-Residential (Fresh)(a) 12 months Child 0.06000(b) 9 months 0.04500(c) 6 months

(i)Special Training (by Special Instructors-NRBC)-

(1-5) Child 0.03000 251 7.530 251 7.53000

(ii) Special Training (by Special Instructors-NRBC)-

(6-8) Child 0.03000 173 5.190 173 5.19000

(d) 3 months Child 0.01500Sub Total 424 12.720 424 12.72000

Total (Special Training) 424 12.720 424 12.7205(B) House Hold Survey (HHS)

5(B).01 House Hold Survey through SMCHouse

Hold0.00001

Sub TotalII RETENTION6 Free Text Book

6.01Free Text Book (PS) for Parishadiya & Aided

Primary Schools (Workbooks not included)Child 0.00120 72866 87.439 72866 87.43920

6.01a

Free Text Book (PS) for 25% children of Class-1

in Private Recognised Primary Schools of other

Boards (Workbooks not included)

Child 0.00150

6.02 Free Brail Books (PS) 0.00150 59 0.089 59 0.08850

6.03 Free Large Print Books (PS) 0.00150

6.04Free Text Book (UPS) (Workbooks not included)

(Including KGBV Girls)Child 0.00200 44580 89.160 44580 89.16000

6.05 Free Brail Books (UPS) 0.00250 15 0.038 15 0.03750

6.06 Free Large Print Books (PS) 0.00250Sub Total 117520 176.725 117520 176.725

7 Provision of 2 set of Uniforms

7.01 All Girls (Including KGBV Girls) Child 0.00400 89485 357.940 89485 357.94000

7.02 SC Boys Child 0.00400 27961 111.844 27961 111.84400

7.03 ST Boys Child 0.00400

7.04 BPL Boys Child 0.00400 7890 31.560 7890 31.56000

7.05

Free Uniform for 25% children of Class-1 in

Private Recognised Primary Schools of other

Boards

Child0.00400

Sub Total 125336 501.344 125336 501.3447(A) Fee Reimbursement

7(A).01

Fee Reimbursement for Admission of children of

Disadvantaged Group & Weaker Section upto

25% of seats in Class-1 of Private Unaided

Recognised Schools

Child 0.05400

Sub Total

Name of District : Meerut -56

ActivityS. No.Physical

UnitRemarks

Outlay Recommendation for 2014-15

Spill OverDeferred laibility

of 2014-15Fresh Recommended Total Recommended

Arti:SSA-AWPB-2014-15-PABMinits:Meerut:16-06-2014 142 / 533

Page 143: U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 · 2015. 1. 6. · U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15

Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

Name of District : Meerut -56

ActivityS. No.Physical

UnitRemarks

Outlay Recommendation for 2014-15

Spill OverDeferred laibility

of 2014-15Fresh Recommended Total Recommended

8 Teaching Learning Equipment (TLE)

8.01 TLE - New Primary School 0.20000 0.20000 0.200008.02 TLE - New Upper Primary School 0.50000 0.50000 0.50000

Sub Total 0.70000 0.70000III ENHANCING QUALITY9 New Teachers Salary

9.01 Primary Teachers (Regular) (Asstt. Teacher) Teacher 0.91500

9.01aHead Teacher for Primary (if the number of

children exceeds 150 in a school)Teacher

9.02 Primary Teachers (Contract) (S.M.) Teacher

9.03Subject specific Upper Primary Teachers

(Regular) (a) Science and Mathematics Teacher 1.26000(b) Social Studies Teacher 1.26000(c) Languages Teacher 1.26000

Sub Total (9.01 to 9.05)Add.Teacher against PTR

Sub Total (9.06 to 9.12)

Total (New Teacher's Salary-9.01 to 9.12)

Teachers Salary (Recurring-sanctioned

earlier)Primary teachers

9.13 Primary Teachers ( Regular)-Existing, in position Teacher 3.66000 440 1610.400 440 1610.40000

9.14Primary Teachers (Contract)-Existing, in

positionTeacher 0.55000

9.14(a) Primary Teachers (Contract)-under Training Teacher 0.38500 190 73.150 190 73.15000

9.14(b)Primary Teacher (Para Teachers Equal to

9.14(a) upgraded as Teachers)0.38500 786 302.610 786 302.61000

9.14(c) Primary Teachers (Para)- Vacant Teacher9.15 Primary Teachers (Vacant) Teacher 0.30500

9.16Head Teacher for Primary (if the number of

children exceeds 150)Teacher 5.04000 12 60.480 12 60.48000

9.16(b)Head Teacher for Primary (if the number of

children exceeds 150) VacantTeacher 0.42000

Additional teachers

9.17Additional Teachers - PS (Special BTC-

Regular) in positionTeacher 0.30500

9.18Additional Teachers - PS (Special BTC Under

Training)Teacher 0.87600

9.19 Additional Teachers - PS (Vacant) Teacher

9.20Others in position (Para Teachers upgraded

as Teachers)Teacher

Upper Primary teachers

9.21 UP Teachers (Regular)-Existing Teacher 5.04000 158 796.320 158 796.32000

9.22 UP Teachers (Contract)-Existing9.23 UP Teachers (Vacant) Teacher 1.26000

9.24Head Teacher for Upper Primary (if the number

of children exceeds 100)-ExistingTeacher 5.34000 73 389.820 73 389.82000

9.24a Head Teacher for Upper Primary (Vacant) Teacher 1.33500

9.25Subject specific Upper Primary Teachers

(Regular)(a) Science and Mathematics(b) Social Studies(c) Languages

9.32 Part Time Instructors in position(a) Art Education 0.77000 59 45.430 59 45.43000(b) Health and Physical Education 0.77000 73 56.210 73 56.21000(c) Work Education 0.77000 56 43.120 56 43.12000

9.32(A) Part Time Instructors Vacant(a) Art Education 0.42000(b) Health and Physical Education 0.42000(c) Work Education 0.42000

9.33

Others-Incentive to Teachers in Schools

Located in Naxal Affected Areas (@

Rs.1500/- per teachers per month)

Sub Total (9.13 to 9.33) 1847 3377.540 1847 3377.54TOTAL

(New Teachers Salary +Teachers Salary

Recurring)

1847 3377.540 1847 3377.54000

10 Teachers Training(a) Teachers

10.01

Refresher In-service Teachers' Training at BRC

level and above - 10 days (@ Rs.200/- per head

per day)

Teacher

(Target &

Ach.-13-14

in

Mandays)

0.00600

Arti:SSA-AWPB-2014-15-PABMinits:Meerut:16-06-2014 143 / 533

Page 144: U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 · 2015. 1. 6. · U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15

Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

Name of District : Meerut -56

ActivityS. No.Physical

UnitRemarks

Outlay Recommendation for 2014-15

Spill OverDeferred laibility

of 2014-15Fresh Recommended Total Recommended

10.01(a)Continuous and Comprehensive Evauation [PS +

UPS)Teacher 0.01300 911 11.843 911 11.84300

10.01(b) Eary Reading and Numeracy Skills [PS] Teacher 0.00500 911 4.555 911 4.55500

10.01(c) Science [UPS] Teacher 0.00800 518 4.144 518 4.14400Recommended as

proposed

10.01(d) CWSN Teacher 0.00400

10.02

One day monthly cluster level meetings and

peer group training sessions for 10 months for

all teachers each year at CRC level - 10 days (@

Rs.100/- per head per day)

Teacher 0.01000

10.03(a)

Induction Training for Newly Recruited Teachers

for 6 Months (Special BTC)- @Rs.2000/- per

head per year

Teacher 0.02000

10.03(b)5 Days Training for Part Time Instructors @ Rs.

200/- per head per day) Teacher 0.01000

10.04

Training of untrained Teachers to acquire

professional qualifications over a two year

period.

Teacher 0.04700 30 1.410 30 1.41000

(b) Head Teachers

10.05Refresher Residencial In-service for 10 days at

BRC level and above

Head

Teacher(c) Resource Persons

10.06

Refresher Training for all Resource

Persons,Master Trainers, BRC & CRC faculty

and Coordinators for 5 days each year (@

Rs.200/- per head per day)

Resource

Person 0.00300 168 0.504 168 0.50400

Sub Total 2538 22.456 2538 22.456

11Academic Support through Block Resource

Centre (BRC)/ URC

11.01 Salary of Faculty and Staff

(a) 5 RPs at BRC for subject specific training in

positionRP 70 70

(b) 2 RPs for CWSN in position RP(b-i) 1 CWSN Resource Person RP 1.10000 21 23.100 21 23.10000

(b-ii) 1 Physiotherapist (Resource person for IE) RP

(c) 1 MIS Coordinator in position RP 1.86000

(d) 1 Datra Entry Operator in position RP 1.74000 14 24.360 14 24.36000

(e) 1 Accountant-cum-support staff in position RP 1.80000 14 25.200 14 25.20000

11.02 Furniture Grant BRC/ URC 1.00000

11.03Replacement of furniture, computer, TLE etc (

Once in 5 years)BRC/ URC 1.00000

11.04 Contingency Grant BRC/ URC 0.50000 14 7.000 14 7.00000

11.05 Meeting, TA BRC/ URC 0.30000 14 4.200 14 4.20000

11.06 TLM Grant BRC/ URC 0.10000

11.07 Maintenance Grant BRC/ URC 0.10000

Sub Total 14 83.860 14 83.86000

12Academic Support through Cluster

Resource Centres (CRC/UERC)

12.01Salary of Cluster Coordinator (on an average of

one Resource Person per 18 schools in a block)RP

12.02 Furniture Grant CRC/ UERC 0.10000

12.03Replacement of furniture, computer, TLE etc.

once in 5 yearsCRC/ UERC 0.10000

12.04 Contingency Grant CRC/UERC 0.10000 95 9.500 95 9.50000

12.05 Meeting, TA CRC/UERC 0.12000 95 11.400 95 11.40000

12.06 TLM Grant CRC/UERC 0.03000

12.07Maintenance Grant

CRC/UERC 0.02000

Sub Total 190 20.900 190 20.90000

13Computer Aided Education in upper

primary schools under Innovation

13.01Computer Aided Education in upper primary

schoolsDistrict 0.01200 48 0.576 48 0.57600

Sub Total 48 0.576 48 0.5760014 Libraries in Schools

Arti:SSA-AWPB-2014-15-PABMinits:Meerut:16-06-2014 144 / 533

Page 145: U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 · 2015. 1. 6. · U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15

Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

Name of District : Meerut -56

ActivityS. No.Physical

UnitRemarks

Outlay Recommendation for 2014-15

Spill OverDeferred laibility

of 2014-15Fresh Recommended Total Recommended

14.01 (a) Primary School (per school) School 0.03000

14.02 (b) Upper Primary School (per school) School 0.10000

Sub TotalIV ANNUAL GRANTS15 Teachers' Grant15.01 Primary Teachers Teacher 0.0050015.02 Upper Primary Teachers Teacher 0.00500 518 2.590 518 2.59000

Sub Total 518 2.590 518 2.5900016 School Grant16.01 Primary School School 0.05000 935 46.750 935 46.7500016.02 Upper Primary School School 0.07000 513 35.910 513 35.91000

Sub Total 1448 82.660 1448 82.66000

17Research, Evaluation, Monitoring &

Supervision

17.01 REMS Activities School 0.00103 1448 1.489 1448 1.48943

17.02 Monitoring & Supervision School 0.00078 1448 1.135 1448 1.13533

17.03 House Hold Survey (Urban) in Million Plus Cities District 35.00000

Sub Total 2896 2.625 2896 2.6247618 Maintenance Grant

18.01 Maintenance in School having upto3 Classrooms School 0.07500 320 24.000 320 24.00000

18.01a Maintenance Grant School 0.07500 1022 76.650 1022 76.65000Sub Total 1342 100.650 1342 100.65000

VBRIDGING GENDER AND SOCIAL

CATEGORY GAPS

19 Interventions for CWSN (IE)

19.01 Provision for Inclusive Education Child 0.02000 4120 82.400 4120 82.40000

Sub Total 4120 82.400 4120 82.40000

20Innovativation Head up to Rs.50 Lakh per

district

20.01 Girls Education District 0.70000 9 6.300 9 6.30000

20.02 ECCE District20.03 Intervention for SC / ST children District

20.04 Intervention for Minority Community children District

20.05 Intervention for Urban Deprived children District 10.00000

Sub Total 9 6.300 9 6.3000021 SMC/PRI Training

21.01Residential for 6 Resource Person per Block (3

days) (@ Rs.500/-)Blocks 0.09000

21.02Non-residential (3 days training of 6 SMC

members) (@ Rs.100/-)SMC 0.01800 1347 24.246 1347 24.24600

21.02(a)Non-residential (3 days training of 3 Members of

PRI/VECs/LA) (@ Rs.100/-)VEC/ WEC 0.00900

21.03

Seminar/Orientation of SMC Women members

and President/Vice President (@ Rs. 50,000/-

per block)

Blocks 0.50000

Sub Total 1347 24.246 1347 24.24600VI SCHOOL INFRASTRUCTURE22 Civil Works22.01 Primary School (Plain) (New) School 13.1550022.02 Primary School (Hilly/Rocky) (New) School 13.2750022.03 Upper Primary (Plain) (New) School 20.65500

22.04 Upper Primary School (Hilly/Rocky) (New) School 20.77500

22.04aComposite Schools for Urban Areas (Class I-

VIII)School 41.04000

22.05 ACR in lieu of upgraded Upper Primary School Rooms

22.06 Additional class rooms for adding Class VIII Rooms

22.07 Building Less (Pry) School 9.7500022.08 Building Less (UP) School 18.5900022.09 Dilapidated Building (Pry) School 9.7500022.10 Dilapidated Building (UP) School 18.59000

22.11 Additional Class Room (Rural) ( PS+UPS) Rooms 3.45000 106 365.700 106 365.70000

22.12 Additional Class Room (Urban) Rooms 3.45000 4 13.800 4 13.8000022.13 Additional Class Room (Hill Area)22.14 Toilet/Urinals (PS & UPS) School 0.7000022.15 Separate Girls Toilet (Rural+Urban) School 0.7000022.16 CWSN friendly Toilets School 0.50000

22.17 Drinking Water Facility (for Urban Area Only)) School 0.15000

22.17a Drinking Water Facility (Plain PS & UPS) School 0.15000

22.17b Drinking Water Facility (Hilly/Rocky PS & UPS) School 0.15000

22.18a Boundary Wall PS (Total in Meters x .01105) 0.01749

22.18bBoundary Wall PS (For Gate) @Rs. 7000 x no. of

P.S.School 0.07800

Arti:SSA-AWPB-2014-15-PABMinits:Meerut:16-06-2014 145 / 533

Page 146: U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 · 2015. 1. 6. · U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15

Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

Name of District : Meerut -56

ActivityS. No.Physical

UnitRemarks

Outlay Recommendation for 2014-15

Spill OverDeferred laibility

of 2014-15Fresh Recommended Total Recommended

22.18c Boundary Wall UPS (Total in Meters x .01105) 0.01749

22.18dBoundary Wall UPS (For Gate) @Rs. 7000 x no.

of UPSSchool 0.07800

22.19a Electrification in P.S./ Electrical Equipment School 0.11000

22.19b Electrification in U. P.S./ Electrical Equipment School 0.11000

22.20Office-cum-store-cum-Head Teacher's room

(Primary)Rooms

22.21Office-cum-store-cum-Head Teacher's room

(Upper Primary)Rooms

22.22Augumentation of training facility in BRC (one

time)BRC/ URC 5.00000

22.23 Child friendly Elements School 0.25000

22.24 Ramps with Handrails (Barrier Free Elements) School 0.06000

22.25 Handrails in existing Ramps School 0.0100022.26 Whole School Develoipment School22.27 Retro-fitting and repairs School

22.28Residential Schools for specific category

of children

(a) Construction of Building including boundary

wall, Water and sanitation facilities, electric

installation (For 100 children)

Building 65.86000

(b) Construction of residential hostel Building 65.86000

(c) Refurnishing unused old buildings Building

22.29

Construction of Hostel in existing Govt UPS

including boundary wall, Water and sanitation

facilities, electric installation etc. (For 50

children)

7.00000

22.30Furniture for Govt. UPS (per child) (@ Rs.500/-

per child enrolled)Child 0.00500

22.31 Major Repairs for Primary School School 0.30000

22.32 Majr Repairs for Upper Primary School School 0.30000

22.33Others (Difference of Civil Wrks

sanctioned in pre.yr.)22.33a Others (Overhead Tank PS) School 0.1200022.33b Others (Overhead Tank UPS) School 0.12000

Sub Total (Civil WOrks) 110 379.500 110 379.50VII PROJECT MANAGEMENT COST23 Management23.01 Management up to 3.5%

(a) Project Management and MIS

(i) DPO ( Salary, Contigency, Consumables,

POL, TA & Computer etc)District 1 131.654 1 131.65380

(ii) EMIS Cell District 1 16.520 1 16.52000Sub Total (a) 1 1 1 148.174 1 148.174

(b) Training of Educational Administrators District

(c) School Mapping and Social Mapping District

Sub Total (23.01)

23.02Learning Enhancement Prog. (LEP) (P & UP) (up

to 2%)District 10.547 10.54730

23.03 Community Mobilization (up to 0.5%) District 1 24.000 1 24.00000

Sub Total (Management) 1 34.547 1 34.54730Total Management Cost 182.721 182.72110Total of SSA (Districs) 0.700 259707 5059.813 259707 5060.513

24 State Component23.01 Management23.02 REMS 0.0044923.03 SIEMAT

Sub Total

STATE SSA TOTAL 0.70000 259707 5059.813 259707 5060.51306

25

KGBV Financial Provision (give

separate costing sheets for different

Models)

Hostel

ANon Recurring One Time Grant (Only

committed liabilities) (Model-I)

25.01 Construction of Building (New)

25.02 Construction of Building KGBV sanctioned earlier 1.53300 1.53300

25.02(a) Additional Class Room Rooms 3.45000

25.02(b) Guard Room Rooms 1.32000

25.02(c) Boundary Wall School 5.0200025.03 Boudary Wall (Spillover only)

25.04

Boring/Handpump (Spillover only)

(minimum rates prescribed by State Drinking

Water Department subject to a ceiling of Rs.

1.00 lakhs)

1.05000 1.05000

Arti:SSA-AWPB-2014-15-PABMinits:Meerut:16-06-2014 146 / 533

Page 147: U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 · 2015. 1. 6. · U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15

Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

Name of District : Meerut -56

ActivityS. No.Physical

UnitRemarks

Outlay Recommendation for 2014-15

Spill OverDeferred laibility

of 2014-15Fresh Recommended Total Recommended

25.05 Electricity /Water charges (Spillover only)

25.05(a) Solar Water Heater & Solar Light 2.97000

25.06Furniture/Equipment (including Kitchen

equipment)3.00000

25.07 TLM and equipment including library books 3.50000

25.08 Bedding (New) 0.75000

25.09 Replacement of Bedding (once in 3 Year) 0.75000 3 2.250 3 2.25000

Subtotal Non Recurring 2.58300 2.250 4.83300

B Recurring Cost Per Annum (Model-I)

25.10Maintenance per girl student per month @ Rs.

1500/-18.00000 5 90.000 5 90.00000

25.11 Stipend for girl student per month @ Rs. 100/- 1.20000 5 6.000 5 6.00000

25.12Supplementary TLM, stationery and other

educational material @ Rs.1000/- per annum1.00000 5 5.000 5 5.00000

25.13 Salaries

25.13.1 Additional Salaries:

(a) 1 Warden @ Rs. 25,000/- per month 3.00000 5 15.00000 5 15.00000

(b)4 Full time teachers as per RTE norms @ Rs.

20,000/- per month per teacher 9.60000 5 48.00000 5 48.00000

(c)

1 Urdu Teachers (only for blocks with muslim

population above 20% and select urban areas), if

required @ Rs. 12,000/- per month per teacher 1.44000 5 7.20000 5 7.20000

(d)3 part time teachers @ Rs. 5,000/- per month per

teacher 1.80000 5 9.00000 5 9.00000

(e)1 Full time Accountant @ Rs. 10,000/- per month

1.20000 5 6.00000 5 6.00000

(f)

2 Support Staff – (Accountant/ Assistant, Peon,

Chowkidar) @ Rs. 5,000/- per month per staff 1.20000 5 6.00000 5 6.00000

(g) 1 Head cook @ Rs. 6,000/- per month 0.72000 5 3.60000 5 3.60000

(h)2 Asstt. Cooks @ Rs. 4,500/- per month per cook

1.08000 5 5.40000 5 5.40000

25.14Specific skill training @ Rs.1000/- per child per

annum1.00000 5 5.000 5 5.00000

25.15Electricity/water charges @ Rs.1000/- per child

per annum1.00000 5 5.000 5 5.00000

25.16Medical care/contingencies @ Rs. 1250 per child

per annum1.25000 5 6.250 5 6.25000

25.17 Maintenance @ Rs.750/- per child per annum 0.75000 5 3.750 5 3.75000

25.18

Miscellaneous (Educational Tour/ Exposure Visit

/ Sports Material etc.) @ Rs.750/- per child per

annum

0.75000 5 3.750 5 3.75000

25.19Preparatory camps @ Rs.200/- per child per

annum0.20000 5 1.000 5 1.00000

25.20PTAs/school functions @ Rs.200/- per child per

annum0.20000 5 1.000 5 1.00000

25.21 Provision of Rent @ Rs.6000/- per annum 6.00000

25.21a Provision of Rent (6 months) 3.6000025.21b Provision of Rent (3 months) 1.8000025.21c Rent (Previous Year (2007-2012)

25.22 Capacity building 0.50000 5 2.500 5 2.50000

25.22(a)Physical/ Self Defence Training @ Rs.200/- per

child per annum0.20000 5 1.000 5 1.00000

Subtotal Recurring 5 230.450 5 230.45000

Subtotal (Model-I) 2.58300 5 232.700 5 235.28300

CNon Recurring One Time Grant (Only

committed liabilities) (Model-II)

25.23 Construction of Building (New)

25.24 Construction of Building KGBV sanctioned earlier

25.24(a) Additional Class Room Rooms 3.45000

25.24(b) Guard Room Rooms 1.32000

25.24(c) Boundary Wall School 5.0200025.25 Boudary Wall (Spillover only)25.26 Boring/Handpump (Spillover only)

25.27 Electricity /Water charges (Spillover only)

25.27(a) Solar Water Heater & Solar Light 2.97000

25.28Furniture/Equipment (including Kitchen

equipment)2.00000

25.29 TLM and equipment including library books 3.00000

Arti:SSA-AWPB-2014-15-PABMinits:Meerut:16-06-2014 147 / 533

Page 148: U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 · 2015. 1. 6. · U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15

Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

Name of District : Meerut -56

ActivityS. No.Physical

UnitRemarks

Outlay Recommendation for 2014-15

Spill OverDeferred laibility

of 2014-15Fresh Recommended Total Recommended

25.30 Bedding (New) 0.37500

25.31 Replacement of Bedding (once in 3 Year) 0.37500

Subtotal Non Recurring

D Recurring Cost Per Annum (Model-II)

25.32Maintenance per girl student per month @ Rs.

1500/-9.00000

25.33 Stipend for girl student per month @ Rs. 100/- 0.60000

25.34Supplementary TLM, stationery and other

educational material @ Rs.1000/- per annum0.50000

25.35 Salaries(a) 1 Warden @ Rs. 25,000/- per month 3.00000

(b)3 Full time teachers as per RTE norms @ Rs.

20,000/- per month per teacher 7.20000

(c) 3 part time teachers @ Rs. 5,000/- per month per

teacher 1.80000

(d)1 Full time Accountant @ Rs. 10,000/- per month

1.20000

(e)

2 Support Staff – (Accountant/ Assistant, Peon,

Chowkidar) @ Rs. 5,000/- per month per staff 1.20000

(f) 1 Head cook @ Rs. 6,000/- per month 0.72000

(g)1 Asstt. Cooks @ Rs. 4,500/- per month per cook

0.54000

25.36Specific skill training @ Rs.1000/- per child per

annum0.50000

25.37Electricity/water charges @ Rs.1000/- per child

per annum0.50000

25.38Medical care/contingencies @ Rs. 1250 per child

per annum0.62500

25.39 Maintenance @ Rs.750/- per child per annum 0.37500

25.40

Miscellaneous (Educational Tour/ Exposure Visit

/ Sports Material etc.) @ Rs.750/- per child per

annum

0.37500

25.41Preparatory camps @ Rs.300/- per child per

annum0.15000

25.42PTAs/school functions @ Rs.300/- per child per

annum0.15000

25.43 Provision of Rent @ Rs.10000/- per annum 5.00000

25.43a Provision of Rent (6 months) 3.6000025.43b Provision of Rent (3 months) 1.8000025.43c Rent (Previous Year (2007-2012)25.44 Capacity building 0.25000

25.44(a)Physical/ Self Defence Training @ Rs.200/- per

child per annum0.10000

Subtotal Recurring

Subtotal (Model-II) Total (KGBV) 2.583 5 232.700 5 235.283

DISTRICT GRAND TOTAL (SSA+KGBV) 2.583 0.700 259712 5292.513 259712 5295.796

Arti:SSA-AWPB-2014-15-PABMinits:Meerut:16-06-2014 148 / 533

Page 149: U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 · 2015. 1. 6. · U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15

Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

I ACCESS

1 Opening of New Schools

1.01 Upgradation of EGS to PSCentres /

School1.02 New PS School

1.03 Upgradation of PS to UPS / New UPS School

1.04 Composite Schools (for Urban Areas) School

1.05Residential Schools for specific category children

(For 100 children)

1.06Residential Hostel (for specific category of

children) (For 50 children)

1.07 Integration of Class V with Primary Schools

1.08Integration of Class VIII with Upper Primary

Schools

2Residential Schools for specific category

of children (For 100 Children)

Total - Residential Schools (For 100

children)

3Residential Hostel for specific category of

children (For 50 Children)

Total - Residential Schools (For 50

children)4 Transport/Escort Facility

4.01

Children in remote habitations with sparse

populations where opening of schools is

unviable

Child 0.03000

4.02

Urban deprived children/children without adult

protection in urban areas where schools are not

opened because availability of land is a problem

Child 0.03000

Sub Total

5Special Training for mainstreaming of Out-

of-School Children

5.03 Non-Residential (Fresh)(a) 12 months Child 0.06000(b) 9 months 0.04500(c) 6 months

(i)Special Training (by Special Instructors-NRBC)-

(1-5) Child 0.03000 68 2.040 68 2.04000

(ii) Special Training (by Special Instructors-NRBC)-

(6-8) Child 0.03000 33 0.990 33 0.99000

(d) 3 months Child 0.01500Sub Total 101 3.030 101 3.03000

Total (Special Training) 101 3.030 101 3.0305(B) House Hold Survey (HHS)

5(B).01 House Hold Survey through SMCHouse

Hold0.00001

Sub TotalII RETENTION6 Free Text Book

6.01Free Text Book (PS) for Parishadiya & Aided

Primary Schools (Workbooks not included)Child 0.00120 114231 137.077 114231 137.07720

6.01a

Free Text Book (PS) for 25% children of Class-1

in Private Recognised Primary Schools of other

Boards (Workbooks not included)

Child 0.00150

6.02 Free Brail Books (PS) 0.00150 177 0.266 177 0.26550

6.03 Free Large Print Books (PS) 0.00150

6.04Free Text Book (UPS) (Workbooks not included)

(Including KGBV Girls)Child 0.00200 56130 112.260 56130 112.26000

6.05 Free Brail Books (UPS) 0.00250 59 0.148 59 0.14750

6.06 Free Large Print Books (PS) 0.00250Sub Total 170597 249.750 170597 249.750

7 Provision of 2 set of Uniforms

7.01 All Girls (Including KGBV Girls) Child 0.00400 129399 517.596 129399 517.59600

7.02 SC Boys Child 0.00400 38595 154.380 38595 154.38000

7.03 ST Boys Child 0.00400 2367 9.468 2367 9.46800

7.04 BPL Boys Child 0.00400 78173 312.692 78173 312.69200

7.05

Free Uniform for 25% children of Class-1 in

Private Recognised Primary Schools of other

Boards

Child0.00400

Sub Total 248534 994.136 248534 994.1367(A) Fee Reimbursement

7(A).01

Fee Reimbursement for Admission of children of

Disadvantaged Group & Weaker Section upto

25% of seats in Class-1 of Private Unaided

Recognised Schools

Child 0.05400

Sub Total

8 Teaching Learning Equipment (TLE)

8.01 TLE - New Primary School 1.00000 0.20000 1.000008.02 TLE - New Upper Primary School 3.00000 0.50000 3.00000

Name of District : Mau -55

ActivityS. No.Physical

UnitRemarks

Outlay Recommendation for 2014-15

Spill OverDeferred laibility of

2014-15Fresh Recommended Total Recommended

Arti:SSA-AWPB-2014-15-PABMinits:Mau:16-06-2014 149 / 533

Page 150: U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 · 2015. 1. 6. · U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15

Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

Name of District : Mau -55

ActivityS. No.Physical

UnitRemarks

Outlay Recommendation for 2014-15

Spill OverDeferred laibility of

2014-15Fresh Recommended Total Recommended

Sub Total 4.00000 4.00000III ENHANCING QUALITY9 New Teachers Salary

9.01 Primary Teachers (Regular) (Asstt. Teacher) Teacher 0.91500

9.01aHead Teacher for Primary (if the number of

children exceeds 150 in a school)Teacher

9.02 Primary Teachers (Contract) (S.M.) Teacher

9.03Subject specific Upper Primary Teachers

(Regular) (a) Science and Mathematics Teacher 1.26000(b) Social Studies Teacher 1.26000(c) Languages Teacher 1.26000

Sub Total (9.01 to 9.05)Add.Teacher against PTR

Sub Total (9.06 to 9.12)

Total (New Teacher's Salary-9.01 to 9.12)

Teachers Salary (Recurring-sanctioned

earlier)Primary teachers

9.13 Primary Teachers ( Regular)-Existing, in position Teacher 3.66000 548 2005.680 548 2005.68000

9.14Primary Teachers (Contract)-Existing, in

positionTeacher 0.55000

9.14(a) Primary Teachers (Contract)-under Training Teacher 0.38500 935 359.975 935 359.97500

9.14(b)Primary Teacher (Para Teachers Equal to

9.14(a) upgraded as Teachers)0.38500 733 282.205 733 282.20500

9.14(c) Primary Teachers (Para)- Vacant Teacher9.15 Primary Teachers (Vacant) Teacher 0.30500

9.16Head Teacher for Primary (if the number of

children exceeds 150)Teacher 5.04000 103 519.120 103 519.12000

9.16(b)Head Teacher for Primary (if the number of

children exceeds 150) VacantTeacher 0.42000

Additional teachers

9.17Additional Teachers - PS (Special BTC-

Regular) in positionTeacher 0.30500

9.18Additional Teachers - PS (Special BTC Under

Training)Teacher 0.87600

9.19 Additional Teachers - PS (Vacant) Teacher

9.20Others in position (Para Teachers upgraded

as Teachers)Teacher

Upper Primary teachers

9.21 UP Teachers (Regular)-Existing Teacher 5.04000 813 4097.520 813 4097.52000

9.22 UP Teachers (Contract)-Existing9.23 UP Teachers (Vacant) Teacher 1.26000

9.24Head Teacher for Upper Primary (if the number

of children exceeds 100)-ExistingTeacher 5.34000 252 1345.680 252 1345.68000

9.24a Head Teacher for Upper Primary (Vacant) Teacher 1.33500

9.25Subject specific Upper Primary Teachers

(Regular)(a) Science and Mathematics(b) Social Studies(c) Languages

9.32 Part Time Instructors in position(a) Art Education 0.77000 144 110.880 144 110.88000(b) Health and Physical Education 0.77000 144 110.880 144 110.88000(c) Work Education 0.77000 122 93.940 122 93.94000

9.32(A) Part Time Instructors Vacant(a) Art Education 0.42000(b) Health and Physical Education 0.42000(c) Work Education 0.42000

9.33

Others-Incentive to Teachers in Schools

Located in Naxal Affected Areas (@

Rs.1500/- per teachers per month)

Sub Total (9.13 to 9.33) 3794 8925.880 3794 8925.88TOTAL

(New Teachers Salary +Teachers Salary

Recurring)

3794 8925.880 3794 8925.88000

10 Teachers Training(a) Teachers

10.01

Refresher In-service Teachers' Training at BRC

level and above - 10 days (@ Rs.200/- per

head per day)

Teacher

(Target &

Ach.-13-14

in

Mandays)

0.00600

10.01(a)Continuous and Comprehensive Evauation [PS +

UPS)Teacher 0.01300 1085 14.105 1085 14.10500

10.01(b) Eary Reading and Numeracy Skills [PS] Teacher 0.00500 1085 5.425 1085 5.42500

10.01(c) Science [UPS] Teacher 0.00800 527 4.216 527 4.21600Recommended as

proposed

10.01(d) CWSN Teacher 0.00400

Arti:SSA-AWPB-2014-15-PABMinits:Mau:16-06-2014 150 / 533

Page 151: U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 · 2015. 1. 6. · U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15

Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

Name of District : Mau -55

ActivityS. No.Physical

UnitRemarks

Outlay Recommendation for 2014-15

Spill OverDeferred laibility of

2014-15Fresh Recommended Total Recommended

10.02

One day monthly cluster level meetings and

peer group training sessions for 10 months for

all teachers each year at CRC level - 10 days (@

Rs.100/- per head per day)

Teacher 0.01000

10.03(a)

Induction Training for Newly Recruited Teachers

for 6 Months (Special BTC)- @Rs.2000/- per

head per year

Teacher 0.02000

10.03(b)5 Days Training for Part Time Instructors @ Rs.

200/- per head per day) Teacher 0.01000

10.04

Training of untrained Teachers to acquire

professional qualifications over a two year

period.

Teacher 0.04700 497 23.359 497 23.35900

(b) Head Teachers

10.05Refresher Residencial In-service for 10 days at

BRC level and above

Head

Teacher(c) Resource Persons

10.06

Refresher Training for all Resource

Persons,Master Trainers, BRC & CRC faculty

and Coordinators for 5 days each year (@

Rs.200/- per head per day)

Resource

Person 0.00300 120 0.360 120 0.36000

Sub Total 3314 47.465 3314 47.465

11Academic Support through Block Resource

Centre (BRC)/ URC

11.01 Salary of Faculty and Staff

(a) 5 RPs at BRC for subject specific training in

positionRP 50 50

(b) 2 RPs for CWSN in position RP(b-i) 1 CWSN Resource Person RP 1.10000 18 19.800 18 19.80000

(b-ii) 1 Physiotherapist (Resource person for IE) RP

(c) 1 MIS Coordinator in position RP 1.86000

(d) 1 Datra Entry Operator in position RP 1.74000 10 17.400 10 17.40000

(e) 1 Accountant-cum-support staff in position RP 1.80000 10 18.000 10 18.00000

11.02 Furniture Grant BRC/ URC 1.00000

11.03Replacement of furniture, computer, TLE etc (

Once in 5 years)BRC/ URC 1.00000

11.04 Contingency Grant BRC/ URC 0.50000 10 5.000 10 5.00000

11.05 Meeting, TA BRC/ URC 0.30000 10 3.000 10 3.00000

11.06 TLM Grant BRC/ URC 0.10000

11.07 Maintenance Grant BRC/ URC 0.10000

Sub Total 10 63.200 10 63.20000

12Academic Support through Cluster

Resource Centres (CRC/UERC)

12.01Salary of Cluster Coordinator (on an average of

one Resource Person per 18 schools in a block)RP

12.02 Furniture GrantCRC/

UERC0.10000

12.03Replacement of furniture, computer, TLE etc.

once in 5 years

CRC/

UERC0.10000

12.04 Contingency Grant CRC/UERC 0.10000 93 9.300 93 9.30000

12.05 Meeting, TA CRC/UERC 0.12000 93 11.160 93 11.16000

12.06 TLM Grant CRC/UERC 0.03000

12.07Maintenance Grant

CRC/UERC 0.02000

Sub Total 186 20.460 186 20.46000

13Computer Aided Education in upper

primary schools under Innovation

13.01Computer Aided Education in upper primary

schoolsDistrict 0.01200 48 0.576 48 0.57600

Sub Total 48 0.576 48 0.5760014 Libraries in Schools14.01 (a) Primary School (per school) School 0.03000

14.02 (b) Upper Primary School (per school) School 0.10000

Sub TotalIV ANNUAL GRANTS15 Teachers' Grant15.01 Primary Teachers Teacher 0.0050015.02 Upper Primary Teachers Teacher 0.00500 527 2.635 527 2.63500

Sub Total 527 2.635 527 2.6350016 School Grant16.01 Primary School School 0.05000 1116 55.800 1116 55.8000016.02 Upper Primary School School 0.07000 641 44.870 641 44.87000

Sub Total 1757 100.670 1757 100.67000

Arti:SSA-AWPB-2014-15-PABMinits:Mau:16-06-2014 151 / 533

Page 152: U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 · 2015. 1. 6. · U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15

Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

Name of District : Mau -55

ActivityS. No.Physical

UnitRemarks

Outlay Recommendation for 2014-15

Spill OverDeferred laibility of

2014-15Fresh Recommended Total Recommended

17Research, Evaluation, Monitoring &

Supervision

17.01 REMS Activities School 0.00103 1757 1.807 1757 1.80727

17.02 Monitoring & Supervision School 0.00078 1757 1.378 1757 1.37761

17.03 House Hold Survey (Urban) in Million Plus Cities District 35.00000

Sub Total 3514 3.185 3514 3.1848818 Maintenance Grant

18.01 Maintenance in School having upto3 Classrooms School 0.07500 318 23.850 318 23.85000

18.01a Maintenance Grant School 0.07500 1184 88.800 1184 88.80000Sub Total 1502 112.650 1502 112.65000

VBRIDGING GENDER AND SOCIAL

CATEGORY GAPS

19 Interventions for CWSN (IE)

19.01 Provision for Inclusive Education Child 0.02000 3589 71.780 3589 71.78000

Sub Total 3589 71.780 3589 71.78000

20Innovativation Head up to Rs.50 Lakh per

district

20.01 Girls Education District 0.70000 10 7.000 10 7.00000

20.02 ECCE District20.03 Intervention for SC / ST children District

20.04 Intervention for Minority Community children District

20.05 Intervention for Urban Deprived children District 10.00000

Sub Total 10 7.000 10 7.0000021 SMC/PRI Training

21.01Residential for 6 Resource Person per Block (3

days) (@ Rs.500/-)Blocks 0.09000

21.02Non-residential (3 days training of 6 SMC

members) (@ Rs.100/-)SMC 0.01800 1507 27.126 1507 27.12600

21.02(a)Non-residential (3 days training of 3 Members of

PRI/VECs/LA) (@ Rs.100/-)VEC/ WEC 0.00900

21.03

Seminar/Orientation of SMC Women members

and President/Vice President (@ Rs. 50,000/-

per block)

Blocks 0.50000

Sub Total 1507 27.126 1507 27.12600VI SCHOOL INFRASTRUCTURE22 Civil Works22.01 Primary School (Plain) (New) School 13.1550022.02 Primary School (Hilly/Rocky) (New) School 13.2750022.03 Upper Primary (Plain) (New) School 34.96000 20.65500 34.96000

22.04 Upper Primary School (Hilly/Rocky) (New) School 20.77500

22.04aComposite Schools for Urban Areas (Class I-

VIII)School 1.06000 41.04000 1.06000

22.05 ACR in lieu of upgraded Upper Primary School Rooms

22.06 Additional class rooms for adding Class VIII Rooms

22.07 Building Less (Pry) School 9.7500022.08 Building Less (UP) School 18.5900022.09 Dilapidated Building (Pry) School 9.7500022.10 Dilapidated Building (UP) School 18.59000

22.11 Additional Class Room (Rural) ( PS+UPS) Rooms 3.45000

22.12 Additional Class Room (Urban) Rooms 3.4500022.13 Additional Class Room (Hill Area)22.14 Toilet/Urinals (PS & UPS) School 0.7000022.15 Separate Girls Toilet (Rural+Urban) School 0.7000022.16 CWSN friendly Toilets School 0.50000

22.17 Drinking Water Facility (for Urban Area Only)) School 0.15000

22.17a Drinking Water Facility (Plain PS & UPS) School 0.15000

22.17b Drinking Water Facility (Hilly/Rocky PS & UPS) School 0.15000

22.18a Boundary Wall PS (Total in Meters x .01105) 0.01749

22.18bBoundary Wall PS (For Gate) @Rs. 7000 x no. of

P.S.School 0.07800

22.18c Boundary Wall UPS (Total in Meters x .01105) 0.01749

22.18dBoundary Wall UPS (For Gate) @Rs. 7000 x no.

of UPSSchool 0.07800

22.19a Electrification in P.S./ Electrical Equipment School 0.11000

22.19b Electrification in U. P.S./ Electrical Equipment School 0.11000

22.20Office-cum-store-cum-Head Teacher's room

(Primary)Rooms

22.21Office-cum-store-cum-Head Teacher's room

(Upper Primary)Rooms

22.22Augumentation of training facility in BRC (one

time)BRC/ URC 5.00000

22.23 Child friendly Elements School 0.25000

22.24 Ramps with Handrails (Barrier Free Elements) School 0.06000

22.25 Handrails in existing Ramps School 0.01000

Arti:SSA-AWPB-2014-15-PABMinits:Mau:16-06-2014 152 / 533

Page 153: U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 · 2015. 1. 6. · U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15

Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

Name of District : Mau -55

ActivityS. No.Physical

UnitRemarks

Outlay Recommendation for 2014-15

Spill OverDeferred laibility of

2014-15Fresh Recommended Total Recommended

22.26 Whole School Develoipment School22.27 Retro-fitting and repairs School

22.28Residential Schools for specific category

of children

(a) Construction of Building including boundary

wall, Water and sanitation facilities, electric

installation (For 100 children)

Building 65.86000

(b) Construction of residential hostel Building 65.86000

(c) Refurnishing unused old buildings Building

22.29

Construction of Hostel in existing Govt UPS

including boundary wall, Water and sanitation

facilities, electric installation etc. (For 50

children)

7.00000

22.30Furniture for Govt. UPS (per child) (@ Rs.500/-

per child enrolled)Child 0.00500

22.31 Major Repairs for Primary School School 0.30000

22.32 Majr Repairs for Upper Primary School School 0.30000

22.33Others (Difference of Civil Wrks

sanctioned in pre.yr.)22.33a Others (Overhead Tank PS) School 0.1200022.33b Others (Overhead Tank UPS) School 0.12000

Sub Total (Civil WOrks) 36.02 36.02VII PROJECT MANAGEMENT COST23 Management23.01 Management up to 3.5%

(a) Project Management and MIS

(i) DPO ( Salary, Contigency, Consumables,

POL, TA & Computer etc)District 1 121.365 1 121.36520

(ii) EMIS Cell District 1 13.343 1 13.34250Sub Total (a) 1 1 1 134.708 1 134.708

(b) Training of Educational Administrators District

(c) School Mapping and Social Mapping District

Sub Total (23.01)

23.02Learning Enhancement Prog. (LEP) (P & UP) (up

to 2%)District 14.098 14.09805

23.03 Community Mobilization (up to 0.5%) District 1 45.850 1 45.85000

Sub Total (Management) 1 59.948 1 59.94805Total Management Cost 194.656 194.65575Total of SSA (Districs) 36.020 4.000 438990 10824.199 438990 10864.219

24 State Component23.01 Management23.02 REMS 0.0044923.03 SIEMAT

Sub Total

STATE SSA TOTAL 36.02000 4.00000 438990 10824.199 438990 10864.21883

25

KGBV Financial Provision (give

separate costing sheets for different

Models)

Hostel

ANon Recurring One Time Grant (Only

committed liabilities) (Model-I)

25.01 Construction of Building (New)

25.02 Construction of Building KGBV sanctioned earlier 1.04000 1.04000

25.02(a) Additional Class Room Rooms 3.45000

25.02(b) Guard Room Rooms 1.32000

25.02(c) Boundary Wall School 5.0200025.03 Boudary Wall (Spillover only) 4.50000 4.50000

25.04

Boring/Handpump (Spillover only)

(minimum rates prescribed by State Drinking

Water Department subject to a ceiling of Rs.

1.00 lakhs)

3.00000 3.00000

25.05 Electricity /Water charges (Spillover only)

25.05(a) Solar Water Heater & Solar Light 2.97000

25.06Furniture/Equipment (including Kitchen

equipment)3.00000

25.07 TLM and equipment including library books 3.50000

25.08 Bedding (New) 0.75000

25.09 Replacement of Bedding (once in 3 Year) 0.75000 3 2.250 3 2.25000

Subtotal Non Recurring 8.54000 2.250 10.79000

B Recurring Cost Per Annum (Model-I)

25.10Maintenance per girl student per month @ Rs.

1500/-18.00000 5 90.000 5 90.00000

25.11 Stipend for girl student per month @ Rs. 100/- 1.20000 5 6.000 5 6.00000

25.12Supplementary TLM, stationery and other

educational material @ Rs.1000/- per annum1.00000 5 5.000 5 5.00000

25.13 Salaries

Arti:SSA-AWPB-2014-15-PABMinits:Mau:16-06-2014 153 / 533

Page 154: U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 · 2015. 1. 6. · U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15

Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

Name of District : Mau -55

ActivityS. No.Physical

UnitRemarks

Outlay Recommendation for 2014-15

Spill OverDeferred laibility of

2014-15Fresh Recommended Total Recommended

25.13.1 Additional Salaries:

(a) 1 Warden @ Rs. 25,000/- per month 3.00000 5 15.00000 5 15.00000

(b)4 Full time teachers as per RTE norms @ Rs.

20,000/- per month per teacher 9.60000 5 48.00000 5 48.00000

(c)

1 Urdu Teachers (only for blocks with muslim

population above 20% and select urban areas), if

required @ Rs. 12,000/- per month per teacher 1.44000 5 7.20000 5 7.20000

(d)3 part time teachers @ Rs. 5,000/- per month per

teacher 1.80000 5 9.00000 5 9.00000

(e)1 Full time Accountant @ Rs. 10,000/- per month

1.20000 5 6.00000 5 6.00000

(f)

2 Support Staff – (Accountant/ Assistant, Peon,

Chowkidar) @ Rs. 5,000/- per month per staff 1.20000 5 6.00000 5 6.00000

(g) 1 Head cook @ Rs. 6,000/- per month 0.72000 5 3.60000 5 3.60000

(h)2 Asstt. Cooks @ Rs. 4,500/- per month per cook

1.08000 5 5.40000 5 5.40000

25.14Specific skill training @ Rs.1000/- per child per

annum1.00000 5 5.000 5 5.00000

25.15Electricity/water charges @ Rs.1000/- per child

per annum1.00000 5 5.000 5 5.00000

25.16Medical care/contingencies @ Rs. 1250 per child

per annum1.25000 5 6.250 5 6.25000

25.17 Maintenance @ Rs.750/- per child per annum 0.75000 5 3.750 5 3.75000

25.18

Miscellaneous (Educational Tour/ Exposure Visit

/ Sports Material etc.) @ Rs.750/- per child per

annum

0.75000 5 3.750 5 3.75000

25.19Preparatory camps @ Rs.200/- per child per

annum0.20000 5 1.000 5 1.00000

25.20PTAs/school functions @ Rs.200/- per child per

annum0.20000 5 1.000 5 1.00000

25.21 Provision of Rent @ Rs.6000/- per annum 6.00000

25.21a Provision of Rent (6 months) 3.6000025.21b Provision of Rent (3 months) 1.8000025.21c Rent (Previous Year (2007-2012)

25.22 Capacity building 0.50000 5 2.500 5 2.50000

25.22(a)Physical/ Self Defence Training @ Rs.200/- per

child per annum0.20000 5 1.000 5 1.00000

Subtotal Recurring 5 230.450 5 230.45000

Subtotal (Model-I) 8.54000 5 232.700 5 241.24000

CNon Recurring One Time Grant (Only

committed liabilities) (Model-II)

25.23 Construction of Building (New)

25.24 Construction of Building KGBV sanctioned earlier

25.24(a) Additional Class Room Rooms 3.45000

25.24(b) Guard Room Rooms 1.32000

25.24(c) Boundary Wall School 5.0200025.25 Boudary Wall (Spillover only)25.26 Boring/Handpump (Spillover only)

25.27 Electricity /Water charges (Spillover only)

25.27(a) Solar Water Heater & Solar Light 2.97000

25.28Furniture/Equipment (including Kitchen

equipment)2.00000

25.29 TLM and equipment including library books 3.00000

25.30 Bedding (New) 0.37500

25.31 Replacement of Bedding (once in 3 Year) 0.37500

Subtotal Non Recurring

D Recurring Cost Per Annum (Model-II)

25.32Maintenance per girl student per month @ Rs.

1500/-9.00000

25.33 Stipend for girl student per month @ Rs. 100/- 0.60000

25.34Supplementary TLM, stationery and other

educational material @ Rs.1000/- per annum0.50000

25.35 Salaries(a) 1 Warden @ Rs. 25,000/- per month 3.00000

(b)3 Full time teachers as per RTE norms @ Rs.

20,000/- per month per teacher 7.20000

(c) 3 part time teachers @ Rs. 5,000/- per month per

teacher 1.80000

(d)1 Full time Accountant @ Rs. 10,000/- per month

1.20000

(e)

2 Support Staff – (Accountant/ Assistant, Peon,

Chowkidar) @ Rs. 5,000/- per month per staff 1.20000

Arti:SSA-AWPB-2014-15-PABMinits:Mau:16-06-2014 154 / 533

Page 155: U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 · 2015. 1. 6. · U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15

Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

Name of District : Mau -55

ActivityS. No.Physical

UnitRemarks

Outlay Recommendation for 2014-15

Spill OverDeferred laibility of

2014-15Fresh Recommended Total Recommended

(f) 1 Head cook @ Rs. 6,000/- per month 0.72000

(g)1 Asstt. Cooks @ Rs. 4,500/- per month per cook

0.54000

25.36Specific skill training @ Rs.1000/- per child per

annum0.50000

25.37Electricity/water charges @ Rs.1000/- per child

per annum0.50000

25.38Medical care/contingencies @ Rs. 1250 per child

per annum0.62500

25.39 Maintenance @ Rs.750/- per child per annum 0.37500

25.40

Miscellaneous (Educational Tour/ Exposure Visit

/ Sports Material etc.) @ Rs.750/- per child per

annum

0.37500

25.41Preparatory camps @ Rs.300/- per child per

annum0.15000

25.42PTAs/school functions @ Rs.300/- per child per

annum0.15000

25.43 Provision of Rent @ Rs.10000/- per annum 5.00000

25.43a Provision of Rent (6 months) 3.6000025.43b Provision of Rent (3 months) 1.8000025.43c Rent (Previous Year (2007-2012)25.44 Capacity building 0.25000

25.44(a)Physical/ Self Defence Training @ Rs.200/- per

child per annum0.10000

Subtotal Recurring

Subtotal (Model-II) Total (KGBV) 8.540 5 232.700 5 241.240

DISTRICT GRAND TOTAL (SSA+KGBV) 44.560 4.000 438995 11056.899 438995 11105.459

Arti:SSA-AWPB-2014-15-PABMinits:Mau:16-06-2014 155 / 533

Page 156: U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 · 2015. 1. 6. · U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15

Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

I ACCESS

1 Opening of New Schools

1.01 Upgradation of EGS to PSCentres /

School1.02 New PS School

1.03 Upgradation of PS to UPS / New UPS School

1.04 Composite Schools (for Urban Areas) School

1.05Residential Schools for specific category children

(For 100 children)

1.06Residential Hostel (for specific category of

children) (For 50 children)

1.07 Integration of Class V with Primary Schools

1.08Integration of Class VIII with Upper Primary

Schools

2Residential Schools for specific category

of children (For 100 Children)

Total - Residential Schools (For 100

children)

3Residential Hostel for specific category of

children (For 50 Children)

Total - Residential Schools (For 50

children)4 Transport/Escort Facility

4.01

Children in remote habitations with sparse

populations where opening of schools is

unviable

Child 0.03000

4.02

Urban deprived children/children without adult

protection in urban areas where schools are not

opened because availability of land is a problem

Child 0.03000

Sub Total

5Special Training for mainstreaming of Out-

of-School Children

5.03 Non-Residential (Fresh)(a) 12 months Child 0.06000(b) 9 months 0.04500(c) 6 months

(i)Special Training (by Special Instructors-NRBC)-

(1-5) Child 0.03000 240 7.200 240 7.20000

(ii) Special Training (by Special Instructors-NRBC)-

(6-8) Child 0.03000 239 7.170 239 7.17000

(d) 3 months Child 0.01500Sub Total 479 14.370 479 14.37000

Total (Special Training) 479 14.370 479 14.3705(B) House Hold Survey (HHS)

5(B).01 House Hold Survey through SMCHouse

Hold0.00001

Sub TotalII RETENTION6 Free Text Book

6.01Free Text Book (PS) for Parishadiya & Aided

Primary Schools (Workbooks not included)Child 0.00120 87843 105.412 87843 105.41160

6.01a

Free Text Book (PS) for 25% children of Class-1

in Private Recognised Primary Schools of other

Boards (Workbooks not included)

Child 0.00150

6.02 Free Brail Books (PS) 0.00150 46 0.069 46 0.06900

6.03 Free Large Print Books (PS) 0.00150

6.04Free Text Book (UPS) (Workbooks not included)

(Including KGBV Girls)Child 0.00200 40115 80.230 40115 80.23000

6.05 Free Brail Books (UPS) 0.00250 8 0.020 8 0.02000

6.06 Free Large Print Books (PS) 0.00250Sub Total 128012 185.731 128012 185.731

7 Provision of 2 set of Uniforms

7.01 All Girls (Including KGBV Girls) Child 0.00400 98519 394.076 98519 394.07600

7.02 SC Boys Child 0.00400 29386 117.544 29386 117.54400

7.03 ST Boys Child 0.00400

7.04 BPL Boys Child 0.00400 31215 124.860 31215 124.86000

7.05

Free Uniform for 25% children of Class-1 in

Private Recognised Primary Schools of other

Boards

Child0.00400

Sub Total 159120 636.480 159120 636.4807(A) Fee Reimbursement

7(A).01

Fee Reimbursement for Admission of children of

Disadvantaged Group & Weaker Section upto

25% of seats in Class-1 of Private Unaided

Recognised Schools

Child 0.05400

Sub Total

8 Teaching Learning Equipment (TLE)

8.01 TLE - New Primary School 4.20000 0.20000 4.200008.02 TLE - New Upper Primary School 0.50000 0.50000 0.50000

Name of District : Mathura -54

ActivityS. No.Physical

UnitRemarks

Outlay Recommendation for 2014-15

Spill OverDeferred laibility of

2014-15Fresh Recommended Total Recommended

Arti:SSA-AWPB-2014-15-PABMinits:Mathura:16-06-2014 156 / 533

Page 157: U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 · 2015. 1. 6. · U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15

Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

Name of District : Mathura -54

ActivityS. No.Physical

UnitRemarks

Outlay Recommendation for 2014-15

Spill OverDeferred laibility of

2014-15Fresh Recommended Total Recommended

Sub Total 4.70000 4.70000III ENHANCING QUALITY9 New Teachers Salary

9.01 Primary Teachers (Regular) (Asstt. Teacher) Teacher 0.91500

9.01aHead Teacher for Primary (if the number of

children exceeds 150 in a school)Teacher

9.02 Primary Teachers (Contract) (S.M.) Teacher

9.03Subject specific Upper Primary Teachers

(Regular) (a) Science and Mathematics Teacher 1.26000(b) Social Studies Teacher 1.26000(c) Languages Teacher 1.26000

Sub Total (9.01 to 9.05)Add.Teacher against PTR

Sub Total (9.06 to 9.12)

Total (New Teacher's Salary-9.01 to 9.12)

Teachers Salary (Recurring-sanctioned

earlier)Primary teachers

9.13 Primary Teachers ( Regular)-Existing, in position Teacher 3.66000 389 1423.740 389 1423.74000

9.14Primary Teachers (Contract)-Existing, in

positionTeacher 0.55000

9.14(a) Primary Teachers (Contract)-under Training Teacher 0.38500 1256 483.560 1256 483.56000

9.14(b)Primary Teacher (Para Teachers Equal to

9.14(a) upgraded as Teachers)0.38500 771 296.835 771 296.83500

9.14(c) Primary Teachers (Para)- Vacant Teacher9.15 Primary Teachers (Vacant) Teacher 0.30500

9.16Head Teacher for Primary (if the number of

children exceeds 150)Teacher 5.04000 166 836.640 166 836.64000

9.16(b)Head Teacher for Primary (if the number of

children exceeds 150) VacantTeacher 0.42000

Additional teachers

9.17Additional Teachers - PS (Special BTC-

Regular) in positionTeacher 0.30500

9.18Additional Teachers - PS (Special BTC Under

Training)Teacher 0.87600

9.19 Additional Teachers - PS (Vacant) Teacher

9.20Others in position (Para Teachers upgraded

as Teachers)Teacher

Upper Primary teachers

9.21 UP Teachers (Regular)-Existing Teacher 5.04000 918 4626.720 918 4626.72000

9.22 UP Teachers (Contract)-Existing9.23 UP Teachers (Vacant) Teacher 1.26000

9.24Head Teacher for Upper Primary (if the number

of children exceeds 100)-ExistingTeacher 5.34000 355 1895.700 355 1895.70000

9.24a Head Teacher for Upper Primary (Vacant) Teacher 1.33500

9.25Subject specific Upper Primary Teachers

(Regular)(a) Science and Mathematics(b) Social Studies(c) Languages

9.32 Part Time Instructors in position(a) Art Education 0.77000 63 48.510 63 48.51000(b) Health and Physical Education 0.77000 94 72.380 94 72.38000(c) Work Education 0.77000 73 56.210 73 56.21000

9.32(A) Part Time Instructors Vacant(a) Art Education 0.42000(b) Health and Physical Education 0.42000(c) Work Education 0.42000

9.33

Others-Incentive to Teachers in Schools

Located in Naxal Affected Areas (@

Rs.1500/- per teachers per month)

Sub Total (9.13 to 9.33) 4085 9740.295 4085 9740.30TOTAL

(New Teachers Salary +Teachers Salary

Recurring)

4085 9740.295 4085 9740.29500

10 Teachers Training(a) Teachers

10.01

Refresher In-service Teachers' Training at BRC

level and above - 10 days (@ Rs.200/- per

head per day)

Teacher

(Target &

Ach.-13-14

in

Mandays)

0.00600

10.01(a)Continuous and Comprehensive Evauation [PS +

UPS)Teacher 0.01300 1306 16.978 1306 16.97800

10.01(b) Eary Reading and Numeracy Skills [PS] Teacher 0.00500 1306 6.530 1306 6.53000

10.01(c) Science [UPS] Teacher 0.00800 730 5.840 730 5.84000Recommended as

proposed

10.01(d) CWSN Teacher 0.00400

Arti:SSA-AWPB-2014-15-PABMinits:Mathura:16-06-2014 157 / 533

Page 158: U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 · 2015. 1. 6. · U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15

Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

Name of District : Mathura -54

ActivityS. No.Physical

UnitRemarks

Outlay Recommendation for 2014-15

Spill OverDeferred laibility of

2014-15Fresh Recommended Total Recommended

10.02

One day monthly cluster level meetings and

peer group training sessions for 10 months for

all teachers each year at CRC level - 10 days (@

Rs.100/- per head per day)

Teacher 0.01000

10.03(a)

Induction Training for Newly Recruited Teachers

for 6 Months (Special BTC)- @Rs.2000/- per

head per year

Teacher 0.02000

10.03(b)5 Days Training for Part Time Instructors @ Rs.

200/- per head per day) Teacher 0.01000

10.04

Training of untrained Teachers to acquire

professional qualifications over a two year

period.

Teacher 0.04700 777 36.519 777 36.51900

(b) Head Teachers

10.05Refresher Residencial In-service for 10 days at

BRC level and above

Head

Teacher(c) Resource Persons

10.06

Refresher Training for all Resource

Persons,Master Trainers, BRC & CRC faculty

and Coordinators for 5 days each year (@

Rs.200/- per head per day)

Resource

Person 0.00300 132 0.396 132 0.39600

Sub Total 4251 66.263 4251 66.263

11Academic Support through Block Resource

Centre (BRC)/ URC

11.01 Salary of Faculty and Staff

(a) 5 RPs at BRC for subject specific training in

positionRP 55 55

(b) 2 RPs for CWSN in position RP(b-i) 1 CWSN Resource Person RP 1.10000 22 24.200 22 24.20000

(b-ii) 1 Physiotherapist (Resource person for IE) RP

(c) 1 MIS Coordinator in position RP 1.86000

(d) 1 Datra Entry Operator in position RP 1.74000 10 17.400 10 17.40000

(e) 1 Accountant-cum-support staff in position RP 1.80000 11 19.800 11 19.80000

11.02 Furniture Grant BRC/ URC 1.00000

11.03Replacement of furniture, computer, TLE etc (

Once in 5 years)BRC/ URC 1.00000

11.04 Contingency Grant BRC/ URC 0.50000 11 5.500 11 5.50000

11.05 Meeting, TA BRC/ URC 0.30000 11 3.300 11 3.30000

11.06 TLM Grant BRC/ URC 0.10000

11.07 Maintenance Grant BRC/ URC 0.10000

Sub Total 11 70.200 11 70.20000

12Academic Support through Cluster

Resource Centres (CRC/UERC)

12.01Salary of Cluster Coordinator (on an average of

one Resource Person per 18 schools in a block)RP

12.02 Furniture GrantCRC/

UERC0.10000

12.03Replacement of furniture, computer, TLE etc.

once in 5 years

CRC/

UERC0.10000

12.04 Contingency Grant CRC/UERC 0.10000 90 9.000 90 9.00000

12.05 Meeting, TA CRC/UERC 0.12000 90 10.800 90 10.80000

12.06 TLM Grant CRC/UERC 0.03000

12.07Maintenance Grant

CRC/UERC 0.02000

Sub Total 180 19.800 180 19.80000

13Computer Aided Education in upper

primary schools under Innovation

13.01Computer Aided Education in upper primary

schoolsDistrict 0.01200 48 0.576 48 0.57600

Sub Total 48 0.576 48 0.5760014 Libraries in Schools14.01 (a) Primary School (per school) School 0.03000

14.02 (b) Upper Primary School (per school) School 0.10000

Sub TotalIV ANNUAL GRANTS15 Teachers' Grant15.01 Primary Teachers Teacher 0.0050015.02 Upper Primary Teachers Teacher 0.00500 730 3.650 730 3.65000

Sub Total 730 3.650 730 3.6500016 School Grant16.01 Primary School School 0.05000 1366 68.300 1366 68.3000016.02 Upper Primary School School 0.07000 720 50.400 720 50.40000

Sub Total 2086 118.700 2086 118.70000

Arti:SSA-AWPB-2014-15-PABMinits:Mathura:16-06-2014 158 / 533

Page 159: U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 · 2015. 1. 6. · U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15

Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

Name of District : Mathura -54

ActivityS. No.Physical

UnitRemarks

Outlay Recommendation for 2014-15

Spill OverDeferred laibility of

2014-15Fresh Recommended Total Recommended

17Research, Evaluation, Monitoring &

Supervision

17.01 REMS Activities School 0.00103 2086 2.146 2086 2.14569

17.02 Monitoring & Supervision School 0.00078 2086 1.636 2086 1.63556

17.03 House Hold Survey (Urban) in Million Plus Cities District 35.00000

Sub Total 4172 3.781 4172 3.7812518 Maintenance Grant

18.01 Maintenance in School having upto3 Classrooms School 0.07500 650 48.750 650 48.75000

18.01a Maintenance Grant School 0.07500 1305 97.875 1305 97.87500Sub Total 1955 146.625 1955 146.62500

VBRIDGING GENDER AND SOCIAL

CATEGORY GAPS

19 Interventions for CWSN (IE)

19.01 Provision for Inclusive Education Child 0.01600 4213 67.408 4213 67.40800

Sub Total 4213 67.408 4213 67.40800

20Innovativation Head up to Rs.50 Lakh per

district

20.01 Girls Education District 0.70000 10 7.000 10 7.00000

20.02 ECCE District20.03 Intervention for SC / ST children District

20.04 Intervention for Minority Community children District

20.05 Intervention for Urban Deprived children District 10.00000

Sub Total 10 7.000 10 7.0000021 SMC/PRI Training

21.01Residential for 6 Resource Person per Block (3

days) (@ Rs.500/-)Blocks 0.09000

21.02Non-residential (3 days training of 6 SMC

members) (@ Rs.100/-)SMC 0.01800 1959 35.262 1959 35.26200

21.02(a)Non-residential (3 days training of 3 Members of

PRI/VECs/LA) (@ Rs.100/-)VEC/ WEC 0.00900

21.03

Seminar/Orientation of SMC Women members

and President/Vice President (@ Rs. 50,000/-

per block)

Blocks 0.50000

Sub Total 1959 35.262 1959 35.26200VI SCHOOL INFRASTRUCTURE22 Civil Works22.01 Primary School (Plain) (New) School 13.1550022.02 Primary School (Hilly/Rocky) (New) School 13.2750022.03 Upper Primary (Plain) (New) School 20.65500

22.04 Upper Primary School (Hilly/Rocky) (New) School 20.77500

22.04aComposite Schools for Urban Areas (Class I-

VIII)School 41.04000

22.05 ACR in lieu of upgraded Upper Primary School Rooms

22.06 Additional class rooms for adding Class VIII Rooms

22.07 Building Less (Pry) School 9.7500022.08 Building Less (UP) School 18.5900022.09 Dilapidated Building (Pry) School 9.7500022.10 Dilapidated Building (UP) School 18.59000

22.11 Additional Class Room (Rural) ( PS+UPS) Rooms 3.45000 80 276.000 80 276.00000

22.12 Additional Class Room (Urban) Rooms 3.4500022.13 Additional Class Room (Hill Area)22.14 Toilet/Urinals (PS & UPS) School 0.7000022.15 Separate Girls Toilet (Rural+Urban) School 0.7000022.16 CWSN friendly Toilets School 0.50000

22.17 Drinking Water Facility (for Urban Area Only)) School 0.15000

22.17a Drinking Water Facility (Plain PS & UPS) School 0.15000 175 26.250 175 26.25000

22.17b Drinking Water Facility (Hilly/Rocky PS & UPS) School 0.15000

22.18a Boundary Wall PS (Total in Meters x .01105) 0.01749

22.18bBoundary Wall PS (For Gate) @Rs. 7000 x no. of

P.S.School 0.07800

22.18c Boundary Wall UPS (Total in Meters x .01105) 0.01749

22.18dBoundary Wall UPS (For Gate) @Rs. 7000 x no.

of UPSSchool 0.07800

22.19a Electrification in P.S./ Electrical Equipment School 0.11000

22.19b Electrification in U. P.S./ Electrical Equipment School 0.11000

22.20Office-cum-store-cum-Head Teacher's room

(Primary)Rooms

22.21Office-cum-store-cum-Head Teacher's room

(Upper Primary)Rooms

22.22Augumentation of training facility in BRC (one

time)BRC/ URC 5.00000

22.23 Child friendly Elements School 0.25000

22.24 Ramps with Handrails (Barrier Free Elements) School 0.06000

22.25 Handrails in existing Ramps School 0.01000

Arti:SSA-AWPB-2014-15-PABMinits:Mathura:16-06-2014 159 / 533

Page 160: U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 · 2015. 1. 6. · U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15

Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

Name of District : Mathura -54

ActivityS. No.Physical

UnitRemarks

Outlay Recommendation for 2014-15

Spill OverDeferred laibility of

2014-15Fresh Recommended Total Recommended

22.26 Whole School Develoipment School22.27 Retro-fitting and repairs School

22.28Residential Schools for specific category

of children

(a) Construction of Building including boundary

wall, Water and sanitation facilities, electric

installation (For 100 children)

Building 65.86000

(b) Construction of residential hostel Building 65.86000

(c) Refurnishing unused old buildings Building

22.29

Construction of Hostel in existing Govt UPS

including boundary wall, Water and sanitation

facilities, electric installation etc. (For 50

children)

7.00000

22.30Furniture for Govt. UPS (per child) (@ Rs.500/-

per child enrolled)Child 0.00500

22.31 Major Repairs for Primary School School 0.30000

22.32 Majr Repairs for Upper Primary School School 0.30000

22.33Others (Difference of Civil Wrks

sanctioned in pre.yr.)22.33a Others (Overhead Tank PS) School 0.1200022.33b Others (Overhead Tank UPS) School 0.12000

Sub Total (Civil WOrks) 255 302.250 255 302.25VII PROJECT MANAGEMENT COST23 Management23.01 Management up to 3.5%

(a) Project Management and MIS

(i) DPO ( Salary, Contigency, Consumables,

POL, TA & Computer etc)District 1 118.605 1 118.60490

(ii) EMIS Cell District 1 15.463 1 15.46250Sub Total (a) 1 1 1 134.067 1 134.067

(b) Training of Educational Administrators District

(c) School Mapping and Social Mapping District

Sub Total (23.01)

23.02Learning Enhancement Prog. (LEP) (P & UP) (up

to 2%)District 13.228 13.22790

23.03 Community Mobilization (up to 0.5%) District 1 45.850 1 45.85000

Sub Total (Management) 1 59.078 1 59.07790Total Management Cost 193.145 193.14530Total of SSA (Districs) 4.700 311566 11611.536 311566 11616.236

24 State Component23.01 Management23.02 REMS 0.0044923.03 SIEMAT

Sub Total

STATE SSA TOTAL 4.70000 311566 11611.536 311566 11616.23615

25

KGBV Financial Provision (give

separate costing sheets for different

Models)

Hostel

ANon Recurring One Time Grant (Only

committed liabilities) (Model-I)

25.01 Construction of Building (New)

25.02 Construction of Building KGBV sanctioned earlier 0.21000 0.21000

25.02(a) Additional Class Room Rooms 3.45000

25.02(b) Guard Room Rooms 1.32000

25.02(c) Boundary Wall School 5.0200025.03 Boudary Wall (Spillover only) 6.00000 6.00000

25.04

Boring/Handpump (Spillover only)

(minimum rates prescribed by State Drinking

Water Department subject to a ceiling of Rs.

1.00 lakhs)

4.00000 4.00000

25.05 Electricity /Water charges (Spillover only)

25.05(a) Solar Water Heater & Solar Light 2.97000

25.06Furniture/Equipment (including Kitchen

equipment)3.00000

25.07 TLM and equipment including library books 3.50000

25.08 Bedding (New) 0.75000

25.09 Replacement of Bedding (once in 3 Year) 0.75000 10 7.500 10 7.50000

Subtotal Non Recurring 10.21000 7.500 17.71000

B Recurring Cost Per Annum (Model-I)

25.10Maintenance per girl student per month @ Rs.

1500/-18.00000 10 180.000 10 180.00000

25.11 Stipend for girl student per month @ Rs. 100/- 1.20000 10 12.000 10 12.00000

25.12Supplementary TLM, stationery and other

educational material @ Rs.1000/- per annum1.00000 10 10.000 10 10.00000

25.13 Salaries

Arti:SSA-AWPB-2014-15-PABMinits:Mathura:16-06-2014 160 / 533

Page 161: U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 · 2015. 1. 6. · U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15

Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

Name of District : Mathura -54

ActivityS. No.Physical

UnitRemarks

Outlay Recommendation for 2014-15

Spill OverDeferred laibility of

2014-15Fresh Recommended Total Recommended

25.13.1 Additional Salaries:

(a) 1 Warden @ Rs. 25,000/- per month 3.00000 10 30.00000 10 30.00000

(b)4 Full time teachers as per RTE norms @ Rs.

20,000/- per month per teacher 9.60000 10 96.00000 10 96.00000

(c)

1 Urdu Teachers (only for blocks with muslim

population above 20% and select urban areas), if

required @ Rs. 12,000/- per month per teacher 1.44000 10 14.40000 10 14.40000

(d)3 part time teachers @ Rs. 5,000/- per month per

teacher 1.80000 10 18.00000 10 18.00000

(e)1 Full time Accountant @ Rs. 10,000/- per month

1.20000 10 12.00000 10 12.00000

(f)

2 Support Staff – (Accountant/ Assistant, Peon,

Chowkidar) @ Rs. 5,000/- per month per staff 1.20000 10 12.00000 10 12.00000

(g) 1 Head cook @ Rs. 6,000/- per month 0.72000 10 7.20000 10 7.20000

(h)2 Asstt. Cooks @ Rs. 4,500/- per month per cook

1.08000 10 10.80000 10 10.80000

25.14Specific skill training @ Rs.1000/- per child per

annum1.00000 10 10.000 10 10.00000

25.15Electricity/water charges @ Rs.1000/- per child

per annum1.00000 10 10.000 10 10.00000

25.16Medical care/contingencies @ Rs. 1250 per child

per annum1.25000 10 12.500 10 12.50000

25.17 Maintenance @ Rs.750/- per child per annum 0.75000 10 7.500 10 7.50000

25.18

Miscellaneous (Educational Tour/ Exposure Visit

/ Sports Material etc.) @ Rs.750/- per child per

annum

0.75000 10 7.500 10 7.50000

25.19Preparatory camps @ Rs.200/- per child per

annum0.20000 10 2.000 10 2.00000

25.20PTAs/school functions @ Rs.200/- per child per

annum0.20000 10 2.000 10 2.00000

25.21 Provision of Rent @ Rs.6000/- per annum 6.00000

25.21a Provision of Rent (6 months) 3.6000025.21b Provision of Rent (3 months) 1.8000025.21c Rent (Previous Year (2007-2012)

25.22 Capacity building 0.50000 10 5.000 10 5.00000

25.22(a)Physical/ Self Defence Training @ Rs.200/- per

child per annum0.20000 10 2.000 10 2.00000

Subtotal Recurring 10 460.900 10 460.90000

Subtotal (Model-I) 10.21000 10 468.400 10 478.61000

CNon Recurring One Time Grant (Only

committed liabilities) (Model-II)

25.23 Construction of Building (New)

25.24 Construction of Building KGBV sanctioned earlier

25.24(a) Additional Class Room Rooms 3.45000

25.24(b) Guard Room Rooms 1.32000

25.24(c) Boundary Wall School 5.0200025.25 Boudary Wall (Spillover only)25.26 Boring/Handpump (Spillover only)

25.27 Electricity /Water charges (Spillover only)

25.27(a) Solar Water Heater & Solar Light 2.97000

25.28Furniture/Equipment (including Kitchen

equipment)2.00000

25.29 TLM and equipment including library books 3.00000

25.30 Bedding (New) 0.37500

25.31 Replacement of Bedding (once in 3 Year) 0.37500

Subtotal Non Recurring

D Recurring Cost Per Annum (Model-II)

25.32Maintenance per girl student per month @ Rs.

1500/-9.00000

25.33 Stipend for girl student per month @ Rs. 100/- 0.60000

25.34Supplementary TLM, stationery and other

educational material @ Rs.1000/- per annum0.50000

25.35 Salaries(a) 1 Warden @ Rs. 25,000/- per month 3.00000

(b)3 Full time teachers as per RTE norms @ Rs.

20,000/- per month per teacher 7.20000

(c) 3 part time teachers @ Rs. 5,000/- per month per

teacher 1.80000

(d)1 Full time Accountant @ Rs. 10,000/- per month

1.20000

(e)

2 Support Staff – (Accountant/ Assistant, Peon,

Chowkidar) @ Rs. 5,000/- per month per staff 1.20000

Arti:SSA-AWPB-2014-15-PABMinits:Mathura:16-06-2014 161 / 533

Page 162: U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 · 2015. 1. 6. · U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15

Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

Name of District : Mathura -54

ActivityS. No.Physical

UnitRemarks

Outlay Recommendation for 2014-15

Spill OverDeferred laibility of

2014-15Fresh Recommended Total Recommended

(f) 1 Head cook @ Rs. 6,000/- per month 0.72000

(g)1 Asstt. Cooks @ Rs. 4,500/- per month per cook

0.54000

25.36Specific skill training @ Rs.1000/- per child per

annum0.50000

25.37Electricity/water charges @ Rs.1000/- per child

per annum0.50000

25.38Medical care/contingencies @ Rs. 1250 per child

per annum0.62500

25.39 Maintenance @ Rs.750/- per child per annum 0.37500

25.40

Miscellaneous (Educational Tour/ Exposure Visit

/ Sports Material etc.) @ Rs.750/- per child per

annum

0.37500

25.41Preparatory camps @ Rs.300/- per child per

annum0.15000

25.42PTAs/school functions @ Rs.300/- per child per

annum0.15000

25.43 Provision of Rent @ Rs.10000/- per annum 5.00000

25.43a Provision of Rent (6 months) 3.6000025.43b Provision of Rent (3 months) 1.8000025.43c Rent (Previous Year (2007-2012)25.44 Capacity building 0.25000

25.44(a)Physical/ Self Defence Training @ Rs.200/- per

child per annum0.10000

Subtotal Recurring

Subtotal (Model-II) Total (KGBV) 10.210 10 468.400 10 478.610

DISTRICT GRAND TOTAL (SSA+KGBV) 10.210 4.700 311576 12079.936 311576 12094.846

Arti:SSA-AWPB-2014-15-PABMinits:Mathura:16-06-2014 162 / 533

Page 163: U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 · 2015. 1. 6. · U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15

Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

I ACCESS

1 Opening of New Schools

1.01 Upgradation of EGS to PSCentres /

School1.02 New PS School

1.03 Upgradation of PS to UPS / New UPS School

1.04 Composite Schools (for Urban Areas) School

1.05Residential Schools for specific category children

(For 100 children)

1.06Residential Hostel (for specific category of

children) (For 50 children)

1.07 Integration of Class V with Primary Schools

1.08Integration of Class VIII with Upper Primary

Schools

2Residential Schools for specific category

of children (For 100 Children)

Total - Residential Schools (For 100

children)

3Residential Hostel for specific category of

children (For 50 Children)

Total - Residential Schools (For 50

children)4 Transport/Escort Facility

4.01

Children in remote habitations with sparse

populations where opening of schools is

unviable

Child 0.03000

4.02

Urban deprived children/children without adult

protection in urban areas where schools are not

opened because availability of land is a problem

Child 0.03000

Sub Total

5Special Training for mainstreaming of Out-

of-School Children

5.03 Non-Residential (Fresh)(a) 12 months Child 0.06000(b) 9 months 0.04500(c) 6 months

(i)Special Training (by Special Instructors-NRBC)-

(1-5) Child 0.03000 69 2.070 69 2.07000

(ii) Special Training (by Special Instructors-NRBC)-

(6-8) Child 0.03000 69 2.070 69 2.07000

(d) 3 months Child 0.01500Sub Total 138 4.140 138 4.14000

Total (Special Training) 138 4.140 138 4.1405(B) House Hold Survey (HHS)

5(B).01 House Hold Survey through SMCHouse

Hold0.00001

Sub TotalII RETENTION6 Free Text Book

6.01Free Text Book (PS) for Parishadiya & Aided

Primary Schools (Workbooks not included)Child 0.00120 86476 103.771 86476 103.77120

6.01a

Free Text Book (PS) for 25% children of Class-1

in Private Recognised Primary Schools of other

Boards (Workbooks not included)

Child 0.00150

6.02 Free Brail Books (PS) 0.00150 62 0.093 62 0.09300

6.03 Free Large Print Books (PS) 0.00150

6.04Free Text Book (UPS) (Workbooks not included)

(Including KGBV Girls)Child 0.00200 35416 70.832 35416 70.83200

6.05 Free Brail Books (UPS) 0.00250 17 0.043 17 0.04250

6.06 Free Large Print Books (PS) 0.00250Sub Total 121971 174.739 121971 174.739

7 Provision of 2 set of Uniforms

7.01 All Girls (Including KGBV Girls) Child 0.00400 94985 379.940 94985 379.94000

7.02 SC Boys Child 0.00400 26907 107.628 26907 107.62800

7.03 ST Boys Child 0.00400

7.04 BPL Boys Child 0.00400 34522 138.088 34522 138.08800

7.05

Free Uniform for 25% children of Class-1 in

Private Recognised Primary Schools of other

Boards

Child0.00400

Sub Total 156414 625.656 156414 625.6567(A) Fee Reimbursement

7(A).01

Fee Reimbursement for Admission of children of

Disadvantaged Group & Weaker Section upto

25% of seats in Class-1 of Private Unaided

Recognised Schools

Child 0.05400

Sub Total

8 Teaching Learning Equipment (TLE)

8.01 TLE - New Primary School 28.00000 0.20000 28.000008.02 TLE - New Upper Primary School 3.50000 0.50000 3.50000

Name of District : Mainpuri -53

ActivityS. No.Physical

UnitRemarks

Outlay Recommendation for 2014-15

Spill OverDeferred laibility of

2014-15Fresh Recommended Total Recommended

Arti:SSA-AWPB-2014-15-PABMinits:Mainpuri:16-06-2014 163 / 533

Page 164: U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 · 2015. 1. 6. · U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15

Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

Name of District : Mainpuri -53

ActivityS. No.Physical

UnitRemarks

Outlay Recommendation for 2014-15

Spill OverDeferred laibility of

2014-15Fresh Recommended Total Recommended

Sub Total 31.50000 31.50000III ENHANCING QUALITY9 New Teachers Salary

9.01 Primary Teachers (Regular) (Asstt. Teacher) Teacher 0.91500

9.01aHead Teacher for Primary (if the number of

children exceeds 150 in a school)Teacher

9.02 Primary Teachers (Contract) (S.M.) Teacher

9.03Subject specific Upper Primary Teachers

(Regular) (a) Science and Mathematics Teacher 1.26000(b) Social Studies Teacher 1.26000(c) Languages Teacher 1.26000

Sub Total (9.01 to 9.05)Add.Teacher against PTR

Sub Total (9.06 to 9.12)

Total (New Teacher's Salary-9.01 to 9.12)

Teachers Salary (Recurring-sanctioned

earlier)Primary teachers

9.13 Primary Teachers ( Regular)-Existing, in position Teacher 3.66000 170 622.200 170 622.20000

9.14Primary Teachers (Contract)-Existing, in

positionTeacher 0.55000

9.14(a) Primary Teachers (Contract)-under Training Teacher 0.38500 1367 526.295 1367 526.29500

9.14(b)Primary Teacher (Para Teachers Equal to

9.14(a) upgraded as Teachers)0.38500 717 276.045 717 276.04500

9.14(c) Primary Teachers (Para)- Vacant Teacher9.15 Primary Teachers (Vacant) Teacher 0.30500

9.16Head Teacher for Primary (if the number of

children exceeds 150)Teacher 5.04000 292 1471.680 292 1471.68000

9.16(b)Head Teacher for Primary (if the number of

children exceeds 150) VacantTeacher 0.42000

Additional teachers

9.17Additional Teachers - PS (Special BTC-

Regular) in positionTeacher 0.30500

9.18Additional Teachers - PS (Special BTC Under

Training)Teacher 0.87600

9.19 Additional Teachers - PS (Vacant) Teacher

9.20Others in position (Para Teachers upgraded

as Teachers)Teacher

Upper Primary teachers

9.21 UP Teachers (Regular)-Existing Teacher 5.04000 699 3522.960 699 3522.96000

9.22 UP Teachers (Contract)-Existing9.23 UP Teachers (Vacant) Teacher 1.26000

9.24Head Teacher for Upper Primary (if the number

of children exceeds 100)-ExistingTeacher 5.34000 221 1180.140 221 1180.14000

9.24a Head Teacher for Upper Primary (Vacant) Teacher 1.33500

9.25Subject specific Upper Primary Teachers

(Regular)(a) Science and Mathematics(b) Social Studies(c) Languages

9.32 Part Time Instructors in position(a) Art Education 0.77000 87 66.990 87 66.99000(b) Health and Physical Education 0.77000 104 80.080 104 80.08000(c) Work Education 0.77000 60 46.200 60 46.20000

9.32(A) Part Time Instructors Vacant(a) Art Education 0.42000(b) Health and Physical Education 0.42000(c) Work Education 0.42000

9.33

Others-Incentive to Teachers in Schools

Located in Naxal Affected Areas (@

Rs.1500/- per teachers per month)

Sub Total (9.13 to 9.33) 3717 7792.590 3717 7792.59TOTAL

(New Teachers Salary +Teachers Salary

Recurring)

3717 7792.590 3717 7792.59000

10 Teachers Training(a) Teachers

10.01

Refresher In-service Teachers' Training at BRC

level and above - 10 days (@ Rs.200/- per

head per day)

Teacher

(Target &

Ach.-13-14

in

Mandays)

0.00600

10.01(a)Continuous and Comprehensive Evauation [PS +

UPS)Teacher 0.01300 1551 20.163 1551 20.16300

10.01(b) Eary Reading and Numeracy Skills [PS] Teacher 0.00500 1551 7.755 1551 7.75500

10.01(c) Science [UPS] Teacher 0.00800 648 5.184 648 5.18400Recommended as

proposed

10.01(d) CWSN Teacher 0.00400

Arti:SSA-AWPB-2014-15-PABMinits:Mainpuri:16-06-2014 164 / 533

Page 165: U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 · 2015. 1. 6. · U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15

Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

Name of District : Mainpuri -53

ActivityS. No.Physical

UnitRemarks

Outlay Recommendation for 2014-15

Spill OverDeferred laibility of

2014-15Fresh Recommended Total Recommended

10.02

One day monthly cluster level meetings and

peer group training sessions for 10 months for

all teachers each year at CRC level - 10 days (@

Rs.100/- per head per day)

Teacher 0.01000

10.03(a)

Induction Training for Newly Recruited Teachers

for 6 Months (Special BTC)- @Rs.2000/- per

head per year

Teacher 0.02000

10.03(b)5 Days Training for Part Time Instructors @ Rs.

200/- per head per day) Teacher 0.01000

10.04

Training of untrained Teachers to acquire

professional qualifications over a two year

period.

Teacher 0.04700 918 43.146 918 43.14600

(b) Head Teachers

10.05Refresher Residencial In-service for 10 days at

BRC level and above

Head

Teacher(c) Resource Persons

10.06

Refresher Training for all Resource

Persons,Master Trainers, BRC & CRC faculty

and Coordinators for 5 days each year (@

Rs.200/- per head per day)

Resource

Person 0.00300 120 0.360 120 0.36000

Sub Total 4788 76.608 4788 76.608

11Academic Support through Block Resource

Centre (BRC)/ URC

11.01 Salary of Faculty and Staff

(a) 5 RPs at BRC for subject specific training in

positionRP 50 50

(b) 2 RPs for CWSN in position RP(b-i) 1 CWSN Resource Person RP 1.10000 20 22.000 20 22.00000

(b-ii) 1 Physiotherapist (Resource person for IE) RP

(c) 1 MIS Coordinator in position RP 1.86000

(d) 1 Datra Entry Operator in position RP 1.74000 10 17.400 10 17.40000

(e) 1 Accountant-cum-support staff in position RP 1.80000 9 16.200 9 16.20000

11.02 Furniture Grant BRC/ URC 1.00000

11.03Replacement of furniture, computer, TLE etc (

Once in 5 years)BRC/ URC 1.00000

11.04 Contingency Grant BRC/ URC 0.50000 10 5.000 10 5.00000

11.05 Meeting, TA BRC/ URC 0.30000 10 3.000 10 3.00000

11.06 TLM Grant BRC/ URC 0.10000

11.07 Maintenance Grant BRC/ URC 0.10000

Sub Total 10 63.600 10 63.60000

12Academic Support through Cluster

Resource Centres (CRC/UERC)

12.01Salary of Cluster Coordinator (on an average of

one Resource Person per 18 schools in a block)RP

12.02 Furniture GrantCRC/

UERC0.10000

12.03Replacement of furniture, computer, TLE etc.

once in 5 years

CRC/

UERC0.10000

12.04 Contingency Grant CRC/UERC 0.10000 81 8.100 81 8.10000

12.05 Meeting, TA CRC/UERC 0.12000 81 9.720 81 9.72000

12.06 TLM Grant CRC/UERC 0.03000

12.07Maintenance Grant

CRC/UERC 0.02000

Sub Total 162 17.820 162 17.82000

13Computer Aided Education in upper

primary schools under Innovation

13.01Computer Aided Education in upper primary

schoolsDistrict 0.01200 48 0.576 48 0.57600

Sub Total 48 0.576 48 0.5760014 Libraries in Schools14.01 (a) Primary School (per school) School 0.03000

14.02 (b) Upper Primary School (per school) School 0.10000

Sub TotalIV ANNUAL GRANTS15 Teachers' Grant15.01 Primary Teachers Teacher 0.0050015.02 Upper Primary Teachers Teacher 0.00500 648 3.240 648 3.24000

Sub Total 648 3.240 648 3.2400016 School Grant16.01 Primary School School 0.05000 1637 81.850 1637 81.8500016.02 Upper Primary School School 0.07000 648 45.360 648 45.36000

Sub Total 2285 127.210 2285 127.21000

Arti:SSA-AWPB-2014-15-PABMinits:Mainpuri:16-06-2014 165 / 533

Page 166: U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 · 2015. 1. 6. · U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15

Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

Name of District : Mainpuri -53

ActivityS. No.Physical

UnitRemarks

Outlay Recommendation for 2014-15

Spill OverDeferred laibility of

2014-15Fresh Recommended Total Recommended

17Research, Evaluation, Monitoring &

Supervision

17.01 REMS Activities School 0.00103 2285 2.350 2285 2.35038

17.02 Monitoring & Supervision School 0.00078 2285 1.792 2285 1.79159

17.03 House Hold Survey (Urban) in Million Plus Cities District 35.00000

Sub Total 4570 4.142 4570 4.1419718 Maintenance Grant

18.01 Maintenance in School having upto3 Classrooms School 0.07500 450 33.750 450 33.75000

18.01a Maintenance Grant School 0.07500 1739 130.425 1739 130.42500Sub Total 2189 164.175 2189 164.17500

VBRIDGING GENDER AND SOCIAL

CATEGORY GAPS

19 Interventions for CWSN (IE)

19.01 Provision for Inclusive Education Child 0.02500 2560 64.000 2560 64.00000

Sub Total 2560 64.000 2560 64.00000

20Innovativation Head up to Rs.50 Lakh per

district

20.01 Girls Education District 0.70000 9 6.300 9 6.30000

20.02 ECCE District20.03 Intervention for SC / ST children District

20.04 Intervention for Minority Community children District

20.05 Intervention for Urban Deprived children District 10.00000

Sub Total 9 6.300 9 6.3000021 SMC/PRI Training

21.01Residential for 6 Resource Person per Block (3

days) (@ Rs.500/-)Blocks 0.09000

21.02Non-residential (3 days training of 6 SMC

members) (@ Rs.100/-)SMC 0.01800 2189 39.402 2189 39.40200

21.02(a)Non-residential (3 days training of 3 Members of

PRI/VECs/LA) (@ Rs.100/-)VEC/ WEC 0.00900

21.03

Seminar/Orientation of SMC Women members

and President/Vice President (@ Rs. 50,000/-

per block)

Blocks 0.50000

Sub Total 2189 39.402 2189 39.40200VI SCHOOL INFRASTRUCTURE22 Civil Works22.01 Primary School (Plain) (New) School 13.1550022.02 Primary School (Hilly/Rocky) (New) School 13.2750022.03 Upper Primary (Plain) (New) School 20.65500

22.04 Upper Primary School (Hilly/Rocky) (New) School 20.77500

22.04aComposite Schools for Urban Areas (Class I-

VIII)School 41.04000

22.05 ACR in lieu of upgraded Upper Primary School Rooms

22.06 Additional class rooms for adding Class VIII Rooms

22.07 Building Less (Pry) School 9.7500022.08 Building Less (UP) School 18.5900022.09 Dilapidated Building (Pry) School 9.7500022.10 Dilapidated Building (UP) School 18.59000

22.11 Additional Class Room (Rural) ( PS+UPS) Rooms 3.45000

22.12 Additional Class Room (Urban) Rooms 3.4500022.13 Additional Class Room (Hill Area)22.14 Toilet/Urinals (PS & UPS) School 0.7000022.15 Separate Girls Toilet (Rural+Urban) School 0.7000022.16 CWSN friendly Toilets School 0.50000

22.17 Drinking Water Facility (for Urban Area Only)) School 0.15000

22.17a Drinking Water Facility (Plain PS & UPS) School 0.15000

22.17b Drinking Water Facility (Hilly/Rocky PS & UPS) School 0.15000

22.18a Boundary Wall PS (Total in Meters x .01105) 0.01749

22.18bBoundary Wall PS (For Gate) @Rs. 7000 x no. of

P.S.School 0.07800

22.18c Boundary Wall UPS (Total in Meters x .01105) 0.01749

22.18dBoundary Wall UPS (For Gate) @Rs. 7000 x no.

of UPSSchool 0.07800

22.19a Electrification in P.S./ Electrical Equipment School 0.11000

22.19b Electrification in U. P.S./ Electrical Equipment School 0.11000

22.20Office-cum-store-cum-Head Teacher's room

(Primary)Rooms

22.21Office-cum-store-cum-Head Teacher's room

(Upper Primary)Rooms

22.22Augumentation of training facility in BRC (one

time)BRC/ URC 5.00000

22.23 Child friendly Elements School 0.25000

22.24 Ramps with Handrails (Barrier Free Elements) School 0.06000

22.25 Handrails in existing Ramps School 0.01000

Arti:SSA-AWPB-2014-15-PABMinits:Mainpuri:16-06-2014 166 / 533

Page 167: U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 · 2015. 1. 6. · U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15

Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

Name of District : Mainpuri -53

ActivityS. No.Physical

UnitRemarks

Outlay Recommendation for 2014-15

Spill OverDeferred laibility of

2014-15Fresh Recommended Total Recommended

22.26 Whole School Develoipment School22.27 Retro-fitting and repairs School

22.28Residential Schools for specific category

of children

(a) Construction of Building including boundary

wall, Water and sanitation facilities, electric

installation (For 100 children)

Building 65.86000

(b) Construction of residential hostel Building 65.86000

(c) Refurnishing unused old buildings Building

22.29

Construction of Hostel in existing Govt UPS

including boundary wall, Water and sanitation

facilities, electric installation etc. (For 50

children)

7.00000

22.30Furniture for Govt. UPS (per child) (@ Rs.500/-

per child enrolled)Child 0.00500

22.31 Major Repairs for Primary School School 0.30000

22.32 Majr Repairs for Upper Primary School School 0.30000

22.33Others (Difference of Civil Wrks

sanctioned in pre.yr.)22.33a Others (Overhead Tank PS) School 0.1200022.33b Others (Overhead Tank UPS) School 0.12000

Sub Total (Civil WOrks)VII PROJECT MANAGEMENT COST23 Management23.01 Management up to 3.5%

(a) Project Management and MIS

(i) DPO ( Salary, Contigency, Consumables,

POL, TA & Computer etc)District 1 88.133 1 88.13310

(ii) EMIS Cell District 1 14.175 1 14.17500Sub Total (a) 1 1 1 102.308 1 102.308

(b) Training of Educational Administrators District

(c) School Mapping and Social Mapping District

Sub Total (23.01)

23.02Learning Enhancement Prog. (LEP) (P & UP) (up

to 2%)District 14.280 14.27960

23.03 Community Mobilization (up to 0.5%) District 1 45.850 1 45.85000

Sub Total (Management) 1 60.130 1 60.12960Total Management Cost 162.438 162.43770Total of SSA (Districs) 31.500 301698 9326.635 301698 9358.135

24 State Component23.01 Management23.02 REMS 0.0044923.03 SIEMAT

Sub Total

STATE SSA TOTAL 31.50000 301698 9326.635 301698 9358.13537

25

KGBV Financial Provision (give

separate costing sheets for different

Models)

Hostel

ANon Recurring One Time Grant (Only

committed liabilities) (Model-I)

25.01 Construction of Building (New)

25.02 Construction of Building KGBV sanctioned earlier

25.02(a) Additional Class Room Rooms 3.45000

25.02(b) Guard Room Rooms 1.32000

25.02(c) Boundary Wall School 5.0200025.03 Boudary Wall (Spillover only) 1.50000 1.50000

25.04

Boring/Handpump (Spillover only)

(minimum rates prescribed by State Drinking

Water Department subject to a ceiling of Rs.

1.00 lakhs)

1.26000 1.26000

25.05 Electricity /Water charges (Spillover only)

25.05(a) Solar Water Heater & Solar Light 2.97000

25.06Furniture/Equipment (including Kitchen

equipment)3.00000

25.07 TLM and equipment including library books 3.50000

25.08 Bedding (New) 0.75000

25.09 Replacement of Bedding (once in 3 Year) 0.75000 2 1.500 2 1.50000

Subtotal Non Recurring 2.76000 1.500 4.26000

B Recurring Cost Per Annum (Model-I)

25.10Maintenance per girl student per month @ Rs.

1500/-18.00000 3 54.000 3 54.00000

25.11 Stipend for girl student per month @ Rs. 100/- 1.20000 3 3.600 3 3.60000

25.12Supplementary TLM, stationery and other

educational material @ Rs.1000/- per annum1.00000 3 3.000 3 3.00000

25.13 Salaries

Arti:SSA-AWPB-2014-15-PABMinits:Mainpuri:16-06-2014 167 / 533

Page 168: U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 · 2015. 1. 6. · U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15

Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

Name of District : Mainpuri -53

ActivityS. No.Physical

UnitRemarks

Outlay Recommendation for 2014-15

Spill OverDeferred laibility of

2014-15Fresh Recommended Total Recommended

25.13.1 Additional Salaries:

(a) 1 Warden @ Rs. 25,000/- per month 3.00000 3 9.00000 3 9.00000

(b)4 Full time teachers as per RTE norms @ Rs.

20,000/- per month per teacher 9.60000 3 28.80000 3 28.80000

(c)

1 Urdu Teachers (only for blocks with muslim

population above 20% and select urban areas), if

required @ Rs. 12,000/- per month per teacher 1.44000 3 4.32000 3 4.32000

(d)3 part time teachers @ Rs. 5,000/- per month per

teacher 1.80000 3 5.40000 3 5.40000

(e)1 Full time Accountant @ Rs. 10,000/- per month

1.20000 3 3.60000 3 3.60000

(f)

2 Support Staff – (Accountant/ Assistant, Peon,

Chowkidar) @ Rs. 5,000/- per month per staff 1.20000 3 3.60000 3 3.60000

(g) 1 Head cook @ Rs. 6,000/- per month 0.72000 3 2.16000 3 2.16000

(h)2 Asstt. Cooks @ Rs. 4,500/- per month per cook

1.08000 3 3.24000 3 3.24000

25.14Specific skill training @ Rs.1000/- per child per

annum1.00000 3 3.000 3 3.00000

25.15Electricity/water charges @ Rs.1000/- per child

per annum1.00000 3 3.000 3 3.00000

25.16Medical care/contingencies @ Rs. 1250 per child

per annum1.25000 3 3.750 3 3.75000

25.17 Maintenance @ Rs.750/- per child per annum 0.75000 3 2.250 3 2.25000

25.18

Miscellaneous (Educational Tour/ Exposure Visit

/ Sports Material etc.) @ Rs.750/- per child per

annum

0.75000 3 2.250 3 2.25000

25.19Preparatory camps @ Rs.200/- per child per

annum0.20000 3 0.600 3 0.60000

25.20PTAs/school functions @ Rs.200/- per child per

annum0.20000 3 0.600 3 0.60000

25.21 Provision of Rent @ Rs.6000/- per annum 6.00000

25.21a Provision of Rent (6 months) 3.6000025.21b Provision of Rent (3 months) 1.8000025.21c Rent (Previous Year (2007-2012)

25.22 Capacity building 0.50000 3 1.500 3 1.50000

25.22(a)Physical/ Self Defence Training @ Rs.200/- per

child per annum0.20000 3 0.600 3 0.60000

Subtotal Recurring 3 138.270 3 138.27000

Subtotal (Model-I) 2.76000 3 139.770 3 142.53000

CNon Recurring One Time Grant (Only

committed liabilities) (Model-II)

25.23 Construction of Building (New)

25.24 Construction of Building KGBV sanctioned earlier

25.24(a) Additional Class Room Rooms 3.45000

25.24(b) Guard Room Rooms 1.32000

25.24(c) Boundary Wall School 5.0200025.25 Boudary Wall (Spillover only)25.26 Boring/Handpump (Spillover only)

25.27 Electricity /Water charges (Spillover only)

25.27(a) Solar Water Heater & Solar Light 2.97000

25.28Furniture/Equipment (including Kitchen

equipment)2.00000

25.29 TLM and equipment including library books 3.00000

25.30 Bedding (New) 0.37500

25.31 Replacement of Bedding (once in 3 Year) 0.37500

Subtotal Non Recurring

D Recurring Cost Per Annum (Model-II)

25.32Maintenance per girl student per month @ Rs.

1500/-9.00000

25.33 Stipend for girl student per month @ Rs. 100/- 0.60000

25.34Supplementary TLM, stationery and other

educational material @ Rs.1000/- per annum0.50000

25.35 Salaries(a) 1 Warden @ Rs. 25,000/- per month 3.00000

(b)3 Full time teachers as per RTE norms @ Rs.

20,000/- per month per teacher 7.20000

(c) 3 part time teachers @ Rs. 5,000/- per month per

teacher 1.80000

(d)1 Full time Accountant @ Rs. 10,000/- per month

1.20000

(e)

2 Support Staff – (Accountant/ Assistant, Peon,

Chowkidar) @ Rs. 5,000/- per month per staff 1.20000

Arti:SSA-AWPB-2014-15-PABMinits:Mainpuri:16-06-2014 168 / 533

Page 169: U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 · 2015. 1. 6. · U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15

Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

Name of District : Mainpuri -53

ActivityS. No.Physical

UnitRemarks

Outlay Recommendation for 2014-15

Spill OverDeferred laibility of

2014-15Fresh Recommended Total Recommended

(f) 1 Head cook @ Rs. 6,000/- per month 0.72000

(g)1 Asstt. Cooks @ Rs. 4,500/- per month per cook

0.54000

25.36Specific skill training @ Rs.1000/- per child per

annum0.50000

25.37Electricity/water charges @ Rs.1000/- per child

per annum0.50000

25.38Medical care/contingencies @ Rs. 1250 per child

per annum0.62500

25.39 Maintenance @ Rs.750/- per child per annum 0.37500

25.40

Miscellaneous (Educational Tour/ Exposure Visit

/ Sports Material etc.) @ Rs.750/- per child per

annum

0.37500

25.41Preparatory camps @ Rs.300/- per child per

annum0.15000

25.42PTAs/school functions @ Rs.300/- per child per

annum0.15000

25.43 Provision of Rent @ Rs.10000/- per annum 5.00000

25.43a Provision of Rent (6 months) 3.6000025.43b Provision of Rent (3 months) 1.8000025.43c Rent (Previous Year (2007-2012)25.44 Capacity building 0.25000

25.44(a)Physical/ Self Defence Training @ Rs.200/- per

child per annum0.10000

Subtotal Recurring

Subtotal (Model-II) Total (KGBV) 2.760 3 139.770 3 142.530

DISTRICT GRAND TOTAL (SSA+KGBV) 2.760 31.500 301701 9466.405 301701 9500.665

Arti:SSA-AWPB-2014-15-PABMinits:Mainpuri:16-06-2014 169 / 533

Page 170: U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 · 2015. 1. 6. · U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15

Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

I ACCESS

1 Opening of New Schools

1.01 Upgradation of EGS to PSCentres /

School1.02 New PS School

1.03 Upgradation of PS to UPS / New UPS School

1.04 Composite Schools (for Urban Areas) School

1.05Residential Schools for specific category children

(For 100 children)

1.06Residential Hostel (for specific category of

children) (For 50 children)

1.07 Integration of Class V with Primary Schools

1.08Integration of Class VIII with Upper Primary

Schools

2Residential Schools for specific category

of children (For 100 Children)

Total - Residential Schools (For 100

children)

3Residential Hostel for specific category of

children (For 50 Children)

Total - Residential Schools (For 50

children)4 Transport/Escort Facility

4.01

Children in remote habitations with sparse

populations where opening of schools is

unviable

Child 0.03000

4.02

Urban deprived children/children without adult

protection in urban areas where schools are not

opened because availability of land is a problem

Child 0.03000

Sub Total

5Special Training for mainstreaming of Out-

of-School Children

5.03 Non-Residential (Fresh)(a) 12 months Child 0.06000(b) 9 months 0.04500(c) 6 months

(i)Special Training (by Special Instructors-NRBC)-

(1-5) Child 0.03000 71 2.130 71 2.13000

(ii) Special Training (by Special Instructors-NRBC)-

(6-8) Child 0.03000 79 2.370 79 2.37000

(d) 3 months Child 0.01500Sub Total 150 4.500 150 4.50000

Total (Special Training) 150 4.500 150 4.5005(B) House Hold Survey (HHS)

5(B).01 House Hold Survey through SMCHouse

Hold0.00001

Sub TotalII RETENTION6 Free Text Book

6.01Free Text Book (PS) for Parishadiya & Aided

Primary Schools (Workbooks not included)Child 0.00120 50684 60.821 50684 60.82080

6.01a

Free Text Book (PS) for 25% children of Class-1

in Private Recognised Primary Schools of other

Boards (Workbooks not included)

Child 0.00150

6.02 Free Brail Books (PS) 0.00150 45 0.068 45 0.06750

6.03 Free Large Print Books (PS) 0.00150

6.04Free Text Book (UPS) (Workbooks not included)

(Including KGBV Girls)Child 0.00200 24607 49.214 24607 49.21400

6.05 Free Brail Books (UPS) 0.00250 20 0.050 20 0.05000

6.06 Free Large Print Books (PS) 0.00250Sub Total 75356 110.152 75356 110.152

7 Provision of 2 set of Uniforms

7.01 All Girls (Including KGBV Girls) Child 0.00400 57306 229.224 57306 229.22400

7.02 SC Boys Child 0.00400 17985 71.940 17985 71.94000

7.03 ST Boys Child 0.00400

7.04 BPL Boys Child 0.00400 8030 32.120 8030 32.12000

7.05

Free Uniform for 25% children of Class-1 in

Private Recognised Primary Schools of other

Boards

Child0.00400

Sub Total 83321 333.284 83321 333.2847(A) Fee Reimbursement

7(A).01

Fee Reimbursement for Admission of children of

Disadvantaged Group & Weaker Section upto

25% of seats in Class-1 of Private Unaided

Recognised Schools

Child 0.05400

Sub Total

8 Teaching Learning Equipment (TLE)

8.01 TLE - New Primary School 4 0.80000 0.20000 4 0.800008.02 TLE - New Upper Primary School 3 1.50000 0.50000 3 1.50000

Name of District : Mahoba -52

ActivityS. No.Physical

UnitRemarks

Outlay Recommendation for 2014-15

Spill OverDeferred laibility of

2014-15Fresh Recommended Total Recommended

Arti:SSA-AWPB-2014-15-PABMinits:Mahoba:16-06-2014 170 / 533

Page 171: U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 · 2015. 1. 6. · U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15

Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

Name of District : Mahoba -52

ActivityS. No.Physical

UnitRemarks

Outlay Recommendation for 2014-15

Spill OverDeferred laibility of

2014-15Fresh Recommended Total Recommended

Sub Total 7 2.30000 7 2.30000III ENHANCING QUALITY9 New Teachers Salary

9.01 Primary Teachers (Regular) (Asstt. Teacher) Teacher 0.91500

9.01aHead Teacher for Primary (if the number of

children exceeds 150 in a school)Teacher

9.02 Primary Teachers (Contract) (S.M.) Teacher

9.03Subject specific Upper Primary Teachers

(Regular) (a) Science and Mathematics Teacher 1.26000(b) Social Studies Teacher 1.26000(c) Languages Teacher 1.26000

Sub Total (9.01 to 9.05)Add.Teacher against PTR

Sub Total (9.06 to 9.12)

Total (New Teacher's Salary-9.01 to 9.12)

Teachers Salary (Recurring-sanctioned

earlier)Primary teachers

9.13 Primary Teachers ( Regular)-Existing, in position Teacher 3.66000 136 497.760 136 497.76000

9.14Primary Teachers (Contract)-Existing, in

positionTeacher 0.55000

9.14(a) Primary Teachers (Contract)-under Training Teacher 0.38500 574 220.990 574 220.99000

9.14(b)Primary Teacher (Para Teachers Equal to

9.14(a) upgraded as Teachers)0.38500 350 134.750 350 134.75000

9.14(c) Primary Teachers (Para)- Vacant Teacher9.15 Primary Teachers (Vacant) Teacher 0.30500

9.16Head Teacher for Primary (if the number of

children exceeds 150)Teacher 5.04000 64 322.560 64 322.56000

9.16(b)Head Teacher for Primary (if the number of

children exceeds 150) VacantTeacher 0.42000

Additional teachers

9.17Additional Teachers - PS (Special BTC-

Regular) in positionTeacher 0.30500

9.18Additional Teachers - PS (Special BTC Under

Training)Teacher 0.87600

9.19 Additional Teachers - PS (Vacant) Teacher

9.20Others in position (Para Teachers upgraded

as Teachers)Teacher

Upper Primary teachers

9.21 UP Teachers (Regular)-Existing Teacher 5.04000 481 2424.240 481 2424.24000

9.22 UP Teachers (Contract)-Existing9.23 UP Teachers (Vacant) Teacher 1.26000

9.24Head Teacher for Upper Primary (if the number

of children exceeds 100)-ExistingTeacher 5.34000 176 939.840 176 939.84000

9.24a Head Teacher for Upper Primary (Vacant) Teacher 1.33500

9.25Subject specific Upper Primary Teachers

(Regular)(a) Science and Mathematics(b) Social Studies(c) Languages

9.32 Part Time Instructors in position(a) Art Education 0.77000 80 61.600 80 61.60000(b) Health and Physical Education 0.77000 73 56.210 73 56.21000(c) Work Education 0.77000 71 54.670 71 54.67000

9.32(A) Part Time Instructors Vacant(a) Art Education 0.42000(b) Health and Physical Education 0.42000(c) Work Education 0.42000

9.33

Others-Incentive to Teachers in Schools

Located in Naxal Affected Areas (@

Rs.1500/- per teachers per month)

Sub Total (9.13 to 9.33) 2005 4712.620 2005 4712.62TOTAL

(New Teachers Salary +Teachers Salary

Recurring)

2005 4712.620 2005 4712.62000

10 Teachers Training(a) Teachers

10.01

Refresher In-service Teachers' Training at BRC

level and above - 10 days (@ Rs.200/- per

head per day)

Teacher

(Target &

Ach.-13-14

in

Mandays)

0.00600

10.01(a)Continuous and Comprehensive Evauation [PS +

UPS)Teacher 0.01300 628 8.164 628 8.16400

10.01(b) Eary Reading and Numeracy Skills [PS] Teacher 0.00500 628 3.140 628 3.14000

10.01(c) Science [UPS] Teacher 0.00800 359 2.872 359 2.87200Recommended as

proposed

10.01(d) CWSN Teacher 0.00400

Arti:SSA-AWPB-2014-15-PABMinits:Mahoba:16-06-2014 171 / 533

Page 172: U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 · 2015. 1. 6. · U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15

Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

Name of District : Mahoba -52

ActivityS. No.Physical

UnitRemarks

Outlay Recommendation for 2014-15

Spill OverDeferred laibility of

2014-15Fresh Recommended Total Recommended

10.02

One day monthly cluster level meetings and

peer group training sessions for 10 months for

all teachers each year at CRC level - 10 days (@

Rs.100/- per head per day)

Teacher 0.01000

10.03(a)

Induction Training for Newly Recruited Teachers

for 6 Months (Special BTC)- @Rs.2000/- per

head per year

Teacher 0.02000

10.03(b)5 Days Training for Part Time Instructors @ Rs.

200/- per head per day) Teacher 0.01000

10.04

Training of untrained Teachers to acquire

professional qualifications over a two year

period.

Teacher 0.04700 430 20.210 430 20.21000

(b) Head Teachers

10.05Refresher Residencial In-service for 10 days at

BRC level and above

Head

Teacher(c) Resource Persons

10.06

Refresher Training for all Resource

Persons,Master Trainers, BRC & CRC faculty

and Coordinators for 5 days each year (@

Rs.200/- per head per day)

Resource

Person 0.00300 60 0.180 60 0.18000

Sub Total 2105 34.566 2105 34.566

11Academic Support through Block Resource

Centre (BRC)/ URC

11.01 Salary of Faculty and Staff

(a) 5 RPs at BRC for subject specific training in

positionRP 25 25

(b) 2 RPs for CWSN in position RP(b-i) 1 CWSN Resource Person RP 1.10000 10 11.000 10 11.00000

(b-ii) 1 Physiotherapist (Resource person for IE) RP

(c) 1 MIS Coordinator in position RP 1.86000

(d) 1 Datra Entry Operator in position RP 1.74000 4 6.960 4 6.96000

(e) 1 Accountant-cum-support staff in position RP 1.80000 5 9.000 5 9.00000

11.02 Furniture Grant BRC/ URC 1.00000

11.03Replacement of furniture, computer, TLE etc (

Once in 5 years)BRC/ URC 1.00000

11.04 Contingency Grant BRC/ URC 0.50000 5 2.500 5 2.50000

11.05 Meeting, TA BRC/ URC 0.30000 5 1.500 5 1.50000

11.06 TLM Grant BRC/ URC 0.10000

11.07 Maintenance Grant BRC/ URC 0.10000

Sub Total 5 30.960 5 30.96000

12Academic Support through Cluster

Resource Centres (CRC/UERC)

12.01Salary of Cluster Coordinator (on an average of

one Resource Person per 18 schools in a block)RP

12.02 Furniture GrantCRC/

UERC0.10000

12.03Replacement of furniture, computer, TLE etc.

once in 5 years

CRC/

UERC0.10000

12.04 Contingency Grant CRC/UERC 0.10000 40 4.000 40 4.00000

12.05 Meeting, TA CRC/UERC 0.12000 40 4.800 40 4.80000

12.06 TLM Grant CRC/UERC 0.03000

12.07Maintenance Grant

CRC/UERC 0.02000

Sub Total 80 8.800 80 8.80000

13Computer Aided Education in upper

primary schools under Innovation

13.01Computer Aided Education in upper primary

schoolsDistrict 0.01200 48 0.576 48 0.57600

Sub Total 48 0.576 48 0.5760014 Libraries in Schools14.01 (a) Primary School (per school) School 0.03000

14.02 (b) Upper Primary School (per school) School 0.10000

Sub TotalIV ANNUAL GRANTS15 Teachers' Grant15.01 Primary Teachers Teacher 0.0050015.02 Upper Primary Teachers Teacher 0.00500 359 1.795 359 1.79500

Sub Total 359 1.795 359 1.7950016 School Grant16.01 Primary School School 0.05000 675 33.750 675 33.7500016.02 Upper Primary School School 0.07000 374 26.180 374 26.18000

Sub Total 1049 59.930 1049 59.93000

Arti:SSA-AWPB-2014-15-PABMinits:Mahoba:16-06-2014 172 / 533

Page 173: U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 · 2015. 1. 6. · U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15

Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

Name of District : Mahoba -52

ActivityS. No.Physical

UnitRemarks

Outlay Recommendation for 2014-15

Spill OverDeferred laibility of

2014-15Fresh Recommended Total Recommended

17Research, Evaluation, Monitoring &

Supervision

17.01 REMS Activities School 0.00103 1049 1.079 1049 1.07901

17.02 Monitoring & Supervision School 0.00078 1049 0.822 1049 0.82249

17.03 House Hold Survey (Urban) in Million Plus Cities District 35.00000

Sub Total 2098 1.902 2098 1.9015018 Maintenance Grant

18.01 Maintenance in School having upto3 Classrooms School 0.07500 333 24.975 333 24.97500

18.01a Maintenance Grant School 0.07500 692 51.900 692 51.90000Sub Total 1025 76.875 1025 76.87500

VBRIDGING GENDER AND SOCIAL

CATEGORY GAPS

19 Interventions for CWSN (IE)

19.01 Provision for Inclusive Education Child 0.01600 3645 58.320 3645 58.32000

Sub Total 3645 58.320 3645 58.32000

20Innovativation Head up to Rs.50 Lakh per

district

20.01 Girls Education District 0.70000 8 5.600 8 5.60000

20.02 ECCE District20.03 Intervention for SC / ST children District

20.04 Intervention for Minority Community children District

20.05 Intervention for Urban Deprived children District 10.00000

Sub Total 8 5.600 8 5.6000021 SMC/PRI Training

21.01Residential for 6 Resource Person per Block (3

days) (@ Rs.500/-)Blocks 0.09000

21.02Non-residential (3 days training of 6 SMC

members) (@ Rs.100/-)SMC 0.01800 1032 18.576 1032 18.57600

21.02(a)Non-residential (3 days training of 3 Members of

PRI/VECs/LA) (@ Rs.100/-)VEC/ WEC 0.00900

21.03

Seminar/Orientation of SMC Women members

and President/Vice President (@ Rs. 50,000/-

per block)

Blocks 0.50000

Sub Total 1032 18.576 1032 18.57600VI SCHOOL INFRASTRUCTURE22 Civil Works22.01 Primary School (Plain) (New) School 0.32020 13.15500 0.3202022.02 Primary School (Hilly/Rocky) (New) School 13.2750022.03 Upper Primary (Plain) (New) School 0.32052 20.65500 0.32052

22.04 Upper Primary School (Hilly/Rocky) (New) School 20.77500

22.04aComposite Schools for Urban Areas (Class I-

VIII)School 12.31000 41.04000 12.31000

22.05 ACR in lieu of upgraded Upper Primary School Rooms

22.06 Additional class rooms for adding Class VIII Rooms

22.07 Building Less (Pry) School 9.7500022.08 Building Less (UP) School 18.5900022.09 Dilapidated Building (Pry) School 9.7500022.10 Dilapidated Building (UP) School 18.59000

22.11 Additional Class Room (Rural) ( PS+UPS) Rooms 3.45000 12 41.400 12 41.40000

22.12 Additional Class Room (Urban) Rooms 3.4500022.13 Additional Class Room (Hill Area)22.14 Toilet/Urinals (PS & UPS) School 0.7000022.15 Separate Girls Toilet (Rural+Urban) School 0.7000022.16 CWSN friendly Toilets School 0.50000

22.17 Drinking Water Facility (for Urban Area Only)) School 0.15000

22.17a Drinking Water Facility (Plain PS & UPS) School 0.15000

22.17b Drinking Water Facility (Hilly/Rocky PS & UPS) School 0.15000

22.18a Boundary Wall PS (Total in Meters x .01105) 0.01749

22.18bBoundary Wall PS (For Gate) @Rs. 7000 x no. of

P.S.School 0.07800

22.18c Boundary Wall UPS (Total in Meters x .01105) 0.01749

22.18dBoundary Wall UPS (For Gate) @Rs. 7000 x no.

of UPSSchool 0.07800

22.19a Electrification in P.S./ Electrical Equipment School 0.11000

22.19b Electrification in U. P.S./ Electrical Equipment School 0.11000

22.20Office-cum-store-cum-Head Teacher's room

(Primary)Rooms

22.21Office-cum-store-cum-Head Teacher's room

(Upper Primary)Rooms

22.22Augumentation of training facility in BRC (one

time)BRC/ URC 5.00000

22.23 Child friendly Elements School 0.25000

22.24 Ramps with Handrails (Barrier Free Elements) School 0.06000

22.25 Handrails in existing Ramps School 0.01000

Arti:SSA-AWPB-2014-15-PABMinits:Mahoba:16-06-2014 173 / 533

Page 174: U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 · 2015. 1. 6. · U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15

Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

Name of District : Mahoba -52

ActivityS. No.Physical

UnitRemarks

Outlay Recommendation for 2014-15

Spill OverDeferred laibility of

2014-15Fresh Recommended Total Recommended

22.26 Whole School Develoipment School22.27 Retro-fitting and repairs School

22.28Residential Schools for specific category

of children

(a) Construction of Building including boundary

wall, Water and sanitation facilities, electric

installation (For 100 children)

Building 65.86000

(b) Construction of residential hostel Building 65.86000

(c) Refurnishing unused old buildings Building

22.29

Construction of Hostel in existing Govt UPS

including boundary wall, Water and sanitation

facilities, electric installation etc. (For 50

children)

7.00000

22.30Furniture for Govt. UPS (per child) (@ Rs.500/-

per child enrolled)Child 0.00500

22.31 Major Repairs for Primary School School 0.30000

22.32 Majr Repairs for Upper Primary School School 0.30000

22.33Others (Difference of Civil Wrks

sanctioned in pre.yr.)22.33a Others (Overhead Tank PS) School 0.1200022.33b Others (Overhead Tank UPS) School 0.12000

Sub Total (Civil WOrks) 12.95 12 41.400 12 54.35VII PROJECT MANAGEMENT COST23 Management23.01 Management up to 3.5%

(a) Project Management and MIS

(i) DPO ( Salary, Contigency, Consumables,

POL, TA & Computer etc)District 1 95.522 1 95.52200

(ii) EMIS Cell District 1 8.460 1 8.46000Sub Total (a) 1 1 1 103.982 1 103.982

(b) Training of Educational Administrators District

(c) School Mapping and Social Mapping District

Sub Total (23.01)

23.02Learning Enhancement Prog. (LEP) (P & UP) (up

to 2%)District 7.140 7.13955

23.03 Community Mobilization (up to 0.5%) District 1 28.000 1 28.00000

Sub Total (Management) 1 35.140 1 35.13955Total Management Cost 139.122 139.12155Total of SSA (Districs) 12.951 7 2.300 172298 5638.977 172305 5654.228

24 State Component23.01 Management23.02 REMS 0.0044923.03 SIEMAT

Sub Total

STATE SSA TOTAL 12.95072 7 2.30000 172298 5638.977 172305 5654.22807

25

KGBV Financial Provision (give

separate costing sheets for different

Models)

Hostel

ANon Recurring One Time Grant (Only

committed liabilities) (Model-I)

25.01 Construction of Building (New)

25.02 Construction of Building KGBV sanctioned earlier

25.02(a) Additional Class Room Rooms 3.45000

25.02(b) Guard Room Rooms 1.32000

25.02(c) Boundary Wall School 5.0200025.03 Boudary Wall (Spillover only)

25.04

Boring/Handpump (Spillover only)

(minimum rates prescribed by State Drinking

Water Department subject to a ceiling of Rs.

1.00 lakhs)

0.21000 0.21000

25.05 Electricity /Water charges (Spillover only)

25.05(a) Solar Water Heater & Solar Light 2.97000

25.06Furniture/Equipment (including Kitchen

equipment)3.00000

25.07 TLM and equipment including library books 3.50000

25.08 Bedding (New) 0.75000

25.09 Replacement of Bedding (once in 3 Year) 0.75000

Subtotal Non Recurring 0.21000 0.21000

B Recurring Cost Per Annum (Model-I)

25.10Maintenance per girl student per month @ Rs.

1500/-18.00000 3 54.000 3 54.00000

25.11 Stipend for girl student per month @ Rs. 100/- 1.20000 3 3.600 3 3.60000

25.12Supplementary TLM, stationery and other

educational material @ Rs.1000/- per annum1.00000 3 3.000 3 3.00000

25.13 Salaries

Arti:SSA-AWPB-2014-15-PABMinits:Mahoba:16-06-2014 174 / 533

Page 175: U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 · 2015. 1. 6. · U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15

Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

Name of District : Mahoba -52

ActivityS. No.Physical

UnitRemarks

Outlay Recommendation for 2014-15

Spill OverDeferred laibility of

2014-15Fresh Recommended Total Recommended

25.13.1 Additional Salaries:

(a) 1 Warden @ Rs. 25,000/- per month 3.00000 3 9.00000 3 9.00000

(b)4 Full time teachers as per RTE norms @ Rs.

20,000/- per month per teacher 9.60000 3 28.80000 3 28.80000

(c)

1 Urdu Teachers (only for blocks with muslim

population above 20% and select urban areas), if

required @ Rs. 12,000/- per month per teacher 1.44000 3 4.32000 3 4.32000

(d)3 part time teachers @ Rs. 5,000/- per month per

teacher 1.80000 3 5.40000 3 5.40000

(e)1 Full time Accountant @ Rs. 10,000/- per month

1.20000 3 3.60000 3 3.60000

(f)

2 Support Staff – (Accountant/ Assistant, Peon,

Chowkidar) @ Rs. 5,000/- per month per staff 1.20000 3 3.60000 3 3.60000

(g) 1 Head cook @ Rs. 6,000/- per month 0.72000 3 2.16000 3 2.16000

(h)2 Asstt. Cooks @ Rs. 4,500/- per month per cook

1.08000 3 3.24000 3 3.24000

25.14Specific skill training @ Rs.1000/- per child per

annum1.00000 3 3.000 3 3.00000

25.15Electricity/water charges @ Rs.1000/- per child

per annum1.00000 3 3.000 3 3.00000

25.16Medical care/contingencies @ Rs. 1250 per child

per annum1.25000 3 3.750 3 3.75000

25.17 Maintenance @ Rs.750/- per child per annum 0.75000 3 2.250 3 2.25000

25.18

Miscellaneous (Educational Tour/ Exposure Visit

/ Sports Material etc.) @ Rs.750/- per child per

annum

0.75000 3 2.250 3 2.25000

25.19Preparatory camps @ Rs.200/- per child per

annum0.20000 3 0.600 3 0.60000

25.20PTAs/school functions @ Rs.200/- per child per

annum0.20000 3 0.600 3 0.60000

25.21 Provision of Rent @ Rs.6000/- per annum 6.00000

25.21a Provision of Rent (6 months) 3.6000025.21b Provision of Rent (3 months) 1.8000025.21c Rent (Previous Year (2007-2012)

25.22 Capacity building 0.50000 3 1.500 3 1.50000

25.22(a)Physical/ Self Defence Training @ Rs.200/- per

child per annum0.20000 3 0.600 3 0.60000

Subtotal Recurring 3 138.270 3 138.27000

Subtotal (Model-I) 0.21000 3 138.270 3 138.48000

CNon Recurring One Time Grant (Only

committed liabilities) (Model-II)

25.23 Construction of Building (New)

25.24 Construction of Building KGBV sanctioned earlier

25.24(a) Additional Class Room Rooms 3.45000

25.24(b) Guard Room Rooms 1.32000

25.24(c) Boundary Wall School 5.0200025.25 Boudary Wall (Spillover only)25.26 Boring/Handpump (Spillover only)

25.27 Electricity /Water charges (Spillover only)

25.27(a) Solar Water Heater & Solar Light 2.97000

25.28Furniture/Equipment (including Kitchen

equipment)2.00000

25.29 TLM and equipment including library books 3.00000

25.30 Bedding (New) 0.37500

25.31 Replacement of Bedding (once in 3 Year) 0.37500

Subtotal Non Recurring

D Recurring Cost Per Annum (Model-II)

25.32Maintenance per girl student per month @ Rs.

1500/-9.00000 1 9.000 1 9.00000

25.33 Stipend for girl student per month @ Rs. 100/- 0.60000 1 0.600 1 0.60000

25.34Supplementary TLM, stationery and other

educational material @ Rs.1000/- per annum0.50000 1 0.500 1 0.50000

25.35 Salaries(a) 1 Warden @ Rs. 25,000/- per month 3.00000 1 3.000 1 3.00000

(b)3 Full time teachers as per RTE norms @ Rs.

20,000/- per month per teacher 7.20000 1 7.200 1 7.20000

(c) 3 part time teachers @ Rs. 5,000/- per month per

teacher 1.80000 1 1.800 1 1.80000

(d)1 Full time Accountant @ Rs. 10,000/- per month

1.20000 1 1.200 1 1.20000

(e)

2 Support Staff – (Accountant/ Assistant, Peon,

Chowkidar) @ Rs. 5,000/- per month per staff 1.20000 1 1.200 1 1.20000

Arti:SSA-AWPB-2014-15-PABMinits:Mahoba:16-06-2014 175 / 533

Page 176: U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 · 2015. 1. 6. · U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15

Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

Name of District : Mahoba -52

ActivityS. No.Physical

UnitRemarks

Outlay Recommendation for 2014-15

Spill OverDeferred laibility of

2014-15Fresh Recommended Total Recommended

(f) 1 Head cook @ Rs. 6,000/- per month 0.72000 1 0.720 1 0.72000

(g)1 Asstt. Cooks @ Rs. 4,500/- per month per cook

0.54000 1 0.540 1 0.54000

25.36Specific skill training @ Rs.1000/- per child per

annum0.50000 1 0.500 1 0.50000

25.37Electricity/water charges @ Rs.1000/- per child

per annum0.50000 1 0.500 1 0.50000

25.38Medical care/contingencies @ Rs. 1250 per child

per annum0.62500 1 0.625 1 0.62500

25.39 Maintenance @ Rs.750/- per child per annum 0.37500 1 0.375 1 0.37500

25.40

Miscellaneous (Educational Tour/ Exposure Visit

/ Sports Material etc.) @ Rs.750/- per child per

annum

0.37500 1 0.375 1 0.37500

25.41Preparatory camps @ Rs.300/- per child per

annum0.15000 1 0.150 1 0.15000

25.42PTAs/school functions @ Rs.300/- per child per

annum0.15000 1 0.150 1 0.15000

25.43 Provision of Rent @ Rs.10000/- per annum 5.00000

25.43a Provision of Rent (6 months) 3.6000025.43b Provision of Rent (3 months) 1.8000025.43c Rent (Previous Year (2007-2012)25.44 Capacity building 0.25000 1 0.250 1 0.25000

25.44(a)Physical/ Self Defence Training @ Rs.200/- per

child per annum0.10000 1 0.100 1 0.10000

Subtotal Recurring 19.00 28.785 19.00 28.78500

Subtotal (Model-II) 19.00 28.785 19.00 28.78500

Total (KGBV) 0.210 22 167.055 22 167.265

DISTRICT GRAND TOTAL (SSA+KGBV) 13.161 7 2.300 172320 5806.032 172327 5821.493

Arti:SSA-AWPB-2014-15-PABMinits:Mahoba:16-06-2014 176 / 533

Page 177: U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 · 2015. 1. 6. · U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15

Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

I ACCESS

1 Opening of New Schools

1.01 Upgradation of EGS to PSCentres /

School1.02 New PS School

1.03 Upgradation of PS to UPS / New UPS School

1.04 Composite Schools (for Urban Areas) School

1.05Residential Schools for specific category children

(For 100 children)

1.06Residential Hostel (for specific category of

children) (For 50 children)

1.07 Integration of Class V with Primary Schools

1.08Integration of Class VIII with Upper Primary

Schools

2Residential Schools for specific category

of children (For 100 Children)

Total - Residential Schools (For 100

children)

3Residential Hostel for specific category of

children (For 50 Children)

Total - Residential Schools (For 50

children)4 Transport/Escort Facility

4.01

Children in remote habitations with sparse

populations where opening of schools is

unviable

Child 0.03000

4.02

Urban deprived children/children without adult

protection in urban areas where schools are not

opened because availability of land is a problem

Child 0.03000

Sub Total

5Special Training for mainstreaming of Out-

of-School Children

5.03 Non-Residential (Fresh)(a) 12 months Child 0.06000(b) 9 months 0.04500(c) 6 months

(i)Special Training (by Special Instructors-NRBC)-

(1-5) Child 0.03000 120 3.600 120 3.60000

(ii) Special Training (by Special Instructors-NRBC)-

(6-8) Child 0.03000 100 3.000 100 3.00000

(d) 3 months Child 0.01500Sub Total 220 6.600 220 6.60000

Total (Special Training) 220 6.600 220 6.6005(B) House Hold Survey (HHS)

5(B).01 House Hold Survey through SMCHouse

Hold0.00001

Sub TotalII RETENTION6 Free Text Book

6.01Free Text Book (PS) for Parishadiya & Aided

Primary Schools (Workbooks not included)Child 0.00120 151559 181.871 151559 181.87080

6.01a

Free Text Book (PS) for 25% children of Class-1

in Private Recognised Primary Schools of other

Boards (Workbooks not included)

Child 0.00150

6.02 Free Brail Books (PS) 0.00150 204 0.306 204 0.30600

6.03 Free Large Print Books (PS) 0.00150

6.04Free Text Book (UPS) (Workbooks not included)

(Including KGBV Girls)Child 0.00200 61102 122.204 61102 122.20400

6.05 Free Brail Books (UPS) 0.00250 70 0.175 70 0.17500

6.06 Free Large Print Books (PS) 0.00250Sub Total 212935 304.556 212935 304.556

7 Provision of 2 set of Uniforms

7.01 All Girls (Including KGBV Girls) Child 0.00400 169216 676.864 169216 676.86400

7.02 SC Boys Child 0.00400 43219 172.876 43219 172.87600

7.03 ST Boys Child 0.00400 226 0.904 226 0.90400

7.04 BPL Boys Child 0.00400 90433 361.732 90433 361.73200

7.05

Free Uniform for 25% children of Class-1 in

Private Recognised Primary Schools of other

Boards

Child0.00400

Sub Total 303094 1212.376 303094 1212.3767(A) Fee Reimbursement

7(A).01

Fee Reimbursement for Admission of children of

Disadvantaged Group & Weaker Section upto

25% of seats in Class-1 of Private Unaided

Recognised Schools

Child 0.05400

Sub Total

8 Teaching Learning Equipment (TLE)

8.01 TLE - New Primary School 41.60000 0.20000 41.600008.02 TLE - New Upper Primary School 18.00000 0.50000 18.00000

Name of District : Maharajganj -51

ActivityS. No.Physical

UnitRemarks

Outlay Recommendation for 2014-15

Spill OverDeferred laibility of

2014-15Fresh Recommended Total Recommended

Arti:SSA-AWPB-2014-15-PABMinits:Maharajganj:16-06-2014 177 / 533

Page 178: U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 · 2015. 1. 6. · U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15

Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

Name of District : Maharajganj -51

ActivityS. No.Physical

UnitRemarks

Outlay Recommendation for 2014-15

Spill OverDeferred laibility of

2014-15Fresh Recommended Total Recommended

Sub Total 59.60000 59.60000III ENHANCING QUALITY9 New Teachers Salary

9.01 Primary Teachers (Regular) (Asstt. Teacher) Teacher 0.91500

9.01aHead Teacher for Primary (if the number of

children exceeds 150 in a school)Teacher

9.02 Primary Teachers (Contract) (S.M.) Teacher

9.03Subject specific Upper Primary Teachers

(Regular) (a) Science and Mathematics Teacher 1.26000(b) Social Studies Teacher 1.26000(c) Languages Teacher 1.26000

Sub Total (9.01 to 9.05)Add.Teacher against PTR

Sub Total (9.06 to 9.12)

Total (New Teacher's Salary-9.01 to 9.12)

Teachers Salary (Recurring-sanctioned

earlier)Primary teachers

9.13 Primary Teachers ( Regular)-Existing, in position Teacher 3.66000 6 21.960 6 21.96000

9.14Primary Teachers (Contract)-Existing, in

positionTeacher 0.55000

9.14(a) Primary Teachers (Contract)-under Training Teacher 0.38500 1118 430.430 1118 430.43000

9.14(b)Primary Teacher (Para Teachers Equal to

9.14(a) upgraded as Teachers)0.38500 753 289.905 753 289.90500

9.14(c) Primary Teachers (Para)- Vacant Teacher9.15 Primary Teachers (Vacant) Teacher 0.30500

9.16Head Teacher for Primary (if the number of

children exceeds 150)Teacher 5.04000 220 1108.800 220 1108.80000

9.16(b)Head Teacher for Primary (if the number of

children exceeds 150) VacantTeacher 0.42000

Additional teachers

9.17Additional Teachers - PS (Special BTC-

Regular) in positionTeacher 0.30500

9.18Additional Teachers - PS (Special BTC Under

Training)Teacher 0.87600

9.19 Additional Teachers - PS (Vacant) Teacher

9.20Others in position (Para Teachers upgraded

as Teachers)Teacher

Upper Primary teachers

9.21 UP Teachers (Regular)-Existing Teacher 5.04000 308 1552.320 308 1552.32000

9.22 UP Teachers (Contract)-Existing9.23 UP Teachers (Vacant) Teacher 1.26000

9.24Head Teacher for Upper Primary (if the number

of children exceeds 100)-ExistingTeacher 5.34000 146 779.640 146 779.64000

9.24a Head Teacher for Upper Primary (Vacant) Teacher 1.33500

9.25Subject specific Upper Primary Teachers

(Regular)(a) Science and Mathematics(b) Social Studies(c) Languages

9.32 Part Time Instructors in position(a) Art Education 0.77000 114 87.780 114 87.78000(b) Health and Physical Education 0.77000 129 99.330 129 99.33000(c) Work Education 0.77000 85 65.450 85 65.45000

9.32(A) Part Time Instructors Vacant(a) Art Education 0.42000(b) Health and Physical Education 0.42000(c) Work Education 0.42000

9.33

Others-Incentive to Teachers in Schools

Located in Naxal Affected Areas (@

Rs.1500/- per teachers per month)

Sub Total (9.13 to 9.33) 2879 4435.615 2879 4435.62TOTAL

(New Teachers Salary +Teachers Salary

Recurring)

2879 4435.615 2879 4435.61500

10 Teachers Training(a) Teachers

10.01

Refresher In-service Teachers' Training at BRC

level and above - 10 days (@ Rs.200/- per

head per day)

Teacher

(Target &

Ach.-13-14

in

Mandays)

0.00600

10.01(a)Continuous and Comprehensive Evauation [PS +

UPS)Teacher 0.01300 1453 18.889 1453 18.88900

10.01(b) Eary Reading and Numeracy Skills [PS] Teacher 0.00500 1453 7.265 1453 7.26500

10.01(c) Science [UPS] Teacher 0.00800 765 6.120 765 6.12000Recommended as

proposed

10.01(d) CWSN Teacher 0.00400

Arti:SSA-AWPB-2014-15-PABMinits:Maharajganj:16-06-2014 178 / 533

Page 179: U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 · 2015. 1. 6. · U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15

Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

Name of District : Maharajganj -51

ActivityS. No.Physical

UnitRemarks

Outlay Recommendation for 2014-15

Spill OverDeferred laibility of

2014-15Fresh Recommended Total Recommended

10.02

One day monthly cluster level meetings and

peer group training sessions for 10 months for

all teachers each year at CRC level - 10 days (@

Rs.100/- per head per day)

Teacher 0.01000

10.03(a)

Induction Training for Newly Recruited Teachers

for 6 Months (Special BTC)- @Rs.2000/- per

head per year

Teacher 0.02000

10.03(b)5 Days Training for Part Time Instructors @ Rs.

200/- per head per day) Teacher 0.01000

10.04

Training of untrained Teachers to acquire

professional qualifications over a two year

period.

Teacher 0.04700 574 26.978 574 26.97800

(b) Head Teachers

10.05Refresher Residencial In-service for 10 days at

BRC level and above

Head

Teacher(c) Resource Persons

10.06

Refresher Training for all Resource

Persons,Master Trainers, BRC & CRC faculty

and Coordinators for 5 days each year (@

Rs.200/- per head per day)

Resource

Person 0.00300 156 0.468 156 0.46800

Sub Total 4401 59.720 4401 59.720

11Academic Support through Block Resource

Centre (BRC)/ URC

11.01 Salary of Faculty and Staff

(a) 5 RPs at BRC for subject specific training in

positionRP 65 65

(b) 2 RPs for CWSN in position RP(b-i) 1 CWSN Resource Person RP 1.10000 26 28.600 26 28.60000

(b-ii) 1 Physiotherapist (Resource person for IE) RP

(c) 1 MIS Coordinator in position RP 1.86000

(d) 1 Datra Entry Operator in position RP 1.74000 12 20.880 12 20.88000

(e) 1 Accountant-cum-support staff in position RP 1.80000 11 19.800 11 19.80000

11.02 Furniture Grant BRC/ URC 1.00000

11.03Replacement of furniture, computer, TLE etc (

Once in 5 years)BRC/ URC 1.00000

11.04 Contingency Grant BRC/ URC 0.50000 13 6.500 13 6.50000

11.05 Meeting, TA BRC/ URC 0.30000 13 3.900 13 3.90000

11.06 TLM Grant BRC/ URC 0.10000

11.07 Maintenance Grant BRC/ URC 0.10000

Sub Total 13 79.680 13 79.68000

12Academic Support through Cluster

Resource Centres (CRC/UERC)

12.01Salary of Cluster Coordinator (on an average of

one Resource Person per 18 schools in a block)RP

12.02 Furniture GrantCRC/

UERC0.10000

12.03Replacement of furniture, computer, TLE etc.

once in 5 years

CRC/

UERC0.10000

12.04 Contingency Grant CRC/UERC 0.10000 103 10.300 103 10.30000

12.05 Meeting, TA CRC/UERC 0.12000 103 12.360 103 12.36000

12.06 TLM Grant CRC/UERC 0.03000

12.07Maintenance Grant

CRC/UERC 0.02000

Sub Total 206 22.660 206 22.66000

13Computer Aided Education in upper

primary schools under Innovation

13.01Computer Aided Education in upper primary

schoolsDistrict 0.01200 48 0.576 48 0.57600

Sub Total 48 0.576 48 0.5760014 Libraries in Schools14.01 (a) Primary School (per school) School 0.03000

14.02 (b) Upper Primary School (per school) School 0.10000

Sub TotalIV ANNUAL GRANTS15 Teachers' Grant15.01 Primary Teachers Teacher 0.0050015.02 Upper Primary Teachers Teacher 0.00500 765 3.825 765 3.82500

Sub Total 765 3.825 765 3.8250016 School Grant16.01 Primary School School 0.05000 1515 75.750 1515 75.7500016.02 Upper Primary School School 0.07000 765 53.550 765 53.55000

Sub Total 2280 129.300 2280 129.30000

Arti:SSA-AWPB-2014-15-PABMinits:Maharajganj:16-06-2014 179 / 533

Page 180: U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 · 2015. 1. 6. · U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15

Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

Name of District : Maharajganj -51

ActivityS. No.Physical

UnitRemarks

Outlay Recommendation for 2014-15

Spill OverDeferred laibility of

2014-15Fresh Recommended Total Recommended

17Research, Evaluation, Monitoring &

Supervision

17.01 REMS Activities School 0.00103 2280 2.345 2280 2.34524

17.02 Monitoring & Supervision School 0.00078 2280 1.788 2280 1.78767

17.03 House Hold Survey (Urban) in Million Plus Cities District 35.00000

Sub Total 4560 4.133 4560 4.1329118 Maintenance Grant

18.01 Maintenance in School having upto3 Classrooms School 0.07500 244 18.300 244 18.30000

18.01a Maintenance Grant School 0.07500 1891 141.825 1891 141.82500Sub Total 2135 160.125 2135 160.12500

VBRIDGING GENDER AND SOCIAL

CATEGORY GAPS

19 Interventions for CWSN (IE)

19.01 Provision for Inclusive Education Child 0.01400 5445 76.230 5445 76.23000

Sub Total 5445 76.230 5445 76.23000

20Innovativation Head up to Rs.50 Lakh per

district

20.01 Girls Education District 0.70000 9 6.300 9 6.30000

20.02 ECCE District20.03 Intervention for SC / ST children District

20.04 Intervention for Minority Community children District

20.05 Intervention for Urban Deprived children District 10.00000

Sub Total 9 6.300 9 6.3000021 SMC/PRI Training

21.01Residential for 6 Resource Person per Block (3

days) (@ Rs.500/-)Blocks 0.09000

21.02Non-residential (3 days training of 6 SMC

members) (@ Rs.100/-)SMC 0.01800 2137 38.466 2137 38.46600

21.02(a)Non-residential (3 days training of 3 Members of

PRI/VECs/LA) (@ Rs.100/-)VEC/ WEC 0.00900

21.03

Seminar/Orientation of SMC Women members

and President/Vice President (@ Rs. 50,000/-

per block)

Blocks 0.50000

Sub Total 2137 38.466 2137 38.46600VI SCHOOL INFRASTRUCTURE22 Civil Works22.01 Primary School (Plain) (New) School 13.1550022.02 Primary School (Hilly/Rocky) (New) School 13.2750022.03 Upper Primary (Plain) (New) School 20.65500

22.04 Upper Primary School (Hilly/Rocky) (New) School 20.77500

22.04aComposite Schools for Urban Areas (Class I-

VIII)School 41.04000

22.05 ACR in lieu of upgraded Upper Primary School Rooms

22.06 Additional class rooms for adding Class VIII Rooms

22.07 Building Less (Pry) School 9.7500022.08 Building Less (UP) School 18.5900022.09 Dilapidated Building (Pry) School 9.7500022.10 Dilapidated Building (UP) School 18.59000

22.11 Additional Class Room (Rural) ( PS+UPS) Rooms 3.45000 171 589.950 171 589.95000

22.12 Additional Class Room (Urban) Rooms 3.4500022.13 Additional Class Room (Hill Area)22.14 Toilet/Urinals (PS & UPS) School 0.7000022.15 Separate Girls Toilet (Rural+Urban) School 0.7000022.16 CWSN friendly Toilets School 0.50000

22.17 Drinking Water Facility (for Urban Area Only)) School 0.15000

22.17a Drinking Water Facility (Plain PS & UPS) School 0.15000

22.17b Drinking Water Facility (Hilly/Rocky PS & UPS) School 0.15000

22.18a Boundary Wall PS (Total in Meters x .01105) 0.01749

22.18bBoundary Wall PS (For Gate) @Rs. 7000 x no. of

P.S.School 0.07800

22.18c Boundary Wall UPS (Total in Meters x .01105) 0.01749

22.18dBoundary Wall UPS (For Gate) @Rs. 7000 x no.

of UPSSchool 0.07800

22.19a Electrification in P.S./ Electrical Equipment School 0.11000

22.19b Electrification in U. P.S./ Electrical Equipment School 0.11000

22.20Office-cum-store-cum-Head Teacher's room

(Primary)Rooms

22.21Office-cum-store-cum-Head Teacher's room

(Upper Primary)Rooms

22.22Augumentation of training facility in BRC (one

time)BRC/ URC 5.00000

22.23 Child friendly Elements School 0.25000

22.24 Ramps with Handrails (Barrier Free Elements) School 0.06000

22.25 Handrails in existing Ramps School 0.01000

Arti:SSA-AWPB-2014-15-PABMinits:Maharajganj:16-06-2014 180 / 533

Page 181: U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 · 2015. 1. 6. · U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15

Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

Name of District : Maharajganj -51

ActivityS. No.Physical

UnitRemarks

Outlay Recommendation for 2014-15

Spill OverDeferred laibility of

2014-15Fresh Recommended Total Recommended

22.26 Whole School Develoipment School22.27 Retro-fitting and repairs School

22.28Residential Schools for specific category

of children

(a) Construction of Building including boundary

wall, Water and sanitation facilities, electric

installation (For 100 children)

Building 65.86000

(b) Construction of residential hostel Building 65.86000

(c) Refurnishing unused old buildings Building

22.29

Construction of Hostel in existing Govt UPS

including boundary wall, Water and sanitation

facilities, electric installation etc. (For 50

children)

7.00000

22.30Furniture for Govt. UPS (per child) (@ Rs.500/-

per child enrolled)Child 0.00500

22.31 Major Repairs for Primary School School 0.30000

22.32 Majr Repairs for Upper Primary School School 0.30000

22.33Others (Difference of Civil Wrks

sanctioned in pre.yr.)22.33a Others (Overhead Tank PS) School 0.1200022.33b Others (Overhead Tank UPS) School 0.12000

Sub Total (Civil WOrks) 171 589.950 171 589.95VII PROJECT MANAGEMENT COST23 Management23.01 Management up to 3.5%

(a) Project Management and MIS

(i) DPO ( Salary, Contigency, Consumables,

POL, TA & Computer etc)District 1 127.891 1 127.89100

(ii) EMIS Cell District 1 15.665 1 15.66500Sub Total (a) 1 1 1 143.556 1 143.556

(b) Training of Educational Administrators District

(c) School Mapping and Social Mapping District

Sub Total (23.01)

23.02Learning Enhancement Prog. (LEP) (P & UP) (up

to 2%)District 18.208 18.20805

23.03 Community Mobilization (up to 0.5%) District 1 32.000 1 32.00000

Sub Total (Management) 1 50.208 1 50.20805Total Management Cost 193.764 193.76405Total of SSA (Districs) 59.600 541298 7323.876 541298 7383.476

24 State Component23.01 Management23.02 REMS 0.0044923.03 SIEMAT

Sub Total

STATE SSA TOTAL 59.60000 541298 7323.876 541298 7383.47576

25

KGBV Financial Provision (give

separate costing sheets for different

Models)

Hostel

ANon Recurring One Time Grant (Only

committed liabilities) (Model-I)

25.01 Construction of Building (New)

25.02 Construction of Building KGBV sanctioned earlier

25.02(a) Additional Class Room Rooms 3.45000

25.02(b) Guard Room Rooms 1.32000

25.02(c) Boundary Wall School 5.0200025.03 Boudary Wall (Spillover only)

25.04

Boring/Handpump (Spillover only)

(minimum rates prescribed by State Drinking

Water Department subject to a ceiling of Rs.

1.00 lakhs)

2.20000 2.20000

25.05 Electricity /Water charges (Spillover only)

25.05(a) Solar Water Heater & Solar Light 2.97000

25.06Furniture/Equipment (including Kitchen

equipment)3.00000

25.07 TLM and equipment including library books 3.50000

25.08 Bedding (New) 0.75000

25.09 Replacement of Bedding (once in 3 Year) 0.75000 11 8.250 11 8.25000

Subtotal Non Recurring 2.20000 8.250 10.45000

B Recurring Cost Per Annum (Model-I)

25.10Maintenance per girl student per month @ Rs.

1500/-18.00000 13 234.000 13 234.00000

25.11 Stipend for girl student per month @ Rs. 100/- 1.20000 13 15.600 13 15.60000

25.12Supplementary TLM, stationery and other

educational material @ Rs.1000/- per annum1.00000 13 13.000 13 13.00000

25.13 Salaries

Arti:SSA-AWPB-2014-15-PABMinits:Maharajganj:16-06-2014 181 / 533

Page 182: U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 · 2015. 1. 6. · U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15

Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

Name of District : Maharajganj -51

ActivityS. No.Physical

UnitRemarks

Outlay Recommendation for 2014-15

Spill OverDeferred laibility of

2014-15Fresh Recommended Total Recommended

25.13.1 Additional Salaries:

(a) 1 Warden @ Rs. 25,000/- per month 3.00000 13 39.00000 13 39.00000

(b)4 Full time teachers as per RTE norms @ Rs.

20,000/- per month per teacher 9.60000 13 124.80000 13 124.80000

(c)

1 Urdu Teachers (only for blocks with muslim

population above 20% and select urban areas), if

required @ Rs. 12,000/- per month per teacher 1.44000 13 18.72000 13 18.72000

(d)3 part time teachers @ Rs. 5,000/- per month per

teacher 1.80000 13 23.40000 13 23.40000

(e)1 Full time Accountant @ Rs. 10,000/- per month

1.20000 13 15.60000 13 15.60000

(f)

2 Support Staff – (Accountant/ Assistant, Peon,

Chowkidar) @ Rs. 5,000/- per month per staff 1.20000 13 15.60000 13 15.60000

(g) 1 Head cook @ Rs. 6,000/- per month 0.72000 13 9.36000 13 9.36000

(h)2 Asstt. Cooks @ Rs. 4,500/- per month per cook

1.08000 13 14.04000 13 14.04000

25.14Specific skill training @ Rs.1000/- per child per

annum1.00000 13 13.000 13 13.00000

25.15Electricity/water charges @ Rs.1000/- per child

per annum1.00000 13 13.000 13 13.00000

25.16Medical care/contingencies @ Rs. 1250 per child

per annum1.25000 13 16.250 13 16.25000

25.17 Maintenance @ Rs.750/- per child per annum 0.75000 13 9.750 13 9.75000

25.18

Miscellaneous (Educational Tour/ Exposure Visit

/ Sports Material etc.) @ Rs.750/- per child per

annum

0.75000 13 9.750 13 9.75000

25.19Preparatory camps @ Rs.200/- per child per

annum0.20000 13 2.600 13 2.60000

25.20PTAs/school functions @ Rs.200/- per child per

annum0.20000 13 2.600 13 2.60000

25.21 Provision of Rent @ Rs.6000/- per annum 6.00000

25.21a Provision of Rent (6 months) 3.6000025.21b Provision of Rent (3 months) 1.8000025.21c Rent (Previous Year (2007-2012)

25.22 Capacity building 0.50000 13 6.500 13 6.50000

25.22(a)Physical/ Self Defence Training @ Rs.200/- per

child per annum0.20000 13 2.600 13 2.60000

Subtotal Recurring 13 599.170 13 599.17000

Subtotal (Model-I) 2.20000 13 607.420 13 609.62000

CNon Recurring One Time Grant (Only

committed liabilities) (Model-II)

25.23 Construction of Building (New)

25.24 Construction of Building KGBV sanctioned earlier

25.24(a) Additional Class Room Rooms 3.45000

25.24(b) Guard Room Rooms 1.32000

25.24(c) Boundary Wall School 5.0200025.25 Boudary Wall (Spillover only)25.26 Boring/Handpump (Spillover only)

25.27 Electricity /Water charges (Spillover only)

25.27(a) Solar Water Heater & Solar Light 2.97000

25.28Furniture/Equipment (including Kitchen

equipment)2.00000

25.29 TLM and equipment including library books 3.00000

25.30 Bedding (New) 0.37500

25.31 Replacement of Bedding (once in 3 Year) 0.37500

Subtotal Non Recurring

D Recurring Cost Per Annum (Model-II)

25.32Maintenance per girl student per month @ Rs.

1500/-9.00000

25.33 Stipend for girl student per month @ Rs. 100/- 0.60000

25.34Supplementary TLM, stationery and other

educational material @ Rs.1000/- per annum0.50000

25.35 Salaries(a) 1 Warden @ Rs. 25,000/- per month 3.00000

(b)3 Full time teachers as per RTE norms @ Rs.

20,000/- per month per teacher 7.20000

(c) 3 part time teachers @ Rs. 5,000/- per month per

teacher 1.80000

(d)1 Full time Accountant @ Rs. 10,000/- per month

1.20000

(e)

2 Support Staff – (Accountant/ Assistant, Peon,

Chowkidar) @ Rs. 5,000/- per month per staff 1.20000

Arti:SSA-AWPB-2014-15-PABMinits:Maharajganj:16-06-2014 182 / 533

Page 183: U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 · 2015. 1. 6. · U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15

Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

Name of District : Maharajganj -51

ActivityS. No.Physical

UnitRemarks

Outlay Recommendation for 2014-15

Spill OverDeferred laibility of

2014-15Fresh Recommended Total Recommended

(f) 1 Head cook @ Rs. 6,000/- per month 0.72000

(g)1 Asstt. Cooks @ Rs. 4,500/- per month per cook

0.54000

25.36Specific skill training @ Rs.1000/- per child per

annum0.50000

25.37Electricity/water charges @ Rs.1000/- per child

per annum0.50000

25.38Medical care/contingencies @ Rs. 1250 per child

per annum0.62500

25.39 Maintenance @ Rs.750/- per child per annum 0.37500

25.40

Miscellaneous (Educational Tour/ Exposure Visit

/ Sports Material etc.) @ Rs.750/- per child per

annum

0.37500

25.41Preparatory camps @ Rs.300/- per child per

annum0.15000

25.42PTAs/school functions @ Rs.300/- per child per

annum0.15000

25.43 Provision of Rent @ Rs.10000/- per annum 5.00000

25.43a Provision of Rent (6 months) 3.6000025.43b Provision of Rent (3 months) 1.8000025.43c Rent (Previous Year (2007-2012)25.44 Capacity building 0.25000

25.44(a)Physical/ Self Defence Training @ Rs.200/- per

child per annum0.10000

Subtotal Recurring

Subtotal (Model-II) Total (KGBV) 2.200 13 607.420 13 609.620

DISTRICT GRAND TOTAL (SSA+KGBV) 2.200 59.600 541311 7931.296 541311 7993.096

Arti:SSA-AWPB-2014-15-PABMinits:Maharajganj:16-06-2014 183 / 533

Page 184: U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 · 2015. 1. 6. · U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15

Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

I ACCESS

1 Opening of New Schools

1.01 Upgradation of EGS to PSCentres /

School1.02 New PS School

1.03 Upgradation of PS to UPS / New UPS School

1.04 Composite Schools (for Urban Areas) School

1.05Residential Schools for specific category children

(For 100 children)

1.06Residential Hostel (for specific category of

children) (For 50 children)

1.07 Integration of Class V with Primary Schools

1.08Integration of Class VIII with Upper Primary

Schools

2Residential Schools for specific category

of children (For 100 Children)

Total - Residential Schools (For 100

children)

3Residential Hostel for specific category of

children (For 50 Children)

Total - Residential Schools (For 50

children)4 Transport/Escort Facility

4.01

Children in remote habitations with sparse

populations where opening of schools is

unviable

Child 0.03000

4.02

Urban deprived children/children without adult

protection in urban areas where schools are not

opened because availability of land is a problem

Child 0.03000

Sub Total

5Special Training for mainstreaming of Out-

of-School Children

5.03 Non-Residential (Fresh)(a) 12 months Child 0.06000(b) 9 months 0.04500(c) 6 months

(i)Special Training (by Special Instructors-NRBC)-

(1-5) Child 0.03000 804 24.120 804 24.12000

(ii) Special Training (by Special Instructors-NRBC)-

(6-8) Child 0.03000 605 18.150 605 18.15000

(d) 3 months Child 0.01500Sub Total 1409 42.270 1409 42.27000

Total (Special Training) 1409 42.270 1409 42.2705(B) House Hold Survey (HHS)

5(B).01 House Hold Survey through SMCHouse

Hold0.00001

Sub TotalII RETENTION6 Free Text Book

6.01Free Text Book (PS) for Parishadiya & Aided

Primary Schools (Workbooks not included)Child 0.00120 124123 148.948 124123 148.94760

6.01a

Free Text Book (PS) for 25% children of Class-1

in Private Recognised Primary Schools of other

Boards (Workbooks not included)

Child 0.00150

6.02 Free Brail Books (PS) 0.00150 22 0.033 22 0.03300

6.03 Free Large Print Books (PS) 0.00150

6.04Free Text Book (UPS) (Workbooks not included)

(Including KGBV Girls)Child 0.00200 55472 110.944 55472 110.94400

6.05 Free Brail Books (UPS) 0.00250 3 0.008 3 0.00750

6.06 Free Large Print Books (PS) 0.00250Sub Total 179620 259.932 179620 259.932

7 Provision of 2 set of Uniforms

7.01 All Girls (Including KGBV Girls) Child 0.00400 123135 492.540 123135 492.54000

7.02 SC Boys Child 0.00400 56460 225.840 56460 225.84000

7.03 ST Boys Child 0.00400

7.04 BPL Boys Child 0.00400 65992 263.968 65992 263.96800

7.05

Free Uniform for 25% children of Class-1 in

Private Recognised Primary Schools of other

Boards

Child0.00400

Sub Total 245587 982.348 245587 982.3487(A) Fee Reimbursement

7(A).01

Fee Reimbursement for Admission of children of

Disadvantaged Group & Weaker Section upto

25% of seats in Class-1 of Private Unaided

Recognised Schools

Child 0.05400

Sub Total

8 Teaching Learning Equipment (TLE)

8.01 TLE - New Primary School 2.00000 0.20000 2.000008.02 TLE - New Upper Primary School 3.30000 0.50000 3.30000

Name of District : Lucknow -50

ActivityS. No.Physical

UnitRemarks

Outlay Recommendation for 2014-15

Spill OverDeferred laibility of

2014-15Fresh Recommended Total Recommended

Arti:SSA-AWPB-2014-15-PABMinits:Lucknow:16-06-2014 184 / 533

Page 185: U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 · 2015. 1. 6. · U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15

Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

Name of District : Lucknow -50

ActivityS. No.Physical

UnitRemarks

Outlay Recommendation for 2014-15

Spill OverDeferred laibility of

2014-15Fresh Recommended Total Recommended

Sub Total 5.30000 5.30000III ENHANCING QUALITY9 New Teachers Salary

9.01 Primary Teachers (Regular) (Asstt. Teacher) Teacher 0.91500

9.01aHead Teacher for Primary (if the number of

children exceeds 150 in a school)Teacher

9.02 Primary Teachers (Contract) (S.M.) Teacher

9.03Subject specific Upper Primary Teachers

(Regular) (a) Science and Mathematics Teacher 1.26000(b) Social Studies Teacher 1.26000(c) Languages Teacher 1.26000

Sub Total (9.01 to 9.05)Add.Teacher against PTR

Sub Total (9.06 to 9.12)

Total (New Teacher's Salary-9.01 to 9.12)

Teachers Salary (Recurring-sanctioned

earlier)Primary teachers

9.13 Primary Teachers ( Regular)-Existing, in position Teacher 3.66000 2097 7675.020 2097 7675.02000

9.14Primary Teachers (Contract)-Existing, in

positionTeacher 0.55000

9.14(a) Primary Teachers (Contract)-under Training Teacher 0.38500 1570 604.450 1570 604.45000

9.14(b)Primary Teacher (Para Teachers Equal to

9.14(a) upgraded as Teachers)0.38500 755 290.675 755 290.67500

9.14(c) Primary Teachers (Para)- Vacant Teacher9.15 Primary Teachers (Vacant) Teacher 0.30500

9.16Head Teacher for Primary (if the number of

children exceeds 150)Teacher 5.04000 265 1335.600 265 1335.60000

9.16(b)Head Teacher for Primary (if the number of

children exceeds 150) VacantTeacher 0.42000

Additional teachers

9.17Additional Teachers - PS (Special BTC-

Regular) in positionTeacher 0.30500

9.18Additional Teachers - PS (Special BTC Under

Training)Teacher 0.87600

9.19 Additional Teachers - PS (Vacant) Teacher

9.20Others in position (Para Teachers upgraded

as Teachers)Teacher

Upper Primary teachers

9.21 UP Teachers (Regular)-Existing Teacher 5.04000 729 3674.160 729 3674.16000

9.22 UP Teachers (Contract)-Existing9.23 UP Teachers (Vacant) Teacher 1.26000

9.24Head Teacher for Upper Primary (if the number

of children exceeds 100)-ExistingTeacher 5.34000 284 1516.560 284 1516.56000

9.24a Head Teacher for Upper Primary (Vacant) Teacher 1.33500

9.25Subject specific Upper Primary Teachers

(Regular)(a) Science and Mathematics(b) Social Studies(c) Languages

9.32 Part Time Instructors in position(a) Art Education 0.77000 116 89.320 116 89.32000(b) Health and Physical Education 0.77000 173 133.210 173 133.21000(c) Work Education 0.77000 133 102.410 133 102.41000

9.32(A) Part Time Instructors Vacant(a) Art Education 0.42000(b) Health and Physical Education 0.42000(c) Work Education 0.42000

9.33

Others-Incentive to Teachers in Schools

Located in Naxal Affected Areas (@

Rs.1500/- per teachers per month)

Sub Total (9.13 to 9.33) 6122 15421.405 6122 15421.41TOTAL

(New Teachers Salary +Teachers Salary

Recurring)

6122 15421.405 6122 15421.40500

10 Teachers Training(a) Teachers

10.01

Refresher In-service Teachers' Training at BRC

level and above - 10 days (@ Rs.200/- per

head per day)

Teacher

(Target &

Ach.-13-14

in

Mandays)

0.00600

10.01(a)Continuous and Comprehensive Evauation [PS +

UPS)Teacher 0.01300 1434 18.642 1434 18.64200

10.01(b) Eary Reading and Numeracy Skills [PS] Teacher 0.00500 1434 7.170 1434 7.17000

10.01(c) Science [UPS] Teacher 0.00800 676 5.408 676 5.40800Recommended as

proposed

10.01(d) CWSN Teacher 0.00400

Arti:SSA-AWPB-2014-15-PABMinits:Lucknow:16-06-2014 185 / 533

Page 186: U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 · 2015. 1. 6. · U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15

Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

Name of District : Lucknow -50

ActivityS. No.Physical

UnitRemarks

Outlay Recommendation for 2014-15

Spill OverDeferred laibility of

2014-15Fresh Recommended Total Recommended

10.02

One day monthly cluster level meetings and

peer group training sessions for 10 months for

all teachers each year at CRC level - 10 days (@

Rs.100/- per head per day)

Teacher 0.01000

10.03(a)

Induction Training for Newly Recruited Teachers

for 6 Months (Special BTC)- @Rs.2000/- per

head per year

Teacher 0.02000

10.03(b)5 Days Training for Part Time Instructors @ Rs.

200/- per head per day) Teacher 0.01000

10.04

Training of untrained Teachers to acquire

professional qualifications over a two year

period.

Teacher 0.04700 1015 47.705 1015 47.70500

(b) Head Teachers

10.05Refresher Residencial In-service for 10 days at

BRC level and above

Head

Teacher(c) Resource Persons

10.06

Refresher Training for all Resource

Persons,Master Trainers, BRC & CRC faculty

and Coordinators for 5 days each year (@

Rs.200/- per head per day)

Resource

Person 0.00300 120 0.360 120 0.36000

Sub Total 4679 79.285 4679 79.285

11Academic Support through Block Resource

Centre (BRC)/ URC

11.01 Salary of Faculty and Staff

(a) 5 RPs at BRC for subject specific training in

positionRP 50 50

(b) 2 RPs for CWSN in position RP(b-i) 1 CWSN Resource Person RP 1.10000 20 22.000 20 22.00000

(b-ii) 1 Physiotherapist (Resource person for IE) RP

(c) 1 MIS Coordinator in position RP 1.86000

(d) 1 Datra Entry Operator in position RP 1.74000 16 27.840 16 27.84000

(e) 1 Accountant-cum-support staff in position RP 1.80000 9 16.200 9 16.20000

11.02 Furniture Grant BRC/ URC 1.00000

11.03Replacement of furniture, computer, TLE etc (

Once in 5 years)BRC/ URC 1.00000

11.04 Contingency Grant BRC/ URC 0.50000 10 5.000 10 5.00000

11.05 Meeting, TA BRC/ URC 0.30000 10 3.000 10 3.00000

11.06 TLM Grant BRC/ URC 0.10000

11.07 Maintenance Grant BRC/ URC 0.10000

Sub Total 10 74.040 10 74.04000

12Academic Support through Cluster

Resource Centres (CRC/UERC)

12.01Salary of Cluster Coordinator (on an average of

one Resource Person per 18 schools in a block)RP

12.02 Furniture GrantCRC/

UERC0.10000

12.03Replacement of furniture, computer, TLE etc.

once in 5 years

CRC/

UERC0.10000

12.04 Contingency Grant CRC/UERC 0.10000 117 11.700 117 11.70000

12.05 Meeting, TA CRC/UERC 0.12000 117 14.040 117 14.04000

12.06 TLM Grant CRC/UERC 0.03000

12.07Maintenance Grant

CRC/UERC 0.02000

Sub Total 234 25.740 234 25.74000

13Computer Aided Education in upper

primary schools under Innovation

13.01Computer Aided Education in upper primary

schoolsDistrict 0.01200 48 0.576 48 0.57600

Sub Total 48 0.576 48 0.5760014 Libraries in Schools14.01 (a) Primary School (per school) School 0.03000

14.02 (b) Upper Primary School (per school) School 0.10000

Sub TotalIV ANNUAL GRANTS15 Teachers' Grant15.01 Primary Teachers Teacher 0.0050015.02 Upper Primary Teachers Teacher 0.00500 676 3.380 676 3.38000

Sub Total 676 3.380 676 3.3800016 School Grant16.01 Primary School School 0.05000 1453 72.650 1453 72.6500016.02 Upper Primary School School 0.07000 676 47.320 676 47.32000

Sub Total 2129 119.970 2129 119.97000

Arti:SSA-AWPB-2014-15-PABMinits:Lucknow:16-06-2014 186 / 533

Page 187: U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 · 2015. 1. 6. · U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15

Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

Name of District : Lucknow -50

ActivityS. No.Physical

UnitRemarks

Outlay Recommendation for 2014-15

Spill OverDeferred laibility of

2014-15Fresh Recommended Total Recommended

17Research, Evaluation, Monitoring &

Supervision

17.01 REMS Activities School 0.00103 2129 2.190 2129 2.18992

17.02 Monitoring & Supervision School 0.00078 2129 1.669 2129 1.66928

17.03 House Hold Survey (Urban) in Million Plus Cities District 35.00000

Sub Total 4258 3.859 4258 3.8591918 Maintenance Grant

18.01 Maintenance in School having upto3 Classrooms School 0.07500 315 23.625 315 23.62500

18.01a Maintenance Grant School 0.07500 1525 114.375 1525 114.37500Sub Total 1840 138.000 1840 138.00000

VBRIDGING GENDER AND SOCIAL

CATEGORY GAPS

19 Interventions for CWSN (IE)

19.01 Provision for Inclusive Education Child 0.02000 3157 63.140 3157 63.14000

Sub Total 3157 63.140 3157 63.14000

20Innovativation Head up to Rs.50 Lakh per

district

20.01 Girls Education District 0.70000 9 6.300 9 6.30000

20.02 ECCE District20.03 Intervention for SC / ST children District

20.04 Intervention for Minority Community children District

20.05 Intervention for Urban Deprived children District 10.00000

Sub Total 9 6.300 9 6.3000021 SMC/PRI Training

21.01Residential for 6 Resource Person per Block (3

days) (@ Rs.500/-)Blocks 0.09000

21.02Non-residential (3 days training of 6 SMC

members) (@ Rs.100/-)SMC 0.01800 1848 33.264 1848 33.26400

21.02(a)Non-residential (3 days training of 3 Members of

PRI/VECs/LA) (@ Rs.100/-)VEC/ WEC 0.00900

21.03

Seminar/Orientation of SMC Women members

and President/Vice President (@ Rs. 50,000/-

per block)

Blocks 0.50000

Sub Total 1848 33.264 1848 33.26400VI SCHOOL INFRASTRUCTURE22 Civil Works22.01 Primary School (Plain) (New) School 13.1550022.02 Primary School (Hilly/Rocky) (New) School 13.2750022.03 Upper Primary (Plain) (New) School 20.65500

22.04 Upper Primary School (Hilly/Rocky) (New) School 20.77500

22.04aComposite Schools for Urban Areas (Class I-

VIII)School 41.04000

22.05 ACR in lieu of upgraded Upper Primary School Rooms

22.06 Additional class rooms for adding Class VIII Rooms

22.07 Building Less (Pry) School 9.7500022.08 Building Less (UP) School 18.5900022.09 Dilapidated Building (Pry) School 9.7500022.10 Dilapidated Building (UP) School 18.59000

22.11 Additional Class Room (Rural) ( PS+UPS) Rooms 3.45000 38 131.100 38 131.10000

22.12 Additional Class Room (Urban) Rooms 3.4500022.13 Additional Class Room (Hill Area)22.14 Toilet/Urinals (PS & UPS) School 0.7000022.15 Separate Girls Toilet (Rural+Urban) School 0.7000022.16 CWSN friendly Toilets School 0.50000

22.17 Drinking Water Facility (for Urban Area Only)) School 0.15000 34 5.100 34 5.10000

22.17a Drinking Water Facility (Plain PS & UPS) School 0.15000 30 4.500 30 4.50000

22.17b Drinking Water Facility (Hilly/Rocky PS & UPS) School 0.15000

22.18a Boundary Wall PS (Total in Meters x .01105) 0.01749

22.18bBoundary Wall PS (For Gate) @Rs. 7000 x no. of

P.S.School 0.07800

22.18c Boundary Wall UPS (Total in Meters x .01105) 0.01749

22.18dBoundary Wall UPS (For Gate) @Rs. 7000 x no.

of UPSSchool 0.07800

22.19a Electrification in P.S./ Electrical Equipment School 0.11000

22.19b Electrification in U. P.S./ Electrical Equipment School 0.11000

22.20Office-cum-store-cum-Head Teacher's room

(Primary)Rooms

22.21Office-cum-store-cum-Head Teacher's room

(Upper Primary)Rooms

22.22Augumentation of training facility in BRC (one

time)BRC/ URC 5.00000

22.23 Child friendly Elements School 0.25000

22.24 Ramps with Handrails (Barrier Free Elements) School 0.06000

22.25 Handrails in existing Ramps School 0.01000

Arti:SSA-AWPB-2014-15-PABMinits:Lucknow:16-06-2014 187 / 533

Page 188: U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 · 2015. 1. 6. · U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15

Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

Name of District : Lucknow -50

ActivityS. No.Physical

UnitRemarks

Outlay Recommendation for 2014-15

Spill OverDeferred laibility of

2014-15Fresh Recommended Total Recommended

22.26 Whole School Develoipment School22.27 Retro-fitting and repairs School

22.28Residential Schools for specific category

of children

(a) Construction of Building including boundary

wall, Water and sanitation facilities, electric

installation (For 100 children)

Building 65.86000

(b) Construction of residential hostel Building 65.86000

(c) Refurnishing unused old buildings Building

22.29

Construction of Hostel in existing Govt UPS

including boundary wall, Water and sanitation

facilities, electric installation etc. (For 50

children)

7.00000

22.30Furniture for Govt. UPS (per child) (@ Rs.500/-

per child enrolled)Child 0.00500

22.31 Major Repairs for Primary School School 0.30000

22.32 Majr Repairs for Upper Primary School School 0.30000

22.33Others (Difference of Civil Wrks

sanctioned in pre.yr.)22.33a Others (Overhead Tank PS) School 0.1200022.33b Others (Overhead Tank UPS) School 0.12000

Sub Total (Civil WOrks) 102 140.700 102 140.70VII PROJECT MANAGEMENT COST23 Management23.01 Management up to 3.5%

(a) Project Management and MIS

(i) DPO ( Salary, Contigency, Consumables,

POL, TA & Computer etc)District 1 153.423 1 153.42300

(ii) EMIS Cell District 1 16.668 1 16.66800Sub Total (a) 1 1 1 170.091 1 170.091

(b) Training of Educational Administrators District

(c) School Mapping and Social Mapping District

Sub Total (23.01)

23.02Learning Enhancement Prog. (LEP) (P & UP) (up

to 2%)District 16.245 16.24475

23.03 Community Mobilization (up to 0.5%) District 1 60.000 1 60.00000

Sub Total (Management) 1 76.245 1 76.24475Total Management Cost 246.336 246.33575Total of SSA (Districs) 5.300 451728 17640.545 451728 17645.845

24 State Component23.01 Management23.02 REMS 0.0044923.03 SIEMAT

Sub Total

STATE SSA TOTAL 5.30000 451728 17640.545 451728 17645.84504

25

KGBV Financial Provision (give

separate costing sheets for different

Models)

Hostel

ANon Recurring One Time Grant (Only

committed liabilities) (Model-I)

25.01 Construction of Building (New)

25.02 Construction of Building KGBV sanctioned earlier

25.02(a) Additional Class Room Rooms 3.45000

25.02(b) Guard Room Rooms 1.32000

25.02(c) Boundary Wall School 5.0200025.03 Boudary Wall (Spillover only)

25.04

Boring/Handpump (Spillover only)

(minimum rates prescribed by State Drinking

Water Department subject to a ceiling of Rs.

1.00 lakhs)

25.05 Electricity /Water charges (Spillover only)

25.05(a) Solar Water Heater & Solar Light 2.97000

25.06Furniture/Equipment (including Kitchen

equipment)3.00000

25.07 TLM and equipment including library books 3.50000

25.08 Bedding (New) 0.75000

25.09 Replacement of Bedding (once in 3 Year) 0.75000 5 3.750 5 3.75000

Subtotal Non Recurring 3.750 3.75000

B Recurring Cost Per Annum (Model-I)

25.10Maintenance per girl student per month @ Rs.

1500/-18.00000 8 144.000 8 144.00000

25.11 Stipend for girl student per month @ Rs. 100/- 1.20000 8 9.600 8 9.60000

25.12Supplementary TLM, stationery and other

educational material @ Rs.1000/- per annum1.00000 8 8.000 8 8.00000

25.13 Salaries

Arti:SSA-AWPB-2014-15-PABMinits:Lucknow:16-06-2014 188 / 533

Page 189: U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 · 2015. 1. 6. · U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15

Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

Name of District : Lucknow -50

ActivityS. No.Physical

UnitRemarks

Outlay Recommendation for 2014-15

Spill OverDeferred laibility of

2014-15Fresh Recommended Total Recommended

25.13.1 Additional Salaries:

(a) 1 Warden @ Rs. 25,000/- per month 3.00000 8 24.00000 8 24.00000

(b)4 Full time teachers as per RTE norms @ Rs.

20,000/- per month per teacher 9.60000 8 76.80000 8 76.80000

(c)

1 Urdu Teachers (only for blocks with muslim

population above 20% and select urban areas), if

required @ Rs. 12,000/- per month per teacher 1.44000 8 11.52000 8 11.52000

(d)3 part time teachers @ Rs. 5,000/- per month per

teacher 1.80000 8 14.40000 8 14.40000

(e)1 Full time Accountant @ Rs. 10,000/- per month

1.20000 8 9.60000 8 9.60000

(f)

2 Support Staff – (Accountant/ Assistant, Peon,

Chowkidar) @ Rs. 5,000/- per month per staff 1.20000 8 9.60000 8 9.60000

(g) 1 Head cook @ Rs. 6,000/- per month 0.72000 8 5.76000 8 5.76000

(h)2 Asstt. Cooks @ Rs. 4,500/- per month per cook

1.08000 8 8.64000 8 8.64000

25.14Specific skill training @ Rs.1000/- per child per

annum1.00000 8 8.000 8 8.00000

25.15Electricity/water charges @ Rs.1000/- per child

per annum1.00000 8 8.000 8 8.00000

25.16Medical care/contingencies @ Rs. 1250 per child

per annum1.25000 8 10.000 8 10.00000

25.17 Maintenance @ Rs.750/- per child per annum 0.75000 8 6.000 8 6.00000

25.18

Miscellaneous (Educational Tour/ Exposure Visit

/ Sports Material etc.) @ Rs.750/- per child per

annum

0.75000 8 6.000 8 6.00000

25.19Preparatory camps @ Rs.200/- per child per

annum0.20000 8 1.600 8 1.60000

25.20PTAs/school functions @ Rs.200/- per child per

annum0.20000 8 1.600 8 1.60000

25.21 Provision of Rent @ Rs.6000/- per annum 6.00000

25.21a Provision of Rent (6 months) 3.6000025.21b Provision of Rent (3 months) 1.8000025.21c Rent (Previous Year (2007-2012)

25.22 Capacity building 0.50000 8 4.000 8 4.00000

25.22(a)Physical/ Self Defence Training @ Rs.200/- per

child per annum0.20000 8 1.600 8 1.60000

Subtotal Recurring 8 368.720 8 368.72000

Subtotal (Model-I) 8 372.470 8 372.47000

CNon Recurring One Time Grant (Only

committed liabilities) (Model-II)

25.23 Construction of Building (New)

25.24 Construction of Building KGBV sanctioned earlier

25.24(a) Additional Class Room Rooms 3.45000

25.24(b) Guard Room Rooms 1.32000

25.24(c) Boundary Wall School 5.0200025.25 Boudary Wall (Spillover only)25.26 Boring/Handpump (Spillover only)

25.27 Electricity /Water charges (Spillover only)

25.27(a) Solar Water Heater & Solar Light 2.97000

25.28Furniture/Equipment (including Kitchen

equipment)2.00000

25.29 TLM and equipment including library books 3.00000

25.30 Bedding (New) 0.37500

25.31 Replacement of Bedding (once in 3 Year) 0.37500

Subtotal Non Recurring

D Recurring Cost Per Annum (Model-II)

25.32Maintenance per girl student per month @ Rs.

1500/-9.00000

25.33 Stipend for girl student per month @ Rs. 100/- 0.60000

25.34Supplementary TLM, stationery and other

educational material @ Rs.1000/- per annum0.50000

25.35 Salaries(a) 1 Warden @ Rs. 25,000/- per month 3.00000

(b)3 Full time teachers as per RTE norms @ Rs.

20,000/- per month per teacher 7.20000

(c) 3 part time teachers @ Rs. 5,000/- per month per

teacher 1.80000

(d)1 Full time Accountant @ Rs. 10,000/- per month

1.20000

(e)

2 Support Staff – (Accountant/ Assistant, Peon,

Chowkidar) @ Rs. 5,000/- per month per staff 1.20000

Arti:SSA-AWPB-2014-15-PABMinits:Lucknow:16-06-2014 189 / 533

Page 190: U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 · 2015. 1. 6. · U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15

Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

Name of District : Lucknow -50

ActivityS. No.Physical

UnitRemarks

Outlay Recommendation for 2014-15

Spill OverDeferred laibility of

2014-15Fresh Recommended Total Recommended

(f) 1 Head cook @ Rs. 6,000/- per month 0.72000

(g)1 Asstt. Cooks @ Rs. 4,500/- per month per cook

0.54000

25.36Specific skill training @ Rs.1000/- per child per

annum0.50000

25.37Electricity/water charges @ Rs.1000/- per child

per annum0.50000

25.38Medical care/contingencies @ Rs. 1250 per child

per annum0.62500

25.39 Maintenance @ Rs.750/- per child per annum 0.37500

25.40

Miscellaneous (Educational Tour/ Exposure Visit

/ Sports Material etc.) @ Rs.750/- per child per

annum

0.37500

25.41Preparatory camps @ Rs.300/- per child per

annum0.15000

25.42PTAs/school functions @ Rs.300/- per child per

annum0.15000

25.43 Provision of Rent @ Rs.10000/- per annum 5.00000

25.43a Provision of Rent (6 months) 3.6000025.43b Provision of Rent (3 months) 1.8000025.43c Rent (Previous Year (2007-2012)25.44 Capacity building 0.25000

25.44(a)Physical/ Self Defence Training @ Rs.200/- per

child per annum0.10000

Subtotal Recurring

Subtotal (Model-II) Total (KGBV) 8 372.470 8 372.470

DISTRICT GRAND TOTAL (SSA+KGBV) 5.300 451736 18013.015 451736 18018.315

Arti:SSA-AWPB-2014-15-PABMinits:Lucknow:16-06-2014 190 / 533

Page 191: U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 · 2015. 1. 6. · U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15

Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

I ACCESS

1 Opening of New Schools

1.01 Upgradation of EGS to PSCentres /

School1.02 New PS School

1.03 Upgradation of PS to UPS / New UPS School

1.04 Composite Schools (for Urban Areas) School

1.05Residential Schools for specific category children

(For 100 children)

1.06Residential Hostel (for specific category of

children) (For 50 children)

1.07 Integration of Class V with Primary Schools

1.08Integration of Class VIII with Upper Primary

Schools

2Residential Schools for specific category

of children (For 100 Children)

Total - Residential Schools (For 100

children)

3Residential Hostel for specific category of

children (For 50 Children)

Total - Residential Schools (For 50

children)4 Transport/Escort Facility

4.01

Children in remote habitations with sparse

populations where opening of schools is

unviable

Child 0.03000

4.02

Urban deprived children/children without adult

protection in urban areas where schools are not

opened because availability of land is a problem

Child 0.03000

Sub Total

5Special Training for mainstreaming of Out-

of-School Children

5.03 Non-Residential (Fresh)(a) 12 months Child 0.06000(b) 9 months 0.04500(c) 6 months

(i)Special Training (by Special Instructors-NRBC)-

(1-5) Child 0.03000 70 2.100 70 2.10000

(ii) Special Training (by Special Instructors-NRBC)-

(6-8) Child 0.03000 128 3.840 128 3.84000

(d) 3 months Child 0.01500Sub Total 198 5.940 198 5.94000

Total (Special Training) 198 5.940 198 5.9405(B) House Hold Survey (HHS)

5(B).01 House Hold Survey through SMCHouse

Hold0.00001

Sub TotalII RETENTION6 Free Text Book

6.01Free Text Book (PS) for Parishadiya & Aided

Primary Schools (Workbooks not included)Child 0.00120 89950 107.940 89950 107.94000

6.01a

Free Text Book (PS) for 25% children of Class-1

in Private Recognised Primary Schools of other

Boards (Workbooks not included)

Child 0.00150

6.02 Free Brail Books (PS) 0.00150 178 0.267 178 0.26700

6.03 Free Large Print Books (PS) 0.00150

6.04Free Text Book (UPS) (Workbooks not included)

(Including KGBV Girls)Child 0.00200 46267 92.534 46267 92.53400

6.05 Free Brail Books (UPS) 0.00250 90 0.225 90 0.22500

6.06 Free Large Print Books (PS) 0.00250Sub Total 136485 200.966 136485 200.966

7 Provision of 2 set of Uniforms

7.01 All Girls (Including KGBV Girls) Child 0.00400 103391 413.564 103391 413.56400

7.02 SC Boys Child 0.00400 24266 97.064 24266 97.06400

7.03 ST Boys Child 0.00400 8560 34.240 8560 34.24000

7.04 BPL Boys Child 0.00400 27155 108.620 27155 108.62000

7.05

Free Uniform for 25% children of Class-1 in

Private Recognised Primary Schools of other

Boards

Child0.00400

Sub Total 163372 653.488 163372 653.4887(A) Fee Reimbursement

7(A).01

Fee Reimbursement for Admission of children of

Disadvantaged Group & Weaker Section upto

25% of seats in Class-1 of Private Unaided

Recognised Schools

Child 0.05400

Sub Total

8 Teaching Learning Equipment (TLE)

8.01 TLE - New Primary School 0.60000 0.20000 0.600008.02 TLE - New Upper Primary School 0.50000 0.50000 0.50000

Name of District : Lalitpur -49

ActivityS. No.Physical

UnitRemarks

Outlay Recommendation for 2014-15

Spill OverDeferred laibility of

2014-15Fresh Recommended Total Recommended

Arti:SSA-AWPB-2014-15-PABMinits:Lalitpur:16-06-2014 191 / 533

Page 192: U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 · 2015. 1. 6. · U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15

Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

Name of District : Lalitpur -49

ActivityS. No.Physical

UnitRemarks

Outlay Recommendation for 2014-15

Spill OverDeferred laibility of

2014-15Fresh Recommended Total Recommended

Sub Total 1.10000 1.10000III ENHANCING QUALITY9 New Teachers Salary

9.01 Primary Teachers (Regular) (Asstt. Teacher) Teacher 0.91500

9.01aHead Teacher for Primary (if the number of

children exceeds 150 in a school)Teacher

9.02 Primary Teachers (Contract) (S.M.) Teacher

9.03Subject specific Upper Primary Teachers

(Regular) (a) Science and Mathematics Teacher 1.26000(b) Social Studies Teacher 1.26000(c) Languages Teacher 1.26000

Sub Total (9.01 to 9.05)Add.Teacher against PTR

Sub Total (9.06 to 9.12)

Total (New Teacher's Salary-9.01 to 9.12)

Teachers Salary (Recurring-sanctioned

earlier)Primary teachers

9.13 Primary Teachers ( Regular)-Existing, in position Teacher 3.66000 139 508.740 139 508.74000

9.14Primary Teachers (Contract)-Existing, in

positionTeacher 0.55000

9.14(a) Primary Teachers (Contract)-under Training Teacher 0.38500 872 335.720 872 335.72000

9.14(b)Primary Teacher (Para Teachers Equal to

9.14(a) upgraded as Teachers)0.38500 508 195.580 508 195.58000

9.14(c) Primary Teachers (Para)- Vacant Teacher9.15 Primary Teachers (Vacant) Teacher 0.30500

9.16Head Teacher for Primary (if the number of

children exceeds 150)Teacher 5.04000 168 846.720 168 846.72000

9.16(b)Head Teacher for Primary (if the number of

children exceeds 150) VacantTeacher 0.42000

Additional teachers

9.17Additional Teachers - PS (Special BTC-

Regular) in positionTeacher 0.30500

9.18Additional Teachers - PS (Special BTC Under

Training)Teacher 0.87600

9.19 Additional Teachers - PS (Vacant) Teacher

9.20Others in position (Para Teachers upgraded

as Teachers)Teacher

Upper Primary teachers

9.21 UP Teachers (Regular)-Existing Teacher 5.04000 584 2943.360 584 2943.36000

9.22 UP Teachers (Contract)-Existing9.23 UP Teachers (Vacant) Teacher 1.26000

9.24Head Teacher for Upper Primary (if the number

of children exceeds 100)-ExistingTeacher 5.34000 289 1543.260 289 1543.26000

9.24a Head Teacher for Upper Primary (Vacant) Teacher 1.33500

9.25Subject specific Upper Primary Teachers

(Regular)(a) Science and Mathematics(b) Social Studies(c) Languages

9.32 Part Time Instructors in position(a) Art Education 0.77000 234 180.180 234 180.18000(b) Health and Physical Education 0.77000 138 106.260 138 106.26000(c) Work Education 0.77000 199 153.230 199 153.23000

9.32(A) Part Time Instructors Vacant(a) Art Education 0.42000(b) Health and Physical Education 0.42000(c) Work Education 0.42000

9.33

Others-Incentive to Teachers in Schools

Located in Naxal Affected Areas (@

Rs.1500/- per teachers per month)

Sub Total (9.13 to 9.33) 3131 6813.050 3131 6813.05TOTAL

(New Teachers Salary +Teachers Salary

Recurring)

3131 6813.050 3131 6813.05000

10 Teachers Training(a) Teachers

10.01

Refresher In-service Teachers' Training at BRC

level and above - 10 days (@ Rs.200/- per

head per day)

Teacher

(Target &

Ach.-13-14

in

Mandays)

0.00600

10.01(a)Continuous and Comprehensive Evauation [PS +

UPS)Teacher 0.01300 888 11.544 888 11.54400

10.01(b) Eary Reading and Numeracy Skills [PS] Teacher 0.00500 888 4.440 888 4.44000

10.01(c) Science [UPS] Teacher 0.00800 520 4.160 520 4.16000Recommended as

proposed

10.01(d) CWSN Teacher 0.00400

Arti:SSA-AWPB-2014-15-PABMinits:Lalitpur:16-06-2014 192 / 533

Page 193: U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 · 2015. 1. 6. · U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15

Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

Name of District : Lalitpur -49

ActivityS. No.Physical

UnitRemarks

Outlay Recommendation for 2014-15

Spill OverDeferred laibility of

2014-15Fresh Recommended Total Recommended

10.02

One day monthly cluster level meetings and

peer group training sessions for 10 months for

all teachers each year at CRC level - 10 days (@

Rs.100/- per head per day)

Teacher 0.01000

10.03(a)

Induction Training for Newly Recruited Teachers

for 6 Months (Special BTC)- @Rs.2000/- per

head per year

Teacher 0.02000

10.03(b)5 Days Training for Part Time Instructors @ Rs.

200/- per head per day) Teacher 0.01000

10.04

Training of untrained Teachers to acquire

professional qualifications over a two year

period.

Teacher 0.04700 856 40.232 856 40.23200

(b) Head Teachers

10.05Refresher Residencial In-service for 10 days at

BRC level and above

Head

Teacher(c) Resource Persons

10.06

Refresher Training for all Resource

Persons,Master Trainers, BRC & CRC faculty

and Coordinators for 5 days each year (@

Rs.200/- per head per day)

Resource

Person 0.00300 84 0.252 84 0.25200

Sub Total 3236 60.628 3236 60.628

11Academic Support through Block Resource

Centre (BRC)/ URC

11.01 Salary of Faculty and Staff

(a) 5 RPs at BRC for subject specific training in

positionRP 35 35

(b) 2 RPs for CWSN in position RP(b-i) 1 CWSN Resource Person RP 1.10000 9 9.900 9 9.90000

(b-ii) 1 Physiotherapist (Resource person for IE) RP

(c) 1 MIS Coordinator in position RP 1.86000

(d) 1 Datra Entry Operator in position RP 1.74000 7 12.180 7 12.18000

(e) 1 Accountant-cum-support staff in position RP 1.80000 7 12.600 7 12.60000

11.02 Furniture Grant BRC/ URC 1.00000

11.03Replacement of furniture, computer, TLE etc (

Once in 5 years)BRC/ URC 1.00000

11.04 Contingency Grant BRC/ URC 0.50000 7 3.500 7 3.50000

11.05 Meeting, TA BRC/ URC 0.30000 7 2.100 7 2.10000

11.06 TLM Grant BRC/ URC 0.10000

11.07 Maintenance Grant BRC/ URC 0.10000

Sub Total 7 40.280 7 40.28000

12Academic Support through Cluster

Resource Centres (CRC/UERC)

12.01Salary of Cluster Coordinator (on an average of

one Resource Person per 18 schools in a block)RP

12.02 Furniture GrantCRC/

UERC0.10000

12.03Replacement of furniture, computer, TLE etc.

once in 5 years

CRC/

UERC0.10000

12.04 Contingency Grant CRC/UERC 0.10000 49 4.900 49 4.90000

12.05 Meeting, TA CRC/UERC 0.12000 49 5.880 49 5.88000

12.06 TLM Grant CRC/UERC 0.03000

12.07Maintenance Grant

CRC/UERC 0.02000

Sub Total 98 10.780 98 10.78000

13Computer Aided Education in upper

primary schools under Innovation

13.01Computer Aided Education in upper primary

schoolsDistrict 0.01200 48 0.576 48 0.57600

Sub Total 48 0.576 48 0.5760014 Libraries in Schools14.01 (a) Primary School (per school) School 0.03000

14.02 (b) Upper Primary School (per school) School 0.10000

Sub TotalIV ANNUAL GRANTS15 Teachers' Grant15.01 Primary Teachers Teacher 0.0050015.02 Upper Primary Teachers Teacher 0.00500 520 2.600 520 2.60000

Sub Total 520 2.600 520 2.6000016 School Grant16.01 Primary School School 0.05000 1052 52.600 1052 52.6000016.02 Upper Primary School School 0.07000 514 35.980 514 35.98000

Sub Total 1566 88.580 1566 88.58000

Arti:SSA-AWPB-2014-15-PABMinits:Lalitpur:16-06-2014 193 / 533

Page 194: U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 · 2015. 1. 6. · U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15

Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

Name of District : Lalitpur -49

ActivityS. No.Physical

UnitRemarks

Outlay Recommendation for 2014-15

Spill OverDeferred laibility of

2014-15Fresh Recommended Total Recommended

17Research, Evaluation, Monitoring &

Supervision

17.01 REMS Activities School 0.00103 1566 1.611 1566 1.61081

17.02 Monitoring & Supervision School 0.00078 1566 1.228 1566 1.22785

17.03 House Hold Survey (Urban) in Million Plus Cities District 35.00000

Sub Total 3132 2.839 3132 2.8386618 Maintenance Grant

18.01 Maintenance in School having upto3 Classrooms School 0.07500 401 30.075 401 30.07500

18.01a Maintenance Grant School 0.07500 1146 85.950 1146 85.95000Sub Total 1547 116.025 1547 116.02500

VBRIDGING GENDER AND SOCIAL

CATEGORY GAPS

19 Interventions for CWSN (IE)

19.01 Provision for Inclusive Education Child 0.02700 1539 41.553 1539 41.55300

Sub Total 1539 41.553 1539 41.55300

20Innovativation Head up to Rs.50 Lakh per

district

20.01 Girls Education District 0.70000 1 0.700 1 0.70000

20.02 ECCE District20.03 Intervention for SC / ST children District

20.04 Intervention for Minority Community children District

20.05 Intervention for Urban Deprived children District 10.00000

Sub Total 1 0.700 1 0.7000021 SMC/PRI Training

21.01Residential for 6 Resource Person per Block (3

days) (@ Rs.500/-)Blocks 0.09000

21.02Non-residential (3 days training of 6 SMC

members) (@ Rs.100/-)SMC 0.01800 1550 27.900 1550 27.90000

21.02(a)Non-residential (3 days training of 3 Members of

PRI/VECs/LA) (@ Rs.100/-)VEC/ WEC 0.00900

21.03

Seminar/Orientation of SMC Women members

and President/Vice President (@ Rs. 50,000/-

per block)

Blocks 0.50000

Sub Total 1550 27.900 1550 27.90000VI SCHOOL INFRASTRUCTURE22 Civil Works22.01 Primary School (Plain) (New) School 13.1550022.02 Primary School (Hilly/Rocky) (New) School 13.2750022.03 Upper Primary (Plain) (New) School 20.65500

22.04 Upper Primary School (Hilly/Rocky) (New) School 20.77500

22.04aComposite Schools for Urban Areas (Class I-

VIII)School 4.10 41.04000 4.10400

22.05 ACR in lieu of upgraded Upper Primary School Rooms

22.06 Additional class rooms for adding Class VIII Rooms

22.07 Building Less (Pry) School 9.7500022.08 Building Less (UP) School 18.5900022.09 Dilapidated Building (Pry) School 9.7500022.10 Dilapidated Building (UP) School 18.59000

22.11 Additional Class Room (Rural) ( PS+UPS) Rooms 3.45000 101 348.450 101 348.45000

22.12 Additional Class Room (Urban) Rooms 3.4500022.13 Additional Class Room (Hill Area)22.14 Toilet/Urinals (PS & UPS) School 0.70000 137 95.900 137 95.9000022.15 Separate Girls Toilet (Rural+Urban) School 0.7000022.16 CWSN friendly Toilets School 0.50000

22.17 Drinking Water Facility (for Urban Area Only)) School 0.15000

22.17a Drinking Water Facility (Plain PS & UPS) School 0.15000

22.17b Drinking Water Facility (Hilly/Rocky PS & UPS) School 0.15000 111 16.650 111 16.65000

22.18a Boundary Wall PS (Total in Meters x .01105) 0.01749

22.18bBoundary Wall PS (For Gate) @Rs. 7000 x no. of

P.S.School 0.07800

22.18c Boundary Wall UPS (Total in Meters x .01105) 0.01749

22.18dBoundary Wall UPS (For Gate) @Rs. 7000 x no.

of UPSSchool 0.07800

22.19a Electrification in P.S./ Electrical Equipment School 0.11000

22.19b Electrification in U. P.S./ Electrical Equipment School 0.11000

22.20Office-cum-store-cum-Head Teacher's room

(Primary)Rooms

22.21Office-cum-store-cum-Head Teacher's room

(Upper Primary)Rooms

22.22Augumentation of training facility in BRC (one

time)BRC/ URC 5.00000

22.23 Child friendly Elements School 0.25000

22.24 Ramps with Handrails (Barrier Free Elements) School 0.06000

22.25 Handrails in existing Ramps School 0.01000

Arti:SSA-AWPB-2014-15-PABMinits:Lalitpur:16-06-2014 194 / 533

Page 195: U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 · 2015. 1. 6. · U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15

Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

Name of District : Lalitpur -49

ActivityS. No.Physical

UnitRemarks

Outlay Recommendation for 2014-15

Spill OverDeferred laibility of

2014-15Fresh Recommended Total Recommended

22.26 Whole School Develoipment School22.27 Retro-fitting and repairs School

22.28Residential Schools for specific category

of children

(a) Construction of Building including boundary

wall, Water and sanitation facilities, electric

installation (For 100 children)

Building 65.86000

(b) Construction of residential hostel Building 65.86000

(c) Refurnishing unused old buildings Building

22.29

Construction of Hostel in existing Govt UPS

including boundary wall, Water and sanitation

facilities, electric installation etc. (For 50

children)

7.00000

22.30Furniture for Govt. UPS (per child) (@ Rs.500/-

per child enrolled)Child 0.00500

22.31 Major Repairs for Primary School School 0.30000

22.32 Majr Repairs for Upper Primary School School 0.30000

22.33Others (Difference of Civil Wrks

sanctioned in pre.yr.)22.33a Others (Overhead Tank PS) School 0.1200022.33b Others (Overhead Tank UPS) School 0.12000

Sub Total (Civil WOrks) 4.10 349 461.000 349 465.10VII PROJECT MANAGEMENT COST23 Management23.01 Management up to 3.5%

(a) Project Management and MIS

(i) DPO ( Salary, Contigency, Consumables,

POL, TA & Computer etc)District 1 132.647 1 132.64680

(ii) EMIS Cell District 1 10.350 1 10.35000Sub Total (a) 1 1 1 142.997 1 142.997

(b) Training of Educational Administrators District

(c) School Mapping and Social Mapping District

Sub Total (23.01)

23.02Learning Enhancement Prog. (LEP) (P & UP) (up

to 2%)District 12.071 12.07085

23.03 Community Mobilization (up to 0.5%) District 1 40.000 1 40.00000

Sub Total (Management) 1 52.071 1 52.07085Total Management Cost 195.068 195.06765Total of SSA (Districs) 4.104 1.100 316779 8721.972 316779 8727.176

24 State Component23.01 Management23.02 REMS 0.0044923.03 SIEMAT

Sub Total

STATE SSA TOTAL 4.10400 1.10000 316779 8721.972 316779 8727.17631

25

KGBV Financial Provision (give

separate costing sheets for different

Models)

Hostel

ANon Recurring One Time Grant (Only

committed liabilities) (Model-I)

25.01 Construction of Building (New)

25.02 Construction of Building KGBV sanctioned earlier

25.02(a) Additional Class Room Rooms 3.45000

25.02(b) Guard Room Rooms 1.32000

25.02(c) Boundary Wall School 5.0200025.03 Boudary Wall (Spillover only)

25.04

Boring/Handpump (Spillover only)

(minimum rates prescribed by State Drinking

Water Department subject to a ceiling of Rs.

1.00 lakhs)

25.05 Electricity /Water charges (Spillover only)

25.05(a) Solar Water Heater & Solar Light 2.97000

25.06Furniture/Equipment (including Kitchen

equipment)3.00000

25.07 TLM and equipment including library books 3.50000

25.08 Bedding (New) 0.75000

25.09 Replacement of Bedding (once in 3 Year) 0.75000 2 1.500 2 1.50000

Subtotal Non Recurring 1.500 1.50000

B Recurring Cost Per Annum (Model-I)

25.10Maintenance per girl student per month @ Rs.

1500/-18.00000 6 108.000 6 108.00000

25.11 Stipend for girl student per month @ Rs. 100/- 1.20000 6 7.200 6 7.20000

25.12Supplementary TLM, stationery and other

educational material @ Rs.1000/- per annum1.00000 6 6.000 6 6.00000

25.13 Salaries

Arti:SSA-AWPB-2014-15-PABMinits:Lalitpur:16-06-2014 195 / 533

Page 196: U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 · 2015. 1. 6. · U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15

Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

Name of District : Lalitpur -49

ActivityS. No.Physical

UnitRemarks

Outlay Recommendation for 2014-15

Spill OverDeferred laibility of

2014-15Fresh Recommended Total Recommended

25.13.1 Additional Salaries:

(a) 1 Warden @ Rs. 25,000/- per month 3.00000 6 18.00000 6 18.00000

(b)4 Full time teachers as per RTE norms @ Rs.

20,000/- per month per teacher 9.60000 6 57.60000 6 57.60000

(c)

1 Urdu Teachers (only for blocks with muslim

population above 20% and select urban areas), if

required @ Rs. 12,000/- per month per teacher 1.44000 6 8.64000 6 8.64000

(d)3 part time teachers @ Rs. 5,000/- per month per

teacher 1.80000 6 10.80000 6 10.80000

(e)1 Full time Accountant @ Rs. 10,000/- per month

1.20000 6 7.20000 6 7.20000

(f)

2 Support Staff – (Accountant/ Assistant, Peon,

Chowkidar) @ Rs. 5,000/- per month per staff 1.20000 6 7.20000 6 7.20000

(g) 1 Head cook @ Rs. 6,000/- per month 0.72000 6 4.32000 6 4.32000

(h)2 Asstt. Cooks @ Rs. 4,500/- per month per cook

1.08000 6 6.48000 6 6.48000

25.14Specific skill training @ Rs.1000/- per child per

annum1.00000 6 6.000 6 6.00000

25.15Electricity/water charges @ Rs.1000/- per child

per annum1.00000 6 6.000 6 6.00000

25.16Medical care/contingencies @ Rs. 1250 per child

per annum1.25000 6 7.500 6 7.50000

25.17 Maintenance @ Rs.750/- per child per annum 0.75000 6 4.500 6 4.50000

25.18

Miscellaneous (Educational Tour/ Exposure Visit

/ Sports Material etc.) @ Rs.750/- per child per

annum

0.75000 6 4.500 6 4.50000

25.19Preparatory camps @ Rs.200/- per child per

annum0.20000 6 1.200 6 1.20000

25.20PTAs/school functions @ Rs.200/- per child per

annum0.20000 6 1.200 6 1.20000

25.21 Provision of Rent @ Rs.6000/- per annum 6.00000

25.21a Provision of Rent (6 months) 3.6000025.21b Provision of Rent (3 months) 1.8000025.21c Rent (Previous Year (2007-2012)

25.22 Capacity building 0.50000 6 3.000 6 3.00000

25.22(a)Physical/ Self Defence Training @ Rs.200/- per

child per annum0.20000 6 1.200 6 1.20000

Subtotal Recurring 6 276.540 6 276.54000

Subtotal (Model-I) 6 278.040 6 278.04000

CNon Recurring One Time Grant (Only

committed liabilities) (Model-II)

25.23 Construction of Building (New)

25.24 Construction of Building KGBV sanctioned earlier

25.24(a) Additional Class Room Rooms 3.45000

25.24(b) Guard Room Rooms 1.32000

25.24(c) Boundary Wall School 5.0200025.25 Boudary Wall (Spillover only)25.26 Boring/Handpump (Spillover only)

25.27 Electricity /Water charges (Spillover only)

25.27(a) Solar Water Heater & Solar Light 2.97000

25.28Furniture/Equipment (including Kitchen

equipment)2.00000

25.29 TLM and equipment including library books 3.00000

25.30 Bedding (New) 0.37500

25.31 Replacement of Bedding (once in 3 Year) 0.37500

Subtotal Non Recurring

D Recurring Cost Per Annum (Model-II)

25.32Maintenance per girl student per month @ Rs.

1500/-9.00000

25.33 Stipend for girl student per month @ Rs. 100/- 0.60000

25.34Supplementary TLM, stationery and other

educational material @ Rs.1000/- per annum0.50000

25.35 Salaries(a) 1 Warden @ Rs. 25,000/- per month 3.00000

(b)3 Full time teachers as per RTE norms @ Rs.

20,000/- per month per teacher 7.20000

(c) 3 part time teachers @ Rs. 5,000/- per month per

teacher 1.80000

(d)1 Full time Accountant @ Rs. 10,000/- per month

1.20000

(e)

2 Support Staff – (Accountant/ Assistant, Peon,

Chowkidar) @ Rs. 5,000/- per month per staff 1.20000

Arti:SSA-AWPB-2014-15-PABMinits:Lalitpur:16-06-2014 196 / 533

Page 197: U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 · 2015. 1. 6. · U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15

Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

Name of District : Lalitpur -49

ActivityS. No.Physical

UnitRemarks

Outlay Recommendation for 2014-15

Spill OverDeferred laibility of

2014-15Fresh Recommended Total Recommended

(f) 1 Head cook @ Rs. 6,000/- per month 0.72000

(g)1 Asstt. Cooks @ Rs. 4,500/- per month per cook

0.54000

25.36Specific skill training @ Rs.1000/- per child per

annum0.50000

25.37Electricity/water charges @ Rs.1000/- per child

per annum0.50000

25.38Medical care/contingencies @ Rs. 1250 per child

per annum0.62500

25.39 Maintenance @ Rs.750/- per child per annum 0.37500

25.40

Miscellaneous (Educational Tour/ Exposure Visit

/ Sports Material etc.) @ Rs.750/- per child per

annum

0.37500

25.41Preparatory camps @ Rs.300/- per child per

annum0.15000

25.42PTAs/school functions @ Rs.300/- per child per

annum0.15000

25.43 Provision of Rent @ Rs.10000/- per annum 5.00000

25.43a Provision of Rent (6 months) 3.6000025.43b Provision of Rent (3 months) 1.8000025.43c Rent (Previous Year (2007-2012)25.44 Capacity building 0.25000

25.44(a)Physical/ Self Defence Training @ Rs.200/- per

child per annum0.10000

Subtotal Recurring

Subtotal (Model-II) Total (KGBV) 6 278.040 6 278.040

DISTRICT GRAND TOTAL (SSA+KGBV) 4.104 1.100 316785 9000.012 316785 9005.216

Arti:SSA-AWPB-2014-15-PABMinits:Lalitpur:16-06-2014 197 / 533

Page 198: U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 · 2015. 1. 6. · U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15

Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

I ACCESS

1 Opening of New Schools

1.01 Upgradation of EGS to PSCentres /

School1.02 New PS School

1.03 Upgradation of PS to UPS / New UPS School

1.04 Composite Schools (for Urban Areas) School

1.05Residential Schools for specific category children

(For 100 children)

1.06Residential Hostel (for specific category of

children) (For 50 children)

1.07 Integration of Class V with Primary Schools

1.08Integration of Class VIII with Upper Primary

Schools

2Residential Schools for specific category

of children (For 100 Children)

Total - Residential Schools (For 100

children)

3Residential Hostel for specific category of

children (For 50 Children)

Total - Residential Schools (For 50

children)4 Transport/Escort Facility

4.01

Children in remote habitations with sparse

populations where opening of schools is

unviable

Child 0.03000

4.02

Urban deprived children/children without adult

protection in urban areas where schools are not

opened because availability of land is a problem

Child 0.03000

Sub Total

5Special Training for mainstreaming of Out-

of-School Children

5.03 Non-Residential (Fresh)(a) 12 months Child 0.06000(b) 9 months 0.04500(c) 6 months

(i)Special Training (by Special Instructors-NRBC)-

(1-5) Child 0.03000 641 19.230 641 19.23000

(ii) Special Training (by Special Instructors-NRBC)-

(6-8) Child 0.03000 921 27.630 921 27.63000

(d) 3 months Child 0.01500Sub Total 1562 46.860 1562 46.86000

Total (Special Training) 1562 46.860 1562 46.8605(B) House Hold Survey (HHS)

5(B).01 House Hold Survey through SMCHouse

Hold0.00001

Sub TotalII RETENTION6 Free Text Book

6.01Free Text Book (PS) for Parishadiya & Aided

Primary Schools (Workbooks not included)Child 0.00120 274058 328.870 274058 328.86960

6.01a

Free Text Book (PS) for 25% children of Class-1

in Private Recognised Primary Schools of other

Boards (Workbooks not included)

Child 0.00150

6.02 Free Brail Books (PS) 0.00150 132 0.198 132 0.19800

6.03 Free Large Print Books (PS) 0.00150

6.04Free Text Book (UPS) (Workbooks not included)

(Including KGBV Girls)Child 0.00200 117925 235.850 117925 235.85000

6.05 Free Brail Books (UPS) 0.00250 40 0.100 40 0.10000

6.06 Free Large Print Books (PS) 0.00250Sub Total 392155 565.018 392155 565.018

7 Provision of 2 set of Uniforms

7.01 All Girls (Including KGBV Girls) Child 0.00400 288807 1155.228 288807 1155.22800

7.02 SC Boys Child 0.00400 99686 398.744 99686 398.74400

7.03 ST Boys Child 0.00400 3490 13.960 3490 13.96000

7.04 BPL Boys Child 0.00400 138913 555.652 138913 555.65200

7.05

Free Uniform for 25% children of Class-1 in

Private Recognised Primary Schools of other

Boards

Child0.00400

Sub Total 530896 2123.584 530896 2123.5847(A) Fee Reimbursement

7(A).01

Fee Reimbursement for Admission of children of

Disadvantaged Group & Weaker Section upto

25% of seats in Class-1 of Private Unaided

Recognised Schools

Child 0.05400

Sub Total

8 Teaching Learning Equipment (TLE)

8.01 TLE - New Primary School 45.60000 0.20000 45.600008.02 TLE - New Upper Primary School 3.50000 0.50000 3.50000

Name of District : Lakhimpur -48

ActivityS. No.Physical

UnitRemarks

Outlay Recommendation for 2014-15

Spill OverDeferred laibility of

2014-15Fresh Recommended Total Recommended

Arti:SSA-AWPB-2014-15-PABMinits:Lakhimpur:16-06-2014 198 / 533

Page 199: U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 · 2015. 1. 6. · U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15

Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

Name of District : Lakhimpur -48

ActivityS. No.Physical

UnitRemarks

Outlay Recommendation for 2014-15

Spill OverDeferred laibility of

2014-15Fresh Recommended Total Recommended

Sub Total 49.10000 49.10000III ENHANCING QUALITY9 New Teachers Salary

9.01 Primary Teachers (Regular) (Asstt. Teacher) Teacher 0.91500

9.01aHead Teacher for Primary (if the number of

children exceeds 150 in a school)Teacher

9.02 Primary Teachers (Contract) (S.M.) Teacher

9.03Subject specific Upper Primary Teachers

(Regular) (a) Science and Mathematics Teacher 1.26000(b) Social Studies Teacher 1.26000(c) Languages Teacher 1.26000

Sub Total (9.01 to 9.05)Add.Teacher against PTR

Sub Total (9.06 to 9.12)

Total (New Teacher's Salary-9.01 to 9.12)

Teachers Salary (Recurring-sanctioned

earlier)Primary teachers

9.13 Primary Teachers ( Regular)-Existing, in position Teacher 3.66000 477 1745.820 477 1745.82000

9.14Primary Teachers (Contract)-Existing, in

positionTeacher 0.55000

9.14(a) Primary Teachers (Contract)-under Training Teacher 0.38500 2125 818.125 2125 818.12500

9.14(b)Primary Teacher (Para Teachers Equal to

9.14(a) upgraded as Teachers)0.38500 1077 414.645 1077 414.64500

9.14(c) Primary Teachers (Para)- Vacant Teacher9.15 Primary Teachers (Vacant) Teacher 0.30500

9.16Head Teacher for Primary (if the number of

children exceeds 150)Teacher 5.04000 488 2459.520 488 2459.52000

9.16(b)Head Teacher for Primary (if the number of

children exceeds 150) VacantTeacher 0.42000

Additional teachers

9.17Additional Teachers - PS (Special BTC-

Regular) in positionTeacher 0.30500

9.18Additional Teachers - PS (Special BTC Under

Training)Teacher 0.87600

9.19 Additional Teachers - PS (Vacant) Teacher

9.20Others in position (Para Teachers upgraded

as Teachers)Teacher

Upper Primary teachers

9.21 UP Teachers (Regular)-Existing Teacher 5.04000 974 4908.960 974 4908.96000

9.22 UP Teachers (Contract)-Existing9.23 UP Teachers (Vacant) Teacher 1.26000

9.24Head Teacher for Upper Primary (if the number

of children exceeds 100)-ExistingTeacher 5.34000 423 2258.820 423 2258.82000

9.24a Head Teacher for Upper Primary (Vacant) Teacher 1.33500

9.25Subject specific Upper Primary Teachers

(Regular)(a) Science and Mathematics(b) Social Studies(c) Languages

9.32 Part Time Instructors in position(a) Art Education 0.77000 423 325.710 423 325.71000(b) Health and Physical Education 0.77000 198 152.460 198 152.46000(c) Work Education 0.77000 299 230.230 299 230.23000

9.32(A) Part Time Instructors Vacant(a) Art Education 0.42000(b) Health and Physical Education 0.42000(c) Work Education 0.42000

9.33

Others-Incentive to Teachers in Schools

Located in Naxal Affected Areas (@

Rs.1500/- per teachers per month)

Sub Total (9.13 to 9.33) 6484 13314.290 6484 13314.29TOTAL

(New Teachers Salary +Teachers Salary

Recurring)

6484 13314.290 6484 13314.29000

10 Teachers Training(a) Teachers

10.01

Refresher In-service Teachers' Training at BRC

level and above - 10 days (@ Rs.200/- per

head per day)

Teacher

(Target &

Ach.-13-14

in

Mandays)

0.00600

10.01(a)Continuous and Comprehensive Evauation [PS +

UPS)Teacher 0.01300 2459 31.967 2459 31.96700

10.01(b) Eary Reading and Numeracy Skills [PS] Teacher 0.00500 2459 12.295 2459 12.29500

10.01(c) Science [UPS] Teacher 0.00800 1182 9.456 1182 9.45600Recommended as

proposed

10.01(d) CWSN Teacher 0.00400

Arti:SSA-AWPB-2014-15-PABMinits:Lakhimpur:16-06-2014 199 / 533

Page 200: U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 · 2015. 1. 6. · U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15

Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

Name of District : Lakhimpur -48

ActivityS. No.Physical

UnitRemarks

Outlay Recommendation for 2014-15

Spill OverDeferred laibility of

2014-15Fresh Recommended Total Recommended

10.02

One day monthly cluster level meetings and

peer group training sessions for 10 months for

all teachers each year at CRC level - 10 days (@

Rs.100/- per head per day)

Teacher 0.01000

10.03(a)

Induction Training for Newly Recruited Teachers

for 6 Months (Special BTC)- @Rs.2000/- per

head per year

Teacher 0.02000

10.03(b)5 Days Training for Part Time Instructors @ Rs.

200/- per head per day) Teacher 0.01000

10.04

Training of untrained Teachers to acquire

professional qualifications over a two year

period.

Teacher 0.04700 1907 89.629 1907 89.62900

(b) Head Teachers

10.05Refresher Residencial In-service for 10 days at

BRC level and above

Head

Teacher(c) Resource Persons

10.06

Refresher Training for all Resource

Persons,Master Trainers, BRC & CRC faculty

and Coordinators for 5 days each year (@

Rs.200/- per head per day)

Resource

Person 0.00300 192 0.576 192 0.57600

Sub Total 8199 143.923 8199 143.923

11Academic Support through Block Resource

Centre (BRC)/ URC

11.01 Salary of Faculty and Staff

(a) 5 RPs at BRC for subject specific training in

positionRP 80 80

(b) 2 RPs for CWSN in position RP(b-i) 1 CWSN Resource Person RP 1.10000 32 35.200 32 35.20000

(b-ii) 1 Physiotherapist (Resource person for IE) RP

(c) 1 MIS Coordinator in position RP 1.86000

(d) 1 Datra Entry Operator in position RP 1.74000 16 27.840 16 27.84000

(e) 1 Accountant-cum-support staff in position RP 1.80000 16 28.800 16 28.80000

11.02 Furniture Grant BRC/ URC 1.00000

11.03Replacement of furniture, computer, TLE etc (

Once in 5 years)BRC/ URC 1.00000

11.04 Contingency Grant BRC/ URC 0.50000 16 8.000 16 8.00000

11.05 Meeting, TA BRC/ URC 0.30000 16 4.800 16 4.80000

11.06 TLM Grant BRC/ URC 0.10000

11.07 Maintenance Grant BRC/ URC 0.10000

Sub Total 16 104.640 16 104.64000

12Academic Support through Cluster

Resource Centres (CRC/UERC)

12.01Salary of Cluster Coordinator (on an average of

one Resource Person per 18 schools in a block)RP

12.02 Furniture GrantCRC/

UERC0.10000

12.03Replacement of furniture, computer, TLE etc.

once in 5 years

CRC/

UERC0.10000

12.04 Contingency Grant CRC/UERC 0.10000 157 15.700 157 15.70000

12.05 Meeting, TA CRC/UERC 0.12000 157 18.840 157 18.84000

12.06 TLM Grant CRC/UERC 0.03000

12.07Maintenance Grant

CRC/UERC 0.02000

Sub Total 314 34.540 314 34.54000

13Computer Aided Education in upper

primary schools under Innovation

13.01Computer Aided Education in upper primary

schoolsDistrict 0.01200 48 0.576 48 0.57600

Sub Total 48 0.576 48 0.5760014 Libraries in Schools14.01 (a) Primary School (per school) School 0.03000

14.02 (b) Upper Primary School (per school) School 0.10000

Sub TotalIV ANNUAL GRANTS15 Teachers' Grant15.01 Primary Teachers Teacher 0.0050015.02 Upper Primary Teachers Teacher 0.00500 1182 5.910 1182 5.91000

Sub Total 1182 5.910 1182 5.9100016 School Grant16.01 Primary School School 0.05000 2731 136.550 2731 136.5500016.02 Upper Primary School School 0.07000 1215 85.050 1215 85.05000

Sub Total 3946 221.600 3946 221.60000

Arti:SSA-AWPB-2014-15-PABMinits:Lakhimpur:16-06-2014 200 / 533

Page 201: U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 · 2015. 1. 6. · U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15

Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

Name of District : Lakhimpur -48

ActivityS. No.Physical

UnitRemarks

Outlay Recommendation for 2014-15

Spill OverDeferred laibility of

2014-15Fresh Recommended Total Recommended

17Research, Evaluation, Monitoring &

Supervision

17.01 REMS Activities School 0.00103 3946 4.059 3946 4.05890

17.02 Monitoring & Supervision School 0.00078 3946 3.094 3946 3.09393

17.03 House Hold Survey (Urban) in Million Plus Cities District 35.00000

Sub Total 7892 7.153 7892 7.1528318 Maintenance Grant

18.01 Maintenance in School having upto3 Classrooms School 0.07500 853 63.975 853 63.97500

18.01a Maintenance Grant School 0.07500 3003 225.225 3003 225.22500Sub Total 3856 289.200 3856 289.20000

VBRIDGING GENDER AND SOCIAL

CATEGORY GAPS

19 Interventions for CWSN (IE)

19.01 Provision for Inclusive Education Child 0.00800 9040 72.320 9040 72.32000

Sub Total 9040 72.320 9040 72.32000

20Innovativation Head up to Rs.50 Lakh per

district

20.01 Girls Education District 0.70000 5 3.500 5 3.50000

20.02 ECCE District20.03 Intervention for SC / ST children District

20.04 Intervention for Minority Community children District

20.05 Intervention for Urban Deprived children District 10.00000

Sub Total 5 3.500 5 3.5000021 SMC/PRI Training

21.01Residential for 6 Resource Person per Block (3

days) (@ Rs.500/-)Blocks 0.09000

21.02Non-residential (3 days training of 6 SMC

members) (@ Rs.100/-)SMC 0.01800 3879 69.822 3879 69.82200

21.02(a)Non-residential (3 days training of 3 Members of

PRI/VECs/LA) (@ Rs.100/-)VEC/ WEC 0.00900

21.03

Seminar/Orientation of SMC Women members

and President/Vice President (@ Rs. 50,000/-

per block)

Blocks 0.50000

Sub Total 3879 69.822 3879 69.82200VI SCHOOL INFRASTRUCTURE22 Civil Works22.01 Primary School (Plain) (New) School 13.1550022.02 Primary School (Hilly/Rocky) (New) School 13.2750022.03 Upper Primary (Plain) (New) School 20.65500

22.04 Upper Primary School (Hilly/Rocky) (New) School 20.77500

22.04aComposite Schools for Urban Areas (Class I-

VIII)School 41.04000

22.05 ACR in lieu of upgraded Upper Primary School Rooms

22.06 Additional class rooms for adding Class VIII Rooms

22.07 Building Less (Pry) School 9.7500022.08 Building Less (UP) School 18.5900022.09 Dilapidated Building (Pry) School 9.7500022.10 Dilapidated Building (UP) School 18.59000

22.11 Additional Class Room (Rural) ( PS+UPS) Rooms 3.45000

22.12 Additional Class Room (Urban) Rooms 3.4500022.13 Additional Class Room (Hill Area)22.14 Toilet/Urinals (PS & UPS) School 0.7000022.15 Separate Girls Toilet (Rural+Urban) School 0.7000022.16 CWSN friendly Toilets School 0.50000

22.17 Drinking Water Facility (for Urban Area Only)) School 0.15000

22.17a Drinking Water Facility (Plain PS & UPS) School 0.15000

22.17b Drinking Water Facility (Hilly/Rocky PS & UPS) School 0.15000

22.18a Boundary Wall PS (Total in Meters x .01105) 0.01749

22.18bBoundary Wall PS (For Gate) @Rs. 7000 x no. of

P.S.School 0.07800

22.18c Boundary Wall UPS (Total in Meters x .01105) 0.01749

22.18dBoundary Wall UPS (For Gate) @Rs. 7000 x no.

of UPSSchool 0.07800

22.19a Electrification in P.S./ Electrical Equipment School 0.11000

22.19b Electrification in U. P.S./ Electrical Equipment School 0.11000

22.20Office-cum-store-cum-Head Teacher's room

(Primary)Rooms

22.21Office-cum-store-cum-Head Teacher's room

(Upper Primary)Rooms

22.22Augumentation of training facility in BRC (one

time)BRC/ URC 5.00000

22.23 Child friendly Elements School 0.25000

22.24 Ramps with Handrails (Barrier Free Elements) School 0.06000

22.25 Handrails in existing Ramps School 0.01000

Arti:SSA-AWPB-2014-15-PABMinits:Lakhimpur:16-06-2014 201 / 533

Page 202: U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 · 2015. 1. 6. · U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15

Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

Name of District : Lakhimpur -48

ActivityS. No.Physical

UnitRemarks

Outlay Recommendation for 2014-15

Spill OverDeferred laibility of

2014-15Fresh Recommended Total Recommended

22.26 Whole School Develoipment School22.27 Retro-fitting and repairs School

22.28Residential Schools for specific category

of children

(a) Construction of Building including boundary

wall, Water and sanitation facilities, electric

installation (For 100 children)

Building 65.86000

(b) Construction of residential hostel Building 65.86000

(c) Refurnishing unused old buildings Building

22.29

Construction of Hostel in existing Govt UPS

including boundary wall, Water and sanitation

facilities, electric installation etc. (For 50

children)

7.00000

22.30Furniture for Govt. UPS (per child) (@ Rs.500/-

per child enrolled)Child 0.00500

22.31 Major Repairs for Primary School School 0.30000

22.32 Majr Repairs for Upper Primary School School 0.30000

22.33Others (Difference of Civil Wrks

sanctioned in pre.yr.)22.33a Others (Overhead Tank PS) School 0.1200022.33b Others (Overhead Tank UPS) School 0.12000

Sub Total (Civil WOrks)VII PROJECT MANAGEMENT COST23 Management23.01 Management up to 3.5%

(a) Project Management and MIS

(i) DPO ( Salary, Contigency, Consumables,

POL, TA & Computer etc)District 1 141.613 1 141.61270

(ii) EMIS Cell District 1 21.263 1 21.26300Sub Total (a) 1 1 1 162.876 1 162.876

(b) Training of Educational Administrators District

(c) School Mapping and Social Mapping District

Sub Total (23.01)

23.02Learning Enhancement Prog. (LEP) (P & UP) (up

to 2%)District 33.254 33.25415

23.03 Community Mobilization (up to 0.5%) District 1 60.000 1 60.00000

Sub Total (Management) 1 93.254 1 93.25415Total Management Cost 256.130 256.12985Total of SSA (Districs) 49.100 969474 17259.065 969474 17308.165

24 State Component23.01 Management23.02 REMS 0.0044923.03 SIEMAT

Sub Total

STATE SSA TOTAL 49.10000 969474 17259.065 969474 17308.16528

25

KGBV Financial Provision (give

separate costing sheets for different

Models)

Hostel

ANon Recurring One Time Grant (Only

committed liabilities) (Model-I)

25.01 Construction of Building (New)

25.02 Construction of Building KGBV sanctioned earlier 35.70000 35.70000

25.02(a) Additional Class Room Rooms 3.45000

25.02(b) Guard Room Rooms 1.32000

25.02(c) Boundary Wall School 5.0200025.03 Boudary Wall (Spillover only) 6.00000 6.00000

25.04

Boring/Handpump (Spillover only)

(minimum rates prescribed by State Drinking

Water Department subject to a ceiling of Rs.

1.00 lakhs)

4.00000 4.00000

25.05 Electricity /Water charges (Spillover only)

25.05(a) Solar Water Heater & Solar Light 2.97000

25.06Furniture/Equipment (including Kitchen

equipment)3.00000

25.07 TLM and equipment including library books 3.50000

25.08 Bedding (New) 0.75000

25.09 Replacement of Bedding (once in 3 Year) 0.75000 16 12.000 16 12.00000

Subtotal Non Recurring 45.70000 12.000 57.70000

B Recurring Cost Per Annum (Model-I)

25.10Maintenance per girl student per month @ Rs.

1500/-18.00000 16 288.000 16 288.00000

25.11 Stipend for girl student per month @ Rs. 100/- 1.20000 16 19.200 16 19.20000

25.12Supplementary TLM, stationery and other

educational material @ Rs.1000/- per annum1.00000 16 16.000 16 16.00000

25.13 Salaries

Arti:SSA-AWPB-2014-15-PABMinits:Lakhimpur:16-06-2014 202 / 533

Page 203: U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 · 2015. 1. 6. · U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15

Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

Name of District : Lakhimpur -48

ActivityS. No.Physical

UnitRemarks

Outlay Recommendation for 2014-15

Spill OverDeferred laibility of

2014-15Fresh Recommended Total Recommended

25.13.1 Additional Salaries:

(a) 1 Warden @ Rs. 25,000/- per month 3.00000 16 48.00000 16 48.00000

(b)4 Full time teachers as per RTE norms @ Rs.

20,000/- per month per teacher 9.60000 16 153.60000 16 153.60000

(c)

1 Urdu Teachers (only for blocks with muslim

population above 20% and select urban areas), if

required @ Rs. 12,000/- per month per teacher 1.44000 16 23.04000 16 23.04000

(d)3 part time teachers @ Rs. 5,000/- per month per

teacher 1.80000 16 28.80000 16 28.80000

(e)1 Full time Accountant @ Rs. 10,000/- per month

1.20000 16 19.20000 16 19.20000

(f)

2 Support Staff – (Accountant/ Assistant, Peon,

Chowkidar) @ Rs. 5,000/- per month per staff 1.20000 16 19.20000 16 19.20000

(g) 1 Head cook @ Rs. 6,000/- per month 0.72000 16 11.52000 16 11.52000

(h)2 Asstt. Cooks @ Rs. 4,500/- per month per cook

1.08000 16 17.28000 16 17.28000

25.14Specific skill training @ Rs.1000/- per child per

annum1.00000 16 16.000 16 16.00000

25.15Electricity/water charges @ Rs.1000/- per child

per annum1.00000 16 16.000 16 16.00000

25.16Medical care/contingencies @ Rs. 1250 per child

per annum1.25000 16 20.000 16 20.00000

25.17 Maintenance @ Rs.750/- per child per annum 0.75000 16 12.000 16 12.00000

25.18

Miscellaneous (Educational Tour/ Exposure Visit

/ Sports Material etc.) @ Rs.750/- per child per

annum

0.75000 16 12.000 16 12.00000

25.19Preparatory camps @ Rs.200/- per child per

annum0.20000 16 3.200 16 3.20000

25.20PTAs/school functions @ Rs.200/- per child per

annum0.20000 16 3.200 16 3.20000

25.21 Provision of Rent @ Rs.6000/- per annum 6.00000

25.21a Provision of Rent (6 months) 3.6000025.21b Provision of Rent (3 months) 1.8000025.21c Rent (Previous Year (2007-2012)

25.22 Capacity building 0.50000 16 8.000 16 8.00000

25.22(a)Physical/ Self Defence Training @ Rs.200/- per

child per annum0.20000 16 3.200 16 3.20000

Subtotal Recurring 16 737.440 16 737.44000

Subtotal (Model-I) 45.70000 16 749.440 16 795.14000

CNon Recurring One Time Grant (Only

committed liabilities) (Model-II)

25.23 Construction of Building (New)

25.24 Construction of Building KGBV sanctioned earlier

25.24(a) Additional Class Room Rooms 3.45000

25.24(b) Guard Room Rooms 1.32000

25.24(c) Boundary Wall School 5.0200025.25 Boudary Wall (Spillover only)25.26 Boring/Handpump (Spillover only)

25.27 Electricity /Water charges (Spillover only)

25.27(a) Solar Water Heater & Solar Light 2.97000

25.28Furniture/Equipment (including Kitchen

equipment)2.00000

25.29 TLM and equipment including library books 3.00000

25.30 Bedding (New) 0.37500

25.31 Replacement of Bedding (once in 3 Year) 0.37500

Subtotal Non Recurring

D Recurring Cost Per Annum (Model-II)

25.32Maintenance per girl student per month @ Rs.

1500/-9.00000

25.33 Stipend for girl student per month @ Rs. 100/- 0.60000

25.34Supplementary TLM, stationery and other

educational material @ Rs.1000/- per annum0.50000

25.35 Salaries(a) 1 Warden @ Rs. 25,000/- per month 3.00000

(b)3 Full time teachers as per RTE norms @ Rs.

20,000/- per month per teacher 7.20000

(c) 3 part time teachers @ Rs. 5,000/- per month per

teacher 1.80000

(d)1 Full time Accountant @ Rs. 10,000/- per month

1.20000

(e)

2 Support Staff – (Accountant/ Assistant, Peon,

Chowkidar) @ Rs. 5,000/- per month per staff 1.20000

Arti:SSA-AWPB-2014-15-PABMinits:Lakhimpur:16-06-2014 203 / 533

Page 204: U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 · 2015. 1. 6. · U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15

Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

Name of District : Lakhimpur -48

ActivityS. No.Physical

UnitRemarks

Outlay Recommendation for 2014-15

Spill OverDeferred laibility of

2014-15Fresh Recommended Total Recommended

(f) 1 Head cook @ Rs. 6,000/- per month 0.72000

(g)1 Asstt. Cooks @ Rs. 4,500/- per month per cook

0.54000

25.36Specific skill training @ Rs.1000/- per child per

annum0.50000

25.37Electricity/water charges @ Rs.1000/- per child

per annum0.50000

25.38Medical care/contingencies @ Rs. 1250 per child

per annum0.62500

25.39 Maintenance @ Rs.750/- per child per annum 0.37500

25.40

Miscellaneous (Educational Tour/ Exposure Visit

/ Sports Material etc.) @ Rs.750/- per child per

annum

0.37500

25.41Preparatory camps @ Rs.300/- per child per

annum0.15000

25.42PTAs/school functions @ Rs.300/- per child per

annum0.15000

25.43 Provision of Rent @ Rs.10000/- per annum 5.00000

25.43a Provision of Rent (6 months) 3.6000025.43b Provision of Rent (3 months) 1.8000025.43c Rent (Previous Year (2007-2012)25.44 Capacity building 0.25000

25.44(a)Physical/ Self Defence Training @ Rs.200/- per

child per annum0.10000

Subtotal Recurring

Subtotal (Model-II) Total (KGBV) 45.700 16 749.440 16 795.140

DISTRICT GRAND TOTAL (SSA+KGBV) 45.700 49.100 969490 18008.505 969490 18103.305

Arti:SSA-AWPB-2014-15-PABMinits:Lakhimpur:16-06-2014 204 / 533

Page 205: U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 · 2015. 1. 6. · U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15

Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

I ACCESS

1 Opening of New Schools

1.01 Upgradation of EGS to PSCentres /

School1.02 New PS School

1.03 Upgradation of PS to UPS / New UPS School

1.04 Composite Schools (for Urban Areas) School

1.05Residential Schools for specific category children

(For 100 children)

1.06Residential Hostel (for specific category of

children) (For 50 children)

1.07 Integration of Class V with Primary Schools

1.08Integration of Class VIII with Upper Primary

Schools

2Residential Schools for specific category

of children (For 100 Children)

Total - Residential Schools (For 100

children)

3Residential Hostel for specific category of

children (For 50 Children)

Total - Residential Schools (For 50

children)4 Transport/Escort Facility

4.01

Children in remote habitations with sparse

populations where opening of schools is

unviable

Child 0.03000

4.02

Urban deprived children/children without adult

protection in urban areas where schools are not

opened because availability of land is a problem

Child 0.03000

Sub Total

5Special Training for mainstreaming of Out-

of-School Children

5.03 Non-Residential (Fresh)(a) 12 months Child 0.06000(b) 9 months 0.04500(c) 6 months

(i)Special Training (by Special Instructors-NRBC)-

(1-5) Child 0.03000 176 5.280 176 5.28000

(ii) Special Training (by Special Instructors-NRBC)-

(6-8) Child 0.03000 172 5.160 172 5.16000

(d) 3 months Child 0.01500Sub Total 348 10.440 348 10.44000

Total (Special Training) 348 10.440 348 10.4405(B) House Hold Survey (HHS)

5(B).01 House Hold Survey through SMCHouse

Hold0.00001

Sub TotalII RETENTION6 Free Text Book

6.01Free Text Book (PS) for Parishadiya & Aided

Primary Schools (Workbooks not included)Child 0.00120 192131 230.557 192131 230.55720

6.01a

Free Text Book (PS) for 25% children of Class-1

in Private Recognised Primary Schools of other

Boards (Workbooks not included)

Child 0.00150

6.02 Free Brail Books (PS) 0.00150 106 0.159 106 0.15900

6.03 Free Large Print Books (PS) 0.00150

6.04Free Text Book (UPS) (Workbooks not included)

(Including KGBV Girls)Child 0.00200 67704 135.408 67704 135.40800

6.05 Free Brail Books (UPS) 0.00250 22 0.055 22 0.05500

6.06 Free Large Print Books (PS) 0.00250Sub Total 259963 366.179 259963 366.179

7 Provision of 2 set of Uniforms

7.01 All Girls (Including KGBV Girls) Child 0.00400 209532 838.128 209532 838.12800

7.02 SC Boys Child 0.00400 50303 201.212 50303 201.21200

7.03 ST Boys Child 0.00400

7.04 BPL Boys Child 0.00400 115882 463.528 115882 463.52800

7.05

Free Uniform for 25% children of Class-1 in

Private Recognised Primary Schools of other

Boards

Child0.00400

Sub Total 375717 1502.868 375717 1502.8687(A) Fee Reimbursement

7(A).01

Fee Reimbursement for Admission of children of

Disadvantaged Group & Weaker Section upto

25% of seats in Class-1 of Private Unaided

Recognised Schools

Child 0.05400

Sub Total

8 Teaching Learning Equipment (TLE)

8.01 TLE - New Primary School 29.20000 0.20000 29.200008.02 TLE - New Upper Primary School 2.50000 0.50000 2.50000

Name of District : Kushinagar -47

ActivityS. No.Physical

UnitRemarks

Outlay Recommendation for 2014-15

Spill OverDeferred laibility of

2014-15Fresh Recommended Total Recommended

Arti:SSA-AWPB-2014-15-PABMinits:Kushinagar:16-06-2014 205 / 533

Page 206: U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 · 2015. 1. 6. · U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15

Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

Name of District : Kushinagar -47

ActivityS. No.Physical

UnitRemarks

Outlay Recommendation for 2014-15

Spill OverDeferred laibility of

2014-15Fresh Recommended Total Recommended

Sub Total 31.70000 31.70000III ENHANCING QUALITY9 New Teachers Salary

9.01 Primary Teachers (Regular) (Asstt. Teacher) Teacher 0.91500

9.01aHead Teacher for Primary (if the number of

children exceeds 150 in a school)Teacher

9.02 Primary Teachers (Contract) (S.M.) Teacher

9.03Subject specific Upper Primary Teachers

(Regular) (a) Science and Mathematics Teacher 1.26000(b) Social Studies Teacher 1.26000(c) Languages Teacher 1.26000

Sub Total (9.01 to 9.05)Add.Teacher against PTR

Sub Total (9.06 to 9.12)

Total (New Teacher's Salary-9.01 to 9.12)

Teachers Salary (Recurring-sanctioned

earlier)Primary teachers

9.13 Primary Teachers ( Regular)-Existing, in position Teacher 3.66000 437 1599.420 437 1599.42000

9.14Primary Teachers (Contract)-Existing, in

positionTeacher 0.55000

9.14(a) Primary Teachers (Contract)-under Training Teacher 0.38500 1713 659.505 1713 659.50500

9.14(b)Primary Teacher (Para Teachers Equal to

9.14(a) upgraded as Teachers)0.38500 805 309.925 805 309.92500

9.14(c) Primary Teachers (Para)- Vacant Teacher9.15 Primary Teachers (Vacant) Teacher 0.30500

9.16Head Teacher for Primary (if the number of

children exceeds 150)Teacher 5.04000 373 1879.920 373 1879.92000

9.16(b)Head Teacher for Primary (if the number of

children exceeds 150) VacantTeacher 0.42000

Additional teachers

9.17Additional Teachers - PS (Special BTC-

Regular) in positionTeacher 0.30500

9.18Additional Teachers - PS (Special BTC Under

Training)Teacher 0.87600

9.19 Additional Teachers - PS (Vacant) Teacher

9.20Others in position (Para Teachers upgraded

as Teachers)Teacher

Upper Primary teachers

9.21 UP Teachers (Regular)-Existing Teacher 5.04000 458 2308.320 458 2308.32000

9.22 UP Teachers (Contract)-Existing9.23 UP Teachers (Vacant) Teacher 1.26000

9.24Head Teacher for Upper Primary (if the number

of children exceeds 100)-ExistingTeacher 5.34000 509 2718.060 509 2718.06000

9.24a Head Teacher for Upper Primary (Vacant) Teacher 1.33500

9.25Subject specific Upper Primary Teachers

(Regular)(a) Science and Mathematics(b) Social Studies(c) Languages

9.32 Part Time Instructors in position(a) Art Education 0.77000 71 54.670 71 54.67000(b) Health and Physical Education 0.77000 110 84.700 110 84.70000(c) Work Education 0.77000 86 66.220 86 66.22000

9.32(A) Part Time Instructors Vacant(a) Art Education 0.42000(b) Health and Physical Education 0.42000(c) Work Education 0.42000

9.33

Others-Incentive to Teachers in Schools

Located in Naxal Affected Areas (@

Rs.1500/- per teachers per month)

Sub Total (9.13 to 9.33) 4562 9680.740 4562 9680.74TOTAL

(New Teachers Salary +Teachers Salary

Recurring)

4562 9680.740 4562 9680.74000

10 Teachers Training(a) Teachers

10.01

Refresher In-service Teachers' Training at BRC

level and above - 10 days (@ Rs.200/- per

head per day)

Teacher

(Target &

Ach.-13-14

in

Mandays)

0.00600

10.01(a)Continuous and Comprehensive Evauation [PS +

UPS)Teacher 0.01300 1736 22.568 1736 22.56800

10.01(b) Eary Reading and Numeracy Skills [PS] Teacher 0.00500 1736 8.680 1736 8.68000

10.01(c) Science [UPS] Teacher 0.00800 838 6.704 838 6.70400Recommended as

proposed

10.01(d) CWSN Teacher 0.00400

Arti:SSA-AWPB-2014-15-PABMinits:Kushinagar:16-06-2014 206 / 533

Page 207: U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 · 2015. 1. 6. · U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15

Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

Name of District : Kushinagar -47

ActivityS. No.Physical

UnitRemarks

Outlay Recommendation for 2014-15

Spill OverDeferred laibility of

2014-15Fresh Recommended Total Recommended

10.02

One day monthly cluster level meetings and

peer group training sessions for 10 months for

all teachers each year at CRC level - 10 days (@

Rs.100/- per head per day)

Teacher 0.01000

10.03(a)

Induction Training for Newly Recruited Teachers

for 6 Months (Special BTC)- @Rs.2000/- per

head per year

Teacher 0.02000

10.03(b)5 Days Training for Part Time Instructors @ Rs.

200/- per head per day) Teacher 0.01000

10.04

Training of untrained Teachers to acquire

professional qualifications over a two year

period.

Teacher 0.04700 755 35.485 755 35.48500

(b) Head Teachers

10.05Refresher Residencial In-service for 10 days at

BRC level and above

Head

Teacher(c) Resource Persons

10.06

Refresher Training for all Resource

Persons,Master Trainers, BRC & CRC faculty

and Coordinators for 5 days each year (@

Rs.200/- per head per day)

Resource

Person 0.00300 168 0.504 168 0.50400

Sub Total 5233 73.941 5233 73.941

11Academic Support through Block Resource

Centre (BRC)/ URC

11.01 Salary of Faculty and Staff

(a) 5 RPs at BRC for subject specific training in

positionRP 70 70

(b) 2 RPs for CWSN in position RP(b-i) 1 CWSN Resource Person RP 1.10000 28 30.800 28 30.80000

(b-ii) 1 Physiotherapist (Resource person for IE) RP

(c) 1 MIS Coordinator in position RP 1.86000

(d) 1 Datra Entry Operator in position RP 1.74000

(e) 1 Accountant-cum-support staff in position RP 1.80000

11.02 Furniture Grant BRC/ URC 1.00000

11.03Replacement of furniture, computer, TLE etc (

Once in 5 years)BRC/ URC 1.00000

11.04 Contingency Grant BRC/ URC 0.50000 14 7.000 14 7.00000

11.05 Meeting, TA BRC/ URC 0.30000 14 4.200 14 4.20000

11.06 TLM Grant BRC/ URC 0.10000

11.07 Maintenance Grant BRC/ URC 0.10000

Sub Total 14 42.000 14 42.00000

12Academic Support through Cluster

Resource Centres (CRC/UERC)

12.01Salary of Cluster Coordinator (on an average of

one Resource Person per 18 schools in a block)RP

12.02 Furniture GrantCRC/

UERC0.10000

12.03Replacement of furniture, computer, TLE etc.

once in 5 years

CRC/

UERC0.10000

12.04 Contingency Grant CRC/UERC 0.10000 142 14.200 142 14.20000

12.05 Meeting, TA CRC/UERC 0.12000 142 17.040 142 17.04000

12.06 TLM Grant CRC/UERC 0.03000

12.07Maintenance Grant

CRC/UERC 0.02000

Sub Total 284 31.240 284 31.24000

13Computer Aided Education in upper

primary schools under Innovation

13.01Computer Aided Education in upper primary

schoolsDistrict 0.01200 48 0.576 48 0.57600

Sub Total 48 0.576 48 0.5760014 Libraries in Schools14.01 (a) Primary School (per school) School 0.03000

14.02 (b) Upper Primary School (per school) School 0.10000

Sub TotalIV ANNUAL GRANTS15 Teachers' Grant15.01 Primary Teachers Teacher 0.0050015.02 Upper Primary Teachers Teacher 0.00500 838 4.190 838 4.19000

Sub Total 838 4.190 838 4.1900016 School Grant16.01 Primary School School 0.05000 2248 112.400 2248 112.4000016.02 Upper Primary School School 0.07000 943 66.010 943 66.01000

Sub Total 3191 178.410 3191 178.41000

Arti:SSA-AWPB-2014-15-PABMinits:Kushinagar:16-06-2014 207 / 533

Page 208: U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 · 2015. 1. 6. · U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15

Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

Name of District : Kushinagar -47

ActivityS. No.Physical

UnitRemarks

Outlay Recommendation for 2014-15

Spill OverDeferred laibility of

2014-15Fresh Recommended Total Recommended

17Research, Evaluation, Monitoring &

Supervision

17.01 REMS Activities School 0.00103 3191 3.282 3191 3.28230

17.02 Monitoring & Supervision School 0.00078 3191 2.502 3191 2.50196

17.03 House Hold Survey (Urban) in Million Plus Cities District 35.00000

Sub Total 6382 5.784 6382 5.7842618 Maintenance Grant

18.01 Maintenance in School having upto3 Classrooms School 0.07500 547 41.025 547 41.02500

18.01a Maintenance Grant School 0.07500 2456 184.200 2456 184.20000Sub Total 3003 225.225 3003 225.22500

VBRIDGING GENDER AND SOCIAL

CATEGORY GAPS

19 Interventions for CWSN (IE)

19.01 Provision for Inclusive Education Child 0.01000 5968 59.680 5968 59.68000

Sub Total 5968 59.680 5968 59.68000

20Innovativation Head up to Rs.50 Lakh per

district

20.01 Girls Education District 0.70000 8 5.600 8 5.60000

20.02 ECCE District20.03 Intervention for SC / ST children District

20.04 Intervention for Minority Community children District

20.05 Intervention for Urban Deprived children District 10.00000

Sub Total 8 5.600 8 5.6000021 SMC/PRI Training

21.01Residential for 6 Resource Person per Block (3

days) (@ Rs.500/-)Blocks 0.09000

21.02Non-residential (3 days training of 6 SMC

members) (@ Rs.100/-)SMC 0.01800 3017 54.306 3017 54.30600

21.02(a)Non-residential (3 days training of 3 Members of

PRI/VECs/LA) (@ Rs.100/-)VEC/ WEC 0.00900

21.03

Seminar/Orientation of SMC Women members

and President/Vice President (@ Rs. 50,000/-

per block)

Blocks 0.50000

Sub Total 3017 54.306 3017 54.30600VI SCHOOL INFRASTRUCTURE22 Civil Works22.01 Primary School (Plain) (New) School 2.67730 13.15500 2.6773022.02 Primary School (Hilly/Rocky) (New) School 13.2750022.03 Upper Primary (Plain) (New) School 0.52058 20.65500 0.52058

22.04 Upper Primary School (Hilly/Rocky) (New) School 20.77500

22.04aComposite Schools for Urban Areas (Class I-

VIII)School 24.63000 41.04000 24.63000

22.05 ACR in lieu of upgraded Upper Primary School Rooms

22.06 Additional class rooms for adding Class VIII Rooms

22.07 Building Less (Pry) School 9.7500022.08 Building Less (UP) School 18.5900022.09 Dilapidated Building (Pry) School 9.7500022.10 Dilapidated Building (UP) School 18.59000

22.11 Additional Class Room (Rural) ( PS+UPS) Rooms 3.45000 196 676.200 196 676.20000

22.12 Additional Class Room (Urban) Rooms 3.4500022.13 Additional Class Room (Hill Area)22.14 Toilet/Urinals (PS & UPS) School 0.70000 200 140.000 200 140.0000022.15 Separate Girls Toilet (Rural+Urban) School 0.70000 213 149.100 213 149.1000022.16 CWSN friendly Toilets School 0.50000

22.17 Drinking Water Facility (for Urban Area Only)) School 0.15000

22.17a Drinking Water Facility (Plain PS & UPS) School 0.15000 264 39.600 264 39.60000

22.17b Drinking Water Facility (Hilly/Rocky PS & UPS) School 0.15000

22.18a Boundary Wall PS (Total in Meters x .01105) 0.01749

22.18bBoundary Wall PS (For Gate) @Rs. 7000 x no. of

P.S.School 0.07800

22.18c Boundary Wall UPS (Total in Meters x .01105) 0.01749

22.18dBoundary Wall UPS (For Gate) @Rs. 7000 x no.

of UPSSchool 0.07800

22.19a Electrification in P.S./ Electrical Equipment School 0.11000

22.19b Electrification in U. P.S./ Electrical Equipment School 0.11000

22.20Office-cum-store-cum-Head Teacher's room

(Primary)Rooms

22.21Office-cum-store-cum-Head Teacher's room

(Upper Primary)Rooms

22.22Augumentation of training facility in BRC (one

time)BRC/ URC 5.00000

22.23 Child friendly Elements School 0.25000

22.24 Ramps with Handrails (Barrier Free Elements) School 0.06000 459 27.540 459 27.54000

22.25 Handrails in existing Ramps School 0.01000

Arti:SSA-AWPB-2014-15-PABMinits:Kushinagar:16-06-2014 208 / 533

Page 209: U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 · 2015. 1. 6. · U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15

Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

Name of District : Kushinagar -47

ActivityS. No.Physical

UnitRemarks

Outlay Recommendation for 2014-15

Spill OverDeferred laibility of

2014-15Fresh Recommended Total Recommended

22.26 Whole School Develoipment School22.27 Retro-fitting and repairs School

22.28Residential Schools for specific category

of children

(a) Construction of Building including boundary

wall, Water and sanitation facilities, electric

installation (For 100 children)

Building 65.86000

(b) Construction of residential hostel Building 65.86000

(c) Refurnishing unused old buildings Building

22.29

Construction of Hostel in existing Govt UPS

including boundary wall, Water and sanitation

facilities, electric installation etc. (For 50

children)

7.00000

22.30Furniture for Govt. UPS (per child) (@ Rs.500/-

per child enrolled)Child 0.00500

22.31 Major Repairs for Primary School School 0.30000

22.32 Majr Repairs for Upper Primary School School 0.30000

22.33Others (Difference of Civil Wrks

sanctioned in pre.yr.)22.33a Others (Overhead Tank PS) School 0.1200022.33b Others (Overhead Tank UPS) School 0.12000

Sub Total (Civil WOrks) 27.83 1332 1032.440 1332 1060.27VII PROJECT MANAGEMENT COST23 Management23.01 Management up to 3.5%

(a) Project Management and MIS

(i) DPO ( Salary, Contigency, Consumables,

POL, TA & Computer etc)District 1 104.159 1 104.15900

(ii) EMIS Cell District 1 18.080 1 18.08000Sub Total (a) 1 1 1 122.239 1 122.239

(b) Training of Educational Administrators District

(c) School Mapping and Social Mapping District

Sub Total (23.01)

23.02Learning Enhancement Prog. (LEP) (P & UP) (up

to 2%)District 24.232 24.23175

23.03 Community Mobilization (up to 0.5%) District 1 45.850 1 45.85000

Sub Total (Management) 1 70.082 1 70.08175Total Management Cost 192.321 192.32075Total of SSA (Districs) 27.828 31.700 669908 13465.940 669908 13525.468

24 State Component23.01 Management23.02 REMS 0.0044923.03 SIEMAT

Sub Total

STATE SSA TOTAL 27.82788 31.70000 669908 13465.940 669908 13525.46809

25

KGBV Financial Provision (give

separate costing sheets for different

Models)

Hostel

ANon Recurring One Time Grant (Only

committed liabilities) (Model-I)

25.01 Construction of Building (New)

25.02 Construction of Building KGBV sanctioned earlier 1.50400 1.50400

25.02(a) Additional Class Room Rooms 3.45000

25.02(b) Guard Room Rooms 1.32000

25.02(c) Boundary Wall School 5.0200025.03 Boudary Wall (Spillover only) 1.50000 1.50000

25.04

Boring/Handpump (Spillover only)

(minimum rates prescribed by State Drinking

Water Department subject to a ceiling of Rs.

1.00 lakhs)

25.05 Electricity /Water charges (Spillover only)

25.05(a) Solar Water Heater & Solar Light 2.97000

25.06Furniture/Equipment (including Kitchen

equipment)3.00000

25.07 TLM and equipment including library books 3.50000

25.08 Bedding (New) 0.75000

25.09 Replacement of Bedding (once in 3 Year) 0.75000 11 8.250 11 8.25000

Subtotal Non Recurring 3.00400 8.250 11.25400

B Recurring Cost Per Annum (Model-I)

25.10Maintenance per girl student per month @ Rs.

1500/-18.00000 14 252.000 14 252.00000

25.11 Stipend for girl student per month @ Rs. 100/- 1.20000 14 16.800 14 16.80000

25.12Supplementary TLM, stationery and other

educational material @ Rs.1000/- per annum1.00000 14 14.000 14 14.00000

25.13 Salaries

Arti:SSA-AWPB-2014-15-PABMinits:Kushinagar:16-06-2014 209 / 533

Page 210: U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 · 2015. 1. 6. · U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15

Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

Name of District : Kushinagar -47

ActivityS. No.Physical

UnitRemarks

Outlay Recommendation for 2014-15

Spill OverDeferred laibility of

2014-15Fresh Recommended Total Recommended

25.13.1 Additional Salaries:

(a) 1 Warden @ Rs. 25,000/- per month 3.00000 14 42.00000 14 42.00000

(b)4 Full time teachers as per RTE norms @ Rs.

20,000/- per month per teacher 9.60000 14 134.40000 14 134.40000

(c)

1 Urdu Teachers (only for blocks with muslim

population above 20% and select urban areas), if

required @ Rs. 12,000/- per month per teacher 1.44000 14 20.16000 14 20.16000

(d)3 part time teachers @ Rs. 5,000/- per month per

teacher 1.80000 14 25.20000 14 25.20000

(e)1 Full time Accountant @ Rs. 10,000/- per month

1.20000 14 16.80000 14 16.80000

(f)

2 Support Staff – (Accountant/ Assistant, Peon,

Chowkidar) @ Rs. 5,000/- per month per staff 1.20000 14 16.80000 14 16.80000

(g) 1 Head cook @ Rs. 6,000/- per month 0.72000 14 10.08000 14 10.08000

(h)2 Asstt. Cooks @ Rs. 4,500/- per month per cook

1.08000 14 15.12000 14 15.12000

25.14Specific skill training @ Rs.1000/- per child per

annum1.00000 14 14.000 14 14.00000

25.15Electricity/water charges @ Rs.1000/- per child

per annum1.00000 14 14.000 14 14.00000

25.16Medical care/contingencies @ Rs. 1250 per child

per annum1.25000 14 17.500 14 17.50000

25.17 Maintenance @ Rs.750/- per child per annum 0.75000 14 10.500 14 10.50000

25.18

Miscellaneous (Educational Tour/ Exposure Visit

/ Sports Material etc.) @ Rs.750/- per child per

annum

0.75000 14 10.500 14 10.50000

25.19Preparatory camps @ Rs.200/- per child per

annum0.20000 14 2.800 14 2.80000

25.20PTAs/school functions @ Rs.200/- per child per

annum0.20000 14 2.800 14 2.80000

25.21 Provision of Rent @ Rs.6000/- per annum 6.00000

25.21a Provision of Rent (6 months) 3.6000025.21b Provision of Rent (3 months) 1.8000025.21c Rent (Previous Year (2007-2012)

25.22 Capacity building 0.50000 14 7.000 14 7.00000

25.22(a)Physical/ Self Defence Training @ Rs.200/- per

child per annum0.20000 14 2.800 14 2.80000

Subtotal Recurring 14 645.260 14 645.26000

Subtotal (Model-I) 3.00400 14 653.510 14 656.51400

CNon Recurring One Time Grant (Only

committed liabilities) (Model-II)

25.23 Construction of Building (New)

25.24 Construction of Building KGBV sanctioned earlier

25.24(a) Additional Class Room Rooms 3.45000

25.24(b) Guard Room Rooms 1.32000

25.24(c) Boundary Wall School 5.0200025.25 Boudary Wall (Spillover only)25.26 Boring/Handpump (Spillover only)

25.27 Electricity /Water charges (Spillover only)

25.27(a) Solar Water Heater & Solar Light 2.97000

25.28Furniture/Equipment (including Kitchen

equipment)2.00000

25.29 TLM and equipment including library books 3.00000

25.30 Bedding (New) 0.37500

25.31 Replacement of Bedding (once in 3 Year) 0.37500

Subtotal Non Recurring

D Recurring Cost Per Annum (Model-II)

25.32Maintenance per girl student per month @ Rs.

1500/-9.00000

25.33 Stipend for girl student per month @ Rs. 100/- 0.60000

25.34Supplementary TLM, stationery and other

educational material @ Rs.1000/- per annum0.50000

25.35 Salaries(a) 1 Warden @ Rs. 25,000/- per month 3.00000

(b)3 Full time teachers as per RTE norms @ Rs.

20,000/- per month per teacher 7.20000

(c) 3 part time teachers @ Rs. 5,000/- per month per

teacher 1.80000

(d)1 Full time Accountant @ Rs. 10,000/- per month

1.20000

(e)

2 Support Staff – (Accountant/ Assistant, Peon,

Chowkidar) @ Rs. 5,000/- per month per staff 1.20000

Arti:SSA-AWPB-2014-15-PABMinits:Kushinagar:16-06-2014 210 / 533

Page 211: U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 · 2015. 1. 6. · U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15

Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

Name of District : Kushinagar -47

ActivityS. No.Physical

UnitRemarks

Outlay Recommendation for 2014-15

Spill OverDeferred laibility of

2014-15Fresh Recommended Total Recommended

(f) 1 Head cook @ Rs. 6,000/- per month 0.72000

(g)1 Asstt. Cooks @ Rs. 4,500/- per month per cook

0.54000

25.36Specific skill training @ Rs.1000/- per child per

annum0.50000

25.37Electricity/water charges @ Rs.1000/- per child

per annum0.50000

25.38Medical care/contingencies @ Rs. 1250 per child

per annum0.62500

25.39 Maintenance @ Rs.750/- per child per annum 0.37500

25.40

Miscellaneous (Educational Tour/ Exposure Visit

/ Sports Material etc.) @ Rs.750/- per child per

annum

0.37500

25.41Preparatory camps @ Rs.300/- per child per

annum0.15000

25.42PTAs/school functions @ Rs.300/- per child per

annum0.15000

25.43 Provision of Rent @ Rs.10000/- per annum 5.00000

25.43a Provision of Rent (6 months) 3.6000025.43b Provision of Rent (3 months) 1.8000025.43c Rent (Previous Year (2007-2012)25.44 Capacity building 0.25000

25.44(a)Physical/ Self Defence Training @ Rs.200/- per

child per annum0.10000

Subtotal Recurring

Subtotal (Model-II) Total (KGBV) 3.004 14 653.510 14 656.514

DISTRICT GRAND TOTAL (SSA+KGBV) 30.832 31.700 669922 14119.450 669922 14181.982

Arti:SSA-AWPB-2014-15-PABMinits:Kushinagar:16-06-2014 211 / 533

Page 212: U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 · 2015. 1. 6. · U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15

Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

I ACCESS

1 Opening of New Schools

1.01 Upgradation of EGS to PSCentres /

School1.02 New PS School

1.03 Upgradation of PS to UPS / New UPS School

1.04 Composite Schools (for Urban Areas) School

1.05Residential Schools for specific category children

(For 100 children)

1.06Residential Hostel (for specific category of

children) (For 50 children)

1.07 Integration of Class V with Primary Schools

1.08Integration of Class VIII with Upper Primary

Schools

2Residential Schools for specific category

of children (For 100 Children)

Total - Residential Schools (For 100

children)

3Residential Hostel for specific category of

children (For 50 Children)

Total - Residential Schools (For 50

children)4 Transport/Escort Facility

4.01

Children in remote habitations with sparse

populations where opening of schools is

unviable

Child 0.03000

4.02

Urban deprived children/children without adult

protection in urban areas where schools are not

opened because availability of land is a problem

Child 0.03000

Sub Total

5Special Training for mainstreaming of Out-

of-School Children

5.03 Non-Residential (Fresh)(a) 12 months Child 0.06000(b) 9 months 0.04500(c) 6 months

(i)Special Training (by Special Instructors-NRBC)-

(1-5) Child 0.03000 48 1.440 48 1.44000

(ii) Special Training (by Special Instructors-NRBC)-

(6-8) Child 0.03000 60 1.800 60 1.80000

(d) 3 months Child 0.01500Sub Total 108 3.240 108 3.24000

Total (Special Training) 108 3.240 108 3.2405(B) House Hold Survey (HHS)

5(B).01 House Hold Survey through SMCHouse

Hold0.00001

Sub TotalII RETENTION6 Free Text Book

6.01Free Text Book (PS) for Parishadiya & Aided

Primary Schools (Workbooks not included)Child 0.00120 102097 122.516 102097 122.51640

6.01a

Free Text Book (PS) for 25% children of Class-1

in Private Recognised Primary Schools of other

Boards (Workbooks not included)

Child 0.00150

6.02 Free Brail Books (PS) 0.00150 49 0.074 49 0.07350

6.03 Free Large Print Books (PS) 0.00150

6.04Free Text Book (UPS) (Workbooks not included)

(Including KGBV Girls)Child 0.00200 36315 72.630 36315 72.63000

6.05 Free Brail Books (UPS) 0.00250 9 0.023 9 0.02250

6.06 Free Large Print Books (PS) 0.00250Sub Total 138470 195.242 138470 195.242

7 Provision of 2 set of Uniforms

7.01 All Girls (Including KGBV Girls) Child 0.00400 94426 377.704 94426 377.70400

7.02 SC Boys Child 0.00400 43986 175.944 43986 175.94400

7.03 ST Boys Child 0.00400

7.04 BPL Boys Child 0.00400 22914 91.656 22914 91.65600

7.05

Free Uniform for 25% children of Class-1 in

Private Recognised Primary Schools of other

Boards

Child0.00400

Sub Total 161326 645.304 161326 645.3047(A) Fee Reimbursement

7(A).01

Fee Reimbursement for Admission of children of

Disadvantaged Group & Weaker Section upto

25% of seats in Class-1 of Private Unaided

Recognised Schools

Child 0.05400

Sub Total

8 Teaching Learning Equipment (TLE)

8.01 TLE - New Primary School 2.80000 0.20000 2.800008.02 TLE - New Upper Primary School 1.00000 0.50000 1.00000

Name of District : Kaushambi -46

ActivityS. No.Physical

UnitRemarks

Outlay Recommendation for 2014-15

Spill OverDeferred laibility of

2014-15Fresh Recommended Total Recommended

Arti:SSA-AWPB-2014-15-PABMinits:Kaushambi:16-06-2014 212 / 533

Page 213: U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 · 2015. 1. 6. · U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15

Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

Name of District : Kaushambi -46

ActivityS. No.Physical

UnitRemarks

Outlay Recommendation for 2014-15

Spill OverDeferred laibility of

2014-15Fresh Recommended Total Recommended

Sub Total 3.80000 3.80000III ENHANCING QUALITY9 New Teachers Salary

9.01 Primary Teachers (Regular) (Asstt. Teacher) Teacher 0.91500

9.01aHead Teacher for Primary (if the number of

children exceeds 150 in a school)Teacher

9.02 Primary Teachers (Contract) (S.M.) Teacher

9.03Subject specific Upper Primary Teachers

(Regular) (a) Science and Mathematics Teacher 1.26000(b) Social Studies Teacher 1.26000(c) Languages Teacher 1.26000

Sub Total (9.01 to 9.05)Add.Teacher against PTR

Sub Total (9.06 to 9.12)

Total (New Teacher's Salary-9.01 to 9.12)

Teachers Salary (Recurring-sanctioned

earlier)Primary teachers

9.13 Primary Teachers ( Regular)-Existing, in position Teacher 3.66000 595 2177.700 595 2177.70000

9.14Primary Teachers (Contract)-Existing, in

positionTeacher 0.55000

9.14(a) Primary Teachers (Contract)-under Training Teacher 0.38500 575 221.375 575 221.37500

9.14(b)Primary Teacher (Para Teachers Equal to

9.14(a) upgraded as Teachers)0.38500 640 246.400 640 246.40000

9.14(c) Primary Teachers (Para)- Vacant Teacher9.15 Primary Teachers (Vacant) Teacher 0.30500

9.16Head Teacher for Primary (if the number of

children exceeds 150)Teacher 5.04000 244 1229.760 244 1229.76000

9.16(b)Head Teacher for Primary (if the number of

children exceeds 150) VacantTeacher 0.42000

Additional teachers

9.17Additional Teachers - PS (Special BTC-

Regular) in positionTeacher 0.30500

9.18Additional Teachers - PS (Special BTC Under

Training)Teacher 0.87600

9.19 Additional Teachers - PS (Vacant) Teacher

9.20Others in position (Para Teachers upgraded

as Teachers)Teacher

Upper Primary teachers

9.21 UP Teachers (Regular)-Existing Teacher 5.04000 600 3024.000 600 3024.00000

9.22 UP Teachers (Contract)-Existing9.23 UP Teachers (Vacant) Teacher 1.26000

9.24Head Teacher for Upper Primary (if the number

of children exceeds 100)-ExistingTeacher 5.34000 300 1602.000 300 1602.00000

9.24a Head Teacher for Upper Primary (Vacant) Teacher 1.33500

9.25Subject specific Upper Primary Teachers

(Regular)(a) Science and Mathematics(b) Social Studies(c) Languages

9.32 Part Time Instructors in position(a) Art Education 0.77000 57 43.890 57 43.89000(b) Health and Physical Education 0.77000 66 50.820 66 50.82000(c) Work Education 0.77000 44 33.880 44 33.88000

9.32(A) Part Time Instructors Vacant(a) Art Education 0.42000(b) Health and Physical Education 0.42000(c) Work Education 0.42000

9.33

Others-Incentive to Teachers in Schools

Located in Naxal Affected Areas (@

Rs.1500/- per teachers per month)

Sub Total (9.13 to 9.33) 3121 8629.825 3121 8629.83TOTAL

(New Teachers Salary +Teachers Salary

Recurring)

3121 8629.825 3121 8629.82500

10 Teachers Training(a) Teachers

10.01

Refresher In-service Teachers' Training at BRC

level and above - 10 days (@ Rs.200/- per

head per day)

Teacher

(Target &

Ach.-13-14

in

Mandays)

0.00600

10.01(a)Continuous and Comprehensive Evauation [PS +

UPS)Teacher 0.01300 964 12.532 964 12.53200

10.01(b) Eary Reading and Numeracy Skills [PS] Teacher 0.00500 964 4.820 964 4.82000

10.01(c) Science [UPS] Teacher 0.00800 504 4.032 504 4.03200Recommended as

proposed

10.01(d) CWSN Teacher 0.00400

Arti:SSA-AWPB-2014-15-PABMinits:Kaushambi:16-06-2014 213 / 533

Page 214: U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 · 2015. 1. 6. · U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15

Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

Name of District : Kaushambi -46

ActivityS. No.Physical

UnitRemarks

Outlay Recommendation for 2014-15

Spill OverDeferred laibility of

2014-15Fresh Recommended Total Recommended

10.02

One day monthly cluster level meetings and

peer group training sessions for 10 months for

all teachers each year at CRC level - 10 days (@

Rs.100/- per head per day)

Teacher 0.01000

10.03(a)

Induction Training for Newly Recruited Teachers

for 6 Months (Special BTC)- @Rs.2000/- per

head per year

Teacher 0.02000

10.03(b)5 Days Training for Part Time Instructors @ Rs.

200/- per head per day) Teacher 0.01000

10.04

Training of untrained Teachers to acquire

professional qualifications over a two year

period.

Teacher 0.04700 470 22.090 470 22.09000

(b) Head Teachers

10.05Refresher Residencial In-service for 10 days at

BRC level and above

Head

Teacher(c) Resource Persons

10.06

Refresher Training for all Resource

Persons,Master Trainers, BRC & CRC faculty

and Coordinators for 5 days each year (@

Rs.200/- per head per day)

Resource

Person 0.00300 96 0.288 96 0.28800

Sub Total 2998 43.762 2998 43.762

11Academic Support through Block Resource

Centre (BRC)/ URC

11.01 Salary of Faculty and Staff

(a) 5 RPs at BRC for subject specific training in

positionRP 40 40

(b) 2 RPs for CWSN in position RP(b-i) 1 CWSN Resource Person RP 1.10000 16 17.600 16 17.60000

(b-ii) 1 Physiotherapist (Resource person for IE) RP

(c) 1 MIS Coordinator in position RP 1.86000

(d) 1 Datra Entry Operator in position RP 1.74000 8 13.920 8 13.92000

(e) 1 Accountant-cum-support staff in position RP 1.80000 8 14.400 8 14.40000

11.02 Furniture Grant BRC/ URC 1.00000

11.03Replacement of furniture, computer, TLE etc (

Once in 5 years)BRC/ URC 1.00000

11.04 Contingency Grant BRC/ URC 0.50000 8 4.000 8 4.00000

11.05 Meeting, TA BRC/ URC 0.30000 8 2.400 8 2.40000

11.06 TLM Grant BRC/ URC 0.10000

11.07 Maintenance Grant BRC/ URC 0.10000

Sub Total 8 52.320 8 52.32000

12Academic Support through Cluster

Resource Centres (CRC/UERC)

12.01Salary of Cluster Coordinator (on an average of

one Resource Person per 18 schools in a block)RP

12.02 Furniture GrantCRC/

UERC0.10000

12.03Replacement of furniture, computer, TLE etc.

once in 5 years

CRC/

UERC0.10000

12.04 Contingency Grant CRC/UERC 0.10000 85 8.500 85 8.50000

12.05 Meeting, TA CRC/UERC 0.12000 85 10.200 85 10.20000

12.06 TLM Grant CRC/UERC 0.03000

12.07Maintenance Grant

CRC/UERC 0.02000

Sub Total 170 18.700 170 18.70000

13Computer Aided Education in upper

primary schools under Innovation

13.01Computer Aided Education in upper primary

schoolsDistrict 0.01200 48 0.576 48 0.57600

Sub Total 48 0.576 48 0.5760014 Libraries in Schools14.01 (a) Primary School (per school) School 0.03000

14.02 (b) Upper Primary School (per school) School 0.10000

Sub TotalIV ANNUAL GRANTS15 Teachers' Grant15.01 Primary Teachers Teacher 0.0050015.02 Upper Primary Teachers Teacher 0.00500 504 2.520 504 2.52000

Sub Total 504 2.520 504 2.5200016 School Grant16.01 Primary School School 0.05000 993 49.650 993 49.6500016.02 Upper Primary School School 0.07000 548 38.360 548 38.36000

Sub Total 1541 88.010 1541 88.01000

Arti:SSA-AWPB-2014-15-PABMinits:Kaushambi:16-06-2014 214 / 533

Page 215: U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 · 2015. 1. 6. · U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15

Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

Name of District : Kaushambi -46

ActivityS. No.Physical

UnitRemarks

Outlay Recommendation for 2014-15

Spill OverDeferred laibility of

2014-15Fresh Recommended Total Recommended

17Research, Evaluation, Monitoring &

Supervision

17.01 REMS Activities School 0.00103 1541 1.585 1541 1.58509

17.02 Monitoring & Supervision School 0.00078 1541 1.208 1541 1.20825

17.03 House Hold Survey (Urban) in Million Plus Cities District 35.00000

Sub Total 3082 2.793 3082 2.7933418 Maintenance Grant

18.01 Maintenance in School having upto3 Classrooms School 0.07500 221 16.575 221 16.57500

18.01a Maintenance Grant School 0.07500 1190 89.250 1190 89.25000Sub Total 1411 105.825 1411 105.82500

VBRIDGING GENDER AND SOCIAL

CATEGORY GAPS

19 Interventions for CWSN (IE)

19.01 Provision for Inclusive Education Child 0.01000 5657 56.570 5657 56.57000

Sub Total 5657 56.570 5657 56.57000

20Innovativation Head up to Rs.50 Lakh per

district

20.01 Girls Education District 0.70000 8 5.600 8 5.60000

20.02 ECCE District20.03 Intervention for SC / ST children District

20.04 Intervention for Minority Community children District

20.05 Intervention for Urban Deprived children District 10.00000

Sub Total 8 5.600 8 5.6000021 SMC/PRI Training

21.01Residential for 6 Resource Person per Block (3

days) (@ Rs.500/-)Blocks 0.09000

21.02Non-residential (3 days training of 6 SMC

members) (@ Rs.100/-)SMC 0.01800 1422 25.596 1422 25.59600

21.02(a)Non-residential (3 days training of 3 Members of

PRI/VECs/LA) (@ Rs.100/-)VEC/ WEC 0.00900

21.03

Seminar/Orientation of SMC Women members

and President/Vice President (@ Rs. 50,000/-

per block)

Blocks 0.50000

Sub Total 1422 25.596 1422 25.59600VI SCHOOL INFRASTRUCTURE22 Civil Works22.01 Primary School (Plain) (New) School 13.1550022.02 Primary School (Hilly/Rocky) (New) School 13.2750022.03 Upper Primary (Plain) (New) School 20.65500

22.04 Upper Primary School (Hilly/Rocky) (New) School 20.77500

22.04aComposite Schools for Urban Areas (Class I-

VIII)School 41.04000

22.05 ACR in lieu of upgraded Upper Primary School Rooms

22.06 Additional class rooms for adding Class VIII Rooms

22.07 Building Less (Pry) School 9.7500022.08 Building Less (UP) School 18.5900022.09 Dilapidated Building (Pry) School 9.7500022.10 Dilapidated Building (UP) School 18.59000

22.11 Additional Class Room (Rural) ( PS+UPS) Rooms 3.45000

22.12 Additional Class Room (Urban) Rooms 3.4500022.13 Additional Class Room (Hill Area)22.14 Toilet/Urinals (PS & UPS) School 0.70000 24 16.800 24 16.8000022.15 Separate Girls Toilet (Rural+Urban) School 0.70000 24 16.800 24 16.8000022.16 CWSN friendly Toilets School 0.50000

22.17 Drinking Water Facility (for Urban Area Only)) School 0.15000

22.17a Drinking Water Facility (Plain PS & UPS) School 0.15000 81 12.150 81 12.15000

22.17b Drinking Water Facility (Hilly/Rocky PS & UPS) School 0.15000

22.18a Boundary Wall PS (Total in Meters x .01105) 0.01749

22.18bBoundary Wall PS (For Gate) @Rs. 7000 x no. of

P.S.School 0.07800

22.18c Boundary Wall UPS (Total in Meters x .01105) 0.01749

22.18dBoundary Wall UPS (For Gate) @Rs. 7000 x no.

of UPSSchool 0.07800

22.19a Electrification in P.S./ Electrical Equipment School 0.11000

22.19b Electrification in U. P.S./ Electrical Equipment School 0.11000

22.20Office-cum-store-cum-Head Teacher's room

(Primary)Rooms

22.21Office-cum-store-cum-Head Teacher's room

(Upper Primary)Rooms

22.22Augumentation of training facility in BRC (one

time)BRC/ URC 5.00000

22.23 Child friendly Elements School 0.25000

22.24 Ramps with Handrails (Barrier Free Elements) School 0.06000

22.25 Handrails in existing Ramps School 0.01000

Arti:SSA-AWPB-2014-15-PABMinits:Kaushambi:16-06-2014 215 / 533

Page 216: U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 · 2015. 1. 6. · U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15

Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

Name of District : Kaushambi -46

ActivityS. No.Physical

UnitRemarks

Outlay Recommendation for 2014-15

Spill OverDeferred laibility of

2014-15Fresh Recommended Total Recommended

22.26 Whole School Develoipment School22.27 Retro-fitting and repairs School

22.28Residential Schools for specific category

of children

(a) Construction of Building including boundary

wall, Water and sanitation facilities, electric

installation (For 100 children)

Building 65.86000

(b) Construction of residential hostel Building 65.86000

(c) Refurnishing unused old buildings Building

22.29

Construction of Hostel in existing Govt UPS

including boundary wall, Water and sanitation

facilities, electric installation etc. (For 50

children)

7.00000

22.30Furniture for Govt. UPS (per child) (@ Rs.500/-

per child enrolled)Child 0.00500

22.31 Major Repairs for Primary School School 0.30000

22.32 Majr Repairs for Upper Primary School School 0.30000

22.33Others (Difference of Civil Wrks

sanctioned in pre.yr.)22.33a Others (Overhead Tank PS) School 0.1200022.33b Others (Overhead Tank UPS) School 0.12000

Sub Total (Civil WOrks) 129 45.750 129 45.75VII PROJECT MANAGEMENT COST23 Management23.01 Management up to 3.5%

(a) Project Management and MIS

(i) DPO ( Salary, Contigency, Consumables,

POL, TA & Computer etc)District 1 117.488 1 117.48780

(ii) EMIS Cell District 1 11.543 1 11.54250Sub Total (a) 1 1 1 129.030 1 129.030

(b) Training of Educational Administrators District

(c) School Mapping and Social Mapping District

Sub Total (23.01)

23.02Learning Enhancement Prog. (LEP) (P & UP) (up

to 2%)District 11.886 11.88560

23.03 Community Mobilization (up to 0.5%) District 1 50.000 1 50.00000

Sub Total (Management) 1 61.886 1 61.88560Total Management Cost 190.916 190.91590Total of SSA (Districs) 3.800 320003 10112.550 320003 10116.350

24 State Component23.01 Management23.02 REMS 0.0044923.03 SIEMAT

Sub Total

STATE SSA TOTAL 3.80000 320003 10112.550 320003 10116.34964

25

KGBV Financial Provision (give

separate costing sheets for different

Models)

Hostel

ANon Recurring One Time Grant (Only

committed liabilities) (Model-I)

25.01 Construction of Building (New)

25.02 Construction of Building KGBV sanctioned earlier

25.02(a) Additional Class Room Rooms 3.45000

25.02(b) Guard Room Rooms 1.32000

25.02(c) Boundary Wall School 5.0200025.03 Boudary Wall (Spillover only)

25.04

Boring/Handpump (Spillover only)

(minimum rates prescribed by State Drinking

Water Department subject to a ceiling of Rs.

1.00 lakhs)

25.05 Electricity /Water charges (Spillover only)

25.05(a) Solar Water Heater & Solar Light 2.97000

25.06Furniture/Equipment (including Kitchen

equipment)3.00000

25.07 TLM and equipment including library books 3.50000

25.08 Bedding (New) 0.75000

25.09 Replacement of Bedding (once in 3 Year) 0.75000 5 3.750 5 3.75000

Subtotal Non Recurring 3.750 3.75000

B Recurring Cost Per Annum (Model-I)

25.10Maintenance per girl student per month @ Rs.

1500/-18.00000 8 144.000 8 144.00000

25.11 Stipend for girl student per month @ Rs. 100/- 1.20000 8 9.600 8 9.60000

25.12Supplementary TLM, stationery and other

educational material @ Rs.1000/- per annum1.00000 8 8.000 8 8.00000

25.13 Salaries

Arti:SSA-AWPB-2014-15-PABMinits:Kaushambi:16-06-2014 216 / 533

Page 217: U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 · 2015. 1. 6. · U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15

Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

Name of District : Kaushambi -46

ActivityS. No.Physical

UnitRemarks

Outlay Recommendation for 2014-15

Spill OverDeferred laibility of

2014-15Fresh Recommended Total Recommended

25.13.1 Additional Salaries:

(a) 1 Warden @ Rs. 25,000/- per month 3.00000 8 24.00000 8 24.00000

(b)4 Full time teachers as per RTE norms @ Rs.

20,000/- per month per teacher 9.60000 8 76.80000 8 76.80000

(c)

1 Urdu Teachers (only for blocks with muslim

population above 20% and select urban areas), if

required @ Rs. 12,000/- per month per teacher 1.44000 8 11.52000 8 11.52000

(d)3 part time teachers @ Rs. 5,000/- per month per

teacher 1.80000 8 14.40000 8 14.40000

(e)1 Full time Accountant @ Rs. 10,000/- per month

1.20000 8 9.60000 8 9.60000

(f)

2 Support Staff – (Accountant/ Assistant, Peon,

Chowkidar) @ Rs. 5,000/- per month per staff 1.20000 8 9.60000 8 9.60000

(g) 1 Head cook @ Rs. 6,000/- per month 0.72000 8 5.76000 8 5.76000

(h)2 Asstt. Cooks @ Rs. 4,500/- per month per cook

1.08000 8 8.64000 8 8.64000

25.14Specific skill training @ Rs.1000/- per child per

annum1.00000 8 8.000 8 8.00000

25.15Electricity/water charges @ Rs.1000/- per child

per annum1.00000 8 8.000 8 8.00000

25.16Medical care/contingencies @ Rs. 1250 per child

per annum1.25000 8 10.000 8 10.00000

25.17 Maintenance @ Rs.750/- per child per annum 0.75000 8 6.000 8 6.00000

25.18

Miscellaneous (Educational Tour/ Exposure Visit

/ Sports Material etc.) @ Rs.750/- per child per

annum

0.75000 8 6.000 8 6.00000

25.19Preparatory camps @ Rs.200/- per child per

annum0.20000 8 1.600 8 1.60000

25.20PTAs/school functions @ Rs.200/- per child per

annum0.20000 8 1.600 8 1.60000

25.21 Provision of Rent @ Rs.6000/- per annum 6.00000

25.21a Provision of Rent (6 months) 3.6000025.21b Provision of Rent (3 months) 1.8000025.21c Rent (Previous Year (2007-2012)

25.22 Capacity building 0.50000 8 4.000 8 4.00000

25.22(a)Physical/ Self Defence Training @ Rs.200/- per

child per annum0.20000 8 1.600 8 1.60000

Subtotal Recurring 8 368.720 8 368.72000

Subtotal (Model-I) 8 372.470 8 372.47000

CNon Recurring One Time Grant (Only

committed liabilities) (Model-II)

25.23 Construction of Building (New)

25.24 Construction of Building KGBV sanctioned earlier

25.24(a) Additional Class Room Rooms 3.45000

25.24(b) Guard Room Rooms 1.32000

25.24(c) Boundary Wall School 5.0200025.25 Boudary Wall (Spillover only)25.26 Boring/Handpump (Spillover only)

25.27 Electricity /Water charges (Spillover only)

25.27(a) Solar Water Heater & Solar Light 2.97000

25.28Furniture/Equipment (including Kitchen

equipment)2.00000

25.29 TLM and equipment including library books 3.00000

25.30 Bedding (New) 0.37500

25.31 Replacement of Bedding (once in 3 Year) 0.37500

Subtotal Non Recurring

D Recurring Cost Per Annum (Model-II)

25.32Maintenance per girl student per month @ Rs.

1500/-9.00000

25.33 Stipend for girl student per month @ Rs. 100/- 0.60000

25.34Supplementary TLM, stationery and other

educational material @ Rs.1000/- per annum0.50000

25.35 Salaries(a) 1 Warden @ Rs. 25,000/- per month 3.00000

(b)3 Full time teachers as per RTE norms @ Rs.

20,000/- per month per teacher 7.20000

(c) 3 part time teachers @ Rs. 5,000/- per month per

teacher 1.80000

(d)1 Full time Accountant @ Rs. 10,000/- per month

1.20000

(e)

2 Support Staff – (Accountant/ Assistant, Peon,

Chowkidar) @ Rs. 5,000/- per month per staff 1.20000

Arti:SSA-AWPB-2014-15-PABMinits:Kaushambi:16-06-2014 217 / 533

Page 218: U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 · 2015. 1. 6. · U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15

Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

Name of District : Kaushambi -46

ActivityS. No.Physical

UnitRemarks

Outlay Recommendation for 2014-15

Spill OverDeferred laibility of

2014-15Fresh Recommended Total Recommended

(f) 1 Head cook @ Rs. 6,000/- per month 0.72000

(g)1 Asstt. Cooks @ Rs. 4,500/- per month per cook

0.54000

25.36Specific skill training @ Rs.1000/- per child per

annum0.50000

25.37Electricity/water charges @ Rs.1000/- per child

per annum0.50000

25.38Medical care/contingencies @ Rs. 1250 per child

per annum0.62500

25.39 Maintenance @ Rs.750/- per child per annum 0.37500

25.40

Miscellaneous (Educational Tour/ Exposure Visit

/ Sports Material etc.) @ Rs.750/- per child per

annum

0.37500

25.41Preparatory camps @ Rs.300/- per child per

annum0.15000

25.42PTAs/school functions @ Rs.300/- per child per

annum0.15000

25.43 Provision of Rent @ Rs.10000/- per annum 5.00000

25.43a Provision of Rent (6 months) 3.6000025.43b Provision of Rent (3 months) 1.8000025.43c Rent (Previous Year (2007-2012)25.44 Capacity building 0.25000

25.44(a)Physical/ Self Defence Training @ Rs.200/- per

child per annum0.10000

Subtotal Recurring

Subtotal (Model-II) Total (KGBV) 8 372.470 8 372.470

DISTRICT GRAND TOTAL (SSA+KGBV) 3.800 320011 10485.020 320011 10488.820

Arti:SSA-AWPB-2014-15-PABMinits:Kaushambi:16-06-2014 218 / 533

Page 219: U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 · 2015. 1. 6. · U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15

Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

I ACCESS

1 Opening of New Schools

1.01 Upgradation of EGS to PSCentres /

School1.02 New PS School

1.03 Upgradation of PS to UPS / New UPS School

1.04 Composite Schools (for Urban Areas) School

1.05Residential Schools for specific category children

(For 100 children)

1.06Residential Hostel (for specific category of

children) (For 50 children)

1.07 Integration of Class V with Primary Schools

1.08Integration of Class VIII with Upper Primary

Schools

2Residential Schools for specific category

of children (For 100 Children)

Total - Residential Schools (For 100

children)

3Residential Hostel for specific category of

children (For 50 Children)

Total - Residential Schools (For 50

children)4 Transport/Escort Facility

4.01

Children in remote habitations with sparse

populations where opening of schools is

unviable

Child 0.03000

4.02

Urban deprived children/children without adult

protection in urban areas where schools are not

opened because availability of land is a problem

Child 0.03000

Sub Total

5Special Training for mainstreaming of Out-

of-School Children

5.03 Non-Residential (Fresh)(a) 12 months Child 0.06000(b) 9 months 0.04500(c) 6 months

(i)Special Training (by Special Instructors-NRBC)-

(1-5) Child 0.03000 153 4.590 153 4.59000

(ii) Special Training (by Special Instructors-NRBC)-

(6-8) Child 0.03000 21 0.630 21 0.63000

(d) 3 months Child 0.01500Sub Total 174 5.220 174 5.22000

Total (Special Training) 174 5.220 174 5.2205(B) House Hold Survey (HHS)

5(B).01 House Hold Survey through SMCHouse

Hold0.00001

Sub TotalII RETENTION6 Free Text Book

6.01Free Text Book (PS) for Parishadiya & Aided

Primary Schools (Workbooks not included)Child 0.00120 77556 93.067 77556 93.06720

6.01a

Free Text Book (PS) for 25% children of Class-1

in Private Recognised Primary Schools of other

Boards (Workbooks not included)

Child 0.00150

6.02 Free Brail Books (PS) 0.00150 16 0.024 16 0.02400

6.03 Free Large Print Books (PS) 0.00150

6.04Free Text Book (UPS) (Workbooks not included)

(Including KGBV Girls)Child 0.00200 28952 57.904 28952 57.90400

6.05 Free Brail Books (UPS) 0.00250

6.06 Free Large Print Books (PS) 0.00250Sub Total 106524 150.995 106524 150.995

7 Provision of 2 set of Uniforms

7.01 All Girls (Including KGBV Girls) Child 0.00400 86888 347.552 86888 347.55200

7.02 SC Boys Child 0.00400 19620 78.480 19620 78.48000

7.03 ST Boys Child 0.00400

7.04 BPL Boys Child 0.00400 15723 62.892 15723 62.89200

7.05

Free Uniform for 25% children of Class-1 in

Private Recognised Primary Schools of other

Boards

Child0.00400

Sub Total 122231 488.924 122231 488.9247(A) Fee Reimbursement

7(A).01

Fee Reimbursement for Admission of children of

Disadvantaged Group & Weaker Section upto

25% of seats in Class-1 of Private Unaided

Recognised Schools

Child 0.05400

Sub Total

8 Teaching Learning Equipment (TLE)

8.01 TLE - New Primary School 0.40000 0.20000 0.400008.02 TLE - New Upper Primary School 1.00000 0.50000 1.00000

Remarks

Outlay Recommendation for 2014-15

Spill OverDeferred laibility of

2014-15Fresh Recommended Total Recommended

Name of District : KanshiramNagar

(Kasganj) -45

S. No. ActivityPhysical

Unit

Arti:SSA-AWPB-2014-15-PABMinits:KanshiramNagar(Kasganj):16-06-2014 219 / 533

Page 220: U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 · 2015. 1. 6. · U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15

Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

Remarks

Outlay Recommendation for 2014-15

Spill OverDeferred laibility of

2014-15Fresh Recommended Total Recommended

Name of District : KanshiramNagar

(Kasganj) -45

S. No. ActivityPhysical

Unit

Sub Total 1.40000 1.40000III ENHANCING QUALITY9 New Teachers Salary

9.01 Primary Teachers (Regular) (Asstt. Teacher) Teacher 0.91500

9.01aHead Teacher for Primary (if the number of

children exceeds 150 in a school)Teacher

9.02 Primary Teachers (Contract) (S.M.) Teacher

9.03Subject specific Upper Primary Teachers

(Regular) (a) Science and Mathematics Teacher 1.26000(b) Social Studies Teacher 1.26000(c) Languages Teacher 1.26000

Sub Total (9.01 to 9.05)Add.Teacher against PTR

Sub Total (9.06 to 9.12)

Total (New Teacher's Salary-9.01 to 9.12)

Teachers Salary (Recurring-sanctioned

earlier)Primary teachers

9.13 Primary Teachers ( Regular)-Existing, in position Teacher 3.66000 111 406.260 111 406.26000

9.14Primary Teachers (Contract)-Existing, in

positionTeacher 0.55000

9.14(a) Primary Teachers (Contract)-under Training Teacher 0.38500 591 227.535 591 227.53500

9.14(b)Primary Teacher (Para Teachers Equal to

9.14(a) upgraded as Teachers)0.38500 590 227.150 590 227.15000

9.14(c) Primary Teachers (Para)- Vacant Teacher9.15 Primary Teachers (Vacant) Teacher 0.30500

9.16Head Teacher for Primary (if the number of

children exceeds 150)Teacher 5.04000 95 478.800 95 478.80000

9.16(b)Head Teacher for Primary (if the number of

children exceeds 150) VacantTeacher 0.42000

Additional teachers

9.17Additional Teachers - PS (Special BTC-

Regular) in positionTeacher 0.30500

9.18Additional Teachers - PS (Special BTC Under

Training)Teacher 0.87600

9.19 Additional Teachers - PS (Vacant) Teacher

9.20Others in position (Para Teachers upgraded

as Teachers)Teacher

Upper Primary teachers

9.21 UP Teachers (Regular)-Existing Teacher 5.04000 255 1285.200 255 1285.20000

9.22 UP Teachers (Contract)-Existing9.23 UP Teachers (Vacant) Teacher 1.26000

9.24Head Teacher for Upper Primary (if the number

of children exceeds 100)-ExistingTeacher 5.34000 98 523.320 98 523.32000

9.24a Head Teacher for Upper Primary (Vacant) Teacher 1.33500

9.25Subject specific Upper Primary Teachers

(Regular)(a) Science and Mathematics(b) Social Studies(c) Languages

9.32 Part Time Instructors in position(a) Art Education 0.77000 33 25.410 33 25.41000(b) Health and Physical Education 0.77000 52 40.040 52 40.04000(c) Work Education 0.77000 38 29.260 38 29.26000

9.32(A) Part Time Instructors Vacant(a) Art Education 0.42000(b) Health and Physical Education 0.42000(c) Work Education 0.42000

9.33

Others-Incentive to Teachers in Schools

Located in Naxal Affected Areas (@

Rs.1500/- per teachers per month)

Sub Total (9.13 to 9.33) 1863 3242.975 1863 3242.98TOTAL

(New Teachers Salary +Teachers Salary

Recurring)

1863 3242.975 1863 3242.97500

10 Teachers Training(a) Teachers

10.01

Refresher In-service Teachers' Training at BRC

level and above - 10 days (@ Rs.200/- per

head per day)

Teacher

(Target &

Ach.-13-14

in

Mandays)

0.00600

10.01(a)Continuous and Comprehensive Evauation [PS +

UPS)Teacher 0.01300 929 12.077 929 12.07700

10.01(b) Eary Reading and Numeracy Skills [PS] Teacher 0.00500 929 4.645 929 4.64500

10.01(c) Science [UPS] Teacher 0.00800 477 3.816 477 3.81600Recommended as

proposed

10.01(d) CWSN Teacher 0.00400

Arti:SSA-AWPB-2014-15-PABMinits:KanshiramNagar(Kasganj):16-06-2014 220 / 533

Page 221: U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 · 2015. 1. 6. · U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15

Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

Remarks

Outlay Recommendation for 2014-15

Spill OverDeferred laibility of

2014-15Fresh Recommended Total Recommended

Name of District : KanshiramNagar

(Kasganj) -45

S. No. ActivityPhysical

Unit

10.02

One day monthly cluster level meetings and

peer group training sessions for 10 months for

all teachers each year at CRC level - 10 days (@

Rs.100/- per head per day)

Teacher 0.01000

10.03(a)

Induction Training for Newly Recruited Teachers

for 6 Months (Special BTC)- @Rs.2000/- per

head per year

Teacher 0.02000

10.03(b)5 Days Training for Part Time Instructors @ Rs.

200/- per head per day) Teacher 0.01000

10.04

Training of untrained Teachers to acquire

professional qualifications over a two year

period.

Teacher 0.04700 315 14.805 315 14.80500

(b) Head Teachers

10.05Refresher Residencial In-service for 10 days at

BRC level and above

Head

Teacher(c) Resource Persons

10.06

Refresher Training for all Resource

Persons,Master Trainers, BRC & CRC faculty

and Coordinators for 5 days each year (@

Rs.200/- per head per day)

Resource

Person 0.00300 84 0.252 84 0.25200

Sub Total 2734 35.595 2734 35.595

11Academic Support through Block Resource

Centre (BRC)/ URC

11.01 Salary of Faculty and Staff

(a) 5 RPs at BRC for subject specific training in

positionRP 35 35

(b) 2 RPs for CWSN in position RP(b-i) 1 CWSN Resource Person RP 1.10000 14 15.400 14 15.40000

(b-ii) 1 Physiotherapist (Resource person for IE) RP

(c) 1 MIS Coordinator in position RP 1.86000

(d) 1 Datra Entry Operator in position RP 1.74000

(e) 1 Accountant-cum-support staff in position RP 1.80000

11.02 Furniture Grant BRC/ URC 1.00000

11.03Replacement of furniture, computer, TLE etc (

Once in 5 years)BRC/ URC 1.00000

11.04 Contingency Grant BRC/ URC 0.50000 7 3.500 7 3.50000

11.05 Meeting, TA BRC/ URC 0.30000 7 2.100 7 2.10000

11.06 TLM Grant BRC/ URC 0.10000

11.07 Maintenance Grant BRC/ URC 0.10000

Sub Total 7 21.000 7 21.00000

12Academic Support through Cluster

Resource Centres (CRC/UERC)

12.01Salary of Cluster Coordinator (on an average of

one Resource Person per 18 schools in a block)RP

12.02 Furniture GrantCRC/

UERC0.10000

12.03Replacement of furniture, computer, TLE etc.

once in 5 years

CRC/

UERC0.10000

12.04 Contingency Grant CRC/UERC 0.10000 78 7.800 78 7.80000

12.05 Meeting, TA CRC/UERC 0.12000 78 9.360 78 9.36000

12.06 TLM Grant CRC/UERC 0.03000

12.07Maintenance Grant

CRC/UERC 0.02000

Sub Total 156 17.160 156 17.16000

13Computer Aided Education in upper

primary schools under Innovation

13.01Computer Aided Education in upper primary

schoolsDistrict 0.01200 48 0.576 48 0.57600

Sub Total 48 0.576 48 0.5760014 Libraries in Schools14.01 (a) Primary School (per school) School 0.03000

14.02 (b) Upper Primary School (per school) School 0.10000

Sub TotalIV ANNUAL GRANTS15 Teachers' Grant15.01 Primary Teachers Teacher 0.0050015.02 Upper Primary Teachers Teacher 0.00500 477 2.385 477 2.38500

Sub Total 477 2.385 477 2.3850016 School Grant16.01 Primary School School 0.05000 998 49.900 998 49.9000016.02 Upper Primary School School 0.07000 469 32.830 469 32.83000

Sub Total 1467 82.730 1467 82.73000

Arti:SSA-AWPB-2014-15-PABMinits:KanshiramNagar(Kasganj):16-06-2014 221 / 533

Page 222: U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 · 2015. 1. 6. · U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15

Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

Remarks

Outlay Recommendation for 2014-15

Spill OverDeferred laibility of

2014-15Fresh Recommended Total Recommended

Name of District : KanshiramNagar

(Kasganj) -45

S. No. ActivityPhysical

Unit

17Research, Evaluation, Monitoring &

Supervision

17.01 REMS Activities School 0.00103 1467 1.509 1467 1.50897

17.02 Monitoring & Supervision School 0.00078 1467 1.150 1467 1.15023

17.03 House Hold Survey (Urban) in Million Plus Cities District 35.00000

Sub Total 2934 2.659 2934 2.6592018 Maintenance Grant

18.01 Maintenance in School having upto3 Classrooms School 0.07500 303 22.725 303 22.72500

18.01a Maintenance Grant School 0.07500 1141 85.575 1141 85.57500Sub Total 1444 108.300 1444 108.30000

VBRIDGING GENDER AND SOCIAL

CATEGORY GAPS

19 Interventions for CWSN (IE)

19.01 Provision for Inclusive Education Child 0.03000 384 11.520 384 11.52000

Sub Total 384 11.520 384 11.52000

20Innovativation Head up to Rs.50 Lakh per

district

20.01 Girls Education District 0.70000 8 5.600 8 5.60000

20.02 ECCE District20.03 Intervention for SC / ST children District

20.04 Intervention for Minority Community children District

20.05 Intervention for Urban Deprived children District 10.00000

Sub Total 8 5.600 8 5.6000021 SMC/PRI Training

21.01Residential for 6 Resource Person per Block (3

days) (@ Rs.500/-)Blocks 0.09000

21.02Non-residential (3 days training of 6 SMC

members) (@ Rs.100/-)SMC 0.01800 1444 25.992 1444 25.99200

21.02(a)Non-residential (3 days training of 3 Members of

PRI/VECs/LA) (@ Rs.100/-)VEC/ WEC 0.00900

21.03

Seminar/Orientation of SMC Women members

and President/Vice President (@ Rs. 50,000/-

per block)

Blocks 0.50000

Sub Total 1444 25.992 1444 25.99200VI SCHOOL INFRASTRUCTURE22 Civil Works22.01 Primary School (Plain) (New) School 13.1550022.02 Primary School (Hilly/Rocky) (New) School 13.2750022.03 Upper Primary (Plain) (New) School 20.65500

22.04 Upper Primary School (Hilly/Rocky) (New) School 20.77500

22.04aComposite Schools for Urban Areas (Class I-

VIII)School 41.04000

22.05 ACR in lieu of upgraded Upper Primary School Rooms

22.06 Additional class rooms for adding Class VIII Rooms

22.07 Building Less (Pry) School 9.7500022.08 Building Less (UP) School 18.5900022.09 Dilapidated Building (Pry) School 9.7500022.10 Dilapidated Building (UP) School 18.59000

22.11 Additional Class Room (Rural) ( PS+UPS) Rooms 3.45000 5 17.250 5 17.25000

22.12 Additional Class Room (Urban) Rooms 3.4500022.13 Additional Class Room (Hill Area)22.14 Toilet/Urinals (PS & UPS) School 0.7000022.15 Separate Girls Toilet (Rural+Urban) School 0.70000 26 18.200 26 18.2000022.16 CWSN friendly Toilets School 0.50000

22.17 Drinking Water Facility (for Urban Area Only)) School 0.15000

22.17a Drinking Water Facility (Plain PS & UPS) School 0.15000 6 0.900 6 0.90000

22.17b Drinking Water Facility (Hilly/Rocky PS & UPS) School 0.15000

22.18a Boundary Wall PS (Total in Meters x .01105) 0.01749

22.18bBoundary Wall PS (For Gate) @Rs. 7000 x no. of

P.S.School 0.07800

22.18c Boundary Wall UPS (Total in Meters x .01105) 0.01749

22.18dBoundary Wall UPS (For Gate) @Rs. 7000 x no.

of UPSSchool 0.07800

22.19a Electrification in P.S./ Electrical Equipment School 0.11000

22.19b Electrification in U. P.S./ Electrical Equipment School 0.11000

22.20Office-cum-store-cum-Head Teacher's room

(Primary)Rooms

22.21Office-cum-store-cum-Head Teacher's room

(Upper Primary)Rooms

22.22Augumentation of training facility in BRC (one

time)BRC/ URC 5.00000

22.23 Child friendly Elements School 0.25000

22.24 Ramps with Handrails (Barrier Free Elements) School 0.06000

22.25 Handrails in existing Ramps School 0.01000

Arti:SSA-AWPB-2014-15-PABMinits:KanshiramNagar(Kasganj):16-06-2014 222 / 533

Page 223: U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 · 2015. 1. 6. · U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15

Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

Remarks

Outlay Recommendation for 2014-15

Spill OverDeferred laibility of

2014-15Fresh Recommended Total Recommended

Name of District : KanshiramNagar

(Kasganj) -45

S. No. ActivityPhysical

Unit

22.26 Whole School Develoipment School22.27 Retro-fitting and repairs School

22.28Residential Schools for specific category

of children

(a) Construction of Building including boundary

wall, Water and sanitation facilities, electric

installation (For 100 children)

Building 65.86000

(b) Construction of residential hostel Building 65.86000

(c) Refurnishing unused old buildings Building

22.29

Construction of Hostel in existing Govt UPS

including boundary wall, Water and sanitation

facilities, electric installation etc. (For 50

children)

7.00000

22.30Furniture for Govt. UPS (per child) (@ Rs.500/-

per child enrolled)Child 0.00500

22.31 Major Repairs for Primary School School 0.30000

22.32 Majr Repairs for Upper Primary School School 0.30000

22.33Others (Difference of Civil Wrks

sanctioned in pre.yr.)22.33a Others (Overhead Tank PS) School 0.1200022.33b Others (Overhead Tank UPS) School 0.12000

Sub Total (Civil WOrks) 37 36.350 37 36.35VII PROJECT MANAGEMENT COST23 Management23.01 Management up to 3.5%

(a) Project Management and MIS

(i) DPO ( Salary, Contigency, Consumables,

POL, TA & Computer etc)District 1 83.516 1 83.51580

(ii) EMIS Cell District 1 10.868 1 10.86750Sub Total (a) 1 1 1 94.383 1 94.383

(b) Training of Educational Administrators District

(c) School Mapping and Social Mapping District

Sub Total (23.01)

23.02Learning Enhancement Prog. (LEP) (P & UP) (up

to 2%)District 10.315 10.31540

23.03 Community Mobilization (up to 0.5%) District 1 21.000 1 21.00000

Sub Total (Management) 1 31.315 1 31.31540Total Management Cost 125.699 125.69870Total of SSA (Districs) 1.400 241932 4363.680 241932 4365.080

24 State Component23.01 Management23.02 REMS 0.0044923.03 SIEMAT

Sub Total

STATE SSA TOTAL 1.40000 241932 4363.680 241932 4365.08010

25

KGBV Financial Provision (give

separate costing sheets for different

Models)

Hostel

ANon Recurring One Time Grant (Only

committed liabilities) (Model-I)

25.01 Construction of Building (New)

25.02 Construction of Building KGBV sanctioned earlier 0.83800 0.83800

25.02(a) Additional Class Room Rooms 3.45000

25.02(b) Guard Room Rooms 1.32000

25.02(c) Boundary Wall School 5.0200025.03 Boudary Wall (Spillover only)

25.04

Boring/Handpump (Spillover only)

(minimum rates prescribed by State Drinking

Water Department subject to a ceiling of Rs.

1.00 lakhs)

4.00000 4.00000

25.05 Electricity /Water charges (Spillover only)

25.05(a) Solar Water Heater & Solar Light 2.97000

25.06Furniture/Equipment (including Kitchen

equipment)3.00000

25.07 TLM and equipment including library books 3.50000

25.08 Bedding (New) 0.75000

25.09 Replacement of Bedding (once in 3 Year) 0.75000 6 4.500 6 4.50000

Subtotal Non Recurring 4.83800 4.500 9.33800

B Recurring Cost Per Annum (Model-I)

25.10Maintenance per girl student per month @ Rs.

1500/-18.00000 8 144.000 8 144.00000

25.11 Stipend for girl student per month @ Rs. 100/- 1.20000 8 9.600 8 9.60000

25.12Supplementary TLM, stationery and other

educational material @ Rs.1000/- per annum1.00000 8 8.000 8 8.00000

25.13 Salaries

Arti:SSA-AWPB-2014-15-PABMinits:KanshiramNagar(Kasganj):16-06-2014 223 / 533

Page 224: U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 · 2015. 1. 6. · U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15

Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

Remarks

Outlay Recommendation for 2014-15

Spill OverDeferred laibility of

2014-15Fresh Recommended Total Recommended

Name of District : KanshiramNagar

(Kasganj) -45

S. No. ActivityPhysical

Unit

25.13.1 Additional Salaries:

(a) 1 Warden @ Rs. 25,000/- per month 3.00000 8 24.00000 8 24.00000

(b)4 Full time teachers as per RTE norms @ Rs.

20,000/- per month per teacher 9.60000 8 76.80000 8 76.80000

(c)

1 Urdu Teachers (only for blocks with muslim

population above 20% and select urban areas), if

required @ Rs. 12,000/- per month per teacher 1.44000 8 11.52000 8 11.52000

(d)3 part time teachers @ Rs. 5,000/- per month per

teacher 1.80000 8 14.40000 8 14.40000

(e)1 Full time Accountant @ Rs. 10,000/- per month

1.20000 8 9.60000 8 9.60000

(f)

2 Support Staff – (Accountant/ Assistant, Peon,

Chowkidar) @ Rs. 5,000/- per month per staff 1.20000 8 9.60000 8 9.60000

(g) 1 Head cook @ Rs. 6,000/- per month 0.72000 8 5.76000 8 5.76000

(h)2 Asstt. Cooks @ Rs. 4,500/- per month per cook

1.08000 8 8.64000 8 8.64000

25.14Specific skill training @ Rs.1000/- per child per

annum1.00000 8 8.000 8 8.00000

25.15Electricity/water charges @ Rs.1000/- per child

per annum1.00000 8 8.000 8 8.00000

25.16Medical care/contingencies @ Rs. 1250 per child

per annum1.25000 8 10.000 8 10.00000

25.17 Maintenance @ Rs.750/- per child per annum 0.75000 8 6.000 8 6.00000

25.18

Miscellaneous (Educational Tour/ Exposure Visit

/ Sports Material etc.) @ Rs.750/- per child per

annum

0.75000 8 6.000 8 6.00000

25.19Preparatory camps @ Rs.200/- per child per

annum0.20000 8 1.600 8 1.60000

25.20PTAs/school functions @ Rs.200/- per child per

annum0.20000 8 1.600 8 1.60000

25.21 Provision of Rent @ Rs.6000/- per annum 6.00000

25.21a Provision of Rent (6 months) 3.6000025.21b Provision of Rent (3 months) 1.8000025.21c Rent (Previous Year (2007-2012)

25.22 Capacity building 0.50000 8 4.000 8 4.00000

25.22(a)Physical/ Self Defence Training @ Rs.200/- per

child per annum0.20000 8 1.600 8 1.60000

Subtotal Recurring 8 368.720 8 368.72000

Subtotal (Model-I) 4.83800 8 373.220 8 378.05800

CNon Recurring One Time Grant (Only

committed liabilities) (Model-II)

25.23 Construction of Building (New)

25.24 Construction of Building KGBV sanctioned earlier

25.24(a) Additional Class Room Rooms 3.45000

25.24(b) Guard Room Rooms 1.32000

25.24(c) Boundary Wall School 5.0200025.25 Boudary Wall (Spillover only)25.26 Boring/Handpump (Spillover only)

25.27 Electricity /Water charges (Spillover only)

25.27(a) Solar Water Heater & Solar Light 2.97000

25.28Furniture/Equipment (including Kitchen

equipment)2.00000

25.29 TLM and equipment including library books 3.00000

25.30 Bedding (New) 0.37500

25.31 Replacement of Bedding (once in 3 Year) 0.37500

Subtotal Non Recurring

D Recurring Cost Per Annum (Model-II)

25.32Maintenance per girl student per month @ Rs.

1500/-9.00000

25.33 Stipend for girl student per month @ Rs. 100/- 0.60000

25.34Supplementary TLM, stationery and other

educational material @ Rs.1000/- per annum0.50000

25.35 Salaries(a) 1 Warden @ Rs. 25,000/- per month 3.00000

(b)3 Full time teachers as per RTE norms @ Rs.

20,000/- per month per teacher 7.20000

(c) 3 part time teachers @ Rs. 5,000/- per month per

teacher 1.80000

(d)1 Full time Accountant @ Rs. 10,000/- per month

1.20000

(e)

2 Support Staff – (Accountant/ Assistant, Peon,

Chowkidar) @ Rs. 5,000/- per month per staff 1.20000

Arti:SSA-AWPB-2014-15-PABMinits:KanshiramNagar(Kasganj):16-06-2014 224 / 533

Page 225: U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 · 2015. 1. 6. · U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15

Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

Remarks

Outlay Recommendation for 2014-15

Spill OverDeferred laibility of

2014-15Fresh Recommended Total Recommended

Name of District : KanshiramNagar

(Kasganj) -45

S. No. ActivityPhysical

Unit

(f) 1 Head cook @ Rs. 6,000/- per month 0.72000

(g)1 Asstt. Cooks @ Rs. 4,500/- per month per cook

0.54000

25.36Specific skill training @ Rs.1000/- per child per

annum0.50000

25.37Electricity/water charges @ Rs.1000/- per child

per annum0.50000

25.38Medical care/contingencies @ Rs. 1250 per child

per annum0.62500

25.39 Maintenance @ Rs.750/- per child per annum 0.37500

25.40

Miscellaneous (Educational Tour/ Exposure Visit

/ Sports Material etc.) @ Rs.750/- per child per

annum

0.37500

25.41Preparatory camps @ Rs.300/- per child per

annum0.15000

25.42PTAs/school functions @ Rs.300/- per child per

annum0.15000

25.43 Provision of Rent @ Rs.10000/- per annum 5.00000

25.43a Provision of Rent (6 months) 3.6000025.43b Provision of Rent (3 months) 1.8000025.43c Rent (Previous Year (2007-2012)25.44 Capacity building 0.25000

25.44(a)Physical/ Self Defence Training @ Rs.200/- per

child per annum0.10000

Subtotal Recurring

Subtotal (Model-II) Total (KGBV) 4.838 8 373.220 8 378.058

DISTRICT GRAND TOTAL (SSA+KGBV) 4.838 1.400 241940 4736.900 241940 4743.138

Arti:SSA-AWPB-2014-15-PABMinits:KanshiramNagar(Kasganj):16-06-2014 225 / 533

Page 226: U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 · 2015. 1. 6. · U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15

Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

I ACCESS

1 Opening of New Schools

1.01 Upgradation of EGS to PSCentres /

School1.02 New PS School

1.03 Upgradation of PS to UPS / New UPS School

1.04 Composite Schools (for Urban Areas) School

1.05Residential Schools for specific category children

(For 100 children)

1.06Residential Hostel (for specific category of

children) (For 50 children)

1.07 Integration of Class V with Primary Schools

1.08Integration of Class VIII with Upper Primary

Schools

2Residential Schools for specific category

of children (For 100 Children)

Total - Residential Schools (For 100

children)

3Residential Hostel for specific category of

children (For 50 Children)

Total - Residential Schools (For 50

children)4 Transport/Escort Facility

4.01

Children in remote habitations with sparse

populations where opening of schools is

unviable

Child 0.03000

4.02

Urban deprived children/children without adult

protection in urban areas where schools are not

opened because availability of land is a problem

Child 0.03000

Sub Total

5Special Training for mainstreaming of Out-

of-School Children

5.03 Non-Residential (Fresh)(a) 12 months Child 0.06000(b) 9 months 0.04500(c) 6 months

(i)Special Training (by Special Instructors-NRBC)-

(1-5) Child 0.03000 558 16.740 558 16.74000

(ii) Special Training (by Special Instructors-NRBC)-

(6-8) Child 0.03000 244 7.320 244 7.32000

(d) 3 months Child 0.01500Sub Total 802 24.060 802 24.06000

Total (Special Training) 802 24.060 802 24.0605(B) House Hold Survey (HHS)

5(B).01 House Hold Survey through SMCHouse

Hold0.00001

Sub TotalII RETENTION6 Free Text Book

6.01Free Text Book (PS) for Parishadiya & Aided

Primary Schools (Workbooks not included)Child 0.00120 106142 127.370 106142 127.37040

6.01a

Free Text Book (PS) for 25% children of Class-1

in Private Recognised Primary Schools of other

Boards (Workbooks not included)

Child 0.00150

6.02 Free Brail Books (PS) 0.00150 56 0.084 56 0.08400

6.03 Free Large Print Books (PS) 0.00150

6.04Free Text Book (UPS) (Workbooks not included)

(Including KGBV Girls)Child 0.00200 55757 111.514 55757 111.51400

6.05 Free Brail Books (UPS) 0.00250 19 0.048 19 0.04750

6.06 Free Large Print Books (PS) 0.00250Sub Total 161974 239.016 161974 239.016

7 Provision of 2 set of Uniforms

7.01 All Girls (Including KGBV Girls) Child 0.00400 119521 478.084 119521 478.08400

7.02 SC Boys Child 0.00400 41106 164.424 41106 164.42400

7.03 ST Boys Child 0.00400

7.04 BPL Boys Child 0.00400 38424 153.696 38424 153.69600

7.05

Free Uniform for 25% children of Class-1 in

Private Recognised Primary Schools of other

Boards

Child0.00400

Sub Total 199051 796.204 199051 796.2047(A) Fee Reimbursement

7(A).01

Fee Reimbursement for Admission of children of

Disadvantaged Group & Weaker Section upto

25% of seats in Class-1 of Private Unaided

Recognised Schools

Child 0.05400

Sub Total

8 Teaching Learning Equipment (TLE)

8.01 TLE - New Primary School 1.20000 0.20000 1.200008.02 TLE - New Upper Primary School 3.00000 0.50000 3.00000

Name of District : KanpurNagar -44

ActivityS. No.Physical

UnitRemarks

Outlay Recommendation for 2014-15

Spill OverDeferred laibility of

2014-15Fresh Recommended Total Recommended

Arti:SSA-AWPB-2014-15-PABMinits:KanpurNagar:16-06-2014 226 / 533

Page 227: U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 · 2015. 1. 6. · U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15

Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

Name of District : KanpurNagar -44

ActivityS. No.Physical

UnitRemarks

Outlay Recommendation for 2014-15

Spill OverDeferred laibility of

2014-15Fresh Recommended Total Recommended

Sub Total 4.20000 4.20000III ENHANCING QUALITY9 New Teachers Salary

9.01 Primary Teachers (Regular) (Asstt. Teacher) Teacher 0.91500

9.01aHead Teacher for Primary (if the number of

children exceeds 150 in a school)Teacher

9.02 Primary Teachers (Contract) (S.M.) Teacher

9.03Subject specific Upper Primary Teachers

(Regular) (a) Science and Mathematics Teacher 1.26000(b) Social Studies Teacher 1.26000(c) Languages Teacher 1.26000

Sub Total (9.01 to 9.05)Add.Teacher against PTR

Sub Total (9.06 to 9.12)

Total (New Teacher's Salary-9.01 to 9.12)

Teachers Salary (Recurring-sanctioned

earlier)Primary teachers

9.13 Primary Teachers ( Regular)-Existing, in position Teacher 3.66000 631 2309.460 631 2309.46000

9.14Primary Teachers (Contract)-Existing, in

positionTeacher 0.55000

9.14(a) Primary Teachers (Contract)-under Training Teacher 0.38500 1720 662.200 1720 662.20000

9.14(b)Primary Teacher (Para Teachers Equal to

9.14(a) upgraded as Teachers)0.38500 803 309.155 803 309.15500

9.14(c) Primary Teachers (Para)- Vacant Teacher9.15 Primary Teachers (Vacant) Teacher 0.30500

9.16Head Teacher for Primary (if the number of

children exceeds 150)Teacher 5.04000 281 1416.240 281 1416.24000

9.16(b)Head Teacher for Primary (if the number of

children exceeds 150) VacantTeacher 0.42000

Additional teachers

9.17Additional Teachers - PS (Special BTC-

Regular) in positionTeacher 0.30500

9.18Additional Teachers - PS (Special BTC Under

Training)Teacher 0.87600

9.19 Additional Teachers - PS (Vacant) Teacher

9.20Others in position (Para Teachers upgraded

as Teachers)Teacher

Upper Primary teachers

9.21 UP Teachers (Regular)-Existing Teacher 5.04000 701 3533.040 701 3533.04000

9.22 UP Teachers (Contract)-Existing9.23 UP Teachers (Vacant) Teacher 1.26000

9.24Head Teacher for Upper Primary (if the number

of children exceeds 100)-ExistingTeacher 5.34000 170 907.800 170 907.80000

9.24a Head Teacher for Upper Primary (Vacant) Teacher 1.33500

9.25Subject specific Upper Primary Teachers

(Regular)(a) Science and Mathematics(b) Social Studies(c) Languages

9.32 Part Time Instructors in position(a) Art Education 0.77000 85 65.450 85 65.45000(b) Health and Physical Education 0.77000 89 68.530 89 68.53000(c) Work Education 0.77000 61 46.970 61 46.97000

9.32(A) Part Time Instructors Vacant(a) Art Education 0.42000(b) Health and Physical Education 0.42000(c) Work Education 0.42000

9.33

Others-Incentive to Teachers in Schools

Located in Naxal Affected Areas (@

Rs.1500/- per teachers per month)

Sub Total (9.13 to 9.33) 4541 9318.845 4541 9318.85TOTAL

(New Teachers Salary +Teachers Salary

Recurring)

4541 9318.845 4541 9318.84500

10 Teachers Training(a) Teachers

10.01

Refresher In-service Teachers' Training at BRC

level and above - 10 days (@ Rs.200/- per

head per day)

Teacher

(Target &

Ach.-13-14

in

Mandays)

0.00600

10.01(a)Continuous and Comprehensive Evauation [PS +

UPS)Teacher 0.01300 1633 21.229 1633 21.22900

10.01(b) Eary Reading and Numeracy Skills [PS] Teacher 0.00500 1633 8.165 1633 8.16500

10.01(c) Science [UPS] Teacher 0.00800 818 6.544 818 6.54400Recommended as

proposed

10.01(d) CWSN Teacher 0.00400

Arti:SSA-AWPB-2014-15-PABMinits:KanpurNagar:16-06-2014 227 / 533

Page 228: U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 · 2015. 1. 6. · U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15

Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

Name of District : KanpurNagar -44

ActivityS. No.Physical

UnitRemarks

Outlay Recommendation for 2014-15

Spill OverDeferred laibility of

2014-15Fresh Recommended Total Recommended

10.02

One day monthly cluster level meetings and

peer group training sessions for 10 months for

all teachers each year at CRC level - 10 days (@

Rs.100/- per head per day)

Teacher 0.01000

10.03(a)

Induction Training for Newly Recruited Teachers

for 6 Months (Special BTC)- @Rs.2000/- per

head per year

Teacher 0.02000

10.03(b)5 Days Training for Part Time Instructors @ Rs.

200/- per head per day) Teacher 0.01000

10.04

Training of untrained Teachers to acquire

professional qualifications over a two year

period.

Teacher 0.04700 1251 58.797 1251 58.79700

(b) Head Teachers

10.05Refresher Residencial In-service for 10 days at

BRC level and above

Head

Teacher(c) Resource Persons

10.06

Refresher Training for all Resource

Persons,Master Trainers, BRC & CRC faculty

and Coordinators for 5 days each year (@

Rs.200/- per head per day)

Resource

Person 0.00300 132 0.396 132 0.39600

Sub Total 5467 95.131 5467 95.131

11Academic Support through Block Resource

Centre (BRC)/ URC

11.01 Salary of Faculty and Staff

(a) 5 RPs at BRC for subject specific training in

positionRP 55 55

(b) 2 RPs for CWSN in position RP(b-i) 1 CWSN Resource Person RP 1.10000 22 24.200 22 24.20000

(b-ii) 1 Physiotherapist (Resource person for IE) RP

(c) 1 MIS Coordinator in position RP 1.86000

(d) 1 Datra Entry Operator in position RP 1.74000 8 13.920 8 13.92000

(e) 1 Accountant-cum-support staff in position RP 1.80000 10 18.000 10 18.00000

11.02 Furniture Grant BRC/ URC 1.00000

11.03Replacement of furniture, computer, TLE etc (

Once in 5 years)BRC/ URC 1.00000

11.04 Contingency Grant BRC/ URC 0.50000 11 5.500 11 5.50000

11.05 Meeting, TA BRC/ URC 0.30000 11 3.300 11 3.30000

11.06 TLM Grant BRC/ URC 0.10000

11.07 Maintenance Grant BRC/ URC 0.10000

Sub Total 11 64.920 11 64.92000

12Academic Support through Cluster

Resource Centres (CRC/UERC)

12.01Salary of Cluster Coordinator (on an average of

one Resource Person per 18 schools in a block)RP

12.02 Furniture GrantCRC/

UERC0.10000

12.03Replacement of furniture, computer, TLE etc.

once in 5 years

CRC/

UERC0.10000

12.04 Contingency Grant CRC/UERC 0.10000 97 9.700 97 9.70000

12.05 Meeting, TA CRC/UERC 0.12000 97 11.640 97 11.64000

12.06 TLM Grant CRC/UERC 0.03000

12.07Maintenance Grant

CRC/UERC 0.02000

Sub Total 194 21.340 194 21.34000

13Computer Aided Education in upper

primary schools under Innovation

13.01Computer Aided Education in upper primary

schoolsDistrict 0.01200 48 0.576 48 0.57600

Sub Total 48 0.576 48 0.5760014 Libraries in Schools14.01 (a) Primary School (per school) School 0.03000

14.02 (b) Upper Primary School (per school) School 0.10000

Sub TotalIV ANNUAL GRANTS15 Teachers' Grant15.01 Primary Teachers Teacher 0.0050015.02 Upper Primary Teachers Teacher 0.00500 818 4.090 818 4.09000

Sub Total 818 4.090 818 4.0900016 School Grant16.01 Primary School School 0.05000 1655 82.750 1655 82.7500016.02 Upper Primary School School 0.07000 821 57.470 821 57.47000

Sub Total 2476 140.220 2476 140.22000

Arti:SSA-AWPB-2014-15-PABMinits:KanpurNagar:16-06-2014 228 / 533

Page 229: U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 · 2015. 1. 6. · U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15

Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

Name of District : KanpurNagar -44

ActivityS. No.Physical

UnitRemarks

Outlay Recommendation for 2014-15

Spill OverDeferred laibility of

2014-15Fresh Recommended Total Recommended

17Research, Evaluation, Monitoring &

Supervision

17.01 REMS Activities School 0.00103 2476 2.547 2476 2.54684

17.02 Monitoring & Supervision School 0.00078 2476 1.941 2476 1.94135

17.03 House Hold Survey (Urban) in Million Plus Cities District 35.00000

Sub Total 4952 4.488 4952 4.4881918 Maintenance Grant

18.01 Maintenance in School having upto3 Classrooms School 0.07500 835 62.625 835 62.62500

18.01a Maintenance Grant School 0.07500 1396 104.700 1396 104.70000Sub Total 2231 167.325 2231 167.32500

VBRIDGING GENDER AND SOCIAL

CATEGORY GAPS

19 Interventions for CWSN (IE)

19.01 Provision for Inclusive Education Child 0.01100 5646 62.106 5646 62.10600

Sub Total 5646 62.106 5646 62.10600

20Innovativation Head up to Rs.50 Lakh per

district

20.01 Girls Education District 0.70000 8 5.600 8 5.60000

20.02 ECCE District20.03 Intervention for SC / ST children District

20.04 Intervention for Minority Community children District

20.05 Intervention for Urban Deprived children District 10.00000

Sub Total 8 5.600 8 5.6000021 SMC/PRI Training

21.01Residential for 6 Resource Person per Block (3

days) (@ Rs.500/-)Blocks 0.09000

21.02Non-residential (3 days training of 6 SMC

members) (@ Rs.100/-)SMC 0.01800 2226 40.068 2226 40.06800

21.02(a)Non-residential (3 days training of 3 Members of

PRI/VECs/LA) (@ Rs.100/-)VEC/ WEC 0.00900

21.03

Seminar/Orientation of SMC Women members

and President/Vice President (@ Rs. 50,000/-

per block)

Blocks 0.50000

Sub Total 2226 40.068 2226 40.06800VI SCHOOL INFRASTRUCTURE22 Civil Works22.01 Primary School (Plain) (New) School 13.1550022.02 Primary School (Hilly/Rocky) (New) School 13.2750022.03 Upper Primary (Plain) (New) School 20.65500

22.04 Upper Primary School (Hilly/Rocky) (New) School 20.77500

22.04aComposite Schools for Urban Areas (Class I-

VIII)School 41.04000

22.05 ACR in lieu of upgraded Upper Primary School Rooms

22.06 Additional class rooms for adding Class VIII Rooms

22.07 Building Less (Pry) School 9.7500022.08 Building Less (UP) School 18.5900022.09 Dilapidated Building (Pry) School 9.7500022.10 Dilapidated Building (UP) School 18.59000

22.11 Additional Class Room (Rural) ( PS+UPS) Rooms 3.45000 69 238.050 69 238.05000

22.12 Additional Class Room (Urban) Rooms 3.45000 1 3.450 1 3.4500022.13 Additional Class Room (Hill Area)22.14 Toilet/Urinals (PS & UPS) School 0.70000 52 36.400 52 36.4000022.15 Separate Girls Toilet (Rural+Urban) School 0.7000022.16 CWSN friendly Toilets School 0.50000

22.17 Drinking Water Facility (for Urban Area Only)) School 0.15000

22.17a Drinking Water Facility (Plain PS & UPS) School 0.15000

22.17b Drinking Water Facility (Hilly/Rocky PS & UPS) School 0.15000

22.18a Boundary Wall PS (Total in Meters x .01105) 0.01749

22.18bBoundary Wall PS (For Gate) @Rs. 7000 x no. of

P.S.School 0.07800

22.18c Boundary Wall UPS (Total in Meters x .01105) 0.01749

22.18dBoundary Wall UPS (For Gate) @Rs. 7000 x no.

of UPSSchool 0.07800

22.19a Electrification in P.S./ Electrical Equipment School 0.11000

22.19b Electrification in U. P.S./ Electrical Equipment School 0.11000

22.20Office-cum-store-cum-Head Teacher's room

(Primary)Rooms

22.21Office-cum-store-cum-Head Teacher's room

(Upper Primary)Rooms

22.22Augumentation of training facility in BRC (one

time)BRC/ URC 5.00000

22.23 Child friendly Elements School 0.25000

22.24 Ramps with Handrails (Barrier Free Elements) School 0.06000

22.25 Handrails in existing Ramps School 0.01000

Arti:SSA-AWPB-2014-15-PABMinits:KanpurNagar:16-06-2014 229 / 533

Page 230: U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 · 2015. 1. 6. · U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15

Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

Name of District : KanpurNagar -44

ActivityS. No.Physical

UnitRemarks

Outlay Recommendation for 2014-15

Spill OverDeferred laibility of

2014-15Fresh Recommended Total Recommended

22.26 Whole School Develoipment School22.27 Retro-fitting and repairs School

22.28Residential Schools for specific category

of children

(a) Construction of Building including boundary

wall, Water and sanitation facilities, electric

installation (For 100 children)

Building 65.86000

(b) Construction of residential hostel Building 65.86000

(c) Refurnishing unused old buildings Building

22.29

Construction of Hostel in existing Govt UPS

including boundary wall, Water and sanitation

facilities, electric installation etc. (For 50

children)

7.00000

22.30Furniture for Govt. UPS (per child) (@ Rs.500/-

per child enrolled)Child 0.00500

22.31 Major Repairs for Primary School School 0.30000

22.32 Majr Repairs for Upper Primary School School 0.30000

22.33Others (Difference of Civil Wrks

sanctioned in pre.yr.)22.33a Others (Overhead Tank PS) School 0.1200022.33b Others (Overhead Tank UPS) School 0.12000

Sub Total (Civil WOrks) 122 277.900 122 277.90VII PROJECT MANAGEMENT COST23 Management23.01 Management up to 3.5%

(a) Project Management and MIS

(i) DPO ( Salary, Contigency, Consumables,

POL, TA & Computer etc)District 1 102.199 1 102.19880

(ii) EMIS Cell District 1 18.379 1 18.37850Sub Total (a) 1 1 1 120.577 1 120.577

(b) Training of Educational Administrators District

(c) School Mapping and Social Mapping District

Sub Total (23.01)

23.02Learning Enhancement Prog. (LEP) (P & UP) (up

to 2%)District 16.370 16.36995

23.03 Community Mobilization (up to 0.5%) District 1 45.850 1 45.85000

Sub Total (Management) 1 62.220 1 62.21995Total Management Cost 182.797 182.79725Total of SSA (Districs) 4.200 390567 11444.686 390567 11448.886

24 State Component23.01 Management23.02 REMS 0.0044923.03 SIEMAT

Sub Total

STATE SSA TOTAL 4.20000 390567 11444.686 390567 11448.88634

25

KGBV Financial Provision (give

separate costing sheets for different

Models)

Hostel

ANon Recurring One Time Grant (Only

committed liabilities) (Model-I)

25.01 Construction of Building (New)

25.02 Construction of Building KGBV sanctioned earlier

25.02(a) Additional Class Room Rooms 3.45000

25.02(b) Guard Room Rooms 1.32000

25.02(c) Boundary Wall School 5.0200025.03 Boudary Wall (Spillover only)

25.04

Boring/Handpump (Spillover only)

(minimum rates prescribed by State Drinking

Water Department subject to a ceiling of Rs.

1.00 lakhs)

25.05 Electricity /Water charges (Spillover only)

25.05(a) Solar Water Heater & Solar Light 2.97000

25.06Furniture/Equipment (including Kitchen

equipment)3.00000

25.07 TLM and equipment including library books 3.50000

25.08 Bedding (New) 0.75000

25.09 Replacement of Bedding (once in 3 Year) 0.75000

Subtotal Non Recurring

B Recurring Cost Per Annum (Model-I)

25.10Maintenance per girl student per month @ Rs.

1500/-18.00000

25.11 Stipend for girl student per month @ Rs. 100/- 1.20000

25.12Supplementary TLM, stationery and other

educational material @ Rs.1000/- per annum1.00000

25.13 Salaries

Arti:SSA-AWPB-2014-15-PABMinits:KanpurNagar:16-06-2014 230 / 533

Page 231: U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 · 2015. 1. 6. · U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15

Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

Name of District : KanpurNagar -44

ActivityS. No.Physical

UnitRemarks

Outlay Recommendation for 2014-15

Spill OverDeferred laibility of

2014-15Fresh Recommended Total Recommended

25.13.1 Additional Salaries:

(a) 1 Warden @ Rs. 25,000/- per month 3.00000

(b)4 Full time teachers as per RTE norms @ Rs.

20,000/- per month per teacher 9.60000

(c)

1 Urdu Teachers (only for blocks with muslim

population above 20% and select urban areas), if

required @ Rs. 12,000/- per month per teacher 1.44000

(d)3 part time teachers @ Rs. 5,000/- per month per

teacher 1.80000

(e)1 Full time Accountant @ Rs. 10,000/- per month

1.20000

(f)

2 Support Staff – (Accountant/ Assistant, Peon,

Chowkidar) @ Rs. 5,000/- per month per staff 1.20000

(g) 1 Head cook @ Rs. 6,000/- per month 0.72000

(h)2 Asstt. Cooks @ Rs. 4,500/- per month per cook

1.08000

25.14Specific skill training @ Rs.1000/- per child per

annum1.00000

25.15Electricity/water charges @ Rs.1000/- per child

per annum1.00000

25.16Medical care/contingencies @ Rs. 1250 per child

per annum1.25000

25.17 Maintenance @ Rs.750/- per child per annum 0.75000

25.18

Miscellaneous (Educational Tour/ Exposure Visit

/ Sports Material etc.) @ Rs.750/- per child per

annum

0.75000

25.19Preparatory camps @ Rs.200/- per child per

annum0.20000

25.20PTAs/school functions @ Rs.200/- per child per

annum0.20000

25.21 Provision of Rent @ Rs.6000/- per annum 6.00000

25.21a Provision of Rent (6 months) 3.6000025.21b Provision of Rent (3 months) 1.8000025.21c Rent (Previous Year (2007-2012)

25.22 Capacity building 0.50000

25.22(a)Physical/ Self Defence Training @ Rs.200/- per

child per annum0.20000

Subtotal Recurring

Subtotal (Model-I)

CNon Recurring One Time Grant (Only

committed liabilities) (Model-II)

25.23 Construction of Building (New)

25.24 Construction of Building KGBV sanctioned earlier

25.24(a) Additional Class Room Rooms 3.45000

25.24(b) Guard Room Rooms 1.32000

25.24(c) Boundary Wall School 5.0200025.25 Boudary Wall (Spillover only)25.26 Boring/Handpump (Spillover only)

25.27 Electricity /Water charges (Spillover only)

25.27(a) Solar Water Heater & Solar Light 2.97000

25.28Furniture/Equipment (including Kitchen

equipment)2.00000

25.29 TLM and equipment including library books 3.00000

25.30 Bedding (New) 0.37500

25.31 Replacement of Bedding (once in 3 Year) 0.37500

Subtotal Non Recurring

D Recurring Cost Per Annum (Model-II)

25.32Maintenance per girl student per month @ Rs.

1500/-9.00000

25.33 Stipend for girl student per month @ Rs. 100/- 0.60000

25.34Supplementary TLM, stationery and other

educational material @ Rs.1000/- per annum0.50000

25.35 Salaries(a) 1 Warden @ Rs. 25,000/- per month 3.00000

(b)3 Full time teachers as per RTE norms @ Rs.

20,000/- per month per teacher 7.20000

(c) 3 part time teachers @ Rs. 5,000/- per month per

teacher 1.80000

(d)1 Full time Accountant @ Rs. 10,000/- per month

1.20000

(e)

2 Support Staff – (Accountant/ Assistant, Peon,

Chowkidar) @ Rs. 5,000/- per month per staff 1.20000

Arti:SSA-AWPB-2014-15-PABMinits:KanpurNagar:16-06-2014 231 / 533

Page 232: U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 · 2015. 1. 6. · U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15

Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

Name of District : KanpurNagar -44

ActivityS. No.Physical

UnitRemarks

Outlay Recommendation for 2014-15

Spill OverDeferred laibility of

2014-15Fresh Recommended Total Recommended

(f) 1 Head cook @ Rs. 6,000/- per month 0.72000

(g)1 Asstt. Cooks @ Rs. 4,500/- per month per cook

0.54000

25.36Specific skill training @ Rs.1000/- per child per

annum0.50000

25.37Electricity/water charges @ Rs.1000/- per child

per annum0.50000

25.38Medical care/contingencies @ Rs. 1250 per child

per annum0.62500

25.39 Maintenance @ Rs.750/- per child per annum 0.37500

25.40

Miscellaneous (Educational Tour/ Exposure Visit

/ Sports Material etc.) @ Rs.750/- per child per

annum

0.37500

25.41Preparatory camps @ Rs.300/- per child per

annum0.15000

25.42PTAs/school functions @ Rs.300/- per child per

annum0.15000

25.43 Provision of Rent @ Rs.10000/- per annum 5.00000

25.43a Provision of Rent (6 months) 3.6000025.43b Provision of Rent (3 months) 1.8000025.43c Rent (Previous Year (2007-2012)25.44 Capacity building 0.25000

25.44(a)Physical/ Self Defence Training @ Rs.200/- per

child per annum0.10000

Subtotal Recurring

Subtotal (Model-II) Total (KGBV)

DISTRICT GRAND TOTAL (SSA+KGBV) 4.200 390567 11444.686 390567 11448.886

Arti:SSA-AWPB-2014-15-PABMinits:KanpurNagar:16-06-2014 232 / 533

Page 233: U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 · 2015. 1. 6. · U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15

Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

I ACCESS

1 Opening of New Schools

1.01 Upgradation of EGS to PSCentres /

School1.02 New PS School

1.03 Upgradation of PS to UPS / New UPS School

1.04 Composite Schools (for Urban Areas) School

1.05Residential Schools for specific category children

(For 100 children)

1.06Residential Hostel (for specific category of

children) (For 50 children)

1.07 Integration of Class V with Primary Schools

1.08Integration of Class VIII with Upper Primary

Schools

2Residential Schools for specific category

of children (For 100 Children)

Total - Residential Schools (For 100

children)

3Residential Hostel for specific category of

children (For 50 Children)

Total - Residential Schools (For 50

children)4 Transport/Escort Facility

4.01

Children in remote habitations with sparse

populations where opening of schools is

unviable

Child 0.03000

4.02

Urban deprived children/children without adult

protection in urban areas where schools are not

opened because availability of land is a problem

Child 0.03000

Sub Total

5Special Training for mainstreaming of Out-

of-School Children

5.03 Non-Residential (Fresh)(a) 12 months Child 0.06000(b) 9 months 0.04500(c) 6 months

(i)Special Training (by Special Instructors-NRBC)-

(1-5) Child 0.03000 35 1.050 35 1.05000

(ii) Special Training (by Special Instructors-NRBC)-

(6-8) Child 0.03000 32 0.960 32 0.96000

(d) 3 months Child 0.01500Sub Total 67 2.010 67 2.01000

Total (Special Training) 67 2.010 67 2.0105(B) House Hold Survey (HHS)

5(B).01 House Hold Survey through SMCHouse

Hold0.00001

Sub TotalII RETENTION6 Free Text Book

6.01Free Text Book (PS) for Parishadiya & Aided

Primary Schools (Workbooks not included)Child 0.00120 87494 104.993 87494 104.99280

6.01a

Free Text Book (PS) for 25% children of Class-1

in Private Recognised Primary Schools of other

Boards (Workbooks not included)

Child 0.00150

6.02 Free Brail Books (PS) 0.00150

6.03 Free Large Print Books (PS) 0.00150

6.04Free Text Book (UPS) (Workbooks not included)

(Including KGBV Girls)Child 0.00200 39493 78.986 39493 78.98600

6.05 Free Brail Books (UPS) 0.00250

6.06 Free Large Print Books (PS) 0.00250Sub Total 126987 183.979 126987 183.979

7 Provision of 2 set of Uniforms

7.01 All Girls (Including KGBV Girls) Child 0.00400 91647 366.588 91647 366.58800

7.02 SC Boys Child 0.00400 35540 142.160 35540 142.16000

7.03 ST Boys Child 0.00400

7.04 BPL Boys Child 0.00400 46251 185.004 46251 185.00400

7.05

Free Uniform for 25% children of Class-1 in

Private Recognised Primary Schools of other

Boards

Child0.00400

Sub Total 173438 693.752 173438 693.7527(A) Fee Reimbursement

7(A).01

Fee Reimbursement for Admission of children of

Disadvantaged Group & Weaker Section upto

25% of seats in Class-1 of Private Unaided

Recognised Schools

Child 0.05400

Sub Total

8 Teaching Learning Equipment (TLE)

8.01 TLE - New Primary School 0.30000 0.20000 0.300008.02 TLE - New Upper Primary School 1.50000 0.50000 1.50000

Name of District : (KanpurDehat)

Ramabai Nagar -43

ActivityS. No.Physical

UnitRemarks

Outlay Recommendation for 2014-15

Spill OverDeferred laibility of

2014-15Fresh Recommended Total Recommended

Arti:SSA-AWPB-2014-15-PABMinits:KanpurDehat(RamabaiNagar):16-06-2014 233 / 533

Page 234: U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 · 2015. 1. 6. · U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15

Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

Name of District : (KanpurDehat)

Ramabai Nagar -43

ActivityS. No.Physical

UnitRemarks

Outlay Recommendation for 2014-15

Spill OverDeferred laibility of

2014-15Fresh Recommended Total Recommended

Sub Total 1.80000 1.80000III ENHANCING QUALITY9 New Teachers Salary

9.01 Primary Teachers (Regular) (Asstt. Teacher) Teacher 0.91500

9.01aHead Teacher for Primary (if the number of

children exceeds 150 in a school)Teacher

9.02 Primary Teachers (Contract) (S.M.) Teacher

9.03Subject specific Upper Primary Teachers

(Regular) (a) Science and Mathematics Teacher 1.26000(b) Social Studies Teacher 1.26000(c) Languages Teacher 1.26000

Sub Total (9.01 to 9.05)Add.Teacher against PTR

Sub Total (9.06 to 9.12)

Total (New Teacher's Salary-9.01 to 9.12)

Teachers Salary (Recurring-sanctioned

earlier)Primary teachers

9.13 Primary Teachers ( Regular)-Existing, in position Teacher 3.66000 444 1625.040 444 1625.04000

9.14Primary Teachers (Contract)-Existing, in

positionTeacher 0.55000

9.14(a) Primary Teachers (Contract)-under Training Teacher 0.38500 1348 518.980 1348 518.98000

9.14(b)Primary Teacher (Para Teachers Equal to

9.14(a) upgraded as Teachers)0.38500 684 263.340 684 263.34000

9.14(c) Primary Teachers (Para)- Vacant Teacher9.15 Primary Teachers (Vacant) Teacher 0.30500

9.16Head Teacher for Primary (if the number of

children exceeds 150)Teacher 5.04000 339 1708.560 339 1708.56000

9.16(b)Head Teacher for Primary (if the number of

children exceeds 150) VacantTeacher 0.42000

Additional teachers

9.17Additional Teachers - PS (Special BTC-

Regular) in positionTeacher 0.30500

9.18Additional Teachers - PS (Special BTC Under

Training)Teacher 0.87600

9.19 Additional Teachers - PS (Vacant) Teacher

9.20Others in position (Para Teachers upgraded

as Teachers)Teacher

Upper Primary teachers

9.21 UP Teachers (Regular)-Existing Teacher 5.04000 787 3966.480 787 3966.48000

9.22 UP Teachers (Contract)-Existing9.23 UP Teachers (Vacant) Teacher 1.26000

9.24Head Teacher for Upper Primary (if the number

of children exceeds 100)-ExistingTeacher 5.34000 163 870.420 163 870.42000

9.24a Head Teacher for Upper Primary (Vacant) Teacher 1.33500

9.25Subject specific Upper Primary Teachers

(Regular)(a) Science and Mathematics(b) Social Studies(c) Languages

9.32 Part Time Instructors in position(a) Art Education 0.77000 123 94.710 123 94.71000(b) Health and Physical Education 0.77000 138 106.260 138 106.26000(c) Work Education 0.77000 81 62.370 81 62.37000

9.32(A) Part Time Instructors Vacant(a) Art Education 0.42000(b) Health and Physical Education 0.42000(c) Work Education 0.42000

9.33

Others-Incentive to Teachers in Schools

Located in Naxal Affected Areas (@

Rs.1500/- per teachers per month)

Sub Total (9.13 to 9.33) 4107 9216.160 4107 9216.16TOTAL

(New Teachers Salary +Teachers Salary

Recurring)

4107 9216.160 4107 9216.16000

10 Teachers Training(a) Teachers

10.01

Refresher In-service Teachers' Training at BRC

level and above - 10 days (@ Rs.200/- per

head per day)

Teacher

(Target &

Ach.-13-14

in

Mandays)

0.00600

10.01(a)Continuous and Comprehensive Evauation [PS +

UPS)Teacher 0.01300 1555 20.215 1555 20.21500

10.01(b) Eary Reading and Numeracy Skills [PS] Teacher 0.00500 1555 7.775 1555 7.77500

10.01(c) Science [UPS] Teacher 0.00800 775 6.200 775 6.20000Recommended as

proposed

10.01(d) CWSN Teacher 0.00400

Arti:SSA-AWPB-2014-15-PABMinits:KanpurDehat(RamabaiNagar):16-06-2014 234 / 533

Page 235: U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 · 2015. 1. 6. · U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15

Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

Name of District : (KanpurDehat)

Ramabai Nagar -43

ActivityS. No.Physical

UnitRemarks

Outlay Recommendation for 2014-15

Spill OverDeferred laibility of

2014-15Fresh Recommended Total Recommended

10.02

One day monthly cluster level meetings and

peer group training sessions for 10 months for

all teachers each year at CRC level - 10 days (@

Rs.100/- per head per day)

Teacher 0.01000

10.03(a)

Induction Training for Newly Recruited Teachers

for 6 Months (Special BTC)- @Rs.2000/- per

head per year

Teacher 0.02000

10.03(b)5 Days Training for Part Time Instructors @ Rs.

200/- per head per day) Teacher 0.01000

10.04

Training of untrained Teachers to acquire

professional qualifications over a two year

period.

Teacher 0.04700 681 32.007 681 32.00700

(b) Head Teachers

10.05Refresher Residencial In-service for 10 days at

BRC level and above

Head

Teacher(c) Resource Persons

10.06

Refresher Training for all Resource

Persons,Master Trainers, BRC & CRC faculty

and Coordinators for 5 days each year (@

Rs.200/- per head per day)

Resource

Person 0.00300 120 0.360 120 0.36000

Sub Total 4686 66.557 4686 66.557

11Academic Support through Block Resource

Centre (BRC)/ URC

11.01 Salary of Faculty and Staff

(a) 5 RPs at BRC for subject specific training in

positionRP 50 50

(b) 2 RPs for CWSN in position RP(b-i) 1 CWSN Resource Person RP 1.10000 20 22.000 20 22.00000

(b-ii) 1 Physiotherapist (Resource person for IE) RP

(c) 1 MIS Coordinator in position RP 1.86000

(d) 1 Datra Entry Operator in position RP 1.74000 5 8.700 5 8.70000

(e) 1 Accountant-cum-support staff in position RP 1.80000

11.02 Furniture Grant BRC/ URC 1.00000

11.03Replacement of furniture, computer, TLE etc (

Once in 5 years)BRC/ URC 1.00000

11.04 Contingency Grant BRC/ URC 0.50000 10 5.000 10 5.00000

11.05 Meeting, TA BRC/ URC 0.30000 10 3.000 10 3.00000

11.06 TLM Grant BRC/ URC 0.10000

11.07 Maintenance Grant BRC/ URC 0.10000

Sub Total 10 38.700 10 38.70000

12Academic Support through Cluster

Resource Centres (CRC/UERC)

12.01Salary of Cluster Coordinator (on an average of

one Resource Person per 18 schools in a block)RP

12.02 Furniture GrantCRC/

UERC0.10000

12.03Replacement of furniture, computer, TLE etc.

once in 5 years

CRC/

UERC0.10000

12.04 Contingency Grant CRC/UERC 0.10000 110 11.000 110 11.00000

12.05 Meeting, TA CRC/UERC 0.12000 110 13.200 110 13.20000

12.06 TLM Grant CRC/UERC 0.03000

12.07Maintenance Grant

CRC/UERC 0.02000

Sub Total 220 24.200 220 24.20000

13Computer Aided Education in upper

primary schools under Innovation

13.01Computer Aided Education in upper primary

schoolsDistrict 0.01200 48 0.576 48 0.57600

Sub Total 48 0.576 48 0.5760014 Libraries in Schools14.01 (a) Primary School (per school) School 0.03000

14.02 (b) Upper Primary School (per school) School 0.10000

Sub TotalIV ANNUAL GRANTS15 Teachers' Grant15.01 Primary Teachers Teacher 0.0050015.02 Upper Primary Teachers Teacher 0.00500 775 3.875 775 3.87500

Sub Total 775 3.875 775 3.8750016 School Grant16.01 Primary School School 0.05000 1612 80.600 1612 80.6000016.02 Upper Primary School School 0.07000 775 54.250 775 54.25000

Sub Total 2387 134.850 2387 134.85000

Arti:SSA-AWPB-2014-15-PABMinits:KanpurDehat(RamabaiNagar):16-06-2014 235 / 533

Page 236: U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 · 2015. 1. 6. · U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15

Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

Name of District : (KanpurDehat)

Ramabai Nagar -43

ActivityS. No.Physical

UnitRemarks

Outlay Recommendation for 2014-15

Spill OverDeferred laibility of

2014-15Fresh Recommended Total Recommended

17Research, Evaluation, Monitoring &

Supervision

17.01 REMS Activities School 0.00103 2387 2.455 2387 2.45530

17.02 Monitoring & Supervision School 0.00078 2387 1.872 2387 1.87157

17.03 House Hold Survey (Urban) in Million Plus Cities District 35.00000

Sub Total 4774 4.327 4774 4.3268718 Maintenance Grant

18.01 Maintenance in School having upto3 Classrooms School 0.07500 999 74.925 999 74.92500

18.01a Maintenance Grant School 0.07500 1289 96.675 1289 96.67500Sub Total 2288 171.600 2288 171.60000

VBRIDGING GENDER AND SOCIAL

CATEGORY GAPS

19 Interventions for CWSN (IE)

19.01 Provision for Inclusive Education Child 0.03000 772 23.160 772 23.16000

Sub Total 772 23.160 772 23.16000

20Innovativation Head up to Rs.50 Lakh per

district

20.01 Girls Education District 0.70000 7 4.900 7 4.90000

20.02 ECCE District20.03 Intervention for SC / ST children District

20.04 Intervention for Minority Community children District

20.05 Intervention for Urban Deprived children District 10.00000

Sub Total 7 4.900 7 4.9000021 SMC/PRI Training

21.01Residential for 6 Resource Person per Block (3

days) (@ Rs.500/-)Blocks 0.09000

21.02Non-residential (3 days training of 6 SMC

members) (@ Rs.100/-)SMC 0.01800 2279 41.022 2279 41.02200

21.02(a)Non-residential (3 days training of 3 Members of

PRI/VECs/LA) (@ Rs.100/-)VEC/ WEC 0.00900

21.03

Seminar/Orientation of SMC Women members

and President/Vice President (@ Rs. 50,000/-

per block)

Blocks 0.50000

Sub Total 2279 41.022 2279 41.02200VI SCHOOL INFRASTRUCTURE22 Civil Works22.01 Primary School (Plain) (New) School 13.1550022.02 Primary School (Hilly/Rocky) (New) School 13.2750022.03 Upper Primary (Plain) (New) School 0.0600 20.65500 0.06000

22.04 Upper Primary School (Hilly/Rocky) (New) School 20.77500

22.04aComposite Schools for Urban Areas (Class I-

VIII)School 41.04000

22.05 ACR in lieu of upgraded Upper Primary School Rooms

22.06 Additional class rooms for adding Class VIII Rooms

22.07 Building Less (Pry) School 9.7500022.08 Building Less (UP) School 18.5900022.09 Dilapidated Building (Pry) School 9.7500022.10 Dilapidated Building (UP) School 18.59000

22.11 Additional Class Room (Rural) ( PS+UPS) Rooms 3.45000 178 614.100 178 614.10000

22.12 Additional Class Room (Urban) Rooms 3.4500022.13 Additional Class Room (Hill Area)22.14 Toilet/Urinals (PS & UPS) School 0.70000 10 7.000 10 7.0000022.15 Separate Girls Toilet (Rural+Urban) School 0.7000022.16 CWSN friendly Toilets School 0.50000

22.17 Drinking Water Facility (for Urban Area Only)) School 0.15000

22.17a Drinking Water Facility (Plain PS & UPS) School 0.15000 37 5.550 37 5.55000

22.17b Drinking Water Facility (Hilly/Rocky PS & UPS) School 0.15000

22.18a Boundary Wall PS (Total in Meters x .01105) 0.01749

22.18bBoundary Wall PS (For Gate) @Rs. 7000 x no. of

P.S.School 0.07800

22.18c Boundary Wall UPS (Total in Meters x .01105) 0.01749

22.18dBoundary Wall UPS (For Gate) @Rs. 7000 x no.

of UPSSchool 0.07800

22.19a Electrification in P.S./ Electrical Equipment School 0.11000

22.19b Electrification in U. P.S./ Electrical Equipment School 0.11000

22.20Office-cum-store-cum-Head Teacher's room

(Primary)Rooms

22.21Office-cum-store-cum-Head Teacher's room

(Upper Primary)Rooms

22.22Augumentation of training facility in BRC (one

time)BRC/ URC 5.00000

22.23 Child friendly Elements School 0.25000

22.24 Ramps with Handrails (Barrier Free Elements) School 0.06000

22.25 Handrails in existing Ramps School 0.01000

Arti:SSA-AWPB-2014-15-PABMinits:KanpurDehat(RamabaiNagar):16-06-2014 236 / 533

Page 237: U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 · 2015. 1. 6. · U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15

Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

Name of District : (KanpurDehat)

Ramabai Nagar -43

ActivityS. No.Physical

UnitRemarks

Outlay Recommendation for 2014-15

Spill OverDeferred laibility of

2014-15Fresh Recommended Total Recommended

22.26 Whole School Develoipment School22.27 Retro-fitting and repairs School

22.28Residential Schools for specific category

of children

(a) Construction of Building including boundary

wall, Water and sanitation facilities, electric

installation (For 100 children)

Building 65.86000

(b) Construction of residential hostel Building 65.86000

(c) Refurnishing unused old buildings Building

22.29

Construction of Hostel in existing Govt UPS

including boundary wall, Water and sanitation

facilities, electric installation etc. (For 50

children)

7.00000

22.30Furniture for Govt. UPS (per child) (@ Rs.500/-

per child enrolled)Child 0.00500

22.31 Major Repairs for Primary School School 0.30000

22.32 Majr Repairs for Upper Primary School School 0.30000

22.33Others (Difference of Civil Wrks

sanctioned in pre.yr.)22.33a Others (Overhead Tank PS) School 0.1200022.33b Others (Overhead Tank UPS) School 0.12000

Sub Total (Civil WOrks) 0.06 225 626.650 225 626.71VII PROJECT MANAGEMENT COST23 Management23.01 Management up to 3.5%

(a) Project Management and MIS

(i) DPO ( Salary, Contigency, Consumables,

POL, TA & Computer etc)District 1 99.271 1 99.27100

(ii) EMIS Cell District 1 12.756 1 12.75600Sub Total (a) 1 1 1 112.027 1 112.027

(b) Training of Educational Administrators District

(c) School Mapping and Social Mapping District

Sub Total (23.01)

23.02Learning Enhancement Prog. (LEP) (P & UP) (up

to 2%)District 14.409 14.40935

23.03 Community Mobilization (up to 0.5%) District 1 45.850 1 45.85000

Sub Total (Management) 1 60.259 1 60.25935Total Management Cost 172.286 172.28635Total of SSA (Districs) 0.060 1.800 323070 11408.604 323070 11410.464

24 State Component23.01 Management23.02 REMS 0.0044923.03 SIEMAT

Sub Total

STATE SSA TOTAL 0.06000 1.80000 323070 11408.604 323070 11410.46402

25

KGBV Financial Provision (give

separate costing sheets for different

Models)

Hostel

ANon Recurring One Time Grant (Only

committed liabilities) (Model-I)

25.01 Construction of Building (New)

25.02 Construction of Building KGBV sanctioned earlier

25.02(a) Additional Class Room Rooms 3.45000

25.02(b) Guard Room Rooms 1.32000

25.02(c) Boundary Wall School 5.0200025.03 Boudary Wall (Spillover only)

25.04

Boring/Handpump (Spillover only)

(minimum rates prescribed by State Drinking

Water Department subject to a ceiling of Rs.

1.00 lakhs)

25.05 Electricity /Water charges (Spillover only)

25.05(a) Solar Water Heater & Solar Light 2.97000

25.06Furniture/Equipment (including Kitchen

equipment)3.00000

25.07 TLM and equipment including library books 3.50000

25.08 Bedding (New) 0.75000

25.09 Replacement of Bedding (once in 3 Year) 0.75000

Subtotal Non Recurring

B Recurring Cost Per Annum (Model-I)

25.10Maintenance per girl student per month @ Rs.

1500/-18.00000 1 18.000 1 18.00000

25.11 Stipend for girl student per month @ Rs. 100/- 1.20000 1 1.200 1 1.20000

25.12Supplementary TLM, stationery and other

educational material @ Rs.1000/- per annum1.00000 1 1.000 1 1.00000

25.13 Salaries

Arti:SSA-AWPB-2014-15-PABMinits:KanpurDehat(RamabaiNagar):16-06-2014 237 / 533

Page 238: U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 · 2015. 1. 6. · U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15

Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

Name of District : (KanpurDehat)

Ramabai Nagar -43

ActivityS. No.Physical

UnitRemarks

Outlay Recommendation for 2014-15

Spill OverDeferred laibility of

2014-15Fresh Recommended Total Recommended

25.13.1 Additional Salaries:

(a) 1 Warden @ Rs. 25,000/- per month 3.00000 1 3.00000 1 3.00000

(b)4 Full time teachers as per RTE norms @ Rs.

20,000/- per month per teacher 9.60000 1 9.60000 1 9.60000

(c)

1 Urdu Teachers (only for blocks with muslim

population above 20% and select urban areas), if

required @ Rs. 12,000/- per month per teacher 1.44000 1 1.44000 1 1.44000

(d)3 part time teachers @ Rs. 5,000/- per month per

teacher 1.80000 1 1.80000 1 1.80000

(e)1 Full time Accountant @ Rs. 10,000/- per month

1.20000 1 1.20000 1 1.20000

(f)

2 Support Staff – (Accountant/ Assistant, Peon,

Chowkidar) @ Rs. 5,000/- per month per staff 1.20000 1 1.20000 1 1.20000

(g) 1 Head cook @ Rs. 6,000/- per month 0.72000 1 0.72000 1 0.72000

(h)2 Asstt. Cooks @ Rs. 4,500/- per month per cook

1.08000 1 1.08000 1 1.08000

25.14Specific skill training @ Rs.1000/- per child per

annum1.00000 1 1.000 1 1.00000

25.15Electricity/water charges @ Rs.1000/- per child

per annum1.00000 1 1.000 1 1.00000

25.16Medical care/contingencies @ Rs. 1250 per child

per annum1.25000 1 1.250 1 1.25000

25.17 Maintenance @ Rs.750/- per child per annum 0.75000 1 0.750 1 0.75000

25.18

Miscellaneous (Educational Tour/ Exposure Visit

/ Sports Material etc.) @ Rs.750/- per child per

annum

0.75000 1 0.750 1 0.75000

25.19Preparatory camps @ Rs.200/- per child per

annum0.20000 1 0.200 1 0.20000

25.20PTAs/school functions @ Rs.200/- per child per

annum0.20000 1 0.200 1 0.20000

25.21 Provision of Rent @ Rs.6000/- per annum 6.00000

25.21a Provision of Rent (6 months) 3.6000025.21b Provision of Rent (3 months) 1.8000025.21c Rent (Previous Year (2007-2012)

25.22 Capacity building 0.50000 1 0.500 1 0.50000

25.22(a)Physical/ Self Defence Training @ Rs.200/- per

child per annum0.20000 1 0.200 1 0.20000

Subtotal Recurring 1 46.090 1 46.09000

Subtotal (Model-I) 1 46.090 1 46.09000

CNon Recurring One Time Grant (Only

committed liabilities) (Model-II)

25.23 Construction of Building (New)

25.24 Construction of Building KGBV sanctioned earlier

25.24(a) Additional Class Room Rooms 3.45000

25.24(b) Guard Room Rooms 1.32000

25.24(c) Boundary Wall School 5.0200025.25 Boudary Wall (Spillover only)25.26 Boring/Handpump (Spillover only)

25.27 Electricity /Water charges (Spillover only)

25.27(a) Solar Water Heater & Solar Light 2.97000

25.28Furniture/Equipment (including Kitchen

equipment)2.00000

25.29 TLM and equipment including library books 3.00000

25.30 Bedding (New) 0.37500

25.31 Replacement of Bedding (once in 3 Year) 0.37500

Subtotal Non Recurring

D Recurring Cost Per Annum (Model-II)

25.32Maintenance per girl student per month @ Rs.

1500/-9.00000

25.33 Stipend for girl student per month @ Rs. 100/- 0.60000

25.34Supplementary TLM, stationery and other

educational material @ Rs.1000/- per annum0.50000

25.35 Salaries(a) 1 Warden @ Rs. 25,000/- per month 3.00000

(b)3 Full time teachers as per RTE norms @ Rs.

20,000/- per month per teacher 7.20000

(c) 3 part time teachers @ Rs. 5,000/- per month per

teacher 1.80000

(d)1 Full time Accountant @ Rs. 10,000/- per month

1.20000

(e)

2 Support Staff – (Accountant/ Assistant, Peon,

Chowkidar) @ Rs. 5,000/- per month per staff 1.20000

Arti:SSA-AWPB-2014-15-PABMinits:KanpurDehat(RamabaiNagar):16-06-2014 238 / 533

Page 239: U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 · 2015. 1. 6. · U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15

Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

Name of District : (KanpurDehat)

Ramabai Nagar -43

ActivityS. No.Physical

UnitRemarks

Outlay Recommendation for 2014-15

Spill OverDeferred laibility of

2014-15Fresh Recommended Total Recommended

(f) 1 Head cook @ Rs. 6,000/- per month 0.72000

(g)1 Asstt. Cooks @ Rs. 4,500/- per month per cook

0.54000

25.36Specific skill training @ Rs.1000/- per child per

annum0.50000

25.37Electricity/water charges @ Rs.1000/- per child

per annum0.50000

25.38Medical care/contingencies @ Rs. 1250 per child

per annum0.62500

25.39 Maintenance @ Rs.750/- per child per annum 0.37500

25.40

Miscellaneous (Educational Tour/ Exposure Visit

/ Sports Material etc.) @ Rs.750/- per child per

annum

0.37500

25.41Preparatory camps @ Rs.300/- per child per

annum0.15000

25.42PTAs/school functions @ Rs.300/- per child per

annum0.15000

25.43 Provision of Rent @ Rs.10000/- per annum 5.00000

25.43a Provision of Rent (6 months) 3.6000025.43b Provision of Rent (3 months) 1.8000025.43c Rent (Previous Year (2007-2012)25.44 Capacity building 0.25000

25.44(a)Physical/ Self Defence Training @ Rs.200/- per

child per annum0.10000

Subtotal Recurring

Subtotal (Model-II) Total (KGBV) 1 46.090 1 46.090

DISTRICT GRAND TOTAL (SSA+KGBV) 0.060 1.800 323071 11454.694 323071 11456.554

Arti:SSA-AWPB-2014-15-PABMinits:KanpurDehat(RamabaiNagar):16-06-2014 239 / 533

Page 240: U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 · 2015. 1. 6. · U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15

Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

I ACCESS

1 Opening of New Schools

1.01 Upgradation of EGS to PSCentres /

School1.02 New PS School

1.03 Upgradation of PS to UPS / New UPS School

1.04 Composite Schools (for Urban Areas) School

1.05Residential Schools for specific category children

(For 100 children)

1.06Residential Hostel (for specific category of

children) (For 50 children)

1.07 Integration of Class V with Primary Schools

1.08Integration of Class VIII with Upper Primary

Schools

2Residential Schools for specific category

of children (For 100 Children)

Total - Residential Schools (For 100

children)

3Residential Hostel for specific category of

children (For 50 Children)

Total - Residential Schools (For 50

children)4 Transport/Escort Facility

4.01

Children in remote habitations with sparse

populations where opening of schools is

unviable

Child 0.03000

4.02

Urban deprived children/children without adult

protection in urban areas where schools are not

opened because availability of land is a problem

Child 0.03000

Sub Total

5Special Training for mainstreaming of Out-

of-School Children

5.03 Non-Residential (Fresh)(a) 12 months Child 0.06000(b) 9 months 0.04500(c) 6 months

(i)Special Training (by Special Instructors-NRBC)-

(1-5) Child 0.03000 128 3.840 128 3.84000

(ii) Special Training (by Special Instructors-NRBC)-

(6-8) Child 0.03000 81 2.430 81 2.43000

(d) 3 months Child 0.01500Sub Total 209 6.270 209 6.27000

Total (Special Training) 209 6.270 209 6.2705(B) House Hold Survey (HHS)

5(B).01 House Hold Survey through SMCHouse

Hold0.00001

Sub TotalII RETENTION6 Free Text Book

6.01Free Text Book (PS) for Parishadiya & Aided

Primary Schools (Workbooks not included)Child 0.00120 83365 100.038 83365 100.03800

6.01a

Free Text Book (PS) for 25% children of Class-1

in Private Recognised Primary Schools of other

Boards (Workbooks not included)

Child 0.00150

6.02 Free Brail Books (PS) 0.00150 54 0.081 54 0.08100

6.03 Free Large Print Books (PS) 0.00150

6.04Free Text Book (UPS) (Workbooks not included)

(Including KGBV Girls)Child 0.00200 36450 72.900 36450 72.90000

6.05 Free Brail Books (UPS) 0.00250 19 0.048 19 0.04750

6.06 Free Large Print Books (PS) 0.00250Sub Total 119888 173.067 119888 173.067

7 Provision of 2 set of Uniforms

7.01 All Girls (Including KGBV Girls) Child 0.00400 94879 379.516 94879 379.51600

7.02 SC Boys Child 0.00400 24936 99.744 24936 99.74400

7.03 ST Boys Child 0.00400

7.04 BPL Boys Child 0.00400 41779 167.116 41779 167.11600

7.05

Free Uniform for 25% children of Class-1 in

Private Recognised Primary Schools of other

Boards

Child0.00400

Sub Total 161594 646.376 161594 646.3767(A) Fee Reimbursement

7(A).01

Fee Reimbursement for Admission of children of

Disadvantaged Group & Weaker Section upto

25% of seats in Class-1 of Private Unaided

Recognised Schools

Child 0.05400

Sub Total

8 Teaching Learning Equipment (TLE)

8.01 TLE - New Primary School 3.80000 0.20000 3.800008.02 TLE - New Upper Primary School 1.00000 0.50000 1.00000

Name of District : Kannauj -42

ActivityS. No.Physical

UnitRemarks

Outlay Recommendation for 2014-15

Spill OverDeferred laibility of

2014-15Fresh Recommended Total Recommended

Arti:SSA-AWPB-2014-15-PABMinits:Kannauj:16-06-2014 240 / 533

Page 241: U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 · 2015. 1. 6. · U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15

Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

Name of District : Kannauj -42

ActivityS. No.Physical

UnitRemarks

Outlay Recommendation for 2014-15

Spill OverDeferred laibility of

2014-15Fresh Recommended Total Recommended

Sub Total 4.80000 4.80000III ENHANCING QUALITY9 New Teachers Salary

9.01 Primary Teachers (Regular) (Asstt. Teacher) Teacher 0.91500

9.01aHead Teacher for Primary (if the number of

children exceeds 150 in a school)Teacher

9.02 Primary Teachers (Contract) (S.M.) Teacher

9.03Subject specific Upper Primary Teachers

(Regular) (a) Science and Mathematics Teacher 1.26000(b) Social Studies Teacher 1.26000(c) Languages Teacher 1.26000

Sub Total (9.01 to 9.05)Add.Teacher against PTR

Sub Total (9.06 to 9.12)

Total (New Teacher's Salary-9.01 to 9.12)

Teachers Salary (Recurring-sanctioned

earlier)Primary teachers

9.13 Primary Teachers ( Regular)-Existing, in position Teacher 3.66000 216 790.560 216 790.56000

9.14Primary Teachers (Contract)-Existing, in

positionTeacher 0.55000

9.14(a) Primary Teachers (Contract)-under Training Teacher 0.38500 1055 406.175 1055 406.17500

9.14(b)Primary Teacher (Para Teachers Equal to

9.14(a) upgraded as Teachers)0.38500 584 224.840 584 224.84000

9.14(c) Primary Teachers (Para)- Vacant Teacher9.15 Primary Teachers (Vacant) Teacher 0.30500

9.16Head Teacher for Primary (if the number of

children exceeds 150)Teacher 5.04000 227 1144.080 227 1144.08000

9.16(b)Head Teacher for Primary (if the number of

children exceeds 150) VacantTeacher 0.42000

Additional teachers

9.17Additional Teachers - PS (Special BTC-

Regular) in positionTeacher 0.30500

9.18Additional Teachers - PS (Special BTC Under

Training)Teacher 0.87600

9.19 Additional Teachers - PS (Vacant) Teacher

9.20Others in position (Para Teachers upgraded

as Teachers)Teacher

Upper Primary teachers

9.21 UP Teachers (Regular)-Existing Teacher 5.04000 650 3276.000 650 3276.00000

9.22 UP Teachers (Contract)-Existing9.23 UP Teachers (Vacant) Teacher 1.26000

9.24Head Teacher for Upper Primary (if the number

of children exceeds 100)-ExistingTeacher 5.34000 317 1692.780 317 1692.78000

9.24a Head Teacher for Upper Primary (Vacant) Teacher 1.33500

9.25Subject specific Upper Primary Teachers

(Regular)(a) Science and Mathematics(b) Social Studies(c) Languages

9.32 Part Time Instructors in position(a) Art Education 0.77000 94 72.380 94 72.38000(b) Health and Physical Education 0.77000 103 79.310 103 79.31000(c) Work Education 0.77000 77 59.290 77 59.29000

9.32(A) Part Time Instructors Vacant(a) Art Education 0.42000(b) Health and Physical Education 0.42000(c) Work Education 0.42000

9.33

Others-Incentive to Teachers in Schools

Located in Naxal Affected Areas (@

Rs.1500/- per teachers per month)

Sub Total (9.13 to 9.33) 3323 7745.415 3323 7745.42TOTAL

(New Teachers Salary +Teachers Salary

Recurring)

3323 7745.415 3323 7745.41500

10 Teachers Training(a) Teachers

10.01

Refresher In-service Teachers' Training at BRC

level and above - 10 days (@ Rs.200/- per

head per day)

Teacher

(Target &

Ach.-13-14

in

Mandays)

0.00600

10.01(a)Continuous and Comprehensive Evauation [PS +

UPS)Teacher 0.01300 1044 13.572 1044 13.57200

10.01(b) Eary Reading and Numeracy Skills [PS] Teacher 0.00500 1044 5.220 1044 5.22000

10.01(c) Science [UPS] Teacher 0.00800 557 4.456 557 4.45600Recommended as

proposed

10.01(d) CWSN Teacher 0.00400

Arti:SSA-AWPB-2014-15-PABMinits:Kannauj:16-06-2014 241 / 533

Page 242: U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 · 2015. 1. 6. · U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15

Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

Name of District : Kannauj -42

ActivityS. No.Physical

UnitRemarks

Outlay Recommendation for 2014-15

Spill OverDeferred laibility of

2014-15Fresh Recommended Total Recommended

10.02

One day monthly cluster level meetings and

peer group training sessions for 10 months for

all teachers each year at CRC level - 10 days (@

Rs.100/- per head per day)

Teacher 0.01000

10.03(a)

Induction Training for Newly Recruited Teachers

for 6 Months (Special BTC)- @Rs.2000/- per

head per year

Teacher 0.02000

10.03(b)5 Days Training for Part Time Instructors @ Rs.

200/- per head per day) Teacher 0.01000

10.04

Training of untrained Teachers to acquire

professional qualifications over a two year

period.

Teacher 0.04700 770 36.190 770 36.19000

(b) Head Teachers

10.05Refresher Residencial In-service for 10 days at

BRC level and above

Head

Teacher(c) Resource Persons

10.06

Refresher Training for all Resource

Persons,Master Trainers, BRC & CRC faculty

and Coordinators for 5 days each year (@

Rs.200/- per head per day)

Resource

Person 0.00300 108 0.324 108 0.32400

Sub Total 3523 59.762 3523 59.762

11Academic Support through Block Resource

Centre (BRC)/ URC

11.01 Salary of Faculty and Staff

(a) 5 RPs at BRC for subject specific training in

positionRP 45 45

(b) 2 RPs for CWSN in position RP(b-i) 1 CWSN Resource Person RP 1.10000 18 19.800 18 19.80000

(b-ii) 1 Physiotherapist (Resource person for IE) RP

(c) 1 MIS Coordinator in position RP 1.86000

(d) 1 Datra Entry Operator in position RP 1.74000 8 13.920 8 13.92000

(e) 1 Accountant-cum-support staff in position RP 1.80000 9 16.200 9 16.20000

11.02 Furniture Grant BRC/ URC 1.00000

11.03Replacement of furniture, computer, TLE etc (

Once in 5 years)BRC/ URC 1.00000

11.04 Contingency Grant BRC/ URC 0.50000 9 4.500 9 4.50000

11.05 Meeting, TA BRC/ URC 0.30000 9 2.700 9 2.70000

11.06 TLM Grant BRC/ URC 0.10000

11.07 Maintenance Grant BRC/ URC 0.10000

Sub Total 9 57.120 9 57.12000

12Academic Support through Cluster

Resource Centres (CRC/UERC)

12.01Salary of Cluster Coordinator (on an average of

one Resource Person per 18 schools in a block)RP

12.02 Furniture GrantCRC/

UERC0.10000

12.03Replacement of furniture, computer, TLE etc.

once in 5 years

CRC/

UERC0.10000

12.04 Contingency Grant CRC/UERC 0.10000 82 8.200 82 8.20000

12.05 Meeting, TA CRC/UERC 0.12000 82 9.840 82 9.84000

12.06 TLM Grant CRC/UERC 0.03000

12.07Maintenance Grant

CRC/UERC 0.02000

Sub Total 164 18.040 164 18.04000

13Computer Aided Education in upper

primary schools under Innovation

13.01Computer Aided Education in upper primary

schoolsDistrict 0.01200 48 0.576 48 0.57600

Sub Total 48 0.576 48 0.5760014 Libraries in Schools14.01 (a) Primary School (per school) School 0.03000

14.02 (b) Upper Primary School (per school) School 0.10000

Sub TotalIV ANNUAL GRANTS15 Teachers' Grant15.01 Primary Teachers Teacher 0.0050015.02 Upper Primary Teachers Teacher 0.00500 557 2.785 557 2.78500

Sub Total 557 2.785 557 2.7850016 School Grant16.01 Primary School School 0.05000 1220 61.000 1220 61.0000016.02 Upper Primary School School 0.07000 552 38.640 552 38.64000

Sub Total 1772 99.640 1772 99.64000

Arti:SSA-AWPB-2014-15-PABMinits:Kannauj:16-06-2014 242 / 533

Page 243: U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 · 2015. 1. 6. · U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15

Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

Name of District : Kannauj -42

ActivityS. No.Physical

UnitRemarks

Outlay Recommendation for 2014-15

Spill OverDeferred laibility of

2014-15Fresh Recommended Total Recommended

17Research, Evaluation, Monitoring &

Supervision

17.01 REMS Activities School 0.00103 1772 1.823 1772 1.82270

17.02 Monitoring & Supervision School 0.00078 1772 1.389 1772 1.38937

17.03 House Hold Survey (Urban) in Million Plus Cities District 35.00000

Sub Total 3544 3.212 3544 3.2120718 Maintenance Grant

18.01 Maintenance in School having upto3 Classrooms School 0.07500 418 31.350 418 31.35000

18.01a Maintenance Grant School 0.07500 1251 93.825 1251 93.82500Sub Total 1669 125.175 1669 125.17500

VBRIDGING GENDER AND SOCIAL

CATEGORY GAPS

19 Interventions for CWSN (IE)

19.01 Provision for Inclusive Education Child 0.02200 3180 69.960 3180 69.96000

Sub Total 3180 69.960 3180 69.96000

20Innovativation Head up to Rs.50 Lakh per

district

20.01 Girls Education District 0.70000 8 5.600 8 5.60000

20.02 ECCE District20.03 Intervention for SC / ST children District

20.04 Intervention for Minority Community children District

20.05 Intervention for Urban Deprived children District 10.00000

Sub Total 8 5.600 8 5.6000021 SMC/PRI Training

21.01Residential for 6 Resource Person per Block (3

days) (@ Rs.500/-)Blocks 0.09000

21.02Non-residential (3 days training of 6 SMC

members) (@ Rs.100/-)SMC 0.01800 1669 30.042 1669 30.04200

21.02(a)Non-residential (3 days training of 3 Members of

PRI/VECs/LA) (@ Rs.100/-)VEC/ WEC 0.00900

21.03

Seminar/Orientation of SMC Women members

and President/Vice President (@ Rs. 50,000/-

per block)

Blocks 0.50000

Sub Total 1669 30.042 1669 30.04200VI SCHOOL INFRASTRUCTURE22 Civil Works22.01 Primary School (Plain) (New) School 13.1550022.02 Primary School (Hilly/Rocky) (New) School 13.2750022.03 Upper Primary (Plain) (New) School 20.65500

22.04 Upper Primary School (Hilly/Rocky) (New) School 20.77500

22.04aComposite Schools for Urban Areas (Class I-

VIII)School 41.04000

22.05 ACR in lieu of upgraded Upper Primary School Rooms

22.06 Additional class rooms for adding Class VIII Rooms

22.07 Building Less (Pry) School 9.7500022.08 Building Less (UP) School 18.5900022.09 Dilapidated Building (Pry) School 9.7500022.10 Dilapidated Building (UP) School 18.59000

22.11 Additional Class Room (Rural) ( PS+UPS) Rooms 3.45000

22.12 Additional Class Room (Urban) Rooms 3.4500022.13 Additional Class Room (Hill Area)22.14 Toilet/Urinals (PS & UPS) School 0.7000022.15 Separate Girls Toilet (Rural+Urban) School 0.7000022.16 CWSN friendly Toilets School 0.50000

22.17 Drinking Water Facility (for Urban Area Only)) School 0.15000

22.17a Drinking Water Facility (Plain PS & UPS) School 0.15000

22.17b Drinking Water Facility (Hilly/Rocky PS & UPS) School 0.15000

22.18a Boundary Wall PS (Total in Meters x .01105) 0.01749

22.18bBoundary Wall PS (For Gate) @Rs. 7000 x no. of

P.S.School 0.07800

22.18c Boundary Wall UPS (Total in Meters x .01105) 0.01749

22.18dBoundary Wall UPS (For Gate) @Rs. 7000 x no.

of UPSSchool 0.07800

22.19a Electrification in P.S./ Electrical Equipment School 0.11000

22.19b Electrification in U. P.S./ Electrical Equipment School 0.11000

22.20Office-cum-store-cum-Head Teacher's room

(Primary)Rooms

22.21Office-cum-store-cum-Head Teacher's room

(Upper Primary)Rooms

22.22Augumentation of training facility in BRC (one

time)BRC/ URC 5.00000

22.23 Child friendly Elements School 0.25000

22.24 Ramps with Handrails (Barrier Free Elements) School 0.06000 8 0.480 8 0.48000

22.25 Handrails in existing Ramps School 0.01000

Arti:SSA-AWPB-2014-15-PABMinits:Kannauj:16-06-2014 243 / 533

Page 244: U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 · 2015. 1. 6. · U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15

Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

Name of District : Kannauj -42

ActivityS. No.Physical

UnitRemarks

Outlay Recommendation for 2014-15

Spill OverDeferred laibility of

2014-15Fresh Recommended Total Recommended

22.26 Whole School Develoipment School22.27 Retro-fitting and repairs School

22.28Residential Schools for specific category

of children

(a) Construction of Building including boundary

wall, Water and sanitation facilities, electric

installation (For 100 children)

Building 65.86000

(b) Construction of residential hostel Building 65.86000

(c) Refurnishing unused old buildings Building

22.29

Construction of Hostel in existing Govt UPS

including boundary wall, Water and sanitation

facilities, electric installation etc. (For 50

children)

7.00000

22.30Furniture for Govt. UPS (per child) (@ Rs.500/-

per child enrolled)Child 0.00500

22.31 Major Repairs for Primary School School 0.30000

22.32 Majr Repairs for Upper Primary School School 0.30000

22.33Others (Difference of Civil Wrks

sanctioned in pre.yr.)22.33a Others (Overhead Tank PS) School 0.1200022.33b Others (Overhead Tank UPS) School 0.12000

Sub Total (Civil WOrks) 8 0.480 8 0.48VII PROJECT MANAGEMENT COST23 Management23.01 Management up to 3.5%

(a) Project Management and MIS

(i) DPO ( Salary, Contigency, Consumables,

POL, TA & Computer etc)District 1 101.130 1 101.13000

(ii) EMIS Cell District 1 12.594 1 12.59400Sub Total (a) 1 1 1 113.724 1 113.724

(b) Training of Educational Administrators District

(c) School Mapping and Social Mapping District

Sub Total (23.01)

23.02Learning Enhancement Prog. (LEP) (P & UP) (up

to 2%)District 12.091 12.09075

23.03 Community Mobilization (up to 0.5%) District 1 45.850 1 45.85000

Sub Total (Management) 1 57.941 1 57.94075Total Management Cost 171.665 171.66475Total of SSA (Districs) 4.800 301165 9215.184 301165 9219.984

24 State Component23.01 Management23.02 REMS 0.0044923.03 SIEMAT

Sub Total

STATE SSA TOTAL 4.80000 301165 9215.184 301165 9219.98432

25

KGBV Financial Provision (give

separate costing sheets for different

Models)

Hostel

ANon Recurring One Time Grant (Only

committed liabilities) (Model-I)

25.01 Construction of Building (New)

25.02 Construction of Building KGBV sanctioned earlier

25.02(a) Additional Class Room Rooms 3.45000

25.02(b) Guard Room Rooms 1.32000

25.02(c) Boundary Wall School 5.0200025.03 Boudary Wall (Spillover only)

25.04

Boring/Handpump (Spillover only)

(minimum rates prescribed by State Drinking

Water Department subject to a ceiling of Rs.

1.00 lakhs)

0.00000 0.00000

25.05 Electricity /Water charges (Spillover only)

25.05(a) Solar Water Heater & Solar Light 2.97000

25.06Furniture/Equipment (including Kitchen

equipment)3.00000

25.07 TLM and equipment including library books 3.50000

25.08 Bedding (New) 0.75000

25.09 Replacement of Bedding (once in 3 Year) 0.75000 5 3.750 5 3.75000

Subtotal Non Recurring 0.00000 3.750 3.75000

B Recurring Cost Per Annum (Model-I)

25.10Maintenance per girl student per month @ Rs.

1500/-18.00000 5 90.000 5 90.00000

25.11 Stipend for girl student per month @ Rs. 100/- 1.20000 5 6.000 5 6.00000

25.12Supplementary TLM, stationery and other

educational material @ Rs.1000/- per annum1.00000 5 5.000 5 5.00000

25.13 Salaries

Arti:SSA-AWPB-2014-15-PABMinits:Kannauj:16-06-2014 244 / 533

Page 245: U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 · 2015. 1. 6. · U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15

Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

Name of District : Kannauj -42

ActivityS. No.Physical

UnitRemarks

Outlay Recommendation for 2014-15

Spill OverDeferred laibility of

2014-15Fresh Recommended Total Recommended

25.13.1 Additional Salaries:

(a) 1 Warden @ Rs. 25,000/- per month 3.00000 5 15.00000 5 15.00000

(b)4 Full time teachers as per RTE norms @ Rs.

20,000/- per month per teacher 9.60000 5 48.00000 5 48.00000

(c)

1 Urdu Teachers (only for blocks with muslim

population above 20% and select urban areas), if

required @ Rs. 12,000/- per month per teacher 1.44000 5 7.20000 5 7.20000

(d)3 part time teachers @ Rs. 5,000/- per month per

teacher 1.80000 5 9.00000 5 9.00000

(e)1 Full time Accountant @ Rs. 10,000/- per month

1.20000 5 6.00000 5 6.00000

(f)

2 Support Staff – (Accountant/ Assistant, Peon,

Chowkidar) @ Rs. 5,000/- per month per staff 1.20000 5 6.00000 5 6.00000

(g) 1 Head cook @ Rs. 6,000/- per month 0.72000 5 3.60000 5 3.60000

(h)2 Asstt. Cooks @ Rs. 4,500/- per month per cook

1.08000 5 5.40000 5 5.40000

25.14Specific skill training @ Rs.1000/- per child per

annum1.00000 5 5.000 5 5.00000

25.15Electricity/water charges @ Rs.1000/- per child

per annum1.00000 5 5.000 5 5.00000

25.16Medical care/contingencies @ Rs. 1250 per child

per annum1.25000 5 6.250 5 6.25000

25.17 Maintenance @ Rs.750/- per child per annum 0.75000 5 3.750 5 3.75000

25.18

Miscellaneous (Educational Tour/ Exposure Visit

/ Sports Material etc.) @ Rs.750/- per child per

annum

0.75000 5 3.750 5 3.75000

25.19Preparatory camps @ Rs.200/- per child per

annum0.20000 5 1.000 5 1.00000

25.20PTAs/school functions @ Rs.200/- per child per

annum0.20000 5 1.000 5 1.00000

25.21 Provision of Rent @ Rs.6000/- per annum 6.00000

25.21a Provision of Rent (6 months) 3.6000025.21b Provision of Rent (3 months) 1.8000025.21c Rent (Previous Year (2007-2012)

25.22 Capacity building 0.50000 5 2.500 5 2.50000

25.22(a)Physical/ Self Defence Training @ Rs.200/- per

child per annum0.20000 5 1.000 5 1.00000

Subtotal Recurring 5 230.450 5 230.45000

Subtotal (Model-I) 0.00000 5 234.200 5 234.20000

CNon Recurring One Time Grant (Only

committed liabilities) (Model-II)

25.23 Construction of Building (New)

25.24 Construction of Building KGBV sanctioned earlier

25.24(a) Additional Class Room Rooms 3.45000

25.24(b) Guard Room Rooms 1.32000

25.24(c) Boundary Wall School 5.0200025.25 Boudary Wall (Spillover only)25.26 Boring/Handpump (Spillover only)

25.27 Electricity /Water charges (Spillover only)

25.27(a) Solar Water Heater & Solar Light 2.97000

25.28Furniture/Equipment (including Kitchen

equipment)2.00000

25.29 TLM and equipment including library books 3.00000

25.30 Bedding (New) 0.37500

25.31 Replacement of Bedding (once in 3 Year) 0.37500

Subtotal Non Recurring

D Recurring Cost Per Annum (Model-II)

25.32Maintenance per girl student per month @ Rs.

1500/-9.00000

25.33 Stipend for girl student per month @ Rs. 100/- 0.60000

25.34Supplementary TLM, stationery and other

educational material @ Rs.1000/- per annum0.50000

25.35 Salaries(a) 1 Warden @ Rs. 25,000/- per month 3.00000

(b)3 Full time teachers as per RTE norms @ Rs.

20,000/- per month per teacher 7.20000

(c) 3 part time teachers @ Rs. 5,000/- per month per

teacher 1.80000

(d)1 Full time Accountant @ Rs. 10,000/- per month

1.20000

(e)

2 Support Staff – (Accountant/ Assistant, Peon,

Chowkidar) @ Rs. 5,000/- per month per staff 1.20000

Arti:SSA-AWPB-2014-15-PABMinits:Kannauj:16-06-2014 245 / 533

Page 246: U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 · 2015. 1. 6. · U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15

Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

Name of District : Kannauj -42

ActivityS. No.Physical

UnitRemarks

Outlay Recommendation for 2014-15

Spill OverDeferred laibility of

2014-15Fresh Recommended Total Recommended

(f) 1 Head cook @ Rs. 6,000/- per month 0.72000

(g)1 Asstt. Cooks @ Rs. 4,500/- per month per cook

0.54000

25.36Specific skill training @ Rs.1000/- per child per

annum0.50000

25.37Electricity/water charges @ Rs.1000/- per child

per annum0.50000

25.38Medical care/contingencies @ Rs. 1250 per child

per annum0.62500

25.39 Maintenance @ Rs.750/- per child per annum 0.37500

25.40

Miscellaneous (Educational Tour/ Exposure Visit

/ Sports Material etc.) @ Rs.750/- per child per

annum

0.37500

25.41Preparatory camps @ Rs.300/- per child per

annum0.15000

25.42PTAs/school functions @ Rs.300/- per child per

annum0.15000

25.43 Provision of Rent @ Rs.10000/- per annum 5.00000

25.43a Provision of Rent (6 months) 3.6000025.43b Provision of Rent (3 months) 1.8000025.43c Rent (Previous Year (2007-2012)25.44 Capacity building 0.25000

25.44(a)Physical/ Self Defence Training @ Rs.200/- per

child per annum0.10000

Subtotal Recurring

Subtotal (Model-II) Total (KGBV) 0.000 5 234.200 5 234.200

DISTRICT GRAND TOTAL (SSA+KGBV) 0.000 4.800 301170 9449.384 301170 9454.184

Arti:SSA-AWPB-2014-15-PABMinits:Kannauj:16-06-2014 246 / 533

Page 247: U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 · 2015. 1. 6. · U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15

Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

I ACCESS

1 Opening of New Schools

1.01 Upgradation of EGS to PSCentres /

School1.02 New PS School

1.03 Upgradation of PS to UPS / New UPS School

1.04 Composite Schools (for Urban Areas) School

1.05Residential Schools for specific category children

(For 100 children)

1.06Residential Hostel (for specific category of

children) (For 50 children)

1.07 Integration of Class V with Primary Schools

1.08Integration of Class VIII with Upper Primary

Schools

2Residential Schools for specific category

of children (For 100 Children)

Total - Residential Schools (For 100

children)

3Residential Hostel for specific category of

children (For 50 Children)

Total - Residential Schools (For 50

children)4 Transport/Escort Facility

4.01

Children in remote habitations with sparse

populations where opening of schools is

unviable

Child 0.03000

4.02

Urban deprived children/children without adult

protection in urban areas where schools are not

opened because availability of land is a problem

Child 0.03000

Sub Total

5Special Training for mainstreaming of Out-

of-School Children

5.03 Non-Residential (Fresh)(a) 12 months Child 0.06000(b) 9 months 0.04500(c) 6 months

(i)Special Training (by Special Instructors-NRBC)-

(1-5) Child 0.03000 235 7.050 235 7.05000

(ii) Special Training (by Special Instructors-NRBC)-

(6-8) Child 0.03000 130 3.900 130 3.90000

(d) 3 months Child 0.01500Sub Total 365 10.950 365 10.95000

Total (Special Training) 365 10.950 365 10.9505(B) House Hold Survey (HHS)

5(B).01 House Hold Survey through SMCHouse

Hold0.00001

Sub TotalII RETENTION6 Free Text Book

6.01Free Text Book (PS) for Parishadiya & Aided

Primary Schools (Workbooks not included)Child 0.00120 63274 75.929 63274 75.92880

6.01a

Free Text Book (PS) for 25% children of Class-1

in Private Recognised Primary Schools of other

Boards (Workbooks not included)

Child 0.00150

6.02 Free Brail Books (PS) 0.00150 28 0.042 28 0.04200

6.03 Free Large Print Books (PS) 0.00150

6.04Free Text Book (UPS) (Workbooks not included)

(Including KGBV Girls)Child 0.00200 28862 57.724 28862 57.72400

6.05 Free Brail Books (UPS) 0.00250

6.06 Free Large Print Books (PS) 0.00250Sub Total 92164 133.695 92164 133.695

7 Provision of 2 set of Uniforms

7.01 All Girls (Including KGBV Girls) Child 0.00400 74676 298.704 74676 298.70400

7.02 SC Boys Child 0.00400 17460 69.840 17460 69.84000

7.03 ST Boys Child 0.00400

7.04 BPL Boys Child 0.00400 14821 59.284 14821 59.28400

7.05

Free Uniform for 25% children of Class-1 in

Private Recognised Primary Schools of other

Boards

Child0.00400

Sub Total 106957 427.828 106957 427.8287(A) Fee Reimbursement

7(A).01

Fee Reimbursement for Admission of children of

Disadvantaged Group & Weaker Section upto

25% of seats in Class-1 of Private Unaided

Recognised Schools

Child 0.05400

Sub Total

8 Teaching Learning Equipment (TLE)

8.01 TLE - New Primary School 0.40000 0.20000 0.400008.02 TLE - New Upper Primary School 1.00000 0.50000 1.00000

Name of District :JPNagar (Amroha) -41

ActivityS. No.Physical

UnitRemarks

Outlay Recommendation for 2014-15

Spill OverDeferred laibility of

2014-15Fresh Recommended Total Recommended

Arti:SSA-AWPB-2014-15-PABMinits:JPNagar:16-06-2014 247 / 533

Page 248: U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 · 2015. 1. 6. · U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15

Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

Name of District :JPNagar (Amroha) -41

ActivityS. No.Physical

UnitRemarks

Outlay Recommendation for 2014-15

Spill OverDeferred laibility of

2014-15Fresh Recommended Total Recommended

Sub Total 1.40000 1.40000III ENHANCING QUALITY9 New Teachers Salary

9.01 Primary Teachers (Regular) (Asstt. Teacher) Teacher 0.91500

9.01aHead Teacher for Primary (if the number of

children exceeds 150 in a school)Teacher

9.02 Primary Teachers (Contract) (S.M.) Teacher

9.03Subject specific Upper Primary Teachers

(Regular) (a) Science and Mathematics Teacher 1.26000(b) Social Studies Teacher 1.26000(c) Languages Teacher 1.26000

Sub Total (9.01 to 9.05)Add.Teacher against PTR

Sub Total (9.06 to 9.12)

Total (New Teacher's Salary-9.01 to 9.12)

Teachers Salary (Recurring-sanctioned

earlier)Primary teachers

9.13 Primary Teachers ( Regular)-Existing, in position Teacher 3.66000 293 1072.380 293 1072.38000

9.14Primary Teachers (Contract)-Existing, in

positionTeacher 0.55000

9.14(a) Primary Teachers (Contract)-under Training Teacher 0.38500 1191 458.535 1191 458.53500

9.14(b)Primary Teacher (Para Teachers Equal to

9.14(a) upgraded as Teachers)0.38500 496 190.960 496 190.96000

9.14(c) Primary Teachers (Para)- Vacant Teacher9.15 Primary Teachers (Vacant) Teacher 0.30500

9.16Head Teacher for Primary (if the number of

children exceeds 150)Teacher 5.04000 194 977.760 194 977.76000

9.16(b)Head Teacher for Primary (if the number of

children exceeds 150) VacantTeacher 0.42000

Additional teachers

9.17Additional Teachers - PS (Special BTC-

Regular) in positionTeacher 0.30500

9.18Additional Teachers - PS (Special BTC Under

Training)Teacher 0.87600

9.19 Additional Teachers - PS (Vacant) Teacher

9.20Others in position (Para Teachers upgraded

as Teachers)Teacher

Upper Primary teachers

9.21 UP Teachers (Regular)-Existing Teacher 5.04000 744 3749.760 744 3749.76000

9.22 UP Teachers (Contract)-Existing9.23 UP Teachers (Vacant) Teacher 1.26000

9.24Head Teacher for Upper Primary (if the number

of children exceeds 100)-ExistingTeacher 5.34000 48 256.320 48 256.32000

9.24a Head Teacher for Upper Primary (Vacant) Teacher 1.33500

9.25Subject specific Upper Primary Teachers

(Regular)(a) Science and Mathematics(b) Social Studies(c) Languages

9.32 Part Time Instructors in position(a) Art Education 0.77000 34 26.180 34 26.18000(b) Health and Physical Education 0.77000 34 26.180 34 26.18000(c) Work Education 0.77000 29 22.330 29 22.33000

9.32(A) Part Time Instructors Vacant(a) Art Education 0.42000(b) Health and Physical Education 0.42000(c) Work Education 0.42000

9.33

Others-Incentive to Teachers in Schools

Located in Naxal Affected Areas (@

Rs.1500/- per teachers per month)

Sub Total (9.13 to 9.33) 3063 6780.405 3063 6780.41TOTAL

(New Teachers Salary +Teachers Salary

Recurring)

3063 6780.405 3063 6780.40500

10 Teachers Training(a) Teachers

10.01

Refresher In-service Teachers' Training at BRC

level and above - 10 days (@ Rs.200/- per

head per day)

Teacher

(Target &

Ach.-13-14

in

Mandays)

0.00600

10.01(a)Continuous and Comprehensive Evauation [PS +

UPS)Teacher 0.01300 1024 13.312 1024 13.31200

10.01(b) Eary Reading and Numeracy Skills [PS] Teacher 0.00500 1024 5.120 1024 5.12000

10.01(c) Science [UPS] Teacher 0.00800 546 4.368 546 4.36800Recommended as

proposed

10.01(d) CWSN Teacher 0.00400

Arti:SSA-AWPB-2014-15-PABMinits:JPNagar:16-06-2014 248 / 533

Page 249: U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 · 2015. 1. 6. · U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15

Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

Name of District :JPNagar (Amroha) -41

ActivityS. No.Physical

UnitRemarks

Outlay Recommendation for 2014-15

Spill OverDeferred laibility of

2014-15Fresh Recommended Total Recommended

10.02

One day monthly cluster level meetings and

peer group training sessions for 10 months for

all teachers each year at CRC level - 10 days (@

Rs.100/- per head per day)

Teacher 0.01000

10.03(a)

Induction Training for Newly Recruited Teachers

for 6 Months (Special BTC)- @Rs.2000/- per

head per year

Teacher 0.02000

10.03(b)5 Days Training for Part Time Instructors @ Rs.

200/- per head per day) Teacher 0.01000

10.04

Training of untrained Teachers to acquire

professional qualifications over a two year

period.

Teacher 0.04700 871 40.937 871 40.93700

(b) Head Teachers

10.05Refresher Residencial In-service for 10 days at

BRC level and above

Head

Teacher(c) Resource Persons

10.06

Refresher Training for all Resource

Persons,Master Trainers, BRC & CRC faculty

and Coordinators for 5 days each year (@

Rs.200/- per head per day)

Resource

Person 0.00300 84 0.252 84 0.25200

Sub Total 3549 63.989 3549 63.989

11Academic Support through Block Resource

Centre (BRC)/ URC

11.01 Salary of Faculty and Staff

(a) 5 RPs at BRC for subject specific training in

positionRP 35 35

(b) 2 RPs for CWSN in position RP(b-i) 1 CWSN Resource Person RP 1.10000 14 15.400 14 15.40000

(b-ii) 1 Physiotherapist (Resource person for IE) RP

(c) 1 MIS Coordinator in position RP 1.86000

(d) 1 Datra Entry Operator in position RP 1.74000 6 10.440 6 10.44000

(e) 1 Accountant-cum-support staff in position RP 1.80000 7 12.600 7 12.60000

11.02 Furniture Grant BRC/ URC 1.00000

11.03Replacement of furniture, computer, TLE etc (

Once in 5 years)BRC/ URC 1.00000

11.04 Contingency Grant BRC/ URC 0.50000 7 3.500 7 3.50000

11.05 Meeting, TA BRC/ URC 0.30000 7 2.100 7 2.10000

11.06 TLM Grant BRC/ URC 0.10000

11.07 Maintenance Grant BRC/ URC 0.10000

Sub Total 7 44.040 7 44.04000

12Academic Support through Cluster

Resource Centres (CRC/UERC)

12.01Salary of Cluster Coordinator (on an average of

one Resource Person per 18 schools in a block)RP

12.02 Furniture GrantCRC/

UERC0.10000

12.03Replacement of furniture, computer, TLE etc.

once in 5 years

CRC/

UERC0.10000

12.04 Contingency Grant CRC/UERC 0.10000 49 4.900 49 4.90000

12.05 Meeting, TA CRC/UERC 0.12000 49 5.880 49 5.88000

12.06 TLM Grant CRC/UERC 0.03000

12.07Maintenance Grant

CRC/UERC 0.02000

Sub Total 98 10.780 98 10.78000

13Computer Aided Education in upper

primary schools under Innovation

13.01Computer Aided Education in upper primary

schoolsDistrict 0.01200 48 0.576 48 0.57600

Sub Total 48 0.576 48 0.5760014 Libraries in Schools14.01 (a) Primary School (per school) School 0.03000

14.02 (b) Upper Primary School (per school) School 0.10000

Sub TotalIV ANNUAL GRANTS15 Teachers' Grant15.01 Primary Teachers Teacher 0.0050015.02 Upper Primary Teachers Teacher 0.00500 546 2.730 546 2.73000

Sub Total 546 2.730 546 2.7300016 School Grant16.01 Primary School School 0.05000 1085 54.250 1085 54.2500016.02 Upper Primary School School 0.07000 533 37.310 533 37.31000

Sub Total 1618 91.560 1618 91.56000

Arti:SSA-AWPB-2014-15-PABMinits:JPNagar:16-06-2014 249 / 533

Page 250: U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 · 2015. 1. 6. · U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15

Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

Name of District :JPNagar (Amroha) -41

ActivityS. No.Physical

UnitRemarks

Outlay Recommendation for 2014-15

Spill OverDeferred laibility of

2014-15Fresh Recommended Total Recommended

17Research, Evaluation, Monitoring &

Supervision

17.01 REMS Activities School 0.00103 1618 1.664 1618 1.66430

17.02 Monitoring & Supervision School 0.00078 1618 1.269 1618 1.26862

17.03 House Hold Survey (Urban) in Million Plus Cities District 35.00000

Sub Total 3236 2.933 3236 2.9329218 Maintenance Grant

18.01 Maintenance in School having upto3 Classrooms School 0.07500 101 7.575 101 7.57500

18.01a Maintenance Grant School 0.07500 1462 109.650 1462 109.65000Sub Total 1563 117.225 1563 117.22500

VBRIDGING GENDER AND SOCIAL

CATEGORY GAPS

19 Interventions for CWSN (IE)

19.01 Provision for Inclusive Education Child 0.03000 1240 37.200 1240 37.20000

Sub Total 1240 37.200 1240 37.20000

20Innovativation Head up to Rs.50 Lakh per

district

20.01 Girls Education District 0.70000 11 7.700 11 7.70000

20.02 ECCE District20.03 Intervention for SC / ST children District

20.04 Intervention for Minority Community children District

20.05 Intervention for Urban Deprived children District 10.00000

Sub Total 11 7.700 11 7.7000021 SMC/PRI Training

21.01Residential for 6 Resource Person per Block (3

days) (@ Rs.500/-)Blocks 0.09000

21.02Non-residential (3 days training of 6 SMC

members) (@ Rs.100/-)SMC 0.01800 1563 28.134 1563 28.13400

21.02(a)Non-residential (3 days training of 3 Members of

PRI/VECs/LA) (@ Rs.100/-)VEC/ WEC 0.00900

21.03

Seminar/Orientation of SMC Women members

and President/Vice President (@ Rs. 50,000/-

per block)

Blocks 0.50000

Sub Total 1563 28.134 1563 28.13400VI SCHOOL INFRASTRUCTURE22 Civil Works22.01 Primary School (Plain) (New) School 13.1550022.02 Primary School (Hilly/Rocky) (New) School 13.2750022.03 Upper Primary (Plain) (New) School 20.65500

22.04 Upper Primary School (Hilly/Rocky) (New) School 20.77500

22.04aComposite Schools for Urban Areas (Class I-

VIII)School 41.04000

22.05 ACR in lieu of upgraded Upper Primary School Rooms

22.06 Additional class rooms for adding Class VIII Rooms

22.07 Building Less (Pry) School 9.7500022.08 Building Less (UP) School 18.5900022.09 Dilapidated Building (Pry) School 9.7500022.10 Dilapidated Building (UP) School 18.59000

22.11 Additional Class Room (Rural) ( PS+UPS) Rooms 3.45000

22.12 Additional Class Room (Urban) Rooms 3.4500022.13 Additional Class Room (Hill Area)22.14 Toilet/Urinals (PS & UPS) School 0.7000022.15 Separate Girls Toilet (Rural+Urban) School 0.7000022.16 CWSN friendly Toilets School 0.50000

22.17 Drinking Water Facility (for Urban Area Only)) School 0.15000

22.17a Drinking Water Facility (Plain PS & UPS) School 0.15000

22.17b Drinking Water Facility (Hilly/Rocky PS & UPS) School 0.15000

22.18a Boundary Wall PS (Total in Meters x .01105) 0.01749

22.18bBoundary Wall PS (For Gate) @Rs. 7000 x no. of

P.S.School 0.07800

22.18c Boundary Wall UPS (Total in Meters x .01105) 0.01749

22.18dBoundary Wall UPS (For Gate) @Rs. 7000 x no.

of UPSSchool 0.07800

22.19a Electrification in P.S./ Electrical Equipment School 0.11000

22.19b Electrification in U. P.S./ Electrical Equipment School 0.11000

22.20Office-cum-store-cum-Head Teacher's room

(Primary)Rooms

22.21Office-cum-store-cum-Head Teacher's room

(Upper Primary)Rooms

22.22Augumentation of training facility in BRC (one

time)BRC/ URC 5.00000

22.23 Child friendly Elements School 0.25000

22.24 Ramps with Handrails (Barrier Free Elements) School 0.06000

22.25 Handrails in existing Ramps School 0.01000

Arti:SSA-AWPB-2014-15-PABMinits:JPNagar:16-06-2014 250 / 533

Page 251: U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 · 2015. 1. 6. · U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15

Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

Name of District :JPNagar (Amroha) -41

ActivityS. No.Physical

UnitRemarks

Outlay Recommendation for 2014-15

Spill OverDeferred laibility of

2014-15Fresh Recommended Total Recommended

22.26 Whole School Develoipment School22.27 Retro-fitting and repairs School

22.28Residential Schools for specific category

of children

(a) Construction of Building including boundary

wall, Water and sanitation facilities, electric

installation (For 100 children)

Building 65.86000

(b) Construction of residential hostel Building 65.86000

(c) Refurnishing unused old buildings Building

22.29

Construction of Hostel in existing Govt UPS

including boundary wall, Water and sanitation

facilities, electric installation etc. (For 50

children)

7.00000

22.30Furniture for Govt. UPS (per child) (@ Rs.500/-

per child enrolled)Child 0.00500

22.31 Major Repairs for Primary School School 0.30000

22.32 Majr Repairs for Upper Primary School School 0.30000

22.33Others (Difference of Civil Wrks

sanctioned in pre.yr.)22.33a Others (Overhead Tank PS) School 0.1200022.33b Others (Overhead Tank UPS) School 0.12000

Sub Total (Civil WOrks)VII PROJECT MANAGEMENT COST23 Management23.01 Management up to 3.5%

(a) Project Management and MIS

(i) DPO ( Salary, Contigency, Consumables,

POL, TA & Computer etc)District 1 121.156 1 121.15620

(ii) EMIS Cell District 1 12.390 1 12.39000Sub Total (a) 1 1 1 133.546 1 133.546

(b) Training of Educational Administrators District

(c) School Mapping and Social Mapping District

Sub Total (23.01)

23.02Learning Enhancement Prog. (LEP) (P & UP) (up

to 2%)District 10.032 10.03180

23.03 Community Mobilization (up to 0.5%) District 1 38.000 1 38.00000

Sub Total (Management) 1 48.032 1 48.03180Total Management Cost 181.578 181.57800Total of SSA (Districs) 1.400 216028 7941.323 216028 7942.723

24 State Component23.01 Management23.02 REMS 0.0044923.03 SIEMAT

Sub Total

STATE SSA TOTAL 1.40000 216028 7941.323 216028 7942.72272

25

KGBV Financial Provision (give

separate costing sheets for different

Models)

Hostel

ANon Recurring One Time Grant (Only

committed liabilities) (Model-I)

25.01 Construction of Building (New)

25.02 Construction of Building KGBV sanctioned earlier

25.02(a) Additional Class Room Rooms 3.45000

25.02(b) Guard Room Rooms 1.32000

25.02(c) Boundary Wall School 5.0200025.03 Boudary Wall (Spillover only) 1.45000 1.45000

25.04

Boring/Handpump (Spillover only)

(minimum rates prescribed by State Drinking

Water Department subject to a ceiling of Rs.

1.00 lakhs)

1.00000 1.00000

25.05 Electricity /Water charges (Spillover only)

25.05(a) Solar Water Heater & Solar Light 2.97000

25.06Furniture/Equipment (including Kitchen

equipment)3.00000

25.07 TLM and equipment including library books 3.50000

25.08 Bedding (New) 0.75000

25.09 Replacement of Bedding (once in 3 Year) -1 0.75000 1 0.750 0.75000

Subtotal Non Recurring 2.45000 0.750 3.20000

B Recurring Cost Per Annum (Model-I)

25.10Maintenance per girl student per month @ Rs.

1500/-18.00000 8 144.000 8 144.00000

25.11 Stipend for girl student per month @ Rs. 100/- 1.20000 8 9.600 8 9.60000

25.12Supplementary TLM, stationery and other

educational material @ Rs.1000/- per annum1.00000 8 8.000 8 8.00000

25.13 Salaries

Arti:SSA-AWPB-2014-15-PABMinits:JPNagar:16-06-2014 251 / 533

Page 252: U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 · 2015. 1. 6. · U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15

Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

Name of District :JPNagar (Amroha) -41

ActivityS. No.Physical

UnitRemarks

Outlay Recommendation for 2014-15

Spill OverDeferred laibility of

2014-15Fresh Recommended Total Recommended

25.13.1 Additional Salaries:

(a) 1 Warden @ Rs. 25,000/- per month 3.00000 8 24.00000 8 24.00000

(b)4 Full time teachers as per RTE norms @ Rs.

20,000/- per month per teacher 9.60000 8 76.80000 8 76.80000

(c)

1 Urdu Teachers (only for blocks with muslim

population above 20% and select urban areas), if

required @ Rs. 12,000/- per month per teacher 1.44000 8 11.52000 8 11.52000

(d)3 part time teachers @ Rs. 5,000/- per month per

teacher 1.80000 8 14.40000 8 14.40000

(e)1 Full time Accountant @ Rs. 10,000/- per month

1.20000 8 9.60000 8 9.60000

(f)

2 Support Staff – (Accountant/ Assistant, Peon,

Chowkidar) @ Rs. 5,000/- per month per staff 1.20000 8 9.60000 8 9.60000

(g) 1 Head cook @ Rs. 6,000/- per month 0.72000 8 5.76000 8 5.76000

(h)2 Asstt. Cooks @ Rs. 4,500/- per month per cook

1.08000 8 8.64000 8 8.64000

25.14Specific skill training @ Rs.1000/- per child per

annum1.00000 8 8.000 8 8.00000

25.15Electricity/water charges @ Rs.1000/- per child

per annum1.00000 8 8.000 8 8.00000

25.16Medical care/contingencies @ Rs. 1250 per child

per annum1.25000 8 10.000 8 10.00000

25.17 Maintenance @ Rs.750/- per child per annum 0.75000 8 6.000 8 6.00000

25.18

Miscellaneous (Educational Tour/ Exposure Visit

/ Sports Material etc.) @ Rs.750/- per child per

annum

0.75000 8 6.000 8 6.00000

25.19Preparatory camps @ Rs.200/- per child per

annum0.20000 8 1.600 8 1.60000

25.20PTAs/school functions @ Rs.200/- per child per

annum0.20000 8 1.600 8 1.60000

25.21 Provision of Rent @ Rs.6000/- per annum 6.00000

25.21a Provision of Rent (6 months) 3.6000025.21b Provision of Rent (3 months) 1.8000025.21c Rent (Previous Year (2007-2012)

25.22 Capacity building 0.50000 8 4.000 8 4.00000

25.22(a)Physical/ Self Defence Training @ Rs.200/- per

child per annum0.20000 8 1.600 8 1.60000

Subtotal Recurring 8 368.720 8 368.72000

Subtotal (Model-I) 2.45000 8 369.470 8 371.92000

CNon Recurring One Time Grant (Only

committed liabilities) (Model-II)

25.23 Construction of Building (New)

25.24 Construction of Building KGBV sanctioned earlier

25.24(a) Additional Class Room Rooms 3.45000

25.24(b) Guard Room Rooms 1.32000

25.24(c) Boundary Wall School 5.0200025.25 Boudary Wall (Spillover only)25.26 Boring/Handpump (Spillover only)

25.27 Electricity /Water charges (Spillover only)

25.27(a) Solar Water Heater & Solar Light 2.97000

25.28Furniture/Equipment (including Kitchen

equipment)2.00000

25.29 TLM and equipment including library books 3.00000

25.30 Bedding (New) 0.37500

25.31 Replacement of Bedding (once in 3 Year) 0.37500

Subtotal Non Recurring

D Recurring Cost Per Annum (Model-II)

25.32Maintenance per girl student per month @ Rs.

1500/-9.00000

25.33 Stipend for girl student per month @ Rs. 100/- 0.60000

25.34Supplementary TLM, stationery and other

educational material @ Rs.1000/- per annum0.50000

25.35 Salaries(a) 1 Warden @ Rs. 25,000/- per month 3.00000

(b)3 Full time teachers as per RTE norms @ Rs.

20,000/- per month per teacher 7.20000

(c) 3 part time teachers @ Rs. 5,000/- per month per

teacher 1.80000

(d)1 Full time Accountant @ Rs. 10,000/- per month

1.20000

(e)

2 Support Staff – (Accountant/ Assistant, Peon,

Chowkidar) @ Rs. 5,000/- per month per staff 1.20000

Arti:SSA-AWPB-2014-15-PABMinits:JPNagar:16-06-2014 252 / 533

Page 253: U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 · 2015. 1. 6. · U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15

Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

Name of District :JPNagar (Amroha) -41

ActivityS. No.Physical

UnitRemarks

Outlay Recommendation for 2014-15

Spill OverDeferred laibility of

2014-15Fresh Recommended Total Recommended

(f) 1 Head cook @ Rs. 6,000/- per month 0.72000

(g)1 Asstt. Cooks @ Rs. 4,500/- per month per cook

0.54000

25.36Specific skill training @ Rs.1000/- per child per

annum0.50000

25.37Electricity/water charges @ Rs.1000/- per child

per annum0.50000

25.38Medical care/contingencies @ Rs. 1250 per child

per annum0.62500

25.39 Maintenance @ Rs.750/- per child per annum 0.37500

25.40

Miscellaneous (Educational Tour/ Exposure Visit

/ Sports Material etc.) @ Rs.750/- per child per

annum

0.37500

25.41Preparatory camps @ Rs.300/- per child per

annum0.15000

25.42PTAs/school functions @ Rs.300/- per child per

annum0.15000

25.43 Provision of Rent @ Rs.10000/- per annum 5.00000

25.43a Provision of Rent (6 months) 3.6000025.43b Provision of Rent (3 months) 1.8000025.43c Rent (Previous Year (2007-2012)25.44 Capacity building 0.25000

25.44(a)Physical/ Self Defence Training @ Rs.200/- per

child per annum0.10000

Subtotal Recurring

Subtotal (Model-II) Total (KGBV) 2.450 8 369.470 8 371.920

DISTRICT GRAND TOTAL (SSA+KGBV) 2.450 1.400 216036 8310.793 216036 8314.643

Arti:SSA-AWPB-2014-15-PABMinits:JPNagar:16-06-2014 253 / 533

Page 254: U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 · 2015. 1. 6. · U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15

Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

I ACCESS

1 Opening of New Schools

1.01 Upgradation of EGS to PSCentres /

School1.02 New PS School

1.03 Upgradation of PS to UPS / New UPS School

1.04 Composite Schools (for Urban Areas) School

1.05Residential Schools for specific category children

(For 100 children)

1.06Residential Hostel (for specific category of

children) (For 50 children)

1.07 Integration of Class V with Primary Schools

1.08Integration of Class VIII with Upper Primary

Schools

2Residential Schools for specific category

of children (For 100 Children)

Total - Residential Schools (For 100

children)

3Residential Hostel for specific category of

children (For 50 Children)

Total - Residential Schools (For 50

children)4 Transport/Escort Facility

4.01

Children in remote habitations with sparse

populations where opening of schools is

unviable

Child 0.03000

4.02

Urban deprived children/children without adult

protection in urban areas where schools are not

opened because availability of land is a problem

Child 0.03000

Sub Total

5Special Training for mainstreaming of Out-

of-School Children

5.03 Non-Residential (Fresh)(a) 12 months Child 0.06000(b) 9 months 0.04500(c) 6 months

(i)Special Training (by Special Instructors-NRBC)-

(1-5) Child 0.03000 179 5.370 179 5.37000

(ii) Special Training (by Special Instructors-NRBC)-

(6-8) Child 0.03000 60 1.800 60 1.80000

(d) 3 months Child 0.01500Sub Total 239 7.170 239 7.17000

Total (Special Training) 239 7.170 239 7.1705(B) House Hold Survey (HHS)

5(B).01 House Hold Survey through SMCHouse

Hold0.00001

Sub TotalII RETENTION6 Free Text Book

6.01Free Text Book (PS) for Parishadiya & Aided

Primary Schools (Workbooks not included)Child 0.00120 89804 107.765 89804 107.76480

6.01a

Free Text Book (PS) for 25% children of Class-1

in Private Recognised Primary Schools of other

Boards (Workbooks not included)

Child 0.00150

6.02 Free Brail Books (PS) 0.00150 67 0.101 67 0.10050

6.03 Free Large Print Books (PS) 0.00150

6.04Free Text Book (UPS) (Workbooks not included)

(Including KGBV Girls)Child 0.00200 48503 97.006 48503 97.00600

6.05 Free Brail Books (UPS) 0.00250 36 0.090 36 0.09000

6.06 Free Large Print Books (PS) 0.00250Sub Total 138410 204.961 138410 204.961

7 Provision of 2 set of Uniforms

7.01 All Girls (Including KGBV Girls) Child 0.00400 101753 407.012 101753 407.01200

7.02 SC Boys Child 0.00400 37648 150.592 37648 150.59200

7.03 ST Boys Child 0.00400

7.04 BPL Boys Child 0.00400 13278 53.112 13278 53.11200

7.05

Free Uniform for 25% children of Class-1 in

Private Recognised Primary Schools of other

Boards

Child0.00400

Sub Total 152679 610.716 152679 610.7167(A) Fee Reimbursement

7(A).01

Fee Reimbursement for Admission of children of

Disadvantaged Group & Weaker Section upto

25% of seats in Class-1 of Private Unaided

Recognised Schools

Child 0.05400

Sub Total

8 Teaching Learning Equipment (TLE)

8.01 TLE - New Primary School 8.40000 0.20000 8.400008.02 TLE - New Upper Primary School 14.60000 0.50000 14.60000

Name of District : Jhansi - 40

ActivityS. No.Physical

UnitRemarks

Outlay Recommendation for 2014-15

Spill OverDeferred laibility of

2014-15Fresh Recommended Total Recommended

Arti:SSA-AWPB-2014-15-PABMinits:Jhansi:16-06-2014 254 / 533

Page 255: U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 · 2015. 1. 6. · U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15

Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

Name of District : Jhansi - 40

ActivityS. No.Physical

UnitRemarks

Outlay Recommendation for 2014-15

Spill OverDeferred laibility of

2014-15Fresh Recommended Total Recommended

Sub Total 23.00000 23.00000III ENHANCING QUALITY9 New Teachers Salary

9.01 Primary Teachers (Regular) (Asstt. Teacher) Teacher 0.91500

9.01aHead Teacher for Primary (if the number of

children exceeds 150 in a school)Teacher

9.02 Primary Teachers (Contract) (S.M.) Teacher

9.03Subject specific Upper Primary Teachers

(Regular) (a) Science and Mathematics Teacher 1.26000(b) Social Studies Teacher 1.26000(c) Languages Teacher 1.26000

Sub Total (9.01 to 9.05)Add.Teacher against PTR

Sub Total (9.06 to 9.12)

Total (New Teacher's Salary-9.01 to 9.12)

Teachers Salary (Recurring-sanctioned

earlier)Primary teachers

9.13 Primary Teachers ( Regular)-Existing, in position Teacher 3.66000 408 1493.280 408 1493.28000

9.14Primary Teachers (Contract)-Existing, in

positionTeacher 0.55000

9.14(a) Primary Teachers (Contract)-under Training Teacher 0.38500 1171 450.835 1171 450.83500

9.14(b)Primary Teacher (Para Teachers Equal to

9.14(a) upgraded as Teachers)0.38500 614 236.390 614 236.39000

9.14(c) Primary Teachers (Para)- Vacant Teacher9.15 Primary Teachers (Vacant) Teacher 0.30500

9.16Head Teacher for Primary (if the number of

children exceeds 150)Teacher 5.04000 156 786.240 156 786.24000

9.16(b)Head Teacher for Primary (if the number of

children exceeds 150) VacantTeacher 0.42000

Additional teachers

9.17Additional Teachers - PS (Special BTC-

Regular) in positionTeacher 0.30500

9.18Additional Teachers - PS (Special BTC Under

Training)Teacher 0.87600

9.19 Additional Teachers - PS (Vacant) Teacher

9.20Others in position (Para Teachers upgraded

as Teachers)Teacher

Upper Primary teachers

9.21 UP Teachers (Regular)-Existing Teacher 5.04000 1172 5906.880 1172 5906.88000

9.22 UP Teachers (Contract)-Existing9.23 UP Teachers (Vacant) Teacher 1.26000

9.24Head Teacher for Upper Primary (if the number

of children exceeds 100)-ExistingTeacher 5.34000 156 833.040 156 833.04000

9.24a Head Teacher for Upper Primary (Vacant) Teacher 1.33500

9.25Subject specific Upper Primary Teachers

(Regular)(a) Science and Mathematics(b) Social Studies(c) Languages

9.32 Part Time Instructors in position(a) Art Education 0.77000 135 103.950 135 103.95000(b) Health and Physical Education 0.77000 215 165.550 215 165.55000(c) Work Education 0.77000 148 113.960 148 113.96000

9.32(A) Part Time Instructors Vacant(a) Art Education 0.42000(b) Health and Physical Education 0.42000(c) Work Education 0.42000

9.33

Others-Incentive to Teachers in Schools

Located in Naxal Affected Areas (@

Rs.1500/- per teachers per month)

Sub Total (9.13 to 9.33) 4175 10090.125 4175 10090.13TOTAL

(New Teachers Salary +Teachers Salary

Recurring)

4175 10090.125 4175 10090.12500

10 Teachers Training(a) Teachers

10.01

Refresher In-service Teachers' Training at BRC

level and above - 10 days (@ Rs.200/- per

head per day)

Teacher

(Target &

Ach.-13-14

in

Mandays)

0.00600

10.01(a)Continuous and Comprehensive Evauation [PS +

UPS)Teacher 0.01300 1179 15.327 1179 15.32700

10.01(b) Eary Reading and Numeracy Skills [PS] Teacher 0.00500 1179 5.895 1179 5.89500

10.01(c) Science [UPS] Teacher 0.00800 728 5.824 728 5.82400Recommended as

proposed

10.01(d) CWSN Teacher 0.00400

Arti:SSA-AWPB-2014-15-PABMinits:Jhansi:16-06-2014 255 / 533

Page 256: U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 · 2015. 1. 6. · U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15

Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

Name of District : Jhansi - 40

ActivityS. No.Physical

UnitRemarks

Outlay Recommendation for 2014-15

Spill OverDeferred laibility of

2014-15Fresh Recommended Total Recommended

10.02

One day monthly cluster level meetings and

peer group training sessions for 10 months for

all teachers each year at CRC level - 10 days (@

Rs.100/- per head per day)

Teacher 0.01000

10.03(a)

Induction Training for Newly Recruited Teachers

for 6 Months (Special BTC)- @Rs.2000/- per

head per year

Teacher 0.02000

10.03(b)5 Days Training for Part Time Instructors @ Rs.

200/- per head per day) Teacher 0.01000

10.04

Training of untrained Teachers to acquire

professional qualifications over a two year

period.

Teacher 0.04700 859 40.373 859 40.37300

(b) Head Teachers

10.05Refresher Residencial In-service for 10 days at

BRC level and above

Head

Teacher(c) Resource Persons

10.06

Refresher Training for all Resource

Persons,Master Trainers, BRC & CRC faculty

and Coordinators for 5 days each year (@

Rs.200/- per head per day)

Resource

Person 0.00300 108 0.324 108 0.32400

Sub Total 4053 67.743 4053 67.743

11Academic Support through Block Resource

Centre (BRC)/ URC

11.01 Salary of Faculty and Staff

(a) 5 RPs at BRC for subject specific training in

positionRP 45 45

(b) 2 RPs for CWSN in position RP(b-i) 1 CWSN Resource Person RP 1.10000 12 13.200 12 13.20000

(b-ii) 1 Physiotherapist (Resource person for IE) RP

(c) 1 MIS Coordinator in position RP 1.86000

(d) 1 Datra Entry Operator in position RP 1.74000

(e) 1 Accountant-cum-support staff in position RP 1.80000

11.02 Furniture Grant BRC/ URC 1.00000

11.03Replacement of furniture, computer, TLE etc (

Once in 5 years)BRC/ URC 1.00000

11.04 Contingency Grant BRC/ URC 0.50000 9 4.500 9 4.50000

11.05 Meeting, TA BRC/ URC 0.30000 9 2.700 9 2.70000

11.06 TLM Grant BRC/ URC 0.10000

11.07 Maintenance Grant BRC/ URC 0.10000

Sub Total 9 20.400 9 20.40000

12Academic Support through Cluster

Resource Centres (CRC/UERC)

12.01Salary of Cluster Coordinator (on an average of

one Resource Person per 18 schools in a block)RP

12.02 Furniture GrantCRC/

UERC0.10000

12.03Replacement of furniture, computer, TLE etc.

once in 5 years

CRC/

UERC0.10000

12.04 Contingency Grant CRC/UERC 0.10000 66 6.600 66 6.60000

12.05 Meeting, TA CRC/UERC 0.12000 66 7.920 66 7.92000

12.06 TLM Grant CRC/UERC 0.03000

12.07Maintenance Grant

CRC/UERC 0.02000

Sub Total 132 14.520 132 14.52000

13Computer Aided Education in upper

primary schools under Innovation

13.01Computer Aided Education in upper primary

schoolsDistrict 0.01200 48 0.576 48 0.57600

Sub Total 48 0.576 48 0.5760014 Libraries in Schools14.01 (a) Primary School (per school) School 0.03000

14.02 (b) Upper Primary School (per school) School 0.10000

Sub TotalIV ANNUAL GRANTS15 Teachers' Grant15.01 Primary Teachers Teacher 0.0050015.02 Upper Primary Teachers Teacher 0.00500 728 3.640 728 3.64000

Sub Total 728 3.640 728 3.6400016 School Grant16.01 Primary School School 0.05000 1210 60.500 1210 60.5000016.02 Upper Primary School School 0.07000 658 46.060 658 46.06000

Sub Total 1868 106.560 1868 106.56000

Arti:SSA-AWPB-2014-15-PABMinits:Jhansi:16-06-2014 256 / 533

Page 257: U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 · 2015. 1. 6. · U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15

Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

Name of District : Jhansi - 40

ActivityS. No.Physical

UnitRemarks

Outlay Recommendation for 2014-15

Spill OverDeferred laibility of

2014-15Fresh Recommended Total Recommended

17Research, Evaluation, Monitoring &

Supervision

17.01 REMS Activities School 0.00103 1868 1.921 1868 1.92145

17.02 Monitoring & Supervision School 0.00078 1868 1.465 1868 1.46464

17.03 House Hold Survey (Urban) in Million Plus Cities District 35.00000

Sub Total 3736 3.386 3736 3.3860818 Maintenance Grant

18.01 Maintenance in School having upto3 Classrooms School 0.07500 642 48.150 642 48.15000

18.01a Maintenance Grant School 0.07500 1118 83.850 1118 83.85000Sub Total 1760 132.000 1760 132.00000

VBRIDGING GENDER AND SOCIAL

CATEGORY GAPS

19 Interventions for CWSN (IE)

19.01 Provision for Inclusive Education Child 0.02500 2278 56.950 2278 56.95000

Sub Total 2278 56.950 2278 56.95000

20Innovativation Head up to Rs.50 Lakh per

district

20.01 Girls Education District 0.70000 9 6.300 9 6.30000

20.02 ECCE District20.03 Intervention for SC / ST children District

20.04 Intervention for Minority Community children District

20.05 Intervention for Urban Deprived children District 10.00000

Sub Total 9 6.300 9 6.3000021 SMC/PRI Training

21.01Residential for 6 Resource Person per Block (3

days) (@ Rs.500/-)Blocks 0.09000

21.02Non-residential (3 days training of 6 SMC

members) (@ Rs.100/-)SMC 0.01800 1775 31.950 1775 31.95000

21.02(a)Non-residential (3 days training of 3 Members of

PRI/VECs/LA) (@ Rs.100/-)VEC/ WEC 0.00900

21.03

Seminar/Orientation of SMC Women members

and President/Vice President (@ Rs. 50,000/-

per block)

Blocks 0.50000

Sub Total 1775 31.950 1775 31.95000VI SCHOOL INFRASTRUCTURE22 Civil Works22.01 Primary School (Plain) (New) School 13.1550022.02 Primary School (Hilly/Rocky) (New) School 13.2750022.03 Upper Primary (Plain) (New) School 20.65500

22.04 Upper Primary School (Hilly/Rocky) (New) School 0.15464 20.77500 0.15464

22.04aComposite Schools for Urban Areas (Class I-

VIII)School 71.2400 41.04000 71.24000

22.05 ACR in lieu of upgraded Upper Primary School Rooms

22.06 Additional class rooms for adding Class VIII Rooms

22.07 Building Less (Pry) School 9.7500022.08 Building Less (UP) School 18.5900022.09 Dilapidated Building (Pry) School 9.7500022.10 Dilapidated Building (UP) School 18.59000

22.11 Additional Class Room (Rural) ( PS+UPS) Rooms 3.45000 99 341.550 99 341.55000

22.12 Additional Class Room (Urban) Rooms 3.4500022.13 Additional Class Room (Hill Area)22.14 Toilet/Urinals (PS & UPS) School 0.7000022.15 Separate Girls Toilet (Rural+Urban) School 0.7000022.16 CWSN friendly Toilets School 0.50000

22.17 Drinking Water Facility (for Urban Area Only)) School 0.15000

22.17a Drinking Water Facility (Plain PS & UPS) School 0.15000

22.17b Drinking Water Facility (Hilly/Rocky PS & UPS) School 0.15000 70 10.500 70 10.50000

22.18a Boundary Wall PS (Total in Meters x .01105) 0.01749

22.18bBoundary Wall PS (For Gate) @Rs. 7000 x no. of

P.S.School 0.07800

22.18c Boundary Wall UPS (Total in Meters x .01105) 0.01749

22.18dBoundary Wall UPS (For Gate) @Rs. 7000 x no.

of UPSSchool 0.07800

22.19a Electrification in P.S./ Electrical Equipment School 0.11000

22.19b Electrification in U. P.S./ Electrical Equipment School 0.11000

22.20Office-cum-store-cum-Head Teacher's room

(Primary)Rooms

22.21Office-cum-store-cum-Head Teacher's room

(Upper Primary)Rooms

22.22Augumentation of training facility in BRC (one

time)BRC/ URC 5.00000

22.23 Child friendly Elements School 0.25000

22.24 Ramps with Handrails (Barrier Free Elements) School 0.06000 102 6.120 102 6.12000

22.25 Handrails in existing Ramps School 0.01000

Arti:SSA-AWPB-2014-15-PABMinits:Jhansi:16-06-2014 257 / 533

Page 258: U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 · 2015. 1. 6. · U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15

Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

Name of District : Jhansi - 40

ActivityS. No.Physical

UnitRemarks

Outlay Recommendation for 2014-15

Spill OverDeferred laibility of

2014-15Fresh Recommended Total Recommended

22.26 Whole School Develoipment School22.27 Retro-fitting and repairs School

22.28Residential Schools for specific category

of children

(a) Construction of Building including boundary

wall, Water and sanitation facilities, electric

installation (For 100 children)

Building 65.86000

(b) Construction of residential hostel Building 65.86000

(c) Refurnishing unused old buildings Building

22.29

Construction of Hostel in existing Govt UPS

including boundary wall, Water and sanitation

facilities, electric installation etc. (For 50

children)

7.00000

22.30Furniture for Govt. UPS (per child) (@ Rs.500/-

per child enrolled)Child 0.00500

22.31 Major Repairs for Primary School School 0.30000

22.32 Majr Repairs for Upper Primary School School 0.30000

22.33Others (Difference of Civil Wrks

sanctioned in pre.yr.)22.33a Others (Overhead Tank PS) School 0.1200022.33b Others (Overhead Tank UPS) School 0.12000

Sub Total (Civil WOrks) 71.39 271 358.170 271 429.56VII PROJECT MANAGEMENT COST23 Management23.01 Management up to 3.5%

(a) Project Management and MIS

(i) DPO ( Salary, Contigency, Consumables,

POL, TA & Computer etc)District 1 129.906 1 129.90600

(ii) EMIS Cell District 1 12.423 1 12.42300Sub Total (a) 1 1 1 142.329 1 142.329

(b) Training of Educational Administrators District

(c) School Mapping and Social Mapping District

Sub Total (23.01)

23.02Learning Enhancement Prog. (LEP) (P & UP) (up

to 2%)District 12.965 12.96535

23.03 Community Mobilization (up to 0.5%) District 1 58.000 1 58.00000

Sub Total (Management) 1 70.965 1 70.96535Total Management Cost 213.294 213.29435Total of SSA (Districs) 71.395 23.000 312170 11928.462 312170 12022.856

24 State Component23.01 Management23.02 REMS 0.0044923.03 SIEMAT

Sub Total

STATE SSA TOTAL 71.39464 23.00000 312170 11928.462 312170 12022.85637

25

KGBV Financial Provision (give

separate costing sheets for different

Models)

Hostel

ANon Recurring One Time Grant (Only

committed liabilities) (Model-I)

25.01 Construction of Building (New)

25.02 Construction of Building KGBV sanctioned earlier 31.08300 31.08300

25.02(a) Additional Class Room Rooms 3.45000

25.02(b) Guard Room Rooms 1.32000

25.02(c) Boundary Wall School 5.0200025.03 Boudary Wall (Spillover only)

25.04

Boring/Handpump (Spillover only)

(minimum rates prescribed by State Drinking

Water Department subject to a ceiling of Rs.

1.00 lakhs)

25.05 Electricity /Water charges (Spillover only)

25.05(a) Solar Water Heater & Solar Light 2.97000

25.06Furniture/Equipment (including Kitchen

equipment)3.00000

25.07 TLM and equipment including library books 3.50000

25.08 Bedding (New) 0.75000

25.09 Replacement of Bedding (once in 3 Year) 0.75000 9 6.750 9 6.75000

Subtotal Non Recurring 31.08300 6.750 37.83300

B Recurring Cost Per Annum (Model-I)

25.10Maintenance per girl student per month @ Rs.

1500/-18.00000 9 162.000 9 162.00000

25.11 Stipend for girl student per month @ Rs. 100/- 1.20000 9 10.800 9 10.80000

25.12Supplementary TLM, stationery and other

educational material @ Rs.1000/- per annum1.00000 9 9.000 9 9.00000

25.13 Salaries

Arti:SSA-AWPB-2014-15-PABMinits:Jhansi:16-06-2014 258 / 533

Page 259: U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 · 2015. 1. 6. · U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15

Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

Name of District : Jhansi - 40

ActivityS. No.Physical

UnitRemarks

Outlay Recommendation for 2014-15

Spill OverDeferred laibility of

2014-15Fresh Recommended Total Recommended

25.13.1 Additional Salaries:

(a) 1 Warden @ Rs. 25,000/- per month 3.00000 9 27.00000 9 27.00000

(b)4 Full time teachers as per RTE norms @ Rs.

20,000/- per month per teacher 9.60000 9 86.40000 9 86.40000

(c)

1 Urdu Teachers (only for blocks with muslim

population above 20% and select urban areas), if

required @ Rs. 12,000/- per month per teacher 1.44000 9 12.96000 9 12.96000

(d)3 part time teachers @ Rs. 5,000/- per month per

teacher 1.80000 9 16.20000 9 16.20000

(e)1 Full time Accountant @ Rs. 10,000/- per month

1.20000 9 10.80000 9 10.80000

(f)

2 Support Staff – (Accountant/ Assistant, Peon,

Chowkidar) @ Rs. 5,000/- per month per staff 1.20000 9 10.80000 9 10.80000

(g) 1 Head cook @ Rs. 6,000/- per month 0.72000 9 6.48000 9 6.48000

(h)2 Asstt. Cooks @ Rs. 4,500/- per month per cook

1.08000 9 9.72000 9 9.72000

25.14Specific skill training @ Rs.1000/- per child per

annum1.00000 9 9.000 9 9.00000

25.15Electricity/water charges @ Rs.1000/- per child

per annum1.00000 9 9.000 9 9.00000

25.16Medical care/contingencies @ Rs. 1250 per child

per annum1.25000 9 11.250 9 11.25000

25.17 Maintenance @ Rs.750/- per child per annum 0.75000 9 6.750 9 6.75000

25.18

Miscellaneous (Educational Tour/ Exposure Visit

/ Sports Material etc.) @ Rs.750/- per child per

annum

0.75000 9 6.750 9 6.75000

25.19Preparatory camps @ Rs.200/- per child per

annum0.20000 9 1.800 9 1.80000

25.20PTAs/school functions @ Rs.200/- per child per

annum0.20000 9 1.800 9 1.80000

25.21 Provision of Rent @ Rs.6000/- per annum 6.00000

25.21a Provision of Rent (6 months) 3.6000025.21b Provision of Rent (3 months) 1.8000025.21c Rent (Previous Year (2007-2012)

25.22 Capacity building 0.50000 9 4.500 9 4.50000

25.22(a)Physical/ Self Defence Training @ Rs.200/- per

child per annum0.20000 9 1.800 9 1.80000

Subtotal Recurring 9 414.810 9 414.81000

Subtotal (Model-I) 31.08300 9 421.560 9 452.64300

CNon Recurring One Time Grant (Only

committed liabilities) (Model-II)

25.23 Construction of Building (New)

25.24 Construction of Building KGBV sanctioned earlier

25.24(a) Additional Class Room Rooms 3.45000

25.24(b) Guard Room Rooms 1.32000

25.24(c) Boundary Wall School 5.0200025.25 Boudary Wall (Spillover only)25.26 Boring/Handpump (Spillover only)

25.27 Electricity /Water charges (Spillover only)

25.27(a) Solar Water Heater & Solar Light 2.97000

25.28Furniture/Equipment (including Kitchen

equipment)2.00000

25.29 TLM and equipment including library books 3.00000

25.30 Bedding (New) 0.37500

25.31 Replacement of Bedding (once in 3 Year) 0.37500

Subtotal Non Recurring

D Recurring Cost Per Annum (Model-II)

25.32Maintenance per girl student per month @ Rs.

1500/-9.00000

25.33 Stipend for girl student per month @ Rs. 100/- 0.60000

25.34Supplementary TLM, stationery and other

educational material @ Rs.1000/- per annum0.50000

25.35 Salaries(a) 1 Warden @ Rs. 25,000/- per month 3.00000

(b)3 Full time teachers as per RTE norms @ Rs.

20,000/- per month per teacher 7.20000

(c) 3 part time teachers @ Rs. 5,000/- per month per

teacher 1.80000

(d)1 Full time Accountant @ Rs. 10,000/- per month

1.20000

(e)

2 Support Staff – (Accountant/ Assistant, Peon,

Chowkidar) @ Rs. 5,000/- per month per staff 1.20000

Arti:SSA-AWPB-2014-15-PABMinits:Jhansi:16-06-2014 259 / 533

Page 260: U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 · 2015. 1. 6. · U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15

Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

Name of District : Jhansi - 40

ActivityS. No.Physical

UnitRemarks

Outlay Recommendation for 2014-15

Spill OverDeferred laibility of

2014-15Fresh Recommended Total Recommended

(f) 1 Head cook @ Rs. 6,000/- per month 0.72000

(g)1 Asstt. Cooks @ Rs. 4,500/- per month per cook

0.54000

25.36Specific skill training @ Rs.1000/- per child per

annum0.50000

25.37Electricity/water charges @ Rs.1000/- per child

per annum0.50000

25.38Medical care/contingencies @ Rs. 1250 per child

per annum0.62500

25.39 Maintenance @ Rs.750/- per child per annum 0.37500

25.40

Miscellaneous (Educational Tour/ Exposure Visit

/ Sports Material etc.) @ Rs.750/- per child per

annum

0.37500

25.41Preparatory camps @ Rs.300/- per child per

annum0.15000

25.42PTAs/school functions @ Rs.300/- per child per

annum0.15000

25.43 Provision of Rent @ Rs.10000/- per annum 5.00000

25.43a Provision of Rent (6 months) 3.6000025.43b Provision of Rent (3 months) 1.8000025.43c Rent (Previous Year (2007-2012)25.44 Capacity building 0.25000

25.44(a)Physical/ Self Defence Training @ Rs.200/- per

child per annum0.10000

Subtotal Recurring

Subtotal (Model-II) Total (KGBV) 31.083 9 421.560 9 452.643

DISTRICT GRAND TOTAL (SSA+KGBV) 102.478 23.000 312179 12350.022 312179 12475.499

Arti:SSA-AWPB-2014-15-PABMinits:Jhansi:16-06-2014 260 / 533

Page 261: U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 · 2015. 1. 6. · U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15

Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

I ACCESS

1 Opening of New Schools

1.01 Upgradation of EGS to PSCentres /

School1.02 New PS School

1.03 Upgradation of PS to UPS / New UPS School

1.04 Composite Schools (for Urban Areas) School

1.05Residential Schools for specific category children

(For 100 children)

1.06Residential Hostel (for specific category of

children) (For 50 children)

1.07 Integration of Class V with Primary Schools

1.08Integration of Class VIII with Upper Primary

Schools

2Residential Schools for specific category

of children (For 100 Children)

Total - Residential Schools (For 100

children)

3Residential Hostel for specific category of

children (For 50 Children)

Total - Residential Schools (For 50

children)4 Transport/Escort Facility

4.01

Children in remote habitations with sparse

populations where opening of schools is

unviable

Child 0.03000

4.02

Urban deprived children/children without adult

protection in urban areas where schools are not

opened because availability of land is a problem

Child 0.03000

Sub Total

5Special Training for mainstreaming of Out-

of-School Children

5.03 Non-Residential (Fresh)(a) 12 months Child 0.06000(b) 9 months 0.04500(c) 6 months

(i)Special Training (by Special Instructors-NRBC)-

(1-5) Child 0.03000 56 1.680 56 1.68000

(ii) Special Training (by Special Instructors-NRBC)-

(6-8) Child 0.03000 68 2.040 68 2.04000

(d) 3 months Child 0.01500Sub Total 124 3.720 124 3.72000

Total (Special Training) 124 3.720 124 3.7205(B) House Hold Survey (HHS)

5(B).01 House Hold Survey through SMCHouse

Hold0.00001

Sub TotalII RETENTION6 Free Text Book

6.01Free Text Book (PS) for Parishadiya & Aided

Primary Schools (Workbooks not included)Child 0.00120 277714 333.257 277714 333.25680

6.01a

Free Text Book (PS) for 25% children of Class-1

in Private Recognised Primary Schools of other

Boards (Workbooks not included)

Child 0.00150

6.02 Free Brail Books (PS) 0.00150 194 0.291 194 0.29100

6.03 Free Large Print Books (PS) 0.00150

6.04Free Text Book (UPS) (Workbooks not included)

(Including KGBV Girls)Child 0.00200 108220 216.440 108220 216.44000

6.05 Free Brail Books (UPS) 0.00250 61 0.153 61 0.15250

6.06 Free Large Print Books (PS) 0.00250Sub Total 386189 550.140 386189 550.140

7 Provision of 2 set of Uniforms

7.01 All Girls (Including KGBV Girls) Child 0.00400 324137 1296.548 324137 1296.54800

7.02 SC Boys Child 0.00400 47359 189.436 47359 189.43600

7.03 ST Boys Child 0.00400

7.04 BPL Boys Child 0.00400 192102 768.408 192102 768.40800

7.05

Free Uniform for 25% children of Class-1 in

Private Recognised Primary Schools of other

Boards

Child0.00400

Sub Total 563598 2254.392 563598 2254.3927(A) Fee Reimbursement

7(A).01

Fee Reimbursement for Admission of children of

Disadvantaged Group & Weaker Section upto

25% of seats in Class-1 of Private Unaided

Recognised Schools

Child 0.05400

Sub Total

8 Teaching Learning Equipment (TLE)

8.01 TLE - New Primary School 34.00000 0.20000 34.000008.02 TLE - New Upper Primary School 11.50000 0.50000 11.50000

Name of District : Jaunpur -39

ActivityS. No.Physical

UnitRemarks

Outlay Recommendation for 2014-15

Spill OverDeferred laibility of

2014-15Fresh Recommended Total Recommended

Arti:SSA-AWPB-2014-15-PABMinits:Jaunpur:16-06-2014 261 / 533

Page 262: U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 · 2015. 1. 6. · U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15

Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

Name of District : Jaunpur -39

ActivityS. No.Physical

UnitRemarks

Outlay Recommendation for 2014-15

Spill OverDeferred laibility of

2014-15Fresh Recommended Total Recommended

Sub Total 45.50000 45.50000III ENHANCING QUALITY9 New Teachers Salary

9.01 Primary Teachers (Regular) (Asstt. Teacher) Teacher 0.91500

9.01aHead Teacher for Primary (if the number of

children exceeds 150 in a school)Teacher

9.02 Primary Teachers (Contract) (S.M.) Teacher

9.03Subject specific Upper Primary Teachers

(Regular) (a) Science and Mathematics Teacher 1.26000(b) Social Studies Teacher 1.26000(c) Languages Teacher 1.26000

Sub Total (9.01 to 9.05)Add.Teacher against PTR

Sub Total (9.06 to 9.12)

Total (New Teacher's Salary-9.01 to 9.12)

Teachers Salary (Recurring-sanctioned

earlier)Primary teachers

9.13 Primary Teachers ( Regular)-Existing, in position Teacher 3.66000 83 303.780 83 303.78000

9.14Primary Teachers (Contract)-Existing, in

positionTeacher 0.55000

9.14(a) Primary Teachers (Contract)-under Training Teacher 0.38500 2289 881.265 2289 881.26500

9.14(b)Primary Teacher (Para Teachers Equal to

9.14(a) upgraded as Teachers)0.38500 1348 518.980 1348 518.98000

9.14(c) Primary Teachers (Para)- Vacant Teacher9.15 Primary Teachers (Vacant) Teacher 0.30500

9.16Head Teacher for Primary (if the number of

children exceeds 150)Teacher 5.04000 219 1103.760 219 1103.76000

9.16(b)Head Teacher for Primary (if the number of

children exceeds 150) VacantTeacher 0.42000

Additional teachers

9.17Additional Teachers - PS (Special BTC-

Regular) in positionTeacher 0.30500

9.18Additional Teachers - PS (Special BTC Under

Training)Teacher 0.87600

9.19 Additional Teachers - PS (Vacant) Teacher

9.20Others in position (Para Teachers upgraded

as Teachers)Teacher

Upper Primary teachers

9.21 UP Teachers (Regular)-Existing Teacher 5.04000 1266 6380.640 1266 6380.64000

9.22 UP Teachers (Contract)-Existing9.23 UP Teachers (Vacant) Teacher 1.26000

9.24Head Teacher for Upper Primary (if the number

of children exceeds 100)-ExistingTeacher 5.34000 278 1484.520 278 1484.52000

9.24a Head Teacher for Upper Primary (Vacant) Teacher 1.33500

9.25Subject specific Upper Primary Teachers

(Regular)(a) Science and Mathematics(b) Social Studies(c) Languages

9.32 Part Time Instructors in position(a) Art Education 0.77000 295 227.150 295 227.15000(b) Health and Physical Education 0.77000 338 260.260 338 260.26000(c) Work Education 0.77000 301 231.770 301 231.77000

9.32(A) Part Time Instructors Vacant(a) Art Education 0.42000(b) Health and Physical Education 0.42000(c) Work Education 0.42000

9.33

Others-Incentive to Teachers in Schools

Located in Naxal Affected Areas (@

Rs.1500/- per teachers per month)

Sub Total (9.13 to 9.33) 6417 11392.125 6417 11392.13TOTAL

(New Teachers Salary +Teachers Salary

Recurring)

6417 11392.125 6417 11392.12500

10 Teachers Training(a) Teachers

10.01

Refresher In-service Teachers' Training at BRC

level and above - 10 days (@ Rs.200/- per

head per day)

Teacher

(Target &

Ach.-13-14

in

Mandays)

0.00600

10.01(a)Continuous and Comprehensive Evauation [PS +

UPS)Teacher 0.01300 2351 30.563 2351 30.56300

10.01(b) Eary Reading and Numeracy Skills [PS] Teacher 0.00500 2351 11.755 2351 11.75500

10.01(c) Science [UPS] Teacher 0.00800 1030 8.240 1030 8.24000Recommended as

proposed

10.01(d) CWSN Teacher 0.00400

Arti:SSA-AWPB-2014-15-PABMinits:Jaunpur:16-06-2014 262 / 533

Page 263: U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 · 2015. 1. 6. · U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15

Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

Name of District : Jaunpur -39

ActivityS. No.Physical

UnitRemarks

Outlay Recommendation for 2014-15

Spill OverDeferred laibility of

2014-15Fresh Recommended Total Recommended

10.02

One day monthly cluster level meetings and

peer group training sessions for 10 months for

all teachers each year at CRC level - 10 days (@

Rs.100/- per head per day)

Teacher 0.01000

10.03(a)

Induction Training for Newly Recruited Teachers

for 6 Months (Special BTC)- @Rs.2000/- per

head per year

Teacher 0.02000

10.03(b)5 Days Training for Part Time Instructors @ Rs.

200/- per head per day) Teacher 0.01000

10.04

Training of untrained Teachers to acquire

professional qualifications over a two year

period.

Teacher 0.04700 1321 62.087 1321 62.08700

(b) Head Teachers

10.05Refresher Residencial In-service for 10 days at

BRC level and above

Head

Teacher(c) Resource Persons

10.06

Refresher Training for all Resource

Persons,Master Trainers, BRC & CRC faculty

and Coordinators for 5 days each year (@

Rs.200/- per head per day)

Resource

Person 0.00300 264 0.792 264 0.79200

Sub Total 7317 113.437 7317 113.437

11Academic Support through Block Resource

Centre (BRC)/ URC

11.01 Salary of Faculty and Staff

(a) 5 RPs at BRC for subject specific training in

positionRP 110 110

(b) 2 RPs for CWSN in position RP(b-i) 1 CWSN Resource Person RP 1.10000 44 48.400 44 48.40000

(b-ii) 1 Physiotherapist (Resource person for IE) RP

(c) 1 MIS Coordinator in position RP 1.86000

(d) 1 Datra Entry Operator in position RP 1.74000 22 38.280 22 38.28000

(e) 1 Accountant-cum-support staff in position RP 1.80000 23 41.400 23 41.40000

11.02 Furniture Grant BRC/ URC 1.00000

11.03Replacement of furniture, computer, TLE etc (

Once in 5 years)BRC/ URC 1.00000

11.04 Contingency Grant BRC/ URC 0.50000 22 11.000 22 11.00000

11.05 Meeting, TA BRC/ URC 0.30000 22 6.600 22 6.60000

11.06 TLM Grant BRC/ URC 0.10000

11.07 Maintenance Grant BRC/ URC 0.10000

Sub Total 22 145.680 22 145.68000

12Academic Support through Cluster

Resource Centres (CRC/UERC)

12.01Salary of Cluster Coordinator (on an average of

one Resource Person per 18 schools in a block)RP

12.02 Furniture GrantCRC/

UERC0.10000

12.03Replacement of furniture, computer, TLE etc.

once in 5 years

CRC/

UERC0.10000

12.04 Contingency Grant CRC/UERC 0.10000 219 21.900 219 21.90000

12.05 Meeting, TA CRC/UERC 0.12000 219 26.280 219 26.28000

12.06 TLM Grant CRC/UERC 0.03000

12.07Maintenance Grant

CRC/UERC 0.02000

Sub Total 438 48.180 438 48.18000

13Computer Aided Education in upper

primary schools under Innovation

13.01Computer Aided Education in upper primary

schoolsDistrict 0.01200 48 0.576 48 0.57600

Sub Total 48 0.576 48 0.5760014 Libraries in Schools14.01 (a) Primary School (per school) School 0.03000

14.02 (b) Upper Primary School (per school) School 0.10000

Sub TotalIV ANNUAL GRANTS15 Teachers' Grant15.01 Primary Teachers Teacher 0.0050015.02 Upper Primary Teachers Teacher 0.00500 1030 5.150 1030 5.15000

Sub Total 1030 5.150 1030 5.1500016 School Grant16.01 Primary School School 0.05000 2416 120.800 2416 120.8000016.02 Upper Primary School School 0.07000 1008 70.560 1008 70.56000

Sub Total 3424 191.360 3424 191.36000

Arti:SSA-AWPB-2014-15-PABMinits:Jaunpur:16-06-2014 263 / 533

Page 264: U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 · 2015. 1. 6. · U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15

Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

Name of District : Jaunpur -39

ActivityS. No.Physical

UnitRemarks

Outlay Recommendation for 2014-15

Spill OverDeferred laibility of

2014-15Fresh Recommended Total Recommended

17Research, Evaluation, Monitoring &

Supervision

17.01 REMS Activities School 0.00103 3424 3.522 3424 3.52197

17.02 Monitoring & Supervision School 0.00078 3424 2.685 3424 2.68464

17.03 House Hold Survey (Urban) in Million Plus Cities District 35.00000

Sub Total 6848 6.207 6848 6.2066118 Maintenance Grant

18.01 Maintenance in School having upto3 Classrooms School 0.07500 619 46.425 619 46.42500

18.01a Maintenance Grant School 0.07500 2455 184.125 2455 184.12500Sub Total 3074 230.550 3074 230.55000

VBRIDGING GENDER AND SOCIAL

CATEGORY GAPS

19 Interventions for CWSN (IE)

19.01 Provision for Inclusive Education Child 0.01500 4583 68.745 4583 68.74500

Sub Total 4583 68.745 4583 68.74500

20Innovativation Head up to Rs.50 Lakh per

district

20.01 Girls Education District 0.70000 11 7.700 11 7.70000

20.02 ECCE District20.03 Intervention for SC / ST children District

20.04 Intervention for Minority Community children District

20.05 Intervention for Urban Deprived children District 10.00000

Sub Total 11 7.700 11 7.7000021 SMC/PRI Training

21.01Residential for 6 Resource Person per Block (3

days) (@ Rs.500/-)Blocks 0.09000

21.02Non-residential (3 days training of 6 SMC

members) (@ Rs.100/-)SMC 0.01800 3313 59.634 3313 59.63400

21.02(a)Non-residential (3 days training of 3 Members of

PRI/VECs/LA) (@ Rs.100/-)VEC/ WEC 0.00900

21.03

Seminar/Orientation of SMC Women members

and President/Vice President (@ Rs. 50,000/-

per block)

Blocks 0.50000

Sub Total 3313 59.634 3313 59.63400VI SCHOOL INFRASTRUCTURE22 Civil Works22.01 Primary School (Plain) (New) School 13.1550022.02 Primary School (Hilly/Rocky) (New) School 13.2750022.03 Upper Primary (Plain) (New) School 20.65500

22.04 Upper Primary School (Hilly/Rocky) (New) School 20.77500

22.04aComposite Schools for Urban Areas (Class I-

VIII)School 41.04000

22.05 ACR in lieu of upgraded Upper Primary School Rooms

22.06 Additional class rooms for adding Class VIII Rooms

22.07 Building Less (Pry) School 9.7500022.08 Building Less (UP) School 18.5900022.09 Dilapidated Building (Pry) School 9.7500022.10 Dilapidated Building (UP) School 18.59000

22.11 Additional Class Room (Rural) ( PS+UPS) Rooms 3.45000 145 500.250 145 500.25000

22.12 Additional Class Room (Urban) Rooms 3.4500022.13 Additional Class Room (Hill Area)22.14 Toilet/Urinals (PS & UPS) School 0.7000022.15 Separate Girls Toilet (Rural+Urban) School 0.70000 37 25.900 37 25.9000022.16 CWSN friendly Toilets School 0.50000

22.17 Drinking Water Facility (for Urban Area Only)) School 0.15000

22.17a Drinking Water Facility (Plain PS & UPS) School 0.15000

22.17b Drinking Water Facility (Hilly/Rocky PS & UPS) School 0.15000

22.18a Boundary Wall PS (Total in Meters x .01105) 0.01749

22.18bBoundary Wall PS (For Gate) @Rs. 7000 x no. of

P.S.School 0.07800

22.18c Boundary Wall UPS (Total in Meters x .01105) 0.01749

22.18dBoundary Wall UPS (For Gate) @Rs. 7000 x no.

of UPSSchool 0.07800

22.19a Electrification in P.S./ Electrical Equipment School 0.11000

22.19b Electrification in U. P.S./ Electrical Equipment School 0.11000

22.20Office-cum-store-cum-Head Teacher's room

(Primary)Rooms

22.21Office-cum-store-cum-Head Teacher's room

(Upper Primary)Rooms

22.22Augumentation of training facility in BRC (one

time)BRC/ URC 5.00000

22.23 Child friendly Elements School 0.25000

22.24 Ramps with Handrails (Barrier Free Elements) School 0.06000

22.25 Handrails in existing Ramps School 0.01000

Arti:SSA-AWPB-2014-15-PABMinits:Jaunpur:16-06-2014 264 / 533

Page 265: U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 · 2015. 1. 6. · U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15

Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

Name of District : Jaunpur -39

ActivityS. No.Physical

UnitRemarks

Outlay Recommendation for 2014-15

Spill OverDeferred laibility of

2014-15Fresh Recommended Total Recommended

22.26 Whole School Develoipment School22.27 Retro-fitting and repairs School

22.28Residential Schools for specific category

of children

(a) Construction of Building including boundary

wall, Water and sanitation facilities, electric

installation (For 100 children)

Building 65.86000

(b) Construction of residential hostel Building 65.86000

(c) Refurnishing unused old buildings Building

22.29

Construction of Hostel in existing Govt UPS

including boundary wall, Water and sanitation

facilities, electric installation etc. (For 50

children)

7.00000

22.30Furniture for Govt. UPS (per child) (@ Rs.500/-

per child enrolled)Child 0.00500

22.31 Major Repairs for Primary School School 0.30000

22.32 Majr Repairs for Upper Primary School School 0.30000

22.33Others (Difference of Civil Wrks

sanctioned in pre.yr.)22.33a Others (Overhead Tank PS) School 0.1200022.33b Others (Overhead Tank UPS) School 0.12000

Sub Total (Civil WOrks) 182 526.150 182 526.15VII PROJECT MANAGEMENT COST23 Management23.01 Management up to 3.5%

(a) Project Management and MIS

(i) DPO ( Salary, Contigency, Consumables,

POL, TA & Computer etc)District 1 94.111 1 94.11130

(ii) EMIS Cell District 1 25.930 1 25.93000Sub Total (a) 1 1 1 120.041 1 120.041

(b) Training of Educational Administrators District

(c) School Mapping and Social Mapping District

Sub Total (23.01)

23.02Learning Enhancement Prog. (LEP) (P & UP) (up

to 2%)District 31.377 31.37670

23.03 Community Mobilization (up to 0.5%) District 1 45.850 1 45.85000

Sub Total (Management) 1 77.227 1 77.22670Total Management Cost 197.268 197.26800Total of SSA (Districs) 45.500 986618 15801.014 986618 15846.514

24 State Component23.01 Management23.02 REMS 0.0044923.03 SIEMAT

Sub Total

STATE SSA TOTAL 45.50000 986618 15801.014 986618 15846.51391

25

KGBV Financial Provision (give

separate costing sheets for different

Models)

Hostel

ANon Recurring One Time Grant (Only

committed liabilities) (Model-I)

25.01 Construction of Building (New)

25.02 Construction of Building KGBV sanctioned earlier 5.20000 5.20000

25.02(a) Additional Class Room Rooms 3.45000

25.02(b) Guard Room Rooms 1.32000

25.02(c) Boundary Wall School 5.0200025.03 Boudary Wall (Spillover only) 4.50000 4.50000

25.04

Boring/Handpump (Spillover only)

(minimum rates prescribed by State Drinking

Water Department subject to a ceiling of Rs.

1.00 lakhs)

5.76000 5.76000

25.05 Electricity /Water charges (Spillover only)

25.05(a) Solar Water Heater & Solar Light 2.97000

25.06Furniture/Equipment (including Kitchen

equipment)3.00000

25.07 TLM and equipment including library books 3.50000

25.08 Bedding (New) 0.75000

25.09 Replacement of Bedding (once in 3 Year) 0.75000

Subtotal Non Recurring 15.46000 15.46000

B Recurring Cost Per Annum (Model-I)

25.10Maintenance per girl student per month @ Rs.

1500/-18.00000 19 342.000 19 342.00000

25.11 Stipend for girl student per month @ Rs. 100/- 1.20000 19 22.800 19 22.80000

25.12Supplementary TLM, stationery and other

educational material @ Rs.1000/- per annum1.00000 19 19.000 19 19.00000

25.13 Salaries

Arti:SSA-AWPB-2014-15-PABMinits:Jaunpur:16-06-2014 265 / 533

Page 266: U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 · 2015. 1. 6. · U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15

Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

Name of District : Jaunpur -39

ActivityS. No.Physical

UnitRemarks

Outlay Recommendation for 2014-15

Spill OverDeferred laibility of

2014-15Fresh Recommended Total Recommended

25.13.1 Additional Salaries:

(a) 1 Warden @ Rs. 25,000/- per month 3.00000 19 57.00000 19 57.00000

(b)4 Full time teachers as per RTE norms @ Rs.

20,000/- per month per teacher 9.60000 19 182.40000 19 182.40000

(c)

1 Urdu Teachers (only for blocks with muslim

population above 20% and select urban areas), if

required @ Rs. 12,000/- per month per teacher 1.44000 19 27.36000 19 27.36000

(d)3 part time teachers @ Rs. 5,000/- per month per

teacher 1.80000 19 34.20000 19 34.20000

(e)1 Full time Accountant @ Rs. 10,000/- per month

1.20000 19 22.80000 19 22.80000

(f)

2 Support Staff – (Accountant/ Assistant, Peon,

Chowkidar) @ Rs. 5,000/- per month per staff 1.20000 19 22.80000 19 22.80000

(g) 1 Head cook @ Rs. 6,000/- per month 0.72000 19 13.68000 19 13.68000

(h)2 Asstt. Cooks @ Rs. 4,500/- per month per cook

1.08000 19 20.52000 19 20.52000

25.14Specific skill training @ Rs.1000/- per child per

annum1.00000 19 19.000 19 19.00000

25.15Electricity/water charges @ Rs.1000/- per child

per annum1.00000 19 19.000 19 19.00000

25.16Medical care/contingencies @ Rs. 1250 per child

per annum1.25000 19 23.750 19 23.75000

25.17 Maintenance @ Rs.750/- per child per annum 0.75000 19 14.250 19 14.25000

25.18

Miscellaneous (Educational Tour/ Exposure Visit

/ Sports Material etc.) @ Rs.750/- per child per

annum

0.75000 19 14.250 19 14.25000

25.19Preparatory camps @ Rs.200/- per child per

annum0.20000 19 3.800 19 3.80000

25.20PTAs/school functions @ Rs.200/- per child per

annum0.20000 19 3.800 19 3.80000

25.21 Provision of Rent @ Rs.6000/- per annum 6.00000

25.21a Provision of Rent (6 months) 3.6000025.21b Provision of Rent (3 months) 1.8000025.21c Rent (Previous Year (2007-2012)

25.22 Capacity building 0.50000 19 9.500 19 9.50000

25.22(a)Physical/ Self Defence Training @ Rs.200/- per

child per annum0.20000 19 3.800 19 3.80000

Subtotal Recurring 19 875.710 19 875.71000

Subtotal (Model-I) 15.46000 19 875.710 19 891.17000

CNon Recurring One Time Grant (Only

committed liabilities) (Model-II)

25.23 Construction of Building (New)

25.24 Construction of Building KGBV sanctioned earlier

25.24(a) Additional Class Room Rooms 3.45000

25.24(b) Guard Room Rooms 1.32000

25.24(c) Boundary Wall School 5.0200025.25 Boudary Wall (Spillover only)25.26 Boring/Handpump (Spillover only)

25.27 Electricity /Water charges (Spillover only)

25.27(a) Solar Water Heater & Solar Light 2.97000

25.28Furniture/Equipment (including Kitchen

equipment)2.00000

25.29 TLM and equipment including library books 3.00000

25.30 Bedding (New) 0.37500

25.31 Replacement of Bedding (once in 3 Year) 0.37500

Subtotal Non Recurring

D Recurring Cost Per Annum (Model-II)

25.32Maintenance per girl student per month @ Rs.

1500/-9.00000

25.33 Stipend for girl student per month @ Rs. 100/- 0.60000

25.34Supplementary TLM, stationery and other

educational material @ Rs.1000/- per annum0.50000

25.35 Salaries(a) 1 Warden @ Rs. 25,000/- per month 3.00000

(b)3 Full time teachers as per RTE norms @ Rs.

20,000/- per month per teacher 7.20000

(c) 3 part time teachers @ Rs. 5,000/- per month per

teacher 1.80000

(d)1 Full time Accountant @ Rs. 10,000/- per month

1.20000

(e)

2 Support Staff – (Accountant/ Assistant, Peon,

Chowkidar) @ Rs. 5,000/- per month per staff 1.20000

Arti:SSA-AWPB-2014-15-PABMinits:Jaunpur:16-06-2014 266 / 533

Page 267: U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 · 2015. 1. 6. · U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15

Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

Name of District : Jaunpur -39

ActivityS. No.Physical

UnitRemarks

Outlay Recommendation for 2014-15

Spill OverDeferred laibility of

2014-15Fresh Recommended Total Recommended

(f) 1 Head cook @ Rs. 6,000/- per month 0.72000

(g)1 Asstt. Cooks @ Rs. 4,500/- per month per cook

0.54000

25.36Specific skill training @ Rs.1000/- per child per

annum0.50000

25.37Electricity/water charges @ Rs.1000/- per child

per annum0.50000

25.38Medical care/contingencies @ Rs. 1250 per child

per annum0.62500

25.39 Maintenance @ Rs.750/- per child per annum 0.37500

25.40

Miscellaneous (Educational Tour/ Exposure Visit

/ Sports Material etc.) @ Rs.750/- per child per

annum

0.37500

25.41Preparatory camps @ Rs.300/- per child per

annum0.15000

25.42PTAs/school functions @ Rs.300/- per child per

annum0.15000

25.43 Provision of Rent @ Rs.10000/- per annum 5.00000

25.43a Provision of Rent (6 months) 3.6000025.43b Provision of Rent (3 months) 1.8000025.43c Rent (Previous Year (2007-2012)25.44 Capacity building 0.25000

25.44(a)Physical/ Self Defence Training @ Rs.200/- per

child per annum0.10000

Subtotal Recurring

Subtotal (Model-II) Total (KGBV) 15.460 19 875.710 19 891.170

DISTRICT GRAND TOTAL (SSA+KGBV) 15.460 45.500 986637 16676.724 986637 16737.684

Arti:SSA-AWPB-2014-15-PABMinits:Jaunpur:16-06-2014 267 / 533

Page 268: U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 · 2015. 1. 6. · U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15

Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

I ACCESS

1 Opening of New Schools

1.01 Upgradation of EGS to PSCentres /

School1.02 New PS School

1.03 Upgradation of PS to UPS / New UPS School

1.04 Composite Schools (for Urban Areas) School

1.05Residential Schools for specific category children

(For 100 children)

1.06Residential Hostel (for specific category of

children) (For 50 children)

1.07 Integration of Class V with Primary Schools

1.08Integration of Class VIII with Upper Primary

Schools

2Residential Schools for specific category

of children (For 100 Children)

Total - Residential Schools (For 100

children)

3Residential Hostel for specific category of

children (For 50 Children)

Total - Residential Schools (For 50

children)4 Transport/Escort Facility

4.01

Children in remote habitations with sparse

populations where opening of schools is

unviable

Child 0.03000

4.02

Urban deprived children/children without adult

protection in urban areas where schools are not

opened because availability of land is a problem

Child 0.03000

Sub Total

5Special Training for mainstreaming of Out-

of-School Children

5.03 Non-Residential (Fresh)(a) 12 months Child 0.06000(b) 9 months 0.04500(c) 6 months

(i)Special Training (by Special Instructors-NRBC)-

(1-5) Child 0.03000 124 3.720 124 3.72000

(ii) Special Training (by Special Instructors-NRBC)-

(6-8) Child 0.03000 79 2.370 79 2.37000

(d) 3 months Child 0.01500Sub Total 203 6.090 203 6.09000

Total (Special Training) 203 6.090 203 6.0905(B) House Hold Survey (HHS)

5(B).01 House Hold Survey through SMCHouse

Hold0.00001

Sub TotalII RETENTION6 Free Text Book

6.01Free Text Book (PS) for Parishadiya & Aided

Primary Schools (Workbooks not included)Child 0.00120 76677 92.012 76677 92.01240

6.01a

Free Text Book (PS) for 25% children of Class-1

in Private Recognised Primary Schools of other

Boards (Workbooks not included)

Child 0.00150

6.02 Free Brail Books (PS) 0.00150 31 0.047 31 0.04650

6.03 Free Large Print Books (PS) 0.00150

6.04Free Text Book (UPS) (Workbooks not included)

(Including KGBV Girls)Child 0.00200 36145 72.290 36145 72.29000

6.05 Free Brail Books (UPS) 0.00250 3 0.008 3 0.00750

6.06 Free Large Print Books (PS) 0.00250Sub Total 112856 164.356 112856 164.356

7 Provision of 2 set of Uniforms

7.01 All Girls (Including KGBV Girls) Child 0.00400 82856 331.424 82856 331.42400

7.02 SC Boys Child 0.00400 29966 119.864 29966 119.86400

7.03 ST Boys Child 0.00400

7.04 BPL Boys Child 0.00400 20539 82.156 20539 82.15600

7.05

Free Uniform for 25% children of Class-1 in

Private Recognised Primary Schools of other

Boards

Child0.00400

Sub Total 133361 533.444 133361 533.4447(A) Fee Reimbursement

7(A).01

Fee Reimbursement for Admission of children of

Disadvantaged Group & Weaker Section upto

25% of seats in Class-1 of Private Unaided

Recognised Schools

Child 0.05400

Sub Total

8 Teaching Learning Equipment (TLE)

8.01 TLE - New Primary School 0.60000 0.20000 0.600008.02 TLE - New Upper Primary School 1.50000 0.50000 1.50000

Name of District : Jalaun -38

ActivityS. No.Physical

UnitRemarks

Outlay Recommendation for 2014-15

Spill OverDeferred laibility of

2014-15Fresh Recommended Total Recommended

Arti:SSA-AWPB-2014-15-PABMinits:Jalaun:16-06-2014 268 / 533

Page 269: U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 · 2015. 1. 6. · U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15

Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

Name of District : Jalaun -38

ActivityS. No.Physical

UnitRemarks

Outlay Recommendation for 2014-15

Spill OverDeferred laibility of

2014-15Fresh Recommended Total Recommended

Sub Total 2.10000 2.10000III ENHANCING QUALITY9 New Teachers Salary

9.01 Primary Teachers (Regular) (Asstt. Teacher) Teacher 0.91500

9.01aHead Teacher for Primary (if the number of

children exceeds 150 in a school)Teacher

9.02 Primary Teachers (Contract) (S.M.) Teacher

9.03Subject specific Upper Primary Teachers

(Regular) (a) Science and Mathematics Teacher 1.26000(b) Social Studies Teacher 1.26000(c) Languages Teacher 1.26000

Sub Total (9.01 to 9.05)Add.Teacher against PTR

Sub Total (9.06 to 9.12)

Total (New Teacher's Salary-9.01 to 9.12)

Teachers Salary (Recurring-sanctioned

earlier)Primary teachers

9.13 Primary Teachers ( Regular)-Existing, in position Teacher 3.66000 283 1035.780 283 1035.78000

9.14Primary Teachers (Contract)-Existing, in

positionTeacher 0.55000

9.14(a) Primary Teachers (Contract)-under Training Teacher 0.38500 270 103.950 270 103.95000

9.14(b)Primary Teacher (Para Teachers Equal to

9.14(a) upgraded as Teachers)0.38500 675 259.875 675 259.87500

9.14(c) Primary Teachers (Para)- Vacant Teacher9.15 Primary Teachers (Vacant) Teacher 0.30500

9.16Head Teacher for Primary (if the number of

children exceeds 150)Teacher 5.04000 90 453.600 90 453.60000

9.16(b)Head Teacher for Primary (if the number of

children exceeds 150) VacantTeacher 0.42000

Additional teachers

9.17Additional Teachers - PS (Special BTC-

Regular) in positionTeacher 0.30500

9.18Additional Teachers - PS (Special BTC Under

Training)Teacher 0.87600

9.19 Additional Teachers - PS (Vacant) Teacher

9.20Others in position (Para Teachers upgraded

as Teachers)Teacher

Upper Primary teachers

9.21 UP Teachers (Regular)-Existing Teacher 5.04000 708 3568.320 708 3568.32000

9.22 UP Teachers (Contract)-Existing9.23 UP Teachers (Vacant) Teacher 1.26000

9.24Head Teacher for Upper Primary (if the number

of children exceeds 100)-ExistingTeacher 5.34000 258 1377.720 258 1377.72000

9.24a Head Teacher for Upper Primary (Vacant) Teacher 1.33500

9.25Subject specific Upper Primary Teachers

(Regular)(a) Science and Mathematics(b) Social Studies(c) Languages

9.32 Part Time Instructors in position(a) Art Education 0.77000 87 66.990 87 66.99000(b) Health and Physical Education 0.77000 98 75.460 98 75.46000(c) Work Education 0.77000 74 56.980 74 56.98000

9.32(A) Part Time Instructors Vacant(a) Art Education 0.42000(b) Health and Physical Education 0.42000(c) Work Education 0.42000

9.33

Others-Incentive to Teachers in Schools

Located in Naxal Affected Areas (@

Rs.1500/- per teachers per month)

Sub Total (9.13 to 9.33) 2543 6998.675 2543 6998.68TOTAL

(New Teachers Salary +Teachers Salary

Recurring)

2543 6998.675 2543 6998.67500

10 Teachers Training(a) Teachers

10.01

Refresher In-service Teachers' Training at BRC

level and above - 10 days (@ Rs.200/- per

head per day)

Teacher

(Target &

Ach.-13-14

in

Mandays)

0.00600

10.01(a)Continuous and Comprehensive Evauation [PS +

UPS)Teacher 0.01300 1113 14.469 1113 14.46900

10.01(b) Eary Reading and Numeracy Skills [PS] Teacher 0.00500 1113 5.565 1113 5.56500

10.01(c) Science [UPS] Teacher 0.00800 674 5.392 674 5.39200Recommended as

proposed

10.01(d) CWSN Teacher 0.00400

Arti:SSA-AWPB-2014-15-PABMinits:Jalaun:16-06-2014 269 / 533

Page 270: U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 · 2015. 1. 6. · U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15

Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

Name of District : Jalaun -38

ActivityS. No.Physical

UnitRemarks

Outlay Recommendation for 2014-15

Spill OverDeferred laibility of

2014-15Fresh Recommended Total Recommended

10.02

One day monthly cluster level meetings and

peer group training sessions for 10 months for

all teachers each year at CRC level - 10 days (@

Rs.100/- per head per day)

Teacher 0.01000

10.03(a)

Induction Training for Newly Recruited Teachers

for 6 Months (Special BTC)- @Rs.2000/- per

head per year

Teacher 0.02000

10.03(b)5 Days Training for Part Time Instructors @ Rs.

200/- per head per day) Teacher 0.01000

10.04

Training of untrained Teachers to acquire

professional qualifications over a two year

period.

Teacher 0.04700

(b) Head Teachers

10.05Refresher Residencial In-service for 10 days at

BRC level and above

Head

Teacher(c) Resource Persons

10.06

Refresher Training for all Resource

Persons,Master Trainers, BRC & CRC faculty

and Coordinators for 5 days each year (@

Rs.200/- per head per day)

Resource

Person 0.00300 120 0.360 120 0.36000

Sub Total 3020 25.786 3020 25.786

11Academic Support through Block Resource

Centre (BRC)/ URC

11.01 Salary of Faculty and Staff

(a) 5 RPs at BRC for subject specific training in

positionRP 50 50

(b) 2 RPs for CWSN in position RP(b-i) 1 CWSN Resource Person RP 1.10000 4 4.400 4 4.40000

(b-ii) 1 Physiotherapist (Resource person for IE) RP

(c) 1 MIS Coordinator in position RP 1.86000

(d) 1 Datra Entry Operator in position RP 1.74000 7 12.180 7 12.18000

(e) 1 Accountant-cum-support staff in position RP 1.80000 9 16.200 9 16.20000

11.02 Furniture Grant BRC/ URC 1.00000

11.03Replacement of furniture, computer, TLE etc (

Once in 5 years)BRC/ URC 1.00000

11.04 Contingency Grant BRC/ URC 0.50000 10 5.000 10 5.00000

11.05 Meeting, TA BRC/ URC 0.30000 10 3.000 10 3.00000

11.06 TLM Grant BRC/ URC 0.10000

11.07 Maintenance Grant BRC/ URC 0.10000

Sub Total 10 40.780 10 40.78000

12Academic Support through Cluster

Resource Centres (CRC/UERC)

12.01Salary of Cluster Coordinator (on an average of

one Resource Person per 18 schools in a block)RP

12.02 Furniture GrantCRC/

UERC0.10000

12.03Replacement of furniture, computer, TLE etc.

once in 5 years

CRC/

UERC0.10000

12.04 Contingency Grant CRC/UERC 0.10000 82 8.200 82 8.20000

12.05 Meeting, TA CRC/UERC 0.12000 82 9.840 82 9.84000

12.06 TLM Grant CRC/UERC 0.03000

12.07Maintenance Grant

CRC/UERC 0.02000

Sub Total 164 18.040 164 18.04000

13Computer Aided Education in upper

primary schools under Innovation

13.01Computer Aided Education in upper primary

schoolsDistrict 0.01200 48 0.576 48 0.57600

Sub Total 48 0.576 48 0.5760014 Libraries in Schools14.01 (a) Primary School (per school) School 0.03000

14.02 (b) Upper Primary School (per school) School 0.10000

Sub TotalIV ANNUAL GRANTS15 Teachers' Grant15.01 Primary Teachers Teacher 0.0050015.02 Upper Primary Teachers Teacher 0.00500 674 3.370 674 3.37000

Sub Total 674 3.370 674 3.3700016 School Grant16.01 Primary School School 0.05000 1268 63.400 1268 63.4000016.02 Upper Primary School School 0.07000 666 46.620 666 46.62000

Sub Total 1934 110.020 1934 110.02000

Arti:SSA-AWPB-2014-15-PABMinits:Jalaun:16-06-2014 270 / 533

Page 271: U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 · 2015. 1. 6. · U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15

Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

Name of District : Jalaun -38

ActivityS. No.Physical

UnitRemarks

Outlay Recommendation for 2014-15

Spill OverDeferred laibility of

2014-15Fresh Recommended Total Recommended

17Research, Evaluation, Monitoring &

Supervision

17.01 REMS Activities School 0.00103 1934 1.989 1934 1.98934

17.02 Monitoring & Supervision School 0.00078 1934 1.516 1934 1.51639

17.03 House Hold Survey (Urban) in Million Plus Cities District 35.00000

Sub Total 3868 3.506 3868 3.5057218 Maintenance Grant

18.01 Maintenance in School having upto3 Classrooms School 0.07500 591 44.325 591 44.32500

18.01a Maintenance Grant School 0.07500 1192 89.400 1192 89.40000Sub Total 1783 133.725 1783 133.72500

VBRIDGING GENDER AND SOCIAL

CATEGORY GAPS

19 Interventions for CWSN (IE)

19.01 Provision for Inclusive Education Child 0.03000 1535 46.050 1535 46.05000

Sub Total 1535 46.050 1535 46.05000

20Innovativation Head up to Rs.50 Lakh per

district

20.01 Girls Education District 0.70000 9 6.300 9 6.30000

20.02 ECCE District20.03 Intervention for SC / ST children District

20.04 Intervention for Minority Community children District

20.05 Intervention for Urban Deprived children District 10.00000

Sub Total 9 6.300 9 6.3000021 SMC/PRI Training

21.01Residential for 6 Resource Person per Block (3

days) (@ Rs.500/-)Blocks 0.09000

21.02Non-residential (3 days training of 6 SMC

members) (@ Rs.100/-)SMC 0.01800 1808 32.544 1808 32.54400

21.02(a)Non-residential (3 days training of 3 Members of

PRI/VECs/LA) (@ Rs.100/-)VEC/ WEC 0.00900

21.03

Seminar/Orientation of SMC Women members

and President/Vice President (@ Rs. 50,000/-

per block)

Blocks 0.50000

Sub Total 1808 32.544 1808 32.54400VI SCHOOL INFRASTRUCTURE22 Civil Works22.01 Primary School (Plain) (New) School 13.1550022.02 Primary School (Hilly/Rocky) (New) School 13.2750022.03 Upper Primary (Plain) (New) School 20.65500

22.04 Upper Primary School (Hilly/Rocky) (New) School 20.77500

22.04aComposite Schools for Urban Areas (Class I-

VIII)School 61.56 41.04000 61.56000

22.05 ACR in lieu of upgraded Upper Primary School Rooms

22.06 Additional class rooms for adding Class VIII Rooms

22.07 Building Less (Pry) School 9.7500022.08 Building Less (UP) School 18.5900022.09 Dilapidated Building (Pry) School 9.7500022.10 Dilapidated Building (UP) School 18.59000

22.11 Additional Class Room (Rural) ( PS+UPS) Rooms 3.45000

22.12 Additional Class Room (Urban) Rooms 3.4500022.13 Additional Class Room (Hill Area)22.14 Toilet/Urinals (PS & UPS) School 0.70000 131 91.700 131 91.7000022.15 Separate Girls Toilet (Rural+Urban) School 0.70000 186 130.200 186 130.2000022.16 CWSN friendly Toilets School 0.50000

22.17 Drinking Water Facility (for Urban Area Only)) School 0.15000

22.17a Drinking Water Facility (Plain PS & UPS) School 0.15000 78 11.700 78 11.70000

22.17b Drinking Water Facility (Hilly/Rocky PS & UPS) School 0.15000

22.18a Boundary Wall PS (Total in Meters x .01105) 0.01749

22.18bBoundary Wall PS (For Gate) @Rs. 7000 x no. of

P.S.School 0.07800

22.18c Boundary Wall UPS (Total in Meters x .01105) 0.01749

22.18dBoundary Wall UPS (For Gate) @Rs. 7000 x no.

of UPSSchool 0.07800

22.19a Electrification in P.S./ Electrical Equipment School 0.11000

22.19b Electrification in U. P.S./ Electrical Equipment School 0.11000

22.20Office-cum-store-cum-Head Teacher's room

(Primary)Rooms

22.21Office-cum-store-cum-Head Teacher's room

(Upper Primary)Rooms

22.22Augumentation of training facility in BRC (one

time)BRC/ URC 5.00000

22.23 Child friendly Elements School 0.25000

22.24 Ramps with Handrails (Barrier Free Elements) School 0.06000

22.25 Handrails in existing Ramps School 0.01000

Arti:SSA-AWPB-2014-15-PABMinits:Jalaun:16-06-2014 271 / 533

Page 272: U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 · 2015. 1. 6. · U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15

Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

Name of District : Jalaun -38

ActivityS. No.Physical

UnitRemarks

Outlay Recommendation for 2014-15

Spill OverDeferred laibility of

2014-15Fresh Recommended Total Recommended

22.26 Whole School Develoipment School22.27 Retro-fitting and repairs School

22.28Residential Schools for specific category

of children

(a) Construction of Building including boundary

wall, Water and sanitation facilities, electric

installation (For 100 children)

Building 65.86000

(b) Construction of residential hostel Building 65.86000

(c) Refurnishing unused old buildings Building

22.29

Construction of Hostel in existing Govt UPS

including boundary wall, Water and sanitation

facilities, electric installation etc. (For 50

children)

7.00000

22.30Furniture for Govt. UPS (per child) (@ Rs.500/-

per child enrolled)Child 0.00500

22.31 Major Repairs for Primary School School 0.30000

22.32 Majr Repairs for Upper Primary School School 0.30000

22.33Others (Difference of Civil Wrks

sanctioned in pre.yr.)22.33a Others (Overhead Tank PS) School 0.1200022.33b Others (Overhead Tank UPS) School 0.12000

Sub Total (Civil WOrks) 61.56 395 233.600 395 295.16VII PROJECT MANAGEMENT COST23 Management23.01 Management up to 3.5%

(a) Project Management and MIS

(i) DPO ( Salary, Contigency, Consumables,

POL, TA & Computer etc)District 1 105.781 1 105.78050

(ii) EMIS Cell District 1 14.309 1 14.30850Sub Total (a) 1 1 1 120.089 1 120.089

(b) Training of Educational Administrators District

(c) School Mapping and Social Mapping District

Sub Total (23.01)

23.02Learning Enhancement Prog. (LEP) (P & UP) (up

to 2%)District 11.981 11.98110

23.03 Community Mobilization (up to 0.5%) District 1 42.000 1 42.00000

Sub Total (Management) 1 53.981 1 53.98110Total Management Cost 174.070 174.07010Total of SSA (Districs) 61.560 2.100 264211 8530.932 264211 8594.592

24 State Component23.01 Management23.02 REMS 0.0044923.03 SIEMAT

Sub Total

STATE SSA TOTAL 61.56000 2.10000 264211 8530.932 264211 8594.59222

25

KGBV Financial Provision (give

separate costing sheets for different

Models)

Hostel

ANon Recurring One Time Grant (Only

committed liabilities) (Model-I)

25.01 Construction of Building (New)

25.02 Construction of Building KGBV sanctioned earlier 18.25000 18.25000

25.02(a) Additional Class Room Rooms 3.45000

25.02(b) Guard Room Rooms 1.32000

25.02(c) Boundary Wall School 5.0200025.03 Boudary Wall (Spillover only)

25.04

Boring/Handpump (Spillover only)

(minimum rates prescribed by State Drinking

Water Department subject to a ceiling of Rs.

1.00 lakhs)

25.05 Electricity /Water charges (Spillover only)

25.05(a) Solar Water Heater & Solar Light 2.97000

25.06Furniture/Equipment (including Kitchen

equipment)3.00000

25.07 TLM and equipment including library books 3.50000

25.08 Bedding (New) 0.75000

25.09 Replacement of Bedding (once in 3 Year) 0.75000 7 5.250 7 5.25000

Subtotal Non Recurring 18.25000 5.250 23.50000

B Recurring Cost Per Annum (Model-I)

25.10Maintenance per girl student per month @ Rs.

1500/-18.00000 7 126.000 7 126.00000

25.11 Stipend for girl student per month @ Rs. 100/- 1.20000 7 8.400 7 8.40000

25.12Supplementary TLM, stationery and other

educational material @ Rs.1000/- per annum1.00000 7 7.000 7 7.00000

25.13 Salaries

Arti:SSA-AWPB-2014-15-PABMinits:Jalaun:16-06-2014 272 / 533

Page 273: U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 · 2015. 1. 6. · U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15

Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

Name of District : Jalaun -38

ActivityS. No.Physical

UnitRemarks

Outlay Recommendation for 2014-15

Spill OverDeferred laibility of

2014-15Fresh Recommended Total Recommended

25.13.1 Additional Salaries:

(a) 1 Warden @ Rs. 25,000/- per month 3.00000 7 21.00000 7 21.00000

(b)4 Full time teachers as per RTE norms @ Rs.

20,000/- per month per teacher 9.60000 7 67.20000 7 67.20000

(c)

1 Urdu Teachers (only for blocks with muslim

population above 20% and select urban areas), if

required @ Rs. 12,000/- per month per teacher 1.44000 7 10.08000 7 10.08000

(d)3 part time teachers @ Rs. 5,000/- per month per

teacher 1.80000 7 12.60000 7 12.60000

(e)1 Full time Accountant @ Rs. 10,000/- per month

1.20000 7 8.40000 7 8.40000

(f)

2 Support Staff – (Accountant/ Assistant, Peon,

Chowkidar) @ Rs. 5,000/- per month per staff 1.20000 7 8.40000 7 8.40000

(g) 1 Head cook @ Rs. 6,000/- per month 0.72000 7 5.04000 7 5.04000

(h)2 Asstt. Cooks @ Rs. 4,500/- per month per cook

1.08000 7 7.56000 7 7.56000

25.14Specific skill training @ Rs.1000/- per child per

annum1.00000 7 7.000 7 7.00000

25.15Electricity/water charges @ Rs.1000/- per child

per annum1.00000 7 7.000 7 7.00000

25.16Medical care/contingencies @ Rs. 1250 per child

per annum1.25000 7 8.750 7 8.75000

25.17 Maintenance @ Rs.750/- per child per annum 0.75000 7 5.250 7 5.25000

25.18

Miscellaneous (Educational Tour/ Exposure Visit

/ Sports Material etc.) @ Rs.750/- per child per

annum

0.75000 7 5.250 7 5.25000

25.19Preparatory camps @ Rs.200/- per child per

annum0.20000 7 1.400 7 1.40000

25.20PTAs/school functions @ Rs.200/- per child per

annum0.20000 7 1.400 7 1.40000

25.21 Provision of Rent @ Rs.6000/- per annum 6.00000

25.21a Provision of Rent (6 months) 3.6000025.21b Provision of Rent (3 months) 1.8000025.21c Rent (Previous Year (2007-2012)

25.22 Capacity building 0.50000 7 3.500 7 3.50000

25.22(a)Physical/ Self Defence Training @ Rs.200/- per

child per annum0.20000 7 1.400 7 1.40000

Subtotal Recurring 7 322.630 7 322.63000

Subtotal (Model-I) 18.25000 7 327.880 7 346.13000

CNon Recurring One Time Grant (Only

committed liabilities) (Model-II)

25.23 Construction of Building (New)

25.24 Construction of Building KGBV sanctioned earlier

25.24(a) Additional Class Room Rooms 3.45000

25.24(b) Guard Room Rooms 1.32000

25.24(c) Boundary Wall School 5.0200025.25 Boudary Wall (Spillover only)25.26 Boring/Handpump (Spillover only)

25.27 Electricity /Water charges (Spillover only)

25.27(a) Solar Water Heater & Solar Light 2.97000

25.28Furniture/Equipment (including Kitchen

equipment)2.00000

25.29 TLM and equipment including library books 3.00000

25.30 Bedding (New) 0.37500

25.31 Replacement of Bedding (once in 3 Year) 0.37500 1 0.375 1 0.37500

Subtotal Non Recurring 1.00 0.375 1.00 0.37500

D Recurring Cost Per Annum (Model-II)

25.32Maintenance per girl student per month @ Rs.

1500/-9.00000 1 9.000 1 9.00000

25.33 Stipend for girl student per month @ Rs. 100/- 0.60000 1 0.600 1 0.60000

25.34Supplementary TLM, stationery and other

educational material @ Rs.1000/- per annum0.50000 1 0.500 1 0.50000

25.35 Salaries(a) 1 Warden @ Rs. 25,000/- per month 3.00000 1 3.000 1 3.00000

(b)3 Full time teachers as per RTE norms @ Rs.

20,000/- per month per teacher 7.20000 1 7.200 1 7.20000

(c) 3 part time teachers @ Rs. 5,000/- per month per

teacher 1.80000 1 1.800 1 1.80000

(d)1 Full time Accountant @ Rs. 10,000/- per month

1.20000 1 1.200 1 1.20000

(e)

2 Support Staff – (Accountant/ Assistant, Peon,

Chowkidar) @ Rs. 5,000/- per month per staff 1.20000 1 1.200 1 1.20000

Arti:SSA-AWPB-2014-15-PABMinits:Jalaun:16-06-2014 273 / 533

Page 274: U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 · 2015. 1. 6. · U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15

Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

Name of District : Jalaun -38

ActivityS. No.Physical

UnitRemarks

Outlay Recommendation for 2014-15

Spill OverDeferred laibility of

2014-15Fresh Recommended Total Recommended

(f) 1 Head cook @ Rs. 6,000/- per month 0.72000 1 0.720 1 0.72000

(g)1 Asstt. Cooks @ Rs. 4,500/- per month per cook

0.54000 1 0.540 1 0.54000

25.36Specific skill training @ Rs.1000/- per child per

annum0.50000 1 0.500 1 0.50000

25.37Electricity/water charges @ Rs.1000/- per child

per annum0.50000 1 0.500 1 0.50000

25.38Medical care/contingencies @ Rs. 1250 per child

per annum0.62500 1 0.625 1 0.62500

25.39 Maintenance @ Rs.750/- per child per annum 0.37500 1 0.375 1 0.37500

25.40

Miscellaneous (Educational Tour/ Exposure Visit

/ Sports Material etc.) @ Rs.750/- per child per

annum

0.37500 1 0.375 1 0.37500

25.41Preparatory camps @ Rs.300/- per child per

annum0.15000 1 0.150 1 0.15000

25.42PTAs/school functions @ Rs.300/- per child per

annum0.15000 1 0.150 1 0.15000

25.43 Provision of Rent @ Rs.10000/- per annum 5.00000

25.43a Provision of Rent (6 months) 3.6000025.43b Provision of Rent (3 months) 1.8000025.43c Rent (Previous Year (2007-2012)25.44 Capacity building 0.25000 1 0.250 1 0.25000

25.44(a)Physical/ Self Defence Training @ Rs.200/- per

child per annum0.10000 1 0.100 1 0.10000

Subtotal Recurring 19.00 28.785 19.00 28.78500

Subtotal (Model-II) 20.00 29.160 20.00 29.16000

Total (KGBV) 18.250 27 357.040 27 375.290

DISTRICT GRAND TOTAL (SSA+KGBV) 79.810 2.100 264238 8887.972 264238 8969.882

Arti:SSA-AWPB-2014-15-PABMinits:Jalaun:16-06-2014 274 / 533

Page 275: U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 · 2015. 1. 6. · U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15

Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

I ACCESS

1 Opening of New Schools

1.01 Upgradation of EGS to PSCentres /

School1.02 New PS School

1.03 Upgradation of PS to UPS / New UPS School

1.04 Composite Schools (for Urban Areas) School

1.05Residential Schools for specific category children

(For 100 children)

1.06Residential Hostel (for specific category of

children) (For 50 children)

1.07 Integration of Class V with Primary Schools

1.08Integration of Class VIII with Upper Primary

Schools

2Residential Schools for specific category

of children (For 100 Children)

Total - Residential Schools (For 100

children)

3Residential Hostel for specific category of

children (For 50 Children)

Total - Residential Schools (For 50

children)4 Transport/Escort Facility

4.01

Children in remote habitations with sparse

populations where opening of schools is

unviable

Child 0.03000

4.02

Urban deprived children/children without adult

protection in urban areas where schools are not

opened because availability of land is a problem

Child 0.03000

Sub Total

5Special Training for mainstreaming of Out-

of-School Children

5.03 Non-Residential (Fresh)(a) 12 months Child 0.06000(b) 9 months 0.04500(c) 6 months

(i)Special Training (by Special Instructors-NRBC)-

(1-5) Child 0.03000 365 10.950 365 10.95000

(ii) Special Training (by Special Instructors-NRBC)-

(6-8) Child 0.03000 197 5.910 197 5.91000

(d) 3 months Child 0.01500Sub Total 562 16.860 562 16.86000

Total (Special Training) 562 16.860 562 16.8605(B) House Hold Survey (HHS)

5(B).01 House Hold Survey through SMCHouse

Hold0.00001

Sub TotalII RETENTION6 Free Text Book

6.01Free Text Book (PS) for Parishadiya & Aided

Primary Schools (Workbooks not included)Child 0.00120 73405 88.086 73405 88.08600

6.01a

Free Text Book (PS) for 25% children of Class-1

in Private Recognised Primary Schools of other

Boards (Workbooks not included)

Child 0.00150

6.02 Free Brail Books (PS) 0.00150 48 0.072 48 0.07200

6.03 Free Large Print Books (PS) 0.00150

6.04Free Text Book (UPS) (Workbooks not included)

(Including KGBV Girls)Child 0.00200 42719 85.438 42719 85.43800

6.05 Free Brail Books (UPS) 0.00250 12 0.030 12 0.03000

6.06 Free Large Print Books (PS) 0.00250Sub Total 116184 173.626 116184 173.626

7 Provision of 2 set of Uniforms

7.01 All Girls (Including KGBV Girls) Child 0.00400 88854 355.416 88854 355.41600

7.02 SC Boys Child 0.00400 27270 109.080 27270 109.08000

7.03 ST Boys Child 0.00400

7.04 BPL Boys Child 0.00400 16744 66.976 16744 66.97600

7.05

Free Uniform for 25% children of Class-1 in

Private Recognised Primary Schools of other

Boards

Child0.00400

Sub Total 132868 531.472 132868 531.4727(A) Fee Reimbursement

7(A).01

Fee Reimbursement for Admission of children of

Disadvantaged Group & Weaker Section upto

25% of seats in Class-1 of Private Unaided

Recognised Schools

Child 0.05400

Sub Total

8 Teaching Learning Equipment (TLE)

8.01 TLE - New Primary School 2.20000 0.20000 2.200008.02 TLE - New Upper Primary School 0.50000 0.50000 0.50000

Name of District : Hathrus (Mahamaya

Nagar) -37

ActivityS. No.Physical

UnitRemarks

Outlay Recommendation for 2014-15

Spill OverDeferred laibility of

2014-15Fresh Recommended Total Recommended

Arti:SSA-AWPB-2014-15-PABMinits:Hathrus:16-06-2014 275 / 533

Page 276: U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 · 2015. 1. 6. · U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15

Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

Name of District : Hathrus (Mahamaya

Nagar) -37

ActivityS. No.Physical

UnitRemarks

Outlay Recommendation for 2014-15

Spill OverDeferred laibility of

2014-15Fresh Recommended Total Recommended

Sub Total 2.70000 2.70000III ENHANCING QUALITY9 New Teachers Salary

9.01 Primary Teachers (Regular) (Asstt. Teacher) Teacher 0.91500

9.01aHead Teacher for Primary (if the number of

children exceeds 150 in a school)Teacher

9.02 Primary Teachers (Contract) (S.M.) Teacher

9.03Subject specific Upper Primary Teachers

(Regular) (a) Science and Mathematics Teacher 1.26000(b) Social Studies Teacher 1.26000(c) Languages Teacher 1.26000

Sub Total (9.01 to 9.05)Add.Teacher against PTR

Sub Total (9.06 to 9.12)

Total (New Teacher's Salary-9.01 to 9.12)

Teachers Salary (Recurring-sanctioned

earlier)Primary teachers

9.13 Primary Teachers ( Regular)-Existing, in position Teacher 3.66000 247 904.020 247 904.02000

9.14Primary Teachers (Contract)-Existing, in

positionTeacher 0.55000

9.14(a) Primary Teachers (Contract)-under Training Teacher 0.38500 862 331.870 862 331.87000

9.14(b)Primary Teacher (Para Teachers Equal to

9.14(a) upgraded as Teachers)0.38500 549 211.365 549 211.36500

9.14(c) Primary Teachers (Para)- Vacant Teacher9.15 Primary Teachers (Vacant) Teacher 0.30500

9.16Head Teacher for Primary (if the number of

children exceeds 150)Teacher 5.04000 229 1154.160 229 1154.16000

9.16(b)Head Teacher for Primary (if the number of

children exceeds 150) VacantTeacher 0.42000

Additional teachers

9.17Additional Teachers - PS (Special BTC-

Regular) in positionTeacher 0.30500

9.18Additional Teachers - PS (Special BTC Under

Training)Teacher 0.87600

9.19 Additional Teachers - PS (Vacant) Teacher

9.20Others in position (Para Teachers upgraded

as Teachers)Teacher

Upper Primary teachers

9.21 UP Teachers (Regular)-Existing Teacher 5.04000 607 3059.280 607 3059.28000

9.22 UP Teachers (Contract)-Existing9.23 UP Teachers (Vacant) Teacher 1.26000

9.24Head Teacher for Upper Primary (if the number

of children exceeds 100)-ExistingTeacher 5.34000 259 1383.060 259 1383.06000

9.24a Head Teacher for Upper Primary (Vacant) Teacher 1.33500

9.25Subject specific Upper Primary Teachers

(Regular)(a) Science and Mathematics(b) Social Studies(c) Languages

9.32 Part Time Instructors in position(a) Art Education 0.77000 109 83.930 109 83.93000(b) Health and Physical Education 0.77000 133 102.410 133 102.41000(c) Work Education 0.77000 112 86.240 112 86.24000

9.32(A) Part Time Instructors Vacant(a) Art Education 0.42000(b) Health and Physical Education 0.42000(c) Work Education 0.42000

9.33

Others-Incentive to Teachers in Schools

Located in Naxal Affected Areas (@

Rs.1500/- per teachers per month)

Sub Total (9.13 to 9.33) 3107 7316.335 3107 7316.34TOTAL

(New Teachers Salary +Teachers Salary

Recurring)

3107 7316.335 3107 7316.33500

10 Teachers Training(a) Teachers

10.01

Refresher In-service Teachers' Training at BRC

level and above - 10 days (@ Rs.200/- per

head per day)

Teacher

(Target &

Ach.-13-14

in

Mandays)

0.00600

10.01(a)Continuous and Comprehensive Evauation [PS +

UPS)Teacher 0.01300 901 11.713 901 11.71300

10.01(b) Eary Reading and Numeracy Skills [PS] Teacher 0.00500 901 4.505 901 4.50500

10.01(c) Science [UPS] Teacher 0.00800 538 4.304 538 4.30400Recommended as

proposed

10.01(d) CWSN Teacher 0.00400

Arti:SSA-AWPB-2014-15-PABMinits:Hathrus:16-06-2014 276 / 533

Page 277: U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 · 2015. 1. 6. · U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15

Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

Name of District : Hathrus (Mahamaya

Nagar) -37

ActivityS. No.Physical

UnitRemarks

Outlay Recommendation for 2014-15

Spill OverDeferred laibility of

2014-15Fresh Recommended Total Recommended

10.02

One day monthly cluster level meetings and

peer group training sessions for 10 months for

all teachers each year at CRC level - 10 days (@

Rs.100/- per head per day)

Teacher 0.01000

10.03(a)

Induction Training for Newly Recruited Teachers

for 6 Months (Special BTC)- @Rs.2000/- per

head per year

Teacher 0.02000

10.03(b)5 Days Training for Part Time Instructors @ Rs.

200/- per head per day) Teacher 0.01000

10.04

Training of untrained Teachers to acquire

professional qualifications over a two year

period.

Teacher 0.04700 479 22.513 479 22.51300

(b) Head Teachers

10.05Refresher Residencial In-service for 10 days at

BRC level and above

Head

Teacher(c) Resource Persons

10.06

Refresher Training for all Resource

Persons,Master Trainers, BRC & CRC faculty

and Coordinators for 5 days each year (@

Rs.200/- per head per day)

Resource

Person 0.00300 96 0.288 96 0.28800

Sub Total 2915 43.323 2915 43.323

11Academic Support through Block Resource

Centre (BRC)/ URC

11.01 Salary of Faculty and Staff

(a) 5 RPs at BRC for subject specific training in

positionRP 40 40

(b) 2 RPs for CWSN in position RP(b-i) 1 CWSN Resource Person RP 1.10000 16 17.600 16 17.60000

(b-ii) 1 Physiotherapist (Resource person for IE) RP

(c) 1 MIS Coordinator in position RP 1.86000

(d) 1 Datra Entry Operator in position RP 1.74000 7 12.180 7 12.18000

(e) 1 Accountant-cum-support staff in position RP 1.80000 8 14.400 8 14.40000

11.02 Furniture Grant BRC/ URC 1.00000

11.03Replacement of furniture, computer, TLE etc (

Once in 5 years)BRC/ URC 1.00000

11.04 Contingency Grant BRC/ URC 0.50000 8 4.000 8 4.00000

11.05 Meeting, TA BRC/ URC 0.30000 8 2.400 8 2.40000

11.06 TLM Grant BRC/ URC 0.10000

11.07 Maintenance Grant BRC/ URC 0.10000

Sub Total 8 50.580 8 50.58000

12Academic Support through Cluster

Resource Centres (CRC/UERC)

12.01Salary of Cluster Coordinator (on an average of

one Resource Person per 18 schools in a block)RP

12.02 Furniture GrantCRC/

UERC0.10000

12.03Replacement of furniture, computer, TLE etc.

once in 5 years

CRC/

UERC0.10000

12.04 Contingency Grant CRC/UERC 0.10000 65 6.500 65 6.50000

12.05 Meeting, TA CRC/UERC 0.12000 65 7.800 65 7.80000

12.06 TLM Grant CRC/UERC 0.03000

12.07Maintenance Grant

CRC/UERC 0.02000

Sub Total 130 14.300 130 14.30000

13Computer Aided Education in upper

primary schools under Innovation

13.01Computer Aided Education in upper primary

schoolsDistrict 0.01200 48 0.576 48 0.57600

Sub Total 48 0.576 48 0.5760014 Libraries in Schools14.01 (a) Primary School (per school) School 0.03000

14.02 (b) Upper Primary School (per school) School 0.10000

Sub TotalIV ANNUAL GRANTS15 Teachers' Grant15.01 Primary Teachers Teacher 0.0050015.02 Upper Primary Teachers Teacher 0.00500 538 2.690 538 2.69000

Sub Total 538 2.690 538 2.6900016 School Grant16.01 Primary School School 0.05000 1059 52.950 1059 52.9500016.02 Upper Primary School School 0.07000 532 37.240 532 37.24000

Sub Total 1591 90.190 1591 90.19000

Arti:SSA-AWPB-2014-15-PABMinits:Hathrus:16-06-2014 277 / 533

Page 278: U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 · 2015. 1. 6. · U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15

Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

Name of District : Hathrus (Mahamaya

Nagar) -37

ActivityS. No.Physical

UnitRemarks

Outlay Recommendation for 2014-15

Spill OverDeferred laibility of

2014-15Fresh Recommended Total Recommended

17Research, Evaluation, Monitoring &

Supervision

17.01 REMS Activities School 0.00103 1591 1.637 1591 1.63652

17.02 Monitoring & Supervision School 0.00078 1591 1.247 1591 1.24745

17.03 House Hold Survey (Urban) in Million Plus Cities District 35.00000

Sub Total 3182 2.884 3182 2.8839718 Maintenance Grant

18.01 Maintenance in School having upto3 Classrooms School 0.07500 596 44.700 596 44.70000

18.01a Maintenance Grant School 0.07500 923 69.225 923 69.22500Sub Total 1519 113.925 1519 113.92500

VBRIDGING GENDER AND SOCIAL

CATEGORY GAPS

19 Interventions for CWSN (IE)

19.01 Provision for Inclusive Education Child 0.02300 3474 79.902 3474 79.90200

Sub Total 3474 79.902 3474 79.90200

20Innovativation Head up to Rs.50 Lakh per

district

20.01 Girls Education District 0.70000 8 5.600 8 5.60000

20.02 ECCE District20.03 Intervention for SC / ST children District

20.04 Intervention for Minority Community children District

20.05 Intervention for Urban Deprived children District 10.00000

Sub Total 8 5.600 8 5.6000021 SMC/PRI Training

21.01Residential for 6 Resource Person per Block (3

days) (@ Rs.500/-)Blocks 0.09000

21.02Non-residential (3 days training of 6 SMC

members) (@ Rs.100/-)SMC 0.01800 1519 27.342 1519 27.34200

21.02(a)Non-residential (3 days training of 3 Members of

PRI/VECs/LA) (@ Rs.100/-)VEC/ WEC 0.00900

21.03

Seminar/Orientation of SMC Women members

and President/Vice President (@ Rs. 50,000/-

per block)

Blocks 0.50000

Sub Total 1519 27.342 1519 27.34200VI SCHOOL INFRASTRUCTURE22 Civil Works22.01 Primary School (Plain) (New) School 13.1550022.02 Primary School (Hilly/Rocky) (New) School 13.2750022.03 Upper Primary (Plain) (New) School 20.65500

22.04 Upper Primary School (Hilly/Rocky) (New) School 20.77500

22.04aComposite Schools for Urban Areas (Class I-

VIII)School 41.04000

22.05 ACR in lieu of upgraded Upper Primary School Rooms

22.06 Additional class rooms for adding Class VIII Rooms

22.07 Building Less (Pry) School 9.7500022.08 Building Less (UP) School 18.5900022.09 Dilapidated Building (Pry) School 9.7500022.10 Dilapidated Building (UP) School 18.59000

22.11 Additional Class Room (Rural) ( PS+UPS) Rooms 3.45000

22.12 Additional Class Room (Urban) Rooms 3.4500022.13 Additional Class Room (Hill Area)22.14 Toilet/Urinals (PS & UPS) School 0.70000 133 93.100 133 93.1000022.15 Separate Girls Toilet (Rural+Urban) School 0.7000022.16 CWSN friendly Toilets School 0.50000

22.17 Drinking Water Facility (for Urban Area Only)) School 0.15000

22.17a Drinking Water Facility (Plain PS & UPS) School 0.15000 68 10.200 68 10.20000

22.17b Drinking Water Facility (Hilly/Rocky PS & UPS) School 0.15000

22.18a Boundary Wall PS (Total in Meters x .01105) 0.01749

22.18bBoundary Wall PS (For Gate) @Rs. 7000 x no. of

P.S.School 0.07800

22.18c Boundary Wall UPS (Total in Meters x .01105) 0.01749

22.18dBoundary Wall UPS (For Gate) @Rs. 7000 x no.

of UPSSchool 0.07800

22.19a Electrification in P.S./ Electrical Equipment School 0.11000

22.19b Electrification in U. P.S./ Electrical Equipment School 0.11000

22.20Office-cum-store-cum-Head Teacher's room

(Primary)Rooms

22.21Office-cum-store-cum-Head Teacher's room

(Upper Primary)Rooms

22.22Augumentation of training facility in BRC (one

time)BRC/ URC 5.00000

22.23 Child friendly Elements School 0.25000

22.24 Ramps with Handrails (Barrier Free Elements) School 0.06000

22.25 Handrails in existing Ramps School 0.01000

Arti:SSA-AWPB-2014-15-PABMinits:Hathrus:16-06-2014 278 / 533

Page 279: U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 · 2015. 1. 6. · U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15

Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

Name of District : Hathrus (Mahamaya

Nagar) -37

ActivityS. No.Physical

UnitRemarks

Outlay Recommendation for 2014-15

Spill OverDeferred laibility of

2014-15Fresh Recommended Total Recommended

22.26 Whole School Develoipment School22.27 Retro-fitting and repairs School

22.28Residential Schools for specific category

of children

(a) Construction of Building including boundary

wall, Water and sanitation facilities, electric

installation (For 100 children)

Building 65.86000

(b) Construction of residential hostel Building 65.86000

(c) Refurnishing unused old buildings Building

22.29

Construction of Hostel in existing Govt UPS

including boundary wall, Water and sanitation

facilities, electric installation etc. (For 50

children)

7.00000

22.30Furniture for Govt. UPS (per child) (@ Rs.500/-

per child enrolled)Child 0.00500

22.31 Major Repairs for Primary School School 0.30000

22.32 Majr Repairs for Upper Primary School School 0.30000

22.33Others (Difference of Civil Wrks

sanctioned in pre.yr.)22.33a Others (Overhead Tank PS) School 0.1200022.33b Others (Overhead Tank UPS) School 0.12000

Sub Total (Civil WOrks) 201 103.300 201 103.30VII PROJECT MANAGEMENT COST23 Management23.01 Management up to 3.5%

(a) Project Management and MIS

(i) DPO ( Salary, Contigency, Consumables,

POL, TA & Computer etc)District 1 98.202 1 98.20150

(ii) EMIS Cell District 1 12.012 1 12.01200Sub Total (a) 1 1 1 110.214 1 110.214

(b) Training of Educational Administrators District

(c) School Mapping and Social Mapping District

Sub Total (23.01)

23.02Learning Enhancement Prog. (LEP) (P & UP) (up

to 2%)District 11.101 11.10120

23.03 Community Mobilization (up to 0.5%) District 1 42.000 1 42.00000

Sub Total (Management) 1 53.101 1 53.10120Total Management Cost 163.315 163.31470Total of SSA (Districs) 2.700 267854 8736.220 267854 8738.920

24 State Component23.01 Management23.02 REMS 0.0044923.03 SIEMAT

Sub Total

STATE SSA TOTAL 2.70000 267854 8736.220 267854 8738.91967

25

KGBV Financial Provision (give

separate costing sheets for different

Models)

Hostel

ANon Recurring One Time Grant (Only

committed liabilities) (Model-I)

25.01 Construction of Building (New)

25.02 Construction of Building KGBV sanctioned earlier 0.78000 0.78000

25.02(a) Additional Class Room Rooms 3.45000

25.02(b) Guard Room Rooms 1.32000

25.02(c) Boundary Wall School 5.0200025.03 Boudary Wall (Spillover only)

25.04

Boring/Handpump (Spillover only)

(minimum rates prescribed by State Drinking

Water Department subject to a ceiling of Rs.

1.00 lakhs)

2.00000 2.00000

25.05 Electricity /Water charges (Spillover only)

25.05(a) Solar Water Heater & Solar Light 2.97000

25.06Furniture/Equipment (including Kitchen

equipment)3.00000

25.07 TLM and equipment including library books 3.50000

25.08 Bedding (New) 0.75000

25.09 Replacement of Bedding (once in 3 Year) 0.75000 2 1.500 2 1.50000

Subtotal Non Recurring 2.78000 1.500 4.28000

B Recurring Cost Per Annum (Model-I)

25.10Maintenance per girl student per month @ Rs.

1500/-18.00000 5 90.000 5 90.00000

25.11 Stipend for girl student per month @ Rs. 100/- 1.20000 5 6.000 5 6.00000

25.12Supplementary TLM, stationery and other

educational material @ Rs.1000/- per annum1.00000 5 5.000 5 5.00000

25.13 Salaries

Arti:SSA-AWPB-2014-15-PABMinits:Hathrus:16-06-2014 279 / 533

Page 280: U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 · 2015. 1. 6. · U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15

Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

Name of District : Hathrus (Mahamaya

Nagar) -37

ActivityS. No.Physical

UnitRemarks

Outlay Recommendation for 2014-15

Spill OverDeferred laibility of

2014-15Fresh Recommended Total Recommended

25.13.1 Additional Salaries:

(a) 1 Warden @ Rs. 25,000/- per month 3.00000 5 15.00000 5 15.00000

(b)4 Full time teachers as per RTE norms @ Rs.

20,000/- per month per teacher 9.60000 5 48.00000 5 48.00000

(c)

1 Urdu Teachers (only for blocks with muslim

population above 20% and select urban areas), if

required @ Rs. 12,000/- per month per teacher 1.44000 5 7.20000 5 7.20000

(d)3 part time teachers @ Rs. 5,000/- per month per

teacher 1.80000 5 9.00000 5 9.00000

(e)1 Full time Accountant @ Rs. 10,000/- per month

1.20000 5 6.00000 5 6.00000

(f)

2 Support Staff – (Accountant/ Assistant, Peon,

Chowkidar) @ Rs. 5,000/- per month per staff 1.20000 5 6.00000 5 6.00000

(g) 1 Head cook @ Rs. 6,000/- per month 0.72000 5 3.60000 5 3.60000

(h)2 Asstt. Cooks @ Rs. 4,500/- per month per cook

1.08000 5 5.40000 5 5.40000

25.14Specific skill training @ Rs.1000/- per child per

annum1.00000 5 5.000 5 5.00000

25.15Electricity/water charges @ Rs.1000/- per child

per annum1.00000 5 5.000 5 5.00000

25.16Medical care/contingencies @ Rs. 1250 per child

per annum1.25000 5 6.250 5 6.25000

25.17 Maintenance @ Rs.750/- per child per annum 0.75000 5 3.750 5 3.75000

25.18

Miscellaneous (Educational Tour/ Exposure Visit

/ Sports Material etc.) @ Rs.750/- per child per

annum

0.75000 5 3.750 5 3.75000

25.19Preparatory camps @ Rs.200/- per child per

annum0.20000 5 1.000 5 1.00000

25.20PTAs/school functions @ Rs.200/- per child per

annum0.20000 5 1.000 5 1.00000

25.21 Provision of Rent @ Rs.6000/- per annum 6.00000

25.21a Provision of Rent (6 months) 3.6000025.21b Provision of Rent (3 months) 1.8000025.21c Rent (Previous Year (2007-2012)

25.22 Capacity building 0.50000 5 2.500 5 2.50000

25.22(a)Physical/ Self Defence Training @ Rs.200/- per

child per annum0.20000 5 1.000 5 1.00000

Subtotal Recurring 5 230.450 5 230.45000

Subtotal (Model-I) 2.78000 5 231.950 5 234.73000

CNon Recurring One Time Grant (Only

committed liabilities) (Model-II)

25.23 Construction of Building (New)

25.24 Construction of Building KGBV sanctioned earlier

25.24(a) Additional Class Room Rooms 3.45000

25.24(b) Guard Room Rooms 1.32000

25.24(c) Boundary Wall School 5.0200025.25 Boudary Wall (Spillover only)25.26 Boring/Handpump (Spillover only)

25.27 Electricity /Water charges (Spillover only)

25.27(a) Solar Water Heater & Solar Light 2.97000

25.28Furniture/Equipment (including Kitchen

equipment)2.00000

25.29 TLM and equipment including library books 3.00000

25.30 Bedding (New) 0.37500

25.31 Replacement of Bedding (once in 3 Year) 0.37500

Subtotal Non Recurring

D Recurring Cost Per Annum (Model-II)

25.32Maintenance per girl student per month @ Rs.

1500/-9.00000 1 9.000 1 9.00000

25.33 Stipend for girl student per month @ Rs. 100/- 0.60000 1 0.600 1 0.60000

25.34Supplementary TLM, stationery and other

educational material @ Rs.1000/- per annum0.50000 1 0.500 1 0.50000

25.35 Salaries(a) 1 Warden @ Rs. 25,000/- per month 3.00000 1 3.000 1 3.00000

(b)3 Full time teachers as per RTE norms @ Rs.

20,000/- per month per teacher 7.20000 1 7.200 1 7.20000

(c) 3 part time teachers @ Rs. 5,000/- per month per

teacher 1.80000 1 1.800 1 1.80000

(d)1 Full time Accountant @ Rs. 10,000/- per month

1.20000 1 1.200 1 1.20000

(e)

2 Support Staff – (Accountant/ Assistant, Peon,

Chowkidar) @ Rs. 5,000/- per month per staff 1.20000 1 1.200 1 1.20000

Arti:SSA-AWPB-2014-15-PABMinits:Hathrus:16-06-2014 280 / 533

Page 281: U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 · 2015. 1. 6. · U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15

Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

Name of District : Hathrus (Mahamaya

Nagar) -37

ActivityS. No.Physical

UnitRemarks

Outlay Recommendation for 2014-15

Spill OverDeferred laibility of

2014-15Fresh Recommended Total Recommended

(f) 1 Head cook @ Rs. 6,000/- per month 0.72000 1 0.720 1 0.72000

(g)1 Asstt. Cooks @ Rs. 4,500/- per month per cook

0.54000 1 0.540 1 0.54000

25.36Specific skill training @ Rs.1000/- per child per

annum0.50000 1 0.500 1 0.50000

25.37Electricity/water charges @ Rs.1000/- per child

per annum0.50000 1 0.500 1 0.50000

25.38Medical care/contingencies @ Rs. 1250 per child

per annum0.62500 1 0.625 1 0.62500

25.39 Maintenance @ Rs.750/- per child per annum 0.37500 1 0.375 1 0.37500

25.40

Miscellaneous (Educational Tour/ Exposure Visit

/ Sports Material etc.) @ Rs.750/- per child per

annum

0.37500 1 0.375 1 0.37500

25.41Preparatory camps @ Rs.300/- per child per

annum0.15000 1 0.150 1 0.15000

25.42PTAs/school functions @ Rs.300/- per child per

annum0.15000 1 0.150 1 0.15000

25.43 Provision of Rent @ Rs.10000/- per annum 5.00000

25.43a Provision of Rent (6 months) 3.6000025.43b Provision of Rent (3 months) 1.8000025.43c Rent (Previous Year (2007-2012)25.44 Capacity building 0.25000 1 0.250 1 0.25000

25.44(a)Physical/ Self Defence Training @ Rs.200/- per

child per annum0.10000 1 0.100 1 0.10000

Subtotal Recurring 19.00 28.785 19.00 28.78500

Subtotal (Model-II) 19.00 28.785 19.00 28.78500

Total (KGBV) 2.780 24 260.735 24 263.515

DISTRICT GRAND TOTAL (SSA+KGBV) 2.780 2.700 267878 8996.955 267878 9002.435

Arti:SSA-AWPB-2014-15-PABMinits:Hathrus:16-06-2014 281 / 533

Page 282: U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 · 2015. 1. 6. · U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15

Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

I ACCESS

1 Opening of New Schools

1.01 Upgradation of EGS to PSCentres /

School1.02 New PS School

1.03 Upgradation of PS to UPS / New UPS School

1.04 Composite Schools (for Urban Areas) School

1.05Residential Schools for specific category children

(For 100 children)

1.06Residential Hostel (for specific category of

children) (For 50 children)

1.07 Integration of Class V with Primary Schools

1.08Integration of Class VIII with Upper Primary

Schools

2Residential Schools for specific category

of children (For 100 Children)

Total - Residential Schools (For 100

children)

3Residential Hostel for specific category of

children (For 50 Children)

Total - Residential Schools (For 50

children)4 Transport/Escort Facility

4.01

Children in remote habitations with sparse

populations where opening of schools is

unviable

Child 0.03000

4.02

Urban deprived children/children without adult

protection in urban areas where schools are not

opened because availability of land is a problem

Child 0.03000

Sub Total

5Special Training for mainstreaming of Out-

of-School Children

5.03 Non-Residential (Fresh)(a) 12 months Child 0.06000(b) 9 months 0.04500(c) 6 months

(i)Special Training (by Special Instructors-NRBC)-

(1-5) Child 0.03000 126 3.780 126 3.78000

(ii) Special Training (by Special Instructors-NRBC)-

(6-8) Child 0.03000 107 3.210 107 3.21000

(d) 3 months Child 0.01500Sub Total 233 6.990 233 6.99000

Total (Special Training) 233 6.990 233 6.9905(B) House Hold Survey (HHS)

5(B).01 House Hold Survey through SMCHouse

Hold0.00001

Sub TotalII RETENTION6 Free Text Book

6.01Free Text Book (PS) for Parishadiya & Aided

Primary Schools (Workbooks not included)Child 0.00120 289653 347.584 289653 347.58360

6.01a

Free Text Book (PS) for 25% children of Class-1

in Private Recognised Primary Schools of other

Boards (Workbooks not included)

Child 0.00150

6.02 Free Brail Books (PS) 0.00150 102 0.153 102 0.15300

6.03 Free Large Print Books (PS) 0.00150

6.04Free Text Book (UPS) (Workbooks not included)

(Including KGBV Girls)Child 0.00200 123877 247.754 123877 247.75400

6.05 Free Brail Books (UPS) 0.00250 25 0.063 25 0.06250

6.06 Free Large Print Books (PS) 0.00250Sub Total 413657 595.553 413657 595.553

7 Provision of 2 set of Uniforms

7.01 All Girls (Including KGBV Girls) Child 0.00400 294248 1176.992 294248 1176.99200

7.02 SC Boys Child 0.00400 110713 442.852 110713 442.85200

7.03 ST Boys Child 0.00400

7.04 BPL Boys Child 0.00400 117922 471.688 117922 471.68800

7.05

Free Uniform for 25% children of Class-1 in

Private Recognised Primary Schools of other

Boards

Child0.00400

Sub Total 522883 2091.532 522883 2091.5327(A) Fee Reimbursement

7(A).01

Fee Reimbursement for Admission of children of

Disadvantaged Group & Weaker Section upto

25% of seats in Class-1 of Private Unaided

Recognised Schools

Child 0.05400

Sub Total

8 Teaching Learning Equipment (TLE)

8.01 TLE - New Primary School 11.00000 0.20000 11.000008.02 TLE - New Upper Primary School 1.00000 0.50000 1.00000

Name of District : Hardoi -36

ActivityS. No.Physical

UnitRemarks

Outlay Recommendation for 2014-15

Spill OverDeferred laibility of

2014-15Fresh Recommended Total Recommended

Arti:SSA-AWPB-2014-15-PABMinits:Hardoi:16-06-2014 282 / 533

Page 283: U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 · 2015. 1. 6. · U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15

Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

Name of District : Hardoi -36

ActivityS. No.Physical

UnitRemarks

Outlay Recommendation for 2014-15

Spill OverDeferred laibility of

2014-15Fresh Recommended Total Recommended

Sub Total 12.00000 12.00000III ENHANCING QUALITY9 New Teachers Salary

9.01 Primary Teachers (Regular) (Asstt. Teacher) Teacher 0.91500

9.01aHead Teacher for Primary (if the number of

children exceeds 150 in a school)Teacher

9.02 Primary Teachers (Contract) (S.M.) Teacher

9.03Subject specific Upper Primary Teachers

(Regular) (a) Science and Mathematics Teacher 1.26000(b) Social Studies Teacher 1.26000(c) Languages Teacher 1.26000

Sub Total (9.01 to 9.05)Add.Teacher against PTR

Sub Total (9.06 to 9.12)

Total (New Teacher's Salary-9.01 to 9.12)

Teachers Salary (Recurring-sanctioned

earlier)Primary teachers

9.13 Primary Teachers ( Regular)-Existing, in position Teacher 3.66000 264 966.240 264 966.24000

9.14Primary Teachers (Contract)-Existing, in

positionTeacher 0.55000

9.14(a) Primary Teachers (Contract)-under Training Teacher 0.38500 2833 1090.705 2833 1090.70500

9.14(b)Primary Teacher (Para Teachers Equal to

9.14(a) upgraded as Teachers)0.38500 1401 539.385 1401 539.38500

9.14(c) Primary Teachers (Para)- Vacant Teacher9.15 Primary Teachers (Vacant) Teacher 0.30500

9.16Head Teacher for Primary (if the number of

children exceeds 150)Teacher 5.04000 335 1688.400 335 1688.40000

9.16(b)Head Teacher for Primary (if the number of

children exceeds 150) VacantTeacher 0.42000

Additional teachers

9.17Additional Teachers - PS (Special BTC-

Regular) in positionTeacher 0.30500

9.18Additional Teachers - PS (Special BTC Under

Training)Teacher 0.87600

9.19 Additional Teachers - PS (Vacant) Teacher

9.20Others in position (Para Teachers upgraded

as Teachers)Teacher

Upper Primary teachers

9.21 UP Teachers (Regular)-Existing Teacher 5.04000 957 4823.280 957 4823.28000

9.22 UP Teachers (Contract)-Existing9.23 UP Teachers (Vacant) Teacher 1.26000

9.24Head Teacher for Upper Primary (if the number

of children exceeds 100)-ExistingTeacher 5.34000 521 2782.140 521 2782.14000

9.24a Head Teacher for Upper Primary (Vacant) Teacher 1.33500

9.25Subject specific Upper Primary Teachers

(Regular)(a) Science and Mathematics(b) Social Studies(c) Languages

9.32 Part Time Instructors in position(a) Art Education 0.77000 460 354.200 460 354.20000(b) Health and Physical Education 0.77000 313 241.010 313 241.01000(c) Work Education 0.77000 316 243.320 316 243.32000

9.32(A) Part Time Instructors Vacant(a) Art Education 0.42000(b) Health and Physical Education 0.42000(c) Work Education 0.42000

9.33

Others-Incentive to Teachers in Schools

Located in Naxal Affected Areas (@

Rs.1500/- per teachers per month)

Sub Total (9.13 to 9.33) 7400 12728.680 7400 12728.68TOTAL

(New Teachers Salary +Teachers Salary

Recurring)

7400 12728.680 7400 12728.68000

10 Teachers Training(a) Teachers

10.01

Refresher In-service Teachers' Training at BRC

level and above - 10 days (@ Rs.200/- per

head per day)

Teacher

(Target &

Ach.-13-14

in

Mandays)

0.00600

10.01(a)Continuous and Comprehensive Evauation [PS +

UPS)Teacher 0.01300 2697 35.061 2697 35.06100

10.01(b) Eary Reading and Numeracy Skills [PS] Teacher 0.00500 2697 13.485 2697 13.48500

10.01(c) Science [UPS] Teacher 0.00800 1088 8.704 1088 8.70400Recommended as

proposed

10.01(d) CWSN Teacher 0.00400

Arti:SSA-AWPB-2014-15-PABMinits:Hardoi:16-06-2014 283 / 533

Page 284: U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 · 2015. 1. 6. · U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15

Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

Name of District : Hardoi -36

ActivityS. No.Physical

UnitRemarks

Outlay Recommendation for 2014-15

Spill OverDeferred laibility of

2014-15Fresh Recommended Total Recommended

10.02

One day monthly cluster level meetings and

peer group training sessions for 10 months for

all teachers each year at CRC level - 10 days (@

Rs.100/- per head per day)

Teacher 0.01000

10.03(a)

Induction Training for Newly Recruited Teachers

for 6 Months (Special BTC)- @Rs.2000/- per

head per year

Teacher 0.02000

10.03(b)5 Days Training for Part Time Instructors @ Rs.

200/- per head per day) Teacher 0.01000

10.04

Training of untrained Teachers to acquire

professional qualifications over a two year

period.

Teacher 0.04700 2109 99.123 2109 99.12300

(b) Head Teachers

10.05Refresher Residencial In-service for 10 days at

BRC level and above

Head

Teacher(c) Resource Persons

10.06

Refresher Training for all Resource

Persons,Master Trainers, BRC & CRC faculty

and Coordinators for 5 days each year (@

Rs.200/- per head per day)

Resource

Person 0.00300 240 0.720 240 0.72000

Sub Total 8831 157.093 8831 157.093

11Academic Support through Block Resource

Centre (BRC)/ URC

11.01 Salary of Faculty and Staff

(a) 5 RPs at BRC for subject specific training in

positionRP 100 100

(b) 2 RPs for CWSN in position RP(b-i) 1 CWSN Resource Person RP 1.10000 39 42.900 39 42.90000

(b-ii) 1 Physiotherapist (Resource person for IE) RP

(c) 1 MIS Coordinator in position RP 1.86000

(d) 1 Datra Entry Operator in position RP 1.74000 17 29.580 17 29.58000

(e) 1 Accountant-cum-support staff in position RP 1.80000 20 36.000 20 36.00000

11.02 Furniture Grant BRC/ URC 1.00000

11.03Replacement of furniture, computer, TLE etc (

Once in 5 years)BRC/ URC 1.00000

11.04 Contingency Grant BRC/ URC 0.50000 20 10.000 20 10.00000

11.05 Meeting, TA BRC/ URC 0.30000 20 6.000 20 6.00000

11.06 TLM Grant BRC/ URC 0.10000

11.07 Maintenance Grant BRC/ URC 0.10000

Sub Total 20 124.480 20 124.48000

12Academic Support through Cluster

Resource Centres (CRC/UERC)

12.01Salary of Cluster Coordinator (on an average of

one Resource Person per 18 schools in a block)RP

12.02 Furniture GrantCRC/

UERC0.10000

12.03Replacement of furniture, computer, TLE etc.

once in 5 years

CRC/

UERC0.10000

12.04 Contingency Grant CRC/UERC 0.10000 192 19.200 192 19.20000

12.05 Meeting, TA CRC/UERC 0.12000 192 23.040 192 23.04000

12.06 TLM Grant CRC/UERC 0.03000

12.07Maintenance Grant

CRC/UERC 0.02000

Sub Total 384 42.240 384 42.24000

13Computer Aided Education in upper

primary schools under Innovation

13.01Computer Aided Education in upper primary

schoolsDistrict 0.01200 48 0.576 48 0.57600

Sub Total 48 0.576 48 0.5760014 Libraries in Schools14.01 (a) Primary School (per school) School 0.03000

14.02 (b) Upper Primary School (per school) School 0.10000

Sub TotalIV ANNUAL GRANTS15 Teachers' Grant15.01 Primary Teachers Teacher 0.0050015.02 Upper Primary Teachers Teacher 0.00500 1088 5.440 1088 5.44000

Sub Total 1088 5.440 1088 5.4400016 School Grant16.01 Primary School School 0.05000 2839 141.950 2839 141.9500016.02 Upper Primary School School 0.07000 1143 80.010 1143 80.01000

Sub Total 3982 221.960 3982 221.96000

Arti:SSA-AWPB-2014-15-PABMinits:Hardoi:16-06-2014 284 / 533

Page 285: U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 · 2015. 1. 6. · U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15

Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

Name of District : Hardoi -36

ActivityS. No.Physical

UnitRemarks

Outlay Recommendation for 2014-15

Spill OverDeferred laibility of

2014-15Fresh Recommended Total Recommended

17Research, Evaluation, Monitoring &

Supervision

17.01 REMS Activities School 0.00103 3982 4.096 3982 4.09593

17.02 Monitoring & Supervision School 0.00078 3982 3.122 3982 3.12215

17.03 House Hold Survey (Urban) in Million Plus Cities District 35.00000

Sub Total 7964 7.218 7964 7.2180918 Maintenance Grant

18.01 Maintenance in School having upto3 Classrooms School 0.07500 1106 82.950 1106 82.95000

18.01a Maintenance Grant School 0.07500 2768 207.600 2768 207.60000Sub Total 3874 290.550 3874 290.55000

VBRIDGING GENDER AND SOCIAL

CATEGORY GAPS

19 Interventions for CWSN (IE)

19.01 Provision for Inclusive Education Child 0.02700 2772 74.844 2772 74.84400

Sub Total 2772 74.844 2772 74.84400

20Innovativation Head up to Rs.50 Lakh per

district

20.01 Girls Education District 0.70000 10 7.000 10 7.00000

20.02 ECCE District20.03 Intervention for SC / ST children District

20.04 Intervention for Minority Community children District

20.05 Intervention for Urban Deprived children District 10.00000

Sub Total 10 7.000 10 7.0000021 SMC/PRI Training

21.01Residential for 6 Resource Person per Block (3

days) (@ Rs.500/-)Blocks 0.09000

21.02Non-residential (3 days training of 6 SMC

members) (@ Rs.100/-)SMC 0.01800 3862 69.516 3862 69.51600

21.02(a)Non-residential (3 days training of 3 Members of

PRI/VECs/LA) (@ Rs.100/-)VEC/ WEC 0.00900

21.03

Seminar/Orientation of SMC Women members

and President/Vice President (@ Rs. 50,000/-

per block)

Blocks 0.50000

Sub Total 3862 69.516 3862 69.51600VI SCHOOL INFRASTRUCTURE22 Civil Works22.01 Primary School (Plain) (New) School 13.1550022.02 Primary School (Hilly/Rocky) (New) School 13.2750022.03 Upper Primary (Plain) (New) School 20.65500

22.04 Upper Primary School (Hilly/Rocky) (New) School 20.77500

22.04aComposite Schools for Urban Areas (Class I-

VIII)School 41.04000

22.05 ACR in lieu of upgraded Upper Primary School Rooms

22.06 Additional class rooms for adding Class VIII Rooms

22.07 Building Less (Pry) School 9.7500022.08 Building Less (UP) School 18.5900022.09 Dilapidated Building (Pry) School 9.7500022.10 Dilapidated Building (UP) School 18.59000

22.11 Additional Class Room (Rural) ( PS+UPS) Rooms 3.45000 260 897.000 260 897.00000

22.12 Additional Class Room (Urban) Rooms 3.4500022.13 Additional Class Room (Hill Area)22.14 Toilet/Urinals (PS & UPS) School 0.70000 40 28.000 40 28.0000022.15 Separate Girls Toilet (Rural+Urban) School 0.7000022.16 CWSN friendly Toilets School 0.50000

22.17 Drinking Water Facility (for Urban Area Only)) School 0.15000

22.17a Drinking Water Facility (Plain PS & UPS) School 0.15000 74 11.100 74 11.10000

22.17b Drinking Water Facility (Hilly/Rocky PS & UPS) School 0.15000

22.18a Boundary Wall PS (Total in Meters x .01105) 0.01749

22.18bBoundary Wall PS (For Gate) @Rs. 7000 x no. of

P.S.School 0.07800

22.18c Boundary Wall UPS (Total in Meters x .01105) 0.01749

22.18dBoundary Wall UPS (For Gate) @Rs. 7000 x no.

of UPSSchool 0.07800

22.19a Electrification in P.S./ Electrical Equipment School 0.11000

22.19b Electrification in U. P.S./ Electrical Equipment School 0.11000

22.20Office-cum-store-cum-Head Teacher's room

(Primary)Rooms

22.21Office-cum-store-cum-Head Teacher's room

(Upper Primary)Rooms

22.22Augumentation of training facility in BRC (one

time)BRC/ URC 5.00000

22.23 Child friendly Elements School 0.25000

22.24 Ramps with Handrails (Barrier Free Elements) School 0.06000 149 8.940 149 8.94000

22.25 Handrails in existing Ramps School 0.01000

Arti:SSA-AWPB-2014-15-PABMinits:Hardoi:16-06-2014 285 / 533

Page 286: U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 · 2015. 1. 6. · U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15

Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

Name of District : Hardoi -36

ActivityS. No.Physical

UnitRemarks

Outlay Recommendation for 2014-15

Spill OverDeferred laibility of

2014-15Fresh Recommended Total Recommended

22.26 Whole School Develoipment School22.27 Retro-fitting and repairs School

22.28Residential Schools for specific category

of children

(a) Construction of Building including boundary

wall, Water and sanitation facilities, electric

installation (For 100 children)

Building 65.86000

(b) Construction of residential hostel Building 65.86000

(c) Refurnishing unused old buildings Building

22.29

Construction of Hostel in existing Govt UPS

including boundary wall, Water and sanitation

facilities, electric installation etc. (For 50

children)

7.00000

22.30Furniture for Govt. UPS (per child) (@ Rs.500/-

per child enrolled)Child 0.00500

22.31 Major Repairs for Primary School School 0.30000

22.32 Majr Repairs for Upper Primary School School 0.30000

22.33Others (Difference of Civil Wrks

sanctioned in pre.yr.)22.33a Others (Overhead Tank PS) School 0.1200022.33b Others (Overhead Tank UPS) School 0.12000

Sub Total (Civil WOrks) 523 945.040 523 945.04VII PROJECT MANAGEMENT COST23 Management23.01 Management up to 3.5%

(a) Project Management and MIS

(i) DPO ( Salary, Contigency, Consumables,

POL, TA & Computer etc)District 1 116.538 1 116.53780

(ii) EMIS Cell District 1 23.759 1 23.75900Sub Total (a) 1 1 1 140.297 1 140.297

(b) Training of Educational Administrators District

(c) School Mapping and Social Mapping District

Sub Total (23.01)

23.02Learning Enhancement Prog. (LEP) (P & UP) (up

to 2%)District 34.872 34.87150

23.03 Community Mobilization (up to 0.5%) District 1 60.000 1 60.00000

Sub Total (Management) 1 94.872 1 94.87150Total Management Cost 235.168 235.16830Total of SSA (Districs) 12.000 977531 17603.880 977531 17615.880

24 State Component23.01 Management23.02 REMS 0.0044923.03 SIEMAT

Sub Total

STATE SSA TOTAL 12.00000 977531 17603.880 977531 17615.88049

25

KGBV Financial Provision (give

separate costing sheets for different

Models)

Hostel

ANon Recurring One Time Grant (Only

committed liabilities) (Model-I)

25.01 Construction of Building (New)

25.02 Construction of Building KGBV sanctioned earlier 4.85000 4.85000

25.02(a) Additional Class Room Rooms 3.45000

25.02(b) Guard Room Rooms 1.32000

25.02(c) Boundary Wall School 5.0200025.03 Boudary Wall (Spillover only) 1.19000 1.19000

25.04

Boring/Handpump (Spillover only)

(minimum rates prescribed by State Drinking

Water Department subject to a ceiling of Rs.

1.00 lakhs)

4.00000 4.00000

25.05 Electricity /Water charges (Spillover only)

25.05(a) Solar Water Heater & Solar Light 2.97000

25.06Furniture/Equipment (including Kitchen

equipment)3.00000

25.07 TLM and equipment including library books 3.50000

25.08 Bedding (New) 0.75000

25.09 Replacement of Bedding (once in 3 Year) 1 0.75000 16 12.000 17 12.00000

Subtotal Non Recurring 10.04000 12.000 22.04000

B Recurring Cost Per Annum (Model-I)

25.10Maintenance per girl student per month @ Rs.

1500/-18.00000 20 360.000 20 360.00000

25.11 Stipend for girl student per month @ Rs. 100/- 1.20000 20 24.000 20 24.00000

25.12Supplementary TLM, stationery and other

educational material @ Rs.1000/- per annum1.00000 20 20.000 20 20.00000

25.13 Salaries

Arti:SSA-AWPB-2014-15-PABMinits:Hardoi:16-06-2014 286 / 533

Page 287: U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 · 2015. 1. 6. · U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15

Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

Name of District : Hardoi -36

ActivityS. No.Physical

UnitRemarks

Outlay Recommendation for 2014-15

Spill OverDeferred laibility of

2014-15Fresh Recommended Total Recommended

25.13.1 Additional Salaries:

(a) 1 Warden @ Rs. 25,000/- per month 3.00000 20 60.00000 20 60.00000

(b)4 Full time teachers as per RTE norms @ Rs.

20,000/- per month per teacher 9.60000 20 192.00000 20 192.00000

(c)

1 Urdu Teachers (only for blocks with muslim

population above 20% and select urban areas), if

required @ Rs. 12,000/- per month per teacher 1.44000 20 28.80000 20 28.80000

(d)3 part time teachers @ Rs. 5,000/- per month per

teacher 1.80000 20 36.00000 20 36.00000

(e)1 Full time Accountant @ Rs. 10,000/- per month

1.20000 20 24.00000 20 24.00000

(f)

2 Support Staff – (Accountant/ Assistant, Peon,

Chowkidar) @ Rs. 5,000/- per month per staff 1.20000 20 24.00000 20 24.00000

(g) 1 Head cook @ Rs. 6,000/- per month 0.72000 20 14.40000 20 14.40000

(h)2 Asstt. Cooks @ Rs. 4,500/- per month per cook

1.08000 20 21.60000 20 21.60000

25.14Specific skill training @ Rs.1000/- per child per

annum1.00000 20 20.000 20 20.00000

25.15Electricity/water charges @ Rs.1000/- per child

per annum1.00000 20 20.000 20 20.00000

25.16Medical care/contingencies @ Rs. 1250 per child

per annum1.25000 20 25.000 20 25.00000

25.17 Maintenance @ Rs.750/- per child per annum 0.75000 20 15.000 20 15.00000

25.18

Miscellaneous (Educational Tour/ Exposure Visit

/ Sports Material etc.) @ Rs.750/- per child per

annum

0.75000 20 15.000 20 15.00000

25.19Preparatory camps @ Rs.200/- per child per

annum0.20000 20 4.000 20 4.00000

25.20PTAs/school functions @ Rs.200/- per child per

annum0.20000 20 4.000 20 4.00000

25.21 Provision of Rent @ Rs.6000/- per annum 6.00000

25.21a Provision of Rent (6 months) 3.6000025.21b Provision of Rent (3 months) 1.8000025.21c Rent (Previous Year (2007-2012)

25.22 Capacity building 0.50000 20 10.000 20 10.00000

25.22(a)Physical/ Self Defence Training @ Rs.200/- per

child per annum0.20000 20 4.000 20 4.00000

Subtotal Recurring 20 921.800 20 921.80000

Subtotal (Model-I) 10.04000 20 933.800 20 943.84000

CNon Recurring One Time Grant (Only

committed liabilities) (Model-II)

25.23 Construction of Building (New)

25.24 Construction of Building KGBV sanctioned earlier

25.24(a) Additional Class Room Rooms 3.45000

25.24(b) Guard Room Rooms 1.32000

25.24(c) Boundary Wall School 5.0200025.25 Boudary Wall (Spillover only)25.26 Boring/Handpump (Spillover only)

25.27 Electricity /Water charges (Spillover only)

25.27(a) Solar Water Heater & Solar Light 2.97000

25.28Furniture/Equipment (including Kitchen

equipment)2.00000

25.29 TLM and equipment including library books 3.00000

25.30 Bedding (New) 0.37500

25.31 Replacement of Bedding (once in 3 Year) 0.37500

Subtotal Non Recurring

D Recurring Cost Per Annum (Model-II)

25.32Maintenance per girl student per month @ Rs.

1500/-9.00000

25.33 Stipend for girl student per month @ Rs. 100/- 0.60000

25.34Supplementary TLM, stationery and other

educational material @ Rs.1000/- per annum0.50000

25.35 Salaries(a) 1 Warden @ Rs. 25,000/- per month 3.00000

(b)3 Full time teachers as per RTE norms @ Rs.

20,000/- per month per teacher 7.20000

(c) 3 part time teachers @ Rs. 5,000/- per month per

teacher 1.80000

(d)1 Full time Accountant @ Rs. 10,000/- per month

1.20000

(e)

2 Support Staff – (Accountant/ Assistant, Peon,

Chowkidar) @ Rs. 5,000/- per month per staff 1.20000

Arti:SSA-AWPB-2014-15-PABMinits:Hardoi:16-06-2014 287 / 533

Page 288: U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 · 2015. 1. 6. · U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15

Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

Name of District : Hardoi -36

ActivityS. No.Physical

UnitRemarks

Outlay Recommendation for 2014-15

Spill OverDeferred laibility of

2014-15Fresh Recommended Total Recommended

(f) 1 Head cook @ Rs. 6,000/- per month 0.72000

(g)1 Asstt. Cooks @ Rs. 4,500/- per month per cook

0.54000

25.36Specific skill training @ Rs.1000/- per child per

annum0.50000

25.37Electricity/water charges @ Rs.1000/- per child

per annum0.50000

25.38Medical care/contingencies @ Rs. 1250 per child

per annum0.62500

25.39 Maintenance @ Rs.750/- per child per annum 0.37500

25.40

Miscellaneous (Educational Tour/ Exposure Visit

/ Sports Material etc.) @ Rs.750/- per child per

annum

0.37500

25.41Preparatory camps @ Rs.300/- per child per

annum0.15000

25.42PTAs/school functions @ Rs.300/- per child per

annum0.15000

25.43 Provision of Rent @ Rs.10000/- per annum 5.00000

25.43a Provision of Rent (6 months) 3.6000025.43b Provision of Rent (3 months) 1.8000025.43c Rent (Previous Year (2007-2012)25.44 Capacity building 0.25000

25.44(a)Physical/ Self Defence Training @ Rs.200/- per

child per annum0.10000

Subtotal Recurring

Subtotal (Model-II) Total (KGBV) 10.040 20 933.800 20 943.840

DISTRICT GRAND TOTAL (SSA+KGBV) 10.040 12.000 977551 18537.680 977551 18559.720

Arti:SSA-AWPB-2014-15-PABMinits:Hardoi:16-06-2014 288 / 533

Page 289: U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 · 2015. 1. 6. · U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15

Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

I ACCESS

1 Opening of New Schools

1.01 Upgradation of EGS to PSCentres /

School1.02 New PS School

1.03 Upgradation of PS to UPS / New UPS School

1.04 Composite Schools (for Urban Areas) School

1.05Residential Schools for specific category children

(For 100 children)

1.06Residential Hostel (for specific category of

children) (For 50 children)

1.07 Integration of Class V with Primary Schools

1.08Integration of Class VIII with Upper Primary

Schools

2Residential Schools for specific category

of children (For 100 Children)

Total - Residential Schools (For 100

children)

3Residential Hostel for specific category of

children (For 50 Children)

Total - Residential Schools (For 50

children)4 Transport/Escort Facility

4.01

Children in remote habitations with sparse

populations where opening of schools is

unviable

Child 0.03000

4.02

Urban deprived children/children without adult

protection in urban areas where schools are not

opened because availability of land is a problem

Child 0.03000

Sub Total

5Special Training for mainstreaming of Out-

of-School Children

5.03 Non-Residential (Fresh)(a) 12 months Child 0.06000(b) 9 months 0.04500(c) 6 months

(i)Special Training (by Special Instructors-NRBC)-

(1-5) Child 0.03000 39 1.170 39 1.17000

(ii) Special Training (by Special Instructors-NRBC)-

(6-8) Child 0.03000 21 0.630 21 0.63000

(d) 3 months Child 0.01500Sub Total 60 1.800 60 1.80000

Total (Special Training) 60 1.800 60 1.8005(B) House Hold Survey (HHS)

5(B).01 House Hold Survey through SMCHouse

Hold0.00001

Sub TotalII RETENTION6 Free Text Book

6.01Free Text Book (PS) for Parishadiya & Aided

Primary Schools (Workbooks not included)Child 0.00120 53725 64.470 53725 64.47000

6.01a

Free Text Book (PS) for 25% children of Class-1

in Private Recognised Primary Schools of other

Boards (Workbooks not included)

Child 0.00150

6.02 Free Brail Books (PS) 0.00150 25 0.038 25 0.03750

6.03 Free Large Print Books (PS) 0.00150

6.04Free Text Book (UPS) (Workbooks not included)

(Including KGBV Girls)Child 0.00200 28944 57.888 28944 57.88800

6.05 Free Brail Books (UPS) 0.00250 3 0.008 3 0.00750

6.06 Free Large Print Books (PS) 0.00250Sub Total 82697 122.403 82697 122.403

7 Provision of 2 set of Uniforms

7.01 All Girls (Including KGBV Girls) Child 0.00400 64848 259.392 64848 259.39200

7.02 SC Boys Child 0.00400 17821 71.284 17821 71.28400

7.03 ST Boys Child 0.00400

7.04 BPL Boys Child 0.00400 35032 140.128 35032 140.12800

7.05

Free Uniform for 25% children of Class-1 in

Private Recognised Primary Schools of other

Boards

Child0.00400

Sub Total 117701 470.804 117701 470.8047(A) Fee Reimbursement

7(A).01

Fee Reimbursement for Admission of children of

Disadvantaged Group & Weaker Section upto

25% of seats in Class-1 of Private Unaided

Recognised Schools

Child 0.05400

Sub Total

8 Teaching Learning Equipment (TLE)

8.01 TLE - New Primary School 1.40000 0.20000 1.400008.02 TLE - New Upper Primary School 4.00000 0.50000 4.00000

Name of District : Hamirpur -35

ActivityS. No.Physical

UnitRemarks

Outlay Recommendation for 2014-15

Spill OverDeferred laibility of

2014-15Fresh Recommended Total Recommended

Arti:SSA-AWPB-2014-15-PABMinits:Hamirpur:16-06-2014 289 / 533

Page 290: U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 · 2015. 1. 6. · U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15

Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

Name of District : Hamirpur -35

ActivityS. No.Physical

UnitRemarks

Outlay Recommendation for 2014-15

Spill OverDeferred laibility of

2014-15Fresh Recommended Total Recommended

Sub Total 5.40000 5.40000III ENHANCING QUALITY9 New Teachers Salary

9.01 Primary Teachers (Regular) (Asstt. Teacher) Teacher 0.91500

9.01aHead Teacher for Primary (if the number of

children exceeds 150 in a school)Teacher

9.02 Primary Teachers (Contract) (S.M.) Teacher

9.03Subject specific Upper Primary Teachers

(Regular) (a) Science and Mathematics Teacher 1.26000(b) Social Studies Teacher 1.26000(c) Languages Teacher 1.26000

Sub Total (9.01 to 9.05)Add.Teacher against PTR

Sub Total (9.06 to 9.12)

Total (New Teacher's Salary-9.01 to 9.12)

Teachers Salary (Recurring-sanctioned

earlier)Primary teachers

9.13 Primary Teachers ( Regular)-Existing, in position Teacher 3.66000 375 1372.500 375 1372.50000

9.14Primary Teachers (Contract)-Existing, in

positionTeacher 0.55000

9.14(a) Primary Teachers (Contract)-under Training Teacher 0.38500 561 215.985 561 215.98500

9.14(b)Primary Teacher (Para Teachers Equal to

9.14(a) upgraded as Teachers)0.38500 474 182.490 474 182.49000

9.14(c) Primary Teachers (Para)- Vacant Teacher9.15 Primary Teachers (Vacant) Teacher 0.30500

9.16Head Teacher for Primary (if the number of

children exceeds 150)Teacher 5.04000 77 388.080 77 388.08000

9.16(b)Head Teacher for Primary (if the number of

children exceeds 150) VacantTeacher 0.42000

Additional teachers

9.17Additional Teachers - PS (Special BTC-

Regular) in positionTeacher 0.30500

9.18Additional Teachers - PS (Special BTC Under

Training)Teacher 0.87600

9.19 Additional Teachers - PS (Vacant) Teacher

9.20Others in position (Para Teachers upgraded

as Teachers)Teacher

Upper Primary teachers

9.21 UP Teachers (Regular)-Existing Teacher 5.04000 392 1975.680 392 1975.68000

9.22 UP Teachers (Contract)-Existing9.23 UP Teachers (Vacant) Teacher 1.26000

9.24Head Teacher for Upper Primary (if the number

of children exceeds 100)-ExistingTeacher 5.34000 196 1046.640 196 1046.64000

9.24a Head Teacher for Upper Primary (Vacant) Teacher 1.33500

9.25Subject specific Upper Primary Teachers

(Regular)(a) Science and Mathematics(b) Social Studies(c) Languages

9.32 Part Time Instructors in position(a) Art Education 0.77000 135 103.950 135 103.95000(b) Health and Physical Education 0.77000 144 110.880 144 110.88000(c) Work Education 0.77000 121 93.170 121 93.17000

9.32(A) Part Time Instructors Vacant(a) Art Education 0.42000(b) Health and Physical Education 0.42000(c) Work Education 0.42000

9.33

Others-Incentive to Teachers in Schools

Located in Naxal Affected Areas (@

Rs.1500/- per teachers per month)

Sub Total (9.13 to 9.33) 2475 5489.375 2475 5489.38TOTAL

(New Teachers Salary +Teachers Salary

Recurring)

2475 5489.375 2475 5489.37500

10 Teachers Training(a) Teachers

10.01

Refresher In-service Teachers' Training at BRC

level and above - 10 days (@ Rs.200/- per

head per day)

Teacher

(Target &

Ach.-13-14

in

Mandays)

0.00600

10.01(a)Continuous and Comprehensive Evauation [PS +

UPS)Teacher 0.01300 759 9.867 759 9.86700

10.01(b) Eary Reading and Numeracy Skills [PS] Teacher 0.00500 759 3.795 759 3.79500

10.01(c) Science [UPS] Teacher 0.00800 441 3.528 441 3.52800Recommended as

proposed

10.01(d) CWSN Teacher 0.00400

Arti:SSA-AWPB-2014-15-PABMinits:Hamirpur:16-06-2014 290 / 533

Page 291: U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 · 2015. 1. 6. · U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15

Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

Name of District : Hamirpur -35

ActivityS. No.Physical

UnitRemarks

Outlay Recommendation for 2014-15

Spill OverDeferred laibility of

2014-15Fresh Recommended Total Recommended

10.02

One day monthly cluster level meetings and

peer group training sessions for 10 months for

all teachers each year at CRC level - 10 days (@

Rs.100/- per head per day)

Teacher 0.01000

10.03(a)

Induction Training for Newly Recruited Teachers

for 6 Months (Special BTC)- @Rs.2000/- per

head per year

Teacher 0.02000

10.03(b)5 Days Training for Part Time Instructors @ Rs.

200/- per head per day) Teacher 0.01000

10.04

Training of untrained Teachers to acquire

professional qualifications over a two year

period.

Teacher 0.04700 411 19.317 411 19.31700

(b) Head Teachers

10.05Refresher Residencial In-service for 10 days at

BRC level and above

Head

Teacher(c) Resource Persons

10.06

Refresher Training for all Resource

Persons,Master Trainers, BRC & CRC faculty

and Coordinators for 5 days each year (@

Rs.200/- per head per day)

Resource

Person 0.00300 84 0.252 84 0.25200

Sub Total 2454 36.759 2454 36.759

11Academic Support through Block Resource

Centre (BRC)/ URC

11.01 Salary of Faculty and Staff

(a) 5 RPs at BRC for subject specific training in

positionRP 35 35

(b) 2 RPs for CWSN in position RP(b-i) 1 CWSN Resource Person RP 1.10000 11 12.100 11 12.10000

(b-ii) 1 Physiotherapist (Resource person for IE) RP

(c) 1 MIS Coordinator in position RP 1.86000

(d) 1 Datra Entry Operator in position RP 1.74000 7 12.180 7 12.18000

(e) 1 Accountant-cum-support staff in position RP 1.80000 7 12.600 7 12.60000

11.02 Furniture Grant BRC/ URC 1.00000

11.03Replacement of furniture, computer, TLE etc (

Once in 5 years)BRC/ URC 1.00000

11.04 Contingency Grant BRC/ URC 0.50000 7 3.500 7 3.50000

11.05 Meeting, TA BRC/ URC 0.30000 7 2.100 7 2.10000

11.06 TLM Grant BRC/ URC 0.10000

11.07 Maintenance Grant BRC/ URC 0.10000

Sub Total 7 42.480 7 42.48000

12Academic Support through Cluster

Resource Centres (CRC/UERC)

12.01Salary of Cluster Coordinator (on an average of

one Resource Person per 18 schools in a block)RP

12.02 Furniture GrantCRC/

UERC0.10000

12.03Replacement of furniture, computer, TLE etc.

once in 5 years

CRC/

UERC0.10000

12.04 Contingency Grant CRC/UERC 0.10000 60 6.000 60 6.00000

12.05 Meeting, TA CRC/UERC 0.12000 60 7.200 60 7.20000

12.06 TLM Grant CRC/UERC 0.03000

12.07Maintenance Grant

CRC/UERC 0.02000

Sub Total 120 13.200 120 13.20000

13Computer Aided Education in upper

primary schools under Innovation

13.01Computer Aided Education in upper primary

schoolsDistrict 0.01200 48 0.576 48 0.57600

Sub Total 48 0.576 48 0.5760014 Libraries in Schools14.01 (a) Primary School (per school) School 0.03000

14.02 (b) Upper Primary School (per school) School 0.10000

Sub TotalIV ANNUAL GRANTS15 Teachers' Grant15.01 Primary Teachers Teacher 0.0050015.02 Upper Primary Teachers Teacher 0.00500 441 2.205 441 2.20500

Sub Total 441 2.205 441 2.2050016 School Grant16.01 Primary School School 0.05000 808 40.400 808 40.4000016.02 Upper Primary School School 0.07000 441 30.870 441 30.87000

Sub Total 1249 71.270 1249 71.27000

Arti:SSA-AWPB-2014-15-PABMinits:Hamirpur:16-06-2014 291 / 533

Page 292: U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 · 2015. 1. 6. · U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15

Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

Name of District : Hamirpur -35

ActivityS. No.Physical

UnitRemarks

Outlay Recommendation for 2014-15

Spill OverDeferred laibility of

2014-15Fresh Recommended Total Recommended

17Research, Evaluation, Monitoring &

Supervision

17.01 REMS Activities School 0.00103 1249 1.285 1249 1.28474

17.02 Monitoring & Supervision School 0.00078 1249 0.979 1249 0.97930

17.03 House Hold Survey (Urban) in Million Plus Cities District 35.00000

Sub Total 2498 2.264 2498 2.2640418 Maintenance Grant

18.01 Maintenance in School having upto3 Classrooms School 0.07500 502 37.650 502 37.65000

18.01a Maintenance Grant School 0.07500 682 51.150 682 51.15000Sub Total 1184 88.800 1184 88.80000

VBRIDGING GENDER AND SOCIAL

CATEGORY GAPS

19 Interventions for CWSN (IE)

19.01 Provision for Inclusive Education Child 0.03000 593 17.790 593 17.79000

Sub Total 593 17.790 593 17.79000

20Innovativation Head up to Rs.50 Lakh per

district

20.01 Girls Education District 0.70000 7 4.900 7 4.90000

20.02 ECCE District20.03 Intervention for SC / ST children District

20.04 Intervention for Minority Community children District

20.05 Intervention for Urban Deprived children District 10.00000

Sub Total 7 4.900 7 4.9000021 SMC/PRI Training

21.01Residential for 6 Resource Person per Block (3

days) (@ Rs.500/-)Blocks 0.09000

21.02Non-residential (3 days training of 6 SMC

members) (@ Rs.100/-)SMC 0.01800 1191 21.438 1191 21.43800

21.02(a)Non-residential (3 days training of 3 Members of

PRI/VECs/LA) (@ Rs.100/-)VEC/ WEC 0.00900

21.03

Seminar/Orientation of SMC Women members

and President/Vice President (@ Rs. 50,000/-

per block)

Blocks 0.50000

Sub Total 1191 21.438 1191 21.43800VI SCHOOL INFRASTRUCTURE22 Civil Works22.01 Primary School (Plain) (New) School 13.1550022.02 Primary School (Hilly/Rocky) (New) School 13.2750022.03 Upper Primary (Plain) (New) School 20.65500

22.04 Upper Primary School (Hilly/Rocky) (New) School 20.77500

22.04aComposite Schools for Urban Areas (Class I-

VIII)School 28.73 41.04000 28.72800

22.05 ACR in lieu of upgraded Upper Primary School Rooms

22.06 Additional class rooms for adding Class VIII Rooms

22.07 Building Less (Pry) School 9.7500022.08 Building Less (UP) School 18.5900022.09 Dilapidated Building (Pry) School 9.7500022.10 Dilapidated Building (UP) School 18.59000

22.11 Additional Class Room (Rural) ( PS+UPS) Rooms 3.45000 89 307.050 89 307.05000

22.12 Additional Class Room (Urban) Rooms 3.4500022.13 Additional Class Room (Hill Area)22.14 Toilet/Urinals (PS & UPS) School 0.70000 114 79.800 114 79.8000022.15 Separate Girls Toilet (Rural+Urban) School 0.7000022.16 CWSN friendly Toilets School 0.50000

22.17 Drinking Water Facility (for Urban Area Only)) School 0.15000

22.17a Drinking Water Facility (Plain PS & UPS) School 0.15000

22.17b Drinking Water Facility (Hilly/Rocky PS & UPS) School 0.15000

22.18a Boundary Wall PS (Total in Meters x .01105) 0.01749

22.18bBoundary Wall PS (For Gate) @Rs. 7000 x no. of

P.S.School 0.07800

22.18c Boundary Wall UPS (Total in Meters x .01105) 0.01749

22.18dBoundary Wall UPS (For Gate) @Rs. 7000 x no.

of UPSSchool 0.07800

22.19a Electrification in P.S./ Electrical Equipment School 0.11000

22.19b Electrification in U. P.S./ Electrical Equipment School 0.11000

22.20Office-cum-store-cum-Head Teacher's room

(Primary)Rooms

22.21Office-cum-store-cum-Head Teacher's room

(Upper Primary)Rooms

22.22Augumentation of training facility in BRC (one

time)BRC/ URC 5.00000

22.23 Child friendly Elements School 0.25000

22.24 Ramps with Handrails (Barrier Free Elements) School 0.06000

22.25 Handrails in existing Ramps School 0.01000

Arti:SSA-AWPB-2014-15-PABMinits:Hamirpur:16-06-2014 292 / 533

Page 293: U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 · 2015. 1. 6. · U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15

Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

Name of District : Hamirpur -35

ActivityS. No.Physical

UnitRemarks

Outlay Recommendation for 2014-15

Spill OverDeferred laibility of

2014-15Fresh Recommended Total Recommended

22.26 Whole School Develoipment School22.27 Retro-fitting and repairs School

22.28Residential Schools for specific category

of children

(a) Construction of Building including boundary

wall, Water and sanitation facilities, electric

installation (For 100 children)

Building 65.86000

(b) Construction of residential hostel Building 65.86000

(c) Refurnishing unused old buildings Building

22.29

Construction of Hostel in existing Govt UPS

including boundary wall, Water and sanitation

facilities, electric installation etc. (For 50

children)

7.00000

22.30Furniture for Govt. UPS (per child) (@ Rs.500/-

per child enrolled)Child 0.00500

22.31 Major Repairs for Primary School School 0.30000

22.32 Majr Repairs for Upper Primary School School 0.30000

22.33Others (Difference of Civil Wrks

sanctioned in pre.yr.)22.33a Others (Overhead Tank PS) School 0.1200022.33b Others (Overhead Tank UPS) School 0.12000

Sub Total (Civil WOrks) 28.73 203 386.850 203 415.58VII PROJECT MANAGEMENT COST23 Management23.01 Management up to 3.5%

(a) Project Management and MIS

(i) DPO ( Salary, Contigency, Consumables,

POL, TA & Computer etc)District 1 101.661 1 101.66120

(ii) EMIS Cell District 1 10.217 1 10.21650Sub Total (a) 1 1 1 111.878 1 111.878

(b) Training of Educational Administrators District

(c) School Mapping and Social Mapping District

Sub Total (23.01)

23.02Learning Enhancement Prog. (LEP) (P & UP) (up

to 2%)District 8.173 8.17345

23.03 Community Mobilization (up to 0.5%) District 1 32.000 1 32.00000

Sub Total (Management) 1 40.173 1 40.17345Total Management Cost 152.051 152.05115Total of SSA (Districs) 28.728 5.400 212928 6924.965 212928 6959.093

24 State Component23.01 Management23.02 REMS 0.0044923.03 SIEMAT

Sub Total

STATE SSA TOTAL 28.72800 5.40000 212928 6924.965 212928 6959.09319

25

KGBV Financial Provision (give

separate costing sheets for different

Models)

Hostel

ANon Recurring One Time Grant (Only

committed liabilities) (Model-I)

25.01 Construction of Building (New)

25.02 Construction of Building KGBV sanctioned earlier 6.25300 6.25300

25.02(a) Additional Class Room Rooms 3.45000

25.02(b) Guard Room Rooms 1.32000

25.02(c) Boundary Wall School 5.0200025.03 Boudary Wall (Spillover only)

25.04

Boring/Handpump (Spillover only)

(minimum rates prescribed by State Drinking

Water Department subject to a ceiling of Rs.

1.00 lakhs)

25.05 Electricity /Water charges (Spillover only)

25.05(a) Solar Water Heater & Solar Light 2.97000

25.06Furniture/Equipment (including Kitchen

equipment)3.00000

25.07 TLM and equipment including library books 3.50000

25.08 Bedding (New) 0.75000

25.09 Replacement of Bedding (once in 3 Year) 0.75000 6 4.500 6 4.50000

Subtotal Non Recurring 6.25300 4.500 10.75300

B Recurring Cost Per Annum (Model-I)

25.10Maintenance per girl student per month @ Rs.

1500/-18.00000 6 108.000 6 108.00000

25.11 Stipend for girl student per month @ Rs. 100/- 1.20000 6 7.200 6 7.20000

25.12Supplementary TLM, stationery and other

educational material @ Rs.1000/- per annum1.00000 6 6.000 6 6.00000

25.13 Salaries

Arti:SSA-AWPB-2014-15-PABMinits:Hamirpur:16-06-2014 293 / 533

Page 294: U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 · 2015. 1. 6. · U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15

Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

Name of District : Hamirpur -35

ActivityS. No.Physical

UnitRemarks

Outlay Recommendation for 2014-15

Spill OverDeferred laibility of

2014-15Fresh Recommended Total Recommended

25.13.1 Additional Salaries:

(a) 1 Warden @ Rs. 25,000/- per month 3.00000 6 18.00000 6 18.00000

(b)4 Full time teachers as per RTE norms @ Rs.

20,000/- per month per teacher 9.60000 6 57.60000 6 57.60000

(c)

1 Urdu Teachers (only for blocks with muslim

population above 20% and select urban areas), if

required @ Rs. 12,000/- per month per teacher 1.44000 6 8.64000 6 8.64000

(d)3 part time teachers @ Rs. 5,000/- per month per

teacher 1.80000 6 10.80000 6 10.80000

(e)1 Full time Accountant @ Rs. 10,000/- per month

1.20000 6 7.20000 6 7.20000

(f)

2 Support Staff – (Accountant/ Assistant, Peon,

Chowkidar) @ Rs. 5,000/- per month per staff 1.20000 6 7.20000 6 7.20000

(g) 1 Head cook @ Rs. 6,000/- per month 0.72000 6 4.32000 6 4.32000

(h)2 Asstt. Cooks @ Rs. 4,500/- per month per cook

1.08000 6 6.48000 6 6.48000

25.14Specific skill training @ Rs.1000/- per child per

annum1.00000 6 6.000 6 6.00000

25.15Electricity/water charges @ Rs.1000/- per child

per annum1.00000 6 6.000 6 6.00000

25.16Medical care/contingencies @ Rs. 1250 per child

per annum1.25000 6 7.500 6 7.50000

25.17 Maintenance @ Rs.750/- per child per annum 0.75000 6 4.500 6 4.50000

25.18

Miscellaneous (Educational Tour/ Exposure Visit

/ Sports Material etc.) @ Rs.750/- per child per

annum

0.75000 6 4.500 6 4.50000

25.19Preparatory camps @ Rs.200/- per child per

annum0.20000 6 1.200 6 1.20000

25.20PTAs/school functions @ Rs.200/- per child per

annum0.20000 6 1.200 6 1.20000

25.21 Provision of Rent @ Rs.6000/- per annum 6.00000

25.21a Provision of Rent (6 months) 3.6000025.21b Provision of Rent (3 months) 1.8000025.21c Rent (Previous Year (2007-2012)

25.22 Capacity building 0.50000 6 3.000 6 3.00000

25.22(a)Physical/ Self Defence Training @ Rs.200/- per

child per annum0.20000 6 1.200 6 1.20000

Subtotal Recurring 6 276.540 6 276.54000

Subtotal (Model-I) 6.25300 6 281.040 6 287.29300

CNon Recurring One Time Grant (Only

committed liabilities) (Model-II)

25.23 Construction of Building (New)

25.24 Construction of Building KGBV sanctioned earlier

25.24(a) Additional Class Room Rooms 3.45000

25.24(b) Guard Room Rooms 1.32000

25.24(c) Boundary Wall School 5.0200025.25 Boudary Wall (Spillover only)25.26 Boring/Handpump (Spillover only)

25.27 Electricity /Water charges (Spillover only)

25.27(a) Solar Water Heater & Solar Light 2.97000

25.28Furniture/Equipment (including Kitchen

equipment)2.00000

25.29 TLM and equipment including library books 3.00000

25.30 Bedding (New) 0.37500

25.31 Replacement of Bedding (once in 3 Year) 0.37500 1 0.375 1 0.37500

Subtotal Non Recurring 1.00 0.375 1.00 0.37500

D Recurring Cost Per Annum (Model-II)

25.32Maintenance per girl student per month @ Rs.

1500/-9.00000 1 9.000 1 9.00000

25.33 Stipend for girl student per month @ Rs. 100/- 0.60000 1 0.600 1 0.60000

25.34Supplementary TLM, stationery and other

educational material @ Rs.1000/- per annum0.50000 1 0.500 1 0.50000

25.35 Salaries(a) 1 Warden @ Rs. 25,000/- per month 3.00000 1 3.000 1 3.00000

(b)3 Full time teachers as per RTE norms @ Rs.

20,000/- per month per teacher 7.20000 1 7.200 1 7.20000

(c) 3 part time teachers @ Rs. 5,000/- per month per

teacher 1.80000 1 1.800 1 1.80000

(d)1 Full time Accountant @ Rs. 10,000/- per month

1.20000 1 1.200 1 1.20000

(e)

2 Support Staff – (Accountant/ Assistant, Peon,

Chowkidar) @ Rs. 5,000/- per month per staff 1.20000 1 1.200 1 1.20000

Arti:SSA-AWPB-2014-15-PABMinits:Hamirpur:16-06-2014 294 / 533

Page 295: U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 · 2015. 1. 6. · U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15

Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

Name of District : Hamirpur -35

ActivityS. No.Physical

UnitRemarks

Outlay Recommendation for 2014-15

Spill OverDeferred laibility of

2014-15Fresh Recommended Total Recommended

(f) 1 Head cook @ Rs. 6,000/- per month 0.72000 1 0.720 1 0.72000

(g)1 Asstt. Cooks @ Rs. 4,500/- per month per cook

0.54000 1 0.540 1 0.54000

25.36Specific skill training @ Rs.1000/- per child per

annum0.50000 1 0.500 1 0.50000

25.37Electricity/water charges @ Rs.1000/- per child

per annum0.50000 1 0.500 1 0.50000

25.38Medical care/contingencies @ Rs. 1250 per child

per annum0.62500 1 0.625 1 0.62500

25.39 Maintenance @ Rs.750/- per child per annum 0.37500 1 0.375 1 0.37500

25.40

Miscellaneous (Educational Tour/ Exposure Visit

/ Sports Material etc.) @ Rs.750/- per child per

annum

0.37500 1 0.375 1 0.37500

25.41Preparatory camps @ Rs.300/- per child per

annum0.15000 1 0.150 1 0.15000

25.42PTAs/school functions @ Rs.300/- per child per

annum0.15000 1 0.150 1 0.15000

25.43 Provision of Rent @ Rs.10000/- per annum 5.00000

25.43a Provision of Rent (6 months) 3.6000025.43b Provision of Rent (3 months) 1.8000025.43c Rent (Previous Year (2007-2012)25.44 Capacity building 0.25000 1 0.250 1 0.25000

25.44(a)Physical/ Self Defence Training @ Rs.200/- per

child per annum0.10000 1 0.100 1 0.10000

Subtotal Recurring 19.00 28.785 19.00 28.78500

Subtotal (Model-II) 20.00 29.160 20.00 29.16000

Total (KGBV) 6.253 26 310.200 26 316.453

DISTRICT GRAND TOTAL (SSA+KGBV) 34.981 5.400 212954 7235.165 212954 7275.546

Arti:SSA-AWPB-2014-15-PABMinits:Hamirpur:16-06-2014 295 / 533

Page 296: U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 · 2015. 1. 6. · U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15

Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

I ACCESS

1 Opening of New Schools

1.01 Upgradation of EGS to PSCentres /

School1.02 New PS School

1.03 Upgradation of PS to UPS / New UPS School

1.04 Composite Schools (for Urban Areas) School

1.05Residential Schools for specific category children

(For 100 children)

1.06Residential Hostel (for specific category of

children) (For 50 children)

1.07 Integration of Class V with Primary Schools

1.08Integration of Class VIII with Upper Primary

Schools

2Residential Schools for specific category

of children (For 100 Children)

Total - Residential Schools (For 100

children)

3Residential Hostel for specific category of

children (For 50 Children)

Total - Residential Schools (For 50

children)4 Transport/Escort Facility

4.01

Children in remote habitations with sparse

populations where opening of schools is

unviable

Child 0.03000

4.02

Urban deprived children/children without adult

protection in urban areas where schools are not

opened because availability of land is a problem

Child 0.03000

Sub Total

5Special Training for mainstreaming of Out-

of-School Children

5.03 Non-Residential (Fresh)(a) 12 months Child 0.06000(b) 9 months 0.04500(c) 6 months

(i)Special Training (by Special Instructors-NRBC)-

(1-5) Child 0.03000 176 5.280 176 5.28000

(ii) Special Training (by Special Instructors-NRBC)-

(6-8) Child 0.03000 208 6.240 208 6.24000

(d) 3 months Child 0.01500Sub Total 384 11.520 384 11.52000

Total (Special Training) 384 11.520 384 11.5205(B) House Hold Survey (HHS)

5(B).01 House Hold Survey through SMCHouse

Hold0.00001

Sub TotalII RETENTION6 Free Text Book

6.01Free Text Book (PS) for Parishadiya & Aided

Primary Schools (Workbooks not included)Child 0.00120 215844 259.013 215844 259.01280

6.01a

Free Text Book (PS) for 25% children of Class-1

in Private Recognised Primary Schools of other

Boards (Workbooks not included)

Child 0.00150

6.02 Free Brail Books (PS) 0.00150 178 0.267 178 0.26700

6.03 Free Large Print Books (PS) 0.00150

6.04Free Text Book (UPS) (Workbooks not included)

(Including KGBV Girls)Child 0.00200 107915 215.830 107915 215.83000

6.05 Free Brail Books (UPS) 0.00250 87 0.218 87 0.21750

6.06 Free Large Print Books (PS) 0.00250Sub Total 324024 475.327 324024 475.327

7 Provision of 2 set of Uniforms

7.01 All Girls (Including KGBV Girls) Child 0.00400 248394 993.576 248394 993.57600

7.02 SC Boys Child 0.00400 75241 300.964 75241 300.96400

7.03 ST Boys Child 0.00400 124 0.496 124 0.49600

7.04 BPL Boys Child 0.00400 116878 467.512 116878 467.51200

7.05

Free Uniform for 25% children of Class-1 in

Private Recognised Primary Schools of other

Boards

Child0.00400

Sub Total 440637 1762.548 440637 1762.5487(A) Fee Reimbursement

7(A).01

Fee Reimbursement for Admission of children of

Disadvantaged Group & Weaker Section upto

25% of seats in Class-1 of Private Unaided

Recognised Schools

Child 0.05400

Sub Total

8 Teaching Learning Equipment (TLE)

8.01 TLE - New Primary School 0.40000 0.20000 0.400008.02 TLE - New Upper Primary School 1.00000 0.50000 1.00000

Name of District : Gorakhpur -34

ActivityS. No.Physical

UnitRemarks

Outlay Recommendation for 2014-15

Spill OverDeferred laibility of

2014-15Fresh Recommended Total Recommended

Arti:SSA-AWPB-2014-15-PABMinits:Gorakhpur:16-06-2014 296 / 533

Page 297: U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 · 2015. 1. 6. · U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15

Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

Name of District : Gorakhpur -34

ActivityS. No.Physical

UnitRemarks

Outlay Recommendation for 2014-15

Spill OverDeferred laibility of

2014-15Fresh Recommended Total Recommended

Sub Total 1.40000 1.40000III ENHANCING QUALITY9 New Teachers Salary

9.01 Primary Teachers (Regular) (Asstt. Teacher) Teacher 0.91500

9.01aHead Teacher for Primary (if the number of

children exceeds 150 in a school)Teacher

9.02 Primary Teachers (Contract) (S.M.) Teacher

9.03Subject specific Upper Primary Teachers

(Regular) (a) Science and Mathematics Teacher 1.26000(b) Social Studies Teacher 1.26000(c) Languages Teacher 1.26000

Sub Total (9.01 to 9.05)Add.Teacher against PTR

Sub Total (9.06 to 9.12)

Total (New Teacher's Salary-9.01 to 9.12)

Teachers Salary (Recurring-sanctioned

earlier)Primary teachers

9.13 Primary Teachers ( Regular)-Existing, in position Teacher 3.66000 785 2873.100 785 2873.10000

9.14Primary Teachers (Contract)-Existing, in

positionTeacher 0.55000

9.14(a) Primary Teachers (Contract)-under Training Teacher 0.38500 777 299.145 777 299.14500

9.14(b)Primary Teacher (Para Teachers Equal to

9.14(a) upgraded as Teachers)0.38500 1326 510.510 1326 510.51000

9.14(c) Primary Teachers (Para)- Vacant Teacher9.15 Primary Teachers (Vacant) Teacher 0.30500

9.16Head Teacher for Primary (if the number of

children exceeds 150)Teacher 5.04000 224 1128.960 224 1128.96000

9.16(b)Head Teacher for Primary (if the number of

children exceeds 150) VacantTeacher 0.42000

Additional teachers

9.17Additional Teachers - PS (Special BTC-

Regular) in positionTeacher 0.30500

9.18Additional Teachers - PS (Special BTC Under

Training)Teacher 0.87600

9.19 Additional Teachers - PS (Vacant) Teacher

9.20Others in position (Para Teachers upgraded

as Teachers)Teacher

Upper Primary teachers

9.21 UP Teachers (Regular)-Existing Teacher 5.04000 1180 5947.200 1180 5947.20000

9.22 UP Teachers (Contract)-Existing9.23 UP Teachers (Vacant) Teacher 1.26000

9.24Head Teacher for Upper Primary (if the number

of children exceeds 100)-ExistingTeacher 5.34000 480 2563.200 480 2563.20000

9.24a Head Teacher for Upper Primary (Vacant) Teacher 1.33500

9.25Subject specific Upper Primary Teachers

(Regular)(a) Science and Mathematics(b) Social Studies(c) Languages

9.32 Part Time Instructors in position(a) Art Education 0.77000 179 137.830 179 137.83000(b) Health and Physical Education 0.77000 229 176.330 229 176.33000(c) Work Education 0.77000 182 140.140 182 140.14000

9.32(A) Part Time Instructors Vacant(a) Art Education 0.42000(b) Health and Physical Education 0.42000(c) Work Education 0.42000

9.33

Others-Incentive to Teachers in Schools

Located in Naxal Affected Areas (@

Rs.1500/- per teachers per month)

Sub Total (9.13 to 9.33) 5362 13776.415 5362 13776.42TOTAL

(New Teachers Salary +Teachers Salary

Recurring)

5362 13776.415 5362 13776.41500

10 Teachers Training(a) Teachers

10.01

Refresher In-service Teachers' Training at BRC

level and above - 10 days (@ Rs.200/- per

head per day)

Teacher

(Target &

Ach.-13-14

in

Mandays)

0.00600

10.01(a)Continuous and Comprehensive Evauation [PS +

UPS)Teacher 0.01300 2114 27.482 2114 27.48200

10.01(b) Eary Reading and Numeracy Skills [PS] Teacher 0.00500 2114 10.570 2114 10.57000

10.01(c) Science [UPS] Teacher 0.00800 854 6.832 854 6.83200Recommended as

proposed

10.01(d) CWSN Teacher 0.00400

Arti:SSA-AWPB-2014-15-PABMinits:Gorakhpur:16-06-2014 297 / 533

Page 298: U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 · 2015. 1. 6. · U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15

Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

Name of District : Gorakhpur -34

ActivityS. No.Physical

UnitRemarks

Outlay Recommendation for 2014-15

Spill OverDeferred laibility of

2014-15Fresh Recommended Total Recommended

10.02

One day monthly cluster level meetings and

peer group training sessions for 10 months for

all teachers each year at CRC level - 10 days (@

Rs.100/- per head per day)

Teacher 0.01000

10.03(a)

Induction Training for Newly Recruited Teachers

for 6 Months (Special BTC)- @Rs.2000/- per

head per year

Teacher 0.02000

10.03(b)5 Days Training for Part Time Instructors @ Rs.

200/- per head per day) Teacher 0.01000

10.04

Training of untrained Teachers to acquire

professional qualifications over a two year

period.

Teacher 0.04700 1290 60.630 1290 60.63000

(b) Head Teachers

10.05Refresher Residencial In-service for 10 days at

BRC level and above

Head

Teacher(c) Resource Persons

10.06

Refresher Training for all Resource

Persons,Master Trainers, BRC & CRC faculty

and Coordinators for 5 days each year (@

Rs.200/- per head per day)

Resource

Person 0.00300 240 0.720 240 0.72000

Sub Total 6612 106.234 6612 106.234

11Academic Support through Block Resource

Centre (BRC)/ URC

11.01 Salary of Faculty and Staff

(a) 5 RPs at BRC for subject specific training in

positionRP 100 100

(b) 2 RPs for CWSN in position RP(b-i) 1 CWSN Resource Person RP 1.10000 40 44.000 40 44.00000

(b-ii) 1 Physiotherapist (Resource person for IE) RP

(c) 1 MIS Coordinator in position RP 1.86000

(d) 1 Datra Entry Operator in position RP 1.74000

(e) 1 Accountant-cum-support staff in position RP 1.80000 20 36.000 20 36.00000

11.02 Furniture Grant BRC/ URC 1.00000

11.03Replacement of furniture, computer, TLE etc (

Once in 5 years)BRC/ URC 1.00000

11.04 Contingency Grant BRC/ URC 0.50000 20 10.000 20 10.00000

11.05 Meeting, TA BRC/ URC 0.30000 20 6.000 20 6.00000

11.06 TLM Grant BRC/ URC 0.10000

11.07 Maintenance Grant BRC/ URC 0.10000

Sub Total 20 96.000 20 96.00000

12Academic Support through Cluster

Resource Centres (CRC/UERC)

12.01Salary of Cluster Coordinator (on an average of

one Resource Person per 18 schools in a block)RP

12.02 Furniture GrantCRC/

UERC0.10000

12.03Replacement of furniture, computer, TLE etc.

once in 5 years

CRC/

UERC0.10000

12.04 Contingency Grant CRC/UERC 0.10000 192 19.200 192 19.20000

12.05 Meeting, TA CRC/UERC 0.12000 192 23.040 192 23.04000

12.06 TLM Grant CRC/UERC 0.03000

12.07Maintenance Grant

CRC/UERC 0.02000

Sub Total 384 42.240 384 42.24000

13Computer Aided Education in upper

primary schools under Innovation

13.01Computer Aided Education in upper primary

schoolsDistrict 0.01200 48 0.576 48 0.57600

Sub Total 48 0.576 48 0.5760014 Libraries in Schools14.01 (a) Primary School (per school) School 0.03000

14.02 (b) Upper Primary School (per school) School 0.10000

Sub TotalIV ANNUAL GRANTS15 Teachers' Grant15.01 Primary Teachers Teacher 0.0050015.02 Upper Primary Teachers Teacher 0.00500 854 4.270 854 4.27000

Sub Total 854 4.270 854 4.2700016 School Grant16.01 Primary School School 0.05000 2182 109.100 2182 109.1000016.02 Upper Primary School School 0.07000 1044 73.080 1044 73.08000

Sub Total 3226 182.180 3226 182.18000

Arti:SSA-AWPB-2014-15-PABMinits:Gorakhpur:16-06-2014 298 / 533

Page 299: U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 · 2015. 1. 6. · U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15

Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

Name of District : Gorakhpur -34

ActivityS. No.Physical

UnitRemarks

Outlay Recommendation for 2014-15

Spill OverDeferred laibility of

2014-15Fresh Recommended Total Recommended

17Research, Evaluation, Monitoring &

Supervision

17.01 REMS Activities School 0.00103 3226 3.318 3226 3.31830

17.02 Monitoring & Supervision School 0.00078 3226 2.529 3226 2.52940

17.03 House Hold Survey (Urban) in Million Plus Cities District 35.00000

Sub Total 6452 5.848 6452 5.8477018 Maintenance Grant

18.01 Maintenance in School having upto3 Classrooms School 0.07500 626 46.950 626 46.95000

18.01a Maintenance Grant School 0.07500 2359 176.925 2359 176.92500Sub Total 2985 223.875 2985 223.87500

VBRIDGING GENDER AND SOCIAL

CATEGORY GAPS

19 Interventions for CWSN (IE)

19.01 Provision for Inclusive Education Child 0.03000 2260 67.800 2260 67.80000

Sub Total 2260 67.800 2260 67.80000

20Innovativation Head up to Rs.50 Lakh per

district

20.01 Girls Education District 0.70000 10 7.000 10 7.00000

20.02 ECCE District20.03 Intervention for SC / ST children District

20.04 Intervention for Minority Community children District

20.05 Intervention for Urban Deprived children District 10.00000

Sub Total 10 7.000 10 7.0000021 SMC/PRI Training

21.01Residential for 6 Resource Person per Block (3

days) (@ Rs.500/-)Blocks 0.09000

21.02Non-residential (3 days training of 6 SMC

members) (@ Rs.100/-)SMC 0.01800 3007 54.126 3007 54.12600

21.02(a)Non-residential (3 days training of 3 Members of

PRI/VECs/LA) (@ Rs.100/-)VEC/ WEC 0.00900

21.03

Seminar/Orientation of SMC Women members

and President/Vice President (@ Rs. 50,000/-

per block)

Blocks 0.50000

Sub Total 3007 54.126 3007 54.12600VI SCHOOL INFRASTRUCTURE22 Civil Works22.01 Primary School (Plain) (New) School 1.17000 13.15500 1.1700022.02 Primary School (Hilly/Rocky) (New) School 13.2750022.03 Upper Primary (Plain) (New) School 0.30940 20.65500 0.30940

22.04 Upper Primary School (Hilly/Rocky) (New) School 20.77500

22.04aComposite Schools for Urban Areas (Class I-

VIII)School 58.85200 41.04000 58.85200

22.05 ACR in lieu of upgraded Upper Primary School Rooms

22.06 Additional class rooms for adding Class VIII Rooms

22.07 Building Less (Pry) School 9.7500022.08 Building Less (UP) School 18.5900022.09 Dilapidated Building (Pry) School 9.7500022.10 Dilapidated Building (UP) School 18.59000

22.11 Additional Class Room (Rural) ( PS+UPS) Rooms 3.45000 46 158.700 46 158.70000

22.12 Additional Class Room (Urban) Rooms 3.4500022.13 Additional Class Room (Hill Area)22.14 Toilet/Urinals (PS & UPS) School 0.7000022.15 Separate Girls Toilet (Rural+Urban) School 0.7000022.16 CWSN friendly Toilets School 0.50000

22.17 Drinking Water Facility (for Urban Area Only)) School 0.15000

22.17a Drinking Water Facility (Plain PS & UPS) School 0.15000

22.17b Drinking Water Facility (Hilly/Rocky PS & UPS) School 0.15000

22.18a Boundary Wall PS (Total in Meters x .01105) 0.01749

22.18bBoundary Wall PS (For Gate) @Rs. 7000 x no. of

P.S.School 0.07800

22.18c Boundary Wall UPS (Total in Meters x .01105) 0.01749

22.18dBoundary Wall UPS (For Gate) @Rs. 7000 x no.

of UPSSchool 0.07800

22.19a Electrification in P.S./ Electrical Equipment School 0.11000

22.19b Electrification in U. P.S./ Electrical Equipment School 0.11000

22.20Office-cum-store-cum-Head Teacher's room

(Primary)Rooms

22.21Office-cum-store-cum-Head Teacher's room

(Upper Primary)Rooms

22.22Augumentation of training facility in BRC (one

time)BRC/ URC 5.00000

22.23 Child friendly Elements School 0.25000

22.24 Ramps with Handrails (Barrier Free Elements) School 0.06000

22.25 Handrails in existing Ramps School 0.01000

Arti:SSA-AWPB-2014-15-PABMinits:Gorakhpur:16-06-2014 299 / 533

Page 300: U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 · 2015. 1. 6. · U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15

Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

Name of District : Gorakhpur -34

ActivityS. No.Physical

UnitRemarks

Outlay Recommendation for 2014-15

Spill OverDeferred laibility of

2014-15Fresh Recommended Total Recommended

22.26 Whole School Develoipment School22.27 Retro-fitting and repairs School

22.28Residential Schools for specific category

of children

(a) Construction of Building including boundary

wall, Water and sanitation facilities, electric

installation (For 100 children)

Building 65.86000

(b) Construction of residential hostel Building 65.86000

(c) Refurnishing unused old buildings Building

22.29

Construction of Hostel in existing Govt UPS

including boundary wall, Water and sanitation

facilities, electric installation etc. (For 50

children)

7.00000

22.30Furniture for Govt. UPS (per child) (@ Rs.500/-

per child enrolled)Child 0.00500

22.31 Major Repairs for Primary School School 0.30000

22.32 Majr Repairs for Upper Primary School School 0.30000

22.33Others (Difference of Civil Wrks

sanctioned in pre.yr.)22.33a Others (Overhead Tank PS) School 0.1200022.33b Others (Overhead Tank UPS) School 0.12000

Sub Total (Civil WOrks) 60.33 46 158.700 46 219.03VII PROJECT MANAGEMENT COST23 Management23.01 Management up to 3.5%

(a) Project Management and MIS

(i) DPO ( Salary, Contigency, Consumables,

POL, TA & Computer etc)District 1 119.329 1 119.32940

(ii) EMIS Cell District 1 21.853 1 21.85250Sub Total (a) 1 1 1 141.182 1 141.182

(b) Training of Educational Administrators District

(c) School Mapping and Social Mapping District

Sub Total (23.01)

23.02Learning Enhancement Prog. (LEP) (P & UP) (up

to 2%)District 27.098 27.09795

23.03 Community Mobilization (up to 0.5%) District 1 45.850 1 45.85000

Sub Total (Management) 1 72.948 1 72.94795Total Management Cost 214.130 214.12985Total of SSA (Districs) 60.331 1.400 796311 17188.789 796311 17250.520

24 State Component23.01 Management23.02 REMS 0.0044923.03 SIEMAT

Sub Total

STATE SSA TOTAL 60.33140 1.40000 796311 17188.789 796311 17250.52025

25

KGBV Financial Provision (give

separate costing sheets for different

Models)

Hostel

ANon Recurring One Time Grant (Only

committed liabilities) (Model-I)

25.01 Construction of Building (New)

25.02 Construction of Building KGBV sanctioned earlier 40.78000 40.78000

25.02(a) Additional Class Room Rooms 3.45000

25.02(b) Guard Room Rooms 1.32000

25.02(c) Boundary Wall School 5.0200025.03 Boudary Wall (Spillover only) 3.00000 3.00000

25.04

Boring/Handpump (Spillover only)

(minimum rates prescribed by State Drinking

Water Department subject to a ceiling of Rs.

1.00 lakhs)

2.50000 2.50000

25.05 Electricity /Water charges (Spillover only)

25.05(a) Solar Water Heater & Solar Light 2.97000

25.06Furniture/Equipment (including Kitchen

equipment)3.00000

25.07 TLM and equipment including library books 3.50000

25.08 Bedding (New) 0.75000

25.09 Replacement of Bedding (once in 3 Year) 0.75000 16 12.000 16 12.00000

Subtotal Non Recurring 46.28000 12.000 58.28000

B Recurring Cost Per Annum (Model-I)

25.10Maintenance per girl student per month @ Rs.

1500/-18.00000 20 360.000 20 360.00000

25.11 Stipend for girl student per month @ Rs. 100/- 1.20000 20 24.000 20 24.00000

25.12Supplementary TLM, stationery and other

educational material @ Rs.1000/- per annum1.00000 20 20.000 20 20.00000

25.13 Salaries

Arti:SSA-AWPB-2014-15-PABMinits:Gorakhpur:16-06-2014 300 / 533

Page 301: U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 · 2015. 1. 6. · U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15

Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

Name of District : Gorakhpur -34

ActivityS. No.Physical

UnitRemarks

Outlay Recommendation for 2014-15

Spill OverDeferred laibility of

2014-15Fresh Recommended Total Recommended

25.13.1 Additional Salaries:

(a) 1 Warden @ Rs. 25,000/- per month 3.00000 20 60.00000 20 60.00000

(b)4 Full time teachers as per RTE norms @ Rs.

20,000/- per month per teacher 9.60000 20 192.00000 20 192.00000

(c)

1 Urdu Teachers (only for blocks with muslim

population above 20% and select urban areas), if

required @ Rs. 12,000/- per month per teacher 1.44000 20 28.80000 20 28.80000

(d)3 part time teachers @ Rs. 5,000/- per month per

teacher 1.80000 20 36.00000 20 36.00000

(e)1 Full time Accountant @ Rs. 10,000/- per month

1.20000 20 24.00000 20 24.00000

(f)

2 Support Staff – (Accountant/ Assistant, Peon,

Chowkidar) @ Rs. 5,000/- per month per staff 1.20000 20 24.00000 20 24.00000

(g) 1 Head cook @ Rs. 6,000/- per month 0.72000 20 14.40000 20 14.40000

(h)2 Asstt. Cooks @ Rs. 4,500/- per month per cook

1.08000 20 21.60000 20 21.60000

25.14Specific skill training @ Rs.1000/- per child per

annum1.00000 20 20.000 20 20.00000

25.15Electricity/water charges @ Rs.1000/- per child

per annum1.00000 20 20.000 20 20.00000

25.16Medical care/contingencies @ Rs. 1250 per child

per annum1.25000 20 25.000 20 25.00000

25.17 Maintenance @ Rs.750/- per child per annum 0.75000 20 15.000 20 15.00000

25.18

Miscellaneous (Educational Tour/ Exposure Visit

/ Sports Material etc.) @ Rs.750/- per child per

annum

0.75000 20 15.000 20 15.00000

25.19Preparatory camps @ Rs.200/- per child per

annum0.20000 20 4.000 20 4.00000

25.20PTAs/school functions @ Rs.200/- per child per

annum0.20000 20 4.000 20 4.00000

25.21 Provision of Rent @ Rs.6000/- per annum 6.00000

25.21a Provision of Rent (6 months) 3.6000025.21b Provision of Rent (3 months) 1.8000025.21c Rent (Previous Year (2007-2012)

25.22 Capacity building 0.50000 20 10.000 20 10.00000

25.22(a)Physical/ Self Defence Training @ Rs.200/- per

child per annum0.20000 20 4.000 20 4.00000

Subtotal Recurring 20 921.800 20 921.80000

Subtotal (Model-I) 46.28000 20 933.800 20 980.08000

CNon Recurring One Time Grant (Only

committed liabilities) (Model-II)

25.23 Construction of Building (New)

25.24 Construction of Building KGBV sanctioned earlier

25.24(a) Additional Class Room Rooms 3.45000

25.24(b) Guard Room Rooms 1.32000

25.24(c) Boundary Wall School 5.0200025.25 Boudary Wall (Spillover only)25.26 Boring/Handpump (Spillover only)

25.27 Electricity /Water charges (Spillover only)

25.27(a) Solar Water Heater & Solar Light 2.97000

25.28Furniture/Equipment (including Kitchen

equipment)2.00000

25.29 TLM and equipment including library books 3.00000

25.30 Bedding (New) 0.37500

25.31 Replacement of Bedding (once in 3 Year) 0.37500

Subtotal Non Recurring

D Recurring Cost Per Annum (Model-II)

25.32Maintenance per girl student per month @ Rs.

1500/-9.00000

25.33 Stipend for girl student per month @ Rs. 100/- 0.60000

25.34Supplementary TLM, stationery and other

educational material @ Rs.1000/- per annum0.50000

25.35 Salaries(a) 1 Warden @ Rs. 25,000/- per month 3.00000

(b)3 Full time teachers as per RTE norms @ Rs.

20,000/- per month per teacher 7.20000

(c) 3 part time teachers @ Rs. 5,000/- per month per

teacher 1.80000

(d)1 Full time Accountant @ Rs. 10,000/- per month

1.20000

(e)

2 Support Staff – (Accountant/ Assistant, Peon,

Chowkidar) @ Rs. 5,000/- per month per staff 1.20000

Arti:SSA-AWPB-2014-15-PABMinits:Gorakhpur:16-06-2014 301 / 533

Page 302: U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 · 2015. 1. 6. · U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15

Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

Name of District : Gorakhpur -34

ActivityS. No.Physical

UnitRemarks

Outlay Recommendation for 2014-15

Spill OverDeferred laibility of

2014-15Fresh Recommended Total Recommended

(f) 1 Head cook @ Rs. 6,000/- per month 0.72000

(g)1 Asstt. Cooks @ Rs. 4,500/- per month per cook

0.54000

25.36Specific skill training @ Rs.1000/- per child per

annum0.50000

25.37Electricity/water charges @ Rs.1000/- per child

per annum0.50000

25.38Medical care/contingencies @ Rs. 1250 per child

per annum0.62500

25.39 Maintenance @ Rs.750/- per child per annum 0.37500

25.40

Miscellaneous (Educational Tour/ Exposure Visit

/ Sports Material etc.) @ Rs.750/- per child per

annum

0.37500

25.41Preparatory camps @ Rs.300/- per child per

annum0.15000

25.42PTAs/school functions @ Rs.300/- per child per

annum0.15000

25.43 Provision of Rent @ Rs.10000/- per annum 5.00000

25.43a Provision of Rent (6 months) 3.6000025.43b Provision of Rent (3 months) 1.8000025.43c Rent (Previous Year (2007-2012)25.44 Capacity building 0.25000

25.44(a)Physical/ Self Defence Training @ Rs.200/- per

child per annum0.10000

Subtotal Recurring

Subtotal (Model-II) Total (KGBV) 46.280 20 933.800 20 980.080

DISTRICT GRAND TOTAL (SSA+KGBV) 106.611 1.400 796331 18122.589 796331 18230.600

Arti:SSA-AWPB-2014-15-PABMinits:Gorakhpur:16-06-2014 302 / 533

Page 303: U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 · 2015. 1. 6. · U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15

Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

I ACCESS

1 Opening of New Schools

1.01 Upgradation of EGS to PSCentres /

School1.02 New PS School

1.03 Upgradation of PS to UPS / New UPS School

1.04 Composite Schools (for Urban Areas) School

1.05Residential Schools for specific category children

(For 100 children)

1.06Residential Hostel (for specific category of

children) (For 50 children)

1.07 Integration of Class V with Primary Schools

1.08Integration of Class VIII with Upper Primary

Schools

2Residential Schools for specific category

of children (For 100 Children)

Total - Residential Schools (For 100

children)

3Residential Hostel for specific category of

children (For 50 Children)

Total - Residential Schools (For 50

children)4 Transport/Escort Facility

4.01

Children in remote habitations with sparse

populations where opening of schools is

unviable

Child 0.03000

4.02

Urban deprived children/children without adult

protection in urban areas where schools are not

opened because availability of land is a problem

Child 0.03000

Sub Total

5Special Training for mainstreaming of Out-

of-School Children

5.03 Non-Residential (Fresh)(a) 12 months Child 0.06000(b) 9 months 0.04500(c) 6 months

(i)Special Training (by Special Instructors-NRBC)-

(1-5) Child 0.03000 151 4.530 151 4.53000

(ii) Special Training (by Special Instructors-NRBC)-

(6-8) Child 0.03000 135 4.050 135 4.05000

(d) 3 months Child 0.01500Sub Total 286 8.580 286 8.58000

Total (Special Training) 286 8.580 286 8.5805(B) House Hold Survey (HHS)

5(B).01 House Hold Survey through SMCHouse

Hold0.00001

Sub TotalII RETENTION6 Free Text Book

6.01Free Text Book (PS) for Parishadiya & Aided

Primary Schools (Workbooks not included)Child 0.00120 183187 219.824 183187 219.82440

6.01a

Free Text Book (PS) for 25% children of Class-1

in Private Recognised Primary Schools of other

Boards (Workbooks not included)

Child 0.00150

6.02 Free Brail Books (PS) 0.00150 86 0.129 86 0.12900

6.03 Free Large Print Books (PS) 0.00150

6.04Free Text Book (UPS) (Workbooks not included)

(Including KGBV Girls)Child 0.00200 64161 128.322 64161 128.32200

6.05 Free Brail Books (UPS) 0.00250 40 0.100 40 0.10000

6.06 Free Large Print Books (PS) 0.00250Sub Total 247474 348.375 247474 348.375

7 Provision of 2 set of Uniforms

7.01 All Girls (Including KGBV Girls) Child 0.00400 202888 811.552 202888 811.55200

7.02 SC Boys Child 0.00400 43485 173.940 43485 173.94000

7.03 ST Boys Child 0.00400 8 0.032 8 0.03200

7.04 BPL Boys Child 0.00400 71911 287.644 71911 287.64400

7.05

Free Uniform for 25% children of Class-1 in

Private Recognised Primary Schools of other

Boards

Child0.00400

Sub Total 318292 1273.168 318292 1273.1687(A) Fee Reimbursement

7(A).01

Fee Reimbursement for Admission of children of

Disadvantaged Group & Weaker Section upto

25% of seats in Class-1 of Private Unaided

Recognised Schools

Child 0.05400

Sub Total

8 Teaching Learning Equipment (TLE)

8.01 TLE - New Primary School 33.40000 0.20000 33.400008.02 TLE - New Upper Primary School 3.50000 0.50000 3.50000

Name of District : Gonda -33

ActivityS. No.Physical

UnitRemarks

Outlay Recommendation for 2014-15

Spill OverDeferred laibility of

2014-15Fresh Recommended Total Recommended

Arti:SSA-AWPB-2014-15-PABMinits:Gonda:16-06-2014 303 / 533

Page 304: U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 · 2015. 1. 6. · U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15

Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

Name of District : Gonda -33

ActivityS. No.Physical

UnitRemarks

Outlay Recommendation for 2014-15

Spill OverDeferred laibility of

2014-15Fresh Recommended Total Recommended

Sub Total 36.90000 36.90000III ENHANCING QUALITY9 New Teachers Salary

9.01 Primary Teachers (Regular) (Asstt. Teacher) Teacher 0.91500

9.01aHead Teacher for Primary (if the number of

children exceeds 150 in a school)Teacher

9.02 Primary Teachers (Contract) (S.M.) Teacher

9.03Subject specific Upper Primary Teachers

(Regular) (a) Science and Mathematics Teacher 1.26000(b) Social Studies Teacher 1.26000(c) Languages Teacher 1.26000

Sub Total (9.01 to 9.05)Add.Teacher against PTR

Sub Total (9.06 to 9.12)

Total (New Teacher's Salary-9.01 to 9.12)

Teachers Salary (Recurring-sanctioned

earlier)Primary teachers

9.13 Primary Teachers ( Regular)-Existing, in position Teacher 3.66000 469 1716.540 469 1716.54000

9.14Primary Teachers (Contract)-Existing, in

positionTeacher 0.55000

9.14(a) Primary Teachers (Contract)-under Training Teacher 0.38500 2020 777.700 2020 777.70000

9.14(b)Primary Teacher (Para Teachers Equal to

9.14(a) upgraded as Teachers)0.38500 1062 408.870 1062 408.87000

9.14(c) Primary Teachers (Para)- Vacant Teacher9.15 Primary Teachers (Vacant) Teacher 0.30500

9.16Head Teacher for Primary (if the number of

children exceeds 150)Teacher 5.04000 295 1486.800 295 1486.80000

9.16(b)Head Teacher for Primary (if the number of

children exceeds 150) VacantTeacher 0.42000

Additional teachers

9.17Additional Teachers - PS (Special BTC-

Regular) in positionTeacher 0.30500

9.18Additional Teachers - PS (Special BTC Under

Training)Teacher 0.87600

9.19 Additional Teachers - PS (Vacant) Teacher

9.20Others in position (Para Teachers upgraded

as Teachers)Teacher

Upper Primary teachers

9.21 UP Teachers (Regular)-Existing Teacher 5.04000 654 3296.160 654 3296.16000

9.22 UP Teachers (Contract)-Existing9.23 UP Teachers (Vacant) Teacher 1.26000

9.24Head Teacher for Upper Primary (if the number

of children exceeds 100)-ExistingTeacher 5.34000 544 2904.960 544 2904.96000

9.24a Head Teacher for Upper Primary (Vacant) Teacher 1.33500

9.25Subject specific Upper Primary Teachers

(Regular)(a) Science and Mathematics(b) Social Studies(c) Languages

9.32 Part Time Instructors in position(a) Art Education 0.77000 169 130.130 169 130.13000(b) Health and Physical Education 0.77000 197 151.690 197 151.69000(c) Work Education 0.77000 135 103.950 135 103.95000

9.32(A) Part Time Instructors Vacant(a) Art Education 0.42000(b) Health and Physical Education 0.42000(c) Work Education 0.42000

9.33

Others-Incentive to Teachers in Schools

Located in Naxal Affected Areas (@

Rs.1500/- per teachers per month)

Sub Total (9.13 to 9.33) 5545 10976.800 5545 10976.80TOTAL

(New Teachers Salary +Teachers Salary

Recurring)

5545 10976.800 5545 10976.80000

10 Teachers Training(a) Teachers

10.01

Refresher In-service Teachers' Training at BRC

level and above - 10 days (@ Rs.200/- per

head per day)

Teacher

(Target &

Ach.-13-14

in

Mandays)

0.00600

10.01(a)Continuous and Comprehensive Evauation [PS +

UPS)Teacher 0.01300 2037 26.481 2037 26.48100

10.01(b) Eary Reading and Numeracy Skills [PS] Teacher 0.00500 2037 10.185 2037 10.18500

10.01(c) Science [UPS] Teacher 0.00800 976 7.808 976 7.80800Recommended as

proposed

10.01(d) CWSN Teacher 0.00400

Arti:SSA-AWPB-2014-15-PABMinits:Gonda:16-06-2014 304 / 533

Page 305: U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 · 2015. 1. 6. · U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15

Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

Name of District : Gonda -33

ActivityS. No.Physical

UnitRemarks

Outlay Recommendation for 2014-15

Spill OverDeferred laibility of

2014-15Fresh Recommended Total Recommended

10.02

One day monthly cluster level meetings and

peer group training sessions for 10 months for

all teachers each year at CRC level - 10 days (@

Rs.100/- per head per day)

Teacher 0.01000

10.03(a)

Induction Training for Newly Recruited Teachers

for 6 Months (Special BTC)- @Rs.2000/- per

head per year

Teacher 0.02000

10.03(b)5 Days Training for Part Time Instructors @ Rs.

200/- per head per day) Teacher 0.01000

10.04

Training of untrained Teachers to acquire

professional qualifications over a two year

period.

Teacher 0.04700 1287 60.489 1287 60.48900

(b) Head Teachers

10.05Refresher Residencial In-service for 10 days at

BRC level and above

Head

Teacher(c) Resource Persons

10.06

Refresher Training for all Resource

Persons,Master Trainers, BRC & CRC faculty

and Coordinators for 5 days each year (@

Rs.200/- per head per day)

Resource

Person 0.00300 204 0.612 204 0.61200

Sub Total 6541 105.575 6541 105.575

11Academic Support through Block Resource

Centre (BRC)/ URC

11.01 Salary of Faculty and Staff

(a) 5 RPs at BRC for subject specific training in

positionRP 85 85

(b) 2 RPs for CWSN in position RP(b-i) 1 CWSN Resource Person RP 1.10000 34 37.400 34 37.40000

(b-ii) 1 Physiotherapist (Resource person for IE) RP

(c) 1 MIS Coordinator in position RP 1.86000

(d) 1 Datra Entry Operator in position RP 1.74000

(e) 1 Accountant-cum-support staff in position RP 1.80000 3 5.400 3 5.40000

11.02 Furniture Grant BRC/ URC 1.00000

11.03Replacement of furniture, computer, TLE etc (

Once in 5 years)BRC/ URC 1.00000

11.04 Contingency Grant BRC/ URC 0.50000 17 8.500 17 8.50000

11.05 Meeting, TA BRC/ URC 0.30000 17 5.100 17 5.10000

11.06 TLM Grant BRC/ URC 0.10000

11.07 Maintenance Grant BRC/ URC 0.10000

Sub Total 17 56.400 17 56.40000

12Academic Support through Cluster

Resource Centres (CRC/UERC)

12.01Salary of Cluster Coordinator (on an average of

one Resource Person per 18 schools in a block)RP

12.02 Furniture GrantCRC/

UERC0.10000

12.03Replacement of furniture, computer, TLE etc.

once in 5 years

CRC/

UERC0.10000

12.04 Contingency Grant CRC/UERC 0.10000 167 16.700 167 16.70000

12.05 Meeting, TA CRC/UERC 0.12000 167 20.040 167 20.04000

12.06 TLM Grant CRC/UERC 0.03000

12.07Maintenance Grant

CRC/UERC 0.02000

Sub Total 334 36.740 334 36.74000

13Computer Aided Education in upper

primary schools under Innovation

13.01Computer Aided Education in upper primary

schoolsDistrict 0.01200 48 0.576 48 0.57600

Sub Total 48 0.576 48 0.5760014 Libraries in Schools14.01 (a) Primary School (per school) School 0.03000

14.02 (b) Upper Primary School (per school) School 0.10000

Sub TotalIV ANNUAL GRANTS15 Teachers' Grant15.01 Primary Teachers Teacher 0.0050015.02 Upper Primary Teachers Teacher 0.00500 976 4.880 976 4.88000

Sub Total 976 4.880 976 4.8800016 School Grant16.01 Primary School School 0.05000 2266 113.300 2266 113.3000016.02 Upper Primary School School 0.07000 992 69.440 992 69.44000

Sub Total 3258 182.740 3258 182.74000

Arti:SSA-AWPB-2014-15-PABMinits:Gonda:16-06-2014 305 / 533

Page 306: U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 · 2015. 1. 6. · U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15

Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

Name of District : Gonda -33

ActivityS. No.Physical

UnitRemarks

Outlay Recommendation for 2014-15

Spill OverDeferred laibility of

2014-15Fresh Recommended Total Recommended

17Research, Evaluation, Monitoring &

Supervision

17.01 REMS Activities School 0.00103 3258 3.351 3258 3.35122

17.02 Monitoring & Supervision School 0.00078 3258 2.554 3258 2.55449

17.03 House Hold Survey (Urban) in Million Plus Cities District 35.00000

Sub Total 6516 5.906 6516 5.9057118 Maintenance Grant

18.01 Maintenance in School having upto3 Classrooms School 0.07500 415 31.125 415 31.12500

18.01a Maintenance Grant School 0.07500 2741 205.575 2741 205.57500Sub Total 3156 236.700 3156 236.70000

VBRIDGING GENDER AND SOCIAL

CATEGORY GAPS

19 Interventions for CWSN (IE)

19.01 Provision for Inclusive Education Child 0.01000 7033 70.330 7033 70.33000

Sub Total 7033 70.330 7033 70.33000

20Innovativation Head up to Rs.50 Lakh per

district

20.01 Girls Education District 0.70000 11 7.700 11 7.70000

20.02 ECCE District20.03 Intervention for SC / ST children District

20.04 Intervention for Minority Community children District

20.05 Intervention for Urban Deprived children District 10.00000

Sub Total 11 7.700 11 7.7000021 SMC/PRI Training

21.01Residential for 6 Resource Person per Block (3

days) (@ Rs.500/-)Blocks 0.09000

21.02Non-residential (3 days training of 6 SMC

members) (@ Rs.100/-)SMC 0.01800 3157 56.826 3157 56.82600

21.02(a)Non-residential (3 days training of 3 Members of

PRI/VECs/LA) (@ Rs.100/-)VEC/ WEC 0.00900

21.03

Seminar/Orientation of SMC Women members

and President/Vice President (@ Rs. 50,000/-

per block)

Blocks 0.50000

Sub Total 3157 56.826 3157 56.82600VI SCHOOL INFRASTRUCTURE22 Civil Works22.01 Primary School (Plain) (New) School 13.1550022.02 Primary School (Hilly/Rocky) (New) School 13.2750022.03 Upper Primary (Plain) (New) School 0.28512 20.65500 0.28512

22.04 Upper Primary School (Hilly/Rocky) (New) School 20.77500

22.04aComposite Schools for Urban Areas (Class I-

VIII)School 12.08640 41.04000 12.08640

22.05 ACR in lieu of upgraded Upper Primary School Rooms

22.06 Additional class rooms for adding Class VIII Rooms

22.07 Building Less (Pry) School 9.7500022.08 Building Less (UP) School 18.5900022.09 Dilapidated Building (Pry) School 9.7500022.10 Dilapidated Building (UP) School 18.59000

22.11 Additional Class Room (Rural) ( PS+UPS) Rooms 3.45000 65 224.250 65 224.25000

22.12 Additional Class Room (Urban) Rooms 3.45000 2 6.900 2 6.9000022.13 Additional Class Room (Hill Area)22.14 Toilet/Urinals (PS & UPS) School 0.70000 15 10.500 15 10.5000022.15 Separate Girls Toilet (Rural+Urban) School 0.70000 25 17.500 25 17.5000022.16 CWSN friendly Toilets School 0.50000

22.17 Drinking Water Facility (for Urban Area Only)) School 0.15000 3 0.450 3 0.45000

22.17a Drinking Water Facility (Plain PS & UPS) School 0.15000 31 4.650 31 4.65000

22.17b Drinking Water Facility (Hilly/Rocky PS & UPS) School 0.15000

22.18a Boundary Wall PS (Total in Meters x .01105) 0.01749

22.18bBoundary Wall PS (For Gate) @Rs. 7000 x no. of

P.S.School 0.07800

22.18c Boundary Wall UPS (Total in Meters x .01105) 0.01749

22.18dBoundary Wall UPS (For Gate) @Rs. 7000 x no.

of UPSSchool 0.07800

22.19a Electrification in P.S./ Electrical Equipment School 0.11000

22.19b Electrification in U. P.S./ Electrical Equipment School 0.11000

22.20Office-cum-store-cum-Head Teacher's room

(Primary)Rooms

22.21Office-cum-store-cum-Head Teacher's room

(Upper Primary)Rooms

22.22Augumentation of training facility in BRC (one

time)BRC/ URC 5.00000

22.23 Child friendly Elements School 0.25000

22.24 Ramps with Handrails (Barrier Free Elements) School 0.06000

22.25 Handrails in existing Ramps School 0.01000

Arti:SSA-AWPB-2014-15-PABMinits:Gonda:16-06-2014 306 / 533

Page 307: U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 · 2015. 1. 6. · U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15

Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

Name of District : Gonda -33

ActivityS. No.Physical

UnitRemarks

Outlay Recommendation for 2014-15

Spill OverDeferred laibility of

2014-15Fresh Recommended Total Recommended

22.26 Whole School Develoipment School22.27 Retro-fitting and repairs School

22.28Residential Schools for specific category

of children

(a) Construction of Building including boundary

wall, Water and sanitation facilities, electric

installation (For 100 children)

Building 65.86000

(b) Construction of residential hostel Building 65.86000

(c) Refurnishing unused old buildings Building

22.29

Construction of Hostel in existing Govt UPS

including boundary wall, Water and sanitation

facilities, electric installation etc. (For 50

children)

7.00000

22.30Furniture for Govt. UPS (per child) (@ Rs.500/-

per child enrolled)Child 0.00500

22.31 Major Repairs for Primary School School 0.30000

22.32 Majr Repairs for Upper Primary School School 0.30000

22.33Others (Difference of Civil Wrks

sanctioned in pre.yr.)22.33a Others (Overhead Tank PS) School 0.1200022.33b Others (Overhead Tank UPS) School 0.12000

Sub Total (Civil WOrks) 12.37 141 264.250 141 276.62VII PROJECT MANAGEMENT COST23 Management23.01 Management up to 3.5%

(a) Project Management and MIS

(i) DPO ( Salary, Contigency, Consumables,

POL, TA & Computer etc)District 1 127.259 1 127.25860

(ii) EMIS Cell District 1 21.122 1 21.12200Sub Total (a) 1 1 1 148.381 1 148.381

(b) Training of Educational Administrators District

(c) School Mapping and Social Mapping District

Sub Total (23.01)

23.02Learning Enhancement Prog. (LEP) (P & UP) (up

to 2%)District 23.697 23.69740

23.03 Community Mobilization (up to 0.5%) District 1 45.850 1 45.85000

Sub Total (Management) 1 69.547 1 69.54740Total Management Cost 217.928 217.92800Total of SSA (Districs) 12.372 36.900 602785 13853.474 602785 13902.746

24 State Component23.01 Management23.02 REMS 0.0044923.03 SIEMAT

Sub Total

STATE SSA TOTAL 12.37152 36.90000 602785 13853.474 602785 13902.74563

25

KGBV Financial Provision (give

separate costing sheets for different

Models)

Hostel

ANon Recurring One Time Grant (Only

committed liabilities) (Model-I)

25.01 Construction of Building (New)

25.02 Construction of Building KGBV sanctioned earlier 0.40000 0.40000

25.02(a) Additional Class Room Rooms 3.45000

25.02(b) Guard Room Rooms 1.32000

25.02(c) Boundary Wall School 5.0200025.03 Boudary Wall (Spillover only)

25.04

Boring/Handpump (Spillover only)

(minimum rates prescribed by State Drinking

Water Department subject to a ceiling of Rs.

1.00 lakhs)

25.05 Electricity /Water charges (Spillover only)

25.05(a) Solar Water Heater & Solar Light 2.97000

25.06Furniture/Equipment (including Kitchen

equipment)3.00000

25.07 TLM and equipment including library books 3.50000

25.08 Bedding (New) 0.75000

25.09 Replacement of Bedding (once in 3 Year) 0.75000 16 12.000 16 12.00000

Subtotal Non Recurring 0.40000 12.000 12.40000

B Recurring Cost Per Annum (Model-I)

25.10Maintenance per girl student per month @ Rs.

1500/-18.00000 17 306.000 17 306.00000

25.11 Stipend for girl student per month @ Rs. 100/- 1.20000 17 20.400 17 20.40000

25.12Supplementary TLM, stationery and other

educational material @ Rs.1000/- per annum1.00000 17 17.000 17 17.00000

25.13 Salaries

Arti:SSA-AWPB-2014-15-PABMinits:Gonda:16-06-2014 307 / 533

Page 308: U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 · 2015. 1. 6. · U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15

Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

Name of District : Gonda -33

ActivityS. No.Physical

UnitRemarks

Outlay Recommendation for 2014-15

Spill OverDeferred laibility of

2014-15Fresh Recommended Total Recommended

25.13.1 Additional Salaries:

(a) 1 Warden @ Rs. 25,000/- per month 3.00000 17 51.00000 17 51.00000

(b)4 Full time teachers as per RTE norms @ Rs.

20,000/- per month per teacher 9.60000 17 163.20000 17 163.20000

(c)

1 Urdu Teachers (only for blocks with muslim

population above 20% and select urban areas), if

required @ Rs. 12,000/- per month per teacher 1.44000 17 24.48000 17 24.48000

(d)3 part time teachers @ Rs. 5,000/- per month per

teacher 1.80000 17 30.60000 17 30.60000

(e)1 Full time Accountant @ Rs. 10,000/- per month

1.20000 17 20.40000 17 20.40000

(f)

2 Support Staff – (Accountant/ Assistant, Peon,

Chowkidar) @ Rs. 5,000/- per month per staff 1.20000 17 20.40000 17 20.40000

(g) 1 Head cook @ Rs. 6,000/- per month 0.72000 17 12.24000 17 12.24000

(h)2 Asstt. Cooks @ Rs. 4,500/- per month per cook

1.08000 17 18.36000 17 18.36000

25.14Specific skill training @ Rs.1000/- per child per

annum1.00000 17 17.000 17 17.00000

25.15Electricity/water charges @ Rs.1000/- per child

per annum1.00000 17 17.000 17 17.00000

25.16Medical care/contingencies @ Rs. 1250 per child

per annum1.25000 17 21.250 17 21.25000

25.17 Maintenance @ Rs.750/- per child per annum 0.75000 17 12.750 17 12.75000

25.18

Miscellaneous (Educational Tour/ Exposure Visit

/ Sports Material etc.) @ Rs.750/- per child per

annum

0.75000 17 12.750 17 12.75000

25.19Preparatory camps @ Rs.200/- per child per

annum0.20000 17 3.400 17 3.40000

25.20PTAs/school functions @ Rs.200/- per child per

annum0.20000 17 3.400 17 3.40000

25.21 Provision of Rent @ Rs.6000/- per annum 6.00000

25.21a Provision of Rent (6 months) 3.6000025.21b Provision of Rent (3 months) 1.8000025.21c Rent (Previous Year (2007-2012)

25.22 Capacity building 0.50000 17 8.500 17 8.50000

25.22(a)Physical/ Self Defence Training @ Rs.200/- per

child per annum0.20000 17 3.400 17 3.40000

Subtotal Recurring 17 783.530 17 783.53000

Subtotal (Model-I) 0.40000 17 795.530 17 795.93000

CNon Recurring One Time Grant (Only

committed liabilities) (Model-II)

25.23 Construction of Building (New)

25.24 Construction of Building KGBV sanctioned earlier

25.24(a) Additional Class Room Rooms 3.45000

25.24(b) Guard Room Rooms 1.32000

25.24(c) Boundary Wall School 5.0200025.25 Boudary Wall (Spillover only)25.26 Boring/Handpump (Spillover only)

25.27 Electricity /Water charges (Spillover only)

25.27(a) Solar Water Heater & Solar Light 2.97000

25.28Furniture/Equipment (including Kitchen

equipment)2.00000

25.29 TLM and equipment including library books 3.00000

25.30 Bedding (New) 0.37500

25.31 Replacement of Bedding (once in 3 Year) 0.37500

Subtotal Non Recurring

D Recurring Cost Per Annum (Model-II)

25.32Maintenance per girl student per month @ Rs.

1500/-9.00000

25.33 Stipend for girl student per month @ Rs. 100/- 0.60000

25.34Supplementary TLM, stationery and other

educational material @ Rs.1000/- per annum0.50000

25.35 Salaries(a) 1 Warden @ Rs. 25,000/- per month 3.00000

(b)3 Full time teachers as per RTE norms @ Rs.

20,000/- per month per teacher 7.20000

(c) 3 part time teachers @ Rs. 5,000/- per month per

teacher 1.80000

(d)1 Full time Accountant @ Rs. 10,000/- per month

1.20000

(e)

2 Support Staff – (Accountant/ Assistant, Peon,

Chowkidar) @ Rs. 5,000/- per month per staff 1.20000

Arti:SSA-AWPB-2014-15-PABMinits:Gonda:16-06-2014 308 / 533

Page 309: U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 · 2015. 1. 6. · U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15

Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

Name of District : Gonda -33

ActivityS. No.Physical

UnitRemarks

Outlay Recommendation for 2014-15

Spill OverDeferred laibility of

2014-15Fresh Recommended Total Recommended

(f) 1 Head cook @ Rs. 6,000/- per month 0.72000

(g)1 Asstt. Cooks @ Rs. 4,500/- per month per cook

0.54000

25.36Specific skill training @ Rs.1000/- per child per

annum0.50000

25.37Electricity/water charges @ Rs.1000/- per child

per annum0.50000

25.38Medical care/contingencies @ Rs. 1250 per child

per annum0.62500

25.39 Maintenance @ Rs.750/- per child per annum 0.37500

25.40

Miscellaneous (Educational Tour/ Exposure Visit

/ Sports Material etc.) @ Rs.750/- per child per

annum

0.37500

25.41Preparatory camps @ Rs.300/- per child per

annum0.15000

25.42PTAs/school functions @ Rs.300/- per child per

annum0.15000

25.43 Provision of Rent @ Rs.10000/- per annum 5.00000

25.43a Provision of Rent (6 months) 3.6000025.43b Provision of Rent (3 months) 1.8000025.43c Rent (Previous Year (2007-2012)25.44 Capacity building 0.25000

25.44(a)Physical/ Self Defence Training @ Rs.200/- per

child per annum0.10000

Subtotal Recurring

Subtotal (Model-II) Total (KGBV) 0.400 17 795.530 17 795.930

DISTRICT GRAND TOTAL (SSA+KGBV) 12.772 36.900 602802 14649.004 602802 14698.676

Arti:SSA-AWPB-2014-15-PABMinits:Gonda:16-06-2014 309 / 533

Page 310: U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 · 2015. 1. 6. · U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15

Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

I ACCESS

1 Opening of New Schools

1.01 Upgradation of EGS to PSCentres /

School1.02 New PS School

1.03 Upgradation of PS to UPS / New UPS School

1.04 Composite Schools (for Urban Areas) School

1.05Residential Schools for specific category children

(For 100 children)

1.06Residential Hostel (for specific category of

children) (For 50 children)

1.07 Integration of Class V with Primary Schools

1.08Integration of Class VIII with Upper Primary

Schools

2Residential Schools for specific category

of children (For 100 Children)

Total - Residential Schools (For 100

children)

3Residential Hostel for specific category of

children (For 50 Children)

Total - Residential Schools (For 50

children)4 Transport/Escort Facility

4.01

Children in remote habitations with sparse

populations where opening of schools is

unviable

Child 0.03000

4.02

Urban deprived children/children without adult

protection in urban areas where schools are not

opened because availability of land is a problem

Child 0.03000

Sub Total

5Special Training for mainstreaming of Out-

of-School Children

5.03 Non-Residential (Fresh)(a) 12 months Child 0.06000(b) 9 months 0.04500(c) 6 months

(i)Special Training (by Special Instructors-NRBC)-

(1-5) Child 0.03000 84 2.520 84 2.52000

(ii) Special Training (by Special Instructors-NRBC)-

(6-8) Child 0.03000 102 3.060 102 3.06000

(d) 3 months Child 0.01500Sub Total 186 5.580 186 5.58000

Total (Special Training) 186 5.580 186 5.5805(B) House Hold Survey (HHS)

5(B).01 House Hold Survey through SMCHouse

Hold0.00001

Sub TotalII RETENTION6 Free Text Book

6.01Free Text Book (PS) for Parishadiya & Aided

Primary Schools (Workbooks not included)Child 0.00120 186905 224.286 186905 224.28600

6.01a

Free Text Book (PS) for 25% children of Class-1

in Private Recognised Primary Schools of other

Boards (Workbooks not included)

Child 0.00150

6.02 Free Brail Books (PS) 0.00150 122 0.183 122 0.18300

6.03 Free Large Print Books (PS) 0.00150

6.04Free Text Book (UPS) (Workbooks not included)

(Including KGBV Girls)Child 0.00200 71926 143.852 71926 143.85200

6.05 Free Brail Books (UPS) 0.00250 30 0.075 30 0.07500

6.06 Free Large Print Books (PS) 0.00250Sub Total 258983 368.396 258983 368.396

7 Provision of 2 set of Uniforms

7.01 All Girls (Including KGBV Girls) Child 0.00400 200457 801.828 200457 801.82800

7.02 SC Boys Child 0.00400 57675 230.700 57675 230.70000

7.03 ST Boys Child 0.00400 699 2.796 699 2.79600

7.04 BPL Boys Child 0.00400 77284 309.136 77284 309.13600

7.05

Free Uniform for 25% children of Class-1 in

Private Recognised Primary Schools of other

Boards

Child0.00400

Sub Total 336115 1344.460 336115 1344.4607(A) Fee Reimbursement

7(A).01

Fee Reimbursement for Admission of children of

Disadvantaged Group & Weaker Section upto

25% of seats in Class-1 of Private Unaided

Recognised Schools

Child 0.05400

Sub Total

8 Teaching Learning Equipment (TLE)

8.01 TLE - New Primary School 47.20000 0.20000 47.200008.02 TLE - New Upper Primary School 18.50000 0.50000 18.50000

Name of District : Ghazipur -32

ActivityS. No.Physical

UnitRemarks

Outlay Recommendation for 2014-15

Spill OverDeferred laibility of

2014-15Fresh Recommended Total Recommended

Arti:SSA-AWPB-2014-15-PABMinits:Ghazipur:16-06-2014 310 / 533

Page 311: U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 · 2015. 1. 6. · U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15

Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

Name of District : Ghazipur -32

ActivityS. No.Physical

UnitRemarks

Outlay Recommendation for 2014-15

Spill OverDeferred laibility of

2014-15Fresh Recommended Total Recommended

Sub Total 65.70000 65.70000III ENHANCING QUALITY9 New Teachers Salary

9.01 Primary Teachers (Regular) (Asstt. Teacher) Teacher 0.91500

9.01aHead Teacher for Primary (if the number of

children exceeds 150 in a school)Teacher

9.02 Primary Teachers (Contract) (S.M.) Teacher

9.03Subject specific Upper Primary Teachers

(Regular) (a) Science and Mathematics Teacher 1.26000(b) Social Studies Teacher 1.26000(c) Languages Teacher 1.26000

Sub Total (9.01 to 9.05)Add.Teacher against PTR

Sub Total (9.06 to 9.12)

Total (New Teacher's Salary-9.01 to 9.12)

Teachers Salary (Recurring-sanctioned

earlier)Primary teachers

9.13 Primary Teachers ( Regular)-Existing, in position Teacher 3.66000 450 1647.000 450 1647.00000

9.14Primary Teachers (Contract)-Existing, in

positionTeacher 0.55000

9.14(a) Primary Teachers (Contract)-under Training Teacher 0.38500 1713 659.505 1713 659.50500

9.14(b)Primary Teacher (Para Teachers Equal to

9.14(a) upgraded as Teachers)0.38500 1234 475.090 1234 475.09000

9.14(c) Primary Teachers (Para)- Vacant Teacher9.15 Primary Teachers (Vacant) Teacher 0.30500

9.16Head Teacher for Primary (if the number of

children exceeds 150)Teacher 5.04000 271 1365.840 271 1365.84000

9.16(b)Head Teacher for Primary (if the number of

children exceeds 150) VacantTeacher 0.42000

Additional teachers

9.17Additional Teachers - PS (Special BTC-

Regular) in positionTeacher 0.30500

9.18Additional Teachers - PS (Special BTC Under

Training)Teacher 0.87600

9.19 Additional Teachers - PS (Vacant) Teacher

9.20Others in position (Para Teachers upgraded

as Teachers)Teacher

Upper Primary teachers

9.21 UP Teachers (Regular)-Existing Teacher 5.04000 1356 6834.240 1356 6834.24000

9.22 UP Teachers (Contract)-Existing9.23 UP Teachers (Vacant) Teacher 1.26000

9.24Head Teacher for Upper Primary (if the number

of children exceeds 100)-ExistingTeacher 5.34000 249 1329.660 249 1329.66000

9.24a Head Teacher for Upper Primary (Vacant) Teacher 1.33500

9.25Subject specific Upper Primary Teachers

(Regular)(a) Science and Mathematics(b) Social Studies(c) Languages

9.32 Part Time Instructors in position(a) Art Education 0.77000 169 130.130 169 130.13000(b) Health and Physical Education 0.77000 193 148.610 193 148.61000(c) Work Education 0.77000 146 112.420 146 112.42000

9.32(A) Part Time Instructors Vacant(a) Art Education 0.42000(b) Health and Physical Education 0.42000(c) Work Education 0.42000

9.33

Others-Incentive to Teachers in Schools

Located in Naxal Affected Areas (@

Rs.1500/- per teachers per month)

Sub Total (9.13 to 9.33) 5781 12702.495 5781 12702.50TOTAL

(New Teachers Salary +Teachers Salary

Recurring)

5781 12702.495 5781 12702.49500

10 Teachers Training(a) Teachers

10.01

Refresher In-service Teachers' Training at BRC

level and above - 10 days (@ Rs.200/- per

head per day)

Teacher

(Target &

Ach.-13-14

in

Mandays)

0.00600

10.01(a)Continuous and Comprehensive Evauation [PS +

UPS)Teacher 0.01300 1847 24.011 1847 24.01100

10.01(b) Eary Reading and Numeracy Skills [PS] Teacher 0.00500 1847 9.235 1847 9.23500

10.01(c) Science [UPS] Teacher 0.00800 588 4.704 588 4.70400Recommended as

proposed

10.01(d) CWSN Teacher 0.00400

Arti:SSA-AWPB-2014-15-PABMinits:Ghazipur:16-06-2014 311 / 533

Page 312: U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 · 2015. 1. 6. · U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15

Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

Name of District : Ghazipur -32

ActivityS. No.Physical

UnitRemarks

Outlay Recommendation for 2014-15

Spill OverDeferred laibility of

2014-15Fresh Recommended Total Recommended

10.02

One day monthly cluster level meetings and

peer group training sessions for 10 months for

all teachers each year at CRC level - 10 days (@

Rs.100/- per head per day)

Teacher 0.01000

10.03(a)

Induction Training for Newly Recruited Teachers

for 6 Months (Special BTC)- @Rs.2000/- per

head per year

Teacher 0.02000

10.03(b)5 Days Training for Part Time Instructors @ Rs.

200/- per head per day) Teacher 0.01000

10.04

Training of untrained Teachers to acquire

professional qualifications over a two year

period.

Teacher 0.04700 1187 55.789 1187 55.78900

(b) Head Teachers

10.05Refresher Residencial In-service for 10 days at

BRC level and above

Head

Teacher(c) Resource Persons

10.06

Refresher Training for all Resource

Persons,Master Trainers, BRC & CRC faculty

and Coordinators for 5 days each year (@

Rs.200/- per head per day)

Resource

Person 0.00300 204 0.612 204 0.61200

Sub Total 5673 94.351 5673 94.351

11Academic Support through Block Resource

Centre (BRC)/ URC

11.01 Salary of Faculty and Staff

(a) 5 RPs at BRC for subject specific training in

positionRP 85 85

(b) 2 RPs for CWSN in position RP(b-i) 1 CWSN Resource Person RP 1.10000 34 37.400 34 37.40000

(b-ii) 1 Physiotherapist (Resource person for IE) RP

(c) 1 MIS Coordinator in position RP 1.86000

(d) 1 Datra Entry Operator in position RP 1.74000 10 17.400 10 17.40000

(e) 1 Accountant-cum-support staff in position RP 1.80000 17 30.600 17 30.60000

11.02 Furniture Grant BRC/ URC 1.00000

11.03Replacement of furniture, computer, TLE etc (

Once in 5 years)BRC/ URC 1.00000

11.04 Contingency Grant BRC/ URC 0.50000 17 8.500 17 8.50000

11.05 Meeting, TA BRC/ URC 0.30000 17 5.100 17 5.10000

11.06 TLM Grant BRC/ URC 0.10000

11.07 Maintenance Grant BRC/ URC 0.10000

Sub Total 17 99.000 17 99.00000

12Academic Support through Cluster

Resource Centres (CRC/UERC)

12.01Salary of Cluster Coordinator (on an average of

one Resource Person per 18 schools in a block)RP

12.02 Furniture GrantCRC/

UERC0.10000

12.03Replacement of furniture, computer, TLE etc.

once in 5 years

CRC/

UERC0.10000

12.04 Contingency Grant CRC/UERC 0.10000 194 19.400 194 19.40000

12.05 Meeting, TA CRC/UERC 0.12000 194 23.280 194 23.28000

12.06 TLM Grant CRC/UERC 0.03000

12.07Maintenance Grant

CRC/UERC 0.02000

Sub Total 388 42.680 388 42.68000

13Computer Aided Education in upper

primary schools under Innovation

13.01Computer Aided Education in upper primary

schoolsDistrict 0.01200 48 0.576 48 0.57600

Sub Total 48 0.576 48 0.5760014 Libraries in Schools14.01 (a) Primary School (per school) School 0.03000

14.02 (b) Upper Primary School (per school) School 0.10000

Sub TotalIV ANNUAL GRANTS15 Teachers' Grant15.01 Primary Teachers Teacher 0.0050015.02 Upper Primary Teachers Teacher 0.00500 588 2.940 588 2.94000

Sub Total 588 2.940 588 2.9400016 School Grant16.01 Primary School School 0.05000 2025 101.250 2025 101.2500016.02 Upper Primary School School 0.07000 998 69.860 998 69.86000

Sub Total 3023 171.110 3023 171.11000

Arti:SSA-AWPB-2014-15-PABMinits:Ghazipur:16-06-2014 312 / 533

Page 313: U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 · 2015. 1. 6. · U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15

Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

Name of District : Ghazipur -32

ActivityS. No.Physical

UnitRemarks

Outlay Recommendation for 2014-15

Spill OverDeferred laibility of

2014-15Fresh Recommended Total Recommended

17Research, Evaluation, Monitoring &

Supervision

17.01 REMS Activities School 0.00103 3023 3.109 3023 3.10950

17.02 Monitoring & Supervision School 0.00078 3023 2.370 3023 2.37023

17.03 House Hold Survey (Urban) in Million Plus Cities District 35.00000

Sub Total 6046 5.480 6046 5.4797318 Maintenance Grant

18.01 Maintenance in School having upto3 Classrooms School 0.07500 388 29.100 388 29.10000

18.01a Maintenance Grant School 0.07500 2380 178.500 2380 178.50000Sub Total 2768 207.600 2768 207.60000

VBRIDGING GENDER AND SOCIAL

CATEGORY GAPS

19 Interventions for CWSN (IE)

19.01 Provision for Inclusive Education Child 0.00900 9223 83.007 9223 83.00700

Sub Total 9223 83.007 9223 83.00700

20Innovativation Head up to Rs.50 Lakh per

district

20.01 Girls Education District 0.70000 9 6.300 9 6.30000

20.02 ECCE District20.03 Intervention for SC / ST children District

20.04 Intervention for Minority Community children District

20.05 Intervention for Urban Deprived children District 10.00000

Sub Total 9 6.300 9 6.3000021 SMC/PRI Training

21.01Residential for 6 Resource Person per Block (3

days) (@ Rs.500/-)Blocks 0.09000

21.02Non-residential (3 days training of 6 SMC

members) (@ Rs.100/-)SMC 0.01800 2768 49.824 2768 49.82400

21.02(a)Non-residential (3 days training of 3 Members of

PRI/VECs/LA) (@ Rs.100/-)VEC/ WEC 0.00900

21.03

Seminar/Orientation of SMC Women members

and President/Vice President (@ Rs. 50,000/-

per block)

Blocks 0.50000

Sub Total 2768 49.824 2768 49.82400VI SCHOOL INFRASTRUCTURE22 Civil Works22.01 Primary School (Plain) (New) School 13.1550022.02 Primary School (Hilly/Rocky) (New) School 13.2750022.03 Upper Primary (Plain) (New) School 0.06948 20.65500 0.06948

22.04 Upper Primary School (Hilly/Rocky) (New) School 20.77500

22.04aComposite Schools for Urban Areas (Class I-

VIII)School 41.04000

22.05 ACR in lieu of upgraded Upper Primary School Rooms

22.06 Additional class rooms for adding Class VIII Rooms

22.07 Building Less (Pry) School 9.7500022.08 Building Less (UP) School 18.5900022.09 Dilapidated Building (Pry) School 9.7500022.10 Dilapidated Building (UP) School 18.59000

22.11 Additional Class Room (Rural) ( PS+UPS) Rooms 3.45000 395 1362.750 395 1362.75000

22.12 Additional Class Room (Urban) Rooms 3.4500022.13 Additional Class Room (Hill Area)22.14 Toilet/Urinals (PS & UPS) School 0.7000022.15 Separate Girls Toilet (Rural+Urban) School 0.7000022.16 CWSN friendly Toilets School 0.50000

22.17 Drinking Water Facility (for Urban Area Only)) School 0.15000

22.17a Drinking Water Facility (Plain PS & UPS) School 0.15000

22.17b Drinking Water Facility (Hilly/Rocky PS & UPS) School 0.15000

22.18a Boundary Wall PS (Total in Meters x .01105) 0.01749

22.18bBoundary Wall PS (For Gate) @Rs. 7000 x no. of

P.S.School 0.07800

22.18c Boundary Wall UPS (Total in Meters x .01105) 0.01749

22.18dBoundary Wall UPS (For Gate) @Rs. 7000 x no.

of UPSSchool 0.07800

22.19a Electrification in P.S./ Electrical Equipment School 0.11000

22.19b Electrification in U. P.S./ Electrical Equipment School 0.11000

22.20Office-cum-store-cum-Head Teacher's room

(Primary)Rooms

22.21Office-cum-store-cum-Head Teacher's room

(Upper Primary)Rooms

22.22Augumentation of training facility in BRC (one

time)BRC/ URC 5.00000

22.23 Child friendly Elements School 0.25000

22.24 Ramps with Handrails (Barrier Free Elements) School 0.06000

22.25 Handrails in existing Ramps School 0.01000

Arti:SSA-AWPB-2014-15-PABMinits:Ghazipur:16-06-2014 313 / 533

Page 314: U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 · 2015. 1. 6. · U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15

Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

Name of District : Ghazipur -32

ActivityS. No.Physical

UnitRemarks

Outlay Recommendation for 2014-15

Spill OverDeferred laibility of

2014-15Fresh Recommended Total Recommended

22.26 Whole School Develoipment School22.27 Retro-fitting and repairs School

22.28Residential Schools for specific category

of children

(a) Construction of Building including boundary

wall, Water and sanitation facilities, electric

installation (For 100 children)

Building 65.86000

(b) Construction of residential hostel Building 65.86000

(c) Refurnishing unused old buildings Building

22.29

Construction of Hostel in existing Govt UPS

including boundary wall, Water and sanitation

facilities, electric installation etc. (For 50

children)

7.00000

22.30Furniture for Govt. UPS (per child) (@ Rs.500/-

per child enrolled)Child 0.00500

22.31 Major Repairs for Primary School School 0.30000

22.32 Majr Repairs for Upper Primary School School 0.30000

22.33Others (Difference of Civil Wrks

sanctioned in pre.yr.)22.33a Others (Overhead Tank PS) School 0.1200022.33b Others (Overhead Tank UPS) School 0.12000

Sub Total (Civil WOrks) 0.07 395 1362.750 395 1362.82VII PROJECT MANAGEMENT COST23 Management23.01 Management up to 3.5%

(a) Project Management and MIS

(i) DPO ( Salary, Contigency, Consumables,

POL, TA & Computer etc)District 1 108.047 1 108.04690

(ii) EMIS Cell District 1 22.861 1 22.86050Sub Total (a) 1 1 1 130.907 1 130.907

(b) Training of Educational Administrators District

(c) School Mapping and Social Mapping District

Sub Total (23.01)

23.02Learning Enhancement Prog. (LEP) (P & UP) (up

to 2%)District 23.067 23.06655

23.03 Community Mobilization (up to 0.5%) District 1 45.850 1 45.85000

Sub Total (Management) 1 68.917 1 68.91655Total Management Cost 199.824 199.82395Total of SSA (Districs) 0.069 65.700 632011 16746.373 632011 16812.142

24 State Component23.01 Management23.02 REMS 0.0044923.03 SIEMAT

Sub Total

STATE SSA TOTAL 0.06948 65.70000 632011 16746.373 632011 16812.14216

25

KGBV Financial Provision (give

separate costing sheets for different

Models)

Hostel

ANon Recurring One Time Grant (Only

committed liabilities) (Model-I)

25.01 Construction of Building (New)

25.02 Construction of Building KGBV sanctioned earlier 63.15000 63.15000

25.02(a) Additional Class Room Rooms 3.45000

25.02(b) Guard Room Rooms 1.32000

25.02(c) Boundary Wall School 5.0200025.03 Boudary Wall (Spillover only)

25.04

Boring/Handpump (Spillover only)

(minimum rates prescribed by State Drinking

Water Department subject to a ceiling of Rs.

1.00 lakhs)

4.00000 4.00000

25.05 Electricity /Water charges (Spillover only)

25.05(a) Solar Water Heater & Solar Light 2.97000

25.06Furniture/Equipment (including Kitchen

equipment)3.00000

25.07 TLM and equipment including library books 3.50000

25.08 Bedding (New) 0.75000

25.09 Replacement of Bedding (once in 3 Year) 1 0.75000 11 8.250 12 8.25000

Subtotal Non Recurring 67.15000 8.250 75.40000

B Recurring Cost Per Annum (Model-I)

25.10Maintenance per girl student per month @ Rs.

1500/-18.00000 14 252.000 14 252.00000

25.11 Stipend for girl student per month @ Rs. 100/- 1.20000 14 16.800 14 16.80000

25.12Supplementary TLM, stationery and other

educational material @ Rs.1000/- per annum1.00000 14 14.000 14 14.00000

25.13 Salaries

Arti:SSA-AWPB-2014-15-PABMinits:Ghazipur:16-06-2014 314 / 533

Page 315: U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 · 2015. 1. 6. · U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15

Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

Name of District : Ghazipur -32

ActivityS. No.Physical

UnitRemarks

Outlay Recommendation for 2014-15

Spill OverDeferred laibility of

2014-15Fresh Recommended Total Recommended

25.13.1 Additional Salaries:

(a) 1 Warden @ Rs. 25,000/- per month 3.00000 14 42.00000 14 42.00000

(b)4 Full time teachers as per RTE norms @ Rs.

20,000/- per month per teacher 9.60000 14 134.40000 14 134.40000

(c)

1 Urdu Teachers (only for blocks with muslim

population above 20% and select urban areas), if

required @ Rs. 12,000/- per month per teacher 1.44000 14 20.16000 14 20.16000

(d)3 part time teachers @ Rs. 5,000/- per month per

teacher 1.80000 14 25.20000 14 25.20000

(e)1 Full time Accountant @ Rs. 10,000/- per month

1.20000 14 16.80000 14 16.80000

(f)

2 Support Staff – (Accountant/ Assistant, Peon,

Chowkidar) @ Rs. 5,000/- per month per staff 1.20000 14 16.80000 14 16.80000

(g) 1 Head cook @ Rs. 6,000/- per month 0.72000 14 10.08000 14 10.08000

(h)2 Asstt. Cooks @ Rs. 4,500/- per month per cook

1.08000 14 15.12000 14 15.12000

25.14Specific skill training @ Rs.1000/- per child per

annum1.00000 14 14.000 14 14.00000

25.15Electricity/water charges @ Rs.1000/- per child

per annum1.00000 14 14.000 14 14.00000

25.16Medical care/contingencies @ Rs. 1250 per child

per annum1.25000 14 17.500 14 17.50000

25.17 Maintenance @ Rs.750/- per child per annum 0.75000 14 10.500 14 10.50000

25.18

Miscellaneous (Educational Tour/ Exposure Visit

/ Sports Material etc.) @ Rs.750/- per child per

annum

0.75000 14 10.500 14 10.50000

25.19Preparatory camps @ Rs.200/- per child per

annum0.20000 14 2.800 14 2.80000

25.20PTAs/school functions @ Rs.200/- per child per

annum0.20000 14 2.800 14 2.80000

25.21 Provision of Rent @ Rs.6000/- per annum 6.00000

25.21a Provision of Rent (6 months) 3.6000025.21b Provision of Rent (3 months) 1.8000025.21c Rent (Previous Year (2007-2012)

25.22 Capacity building 0.50000 14 7.000 14 7.00000

25.22(a)Physical/ Self Defence Training @ Rs.200/- per

child per annum0.20000 14 2.800 14 2.80000

Subtotal Recurring 14 645.260 14 645.26000

Subtotal (Model-I) 67.15000 14 653.510 14 720.66000

CNon Recurring One Time Grant (Only

committed liabilities) (Model-II)

25.23 Construction of Building (New)

25.24 Construction of Building KGBV sanctioned earlier

25.24(a) Additional Class Room Rooms 3.45000

25.24(b) Guard Room Rooms 1.32000

25.24(c) Boundary Wall School 5.0200025.25 Boudary Wall (Spillover only)25.26 Boring/Handpump (Spillover only)

25.27 Electricity /Water charges (Spillover only)

25.27(a) Solar Water Heater & Solar Light 2.97000

25.28Furniture/Equipment (including Kitchen

equipment)2.00000

25.29 TLM and equipment including library books 3.00000

25.30 Bedding (New) 0.37500

25.31 Replacement of Bedding (once in 3 Year) 0.37500

Subtotal Non Recurring

D Recurring Cost Per Annum (Model-II)

25.32Maintenance per girl student per month @ Rs.

1500/-9.00000

25.33 Stipend for girl student per month @ Rs. 100/- 0.60000

25.34Supplementary TLM, stationery and other

educational material @ Rs.1000/- per annum0.50000

25.35 Salaries(a) 1 Warden @ Rs. 25,000/- per month 3.00000

(b)3 Full time teachers as per RTE norms @ Rs.

20,000/- per month per teacher 7.20000

(c) 3 part time teachers @ Rs. 5,000/- per month per

teacher 1.80000

(d)1 Full time Accountant @ Rs. 10,000/- per month

1.20000

(e)

2 Support Staff – (Accountant/ Assistant, Peon,

Chowkidar) @ Rs. 5,000/- per month per staff 1.20000

Arti:SSA-AWPB-2014-15-PABMinits:Ghazipur:16-06-2014 315 / 533

Page 316: U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 · 2015. 1. 6. · U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15

Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

Name of District : Ghazipur -32

ActivityS. No.Physical

UnitRemarks

Outlay Recommendation for 2014-15

Spill OverDeferred laibility of

2014-15Fresh Recommended Total Recommended

(f) 1 Head cook @ Rs. 6,000/- per month 0.72000

(g)1 Asstt. Cooks @ Rs. 4,500/- per month per cook

0.54000

25.36Specific skill training @ Rs.1000/- per child per

annum0.50000

25.37Electricity/water charges @ Rs.1000/- per child

per annum0.50000

25.38Medical care/contingencies @ Rs. 1250 per child

per annum0.62500

25.39 Maintenance @ Rs.750/- per child per annum 0.37500

25.40

Miscellaneous (Educational Tour/ Exposure Visit

/ Sports Material etc.) @ Rs.750/- per child per

annum

0.37500

25.41Preparatory camps @ Rs.300/- per child per

annum0.15000

25.42PTAs/school functions @ Rs.300/- per child per

annum0.15000

25.43 Provision of Rent @ Rs.10000/- per annum 5.00000

25.43a Provision of Rent (6 months) 3.6000025.43b Provision of Rent (3 months) 1.8000025.43c Rent (Previous Year (2007-2012)25.44 Capacity building 0.25000

25.44(a)Physical/ Self Defence Training @ Rs.200/- per

child per annum0.10000

Subtotal Recurring

Subtotal (Model-II) Total (KGBV) 67.150 14 653.510 14 720.660

DISTRICT GRAND TOTAL (SSA+KGBV) 67.219 65.700 632025 17399.883 632025 17532.802

Arti:SSA-AWPB-2014-15-PABMinits:Ghazipur:16-06-2014 316 / 533

Page 317: U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 · 2015. 1. 6. · U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15

Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

I ACCESS

1 Opening of New Schools

1.01 Upgradation of EGS to PSCentres /

School1.02 New PS School

1.03 Upgradation of PS to UPS / New UPS School

1.04 Composite Schools (for Urban Areas) School

1.05Residential Schools for specific category children

(For 100 children)

1.06Residential Hostel (for specific category of

children) (For 50 children)

1.07 Integration of Class V with Primary Schools

1.08Integration of Class VIII with Upper Primary

Schools

2Residential Schools for specific category

of children (For 100 Children)

Total - Residential Schools (For 100

children)

3Residential Hostel for specific category of

children (For 50 Children)

Total - Residential Schools (For 50

children)4 Transport/Escort Facility

4.01

Children in remote habitations with sparse

populations where opening of schools is

unviable

Child 0.03000

4.02

Urban deprived children/children without adult

protection in urban areas where schools are not

opened because availability of land is a problem

Child 0.03000

Sub Total

5Special Training for mainstreaming of Out-

of-School Children

5.03 Non-Residential (Fresh)(a) 12 months Child 0.06000(b) 9 months 0.04500(c) 6 months

(i)Special Training (by Special Instructors-NRBC)-

(1-5) Child 0.03000 341 10.230 341 10.23000

(ii) Special Training (by Special Instructors-NRBC)-

(6-8) Child 0.03000 200 6.000 200 6.00000

(d) 3 months Child 0.01500Sub Total 541 16.230 541 16.23000

Total (Special Training) 541 16.230 541 16.2305(B) House Hold Survey (HHS)

5(B).01 House Hold Survey through SMCHouse

Hold0.00001

Sub TotalII RETENTION6 Free Text Book

6.01Free Text Book (PS) for Parishadiya & Aided

Primary Schools (Workbooks not included)Child 0.00120 42038 50.446 42038 50.44560

6.01a

Free Text Book (PS) for 25% children of Class-1

in Private Recognised Primary Schools of other

Boards (Workbooks not included)

Child 0.00150

6.02 Free Brail Books (PS) 0.00150 40 0.060 40 0.06000

6.03 Free Large Print Books (PS) 0.00150

6.04Free Text Book (UPS) (Workbooks not included)

(Including KGBV Girls)Child 0.00200 26114 52.228 26114 52.22800

6.05 Free Brail Books (UPS) 0.00250 5 0.013 5 0.01250

6.06 Free Large Print Books (PS) 0.00250Sub Total 68197 102.746 68197 102.746

7 Provision of 2 set of Uniforms

7.01 All Girls (Including KGBV Girls) Child 0.00400 55835 223.340 55835 223.34000

7.02 SC Boys Child 0.00400 12864 51.456 12864 51.45600

7.03 ST Boys Child 0.00400

7.04 BPL Boys Child 0.00400 9211 36.844 9211 36.84400

7.05

Free Uniform for 25% children of Class-1 in

Private Recognised Primary Schools of other

Boards

Child0.00400

Sub Total 77910 311.640 77910 311.6407(A) Fee Reimbursement

7(A).01

Fee Reimbursement for Admission of children of

Disadvantaged Group & Weaker Section upto

25% of seats in Class-1 of Private Unaided

Recognised Schools

Child 0.05400

Sub Total

Name of District : Ghaziabad -31

ActivityS. No.Physical

UnitRemarks

Outlay Recommendation for 2014-15

Spill OverDeferred laibility

of 2014-15Fresh Recommended Total Recommended

Arti:SSA-AWPB-2014-15-PABMinits:Ghaziabad:16-06-2014 317 / 533

Page 318: U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 · 2015. 1. 6. · U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15

Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

Name of District : Ghaziabad -31

ActivityS. No.Physical

UnitRemarks

Outlay Recommendation for 2014-15

Spill OverDeferred laibility

of 2014-15Fresh Recommended Total Recommended

8 Teaching Learning Equipment (TLE)

8.01 TLE - New Primary School 1.00000 0.20000 1.000008.02 TLE - New Upper Primary School 3.00000 0.50000 3.00000

Sub Total 4.00000 4.00000III ENHANCING QUALITY9 New Teachers Salary

9.01 Primary Teachers (Regular) (Asstt. Teacher) Teacher 0.91500

9.01aHead Teacher for Primary (if the number of

children exceeds 150 in a school)Teacher

9.02 Primary Teachers (Contract) (S.M.) Teacher

9.03Subject specific Upper Primary Teachers

(Regular) (a) Science and Mathematics Teacher 1.26000(b) Social Studies Teacher 1.26000(c) Languages Teacher 1.26000

Sub Total (9.01 to 9.05)Add.Teacher against PTR

Sub Total (9.06 to 9.12)

Total (New Teacher's Salary-9.01 to 9.12)

Teachers Salary (Recurring-sanctioned

earlier)Primary teachers

9.13 Primary Teachers ( Regular)-Existing, in position Teacher 3.66000 356 1302.960 356 1302.96000

9.14Primary Teachers (Contract)-Existing, in

positionTeacher 0.55000

9.14(a) Primary Teachers (Contract)-under Training Teacher 0.38500 281 108.185 281 108.18500

9.14(b)Primary Teacher (Para Teachers Equal to

9.14(a) upgraded as Teachers)0.38500 255 98.175 255 98.17500

9.14(c) Primary Teachers (Para)- Vacant Teacher9.15 Primary Teachers (Vacant) Teacher 0.30500

9.16Head Teacher for Primary (if the number of

children exceeds 150)Teacher 5.04000 23 115.920 23 115.92000

9.16(b)Head Teacher for Primary (if the number of

children exceeds 150) VacantTeacher 0.42000

Additional teachers

9.17Additional Teachers - PS (Special BTC-

Regular) in positionTeacher 0.30500

9.18Additional Teachers - PS (Special BTC Under

Training)Teacher 0.87600

9.19 Additional Teachers - PS (Vacant) Teacher

9.20Others in position (Para Teachers upgraded

as Teachers)Teacher

Upper Primary teachers

9.21 UP Teachers (Regular)-Existing Teacher 5.04000 50 252.000 50 252.00000

9.22 UP Teachers (Contract)-Existing9.23 UP Teachers (Vacant) Teacher 1.26000

9.24Head Teacher for Upper Primary (if the number

of children exceeds 100)-ExistingTeacher 5.34000 32 170.880 32 170.88000

9.24a Head Teacher for Upper Primary (Vacant) Teacher 1.33500

9.25Subject specific Upper Primary Teachers

(Regular)(a) Science and Mathematics(b) Social Studies(c) Languages

9.32 Part Time Instructors in position(a) Art Education 0.77000 41 31.570 41 31.57000(b) Health and Physical Education 0.77000 47 36.190 47 36.19000(c) Work Education 0.77000 37 28.490 37 28.49000

9.32(A) Part Time Instructors Vacant(a) Art Education 0.42000(b) Health and Physical Education 0.42000(c) Work Education 0.42000

9.33

Others-Incentive to Teachers in Schools

Located in Naxal Affected Areas (@

Rs.1500/- per teachers per month)

Sub Total (9.13 to 9.33) 1122 2144.370 1122 2144.37TOTAL

(New Teachers Salary +Teachers Salary

Recurring)

1122 2144.370 1122 2144.37000

10 Teachers Training(a) Teachers

10.01

Refresher In-service Teachers' Training at BRC

level and above - 10 days (@ Rs.200/- per head

per day)

Teacher

(Target &

Ach.-13-14

in

Mandays)

0.00600

Arti:SSA-AWPB-2014-15-PABMinits:Ghaziabad:16-06-2014 318 / 533

Page 319: U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 · 2015. 1. 6. · U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15

Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

Name of District : Ghaziabad -31

ActivityS. No.Physical

UnitRemarks

Outlay Recommendation for 2014-15

Spill OverDeferred laibility

of 2014-15Fresh Recommended Total Recommended

10.01(a)Continuous and Comprehensive Evauation [PS +

UPS)Teacher 0.01300 411 5.343 411 5.34300

10.01(b) Eary Reading and Numeracy Skills [PS] Teacher 0.00500 411 2.055 411 2.05500

10.01(c) Science [UPS] Teacher 0.00800 221 1.768 221 1.76800Recommended as

proposed

10.01(d) CWSN Teacher 0.00400

10.02

One day monthly cluster level meetings and

peer group training sessions for 10 months for

all teachers each year at CRC level - 10 days (@

Rs.100/- per head per day)

Teacher 0.01000

10.03(a)

Induction Training for Newly Recruited Teachers

for 6 Months (Special BTC)- @Rs.2000/- per

head per year

Teacher 0.02000

10.03(b)5 Days Training for Part Time Instructors @ Rs.

200/- per head per day) Teacher 0.01000

10.04

Training of untrained Teachers to acquire

professional qualifications over a two year

period.

Teacher 0.04700 379 17.813 379 17.81300

(b) Head Teachers

10.05Refresher Residencial In-service for 10 days at

BRC level and above

Head

Teacher(c) Resource Persons

10.06

Refresher Training for all Resource

Persons,Master Trainers, BRC & CRC faculty

and Coordinators for 5 days each year (@

Rs.200/- per head per day)

Resource

Person 0.00300 60 0.180 60 0.18000

Sub Total 1482 27.159 1482 27.159

11Academic Support through Block Resource

Centre (BRC)/ URC

11.01 Salary of Faculty and Staff

(a) 5 RPs at BRC for subject specific training in

positionRP 25 25

(b) 2 RPs for CWSN in position RP(b-i) 1 CWSN Resource Person RP 1.10000 10 11.000 10 11.00000

(b-ii) 1 Physiotherapist (Resource person for IE) RP

(c) 1 MIS Coordinator in position RP 1.86000

(d) 1 Datra Entry Operator in position RP 1.74000 4 6.960 4 6.96000

(e) 1 Accountant-cum-support staff in position RP 1.80000 5 9.000 5 9.00000

11.02 Furniture Grant BRC/ URC 1.00000

11.03Replacement of furniture, computer, TLE etc (

Once in 5 years)BRC/ URC 1.00000

11.04 Contingency Grant BRC/ URC 0.50000 5 2.500 5 2.50000

11.05 Meeting, TA BRC/ URC 0.30000 5 1.500 5 1.50000

11.06 TLM Grant BRC/ URC 0.10000

11.07 Maintenance Grant BRC/ URC 0.10000

Sub Total 5 30.960 5 30.96000

12Academic Support through Cluster

Resource Centres (CRC/UERC)

12.01Salary of Cluster Coordinator (on an average of

one Resource Person per 18 schools in a block)RP

12.02 Furniture Grant CRC/ UERC 0.10000

12.03Replacement of furniture, computer, TLE etc.

once in 5 yearsCRC/ UERC 0.10000

12.04 Contingency Grant CRC/UERC 0.10000 26 2.600 26 2.60000

12.05 Meeting, TA CRC/UERC 0.12000 26 3.120 26 3.12000

12.06 TLM Grant CRC/UERC 0.03000

12.07Maintenance Grant

CRC/UERC 0.02000

Sub Total 52 5.720 52 5.72000

13Computer Aided Education in upper

primary schools under Innovation

13.01Computer Aided Education in upper primary

schoolsDistrict 0.01200 48 0.576 48 0.57600

Sub Total 48 0.576 48 0.5760014 Libraries in Schools

Arti:SSA-AWPB-2014-15-PABMinits:Ghaziabad:16-06-2014 319 / 533

Page 320: U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 · 2015. 1. 6. · U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15

Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

Name of District : Ghaziabad -31

ActivityS. No.Physical

UnitRemarks

Outlay Recommendation for 2014-15

Spill OverDeferred laibility

of 2014-15Fresh Recommended Total Recommended

14.01 (a) Primary School (per school) School 0.03000

14.02 (b) Upper Primary School (per school) School 0.10000

Sub TotalIV ANNUAL GRANTS15 Teachers' Grant15.01 Primary Teachers Teacher 0.0050015.02 Upper Primary Teachers Teacher 0.00500 221 1.105 221 1.10500

Sub Total 221 1.105 221 1.1050016 School Grant16.01 Primary School School 0.05000 411 20.550 411 20.5500016.02 Upper Primary School School 0.07000 218 15.260 218 15.26000

Sub Total 629 35.810 629 35.81000

17Research, Evaluation, Monitoring &

Supervision

17.01 REMS Activities School 0.00103 629 0.647 629 0.64700

17.02 Monitoring & Supervision School 0.00078 629 0.493 629 0.49318

17.03 House Hold Survey (Urban) in Million Plus Cities District 35.00000

Sub Total 1258 1.140 1258 1.1401818 Maintenance Grant

18.01 Maintenance in School having upto3 Classrooms School 0.07500 82 6.150 82 6.15000

18.01a Maintenance Grant School 0.07500 509 38.175 509 38.17500Sub Total 591 44.325 591 44.32500

VBRIDGING GENDER AND SOCIAL

CATEGORY GAPS

19 Interventions for CWSN (IE)

19.01 Provision for Inclusive Education Child 0.03000 1839 55.170 1839 55.17000

Sub Total 1839 55.170 1839 55.17000

20Innovativation Head up to Rs.50 Lakh per

district

20.01 Girls Education District 0.70000 5 3.500 5 3.50000

20.02 ECCE District20.03 Intervention for SC / ST children District

20.04 Intervention for Minority Community children District

20.05 Intervention for Urban Deprived children District 10.00000

Sub Total 5 3.500 5 3.5000021 SMC/PRI Training

21.01Residential for 6 Resource Person per Block (3

days) (@ Rs.500/-)Blocks 0.09000

21.02Non-residential (3 days training of 6 SMC

members) (@ Rs.100/-)SMC 0.01800 594 10.692 594 10.69200

21.02(a)Non-residential (3 days training of 3 Members of

PRI/VECs/LA) (@ Rs.100/-)VEC/ WEC 0.00900

21.03

Seminar/Orientation of SMC Women members

and President/Vice President (@ Rs. 50,000/-

per block)

Blocks 0.50000

Sub Total 594 10.692 594 10.69200VI SCHOOL INFRASTRUCTURE22 Civil Works22.01 Primary School (Plain) (New) School 4.20 13.15500 4.2043022.02 Primary School (Hilly/Rocky) (New) School 13.2750022.03 Upper Primary (Plain) (New) School 20.65500

22.04 Upper Primary School (Hilly/Rocky) (New) School 20.77500

22.04aComposite Schools for Urban Areas (Class I-

VIII)School 41.04000

22.05 ACR in lieu of upgraded Upper Primary School Rooms

22.06 Additional class rooms for adding Class VIII Rooms

22.07 Building Less (Pry) School 9.7500022.08 Building Less (UP) School 18.5900022.09 Dilapidated Building (Pry) School 9.7500022.10 Dilapidated Building (UP) School 18.59000

22.11 Additional Class Room (Rural) ( PS+UPS) Rooms 3.45000

22.12 Additional Class Room (Urban) Rooms 3.4500022.13 Additional Class Room (Hill Area)22.14 Toilet/Urinals (PS & UPS) School 0.7000022.15 Separate Girls Toilet (Rural+Urban) School 0.7000022.16 CWSN friendly Toilets School 0.50000

22.17 Drinking Water Facility (for Urban Area Only)) School 0.15000

22.17a Drinking Water Facility (Plain PS & UPS) School 0.15000 14 2.100 14 2.10000

22.17b Drinking Water Facility (Hilly/Rocky PS & UPS) School 0.15000

22.18a Boundary Wall PS (Total in Meters x .01105) 0.01749

22.18bBoundary Wall PS (For Gate) @Rs. 7000 x no. of

P.S.School 0.07800

Arti:SSA-AWPB-2014-15-PABMinits:Ghaziabad:16-06-2014 320 / 533

Page 321: U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 · 2015. 1. 6. · U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15

Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

Name of District : Ghaziabad -31

ActivityS. No.Physical

UnitRemarks

Outlay Recommendation for 2014-15

Spill OverDeferred laibility

of 2014-15Fresh Recommended Total Recommended

22.18c Boundary Wall UPS (Total in Meters x .01105) 0.01749

22.18dBoundary Wall UPS (For Gate) @Rs. 7000 x no.

of UPSSchool 0.07800

22.19a Electrification in P.S./ Electrical Equipment School 0.11000

22.19b Electrification in U. P.S./ Electrical Equipment School 0.11000

22.20Office-cum-store-cum-Head Teacher's room

(Primary)Rooms

22.21Office-cum-store-cum-Head Teacher's room

(Upper Primary)Rooms

22.22Augumentation of training facility in BRC (one

time)BRC/ URC 5.00000

22.23 Child friendly Elements School 0.25000

22.24 Ramps with Handrails (Barrier Free Elements) School 0.06000

22.25 Handrails in existing Ramps School 0.0100022.26 Whole School Develoipment School22.27 Retro-fitting and repairs School

22.28Residential Schools for specific category

of children

(a) Construction of Building including boundary

wall, Water and sanitation facilities, electric

installation (For 100 children)

Building 65.86000

(b) Construction of residential hostel Building 65.86000

(c) Refurnishing unused old buildings Building

22.29

Construction of Hostel in existing Govt UPS

including boundary wall, Water and sanitation

facilities, electric installation etc. (For 50

children)

7.00000

22.30Furniture for Govt. UPS (per child) (@ Rs.500/-

per child enrolled)Child 0.00500

22.31 Major Repairs for Primary School School 0.30000

22.32 Majr Repairs for Upper Primary School School 0.30000

22.33Others (Difference of Civil Wrks

sanctioned in pre.yr.)22.33a Others (Overhead Tank PS) School 0.1200022.33b Others (Overhead Tank UPS) School 0.12000

Sub Total (Civil WOrks) 4.20 14 2.100 14 6.30VII PROJECT MANAGEMENT COST23 Management23.01 Management up to 3.5%

(a) Project Management and MIS

(i) DPO ( Salary, Contigency, Consumables,

POL, TA & Computer etc)District 1 124.259 1 124.25860

(ii) EMIS Cell District 1 9.600 1 9.60000Sub Total (a) 1 1 1 133.859 1 133.859

(b) Training of Educational Administrators District

(c) School Mapping and Social Mapping District

Sub Total (23.01)

23.02Learning Enhancement Prog. (LEP) (P & UP) (up

to 2%)District 5.463 5.46260

23.03 Community Mobilization (up to 0.5%) District 1 14.000 1 14.00000

Sub Total (Management) 1 19.463 1 19.46260Total Management Cost 153.321 153.32120Total of SSA (Districs) 4.204 4.000 154508 2946.564 154508 2954.769

24 State Component23.01 Management23.02 REMS 0.0044923.03 SIEMAT

Sub Total

STATE SSA TOTAL 4.20430 4.00000 154508 2946.564 154508 2954.76878

25

KGBV Financial Provision (give

separate costing sheets for different

Models)

Hostel

ANon Recurring One Time Grant (Only

committed liabilities) (Model-I)

25.01 Construction of Building (New)

25.02 Construction of Building KGBV sanctioned earlier

25.02(a) Additional Class Room Rooms 3.45000

25.02(b) Guard Room Rooms 1.32000

25.02(c) Boundary Wall School 5.0200025.03 Boudary Wall (Spillover only) 0.00000 0.00000

25.04

Boring/Handpump (Spillover only)

(minimum rates prescribed by State Drinking

Water Department subject to a ceiling of Rs.

1.00 lakhs)

0.52200 0.52200

Arti:SSA-AWPB-2014-15-PABMinits:Ghaziabad:16-06-2014 321 / 533

Page 322: U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 · 2015. 1. 6. · U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15

Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

Name of District : Ghaziabad -31

ActivityS. No.Physical

UnitRemarks

Outlay Recommendation for 2014-15

Spill OverDeferred laibility

of 2014-15Fresh Recommended Total Recommended

25.05 Electricity /Water charges (Spillover only)

25.05(a) Solar Water Heater & Solar Light 2.97000

25.06Furniture/Equipment (including Kitchen

equipment)3.00000

25.07 TLM and equipment including library books 3.50000

25.08 Bedding (New) 0.75000

25.09 Replacement of Bedding (once in 3 Year) 0.75000 3 2.250 3 2.25000

Subtotal Non Recurring 0.52200 2.250 2.77200

B Recurring Cost Per Annum (Model-I)

25.10Maintenance per girl student per month @ Rs.

1500/-18.00000 3 54.000 3 54.00000

25.11 Stipend for girl student per month @ Rs. 100/- 1.20000 3 3.600 3 3.60000

25.12Supplementary TLM, stationery and other

educational material @ Rs.1000/- per annum1.00000 3 3.000 3 3.00000

25.13 Salaries

25.13.1 Additional Salaries:

(a) 1 Warden @ Rs. 25,000/- per month 3.00000 3 9.00000 3 9.00000

(b)4 Full time teachers as per RTE norms @ Rs.

20,000/- per month per teacher 9.60000 3 28.80000 3 28.80000

(c)

1 Urdu Teachers (only for blocks with muslim

population above 20% and select urban areas), if

required @ Rs. 12,000/- per month per teacher 1.44000 3 4.32000 3 4.32000

(d)3 part time teachers @ Rs. 5,000/- per month per

teacher 1.80000 3 5.40000 3 5.40000

(e)1 Full time Accountant @ Rs. 10,000/- per month

1.20000 3 3.60000 3 3.60000

(f)

2 Support Staff – (Accountant/ Assistant, Peon,

Chowkidar) @ Rs. 5,000/- per month per staff 1.20000 3 3.60000 3 3.60000

(g) 1 Head cook @ Rs. 6,000/- per month 0.72000 3 2.16000 3 2.16000

(h)2 Asstt. Cooks @ Rs. 4,500/- per month per cook

1.08000 3 3.24000 3 3.24000

25.14Specific skill training @ Rs.1000/- per child per

annum1.00000 3 3.000 3 3.00000

25.15Electricity/water charges @ Rs.1000/- per child

per annum1.00000 3 3.000 3 3.00000

25.16Medical care/contingencies @ Rs. 1250 per child

per annum1.25000 3 3.750 3 3.75000

25.17 Maintenance @ Rs.750/- per child per annum 0.75000 3 2.250 3 2.25000

25.18

Miscellaneous (Educational Tour/ Exposure Visit

/ Sports Material etc.) @ Rs.750/- per child per

annum

0.75000 3 2.250 3 2.25000

25.19Preparatory camps @ Rs.200/- per child per

annum0.20000 3 0.600 3 0.60000

25.20PTAs/school functions @ Rs.200/- per child per

annum0.20000 3 0.600 3 0.60000

25.21 Provision of Rent @ Rs.6000/- per annum 6.00000

25.21a Provision of Rent (6 months) 3.6000025.21b Provision of Rent (3 months) 1.8000025.21c Rent (Previous Year (2007-2012)

25.22 Capacity building 0.50000 3 1.500 3 1.50000

25.22(a)Physical/ Self Defence Training @ Rs.200/- per

child per annum0.20000 3 0.600 3 0.60000

Subtotal Recurring 3 138.270 3 138.27000

Subtotal (Model-I) 0.52200 3 140.520 3 141.04200

CNon Recurring One Time Grant (Only

committed liabilities) (Model-II)

25.23 Construction of Building (New)

25.24 Construction of Building KGBV sanctioned earlier

25.24(a) Additional Class Room Rooms 3.45000

25.24(b) Guard Room Rooms 1.32000

25.24(c) Boundary Wall School 5.0200025.25 Boudary Wall (Spillover only)25.26 Boring/Handpump (Spillover only)

25.27 Electricity /Water charges (Spillover only)

25.27(a) Solar Water Heater & Solar Light 2.97000

25.28Furniture/Equipment (including Kitchen

equipment)2.00000

25.29 TLM and equipment including library books 3.00000

Arti:SSA-AWPB-2014-15-PABMinits:Ghaziabad:16-06-2014 322 / 533

Page 323: U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 · 2015. 1. 6. · U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15

Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

Name of District : Ghaziabad -31

ActivityS. No.Physical

UnitRemarks

Outlay Recommendation for 2014-15

Spill OverDeferred laibility

of 2014-15Fresh Recommended Total Recommended

25.30 Bedding (New) 0.37500

25.31 Replacement of Bedding (once in 3 Year) 0.37500

Subtotal Non Recurring

D Recurring Cost Per Annum (Model-II)

25.32Maintenance per girl student per month @ Rs.

1500/-9.00000

25.33 Stipend for girl student per month @ Rs. 100/- 0.60000

25.34Supplementary TLM, stationery and other

educational material @ Rs.1000/- per annum0.50000

25.35 Salaries(a) 1 Warden @ Rs. 25,000/- per month 3.00000

(b)3 Full time teachers as per RTE norms @ Rs.

20,000/- per month per teacher 7.20000

(c) 3 part time teachers @ Rs. 5,000/- per month per

teacher 1.80000

(d)1 Full time Accountant @ Rs. 10,000/- per month

1.20000

(e)

2 Support Staff – (Accountant/ Assistant, Peon,

Chowkidar) @ Rs. 5,000/- per month per staff 1.20000

(f) 1 Head cook @ Rs. 6,000/- per month 0.72000

(g)1 Asstt. Cooks @ Rs. 4,500/- per month per cook

0.54000

25.36Specific skill training @ Rs.1000/- per child per

annum0.50000

25.37Electricity/water charges @ Rs.1000/- per child

per annum0.50000

25.38Medical care/contingencies @ Rs. 1250 per child

per annum0.62500

25.39 Maintenance @ Rs.750/- per child per annum 0.37500

25.40

Miscellaneous (Educational Tour/ Exposure Visit

/ Sports Material etc.) @ Rs.750/- per child per

annum

0.37500

25.41Preparatory camps @ Rs.300/- per child per

annum0.15000

25.42PTAs/school functions @ Rs.300/- per child per

annum0.15000

25.43 Provision of Rent @ Rs.10000/- per annum 5.00000

25.43a Provision of Rent (6 months) 3.6000025.43b Provision of Rent (3 months) 1.8000025.43c Rent (Previous Year (2007-2012)25.44 Capacity building 0.25000

25.44(a)Physical/ Self Defence Training @ Rs.200/- per

child per annum0.10000

Subtotal Recurring

Subtotal (Model-II) Total (KGBV) 0.522 3 140.520 3 141.042

DISTRICT GRAND TOTAL (SSA+KGBV) 4.726 4.000 154511 3087.084 154511 3095.811

Arti:SSA-AWPB-2014-15-PABMinits:Ghaziabad:16-06-2014 323 / 533

Page 324: U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 · 2015. 1. 6. · U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15

Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

I ACCESS

1 Opening of New Schools

1.01 Upgradation of EGS to PSCentres /

School1.02 New PS School

1.03 Upgradation of PS to UPS / New UPS School

1.04 Composite Schools (for Urban Areas) School

1.05Residential Schools for specific category children

(For 100 children)

1.06Residential Hostel (for specific category of

children) (For 50 children)

1.07 Integration of Class V with Primary Schools

1.08Integration of Class VIII with Upper Primary

Schools

2Residential Schools for specific category

of children (For 100 Children)

Total - Residential Schools (For 100

children)

3Residential Hostel for specific category of

children (For 50 Children)

Total - Residential Schools (For 50

children)4 Transport/Escort Facility

4.01

Children in remote habitations with sparse

populations where opening of schools is

unviable

Child 0.03000

4.02

Urban deprived children/children without adult

protection in urban areas where schools are not

opened because availability of land is a problem

Child 0.03000

Sub Total

5Special Training for mainstreaming of Out-

of-School Children

5.03 Non-Residential (Fresh)(a) 12 months Child 0.06000(b) 9 months 0.04500(c) 6 months

(i)Special Training (by Special Instructors-NRBC)-

(1-5) Child 0.03000 325 9.750 325 9.75000

(ii) Special Training (by Special Instructors-NRBC)-

(6-8) Child 0.03000 106 3.180 106 3.18000

(d) 3 months Child 0.01500Sub Total 431 12.930 431 12.93000

Total (Special Training) 431 12.930 431 12.9305(B) House Hold Survey (HHS)

5(B).01 House Hold Survey through SMCHouse

Hold0.00001

Sub TotalII RETENTION6 Free Text Book

6.01Free Text Book (PS) for Parishadiya & Aided

Primary Schools (Workbooks not included)Child 0.00120 46868 56.242 46868 56.24160

6.01a

Free Text Book (PS) for 25% children of Class-1

in Private Recognised Primary Schools of other

Boards (Workbooks not included)

Child 0.00150

6.02 Free Brail Books (PS) 0.00150 1 0.002 1 0.00150

6.03 Free Large Print Books (PS) 0.00150

6.04Free Text Book (UPS) (Workbooks not included)

(Including KGBV Girls)Child 0.00200 16909 33.818 16909 33.81800

6.05 Free Brail Books (UPS) 0.00250

6.06 Free Large Print Books (PS) 0.00250Sub Total 63778 90.061 63778 90.061

7 Provision of 2 set of Uniforms

7.01 All Girls (Including KGBV Girls) Child 0.00400 43996 175.984 43996 175.98400

7.02 SC Boys Child 0.00400 13385 53.540 13385 53.54000

7.03 ST Boys Child 0.00400

7.04 BPL Boys Child 0.00400 23063 92.252 23063 92.25200

7.05

Free Uniform for 25% children of Class-1 in

Private Recognised Primary Schools of other

Boards

Child0.00400

Sub Total 80444 321.776 80444 321.7767(A) Fee Reimbursement

7(A).01

Fee Reimbursement for Admission of children of

Disadvantaged Group & Weaker Section upto

25% of seats in Class-1 of Private Unaided

Recognised Schools

Child 0.05400

Sub Total

8 Teaching Learning Equipment (TLE)

8.01 TLE - New Primary School 2.20000 0.20000 2.200008.02 TLE - New Upper Primary School 3.00000 0.50000 3.00000

Name of District : G.B.Nagar -30

ActivityS. No.Physical

UnitRemarks

Outlay Recommendation for 2014-15

Spill OverDeferred laibility

of 2014-15Fresh Recommended Total Recommended

Arti:SSA-AWPB-2014-15-PABMinits:GBNagar:16-06-2014 324 / 533

Page 325: U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 · 2015. 1. 6. · U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15

Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

Name of District : G.B.Nagar -30

ActivityS. No.Physical

UnitRemarks

Outlay Recommendation for 2014-15

Spill OverDeferred laibility

of 2014-15Fresh Recommended Total Recommended

Sub Total 5.20000 5.20000III ENHANCING QUALITY9 New Teachers Salary

9.01 Primary Teachers (Regular) (Asstt. Teacher) Teacher 0.91500

9.01aHead Teacher for Primary (if the number of

children exceeds 150 in a school)Teacher

9.02 Primary Teachers (Contract) (S.M.) Teacher

9.03Subject specific Upper Primary Teachers

(Regular) (a) Science and Mathematics Teacher 1.26000(b) Social Studies Teacher 1.26000(c) Languages Teacher 1.26000

Sub Total (9.01 to 9.05)Add.Teacher against PTR

Sub Total (9.06 to 9.12)

Total (New Teacher's Salary-9.01 to 9.12)

Teachers Salary (Recurring-sanctioned

earlier)Primary teachers

9.13 Primary Teachers ( Regular)-Existing, in position Teacher 3.66000 111 406.260 111 406.26000

9.14Primary Teachers (Contract)-Existing, in

positionTeacher 0.55000

9.14(a) Primary Teachers (Contract)-under Training Teacher 0.38500 434 167.090 434 167.09000

9.14(b)Primary Teacher (Para Teachers Equal to

9.14(a) upgraded as Teachers)0.38500 276 106.260 276 106.26000

9.14(c) Primary Teachers (Para)- Vacant Teacher9.15 Primary Teachers (Vacant) Teacher 0.30500

9.16Head Teacher for Primary (if the number of

children exceeds 150)Teacher 5.04000 83 418.320 83 418.32000

9.16(b)Head Teacher for Primary (if the number of

children exceeds 150) VacantTeacher 0.42000

Additional teachers

9.17Additional Teachers - PS (Special BTC-

Regular) in positionTeacher 0.30500

9.18Additional Teachers - PS (Special BTC Under

Training)Teacher 0.87600

9.19 Additional Teachers - PS (Vacant) Teacher

9.20Others in position (Para Teachers upgraded

as Teachers)Teacher

Upper Primary teachers

9.21 UP Teachers (Regular)-Existing Teacher 5.04000 288 1451.520 288 1451.52000

9.22 UP Teachers (Contract)-Existing9.23 UP Teachers (Vacant) Teacher 1.26000

9.24Head Teacher for Upper Primary (if the number

of children exceeds 100)-ExistingTeacher 5.34000 64 341.760 64 341.76000

9.24a Head Teacher for Upper Primary (Vacant) Teacher 1.33500

9.25Subject specific Upper Primary Teachers

(Regular)(a) Science and Mathematics(b) Social Studies(c) Languages

9.32 Part Time Instructors in position(a) Art Education 0.77000 24 18.480 24 18.48000(b) Health and Physical Education 0.77000 25 19.250 25 19.25000(c) Work Education 0.77000 19 14.630 19 14.63000

9.32(A) Part Time Instructors Vacant(a) Art Education 0.42000(b) Health and Physical Education 0.42000(c) Work Education 0.42000

9.33

Others-Incentive to Teachers in Schools

Located in Naxal Affected Areas (@

Rs.1500/- per teachers per month)

Sub Total (9.13 to 9.33) 1324 2943.570 1324 2943.57TOTAL

(New Teachers Salary +Teachers Salary

Recurring)

1324 2943.570 1324 2943.57000

10 Teachers Training(a) Teachers

10.01

Refresher In-service Teachers' Training at BRC

level and above - 10 days (@ Rs.200/- per

head per day)

Teacher

(Target &

Ach.-13-14

in

Mandays)

0.00600

10.01(a)Continuous and Comprehensive Evauation [PS +

UPS)Teacher 0.01300 470 6.110 470 6.11000

10.01(b) Eary Reading and Numeracy Skills [PS] Teacher 0.00500 470 2.350 470 2.35000

10.01(c) Science [UPS] Teacher 0.00800 274 2.192 274 2.19200Recommended as

proposed

10.01(d) CWSN Teacher 0.00400

Arti:SSA-AWPB-2014-15-PABMinits:GBNagar:16-06-2014 325 / 533

Page 326: U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 · 2015. 1. 6. · U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15

Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

Name of District : G.B.Nagar -30

ActivityS. No.Physical

UnitRemarks

Outlay Recommendation for 2014-15

Spill OverDeferred laibility

of 2014-15Fresh Recommended Total Recommended

10.02

One day monthly cluster level meetings and

peer group training sessions for 10 months for

all teachers each year at CRC level - 10 days (@

Rs.100/- per head per day)

Teacher 0.01000

10.03(a)

Induction Training for Newly Recruited Teachers

for 6 Months (Special BTC)- @Rs.2000/- per

head per year

Teacher 0.02000

10.03(b)5 Days Training for Part Time Instructors @ Rs.

200/- per head per day) Teacher 0.01000

10.04

Training of untrained Teachers to acquire

professional qualifications over a two year

period.

Teacher 0.04700 201 9.447 201 9.44700

(b) Head Teachers

10.05Refresher Residencial In-service for 10 days at

BRC level and above

Head

Teacher(c) Resource Persons

10.06

Refresher Training for all Resource

Persons,Master Trainers, BRC & CRC faculty

and Coordinators for 5 days each year (@

Rs.200/- per head per day)

Resource

Person 0.00300 48 0.144 48 0.14400

Sub Total 1463 20.243 1463 20.243

11Academic Support through Block Resource

Centre (BRC)/ URC

11.01 Salary of Faculty and Staff

(a) 5 RPs at BRC for subject specific training in

positionRP 20 20

(b) 2 RPs for CWSN in position RP(b-i) 1 CWSN Resource Person RP 1.10000 8 8.800 8 8.80000

(b-ii) 1 Physiotherapist (Resource person for IE) RP

(c) 1 MIS Coordinator in position RP 1.86000

(d) 1 Datra Entry Operator in position RP 1.74000 4 6.960 4 6.96000

(e) 1 Accountant-cum-support staff in position RP 1.80000 3 5.400 3 5.40000

11.02 Furniture Grant BRC/ URC 1.00000

11.03Replacement of furniture, computer, TLE etc (

Once in 5 years)BRC/ URC 1.00000

11.04 Contingency Grant BRC/ URC 0.50000 4 2.000 4 2.00000

11.05 Meeting, TA BRC/ URC 0.30000 4 1.200 4 1.20000

11.06 TLM Grant BRC/ URC 0.10000

11.07 Maintenance Grant BRC/ URC 0.10000

Sub Total 4 24.360 4 24.36000

12Academic Support through Cluster

Resource Centres (CRC/UERC)

12.01Salary of Cluster Coordinator (on an average of

one Resource Person per 18 schools in a block)RP

12.02 Furniture GrantCRC/

UERC0.10000

12.03Replacement of furniture, computer, TLE etc.

once in 5 years

CRC/

UERC0.10000

12.04 Contingency Grant CRC/UERC 0.10000 37 3.700 37 3.70000

12.05 Meeting, TA CRC/UERC 0.12000 37 4.440 37 4.44000

12.06 TLM Grant CRC/UERC 0.03000

12.07Maintenance Grant

CRC/UERC 0.02000

Sub Total 74 8.140 74 8.14000

13Computer Aided Education in upper

primary schools under Innovation

13.01Computer Aided Education in upper primary

schoolsDistrict 0.01200 48 0.576 48 0.57600

Sub Total 48 0.576 48 0.5760014 Libraries in Schools14.01 (a) Primary School (per school) School 0.03000

14.02 (b) Upper Primary School (per school) School 0.10000

Sub TotalIV ANNUAL GRANTS15 Teachers' Grant15.01 Primary Teachers Teacher 0.0050015.02 Upper Primary Teachers Teacher 0.00500 274 1.370 274 1.37000

Sub Total 274 1.370 274 1.3700016 School Grant16.01 Primary School School 0.05000 476 23.800 476 23.8000016.02 Upper Primary School School 0.07000 271 18.970 271 18.97000

Sub Total 747 42.770 747 42.77000

Arti:SSA-AWPB-2014-15-PABMinits:GBNagar:16-06-2014 326 / 533

Page 327: U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 · 2015. 1. 6. · U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15

Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

Name of District : G.B.Nagar -30

ActivityS. No.Physical

UnitRemarks

Outlay Recommendation for 2014-15

Spill OverDeferred laibility

of 2014-15Fresh Recommended Total Recommended

17Research, Evaluation, Monitoring &

Supervision

17.01 REMS Activities School 0.00103 747 0.768 747 0.76837

17.02 Monitoring & Supervision School 0.00078 747 0.586 747 0.58570

17.03 House Hold Survey (Urban) in Million Plus Cities District 35.00000

Sub Total 1494 1.354 1494 1.3540718 Maintenance Grant

18.01 Maintenance in School having upto3 Classrooms School 0.07500 168 12.600 168 12.60000

18.01a Maintenance Grant School 0.07500 516 38.700 516 38.70000Sub Total 684 51.300 684 51.30000

VBRIDGING GENDER AND SOCIAL

CATEGORY GAPS

19 Interventions for CWSN (IE)

19.01 Provision for Inclusive Education Child 0.03000 480 14.400 480 14.40000

Sub Total 480 14.400 480 14.40000

20Innovativation Head up to Rs.50 Lakh per

district

20.01 Girls Education District 0.70000 8 5.600 8 5.60000

20.02 ECCE District20.03 Intervention for SC / ST children District

20.04 Intervention for Minority Community children District

20.05 Intervention for Urban Deprived children District 10.00000

Sub Total 8 5.600 8 5.6000021 SMC/PRI Training

21.01Residential for 6 Resource Person per Block (3

days) (@ Rs.500/-)Blocks 0.09000

21.02Non-residential (3 days training of 6 SMC

members) (@ Rs.100/-)SMC 0.01800 688 12.384 688 12.38400

21.02(a)Non-residential (3 days training of 3 Members of

PRI/VECs/LA) (@ Rs.100/-)VEC/ WEC 0.00900

21.03

Seminar/Orientation of SMC Women members

and President/Vice President (@ Rs. 50,000/-

per block)

Blocks 0.50000

Sub Total 688 12.384 688 12.38400VI SCHOOL INFRASTRUCTURE22 Civil Works22.01 Primary School (Plain) (New) School 43.53 13.15500 43.5300022.02 Primary School (Hilly/Rocky) (New) School 13.2750022.03 Upper Primary (Plain) (New) School 20.65500

22.04 Upper Primary School (Hilly/Rocky) (New) School 20.77500

22.04aComposite Schools for Urban Areas (Class I-

VIII)School 41.04000

22.05 ACR in lieu of upgraded Upper Primary School Rooms

22.06 Additional class rooms for adding Class VIII Rooms

22.07 Building Less (Pry) School 9.7500022.08 Building Less (UP) School 18.5900022.09 Dilapidated Building (Pry) School 9.7500022.10 Dilapidated Building (UP) School 18.59000

22.11 Additional Class Room (Rural) ( PS+UPS) Rooms 3.45000

22.12 Additional Class Room (Urban) Rooms 3.4500022.13 Additional Class Room (Hill Area)22.14 Toilet/Urinals (PS & UPS) School 0.7000022.15 Separate Girls Toilet (Rural+Urban) School 0.7000022.16 CWSN friendly Toilets School 0.50000

22.17 Drinking Water Facility (for Urban Area Only)) School 0.15000

22.17a Drinking Water Facility (Plain PS & UPS) School 0.15000

22.17b Drinking Water Facility (Hilly/Rocky PS & UPS) School 0.15000

22.18a Boundary Wall PS (Total in Meters x .01105) 0.01749

22.18bBoundary Wall PS (For Gate) @Rs. 7000 x no. of

P.S.School 0.07800

22.18c Boundary Wall UPS (Total in Meters x .01105) 0.01749

22.18dBoundary Wall UPS (For Gate) @Rs. 7000 x no.

of UPSSchool 0.07800

22.19a Electrification in P.S./ Electrical Equipment School 0.11000

22.19b Electrification in U. P.S./ Electrical Equipment School 0.11000

22.20Office-cum-store-cum-Head Teacher's room

(Primary)Rooms

22.21Office-cum-store-cum-Head Teacher's room

(Upper Primary)Rooms

22.22Augumentation of training facility in BRC (one

time)BRC/ URC 5.00000

22.23 Child friendly Elements School 0.25000

22.24 Ramps with Handrails (Barrier Free Elements) School 0.06000

22.25 Handrails in existing Ramps School 0.01000

Arti:SSA-AWPB-2014-15-PABMinits:GBNagar:16-06-2014 327 / 533

Page 328: U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 · 2015. 1. 6. · U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15

Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

Name of District : G.B.Nagar -30

ActivityS. No.Physical

UnitRemarks

Outlay Recommendation for 2014-15

Spill OverDeferred laibility

of 2014-15Fresh Recommended Total Recommended

22.26 Whole School Develoipment School22.27 Retro-fitting and repairs School

22.28Residential Schools for specific category

of children

(a) Construction of Building including boundary

wall, Water and sanitation facilities, electric

installation (For 100 children)

Building 65.86000

(b) Construction of residential hostel Building 65.86000

(c) Refurnishing unused old buildings Building

22.29

Construction of Hostel in existing Govt UPS

including boundary wall, Water and sanitation

facilities, electric installation etc. (For 50

children)

7.00000

22.30Furniture for Govt. UPS (per child) (@ Rs.500/-

per child enrolled)Child 0.00500

22.31 Major Repairs for Primary School School 0.30000

22.32 Majr Repairs for Upper Primary School School 0.30000

22.33Others (Difference of Civil Wrks

sanctioned in pre.yr.)22.33a Others (Overhead Tank PS) School 0.1200022.33b Others (Overhead Tank UPS) School 0.12000

Sub Total (Civil WOrks) 43.53 43.53VII PROJECT MANAGEMENT COST23 Management23.01 Management up to 3.5%

(a) Project Management and MIS

(i) DPO ( Salary, Contigency, Consumables,

POL, TA & Computer etc)District 1 115.201 1 115.20130

(ii) EMIS Cell District 1 8.009 1 8.00850Sub Total (a) 1 1 1 123.210 1 123.210

(b) Training of Educational Administrators District

(c) School Mapping and Social Mapping District

Sub Total (23.01)

23.02Learning Enhancement Prog. (LEP) (P & UP) (up

to 2%)District 5.569 5.56885

23.03 Community Mobilization (up to 0.5%) District 1 18.000 1 18.00000

Sub Total (Management) 1 23.569 1 23.56885Total Management Cost 146.779 146.77865Total of SSA (Districs) 43.530 5.200 151941 3697.613 151941 3746.343

24 State Component23.01 Management23.02 REMS 0.0044923.03 SIEMAT

Sub Total

STATE SSA TOTAL 43.53000 5.20000 151941 3697.613 151941 3746.34282

25

KGBV Financial Provision (give

separate costing sheets for different

Models)

Hostel

ANon Recurring One Time Grant (Only

committed liabilities) (Model-I)

25.01 Construction of Building (New)

25.02 Construction of Building KGBV sanctioned earlier

25.02(a) Additional Class Room Rooms 3.45000

25.02(b) Guard Room Rooms 1.32000

25.02(c) Boundary Wall School 5.0200025.03 Boudary Wall (Spillover only)

25.04

Boring/Handpump (Spillover only)

(minimum rates prescribed by State Drinking

Water Department subject to a ceiling of Rs.

1.00 lakhs)

25.05 Electricity /Water charges (Spillover only)

25.05(a) Solar Water Heater & Solar Light 2.97000

25.06Furniture/Equipment (including Kitchen

equipment)3.00000

25.07 TLM and equipment including library books 3.50000

25.08 Bedding (New) 0.75000

25.09 Replacement of Bedding (once in 3 Year) 0.75000 2 1.500 2 1.50000

Subtotal Non Recurring 1.500 1.50000

B Recurring Cost Per Annum (Model-I)

25.10Maintenance per girl student per month @ Rs.

1500/-18.00000 2 36.000 2 36.00000

25.11 Stipend for girl student per month @ Rs. 100/- 1.20000 2 2.400 2 2.40000

25.12Supplementary TLM, stationery and other

educational material @ Rs.1000/- per annum1.00000 2 2.000 2 2.00000

25.13 Salaries

Arti:SSA-AWPB-2014-15-PABMinits:GBNagar:16-06-2014 328 / 533

Page 329: U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 · 2015. 1. 6. · U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15

Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

Name of District : G.B.Nagar -30

ActivityS. No.Physical

UnitRemarks

Outlay Recommendation for 2014-15

Spill OverDeferred laibility

of 2014-15Fresh Recommended Total Recommended

25.13.1 Additional Salaries:

(a) 1 Warden @ Rs. 25,000/- per month 3.00000 2 6.00000 2 6.00000

(b)4 Full time teachers as per RTE norms @ Rs.

20,000/- per month per teacher 9.60000 2 19.20000 2 19.20000

(c)

1 Urdu Teachers (only for blocks with muslim

population above 20% and select urban areas), if

required @ Rs. 12,000/- per month per teacher 1.44000 2 2.88000 2 2.88000

(d)3 part time teachers @ Rs. 5,000/- per month per

teacher 1.80000 2 3.60000 2 3.60000

(e)1 Full time Accountant @ Rs. 10,000/- per month

1.20000 2 2.40000 2 2.40000

(f)

2 Support Staff – (Accountant/ Assistant, Peon,

Chowkidar) @ Rs. 5,000/- per month per staff 1.20000 2 2.40000 2 2.40000

(g) 1 Head cook @ Rs. 6,000/- per month 0.72000 2 1.44000 2 1.44000

(h)2 Asstt. Cooks @ Rs. 4,500/- per month per cook

1.08000 2 2.16000 2 2.16000

25.14Specific skill training @ Rs.1000/- per child per

annum1.00000 2 2.000 2 2.00000

25.15Electricity/water charges @ Rs.1000/- per child

per annum1.00000 2 2.000 2 2.00000

25.16Medical care/contingencies @ Rs. 1250 per child

per annum1.25000 2 2.500 2 2.50000

25.17 Maintenance @ Rs.750/- per child per annum 0.75000 2 1.500 2 1.50000

25.18

Miscellaneous (Educational Tour/ Exposure Visit

/ Sports Material etc.) @ Rs.750/- per child per

annum

0.75000 2 1.500 2 1.50000

25.19Preparatory camps @ Rs.200/- per child per

annum0.20000 2 0.400 2 0.40000

25.20PTAs/school functions @ Rs.200/- per child per

annum0.20000 2 0.400 2 0.40000

25.21 Provision of Rent @ Rs.6000/- per annum 6.00000

25.21a Provision of Rent (6 months) 3.6000025.21b Provision of Rent (3 months) 1.8000025.21c Rent (Previous Year (2007-2012)

25.22 Capacity building 0.50000 2 1.000 2 1.00000

25.22(a)Physical/ Self Defence Training @ Rs.200/- per

child per annum0.20000 2 0.400 2 0.40000

Subtotal Recurring 2 92.180 2 92.18000

Subtotal (Model-I) 2 93.680 2 93.68000

CNon Recurring One Time Grant (Only

committed liabilities) (Model-II)

25.23 Construction of Building (New)

25.24 Construction of Building KGBV sanctioned earlier

25.24(a) Additional Class Room Rooms 3.45000

25.24(b) Guard Room Rooms 1.32000

25.24(c) Boundary Wall School 5.0200025.25 Boudary Wall (Spillover only)25.26 Boring/Handpump (Spillover only)

25.27 Electricity /Water charges (Spillover only)

25.27(a) Solar Water Heater & Solar Light 2.97000

25.28Furniture/Equipment (including Kitchen

equipment)2.00000

25.29 TLM and equipment including library books 3.00000

25.30 Bedding (New) 0.37500

25.31 Replacement of Bedding (once in 3 Year) 0.37500 1 0.375 1 0.37500

Subtotal Non Recurring 1.00 0.375 1.00 0.37500

D Recurring Cost Per Annum (Model-II)

25.32Maintenance per girl student per month @ Rs.

1500/-9.00000 1 9.000 1 9.00000

25.33 Stipend for girl student per month @ Rs. 100/- 0.60000 1 0.600 1 0.60000

25.34Supplementary TLM, stationery and other

educational material @ Rs.1000/- per annum0.50000 1 0.500 1 0.50000

25.35 Salaries(a) 1 Warden @ Rs. 25,000/- per month 3.00000 1 3.000 1 3.00000

(b)3 Full time teachers as per RTE norms @ Rs.

20,000/- per month per teacher 7.20000 1 7.200 1 7.20000

(c) 3 part time teachers @ Rs. 5,000/- per month per

teacher 1.80000 1 1.800 1 1.80000

(d)1 Full time Accountant @ Rs. 10,000/- per month

1.20000 1 1.200 1 1.20000

(e)

2 Support Staff – (Accountant/ Assistant, Peon,

Chowkidar) @ Rs. 5,000/- per month per staff 1.20000 1 1.200 1 1.20000

Arti:SSA-AWPB-2014-15-PABMinits:GBNagar:16-06-2014 329 / 533

Page 330: U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 · 2015. 1. 6. · U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15

Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

Name of District : G.B.Nagar -30

ActivityS. No.Physical

UnitRemarks

Outlay Recommendation for 2014-15

Spill OverDeferred laibility

of 2014-15Fresh Recommended Total Recommended

(f) 1 Head cook @ Rs. 6,000/- per month 0.72000 1 0.720 1 0.72000

(g)1 Asstt. Cooks @ Rs. 4,500/- per month per cook

0.54000 1 0.540 1 0.54000

25.36Specific skill training @ Rs.1000/- per child per

annum0.50000 1 0.500 1 0.50000

25.37Electricity/water charges @ Rs.1000/- per child

per annum0.50000 1 0.500 1 0.50000

25.38Medical care/contingencies @ Rs. 1250 per child

per annum0.62500 1 0.625 1 0.62500

25.39 Maintenance @ Rs.750/- per child per annum 0.37500 1 0.375 1 0.37500

25.40

Miscellaneous (Educational Tour/ Exposure Visit

/ Sports Material etc.) @ Rs.750/- per child per

annum

0.37500 1 0.375 1 0.37500

25.41Preparatory camps @ Rs.300/- per child per

annum0.15000 1 0.150 1 0.15000

25.42PTAs/school functions @ Rs.300/- per child per

annum0.15000 1 0.150 1 0.15000

25.43 Provision of Rent @ Rs.10000/- per annum 5.00000

25.43a Provision of Rent (6 months) 3.6000025.43b Provision of Rent (3 months) 1.8000025.43c Rent (Previous Year (2007-2012)25.44 Capacity building 0.25000 1 0.250 1 0.25000

25.44(a)Physical/ Self Defence Training @ Rs.200/- per

child per annum0.10000 1 0.100 1 0.10000

Subtotal Recurring 19.00 28.785 19.00 28.78500

Subtotal (Model-II) 20.00 29.160 20.00 29.16000

Total (KGBV) 22 122.840 22 122.840

DISTRICT GRAND TOTAL (SSA+KGBV) 43.530 5.200 151963 3820.453 151963 3869.183

Arti:SSA-AWPB-2014-15-PABMinits:GBNagar:16-06-2014 330 / 533

Page 331: U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 · 2015. 1. 6. · U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15

Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

I ACCESS

1 Opening of New Schools

1.01 Upgradation of EGS to PSCentres /

School1.02 New PS School

1.03 Upgradation of PS to UPS / New UPS School

1.04 Composite Schools (for Urban Areas) School

1.05Residential Schools for specific category children

(For 100 children)

1.06Residential Hostel (for specific category of

children) (For 50 children)

1.07 Integration of Class V with Primary Schools

1.08Integration of Class VIII with Upper Primary

Schools

2Residential Schools for specific category

of children (For 100 Children)

Total - Residential Schools (For 100

children)

3Residential Hostel for specific category of

children (For 50 Children)

Total - Residential Schools (For 50

children)4 Transport/Escort Facility

4.01

Children in remote habitations with sparse

populations where opening of schools is

unviable

Child 0.03000

4.02

Urban deprived children/children without adult

protection in urban areas where schools are not

opened because availability of land is a problem

Child 0.03000

Sub Total

5Special Training for mainstreaming of Out-

of-School Children

5.03 Non-Residential (Fresh)(a) 12 months Child 0.06000(b) 9 months 0.04500(c) 6 months

(i)Special Training (by Special Instructors-NRBC)-

(1-5) Child 0.03000 514 15.420 514 15.42000

(ii) Special Training (by Special Instructors-NRBC)-

(6-8) Child 0.03000 286 8.580 286 8.58000

(d) 3 months Child 0.01500Sub Total 800 24.000 800 24.00000

Total (Special Training) 800 24.000 800 24.0005(B) House Hold Survey (HHS)

5(B).01 House Hold Survey through SMCHouse

Hold0.00001

Sub TotalII RETENTION6 Free Text Book

6.01Free Text Book (PS) for Parishadiya & Aided

Primary Schools (Workbooks not included)Child 0.00120 96640 115.968 96640 115.96800

6.01a

Free Text Book (PS) for 25% children of Class-1

in Private Recognised Primary Schools of other

Boards (Workbooks not included)

Child 0.00150

6.02 Free Brail Books (PS) 0.00150 51 0.077 51 0.07650

6.03 Free Large Print Books (PS) 0.00150

6.04Free Text Book (UPS) (Workbooks not included)

(Including KGBV Girls)Child 0.00200 43300 86.600 43300 86.60000

6.05 Free Brail Books (UPS) 0.00250 7 0.018 7 0.01750

6.06 Free Large Print Books (PS) 0.00250Sub Total 139998 202.662 139998 202.662

7 Provision of 2 set of Uniforms

7.01 All Girls (Including KGBV Girls) Child 0.00400 111710 446.840 111710 446.84000

7.02 SC Boys Child 0.00400 28230 112.920 28230 112.92000

7.03 ST Boys Child 0.00400

7.04 BPL Boys Child 0.00400 21088 84.352 21088 84.35200

7.05

Free Uniform for 25% children of Class-1 in

Private Recognised Primary Schools of other

Boards

Child0.00400

Sub Total 161028 644.112 161028 644.1127(A) Fee Reimbursement

7(A).01

Fee Reimbursement for Admission of children of

Disadvantaged Group & Weaker Section upto

25% of seats in Class-1 of Private Unaided

Recognised Schools

Child 0.05400

Sub Total

Name of District : Firozabad -29

ActivityS. No.Physical

UnitRemarks

Outlay Recommendation for 2014-15

Spill OverDeferred laibility of

2014-15Fresh Recommended Total Recommended

Arti:SSA-AWPB-2014-15-PABMinits:Firozabad:16-06-2014 331 / 533

Page 332: U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 · 2015. 1. 6. · U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15

Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

Name of District : Firozabad -29

ActivityS. No.Physical

UnitRemarks

Outlay Recommendation for 2014-15

Spill OverDeferred laibility of

2014-15Fresh Recommended Total Recommended

8 Teaching Learning Equipment (TLE)

8.01 TLE - New Primary School 0.40000 0.20000 0.400008.02 TLE - New Upper Primary School 1.50000 0.50000 1.50000

Sub Total 1.90000 1.90000III ENHANCING QUALITY9 New Teachers Salary

9.01 Primary Teachers (Regular) (Asstt. Teacher) Teacher 0.91500

9.01aHead Teacher for Primary (if the number of

children exceeds 150 in a school)Teacher

9.02 Primary Teachers (Contract) (S.M.) Teacher

9.03Subject specific Upper Primary Teachers

(Regular) (a) Science and Mathematics Teacher 1.26000(b) Social Studies Teacher 1.26000(c) Languages Teacher 1.26000

Sub Total (9.01 to 9.05)Add.Teacher against PTR

Sub Total (9.06 to 9.12)

Total (New Teacher's Salary-9.01 to 9.12)

Teachers Salary (Recurring-sanctioned

earlier)Primary teachers

9.13 Primary Teachers ( Regular)-Existing, in position Teacher 3.66000 421 1540.860 421 1540.86000

9.14Primary Teachers (Contract)-Existing, in

positionTeacher 0.55000

9.14(a) Primary Teachers (Contract)-under Training Teacher 0.38500 1302 501.270 1302 501.27000

9.14(b)Primary Teacher (Para Teachers Equal to

9.14(a) upgraded as Teachers)0.38500 716 275.660 716 275.66000

9.14(c) Primary Teachers (Para)- Vacant Teacher9.15 Primary Teachers (Vacant) Teacher 0.30500

9.16Head Teacher for Primary (if the number of

children exceeds 150)Teacher 5.04000 365 1839.600 365 1839.60000

9.16(b)Head Teacher for Primary (if the number of

children exceeds 150) VacantTeacher 0.42000

Additional teachers

9.17Additional Teachers - PS (Special BTC-

Regular) in positionTeacher 0.30500

9.18Additional Teachers - PS (Special BTC Under

Training)Teacher 0.87600

9.19 Additional Teachers - PS (Vacant) Teacher

9.20Others in position (Para Teachers upgraded

as Teachers)Teacher

Upper Primary teachers

9.21 UP Teachers (Regular)-Existing Teacher 5.04000 992 4999.680 992 4999.68000

9.22 UP Teachers (Contract)-Existing9.23 UP Teachers (Vacant) Teacher 1.26000

9.24Head Teacher for Upper Primary (if the number

of children exceeds 100)-ExistingTeacher 5.34000 344 1836.960 344 1836.96000

9.24a Head Teacher for Upper Primary (Vacant) Teacher 1.33500

9.25Subject specific Upper Primary Teachers

(Regular)(a) Science and Mathematics(b) Social Studies(c) Languages

9.32 Part Time Instructors in position(a) Art Education 0.77000 89 68.530 89 68.53000(b) Health and Physical Education 0.77000 92 70.840 92 70.84000(c) Work Education 0.77000 71 54.670 71 54.67000

9.32(A) Part Time Instructors Vacant(a) Art Education 0.42000(b) Health and Physical Education 0.42000(c) Work Education 0.42000

9.33

Others-Incentive to Teachers in Schools

Located in Naxal Affected Areas (@

Rs.1500/- per teachers per month)

Sub Total (9.13 to 9.33) 4392 11188.070 4392 11188.07TOTAL

(New Teachers Salary +Teachers Salary

Recurring)

4392 11188.070 4392 11188.07000

10 Teachers Training(a) Teachers

10.01

Refresher In-service Teachers' Training at BRC

level and above - 10 days (@ Rs.200/- per head

per day)

Teacher

(Target &

Ach.-13-14

in

Mandays)

0.00600

Arti:SSA-AWPB-2014-15-PABMinits:Firozabad:16-06-2014 332 / 533

Page 333: U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 · 2015. 1. 6. · U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15

Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

Name of District : Firozabad -29

ActivityS. No.Physical

UnitRemarks

Outlay Recommendation for 2014-15

Spill OverDeferred laibility of

2014-15Fresh Recommended Total Recommended

10.01(a)Continuous and Comprehensive Evauation [PS +

UPS)Teacher 0.01300 1450 18.850 1450 18.85000

10.01(b) Eary Reading and Numeracy Skills [PS] Teacher 0.00500 1450 7.250 1450 7.25000

10.01(c) Science [UPS] Teacher 0.00800 735 5.880 735 5.88000Recommended as

proposed

10.01(d) CWSN Teacher 0.00400

10.02

One day monthly cluster level meetings and

peer group training sessions for 10 months for

all teachers each year at CRC level - 10 days (@

Rs.100/- per head per day)

Teacher 0.01000

10.03(a)

Induction Training for Newly Recruited Teachers

for 6 Months (Special BTC)- @Rs.2000/- per

head per year

Teacher 0.02000

10.03(b)5 Days Training for Part Time Instructors @ Rs.

200/- per head per day) Teacher 0.01000

10.04

Training of untrained Teachers to acquire

professional qualifications over a two year

period.

Teacher 0.04700 746 35.062 746 35.06200

(b) Head Teachers

10.05Refresher Residencial In-service for 10 days at

BRC level and above

Head

Teacher(c) Resource Persons

10.06

Refresher Training for all Resource

Persons,Master Trainers, BRC & CRC faculty

and Coordinators for 5 days each year (@

Rs.200/- per head per day)

Resource

Person 0.00300 120 0.360 120 0.36000

Sub Total 4501 67.402 4501 67.402

11Academic Support through Block Resource

Centre (BRC)/ URC

11.01 Salary of Faculty and Staff

(a) 5 RPs at BRC for subject specific training in

positionRP 50 50

(b) 2 RPs for CWSN in position RP(b-i) 1 CWSN Resource Person RP 1.10000 20 22.000 20 22.00000

(b-ii) 1 Physiotherapist (Resource person for IE) RP

(c) 1 MIS Coordinator in position RP 1.86000

(d) 1 Datra Entry Operator in position RP 1.74000

(e) 1 Accountant-cum-support staff in position RP 1.80000 9 16.200 9 16.20000

11.02 Furniture Grant BRC/ URC 1.00000

11.03Replacement of furniture, computer, TLE etc (

Once in 5 years)BRC/ URC 1.00000

11.04 Contingency Grant BRC/ URC 0.50000 10 5.000 10 5.00000

11.05 Meeting, TA BRC/ URC 0.30000 10 3.000 10 3.00000

11.06 TLM Grant BRC/ URC 0.10000

11.07 Maintenance Grant BRC/ URC 0.10000

Sub Total 10 46.200 10 46.20000

12Academic Support through Cluster

Resource Centres (CRC/UERC)

12.01Salary of Cluster Coordinator (on an average of

one Resource Person per 18 schools in a block)RP

12.02 Furniture Grant CRC/ UERC 0.10000

12.03Replacement of furniture, computer, TLE etc.

once in 5 yearsCRC/ UERC 0.10000

12.04 Contingency Grant CRC/UERC 0.10000 81 8.100 81 8.10000

12.05 Meeting, TA CRC/UERC 0.12000 81 9.720 81 9.72000

12.06 TLM Grant CRC/UERC 0.03000

12.07Maintenance Grant

CRC/UERC 0.02000

Sub Total 162 17.820 162 17.82000

13Computer Aided Education in upper

primary schools under Innovation

13.01Computer Aided Education in upper primary

schoolsDistrict 0.01200 48 0.576 48 0.57600

Sub Total 48 0.576 48 0.5760014 Libraries in Schools

Arti:SSA-AWPB-2014-15-PABMinits:Firozabad:16-06-2014 333 / 533

Page 334: U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 · 2015. 1. 6. · U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15

Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

Name of District : Firozabad -29

ActivityS. No.Physical

UnitRemarks

Outlay Recommendation for 2014-15

Spill OverDeferred laibility of

2014-15Fresh Recommended Total Recommended

14.01 (a) Primary School (per school) School 0.03000

14.02 (b) Upper Primary School (per school) School 0.10000

Sub TotalIV ANNUAL GRANTS15 Teachers' Grant15.01 Primary Teachers Teacher 0.0050015.02 Upper Primary Teachers Teacher 0.00500 735 3.675 735 3.67500

Sub Total 735 3.675 735 3.6750016 School Grant16.01 Primary School School 0.05000 1546 77.300 1546 77.3000016.02 Upper Primary School School 0.07000 732 51.240 732 51.24000

Sub Total 2278 128.540 2278 128.54000

17Research, Evaluation, Monitoring &

Supervision

17.01 REMS Activities School 0.00103 2278 2.343 2278 2.34318

17.02 Monitoring & Supervision School 0.00078 2278 1.786 2278 1.78610

17.03 House Hold Survey (Urban) in Million Plus Cities District 35.00000

Sub Total 4556 4.129 4556 4.1292818 Maintenance Grant

18.01 Maintenance in School having upto3 Classrooms School 0.07500 821 61.575 821 61.57500

18.01a Maintenance Grant School 0.07500 1334 100.050 1334 100.05000Sub Total 2155 161.625 2155 161.62500

VBRIDGING GENDER AND SOCIAL

CATEGORY GAPS

19 Interventions for CWSN (IE)

19.01 Provision for Inclusive Education Child 0.01600 4647 74.352 4647 74.35200

Sub Total 4647 74.352 4647 74.35200

20Innovativation Head up to Rs.50 Lakh per

district

20.01 Girls Education District 0.70000 10 7.000 10 7.00000

20.02 ECCE District20.03 Intervention for SC / ST children District

20.04 Intervention for Minority Community children District

20.05 Intervention for Urban Deprived children District 10.00000

Sub Total 10 7.000 10 7.0000021 SMC/PRI Training

21.01Residential for 6 Resource Person per Block (3

days) (@ Rs.500/-)Blocks 0.09000

21.02Non-residential (3 days training of 6 SMC

members) (@ Rs.100/-)SMC 0.01800 2155 38.790 2155 38.79000

21.02(a)Non-residential (3 days training of 3 Members of

PRI/VECs/LA) (@ Rs.100/-)VEC/ WEC 0.00900

21.03

Seminar/Orientation of SMC Women members

and President/Vice President (@ Rs. 50,000/-

per block)

Blocks 0.50000

Sub Total 2155 38.790 2155 38.79000VI SCHOOL INFRASTRUCTURE22 Civil Works22.01 Primary School (Plain) (New) School 13.1550022.02 Primary School (Hilly/Rocky) (New) School 13.2750022.03 Upper Primary (Plain) (New) School 20.65500

22.04 Upper Primary School (Hilly/Rocky) (New) School 20.77500

22.04aComposite Schools for Urban Areas (Class I-

VIII)School 41.04000

22.05 ACR in lieu of upgraded Upper Primary School Rooms

22.06 Additional class rooms for adding Class VIII Rooms

22.07 Building Less (Pry) School 9.7500022.08 Building Less (UP) School 18.5900022.09 Dilapidated Building (Pry) School 9.7500022.10 Dilapidated Building (UP) School 18.59000

22.11 Additional Class Room (Rural) ( PS+UPS) Rooms 3.45000 66 227.700 66 227.70000

22.12 Additional Class Room (Urban) Rooms 3.45000 14 48.300 14 48.3000022.13 Additional Class Room (Hill Area)22.14 Toilet/Urinals (PS & UPS) School 0.7000022.15 Separate Girls Toilet (Rural+Urban) School 0.7000022.16 CWSN friendly Toilets School 0.50000

22.17 Drinking Water Facility (for Urban Area Only)) School 0.15000

22.17a Drinking Water Facility (Plain PS & UPS) School 0.15000 517 77.550 517 77.55000

22.17b Drinking Water Facility (Hilly/Rocky PS & UPS) School 0.15000

22.18a Boundary Wall PS (Total in Meters x .01105) 0.01749

22.18bBoundary Wall PS (For Gate) @Rs. 7000 x no. of

P.S.School 0.07800

Arti:SSA-AWPB-2014-15-PABMinits:Firozabad:16-06-2014 334 / 533

Page 335: U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 · 2015. 1. 6. · U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15

Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

Name of District : Firozabad -29

ActivityS. No.Physical

UnitRemarks

Outlay Recommendation for 2014-15

Spill OverDeferred laibility of

2014-15Fresh Recommended Total Recommended

22.18c Boundary Wall UPS (Total in Meters x .01105) 0.01749

22.18dBoundary Wall UPS (For Gate) @Rs. 7000 x no.

of UPSSchool 0.07800

22.19a Electrification in P.S./ Electrical Equipment School 0.11000

22.19b Electrification in U. P.S./ Electrical Equipment School 0.11000

22.20Office-cum-store-cum-Head Teacher's room

(Primary)Rooms

22.21Office-cum-store-cum-Head Teacher's room

(Upper Primary)Rooms

22.22Augumentation of training facility in BRC (one

time)BRC/ URC 5.00000

22.23 Child friendly Elements School 0.25000

22.24 Ramps with Handrails (Barrier Free Elements) School 0.06000

22.25 Handrails in existing Ramps School 0.0100022.26 Whole School Develoipment School22.27 Retro-fitting and repairs School

22.28Residential Schools for specific category

of children

(a) Construction of Building including boundary

wall, Water and sanitation facilities, electric

installation (For 100 children)

Building 65.86000

(b) Construction of residential hostel Building 65.86000

(c) Refurnishing unused old buildings Building

22.29

Construction of Hostel in existing Govt UPS

including boundary wall, Water and sanitation

facilities, electric installation etc. (For 50

children)

7.00000

22.30Furniture for Govt. UPS (per child) (@ Rs.500/-

per child enrolled)Child 0.00500

22.31 Major Repairs for Primary School School 0.30000

22.32 Majr Repairs for Upper Primary School School 0.30000

22.33Others (Difference of Civil Wrks

sanctioned in pre.yr.)22.33a Others (Overhead Tank PS) School 0.1200022.33b Others (Overhead Tank UPS) School 0.12000

Sub Total (Civil WOrks) 597 353.550 597 353.55VII PROJECT MANAGEMENT COST23 Management23.01 Management up to 3.5%

(a) Project Management and MIS

(i) DPO ( Salary, Contigency, Consumables,

POL, TA & Computer etc)District 1 115.317 1 115.31720

(ii) EMIS Cell District 1 14.483 1 14.48250Sub Total (a) 1 1 1 129.800 1 129.800

(b) Training of Educational Administrators District

(c) School Mapping and Social Mapping District

Sub Total (23.01)

23.02Learning Enhancement Prog. (LEP) (P & UP) (up

to 2%)District 14.727 14.72700

23.03 Community Mobilization (up to 0.5%) District 1 45.850 1 45.85000

Sub Total (Management) 1 60.577 1 60.57700Total Management Cost 190.377 190.37670Total of SSA (Districs) 1.900 328072 13152.880 328072 13154.780

24 State Component23.01 Management23.02 REMS 0.0044923.03 SIEMAT

Sub Total

STATE SSA TOTAL 1.90000 328072 13152.880 328072 13154.77998

25

KGBV Financial Provision (give

separate costing sheets for different

Models)

Hostel

ANon Recurring One Time Grant (Only

committed liabilities) (Model-I)

25.01 Construction of Building (New)

25.02 Construction of Building KGBV sanctioned earlier

25.02(a) Additional Class Room Rooms 3.45000

25.02(b) Guard Room Rooms 1.32000

25.02(c) Boundary Wall School 5.0200025.03 Boudary Wall (Spillover only)

25.04

Boring/Handpump (Spillover only)

(minimum rates prescribed by State Drinking

Water Department subject to a ceiling of Rs.

1.00 lakhs)

Arti:SSA-AWPB-2014-15-PABMinits:Firozabad:16-06-2014 335 / 533

Page 336: U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 · 2015. 1. 6. · U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15

Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

Name of District : Firozabad -29

ActivityS. No.Physical

UnitRemarks

Outlay Recommendation for 2014-15

Spill OverDeferred laibility of

2014-15Fresh Recommended Total Recommended

25.05 Electricity /Water charges (Spillover only)

25.05(a) Solar Water Heater & Solar Light 2.97000

25.06Furniture/Equipment (including Kitchen

equipment)3.00000

25.07 TLM and equipment including library books 3.50000

25.08 Bedding (New) 0.75000

25.09 Replacement of Bedding (once in 3 Year) 0.75000 1 0.750 1 0.75000

Subtotal Non Recurring 0.750 0.75000

B Recurring Cost Per Annum (Model-I)

25.10Maintenance per girl student per month @ Rs.

1500/-18.00000 3 54.000 3 54.00000

25.11 Stipend for girl student per month @ Rs. 100/- 1.20000 3 3.600 3 3.60000

25.12Supplementary TLM, stationery and other

educational material @ Rs.1000/- per annum1.00000 3 3.000 3 3.00000

25.13 Salaries

25.13.1 Additional Salaries:

(a) 1 Warden @ Rs. 25,000/- per month 3.00000 3 9.00000 3 9.00000

(b)4 Full time teachers as per RTE norms @ Rs.

20,000/- per month per teacher 9.60000 3 28.80000 3 28.80000

(c)

1 Urdu Teachers (only for blocks with muslim

population above 20% and select urban areas), if

required @ Rs. 12,000/- per month per teacher 1.44000 3 4.32000 3 4.32000

(d)3 part time teachers @ Rs. 5,000/- per month per

teacher 1.80000 3 5.40000 3 5.40000

(e)1 Full time Accountant @ Rs. 10,000/- per month

1.20000 3 3.60000 3 3.60000

(f)

2 Support Staff – (Accountant/ Assistant, Peon,

Chowkidar) @ Rs. 5,000/- per month per staff 1.20000 3 3.60000 3 3.60000

(g) 1 Head cook @ Rs. 6,000/- per month 0.72000 3 2.16000 3 2.16000

(h)2 Asstt. Cooks @ Rs. 4,500/- per month per cook

1.08000 3 3.24000 3 3.24000

25.14Specific skill training @ Rs.1000/- per child per

annum1.00000 3 3.000 3 3.00000

25.15Electricity/water charges @ Rs.1000/- per child

per annum1.00000 3 3.000 3 3.00000

25.16Medical care/contingencies @ Rs. 1250 per child

per annum1.25000 3 3.750 3 3.75000

25.17 Maintenance @ Rs.750/- per child per annum 0.75000 3 2.250 3 2.25000

25.18

Miscellaneous (Educational Tour/ Exposure Visit

/ Sports Material etc.) @ Rs.750/- per child per

annum

0.75000 3 2.250 3 2.25000

25.19Preparatory camps @ Rs.200/- per child per

annum0.20000 3 0.600 3 0.60000

25.20PTAs/school functions @ Rs.200/- per child per

annum0.20000 3 0.600 3 0.60000

25.21 Provision of Rent @ Rs.6000/- per annum 6.00000

25.21a Provision of Rent (6 months) 3.6000025.21b Provision of Rent (3 months) 1.8000025.21c Rent (Previous Year (2007-2012)

25.22 Capacity building 0.50000 3 1.500 3 1.50000

25.22(a)Physical/ Self Defence Training @ Rs.200/- per

child per annum0.20000 3 0.600 3 0.60000

Subtotal Recurring 3 138.270 3 138.27000

Subtotal (Model-I) 3 139.020 3 139.02000

CNon Recurring One Time Grant (Only

committed liabilities) (Model-II)

25.23 Construction of Building (New)

25.24 Construction of Building KGBV sanctioned earlier

25.24(a) Additional Class Room Rooms 3.45000

25.24(b) Guard Room Rooms 1.32000

25.24(c) Boundary Wall School 5.0200025.25 Boudary Wall (Spillover only)25.26 Boring/Handpump (Spillover only)

25.27 Electricity /Water charges (Spillover only)

25.27(a) Solar Water Heater & Solar Light 2.97000

25.28Furniture/Equipment (including Kitchen

equipment)2.00000

25.29 TLM and equipment including library books 3.00000

Arti:SSA-AWPB-2014-15-PABMinits:Firozabad:16-06-2014 336 / 533

Page 337: U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 · 2015. 1. 6. · U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15

Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

Name of District : Firozabad -29

ActivityS. No.Physical

UnitRemarks

Outlay Recommendation for 2014-15

Spill OverDeferred laibility of

2014-15Fresh Recommended Total Recommended

25.30 Bedding (New) 0.37500

25.31 Replacement of Bedding (once in 3 Year) 0.37500

Subtotal Non Recurring

D Recurring Cost Per Annum (Model-II)

25.32Maintenance per girl student per month @ Rs.

1500/-9.00000

25.33 Stipend for girl student per month @ Rs. 100/- 0.60000

25.34Supplementary TLM, stationery and other

educational material @ Rs.1000/- per annum0.50000

25.35 Salaries(a) 1 Warden @ Rs. 25,000/- per month 3.00000

(b)3 Full time teachers as per RTE norms @ Rs.

20,000/- per month per teacher 7.20000

(c) 3 part time teachers @ Rs. 5,000/- per month per

teacher 1.80000

(d)1 Full time Accountant @ Rs. 10,000/- per month

1.20000

(e)

2 Support Staff – (Accountant/ Assistant, Peon,

Chowkidar) @ Rs. 5,000/- per month per staff 1.20000

(f) 1 Head cook @ Rs. 6,000/- per month 0.72000

(g)1 Asstt. Cooks @ Rs. 4,500/- per month per cook

0.54000

25.36Specific skill training @ Rs.1000/- per child per

annum0.50000

25.37Electricity/water charges @ Rs.1000/- per child

per annum0.50000

25.38Medical care/contingencies @ Rs. 1250 per child

per annum0.62500

25.39 Maintenance @ Rs.750/- per child per annum 0.37500

25.40

Miscellaneous (Educational Tour/ Exposure Visit

/ Sports Material etc.) @ Rs.750/- per child per

annum

0.37500

25.41Preparatory camps @ Rs.300/- per child per

annum0.15000

25.42PTAs/school functions @ Rs.300/- per child per

annum0.15000

25.43 Provision of Rent @ Rs.10000/- per annum 5.00000

25.43a Provision of Rent (6 months) 3.6000025.43b Provision of Rent (3 months) 1.8000025.43c Rent (Previous Year (2007-2012)25.44 Capacity building 0.25000

25.44(a)Physical/ Self Defence Training @ Rs.200/- per

child per annum0.10000

Subtotal Recurring

Subtotal (Model-II) Total (KGBV) 3 139.020 3 139.020

DISTRICT GRAND TOTAL (SSA+KGBV) 1.900 328075 13291.900 328075 13293.800

Arti:SSA-AWPB-2014-15-PABMinits:Firozabad:16-06-2014 337 / 533

Page 338: U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 · 2015. 1. 6. · U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15

Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

I ACCESS

1 Opening of New Schools

1.01 Upgradation of EGS to PSCentres /

School1.02 New PS School

1.03 Upgradation of PS to UPS / New UPS School

1.04 Composite Schools (for Urban Areas) School

1.05Residential Schools for specific category children

(For 100 children)

1.06Residential Hostel (for specific category of

children) (For 50 children)

1.07 Integration of Class V with Primary Schools

1.08Integration of Class VIII with Upper Primary

Schools

2Residential Schools for specific category

of children (For 100 Children)

Total - Residential Schools (For 100

children)

3Residential Hostel for specific category of

children (For 50 Children)

Total - Residential Schools (For 50

children)4 Transport/Escort Facility

4.01

Children in remote habitations with sparse

populations where opening of schools is

unviable

Child 0.03000

4.02

Urban deprived children/children without adult

protection in urban areas where schools are not

opened because availability of land is a problem

Child 0.03000

Sub Total

5Special Training for mainstreaming of Out-

of-School Children

5.03 Non-Residential (Fresh)(a) 12 months Child 0.06000(b) 9 months 0.04500(c) 6 months

(i)Special Training (by Special Instructors-NRBC)-

(1-5) Child 0.03000 80 2.400 80 2.40000

(ii) Special Training (by Special Instructors-NRBC)-

(6-8) Child 0.03000 74 2.220 74 2.22000

(d) 3 months Child 0.01500Sub Total 154 4.620 154 4.62000

Total (Special Training) 154 4.620 154 4.6205(B) House Hold Survey (HHS)

5(B).01 House Hold Survey through SMCHouse

Hold0.00001

Sub TotalII RETENTION6 Free Text Book

6.01Free Text Book (PS) for Parishadiya & Aided

Primary Schools (Workbooks not included)Child 0.00120 131821 158.185 131821 158.18520

6.01a

Free Text Book (PS) for 25% children of Class-1

in Private Recognised Primary Schools of other

Boards (Workbooks not included)

Child 0.00150

6.02 Free Brail Books (PS) 0.00150 66 0.099 66 0.09900

6.03 Free Large Print Books (PS) 0.00150

6.04Free Text Book (UPS) (Workbooks not included)

(Including KGBV Girls)Child 0.00200 56908 113.816 56908 113.81600

6.05 Free Brail Books (UPS) 0.00250 18 0.045 18 0.04500

6.06 Free Large Print Books (PS) 0.00250Sub Total 188813 272.145 188813 272.145

7 Provision of 2 set of Uniforms

7.01 All Girls (Including KGBV Girls) Child 0.00400 139839 559.356 139839 559.35600

7.02 SC Boys Child 0.00400 48890 195.560 48890 195.56000

7.03 ST Boys Child 0.00400

7.04 BPL Boys Child 0.00400 32435 129.740 32435 129.74000

7.05

Free Uniform for 25% children of Class-1 in

Private Recognised Primary Schools of other

Boards

Child0.00400

Sub Total 221164 884.656 221164 884.6567(A) Fee Reimbursement

7(A).01

Fee Reimbursement for Admission of children of

Disadvantaged Group & Weaker Section upto

25% of seats in Class-1 of Private Unaided

Recognised Schools

Child 0.05400

Sub Total

8 Teaching Learning Equipment (TLE)

8.01 TLE - New Primary School 0.40000 0.20000 0.400008.02 TLE - New Upper Primary School 9.00000 0.50000 9.00000

Name of District : Fatehpur -28

ActivityS. No.Physical

UnitRemarks

Outlay Recommendation for 2014-15

Spill OverDeferred laibility of

2014-15Fresh Recommended Total Recommended

Arti:SSA-AWPB-2014-15-PABMinits:Fatehpur:16-06-2014 338 / 533

Page 339: U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 · 2015. 1. 6. · U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15

Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

Name of District : Fatehpur -28

ActivityS. No.Physical

UnitRemarks

Outlay Recommendation for 2014-15

Spill OverDeferred laibility of

2014-15Fresh Recommended Total Recommended

Sub Total 9.40000 9.40000III ENHANCING QUALITY9 New Teachers Salary

9.01 Primary Teachers (Regular) (Asstt. Teacher) Teacher 0.91500

9.01aHead Teacher for Primary (if the number of

children exceeds 150 in a school)Teacher

9.02 Primary Teachers (Contract) (S.M.) Teacher

9.03Subject specific Upper Primary Teachers

(Regular) (a) Science and Mathematics Teacher 1.26000(b) Social Studies Teacher 1.26000(c) Languages Teacher 1.26000

Sub Total (9.01 to 9.05)Add.Teacher against PTR

Sub Total (9.06 to 9.12)

Total (New Teacher's Salary-9.01 to 9.12)

Teachers Salary (Recurring-sanctioned

earlier)Primary teachers

9.13 Primary Teachers ( Regular)-Existing, in position Teacher 3.66000 45 164.700 45 164.70000

9.14Primary Teachers (Contract)-Existing, in

positionTeacher 0.55000

9.14(a) Primary Teachers (Contract)-under Training Teacher 0.38500 1894 729.190 1894 729.19000

9.14(b)Primary Teacher (Para Teachers Equal to

9.14(a) upgraded as Teachers)0.38500 966 371.910 966 371.91000

9.14(c) Primary Teachers (Para)- Vacant Teacher9.15 Primary Teachers (Vacant) Teacher 0.30500

9.16Head Teacher for Primary (if the number of

children exceeds 150)Teacher 5.04000 227 1144.080 227 1144.08000

9.16(b)Head Teacher for Primary (if the number of

children exceeds 150) VacantTeacher 0.42000

Additional teachers

9.17Additional Teachers - PS (Special BTC-

Regular) in positionTeacher 0.30500

9.18Additional Teachers - PS (Special BTC Under

Training)Teacher 0.87600

9.19 Additional Teachers - PS (Vacant) Teacher

9.20Others in position (Para Teachers upgraded

as Teachers)Teacher

Upper Primary teachers

9.21 UP Teachers (Regular)-Existing Teacher 5.04000 1146 5775.840 1146 5775.84000

9.22 UP Teachers (Contract)-Existing9.23 UP Teachers (Vacant) Teacher 1.26000

9.24Head Teacher for Upper Primary (if the number

of children exceeds 100)-ExistingTeacher 5.34000 366 1954.440 366 1954.44000

9.24a Head Teacher for Upper Primary (Vacant) Teacher 1.33500

9.25Subject specific Upper Primary Teachers

(Regular)(a) Science and Mathematics(b) Social Studies(c) Languages

9.32 Part Time Instructors in position(a) Art Education 0.77000 128 98.560 128 98.56000(b) Health and Physical Education 0.77000 142 109.340 142 109.34000(c) Work Education 0.77000 100 77.000 100 77.00000

9.32(A) Part Time Instructors Vacant(a) Art Education 0.42000(b) Health and Physical Education 0.42000(c) Work Education 0.42000

9.33

Others-Incentive to Teachers in Schools

Located in Naxal Affected Areas (@

Rs.1500/- per teachers per month)

Sub Total (9.13 to 9.33) 5014 10425.060 5014 10425.06TOTAL

(New Teachers Salary +Teachers Salary

Recurring)

5014 10425.060 5014 10425.06000

10 Teachers Training(a) Teachers

10.01

Refresher In-service Teachers' Training at BRC

level and above - 10 days (@ Rs.200/- per

head per day)

Teacher

(Target &

Ach.-13-14

in

Mandays)

0.00600

10.01(a)Continuous and Comprehensive Evauation [PS +

UPS)Teacher 0.01300 1842 23.946 1842 23.94600

10.01(b) Eary Reading and Numeracy Skills [PS] Teacher 0.00500 1842 9.210 1842 9.21000

10.01(c) Science [UPS] Teacher 0.00800 807 6.456 807 6.45600Recommended as

proposed

10.01(d) CWSN Teacher 0.00400

Arti:SSA-AWPB-2014-15-PABMinits:Fatehpur:16-06-2014 339 / 533

Page 340: U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 · 2015. 1. 6. · U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15

Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

Name of District : Fatehpur -28

ActivityS. No.Physical

UnitRemarks

Outlay Recommendation for 2014-15

Spill OverDeferred laibility of

2014-15Fresh Recommended Total Recommended

10.02

One day monthly cluster level meetings and

peer group training sessions for 10 months for

all teachers each year at CRC level - 10 days (@

Rs.100/- per head per day)

Teacher 0.01000

10.03(a)

Induction Training for Newly Recruited Teachers

for 6 Months (Special BTC)- @Rs.2000/- per

head per year

Teacher 0.02000

10.03(b)5 Days Training for Part Time Instructors @ Rs.

200/- per head per day) Teacher 0.01000

10.04

Training of untrained Teachers to acquire

professional qualifications over a two year

period.

Teacher 0.04700 1446 67.962 1446 67.96200

(b) Head Teachers

10.05Refresher Residencial In-service for 10 days at

BRC level and above

Head

Teacher(c) Resource Persons

10.06

Refresher Training for all Resource

Persons,Master Trainers, BRC & CRC faculty

and Coordinators for 5 days each year (@

Rs.200/- per head per day)

Resource

Person 0.00300 168 0.504 168 0.50400

Sub Total 6105 108.078 6105 108.078

11Academic Support through Block Resource

Centre (BRC)/ URC

11.01 Salary of Faculty and Staff

(a) 5 RPs at BRC for subject specific training in

positionRP 70 70

(b) 2 RPs for CWSN in position RP(b-i) 1 CWSN Resource Person RP 1.10000 28 30.800 28 30.80000

(b-ii) 1 Physiotherapist (Resource person for IE) RP

(c) 1 MIS Coordinator in position RP 1.86000

(d) 1 Datra Entry Operator in position RP 1.74000 11 19.140 11 19.14000

(e) 1 Accountant-cum-support staff in position RP 1.80000 14 25.200 14 25.20000

11.02 Furniture Grant BRC/ URC 1.00000

11.03Replacement of furniture, computer, TLE etc (

Once in 5 years)BRC/ URC 1.00000

11.04 Contingency Grant BRC/ URC 0.50000 14 7.000 14 7.00000

11.05 Meeting, TA BRC/ URC 0.30000 14 4.200 14 4.20000

11.06 TLM Grant BRC/ URC 0.10000

11.07 Maintenance Grant BRC/ URC 0.10000

Sub Total 14 86.340 14 86.34000

12Academic Support through Cluster

Resource Centres (CRC/UERC)

12.01Salary of Cluster Coordinator (on an average of

one Resource Person per 18 schools in a block)RP

12.02 Furniture GrantCRC/

UERC0.10000

12.03Replacement of furniture, computer, TLE etc.

once in 5 years

CRC/

UERC0.10000

12.04 Contingency Grant CRC/UERC 0.10000 133 13.300 133 13.30000

12.05 Meeting, TA CRC/UERC 0.12000 133 15.960 133 15.96000

12.06 TLM Grant CRC/UERC 0.03000

12.07Maintenance Grant

CRC/UERC 0.02000

Sub Total 266 29.260 266 29.26000

13Computer Aided Education in upper

primary schools under Innovation

13.01Computer Aided Education in upper primary

schoolsDistrict 0.01200 48 0.576 48 0.57600

Sub Total 48 0.576 48 0.5760014 Libraries in Schools14.01 (a) Primary School (per school) School 0.03000

14.02 (b) Upper Primary School (per school) School 0.10000

Sub TotalIV ANNUAL GRANTS15 Teachers' Grant15.01 Primary Teachers Teacher 0.0050015.02 Upper Primary Teachers Teacher 0.00500 807 4.035 807 4.03500

Sub Total 807 4.035 807 4.0350016 School Grant16.01 Primary School School 0.05000 1905 95.250 1905 95.2500016.02 Upper Primary School School 0.07000 797 55.790 797 55.79000

Sub Total 2702 151.040 2702 151.04000

Arti:SSA-AWPB-2014-15-PABMinits:Fatehpur:16-06-2014 340 / 533

Page 341: U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 · 2015. 1. 6. · U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15

Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

Name of District : Fatehpur -28

ActivityS. No.Physical

UnitRemarks

Outlay Recommendation for 2014-15

Spill OverDeferred laibility of

2014-15Fresh Recommended Total Recommended

17Research, Evaluation, Monitoring &

Supervision

17.01 REMS Activities School 0.00103 2702 2.779 2702 2.77931

17.02 Monitoring & Supervision School 0.00078 2702 2.119 2702 2.11855

17.03 House Hold Survey (Urban) in Million Plus Cities District 35.00000

Sub Total 5404 4.898 5404 4.8978618 Maintenance Grant

18.01 Maintenance in School having upto3 Classrooms School 0.07500 148 11.100 148 11.10000

18.01a Maintenance Grant School 0.07500 2153 161.475 2153 161.47500Sub Total 2301 172.575 2301 172.57500

VBRIDGING GENDER AND SOCIAL

CATEGORY GAPS

19 Interventions for CWSN (IE)

19.01 Provision for Inclusive Education Child 0.01800 5630 101.340 5630 101.34000

Sub Total 5630 101.340 5630 101.34000

20Innovativation Head up to Rs.50 Lakh per

district

20.01 Girls Education District 0.70000 10 7.000 10 7.00000

20.02 ECCE District20.03 Intervention for SC / ST children District

20.04 Intervention for Minority Community children District

20.05 Intervention for Urban Deprived children District 10.00000

Sub Total 10 7.000 10 7.0000021 SMC/PRI Training

21.01Residential for 6 Resource Person per Block (3

days) (@ Rs.500/-)Blocks 0.09000

21.02Non-residential (3 days training of 6 SMC

members) (@ Rs.100/-)SMC 0.01800 2659 47.862 2659 47.86200

21.02(a)Non-residential (3 days training of 3 Members of

PRI/VECs/LA) (@ Rs.100/-)VEC/ WEC 0.00900

21.03

Seminar/Orientation of SMC Women members

and President/Vice President (@ Rs. 50,000/-

per block)

Blocks 0.50000

Sub Total 2659 47.862 2659 47.86200VI SCHOOL INFRASTRUCTURE22 Civil Works22.01 Primary School (Plain) (New) School 13.1550022.02 Primary School (Hilly/Rocky) (New) School 13.2750022.03 Upper Primary (Plain) (New) School 20.65500

22.04 Upper Primary School (Hilly/Rocky) (New) School 20.77500

22.04aComposite Schools for Urban Areas (Class I-

VIII)School 41.04000

22.05 ACR in lieu of upgraded Upper Primary School Rooms

22.06 Additional class rooms for adding Class VIII Rooms

22.07 Building Less (Pry) School 9.7500022.08 Building Less (UP) School 18.5900022.09 Dilapidated Building (Pry) School 9.7500022.10 Dilapidated Building (UP) School 18.59000

22.11 Additional Class Room (Rural) ( PS+UPS) Rooms 3.45000 46 158.700 46 158.70000

22.12 Additional Class Room (Urban) Rooms 3.45000 4 13.800 4 13.8000022.13 Additional Class Room (Hill Area)22.14 Toilet/Urinals (PS & UPS) School 0.7000022.15 Separate Girls Toilet (Rural+Urban) School 0.7000022.16 CWSN friendly Toilets School 0.50000

22.17 Drinking Water Facility (for Urban Area Only)) School 0.15000

22.17a Drinking Water Facility (Plain PS & UPS) School 0.15000

22.17b Drinking Water Facility (Hilly/Rocky PS & UPS) School 0.15000

22.18a Boundary Wall PS (Total in Meters x .01105) 0.01749

22.18bBoundary Wall PS (For Gate) @Rs. 7000 x no. of

P.S.School 0.07800

22.18c Boundary Wall UPS (Total in Meters x .01105) 0.01749

22.18dBoundary Wall UPS (For Gate) @Rs. 7000 x no.

of UPSSchool 0.07800

22.19a Electrification in P.S./ Electrical Equipment School 0.11000

22.19b Electrification in U. P.S./ Electrical Equipment School 0.11000

22.20Office-cum-store-cum-Head Teacher's room

(Primary)Rooms

22.21Office-cum-store-cum-Head Teacher's room

(Upper Primary)Rooms

22.22Augumentation of training facility in BRC (one

time)BRC/ URC 5.00000

22.23 Child friendly Elements School 0.25000

22.24 Ramps with Handrails (Barrier Free Elements) School 0.06000 267 16.020 267 16.02000

22.25 Handrails in existing Ramps School 0.01000

Arti:SSA-AWPB-2014-15-PABMinits:Fatehpur:16-06-2014 341 / 533

Page 342: U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 · 2015. 1. 6. · U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15

Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

Name of District : Fatehpur -28

ActivityS. No.Physical

UnitRemarks

Outlay Recommendation for 2014-15

Spill OverDeferred laibility of

2014-15Fresh Recommended Total Recommended

22.26 Whole School Develoipment School22.27 Retro-fitting and repairs School

22.28Residential Schools for specific category

of children

(a) Construction of Building including boundary

wall, Water and sanitation facilities, electric

installation (For 100 children)

Building 65.86000

(b) Construction of residential hostel Building 65.86000

(c) Refurnishing unused old buildings Building

22.29

Construction of Hostel in existing Govt UPS

including boundary wall, Water and sanitation

facilities, electric installation etc. (For 50

children)

7.00000

22.30Furniture for Govt. UPS (per child) (@ Rs.500/-

per child enrolled)Child 0.00500

22.31 Major Repairs for Primary School School 0.30000

22.32 Majr Repairs for Upper Primary School School 0.30000

22.33Others (Difference of Civil Wrks

sanctioned in pre.yr.)22.33a Others (Overhead Tank PS) School 0.1200022.33b Others (Overhead Tank UPS) School 0.12000

Sub Total (Civil WOrks) 317 188.520 317 188.52VII PROJECT MANAGEMENT COST23 Management23.01 Management up to 3.5%

(a) Project Management and MIS

(i) DPO ( Salary, Contigency, Consumables,

POL, TA & Computer etc)District 1 127.548 1 127.54790

(ii) EMIS Cell District 1 18.271 1 18.27050Sub Total (a) 1 1 1 145.818 1 145.818

(b) Training of Educational Administrators District

(c) School Mapping and Social Mapping District

Sub Total (23.01)

23.02Learning Enhancement Prog. (LEP) (P & UP) (up

to 2%)District 18.961 18.96145

23.03 Community Mobilization (up to 0.5%) District 1 60.000 1 60.00000

Sub Total (Management) 1 78.961 1 78.96145Total Management Cost 224.780 224.77985Total of SSA (Districs) 9.400 441408 12712.785 441408 12722.185

24 State Component23.01 Management23.02 REMS 0.0044923.03 SIEMAT

Sub Total

STATE SSA TOTAL 9.40000 441408 12712.785 441408 12722.18491

25

KGBV Financial Provision (give

separate costing sheets for different

Models)

Hostel

ANon Recurring One Time Grant (Only

committed liabilities) (Model-I)

25.01 Construction of Building (New)

25.02 Construction of Building KGBV sanctioned earlier

25.02(a) Additional Class Room Rooms 3.45000

25.02(b) Guard Room Rooms 1.32000

25.02(c) Boundary Wall School 5.0200025.03 Boudary Wall (Spillover only)

25.04

Boring/Handpump (Spillover only)

(minimum rates prescribed by State Drinking

Water Department subject to a ceiling of Rs.

1.00 lakhs)

25.05 Electricity /Water charges (Spillover only)

25.05(a) Solar Water Heater & Solar Light 2.97000

25.06Furniture/Equipment (including Kitchen

equipment)3.00000

25.07 TLM and equipment including library books 3.50000

25.08 Bedding (New) 0.75000

25.09 Replacement of Bedding (once in 3 Year) 1 0.75000 7 5.250 8 5.25000

Subtotal Non Recurring 5.250 5.25000

B Recurring Cost Per Annum (Model-I)

25.10Maintenance per girl student per month @ Rs.

1500/-18.00000 10 180.000 10 180.00000

25.11 Stipend for girl student per month @ Rs. 100/- 1.20000 10 12.000 10 12.00000

25.12Supplementary TLM, stationery and other

educational material @ Rs.1000/- per annum1.00000 10 10.000 10 10.00000

25.13 Salaries

Arti:SSA-AWPB-2014-15-PABMinits:Fatehpur:16-06-2014 342 / 533

Page 343: U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 · 2015. 1. 6. · U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15

Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

Name of District : Fatehpur -28

ActivityS. No.Physical

UnitRemarks

Outlay Recommendation for 2014-15

Spill OverDeferred laibility of

2014-15Fresh Recommended Total Recommended

25.13.1 Additional Salaries:

(a) 1 Warden @ Rs. 25,000/- per month 3.00000 10 30.00000 10 30.00000

(b)4 Full time teachers as per RTE norms @ Rs.

20,000/- per month per teacher 9.60000 10 96.00000 10 96.00000

(c)

1 Urdu Teachers (only for blocks with muslim

population above 20% and select urban areas), if

required @ Rs. 12,000/- per month per teacher 1.44000 10 14.40000 10 14.40000

(d)3 part time teachers @ Rs. 5,000/- per month per

teacher 1.80000 10 18.00000 10 18.00000

(e)1 Full time Accountant @ Rs. 10,000/- per month

1.20000 10 12.00000 10 12.00000

(f)

2 Support Staff – (Accountant/ Assistant, Peon,

Chowkidar) @ Rs. 5,000/- per month per staff 1.20000 10 12.00000 10 12.00000

(g) 1 Head cook @ Rs. 6,000/- per month 0.72000 10 7.20000 10 7.20000

(h)2 Asstt. Cooks @ Rs. 4,500/- per month per cook

1.08000 10 10.80000 10 10.80000

25.14Specific skill training @ Rs.1000/- per child per

annum1.00000 10 10.000 10 10.00000

25.15Electricity/water charges @ Rs.1000/- per child

per annum1.00000 10 10.000 10 10.00000

25.16Medical care/contingencies @ Rs. 1250 per child

per annum1.25000 10 12.500 10 12.50000

25.17 Maintenance @ Rs.750/- per child per annum 0.75000 10 7.500 10 7.50000

25.18

Miscellaneous (Educational Tour/ Exposure Visit

/ Sports Material etc.) @ Rs.750/- per child per

annum

0.75000 10 7.500 10 7.50000

25.19Preparatory camps @ Rs.200/- per child per

annum0.20000 10 2.000 10 2.00000

25.20PTAs/school functions @ Rs.200/- per child per

annum0.20000 10 2.000 10 2.00000

25.21 Provision of Rent @ Rs.6000/- per annum 6.00000

25.21a Provision of Rent (6 months) 3.6000025.21b Provision of Rent (3 months) 1.8000025.21c Rent (Previous Year (2007-2012)

25.22 Capacity building 0.50000 10 5.000 10 5.00000

25.22(a)Physical/ Self Defence Training @ Rs.200/- per

child per annum0.20000 10 2.000 10 2.00000

Subtotal Recurring 10 460.900 10 460.90000

Subtotal (Model-I) 10 466.150 10 466.15000

CNon Recurring One Time Grant (Only

committed liabilities) (Model-II)

25.23 Construction of Building (New)

25.24 Construction of Building KGBV sanctioned earlier

25.24(a) Additional Class Room Rooms 3.45000

25.24(b) Guard Room Rooms 1.32000

25.24(c) Boundary Wall School 5.0200025.25 Boudary Wall (Spillover only)25.26 Boring/Handpump (Spillover only)

25.27 Electricity /Water charges (Spillover only)

25.27(a) Solar Water Heater & Solar Light 2.97000

25.28Furniture/Equipment (including Kitchen

equipment)2.00000

25.29 TLM and equipment including library books 3.00000

25.30 Bedding (New) 0.37500

25.31 Replacement of Bedding (once in 3 Year) 0.37500

Subtotal Non Recurring

D Recurring Cost Per Annum (Model-II)

25.32Maintenance per girl student per month @ Rs.

1500/-9.00000

25.33 Stipend for girl student per month @ Rs. 100/- 0.60000

25.34Supplementary TLM, stationery and other

educational material @ Rs.1000/- per annum0.50000

25.35 Salaries(a) 1 Warden @ Rs. 25,000/- per month 3.00000

(b)3 Full time teachers as per RTE norms @ Rs.

20,000/- per month per teacher 7.20000

(c) 3 part time teachers @ Rs. 5,000/- per month per

teacher 1.80000

(d)1 Full time Accountant @ Rs. 10,000/- per month

1.20000

(e)

2 Support Staff – (Accountant/ Assistant, Peon,

Chowkidar) @ Rs. 5,000/- per month per staff 1.20000

Arti:SSA-AWPB-2014-15-PABMinits:Fatehpur:16-06-2014 343 / 533

Page 344: U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 · 2015. 1. 6. · U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15

Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

Name of District : Fatehpur -28

ActivityS. No.Physical

UnitRemarks

Outlay Recommendation for 2014-15

Spill OverDeferred laibility of

2014-15Fresh Recommended Total Recommended

(f) 1 Head cook @ Rs. 6,000/- per month 0.72000

(g)1 Asstt. Cooks @ Rs. 4,500/- per month per cook

0.54000

25.36Specific skill training @ Rs.1000/- per child per

annum0.50000

25.37Electricity/water charges @ Rs.1000/- per child

per annum0.50000

25.38Medical care/contingencies @ Rs. 1250 per child

per annum0.62500

25.39 Maintenance @ Rs.750/- per child per annum 0.37500

25.40

Miscellaneous (Educational Tour/ Exposure Visit

/ Sports Material etc.) @ Rs.750/- per child per

annum

0.37500

25.41Preparatory camps @ Rs.300/- per child per

annum0.15000

25.42PTAs/school functions @ Rs.300/- per child per

annum0.15000

25.43 Provision of Rent @ Rs.10000/- per annum 5.00000

25.43a Provision of Rent (6 months) 3.6000025.43b Provision of Rent (3 months) 1.8000025.43c Rent (Previous Year (2007-2012)25.44 Capacity building 0.25000

25.44(a)Physical/ Self Defence Training @ Rs.200/- per

child per annum0.10000

Subtotal Recurring

Subtotal (Model-II) Total (KGBV) 10 466.150 10 466.150

DISTRICT GRAND TOTAL (SSA+KGBV) 9.400 441418 13178.935 441418 13188.335

Arti:SSA-AWPB-2014-15-PABMinits:Fatehpur:16-06-2014 344 / 533

Page 345: U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 · 2015. 1. 6. · U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15

Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

I ACCESS

1 Opening of New Schools

1.01 Upgradation of EGS to PSCentres /

School1.02 New PS School

1.03 Upgradation of PS to UPS / New UPS School

1.04 Composite Schools (for Urban Areas) School

1.05Residential Schools for specific category children

(For 100 children)

1.06Residential Hostel (for specific category of

children) (For 50 children)

1.07 Integration of Class V with Primary Schools

1.08Integration of Class VIII with Upper Primary

Schools

2Residential Schools for specific category

of children (For 100 Children)

Total - Residential Schools (For 100

children)

3Residential Hostel for specific category of

children (For 50 Children)

Total - Residential Schools (For 50

children)4 Transport/Escort Facility

4.01

Children in remote habitations with sparse

populations where opening of schools is

unviable

Child 0.03000

4.02

Urban deprived children/children without adult

protection in urban areas where schools are not

opened because availability of land is a problem

Child 0.03000

Sub Total

5Special Training for mainstreaming of Out-

of-School Children

5.03 Non-Residential (Fresh)(a) 12 months Child 0.06000(b) 9 months 0.04500(c) 6 months

(i)Special Training (by Special Instructors-NRBC)-

(1-5) Child 0.03000 191 5.730 191 5.73000

(ii) Special Training (by Special Instructors-NRBC)-

(6-8) Child 0.03000 140 4.200 140 4.20000

(d) 3 months Child 0.01500Sub Total 331 9.930 331 9.93000

Total (Special Training) 331 9.930 331 9.9305(B) House Hold Survey (HHS)

5(B).01 House Hold Survey through SMCHouse

Hold0.00001

Sub TotalII RETENTION6 Free Text Book

6.01Free Text Book (PS) for Parishadiya & Aided

Primary Schools (Workbooks not included)Child 0.00120 92838 111.406 92838 111.40560

6.01a

Free Text Book (PS) for 25% children of Class-1

in Private Recognised Primary Schools of other

Boards (Workbooks not included)

Child 0.00150

6.02 Free Brail Books (PS) 0.00150 51 0.077 51 0.07650

6.03 Free Large Print Books (PS) 0.00150

6.04Free Text Book (UPS) (Workbooks not included)

(Including KGBV Girls)Child 0.00200 43257 86.514 43257 86.51400

6.05 Free Brail Books (UPS) 0.00250 24 0.060 24 0.06000

6.06 Free Large Print Books (PS) 0.00250Sub Total 136170 198.056 136170 198.056

7 Provision of 2 set of Uniforms

7.01 All Girls (Including KGBV Girls) Child 0.00400 110897 443.588 110897 443.58800

7.02 SC Boys Child 0.00400 25198 100.792 25198 100.79200

7.03 ST Boys Child 0.00400

7.04 BPL Boys Child 0.00400 52075 208.300 52075 208.30000

7.05

Free Uniform for 25% children of Class-1 in

Private Recognised Primary Schools of other

Boards

Child0.00400

Sub Total 188170 752.680 188170 752.6807(A) Fee Reimbursement

7(A).01

Fee Reimbursement for Admission of children of

Disadvantaged Group & Weaker Section upto

25% of seats in Class-1 of Private Unaided

Recognised Schools

Child 0.05400

Sub Total

8 Teaching Learning Equipment (TLE)

8.01 TLE - New Primary School 0.40000 0.20000 0.400008.02 TLE - New Upper Primary School 3.50000 0.50000 3.50000

Name of District : Farrukhabad -27

ActivityS. No.Physical

UnitRemarks

Outlay Recommendation for 2014-15

Spill OverDeferred laibility of

2014-15Fresh Recommended Total Recommended

Arti:SSA-AWPB-2014-15-PABMinits:Farrukhabad:16-06-2014 345 / 533

Page 346: U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 · 2015. 1. 6. · U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15

Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

Name of District : Farrukhabad -27

ActivityS. No.Physical

UnitRemarks

Outlay Recommendation for 2014-15

Spill OverDeferred laibility of

2014-15Fresh Recommended Total Recommended

Sub Total 3.90000 3.90000III ENHANCING QUALITY9 New Teachers Salary

9.01 Primary Teachers (Regular) (Asstt. Teacher) Teacher 0.91500

9.01aHead Teacher for Primary (if the number of

children exceeds 150 in a school)Teacher

9.02 Primary Teachers (Contract) (S.M.) Teacher

9.03Subject specific Upper Primary Teachers

(Regular) (a) Science and Mathematics Teacher 1.26000(b) Social Studies Teacher 1.26000(c) Languages Teacher 1.26000

Sub Total (9.01 to 9.05)Add.Teacher against PTR

Sub Total (9.06 to 9.12)

Total (New Teacher's Salary-9.01 to 9.12)

Teachers Salary (Recurring-sanctioned

earlier)Primary teachers

9.13 Primary Teachers ( Regular)-Existing, in position Teacher 3.66000 120 439.200 120 439.20000

9.14Primary Teachers (Contract)-Existing, in

positionTeacher 0.55000

9.14(a) Primary Teachers (Contract)-under Training Teacher 0.38500 1235 475.475 1235 475.47500

9.14(b)Primary Teacher (Para Teachers Equal to

9.14(a) upgraded as Teachers)0.38500 565 217.525 565 217.52500

9.14(c) Primary Teachers (Para)- Vacant Teacher9.15 Primary Teachers (Vacant) Teacher 0.30500

9.16Head Teacher for Primary (if the number of

children exceeds 150)Teacher 5.04000 234 1179.360 234 1179.36000

9.16(b)Head Teacher for Primary (if the number of

children exceeds 150) VacantTeacher 0.42000

Additional teachers

9.17Additional Teachers - PS (Special BTC-

Regular) in positionTeacher 0.30500

9.18Additional Teachers - PS (Special BTC Under

Training)Teacher 0.87600

9.19 Additional Teachers - PS (Vacant) Teacher

9.20Others in position (Para Teachers upgraded

as Teachers)Teacher

Upper Primary teachers

9.21 UP Teachers (Regular)-Existing Teacher 5.04000 737 3714.480 737 3714.48000

9.22 UP Teachers (Contract)-Existing9.23 UP Teachers (Vacant) Teacher 1.26000

9.24Head Teacher for Upper Primary (if the number

of children exceeds 100)-ExistingTeacher 5.34000 259 1383.060 259 1383.06000

9.24a Head Teacher for Upper Primary (Vacant) Teacher 1.33500

9.25Subject specific Upper Primary Teachers

(Regular)(a) Science and Mathematics(b) Social Studies(c) Languages

9.32 Part Time Instructors in position(a) Art Education 0.77000 111 85.470 111 85.47000(b) Health and Physical Education 0.77000 115 88.550 115 88.55000(c) Work Education 0.77000 93 71.610 93 71.61000

9.32(A) Part Time Instructors Vacant(a) Art Education 0.42000(b) Health and Physical Education 0.42000(c) Work Education 0.42000

9.33

Others-Incentive to Teachers in Schools

Located in Naxal Affected Areas (@

Rs.1500/- per teachers per month)

Sub Total (9.13 to 9.33) 3469 7654.730 3469 7654.73TOTAL

(New Teachers Salary +Teachers Salary

Recurring)

3469 7654.730 3469 7654.73000

10 Teachers Training(a) Teachers

10.01

Refresher In-service Teachers' Training at BRC

level and above - 10 days (@ Rs.200/- per

head per day)

Teacher

(Target &

Ach.-13-14

in

Mandays)

0.00600

10.01(a)Continuous and Comprehensive Evauation [PS +

UPS)Teacher 0.01300 1205 15.665 1205 15.66500

10.01(b) Eary Reading and Numeracy Skills [PS] Teacher 0.00500 1205 6.025 1205 6.02500

10.01(c) Science [UPS] Teacher 0.00800 689 5.512 689 5.51200Recommended as

proposed

10.01(d) CWSN Teacher 0.00400

Arti:SSA-AWPB-2014-15-PABMinits:Farrukhabad:16-06-2014 346 / 533

Page 347: U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 · 2015. 1. 6. · U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15

Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

Name of District : Farrukhabad -27

ActivityS. No.Physical

UnitRemarks

Outlay Recommendation for 2014-15

Spill OverDeferred laibility of

2014-15Fresh Recommended Total Recommended

10.02

One day monthly cluster level meetings and

peer group training sessions for 10 months for

all teachers each year at CRC level - 10 days (@

Rs.100/- per head per day)

Teacher 0.01000

10.03(a)

Induction Training for Newly Recruited Teachers

for 6 Months (Special BTC)- @Rs.2000/- per

head per year

Teacher 0.02000

10.03(b)5 Days Training for Part Time Instructors @ Rs.

200/- per head per day) Teacher 0.01000

10.04

Training of untrained Teachers to acquire

professional qualifications over a two year

period.

Teacher 0.04700 895 42.065 895 42.06500

(b) Head Teachers

10.05Refresher Residencial In-service for 10 days at

BRC level and above

Head

Teacher(c) Resource Persons

10.06

Refresher Training for all Resource

Persons,Master Trainers, BRC & CRC faculty

and Coordinators for 5 days each year (@

Rs.200/- per head per day)

Resource

Person 0.00300 96 0.288 96 0.28800

Sub Total 4090 69.555 4090 69.555

11Academic Support through Block Resource

Centre (BRC)/ URC

11.01 Salary of Faculty and Staff

(a) 5 RPs at BRC for subject specific training in

positionRP 40 40

(b) 2 RPs for CWSN in position RP(b-i) 1 CWSN Resource Person RP 1.10000 16 17.600 16 17.60000

(b-ii) 1 Physiotherapist (Resource person for IE) RP

(c) 1 MIS Coordinator in position RP 1.86000

(d) 1 Datra Entry Operator in position RP 1.74000 8 13.920 8 13.92000

(e) 1 Accountant-cum-support staff in position RP 1.80000 8 14.400 8 14.40000

11.02 Furniture Grant BRC/ URC 1.00000

11.03Replacement of furniture, computer, TLE etc (

Once in 5 years)BRC/ URC 1.00000

11.04 Contingency Grant BRC/ URC 0.50000 8 4.000 8 4.00000

11.05 Meeting, TA BRC/ URC 0.30000 8 2.400 8 2.40000

11.06 TLM Grant BRC/ URC 0.10000

11.07 Maintenance Grant BRC/ URC 0.10000

Sub Total 8 52.320 8 52.32000

12Academic Support through Cluster

Resource Centres (CRC/UERC)

12.01Salary of Cluster Coordinator (on an average of

one Resource Person per 18 schools in a block)RP

12.02 Furniture GrantCRC/

UERC0.10000

12.03Replacement of furniture, computer, TLE etc.

once in 5 years

CRC/

UERC0.10000

12.04 Contingency Grant CRC/UERC 0.10000 88 8.800 88 8.80000

12.05 Meeting, TA CRC/UERC 0.12000 88 10.560 88 10.56000

12.06 TLM Grant CRC/UERC 0.03000

12.07Maintenance Grant

CRC/UERC 0.02000

Sub Total 176 19.360 176 19.36000

13Computer Aided Education in upper

primary schools under Innovation

13.01Computer Aided Education in upper primary

schoolsDistrict 0.01200 48 0.576 48 0.57600

Sub Total 48 0.576 48 0.5760014 Libraries in Schools14.01 (a) Primary School (per school) School 0.03000

14.02 (b) Upper Primary School (per school) School 0.10000

Sub TotalIV ANNUAL GRANTS15 Teachers' Grant15.01 Primary Teachers Teacher 0.0050015.02 Upper Primary Teachers Teacher 0.00500 689 3.445 689 3.44500

Sub Total 689 3.445 689 3.4450016 School Grant16.01 Primary School School 0.05000 1304 65.200 1304 65.2000016.02 Upper Primary School School 0.07000 690 48.300 690 48.30000

Sub Total 1994 113.500 1994 113.50000

Arti:SSA-AWPB-2014-15-PABMinits:Farrukhabad:16-06-2014 347 / 533

Page 348: U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 · 2015. 1. 6. · U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15

Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

Name of District : Farrukhabad -27

ActivityS. No.Physical

UnitRemarks

Outlay Recommendation for 2014-15

Spill OverDeferred laibility of

2014-15Fresh Recommended Total Recommended

17Research, Evaluation, Monitoring &

Supervision

17.01 REMS Activities School 0.00103 1994 2.051 1994 2.05105

17.02 Monitoring & Supervision School 0.00078 1994 1.563 1994 1.56343

17.03 House Hold Survey (Urban) in Million Plus Cities District 35.00000

Sub Total 3988 3.614 3988 3.6144818 Maintenance Grant

18.01 Maintenance in School having upto3 Classrooms School 0.07500 356 26.700 356 26.70000

18.01a Maintenance Grant School 0.07500 1500 112.500 1500 112.50000Sub Total 1856 139.200 1856 139.20000

VBRIDGING GENDER AND SOCIAL

CATEGORY GAPS

19 Interventions for CWSN (IE)

19.01 Provision for Inclusive Education Child 0.01300 5070 65.910 5070 65.91000

Sub Total 5070 65.910 5070 65.91000

20Innovativation Head up to Rs.50 Lakh per

district

20.01 Girls Education District 0.70000 8 5.600 8 5.60000

20.02 ECCE District20.03 Intervention for SC / ST children District

20.04 Intervention for Minority Community children District

20.05 Intervention for Urban Deprived children District 10.00000

Sub Total 8 5.600 8 5.6000021 SMC/PRI Training

21.01Residential for 6 Resource Person per Block (3

days) (@ Rs.500/-)Blocks 0.09000

21.02Non-residential (3 days training of 6 SMC

members) (@ Rs.100/-)SMC 0.01800 1860 33.480 1860 33.48000

21.02(a)Non-residential (3 days training of 3 Members of

PRI/VECs/LA) (@ Rs.100/-)VEC/ WEC 0.00900

21.03

Seminar/Orientation of SMC Women members

and President/Vice President (@ Rs. 50,000/-

per block)

Blocks 0.50000

Sub Total 1860 33.480 1860 33.48000VI SCHOOL INFRASTRUCTURE22 Civil Works22.01 Primary School (Plain) (New) School 13.1550022.02 Primary School (Hilly/Rocky) (New) School 13.2750022.03 Upper Primary (Plain) (New) School 20.65500

22.04 Upper Primary School (Hilly/Rocky) (New) School 20.77500

22.04aComposite Schools for Urban Areas (Class I-

VIII)School 41.04000

22.05 ACR in lieu of upgraded Upper Primary School Rooms

22.06 Additional class rooms for adding Class VIII Rooms

22.07 Building Less (Pry) School 9.7500022.08 Building Less (UP) School 18.5900022.09 Dilapidated Building (Pry) School 9.7500022.10 Dilapidated Building (UP) School 18.59000

22.11 Additional Class Room (Rural) ( PS+UPS) Rooms 52.26000 3.45000 52.26000

22.12 Additional Class Room (Urban) Rooms 3.4500022.13 Additional Class Room (Hill Area)22.14 Toilet/Urinals (PS & UPS) School 0.70000 24 16.800 24 16.8000022.15 Separate Girls Toilet (Rural+Urban) School 0.7000022.16 CWSN friendly Toilets School 0.50000

22.17 Drinking Water Facility (for Urban Area Only)) School 0.15000

22.17a Drinking Water Facility (Plain PS & UPS) School 0.15000 16 2.400 16 2.40000

22.17b Drinking Water Facility (Hilly/Rocky PS & UPS) School 0.15000

22.18a Boundary Wall PS (Total in Meters x .01105) 0.01749

22.18bBoundary Wall PS (For Gate) @Rs. 7000 x no. of

P.S.School 0.07800

22.18c Boundary Wall UPS (Total in Meters x .01105) 0.01749

22.18dBoundary Wall UPS (For Gate) @Rs. 7000 x no.

of UPSSchool 0.07800

22.19a Electrification in P.S./ Electrical Equipment School 0.11000

22.19b Electrification in U. P.S./ Electrical Equipment School 0.11000

22.20Office-cum-store-cum-Head Teacher's room

(Primary)Rooms

22.21Office-cum-store-cum-Head Teacher's room

(Upper Primary)Rooms

22.22Augumentation of training facility in BRC (one

time)BRC/ URC 5.00000

22.23 Child friendly Elements School 0.25000

22.24 Ramps with Handrails (Barrier Free Elements) School 0.06000

22.25 Handrails in existing Ramps School 0.01000

Arti:SSA-AWPB-2014-15-PABMinits:Farrukhabad:16-06-2014 348 / 533

Page 349: U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 · 2015. 1. 6. · U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15

Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

Name of District : Farrukhabad -27

ActivityS. No.Physical

UnitRemarks

Outlay Recommendation for 2014-15

Spill OverDeferred laibility of

2014-15Fresh Recommended Total Recommended

22.26 Whole School Develoipment School22.27 Retro-fitting and repairs School

22.28Residential Schools for specific category

of children

(a) Construction of Building including boundary

wall, Water and sanitation facilities, electric

installation (For 100 children)

Building 65.86000

(b) Construction of residential hostel Building 65.86000

(c) Refurnishing unused old buildings Building

22.29

Construction of Hostel in existing Govt UPS

including boundary wall, Water and sanitation

facilities, electric installation etc. (For 50

children)

7.00000

22.30Furniture for Govt. UPS (per child) (@ Rs.500/-

per child enrolled)Child 0.00500

22.31 Major Repairs for Primary School School 0.30000

22.32 Majr Repairs for Upper Primary School School 0.30000

22.33Others (Difference of Civil Wrks

sanctioned in pre.yr.)22.33a Others (Overhead Tank PS) School 0.1200022.33b Others (Overhead Tank UPS) School 0.12000

Sub Total (Civil WOrks) 52.26 40 19.200 40 71.46VII PROJECT MANAGEMENT COST23 Management23.01 Management up to 3.5%

(a) Project Management and MIS

(i) DPO ( Salary, Contigency, Consumables,

POL, TA & Computer etc)District 1 101.947 1 101.94710

(ii) EMIS Cell District 1 12.444 1 12.44400Sub Total (a) 1 1 1 114.391 1 114.391

(b) Training of Educational Administrators District

(c) School Mapping and Social Mapping District

Sub Total (23.01)

23.02Learning Enhancement Prog. (LEP) (P & UP) (up

to 2%)District 13.325 13.32475

23.03 Community Mobilization (up to 0.5%) District 1 45.850 1 45.85000

Sub Total (Management) 1 59.175 1 59.17475Total Management Cost 173.566 173.56585Total of SSA (Districs) 52.260 3.900 347967 9314.722 347967 9370.882

24 State Component23.01 Management23.02 REMS 0.0044923.03 SIEMAT

Sub Total

STATE SSA TOTAL 52.26000 3.90000 347967 9314.722 347967 9370.88243

25

KGBV Financial Provision (give

separate costing sheets for different

Models)

Hostel

ANon Recurring One Time Grant (Only

committed liabilities) (Model-I)

25.01 Construction of Building (New)

25.02 Construction of Building KGBV sanctioned earlier

25.02(a) Additional Class Room Rooms 3.45000

25.02(b) Guard Room Rooms 1.32000

25.02(c) Boundary Wall School 5.0200025.03 Boudary Wall (Spillover only) 1.50000 1.50000

25.04

Boring/Handpump (Spillover only)

(minimum rates prescribed by State Drinking

Water Department subject to a ceiling of Rs.

1.00 lakhs)

25.05 Electricity /Water charges (Spillover only)

25.05(a) Solar Water Heater & Solar Light 2.97000

25.06Furniture/Equipment (including Kitchen

equipment)3.00000

25.07 TLM and equipment including library books 3.50000

25.08 Bedding (New) 0.75000

25.09 Replacement of Bedding (once in 3 Year) 0.75000 2 1.500 2 1.50000

Subtotal Non Recurring 1.50000 1.500 3.00000

B Recurring Cost Per Annum (Model-I)

25.10Maintenance per girl student per month @ Rs.

1500/-18.00000 5 90.000 5 90.00000

25.11 Stipend for girl student per month @ Rs. 100/- 1.20000 5 6.000 5 6.00000

25.12Supplementary TLM, stationery and other

educational material @ Rs.1000/- per annum1.00000 5 5.000 5 5.00000

25.13 Salaries

Arti:SSA-AWPB-2014-15-PABMinits:Farrukhabad:16-06-2014 349 / 533

Page 350: U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 · 2015. 1. 6. · U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15

Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

Name of District : Farrukhabad -27

ActivityS. No.Physical

UnitRemarks

Outlay Recommendation for 2014-15

Spill OverDeferred laibility of

2014-15Fresh Recommended Total Recommended

25.13.1 Additional Salaries:

(a) 1 Warden @ Rs. 25,000/- per month 3.00000 5 15.00000 5 15.00000

(b)4 Full time teachers as per RTE norms @ Rs.

20,000/- per month per teacher 9.60000 5 48.00000 5 48.00000

(c)

1 Urdu Teachers (only for blocks with muslim

population above 20% and select urban areas), if

required @ Rs. 12,000/- per month per teacher 1.44000 5 7.20000 5 7.20000

(d)3 part time teachers @ Rs. 5,000/- per month per

teacher 1.80000 5 9.00000 5 9.00000

(e)1 Full time Accountant @ Rs. 10,000/- per month

1.20000 5 6.00000 5 6.00000

(f)

2 Support Staff – (Accountant/ Assistant, Peon,

Chowkidar) @ Rs. 5,000/- per month per staff 1.20000 5 6.00000 5 6.00000

(g) 1 Head cook @ Rs. 6,000/- per month 0.72000 5 3.60000 5 3.60000

(h)2 Asstt. Cooks @ Rs. 4,500/- per month per cook

1.08000 5 5.40000 5 5.40000

25.14Specific skill training @ Rs.1000/- per child per

annum1.00000 5 5.000 5 5.00000

25.15Electricity/water charges @ Rs.1000/- per child

per annum1.00000 5 5.000 5 5.00000

25.16Medical care/contingencies @ Rs. 1250 per child

per annum1.25000 5 6.250 5 6.25000

25.17 Maintenance @ Rs.750/- per child per annum 0.75000 5 3.750 5 3.75000

25.18

Miscellaneous (Educational Tour/ Exposure Visit

/ Sports Material etc.) @ Rs.750/- per child per

annum

0.75000 5 3.750 5 3.75000

25.19Preparatory camps @ Rs.200/- per child per

annum0.20000 5 1.000 5 1.00000

25.20PTAs/school functions @ Rs.200/- per child per

annum0.20000 5 1.000 5 1.00000

25.21 Provision of Rent @ Rs.6000/- per annum 6.00000

25.21a Provision of Rent (6 months) 3.6000025.21b Provision of Rent (3 months) 1.8000025.21c Rent (Previous Year (2007-2012)

25.22 Capacity building 0.50000 5 2.500 5 2.50000

25.22(a)Physical/ Self Defence Training @ Rs.200/- per

child per annum0.20000 5 1.000 5 1.00000

Subtotal Recurring 5 230.450 5 230.45000

Subtotal (Model-I) 1.50000 5 231.950 5 233.45000

CNon Recurring One Time Grant (Only

committed liabilities) (Model-II)

25.23 Construction of Building (New)

25.24 Construction of Building KGBV sanctioned earlier

25.24(a) Additional Class Room Rooms 3.45000

25.24(b) Guard Room Rooms 1.32000

25.24(c) Boundary Wall School 5.0200025.25 Boudary Wall (Spillover only)25.26 Boring/Handpump (Spillover only)

25.27 Electricity /Water charges (Spillover only)

25.27(a) Solar Water Heater & Solar Light 2.97000

25.28Furniture/Equipment (including Kitchen

equipment)2.00000

25.29 TLM and equipment including library books 3.00000

25.30 Bedding (New) 0.37500

25.31 Replacement of Bedding (once in 3 Year) 0.37500

Subtotal Non Recurring

D Recurring Cost Per Annum (Model-II)

25.32Maintenance per girl student per month @ Rs.

1500/-9.00000

25.33 Stipend for girl student per month @ Rs. 100/- 0.60000

25.34Supplementary TLM, stationery and other

educational material @ Rs.1000/- per annum0.50000

25.35 Salaries(a) 1 Warden @ Rs. 25,000/- per month 3.00000

(b)3 Full time teachers as per RTE norms @ Rs.

20,000/- per month per teacher 7.20000

(c) 3 part time teachers @ Rs. 5,000/- per month per

teacher 1.80000

(d)1 Full time Accountant @ Rs. 10,000/- per month

1.20000

(e)

2 Support Staff – (Accountant/ Assistant, Peon,

Chowkidar) @ Rs. 5,000/- per month per staff 1.20000

Arti:SSA-AWPB-2014-15-PABMinits:Farrukhabad:16-06-2014 350 / 533

Page 351: U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 · 2015. 1. 6. · U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15

Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

Name of District : Farrukhabad -27

ActivityS. No.Physical

UnitRemarks

Outlay Recommendation for 2014-15

Spill OverDeferred laibility of

2014-15Fresh Recommended Total Recommended

(f) 1 Head cook @ Rs. 6,000/- per month 0.72000

(g)1 Asstt. Cooks @ Rs. 4,500/- per month per cook

0.54000

25.36Specific skill training @ Rs.1000/- per child per

annum0.50000

25.37Electricity/water charges @ Rs.1000/- per child

per annum0.50000

25.38Medical care/contingencies @ Rs. 1250 per child

per annum0.62500

25.39 Maintenance @ Rs.750/- per child per annum 0.37500

25.40

Miscellaneous (Educational Tour/ Exposure Visit

/ Sports Material etc.) @ Rs.750/- per child per

annum

0.37500

25.41Preparatory camps @ Rs.300/- per child per

annum0.15000

25.42PTAs/school functions @ Rs.300/- per child per

annum0.15000

25.43 Provision of Rent @ Rs.10000/- per annum 5.00000

25.43a Provision of Rent (6 months) 3.6000025.43b Provision of Rent (3 months) 1.8000025.43c Rent (Previous Year (2007-2012)25.44 Capacity building 0.25000

25.44(a)Physical/ Self Defence Training @ Rs.200/- per

child per annum0.10000

Subtotal Recurring

Subtotal (Model-II) Total (KGBV) 1.500 5 231.950 5 233.450

DISTRICT GRAND TOTAL (SSA+KGBV) 53.760 3.900 347972 9546.672 347972 9604.332

Arti:SSA-AWPB-2014-15-PABMinits:Farrukhabad:16-06-2014 351 / 533

Page 352: U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 · 2015. 1. 6. · U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15

Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

I ACCESS

1 Opening of New Schools

1.01 Upgradation of EGS to PSCentres /

School1.02 New PS School

1.03 Upgradation of PS to UPS / New UPS School

1.04 Composite Schools (for Urban Areas) School

1.05Residential Schools for specific category children

(For 100 children)

1.06Residential Hostel (for specific category of

children) (For 50 children)

1.07 Integration of Class V with Primary Schools

1.08Integration of Class VIII with Upper Primary

Schools

2Residential Schools for specific category

of children (For 100 Children)

Total - Residential Schools (For 100

children)

3Residential Hostel for specific category of

children (For 50 Children)

Total - Residential Schools (For 50

children)4 Transport/Escort Facility

4.01

Children in remote habitations with sparse

populations where opening of schools is

unviable

Child 0.03000

4.02

Urban deprived children/children without adult

protection in urban areas where schools are not

opened because availability of land is a problem

Child 0.03000

Sub Total

5Special Training for mainstreaming of Out-

of-School Children

5.03 Non-Residential (Fresh)(a) 12 months Child 0.06000(b) 9 months 0.04500(c) 6 months

(i)Special Training (by Special Instructors-NRBC)-

(1-5) Child 0.03000 147 4.410 147 4.41000

(ii) Special Training (by Special Instructors-NRBC)-

(6-8) Child 0.03000 139 4.170 139 4.17000

(d) 3 months Child 0.01500Sub Total 286 8.580 286 8.58000

Total (Special Training) 286 8.580 286 8.5805(B) House Hold Survey (HHS)

5(B).01 House Hold Survey through SMCHouse

Hold0.00001

Sub TotalII RETENTION6 Free Text Book

6.01Free Text Book (PS) for Parishadiya & Aided

Primary Schools (Workbooks not included)Child 0.00120 121813 146.176 121813 146.17560

6.01a

Free Text Book (PS) for 25% children of Class-1

in Private Recognised Primary Schools of other

Boards (Workbooks not included)

Child 0.00150

6.02 Free Brail Books (PS) 0.00150 82 0.123 82 0.12300

6.03 Free Large Print Books (PS) 0.00150

6.04Free Text Book (UPS) (Workbooks not included)

(Including KGBV Girls)Child 0.00200 57636 115.272 57636 115.27200

6.05 Free Brail Books (UPS) 0.00250 34 0.085 34 0.08500

6.06 Free Large Print Books (PS) 0.00250Sub Total 179565 261.656 179565 261.656

7 Provision of 2 set of Uniforms

7.01 All Girls (Including KGBV Girls) Child 0.00400 134356 537.424 134356 537.42400

7.02 SC Boys Child 0.00400 44710 178.840 44710 178.84000

7.03 ST Boys Child 0.00400

7.04 BPL Boys Child 0.00400 55616 222.464 55616 222.46400

7.05

Free Uniform for 25% children of Class-1 in

Private Recognised Primary Schools of other

Boards

Child0.00400

Sub Total 234682 938.728 234682 938.7287(A) Fee Reimbursement

7(A).01

Fee Reimbursement for Admission of children of

Disadvantaged Group & Weaker Section upto

25% of seats in Class-1 of Private Unaided

Recognised Schools

Child 0.05400

Sub Total

8 Teaching Learning Equipment (TLE)

8.01 TLE - New Primary School 15.80000 0.20000 15.800008.02 TLE - New Upper Primary School 2.00000 0.50000 2.00000

Name of District : Faizabad -26

ActivityS. No.Physical

UnitRemarks

Outlay Recommendation for 2014-15

Spill OverDeferred laibility of

2014-15Fresh Recommended Total Recommended

Arti:SSA-AWPB-2014-15-PABMinits:Faizabad:16-06-2014 352 / 533

Page 353: U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 · 2015. 1. 6. · U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15

Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

Name of District : Faizabad -26

ActivityS. No.Physical

UnitRemarks

Outlay Recommendation for 2014-15

Spill OverDeferred laibility of

2014-15Fresh Recommended Total Recommended

Sub Total 17.80000 17.80000III ENHANCING QUALITY9 New Teachers Salary

9.01 Primary Teachers (Regular) (Asstt. Teacher) Teacher 0.91500

9.01aHead Teacher for Primary (if the number of

children exceeds 150 in a school)Teacher

9.02 Primary Teachers (Contract) (S.M.) Teacher

9.03Subject specific Upper Primary Teachers

(Regular) (a) Science and Mathematics Teacher 1.26000(b) Social Studies Teacher 1.26000(c) Languages Teacher 1.26000

Sub Total (9.01 to 9.05)Add.Teacher against PTR

Sub Total (9.06 to 9.12)

Total (New Teacher's Salary-9.01 to 9.12)

Teachers Salary (Recurring-sanctioned

earlier)Primary teachers

9.13 Primary Teachers ( Regular)-Existing, in position Teacher 3.66000 26 95.160 26 95.16000

9.14Primary Teachers (Contract)-Existing, in

positionTeacher 0.55000

9.14(a) Primary Teachers (Contract)-under Training Teacher 0.38500 909 349.965 909 349.96500

9.14(b)Primary Teacher (Para Teachers Equal to

9.14(a) upgraded as Teachers)0.38500 799 307.615 799 307.61500

9.14(c) Primary Teachers (Para)- Vacant Teacher9.15 Primary Teachers (Vacant) Teacher 0.30500

9.16Head Teacher for Primary (if the number of

children exceeds 150)Teacher 5.04000 244 1229.760 244 1229.76000

9.16(b)Head Teacher for Primary (if the number of

children exceeds 150) VacantTeacher 0.42000

Additional teachers

9.17Additional Teachers - PS (Special BTC-

Regular) in positionTeacher 0.30500

9.18Additional Teachers - PS (Special BTC Under

Training)Teacher 0.87600

9.19 Additional Teachers - PS (Vacant) Teacher

9.20Others in position (Para Teachers upgraded

as Teachers)Teacher

Upper Primary teachers

9.21 UP Teachers (Regular)-Existing Teacher 5.04000 789 3976.560 789 3976.56000

9.22 UP Teachers (Contract)-Existing9.23 UP Teachers (Vacant) Teacher 1.26000

9.24Head Teacher for Upper Primary (if the number

of children exceeds 100)-ExistingTeacher 5.34000 381 2034.540 381 2034.54000

9.24a Head Teacher for Upper Primary (Vacant) Teacher 1.33500

9.25Subject specific Upper Primary Teachers

(Regular)(a) Science and Mathematics(b) Social Studies(c) Languages

9.32 Part Time Instructors in position(a) Art Education 0.77000 162 124.740 162 124.74000(b) Health and Physical Education 0.77000 178 137.060 178 137.06000(c) Work Education 0.77000 121 93.170 121 93.17000

9.32(A) Part Time Instructors Vacant(a) Art Education 0.42000(b) Health and Physical Education 0.42000(c) Work Education 0.42000

9.33

Others-Incentive to Teachers in Schools

Located in Naxal Affected Areas (@

Rs.1500/- per teachers per month)

Sub Total (9.13 to 9.33) 3609 8348.570 3609 8348.57TOTAL

(New Teachers Salary +Teachers Salary

Recurring)

3609 8348.570 3609 8348.57000

10 Teachers Training(a) Teachers

10.01

Refresher In-service Teachers' Training at BRC

level and above - 10 days (@ Rs.200/- per

head per day)

Teacher

(Target &

Ach.-13-14

in

Mandays)

0.00600

10.01(a)Continuous and Comprehensive Evauation [PS +

UPS)Teacher 0.01300 1512 19.656 1512 19.65600

10.01(b) Eary Reading and Numeracy Skills [PS] Teacher 0.00500 1512 7.560 1512 7.56000

10.01(c) Science [UPS] Teacher 0.00800 695 5.560 695 5.56000Recommended as

proposed

10.01(d) CWSN Teacher 0.00400

Arti:SSA-AWPB-2014-15-PABMinits:Faizabad:16-06-2014 353 / 533

Page 354: U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 · 2015. 1. 6. · U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15

Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

Name of District : Faizabad -26

ActivityS. No.Physical

UnitRemarks

Outlay Recommendation for 2014-15

Spill OverDeferred laibility of

2014-15Fresh Recommended Total Recommended

10.02

One day monthly cluster level meetings and

peer group training sessions for 10 months for

all teachers each year at CRC level - 10 days (@

Rs.100/- per head per day)

Teacher 0.01000

10.03(a)

Induction Training for Newly Recruited Teachers

for 6 Months (Special BTC)- @Rs.2000/- per

head per year

Teacher 0.02000

10.03(b)5 Days Training for Part Time Instructors @ Rs.

200/- per head per day) Teacher 0.01000

10.04

Training of untrained Teachers to acquire

professional qualifications over a two year

period.

Teacher 0.04700 833 39.151 833 39.15100

(b) Head Teachers

10.05Refresher Residencial In-service for 10 days at

BRC level and above

Head

Teacher(c) Resource Persons

10.06

Refresher Training for all Resource

Persons,Master Trainers, BRC & CRC faculty

and Coordinators for 5 days each year (@

Rs.200/- per head per day)

Resource

Person 0.00300 144 0.432 144 0.43200

Sub Total 4696 72.359 4696 72.359

11Academic Support through Block Resource

Centre (BRC)/ URC

11.01 Salary of Faculty and Staff

(a) 5 RPs at BRC for subject specific training in

positionRP 60 60

(b) 2 RPs for CWSN in position RP(b-i) 1 CWSN Resource Person RP 1.10000 24 26.400 24 26.40000

(b-ii) 1 Physiotherapist (Resource person for IE) RP

(c) 1 MIS Coordinator in position RP 1.86000

(d) 1 Datra Entry Operator in position RP 1.74000 16 27.840 16 27.84000

(e) 1 Accountant-cum-support staff in position RP 1.80000 12 21.600 12 21.60000

11.02 Furniture Grant BRC/ URC 1.00000

11.03Replacement of furniture, computer, TLE etc (

Once in 5 years)BRC/ URC 1.00000

11.04 Contingency Grant BRC/ URC 0.50000 12 6.000 12 6.00000

11.05 Meeting, TA BRC/ URC 0.30000 12 3.600 12 3.60000

11.06 TLM Grant BRC/ URC 0.10000

11.07 Maintenance Grant BRC/ URC 0.10000

Sub Total 12 85.440 12 85.44000

12Academic Support through Cluster

Resource Centres (CRC/UERC)

12.01Salary of Cluster Coordinator (on an average of

one Resource Person per 18 schools in a block)RP

12.02 Furniture GrantCRC/

UERC0.10000

12.03Replacement of furniture, computer, TLE etc.

once in 5 years

CRC/

UERC0.10000

12.04 Contingency Grant CRC/UERC 0.10000 131 13.100 131 13.10000

12.05 Meeting, TA CRC/UERC 0.12000 131 15.720 131 15.72000

12.06 TLM Grant CRC/UERC 0.03000

12.07Maintenance Grant

CRC/UERC 0.02000

Sub Total 262 28.820 262 28.82000

13Computer Aided Education in upper

primary schools under Innovation

13.01Computer Aided Education in upper primary

schoolsDistrict 0.01200 48 0.576 48 0.57600

Sub Total 48 0.576 48 0.5760014 Libraries in Schools14.01 (a) Primary School (per school) School 0.03000

14.02 (b) Upper Primary School (per school) School 0.10000

Sub TotalIV ANNUAL GRANTS15 Teachers' Grant15.01 Primary Teachers Teacher 0.0050015.02 Upper Primary Teachers Teacher 0.00500 695 3.475 695 3.47500

Sub Total 695 3.475 695 3.4750016 School Grant16.01 Primary School School 0.05000 1555 77.750 1555 77.7500016.02 Upper Primary School School 0.07000 685 47.950 685 47.95000

Sub Total 2240 125.700 2240 125.70000

Arti:SSA-AWPB-2014-15-PABMinits:Faizabad:16-06-2014 354 / 533

Page 355: U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 · 2015. 1. 6. · U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15

Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

Name of District : Faizabad -26

ActivityS. No.Physical

UnitRemarks

Outlay Recommendation for 2014-15

Spill OverDeferred laibility of

2014-15Fresh Recommended Total Recommended

17Research, Evaluation, Monitoring &

Supervision

17.01 REMS Activities School 0.00103 2240 2.304 2240 2.30409

17.02 Monitoring & Supervision School 0.00078 2240 1.756 2240 1.75631

17.03 House Hold Survey (Urban) in Million Plus Cities District 35.00000

Sub Total 4480 4.060 4480 4.0604018 Maintenance Grant

18.01 Maintenance in School having upto3 Classrooms School 0.07500 971 72.825 971 72.82500

18.01a Maintenance Grant School 0.07500 1385 103.875 1385 103.87500Sub Total 2356 176.700 2356 176.70000

VBRIDGING GENDER AND SOCIAL

CATEGORY GAPS

19 Interventions for CWSN (IE)

19.01 Provision for Inclusive Education Child 0.03000 2566 76.980 2566 76.98000

Sub Total 2566 76.980 2566 76.98000

20Innovativation Head up to Rs.50 Lakh per

district

20.01 Girls Education District 0.70000 8 5.600 8 5.60000

20.02 ECCE District20.03 Intervention for SC / ST children District

20.04 Intervention for Minority Community children District

20.05 Intervention for Urban Deprived children District 10.00000

Sub Total 8 5.600 8 5.6000021 SMC/PRI Training

21.01Residential for 6 Resource Person per Block (3

days) (@ Rs.500/-)Blocks 0.09000

21.02Non-residential (3 days training of 6 SMC

members) (@ Rs.100/-)SMC 0.01800 2138 38.484 2138 38.48400

21.02(a)Non-residential (3 days training of 3 Members of

PRI/VECs/LA) (@ Rs.100/-)VEC/ WEC 0.00900

21.03

Seminar/Orientation of SMC Women members

and President/Vice President (@ Rs. 50,000/-

per block)

Blocks 0.50000

Sub Total 2138 38.484 2138 38.48400VI SCHOOL INFRASTRUCTURE22 Civil Works22.01 Primary School (Plain) (New) School 13.1550022.02 Primary School (Hilly/Rocky) (New) School 13.2750022.03 Upper Primary (Plain) (New) School 20.65500

22.04 Upper Primary School (Hilly/Rocky) (New) School 20.77500

22.04aComposite Schools for Urban Areas (Class I-

VIII)School 41.04000

22.05 ACR in lieu of upgraded Upper Primary School Rooms

22.06 Additional class rooms for adding Class VIII Rooms

22.07 Building Less (Pry) School 9.7500022.08 Building Less (UP) School 18.5900022.09 Dilapidated Building (Pry) School 9.7500022.10 Dilapidated Building (UP) School 18.59000

22.11 Additional Class Room (Rural) ( PS+UPS) Rooms 3.45000

22.12 Additional Class Room (Urban) Rooms 3.4500022.13 Additional Class Room (Hill Area)22.14 Toilet/Urinals (PS & UPS) School 0.7000022.15 Separate Girls Toilet (Rural+Urban) School 0.70000 95 66.500 95 66.5000022.16 CWSN friendly Toilets School 0.50000

22.17 Drinking Water Facility (for Urban Area Only)) School 0.15000

22.17a Drinking Water Facility (Plain PS & UPS) School 0.15000 29 4.350 29 4.35000

22.17b Drinking Water Facility (Hilly/Rocky PS & UPS) School 0.15000

22.18a Boundary Wall PS (Total in Meters x .01105) 0.01749

22.18bBoundary Wall PS (For Gate) @Rs. 7000 x no. of

P.S.School 0.07800

22.18c Boundary Wall UPS (Total in Meters x .01105) 0.01749

22.18dBoundary Wall UPS (For Gate) @Rs. 7000 x no.

of UPSSchool 0.07800

22.19a Electrification in P.S./ Electrical Equipment School 0.11000

22.19b Electrification in U. P.S./ Electrical Equipment School 0.11000

22.20Office-cum-store-cum-Head Teacher's room

(Primary)Rooms

22.21Office-cum-store-cum-Head Teacher's room

(Upper Primary)Rooms

22.22Augumentation of training facility in BRC (one

time)BRC/ URC 5.00000

22.23 Child friendly Elements School 0.25000

22.24 Ramps with Handrails (Barrier Free Elements) School 0.06000

22.25 Handrails in existing Ramps School 0.01000

Arti:SSA-AWPB-2014-15-PABMinits:Faizabad:16-06-2014 355 / 533

Page 356: U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 · 2015. 1. 6. · U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15

Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

Name of District : Faizabad -26

ActivityS. No.Physical

UnitRemarks

Outlay Recommendation for 2014-15

Spill OverDeferred laibility of

2014-15Fresh Recommended Total Recommended

22.26 Whole School Develoipment School22.27 Retro-fitting and repairs School

22.28Residential Schools for specific category

of children

(a) Construction of Building including boundary

wall, Water and sanitation facilities, electric

installation (For 100 children)

Building 65.86000

(b) Construction of residential hostel Building 65.86000

(c) Refurnishing unused old buildings Building

22.29

Construction of Hostel in existing Govt UPS

including boundary wall, Water and sanitation

facilities, electric installation etc. (For 50

children)

7.00000

22.30Furniture for Govt. UPS (per child) (@ Rs.500/-

per child enrolled)Child 0.00500

22.31 Major Repairs for Primary School School 0.30000

22.32 Majr Repairs for Upper Primary School School 0.30000

22.33Others (Difference of Civil Wrks

sanctioned in pre.yr.)22.33a Others (Overhead Tank PS) School 0.1200022.33b Others (Overhead Tank UPS) School 0.12000

Sub Total (Civil WOrks) 124 70.850 124 70.85VII PROJECT MANAGEMENT COST23 Management23.01 Management up to 3.5%

(a) Project Management and MIS

(i) DPO ( Salary, Contigency, Consumables,

POL, TA & Computer etc)District 1 152.590 1 152.58980

(ii) EMIS Cell District 1 16.202 1 16.20200Sub Total (a) 1 1 1 168.792 1 168.792

(b) Training of Educational Administrators District

(c) School Mapping and Social Mapping District

Sub Total (23.01)

23.02Learning Enhancement Prog. (LEP) (P & UP) (up

to 2%)District 16.747 16.74745

23.03 Community Mobilization (up to 0.5%) District 1 45.850 1 45.85000

Sub Total (Management) 1 62.597 1 62.59745Total Management Cost 231.389 231.38925Total of SSA (Districs) 17.800 437767 10477.967 437767 10495.767

24 State Component23.01 Management23.02 REMS 0.0044923.03 SIEMAT

Sub Total

STATE SSA TOTAL 17.80000 437767 10477.967 437767 10495.76725

25

KGBV Financial Provision (give

separate costing sheets for different

Models)

Hostel

ANon Recurring One Time Grant (Only

committed liabilities) (Model-I)

25.01 Construction of Building (New)

25.02 Construction of Building KGBV sanctioned earlier 0.00000 0.00000

25.02(a) Additional Class Room Rooms 3.45000

25.02(b) Guard Room Rooms 1.32000

25.02(c) Boundary Wall School 5.0200025.03 Boudary Wall (Spillover only)

25.04

Boring/Handpump (Spillover only)

(minimum rates prescribed by State Drinking

Water Department subject to a ceiling of Rs.

1.00 lakhs)

25.05 Electricity /Water charges (Spillover only)

25.05(a) Solar Water Heater & Solar Light 2.97000

25.06Furniture/Equipment (including Kitchen

equipment)3.00000

25.07 TLM and equipment including library books 3.50000

25.08 Bedding (New) 0.75000

25.09 Replacement of Bedding (once in 3 Year) 0.75000 10 7.500 10 7.50000

Subtotal Non Recurring 0.00000 7.500 7.50000

B Recurring Cost Per Annum (Model-I)

25.10Maintenance per girl student per month @ Rs.

1500/-18.00000 10 180.000 10 180.00000

25.11 Stipend for girl student per month @ Rs. 100/- 1.20000 10 12.000 10 12.00000

25.12Supplementary TLM, stationery and other

educational material @ Rs.1000/- per annum1.00000 10 10.000 10 10.00000

25.13 Salaries

Arti:SSA-AWPB-2014-15-PABMinits:Faizabad:16-06-2014 356 / 533

Page 357: U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 · 2015. 1. 6. · U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15

Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

Name of District : Faizabad -26

ActivityS. No.Physical

UnitRemarks

Outlay Recommendation for 2014-15

Spill OverDeferred laibility of

2014-15Fresh Recommended Total Recommended

25.13.1 Additional Salaries:

(a) 1 Warden @ Rs. 25,000/- per month 3.00000 10 30.00000 10 30.00000

(b)4 Full time teachers as per RTE norms @ Rs.

20,000/- per month per teacher 9.60000 10 96.00000 10 96.00000

(c)

1 Urdu Teachers (only for blocks with muslim

population above 20% and select urban areas), if

required @ Rs. 12,000/- per month per teacher 1.44000 10 14.40000 10 14.40000

(d)3 part time teachers @ Rs. 5,000/- per month per

teacher 1.80000 10 18.00000 10 18.00000

(e)1 Full time Accountant @ Rs. 10,000/- per month

1.20000 10 12.00000 10 12.00000

(f)

2 Support Staff – (Accountant/ Assistant, Peon,

Chowkidar) @ Rs. 5,000/- per month per staff 1.20000 10 12.00000 10 12.00000

(g) 1 Head cook @ Rs. 6,000/- per month 0.72000 10 7.20000 10 7.20000

(h)2 Asstt. Cooks @ Rs. 4,500/- per month per cook

1.08000 10 10.80000 10 10.80000

25.14Specific skill training @ Rs.1000/- per child per

annum1.00000 10 10.000 10 10.00000

25.15Electricity/water charges @ Rs.1000/- per child

per annum1.00000 10 10.000 10 10.00000

25.16Medical care/contingencies @ Rs. 1250 per child

per annum1.25000 10 12.500 10 12.50000

25.17 Maintenance @ Rs.750/- per child per annum 0.75000 10 7.500 10 7.50000

25.18

Miscellaneous (Educational Tour/ Exposure Visit

/ Sports Material etc.) @ Rs.750/- per child per

annum

0.75000 10 7.500 10 7.50000

25.19Preparatory camps @ Rs.200/- per child per

annum0.20000 10 2.000 10 2.00000

25.20PTAs/school functions @ Rs.200/- per child per

annum0.20000 10 2.000 10 2.00000

25.21 Provision of Rent @ Rs.6000/- per annum 6.00000

25.21a Provision of Rent (6 months) 3.6000025.21b Provision of Rent (3 months) 1.8000025.21c Rent (Previous Year (2007-2012)

25.22 Capacity building 0.50000 10 5.000 10 5.00000

25.22(a)Physical/ Self Defence Training @ Rs.200/- per

child per annum0.20000 10 2.000 10 2.00000

Subtotal Recurring 10 460.900 10 460.90000

Subtotal (Model-I) 0.00000 10 468.400 10 468.40000

CNon Recurring One Time Grant (Only

committed liabilities) (Model-II)

25.23 Construction of Building (New)

25.24 Construction of Building KGBV sanctioned earlier

25.24(a) Additional Class Room Rooms 3.45000

25.24(b) Guard Room Rooms 1.32000

25.24(c) Boundary Wall School 5.0200025.25 Boudary Wall (Spillover only)25.26 Boring/Handpump (Spillover only)

25.27 Electricity /Water charges (Spillover only)

25.27(a) Solar Water Heater & Solar Light 2.97000

25.28Furniture/Equipment (including Kitchen

equipment)2.00000

25.29 TLM and equipment including library books 3.00000

25.30 Bedding (New) 0.37500

25.31 Replacement of Bedding (once in 3 Year) 0.37500

Subtotal Non Recurring

D Recurring Cost Per Annum (Model-II)

25.32Maintenance per girl student per month @ Rs.

1500/-9.00000

25.33 Stipend for girl student per month @ Rs. 100/- 0.60000

25.34Supplementary TLM, stationery and other

educational material @ Rs.1000/- per annum0.50000

25.35 Salaries(a) 1 Warden @ Rs. 25,000/- per month 3.00000

(b)3 Full time teachers as per RTE norms @ Rs.

20,000/- per month per teacher 7.20000

(c) 3 part time teachers @ Rs. 5,000/- per month per

teacher 1.80000

(d)1 Full time Accountant @ Rs. 10,000/- per month

1.20000

(e)

2 Support Staff – (Accountant/ Assistant, Peon,

Chowkidar) @ Rs. 5,000/- per month per staff 1.20000

Arti:SSA-AWPB-2014-15-PABMinits:Faizabad:16-06-2014 357 / 533

Page 358: U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 · 2015. 1. 6. · U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15

Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

Name of District : Faizabad -26

ActivityS. No.Physical

UnitRemarks

Outlay Recommendation for 2014-15

Spill OverDeferred laibility of

2014-15Fresh Recommended Total Recommended

(f) 1 Head cook @ Rs. 6,000/- per month 0.72000

(g)1 Asstt. Cooks @ Rs. 4,500/- per month per cook

0.54000

25.36Specific skill training @ Rs.1000/- per child per

annum0.50000

25.37Electricity/water charges @ Rs.1000/- per child

per annum0.50000

25.38Medical care/contingencies @ Rs. 1250 per child

per annum0.62500

25.39 Maintenance @ Rs.750/- per child per annum 0.37500

25.40

Miscellaneous (Educational Tour/ Exposure Visit

/ Sports Material etc.) @ Rs.750/- per child per

annum

0.37500

25.41Preparatory camps @ Rs.300/- per child per

annum0.15000

25.42PTAs/school functions @ Rs.300/- per child per

annum0.15000

25.43 Provision of Rent @ Rs.10000/- per annum 5.00000

25.43a Provision of Rent (6 months) 3.6000025.43b Provision of Rent (3 months) 1.8000025.43c Rent (Previous Year (2007-2012)25.44 Capacity building 0.25000

25.44(a)Physical/ Self Defence Training @ Rs.200/- per

child per annum0.10000

Subtotal Recurring

Subtotal (Model-II) Total (KGBV) 0.000 10 468.400 10 468.400

DISTRICT GRAND TOTAL (SSA+KGBV) 0.000 17.800 437777 10946.367 437777 10964.167

Arti:SSA-AWPB-2014-15-PABMinits:Faizabad:16-06-2014 358 / 533

Page 359: U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 · 2015. 1. 6. · U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15

Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

I ACCESS

1 Opening of New Schools

1.01 Upgradation of EGS to PSCentres /

School1.02 New PS School

1.03 Upgradation of PS to UPS / New UPS School

1.04 Composite Schools (for Urban Areas) School

1.05Residential Schools for specific category children

(For 100 children)

1.06Residential Hostel (for specific category of

children) (For 50 children)

1.07 Integration of Class V with Primary Schools

1.08Integration of Class VIII with Upper Primary

Schools

2Residential Schools for specific category

of children (For 100 Children)

Total - Residential Schools (For 100

children)

3Residential Hostel for specific category of

children (For 50 Children)

Total - Residential Schools (For 50

children)4 Transport/Escort Facility

4.01

Children in remote habitations with sparse

populations where opening of schools is

unviable

Child 0.03000

4.02

Urban deprived children/children without adult

protection in urban areas where schools are not

opened because availability of land is a problem

Child 0.03000

Sub Total

5Special Training for mainstreaming of Out-

of-School Children

5.03 Non-Residential (Fresh)(a) 12 months Child 0.06000(b) 9 months 0.04500(c) 6 months

(i)Special Training (by Special Instructors-NRBC)-

(1-5) Child 0.03000 98 2.940 98 2.94000

(ii) Special Training (by Special Instructors-NRBC)-

(6-8) Child 0.03000 85 2.550 85 2.55000

(d) 3 months Child 0.01500Sub Total 183 5.490 183 5.49000

Total (Special Training) 183 5.490 183 5.4905(B) House Hold Survey (HHS)

5(B).01 House Hold Survey through SMCHouse

Hold0.00001

Sub TotalII RETENTION6 Free Text Book

6.01Free Text Book (PS) for Parishadiya & Aided

Primary Schools (Workbooks not included)Child 0.00120 68777 82.532 68777 82.53240

6.01a

Free Text Book (PS) for 25% children of Class-1

in Private Recognised Primary Schools of other

Boards (Workbooks not included)

Child 0.00150

6.02 Free Brail Books (PS) 0.00150 45 0.068 45 0.06750

6.03 Free Large Print Books (PS) 0.00150

6.04Free Text Book (UPS) (Workbooks not included)

(Including KGBV Girls)Child 0.00200 30198 60.396 30198 60.39600

6.05 Free Brail Books (UPS) 0.00250 9 0.023 9 0.02250

6.06 Free Large Print Books (PS) 0.00250Sub Total 99029 143.018 99029 143.018

7 Provision of 2 set of Uniforms

7.01 All Girls (Including KGBV Girls) Child 0.00400 72171 288.684 72171 288.68400

7.02 SC Boys Child 0.00400 26804 107.216 26804 107.21600

7.03 ST Boys Child 0.00400

7.04 BPL Boys Child 0.00400 21938 87.752 21938 87.75200

7.05

Free Uniform for 25% children of Class-1 in

Private Recognised Primary Schools of other

Boards

Child0.00400

Sub Total 120913 483.652 120913 483.6527(A) Fee Reimbursement

7(A).01

Fee Reimbursement for Admission of children of

Disadvantaged Group & Weaker Section upto

25% of seats in Class-1 of Private Unaided

Recognised Schools

Child 0.05400

Sub Total

8 Teaching Learning Equipment (TLE)

8.01 TLE - New Primary School 0.40000 0.20000 0.400008.02 TLE - New Upper Primary School 2.50000 0.50000 2.50000

Name of District : Etawah -25

ActivityS. No.Physical

UnitRemarks

Outlay Recommendation for 2014-15

Spill OverDeferred laibility of

2014-15Fresh Recommended Total Recommended

Arti:SSA-AWPB-2014-15-PABMinits:Etawah:16-06-2014 359 / 533

Page 360: U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 · 2015. 1. 6. · U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15

Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

Name of District : Etawah -25

ActivityS. No.Physical

UnitRemarks

Outlay Recommendation for 2014-15

Spill OverDeferred laibility of

2014-15Fresh Recommended Total Recommended

Sub Total 2.90000 2.90000III ENHANCING QUALITY9 New Teachers Salary

9.01 Primary Teachers (Regular) (Asstt. Teacher) Teacher 0.91500

9.01aHead Teacher for Primary (if the number of

children exceeds 150 in a school)Teacher

9.02 Primary Teachers (Contract) (S.M.) Teacher

9.03Subject specific Upper Primary Teachers

(Regular) (a) Science and Mathematics Teacher 1.26000(b) Social Studies Teacher 1.26000(c) Languages Teacher 1.26000

Sub Total (9.01 to 9.05)Add.Teacher against PTR

Sub Total (9.06 to 9.12)

Total (New Teacher's Salary-9.01 to 9.12)

Teachers Salary (Recurring-sanctioned

earlier)Primary teachers

9.13 Primary Teachers ( Regular)-Existing, in position Teacher 3.66000 490 1793.400 490 1793.40000

9.14Primary Teachers (Contract)-Existing, in

positionTeacher 0.55000

9.14(a) Primary Teachers (Contract)-under Training Teacher 0.38500 791 304.535 791 304.53500

9.14(b)Primary Teacher (Para Teachers Equal to

9.14(a) upgraded as Teachers)0.38500 636 244.860 636 244.86000

9.14(c) Primary Teachers (Para)- Vacant Teacher9.15 Primary Teachers (Vacant) Teacher 0.30500

9.16Head Teacher for Primary (if the number of

children exceeds 150)Teacher 5.04000 247 1244.880 247 1244.88000

9.16(b)Head Teacher for Primary (if the number of

children exceeds 150) VacantTeacher 0.42000

Additional teachers

9.17Additional Teachers - PS (Special BTC-

Regular) in positionTeacher 0.30500

9.18Additional Teachers - PS (Special BTC Under

Training)Teacher 0.87600

9.19 Additional Teachers - PS (Vacant) Teacher

9.20Others in position (Para Teachers upgraded

as Teachers)Teacher

Upper Primary teachers

9.21 UP Teachers (Regular)-Existing Teacher 5.04000 541 2726.640 541 2726.64000

9.22 UP Teachers (Contract)-Existing9.23 UP Teachers (Vacant) Teacher 1.26000

9.24Head Teacher for Upper Primary (if the number

of children exceeds 100)-ExistingTeacher 5.34000 223 1190.820 223 1190.82000

9.24a Head Teacher for Upper Primary (Vacant) Teacher 1.33500

9.25Subject specific Upper Primary Teachers

(Regular)(a) Science and Mathematics(b) Social Studies(c) Languages

9.32 Part Time Instructors in position(a) Art Education 0.77000 51 39.270 51 39.27000(b) Health and Physical Education 0.77000 51 39.270 51 39.27000(c) Work Education 0.77000 45 34.650 45 34.65000

9.32(A) Part Time Instructors Vacant(a) Art Education 0.42000(b) Health and Physical Education 0.42000(c) Work Education 0.42000

9.33

Others-Incentive to Teachers in Schools

Located in Naxal Affected Areas (@

Rs.1500/- per teachers per month)

Sub Total (9.13 to 9.33) 3075 7618.325 3075 7618.33TOTAL

(New Teachers Salary +Teachers Salary

Recurring)

3075 7618.325 3075 7618.32500

10 Teachers Training(a) Teachers

10.01

Refresher In-service Teachers' Training at BRC

level and above - 10 days (@ Rs.200/- per

head per day)

Teacher

(Target &

Ach.-13-14

in

Mandays)

0.00600

10.01(a)Continuous and Comprehensive Evauation [PS +

UPS)Teacher 0.01300 1158 15.054 1158 15.05400

10.01(b) Eary Reading and Numeracy Skills [PS] Teacher 0.00500 1158 5.790 1158 5.79000

10.01(c) Science [UPS] Teacher 0.00800 622 4.976 622 4.97600Recommended as

proposed

10.01(d) CWSN Teacher 0.00400

Arti:SSA-AWPB-2014-15-PABMinits:Etawah:16-06-2014 360 / 533

Page 361: U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 · 2015. 1. 6. · U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15

Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

Name of District : Etawah -25

ActivityS. No.Physical

UnitRemarks

Outlay Recommendation for 2014-15

Spill OverDeferred laibility of

2014-15Fresh Recommended Total Recommended

10.02

One day monthly cluster level meetings and

peer group training sessions for 10 months for

all teachers each year at CRC level - 10 days (@

Rs.100/- per head per day)

Teacher 0.01000

10.03(a)

Induction Training for Newly Recruited Teachers

for 6 Months (Special BTC)- @Rs.2000/- per

head per year

Teacher 0.02000

10.03(b)5 Days Training for Part Time Instructors @ Rs.

200/- per head per day) Teacher 0.01000

10.04

Training of untrained Teachers to acquire

professional qualifications over a two year

period.

Teacher 0.04700 532 25.004 532 25.00400

(b) Head Teachers

10.05Refresher Residencial In-service for 10 days at

BRC level and above

Head

Teacher(c) Resource Persons

10.06

Refresher Training for all Resource

Persons,Master Trainers, BRC & CRC faculty

and Coordinators for 5 days each year (@

Rs.200/- per head per day)

Resource

Person 0.00300 108 0.324 108 0.32400

Sub Total 3578 51.148 3578 51.148

11Academic Support through Block Resource

Centre (BRC)/ URC

11.01 Salary of Faculty and Staff

(a) 5 RPs at BRC for subject specific training in

positionRP 45 45

(b) 2 RPs for CWSN in position RP(b-i) 1 CWSN Resource Person RP 1.10000 18 19.800 18 19.80000

(b-ii) 1 Physiotherapist (Resource person for IE) RP

(c) 1 MIS Coordinator in position RP 1.86000

(d) 1 Datra Entry Operator in position RP 1.74000

(e) 1 Accountant-cum-support staff in position RP 1.80000

11.02 Furniture Grant BRC/ URC 1.00000

11.03Replacement of furniture, computer, TLE etc (

Once in 5 years)BRC/ URC 1.00000

11.04 Contingency Grant BRC/ URC 0.50000 9 4.500 9 4.50000

11.05 Meeting, TA BRC/ URC 0.30000 9 2.700 9 2.70000

11.06 TLM Grant BRC/ URC 0.10000

11.07 Maintenance Grant BRC/ URC 0.10000

Sub Total 9 27.000 9 27.00000

12Academic Support through Cluster

Resource Centres (CRC/UERC)

12.01Salary of Cluster Coordinator (on an average of

one Resource Person per 18 schools in a block)RP

12.02 Furniture GrantCRC/

UERC0.10000

12.03Replacement of furniture, computer, TLE etc.

once in 5 years

CRC/

UERC0.10000

12.04 Contingency Grant CRC/UERC 0.10000 76 7.600 76 7.60000

12.05 Meeting, TA CRC/UERC 0.12000 76 9.120 76 9.12000

12.06 TLM Grant CRC/UERC 0.03000

12.07Maintenance Grant

CRC/UERC 0.02000

Sub Total 152 16.720 152 16.72000

13Computer Aided Education in upper

primary schools under Innovation

13.01Computer Aided Education in upper primary

schoolsDistrict 0.01200 48 0.576 48 0.57600

Sub Total 48 0.576 48 0.5760014 Libraries in Schools14.01 (a) Primary School (per school) School 0.03000

14.02 (b) Upper Primary School (per school) School 0.10000

Sub TotalIV ANNUAL GRANTS15 Teachers' Grant15.01 Primary Teachers Teacher 0.0050015.02 Upper Primary Teachers Teacher 0.00500 622 3.110 622 3.11000

Sub Total 622 3.110 622 3.1100016 School Grant16.01 Primary School School 0.05000 1250 62.500 1250 62.5000016.02 Upper Primary School School 0.07000 649 45.430 649 45.43000

Sub Total 1899 107.930 1899 107.93000

Arti:SSA-AWPB-2014-15-PABMinits:Etawah:16-06-2014 361 / 533

Page 362: U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 · 2015. 1. 6. · U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15

Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

Name of District : Etawah -25

ActivityS. No.Physical

UnitRemarks

Outlay Recommendation for 2014-15

Spill OverDeferred laibility of

2014-15Fresh Recommended Total Recommended

17Research, Evaluation, Monitoring &

Supervision

17.01 REMS Activities School 0.00103 1899 1.953 1899 1.95334

17.02 Monitoring & Supervision School 0.00078 1899 1.489 1899 1.48894

17.03 House Hold Survey (Urban) in Million Plus Cities District 35.00000

Sub Total 3798 3.442 3798 3.4422818 Maintenance Grant

18.01 Maintenance in School having upto3 Classrooms School 0.07500 883 66.225 883 66.22500

18.01a Maintenance Grant School 0.07500 897 67.275 897 67.27500Sub Total 1780 133.500 1780 133.50000

VBRIDGING GENDER AND SOCIAL

CATEGORY GAPS

19 Interventions for CWSN (IE)

19.01 Provision for Inclusive Education Child 0.02500 2372 59.300 2372 59.30000

Sub Total 2372 59.300 2372 59.30000

20Innovativation Head up to Rs.50 Lakh per

district

20.01 Girls Education District 0.70000 9 6.300 9 6.30000

20.02 ECCE District20.03 Intervention for SC / ST children District

20.04 Intervention for Minority Community children District

20.05 Intervention for Urban Deprived children District 10.00000

Sub Total 9 6.300 9 6.3000021 SMC/PRI Training

21.01Residential for 6 Resource Person per Block (3

days) (@ Rs.500/-)Blocks 0.09000

21.02Non-residential (3 days training of 6 SMC

members) (@ Rs.100/-)SMC 0.01800 1780 32.040 1780 32.04000

21.02(a)Non-residential (3 days training of 3 Members of

PRI/VECs/LA) (@ Rs.100/-)VEC/ WEC 0.00900

21.03

Seminar/Orientation of SMC Women members

and President/Vice President (@ Rs. 50,000/-

per block)

Blocks 0.50000

Sub Total 1780 32.040 1780 32.04000VI SCHOOL INFRASTRUCTURE22 Civil Works22.01 Primary School (Plain) (New) School 13.1550022.02 Primary School (Hilly/Rocky) (New) School 13.2750022.03 Upper Primary (Plain) (New) School 20.65500

22.04 Upper Primary School (Hilly/Rocky) (New) School 20.77500

22.04aComposite Schools for Urban Areas (Class I-

VIII)School 41.04000

22.05 ACR in lieu of upgraded Upper Primary School Rooms

22.06 Additional class rooms for adding Class VIII Rooms

22.07 Building Less (Pry) School 9.7500022.08 Building Less (UP) School 18.5900022.09 Dilapidated Building (Pry) School 9.7500022.10 Dilapidated Building (UP) School 18.59000

22.11 Additional Class Room (Rural) ( PS+UPS) Rooms 3.45000

22.12 Additional Class Room (Urban) Rooms 3.4500022.13 Additional Class Room (Hill Area)22.14 Toilet/Urinals (PS & UPS) School 0.7000022.15 Separate Girls Toilet (Rural+Urban) School 0.7000022.16 CWSN friendly Toilets School 0.50000

22.17 Drinking Water Facility (for Urban Area Only)) School 0.15000

22.17a Drinking Water Facility (Plain PS & UPS) School 0.15000

22.17b Drinking Water Facility (Hilly/Rocky PS & UPS) School 0.15000

22.18a Boundary Wall PS (Total in Meters x .01105) 0.01749

22.18bBoundary Wall PS (For Gate) @Rs. 7000 x no. of

P.S.School 0.07800

22.18c Boundary Wall UPS (Total in Meters x .01105) 0.01749

22.18dBoundary Wall UPS (For Gate) @Rs. 7000 x no.

of UPSSchool 0.07800

22.19a Electrification in P.S./ Electrical Equipment School 0.11000

22.19b Electrification in U. P.S./ Electrical Equipment School 0.11000

22.20Office-cum-store-cum-Head Teacher's room

(Primary)Rooms

22.21Office-cum-store-cum-Head Teacher's room

(Upper Primary)Rooms

22.22Augumentation of training facility in BRC (one

time)BRC/ URC 5.00000

22.23 Child friendly Elements School 0.25000

22.24 Ramps with Handrails (Barrier Free Elements) School 0.06000

22.25 Handrails in existing Ramps School 0.01000

Arti:SSA-AWPB-2014-15-PABMinits:Etawah:16-06-2014 362 / 533

Page 363: U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 · 2015. 1. 6. · U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15

Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

Name of District : Etawah -25

ActivityS. No.Physical

UnitRemarks

Outlay Recommendation for 2014-15

Spill OverDeferred laibility of

2014-15Fresh Recommended Total Recommended

22.26 Whole School Develoipment School22.27 Retro-fitting and repairs School

22.28Residential Schools for specific category

of children

(a) Construction of Building including boundary

wall, Water and sanitation facilities, electric

installation (For 100 children)

Building 65.86000

(b) Construction of residential hostel Building 65.86000

(c) Refurnishing unused old buildings Building

22.29

Construction of Hostel in existing Govt UPS

including boundary wall, Water and sanitation

facilities, electric installation etc. (For 50

children)

7.00000

22.30Furniture for Govt. UPS (per child) (@ Rs.500/-

per child enrolled)Child 0.00500

22.31 Major Repairs for Primary School School 0.30000

22.32 Majr Repairs for Upper Primary School School 0.30000

22.33Others (Difference of Civil Wrks

sanctioned in pre.yr.)22.33a Others (Overhead Tank PS) School 0.1200022.33b Others (Overhead Tank UPS) School 0.12000

Sub Total (Civil WOrks)VII PROJECT MANAGEMENT COST23 Management23.01 Management up to 3.5%

(a) Project Management and MIS

(i) DPO ( Salary, Contigency, Consumables,

POL, TA & Computer etc)District 1 127.934 1 127.93430

(ii) EMIS Cell District 1 15.006 1 15.00600Sub Total (a) 1 1 1 142.940 1 142.940

(b) Training of Educational Administrators District

(c) School Mapping and Social Mapping District

Sub Total (23.01)

23.02Learning Enhancement Prog. (LEP) (P & UP) (up

to 2%)District 11.199 11.19875

23.03 Community Mobilization (up to 0.5%) District 1 42.000 1 42.00000

Sub Total (Management) 1 53.199 1 53.19875Total Management Cost 196.139 196.13905Total of SSA (Districs) 2.900 239247 8887.691 239247 8890.591

24 State Component23.01 Management23.02 REMS 0.0044923.03 SIEMAT

Sub Total

STATE SSA TOTAL 2.90000 239247 8887.691 239247 8890.59073

25

KGBV Financial Provision (give

separate costing sheets for different

Models)

Hostel

ANon Recurring One Time Grant (Only

committed liabilities) (Model-I)

25.01 Construction of Building (New)

25.02 Construction of Building KGBV sanctioned earlier

25.02(a) Additional Class Room Rooms 3.45000

25.02(b) Guard Room Rooms 1.32000

25.02(c) Boundary Wall School 5.0200025.03 Boudary Wall (Spillover only)

25.04

Boring/Handpump (Spillover only)

(minimum rates prescribed by State Drinking

Water Department subject to a ceiling of Rs.

1.00 lakhs)

25.05 Electricity /Water charges (Spillover only)

25.05(a) Solar Water Heater & Solar Light 2.97000

25.06Furniture/Equipment (including Kitchen

equipment)3.00000

25.07 TLM and equipment including library books 3.50000

25.08 Bedding (New) 0.75000

25.09 Replacement of Bedding (once in 3 Year) 0.75000 1 0.750 1 0.75000

Subtotal Non Recurring 0.750 0.75000

B Recurring Cost Per Annum (Model-I)

25.10Maintenance per girl student per month @ Rs.

1500/-18.00000 2 36.000 2 36.00000

25.11 Stipend for girl student per month @ Rs. 100/- 1.20000 2 2.400 2 2.40000

25.12Supplementary TLM, stationery and other

educational material @ Rs.1000/- per annum1.00000 2 2.000 2 2.00000

25.13 Salaries

Arti:SSA-AWPB-2014-15-PABMinits:Etawah:16-06-2014 363 / 533

Page 364: U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 · 2015. 1. 6. · U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15

Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

Name of District : Etawah -25

ActivityS. No.Physical

UnitRemarks

Outlay Recommendation for 2014-15

Spill OverDeferred laibility of

2014-15Fresh Recommended Total Recommended

25.13.1 Additional Salaries:

(a) 1 Warden @ Rs. 25,000/- per month 3.00000 2 6.00000 2 6.00000

(b)4 Full time teachers as per RTE norms @ Rs.

20,000/- per month per teacher 9.60000 2 19.20000 2 19.20000

(c)

1 Urdu Teachers (only for blocks with muslim

population above 20% and select urban areas), if

required @ Rs. 12,000/- per month per teacher 1.44000 2 2.88000 2 2.88000

(d)3 part time teachers @ Rs. 5,000/- per month per

teacher 1.80000 2 3.60000 2 3.60000

(e)1 Full time Accountant @ Rs. 10,000/- per month

1.20000 2 2.40000 2 2.40000

(f)

2 Support Staff – (Accountant/ Assistant, Peon,

Chowkidar) @ Rs. 5,000/- per month per staff 1.20000 2 2.40000 2 2.40000

(g) 1 Head cook @ Rs. 6,000/- per month 0.72000 2 1.44000 2 1.44000

(h)2 Asstt. Cooks @ Rs. 4,500/- per month per cook

1.08000 2 2.16000 2 2.16000

25.14Specific skill training @ Rs.1000/- per child per

annum1.00000 2 2.000 2 2.00000

25.15Electricity/water charges @ Rs.1000/- per child

per annum1.00000 2 2.000 2 2.00000

25.16Medical care/contingencies @ Rs. 1250 per child

per annum1.25000 2 2.500 2 2.50000

25.17 Maintenance @ Rs.750/- per child per annum 0.75000 2 1.500 2 1.50000

25.18

Miscellaneous (Educational Tour/ Exposure Visit

/ Sports Material etc.) @ Rs.750/- per child per

annum

0.75000 2 1.500 2 1.50000

25.19Preparatory camps @ Rs.200/- per child per

annum0.20000 2 0.400 2 0.40000

25.20PTAs/school functions @ Rs.200/- per child per

annum0.20000 2 0.400 2 0.40000

25.21 Provision of Rent @ Rs.6000/- per annum 6.00000

25.21a Provision of Rent (6 months) 3.6000025.21b Provision of Rent (3 months) 1.8000025.21c Rent (Previous Year (2007-2012)

25.22 Capacity building 0.50000 2 1.000 2 1.00000

25.22(a)Physical/ Self Defence Training @ Rs.200/- per

child per annum0.20000 2 0.400 2 0.40000

Subtotal Recurring 2 92.180 2 92.18000

Subtotal (Model-I) 2 92.930 2 92.93000

CNon Recurring One Time Grant (Only

committed liabilities) (Model-II)

25.23 Construction of Building (New)

25.24 Construction of Building KGBV sanctioned earlier

25.24(a) Additional Class Room Rooms 3.45000

25.24(b) Guard Room Rooms 1.32000

25.24(c) Boundary Wall School 5.0200025.25 Boudary Wall (Spillover only)25.26 Boring/Handpump (Spillover only)

25.27 Electricity /Water charges (Spillover only)

25.27(a) Solar Water Heater & Solar Light 2.97000

25.28Furniture/Equipment (including Kitchen

equipment)2.00000

25.29 TLM and equipment including library books 3.00000

25.30 Bedding (New) 0.37500

25.31 Replacement of Bedding (once in 3 Year) 0.37500

Subtotal Non Recurring

D Recurring Cost Per Annum (Model-II)

25.32Maintenance per girl student per month @ Rs.

1500/-9.00000

25.33 Stipend for girl student per month @ Rs. 100/- 0.60000

25.34Supplementary TLM, stationery and other

educational material @ Rs.1000/- per annum0.50000

25.35 Salaries(a) 1 Warden @ Rs. 25,000/- per month 3.00000

(b)3 Full time teachers as per RTE norms @ Rs.

20,000/- per month per teacher 7.20000

(c) 3 part time teachers @ Rs. 5,000/- per month per

teacher 1.80000

(d)1 Full time Accountant @ Rs. 10,000/- per month

1.20000

(e)

2 Support Staff – (Accountant/ Assistant, Peon,

Chowkidar) @ Rs. 5,000/- per month per staff 1.20000

Arti:SSA-AWPB-2014-15-PABMinits:Etawah:16-06-2014 364 / 533

Page 365: U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 · 2015. 1. 6. · U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15

Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

Name of District : Etawah -25

ActivityS. No.Physical

UnitRemarks

Outlay Recommendation for 2014-15

Spill OverDeferred laibility of

2014-15Fresh Recommended Total Recommended

(f) 1 Head cook @ Rs. 6,000/- per month 0.72000

(g)1 Asstt. Cooks @ Rs. 4,500/- per month per cook

0.54000

25.36Specific skill training @ Rs.1000/- per child per

annum0.50000

25.37Electricity/water charges @ Rs.1000/- per child

per annum0.50000

25.38Medical care/contingencies @ Rs. 1250 per child

per annum0.62500

25.39 Maintenance @ Rs.750/- per child per annum 0.37500

25.40

Miscellaneous (Educational Tour/ Exposure Visit

/ Sports Material etc.) @ Rs.750/- per child per

annum

0.37500

25.41Preparatory camps @ Rs.300/- per child per

annum0.15000

25.42PTAs/school functions @ Rs.300/- per child per

annum0.15000

25.43 Provision of Rent @ Rs.10000/- per annum 5.00000

25.43a Provision of Rent (6 months) 3.6000025.43b Provision of Rent (3 months) 1.8000025.43c Rent (Previous Year (2007-2012)25.44 Capacity building 0.25000

25.44(a)Physical/ Self Defence Training @ Rs.200/- per

child per annum0.10000

Subtotal Recurring

Subtotal (Model-II) Total (KGBV) 2 92.930 2 92.930

DISTRICT GRAND TOTAL (SSA+KGBV) 2.900 239249 8980.621 239249 8983.521

Arti:SSA-AWPB-2014-15-PABMinits:Etawah:16-06-2014 365 / 533

Page 366: U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 · 2015. 1. 6. · U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15

Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

I ACCESS

1 Opening of New Schools

1.01 Upgradation of EGS to PSCentres /

School1.02 New PS School

1.03 Upgradation of PS to UPS / New UPS School

1.04 Composite Schools (for Urban Areas) School

1.05Residential Schools for specific category children

(For 100 children)

1.06Residential Hostel (for specific category of

children) (For 50 children)

1.07 Integration of Class V with Primary Schools

1.08Integration of Class VIII with Upper Primary

Schools

2Residential Schools for specific category

of children (For 100 Children)

Total - Residential Schools (For 100

children)

3Residential Hostel for specific category of

children (For 50 Children)

Total - Residential Schools (For 50

children)4 Transport/Escort Facility

4.01

Children in remote habitations with sparse

populations where opening of schools is

unviable

Child 0.03000

4.02

Urban deprived children/children without adult

protection in urban areas where schools are not

opened because availability of land is a problem

Child 0.03000

Sub Total

5Special Training for mainstreaming of Out-

of-School Children

5.03 Non-Residential (Fresh)(a) 12 months Child 0.06000(b) 9 months 0.04500(c) 6 months

(i)Special Training (by Special Instructors-NRBC)-

(1-5) Child 0.03000 85 2.550 85 2.55000

(ii) Special Training (by Special Instructors-NRBC)-

(6-8) Child 0.03000 66 1.980 66 1.98000

(d) 3 months Child 0.01500Sub Total 151 4.530 151 4.53000

Total (Special Training) 151 4.530 151 4.5305(B) House Hold Survey (HHS)

5(B).01 House Hold Survey through SMCHouse

Hold0.00001

Sub TotalII RETENTION6 Free Text Book

6.01Free Text Book (PS) for Parishadiya & Aided

Primary Schools (Workbooks not included)Child 0.00120 85532 102.638 85532 102.63840

6.01a

Free Text Book (PS) for 25% children of Class-1

in Private Recognised Primary Schools of other

Boards (Workbooks not included)

Child 0.00150

6.02 Free Brail Books (PS) 0.00150 36 0.054 36 0.05400

6.03 Free Large Print Books (PS) 0.00150

6.04Free Text Book (UPS) (Workbooks not included)

(Including KGBV Girls)Child 0.00200 38566 77.132 38566 77.13200

6.05 Free Brail Books (UPS) 0.00250 15 0.038 15 0.03750

6.06 Free Large Print Books (PS) 0.00250Sub Total 124149 179.862 124149 179.862

7 Provision of 2 set of Uniforms

7.01 All Girls (Including KGBV Girls) Child 0.00400 102216 408.864 102216 408.86400

7.02 SC Boys Child 0.00400 21882 87.528 21882 87.52800

7.03 ST Boys Child 0.00400

7.04 BPL Boys Child 0.00400 31537 126.148 31537 126.14800

7.05

Free Uniform for 25% children of Class-1 in

Private Recognised Primary Schools of other

Boards

Child0.00400

Sub Total 155635 622.540 155635 622.5407(A) Fee Reimbursement

7(A).01

Fee Reimbursement for Admission of children of

Disadvantaged Group & Weaker Section upto

25% of seats in Class-1 of Private Unaided

Recognised Schools

Child 0.05400

Sub Total

8 Teaching Learning Equipment (TLE)

8.01 TLE - New Primary School 0.20000 0.20000 0.200008.02 TLE - New Upper Primary School 0.50000 0.50000 0.50000

Name of District : Etah -24

ActivityS. No.Physical

UnitRemarks

Outlay Recommendation for 2014-15

Spill OverDeferred laibility of

2014-15Fresh Recommended Total Recommended

Arti:SSA-AWPB-2014-15-PABMinits:Etah:16-06-2014 366 / 533

Page 367: U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 · 2015. 1. 6. · U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15

Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

Name of District : Etah -24

ActivityS. No.Physical

UnitRemarks

Outlay Recommendation for 2014-15

Spill OverDeferred laibility of

2014-15Fresh Recommended Total Recommended

Sub Total 0.70000 0.70000III ENHANCING QUALITY9 New Teachers Salary

9.01 Primary Teachers (Regular) (Asstt. Teacher) Teacher 0.91500

9.01aHead Teacher for Primary (if the number of

children exceeds 150 in a school)Teacher

9.02 Primary Teachers (Contract) (S.M.) Teacher

9.03Subject specific Upper Primary Teachers

(Regular) (a) Science and Mathematics Teacher 1.26000(b) Social Studies Teacher 1.26000(c) Languages Teacher 1.26000

Sub Total (9.01 to 9.05)Add.Teacher against PTR

Sub Total (9.06 to 9.12)

Total (New Teacher's Salary-9.01 to 9.12)

Teachers Salary (Recurring-sanctioned

earlier)Primary teachers

9.13 Primary Teachers ( Regular)-Existing, in position Teacher 3.66000 103 376.980 103 376.98000

9.14Primary Teachers (Contract)-Existing, in

positionTeacher 0.55000

9.14(a) Primary Teachers (Contract)-under Training Teacher 0.38500 964 371.140 964 371.14000

9.14(b)Primary Teacher (Para Teachers Equal to

9.14(a) upgraded as Teachers)0.38500 630 242.550 630 242.55000

9.14(c) Primary Teachers (Para)- Vacant Teacher9.15 Primary Teachers (Vacant) Teacher 0.30500

9.16Head Teacher for Primary (if the number of

children exceeds 150)Teacher 5.04000 176 887.040 176 887.04000

9.16(b)Head Teacher for Primary (if the number of

children exceeds 150) VacantTeacher 0.42000

Additional teachers

9.17Additional Teachers - PS (Special BTC-

Regular) in positionTeacher 0.30500

9.18Additional Teachers - PS (Special BTC Under

Training)Teacher 0.87600

9.19 Additional Teachers - PS (Vacant) Teacher

9.20Others in position (Para Teachers upgraded

as Teachers)Teacher

Upper Primary teachers

9.21 UP Teachers (Regular)-Existing Teacher 5.04000 454 2288.160 454 2288.16000

9.22 UP Teachers (Contract)-Existing9.23 UP Teachers (Vacant) Teacher 1.26000

9.24Head Teacher for Upper Primary (if the number

of children exceeds 100)-ExistingTeacher 5.34000 215 1148.100 215 1148.10000

9.24a Head Teacher for Upper Primary (Vacant) Teacher 1.33500

9.25Subject specific Upper Primary Teachers

(Regular)(a) Science and Mathematics(b) Social Studies(c) Languages

9.32 Part Time Instructors in position(a) Art Education 0.77000 52 40.040 52 40.04000(b) Health and Physical Education 0.77000 69 53.130 69 53.13000(c) Work Education 0.77000 57 43.890 57 43.89000

9.32(A) Part Time Instructors Vacant(a) Art Education 0.42000(b) Health and Physical Education 0.42000(c) Work Education 0.42000

9.33

Others-Incentive to Teachers in Schools

Located in Naxal Affected Areas (@

Rs.1500/- per teachers per month)

Sub Total (9.13 to 9.33) 2720 5451.030 2720 5451.03TOTAL

(New Teachers Salary +Teachers Salary

Recurring)

2720 5451.030 2720 5451.03000

10 Teachers Training(a) Teachers

10.01

Refresher In-service Teachers' Training at BRC

level and above - 10 days (@ Rs.200/- per

head per day)

Teacher

(Target &

Ach.-13-14

in

Mandays)

0.00600

10.01(a)Continuous and Comprehensive Evauation [PS +

UPS)Teacher 0.01300 1324 17.212 1324 17.21200

10.01(b) Eary Reading and Numeracy Skills [PS] Teacher 0.00500 1324 6.620 1324 6.62000

10.01(c) Science [UPS] Teacher 0.00800 667 5.336 667 5.33600Recommended as

proposed

10.01(d) CWSN Teacher 0.00400

Arti:SSA-AWPB-2014-15-PABMinits:Etah:16-06-2014 367 / 533

Page 368: U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 · 2015. 1. 6. · U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15

Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

Name of District : Etah -24

ActivityS. No.Physical

UnitRemarks

Outlay Recommendation for 2014-15

Spill OverDeferred laibility of

2014-15Fresh Recommended Total Recommended

10.02

One day monthly cluster level meetings and

peer group training sessions for 10 months for

all teachers each year at CRC level - 10 days (@

Rs.100/- per head per day)

Teacher 0.01000

10.03(a)

Induction Training for Newly Recruited Teachers

for 6 Months (Special BTC)- @Rs.2000/- per

head per year

Teacher 0.02000

10.03(b)5 Days Training for Part Time Instructors @ Rs.

200/- per head per day) Teacher 0.01000

10.04

Training of untrained Teachers to acquire

professional qualifications over a two year

period.

Teacher 0.04700 556 26.132 556 26.13200

(b) Head Teachers

10.05Refresher Residencial In-service for 10 days at

BRC level and above

Head

Teacher(c) Resource Persons

10.06

Refresher Training for all Resource

Persons,Master Trainers, BRC & CRC faculty

and Coordinators for 5 days each year (@

Rs.200/- per head per day)

Resource

Person 0.00300 108 0.324 108 0.32400

Sub Total 3979 55.624 3979 55.624

11Academic Support through Block Resource

Centre (BRC)/ URC

11.01 Salary of Faculty and Staff

(a) 5 RPs at BRC for subject specific training in

positionRP 45 45

(b) 2 RPs for CWSN in position RP(b-i) 1 CWSN Resource Person RP 1.10000 18 19.800 18 19.80000

(b-ii) 1 Physiotherapist (Resource person for IE) RP

(c) 1 MIS Coordinator in position RP 1.86000

(d) 1 Datra Entry Operator in position RP 1.74000 8 13.920 8 13.92000

(e) 1 Accountant-cum-support staff in position RP 1.80000 9 16.200 9 16.20000

11.02 Furniture Grant BRC/ URC 1.00000

11.03Replacement of furniture, computer, TLE etc (

Once in 5 years)BRC/ URC 1.00000

11.04 Contingency Grant BRC/ URC 0.50000 9 4.500 9 4.50000

11.05 Meeting, TA BRC/ URC 0.30000 9 2.700 9 2.70000

11.06 TLM Grant BRC/ URC 0.10000

11.07 Maintenance Grant BRC/ URC 0.10000

Sub Total 9 57.120 9 57.12000

12Academic Support through Cluster

Resource Centres (CRC/UERC)

12.01Salary of Cluster Coordinator (on an average of

one Resource Person per 18 schools in a block)RP

12.02 Furniture GrantCRC/

UERC0.10000

12.03Replacement of furniture, computer, TLE etc.

once in 5 years

CRC/

UERC0.10000

12.04 Contingency Grant CRC/UERC 0.10000 71 7.100 71 7.10000

12.05 Meeting, TA CRC/UERC 0.12000 71 8.520 71 8.52000

12.06 TLM Grant CRC/UERC 0.03000

12.07Maintenance Grant

CRC/UERC 0.02000

Sub Total 142 15.620 142 15.62000

13Computer Aided Education in upper

primary schools under Innovation

13.01Computer Aided Education in upper primary

schoolsDistrict 0.01200 48 0.576 48 0.57600

Sub Total 48 0.576 48 0.5760014 Libraries in Schools14.01 (a) Primary School (per school) School 0.03000

14.02 (b) Upper Primary School (per school) School 0.10000

Sub TotalIV ANNUAL GRANTS15 Teachers' Grant15.01 Primary Teachers Teacher 0.0050015.02 Upper Primary Teachers Teacher 0.00500 667 3.335 667 3.33500

Sub Total 667 3.335 667 3.3350016 School Grant16.01 Primary School School 0.05000 1367 68.350 1367 68.3500016.02 Upper Primary School School 0.07000 667 46.690 667 46.69000

Sub Total 2034 115.040 2034 115.04000

Arti:SSA-AWPB-2014-15-PABMinits:Etah:16-06-2014 368 / 533

Page 369: U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 · 2015. 1. 6. · U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15

Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

Name of District : Etah -24

ActivityS. No.Physical

UnitRemarks

Outlay Recommendation for 2014-15

Spill OverDeferred laibility of

2014-15Fresh Recommended Total Recommended

17Research, Evaluation, Monitoring &

Supervision

17.01 REMS Activities School 0.00103 2034 2.092 2034 2.09220

17.02 Monitoring & Supervision School 0.00078 2034 1.595 2034 1.59479

17.03 House Hold Survey (Urban) in Million Plus Cities District 35.00000

Sub Total 4068 3.687 4068 3.6869918 Maintenance Grant

18.01 Maintenance in School having upto3 Classrooms School 0.07500 573 42.975 573 42.97500

18.01a Maintenance Grant School 0.07500 1362 102.150 1362 102.15000Sub Total 1935 145.125 1935 145.12500

VBRIDGING GENDER AND SOCIAL

CATEGORY GAPS

19 Interventions for CWSN (IE)

19.01 Provision for Inclusive Education Child 0.03000 727 21.810 727 21.81000

Sub Total 727 21.810 727 21.81000

20Innovativation Head up to Rs.50 Lakh per

district

20.01 Girls Education District 0.70000 8 5.600 8 5.60000

20.02 ECCE District20.03 Intervention for SC / ST children District

20.04 Intervention for Minority Community children District

20.05 Intervention for Urban Deprived children District 10.00000

Sub Total 8 5.600 8 5.6000021 SMC/PRI Training

21.01Residential for 6 Resource Person per Block (3

days) (@ Rs.500/-)Blocks 0.09000

21.02Non-residential (3 days training of 6 SMC

members) (@ Rs.100/-)SMC 0.01800 1935 34.830 1935 34.83000

21.02(a)Non-residential (3 days training of 3 Members of

PRI/VECs/LA) (@ Rs.100/-)VEC/ WEC 0.00900

21.03

Seminar/Orientation of SMC Women members

and President/Vice President (@ Rs. 50,000/-

per block)

Blocks 0.50000

Sub Total 1935 34.830 1935 34.83000VI SCHOOL INFRASTRUCTURE22 Civil Works22.01 Primary School (Plain) (New) School 13.1550022.02 Primary School (Hilly/Rocky) (New) School 13.2750022.03 Upper Primary (Plain) (New) School 20.65500

22.04 Upper Primary School (Hilly/Rocky) (New) School 20.77500

22.04aComposite Schools for Urban Areas (Class I-

VIII)School 41.04000

22.05 ACR in lieu of upgraded Upper Primary School Rooms

22.06 Additional class rooms for adding Class VIII Rooms

22.07 Building Less (Pry) School 9.7500022.08 Building Less (UP) School 18.5900022.09 Dilapidated Building (Pry) School 9.7500022.10 Dilapidated Building (UP) School 18.59000

22.11 Additional Class Room (Rural) ( PS+UPS) Rooms 3.45000 100 345.000 100 345.00000

22.12 Additional Class Room (Urban) Rooms 3.4500022.13 Additional Class Room (Hill Area)22.14 Toilet/Urinals (PS & UPS) School 0.70000 352 246.400 352 246.4000022.15 Separate Girls Toilet (Rural+Urban) School 0.7000022.16 CWSN friendly Toilets School 0.50000

22.17 Drinking Water Facility (for Urban Area Only)) School 0.15000

22.17a Drinking Water Facility (Plain PS & UPS) School 0.15000 180 27.000 180 27.00000

22.17b Drinking Water Facility (Hilly/Rocky PS & UPS) School 0.15000

22.18a Boundary Wall PS (Total in Meters x .01105) 0.01749

22.18bBoundary Wall PS (For Gate) @Rs. 7000 x no. of

P.S.School 0.07800

22.18c Boundary Wall UPS (Total in Meters x .01105) 0.01749

22.18dBoundary Wall UPS (For Gate) @Rs. 7000 x no.

of UPSSchool 0.07800

22.19a Electrification in P.S./ Electrical Equipment School 0.11000

22.19b Electrification in U. P.S./ Electrical Equipment School 0.11000

22.20Office-cum-store-cum-Head Teacher's room

(Primary)Rooms

22.21Office-cum-store-cum-Head Teacher's room

(Upper Primary)Rooms

22.22Augumentation of training facility in BRC (one

time)BRC/ URC 5.00000

22.23 Child friendly Elements School 0.25000

22.24 Ramps with Handrails (Barrier Free Elements) School 0.06000 258 15.480 258 15.48000

22.25 Handrails in existing Ramps School 0.01000

Arti:SSA-AWPB-2014-15-PABMinits:Etah:16-06-2014 369 / 533

Page 370: U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 · 2015. 1. 6. · U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15

Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

Name of District : Etah -24

ActivityS. No.Physical

UnitRemarks

Outlay Recommendation for 2014-15

Spill OverDeferred laibility of

2014-15Fresh Recommended Total Recommended

22.26 Whole School Develoipment School22.27 Retro-fitting and repairs School

22.28Residential Schools for specific category

of children

(a) Construction of Building including boundary

wall, Water and sanitation facilities, electric

installation (For 100 children)

Building 65.86000

(b) Construction of residential hostel Building 65.86000

(c) Refurnishing unused old buildings Building

22.29

Construction of Hostel in existing Govt UPS

including boundary wall, Water and sanitation

facilities, electric installation etc. (For 50

children)

7.00000

22.30Furniture for Govt. UPS (per child) (@ Rs.500/-

per child enrolled)Child 0.00500

22.31 Major Repairs for Primary School School 0.30000

22.32 Majr Repairs for Upper Primary School School 0.30000

22.33Others (Difference of Civil Wrks

sanctioned in pre.yr.)22.33a Others (Overhead Tank PS) School 0.1200022.33b Others (Overhead Tank UPS) School 0.12000

Sub Total (Civil WOrks) 890 633.880 890 633.88VII PROJECT MANAGEMENT COST23 Management23.01 Management up to 3.5%

(a) Project Management and MIS

(i) DPO ( Salary, Contigency, Consumables,

POL, TA & Computer etc)District 1 90.437 1 90.43690

(ii) EMIS Cell District 1 13.340 1 13.33950Sub Total (a) 1 1 1 103.776 1 103.776

(b) Training of Educational Administrators District

(c) School Mapping and Social Mapping District

Sub Total (23.01)

23.02Learning Enhancement Prog. (LEP) (P & UP) (up

to 2%)District 13.040 13.03990

23.03 Community Mobilization (up to 0.5%) District 1 35.000 1 35.00000

Sub Total (Management) 1 48.040 1 48.03990Total Management Cost 151.816 151.81630Total of SSA (Districs) 0.700 299097 7502.025 299097 7502.725

24 State Component23.01 Management23.02 REMS 0.0044923.03 SIEMAT

Sub Total

STATE SSA TOTAL 0.70000 299097 7502.025 299097 7502.72519

25

KGBV Financial Provision (give

separate costing sheets for different

Models)

Hostel

ANon Recurring One Time Grant (Only

committed liabilities) (Model-I)

25.01 Construction of Building (New)

25.02 Construction of Building KGBV sanctioned earlier

25.02(a) Additional Class Room Rooms 3.45000

25.02(b) Guard Room Rooms 1.32000

25.02(c) Boundary Wall School 5.0200025.03 Boudary Wall (Spillover only)

25.04

Boring/Handpump (Spillover only)

(minimum rates prescribed by State Drinking

Water Department subject to a ceiling of Rs.

1.00 lakhs)

25.05 Electricity /Water charges (Spillover only)

25.05(a) Solar Water Heater & Solar Light 2.97000

25.06Furniture/Equipment (including Kitchen

equipment)3.00000

25.07 TLM and equipment including library books 3.50000

25.08 Bedding (New) 0.75000

25.09 Replacement of Bedding (once in 3 Year) 0.75000 7 5.250 7 5.25000

Subtotal Non Recurring 5.250 5.25000

B Recurring Cost Per Annum (Model-I)

25.10Maintenance per girl student per month @ Rs.

1500/-18.00000 8 144.000 8 144.00000

25.11 Stipend for girl student per month @ Rs. 100/- 1.20000 8 9.600 8 9.60000

25.12Supplementary TLM, stationery and other

educational material @ Rs.1000/- per annum1.00000 8 8.000 8 8.00000

25.13 Salaries

Arti:SSA-AWPB-2014-15-PABMinits:Etah:16-06-2014 370 / 533

Page 371: U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 · 2015. 1. 6. · U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15

Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

Name of District : Etah -24

ActivityS. No.Physical

UnitRemarks

Outlay Recommendation for 2014-15

Spill OverDeferred laibility of

2014-15Fresh Recommended Total Recommended

25.13.1 Additional Salaries:

(a) 1 Warden @ Rs. 25,000/- per month 3.00000 8 24.00000 8 24.00000

(b)4 Full time teachers as per RTE norms @ Rs.

20,000/- per month per teacher 9.60000 8 76.80000 8 76.80000

(c)

1 Urdu Teachers (only for blocks with muslim

population above 20% and select urban areas), if

required @ Rs. 12,000/- per month per teacher 1.44000 8 11.52000 8 11.52000

(d)3 part time teachers @ Rs. 5,000/- per month per

teacher 1.80000 8 14.40000 8 14.40000

(e)1 Full time Accountant @ Rs. 10,000/- per month

1.20000 8 9.60000 8 9.60000

(f)

2 Support Staff – (Accountant/ Assistant, Peon,

Chowkidar) @ Rs. 5,000/- per month per staff 1.20000 8 9.60000 8 9.60000

(g) 1 Head cook @ Rs. 6,000/- per month 0.72000 8 5.76000 8 5.76000

(h)2 Asstt. Cooks @ Rs. 4,500/- per month per cook

1.08000 8 8.64000 8 8.64000

25.14Specific skill training @ Rs.1000/- per child per

annum1.00000 8 8.000 8 8.00000

25.15Electricity/water charges @ Rs.1000/- per child

per annum1.00000 8 8.000 8 8.00000

25.16Medical care/contingencies @ Rs. 1250 per child

per annum1.25000 8 10.000 8 10.00000

25.17 Maintenance @ Rs.750/- per child per annum 0.75000 8 6.000 8 6.00000

25.18

Miscellaneous (Educational Tour/ Exposure Visit

/ Sports Material etc.) @ Rs.750/- per child per

annum

0.75000 8 6.000 8 6.00000

25.19Preparatory camps @ Rs.200/- per child per

annum0.20000 8 1.600 8 1.60000

25.20PTAs/school functions @ Rs.200/- per child per

annum0.20000 8 1.600 8 1.60000

25.21 Provision of Rent @ Rs.6000/- per annum 6.00000

25.21a Provision of Rent (6 months) 3.6000025.21b Provision of Rent (3 months) 1.8000025.21c Rent (Previous Year (2007-2012)

25.22 Capacity building 0.50000 8 4.000 8 4.00000

25.22(a)Physical/ Self Defence Training @ Rs.200/- per

child per annum0.20000 8 1.600 8 1.60000

Subtotal Recurring 8 368.720 8 368.72000

Subtotal (Model-I) 8 373.970 8 373.97000

CNon Recurring One Time Grant (Only

committed liabilities) (Model-II)

25.23 Construction of Building (New)

25.24 Construction of Building KGBV sanctioned earlier

25.24(a) Additional Class Room Rooms 3.45000

25.24(b) Guard Room Rooms 1.32000

25.24(c) Boundary Wall School 5.0200025.25 Boudary Wall (Spillover only)25.26 Boring/Handpump (Spillover only)

25.27 Electricity /Water charges (Spillover only)

25.27(a) Solar Water Heater & Solar Light 2.97000

25.28Furniture/Equipment (including Kitchen

equipment)2.00000

25.29 TLM and equipment including library books 3.00000

25.30 Bedding (New) 0.37500

25.31 Replacement of Bedding (once in 3 Year) 0.37500

Subtotal Non Recurring

D Recurring Cost Per Annum (Model-II)

25.32Maintenance per girl student per month @ Rs.

1500/-9.00000

25.33 Stipend for girl student per month @ Rs. 100/- 0.60000

25.34Supplementary TLM, stationery and other

educational material @ Rs.1000/- per annum0.50000

25.35 Salaries(a) 1 Warden @ Rs. 25,000/- per month 3.00000

(b)3 Full time teachers as per RTE norms @ Rs.

20,000/- per month per teacher 7.20000

(c) 3 part time teachers @ Rs. 5,000/- per month per

teacher 1.80000

(d)1 Full time Accountant @ Rs. 10,000/- per month

1.20000

(e)

2 Support Staff – (Accountant/ Assistant, Peon,

Chowkidar) @ Rs. 5,000/- per month per staff 1.20000

Arti:SSA-AWPB-2014-15-PABMinits:Etah:16-06-2014 371 / 533

Page 372: U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 · 2015. 1. 6. · U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15

Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

Name of District : Etah -24

ActivityS. No.Physical

UnitRemarks

Outlay Recommendation for 2014-15

Spill OverDeferred laibility of

2014-15Fresh Recommended Total Recommended

(f) 1 Head cook @ Rs. 6,000/- per month 0.72000

(g)1 Asstt. Cooks @ Rs. 4,500/- per month per cook

0.54000

25.36Specific skill training @ Rs.1000/- per child per

annum0.50000

25.37Electricity/water charges @ Rs.1000/- per child

per annum0.50000

25.38Medical care/contingencies @ Rs. 1250 per child

per annum0.62500

25.39 Maintenance @ Rs.750/- per child per annum 0.37500

25.40

Miscellaneous (Educational Tour/ Exposure Visit

/ Sports Material etc.) @ Rs.750/- per child per

annum

0.37500

25.41Preparatory camps @ Rs.300/- per child per

annum0.15000

25.42PTAs/school functions @ Rs.300/- per child per

annum0.15000

25.43 Provision of Rent @ Rs.10000/- per annum 5.00000

25.43a Provision of Rent (6 months) 3.6000025.43b Provision of Rent (3 months) 1.8000025.43c Rent (Previous Year (2007-2012)25.44 Capacity building 0.25000

25.44(a)Physical/ Self Defence Training @ Rs.200/- per

child per annum0.10000

Subtotal Recurring

Subtotal (Model-II) Total (KGBV) 8 373.970 8 373.970

DISTRICT GRAND TOTAL (SSA+KGBV) 0.700 299105 7875.995 299105 7876.695

Arti:SSA-AWPB-2014-15-PABMinits:Etah:16-06-2014 372 / 533

Page 373: U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 · 2015. 1. 6. · U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15

Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

I ACCESS

1 Opening of New Schools

1.01 Upgradation of EGS to PSCentres /

School1.02 New PS School

1.03 Upgradation of PS to UPS / New UPS School

1.04 Composite Schools (for Urban Areas) School

1.05Residential Schools for specific category children

(For 100 children)

1.06Residential Hostel (for specific category of

children) (For 50 children)

1.07 Integration of Class V with Primary Schools

1.08Integration of Class VIII with Upper Primary

Schools

2Residential Schools for specific category

of children (For 100 Children)

Total - Residential Schools (For 100

children)

3Residential Hostel for specific category of

children (For 50 Children)

Total - Residential Schools (For 50

children)4 Transport/Escort Facility

4.01

Children in remote habitations with sparse

populations where opening of schools is

unviable

Child 0.03000

4.02

Urban deprived children/children without adult

protection in urban areas where schools are not

opened because availability of land is a problem

Child 0.03000

Sub Total

5Special Training for mainstreaming of Out-

of-School Children

5.03 Non-Residential (Fresh)(a) 12 months Child 0.06000(b) 9 months 0.04500(c) 6 months

(i)Special Training (by Special Instructors-NRBC)-

(1-5) Child 0.03000 120 3.600 120 3.60000

(ii) Special Training (by Special Instructors-NRBC)-

(6-8) Child 0.03000 153 4.590 153 4.59000

(d) 3 months Child 0.01500Sub Total 273 8.190 273 8.19000

Total (Special Training) 273 8.190 273 8.1905(B) House Hold Survey (HHS)

5(B).01 House Hold Survey through SMCHouse

Hold0.00001

Sub TotalII RETENTION6 Free Text Book

6.01Free Text Book (PS) for Parishadiya & Aided

Primary Schools (Workbooks not included)Child 0.00120 176632 211.958 176632 211.95840

6.01a

Free Text Book (PS) for 25% children of Class-1

in Private Recognised Primary Schools of other

Boards (Workbooks not included)

Child 0.00150

6.02 Free Brail Books (PS) 0.00150 151 0.227 151 0.22650

6.03 Free Large Print Books (PS) 0.00150

6.04Free Text Book (UPS) (Workbooks not included)

(Including KGBV Girls)Child 0.00200 71988 143.976 71988 143.97600

6.05 Free Brail Books (UPS) 0.00250 40 0.100 40 0.10000

6.06 Free Large Print Books (PS) 0.00250Sub Total 248811 356.261 248811 356.261

7 Provision of 2 set of Uniforms

7.01 All Girls (Including KGBV Girls) Child 0.00400 197343 789.372 197343 789.37200

7.02 SC Boys Child 0.00400 44234 176.936 44234 176.93600

7.03 ST Boys Child 0.00400 6462 25.848 6462 25.84800

7.04 BPL Boys Child 0.00400 106988 427.952 106988 427.95200

7.05

Free Uniform for 25% children of Class-1 in

Private Recognised Primary Schools of other

Boards

Child0.00400

Sub Total 355027 1420.108 355027 1420.1087(A) Fee Reimbursement

7(A).01

Fee Reimbursement for Admission of children of

Disadvantaged Group & Weaker Section upto

25% of seats in Class-1 of Private Unaided

Recognised Schools

Child 0.05400

Sub Total

Name of District : Deoria -23

ActivityS. No.Physical

UnitRemarks

Outlay Recommendation for 2014-15

Spill OverDeferred laibility of

2014-15Fresh Recommended Total Recommended

Arti:SSA-AWPB-2014-15-PABMinits:Deoria:16-06-2014 373 / 533

Page 374: U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 · 2015. 1. 6. · U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15

Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

Name of District : Deoria -23

ActivityS. No.Physical

UnitRemarks

Outlay Recommendation for 2014-15

Spill OverDeferred laibility of

2014-15Fresh Recommended Total Recommended

8 Teaching Learning Equipment (TLE)

8.01 TLE - New Primary School 2.60000 0.20000 2.600008.02 TLE - New Upper Primary School 2.50000 0.50000 2.50000

Sub Total 5.10000 5.10000III ENHANCING QUALITY9 New Teachers Salary

9.01 Primary Teachers (Regular) (Asstt. Teacher) Teacher 0.91500

9.01aHead Teacher for Primary (if the number of

children exceeds 150 in a school)Teacher

9.02 Primary Teachers (Contract) (S.M.) Teacher

9.03Subject specific Upper Primary Teachers

(Regular) (a) Science and Mathematics Teacher 1.26000(b) Social Studies Teacher 1.26000(c) Languages Teacher 1.26000

Sub Total (9.01 to 9.05)Add.Teacher against PTR

Sub Total (9.06 to 9.12)

Total (New Teacher's Salary-9.01 to 9.12)

Teachers Salary (Recurring-sanctioned

earlier)Primary teachers

9.13 Primary Teachers ( Regular)-Existing, in position Teacher 3.66000 693 2536.380 693 2536.38000

9.14Primary Teachers (Contract)-Existing, in

positionTeacher 0.55000

9.14(a) Primary Teachers (Contract)-under Training Teacher 0.38500 1985 764.225 1985 764.22500

9.14(b)Primary Teacher (Para Teachers Equal to

9.14(a) upgraded as Teachers)0.38500 1049 403.865 1049 403.86500

9.14(c) Primary Teachers (Para)- Vacant Teacher9.15 Primary Teachers (Vacant) Teacher 0.30500

9.16Head Teacher for Primary (if the number of

children exceeds 150)Teacher 5.04000 186 937.440 186 937.44000

9.16(b)Head Teacher for Primary (if the number of

children exceeds 150) VacantTeacher 0.42000

Additional teachers

9.17Additional Teachers - PS (Special BTC-

Regular) in positionTeacher 0.30500

9.18Additional Teachers - PS (Special BTC Under

Training)Teacher 0.87600

9.19 Additional Teachers - PS (Vacant) Teacher

9.20Others in position (Para Teachers upgraded

as Teachers)Teacher

Upper Primary teachers

9.21 UP Teachers (Regular)-Existing Teacher 5.04000 1043 5256.720 1043 5256.72000

9.22 UP Teachers (Contract)-Existing9.23 UP Teachers (Vacant) Teacher 1.26000

9.24Head Teacher for Upper Primary (if the number

of children exceeds 100)-ExistingTeacher 5.34000 473 2525.820 473 2525.82000

9.24a Head Teacher for Upper Primary (Vacant) Teacher 1.33500

9.25Subject specific Upper Primary Teachers

(Regular)(a) Science and Mathematics(b) Social Studies(c) Languages

9.32 Part Time Instructors in position(a) Art Education 0.77000 131 100.870 131 100.87000(b) Health and Physical Education 0.77000 168 129.360 168 129.36000(c) Work Education 0.77000 151 116.270 151 116.27000

9.32(A) Part Time Instructors Vacant(a) Art Education 0.42000(b) Health and Physical Education 0.42000(c) Work Education 0.42000

9.33

Others-Incentive to Teachers in Schools

Located in Naxal Affected Areas (@

Rs.1500/- per teachers per month)

Sub Total (9.13 to 9.33) 5879 12770.950 5879 12770.95TOTAL

(New Teachers Salary +Teachers Salary

Recurring)

5879 12770.950 5879 12770.95000

10 Teachers Training(a) Teachers

10.01

Refresher In-service Teachers' Training at BRC

level and above - 10 days (@ Rs.200/- per head

per day)

Teacher

(Target &

Ach.-13-14

in

Mandays)

0.00600

Arti:SSA-AWPB-2014-15-PABMinits:Deoria:16-06-2014 374 / 533

Page 375: U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 · 2015. 1. 6. · U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15

Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

Name of District : Deoria -23

ActivityS. No.Physical

UnitRemarks

Outlay Recommendation for 2014-15

Spill OverDeferred laibility of

2014-15Fresh Recommended Total Recommended

10.01(a)Continuous and Comprehensive Evauation [PS +

UPS)Teacher 0.01300 1871 24.323 1871 24.32300

10.01(b) Eary Reading and Numeracy Skills [PS] Teacher 0.00500 1871 9.355 1871 9.35500

10.01(c) Science [UPS] Teacher 0.00800 746 5.968 746 5.96800Recommended as

proposed

10.01(d) CWSN Teacher 0.00400

10.02

One day monthly cluster level meetings and

peer group training sessions for 10 months for

all teachers each year at CRC level - 10 days (@

Rs.100/- per head per day)

Teacher 0.01000

10.03(a)

Induction Training for Newly Recruited Teachers

for 6 Months (Special BTC)- @Rs.2000/- per

head per year

Teacher 0.02000

10.03(b)5 Days Training for Part Time Instructors @ Rs.

200/- per head per day) Teacher 0.01000

10.04

Training of untrained Teachers to acquire

professional qualifications over a two year

period.

Teacher 0.04700 730 34.310 730 34.31000

(b) Head Teachers

10.05Refresher Residencial In-service for 10 days at

BRC level and above

Head

Teacher(c) Resource Persons

10.06

Refresher Training for all Resource

Persons,Master Trainers, BRC & CRC faculty

and Coordinators for 5 days each year (@

Rs.200/- per head per day)

Resource

Person 0.00300 204 0.612 204 0.61200

Sub Total 5422 74.568 5422 74.568

11Academic Support through Block Resource

Centre (BRC)/ URC

11.01 Salary of Faculty and Staff

(a) 5 RPs at BRC for subject specific training in

positionRP 85 85

(b) 2 RPs for CWSN in position RP(b-i) 1 CWSN Resource Person RP 1.10000 34 37.400 34 37.40000

(b-ii) 1 Physiotherapist (Resource person for IE) RP

(c) 1 MIS Coordinator in position RP 1.86000

(d) 1 Datra Entry Operator in position RP 1.74000 17 29.580 17 29.58000

(e) 1 Accountant-cum-support staff in position RP 1.80000 17 30.600 17 30.60000

11.02 Furniture Grant BRC/ URC 1.00000

11.03Replacement of furniture, computer, TLE etc (

Once in 5 years)BRC/ URC 1.00000

11.04 Contingency Grant BRC/ URC 0.50000 17 8.500 17 8.50000

11.05 Meeting, TA BRC/ URC 0.30000 17 5.100 17 5.10000

11.06 TLM Grant BRC/ URC 0.10000

11.07 Maintenance Grant BRC/ URC 0.10000

Sub Total 17 111.180 17 111.18000

12Academic Support through Cluster

Resource Centres (CRC/UERC)

12.01Salary of Cluster Coordinator (on an average of

one Resource Person per 18 schools in a block)RP

12.02 Furniture Grant CRC/ UERC 0.10000

12.03Replacement of furniture, computer, TLE etc.

once in 5 yearsCRC/ UERC 0.10000

12.04 Contingency Grant CRC/UERC 0.10000 177 17.700 177 17.70000

12.05 Meeting, TA CRC/UERC 0.12000 177 21.240 177 21.24000

12.06 TLM Grant CRC/UERC 0.03000

12.07Maintenance Grant

CRC/UERC 0.02000

Sub Total 354 38.940 354 38.94000

13Computer Aided Education in upper

primary schools under Innovation

13.01Computer Aided Education in upper primary

schoolsDistrict 0.01200 48 0.576 48 0.57600

Sub Total 48 0.576 48 0.5760014 Libraries in Schools

Arti:SSA-AWPB-2014-15-PABMinits:Deoria:16-06-2014 375 / 533

Page 376: U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 · 2015. 1. 6. · U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15

Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

Name of District : Deoria -23

ActivityS. No.Physical

UnitRemarks

Outlay Recommendation for 2014-15

Spill OverDeferred laibility of

2014-15Fresh Recommended Total Recommended

14.01 (a) Primary School (per school) School 0.03000

14.02 (b) Upper Primary School (per school) School 0.10000

Sub TotalIV ANNUAL GRANTS15 Teachers' Grant15.01 Primary Teachers Teacher 0.0050015.02 Upper Primary Teachers Teacher 0.00500 746 3.730 746 3.73000

Sub Total 746 3.730 746 3.7300016 School Grant16.01 Primary School School 0.05000 1925 96.250 1925 96.2500016.02 Upper Primary School School 0.07000 996 69.720 996 69.72000

Sub Total 2921 165.970 2921 165.97000

17Research, Evaluation, Monitoring &

Supervision

17.01 REMS Activities School 0.00103 2921 3.005 2921 3.00458

17.02 Monitoring & Supervision School 0.00078 2921 2.290 2921 2.29026

17.03 House Hold Survey (Urban) in Million Plus Cities District 35.00000

Sub Total 5842 5.295 5842 5.2948418 Maintenance Grant

18.01 Maintenance in School having upto3 Classrooms School 0.07500 84 6.300 84 6.30000

18.01a Maintenance Grant School 0.07500 2550 191.250 2550 191.25000Sub Total 2634 197.550 2634 197.55000

VBRIDGING GENDER AND SOCIAL

CATEGORY GAPS

19 Interventions for CWSN (IE)

19.01 Provision for Inclusive Education Child 0.01500 6751 101.265 6751 101.26500

Sub Total 6751 101.265 6751 101.26500

20Innovativation Head up to Rs.50 Lakh per

district

20.01 Girls Education District 0.70000 10 7.000 10 7.00000

20.02 ECCE District20.03 Intervention for SC / ST children District

20.04 Intervention for Minority Community children District

20.05 Intervention for Urban Deprived children District 10.00000

Sub Total 10 7.000 10 7.0000021 SMC/PRI Training

21.01Residential for 6 Resource Person per Block (3

days) (@ Rs.500/-)Blocks 0.09000

21.02Non-residential (3 days training of 6 SMC

members) (@ Rs.100/-)SMC 0.01800 2634 47.412 2634 47.41200

21.02(a)Non-residential (3 days training of 3 Members of

PRI/VECs/LA) (@ Rs.100/-)VEC/ WEC 0.00900

21.03

Seminar/Orientation of SMC Women members

and President/Vice President (@ Rs. 50,000/-

per block)

Blocks 0.50000

Sub Total 2634 47.412 2634 47.41200VI SCHOOL INFRASTRUCTURE22 Civil Works22.01 Primary School (Plain) (New) School 13.1550022.02 Primary School (Hilly/Rocky) (New) School 13.2750022.03 Upper Primary (Plain) (New) School 20.65500

22.04 Upper Primary School (Hilly/Rocky) (New) School 20.77500

22.04aComposite Schools for Urban Areas (Class I-

VIII)School 41.04000

22.05 ACR in lieu of upgraded Upper Primary School Rooms

22.06 Additional class rooms for adding Class VIII Rooms

22.07 Building Less (Pry) School 9.7500022.08 Building Less (UP) School 18.5900022.09 Dilapidated Building (Pry) School 9.7500022.10 Dilapidated Building (UP) School 18.59000

22.11 Additional Class Room (Rural) ( PS+UPS) Rooms 3.45000

22.12 Additional Class Room (Urban) Rooms 3.4500022.13 Additional Class Room (Hill Area)22.14 Toilet/Urinals (PS & UPS) School 0.7000022.15 Separate Girls Toilet (Rural+Urban) School 0.7000022.16 CWSN friendly Toilets School 0.50000

22.17 Drinking Water Facility (for Urban Area Only)) School 0.15000

22.17a Drinking Water Facility (Plain PS & UPS) School 0.15000

22.17b Drinking Water Facility (Hilly/Rocky PS & UPS) School 0.15000

22.18a Boundary Wall PS (Total in Meters x .01105) 0.01749

22.18bBoundary Wall PS (For Gate) @Rs. 7000 x no. of

P.S.School 0.07800

Arti:SSA-AWPB-2014-15-PABMinits:Deoria:16-06-2014 376 / 533

Page 377: U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 · 2015. 1. 6. · U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15

Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

Name of District : Deoria -23

ActivityS. No.Physical

UnitRemarks

Outlay Recommendation for 2014-15

Spill OverDeferred laibility of

2014-15Fresh Recommended Total Recommended

22.18c Boundary Wall UPS (Total in Meters x .01105) 0.01749

22.18dBoundary Wall UPS (For Gate) @Rs. 7000 x no.

of UPSSchool 0.07800

22.19a Electrification in P.S./ Electrical Equipment School 0.11000

22.19b Electrification in U. P.S./ Electrical Equipment School 0.11000

22.20Office-cum-store-cum-Head Teacher's room

(Primary)Rooms

22.21Office-cum-store-cum-Head Teacher's room

(Upper Primary)Rooms

22.22Augumentation of training facility in BRC (one

time)BRC/ URC 5.00000

22.23 Child friendly Elements School 0.25000

22.24 Ramps with Handrails (Barrier Free Elements) School 0.06000

22.25 Handrails in existing Ramps School 0.0100022.26 Whole School Develoipment School22.27 Retro-fitting and repairs School

22.28Residential Schools for specific category

of children

(a) Construction of Building including boundary

wall, Water and sanitation facilities, electric

installation (For 100 children)

Building 65.86000

(b) Construction of residential hostel Building 65.86000

(c) Refurnishing unused old buildings Building

22.29

Construction of Hostel in existing Govt UPS

including boundary wall, Water and sanitation

facilities, electric installation etc. (For 50

children)

7.00000

22.30Furniture for Govt. UPS (per child) (@ Rs.500/-

per child enrolled)Child 0.00500

22.31 Major Repairs for Primary School School 0.30000

22.32 Majr Repairs for Upper Primary School School 0.30000

22.33Others (Difference of Civil Wrks

sanctioned in pre.yr.)22.33a Others (Overhead Tank PS) School 0.1200022.33b Others (Overhead Tank UPS) School 0.12000

Sub Total (Civil WOrks)VII PROJECT MANAGEMENT COST23 Management23.01 Management up to 3.5%

(a) Project Management and MIS

(i) DPO ( Salary, Contigency, Consumables,

POL, TA & Computer etc)District 1 133.080 1 133.08030

(ii) EMIS Cell District 1 19.669 1 19.66850Sub Total (a) 1 1 1 152.749 1 152.749

(b) Training of Educational Administrators District

(c) School Mapping and Social Mapping District

Sub Total (23.01)

23.02Learning Enhancement Prog. (LEP) (P & UP) (up

to 2%)District 22.056 22.05600

23.03 Community Mobilization (up to 0.5%) District 1 45.850 1 45.85000

Sub Total (Management) 1 67.906 1 67.90600Total Management Cost 220.655 220.65480Total of SSA (Districs) 5.100 637369 15529.650 637369 15534.750

24 State Component23.01 Management23.02 REMS 0.0044923.03 SIEMAT

Sub Total

STATE SSA TOTAL 5.10000 637369 15529.650 637369 15534.74954

25

KGBV Financial Provision (give

separate costing sheets for different

Models)

Hostel

ANon Recurring One Time Grant (Only

committed liabilities) (Model-I)

25.01 Construction of Building (New)

25.02 Construction of Building KGBV sanctioned earlier

25.02(a) Additional Class Room Rooms 3.45000

25.02(b) Guard Room Rooms 1.32000

25.02(c) Boundary Wall School 5.0200025.03 Boudary Wall (Spillover only)

25.04

Boring/Handpump (Spillover only)

(minimum rates prescribed by State Drinking

Water Department subject to a ceiling of Rs.

1.00 lakhs)

Arti:SSA-AWPB-2014-15-PABMinits:Deoria:16-06-2014 377 / 533

Page 378: U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 · 2015. 1. 6. · U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15

Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

Name of District : Deoria -23

ActivityS. No.Physical

UnitRemarks

Outlay Recommendation for 2014-15

Spill OverDeferred laibility of

2014-15Fresh Recommended Total Recommended

25.05 Electricity /Water charges (Spillover only)

25.05(a) Solar Water Heater & Solar Light 2.97000

25.06Furniture/Equipment (including Kitchen

equipment)3.00000

25.07 TLM and equipment including library books 3.50000

25.08 Bedding (New) 0.75000

25.09 Replacement of Bedding (once in 3 Year) 0.75000 11 8.250 11 8.25000

Subtotal Non Recurring 8.250 8.25000

B Recurring Cost Per Annum (Model-I)

25.10Maintenance per girl student per month @ Rs.

1500/-18.00000 13 234.000 13 234.00000

25.11 Stipend for girl student per month @ Rs. 100/- 1.20000 13 15.600 13 15.60000

25.12Supplementary TLM, stationery and other

educational material @ Rs.1000/- per annum1.00000 13 13.000 13 13.00000

25.13 Salaries

25.13.1 Additional Salaries:

(a) 1 Warden @ Rs. 25,000/- per month 3.00000 13 39.00000 13 39.00000

(b)4 Full time teachers as per RTE norms @ Rs.

20,000/- per month per teacher 9.60000 13 124.80000 13 124.80000

(c)

1 Urdu Teachers (only for blocks with muslim

population above 20% and select urban areas), if

required @ Rs. 12,000/- per month per teacher 1.44000 13 18.72000 13 18.72000

(d)3 part time teachers @ Rs. 5,000/- per month per

teacher 1.80000 13 23.40000 13 23.40000

(e)1 Full time Accountant @ Rs. 10,000/- per month

1.20000 13 15.60000 13 15.60000

(f)

2 Support Staff – (Accountant/ Assistant, Peon,

Chowkidar) @ Rs. 5,000/- per month per staff 1.20000 13 15.60000 13 15.60000

(g) 1 Head cook @ Rs. 6,000/- per month 0.72000 13 9.36000 13 9.36000

(h)2 Asstt. Cooks @ Rs. 4,500/- per month per cook

1.08000 13 14.04000 13 14.04000

25.14Specific skill training @ Rs.1000/- per child per

annum1.00000 13 13.000 13 13.00000

25.15Electricity/water charges @ Rs.1000/- per child

per annum1.00000 13 13.000 13 13.00000

25.16Medical care/contingencies @ Rs. 1250 per child

per annum1.25000 13 16.250 13 16.25000

25.17 Maintenance @ Rs.750/- per child per annum 0.75000 13 9.750 13 9.75000

25.18

Miscellaneous (Educational Tour/ Exposure Visit

/ Sports Material etc.) @ Rs.750/- per child per

annum

0.75000 13 9.750 13 9.75000

25.19Preparatory camps @ Rs.200/- per child per

annum0.20000 13 2.600 13 2.60000

25.20PTAs/school functions @ Rs.200/- per child per

annum0.20000 13 2.600 13 2.60000

25.21 Provision of Rent @ Rs.6000/- per annum 6.00000

25.21a Provision of Rent (6 months) 3.6000025.21b Provision of Rent (3 months) 1.8000025.21c Rent (Previous Year (2007-2012)

25.22 Capacity building 0.50000 13 6.500 13 6.50000

25.22(a)Physical/ Self Defence Training @ Rs.200/- per

child per annum0.20000 13 2.600 13 2.60000

Subtotal Recurring 13 599.170 13 599.17000

Subtotal (Model-I) 13 607.420 13 607.42000

CNon Recurring One Time Grant (Only

committed liabilities) (Model-II)

25.23 Construction of Building (New)

25.24 Construction of Building KGBV sanctioned earlier

25.24(a) Additional Class Room Rooms 3.45000

25.24(b) Guard Room Rooms 1.32000

25.24(c) Boundary Wall School 5.0200025.25 Boudary Wall (Spillover only)25.26 Boring/Handpump (Spillover only)

25.27 Electricity /Water charges (Spillover only)

25.27(a) Solar Water Heater & Solar Light 2.97000

25.28Furniture/Equipment (including Kitchen

equipment)2.00000

25.29 TLM and equipment including library books 3.00000

Arti:SSA-AWPB-2014-15-PABMinits:Deoria:16-06-2014 378 / 533

Page 379: U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 · 2015. 1. 6. · U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15

Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

Name of District : Deoria -23

ActivityS. No.Physical

UnitRemarks

Outlay Recommendation for 2014-15

Spill OverDeferred laibility of

2014-15Fresh Recommended Total Recommended

25.30 Bedding (New) 0.37500

25.31 Replacement of Bedding (once in 3 Year) 0.37500

Subtotal Non Recurring

D Recurring Cost Per Annum (Model-II)

25.32Maintenance per girl student per month @ Rs.

1500/-9.00000

25.33 Stipend for girl student per month @ Rs. 100/- 0.60000

25.34Supplementary TLM, stationery and other

educational material @ Rs.1000/- per annum0.50000

25.35 Salaries(a) 1 Warden @ Rs. 25,000/- per month 3.00000

(b)3 Full time teachers as per RTE norms @ Rs.

20,000/- per month per teacher 7.20000

(c) 3 part time teachers @ Rs. 5,000/- per month per

teacher 1.80000

(d)1 Full time Accountant @ Rs. 10,000/- per month

1.20000

(e)

2 Support Staff – (Accountant/ Assistant, Peon,

Chowkidar) @ Rs. 5,000/- per month per staff 1.20000

(f) 1 Head cook @ Rs. 6,000/- per month 0.72000

(g)1 Asstt. Cooks @ Rs. 4,500/- per month per cook

0.54000

25.36Specific skill training @ Rs.1000/- per child per

annum0.50000

25.37Electricity/water charges @ Rs.1000/- per child

per annum0.50000

25.38Medical care/contingencies @ Rs. 1250 per child

per annum0.62500

25.39 Maintenance @ Rs.750/- per child per annum 0.37500

25.40

Miscellaneous (Educational Tour/ Exposure Visit

/ Sports Material etc.) @ Rs.750/- per child per

annum

0.37500

25.41Preparatory camps @ Rs.300/- per child per

annum0.15000

25.42PTAs/school functions @ Rs.300/- per child per

annum0.15000

25.43 Provision of Rent @ Rs.10000/- per annum 5.00000

25.43a Provision of Rent (6 months) 3.6000025.43b Provision of Rent (3 months) 1.8000025.43c Rent (Previous Year (2007-2012)25.44 Capacity building 0.25000

25.44(a)Physical/ Self Defence Training @ Rs.200/- per

child per annum0.10000

Subtotal Recurring

Subtotal (Model-II) Total (KGBV) 13 607.420 13 607.420

DISTRICT GRAND TOTAL (SSA+KGBV) 5.100 637382 16137.070 637382 16142.170

Arti:SSA-AWPB-2014-15-PABMinits:Deoria:16-06-2014 379 / 533

Page 380: U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 · 2015. 1. 6. · U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15

Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

I ACCESS

1 Opening of New Schools

1.01 Upgradation of EGS to PSCentres /

School1.02 New PS School

1.03 Upgradation of PS to UPS / New UPS School

1.04 Composite Schools (for Urban Areas) School

1.05Residential Schools for specific category children

(For 100 children)

1.06Residential Hostel (for specific category of

children) (For 50 children)

1.07 Integration of Class V with Primary Schools

1.08Integration of Class VIII with Upper Primary

Schools

2Residential Schools for specific category

of children (For 100 Children)

Total - Residential Schools (For 100

children)

3Residential Hostel for specific category of

children (For 50 Children)

Total - Residential Schools (For 50

children)4 Transport/Escort Facility

4.01

Children in remote habitations with sparse

populations where opening of schools is

unviable

Child 0.03000

4.02

Urban deprived children/children without adult

protection in urban areas where schools are not

opened because availability of land is a problem

Child 0.03000

Sub Total

5Special Training for mainstreaming of Out-

of-School Children

5.03 Non-Residential (Fresh)(a) 12 months Child 0.06000(b) 9 months 0.04500(c) 6 months

(i)Special Training (by Special Instructors-NRBC)-

(1-5) Child 0.03000 28 0.840 28 0.84000

(ii) Special Training (by Special Instructors-NRBC)-

(6-8) Child 0.03000 64 1.920 64 1.92000

(d) 3 months Child 0.01500Sub Total 92 2.760 92 2.76000

Total (Special Training) 92 2.760 92 2.7605(B) House Hold Survey (HHS)

5(B).01 House Hold Survey through SMCHouse

Hold0.00001

Sub TotalII RETENTION6 Free Text Book

6.01Free Text Book (PS) for Parishadiya & Aided

Primary Schools (Workbooks not included)Child 0.00120 78421 94.105 78421 94.10520

6.01a

Free Text Book (PS) for 25% children of Class-1

in Private Recognised Primary Schools of other

Boards (Workbooks not included)

Child 0.00150

6.02 Free Brail Books (PS) 0.00150 97 0.146 97 0.14550

6.03 Free Large Print Books (PS) 0.00150

6.04Free Text Book (UPS) (Workbooks not included)

(Including KGBV Girls)Child 0.00200 34796 69.592 34796 69.59200

6.05 Free Brail Books (UPS) 0.00250 40 0.100 40 0.10000

6.06 Free Large Print Books (PS) 0.00250Sub Total 113354 163.943 113354 163.943

7 Provision of 2 set of Uniforms

7.01 All Girls (Including KGBV Girls) Child 0.00400 83400 333.600 83400 333.60000

7.02 SC Boys Child 0.00400 29734 118.936 29734 118.93600

7.03 ST Boys Child 0.00400

7.04 BPL Boys Child 0.00400 20349 81.396 20349 81.39600

7.05

Free Uniform for 25% children of Class-1 in

Private Recognised Primary Schools of other

Boards

Child0.00400

Sub Total 133483 533.932 133483 533.9327(A) Fee Reimbursement

7(A).01

Fee Reimbursement for Admission of children of

Disadvantaged Group & Weaker Section upto

25% of seats in Class-1 of Private Unaided

Recognised Schools

Child 0.05400

Sub Total

8 Teaching Learning Equipment (TLE)

8.01 TLE - New Primary School 1.80000 0.20000 1.800008.02 TLE - New Upper Primary School 1.00000 0.50000 1.00000

Name of District : Chitrakoot -22

ActivityS. No.Physical

UnitRemarks

Outlay Recommendation for 2014-15

Spill OverDeferred laibility of

2014-15Fresh Recommended Total Recommended

Arti:SSA-AWPB-2014-15-PABMinits:Chitrakoot:16-06-2014 380 / 533

Page 381: U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 · 2015. 1. 6. · U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15

Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

Name of District : Chitrakoot -22

ActivityS. No.Physical

UnitRemarks

Outlay Recommendation for 2014-15

Spill OverDeferred laibility of

2014-15Fresh Recommended Total Recommended

Sub Total 2.80000 2.80000III ENHANCING QUALITY9 New Teachers Salary

9.01 Primary Teachers (Regular) (Asstt. Teacher) Teacher 0.91500

9.01aHead Teacher for Primary (if the number of

children exceeds 150 in a school)Teacher

9.02 Primary Teachers (Contract) (S.M.) Teacher

9.03Subject specific Upper Primary Teachers

(Regular) (a) Science and Mathematics Teacher 1.26000(b) Social Studies Teacher 1.26000(c) Languages Teacher 1.26000

Sub Total (9.01 to 9.05)Add.Teacher against PTR

Sub Total (9.06 to 9.12)

Total (New Teacher's Salary-9.01 to 9.12)

Teachers Salary (Recurring-sanctioned

earlier)Primary teachers

9.13 Primary Teachers ( Regular)-Existing, in position Teacher 3.66000 550 2013.000 550 2013.00000

9.14Primary Teachers (Contract)-Existing, in

positionTeacher 0.55000

9.14(a) Primary Teachers (Contract)-under Training Teacher 0.38500 912 351.120 912 351.12000

9.14(b)Primary Teacher (Para Teachers Equal to

9.14(a) upgraded as Teachers)0.38500 411 158.235 411 158.23500

9.14(c) Primary Teachers (Para)- Vacant Teacher9.15 Primary Teachers (Vacant) Teacher 0.30500

9.16Head Teacher for Primary (if the number of

children exceeds 150)Teacher 5.04000 214 1078.560 214 1078.56000

9.16(b)Head Teacher for Primary (if the number of

children exceeds 150) VacantTeacher 0.42000

Additional teachers

9.17Additional Teachers - PS (Special BTC-

Regular) in positionTeacher 0.30500

9.18Additional Teachers - PS (Special BTC Under

Training)Teacher 0.87600

9.19 Additional Teachers - PS (Vacant) Teacher

9.20Others in position (Para Teachers upgraded

as Teachers)Teacher

Upper Primary teachers

9.21 UP Teachers (Regular)-Existing Teacher 5.04000 459 2313.360 459 2313.36000

9.22 UP Teachers (Contract)-Existing9.23 UP Teachers (Vacant) Teacher 1.26000

9.24Head Teacher for Upper Primary (if the number

of children exceeds 100)-ExistingTeacher 5.34000 241 1286.940 241 1286.94000

9.24a Head Teacher for Upper Primary (Vacant) Teacher 1.33500

9.25Subject specific Upper Primary Teachers

(Regular)(a) Science and Mathematics(b) Social Studies(c) Languages

9.32 Part Time Instructors in position(a) Art Education 0.77000 99 76.230 99 76.23000(b) Health and Physical Education 0.77000 107 82.390 107 82.39000(c) Work Education 0.77000 83 63.910 83 63.91000

9.32(A) Part Time Instructors Vacant(a) Art Education 0.42000(b) Health and Physical Education 0.42000(c) Work Education 0.42000

9.33

Others-Incentive to Teachers in Schools

Located in Naxal Affected Areas (@

Rs.1500/- per teachers per month)

Sub Total (9.13 to 9.33) 3076 7423.745 3076 7423.75TOTAL

(New Teachers Salary +Teachers Salary

Recurring)

3076 7423.745 3076 7423.74500

10 Teachers Training(a) Teachers

10.01

Refresher In-service Teachers' Training at BRC

level and above - 10 days (@ Rs.200/- per

head per day)

Teacher

(Target &

Ach.-13-14

in

Mandays)

0.00600

10.01(a)Continuous and Comprehensive Evauation [PS +

UPS)Teacher 0.01300 895 11.635 895 11.63500

10.01(b) Eary Reading and Numeracy Skills [PS] Teacher 0.00500 895 4.475 895 4.47500

10.01(c) Science [UPS] Teacher 0.00800 486 3.888 486 3.88800Recommended as

proposed

10.01(d) CWSN Teacher 0.00400

Arti:SSA-AWPB-2014-15-PABMinits:Chitrakoot:16-06-2014 381 / 533

Page 382: U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 · 2015. 1. 6. · U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15

Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

Name of District : Chitrakoot -22

ActivityS. No.Physical

UnitRemarks

Outlay Recommendation for 2014-15

Spill OverDeferred laibility of

2014-15Fresh Recommended Total Recommended

10.02

One day monthly cluster level meetings and

peer group training sessions for 10 months for

all teachers each year at CRC level - 10 days (@

Rs.100/- per head per day)

Teacher 0.01000

10.03(a)

Induction Training for Newly Recruited Teachers

for 6 Months (Special BTC)- @Rs.2000/- per

head per year

Teacher 0.02000

10.03(b)5 Days Training for Part Time Instructors @ Rs.

200/- per head per day) Teacher 0.01000

10.04

Training of untrained Teachers to acquire

professional qualifications over a two year

period.

Teacher 0.04700 643 30.221 643 30.22100

(b) Head Teachers

10.05Refresher Residencial In-service for 10 days at

BRC level and above

Head

Teacher(c) Resource Persons

10.06

Refresher Training for all Resource

Persons,Master Trainers, BRC & CRC faculty

and Coordinators for 5 days each year (@

Rs.200/- per head per day)

Resource

Person 0.00300 60 0.180 60 0.18000

Sub Total 2979 50.399 2979 50.399

11Academic Support through Block Resource

Centre (BRC)/ URC

11.01 Salary of Faculty and Staff

(a) 5 RPs at BRC for subject specific training in

positionRP 25 25

(b) 2 RPs for CWSN in position RP(b-i) 1 CWSN Resource Person RP 1.10000 10 11.000 10 11.00000

(b-ii) 1 Physiotherapist (Resource person for IE) RP

(c) 1 MIS Coordinator in position RP 1.86000

(d) 1 Datra Entry Operator in position RP 1.74000 5 8.700 5 8.70000

(e) 1 Accountant-cum-support staff in position RP 1.80000 5 9.000 5 9.00000

11.02 Furniture Grant BRC/ URC 1.00000

11.03Replacement of furniture, computer, TLE etc (

Once in 5 years)BRC/ URC 1.00000

11.04 Contingency Grant BRC/ URC 0.50000 5 2.500 5 2.50000

11.05 Meeting, TA BRC/ URC 0.30000 5 1.500 5 1.50000

11.06 TLM Grant BRC/ URC 0.10000

11.07 Maintenance Grant BRC/ URC 0.10000

Sub Total 5 32.700 5 32.70000

12Academic Support through Cluster

Resource Centres (CRC/UERC)

12.01Salary of Cluster Coordinator (on an average of

one Resource Person per 18 schools in a block)RP

12.02 Furniture GrantCRC/

UERC0.10000

12.03Replacement of furniture, computer, TLE etc.

once in 5 years

CRC/

UERC0.10000

12.04 Contingency Grant CRC/UERC 0.10000 49 4.900 49 4.90000

12.05 Meeting, TA CRC/UERC 0.12000 49 5.880 49 5.88000

12.06 TLM Grant CRC/UERC 0.03000

12.07Maintenance Grant

CRC/UERC 0.02000

Sub Total 98 10.780 98 10.78000

13Computer Aided Education in upper

primary schools under Innovation

13.01Computer Aided Education in upper primary

schoolsDistrict 0.01200 48 0.576 48 0.57600

Sub Total 48 0.576 48 0.5760014 Libraries in Schools14.01 (a) Primary School (per school) School 0.03000

14.02 (b) Upper Primary School (per school) School 0.10000

Sub TotalIV ANNUAL GRANTS15 Teachers' Grant15.01 Primary Teachers Teacher 0.0050015.02 Upper Primary Teachers Teacher 0.00500 486 2.430 486 2.43000

Sub Total 486 2.430 486 2.4300016 School Grant16.01 Primary School School 0.05000 998 49.900 998 49.9000016.02 Upper Primary School School 0.07000 485 33.950 485 33.95000

Sub Total 1483 83.850 1483 83.85000

Arti:SSA-AWPB-2014-15-PABMinits:Chitrakoot:16-06-2014 382 / 533

Page 383: U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 · 2015. 1. 6. · U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15

Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

Name of District : Chitrakoot -22

ActivityS. No.Physical

UnitRemarks

Outlay Recommendation for 2014-15

Spill OverDeferred laibility of

2014-15Fresh Recommended Total Recommended

17Research, Evaluation, Monitoring &

Supervision

17.01 REMS Activities School 0.00103 1483 1.525 1483 1.52543

17.02 Monitoring & Supervision School 0.00078 1483 1.163 1483 1.16277

17.03 House Hold Survey (Urban) in Million Plus Cities District 35.00000

Sub Total 2966 2.688 2966 2.6882018 Maintenance Grant

18.01 Maintenance in School having upto3 Classrooms School 0.07500 508 38.100 508 38.10000

18.01a Maintenance Grant School 0.07500 927 69.525 927 69.52500Sub Total 1435 107.625 1435 107.62500

VBRIDGING GENDER AND SOCIAL

CATEGORY GAPS

19 Interventions for CWSN (IE)

19.01 Provision for Inclusive Education Child 0.03000 2713 81.390 2713 81.39000

Sub Total 2713 81.390 2713 81.39000

20Innovativation Head up to Rs.50 Lakh per

district

20.01 Girls Education District 0.70000 8 5.600 8 5.60000

20.02 ECCE District20.03 Intervention for SC / ST children District

20.04 Intervention for Minority Community children District

20.05 Intervention for Urban Deprived children District 10.00000

Sub Total 8 5.600 8 5.6000021 SMC/PRI Training

21.01Residential for 6 Resource Person per Block (3

days) (@ Rs.500/-)Blocks 0.09000

21.02Non-residential (3 days training of 6 SMC

members) (@ Rs.100/-)SMC 0.01800 1439 25.902 1439 25.90200

21.02(a)Non-residential (3 days training of 3 Members of

PRI/VECs/LA) (@ Rs.100/-)VEC/ WEC 0.00900

21.03

Seminar/Orientation of SMC Women members

and President/Vice President (@ Rs. 50,000/-

per block)

Blocks 0.50000

Sub Total 1439 25.902 1439 25.90200VI SCHOOL INFRASTRUCTURE22 Civil Works22.01 Primary School (Plain) (New) School 16.64 13.15500 16.6401822.02 Primary School (Hilly/Rocky) (New) School 13.2750022.03 Upper Primary (Plain) (New) School 3.04 20.65500 3.04021

22.04 Upper Primary School (Hilly/Rocky) (New) School 20.77500

22.04aComposite Schools for Urban Areas (Class I-

VIII)School 15.10 41.04000 15.10000

22.05 ACR in lieu of upgraded Upper Primary School Rooms

22.06 Additional class rooms for adding Class VIII Rooms

22.07 Building Less (Pry) School 9.7500022.08 Building Less (UP) School 18.5900022.09 Dilapidated Building (Pry) School 9.7500022.10 Dilapidated Building (UP) School 18.59000

22.11 Additional Class Room (Rural) ( PS+UPS) Rooms 3.45000 235 810.750 235 810.75000

22.12 Additional Class Room (Urban) Rooms 3.4500022.13 Additional Class Room (Hill Area)22.14 Toilet/Urinals (PS & UPS) School 0.70000 130 91.000 130 91.0000022.15 Separate Girls Toilet (Rural+Urban) School 0.7000022.16 CWSN friendly Toilets School 0.50000

22.17 Drinking Water Facility (for Urban Area Only)) School 0.15000

22.17a Drinking Water Facility (Plain PS & UPS) School 0.15000

22.17b Drinking Water Facility (Hilly/Rocky PS & UPS) School 0.15000 107 16.050 107 16.05000

22.18a Boundary Wall PS (Total in Meters x .01105) 0.01749

22.18bBoundary Wall PS (For Gate) @Rs. 7000 x no. of

P.S.School 0.07800

22.18c Boundary Wall UPS (Total in Meters x .01105) 0.01749

22.18dBoundary Wall UPS (For Gate) @Rs. 7000 x no.

of UPSSchool 0.07800

22.19a Electrification in P.S./ Electrical Equipment School 0.11000

22.19b Electrification in U. P.S./ Electrical Equipment School 0.11000

22.20Office-cum-store-cum-Head Teacher's room

(Primary)Rooms

22.21Office-cum-store-cum-Head Teacher's room

(Upper Primary)Rooms

22.22Augumentation of training facility in BRC (one

time)BRC/ URC 5.00000

22.23 Child friendly Elements School 0.25000

22.24 Ramps with Handrails (Barrier Free Elements) School 0.06000

22.25 Handrails in existing Ramps School 0.01000

Arti:SSA-AWPB-2014-15-PABMinits:Chitrakoot:16-06-2014 383 / 533

Page 384: U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 · 2015. 1. 6. · U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15

Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

Name of District : Chitrakoot -22

ActivityS. No.Physical

UnitRemarks

Outlay Recommendation for 2014-15

Spill OverDeferred laibility of

2014-15Fresh Recommended Total Recommended

22.26 Whole School Develoipment School22.27 Retro-fitting and repairs School

22.28Residential Schools for specific category

of children

(a) Construction of Building including boundary

wall, Water and sanitation facilities, electric

installation (For 100 children)

Building 65.86000

(b) Construction of residential hostel Building 65.86000

(c) Refurnishing unused old buildings Building

22.29

Construction of Hostel in existing Govt UPS

including boundary wall, Water and sanitation

facilities, electric installation etc. (For 50

children)

7.00000

22.30Furniture for Govt. UPS (per child) (@ Rs.500/-

per child enrolled)Child 0.00500

22.31 Major Repairs for Primary School School 0.30000

22.32 Majr Repairs for Upper Primary School School 0.30000

22.33Others (Difference of Civil Wrks

sanctioned in pre.yr.)22.33a Others (Overhead Tank PS) School 0.1200022.33b Others (Overhead Tank UPS) School 0.12000

Sub Total (Civil WOrks) 34.78 472 917.800 472 952.58VII PROJECT MANAGEMENT COST23 Management23.01 Management up to 3.5%

(a) Project Management and MIS

(i) DPO ( Salary, Contigency, Consumables,

POL, TA & Computer etc)District 1 100.051 1 100.05080

(ii) EMIS Cell District 1 9.772 1 9.77150Sub Total (a) 1 1 1 109.822 1 109.822

(b) Training of Educational Administrators District

(c) School Mapping and Social Mapping District

Sub Total (23.01)

23.02Learning Enhancement Prog. (LEP) (P & UP) (up

to 2%)District 10.651 10.65085

23.03 Community Mobilization (up to 0.5%) District 1 42.000 1 42.00000

Sub Total (Management) 1 52.651 1 52.65085Total Management Cost 162.473 162.47315Total of SSA (Districs) 34.780 2.800 264137 9608.593 264137 9646.173

24 State Component23.01 Management23.02 REMS 0.0044923.03 SIEMAT

Sub Total

STATE SSA TOTAL 34.78039 2.80000 264137 9608.593 264137 9646.17344

25

KGBV Financial Provision (give

separate costing sheets for different

Models)

Hostel

ANon Recurring One Time Grant (Only

committed liabilities) (Model-I)

25.01 Construction of Building (New)

25.02 Construction of Building KGBV sanctioned earlier 0.00000 0.00000

25.02(a) Additional Class Room Rooms 3.45000

25.02(b) Guard Room Rooms 1.32000

25.02(c) Boundary Wall School 5.0200025.03 Boudary Wall (Spillover only)

25.04

Boring/Handpump (Spillover only)

(minimum rates prescribed by State Drinking

Water Department subject to a ceiling of Rs.

1.00 lakhs)

25.05 Electricity /Water charges (Spillover only)

25.05(a) Solar Water Heater & Solar Light 2.97000

25.06Furniture/Equipment (including Kitchen

equipment)3.00000

25.07 TLM and equipment including library books 3.50000

25.08 Bedding (New) 0.75000

25.09 Replacement of Bedding (once in 3 Year) 1 0.75000 1

Subtotal Non Recurring 0.00000 0.00000

B Recurring Cost Per Annum (Model-I)

25.10Maintenance per girl student per month @ Rs.

1500/-18.00000 4 72.000 4 72.00000

25.11 Stipend for girl student per month @ Rs. 100/- 1.20000 4 4.800 4 4.80000

25.12Supplementary TLM, stationery and other

educational material @ Rs.1000/- per annum1.00000 4 4.000 4 4.00000

25.13 Salaries

Arti:SSA-AWPB-2014-15-PABMinits:Chitrakoot:16-06-2014 384 / 533

Page 385: U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 · 2015. 1. 6. · U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15

Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

Name of District : Chitrakoot -22

ActivityS. No.Physical

UnitRemarks

Outlay Recommendation for 2014-15

Spill OverDeferred laibility of

2014-15Fresh Recommended Total Recommended

25.13.1 Additional Salaries:

(a) 1 Warden @ Rs. 25,000/- per month 3.00000 4 12.00000 4 12.00000

(b)4 Full time teachers as per RTE norms @ Rs.

20,000/- per month per teacher 9.60000 4 38.40000 4 38.40000

(c)

1 Urdu Teachers (only for blocks with muslim

population above 20% and select urban areas), if

required @ Rs. 12,000/- per month per teacher 1.44000 4 5.76000 4 5.76000

(d)3 part time teachers @ Rs. 5,000/- per month per

teacher 1.80000 4 7.20000 4 7.20000

(e)1 Full time Accountant @ Rs. 10,000/- per month

1.20000 4 4.80000 4 4.80000

(f)

2 Support Staff – (Accountant/ Assistant, Peon,

Chowkidar) @ Rs. 5,000/- per month per staff 1.20000 4 4.80000 4 4.80000

(g) 1 Head cook @ Rs. 6,000/- per month 0.72000 4 2.88000 4 2.88000

(h)2 Asstt. Cooks @ Rs. 4,500/- per month per cook

1.08000 4 4.32000 4 4.32000

25.14Specific skill training @ Rs.1000/- per child per

annum1.00000 4 4.000 4 4.00000

25.15Electricity/water charges @ Rs.1000/- per child

per annum1.00000 4 4.000 4 4.00000

25.16Medical care/contingencies @ Rs. 1250 per child

per annum1.25000 4 5.000 4 5.00000

25.17 Maintenance @ Rs.750/- per child per annum 0.75000 4 3.000 4 3.00000

25.18

Miscellaneous (Educational Tour/ Exposure Visit

/ Sports Material etc.) @ Rs.750/- per child per

annum

0.75000 4 3.000 4 3.00000

25.19Preparatory camps @ Rs.200/- per child per

annum0.20000 4 0.800 4 0.80000

25.20PTAs/school functions @ Rs.200/- per child per

annum0.20000 4 0.800 4 0.80000

25.21 Provision of Rent @ Rs.6000/- per annum 6.00000

25.21a Provision of Rent (6 months) 3.6000025.21b Provision of Rent (3 months) 1.8000025.21c Rent (Previous Year (2007-2012)

25.22 Capacity building 0.50000 4 2.000 4 2.00000

25.22(a)Physical/ Self Defence Training @ Rs.200/- per

child per annum0.20000 4 0.800 4 0.80000

Subtotal Recurring 4 184.360 4 184.36000

Subtotal (Model-I) 0.00000 4 184.360 4 184.36000

CNon Recurring One Time Grant (Only

committed liabilities) (Model-II)

25.23 Construction of Building (New)

25.24 Construction of Building KGBV sanctioned earlier

25.24(a) Additional Class Room Rooms 3.45000

25.24(b) Guard Room Rooms 1.32000

25.24(c) Boundary Wall School 5.0200025.25 Boudary Wall (Spillover only)25.26 Boring/Handpump (Spillover only)

25.27 Electricity /Water charges (Spillover only)

25.27(a) Solar Water Heater & Solar Light 2.97000

25.28Furniture/Equipment (including Kitchen

equipment)2.00000

25.29 TLM and equipment including library books 3.00000

25.30 Bedding (New) 0.37500

25.31 Replacement of Bedding (once in 3 Year) 0.37500

Subtotal Non Recurring

D Recurring Cost Per Annum (Model-II)

25.32Maintenance per girl student per month @ Rs.

1500/-9.00000

25.33 Stipend for girl student per month @ Rs. 100/- 0.60000

25.34Supplementary TLM, stationery and other

educational material @ Rs.1000/- per annum0.50000

25.35 Salaries(a) 1 Warden @ Rs. 25,000/- per month 3.00000

(b)3 Full time teachers as per RTE norms @ Rs.

20,000/- per month per teacher 7.20000

(c) 3 part time teachers @ Rs. 5,000/- per month per

teacher 1.80000

(d)1 Full time Accountant @ Rs. 10,000/- per month

1.20000

(e)

2 Support Staff – (Accountant/ Assistant, Peon,

Chowkidar) @ Rs. 5,000/- per month per staff 1.20000

Arti:SSA-AWPB-2014-15-PABMinits:Chitrakoot:16-06-2014 385 / 533

Page 386: U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 · 2015. 1. 6. · U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15

Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

Name of District : Chitrakoot -22

ActivityS. No.Physical

UnitRemarks

Outlay Recommendation for 2014-15

Spill OverDeferred laibility of

2014-15Fresh Recommended Total Recommended

(f) 1 Head cook @ Rs. 6,000/- per month 0.72000

(g)1 Asstt. Cooks @ Rs. 4,500/- per month per cook

0.54000

25.36Specific skill training @ Rs.1000/- per child per

annum0.50000

25.37Electricity/water charges @ Rs.1000/- per child

per annum0.50000

25.38Medical care/contingencies @ Rs. 1250 per child

per annum0.62500

25.39 Maintenance @ Rs.750/- per child per annum 0.37500

25.40

Miscellaneous (Educational Tour/ Exposure Visit

/ Sports Material etc.) @ Rs.750/- per child per

annum

0.37500

25.41Preparatory camps @ Rs.300/- per child per

annum0.15000

25.42PTAs/school functions @ Rs.300/- per child per

annum0.15000

25.43 Provision of Rent @ Rs.10000/- per annum 5.00000

25.43a Provision of Rent (6 months) 3.6000025.43b Provision of Rent (3 months) 1.8000025.43c Rent (Previous Year (2007-2012)25.44 Capacity building 0.25000

25.44(a)Physical/ Self Defence Training @ Rs.200/- per

child per annum0.10000

Subtotal Recurring

Subtotal (Model-II) Total (KGBV) 0.000 4 184.360 4 184.360

DISTRICT GRAND TOTAL (SSA+KGBV) 34.780 2.800 264141 9792.953 264141 9830.533

Arti:SSA-AWPB-2014-15-PABMinits:Chitrakoot:16-06-2014 386 / 533

Page 387: U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 · 2015. 1. 6. · U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15

Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

I ACCESS

1 Opening of New Schools

1.01 Upgradation of EGS to PSCentres /

School1.02 New PS School

1.03 Upgradation of PS to UPS / New UPS School

1.04 Composite Schools (for Urban Areas) School

1.05Residential Schools for specific category children

(For 100 children)

1.06Residential Hostel (for specific category of

children) (For 50 children)

1.07 Integration of Class V with Primary Schools

1.08Integration of Class VIII with Upper Primary

Schools

2Residential Schools for specific category

of children (For 100 Children)

Total - Residential Schools (For 100

children)

3Residential Hostel for specific category of

children (For 50 Children)

Total - Residential Schools (For 50

children)4 Transport/Escort Facility

4.01

Children in remote habitations with sparse

populations where opening of schools is

unviable

Child 0.03000

4.02

Urban deprived children/children without adult

protection in urban areas where schools are not

opened because availability of land is a problem

Child 0.03000

Sub Total

5Special Training for mainstreaming of Out-

of-School Children

5.03 Non-Residential (Fresh)(a) 12 months Child 0.06000(b) 9 months 0.04500(c) 6 months

(i)Special Training (by Special Instructors-NRBC)-

(1-5) Child 0.03000 130 3.900 130 3.90000

(ii) Special Training (by Special Instructors-NRBC)-

(6-8) Child 0.03000 143 4.290 143 4.29000

(d) 3 months Child 0.01500Sub Total 273 8.190 273 8.19000

Total (Special Training) 273 8.190 273 8.1905(B) House Hold Survey (HHS)

5(B).01 House Hold Survey through SMCHouse

Hold0.00001

Sub TotalII RETENTION6 Free Text Book

6.01Free Text Book (PS) for Parishadiya & Aided

Primary Schools (Workbooks not included)Child 0.00120 109127 130.952 109127 130.95240

6.01a

Free Text Book (PS) for 25% children of Class-1

in Private Recognised Primary Schools of other

Boards (Workbooks not included)

Child 0.00150

6.02 Free Brail Books (PS) 0.00150 62 0.093 62 0.09300

6.03 Free Large Print Books (PS) 0.00150

6.04Free Text Book (UPS) (Workbooks not included)

(Including KGBV Girls)Child 0.00200 42668 85.336 42668 85.33600

6.05 Free Brail Books (UPS) 0.00250 26 0.065 26 0.06500

6.06 Free Large Print Books (PS) 0.00250Sub Total 151883 216.446 151883 216.446

7 Provision of 2 set of Uniforms

7.01 All Girls (Including KGBV Girls) Child 0.00400 106381 425.524 106381 425.52400

7.02 SC Boys Child 0.00400 14037 56.148 14037 56.14800

7.03 ST Boys Child 0.00400

7.04 BPL Boys Child 0.00400 91229 364.916 91229 364.91600

7.05

Free Uniform for 25% children of Class-1 in

Private Recognised Primary Schools of other

Boards

Child0.00400

Sub Total 211647 846.588 211647 846.5887(A) Fee Reimbursement

7(A).01

Fee Reimbursement for Admission of children of

Disadvantaged Group & Weaker Section upto

25% of seats in Class-1 of Private Unaided

Recognised Schools

Child 0.05400

Sub Total

8 Teaching Learning Equipment (TLE)

8.01 TLE - New Primary School 10.80000 0.20000 10.800008.02 TLE - New Upper Primary School 2.00000 0.50000 2.00000

Remarks

Outlay Recommendation for 2014-15

Spill OverDeferred laibility of

2014-15Fresh Recommended Total Recommended

Name of District :Chhatrapati Sahuji

Maharaj Nagar (Amethi) - 21

ActivityS. No.Physical

Unit

Arti:SSA-AWPB-2014-15-PABMinits:CSM Nagar(Amethi):16-06-2014 387 / 533

Page 388: U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 · 2015. 1. 6. · U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15

Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

Remarks

Outlay Recommendation for 2014-15

Spill OverDeferred laibility of

2014-15Fresh Recommended Total Recommended

Name of District :Chhatrapati Sahuji

Maharaj Nagar (Amethi) - 21

ActivityS. No.Physical

Unit

Sub Total 12.80000 12.80000III ENHANCING QUALITY9 New Teachers Salary

9.01 Primary Teachers (Regular) (Asstt. Teacher) Teacher 0.91500

9.01aHead Teacher for Primary (if the number of

children exceeds 150 in a school)Teacher

9.02 Primary Teachers (Contract) (S.M.) Teacher

9.03Subject specific Upper Primary Teachers

(Regular) (a) Science and Mathematics Teacher 1.26000(b) Social Studies Teacher 1.26000(c) Languages Teacher 1.26000

Sub Total (9.01 to 9.05)Add.Teacher against PTR

Sub Total (9.06 to 9.12)

Total (New Teacher's Salary-9.01 to 9.12)

Teachers Salary (Recurring-sanctioned

earlier)Primary teachers

9.13 Primary Teachers ( Regular)-Existing, in position Teacher 3.66000 426 1559.160 426 1559.16000

9.14Primary Teachers (Contract)-Existing, in

positionTeacher 0.55000

9.14(a) Primary Teachers (Contract)-under Training Teacher 0.38500 615 236.775 615 236.77500

9.14(b)Primary Teacher (Para Teachers Equal to

9.14(a) upgraded as Teachers)0.38500 811 312.235 811 312.23500

9.14(c) Primary Teachers (Para)- Vacant Teacher9.15 Primary Teachers (Vacant) Teacher 0.30500

9.16Head Teacher for Primary (if the number of

children exceeds 150)Teacher 5.04000 132 665.280 132 665.28000

9.16(b)Head Teacher for Primary (if the number of

children exceeds 150) VacantTeacher 0.42000

Additional teachers

9.17Additional Teachers - PS (Special BTC-

Regular) in positionTeacher 0.30500

9.18Additional Teachers - PS (Special BTC Under

Training)Teacher 0.87600

9.19 Additional Teachers - PS (Vacant) Teacher

9.20Others in position (Para Teachers upgraded

as Teachers)Teacher

Upper Primary teachers

9.21 UP Teachers (Regular)-Existing Teacher 5.04000 451 2273.040 451 2273.04000

9.22 UP Teachers (Contract)-Existing9.23 UP Teachers (Vacant) Teacher 1.26000

9.24Head Teacher for Upper Primary (if the number

of children exceeds 100)-ExistingTeacher 5.34000 349 1863.660 349 1863.66000

9.24a Head Teacher for Upper Primary (Vacant) Teacher 1.33500

9.25Subject specific Upper Primary Teachers

(Regular)(a) Science and Mathematics(b) Social Studies(c) Languages

9.32 Part Time Instructors in position(a) Art Education 0.77000 128 98.560 128 98.56000(b) Health and Physical Education 0.77000 128 98.560 128 98.56000(c) Work Education 0.77000 81 62.370 81 62.37000

9.32(A) Part Time Instructors Vacant(a) Art Education 0.42000(b) Health and Physical Education 0.42000(c) Work Education 0.42000

9.33

Others-Incentive to Teachers in Schools

Located in Naxal Affected Areas (@

Rs.1500/- per teachers per month)

Sub Total (9.13 to 9.33) 3121 7169.640 3121 7169.64TOTAL

(New Teachers Salary +Teachers Salary

Recurring)

3121 7169.640 3121 7169.64000

10 Teachers Training(a) Teachers

10.01

Refresher In-service Teachers' Training at BRC

level and above - 10 days (@ Rs.200/- per

head per day)

Teacher

(Target &

Ach.-13-14

in

Mandays)

0.00600

10.01(a)Continuous and Comprehensive Evauation [PS +

UPS)Teacher 0.01300 1162 15.106 1162 15.10600

10.01(b) Eary Reading and Numeracy Skills [PS] Teacher 0.00500 1162 5.810 1162 5.81000

10.01(c) Science [UPS] Teacher 0.00800 432 3.456 432 3.45600Recommended as

proposed

10.01(d) CWSN Teacher 0.00400

Arti:SSA-AWPB-2014-15-PABMinits:CSM Nagar(Amethi):16-06-2014 388 / 533

Page 389: U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 · 2015. 1. 6. · U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15

Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

Remarks

Outlay Recommendation for 2014-15

Spill OverDeferred laibility of

2014-15Fresh Recommended Total Recommended

Name of District :Chhatrapati Sahuji

Maharaj Nagar (Amethi) - 21

ActivityS. No.Physical

Unit

10.02

One day monthly cluster level meetings and

peer group training sessions for 10 months for

all teachers each year at CRC level - 10 days (@

Rs.100/- per head per day)

Teacher 0.01000

10.03(a)

Induction Training for Newly Recruited Teachers

for 6 Months (Special BTC)- @Rs.2000/- per

head per year

Teacher 0.02000

10.03(b)5 Days Training for Part Time Instructors @ Rs.

200/- per head per day) Teacher 0.01000

10.04

Training of untrained Teachers to acquire

professional qualifications over a two year

period.

Teacher 0.04700 539 25.333 539 25.33300

(b) Head Teachers

10.05Refresher Residencial In-service for 10 days at

BRC level and above

Head

Teacher(c) Resource Persons

10.06

Refresher Training for all Resource

Persons,Master Trainers, BRC & CRC faculty

and Coordinators for 5 days each year (@

Rs.200/- per head per day)

Resource

Person 0.00300 156 0.468 156 0.46800

Sub Total 3451 50.173 3451 50.173

11Academic Support through Block Resource

Centre (BRC)/ URC

11.01 Salary of Faculty and Staff

(a) 5 RPs at BRC for subject specific training in

positionRP 65 65

(b) 2 RPs for CWSN in position RP(b-i) 1 CWSN Resource Person RP 1.10000 26 28.600 26 28.60000

(b-ii) 1 Physiotherapist (Resource person for IE) RP

(c) 1 MIS Coordinator in position RP 1.86000

(d) 1 Datra Entry Operator in position RP 1.74000 15 26.100 15 26.10000

(e) 1 Accountant-cum-support staff in position RP 1.80000 16 28.800 16 28.80000

11.02 Furniture Grant BRC/ URC 1.00000

11.03Replacement of furniture, computer, TLE etc (

Once in 5 years)BRC/ URC 1.00000

11.04 Contingency Grant BRC/ URC 0.50000 13 6.500 13 6.50000

11.05 Meeting, TA BRC/ URC 0.30000 13 3.900 13 3.90000

11.06 TLM Grant BRC/ URC 0.10000

11.07 Maintenance Grant BRC/ URC 0.10000

Sub Total 13 93.900 13 93.90000

12Academic Support through Cluster

Resource Centres (CRC/UERC)

12.01Salary of Cluster Coordinator (on an average of

one Resource Person per 18 schools in a block)RP

12.02 Furniture GrantCRC/

UERC0.10000

12.03Replacement of furniture, computer, TLE etc.

once in 5 years

CRC/

UERC0.10000

12.04 Contingency Grant CRC/UERC 0.10000 99 9.900 99 9.90000

12.05 Meeting, TA CRC/UERC 0.12000 99 11.880 99 11.88000

12.06 TLM Grant CRC/UERC 0.03000

12.07Maintenance Grant

CRC/UERC 0.02000

Sub Total 198 21.780 198 21.78000

13Computer Aided Education in upper

primary schools under Innovation

13.01Computer Aided Education in upper primary

schoolsDistrict 0.01200 48 0.576 48 0.57600

Sub Total 48 0.576 48 0.5760014 Libraries in Schools14.01 (a) Primary School (per school) School 0.03000

14.02 (b) Upper Primary School (per school) School 0.10000

Sub TotalIV ANNUAL GRANTS15 Teachers' Grant15.01 Primary Teachers Teacher 0.0050015.02 Upper Primary Teachers Teacher 0.00500 432 2.160 432 2.16000

Arti:SSA-AWPB-2014-15-PABMinits:CSM Nagar(Amethi):16-06-2014 389 / 533

Page 390: U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 · 2015. 1. 6. · U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15

Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

Remarks

Outlay Recommendation for 2014-15

Spill OverDeferred laibility of

2014-15Fresh Recommended Total Recommended

Name of District :Chhatrapati Sahuji

Maharaj Nagar (Amethi) - 21

ActivityS. No.Physical

Unit

Sub Total 432 2.160 432 2.1600016 School Grant16.01 Primary School School 0.05000 1337 66.850 1337 66.8500016.02 Upper Primary School School 0.07000 525 36.750 525 36.75000

Sub Total 1862 103.600 1862 103.60000

17Research, Evaluation, Monitoring &

Supervision

17.01 REMS Activities School 0.00103 1862 1.915 1862 1.91528

17.02 Monitoring & Supervision School 0.00078 1862 1.460 1862 1.45993

17.03 House Hold Survey (Urban) in Million Plus Cities District 35.00000

Sub Total 3724 3.375 3724 3.3752118 Maintenance Grant

18.01 Maintenance in School having upto3 Classrooms School 0.07500 502 37.650 502 37.65000

18.01a Maintenance Grant School 0.07500 1267 95.025 1267 95.02500Sub Total 1769 132.675 1769 132.67500

VBRIDGING GENDER AND SOCIAL

CATEGORY GAPS

19 Interventions for CWSN (IE)

19.01 Provision for Inclusive Education Child 0.02000 3608 72.160 3608 72.16000

Sub Total 3608 72.160 3608 72.16000

20Innovativation Head up to Rs.50 Lakh per

district

20.01 Girls Education District 0.70000 9 6.300 9 6.30000

20.02 ECCE District20.03 Intervention for SC / ST children District

20.04 Intervention for Minority Community children District

20.05 Intervention for Urban Deprived children District 10.00000

Sub Total 9 6.300 9 6.3000021 SMC/PRI Training

21.01Residential for 6 Resource Person per Block (3

days) (@ Rs.500/-)Blocks 0.09000

21.02Non-residential (3 days training of 6 SMC

members) (@ Rs.100/-)SMC 0.01800 1782 32.076 1782 32.07600

21.02(a)Non-residential (3 days training of 3 Members of

PRI/VECs/LA) (@ Rs.100/-)VEC/ WEC 0.00900

21.03

Seminar/Orientation of SMC Women members

and President/Vice President (@ Rs. 50,000/-

per block)

Blocks 0.50000

Sub Total 1782 32.076 1782 32.07600VI SCHOOL INFRASTRUCTURE22 Civil Works22.01 Primary School (Plain) (New) School 13.1550022.02 Primary School (Hilly/Rocky) (New) School 13.2750022.03 Upper Primary (Plain) (New) School 20.65500

22.04 Upper Primary School (Hilly/Rocky) (New) School 20.77500

22.04aComposite Schools for Urban Areas (Class I-

VIII)School 41.04000

22.05 ACR in lieu of upgraded Upper Primary School Rooms

22.06 Additional class rooms for adding Class VIII Rooms

22.07 Building Less (Pry) School 9.7500022.08 Building Less (UP) School 18.5900022.09 Dilapidated Building (Pry) School 9.7500022.10 Dilapidated Building (UP) School 18.59000

22.11 Additional Class Room (Rural) ( PS+UPS) Rooms 74 3.45000 69 238.050 143 238.05000

22.12 Additional Class Room (Urban) Rooms 3.4500022.13 Additional Class Room (Hill Area)22.14 Toilet/Urinals (PS & UPS) School 0.7000022.15 Separate Girls Toilet (Rural+Urban) School 0.7000022.16 CWSN friendly Toilets School 0.50000

22.17 Drinking Water Facility (for Urban Area Only)) School 0.15000

22.17a Drinking Water Facility (Plain PS & UPS) School 0.15000

22.17b Drinking Water Facility (Hilly/Rocky PS & UPS) School 0.15000

22.18a Boundary Wall PS (Total in Meters x .01105) 0.01749

22.18bBoundary Wall PS (For Gate) @Rs. 7000 x no. of

P.S.School 0.07800

22.18c Boundary Wall UPS (Total in Meters x .01105) 0.01749

22.18dBoundary Wall UPS (For Gate) @Rs. 7000 x no.

of UPSSchool 0.07800

22.19a Electrification in P.S./ Electrical Equipment School 0.11000

22.19b Electrification in U. P.S./ Electrical Equipment School 0.11000

22.20Office-cum-store-cum-Head Teacher's room

(Primary)Rooms

22.21Office-cum-store-cum-Head Teacher's room

(Upper Primary)Rooms

Arti:SSA-AWPB-2014-15-PABMinits:CSM Nagar(Amethi):16-06-2014 390 / 533

Page 391: U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 · 2015. 1. 6. · U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15

Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

Remarks

Outlay Recommendation for 2014-15

Spill OverDeferred laibility of

2014-15Fresh Recommended Total Recommended

Name of District :Chhatrapati Sahuji

Maharaj Nagar (Amethi) - 21

ActivityS. No.Physical

Unit

22.22Augumentation of training facility in BRC (one

time)BRC/ URC 5.00000

22.23 Child friendly Elements School 0.25000

22.24 Ramps with Handrails (Barrier Free Elements) School 0.06000

22.25 Handrails in existing Ramps School 0.0100022.26 Whole School Develoipment School22.27 Retro-fitting and repairs School

22.28Residential Schools for specific category

of children

(a) Construction of Building including boundary

wall, Water and sanitation facilities, electric

installation (For 100 children)

Building 65.86000

(b) Construction of residential hostel Building 65.86000

(c) Refurnishing unused old buildings Building

22.29

Construction of Hostel in existing Govt UPS

including boundary wall, Water and sanitation

facilities, electric installation etc. (For 50

children)

7.00000

22.30Furniture for Govt. UPS (per child) (@ Rs.500/-

per child enrolled)Child 0.00500

22.31 Major Repairs for Primary School School 0.30000

22.32 Majr Repairs for Upper Primary School School 0.30000

22.33Others (Difference of Civil Wrks

sanctioned in pre.yr.)22.33a Others (Overhead Tank PS) School 0.1200022.33b Others (Overhead Tank UPS) School 0.12000

Sub Total (Civil WOrks) 74 69 238.050 143 238.05VII PROJECT MANAGEMENT COST23 Management23.01 Management up to 3.5%

(a) Project Management and MIS

(i) DPO ( Salary, Contigency, Consumables,

POL, TA & Computer etc)District 1 115.187 1 115.18720

(ii) EMIS Cell District 1 16.183 1 16.18250Sub Total (a) 1 1 1 131.370 1 131.370

(b) Training of Educational Administrators District

(c) School Mapping and Social Mapping District

Sub Total (23.01)

23.02Learning Enhancement Prog. (LEP) (P & UP) (up

to 2%)District 14.275 14.27475

23.03 Community Mobilization (up to 0.5%) District 1 44.000 1 44.00000

Sub Total (Management) 1 58.275 1 58.27475Total Management Cost 189.644 189.64445Total of SSA (Districs) 74 12.800 383889 9187.334 383963 9200.134

24 State Component23.01 Management23.02 REMS 0.0044923.03 SIEMAT

Sub Total

STATE SSA TOTAL 74 12.80000 383889 9187.334 383963 9200.13406

25

KGBV Financial Provision (give

separate costing sheets for different

Models)

Hostel

ANon Recurring One Time Grant (Only

committed liabilities) (Model-I)

25.01 Construction of Building (New)

25.02 Construction of Building KGBV sanctioned earlier 0.00000 0.00000

25.02(a) Additional Class Room Rooms 3.45000

25.02(b) Guard Room Rooms 1.32000

25.02(c) Boundary Wall School 5.0200025.03 Boudary Wall (Spillover only) 0.10000 0.10000

25.04

Boring/Handpump (Spillover only)

(minimum rates prescribed by State Drinking

Water Department subject to a ceiling of Rs.

1.00 lakhs)

0.25000 0.25000

25.05 Electricity /Water charges (Spillover only)

25.05(a) Solar Water Heater & Solar Light 2.97000

25.06Furniture/Equipment (including Kitchen

equipment)3.00000

25.07 TLM and equipment including library books 3.50000

25.08 Bedding (New) 0.75000

25.09 Replacement of Bedding (once in 3 Year) 0.75000 8 6.000 8 6.00000

Subtotal Non Recurring 0.35000 6.000 6.35000

B Recurring Cost Per Annum (Model-I)

25.10Maintenance per girl student per month @ Rs.

1500/-18.00000 13 234.000 13 234.00000

Arti:SSA-AWPB-2014-15-PABMinits:CSM Nagar(Amethi):16-06-2014 391 / 533

Page 392: U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 · 2015. 1. 6. · U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15

Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

Remarks

Outlay Recommendation for 2014-15

Spill OverDeferred laibility of

2014-15Fresh Recommended Total Recommended

Name of District :Chhatrapati Sahuji

Maharaj Nagar (Amethi) - 21

ActivityS. No.Physical

Unit

25.11 Stipend for girl student per month @ Rs. 100/- 1.20000 13 15.600 13 15.60000

25.12Supplementary TLM, stationery and other

educational material @ Rs.1000/- per annum1.00000 13 13.000 13 13.00000

25.13 Salaries

25.13.1 Additional Salaries:

(a) 1 Warden @ Rs. 25,000/- per month 3.00000 13 39.00000 13 39.00000

(b)4 Full time teachers as per RTE norms @ Rs.

20,000/- per month per teacher 9.60000 13 124.80000 13 124.80000

(c)

1 Urdu Teachers (only for blocks with muslim

population above 20% and select urban areas), if

required @ Rs. 12,000/- per month per teacher 1.44000 13 18.72000 13 18.72000

(d)3 part time teachers @ Rs. 5,000/- per month per

teacher 1.80000 13 23.40000 13 23.40000

(e)1 Full time Accountant @ Rs. 10,000/- per month

1.20000 13 15.60000 13 15.60000

(f)

2 Support Staff – (Accountant/ Assistant, Peon,

Chowkidar) @ Rs. 5,000/- per month per staff 1.20000 13 15.60000 13 15.60000

(g) 1 Head cook @ Rs. 6,000/- per month 0.72000 13 9.36000 13 9.36000

(h)2 Asstt. Cooks @ Rs. 4,500/- per month per cook

1.08000 13 14.04000 13 14.04000

25.14Specific skill training @ Rs.1000/- per child per

annum1.00000 13 13.000 13 13.00000

25.15Electricity/water charges @ Rs.1000/- per child

per annum1.00000 13 13.000 13 13.00000

25.16Medical care/contingencies @ Rs. 1250 per child

per annum1.25000 13 16.250 13 16.25000

25.17 Maintenance @ Rs.750/- per child per annum 0.75000 13 9.750 13 9.75000

25.18

Miscellaneous (Educational Tour/ Exposure Visit

/ Sports Material etc.) @ Rs.750/- per child per

annum

0.75000 13 9.750 13 9.75000

25.19Preparatory camps @ Rs.200/- per child per

annum0.20000 13 2.600 13 2.60000

25.20PTAs/school functions @ Rs.200/- per child per

annum0.20000 13 2.600 13 2.60000

25.21 Provision of Rent @ Rs.6000/- per annum 6.00000

25.21a Provision of Rent (6 months) 3.6000025.21b Provision of Rent (3 months) 1.8000025.21c Rent (Previous Year (2007-2012)

25.22 Capacity building 0.50000 13 6.500 13 6.50000

25.22(a)Physical/ Self Defence Training @ Rs.200/- per

child per annum0.20000 13 2.600 13 2.60000

Subtotal Recurring 13 599.170 13 599.17000

Subtotal (Model-I) 0.35000 13 605.170 13 605.52000

CNon Recurring One Time Grant (Only

committed liabilities) (Model-II)

25.23 Construction of Building (New)

25.24 Construction of Building KGBV sanctioned earlier

25.24(a) Additional Class Room Rooms 3.45000

25.24(b) Guard Room Rooms 1.32000

25.24(c) Boundary Wall School 5.0200025.25 Boudary Wall (Spillover only)25.26 Boring/Handpump (Spillover only)

25.27 Electricity /Water charges (Spillover only)

25.27(a) Solar Water Heater & Solar Light 2.97000

25.28Furniture/Equipment (including Kitchen

equipment)2.00000

25.29 TLM and equipment including library books 3.00000

25.30 Bedding (New) 0.37500

25.31 Replacement of Bedding (once in 3 Year) 0.37500

Subtotal Non Recurring

D Recurring Cost Per Annum (Model-II)

25.32Maintenance per girl student per month @ Rs.

1500/-9.00000

25.33 Stipend for girl student per month @ Rs. 100/- 0.60000

25.34Supplementary TLM, stationery and other

educational material @ Rs.1000/- per annum0.50000

25.35 Salaries(a) 1 Warden @ Rs. 25,000/- per month 3.00000

(b)3 Full time teachers as per RTE norms @ Rs.

20,000/- per month per teacher 7.20000

Arti:SSA-AWPB-2014-15-PABMinits:CSM Nagar(Amethi):16-06-2014 392 / 533

Page 393: U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 · 2015. 1. 6. · U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15

Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

Remarks

Outlay Recommendation for 2014-15

Spill OverDeferred laibility of

2014-15Fresh Recommended Total Recommended

Name of District :Chhatrapati Sahuji

Maharaj Nagar (Amethi) - 21

ActivityS. No.Physical

Unit

(c) 3 part time teachers @ Rs. 5,000/- per month per

teacher 1.80000

(d)1 Full time Accountant @ Rs. 10,000/- per month

1.20000

(e)

2 Support Staff – (Accountant/ Assistant, Peon,

Chowkidar) @ Rs. 5,000/- per month per staff 1.20000

(f) 1 Head cook @ Rs. 6,000/- per month 0.72000

(g)1 Asstt. Cooks @ Rs. 4,500/- per month per cook

0.54000

25.36Specific skill training @ Rs.1000/- per child per

annum0.50000

25.37Electricity/water charges @ Rs.1000/- per child

per annum0.50000

25.38Medical care/contingencies @ Rs. 1250 per child

per annum0.62500

25.39 Maintenance @ Rs.750/- per child per annum 0.37500

25.40

Miscellaneous (Educational Tour/ Exposure Visit

/ Sports Material etc.) @ Rs.750/- per child per

annum

0.37500

25.41Preparatory camps @ Rs.300/- per child per

annum0.15000

25.42PTAs/school functions @ Rs.300/- per child per

annum0.15000

25.43 Provision of Rent @ Rs.10000/- per annum 5.00000

25.43a Provision of Rent (6 months) 3.6000025.43b Provision of Rent (3 months) 1.8000025.43c Rent (Previous Year (2007-2012)25.44 Capacity building 0.25000

25.44(a)Physical/ Self Defence Training @ Rs.200/- per

child per annum0.10000

Subtotal Recurring

Subtotal (Model-II) Total (KGBV) 0.350 13 605.170 13 605.520

DISTRICT GRAND TOTAL (SSA+KGBV) 74 0.350 12.800 383902 9792.504 383976 9805.654

Arti:SSA-AWPB-2014-15-PABMinits:CSM Nagar(Amethi):16-06-2014 393 / 533

Page 394: U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 · 2015. 1. 6. · U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15

Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

I ACCESS

1 Opening of New Schools

1.01 Upgradation of EGS to PSCentres /

School1.02 New PS School

1.03 Upgradation of PS to UPS / New UPS School

1.04 Composite Schools (for Urban Areas) School

1.05Residential Schools for specific category children

(For 100 children)

1.06Residential Hostel (for specific category of

children) (For 50 children)

1.07 Integration of Class V with Primary Schools

1.08Integration of Class VIII with Upper Primary

Schools

2Residential Schools for specific category

of children (For 100 Children)

Total - Residential Schools (For 100

children)

3Residential Hostel for specific category of

children (For 50 Children)

Total - Residential Schools (For 50

children)4 Transport/Escort Facility

4.01

Children in remote habitations with sparse

populations where opening of schools is

unviable

Child 0.03000

4.02

Urban deprived children/children without adult

protection in urban areas where schools are not

opened because availability of land is a problem

Child 0.03000

Sub Total

5Special Training for mainstreaming of Out-

of-School Children

5.03 Non-Residential (Fresh)(a) 12 months Child 0.06000(b) 9 months 0.04500(c) 6 months

(i)Special Training (by Special Instructors-NRBC)-

(1-5) Child 0.03000 161 4.830 161 4.83000

(ii) Special Training (by Special Instructors-NRBC)-

(6-8) Child 0.03000 94 2.820 94 2.82000

(d) 3 months Child 0.01500Sub Total 255 7.650 255 7.65000

Total (Special Training) 255 7.650 255 7.6505(B) House Hold Survey (HHS)

5(B).01 House Hold Survey through SMCHouse

Hold0.00001

Sub TotalII RETENTION6 Free Text Book

6.01Free Text Book (PS) for Parishadiya & Aided

Primary Schools (Workbooks not included)Child 0.00120 118234 141.881 118234 141.88080

6.01a

Free Text Book (PS) for 25% children of Class-1

in Private Recognised Primary Schools of other

Boards (Workbooks not included)

Child 0.00150

6.02 Free Brail Books (PS) 0.00150 102 0.153 102 0.15300

6.03 Free Large Print Books (PS) 0.00150

6.04Free Text Book (UPS) (Workbooks not included)

(Including KGBV Girls)Child 0.00200 56370 112.740 56370 112.74000

6.05 Free Brail Books (UPS) 0.00250 30 0.075 30 0.07500

6.06 Free Large Print Books (PS) 0.00250Sub Total 174736 254.849 174736 254.849

7 Provision of 2 set of Uniforms

7.01 All Girls (Including KGBV Girls) Child 0.00400 128224 512.896 128224 512.89600

7.02 SC Boys Child 0.00400 46380 185.520 46380 185.52000

7.03 ST Boys Child 0.00400

7.04 BPL Boys Child 0.00400 64903 259.612 64903 259.61200

7.05

Free Uniform for 25% children of Class-1 in

Private Recognised Primary Schools of other

Boards

Child0.00400

Sub Total 239507 958.028 239507 958.0287(A) Fee Reimbursement

7(A).01

Fee Reimbursement for Admission of children of

Disadvantaged Group & Weaker Section upto

25% of seats in Class-1 of Private Unaided

Recognised Schools

Child 0.05400

Sub Total

Name of District :Chandauli -20

ActivityS. No.Physical

UnitRemarks

Outlay Recommendation for 2014-15

Spill OverDeferred laibility of

2014-15Fresh Recommended Total Recommended

Arti:SSA-AWPB-2014-15-PABMinits:Chandauli:16-06-2014 394 / 533

Page 395: U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 · 2015. 1. 6. · U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15

Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

Name of District :Chandauli -20

ActivityS. No.Physical

UnitRemarks

Outlay Recommendation for 2014-15

Spill OverDeferred laibility of

2014-15Fresh Recommended Total Recommended

8 Teaching Learning Equipment (TLE)

8.01 TLE - New Primary School 0.40000 0.20000 0.400008.02 TLE - New Upper Primary School 0.50000 0.50000 0.50000

Sub Total 0.90000 0.90000III ENHANCING QUALITY9 New Teachers Salary

9.01 Primary Teachers (Regular) (Asstt. Teacher) Teacher 0.91500

9.01aHead Teacher for Primary (if the number of

children exceeds 150 in a school)Teacher

9.02 Primary Teachers (Contract) (S.M.) Teacher

9.03Subject specific Upper Primary Teachers

(Regular) (a) Science and Mathematics Teacher 1.26000(b) Social Studies Teacher 1.26000(c) Languages Teacher 1.26000

Sub Total (9.01 to 9.05)Add.Teacher against PTR

Sub Total (9.06 to 9.12)

Total (New Teacher's Salary-9.01 to 9.12)

Teachers Salary (Recurring-sanctioned

earlier)Primary teachers

9.13 Primary Teachers ( Regular)-Existing, in position Teacher 3.66000 186 680.760 186 680.76000

9.14Primary Teachers (Contract)-Existing, in

positionTeacher 0.55000

9.14(a) Primary Teachers (Contract)-under Training Teacher 0.38500 696 267.960 696 267.96000

9.14(b)Primary Teacher (Para Teachers Equal to

9.14(a) upgraded as Teachers)0.38500 614 236.390 614 236.39000

9.14(c) Primary Teachers (Para)- Vacant Teacher9.15 Primary Teachers (Vacant) Teacher 0.30500

9.16Head Teacher for Primary (if the number of

children exceeds 150)Teacher 5.04000 178 897.120 178 897.12000

9.16(b)Head Teacher for Primary (if the number of

children exceeds 150) VacantTeacher 0.42000

Additional teachers

9.17Additional Teachers - PS (Special BTC-

Regular) in positionTeacher 0.30500

9.18Additional Teachers - PS (Special BTC Under

Training)Teacher 0.87600

9.19 Additional Teachers - PS (Vacant) Teacher

9.20Others in position (Para Teachers upgraded

as Teachers)Teacher

Upper Primary teachers

9.21 UP Teachers (Regular)-Existing Teacher 5.04000 633 3190.320 633 3190.32000

9.22 UP Teachers (Contract)-Existing9.23 UP Teachers (Vacant) Teacher 1.26000

9.24Head Teacher for Upper Primary (if the number

of children exceeds 100)-ExistingTeacher 5.34000 130 694.200 130 694.20000

9.24a Head Teacher for Upper Primary (Vacant) Teacher 1.33500

9.25Subject specific Upper Primary Teachers

(Regular)(a) Science and Mathematics(b) Social Studies(c) Languages

9.32 Part Time Instructors in position(a) Art Education 0.77000 231 177.870 231 177.87000(b) Health and Physical Education 0.77000 229 176.330 229 176.33000(c) Work Education 0.77000 188 144.760 188 144.76000

9.32(A) Part Time Instructors Vacant(a) Art Education 0.42000(b) Health and Physical Education 0.42000(c) Work Education 0.42000

9.33

Others-Incentive to Teachers in Schools

Located in Naxal Affected Areas (@

Rs.1500/- per teachers per month)

Sub Total (9.13 to 9.33) 3085 6465.710 3085 6465.71TOTAL

(New Teachers Salary +Teachers Salary

Recurring)

3085 6465.710 3085 6465.71000

10 Teachers Training(a) Teachers

10.01

Refresher In-service Teachers' Training at BRC

level and above - 10 days (@ Rs.200/- per head

per day)

Teacher

(Target &

Ach.-13-14

in

Mandays)

0.00600

Arti:SSA-AWPB-2014-15-PABMinits:Chandauli:16-06-2014 395 / 533

Page 396: U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 · 2015. 1. 6. · U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15

Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

Name of District :Chandauli -20

ActivityS. No.Physical

UnitRemarks

Outlay Recommendation for 2014-15

Spill OverDeferred laibility of

2014-15Fresh Recommended Total Recommended

10.01(a)Continuous and Comprehensive Evauation [PS +

UPS)Teacher 0.01300 986 12.818 986 12.81800

10.01(b) Eary Reading and Numeracy Skills [PS] Teacher 0.00500 986 4.930 986 4.93000

10.01(c) Science [UPS] Teacher 0.00800 519 4.152 519 4.15200Recommended as

proposed

10.01(d) CWSN Teacher 0.00400

10.02

One day monthly cluster level meetings and

peer group training sessions for 10 months for

all teachers each year at CRC level - 10 days (@

Rs.100/- per head per day)

Teacher 0.01000

10.03(a)

Induction Training for Newly Recruited Teachers

for 6 Months (Special BTC)- @Rs.2000/- per

head per year

Teacher 0.02000

10.03(b)5 Days Training for Part Time Instructors @ Rs.

200/- per head per day) Teacher 0.01000

10.04

Training of untrained Teachers to acquire

professional qualifications over a two year

period.

Teacher 0.04700 426 20.022 426 20.02200

(b) Head Teachers

10.05Refresher Residencial In-service for 10 days at

BRC level and above

Head

Teacher(c) Resource Persons

10.06

Refresher Training for all Resource

Persons,Master Trainers, BRC & CRC faculty

and Coordinators for 5 days each year (@

Rs.200/- per head per day)

Resource

Person 0.00300 108 0.324 108 0.32400

Sub Total 3025 42.246 3025 42.246

11Academic Support through Block Resource

Centre (BRC)/ URC

11.01 Salary of Faculty and Staff

(a) 5 RPs at BRC for subject specific training in

positionRP 45 45

(b) 2 RPs for CWSN in position RP(b-i) 1 CWSN Resource Person RP 1.10000 18 19.800 18 19.80000

(b-ii) 1 Physiotherapist (Resource person for IE) RP

(c) 1 MIS Coordinator in position RP 1.86000

(d) 1 Datra Entry Operator in position RP 1.74000 17 29.580 17 29.58000

(e) 1 Accountant-cum-support staff in position RP 1.80000 7 12.600 7 12.60000

11.02 Furniture Grant BRC/ URC 1.00000

11.03Replacement of furniture, computer, TLE etc (

Once in 5 years)BRC/ URC 1.00000

11.04 Contingency Grant BRC/ URC 0.50000 9 4.500 9 4.50000

11.05 Meeting, TA BRC/ URC 0.30000 9 2.700 9 2.70000

11.06 TLM Grant BRC/ URC 0.10000

11.07 Maintenance Grant BRC/ URC 0.10000

Sub Total 9 69.180 9 69.18000

12Academic Support through Cluster

Resource Centres (CRC/UERC)

12.01Salary of Cluster Coordinator (on an average of

one Resource Person per 18 schools in a block)RP

12.02 Furniture Grant CRC/ UERC 0.10000

12.03Replacement of furniture, computer, TLE etc.

once in 5 yearsCRC/ UERC 0.10000

12.04 Contingency Grant CRC/UERC 0.10000 103 10.300 103 10.30000

12.05 Meeting, TA CRC/UERC 0.12000 103 12.360 103 12.36000

12.06 TLM Grant CRC/UERC 0.03000

12.07Maintenance Grant

CRC/UERC 0.02000

Sub Total 206 22.660 206 22.66000

13Computer Aided Education in upper

primary schools under Innovation

13.01Computer Aided Education in upper primary

schoolsDistrict 0.01200 48 0.576 48 0.57600

Sub Total 48 0.576 48 0.5760014 Libraries in Schools

Arti:SSA-AWPB-2014-15-PABMinits:Chandauli:16-06-2014 396 / 533

Page 397: U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 · 2015. 1. 6. · U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15

Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

Name of District :Chandauli -20

ActivityS. No.Physical

UnitRemarks

Outlay Recommendation for 2014-15

Spill OverDeferred laibility of

2014-15Fresh Recommended Total Recommended

14.01 (a) Primary School (per school) School 0.03000

14.02 (b) Upper Primary School (per school) School 0.10000

Sub TotalIV ANNUAL GRANTS15 Teachers' Grant15.01 Primary Teachers Teacher 0.0050015.02 Upper Primary Teachers Teacher 0.00500 519 2.595 519 2.59500

Sub Total 519 2.595 519 2.5950016 School Grant16.01 Primary School School 0.05000 1005 50.250 1005 50.2500016.02 Upper Primary School School 0.07000 523 36.610 523 36.61000

Sub Total 1528 86.860 1528 86.86000

17Research, Evaluation, Monitoring &

Supervision

17.01 REMS Activities School 0.00103 1528 1.572 1528 1.57172

17.02 Monitoring & Supervision School 0.00078 1528 1.198 1528 1.19805

17.03 House Hold Survey (Urban) in Million Plus Cities District 35.00000

Sub Total 3056 2.770 3056 2.7697718 Maintenance Grant

18.01 Maintenance in School having upto3 Classrooms School 0.07500 32 2.400 32 2.40000

18.01a Maintenance Grant School 0.07500 1430 107.250 1430 107.25000Sub Total 1462 109.650 1462 109.65000

VBRIDGING GENDER AND SOCIAL

CATEGORY GAPS

19 Interventions for CWSN (IE)

19.01 Provision for Inclusive Education Child 0.02000 3571 71.420 3571 71.42000

Sub Total 3571 71.420 3571 71.42000

20Innovativation Head up to Rs.50 Lakh per

district

20.01 Girls Education District 0.70000 10 7.000 10 7.00000

20.02 ECCE District20.03 Intervention for SC / ST children District

20.04 Intervention for Minority Community children District

20.05 Intervention for Urban Deprived children District 10.00000

Sub Total 10 7.000 10 7.0000021 SMC/PRI Training

21.01Residential for 6 Resource Person per Block (3

days) (@ Rs.500/-)Blocks 0.09000

21.02Non-residential (3 days training of 6 SMC

members) (@ Rs.100/-)SMC 0.01800 1472 26.496 1472 26.49600

21.02(a)Non-residential (3 days training of 3 Members of

PRI/VECs/LA) (@ Rs.100/-)VEC/ WEC 0.00900

21.03

Seminar/Orientation of SMC Women members

and President/Vice President (@ Rs. 50,000/-

per block)

Blocks 0.50000

Sub Total 1472 26.496 1472 26.49600VI SCHOOL INFRASTRUCTURE22 Civil Works22.01 Primary School (Plain) (New) School 13.1550022.02 Primary School (Hilly/Rocky) (New) School 13.2750022.03 Upper Primary (Plain) (New) School 20.65500

22.04 Upper Primary School (Hilly/Rocky) (New) School 20.77500

22.04aComposite Schools for Urban Areas (Class I-

VIII)School 41.04000

22.05 ACR in lieu of upgraded Upper Primary School Rooms

22.06 Additional class rooms for adding Class VIII Rooms

22.07 Building Less (Pry) School 9.7500022.08 Building Less (UP) School 18.5900022.09 Dilapidated Building (Pry) School 9.7500022.10 Dilapidated Building (UP) School 18.59000

22.11 Additional Class Room (Rural) ( PS+UPS) Rooms 3.45000 87 300.150 87 300.15000

22.12 Additional Class Room (Urban) Rooms 3.4500022.13 Additional Class Room (Hill Area)22.14 Toilet/Urinals (PS & UPS) School 0.7000022.15 Separate Girls Toilet (Rural+Urban) School 0.7000022.16 CWSN friendly Toilets School 0.50000

22.17 Drinking Water Facility (for Urban Area Only)) School 0.15000

22.17a Drinking Water Facility (Plain PS & UPS) School 0.15000

22.17b Drinking Water Facility (Hilly/Rocky PS & UPS) School 0.15000

22.18a Boundary Wall PS (Total in Meters x .01105) 0.01749

22.18bBoundary Wall PS (For Gate) @Rs. 7000 x no. of

P.S.School 0.07800

Arti:SSA-AWPB-2014-15-PABMinits:Chandauli:16-06-2014 397 / 533

Page 398: U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 · 2015. 1. 6. · U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15

Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

Name of District :Chandauli -20

ActivityS. No.Physical

UnitRemarks

Outlay Recommendation for 2014-15

Spill OverDeferred laibility of

2014-15Fresh Recommended Total Recommended

22.18c Boundary Wall UPS (Total in Meters x .01105) 0.01749

22.18dBoundary Wall UPS (For Gate) @Rs. 7000 x no.

of UPSSchool 0.07800

22.19a Electrification in P.S./ Electrical Equipment School 0.11000

22.19b Electrification in U. P.S./ Electrical Equipment School 0.11000

22.20Office-cum-store-cum-Head Teacher's room

(Primary)Rooms

22.21Office-cum-store-cum-Head Teacher's room

(Upper Primary)Rooms

22.22Augumentation of training facility in BRC (one

time)BRC/ URC 5.00000

22.23 Child friendly Elements School 0.25000

22.24 Ramps with Handrails (Barrier Free Elements) School 0.06000

22.25 Handrails in existing Ramps School 0.0100022.26 Whole School Develoipment School22.27 Retro-fitting and repairs School

22.28Residential Schools for specific category

of children

(a) Construction of Building including boundary

wall, Water and sanitation facilities, electric

installation (For 100 children)

Building 65.86000

(b) Construction of residential hostel Building 65.86000

(c) Refurnishing unused old buildings Building

22.29

Construction of Hostel in existing Govt UPS

including boundary wall, Water and sanitation

facilities, electric installation etc. (For 50

children)

7.00000

22.30Furniture for Govt. UPS (per child) (@ Rs.500/-

per child enrolled)Child 0.00500

22.31 Major Repairs for Primary School School 0.30000

22.32 Majr Repairs for Upper Primary School School 0.30000

22.33Others (Difference of Civil Wrks

sanctioned in pre.yr.)22.33a Others (Overhead Tank PS) School 0.1200022.33b Others (Overhead Tank UPS) School 0.12000

Sub Total (Civil WOrks) 87 300.150 87 300.15VII PROJECT MANAGEMENT COST23 Management23.01 Management up to 3.5%

(a) Project Management and MIS

(i) DPO ( Salary, Contigency, Consumables,

POL, TA & Computer etc)District 1 129.715 1 129.71470

(ii) EMIS Cell District 1 12.600 1 12.60000Sub Total (a) 1 1 1 142.315 1 142.315

(b) Training of Educational Administrators District

(c) School Mapping and Social Mapping District

Sub Total (23.01)

23.02Learning Enhancement Prog. (LEP) (P & UP) (up

to 2%)District 13.755 13.75520

23.03 Community Mobilization (up to 0.5%) District 1 40.000 1 40.00000

Sub Total (Management) 1 53.755 1 53.75520Total Management Cost 196.070 196.06990Total of SSA (Districs) 0.900 432576 8623.909 432576 8624.809

24 State Component23.01 Management23.02 REMS 0.0044923.03 SIEMAT

Sub Total

STATE SSA TOTAL 0.90000 432576 8623.909 432576 8624.80947

25

KGBV Financial Provision (give

separate costing sheets for different

Models)

Hostel

ANon Recurring One Time Grant (Only

committed liabilities) (Model-I)

25.01 Construction of Building (New)

25.02 Construction of Building KGBV sanctioned earlier

25.02(a) Additional Class Room Rooms 3.45000

25.02(b) Guard Room Rooms 1.32000

25.02(c) Boundary Wall School 5.0200025.03 Boudary Wall (Spillover only)

25.04

Boring/Handpump (Spillover only)

(minimum rates prescribed by State Drinking

Water Department subject to a ceiling of Rs.

1.00 lakhs)

Arti:SSA-AWPB-2014-15-PABMinits:Chandauli:16-06-2014 398 / 533

Page 399: U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 · 2015. 1. 6. · U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15

Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

Name of District :Chandauli -20

ActivityS. No.Physical

UnitRemarks

Outlay Recommendation for 2014-15

Spill OverDeferred laibility of

2014-15Fresh Recommended Total Recommended

25.05 Electricity /Water charges (Spillover only)

25.05(a) Solar Water Heater & Solar Light 2.97000

25.06Furniture/Equipment (including Kitchen

equipment)3.00000

25.07 TLM and equipment including library books 3.50000

25.08 Bedding (New) 0.75000

25.09 Replacement of Bedding (once in 3 Year) 0.75000 8 6.000 8 6.00000

Subtotal Non Recurring 6.000 6.00000

B Recurring Cost Per Annum (Model-I)

25.10Maintenance per girl student per month @ Rs.

1500/-18.00000 9 162.000 9 162.00000

25.11 Stipend for girl student per month @ Rs. 100/- 1.20000 9 10.800 9 10.80000

25.12Supplementary TLM, stationery and other

educational material @ Rs.1000/- per annum1.00000 9 9.000 9 9.00000

25.13 Salaries

25.13.1 Additional Salaries:

(a) 1 Warden @ Rs. 25,000/- per month 3.00000 9 27.00000 9 27.00000

(b)4 Full time teachers as per RTE norms @ Rs.

20,000/- per month per teacher 9.60000 9 86.40000 9 86.40000

(c)

1 Urdu Teachers (only for blocks with muslim

population above 20% and select urban areas), if

required @ Rs. 12,000/- per month per teacher 1.44000 9 12.96000 9 12.96000

(d)3 part time teachers @ Rs. 5,000/- per month per

teacher 1.80000 9 16.20000 9 16.20000

(e)1 Full time Accountant @ Rs. 10,000/- per month

1.20000 9 10.80000 9 10.80000

(f)

2 Support Staff – (Accountant/ Assistant, Peon,

Chowkidar) @ Rs. 5,000/- per month per staff 1.20000 9 10.80000 9 10.80000

(g) 1 Head cook @ Rs. 6,000/- per month 0.72000 9 6.48000 9 6.48000

(h)2 Asstt. Cooks @ Rs. 4,500/- per month per cook

1.08000 9 9.72000 9 9.72000

25.14Specific skill training @ Rs.1000/- per child per

annum1.00000 9 9.000 9 9.00000

25.15Electricity/water charges @ Rs.1000/- per child

per annum1.00000 9 9.000 9 9.00000

25.16Medical care/contingencies @ Rs. 1250 per child

per annum1.25000 9 11.250 9 11.25000

25.17 Maintenance @ Rs.750/- per child per annum 0.75000 9 6.750 9 6.75000

25.18

Miscellaneous (Educational Tour/ Exposure Visit

/ Sports Material etc.) @ Rs.750/- per child per

annum

0.75000 9 6.750 9 6.75000

25.19Preparatory camps @ Rs.200/- per child per

annum0.20000 9 1.800 9 1.80000

25.20PTAs/school functions @ Rs.200/- per child per

annum0.20000 9 1.800 9 1.80000

25.21 Provision of Rent @ Rs.6000/- per annum 6.00000

25.21a Provision of Rent (6 months) 3.6000025.21b Provision of Rent (3 months) 1.8000025.21c Rent (Previous Year (2007-2012)

25.22 Capacity building 0.50000 9 4.500 9 4.50000

25.22(a)Physical/ Self Defence Training @ Rs.200/- per

child per annum0.20000 9 1.800 9 1.80000

Subtotal Recurring 9 414.810 9 414.81000

Subtotal (Model-I) 9 420.810 9 420.81000

CNon Recurring One Time Grant (Only

committed liabilities) (Model-II)

25.23 Construction of Building (New)

25.24 Construction of Building KGBV sanctioned earlier

25.24(a) Additional Class Room Rooms 3.45000

25.24(b) Guard Room Rooms 1.32000

25.24(c) Boundary Wall School 5.0200025.25 Boudary Wall (Spillover only)25.26 Boring/Handpump (Spillover only)

25.27 Electricity /Water charges (Spillover only)

25.27(a) Solar Water Heater & Solar Light 2.97000

25.28Furniture/Equipment (including Kitchen

equipment)2.00000

25.29 TLM and equipment including library books 3.00000

Arti:SSA-AWPB-2014-15-PABMinits:Chandauli:16-06-2014 399 / 533

Page 400: U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 · 2015. 1. 6. · U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15

Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

Name of District :Chandauli -20

ActivityS. No.Physical

UnitRemarks

Outlay Recommendation for 2014-15

Spill OverDeferred laibility of

2014-15Fresh Recommended Total Recommended

25.30 Bedding (New) 0.37500

25.31 Replacement of Bedding (once in 3 Year) 0.37500

Subtotal Non Recurring

D Recurring Cost Per Annum (Model-II)

25.32Maintenance per girl student per month @ Rs.

1500/-9.00000

25.33 Stipend for girl student per month @ Rs. 100/- 0.60000

25.34Supplementary TLM, stationery and other

educational material @ Rs.1000/- per annum0.50000

25.35 Salaries(a) 1 Warden @ Rs. 25,000/- per month 3.00000

(b)3 Full time teachers as per RTE norms @ Rs.

20,000/- per month per teacher 7.20000

(c) 3 part time teachers @ Rs. 5,000/- per month per

teacher 1.80000

(d)1 Full time Accountant @ Rs. 10,000/- per month

1.20000

(e)

2 Support Staff – (Accountant/ Assistant, Peon,

Chowkidar) @ Rs. 5,000/- per month per staff 1.20000

(f) 1 Head cook @ Rs. 6,000/- per month 0.72000

(g)1 Asstt. Cooks @ Rs. 4,500/- per month per cook

0.54000

25.36Specific skill training @ Rs.1000/- per child per

annum0.50000

25.37Electricity/water charges @ Rs.1000/- per child

per annum0.50000

25.38Medical care/contingencies @ Rs. 1250 per child

per annum0.62500

25.39 Maintenance @ Rs.750/- per child per annum 0.37500

25.40

Miscellaneous (Educational Tour/ Exposure Visit

/ Sports Material etc.) @ Rs.750/- per child per

annum

0.37500

25.41Preparatory camps @ Rs.300/- per child per

annum0.15000

25.42PTAs/school functions @ Rs.300/- per child per

annum0.15000

25.43 Provision of Rent @ Rs.10000/- per annum 5.00000

25.43a Provision of Rent (6 months) 3.6000025.43b Provision of Rent (3 months) 1.8000025.43c Rent (Previous Year (2007-2012)25.44 Capacity building 0.25000

25.44(a)Physical/ Self Defence Training @ Rs.200/- per

child per annum0.10000

Subtotal Recurring

Subtotal (Model-II) Total (KGBV) 9 420.810 9 420.810

DISTRICT GRAND TOTAL (SSA+KGBV) 0.900 432585 9044.719 432585 9045.619

Arti:SSA-AWPB-2014-15-PABMinits:Chandauli:16-06-2014 400 / 533

Page 401: U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 · 2015. 1. 6. · U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15

Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

I ACCESS

1 Opening of New Schools

1.01 Upgradation of EGS to PSCentres /

School1.02 New PS School

1.03 Upgradation of PS to UPS / New UPS School

1.04 Composite Schools (for Urban Areas) School

1.05Residential Schools for specific category children

(For 100 children)

1.06Residential Hostel (for specific category of

children) (For 50 children)

1.07 Integration of Class V with Primary Schools

1.08Integration of Class VIII with Upper Primary

Schools

2Residential Schools for specific category

of children (For 100 Children)

Total - Residential Schools (For 100

children)

3Residential Hostel for specific category of

children (For 50 Children)

Total - Residential Schools (For 50

children)4 Transport/Escort Facility

4.01

Children in remote habitations with sparse

populations where opening of schools is

unviable

Child 0.03000

4.02

Urban deprived children/children without adult

protection in urban areas where schools are not

opened because availability of land is a problem

Child 0.03000

Sub Total

5Special Training for mainstreaming of Out-

of-School Children

5.03 Non-Residential (Fresh)(a) 12 months Child 0.06000(b) 9 months 0.04500(c) 6 months

(i)Special Training (by Special Instructors-NRBC)-

(1-5) Child 0.03000 1558 46.740 1558 46.74000

(ii) Special Training (by Special Instructors-NRBC)-

(6-8) Child 0.03000 1831 54.930 1831 54.93000

(d) 3 months Child 0.01500Sub Total 3389 101.670 3389 101.67000

Total (Special Training) 3389 101.670 3389 101.6705(B) House Hold Survey (HHS)

5(B).01 House Hold Survey through SMCHouse

Hold0.00001

Sub TotalII RETENTION6 Free Text Book

6.01Free Text Book (PS) for Parishadiya & Aided

Primary Schools (Workbooks not included)Child 0.00120 190349 228.419 190349 228.41880

6.01a

Free Text Book (PS) for 25% children of Class-1

in Private Recognised Primary Schools of other

Boards (Workbooks not included)

Child 0.00150

6.02 Free Brail Books (PS) 0.00150 42 0.063 42 0.06300

6.03 Free Large Print Books (PS) 0.00150

6.04Free Text Book (UPS) (Workbooks not included)

(Including KGBV Girls)Child 0.00200 69466 138.932 69466 138.93200

6.05 Free Brail Books (UPS) 0.00250

6.06 Free Large Print Books (PS) 0.00250Sub Total 259857 367.414 259857 367.414

7 Provision of 2 set of Uniforms

7.01 All Girls (Including KGBV Girls) Child 0.00400 143816 575.264 143816 575.26400

7.02 SC Boys Child 0.00400 44493 177.972 44493 177.97200

7.03 ST Boys Child 0.00400

7.04 BPL Boys Child 0.00400 8963 35.852 8963 35.85200

7.05

Free Uniform for 25% children of Class-1 in

Private Recognised Primary Schools of other

Boards

Child0.00400

Sub Total 197272 789.088 197272 789.0887(A) Fee Reimbursement

7(A).01

Fee Reimbursement for Admission of children of

Disadvantaged Group & Weaker Section upto

25% of seats in Class-1 of Private Unaided

Recognised Schools

Child 0.05400

Sub Total

8 Teaching Learning Equipment (TLE)

8.01 TLE - New Primary School 11 2.60000 0.20000 11 2.600008.02 TLE - New Upper Primary School 4 3.00000 0.50000 4 3.00000

Name of District : Buland Shahar -19

ActivityS. No.Physical

UnitRemarks

Outlay Recommendation for 2014-15

Spill OverDeferred laibility of

2014-15Fresh Recommended Total Recommended

Arti:SSA-AWPB-2014-15-PABMinits:BulandShahar:16-06-2014 401 / 533

Page 402: U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 · 2015. 1. 6. · U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15

Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

Name of District : Buland Shahar -19

ActivityS. No.Physical

UnitRemarks

Outlay Recommendation for 2014-15

Spill OverDeferred laibility of

2014-15Fresh Recommended Total Recommended

Sub Total 15 5.60000 15 5.60000III ENHANCING QUALITY9 New Teachers Salary

9.01 Primary Teachers (Regular) (Asstt. Teacher) Teacher 0.91500

9.01aHead Teacher for Primary (if the number of

children exceeds 150 in a school)Teacher

9.02 Primary Teachers (Contract) (S.M.) Teacher

9.03Subject specific Upper Primary Teachers

(Regular) (a) Science and Mathematics Teacher 1.26000(b) Social Studies Teacher 1.26000(c) Languages Teacher 1.26000

Sub Total (9.01 to 9.05)Add.Teacher against PTR

Sub Total (9.06 to 9.12)

Total (New Teacher's Salary-9.01 to 9.12)

Teachers Salary (Recurring-sanctioned

earlier)Primary teachers

9.13 Primary Teachers ( Regular)-Existing, in position Teacher 3.66000 257 940.620 257 940.62000

9.14Primary Teachers (Contract)-Existing, in

positionTeacher 0.55000

9.14(a) Primary Teachers (Contract)-under Training Teacher 0.38500 1193 459.305 1193 459.30500

9.14(b)Primary Teacher (Para Teachers Equal to

9.14(a) upgraded as Teachers)0.38500 1373 528.605 1373 528.60500

9.14(c) Primary Teachers (Para)- Vacant Teacher9.15 Primary Teachers (Vacant) Teacher 0.30500

9.16Head Teacher for Primary (if the number of

children exceeds 150)Teacher 5.04000 144 725.760 144 725.76000

9.16(b)Head Teacher for Primary (if the number of

children exceeds 150) VacantTeacher 0.42000

Additional teachers

9.17Additional Teachers - PS (Special BTC-

Regular) in positionTeacher 0.30500

9.18Additional Teachers - PS (Special BTC Under

Training)Teacher 0.87600

9.19 Additional Teachers - PS (Vacant) Teacher

9.20Others in position (Para Teachers upgraded

as Teachers)Teacher

Upper Primary teachers

9.21 UP Teachers (Regular)-Existing Teacher 5.04000 1230 6199.200 1230 6199.20000

9.22 UP Teachers (Contract)-Existing9.23 UP Teachers (Vacant) Teacher 1.26000

9.24Head Teacher for Upper Primary (if the number

of children exceeds 100)-ExistingTeacher 5.34000 309 1650.060 309 1650.06000

9.24a Head Teacher for Upper Primary (Vacant) Teacher 1.33500

9.25Subject specific Upper Primary Teachers

(Regular)(a) Science and Mathematics(b) Social Studies(c) Languages

9.32 Part Time Instructors in position(a) Art Education 0.77000 61 46.970 61 46.97000(b) Health and Physical Education 0.77000 65 50.050 65 50.05000(c) Work Education 0.77000 60 46.200 60 46.20000

9.32(A) Part Time Instructors Vacant(a) Art Education 0.42000(b) Health and Physical Education 0.42000(c) Work Education 0.42000

9.33

Others-Incentive to Teachers in Schools

Located in Naxal Affected Areas (@

Rs.1500/- per teachers per month)

Sub Total (9.13 to 9.33) 4692 10646.770 4692 10646.77TOTAL

(New Teachers Salary +Teachers Salary

Recurring)

4692 10646.770 4692 10646.77000

10 Teachers Training(a) Teachers

10.01

Refresher In-service Teachers' Training at BRC

level and above - 10 days (@ Rs.200/- per

head per day)

Teacher

(Target &

Ach.-13-14

in

Mandays)

0.00600

10.01(a)Continuous and Comprehensive Evauation [PS +

UPS)Teacher 0.01300 1571 20.423 1571 20.42300

10.01(b) Eary Reading and Numeracy Skills [PS] Teacher 0.00500 1571 7.855 1571 7.85500

10.01(c) Science [UPS] Teacher 0.00800 781 6.248 781 6.24800Recommended as

proposed

10.01(d) CWSN Teacher 0.00400

Arti:SSA-AWPB-2014-15-PABMinits:BulandShahar:16-06-2014 402 / 533

Page 403: U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 · 2015. 1. 6. · U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15

Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

Name of District : Buland Shahar -19

ActivityS. No.Physical

UnitRemarks

Outlay Recommendation for 2014-15

Spill OverDeferred laibility of

2014-15Fresh Recommended Total Recommended

10.02

One day monthly cluster level meetings and

peer group training sessions for 10 months for

all teachers each year at CRC level - 10 days (@

Rs.100/- per head per day)

Teacher 0.01000

10.03(a)

Induction Training for Newly Recruited Teachers

for 6 Months (Special BTC)- @Rs.2000/- per

head per year

Teacher 0.02000

10.03(b)5 Days Training for Part Time Instructors @ Rs.

200/- per head per day) Teacher 0.01000

10.04

Training of untrained Teachers to acquire

professional qualifications over a two year

period.

Teacher 0.04700 620 29.140 620 29.14000

(b) Head Teachers

10.05Refresher Residencial In-service for 10 days at

BRC level and above

Head

Teacher(c) Resource Persons

10.06

Refresher Training for all Resource

Persons,Master Trainers, BRC & CRC faculty

and Coordinators for 5 days each year (@

Rs.200/- per head per day)

Resource

Person 0.00300 192 0.576 192 0.57600

Sub Total 4735 64.242 4735 64.242

11Academic Support through Block Resource

Centre (BRC)/ URC

11.01 Salary of Faculty and Staff

(a) 5 RPs at BRC for subject specific training in

positionRP 80 80

(b) 2 RPs for CWSN in position RP(b-i) 1 CWSN Resource Person RP 1.10000 32 35.200 32 35.20000

(b-ii) 1 Physiotherapist (Resource person for IE) RP

(c) 1 MIS Coordinator in position RP 1.86000

(d) 1 Datra Entry Operator in position RP 1.74000

(e) 1 Accountant-cum-support staff in position RP 1.80000

11.02 Furniture Grant BRC/ URC 1.00000

11.03Replacement of furniture, computer, TLE etc (

Once in 5 years)BRC/ URC 1.00000

11.04 Contingency Grant BRC/ URC 0.50000 16 8.000 16 8.00000

11.05 Meeting, TA BRC/ URC 0.30000 16 4.800 16 4.80000

11.06 TLM Grant BRC/ URC 0.10000

11.07 Maintenance Grant BRC/ URC 0.10000

Sub Total 16 48.000 16 48.00000

12Academic Support through Cluster

Resource Centres (CRC/UERC)

12.01Salary of Cluster Coordinator (on an average of

one Resource Person per 18 schools in a block)RP

12.02 Furniture GrantCRC/

UERC0.10000

12.03Replacement of furniture, computer, TLE etc.

once in 5 years

CRC/

UERC0.10000

12.04 Contingency Grant CRC/UERC 0.10000 154 15.400 154 15.40000

12.05 Meeting, TA CRC/UERC 0.12000 154 18.480 154 18.48000

12.06 TLM Grant CRC/UERC 0.03000

12.07Maintenance Grant

CRC/UERC 0.02000

Sub Total 308 33.880 308 33.88000

13Computer Aided Education in upper

primary schools under Innovation

13.01Computer Aided Education in upper primary

schoolsDistrict 0.01200 48 0.576 48 0.57600

Sub Total 48 0.576 48 0.5760014 Libraries in Schools14.01 (a) Primary School (per school) School 0.03000

14.02 (b) Upper Primary School (per school) School 0.10000

Sub TotalIV ANNUAL GRANTS15 Teachers' Grant15.01 Primary Teachers Teacher 0.0050015.02 Upper Primary Teachers Teacher 0.00500 781 3.905 781 3.90500

Sub Total 781 3.905 781 3.9050016 School Grant16.01 Primary School School 0.05000 1640 82.000 1640 82.0000016.02 Upper Primary School School 0.07000 832 58.240 832 58.24000

Sub Total 2472 140.240 2472 140.24000

Arti:SSA-AWPB-2014-15-PABMinits:BulandShahar:16-06-2014 403 / 533

Page 404: U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 · 2015. 1. 6. · U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15

Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

Name of District : Buland Shahar -19

ActivityS. No.Physical

UnitRemarks

Outlay Recommendation for 2014-15

Spill OverDeferred laibility of

2014-15Fresh Recommended Total Recommended

17Research, Evaluation, Monitoring &

Supervision

17.01 REMS Activities School 0.00103 2472 2.543 2472 2.54273

17.02 Monitoring & Supervision School 0.00078 2472 1.938 2472 1.93821

17.03 House Hold Survey (Urban) in Million Plus Cities District 35.00000

Sub Total 4944 4.481 4944 4.4809418 Maintenance Grant

18.01 Maintenance in School having upto3 Classrooms School 0.07500 485 36.375 485 36.37500

18.01a Maintenance Grant School 0.07500 1930 144.750 1930 144.75000Sub Total 2415 181.125 2415 181.12500

VBRIDGING GENDER AND SOCIAL

CATEGORY GAPS

19 Interventions for CWSN (IE)

19.01 Provision for Inclusive Education Child 0.03000 2237 67.110 2237 67.11000

Sub Total 2237 67.110 2237 67.11000

20Innovativation Head up to Rs.50 Lakh per

district

20.01 Girls Education District 0.70000 10 7.000 10 7.00000

20.02 ECCE District20.03 Intervention for SC / ST children District

20.04 Intervention for Minority Community children District 7.700 7.70000

20.05 Intervention for Urban Deprived children District 10.00000

Sub Total 10 14.700 10 14.7000021 SMC/PRI Training

21.01Residential for 6 Resource Person per Block (3

days) (@ Rs.500/-)Blocks 0.09000

21.02Non-residential (3 days training of 6 SMC

members) (@ Rs.100/-)SMC 0.01800 2415 43.470 2415 43.47000

21.02(a)Non-residential (3 days training of 3 Members of

PRI/VECs/LA) (@ Rs.100/-)VEC/ WEC 0.00900

21.03

Seminar/Orientation of SMC Women members

and President/Vice President (@ Rs. 50,000/-

per block)

Blocks 0.50000

Sub Total 2415 43.470 2415 43.47000VI SCHOOL INFRASTRUCTURE22 Civil Works22.01 Primary School (Plain) (New) School 13.1550022.02 Primary School (Hilly/Rocky) (New) School 13.2750022.03 Upper Primary (Plain) (New) School 20.65500

22.04 Upper Primary School (Hilly/Rocky) (New) School 20.77500

22.04aComposite Schools for Urban Areas (Class I-

VIII)School 41.04000

22.05 ACR in lieu of upgraded Upper Primary School Rooms

22.06 Additional class rooms for adding Class VIII Rooms

22.07 Building Less (Pry) School 9.7500022.08 Building Less (UP) School 18.5900022.09 Dilapidated Building (Pry) School 9.7500022.10 Dilapidated Building (UP) School 18.59000

22.11 Additional Class Room (Rural) ( PS+UPS) Rooms 3.45000 32 110.400 32 110.40000

22.12 Additional Class Room (Urban) Rooms 3.4500022.13 Additional Class Room (Hill Area)22.14 Toilet/Urinals (PS & UPS) School 0.70000 25 17.500 25 17.5000022.15 Separate Girls Toilet (Rural+Urban) School 0.7000022.16 CWSN friendly Toilets School 0.50000

22.17 Drinking Water Facility (for Urban Area Only)) School 0.15000

22.17a Drinking Water Facility (Plain PS & UPS) School 0.15000

22.17b Drinking Water Facility (Hilly/Rocky PS & UPS) School 0.15000

22.18a Boundary Wall PS (Total in Meters x .01105) 0.01749

22.18bBoundary Wall PS (For Gate) @Rs. 7000 x no. of

P.S.School 0.07800

22.18c Boundary Wall UPS (Total in Meters x .01105) 0.01749

22.18dBoundary Wall UPS (For Gate) @Rs. 7000 x no.

of UPSSchool 0.07800

22.19a Electrification in P.S./ Electrical Equipment School 0.11000

22.19b Electrification in U. P.S./ Electrical Equipment School 0.11000

22.20Office-cum-store-cum-Head Teacher's room

(Primary)Rooms

22.21Office-cum-store-cum-Head Teacher's room

(Upper Primary)Rooms

22.22Augumentation of training facility in BRC (one

time)BRC/ URC 5.00000

22.23 Child friendly Elements School 0.25000

22.24 Ramps with Handrails (Barrier Free Elements) School 0.06000 174 10.440 174 10.44000

22.25 Handrails in existing Ramps School 0.01000

Arti:SSA-AWPB-2014-15-PABMinits:BulandShahar:16-06-2014 404 / 533

Page 405: U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 · 2015. 1. 6. · U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15

Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

Name of District : Buland Shahar -19

ActivityS. No.Physical

UnitRemarks

Outlay Recommendation for 2014-15

Spill OverDeferred laibility of

2014-15Fresh Recommended Total Recommended

22.26 Whole School Develoipment School22.27 Retro-fitting and repairs School

22.28Residential Schools for specific category

of children

(a) Construction of Building including boundary

wall, Water and sanitation facilities, electric

installation (For 100 children)

Building 65.86000

(b) Construction of residential hostel Building 65.86000

(c) Refurnishing unused old buildings Building

22.29

Construction of Hostel in existing Govt UPS

including boundary wall, Water and sanitation

facilities, electric installation etc. (For 50

children)

7.00000

22.30Furniture for Govt. UPS (per child) (@ Rs.500/-

per child enrolled)Child 0.00500

22.31 Major Repairs for Primary School School 0.30000

22.32 Majr Repairs for Upper Primary School School 0.30000

22.33Others (Difference of Civil Wrks

sanctioned in pre.yr.)22.33a Others (Overhead Tank PS) School 0.1200022.33b Others (Overhead Tank UPS) School 0.12000

Sub Total (Civil WOrks) 231 138.340 231 138.34VII PROJECT MANAGEMENT COST23 Management23.01 Management up to 3.5%

(a) Project Management and MIS

(i) DPO ( Salary, Contigency, Consumables,

POL, TA & Computer etc)District 1 106.906 1 106.90580

(ii) EMIS Cell District 1 20.851 1 20.85050Sub Total (a) 1 1 1 127.756 1 127.756

(b) Training of Educational Administrators District

(c) School Mapping and Social Mapping District

Sub Total (23.01)

23.02Learning Enhancement Prog. (LEP) (P & UP) (up

to 2%)District 21.191 21.19075

23.03 Community Mobilization (up to 0.5%) District 1 60.000 1 60.00000

Sub Total (Management) 1 81.191 1 81.19075Total Management Cost 208.947 208.94705Total of SSA (Districs) 15 5.600 485822 12853.958 485837 12859.558

24 State Component23.01 Management23.02 REMS 0.0044923.03 SIEMAT

Sub Total

STATE SSA TOTAL 15 5.60000 485822 12853.958 485837 12859.55779

25

KGBV Financial Provision (give

separate costing sheets for different

Models)

Hostel

ANon Recurring One Time Grant (Only

committed liabilities) (Model-I)

25.01 Construction of Building (New)

25.02 Construction of Building KGBV sanctioned earlier

25.02(a) Additional Class Room Rooms 3.45000

25.02(b) Guard Room Rooms 1.32000

25.02(c) Boundary Wall School 5.0200025.03 Boudary Wall (Spillover only) 1.43000 1.43000

25.04

Boring/Handpump (Spillover only)

(minimum rates prescribed by State Drinking

Water Department subject to a ceiling of Rs.

1.00 lakhs)

2.67500 2.67500

25.05 Electricity /Water charges (Spillover only)

25.05(a) Solar Water Heater & Solar Light 2.97000

25.06Furniture/Equipment (including Kitchen

equipment)3.00000

25.07 TLM and equipment including library books 3.50000

25.08 Bedding (New) 0.75000

25.09 Replacement of Bedding (once in 3 Year) 1 0.75000 14 10.500 15 10.50000

Subtotal Non Recurring 4.10500 10.500 14.60500

B Recurring Cost Per Annum (Model-I)

25.10Maintenance per girl student per month @ Rs.

1500/-18.00000 16 288.000 16 288.00000

25.11 Stipend for girl student per month @ Rs. 100/- 1.20000 16 19.200 16 19.20000

25.12Supplementary TLM, stationery and other

educational material @ Rs.1000/- per annum1.00000 16 16.000 16 16.00000

25.13 Salaries

Arti:SSA-AWPB-2014-15-PABMinits:BulandShahar:16-06-2014 405 / 533

Page 406: U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 · 2015. 1. 6. · U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15

Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

Name of District : Buland Shahar -19

ActivityS. No.Physical

UnitRemarks

Outlay Recommendation for 2014-15

Spill OverDeferred laibility of

2014-15Fresh Recommended Total Recommended

25.13.1 Additional Salaries:

(a) 1 Warden @ Rs. 25,000/- per month 3.00000 16 48.00000 16 48.00000

(b)4 Full time teachers as per RTE norms @ Rs.

20,000/- per month per teacher 9.60000 16 153.60000 16 153.60000

(c)

1 Urdu Teachers (only for blocks with muslim

population above 20% and select urban areas), if

required @ Rs. 12,000/- per month per teacher 1.44000 16 23.04000 16 23.04000

(d)3 part time teachers @ Rs. 5,000/- per month per

teacher 1.80000 16 28.80000 16 28.80000

(e)1 Full time Accountant @ Rs. 10,000/- per month

1.20000 16 19.20000 16 19.20000

(f)

2 Support Staff – (Accountant/ Assistant, Peon,

Chowkidar) @ Rs. 5,000/- per month per staff 1.20000 16 19.20000 16 19.20000

(g) 1 Head cook @ Rs. 6,000/- per month 0.72000 16 11.52000 16 11.52000

(h)2 Asstt. Cooks @ Rs. 4,500/- per month per cook

1.08000 16 17.28000 16 17.28000

25.14Specific skill training @ Rs.1000/- per child per

annum1.00000 16 16.000 16 16.00000

25.15Electricity/water charges @ Rs.1000/- per child

per annum1.00000 16 16.000 16 16.00000

25.16Medical care/contingencies @ Rs. 1250 per child

per annum1.25000 16 20.000 16 20.00000

25.17 Maintenance @ Rs.750/- per child per annum 0.75000 16 12.000 16 12.00000

25.18

Miscellaneous (Educational Tour/ Exposure Visit

/ Sports Material etc.) @ Rs.750/- per child per

annum

0.75000 16 12.000 16 12.00000

25.19Preparatory camps @ Rs.200/- per child per

annum0.20000 16 3.200 16 3.20000

25.20PTAs/school functions @ Rs.200/- per child per

annum0.20000 16 3.200 16 3.20000

25.21 Provision of Rent @ Rs.6000/- per annum 6.00000

25.21a Provision of Rent (6 months) 3.6000025.21b Provision of Rent (3 months) 1.8000025.21c Rent (Previous Year (2007-2012)

25.22 Capacity building 0.50000 16 8.000 16 8.00000

25.22(a)Physical/ Self Defence Training @ Rs.200/- per

child per annum0.20000 16 3.200 16 3.20000

Subtotal Recurring 16 737.440 16 737.44000

Subtotal (Model-I) 4.10500 16 747.940 16 752.04500

CNon Recurring One Time Grant (Only

committed liabilities) (Model-II)

25.23 Construction of Building (New)

25.24 Construction of Building KGBV sanctioned earlier

25.24(a) Additional Class Room Rooms 3.45000

25.24(b) Guard Room Rooms 1.32000

25.24(c) Boundary Wall School 5.0200025.25 Boudary Wall (Spillover only)25.26 Boring/Handpump (Spillover only)

25.27 Electricity /Water charges (Spillover only)

25.27(a) Solar Water Heater & Solar Light 2.97000

25.28Furniture/Equipment (including Kitchen

equipment)2.00000

25.29 TLM and equipment including library books 3.00000

25.30 Bedding (New) 0.37500

25.31 Replacement of Bedding (once in 3 Year) 0.37500

Subtotal Non Recurring

D Recurring Cost Per Annum (Model-II)

25.32Maintenance per girl student per month @ Rs.

1500/-9.00000

25.33 Stipend for girl student per month @ Rs. 100/- 0.60000

25.34Supplementary TLM, stationery and other

educational material @ Rs.1000/- per annum0.50000

25.35 Salaries(a) 1 Warden @ Rs. 25,000/- per month 3.00000

(b)3 Full time teachers as per RTE norms @ Rs.

20,000/- per month per teacher 7.20000

(c) 3 part time teachers @ Rs. 5,000/- per month per

teacher 1.80000

(d)1 Full time Accountant @ Rs. 10,000/- per month

1.20000

(e)

2 Support Staff – (Accountant/ Assistant, Peon,

Chowkidar) @ Rs. 5,000/- per month per staff 1.20000

Arti:SSA-AWPB-2014-15-PABMinits:BulandShahar:16-06-2014 406 / 533

Page 407: U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 · 2015. 1. 6. · U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15

Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

Name of District : Buland Shahar -19

ActivityS. No.Physical

UnitRemarks

Outlay Recommendation for 2014-15

Spill OverDeferred laibility of

2014-15Fresh Recommended Total Recommended

(f) 1 Head cook @ Rs. 6,000/- per month 0.72000

(g)1 Asstt. Cooks @ Rs. 4,500/- per month per cook

0.54000

25.36Specific skill training @ Rs.1000/- per child per

annum0.50000

25.37Electricity/water charges @ Rs.1000/- per child

per annum0.50000

25.38Medical care/contingencies @ Rs. 1250 per child

per annum0.62500

25.39 Maintenance @ Rs.750/- per child per annum 0.37500

25.40

Miscellaneous (Educational Tour/ Exposure Visit

/ Sports Material etc.) @ Rs.750/- per child per

annum

0.37500

25.41Preparatory camps @ Rs.300/- per child per

annum0.15000

25.42PTAs/school functions @ Rs.300/- per child per

annum0.15000

25.43 Provision of Rent @ Rs.10000/- per annum 5.00000

25.43a Provision of Rent (6 months) 3.6000025.43b Provision of Rent (3 months) 1.8000025.43c Rent (Previous Year (2007-2012)25.44 Capacity building 0.25000

25.44(a)Physical/ Self Defence Training @ Rs.200/- per

child per annum0.10000

Subtotal Recurring

Subtotal (Model-II) Total (KGBV) 4.105 16 747.940 16 752.045

DISTRICT GRAND TOTAL (SSA+KGBV) 4.105 15 5.600 485838 13601.898 485853 13611.603

Arti:SSA-AWPB-2014-15-PABMinits:BulandShahar:16-06-2014 407 / 533

Page 408: U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 · 2015. 1. 6. · U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15

Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

I ACCESS

1 Opening of New Schools

1.01 Upgradation of EGS to PSCentres /

School1.02 New PS School

1.03 Upgradation of PS to UPS / New UPS School

1.04 Composite Schools (for Urban Areas) School

1.05Residential Schools for specific category children

(For 100 children)

1.06Residential Hostel (for specific category of

children) (For 50 children)

1.07 Integration of Class V with Primary Schools

1.08Integration of Class VIII with Upper Primary

Schools

2Residential Schools for specific category

of children (For 100 Children)

Total - Residential Schools (For 100

children)

3Residential Hostel for specific category of

children (For 50 Children)

Total - Residential Schools (For 50

children)4 Transport/Escort Facility

4.01

Children in remote habitations with sparse

populations where opening of schools is

unviable

Child 0.03000

4.02

Urban deprived children/children without adult

protection in urban areas where schools are not

opened because availability of land is a problem

Child 0.03000

Sub Total

5Special Training for mainstreaming of Out-

of-School Children

5.03 Non-Residential (Fresh)(a) 12 months Child 0.06000(b) 9 months 0.04500(c) 6 months

(i)Special Training (by Special Instructors-NRBC)-

(1-5) Child 0.03000 494 14.820 494 14.82000

(ii) Special Training (by Special Instructors-NRBC)-

(6-8) Child 0.03000 340 10.200 340 10.20000

(d) 3 months Child 0.01500Sub Total 834 25.020 834 25.02000

Total (Special Training) 834 25.020 834 25.0205(B) House Hold Survey (HHS)

5(B).01 House Hold Survey through SMCHouse

Hold0.00001

Sub TotalII RETENTION6 Free Text Book

6.01Free Text Book (PS) for Parishadiya & Aided

Primary Schools (Workbooks not included)Child 0.00120 145735 174.882 145735 174.88200

6.01a

Free Text Book (PS) for 25% children of Class-1

in Private Recognised Primary Schools of other

Boards (Workbooks not included)

Child 0.00150

6.02 Free Brail Books (PS) 0.00150 130 0.195 130 0.19500

6.03 Free Large Print Books (PS) 0.00150

6.04Free Text Book (UPS) (Workbooks not included)

(Including KGBV Girls)Child 0.00200 71383 142.766 71383 142.76600

6.05 Free Brail Books (UPS) 0.00250 25 0.063 25 0.06250

6.06 Free Large Print Books (PS) 0.00250Sub Total 217273 317.906 217273 317.906

7 Provision of 2 set of Uniforms

7.01 All Girls (Including KGBV Girls) Child 0.00400 145464 581.856 145464 581.85600

7.02 SC Boys Child 0.00400 45638 182.552 45638 182.55200

7.03 ST Boys Child 0.00400 270 1.080 270 1.08000

7.04 BPL Boys Child 0.00400 45615 182.460 45615 182.46000

7.05

Free Uniform for 25% children of Class-1 in

Private Recognised Primary Schools of other

Boards

Child0.00400

Sub Total 236987 947.948 236987 947.9487(A) Fee Reimbursement

7(A).01

Fee Reimbursement for Admission of children of

Disadvantaged Group & Weaker Section upto

25% of seats in Class-1 of Private Unaided

Recognised Schools

Child 0.05400

Sub Total

8 Teaching Learning Equipment (TLE)

8.01 TLE - New Primary School 5.60000 0.20000 5.600008.02 TLE - New Upper Primary School 1.00000 0.50000 1.00000

Name of District :Bijnor -18

ActivityS. No.Physical

UnitRemarks

Outlay Recommendation for 2014-15

Spill OverDeferred laibility of

2014-15Fresh Recommended Total Recommended

Arti:SSA-AWPB-2014-15-PABMinits:Bijnor:16-06-2014 408 / 533

Page 409: U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 · 2015. 1. 6. · U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15

Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

Name of District :Bijnor -18

ActivityS. No.Physical

UnitRemarks

Outlay Recommendation for 2014-15

Spill OverDeferred laibility of

2014-15Fresh Recommended Total Recommended

Sub Total 6.60000 6.60000III ENHANCING QUALITY9 New Teachers Salary

9.01 Primary Teachers (Regular) (Asstt. Teacher) Teacher 0.91500

9.01aHead Teacher for Primary (if the number of

children exceeds 150 in a school)Teacher

9.02 Primary Teachers (Contract) (S.M.) Teacher

9.03Subject specific Upper Primary Teachers

(Regular) (a) Science and Mathematics Teacher 1.26000(b) Social Studies Teacher 1.26000(c) Languages Teacher 1.26000

Sub Total (9.01 to 9.05)Add.Teacher against PTR

Sub Total (9.06 to 9.12)

Total (New Teacher's Salary-9.01 to 9.12)

Teachers Salary (Recurring-sanctioned

earlier)Primary teachers

9.13 Primary Teachers ( Regular)-Existing, in position Teacher 3.66000 54 197.640 54 197.64000

9.14Primary Teachers (Contract)-Existing, in

positionTeacher 0.55000

9.14(a) Primary Teachers (Contract)-under Training Teacher 0.38500 2174 836.990 2174 836.99000

9.14(b)Primary Teacher (Para Teachers Equal to

9.14(a) upgraded as Teachers)0.38500 836 321.860 836 321.86000

9.14(c) Primary Teachers (Para)- Vacant Teacher9.15 Primary Teachers (Vacant) Teacher 0.30500

9.16Head Teacher for Primary (if the number of

children exceeds 150)Teacher 5.04000 133 670.320 133 670.32000

9.16(b)Head Teacher for Primary (if the number of

children exceeds 150) VacantTeacher 0.42000

Additional teachers

9.17Additional Teachers - PS (Special BTC-

Regular) in positionTeacher 0.30500

9.18Additional Teachers - PS (Special BTC Under

Training)Teacher 0.87600

9.19 Additional Teachers - PS (Vacant) Teacher

9.20Others in position (Para Teachers upgraded

as Teachers)Teacher

Upper Primary teachers

9.21 UP Teachers (Regular)-Existing Teacher 5.04000 1102 5554.080 1102 5554.08000

9.22 UP Teachers (Contract)-Existing9.23 UP Teachers (Vacant) Teacher 1.26000

9.24Head Teacher for Upper Primary (if the number

of children exceeds 100)-ExistingTeacher 5.34000 428 2285.520 428 2285.52000

9.24a Head Teacher for Upper Primary (Vacant) Teacher 1.33500

9.25Subject specific Upper Primary Teachers

(Regular)(a) Science and Mathematics(b) Social Studies(c) Languages

9.32 Part Time Instructors in position(a) Art Education 0.77000 154 118.580 154 118.58000(b) Health and Physical Education 0.77000 158 121.660 158 121.66000(c) Work Education 0.77000 100 77.000 100 77.00000

9.32(A) Part Time Instructors Vacant(a) Art Education 0.42000(b) Health and Physical Education 0.42000(c) Work Education 0.42000

9.33

Others-Incentive to Teachers in Schools

Located in Naxal Affected Areas (@

Rs.1500/- per teachers per month)

Sub Total (9.13 to 9.33) 5139 10183.650 5139 10183.65TOTAL

(New Teachers Salary +Teachers Salary

Recurring)

5139 10183.650 5139 10183.65000

10 Teachers Training(a) Teachers

10.01

Refresher In-service Teachers' Training at BRC

level and above - 10 days (@ Rs.200/- per

head per day)

Teacher

(Target &

Ach.-13-14

in

Mandays)

0.00600

10.01(a)Continuous and Comprehensive Evauation [PS +

UPS)Teacher 0.01300 1782 23.166 1782 23.16600

10.01(b) Eary Reading and Numeracy Skills [PS] Teacher 0.00500 1782 8.910 1782 8.91000

10.01(c) Science [UPS] Teacher 0.00800 832 6.656 832 6.65600Recommended as

proposed

10.01(d) CWSN Teacher 0.00400

Arti:SSA-AWPB-2014-15-PABMinits:Bijnor:16-06-2014 409 / 533

Page 410: U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 · 2015. 1. 6. · U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15

Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

Name of District :Bijnor -18

ActivityS. No.Physical

UnitRemarks

Outlay Recommendation for 2014-15

Spill OverDeferred laibility of

2014-15Fresh Recommended Total Recommended

10.02

One day monthly cluster level meetings and

peer group training sessions for 10 months for

all teachers each year at CRC level - 10 days (@

Rs.100/- per head per day)

Teacher 0.01000

10.03(a)

Induction Training for Newly Recruited Teachers

for 6 Months (Special BTC)- @Rs.2000/- per

head per year

Teacher 0.02000

10.03(b)5 Days Training for Part Time Instructors @ Rs.

200/- per head per day) Teacher 0.01000

10.04

Training of untrained Teachers to acquire

professional qualifications over a two year

period.

Teacher 0.04700 1903 89.441 1903 89.44100

(b) Head Teachers

10.05Refresher Residencial In-service for 10 days at

BRC level and above

Head

Teacher(c) Resource Persons

10.06

Refresher Training for all Resource

Persons,Master Trainers, BRC & CRC faculty

and Coordinators for 5 days each year (@

Rs.200/- per head per day)

Resource

Person 0.00300 144 0.432 144 0.43200

Sub Total 6443 128.605 6443 128.605

11Academic Support through Block Resource

Centre (BRC)/ URC

11.01 Salary of Faculty and Staff

(a) 5 RPs at BRC for subject specific training in

positionRP 60 60

(b) 2 RPs for CWSN in position RP(b-i) 1 CWSN Resource Person RP 1.10000 22 24.200 22 24.20000

(b-ii) 1 Physiotherapist (Resource person for IE) RP

(c) 1 MIS Coordinator in position RP 1.86000

(d) 1 Datra Entry Operator in position RP 1.74000 7 12.180 7 12.18000

(e) 1 Accountant-cum-support staff in position RP 1.80000 12 21.600 12 21.60000

11.02 Furniture Grant BRC/ URC 1.00000

11.03Replacement of furniture, computer, TLE etc (

Once in 5 years)BRC/ URC 1.00000

11.04 Contingency Grant BRC/ URC 0.50000 12 6.000 12 6.00000

11.05 Meeting, TA BRC/ URC 0.30000 12 3.600 12 3.60000

11.06 TLM Grant BRC/ URC 0.10000

11.07 Maintenance Grant BRC/ URC 0.10000

Sub Total 12 67.580 12 67.58000

12Academic Support through Cluster

Resource Centres (CRC/UERC)

12.01Salary of Cluster Coordinator (on an average of

one Resource Person per 18 schools in a block)RP

12.02 Furniture GrantCRC/

UERC0.10000

12.03Replacement of furniture, computer, TLE etc.

once in 5 years

CRC/

UERC0.10000

12.04 Contingency Grant CRC/UERC 0.10000 131 13.100 131 13.10000

12.05 Meeting, TA CRC/UERC 0.12000 131 15.720 131 15.72000

12.06 TLM Grant CRC/UERC 0.03000

12.07Maintenance Grant

CRC/UERC 0.02000

Sub Total 262 28.820 262 28.82000

13Computer Aided Education in upper

primary schools under Innovation

13.01Computer Aided Education in upper primary

schoolsDistrict 0.01200 48 0.576 48 0.57600

Sub Total 48 0.576 48 0.5760014 Libraries in Schools14.01 (a) Primary School (per school) School 0.03000

14.02 (b) Upper Primary School (per school) School 0.10000

Sub TotalIV ANNUAL GRANTS15 Teachers' Grant15.01 Primary Teachers Teacher 0.0050015.02 Upper Primary Teachers Teacher 0.00500 832 4.160 832 4.16000

Sub Total 832 4.160 832 4.1600016 School Grant16.01 Primary School School 0.05000 1817 90.850 1817 90.8500016.02 Upper Primary School School 0.07000 818 57.260 818 57.26000

Sub Total 2635 148.110 2635 148.11000

Arti:SSA-AWPB-2014-15-PABMinits:Bijnor:16-06-2014 410 / 533

Page 411: U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 · 2015. 1. 6. · U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15

Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

Name of District :Bijnor -18

ActivityS. No.Physical

UnitRemarks

Outlay Recommendation for 2014-15

Spill OverDeferred laibility of

2014-15Fresh Recommended Total Recommended

17Research, Evaluation, Monitoring &

Supervision

17.01 REMS Activities School 0.00103 2635 2.710 2635 2.71039

17.02 Monitoring & Supervision School 0.00078 2635 2.066 2635 2.06602

17.03 House Hold Survey (Urban) in Million Plus Cities District 35.00000

Sub Total 5270 4.776 5270 4.7764118 Maintenance Grant

18.01 Maintenance in School having upto3 Classrooms School 0.07500 89 6.675 89 6.67500

18.01a Maintenance Grant School 0.07500 2447 183.525 2447 183.52500Sub Total 2536 190.200 2536 190.20000

VBRIDGING GENDER AND SOCIAL

CATEGORY GAPS

19 Interventions for CWSN (IE)

19.01 Provision for Inclusive Education Child 0.01300 6855 89.115 6855 89.11500

Sub Total 6855 89.115 6855 89.11500

20Innovativation Head up to Rs.50 Lakh per

district

20.01 Girls Education District 0.70000 8 5.600 8 5.60000

20.02 ECCE District20.03 Intervention for SC / ST children District

20.04 Intervention for Minority Community children District 0.650 0.65000

20.05 Intervention for Urban Deprived children District 10.00000

Sub Total 8 6.250 8 6.2500021 SMC/PRI Training

21.01Residential for 6 Resource Person per Block (3

days) (@ Rs.500/-)Blocks 0.09000

21.02Non-residential (3 days training of 6 SMC

members) (@ Rs.100/-)SMC 0.01800 2580 46.440 2580 46.44000

21.02(a)Non-residential (3 days training of 3 Members of

PRI/VECs/LA) (@ Rs.100/-)VEC/ WEC 0.00900

21.03

Seminar/Orientation of SMC Women members

and President/Vice President (@ Rs. 50,000/-

per block)

Blocks 0.50000

Sub Total 2580 46.440 2580 46.44000VI SCHOOL INFRASTRUCTURE22 Civil Works22.01 Primary School (Plain) (New) School 13.1550022.02 Primary School (Hilly/Rocky) (New) School 13.2750022.03 Upper Primary (Plain) (New) School 20.65500

22.04 Upper Primary School (Hilly/Rocky) (New) School 20.77500

22.04aComposite Schools for Urban Areas (Class I-

VIII)School 41.04000

22.05 ACR in lieu of upgraded Upper Primary School Rooms

22.06 Additional class rooms for adding Class VIII Rooms

22.07 Building Less (Pry) School 9.7500022.08 Building Less (UP) School 18.5900022.09 Dilapidated Building (Pry) School 9.7500022.10 Dilapidated Building (UP) School 18.59000

22.11 Additional Class Room (Rural) ( PS+UPS) Rooms 3.45000

22.12 Additional Class Room (Urban) Rooms 3.4500022.13 Additional Class Room (Hill Area)22.14 Toilet/Urinals (PS & UPS) School 0.7000022.15 Separate Girls Toilet (Rural+Urban) School 0.7000022.16 CWSN friendly Toilets School 0.50000

22.17 Drinking Water Facility (for Urban Area Only)) School 0.15000

22.17a Drinking Water Facility (Plain PS & UPS) School 0.15000

22.17b Drinking Water Facility (Hilly/Rocky PS & UPS) School 0.15000

22.18a Boundary Wall PS (Total in Meters x .01105) 0.01749

22.18bBoundary Wall PS (For Gate) @Rs. 7000 x no. of

P.S.School 0.07800

22.18c Boundary Wall UPS (Total in Meters x .01105) 0.01749

22.18dBoundary Wall UPS (For Gate) @Rs. 7000 x no.

of UPSSchool 0.07800

22.19a Electrification in P.S./ Electrical Equipment School 0.11000

22.19b Electrification in U. P.S./ Electrical Equipment School 0.11000

22.20Office-cum-store-cum-Head Teacher's room

(Primary)Rooms

22.21Office-cum-store-cum-Head Teacher's room

(Upper Primary)Rooms

22.22Augumentation of training facility in BRC (one

time)BRC/ URC 5.00000

22.23 Child friendly Elements School 0.25000

22.24 Ramps with Handrails (Barrier Free Elements) School 0.06000

22.25 Handrails in existing Ramps School 0.01000

Arti:SSA-AWPB-2014-15-PABMinits:Bijnor:16-06-2014 411 / 533

Page 412: U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 · 2015. 1. 6. · U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15

Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

Name of District :Bijnor -18

ActivityS. No.Physical

UnitRemarks

Outlay Recommendation for 2014-15

Spill OverDeferred laibility of

2014-15Fresh Recommended Total Recommended

22.26 Whole School Develoipment School22.27 Retro-fitting and repairs School

22.28Residential Schools for specific category

of children

(a) Construction of Building including boundary

wall, Water and sanitation facilities, electric

installation (For 100 children)

Building 65.86000

(b) Construction of residential hostel Building 65.86000

(c) Refurnishing unused old buildings Building

22.29

Construction of Hostel in existing Govt UPS

including boundary wall, Water and sanitation

facilities, electric installation etc. (For 50

children)

7.00000

22.30Furniture for Govt. UPS (per child) (@ Rs.500/-

per child enrolled)Child 0.00500

22.31 Major Repairs for Primary School School 0.30000

22.32 Majr Repairs for Upper Primary School School 0.30000

22.33Others (Difference of Civil Wrks

sanctioned in pre.yr.)22.33a Others (Overhead Tank PS) School 0.1200022.33b Others (Overhead Tank UPS) School 0.12000

Sub Total (Civil WOrks)VII PROJECT MANAGEMENT COST23 Management23.01 Management up to 3.5%

(a) Project Management and MIS

(i) DPO ( Salary, Contigency, Consumables,

POL, TA & Computer etc)District 1 116.893 1 116.89310

(ii) EMIS Cell District 1 18.539 1 18.53900Sub Total (a) 1 1 1 135.432 1 135.432

(b) Training of Educational Administrators District

(c) School Mapping and Social Mapping District

Sub Total (23.01)

23.02Learning Enhancement Prog. (LEP) (P & UP) (up

to 2%)District 19.941 19.94090

23.03 Community Mobilization (up to 0.5%) District 1 60.000 1 60.00000

Sub Total (Management) 1 79.941 1 79.94090Total Management Cost 215.373 215.37300Total of SSA (Districs) 6.600 487714 12404.529 487714 12411.129

24 State Component23.01 Management23.02 REMS 0.0044923.03 SIEMAT

Sub Total

STATE SSA TOTAL 6.60000 487714 12404.529 487714 12411.12891

25

KGBV Financial Provision (give

separate costing sheets for different

Models)

Hostel

ANon Recurring One Time Grant (Only

committed liabilities) (Model-I)

25.01 Construction of Building (New)

25.02 Construction of Building KGBV sanctioned earlier

25.02(a) Additional Class Room Rooms 3.45000

25.02(b) Guard Room Rooms 1.32000

25.02(c) Boundary Wall School 5.0200025.03 Boudary Wall (Spillover only) 19.50000 19.50000

25.04

Boring/Handpump (Spillover only)

(minimum rates prescribed by State Drinking

Water Department subject to a ceiling of Rs.

1.00 lakhs)

13.00000 13.00000

25.05 Electricity /Water charges (Spillover only)

25.05(a) Solar Water Heater & Solar Light 2.97000

25.06Furniture/Equipment (including Kitchen

equipment)3.00000

25.07 TLM and equipment including library books 3.50000

25.08 Bedding (New) 0.75000

25.09 Replacement of Bedding (once in 3 Year) 0.75000 12 9.000 12 9.00000

Subtotal Non Recurring 32.50000 9.000 41.50000

B Recurring Cost Per Annum (Model-I)

25.10Maintenance per girl student per month @ Rs.

1500/-18.00000 14 252.000 14 252.00000

25.11 Stipend for girl student per month @ Rs. 100/- 1.20000 14 16.800 14 16.80000

25.12Supplementary TLM, stationery and other

educational material @ Rs.1000/- per annum1.00000 14 14.000 14 14.00000

25.13 Salaries

Arti:SSA-AWPB-2014-15-PABMinits:Bijnor:16-06-2014 412 / 533

Page 413: U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 · 2015. 1. 6. · U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15

Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

Name of District :Bijnor -18

ActivityS. No.Physical

UnitRemarks

Outlay Recommendation for 2014-15

Spill OverDeferred laibility of

2014-15Fresh Recommended Total Recommended

25.13.1 Additional Salaries:

(a) 1 Warden @ Rs. 25,000/- per month 3.00000 14 42.00000 14 42.00000

(b)4 Full time teachers as per RTE norms @ Rs.

20,000/- per month per teacher 9.60000 14 134.40000 14 134.40000

(c)

1 Urdu Teachers (only for blocks with muslim

population above 20% and select urban areas), if

required @ Rs. 12,000/- per month per teacher 1.44000 14 20.16000 14 20.16000

(d)3 part time teachers @ Rs. 5,000/- per month per

teacher 1.80000 14 25.20000 14 25.20000

(e)1 Full time Accountant @ Rs. 10,000/- per month

1.20000 14 16.80000 14 16.80000

(f)

2 Support Staff – (Accountant/ Assistant, Peon,

Chowkidar) @ Rs. 5,000/- per month per staff 1.20000 14 16.80000 14 16.80000

(g) 1 Head cook @ Rs. 6,000/- per month 0.72000 14 10.08000 14 10.08000

(h)2 Asstt. Cooks @ Rs. 4,500/- per month per cook

1.08000 14 15.12000 14 15.12000

25.14Specific skill training @ Rs.1000/- per child per

annum1.00000 14 14.000 14 14.00000

25.15Electricity/water charges @ Rs.1000/- per child

per annum1.00000 14 14.000 14 14.00000

25.16Medical care/contingencies @ Rs. 1250 per child

per annum1.25000 14 17.500 14 17.50000

25.17 Maintenance @ Rs.750/- per child per annum 0.75000 14 10.500 14 10.50000

25.18

Miscellaneous (Educational Tour/ Exposure Visit

/ Sports Material etc.) @ Rs.750/- per child per

annum

0.75000 14 10.500 14 10.50000

25.19Preparatory camps @ Rs.200/- per child per

annum0.20000 14 2.800 14 2.80000

25.20PTAs/school functions @ Rs.200/- per child per

annum0.20000 14 2.800 14 2.80000

25.21 Provision of Rent @ Rs.6000/- per annum 6.00000

25.21a Provision of Rent (6 months) 3.6000025.21b Provision of Rent (3 months) 1.8000025.21c Rent (Previous Year (2007-2012)

25.22 Capacity building 0.50000 14 7.000 14 7.00000

25.22(a)Physical/ Self Defence Training @ Rs.200/- per

child per annum0.20000 14 2.800 14 2.80000

Subtotal Recurring 14 645.260 14 645.26000

Subtotal (Model-I) 32.50000 14 654.260 14 686.76000

CNon Recurring One Time Grant (Only

committed liabilities) (Model-II)

25.23 Construction of Building (New)

25.24 Construction of Building KGBV sanctioned earlier

25.24(a) Additional Class Room Rooms 3.45000

25.24(b) Guard Room Rooms 1.32000

25.24(c) Boundary Wall School 5.0200025.25 Boudary Wall (Spillover only)25.26 Boring/Handpump (Spillover only)

25.27 Electricity /Water charges (Spillover only)

25.27(a) Solar Water Heater & Solar Light 2.97000

25.28Furniture/Equipment (including Kitchen

equipment)2.00000

25.29 TLM and equipment including library books 3.00000

25.30 Bedding (New) 0.37500

25.31 Replacement of Bedding (once in 3 Year) 0.37500

Subtotal Non Recurring

D Recurring Cost Per Annum (Model-II)

25.32Maintenance per girl student per month @ Rs.

1500/-9.00000

25.33 Stipend for girl student per month @ Rs. 100/- 0.60000

25.34Supplementary TLM, stationery and other

educational material @ Rs.1000/- per annum0.50000

25.35 Salaries(a) 1 Warden @ Rs. 25,000/- per month 3.00000

(b)3 Full time teachers as per RTE norms @ Rs.

20,000/- per month per teacher 7.20000

(c) 3 part time teachers @ Rs. 5,000/- per month per

teacher 1.80000

(d)1 Full time Accountant @ Rs. 10,000/- per month

1.20000

(e)

2 Support Staff – (Accountant/ Assistant, Peon,

Chowkidar) @ Rs. 5,000/- per month per staff 1.20000

Arti:SSA-AWPB-2014-15-PABMinits:Bijnor:16-06-2014 413 / 533

Page 414: U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 · 2015. 1. 6. · U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15

Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

Name of District :Bijnor -18

ActivityS. No.Physical

UnitRemarks

Outlay Recommendation for 2014-15

Spill OverDeferred laibility of

2014-15Fresh Recommended Total Recommended

(f) 1 Head cook @ Rs. 6,000/- per month 0.72000

(g)1 Asstt. Cooks @ Rs. 4,500/- per month per cook

0.54000

25.36Specific skill training @ Rs.1000/- per child per

annum0.50000

25.37Electricity/water charges @ Rs.1000/- per child

per annum0.50000

25.38Medical care/contingencies @ Rs. 1250 per child

per annum0.62500

25.39 Maintenance @ Rs.750/- per child per annum 0.37500

25.40

Miscellaneous (Educational Tour/ Exposure Visit

/ Sports Material etc.) @ Rs.750/- per child per

annum

0.37500

25.41Preparatory camps @ Rs.300/- per child per

annum0.15000

25.42PTAs/school functions @ Rs.300/- per child per

annum0.15000

25.43 Provision of Rent @ Rs.10000/- per annum 5.00000

25.43a Provision of Rent (6 months) 3.6000025.43b Provision of Rent (3 months) 1.8000025.43c Rent (Previous Year (2007-2012)25.44 Capacity building 0.25000

25.44(a)Physical/ Self Defence Training @ Rs.200/- per

child per annum0.10000

Subtotal Recurring

Subtotal (Model-II) Total (KGBV) 32.500 14 654.260 14 686.760

DISTRICT GRAND TOTAL (SSA+KGBV) 32.500 6.600 487728 13058.789 487728 13097.889

Arti:SSA-AWPB-2014-15-PABMinits:Bijnor:16-06-2014 414 / 533

Page 415: U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 · 2015. 1. 6. · U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15

Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

I ACCESS

1 Opening of New Schools

1.01 Upgradation of EGS to PSCentres /

School1.02 New PS School

1.03 Upgradation of PS to UPS / New UPS School

1.04 Composite Schools (for Urban Areas) School

1.05Residential Schools for specific category children

(For 100 children)

1.06Residential Hostel (for specific category of

children) (For 50 children)

1.07 Integration of Class V with Primary Schools

1.08Integration of Class VIII with Upper Primary

Schools

2Residential Schools for specific category

of children (For 100 Children)

Total - Residential Schools (For 100

children)

3Residential Hostel for specific category of

children (For 50 Children)

Total - Residential Schools (For 50

children)4 Transport/Escort Facility

4.01

Children in remote habitations with sparse

populations where opening of schools is

unviable

Child 0.03000

4.02

Urban deprived children/children without adult

protection in urban areas where schools are not

opened because availability of land is a problem

Child 0.03000

Sub Total

5Special Training for mainstreaming of Out-

of-School Children

5.03 Non-Residential (Fresh)(a) 12 months Child 0.06000(b) 9 months 0.04500(c) 6 months

(i)Special Training (by Special Instructors-NRBC)-

(1-5) Child 0.03000 70 2.100 70 2.10000

(ii) Special Training (by Special Instructors-NRBC)-

(6-8) Child 0.03000 123 3.690 123 3.69000

(d) 3 months Child 0.01500Sub Total 193 5.790 193 5.79000

Total (Special Training) 193 5.790 193 5.7905(B) House Hold Survey (HHS)

5(B).01 House Hold Survey through SMCHouse

Hold0.00001

Sub TotalII RETENTION6 Free Text Book

6.01Free Text Book (PS) for Parishadiya & Aided

Primary Schools (Workbooks not included)Child 0.00120 110064 132.077 110064 132.07680

6.01a

Free Text Book (PS) for 25% children of Class-1

in Private Recognised Primary Schools of other

Boards (Workbooks not included)

Child 0.00150

6.02 Free Brail Books (PS) 0.00150 71 0.107 71 0.10650

6.03 Free Large Print Books (PS) 0.00150

6.04Free Text Book (UPS) (Workbooks not included)

(Including KGBV Girls)Child 0.00200 37413 74.826 37413 74.82600

6.05 Free Brail Books (UPS) 0.00250 16 0.040 16 0.04000

6.06 Free Large Print Books (PS) 0.00250Sub Total 147564 207.049 147564 207.049

7 Provision of 2 set of Uniforms

7.01 All Girls (Including KGBV Girls) Child 0.00400 120372 481.488 120372 481.48800

7.02 SC Boys Child 0.00400 24039 96.156 24039 96.15600

7.03 ST Boys Child 0.00400

7.04 BPL Boys Child 0.00400 18864 75.456 18864 75.45600

7.05

Free Uniform for 25% children of Class-1 in

Private Recognised Primary Schools of other

Boards

Child0.00400

Sub Total 163275 653.100 163275 653.1007(A) Fee Reimbursement

7(A).01

Fee Reimbursement for Admission of children of

Disadvantaged Group & Weaker Section upto

25% of seats in Class-1 of Private Unaided

Recognised Schools

Child 0.05400

Sub Total

Remarks

Outlay Recommendation for 2014-15

Spill OverDeferred laibility of

2014-15Fresh Recommended Total Recommended

Name of District : Bheem Nagar

(Sambhal)-17

S. No. ActivityPhysical

Unit

Arti:SSA-AWPB-2014-15-PABMinits:BheemNagar(Sambhal):16-06-2014 415 / 533

Page 416: U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 · 2015. 1. 6. · U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15

Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

Remarks

Outlay Recommendation for 2014-15

Spill OverDeferred laibility of

2014-15Fresh Recommended Total Recommended

Name of District : Bheem Nagar

(Sambhal)-17

S. No. ActivityPhysical

Unit

8 Teaching Learning Equipment (TLE)

8.01 TLE - New Primary School 0.200008.02 TLE - New Upper Primary School 0.50000

Sub TotalIII ENHANCING QUALITY9 New Teachers Salary

9.01 Primary Teachers (Regular) (Asstt. Teacher) Teacher 0.91500

9.01aHead Teacher for Primary (if the number of

children exceeds 150 in a school)Teacher

9.02 Primary Teachers (Contract) (S.M.) Teacher

9.03Subject specific Upper Primary Teachers

(Regular) (a) Science and Mathematics Teacher 1.26000(b) Social Studies Teacher 1.26000(c) Languages Teacher 1.26000

Sub Total (9.01 to 9.05)Add.Teacher against PTR

Sub Total (9.06 to 9.12)

Total (New Teacher's Salary-9.01 to 9.12)

Teachers Salary (Recurring-sanctioned

earlier)Primary teachers

9.13 Primary Teachers ( Regular)-Existing, in position Teacher 3.66000 469 1716.540 469 1716.54000

9.14Primary Teachers (Contract)-Existing, in

positionTeacher 0.55000

9.14(a) Primary Teachers (Contract)-under Training Teacher 0.38500 941 362.285 941 362.28500

9.14(b)Primary Teacher (Para Teachers Equal to

9.14(a) upgraded as Teachers)0.38500 819 315.315 819 315.31500

9.14(c) Primary Teachers (Para)- Vacant Teacher9.15 Primary Teachers (Vacant) Teacher 0.30500

9.16Head Teacher for Primary (if the number of

children exceeds 150)Teacher 5.04000 126 635.040 126 635.04000

9.16(b)Head Teacher for Primary (if the number of

children exceeds 150) VacantTeacher 0.42000

Additional teachers

9.17Additional Teachers - PS (Special BTC-

Regular) in positionTeacher 0.30500

9.18Additional Teachers - PS (Special BTC Under

Training)Teacher 0.87600

9.19 Additional Teachers - PS (Vacant) Teacher

9.20Others in position (Para Teachers upgraded

as Teachers)Teacher

Upper Primary teachers

9.21 UP Teachers (Regular)-Existing Teacher 5.04000 449 2262.960 449 2262.96000

9.22 UP Teachers (Contract)-Existing9.23 UP Teachers (Vacant) Teacher 1.26000

9.24Head Teacher for Upper Primary (if the number

of children exceeds 100)-ExistingTeacher 5.34000 156 833.040 156 833.04000

9.24a Head Teacher for Upper Primary (Vacant) Teacher 1.33500

9.25Subject specific Upper Primary Teachers

(Regular)(a) Science and Mathematics(b) Social Studies(c) Languages

9.32 Part Time Instructors in position(a) Art Education 0.77000 129 99.330 129 99.33000(b) Health and Physical Education 0.77000 129 99.330 129 99.33000(c) Work Education 0.77000 129 99.330 129 99.33000

9.32(A) Part Time Instructors Vacant(a) Art Education 0.42000(b) Health and Physical Education 0.42000(c) Work Education 0.42000

9.33

Others-Incentive to Teachers in Schools

Located in Naxal Affected Areas (@

Rs.1500/- per teachers per month)

Sub Total (9.13 to 9.33) 3347 6423.170 3347 6423.17TOTAL

(New Teachers Salary +Teachers Salary

Recurring)

3347 6423.170 3347 6423.17000

10 Teachers Training(a) Teachers

10.01

Refresher In-service Teachers' Training at BRC

level and above - 10 days (@ Rs.200/- per head

per day)

Teacher

(Target &

Ach.-13-14

in

Mandays)

0.00600

Arti:SSA-AWPB-2014-15-PABMinits:BheemNagar(Sambhal):16-06-2014 416 / 533

Page 417: U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 · 2015. 1. 6. · U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15

Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

Remarks

Outlay Recommendation for 2014-15

Spill OverDeferred laibility of

2014-15Fresh Recommended Total Recommended

Name of District : Bheem Nagar

(Sambhal)-17

S. No. ActivityPhysical

Unit

10.01(a)Continuous and Comprehensive Evauation [PS +

UPS)Teacher 0.01300 986 12.818 986 12.81800

10.01(b) Eary Reading and Numeracy Skills [PS] Teacher 0.00500 986 4.930 986 4.93000

10.01(c) Science [UPS] Teacher 0.00800 517 4.136 517 4.13600Recommended as

proposed

10.01(d) CWSN Teacher 0.00400

10.02

One day monthly cluster level meetings and

peer group training sessions for 10 months for

all teachers each year at CRC level - 10 days (@

Rs.100/- per head per day)

Teacher 0.01000

10.03(a)

Induction Training for Newly Recruited Teachers

for 6 Months (Special BTC)- @Rs.2000/- per

head per year

Teacher 0.02000

10.03(b)5 Days Training for Part Time Instructors @ Rs.

200/- per head per day) Teacher 0.01000

10.04

Training of untrained Teachers to acquire

professional qualifications over a two year

period.

Teacher 0.04700

(b) Head Teachers

10.05Refresher Residencial In-service for 10 days at

BRC level and above

Head

Teacher(c) Resource Persons

10.06

Refresher Training for all Resource

Persons,Master Trainers, BRC & CRC faculty

and Coordinators for 5 days each year (@

Rs.200/- per head per day)

Resource

Person 0.00300 96 0.288 96 0.28800

Sub Total 2585 22.172 2585 22.172

11Academic Support through Block Resource

Centre (BRC)/ URC

11.01 Salary of Faculty and Staff

(a) 5 RPs at BRC for subject specific training in

positionRP 40 40

(b) 2 RPs for CWSN in position RP(b-i) 1 CWSN Resource Person RP 1.10000 16 17.600 16 17.60000

(b-ii) 1 Physiotherapist (Resource person for IE) RP

(c) 1 MIS Coordinator in position RP 1.86000

(d) 1 Datra Entry Operator in position RP 1.74000

(e) 1 Accountant-cum-support staff in position RP 1.80000 8 14.400 8 14.40000

11.02 Furniture Grant BRC/ URC 1.00000

11.03Replacement of furniture, computer, TLE etc (

Once in 5 years)BRC/ URC 1.00000

11.04 Contingency Grant BRC/ URC 0.50000 8 4.000 8 4.00000

11.05 Meeting, TA BRC/ URC 0.30000 8 2.400 8 2.40000

11.06 TLM Grant BRC/ URC 0.10000

11.07 Maintenance Grant BRC/ URC 0.10000

Sub Total 8 38.400 8 38.40000

12Academic Support through Cluster

Resource Centres (CRC/UERC)

12.01Salary of Cluster Coordinator (on an average of

one Resource Person per 18 schools in a block)RP

12.02 Furniture Grant CRC/ UERC 0.10000

12.03Replacement of furniture, computer, TLE etc.

once in 5 yearsCRC/ UERC 0.10000

12.04 Contingency Grant CRC/UERC 0.10000 66 6.600 66 6.60000

12.05 Meeting, TA CRC/UERC 0.12000 66 7.920 66 7.92000

12.06 TLM Grant CRC/UERC 0.03000

12.07Maintenance Grant

CRC/UERC 0.02000

Sub Total 132 14.520 132 14.52000

13Computer Aided Education in upper

primary schools under Innovation

13.01Computer Aided Education in upper primary

schoolsDistrict 0.01200 48 0.576 48 0.57600

Sub Total 48 0.576 48 0.5760014 Libraries in Schools

Arti:SSA-AWPB-2014-15-PABMinits:BheemNagar(Sambhal):16-06-2014 417 / 533

Page 418: U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 · 2015. 1. 6. · U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15

Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

Remarks

Outlay Recommendation for 2014-15

Spill OverDeferred laibility of

2014-15Fresh Recommended Total Recommended

Name of District : Bheem Nagar

(Sambhal)-17

S. No. ActivityPhysical

Unit

14.01 (a) Primary School (per school) School 0.03000

14.02 (b) Upper Primary School (per school) School 0.10000

Sub TotalIV ANNUAL GRANTS15 Teachers' Grant15.01 Primary Teachers Teacher 0.0050015.02 Upper Primary Teachers Teacher 0.00500 517 2.585 517 2.58500

Sub Total 517 2.585 517 2.5850016 School Grant16.01 Primary School School 0.05000 1046 52.300 1046 52.3000016.02 Upper Primary School School 0.07000 507 35.490 507 35.49000

Sub Total 1553 87.790 1553 87.79000

17Research, Evaluation, Monitoring &

Supervision

17.01 REMS Activities School 0.00103 1553 1.597 1553 1.59744

17.02 Monitoring & Supervision School 0.00078 1553 1.218 1553 1.21766

17.03 House Hold Survey (Urban) in Million Plus Cities District 35.00000

Sub Total 3106 2.815 3106 2.8150918 Maintenance Grant

18.01 Maintenance in School having upto3 Classrooms School 0.07500 212 15.900 212 15.90000

18.01a Maintenance Grant School 0.07500 1320 99.000 1320 99.00000Sub Total 1532 114.900 1532 114.90000

VBRIDGING GENDER AND SOCIAL

CATEGORY GAPS

19 Interventions for CWSN (IE)

19.01 Provision for Inclusive Education Child 0.03000 2582 77.460 2582 77.46000

Sub Total 2582 77.460 2582 77.46000

20Innovativation Head up to Rs.50 Lakh per

district

20.01 Girls Education District 0.70000 10 7.000 10 7.00000

20.02 ECCE District20.03 Intervention for SC / ST children District

20.04 Intervention for Minority Community children District

20.05 Intervention for Urban Deprived children District 10.00000

Sub Total 10 7.000 10 7.0000021 SMC/PRI Training

21.01Residential for 6 Resource Person per Block (3

days) (@ Rs.500/-)Blocks 0.09000

21.02Non-residential (3 days training of 6 SMC

members) (@ Rs.100/-)SMC 0.01800 1534 27.612 1534 27.61200

21.02(a)Non-residential (3 days training of 3 Members of

PRI/VECs/LA) (@ Rs.100/-)VEC/ WEC 0.00900

21.03

Seminar/Orientation of SMC Women members

and President/Vice President (@ Rs. 50,000/-

per block)

Blocks 0.50000

Sub Total 1534 27.612 1534 27.61200VI SCHOOL INFRASTRUCTURE22 Civil Works22.01 Primary School (Plain) (New) School 13.1550022.02 Primary School (Hilly/Rocky) (New) School 13.2750022.03 Upper Primary (Plain) (New) School 20.65500

22.04 Upper Primary School (Hilly/Rocky) (New) School 20.77500

22.04aComposite Schools for Urban Areas (Class I-

VIII)School 41.04000

22.05 ACR in lieu of upgraded Upper Primary School Rooms

22.06 Additional class rooms for adding Class VIII Rooms

22.07 Building Less (Pry) School 9.7500022.08 Building Less (UP) School 18.5900022.09 Dilapidated Building (Pry) School 9.7500022.10 Dilapidated Building (UP) School 18.59000

22.11 Additional Class Room (Rural) ( PS+UPS) Rooms 3.45000

22.12 Additional Class Room (Urban) Rooms 3.4500022.13 Additional Class Room (Hill Area)22.14 Toilet/Urinals (PS & UPS) School 0.7000022.15 Separate Girls Toilet (Rural+Urban) School 0.7000022.16 CWSN friendly Toilets School 0.50000

22.17 Drinking Water Facility (for Urban Area Only)) School 0.15000

22.17a Drinking Water Facility (Plain PS & UPS) School 0.15000

22.17b Drinking Water Facility (Hilly/Rocky PS & UPS) School 0.15000

22.18a Boundary Wall PS (Total in Meters x .01105) 0.01749

22.18bBoundary Wall PS (For Gate) @Rs. 7000 x no. of

P.S.School 0.07800

Arti:SSA-AWPB-2014-15-PABMinits:BheemNagar(Sambhal):16-06-2014 418 / 533

Page 419: U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 · 2015. 1. 6. · U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15

Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

Remarks

Outlay Recommendation for 2014-15

Spill OverDeferred laibility of

2014-15Fresh Recommended Total Recommended

Name of District : Bheem Nagar

(Sambhal)-17

S. No. ActivityPhysical

Unit

22.18c Boundary Wall UPS (Total in Meters x .01105) 0.01749

22.18dBoundary Wall UPS (For Gate) @Rs. 7000 x no.

of UPSSchool 0.07800

22.19a Electrification in P.S./ Electrical Equipment School 0.11000

22.19b Electrification in U. P.S./ Electrical Equipment School 0.11000

22.20Office-cum-store-cum-Head Teacher's room

(Primary)Rooms

22.21Office-cum-store-cum-Head Teacher's room

(Upper Primary)Rooms

22.22Augumentation of training facility in BRC (one

time)BRC/ URC 5.00000

22.23 Child friendly Elements School 0.25000

22.24 Ramps with Handrails (Barrier Free Elements) School 0.06000

22.25 Handrails in existing Ramps School 0.0100022.26 Whole School Develoipment School22.27 Retro-fitting and repairs School

22.28Residential Schools for specific category

of children

(a) Construction of Building including boundary

wall, Water and sanitation facilities, electric

installation (For 100 children)

Building 65.86000

(b) Construction of residential hostel Building 65.86000

(c) Refurnishing unused old buildings Building

22.29

Construction of Hostel in existing Govt UPS

including boundary wall, Water and sanitation

facilities, electric installation etc. (For 50

children)

7.00000

22.30Furniture for Govt. UPS (per child) (@ Rs.500/-

per child enrolled)Child 0.00500

22.31 Major Repairs for Primary School School 0.30000

22.32 Majr Repairs for Upper Primary School School 0.30000

22.33Others (Difference of Civil Wrks

sanctioned in pre.yr.)22.33a Others (Overhead Tank PS) School 0.1200022.33b Others (Overhead Tank UPS) School 0.12000

Sub Total (Civil WOrks)VII PROJECT MANAGEMENT COST23 Management23.01 Management up to 3.5%

(a) Project Management and MIS

(i) DPO ( Salary, Contigency, Consumables,

POL, TA & Computer etc)District 1 108.906 1 108.90550

(ii) EMIS Cell District 1 11.460 1 11.46000Sub Total (a) 1 1 1 120.366 1 120.366

(b) Training of Educational Administrators District

(c) School Mapping and Social Mapping District

Sub Total (23.01)

23.02Learning Enhancement Prog. (LEP) (P & UP) (up

to 2%)District 12.604 12.60385

23.03 Community Mobilization (up to 0.5%) District 1 38.000 1 38.00000

Sub Total (Management) 1 50.604 1 50.60385Total Management Cost 170.969 170.96935Total of SSA (Districs) 327986 7855.909 327986 7855.909

24 State Component23.01 Management23.02 REMS 0.0044923.03 SIEMAT

Sub Total

STATE SSA TOTAL 327986 7855.909 327986 7855.90874

25

KGBV Financial Provision (give

separate costing sheets for different

Models)

Hostel

ANon Recurring One Time Grant (Only

committed liabilities) (Model-I)

25.01 Construction of Building (New)

25.02 Construction of Building KGBV sanctioned earlier

25.02(a) Additional Class Room Rooms 3.45000

25.02(b) Guard Room Rooms 1.32000

25.02(c) Boundary Wall School 5.0200025.03 Boudary Wall (Spillover only)

25.04

Boring/Handpump (Spillover only)

(minimum rates prescribed by State Drinking

Water Department subject to a ceiling of Rs.

1.00 lakhs)

Arti:SSA-AWPB-2014-15-PABMinits:BheemNagar(Sambhal):16-06-2014 419 / 533

Page 420: U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 · 2015. 1. 6. · U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15

Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

Remarks

Outlay Recommendation for 2014-15

Spill OverDeferred laibility of

2014-15Fresh Recommended Total Recommended

Name of District : Bheem Nagar

(Sambhal)-17

S. No. ActivityPhysical

Unit

25.05 Electricity /Water charges (Spillover only)

25.05(a) Solar Water Heater & Solar Light 2.97000

25.06Furniture/Equipment (including Kitchen

equipment)3.00000

25.07 TLM and equipment including library books 3.50000

25.08 Bedding (New) 0.75000

25.09 Replacement of Bedding (once in 3 Year) 0.75000

Subtotal Non Recurring

B Recurring Cost Per Annum (Model-I)

25.10Maintenance per girl student per month @ Rs.

1500/-18.00000 10 180.000 10 180.00000

25.11 Stipend for girl student per month @ Rs. 100/- 1.20000 10 12.000 10 12.00000

25.12Supplementary TLM, stationery and other

educational material @ Rs.1000/- per annum1.00000 10 10.000 10 10.00000

25.13 Salaries

25.13.1 Additional Salaries:

(a) 1 Warden @ Rs. 25,000/- per month 3.00000 10 30.00000 10 30.00000

(b)4 Full time teachers as per RTE norms @ Rs.

20,000/- per month per teacher 9.60000 10 96.00000 10 96.00000

(c)

1 Urdu Teachers (only for blocks with muslim

population above 20% and select urban areas), if

required @ Rs. 12,000/- per month per teacher 1.44000 10 14.40000 10 14.40000

(d)3 part time teachers @ Rs. 5,000/- per month per

teacher 1.80000 10 18.00000 10 18.00000

(e)1 Full time Accountant @ Rs. 10,000/- per month

1.20000 10 12.00000 10 12.00000

(f)

2 Support Staff – (Accountant/ Assistant, Peon,

Chowkidar) @ Rs. 5,000/- per month per staff 1.20000 10 12.00000 10 12.00000

(g) 1 Head cook @ Rs. 6,000/- per month 0.72000 10 7.20000 10 7.20000

(h)2 Asstt. Cooks @ Rs. 4,500/- per month per cook

1.08000 10 10.80000 10 10.80000

25.14Specific skill training @ Rs.1000/- per child per

annum1.00000 10 10.000 10 10.00000

25.15Electricity/water charges @ Rs.1000/- per child

per annum1.00000 10 10.000 10 10.00000

25.16Medical care/contingencies @ Rs. 1250 per child

per annum1.25000 10 12.500 10 12.50000

25.17 Maintenance @ Rs.750/- per child per annum 0.75000 10 7.500 10 7.50000

25.18

Miscellaneous (Educational Tour/ Exposure Visit

/ Sports Material etc.) @ Rs.750/- per child per

annum

0.75000 10 7.500 10 7.50000

25.19Preparatory camps @ Rs.200/- per child per

annum0.20000 10 2.000 10 2.00000

25.20PTAs/school functions @ Rs.200/- per child per

annum0.20000 10 2.000 10 2.00000

25.21 Provision of Rent @ Rs.6000/- per annum 6.00000

25.21a Provision of Rent (6 months) 3.6000025.21b Provision of Rent (3 months) 1.8000025.21c Rent (Previous Year (2007-2012)

25.22 Capacity building 0.50000 10 5.000 10 5.00000

25.22(a)Physical/ Self Defence Training @ Rs.200/- per

child per annum0.20000 10 2.000 10 2.00000

Subtotal Recurring 10 460.900 10 460.90000

Subtotal (Model-I) 10 460.900 10 460.90000

CNon Recurring One Time Grant (Only

committed liabilities) (Model-II)

25.23 Construction of Building (New)

25.24 Construction of Building KGBV sanctioned earlier

25.24(a) Additional Class Room Rooms 3.45000

25.24(b) Guard Room Rooms 1.32000

25.24(c) Boundary Wall School 5.0200025.25 Boudary Wall (Spillover only)25.26 Boring/Handpump (Spillover only)

25.27 Electricity /Water charges (Spillover only)

25.27(a) Solar Water Heater & Solar Light 2.97000

25.28Furniture/Equipment (including Kitchen

equipment)2.00000

25.29 TLM and equipment including library books 3.00000

Arti:SSA-AWPB-2014-15-PABMinits:BheemNagar(Sambhal):16-06-2014 420 / 533

Page 421: U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 · 2015. 1. 6. · U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15

Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

Remarks

Outlay Recommendation for 2014-15

Spill OverDeferred laibility of

2014-15Fresh Recommended Total Recommended

Name of District : Bheem Nagar

(Sambhal)-17

S. No. ActivityPhysical

Unit

25.30 Bedding (New) 0.37500

25.31 Replacement of Bedding (once in 3 Year) 0.37500

Subtotal Non Recurring

D Recurring Cost Per Annum (Model-II)

25.32Maintenance per girl student per month @ Rs.

1500/-9.00000

25.33 Stipend for girl student per month @ Rs. 100/- 0.60000

25.34Supplementary TLM, stationery and other

educational material @ Rs.1000/- per annum0.50000

25.35 Salaries(a) 1 Warden @ Rs. 25,000/- per month 3.00000

(b)3 Full time teachers as per RTE norms @ Rs.

20,000/- per month per teacher 7.20000

(c) 3 part time teachers @ Rs. 5,000/- per month per

teacher 1.80000

(d)1 Full time Accountant @ Rs. 10,000/- per month

1.20000

(e)

2 Support Staff – (Accountant/ Assistant, Peon,

Chowkidar) @ Rs. 5,000/- per month per staff 1.20000

(f) 1 Head cook @ Rs. 6,000/- per month 0.72000

(g)1 Asstt. Cooks @ Rs. 4,500/- per month per cook

0.54000

25.36Specific skill training @ Rs.1000/- per child per

annum0.50000

25.37Electricity/water charges @ Rs.1000/- per child

per annum0.50000

25.38Medical care/contingencies @ Rs. 1250 per child

per annum0.62500

25.39 Maintenance @ Rs.750/- per child per annum 0.37500

25.40

Miscellaneous (Educational Tour/ Exposure Visit

/ Sports Material etc.) @ Rs.750/- per child per

annum

0.37500

25.41Preparatory camps @ Rs.300/- per child per

annum0.15000

25.42PTAs/school functions @ Rs.300/- per child per

annum0.15000

25.43 Provision of Rent @ Rs.10000/- per annum 5.00000

25.43a Provision of Rent (6 months) 3.6000025.43b Provision of Rent (3 months) 1.8000025.43c Rent (Previous Year (2007-2012)25.44 Capacity building 0.25000

25.44(a)Physical/ Self Defence Training @ Rs.200/- per

child per annum0.10000

Subtotal Recurring

Subtotal (Model-II) Total (KGBV) 10 460.900 10 460.900

DISTRICT GRAND TOTAL (SSA+KGBV) 327996 8316.809 327996 8316.809

Arti:SSA-AWPB-2014-15-PABMinits:BheemNagar(Sambhal):16-06-2014 421 / 533

Page 422: U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 · 2015. 1. 6. · U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15

Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

I ACCESS

1 Opening of New Schools

1.01 Upgradation of EGS to PSCentres /

School1.02 New PS School

1.03 Upgradation of PS to UPS / New UPS School

1.04 Composite Schools (for Urban Areas) School

1.05Residential Schools for specific category children

(For 100 children)

1.06Residential Hostel (for specific category of

children) (For 50 children)

1.07 Integration of Class V with Primary Schools

1.08Integration of Class VIII with Upper Primary

Schools

2Residential Schools for specific category

of children (For 100 Children)

Total - Residential Schools (For 100

children)

3Residential Hostel for specific category of

children (For 50 Children)

Total - Residential Schools (For 50

children)4 Transport/Escort Facility

4.01

Children in remote habitations with sparse

populations where opening of schools is

unviable

Child 0.03000

4.02

Urban deprived children/children without adult

protection in urban areas where schools are not

opened because availability of land is a problem

Child 0.03000

Sub Total

5Special Training for mainstreaming of Out-

of-School Children

5.03 Non-Residential (Fresh)(a) 12 months Child 0.06000(b) 9 months 0.04500(c) 6 months

(i)Special Training (by Special Instructors-NRBC)-

(1-5) Child 0.03000 179 5.370 179 5.37000

(ii) Special Training (by Special Instructors-NRBC)-

(6-8) Child 0.03000 228 6.840 228 6.84000

(d) 3 months Child 0.01500Sub Total 407 12.210 407 12.21000

Total (Special Training) 407 12.210 407 12.2105(B) House Hold Survey (HHS)

5(B).01 House Hold Survey through SMCHouse

Hold0.00001

Sub TotalII RETENTION6 Free Text Book

6.01Free Text Book (PS) for Parishadiya & Aided

Primary Schools (Workbooks not included)Child 0.00120 88302 105.962 88302 105.96240

6.01a

Free Text Book (PS) for 25% children of Class-1

in Private Recognised Primary Schools of other

Boards (Workbooks not included)

Child 0.00150

6.02 Free Brail Books (PS) 0.00150 51 0.077 51 0.07650

6.03 Free Large Print Books (PS) 0.00150

6.04Free Text Book (UPS) (Workbooks not included)

(Including KGBV Girls)Child 0.00200 36692 73.384 36692 73.38400

6.05 Free Brail Books (UPS) 0.00250 10 0.025 10 0.02500

6.06 Free Large Print Books (PS) 0.00250Sub Total 125055 179.448 125055 179.448

7 Provision of 2 set of Uniforms

7.01 All Girls (Including KGBV Girls) Child 0.00400 93343 373.372 93343 373.37200

7.02 SC Boys Child 0.00400 31651 126.604 31651 126.60400

7.03 ST Boys Child 0.00400

7.04 BPL Boys Child 0.00400 16900 67.600 16900 67.60000

7.05

Free Uniform for 25% children of Class-1 in

Private Recognised Primary Schools of other

Boards

Child0.00400

Sub Total 141894 567.576 141894 567.5767(A) Fee Reimbursement

7(A).01

Fee Reimbursement for Admission of children of

Disadvantaged Group & Weaker Section upto

25% of seats in Class-1 of Private Unaided

Recognised Schools

Child 0.05400

Sub Total

8 Teaching Learning Equipment (TLE)

8.01 TLE - New Primary School 4.60000 0.20000 4.600008.02 TLE - New Upper Primary School 0.50000 0.50000 0.50000

Name of District :Bhadohi -16

ActivityS. No.Physical

UnitRemarks

Outlay Recommendation for 2014-15

Spill OverDeferred laibility of

2014-15Fresh Recommended Total Recommended

Arti:SSA-AWPB-2014-15-PABMinits:Bhadohi:16-06-2014 422 / 533

Page 423: U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 · 2015. 1. 6. · U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15

Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

Name of District :Bhadohi -16

ActivityS. No.Physical

UnitRemarks

Outlay Recommendation for 2014-15

Spill OverDeferred laibility of

2014-15Fresh Recommended Total Recommended

Sub Total 5.10000 5.10000III ENHANCING QUALITY9 New Teachers Salary

9.01 Primary Teachers (Regular) (Asstt. Teacher) Teacher 0.91500

9.01aHead Teacher for Primary (if the number of

children exceeds 150 in a school)Teacher

9.02 Primary Teachers (Contract) (S.M.) Teacher

9.03Subject specific Upper Primary Teachers

(Regular) (a) Science and Mathematics Teacher 1.26000(b) Social Studies Teacher 1.26000(c) Languages Teacher 1.26000

Sub Total (9.01 to 9.05)Add.Teacher against PTR

Sub Total (9.06 to 9.12)

Total (New Teacher's Salary-9.01 to 9.12)

Teachers Salary (Recurring-sanctioned

earlier)Primary teachers

9.13 Primary Teachers ( Regular)-Existing, in position Teacher 3.66000 908 3323.280 908 3323.28000

9.14Primary Teachers (Contract)-Existing, in

positionTeacher 0.55000

9.14(a) Primary Teachers (Contract)-under Training Teacher 0.38500 342 131.670 342 131.67000

9.14(b)Primary Teacher (Para Teachers Equal to

9.14(a) upgraded as Teachers)0.38500 369 142.065 369 142.06500

9.14(c) Primary Teachers (Para)- Vacant Teacher9.15 Primary Teachers (Vacant) Teacher 0.30500

9.16Head Teacher for Primary (if the number of

children exceeds 150)Teacher 5.04000 160 806.400 160 806.40000

9.16(b)Head Teacher for Primary (if the number of

children exceeds 150) VacantTeacher 0.42000

Additional teachers

9.17Additional Teachers - PS (Special BTC-

Regular) in positionTeacher 0.30500

9.18Additional Teachers - PS (Special BTC Under

Training)Teacher 0.87600

9.19 Additional Teachers - PS (Vacant) Teacher

9.20Others in position (Para Teachers upgraded

as Teachers)Teacher

Upper Primary teachers

9.21 UP Teachers (Regular)-Existing Teacher 5.04000 365 1839.600 365 1839.60000

9.22 UP Teachers (Contract)-Existing9.23 UP Teachers (Vacant) Teacher 1.26000

9.24Head Teacher for Upper Primary (if the number

of children exceeds 100)-ExistingTeacher 5.34000 229 1222.860 229 1222.86000

9.24a Head Teacher for Upper Primary (Vacant) Teacher 1.33500

9.25Subject specific Upper Primary Teachers

(Regular)(a) Science and Mathematics(b) Social Studies(c) Languages

9.32 Part Time Instructors in position(a) Art Education 0.77000 181 139.370 181 139.37000(b) Health and Physical Education 0.77000 167 128.590 167 128.59000(c) Work Education 0.77000 147 113.190 147 113.19000

9.32(A) Part Time Instructors Vacant(a) Art Education 0.42000(b) Health and Physical Education 0.42000(c) Work Education 0.42000

9.33

Others-Incentive to Teachers in Schools

Located in Naxal Affected Areas (@

Rs.1500/- per teachers per month)

Sub Total (9.13 to 9.33) 2868 7847.025 2868 7847.03TOTAL

(New Teachers Salary +Teachers Salary

Recurring)

2868 7847.025 2868 7847.02500

10 Teachers Training(a) Teachers

10.01

Refresher In-service Teachers' Training at BRC

level and above - 10 days (@ Rs.200/- per

head per day)

Teacher

(Target &

Ach.-13-14

in

Mandays)

0.00600

10.01(a)Continuous and Comprehensive Evauation [PS +

UPS)Teacher 0.01300 700 9.100 700 9.10000

10.01(b) Eary Reading and Numeracy Skills [PS] Teacher 0.00500 700 3.500 700 3.50000

10.01(c) Science [UPS] Teacher 0.00800 412 3.296 412 3.29600Recommended as

proposed

10.01(d) CWSN Teacher 0.00400

Arti:SSA-AWPB-2014-15-PABMinits:Bhadohi:16-06-2014 423 / 533

Page 424: U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 · 2015. 1. 6. · U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15

Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

Name of District :Bhadohi -16

ActivityS. No.Physical

UnitRemarks

Outlay Recommendation for 2014-15

Spill OverDeferred laibility of

2014-15Fresh Recommended Total Recommended

10.02

One day monthly cluster level meetings and

peer group training sessions for 10 months for

all teachers each year at CRC level - 10 days (@

Rs.100/- per head per day)

Teacher 0.01000

10.03(a)

Induction Training for Newly Recruited Teachers

for 6 Months (Special BTC)- @Rs.2000/- per

head per year

Teacher 0.02000

10.03(b)5 Days Training for Part Time Instructors @ Rs.

200/- per head per day) Teacher 0.01000

10.04

Training of untrained Teachers to acquire

professional qualifications over a two year

period.

Teacher 0.04700 125 5.875 125 5.87500

(b) Head Teachers

10.05Refresher Residencial In-service for 10 days at

BRC level and above

Head

Teacher(c) Resource Persons

10.06

Refresher Training for all Resource

Persons,Master Trainers, BRC & CRC faculty

and Coordinators for 5 days each year (@

Rs.200/- per head per day)

Resource

Person 0.00300 84 0.252 84 0.25200

Sub Total 2021 22.023 2021 22.023

11Academic Support through Block Resource

Centre (BRC)/ URC

11.01 Salary of Faculty and Staff

(a) 5 RPs at BRC for subject specific training in

positionRP 35 35

(b) 2 RPs for CWSN in position RP(b-i) 1 CWSN Resource Person RP 1.10000 14 15.400 14 15.40000

(b-ii) 1 Physiotherapist (Resource person for IE) RP

(c) 1 MIS Coordinator in position RP 1.86000

(d) 1 Datra Entry Operator in position RP 1.74000 13 22.620 13 22.62000

(e) 1 Accountant-cum-support staff in position RP 1.80000 7 12.600 7 12.60000

11.02 Furniture Grant BRC/ URC 1.00000

11.03Replacement of furniture, computer, TLE etc (

Once in 5 years)BRC/ URC 1.00000

11.04 Contingency Grant BRC/ URC 0.50000 7 3.500 7 3.50000

11.05 Meeting, TA BRC/ URC 0.30000 7 2.100 7 2.10000

11.06 TLM Grant BRC/ URC 0.10000

11.07 Maintenance Grant BRC/ URC 0.10000

Sub Total 7 56.220 7 56.22000

12Academic Support through Cluster

Resource Centres (CRC/UERC)

12.01Salary of Cluster Coordinator (on an average of

one Resource Person per 18 schools in a block)RP

12.02 Furniture GrantCRC/

UERC0.10000

12.03Replacement of furniture, computer, TLE etc.

once in 5 years

CRC/

UERC0.10000

12.04 Contingency Grant CRC/UERC 0.10000 80 8.000 80 8.00000

12.05 Meeting, TA CRC/UERC 0.12000 80 9.600 80 9.60000

12.06 TLM Grant CRC/UERC 0.03000

12.07Maintenance Grant

CRC/UERC 0.02000

Sub Total 160 17.600 160 17.60000

13Computer Aided Education in upper

primary schools under Innovation

13.01Computer Aided Education in upper primary

schoolsDistrict 0.01200 48 0.576 48 0.57600

Sub Total 48 0.576 48 0.5760014 Libraries in Schools14.01 (a) Primary School (per school) School 0.03000

14.02 (b) Upper Primary School (per school) School 0.10000

Sub TotalIV ANNUAL GRANTS15 Teachers' Grant15.01 Primary Teachers Teacher 0.0050015.02 Upper Primary Teachers Teacher 0.00500 412 2.060 412 2.06000

Sub Total 412 2.060 412 2.0600016 School Grant16.01 Primary School School 0.05000 761 38.050 761 38.0500016.02 Upper Primary School School 0.07000 412 28.840 412 28.84000

Sub Total 1173 66.890 1173 66.89000

Arti:SSA-AWPB-2014-15-PABMinits:Bhadohi:16-06-2014 424 / 533

Page 425: U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 · 2015. 1. 6. · U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15

Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

Name of District :Bhadohi -16

ActivityS. No.Physical

UnitRemarks

Outlay Recommendation for 2014-15

Spill OverDeferred laibility of

2014-15Fresh Recommended Total Recommended

17Research, Evaluation, Monitoring &

Supervision

17.01 REMS Activities School 0.00103 1173 1.207 1173 1.20656

17.02 Monitoring & Supervision School 0.00078 1173 0.920 1173 0.91971

17.03 House Hold Survey (Urban) in Million Plus Cities District 35.00000

Sub Total 2346 2.126 2346 2.1262718 Maintenance Grant

18.01 Maintenance in School having upto3 Classrooms School 0.07500 74 5.550 74 5.55000

18.01a Maintenance Grant School 0.07500 1048 78.600 1048 78.60000Sub Total 1122 84.150 1122 84.15000

VBRIDGING GENDER AND SOCIAL

CATEGORY GAPS

19 Interventions for CWSN (IE)

19.01 Provision for Inclusive Education Child 0.03000 1997 59.910 1997 59.91000

Sub Total 1997 59.910 1997 59.91000

20Innovativation Head up to Rs.50 Lakh per

district

20.01 Girls Education District 0.70000 10 7.000 10 7.00000

20.02 ECCE District20.03 Intervention for SC / ST children District

20.04 Intervention for Minority Community children District

20.05 Intervention for Urban Deprived children District 10.00000

Sub Total 10 7.000 10 7.0000021 SMC/PRI Training

21.01Residential for 6 Resource Person per Block (3

days) (@ Rs.500/-)Blocks 0.09000

21.02Non-residential (3 days training of 6 SMC

members) (@ Rs.100/-)SMC 0.01800 1122 20.196 1122 20.19600

21.02(a)Non-residential (3 days training of 3 Members of

PRI/VECs/LA) (@ Rs.100/-)VEC/ WEC 0.00900

21.03

Seminar/Orientation of SMC Women members

and President/Vice President (@ Rs. 50,000/-

per block)

Blocks 0.50000

Sub Total 1122 20.196 1122 20.19600VI SCHOOL INFRASTRUCTURE22 Civil Works22.01 Primary School (Plain) (New) School 8.96 13.15500 8.9606022.02 Primary School (Hilly/Rocky) (New) School 13.2750022.03 Upper Primary (Plain) (New) School 20.65500

22.04 Upper Primary School (Hilly/Rocky) (New) School 20.77500

22.04aComposite Schools for Urban Areas (Class I-

VIII)School 2.03 41.04000 2.03400

22.05 ACR in lieu of upgraded Upper Primary School Rooms

22.06 Additional class rooms for adding Class VIII Rooms

22.07 Building Less (Pry) School 9.7500022.08 Building Less (UP) School 18.5900022.09 Dilapidated Building (Pry) School 9.7500022.10 Dilapidated Building (UP) School 18.59000

22.11 Additional Class Room (Rural) ( PS+UPS) Rooms 3.45000 96 331.200 96 331.20000

22.12 Additional Class Room (Urban) Rooms 3.4500022.13 Additional Class Room (Hill Area)22.14 Toilet/Urinals (PS & UPS) School 0.70000 16 11.200 16 11.2000022.15 Separate Girls Toilet (Rural+Urban) School 0.70000 30 21.000 30 21.0000022.16 CWSN friendly Toilets School 0.50000

22.17 Drinking Water Facility (for Urban Area Only)) School 0.15000

22.17a Drinking Water Facility (Plain PS & UPS) School 0.15000 109 16.350 109 16.35000

22.17b Drinking Water Facility (Hilly/Rocky PS & UPS) School 0.15000

22.18a Boundary Wall PS (Total in Meters x .01105) 0.01749

22.18bBoundary Wall PS (For Gate) @Rs. 7000 x no. of

P.S.School 0.07800

22.18c Boundary Wall UPS (Total in Meters x .01105) 0.01749

22.18dBoundary Wall UPS (For Gate) @Rs. 7000 x no.

of UPSSchool 0.07800

22.19a Electrification in P.S./ Electrical Equipment School 0.11000

22.19b Electrification in U. P.S./ Electrical Equipment School 0.11000

22.20Office-cum-store-cum-Head Teacher's room

(Primary)Rooms

22.21Office-cum-store-cum-Head Teacher's room

(Upper Primary)Rooms

22.22Augumentation of training facility in BRC (one

time)BRC/ URC 5.00000

22.23 Child friendly Elements School 0.25000

22.24 Ramps with Handrails (Barrier Free Elements) School 0.06000

22.25 Handrails in existing Ramps School 0.01000

Arti:SSA-AWPB-2014-15-PABMinits:Bhadohi:16-06-2014 425 / 533

Page 426: U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 · 2015. 1. 6. · U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15

Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

Name of District :Bhadohi -16

ActivityS. No.Physical

UnitRemarks

Outlay Recommendation for 2014-15

Spill OverDeferred laibility of

2014-15Fresh Recommended Total Recommended

22.26 Whole School Develoipment School22.27 Retro-fitting and repairs School

22.28Residential Schools for specific category

of children

(a) Construction of Building including boundary

wall, Water and sanitation facilities, electric

installation (For 100 children)

Building 65.86000

(b) Construction of residential hostel Building 65.86000

(c) Refurnishing unused old buildings Building

22.29

Construction of Hostel in existing Govt UPS

including boundary wall, Water and sanitation

facilities, electric installation etc. (For 50

children)

7.00000

22.30Furniture for Govt. UPS (per child) (@ Rs.500/-

per child enrolled)Child 0.00500

22.31 Major Repairs for Primary School School 0.30000

22.32 Majr Repairs for Upper Primary School School 0.30000

22.33Others (Difference of Civil Wrks

sanctioned in pre.yr.)22.33a Others (Overhead Tank PS) School 0.1200022.33b Others (Overhead Tank UPS) School 0.12000

Sub Total (Civil WOrks) 10.99 251 379.750 251 390.74VII PROJECT MANAGEMENT COST23 Management23.01 Management up to 3.5%

(a) Project Management and MIS

(i) DPO ( Salary, Contigency, Consumables,

POL, TA & Computer etc)District 1 110.395 1 110.39460

(ii) EMIS Cell District 1 10.485 1 10.48500Sub Total (a) 1 1 1 120.880 1 120.880

(b) Training of Educational Administrators District

(c) School Mapping and Social Mapping District

Sub Total (23.01)

23.02Learning Enhancement Prog. (LEP) (P & UP) (up

to 2%)District 10.055 10.05470

23.03 Community Mobilization (up to 0.5%) District 1 44.000 1 44.00000

Sub Total (Management) 1 54.055 1 54.05470Total Management Cost 174.934 174.93430Total of SSA (Districs) 10.995 5.100 280893 9499.694 280893 9515.789

24 State Component23.01 Management23.02 REMS 0.0044923.03 SIEMAT

Sub Total

STATE SSA TOTAL 10.99460 5.10000 280893 9499.694 280893 9515.78907

25

KGBV Financial Provision (give

separate costing sheets for different

Models)

Hostel

ANon Recurring One Time Grant (Only

committed liabilities) (Model-I)

25.01 Construction of Building (New)

25.02 Construction of Building KGBV sanctioned earlier

25.02(a) Additional Class Room Rooms 3.45000

25.02(b) Guard Room Rooms 1.32000

25.02(c) Boundary Wall School 5.0200025.03 Boudary Wall (Spillover only)

25.04

Boring/Handpump (Spillover only)

(minimum rates prescribed by State Drinking

Water Department subject to a ceiling of Rs.

1.00 lakhs)

25.05 Electricity /Water charges (Spillover only)

25.05(a) Solar Water Heater & Solar Light 2.97000

25.06Furniture/Equipment (including Kitchen

equipment)3.00000

25.07 TLM and equipment including library books 3.50000

25.08 Bedding (New) 0.75000

25.09 Replacement of Bedding (once in 3 Year) 0.75000 5 3.750 5 3.75000

Subtotal Non Recurring 3.750 3.75000

B Recurring Cost Per Annum (Model-I)

25.10Maintenance per girl student per month @ Rs.

1500/-18.00000 5 90.000 5 90.00000

25.11 Stipend for girl student per month @ Rs. 100/- 1.20000 5 6.000 5 6.00000

25.12Supplementary TLM, stationery and other

educational material @ Rs.1000/- per annum1.00000 5 5.000 5 5.00000

25.13 Salaries

Arti:SSA-AWPB-2014-15-PABMinits:Bhadohi:16-06-2014 426 / 533

Page 427: U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 · 2015. 1. 6. · U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15

Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

Name of District :Bhadohi -16

ActivityS. No.Physical

UnitRemarks

Outlay Recommendation for 2014-15

Spill OverDeferred laibility of

2014-15Fresh Recommended Total Recommended

25.13.1 Additional Salaries:

(a) 1 Warden @ Rs. 25,000/- per month 3.00000 5 15.00000 5 15.00000

(b)4 Full time teachers as per RTE norms @ Rs.

20,000/- per month per teacher 9.60000 5 48.00000 5 48.00000

(c)

1 Urdu Teachers (only for blocks with muslim

population above 20% and select urban areas), if

required @ Rs. 12,000/- per month per teacher 1.44000 5 7.20000 5 7.20000

(d)3 part time teachers @ Rs. 5,000/- per month per

teacher 1.80000 5 9.00000 5 9.00000

(e)1 Full time Accountant @ Rs. 10,000/- per month

1.20000 5 6.00000 5 6.00000

(f)

2 Support Staff – (Accountant/ Assistant, Peon,

Chowkidar) @ Rs. 5,000/- per month per staff 1.20000 5 6.00000 5 6.00000

(g) 1 Head cook @ Rs. 6,000/- per month 0.72000 5 3.60000 5 3.60000

(h)2 Asstt. Cooks @ Rs. 4,500/- per month per cook

1.08000 5 5.40000 5 5.40000

25.14Specific skill training @ Rs.1000/- per child per

annum1.00000 5 5.000 5 5.00000

25.15Electricity/water charges @ Rs.1000/- per child

per annum1.00000 5 5.000 5 5.00000

25.16Medical care/contingencies @ Rs. 1250 per child

per annum1.25000 5 6.250 5 6.25000

25.17 Maintenance @ Rs.750/- per child per annum 0.75000 5 3.750 5 3.75000

25.18

Miscellaneous (Educational Tour/ Exposure Visit

/ Sports Material etc.) @ Rs.750/- per child per

annum

0.75000 5 3.750 5 3.75000

25.19Preparatory camps @ Rs.200/- per child per

annum0.20000 5 1.000 5 1.00000

25.20PTAs/school functions @ Rs.200/- per child per

annum0.20000 5 1.000 5 1.00000

25.21 Provision of Rent @ Rs.6000/- per annum 6.00000

25.21a Provision of Rent (6 months) 3.6000025.21b Provision of Rent (3 months) 1.8000025.21c Rent (Previous Year (2007-2012)

25.22 Capacity building 0.50000 5 2.500 5 2.50000

25.22(a)Physical/ Self Defence Training @ Rs.200/- per

child per annum0.20000 5 1.000 5 1.00000

Subtotal Recurring 5 230.450 5 230.45000

Subtotal (Model-I) 5 234.200 5 234.20000

CNon Recurring One Time Grant (Only

committed liabilities) (Model-II)

25.23 Construction of Building (New)

25.24 Construction of Building KGBV sanctioned earlier

25.24(a) Additional Class Room Rooms 3.45000

25.24(b) Guard Room Rooms 1.32000

25.24(c) Boundary Wall School 5.0200025.25 Boudary Wall (Spillover only)25.26 Boring/Handpump (Spillover only)

25.27 Electricity /Water charges (Spillover only)

25.27(a) Solar Water Heater & Solar Light 2.97000

25.28Furniture/Equipment (including Kitchen

equipment)2.00000

25.29 TLM and equipment including library books 3.00000

25.30 Bedding (New) 0.37500

25.31 Replacement of Bedding (once in 3 Year) 0.37500

Subtotal Non Recurring

D Recurring Cost Per Annum (Model-II)

25.32Maintenance per girl student per month @ Rs.

1500/-9.00000

25.33 Stipend for girl student per month @ Rs. 100/- 0.60000

25.34Supplementary TLM, stationery and other

educational material @ Rs.1000/- per annum0.50000

25.35 Salaries(a) 1 Warden @ Rs. 25,000/- per month 3.00000

(b)3 Full time teachers as per RTE norms @ Rs.

20,000/- per month per teacher 7.20000

(c) 3 part time teachers @ Rs. 5,000/- per month per

teacher 1.80000

(d)1 Full time Accountant @ Rs. 10,000/- per month

1.20000

(e)

2 Support Staff – (Accountant/ Assistant, Peon,

Chowkidar) @ Rs. 5,000/- per month per staff 1.20000

Arti:SSA-AWPB-2014-15-PABMinits:Bhadohi:16-06-2014 427 / 533

Page 428: U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 · 2015. 1. 6. · U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15

Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

Name of District :Bhadohi -16

ActivityS. No.Physical

UnitRemarks

Outlay Recommendation for 2014-15

Spill OverDeferred laibility of

2014-15Fresh Recommended Total Recommended

(f) 1 Head cook @ Rs. 6,000/- per month 0.72000

(g)1 Asstt. Cooks @ Rs. 4,500/- per month per cook

0.54000

25.36Specific skill training @ Rs.1000/- per child per

annum0.50000

25.37Electricity/water charges @ Rs.1000/- per child

per annum0.50000

25.38Medical care/contingencies @ Rs. 1250 per child

per annum0.62500

25.39 Maintenance @ Rs.750/- per child per annum 0.37500

25.40

Miscellaneous (Educational Tour/ Exposure Visit

/ Sports Material etc.) @ Rs.750/- per child per

annum

0.37500

25.41Preparatory camps @ Rs.300/- per child per

annum0.15000

25.42PTAs/school functions @ Rs.300/- per child per

annum0.15000

25.43 Provision of Rent @ Rs.10000/- per annum 5.00000

25.43a Provision of Rent (6 months) 3.6000025.43b Provision of Rent (3 months) 1.8000025.43c Rent (Previous Year (2007-2012)25.44 Capacity building 0.25000

25.44(a)Physical/ Self Defence Training @ Rs.200/- per

child per annum0.10000

Subtotal Recurring

Subtotal (Model-II) Total (KGBV) 5 234.200 5 234.200

DISTRICT GRAND TOTAL (SSA+KGBV) 10.995 5.100 280898 9733.894 280898 9749.989

Arti:SSA-AWPB-2014-15-PABMinits:Bhadohi:16-06-2014 428 / 533

Page 429: U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 · 2015. 1. 6. · U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15

Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

I ACCESS

1 Opening of New Schools

1.01 Upgradation of EGS to PSCentres /

School1.02 New PS School

1.03 Upgradation of PS to UPS / New UPS School

1.04 Composite Schools (for Urban Areas) School

1.05Residential Schools for specific category children

(For 100 children)

1.06Residential Hostel (for specific category of

children) (For 50 children)

1.07 Integration of Class V with Primary Schools

1.08Integration of Class VIII with Upper Primary

Schools

2Residential Schools for specific category

of children (For 100 Children)

Total - Residential Schools (For 100

children)

3Residential Hostel for specific category of

children (For 50 Children)

Total - Residential Schools (For 50

children)4 Transport/Escort Facility

4.01

Children in remote habitations with sparse

populations where opening of schools is

unviable

Child 0.03000

4.02

Urban deprived children/children without adult

protection in urban areas where schools are not

opened because availability of land is a problem

Child 0.03000

Sub Total

5Special Training for mainstreaming of Out-

of-School Children

5.03 Non-Residential (Fresh)(a) 12 months Child 0.06000(b) 9 months 0.04500(c) 6 months

(i)Special Training (by Special Instructors-NRBC)-

(1-5) Child 0.03000 165 4.950 165 4.95000

(ii) Special Training (by Special Instructors-NRBC)-

(6-8) Child 0.03000 110 3.300 110 3.30000

(d) 3 months Child 0.01500Sub Total 275 8.250 275 8.25000

Total (Special Training) 275 8.250 275 8.2505(B) House Hold Survey (HHS)

5(B).01 House Hold Survey through SMCHouse

Hold0.00001

Sub TotalII RETENTION6 Free Text Book

6.01Free Text Book (PS) for Parishadiya & Aided

Primary Schools (Workbooks not included)Child 0.00120 130127 156.152 130127 156.15240

6.01a

Free Text Book (PS) for 25% children of Class-1

in Private Recognised Primary Schools of other

Boards (Workbooks not included)

Child 0.00150

6.02 Free Brail Books (PS) 0.00150 112 0.168 112 0.16800

6.03 Free Large Print Books (PS) 0.00150

6.04Free Text Book (UPS) (Workbooks not included)

(Including KGBV Girls)Child 0.00200 58733 117.466 58733 117.46600

6.05 Free Brail Books (UPS) 0.00250 20 0.050 20 0.05000

6.06 Free Large Print Books (PS) 0.00250Sub Total 188992 273.836 188992 273.836

7 Provision of 2 set of Uniforms

7.01 All Girls (Including KGBV Girls) Child 0.00400 147724 590.896 147724 590.89600

7.02 SC Boys Child 0.00400 41136 164.544 41136 164.54400

7.03 ST Boys Child 0.00400

7.04 BPL Boys Child 0.00400 77270 309.080 77270 309.08000

7.05

Free Uniform for 25% children of Class-1 in

Private Recognised Primary Schools of other

Boards

Child0.00400

Sub Total 266130 1064.520 266130 1064.5207(A) Fee Reimbursement

7(A).01

Fee Reimbursement for Admission of children of

Disadvantaged Group & Weaker Section upto

25% of seats in Class-1 of Private Unaided

Recognised Schools

Child 0.05400

Sub Total

Name of District : Basti -15

ActivityS. No.Physical

UnitRemarks

Outlay Recommendation for 2014-15

Spill OverDeferred laibility of

2014-15Fresh Recommended Total Recommended

Arti:SSA-AWPB-2014-15-PABMinits:Basti:16-06-2014 429 / 533

Page 430: U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 · 2015. 1. 6. · U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15

Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

Name of District : Basti -15

ActivityS. No.Physical

UnitRemarks

Outlay Recommendation for 2014-15

Spill OverDeferred laibility of

2014-15Fresh Recommended Total Recommended

8 Teaching Learning Equipment (TLE)

8.01 TLE - New Primary School 39.80000 0.20000 39.800008.02 TLE - New Upper Primary School 5.00000 0.50000 5.00000

Sub Total 44.80000 44.80000III ENHANCING QUALITY9 New Teachers Salary

9.01 Primary Teachers (Regular) (Asstt. Teacher) Teacher 0.91500

9.01aHead Teacher for Primary (if the number of

children exceeds 150 in a school)Teacher

9.02 Primary Teachers (Contract) (S.M.) Teacher

9.03Subject specific Upper Primary Teachers

(Regular) (a) Science and Mathematics Teacher 1.26000(b) Social Studies Teacher 1.26000(c) Languages Teacher 1.26000

Sub Total (9.01 to 9.05)Add.Teacher against PTR

Sub Total (9.06 to 9.12)

Total (New Teacher's Salary-9.01 to 9.12)

Teachers Salary (Recurring-sanctioned

earlier)Primary teachers

9.13 Primary Teachers ( Regular)-Existing, in position Teacher 3.66000 65 237.900 65 237.90000

9.14Primary Teachers (Contract)-Existing, in

positionTeacher 0.55000

9.14(a) Primary Teachers (Contract)-under Training Teacher 0.38500 1585 610.225 1585 610.22500

9.14(b)Primary Teacher (Para Teachers Equal to

9.14(a) upgraded as Teachers)0.38500 1050 404.250 1050 404.25000

9.14(c) Primary Teachers (Para)- Vacant Teacher9.15 Primary Teachers (Vacant) Teacher 0.30500

9.16Head Teacher for Primary (if the number of

children exceeds 150)Teacher 5.04000 203 1023.120 203 1023.12000

9.16(b)Head Teacher for Primary (if the number of

children exceeds 150) VacantTeacher 0.42000

Additional teachers

9.17Additional Teachers - PS (Special BTC-

Regular) in positionTeacher 0.30500

9.18Additional Teachers - PS (Special BTC Under

Training)Teacher 0.87600

9.19 Additional Teachers - PS (Vacant) Teacher

9.20Others in position (Para Teachers upgraded

as Teachers)Teacher

Upper Primary teachers

9.21 UP Teachers (Regular)-Existing Teacher 5.04000 965 4863.600 965 4863.60000

9.22 UP Teachers (Contract)-Existing9.23 UP Teachers (Vacant) Teacher 1.26000

9.24Head Teacher for Upper Primary (if the number

of children exceeds 100)-ExistingTeacher 5.34000 314 1676.760 314 1676.76000

9.24a Head Teacher for Upper Primary (Vacant) Teacher 1.33500

9.25Subject specific Upper Primary Teachers

(Regular)(a) Science and Mathematics(b) Social Studies(c) Languages

9.32 Part Time Instructors in position(a) Art Education 0.77000 146 112.420 146 112.42000(b) Health and Physical Education 0.77000 159 122.430 159 122.43000(c) Work Education 0.77000 118 90.860 118 90.86000

9.32(A) Part Time Instructors Vacant(a) Art Education 0.42000(b) Health and Physical Education 0.42000(c) Work Education 0.42000

9.33

Others-Incentive to Teachers in Schools

Located in Naxal Affected Areas (@

Rs.1500/- per teachers per month)

Sub Total (9.13 to 9.33) 4605 9141.565 4605 9141.57TOTAL

(New Teachers Salary +Teachers Salary

Recurring)

4605 9141.565 4605 9141.56500

10 Teachers Training(a) Teachers

10.01

Refresher In-service Teachers' Training at BRC

level and above - 10 days (@ Rs.200/- per head

per day)

Teacher

(Target &

Ach.-13-14

in

Mandays)

0.00600

Arti:SSA-AWPB-2014-15-PABMinits:Basti:16-06-2014 430 / 533

Page 431: U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 · 2015. 1. 6. · U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15

Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

Name of District : Basti -15

ActivityS. No.Physical

UnitRemarks

Outlay Recommendation for 2014-15

Spill OverDeferred laibility of

2014-15Fresh Recommended Total Recommended

10.01(a)Continuous and Comprehensive Evauation [PS +

UPS)Teacher 0.01300 1615 20.995 1615 20.99500

10.01(b) Eary Reading and Numeracy Skills [PS] Teacher 0.00500 1615 8.075 1615 8.07500

10.01(c) Science [UPS] Teacher 0.00800 809 6.472 809 6.47200Recommended as

proposed

10.01(d) CWSN Teacher 0.00400

10.02

One day monthly cluster level meetings and

peer group training sessions for 10 months for

all teachers each year at CRC level - 10 days (@

Rs.100/- per head per day)

Teacher 0.01000

10.03(a)

Induction Training for Newly Recruited Teachers

for 6 Months (Special BTC)- @Rs.2000/- per

head per year

Teacher 0.02000

10.03(b)5 Days Training for Part Time Instructors @ Rs.

200/- per head per day) Teacher 0.01000

10.04

Training of untrained Teachers to acquire

professional qualifications over a two year

period.

Teacher 0.04700 1072 50.384 1072 50.38400

(b) Head Teachers

10.05Refresher Residencial In-service for 10 days at

BRC level and above

Head

Teacher(c) Resource Persons

10.06

Refresher Training for all Resource

Persons,Master Trainers, BRC & CRC faculty

and Coordinators for 5 days each year (@

Rs.200/- per head per day)

Resource

Person 0.00300 180 0.540 180 0.54000

Sub Total 5291 86.466 5291 86.466

11Academic Support through Block Resource

Centre (BRC)/ URC

11.01 Salary of Faculty and Staff

(a) 5 RPs at BRC for subject specific training in

positionRP 75 75

(b) 2 RPs for CWSN in position RP(b-i) 1 CWSN Resource Person RP 1.10000 30 33.000 30 33.00000

(b-ii) 1 Physiotherapist (Resource person for IE) RP

(c) 1 MIS Coordinator in position RP 1.86000

(d) 1 Datra Entry Operator in position RP 1.74000 15 26.100 15 26.10000

(e) 1 Accountant-cum-support staff in position RP 1.80000 15 27.000 15 27.00000

11.02 Furniture Grant BRC/ URC 1.00000

11.03Replacement of furniture, computer, TLE etc (

Once in 5 years)BRC/ URC 1.00000

11.04 Contingency Grant BRC/ URC 0.50000 15 7.500 15 7.50000

11.05 Meeting, TA BRC/ URC 0.30000 15 4.500 15 4.50000

11.06 TLM Grant BRC/ URC 0.10000

11.07 Maintenance Grant BRC/ URC 0.10000

Sub Total 15 98.100 15 98.10000

12Academic Support through Cluster

Resource Centres (CRC/UERC)

12.01Salary of Cluster Coordinator (on an average of

one Resource Person per 18 schools in a block)RP

12.02 Furniture Grant CRC/ UERC 0.10000

12.03Replacement of furniture, computer, TLE etc.

once in 5 yearsCRC/ UERC 0.10000

12.04 Contingency Grant CRC/UERC 0.10000 140 14.000 140 14.00000

12.05 Meeting, TA CRC/UERC 0.12000 140 16.800 140 16.80000

12.06 TLM Grant CRC/UERC 0.03000

12.07Maintenance Grant

CRC/UERC 0.02000

Sub Total 280 30.800 280 30.80000

13Computer Aided Education in upper

primary schools under Innovation

13.01Computer Aided Education in upper primary

schoolsDistrict 0.01200 48 0.576 48 0.57600

Sub Total 48 0.576 48 0.5760014 Libraries in Schools

Arti:SSA-AWPB-2014-15-PABMinits:Basti:16-06-2014 431 / 533

Page 432: U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 · 2015. 1. 6. · U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15

Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

Name of District : Basti -15

ActivityS. No.Physical

UnitRemarks

Outlay Recommendation for 2014-15

Spill OverDeferred laibility of

2014-15Fresh Recommended Total Recommended

14.01 (a) Primary School (per school) School 0.03000

14.02 (b) Upper Primary School (per school) School 0.10000

Sub TotalIV ANNUAL GRANTS15 Teachers' Grant15.01 Primary Teachers Teacher 0.0050015.02 Upper Primary Teachers Teacher 0.00500 809 4.045 809 4.04500

Sub Total 809 4.045 809 4.0450016 School Grant16.01 Primary School School 0.05000 1762 88.100 1762 88.1000016.02 Upper Primary School School 0.07000 798 55.860 798 55.86000

Sub Total 2560 143.960 2560 143.96000

17Research, Evaluation, Monitoring &

Supervision

17.01 REMS Activities School 0.00103 2560 2.633 2560 2.63325

17.02 Monitoring & Supervision School 0.00078 2560 2.007 2560 2.00721

17.03 House Hold Survey (Urban) in Million Plus Cities District 35.00000

Sub Total 5120 4.640 5120 4.6404618 Maintenance Grant

18.01 Maintenance in School having upto3 Classrooms School 0.07500 676 50.700 676 50.70000

18.01a Maintenance Grant School 0.07500 1720 129.000 1720 129.00000Sub Total 2396 179.700 2396 179.70000

VBRIDGING GENDER AND SOCIAL

CATEGORY GAPS

19 Interventions for CWSN (IE)

19.01 Provision for Inclusive Education Child 0.00900 8533 76.797 8533 76.79700

Sub Total 8533 76.797 8533 76.79700

20Innovativation Head up to Rs.50 Lakh per

district

20.01 Girls Education District 0.70000 7 4.900 7 4.90000

20.02 ECCE District20.03 Intervention for SC / ST children District

20.04 Intervention for Minority Community children District

20.05 Intervention for Urban Deprived children District 10.00000

Sub Total 7 4.900 7 4.9000021 SMC/PRI Training

21.01Residential for 6 Resource Person per Block (3

days) (@ Rs.500/-)Blocks 0.09000

21.02Non-residential (3 days training of 6 SMC

members) (@ Rs.100/-)SMC 0.01800 2399 43.182 2399 43.18200

21.02(a)Non-residential (3 days training of 3 Members of

PRI/VECs/LA) (@ Rs.100/-)VEC/ WEC 0.00900

21.03

Seminar/Orientation of SMC Women members

and President/Vice President (@ Rs. 50,000/-

per block)

Blocks 0.50000

Sub Total 2399 43.182 2399 43.18200VI SCHOOL INFRASTRUCTURE22 Civil Works22.01 Primary School (Plain) (New) School 13.1550022.02 Primary School (Hilly/Rocky) (New) School 13.2750022.03 Upper Primary (Plain) (New) School 20.65500

22.04 Upper Primary School (Hilly/Rocky) (New) School 20.77500

22.04aComposite Schools for Urban Areas (Class I-

VIII)School 41.04000

22.05 ACR in lieu of upgraded Upper Primary School Rooms

22.06 Additional class rooms for adding Class VIII Rooms

22.07 Building Less (Pry) School 9.7500022.08 Building Less (UP) School 18.5900022.09 Dilapidated Building (Pry) School 9.7500022.10 Dilapidated Building (UP) School 18.59000

22.11 Additional Class Room (Rural) ( PS+UPS) Rooms 3.45000

22.12 Additional Class Room (Urban) Rooms 3.4500022.13 Additional Class Room (Hill Area)22.14 Toilet/Urinals (PS & UPS) School 0.70000 37 25.900 37 25.9000022.15 Separate Girls Toilet (Rural+Urban) School 0.7000022.16 CWSN friendly Toilets School 0.50000

22.17 Drinking Water Facility (for Urban Area Only)) School 0.15000

22.17a Drinking Water Facility (Plain PS & UPS) School 0.15000 17 2.550 17 2.55000

22.17b Drinking Water Facility (Hilly/Rocky PS & UPS) School 0.15000

22.18a Boundary Wall PS (Total in Meters x .01105) 0.01749

22.18bBoundary Wall PS (For Gate) @Rs. 7000 x no. of

P.S.School 0.07800

Arti:SSA-AWPB-2014-15-PABMinits:Basti:16-06-2014 432 / 533

Page 433: U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 · 2015. 1. 6. · U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15

Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

Name of District : Basti -15

ActivityS. No.Physical

UnitRemarks

Outlay Recommendation for 2014-15

Spill OverDeferred laibility of

2014-15Fresh Recommended Total Recommended

22.18c Boundary Wall UPS (Total in Meters x .01105) 0.01749

22.18dBoundary Wall UPS (For Gate) @Rs. 7000 x no.

of UPSSchool 0.07800

22.19a Electrification in P.S./ Electrical Equipment School 0.11000

22.19b Electrification in U. P.S./ Electrical Equipment School 0.11000

22.20Office-cum-store-cum-Head Teacher's room

(Primary)Rooms

22.21Office-cum-store-cum-Head Teacher's room

(Upper Primary)Rooms

22.22Augumentation of training facility in BRC (one

time)BRC/ URC 5.00000

22.23 Child friendly Elements School 0.25000

22.24 Ramps with Handrails (Barrier Free Elements) School 0.06000

22.25 Handrails in existing Ramps School 0.0100022.26 Whole School Develoipment School22.27 Retro-fitting and repairs School

22.28Residential Schools for specific category

of children

(a) Construction of Building including boundary

wall, Water and sanitation facilities, electric

installation (For 100 children)

Building 65.86000

(b) Construction of residential hostel Building 65.86000

(c) Refurnishing unused old buildings Building

22.29

Construction of Hostel in existing Govt UPS

including boundary wall, Water and sanitation

facilities, electric installation etc. (For 50

children)

7.00000

22.30Furniture for Govt. UPS (per child) (@ Rs.500/-

per child enrolled)Child 0.00500

22.31 Major Repairs for Primary School School 0.30000

22.32 Majr Repairs for Upper Primary School School 0.30000

22.33Others (Difference of Civil Wrks

sanctioned in pre.yr.)22.33a Others (Overhead Tank PS) School 0.1200022.33b Others (Overhead Tank UPS) School 0.12000

Sub Total (Civil WOrks) 54 28.450 54 28.45VII PROJECT MANAGEMENT COST23 Management23.01 Management up to 3.5%

(a) Project Management and MIS

(i) DPO ( Salary, Contigency, Consumables,

POL, TA & Computer etc)District 1 101.246 1 101.24570

(ii) EMIS Cell District 1 17.600 1 17.60000Sub Total (a) 1 1 1 118.846 1 118.846

(b) Training of Educational Administrators District

(c) School Mapping and Social Mapping District

Sub Total (23.01)

23.02Learning Enhancement Prog. (LEP) (P & UP) (up

to 2%)District 18.253 18.25300

23.03 Community Mobilization (up to 0.5%) District 1 45.850 1 45.85000

Sub Total (Management) 1 64.103 1 64.10300Total Management Cost 182.949 182.94870Total of SSA (Districs) 44.800 487514 11372.737 487514 11417.537

24 State Component23.01 Management23.02 REMS 0.0044923.03 SIEMAT

Sub Total

STATE SSA TOTAL 44.80000 487514 11372.737 487514 11417.53656

25

KGBV Financial Provision (give

separate costing sheets for different

Models)

Hostel

ANon Recurring One Time Grant (Only

committed liabilities) (Model-I)

25.01 Construction of Building (New)

25.02 Construction of Building KGBV sanctioned earlier

25.02(a) Additional Class Room Rooms 3.45000

25.02(b) Guard Room Rooms 1.32000

25.02(c) Boundary Wall School 5.0200025.03 Boudary Wall (Spillover only)

25.04

Boring/Handpump (Spillover only)

(minimum rates prescribed by State Drinking

Water Department subject to a ceiling of Rs.

1.00 lakhs)

Arti:SSA-AWPB-2014-15-PABMinits:Basti:16-06-2014 433 / 533

Page 434: U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 · 2015. 1. 6. · U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15

Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

Name of District : Basti -15

ActivityS. No.Physical

UnitRemarks

Outlay Recommendation for 2014-15

Spill OverDeferred laibility of

2014-15Fresh Recommended Total Recommended

25.05 Electricity /Water charges (Spillover only)

25.05(a) Solar Water Heater & Solar Light 2.97000

25.06Furniture/Equipment (including Kitchen

equipment)3.00000

25.07 TLM and equipment including library books 3.50000

25.08 Bedding (New) 0.75000

25.09 Replacement of Bedding (once in 3 Year) 0.75000 3 2.250 3 2.25000

Subtotal Non Recurring 2.250 2.25000

B Recurring Cost Per Annum (Model-I)

25.10Maintenance per girl student per month @ Rs.

1500/-18.00000 13 234.000 13 234.00000

25.11 Stipend for girl student per month @ Rs. 100/- 1.20000 13 15.600 13 15.60000

25.12Supplementary TLM, stationery and other

educational material @ Rs.1000/- per annum1.00000 13 13.000 13 13.00000

25.13 Salaries

25.13.1 Additional Salaries:

(a) 1 Warden @ Rs. 25,000/- per month 3.00000 13 39.00000 13 39.00000

(b)4 Full time teachers as per RTE norms @ Rs.

20,000/- per month per teacher 9.60000 13 124.80000 13 124.80000

(c)

1 Urdu Teachers (only for blocks with muslim

population above 20% and select urban areas), if

required @ Rs. 12,000/- per month per teacher 1.44000 13 18.72000 13 18.72000

(d)3 part time teachers @ Rs. 5,000/- per month per

teacher 1.80000 13 23.40000 13 23.40000

(e)1 Full time Accountant @ Rs. 10,000/- per month

1.20000 13 15.60000 13 15.60000

(f)

2 Support Staff – (Accountant/ Assistant, Peon,

Chowkidar) @ Rs. 5,000/- per month per staff 1.20000 13 15.60000 13 15.60000

(g) 1 Head cook @ Rs. 6,000/- per month 0.72000 13 9.36000 13 9.36000

(h)2 Asstt. Cooks @ Rs. 4,500/- per month per cook

1.08000 13 14.04000 13 14.04000

25.14Specific skill training @ Rs.1000/- per child per

annum1.00000 13 13.000 13 13.00000

25.15Electricity/water charges @ Rs.1000/- per child

per annum1.00000 13 13.000 13 13.00000

25.16Medical care/contingencies @ Rs. 1250 per child

per annum1.25000 13 16.250 13 16.25000

25.17 Maintenance @ Rs.750/- per child per annum 0.75000 13 9.750 13 9.75000

25.18

Miscellaneous (Educational Tour/ Exposure Visit

/ Sports Material etc.) @ Rs.750/- per child per

annum

0.75000 13 9.750 13 9.75000

25.19Preparatory camps @ Rs.200/- per child per

annum0.20000 13 2.600 13 2.60000

25.20PTAs/school functions @ Rs.200/- per child per

annum0.20000 13 2.600 13 2.60000

25.21 Provision of Rent @ Rs.6000/- per annum 6.00000

25.21a Provision of Rent (6 months) 3.6000025.21b Provision of Rent (3 months) 1.8000025.21c Rent (Previous Year (2007-2012)

25.22 Capacity building 0.50000 13 6.500 13 6.50000

25.22(a)Physical/ Self Defence Training @ Rs.200/- per

child per annum0.20000 13 2.600 13 2.60000

Subtotal Recurring 13 599.170 13 599.17000

Subtotal (Model-I) 13 601.420 13 601.42000

CNon Recurring One Time Grant (Only

committed liabilities) (Model-II)

25.23 Construction of Building (New)

25.24 Construction of Building KGBV sanctioned earlier

25.24(a) Additional Class Room Rooms 3.45000

25.24(b) Guard Room Rooms 1.32000

25.24(c) Boundary Wall School 5.0200025.25 Boudary Wall (Spillover only)25.26 Boring/Handpump (Spillover only)

25.27 Electricity /Water charges (Spillover only)

25.27(a) Solar Water Heater & Solar Light 2.97000

25.28Furniture/Equipment (including Kitchen

equipment)2.00000

25.29 TLM and equipment including library books 3.00000

Arti:SSA-AWPB-2014-15-PABMinits:Basti:16-06-2014 434 / 533

Page 435: U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 · 2015. 1. 6. · U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15

Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

Name of District : Basti -15

ActivityS. No.Physical

UnitRemarks

Outlay Recommendation for 2014-15

Spill OverDeferred laibility of

2014-15Fresh Recommended Total Recommended

25.30 Bedding (New) 0.37500

25.31 Replacement of Bedding (once in 3 Year) 0.37500

Subtotal Non Recurring

D Recurring Cost Per Annum (Model-II)

25.32Maintenance per girl student per month @ Rs.

1500/-9.00000

25.33 Stipend for girl student per month @ Rs. 100/- 0.60000

25.34Supplementary TLM, stationery and other

educational material @ Rs.1000/- per annum0.50000

25.35 Salaries(a) 1 Warden @ Rs. 25,000/- per month 3.00000

(b)3 Full time teachers as per RTE norms @ Rs.

20,000/- per month per teacher 7.20000

(c) 3 part time teachers @ Rs. 5,000/- per month per

teacher 1.80000

(d)1 Full time Accountant @ Rs. 10,000/- per month

1.20000

(e)

2 Support Staff – (Accountant/ Assistant, Peon,

Chowkidar) @ Rs. 5,000/- per month per staff 1.20000

(f) 1 Head cook @ Rs. 6,000/- per month 0.72000

(g)1 Asstt. Cooks @ Rs. 4,500/- per month per cook

0.54000

25.36Specific skill training @ Rs.1000/- per child per

annum0.50000

25.37Electricity/water charges @ Rs.1000/- per child

per annum0.50000

25.38Medical care/contingencies @ Rs. 1250 per child

per annum0.62500

25.39 Maintenance @ Rs.750/- per child per annum 0.37500

25.40

Miscellaneous (Educational Tour/ Exposure Visit

/ Sports Material etc.) @ Rs.750/- per child per

annum

0.37500

25.41Preparatory camps @ Rs.300/- per child per

annum0.15000

25.42PTAs/school functions @ Rs.300/- per child per

annum0.15000

25.43 Provision of Rent @ Rs.10000/- per annum 5.00000

25.43a Provision of Rent (6 months) 3.6000025.43b Provision of Rent (3 months) 1.8000025.43c Rent (Previous Year (2007-2012)25.44 Capacity building 0.25000

25.44(a)Physical/ Self Defence Training @ Rs.200/- per

child per annum0.10000

Subtotal Recurring

Subtotal (Model-II) Total (KGBV) 13 601.420 13 601.420

DISTRICT GRAND TOTAL (SSA+KGBV) 44.800 487527 11974.157 487527 12018.957

Arti:SSA-AWPB-2014-15-PABMinits:Basti:16-06-2014 435 / 533

Page 436: U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 · 2015. 1. 6. · U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15

Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

I ACCESS

1 Opening of New Schools

1.01 Upgradation of EGS to PSCentres /

School1.02 New PS School

1.03 Upgradation of PS to UPS / New UPS School

1.04 Composite Schools (for Urban Areas) School

1.05Residential Schools for specific category children

(For 100 children)

1.06Residential Hostel (for specific category of

children) (For 50 children)

1.07 Integration of Class V with Primary Schools

1.08Integration of Class VIII with Upper Primary

Schools

2Residential Schools for specific category

of children (For 100 Children)

Total - Residential Schools (For 100

children)

3Residential Hostel for specific category of

children (For 50 Children)

Total - Residential Schools (For 50

children)4 Transport/Escort Facility

4.01

Children in remote habitations with sparse

populations where opening of schools is

unviable

Child 0.03000

4.02

Urban deprived children/children without adult

protection in urban areas where schools are not

opened because availability of land is a problem

Child 0.03000

Sub Total

5Special Training for mainstreaming of Out-

of-School Children

5.03 Non-Residential (Fresh)(a) 12 months Child 0.06000(b) 9 months 0.04500(c) 6 months

(i)Special Training (by Special Instructors-NRBC)-

(1-5) Child 0.03000 621 18.630 621 18.63000

(ii) Special Training (by Special Instructors-NRBC)-

(6-8) Child 0.03000 759 22.770 759 22.77000

(d) 3 months Child 0.01500Sub Total 1380 41.400 1380 41.40000

Total (Special Training) 1380 41.400 1380 41.4005(B) House Hold Survey (HHS)

5(B).01 House Hold Survey through SMCHouse

Hold0.00001

Sub TotalII RETENTION6 Free Text Book

6.01Free Text Book (PS) for Parishadiya & Aided

Primary Schools (Workbooks not included)Child 0.00120 162512 195.014 162512 195.01440

6.01a

Free Text Book (PS) for 25% children of Class-1

in Private Recognised Primary Schools of other

Boards (Workbooks not included)

Child 0.00150

6.02 Free Brail Books (PS) 0.00150 31 0.047 31 0.04650

6.03 Free Large Print Books (PS) 0.00150

6.04Free Text Book (UPS) (Workbooks not included)

(Including KGBV Girls)Child 0.00200 79395 158.790 79395 158.79000

6.05 Free Brail Books (UPS) 0.00250

6.06 Free Large Print Books (PS) 0.00250Sub Total 241938 353.851 241938 353.851

7 Provision of 2 set of Uniforms

7.01 All Girls (Including KGBV Girls) Child 0.00400 205118 820.472 205118 820.47200

7.02 SC Boys Child 0.00400 48158 192.632 48158 192.63200

7.03 ST Boys Child 0.00400

7.04 BPL Boys Child 0.00400 89162 356.648 89162 356.64800

7.05

Free Uniform for 25% children of Class-1 in

Private Recognised Primary Schools of other

Boards

Child0.00400

Sub Total 342438 1369.752 342438 1369.7527(A) Fee Reimbursement

7(A).01

Fee Reimbursement for Admission of children of

Disadvantaged Group & Weaker Section upto

25% of seats in Class-1 of Private Unaided

Recognised Schools

Child 0.05400

Sub Total

Name of District : Bareilly -14

ActivityS. No.Physical

UnitRemarks

Outlay Recommendation for 2014-15

Spill OverDeferred laibility of

2014-15Fresh Recommended Total Recommended

Arti:SSA-AWPB-2014-15-PABMinits:Bareilly:16-06-2014 436 / 533

Page 437: U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 · 2015. 1. 6. · U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15

Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

Name of District : Bareilly -14

ActivityS. No.Physical

UnitRemarks

Outlay Recommendation for 2014-15

Spill OverDeferred laibility of

2014-15Fresh Recommended Total Recommended

8 Teaching Learning Equipment (TLE)

8.01 TLE - New Primary School 1.00000 0.20000 1.000008.02 TLE - New Upper Primary School 1.10000 0.50000 1.10000

Sub Total 2.10000 2.10000III ENHANCING QUALITY9 New Teachers Salary

9.01 Primary Teachers (Regular) (Asstt. Teacher) Teacher 0.91500

9.01aHead Teacher for Primary (if the number of

children exceeds 150 in a school)Teacher

9.02 Primary Teachers (Contract) (S.M.) Teacher

9.03Subject specific Upper Primary Teachers

(Regular) (a) Science and Mathematics Teacher 1.26000(b) Social Studies Teacher 1.26000(c) Languages Teacher 1.26000

Sub Total (9.01 to 9.05)Add.Teacher against PTR

Sub Total (9.06 to 9.12)

Total (New Teacher's Salary-9.01 to 9.12)

Teachers Salary (Recurring-sanctioned

earlier)Primary teachers

9.13 Primary Teachers ( Regular)-Existing, in position Teacher 3.66000 263 962.580 263 962.58000

9.14Primary Teachers (Contract)-Existing, in

positionTeacher 0.55000

9.14(a) Primary Teachers (Contract)-under Training Teacher 0.38500 2345 902.825 2345 902.82500

9.14(b)Primary Teacher (Para Teachers Equal to

9.14(a) upgraded as Teachers)0.38500 1087 418.495 1087 418.49500

9.14(c) Primary Teachers (Para)- Vacant Teacher9.15 Primary Teachers (Vacant) Teacher 0.30500

9.16Head Teacher for Primary (if the number of

children exceeds 150)Teacher 5.04000 337 1698.480 337 1698.48000

9.16(b)Head Teacher for Primary (if the number of

children exceeds 150) VacantTeacher 0.42000

Additional teachers

9.17Additional Teachers - PS (Special BTC-

Regular) in positionTeacher 0.30500

9.18Additional Teachers - PS (Special BTC Under

Training)Teacher 0.87600

9.19 Additional Teachers - PS (Vacant) Teacher

9.20Others in position (Para Teachers upgraded

as Teachers)Teacher

Upper Primary teachers

9.21 UP Teachers (Regular)-Existing Teacher 5.04000 1081 5448.240 1081 5448.24000

9.22 UP Teachers (Contract)-Existing9.23 UP Teachers (Vacant) Teacher 1.26000

9.24Head Teacher for Upper Primary (if the number

of children exceeds 100)-ExistingTeacher 5.34000 223 1190.820 223 1190.82000

9.24a Head Teacher for Upper Primary (Vacant) Teacher 1.33500

9.25Subject specific Upper Primary Teachers

(Regular)(a) Science and Mathematics(b) Social Studies(c) Languages

9.32 Part Time Instructors in position(a) Art Education 0.77000 225 173.250 225 173.25000(b) Health and Physical Education 0.77000 244 187.880 244 187.88000(c) Work Education 0.77000 176 135.520 176 135.52000

9.32(A) Part Time Instructors Vacant(a) Art Education 0.42000(b) Health and Physical Education 0.42000(c) Work Education 0.42000

9.33

Others-Incentive to Teachers in Schools

Located in Naxal Affected Areas (@

Rs.1500/- per teachers per month)

Sub Total (9.13 to 9.33) 5981 11118.090 5981 11118.09TOTAL

(New Teachers Salary +Teachers Salary

Recurring)

5981 11118.090 5981 11118.09000

10 Teachers Training(a) Teachers

10.01

Refresher In-service Teachers' Training at BRC

level and above - 10 days (@ Rs.200/- per head

per day)

Teacher

(Target &

Ach.-13-14

in

Mandays)

0.00600

Arti:SSA-AWPB-2014-15-PABMinits:Bareilly:16-06-2014 437 / 533

Page 438: U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 · 2015. 1. 6. · U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15

Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

Name of District : Bareilly -14

ActivityS. No.Physical

UnitRemarks

Outlay Recommendation for 2014-15

Spill OverDeferred laibility of

2014-15Fresh Recommended Total Recommended

10.01(a)Continuous and Comprehensive Evauation [PS +

UPS)Teacher 0.01300 2010 26.130 2010 26.13000

10.01(b) Eary Reading and Numeracy Skills [PS] Teacher 0.00500 2010 10.050 2010 10.05000

10.01(c) Science [UPS] Teacher 0.00800 815 6.520 815 6.52000Recommended as

proposed

10.01(d) CWSN Teacher 0.00400

10.02

One day monthly cluster level meetings and

peer group training sessions for 10 months for

all teachers each year at CRC level - 10 days (@

Rs.100/- per head per day)

Teacher 0.01000

10.03(a)

Induction Training for Newly Recruited Teachers

for 6 Months (Special BTC)- @Rs.2000/- per

head per year

Teacher 0.02000

10.03(b)5 Days Training for Part Time Instructors @ Rs.

200/- per head per day) Teacher 0.01000

10.04

Training of untrained Teachers to acquire

professional qualifications over a two year

period.

Teacher 0.04700 1870 87.890 1870 87.89000

(b) Head Teachers

10.05Refresher Residencial In-service for 10 days at

BRC level and above

Head

Teacher(c) Resource Persons

10.06

Refresher Training for all Resource

Persons,Master Trainers, BRC & CRC faculty

and Coordinators for 5 days each year (@

Rs.200/- per head per day)

Resource

Person 0.00300 192 0.576 192 0.57600

Sub Total 6897 131.166 6897 131.166

11Academic Support through Block Resource

Centre (BRC)/ URC

11.01 Salary of Faculty and Staff

(a) 5 RPs at BRC for subject specific training in

positionRP 80 80

(b) 2 RPs for CWSN in position RP(b-i) 1 CWSN Resource Person RP 1.10000 32 35.200 32 35.20000

(b-ii) 1 Physiotherapist (Resource person for IE) RP

(c) 1 MIS Coordinator in position RP 1.86000

(d) 1 Datra Entry Operator in position RP 1.74000 15 26.100 15 26.10000

(e) 1 Accountant-cum-support staff in position RP 1.80000 15 27.000 15 27.00000

11.02 Furniture Grant BRC/ URC 1.00000

11.03Replacement of furniture, computer, TLE etc (

Once in 5 years)BRC/ URC 1.00000

11.04 Contingency Grant BRC/ URC 0.50000 16 8.000 16 8.00000

11.05 Meeting, TA BRC/ URC 0.30000 16 4.800 16 4.80000

11.06 TLM Grant BRC/ URC 0.10000

11.07 Maintenance Grant BRC/ URC 0.10000

Sub Total 16 101.100 16 101.10000

12Academic Support through Cluster

Resource Centres (CRC/UERC)

12.01Salary of Cluster Coordinator (on an average of

one Resource Person per 18 schools in a block)RP

12.02 Furniture Grant CRC/ UERC 0.10000

12.03Replacement of furniture, computer, TLE etc.

once in 5 yearsCRC/ UERC 0.10000

12.04 Contingency Grant CRC/UERC 0.10000 146 14.600 146 14.60000

12.05 Meeting, TA CRC/UERC 0.12000 146 17.520 146 17.52000

12.06 TLM Grant CRC/UERC 0.03000

12.07Maintenance Grant

CRC/UERC 0.02000

Sub Total 292 32.120 292 32.12000

13Computer Aided Education in upper

primary schools under Innovation

13.01Computer Aided Education in upper primary

schoolsDistrict 0.01200 48 0.576 48 0.57600

Sub Total 48 0.576 48 0.5760014 Libraries in Schools

Arti:SSA-AWPB-2014-15-PABMinits:Bareilly:16-06-2014 438 / 533

Page 439: U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 · 2015. 1. 6. · U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15

Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

Name of District : Bareilly -14

ActivityS. No.Physical

UnitRemarks

Outlay Recommendation for 2014-15

Spill OverDeferred laibility of

2014-15Fresh Recommended Total Recommended

14.01 (a) Primary School (per school) School 0.03000

14.02 (b) Upper Primary School (per school) School 0.10000

Sub TotalIV ANNUAL GRANTS15 Teachers' Grant15.01 Primary Teachers Teacher 0.0050015.02 Upper Primary Teachers Teacher 0.00500 815 4.075 815 4.07500

Sub Total 815 4.075 815 4.0750016 School Grant16.01 Primary School School 0.05000 2100 105.000 2100 105.0000016.02 Upper Primary School School 0.07000 900 63.000 900 63.00000

Sub Total 3000 168.000 3000 168.00000

17Research, Evaluation, Monitoring &

Supervision

17.01 REMS Activities School 0.00103 3000 3.086 3000 3.08584

17.02 Monitoring & Supervision School 0.00078 3000 2.352 3000 2.35220

17.03 House Hold Survey (Urban) in Million Plus Cities District 35.00000

Sub Total 6000 5.438 6000 5.4380418 Maintenance Grant

18.01 Maintenance in School having upto3 Classrooms School 0.07500 403 30.225 403 30.22500

18.01a Maintenance Grant School 0.07500 2503 187.725 2503 187.72500Sub Total 2906 217.950 2906 217.95000

VBRIDGING GENDER AND SOCIAL

CATEGORY GAPS

19 Interventions for CWSN (IE)

19.01 Provision for Inclusive Education Child 0.03000 2457 73.710 2457 73.71000

Sub Total 2457 73.710 2457 73.71000

20Innovativation Head up to Rs.50 Lakh per

district

20.01 Girls Education District 0.70000 11 7.700 11 7.70000

20.02 ECCE District20.03 Intervention for SC / ST children District

20.04 Intervention for Minority Community children District

20.05 Intervention for Urban Deprived children District 10.00000

Sub Total 11 7.700 11 7.7000021 SMC/PRI Training

21.01Residential for 6 Resource Person per Block (3

days) (@ Rs.500/-)Blocks 0.09000

21.02Non-residential (3 days training of 6 SMC

members) (@ Rs.100/-)SMC 0.01800 2912 52.416 2912 52.41600

21.02(a)Non-residential (3 days training of 3 Members of

PRI/VECs/LA) (@ Rs.100/-)VEC/ WEC 0.00900

21.03

Seminar/Orientation of SMC Women members

and President/Vice President (@ Rs. 50,000/-

per block)

Blocks 0.50000

Sub Total 2912 52.416 2912 52.41600VI SCHOOL INFRASTRUCTURE22 Civil Works22.01 Primary School (Plain) (New) School 13.1550022.02 Primary School (Hilly/Rocky) (New) School 13.2750022.03 Upper Primary (Plain) (New) School 20.65500

22.04 Upper Primary School (Hilly/Rocky) (New) School 20.77500

22.04aComposite Schools for Urban Areas (Class I-

VIII)School 41.04000

22.05 ACR in lieu of upgraded Upper Primary School Rooms

22.06 Additional class rooms for adding Class VIII Rooms

22.07 Building Less (Pry) School 9.7500022.08 Building Less (UP) School 18.5900022.09 Dilapidated Building (Pry) School 9.7500022.10 Dilapidated Building (UP) School 18.59000

22.11 Additional Class Room (Rural) ( PS+UPS) Rooms 3.45000 69 238.050 69 238.05000

22.12 Additional Class Room (Urban) Rooms 3.45000 3 10.350 3 10.3500022.13 Additional Class Room (Hill Area)22.14 Toilet/Urinals (PS & UPS) School 0.7000022.15 Separate Girls Toilet (Rural+Urban) School 0.7000022.16 CWSN friendly Toilets School 0.50000

22.17 Drinking Water Facility (for Urban Area Only)) School 0.15000

22.17a Drinking Water Facility (Plain PS & UPS) School 0.15000

22.17b Drinking Water Facility (Hilly/Rocky PS & UPS) School 0.15000

22.18a Boundary Wall PS (Total in Meters x .01105) 0.01749

22.18bBoundary Wall PS (For Gate) @Rs. 7000 x no. of

P.S.School 0.07800

Arti:SSA-AWPB-2014-15-PABMinits:Bareilly:16-06-2014 439 / 533

Page 440: U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 · 2015. 1. 6. · U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15

Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

Name of District : Bareilly -14

ActivityS. No.Physical

UnitRemarks

Outlay Recommendation for 2014-15

Spill OverDeferred laibility of

2014-15Fresh Recommended Total Recommended

22.18c Boundary Wall UPS (Total in Meters x .01105) 0.01749

22.18dBoundary Wall UPS (For Gate) @Rs. 7000 x no.

of UPSSchool 0.07800

22.19a Electrification in P.S./ Electrical Equipment School 0.11000

22.19b Electrification in U. P.S./ Electrical Equipment School 0.11000

22.20Office-cum-store-cum-Head Teacher's room

(Primary)Rooms

22.21Office-cum-store-cum-Head Teacher's room

(Upper Primary)Rooms

22.22Augumentation of training facility in BRC (one

time)BRC/ URC 5.00000

22.23 Child friendly Elements School 0.25000

22.24 Ramps with Handrails (Barrier Free Elements) School 0.06000

22.25 Handrails in existing Ramps School 0.0100022.26 Whole School Develoipment School22.27 Retro-fitting and repairs School

22.28Residential Schools for specific category

of children

(a) Construction of Building including boundary

wall, Water and sanitation facilities, electric

installation (For 100 children)

Building 65.86000

(b) Construction of residential hostel Building 65.86000

(c) Refurnishing unused old buildings Building

22.29

Construction of Hostel in existing Govt UPS

including boundary wall, Water and sanitation

facilities, electric installation etc. (For 50

children)

7.00000

22.30Furniture for Govt. UPS (per child) (@ Rs.500/-

per child enrolled)Child 0.00500

22.31 Major Repairs for Primary School School 0.30000

22.32 Majr Repairs for Upper Primary School School 0.30000

22.33Others (Difference of Civil Wrks

sanctioned in pre.yr.)22.33a Others (Overhead Tank PS) School 0.1200022.33b Others (Overhead Tank UPS) School 0.12000

Sub Total (Civil WOrks) 72 248.400 72 248.40VII PROJECT MANAGEMENT COST23 Management23.01 Management up to 3.5%

(a) Project Management and MIS

(i) DPO ( Salary, Contigency, Consumables,

POL, TA & Computer etc)District 1 120.027 1 120.02690

(ii) EMIS Cell District 1 20.948 1 20.94800Sub Total (a) 1 1 1 140.975 1 140.975

(b) Training of Educational Administrators District

(c) School Mapping and Social Mapping District

Sub Total (23.01)

23.02Learning Enhancement Prog. (LEP) (P & UP) (up

to 2%)District 22.595 22.59535

23.03 Community Mobilization (up to 0.5%) District 1 60.000 1 60.00000

Sub Total (Management) 1 82.595 1 82.59535Total Management Cost 223.570 223.57025Total of SSA (Districs) 2.100 617163 14149.314 617163 14151.414

24 State Component23.01 Management23.02 REMS 0.0044923.03 SIEMAT

Sub Total

STATE SSA TOTAL 2.10000 617163 14149.314 617163 14151.41419

25

KGBV Financial Provision (give

separate costing sheets for different

Models)

Hostel

ANon Recurring One Time Grant (Only

committed liabilities) (Model-I)

25.01 Construction of Building (New)

25.02 Construction of Building KGBV sanctioned earlier

25.02(a) Additional Class Room Rooms 3.45000

25.02(b) Guard Room Rooms 1.32000

25.02(c) Boundary Wall School 5.0200025.03 Boudary Wall (Spillover only)

25.04

Boring/Handpump (Spillover only)

(minimum rates prescribed by State Drinking

Water Department subject to a ceiling of Rs.

1.00 lakhs)

Arti:SSA-AWPB-2014-15-PABMinits:Bareilly:16-06-2014 440 / 533

Page 441: U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 · 2015. 1. 6. · U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15

Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

Name of District : Bareilly -14

ActivityS. No.Physical

UnitRemarks

Outlay Recommendation for 2014-15

Spill OverDeferred laibility of

2014-15Fresh Recommended Total Recommended

25.05 Electricity /Water charges (Spillover only)

25.05(a) Solar Water Heater & Solar Light 2.97000

25.06Furniture/Equipment (including Kitchen

equipment)3.00000

25.07 TLM and equipment including library books 3.50000

25.08 Bedding (New) 0.75000

25.09 Replacement of Bedding (once in 3 Year) 0.75000 17 12.750 17 12.75000

Subtotal Non Recurring 12.750 12.75000

B Recurring Cost Per Annum (Model-I)

25.10Maintenance per girl student per month @ Rs.

1500/-18.00000 18 324.000 18 324.00000

25.11 Stipend for girl student per month @ Rs. 100/- 1.20000 18 21.600 18 21.60000

25.12Supplementary TLM, stationery and other

educational material @ Rs.1000/- per annum1.00000 18 18.000 18 18.00000

25.13 Salaries

25.13.1 Additional Salaries:

(a) 1 Warden @ Rs. 25,000/- per month 3.00000 18 54.00000 18 54.00000

(b)4 Full time teachers as per RTE norms @ Rs.

20,000/- per month per teacher 9.60000 18 172.80000 18 172.80000

(c)

1 Urdu Teachers (only for blocks with muslim

population above 20% and select urban areas), if

required @ Rs. 12,000/- per month per teacher 1.44000 18 25.92000 18 25.92000

(d)3 part time teachers @ Rs. 5,000/- per month per

teacher 1.80000 18 32.40000 18 32.40000

(e)1 Full time Accountant @ Rs. 10,000/- per month

1.20000 18 21.60000 18 21.60000

(f)

2 Support Staff – (Accountant/ Assistant, Peon,

Chowkidar) @ Rs. 5,000/- per month per staff 1.20000 18 21.60000 18 21.60000

(g) 1 Head cook @ Rs. 6,000/- per month 0.72000 18 12.96000 18 12.96000

(h)2 Asstt. Cooks @ Rs. 4,500/- per month per cook

1.08000 18 19.44000 18 19.44000

25.14Specific skill training @ Rs.1000/- per child per

annum1.00000 18 18.000 18 18.00000

25.15Electricity/water charges @ Rs.1000/- per child

per annum1.00000 18 18.000 18 18.00000

25.16Medical care/contingencies @ Rs. 1250 per child

per annum1.25000 18 22.500 18 22.50000

25.17 Maintenance @ Rs.750/- per child per annum 0.75000 18 13.500 18 13.50000

25.18

Miscellaneous (Educational Tour/ Exposure Visit

/ Sports Material etc.) @ Rs.750/- per child per

annum

0.75000 18 13.500 18 13.50000

25.19Preparatory camps @ Rs.200/- per child per

annum0.20000 18 3.600 18 3.60000

25.20PTAs/school functions @ Rs.200/- per child per

annum0.20000 18 3.600 18 3.60000

25.21 Provision of Rent @ Rs.6000/- per annum 6.00000

25.21a Provision of Rent (6 months) 3.6000025.21b Provision of Rent (3 months) 1.8000025.21c Rent (Previous Year (2007-2012)

25.22 Capacity building 0.50000 18 9.000 18 9.00000

25.22(a)Physical/ Self Defence Training @ Rs.200/- per

child per annum0.20000 18 3.600 18 3.60000

Subtotal Recurring 18 829.620 18 829.62000

Subtotal (Model-I) 18 842.370 18 842.37000

CNon Recurring One Time Grant (Only

committed liabilities) (Model-II)

25.23 Construction of Building (New)

25.24 Construction of Building KGBV sanctioned earlier

25.24(a) Additional Class Room Rooms 3.45000

25.24(b) Guard Room Rooms 1.32000

25.24(c) Boundary Wall School 5.0200025.25 Boudary Wall (Spillover only)25.26 Boring/Handpump (Spillover only)

25.27 Electricity /Water charges (Spillover only)

25.27(a) Solar Water Heater & Solar Light 2.97000

25.28Furniture/Equipment (including Kitchen

equipment)2.00000

25.29 TLM and equipment including library books 3.00000

Arti:SSA-AWPB-2014-15-PABMinits:Bareilly:16-06-2014 441 / 533

Page 442: U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 · 2015. 1. 6. · U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15

Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

Name of District : Bareilly -14

ActivityS. No.Physical

UnitRemarks

Outlay Recommendation for 2014-15

Spill OverDeferred laibility of

2014-15Fresh Recommended Total Recommended

25.30 Bedding (New) 0.37500

25.31 Replacement of Bedding (once in 3 Year) 0.37500

Subtotal Non Recurring

D Recurring Cost Per Annum (Model-II)

25.32Maintenance per girl student per month @ Rs.

1500/-9.00000

25.33 Stipend for girl student per month @ Rs. 100/- 0.60000

25.34Supplementary TLM, stationery and other

educational material @ Rs.1000/- per annum0.50000

25.35 Salaries(a) 1 Warden @ Rs. 25,000/- per month 3.00000

(b)3 Full time teachers as per RTE norms @ Rs.

20,000/- per month per teacher 7.20000

(c) 3 part time teachers @ Rs. 5,000/- per month per

teacher 1.80000

(d)1 Full time Accountant @ Rs. 10,000/- per month

1.20000

(e)

2 Support Staff – (Accountant/ Assistant, Peon,

Chowkidar) @ Rs. 5,000/- per month per staff 1.20000

(f) 1 Head cook @ Rs. 6,000/- per month 0.72000

(g)1 Asstt. Cooks @ Rs. 4,500/- per month per cook

0.54000

25.36Specific skill training @ Rs.1000/- per child per

annum0.50000

25.37Electricity/water charges @ Rs.1000/- per child

per annum0.50000

25.38Medical care/contingencies @ Rs. 1250 per child

per annum0.62500

25.39 Maintenance @ Rs.750/- per child per annum 0.37500

25.40

Miscellaneous (Educational Tour/ Exposure Visit

/ Sports Material etc.) @ Rs.750/- per child per

annum

0.37500

25.41Preparatory camps @ Rs.300/- per child per

annum0.15000

25.42PTAs/school functions @ Rs.300/- per child per

annum0.15000

25.43 Provision of Rent @ Rs.10000/- per annum 5.00000

25.43a Provision of Rent (6 months) 3.6000025.43b Provision of Rent (3 months) 1.8000025.43c Rent (Previous Year (2007-2012)25.44 Capacity building 0.25000

25.44(a)Physical/ Self Defence Training @ Rs.200/- per

child per annum0.10000

Subtotal Recurring

Subtotal (Model-II) Total (KGBV) 18 842.370 18 842.370

DISTRICT GRAND TOTAL (SSA+KGBV) 2.100 617181 14991.684 617181 14993.784

Arti:SSA-AWPB-2014-15-PABMinits:Bareilly:16-06-2014 442 / 533

Page 443: U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 · 2015. 1. 6. · U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15

Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

I ACCESS

1 Opening of New Schools

1.01 Upgradation of EGS to PSCentres /

School1.02 New PS School

1.03 Upgradation of PS to UPS / New UPS School

1.04 Composite Schools (for Urban Areas) School

1.05Residential Schools for specific category children

(For 100 children)

1.06Residential Hostel (for specific category of

children) (For 50 children)

1.07 Integration of Class V with Primary Schools

1.08Integration of Class VIII with Upper Primary

Schools

2Residential Schools for specific category

of children (For 100 Children)

Total - Residential Schools (For 100

children)

3Residential Hostel for specific category of

children (For 50 Children)

Total - Residential Schools (For 50

children)4 Transport/Escort Facility

4.01

Children in remote habitations with sparse

populations where opening of schools is

unviable

Child 0.03000

4.02

Urban deprived children/children without adult

protection in urban areas where schools are not

opened because availability of land is a problem

Child 0.03000

Sub Total

5Special Training for mainstreaming of Out-

of-School Children

5.03 Non-Residential (Fresh)(a) 12 months Child 0.06000(b) 9 months 0.04500(c) 6 months

(i)Special Training (by Special Instructors-NRBC)-

(1-5) Child 0.03000 238 7.140 238 7.14000

(ii) Special Training (by Special Instructors-NRBC)-

(6-8) Child 0.03000 404 12.120 404 12.12000

(d) 3 months Child 0.01500Sub Total 642 19.260 642 19.26000

Total (Special Training) 642 19.260 642 19.2605(B) House Hold Survey (HHS)

5(B).01 House Hold Survey through SMCHouse

Hold0.00001

Sub TotalII RETENTION6 Free Text Book

6.01Free Text Book (PS) for Parishadiya & Aided

Primary Schools (Workbooks not included)Child 0.00120 186023 223.228 186023 223.22760

6.01a

Free Text Book (PS) for 25% children of Class-1

in Private Recognised Primary Schools of other

Boards (Workbooks not included)

Child 0.00150

6.02 Free Brail Books (PS) 0.00150 201 0.302 201 0.30150

6.03 Free Large Print Books (PS) 0.00150

6.04Free Text Book (UPS) (Workbooks not included)

(Including KGBV Girls)Child 0.00200 75720 151.440 75720 151.44000

6.05 Free Brail Books (UPS) 0.00250 29 0.073 29 0.07250

6.06 Free Large Print Books (PS) 0.00250Sub Total 261973 375.042 261973 375.042

7 Provision of 2 set of Uniforms

7.01 All Girls (Including KGBV Girls) Child 0.00400 191532 766.128 191532 766.12800

7.02 SC Boys Child 0.00400 70922 283.688 70922 283.68800

7.03 ST Boys Child 0.00400

7.04 BPL Boys Child 0.00400 81331 325.324 81331 325.32400

7.05

Free Uniform for 25% children of Class-1 in

Private Recognised Primary Schools of other

Boards

Child0.00400

Sub Total 343785 1375.140 343785 1375.1407(A) Fee Reimbursement

7(A).01

Fee Reimbursement for Admission of children of

Disadvantaged Group & Weaker Section upto

25% of seats in Class-1 of Private Unaided

Recognised Schools

Child 0.05400

Sub Total

8 Teaching Learning Equipment (TLE)

8.01 TLE - New Primary School 3.60000 0.20000 3.600008.02 TLE - New Upper Primary School 0.50000 0.50000 0.50000

Name of District : Barabanki -13

ActivityS. No.Physical

UnitRemarks

Outlay Recommendation for 2014-15

Spill OverDeferred laibility of

2014-15Fresh Recommended Total Recommended

Arti:SSA-AWPB-2014-15-PABMinits:Barabanki:16-06-2014 443 / 533

Page 444: U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 · 2015. 1. 6. · U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15

Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

Name of District : Barabanki -13

ActivityS. No.Physical

UnitRemarks

Outlay Recommendation for 2014-15

Spill OverDeferred laibility of

2014-15Fresh Recommended Total Recommended

Sub Total 4.10000 4.10000III ENHANCING QUALITY9 New Teachers Salary

9.01 Primary Teachers (Regular) (Asstt. Teacher) Teacher 0.91500

9.01aHead Teacher for Primary (if the number of

children exceeds 150 in a school)Teacher

9.02 Primary Teachers (Contract) (S.M.) Teacher

9.03Subject specific Upper Primary Teachers

(Regular) (a) Science and Mathematics Teacher 1.26000(b) Social Studies Teacher 1.26000(c) Languages Teacher 1.26000

Sub Total (9.01 to 9.05)Add.Teacher against PTR

Sub Total (9.06 to 9.12)

Total (New Teacher's Salary-9.01 to 9.12)

Teachers Salary (Recurring-sanctioned

earlier)Primary teachers

9.13 Primary Teachers ( Regular)-Existing, in position Teacher 3.66000 583 2133.780 583 2133.78000

9.14Primary Teachers (Contract)-Existing, in

positionTeacher 0.55000

9.14(a) Primary Teachers (Contract)-under Training Teacher 0.38500 1788 688.380 1788 688.38000

9.14(b)Primary Teacher (Para Teachers Equal to

9.14(a) upgraded as Teachers)0.38500 1142 439.670 1142 439.67000

9.14(c) Primary Teachers (Para)- Vacant Teacher9.15 Primary Teachers (Vacant) Teacher 0.30500

9.16Head Teacher for Primary (if the number of

children exceeds 150)Teacher 5.04000 296 1491.840 296 1491.84000

9.16(b)Head Teacher for Primary (if the number of

children exceeds 150) VacantTeacher 0.42000

Additional teachers

9.17Additional Teachers - PS (Special BTC-

Regular) in positionTeacher 0.30500

9.18Additional Teachers - PS (Special BTC Under

Training)Teacher 0.87600

9.19 Additional Teachers - PS (Vacant) Teacher

9.20Others in position (Para Teachers upgraded

as Teachers)Teacher

Upper Primary teachers

9.21 UP Teachers (Regular)-Existing Teacher 5.04000 1046 5271.840 1046 5271.84000

9.22 UP Teachers (Contract)-Existing9.23 UP Teachers (Vacant) Teacher 1.26000

9.24Head Teacher for Upper Primary (if the number

of children exceeds 100)-ExistingTeacher 5.34000 301 1607.340 301 1607.34000

9.24a Head Teacher for Upper Primary (Vacant) Teacher 1.33500

9.25Subject specific Upper Primary Teachers

(Regular)(a) Science and Mathematics(b) Social Studies(c) Languages

9.32 Part Time Instructors in position(a) Art Education 0.77000 332 255.640 332 255.64000(b) Health and Physical Education 0.77000 332 255.640 332 255.64000(c) Work Education 0.77000 332 255.640 332 255.64000

9.32(A) Part Time Instructors Vacant(a) Art Education 0.42000(b) Health and Physical Education 0.42000(c) Work Education 0.42000

9.33

Others-Incentive to Teachers in Schools

Located in Naxal Affected Areas (@

Rs.1500/- per teachers per month)

Sub Total (9.13 to 9.33) 6152 12399.770 6152 12399.77TOTAL

(New Teachers Salary +Teachers Salary

Recurring)

6152 12399.770 6152 12399.77000

10 Teachers Training(a) Teachers

10.01

Refresher In-service Teachers' Training at BRC

level and above - 10 days (@ Rs.200/- per

head per day)

Teacher

(Target &

Ach.-13-14

in

Mandays)

0.00600

10.01(a)Continuous and Comprehensive Evauation [PS +

UPS)Teacher 0.01300 2131 27.703 2131 27.70300

10.01(b) Eary Reading and Numeracy Skills [PS] Teacher 0.00500 2131 10.655 2131 10.65500

10.01(c) Science [UPS] Teacher 0.00800 861 6.888 861 6.88800Recommended as

proposed

10.01(d) CWSN Teacher 0.00400

Arti:SSA-AWPB-2014-15-PABMinits:Barabanki:16-06-2014 444 / 533

Page 445: U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 · 2015. 1. 6. · U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15

Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

Name of District : Barabanki -13

ActivityS. No.Physical

UnitRemarks

Outlay Recommendation for 2014-15

Spill OverDeferred laibility of

2014-15Fresh Recommended Total Recommended

10.02

One day monthly cluster level meetings and

peer group training sessions for 10 months for

all teachers each year at CRC level - 10 days (@

Rs.100/- per head per day)

Teacher 0.01000

10.03(a)

Induction Training for Newly Recruited Teachers

for 6 Months (Special BTC)- @Rs.2000/- per

head per year

Teacher 0.02000

10.03(b)5 Days Training for Part Time Instructors @ Rs.

200/- per head per day) Teacher 0.01000

10.04

Training of untrained Teachers to acquire

professional qualifications over a two year

period.

Teacher 0.04700 1269 59.643 1269 59.64300

(b) Head Teachers

10.05Refresher Residencial In-service for 10 days at

BRC level and above

Head

Teacher(c) Resource Persons

10.06

Refresher Training for all Resource

Persons,Master Trainers, BRC & CRC faculty

and Coordinators for 5 days each year (@

Rs.200/- per head per day)

Resource

Person 0.00300 192 0.576 192 0.57600

Sub Total 6584 105.465 6584 105.465

11Academic Support through Block Resource

Centre (BRC)/ URC

11.01 Salary of Faculty and Staff

(a) 5 RPs at BRC for subject specific training in

positionRP 80 80

(b) 2 RPs for CWSN in position RP(b-i) 1 CWSN Resource Person RP 1.10000 30 33.000 30 33.00000

(b-ii) 1 Physiotherapist (Resource person for IE) RP

(c) 1 MIS Coordinator in position RP 1.86000

(d) 1 Datra Entry Operator in position RP 1.74000 13 22.620 13 22.62000

(e) 1 Accountant-cum-support staff in position RP 1.80000 6 10.800 6 10.80000

11.02 Furniture Grant BRC/ URC 1.00000

11.03Replacement of furniture, computer, TLE etc (

Once in 5 years)BRC/ URC 1.00000

11.04 Contingency Grant BRC/ URC 0.50000 16 8.000 16 8.00000

11.05 Meeting, TA BRC/ URC 0.30000 16 4.800 16 4.80000

11.06 TLM Grant BRC/ URC 0.10000

11.07 Maintenance Grant BRC/ URC 0.10000

Sub Total 16 79.220 16 79.22000

12Academic Support through Cluster

Resource Centres (CRC/UERC)

12.01Salary of Cluster Coordinator (on an average of

one Resource Person per 18 schools in a block)RP

12.02 Furniture GrantCRC/

UERC0.10000

12.03Replacement of furniture, computer, TLE etc.

once in 5 years

CRC/

UERC0.10000

12.04 Contingency Grant CRC/UERC 0.10000 137 13.700 137 13.70000

12.05 Meeting, TA CRC/UERC 0.12000 137 16.440 137 16.44000

12.06 TLM Grant CRC/UERC 0.03000

12.07Maintenance Grant

CRC/UERC 0.02000

Sub Total 274 30.140 274 30.14000

13Computer Aided Education in upper

primary schools under Innovation

13.01Computer Aided Education in upper primary

schoolsDistrict 0.01200 48 0.576 48 0.57600

Sub Total 48 0.576 48 0.5760014 Libraries in Schools14.01 (a) Primary School (per school) School 0.03000

14.02 (b) Upper Primary School (per school) School 0.10000

Sub TotalIV ANNUAL GRANTS15 Teachers' Grant15.01 Primary Teachers Teacher 0.0050015.02 Upper Primary Teachers Teacher 0.00500 861 4.305 861 4.30500

Sub Total 861 4.305 861 4.3050016 School Grant16.01 Primary School School 0.05000 2202 110.100 2202 110.1000016.02 Upper Primary School School 0.07000 932 65.240 932 65.24000

Sub Total 3134 175.340 3134 175.34000

Arti:SSA-AWPB-2014-15-PABMinits:Barabanki:16-06-2014 445 / 533

Page 446: U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 · 2015. 1. 6. · U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15

Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

Name of District : Barabanki -13

ActivityS. No.Physical

UnitRemarks

Outlay Recommendation for 2014-15

Spill OverDeferred laibility of

2014-15Fresh Recommended Total Recommended

17Research, Evaluation, Monitoring &

Supervision

17.01 REMS Activities School 0.00103 3134 3.224 3134 3.22367

17.02 Monitoring & Supervision School 0.00078 3134 2.457 3134 2.45727

17.03 House Hold Survey (Urban) in Million Plus Cities District 35.00000

Sub Total 6268 5.681 6268 5.6809418 Maintenance Grant

18.01 Maintenance in School having upto3 Classrooms School 0.07500 902 67.650 902 67.65000

18.01a Maintenance Grant School 0.07500 2115 158.625 2115 158.62500Sub Total 3017 226.275 3017 226.27500

VBRIDGING GENDER AND SOCIAL

CATEGORY GAPS

19 Interventions for CWSN (IE)

19.01 Provision for Inclusive Education Child 0.02000 4389 87.780 4389 87.78000

Sub Total 4389 87.780 4389 87.78000

20Innovativation Head up to Rs.50 Lakh per

district

20.01 Girls Education District 0.70000 8 5.600 8 5.60000

20.02 ECCE District20.03 Intervention for SC / ST children District

20.04 Intervention for Minority Community children District

20.05 Intervention for Urban Deprived children District 10.00000

Sub Total 8 5.600 8 5.6000021 SMC/PRI Training

21.01Residential for 6 Resource Person per Block (3

days) (@ Rs.500/-)Blocks 0.09000

21.02Non-residential (3 days training of 6 SMC

members) (@ Rs.100/-)SMC 0.01800 3032 54.576 3032 54.57600

21.02(a)Non-residential (3 days training of 3 Members of

PRI/VECs/LA) (@ Rs.100/-)VEC/ WEC 0.00900

21.03

Seminar/Orientation of SMC Women members

and President/Vice President (@ Rs. 50,000/-

per block)

Blocks 0.50000

Sub Total 3032 54.576 3032 54.57600VI SCHOOL INFRASTRUCTURE22 Civil Works22.01 Primary School (Plain) (New) School 13.1550022.02 Primary School (Hilly/Rocky) (New) School 13.2750022.03 Upper Primary (Plain) (New) School 20.65500

22.04 Upper Primary School (Hilly/Rocky) (New) School 20.77500

22.04aComposite Schools for Urban Areas (Class I-

VIII)School 41.04000

22.05 ACR in lieu of upgraded Upper Primary School Rooms

22.06 Additional class rooms for adding Class VIII Rooms

22.07 Building Less (Pry) School 9.7500022.08 Building Less (UP) School 18.5900022.09 Dilapidated Building (Pry) School 9.7500022.10 Dilapidated Building (UP) School 18.59000

22.11 Additional Class Room (Rural) ( PS+UPS) Rooms 3.45000

22.12 Additional Class Room (Urban) Rooms 3.4500022.13 Additional Class Room (Hill Area)22.14 Toilet/Urinals (PS & UPS) School 0.7000022.15 Separate Girls Toilet (Rural+Urban) School 0.7000022.16 CWSN friendly Toilets School 0.50000

22.17 Drinking Water Facility (for Urban Area Only)) School 0.15000

22.17a Drinking Water Facility (Plain PS & UPS) School 0.15000

22.17b Drinking Water Facility (Hilly/Rocky PS & UPS) School 0.15000

22.18a Boundary Wall PS (Total in Meters x .01105) 0.01749

22.18bBoundary Wall PS (For Gate) @Rs. 7000 x no. of

P.S.School 0.07800

22.18c Boundary Wall UPS (Total in Meters x .01105) 0.01749

22.18dBoundary Wall UPS (For Gate) @Rs. 7000 x no.

of UPSSchool 0.07800

22.19a Electrification in P.S./ Electrical Equipment School 0.11000

22.19b Electrification in U. P.S./ Electrical Equipment School 0.11000

22.20Office-cum-store-cum-Head Teacher's room

(Primary)Rooms

22.21Office-cum-store-cum-Head Teacher's room

(Upper Primary)Rooms

22.22Augumentation of training facility in BRC (one

time)BRC/ URC 5.00000

22.23 Child friendly Elements School 0.25000

22.24 Ramps with Handrails (Barrier Free Elements) School 0.06000

22.25 Handrails in existing Ramps School 0.01000

Arti:SSA-AWPB-2014-15-PABMinits:Barabanki:16-06-2014 446 / 533

Page 447: U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 · 2015. 1. 6. · U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15

Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

Name of District : Barabanki -13

ActivityS. No.Physical

UnitRemarks

Outlay Recommendation for 2014-15

Spill OverDeferred laibility of

2014-15Fresh Recommended Total Recommended

22.26 Whole School Develoipment School22.27 Retro-fitting and repairs School

22.28Residential Schools for specific category

of children

(a) Construction of Building including boundary

wall, Water and sanitation facilities, electric

installation (For 100 children)

Building 65.86000

(b) Construction of residential hostel Building 65.86000

(c) Refurnishing unused old buildings Building

22.29

Construction of Hostel in existing Govt UPS

including boundary wall, Water and sanitation

facilities, electric installation etc. (For 50

children)

7.00000

22.30Furniture for Govt. UPS (per child) (@ Rs.500/-

per child enrolled)Child 0.00500

22.31 Major Repairs for Primary School School 0.30000

22.32 Majr Repairs for Upper Primary School School 0.30000

22.33Others (Difference of Civil Wrks

sanctioned in pre.yr.)22.33a Others (Overhead Tank PS) School 0.1200022.33b Others (Overhead Tank UPS) School 0.12000

Sub Total (Civil WOrks)VII PROJECT MANAGEMENT COST23 Management23.01 Management up to 3.5%

(a) Project Management and MIS

(i) DPO ( Salary, Contigency, Consumables,

POL, TA & Computer etc)District 1 116.070 1 116.07030

(ii) EMIS Cell District 1 18.695 1 18.69500Sub Total (a) 1 1 1 134.765 1 134.765

(b) Training of Educational Administrators District

(c) School Mapping and Social Mapping District

Sub Total (23.01)

23.02Learning Enhancement Prog. (LEP) (P & UP) (up

to 2%)District 24.097 24.09715

23.03 Community Mobilization (up to 0.5%) District 1 60.000 1 60.00000

Sub Total (Management) 1 84.097 1 84.09715Total Management Cost 218.862 218.86245Total of SSA (Districs) 4.100 640183 15163.032 640183 15167.132

24 State Component23.01 Management23.02 REMS 0.0044923.03 SIEMAT

Sub Total

STATE SSA TOTAL 4.10000 640183 15163.032 640183 15167.13199

25

KGBV Financial Provision (give

separate costing sheets for different

Models)

Hostel

ANon Recurring One Time Grant (Only

committed liabilities) (Model-I)

25.01 Construction of Building (New)

25.02 Construction of Building KGBV sanctioned earlier

25.02(a) Additional Class Room Rooms 3.45000

25.02(b) Guard Room Rooms 1.32000

25.02(c) Boundary Wall School 5.0200025.03 Boudary Wall (Spillover only)

25.04

Boring/Handpump (Spillover only)

(minimum rates prescribed by State Drinking

Water Department subject to a ceiling of Rs.

1.00 lakhs)

25.05 Electricity /Water charges (Spillover only)

25.05(a) Solar Water Heater & Solar Light 2.97000

25.06Furniture/Equipment (including Kitchen

equipment)3.00000

25.07 TLM and equipment including library books 3.50000

25.08 Bedding (New) 0.75000

25.09 Replacement of Bedding (once in 3 Year) 1 0.75000 14 10.500 15 10.50000

Subtotal Non Recurring 10.500 10.50000

B Recurring Cost Per Annum (Model-I)

25.10Maintenance per girl student per month @ Rs.

1500/-18.00000 15 270.000 15 270.00000

25.11 Stipend for girl student per month @ Rs. 100/- 1.20000 15 18.000 15 18.00000

25.12Supplementary TLM, stationery and other

educational material @ Rs.1000/- per annum1.00000 15 15.000 15 15.00000

25.13 Salaries

Arti:SSA-AWPB-2014-15-PABMinits:Barabanki:16-06-2014 447 / 533

Page 448: U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 · 2015. 1. 6. · U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15

Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

Name of District : Barabanki -13

ActivityS. No.Physical

UnitRemarks

Outlay Recommendation for 2014-15

Spill OverDeferred laibility of

2014-15Fresh Recommended Total Recommended

25.13.1 Additional Salaries:

(a) 1 Warden @ Rs. 25,000/- per month 3.00000 15 45.00000 15 45.00000

(b)4 Full time teachers as per RTE norms @ Rs.

20,000/- per month per teacher 9.60000 15 144.00000 15 144.00000

(c)

1 Urdu Teachers (only for blocks with muslim

population above 20% and select urban areas), if

required @ Rs. 12,000/- per month per teacher 1.44000 15 21.60000 15 21.60000

(d)3 part time teachers @ Rs. 5,000/- per month per

teacher 1.80000 15 27.00000 15 27.00000

(e)1 Full time Accountant @ Rs. 10,000/- per month

1.20000 15 18.00000 15 18.00000

(f)

2 Support Staff – (Accountant/ Assistant, Peon,

Chowkidar) @ Rs. 5,000/- per month per staff 1.20000 15 18.00000 15 18.00000

(g) 1 Head cook @ Rs. 6,000/- per month 0.72000 15 10.80000 15 10.80000

(h)2 Asstt. Cooks @ Rs. 4,500/- per month per cook

1.08000 15 16.20000 15 16.20000

25.14Specific skill training @ Rs.1000/- per child per

annum1.00000 15 15.000 15 15.00000

25.15Electricity/water charges @ Rs.1000/- per child

per annum1.00000 15 15.000 15 15.00000

25.16Medical care/contingencies @ Rs. 1250 per child

per annum1.25000 15 18.750 15 18.75000

25.17 Maintenance @ Rs.750/- per child per annum 0.75000 15 11.250 15 11.25000

25.18

Miscellaneous (Educational Tour/ Exposure Visit

/ Sports Material etc.) @ Rs.750/- per child per

annum

0.75000 15 11.250 15 11.25000

25.19Preparatory camps @ Rs.200/- per child per

annum0.20000 15 3.000 15 3.00000

25.20PTAs/school functions @ Rs.200/- per child per

annum0.20000 15 3.000 15 3.00000

25.21 Provision of Rent @ Rs.6000/- per annum 6.00000

25.21a Provision of Rent (6 months) 3.6000025.21b Provision of Rent (3 months) 1.8000025.21c Rent (Previous Year (2007-2012)

25.22 Capacity building 0.50000 15 7.500 15 7.50000

25.22(a)Physical/ Self Defence Training @ Rs.200/- per

child per annum0.20000 15 3.000 15 3.00000

Subtotal Recurring 15 691.350 15 691.35000

Subtotal (Model-I) 15 701.850 15 701.85000

CNon Recurring One Time Grant (Only

committed liabilities) (Model-II)

25.23 Construction of Building (New)

25.24 Construction of Building KGBV sanctioned earlier

25.24(a) Additional Class Room Rooms 3.45000

25.24(b) Guard Room Rooms 1.32000

25.24(c) Boundary Wall School 5.0200025.25 Boudary Wall (Spillover only)25.26 Boring/Handpump (Spillover only)

25.27 Electricity /Water charges (Spillover only)

25.27(a) Solar Water Heater & Solar Light 2.97000

25.28Furniture/Equipment (including Kitchen

equipment)2.00000

25.29 TLM and equipment including library books 3.00000

25.30 Bedding (New) 0.37500

25.31 Replacement of Bedding (once in 3 Year) 0.37500

Subtotal Non Recurring

D Recurring Cost Per Annum (Model-II)

25.32Maintenance per girl student per month @ Rs.

1500/-9.00000

25.33 Stipend for girl student per month @ Rs. 100/- 0.60000

25.34Supplementary TLM, stationery and other

educational material @ Rs.1000/- per annum0.50000

25.35 Salaries(a) 1 Warden @ Rs. 25,000/- per month 3.00000

(b)3 Full time teachers as per RTE norms @ Rs.

20,000/- per month per teacher 7.20000

(c) 3 part time teachers @ Rs. 5,000/- per month per

teacher 1.80000

(d)1 Full time Accountant @ Rs. 10,000/- per month

1.20000

(e)

2 Support Staff – (Accountant/ Assistant, Peon,

Chowkidar) @ Rs. 5,000/- per month per staff 1.20000

Arti:SSA-AWPB-2014-15-PABMinits:Barabanki:16-06-2014 448 / 533

Page 449: U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 · 2015. 1. 6. · U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15

Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

Name of District : Barabanki -13

ActivityS. No.Physical

UnitRemarks

Outlay Recommendation for 2014-15

Spill OverDeferred laibility of

2014-15Fresh Recommended Total Recommended

(f) 1 Head cook @ Rs. 6,000/- per month 0.72000

(g)1 Asstt. Cooks @ Rs. 4,500/- per month per cook

0.54000

25.36Specific skill training @ Rs.1000/- per child per

annum0.50000

25.37Electricity/water charges @ Rs.1000/- per child

per annum0.50000

25.38Medical care/contingencies @ Rs. 1250 per child

per annum0.62500

25.39 Maintenance @ Rs.750/- per child per annum 0.37500

25.40

Miscellaneous (Educational Tour/ Exposure Visit

/ Sports Material etc.) @ Rs.750/- per child per

annum

0.37500

25.41Preparatory camps @ Rs.300/- per child per

annum0.15000

25.42PTAs/school functions @ Rs.300/- per child per

annum0.15000

25.43 Provision of Rent @ Rs.10000/- per annum 5.00000

25.43a Provision of Rent (6 months) 3.6000025.43b Provision of Rent (3 months) 1.8000025.43c Rent (Previous Year (2007-2012)25.44 Capacity building 0.25000

25.44(a)Physical/ Self Defence Training @ Rs.200/- per

child per annum0.10000

Subtotal Recurring

Subtotal (Model-II) Total (KGBV) 15 701.850 15 701.850

DISTRICT GRAND TOTAL (SSA+KGBV) 4.100 640198 15864.882 640198 15868.982

Arti:SSA-AWPB-2014-15-PABMinits:Barabanki:16-06-2014 449 / 533

Page 450: U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 · 2015. 1. 6. · U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15

Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

I ACCESS

1 Opening of New Schools

1.01 Upgradation of EGS to PSCentres /

School1.02 New PS School

1.03 Upgradation of PS to UPS / New UPS School

1.04 Composite Schools (for Urban Areas) School

1.05Residential Schools for specific category children

(For 100 children)

1.06Residential Hostel (for specific category of

children) (For 50 children)

1.07 Integration of Class V with Primary Schools

1.08Integration of Class VIII with Upper Primary

Schools

2Residential Schools for specific category

of children (For 100 Children)

Total - Residential Schools (For 100

children)

3Residential Hostel for specific category of

children (For 50 Children)

Total - Residential Schools (For 50

children)4 Transport/Escort Facility

4.01

Children in remote habitations with sparse

populations where opening of schools is

unviable

Child 0.03000

4.02

Urban deprived children/children without adult

protection in urban areas where schools are not

opened because availability of land is a problem

Child 0.03000

Sub Total

5Special Training for mainstreaming of Out-

of-School Children

5.03 Non-Residential (Fresh)(a) 12 months Child 0.06000(b) 9 months 0.04500(c) 6 months

(i)Special Training (by Special Instructors-NRBC)-

(1-5) Child 0.03000 20 0.600 20 0.60000

(ii) Special Training (by Special Instructors-NRBC)-

(6-8) Child 0.03000 43 1.290 43 1.29000

(d) 3 months Child 0.01500Sub Total 63 1.890 63 1.89000

Total (Special Training) 63 1.890 63 1.8905(B) House Hold Survey (HHS)

5(B).01 House Hold Survey through SMCHouse

Hold0.00001

Sub TotalII RETENTION6 Free Text Book

6.01Free Text Book (PS) for Parishadiya & Aided

Primary Schools (Workbooks not included)Child 0.00120 113398 136.078 113398 136.07760

6.01a

Free Text Book (PS) for 25% children of Class-1

in Private Recognised Primary Schools of other

Boards (Workbooks not included)

Child 0.00150

6.02 Free Brail Books (PS) 0.00150 104 0.156 104 0.15600

6.03 Free Large Print Books (PS) 0.00150

6.04Free Text Book (UPS) (Workbooks not included)

(Including KGBV Girls)Child 0.00200 56907 113.814 56907 113.81400

6.05 Free Brail Books (UPS) 0.00250 15 0.038 15 0.03750

6.06 Free Large Print Books (PS) 0.00250Sub Total 170424 250.085 170424 250.085

7 Provision of 2 set of Uniforms

7.01 All Girls (Including KGBV Girls) Child 0.00400 132447 529.788 132447 529.78800

7.02 SC Boys Child 0.00400 37858 151.432 37858 151.43200

7.03 ST Boys Child 0.00400

7.04 BPL Boys Child 0.00400 27036 108.144 27036 108.14400

7.05

Free Uniform for 25% children of Class-1 in

Private Recognised Primary Schools of other

Boards

Child0.00400

Sub Total 197341 789.364 197341 789.3647(A) Fee Reimbursement

7(A).01

Fee Reimbursement for Admission of children of

Disadvantaged Group & Weaker Section upto

25% of seats in Class-1 of Private Unaided

Recognised Schools

Child 0.05400

Sub Total

8 Teaching Learning Equipment (TLE)

8.01 TLE - New Primary School 2.00000 0.20000 2.000008.02 TLE - New Upper Primary School 1.00000 0.50000 1.00000

Name of District : Banda -12

ActivityS. No.Physical

UnitRemarks

Outlay Recommendation for 2014-15

Spill OverDeferred laibility of

2014-15Fresh Recommended Total Recommended

Arti:SSA-AWPB-2014-15-PABMinits:Banda:16-06-2014 450 / 533

Page 451: U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 · 2015. 1. 6. · U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15

Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

Name of District : Banda -12

ActivityS. No.Physical

UnitRemarks

Outlay Recommendation for 2014-15

Spill OverDeferred laibility of

2014-15Fresh Recommended Total Recommended

Sub Total 3.00000 3.00000III ENHANCING QUALITY9 New Teachers Salary

9.01 Primary Teachers (Regular) (Asstt. Teacher) Teacher 0.91500

9.01aHead Teacher for Primary (if the number of

children exceeds 150 in a school)Teacher

9.02 Primary Teachers (Contract) (S.M.) Teacher

9.03Subject specific Upper Primary Teachers

(Regular) (a) Science and Mathematics Teacher 1.26000(b) Social Studies Teacher 1.26000(c) Languages Teacher 1.26000

Sub Total (9.01 to 9.05)Add.Teacher against PTR

Sub Total (9.06 to 9.12)

Total (New Teacher's Salary-9.01 to 9.12)

Teachers Salary (Recurring-sanctioned

earlier)Primary teachers

9.13 Primary Teachers ( Regular)-Existing, in position Teacher 3.66000 612 2239.920 612 2239.92000

9.14Primary Teachers (Contract)-Existing, in

positionTeacher 0.55000

9.14(a) Primary Teachers (Contract)-under Training Teacher 0.38500 983 378.455 983 378.45500

9.14(b)Primary Teacher (Para Teachers Equal to

9.14(a) upgraded as Teachers)0.38500 621 239.085 621 239.08500

9.14(c) Primary Teachers (Para)- Vacant Teacher9.15 Primary Teachers (Vacant) Teacher 0.30500

9.16Head Teacher for Primary (if the number of

children exceeds 150)Teacher 5.04000 238 1199.520 238 1199.52000

9.16(b)Head Teacher for Primary (if the number of

children exceeds 150) VacantTeacher 0.42000

Additional teachers

9.17Additional Teachers - PS (Special BTC-

Regular) in positionTeacher 0.30500

9.18Additional Teachers - PS (Special BTC Under

Training)Teacher 0.87600

9.19 Additional Teachers - PS (Vacant) Teacher

9.20Others in position (Para Teachers upgraded

as Teachers)Teacher

Upper Primary teachers

9.21 UP Teachers (Regular)-Existing Teacher 5.04000 591 2978.640 591 2978.64000

9.22 UP Teachers (Contract)-Existing9.23 UP Teachers (Vacant) Teacher 1.26000

9.24Head Teacher for Upper Primary (if the number

of children exceeds 100)-ExistingTeacher 5.34000 303 1618.020 303 1618.02000

9.24a Head Teacher for Upper Primary (Vacant) Teacher 1.33500

9.25Subject specific Upper Primary Teachers

(Regular)(a) Science and Mathematics(b) Social Studies(c) Languages

9.32 Part Time Instructors in position(a) Art Education 0.77000 273 210.210 273 210.21000(b) Health and Physical Education 0.77000 262 201.740 262 201.74000(c) Work Education 0.77000 212 163.240 212 163.24000

9.32(A) Part Time Instructors Vacant(a) Art Education 0.42000(b) Health and Physical Education 0.42000(c) Work Education 0.42000

9.33

Others-Incentive to Teachers in Schools

Located in Naxal Affected Areas (@

Rs.1500/- per teachers per month)

Sub Total (9.13 to 9.33) 4095 9228.830 4095 9228.83TOTAL

(New Teachers Salary +Teachers Salary

Recurring)

4095 9228.830 4095 9228.83000

10 Teachers Training(a) Teachers

10.01

Refresher In-service Teachers' Training at BRC

level and above - 10 days (@ Rs.200/- per

head per day)

Teacher

(Target &

Ach.-13-14

in

Mandays)

0.00600

10.01(a)Continuous and Comprehensive Evauation [PS +

UPS)Teacher 0.01300 1298 16.874 1298 16.87400

10.01(b) Eary Reading and Numeracy Skills [PS] Teacher 0.00500 1298 6.490 1298 6.49000

10.01(c) Science [UPS] Teacher 0.00800 690 5.520 690 5.52000Recommended as

proposed

10.01(d) CWSN Teacher 0.00400

Arti:SSA-AWPB-2014-15-PABMinits:Banda:16-06-2014 451 / 533

Page 452: U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 · 2015. 1. 6. · U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15

Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

Name of District : Banda -12

ActivityS. No.Physical

UnitRemarks

Outlay Recommendation for 2014-15

Spill OverDeferred laibility of

2014-15Fresh Recommended Total Recommended

10.02

One day monthly cluster level meetings and

peer group training sessions for 10 months for

all teachers each year at CRC level - 10 days (@

Rs.100/- per head per day)

Teacher 0.01000

10.03(a)

Induction Training for Newly Recruited Teachers

for 6 Months (Special BTC)- @Rs.2000/- per

head per year

Teacher 0.02000

10.03(b)5 Days Training for Part Time Instructors @ Rs.

200/- per head per day) Teacher 0.01000

10.04

Training of untrained Teachers to acquire

professional qualifications over a two year

period.

Teacher 0.04700 1004 47.188 1004 47.18800

(b) Head Teachers

10.05Refresher Residencial In-service for 10 days at

BRC level and above

Head

Teacher(c) Resource Persons

10.06

Refresher Training for all Resource

Persons,Master Trainers, BRC & CRC faculty

and Coordinators for 5 days each year (@

Rs.200/- per head per day)

Resource

Person 0.00300 108 0.324 108 0.32400

Sub Total 4398 76.396 4398 76.396

11Academic Support through Block Resource

Centre (BRC)/ URC

11.01 Salary of Faculty and Staff

(a) 5 RPs at BRC for subject specific training in

positionRP 45 45

(b) 2 RPs for CWSN in position RP(b-i) 1 CWSN Resource Person RP 1.10000 18 19.800 18 19.80000

(b-ii) 1 Physiotherapist (Resource person for IE) RP

(c) 1 MIS Coordinator in position RP 1.86000

(d) 1 Datra Entry Operator in position RP 1.74000 9 15.660 9 15.66000

(e) 1 Accountant-cum-support staff in position RP 1.80000 9 16.200 9 16.20000

11.02 Furniture Grant BRC/ URC 1.00000

11.03Replacement of furniture, computer, TLE etc (

Once in 5 years)BRC/ URC 1.00000

11.04 Contingency Grant BRC/ URC 0.50000 9 4.500 9 4.50000

11.05 Meeting, TA BRC/ URC 0.30000 9 2.700 9 2.70000

11.06 TLM Grant BRC/ URC 0.10000

11.07 Maintenance Grant BRC/ URC 0.10000

Sub Total 9 58.860 9 58.86000

12Academic Support through Cluster

Resource Centres (CRC/UERC)

12.01Salary of Cluster Coordinator (on an average of

one Resource Person per 18 schools in a block)RP

12.02 Furniture GrantCRC/

UERC0.10000

12.03Replacement of furniture, computer, TLE etc.

once in 5 years

CRC/

UERC0.10000

12.04 Contingency Grant CRC/UERC 0.10000 72 7.200 72 7.20000

12.05 Meeting, TA CRC/UERC 0.12000 72 8.640 72 8.64000

12.06 TLM Grant CRC/UERC 0.03000

12.07Maintenance Grant

CRC/UERC 0.02000

Sub Total 144 15.840 144 15.84000

13Computer Aided Education in upper

primary schools under Innovation

13.01Computer Aided Education in upper primary

schoolsDistrict 0.01200 48 0.576 48 0.57600

Sub Total 48 0.576 48 0.5760014 Libraries in Schools14.01 (a) Primary School (per school) School 0.03000

14.02 (b) Upper Primary School (per school) School 0.10000

Sub TotalIV ANNUAL GRANTS15 Teachers' Grant15.01 Primary Teachers Teacher 0.0050015.02 Upper Primary Teachers Teacher 0.00500 690 3.450 690 3.45000

Sub Total 690 3.450 690 3.4500016 School Grant16.01 Primary School School 0.05000 1395 69.750 1395 69.7500016.02 Upper Primary School School 0.07000 690 48.300 690 48.30000

Sub Total 2085 118.050 2085 118.05000

Arti:SSA-AWPB-2014-15-PABMinits:Banda:16-06-2014 452 / 533

Page 453: U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 · 2015. 1. 6. · U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15

Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

Name of District : Banda -12

ActivityS. No.Physical

UnitRemarks

Outlay Recommendation for 2014-15

Spill OverDeferred laibility of

2014-15Fresh Recommended Total Recommended

17Research, Evaluation, Monitoring &

Supervision

17.01 REMS Activities School 0.00103 2085 2.145 2085 2.14466

17.02 Monitoring & Supervision School 0.00078 2085 1.635 2085 1.63478

17.03 House Hold Survey (Urban) in Million Plus Cities District 35.00000

Sub Total 4170 3.779 4170 3.7794418 Maintenance Grant

18.01 Maintenance in School having upto3 Classrooms School 0.07500 675 50.625 675 50.62500

18.01a Maintenance Grant School 0.07500 1358 101.850 1358 101.85000Sub Total 2033 152.475 2033 152.47500

VBRIDGING GENDER AND SOCIAL

CATEGORY GAPS

19 Interventions for CWSN (IE)

19.01 Provision for Inclusive Education Child 0.02000 4455 89.100 4455 89.10000

Sub Total 4455 89.100 4455 89.10000

20Innovativation Head up to Rs.50 Lakh per

district

20.01 Girls Education District 0.70000 8 5.600 8 5.60000

20.02 ECCE District20.03 Intervention for SC / ST children District

20.04 Intervention for Minority Community children District

20.05 Intervention for Urban Deprived children District 10.00000

Sub Total 8 5.600 8 5.6000021 SMC/PRI Training

21.01Residential for 6 Resource Person per Block (3

days) (@ Rs.500/-)Blocks 0.09000

21.02Non-residential (3 days training of 6 SMC

members) (@ Rs.100/-)SMC 0.01800 2041 36.738 2041 36.73800

21.02(a)Non-residential (3 days training of 3 Members of

PRI/VECs/LA) (@ Rs.100/-)VEC/ WEC 0.00900

21.03

Seminar/Orientation of SMC Women members

and President/Vice President (@ Rs. 50,000/-

per block)

Blocks 0.50000

Sub Total 2041 36.738 2041 36.73800VI SCHOOL INFRASTRUCTURE22 Civil Works22.01 Primary School (Plain) (New) School 13.1550022.02 Primary School (Hilly/Rocky) (New) School 13.2750022.03 Upper Primary (Plain) (New) School 20.65500

22.04 Upper Primary School (Hilly/Rocky) (New) School 20.77500

22.04aComposite Schools for Urban Areas (Class I-

VIII)School 41.04000

22.05 ACR in lieu of upgraded Upper Primary School Rooms

22.06 Additional class rooms for adding Class VIII Rooms

22.07 Building Less (Pry) School 9.7500022.08 Building Less (UP) School 18.5900022.09 Dilapidated Building (Pry) School 9.7500022.10 Dilapidated Building (UP) School 18.59000

22.11 Additional Class Room (Rural) ( PS+UPS) Rooms 3.45000 82 282.900 82 282.90000

22.12 Additional Class Room (Urban) Rooms 3.4500022.13 Additional Class Room (Hill Area)22.14 Toilet/Urinals (PS & UPS) School 0.7000022.15 Separate Girls Toilet (Rural+Urban) School 0.7000022.16 CWSN friendly Toilets School 0.50000

22.17 Drinking Water Facility (for Urban Area Only)) School 0.15000

22.17a Drinking Water Facility (Plain PS & UPS) School 0.15000

22.17b Drinking Water Facility (Hilly/Rocky PS & UPS) School 0.15000

22.18a Boundary Wall PS (Total in Meters x .01105) 0.01749

22.18bBoundary Wall PS (For Gate) @Rs. 7000 x no. of

P.S.School 0.07800

22.18c Boundary Wall UPS (Total in Meters x .01105) 0.01749

22.18dBoundary Wall UPS (For Gate) @Rs. 7000 x no.

of UPSSchool 0.07800

22.19a Electrification in P.S./ Electrical Equipment School 0.11000

22.19b Electrification in U. P.S./ Electrical Equipment School 0.11000

22.20Office-cum-store-cum-Head Teacher's room

(Primary)Rooms

22.21Office-cum-store-cum-Head Teacher's room

(Upper Primary)Rooms

22.22Augumentation of training facility in BRC (one

time)BRC/ URC 5.00000

22.23 Child friendly Elements School 0.25000

22.24 Ramps with Handrails (Barrier Free Elements) School 0.06000

22.25 Handrails in existing Ramps School 0.01000

Arti:SSA-AWPB-2014-15-PABMinits:Banda:16-06-2014 453 / 533

Page 454: U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 · 2015. 1. 6. · U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15

Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

Name of District : Banda -12

ActivityS. No.Physical

UnitRemarks

Outlay Recommendation for 2014-15

Spill OverDeferred laibility of

2014-15Fresh Recommended Total Recommended

22.26 Whole School Develoipment School22.27 Retro-fitting and repairs School

22.28Residential Schools for specific category

of children

(a) Construction of Building including boundary

wall, Water and sanitation facilities, electric

installation (For 100 children)

Building 65.86000

(b) Construction of residential hostel Building 65.86000

(c) Refurnishing unused old buildings Building

22.29

Construction of Hostel in existing Govt UPS

including boundary wall, Water and sanitation

facilities, electric installation etc. (For 50

children)

7.00000

22.30Furniture for Govt. UPS (per child) (@ Rs.500/-

per child enrolled)Child 0.00500

22.31 Major Repairs for Primary School School 0.30000

22.32 Majr Repairs for Upper Primary School School 0.30000

22.33Others (Difference of Civil Wrks

sanctioned in pre.yr.)22.33a Others (Overhead Tank PS) School 0.1200022.33b Others (Overhead Tank UPS) School 0.12000

Sub Total (Civil WOrks) 82 282.900 82 282.90VII PROJECT MANAGEMENT COST23 Management23.01 Management up to 3.5%

(a) Project Management and MIS

(i) DPO ( Salary, Contigency, Consumables,

POL, TA & Computer etc)District 1 122.113 1 122.11330

(ii) EMIS Cell District 1 12.594 1 12.59400Sub Total (a) 1 1 1 134.707 1 134.707

(b) Training of Educational Administrators District

(c) School Mapping and Social Mapping District

Sub Total (23.01)

23.02Learning Enhancement Prog. (LEP) (P & UP) (up

to 2%)District 15.490 15.49025

23.03 Community Mobilization (up to 0.5%) District 1 45.850 1 45.85000

Sub Total (Management) 1 61.340 1 61.34025Total Management Cost 196.048 196.04755Total of SSA (Districs) 3.000 392086 11309.981 392086 11312.981

24 State Component23.01 Management23.02 REMS 0.0044923.03 SIEMAT

Sub Total

STATE SSA TOTAL 3.00000 392086 11309.981 392086 11312.98109

25

KGBV Financial Provision (give

separate costing sheets for different

Models)

Hostel

ANon Recurring One Time Grant (Only

committed liabilities) (Model-I)

25.01 Construction of Building (New)

25.02 Construction of Building KGBV sanctioned earlier 14.03000 14.03000

25.02(a) Additional Class Room Rooms 3.45000

25.02(b) Guard Room Rooms 1.32000

25.02(c) Boundary Wall School 5.0200025.03 Boudary Wall (Spillover only) 3.72600 3.72600

25.04

Boring/Handpump (Spillover only)

(minimum rates prescribed by State Drinking

Water Department subject to a ceiling of Rs.

1.00 lakhs)

1.17000 1.17000

25.05 Electricity /Water charges (Spillover only)

25.05(a) Solar Water Heater & Solar Light 2.97000

25.06Furniture/Equipment (including Kitchen

equipment)3.00000

25.07 TLM and equipment including library books 3.50000

25.08 Bedding (New) 0.75000

25.09 Replacement of Bedding (once in 3 Year) 0.75000 5 3.750 5 3.75000

Subtotal Non Recurring 18.92600 3.750 22.67600

B Recurring Cost Per Annum (Model-I)

25.10Maintenance per girl student per month @ Rs.

1500/-18.00000 8 144.000 8 144.00000

25.11 Stipend for girl student per month @ Rs. 100/- 1.20000 8 9.600 8 9.60000

25.12Supplementary TLM, stationery and other

educational material @ Rs.1000/- per annum1.00000 8 8.000 8 8.00000

25.13 Salaries

Arti:SSA-AWPB-2014-15-PABMinits:Banda:16-06-2014 454 / 533

Page 455: U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 · 2015. 1. 6. · U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15

Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

Name of District : Banda -12

ActivityS. No.Physical

UnitRemarks

Outlay Recommendation for 2014-15

Spill OverDeferred laibility of

2014-15Fresh Recommended Total Recommended

25.13.1 Additional Salaries:

(a) 1 Warden @ Rs. 25,000/- per month 3.00000 8 24.00000 8 24.00000

(b)4 Full time teachers as per RTE norms @ Rs.

20,000/- per month per teacher 9.60000 8 76.80000 8 76.80000

(c)

1 Urdu Teachers (only for blocks with muslim

population above 20% and select urban areas), if

required @ Rs. 12,000/- per month per teacher 1.44000 8 11.52000 8 11.52000

(d)3 part time teachers @ Rs. 5,000/- per month per

teacher 1.80000 8 14.40000 8 14.40000

(e)1 Full time Accountant @ Rs. 10,000/- per month

1.20000 8 9.60000 8 9.60000

(f)

2 Support Staff – (Accountant/ Assistant, Peon,

Chowkidar) @ Rs. 5,000/- per month per staff 1.20000 8 9.60000 8 9.60000

(g) 1 Head cook @ Rs. 6,000/- per month 0.72000 8 5.76000 8 5.76000

(h)2 Asstt. Cooks @ Rs. 4,500/- per month per cook

1.08000 8 8.64000 8 8.64000

25.14Specific skill training @ Rs.1000/- per child per

annum1.00000 8 8.000 8 8.00000

25.15Electricity/water charges @ Rs.1000/- per child

per annum1.00000 8 8.000 8 8.00000

25.16Medical care/contingencies @ Rs. 1250 per child

per annum1.25000 8 10.000 8 10.00000

25.17 Maintenance @ Rs.750/- per child per annum 0.75000 8 6.000 8 6.00000

25.18

Miscellaneous (Educational Tour/ Exposure Visit

/ Sports Material etc.) @ Rs.750/- per child per

annum

0.75000 8 6.000 8 6.00000

25.19Preparatory camps @ Rs.200/- per child per

annum0.20000 8 1.600 8 1.60000

25.20PTAs/school functions @ Rs.200/- per child per

annum0.20000 8 1.600 8 1.60000

25.21 Provision of Rent @ Rs.6000/- per annum 6.00000

25.21a Provision of Rent (6 months) 3.6000025.21b Provision of Rent (3 months) 1.8000025.21c Rent (Previous Year (2007-2012)

25.22 Capacity building 0.50000 8 4.000 8 4.00000

25.22(a)Physical/ Self Defence Training @ Rs.200/- per

child per annum0.20000 8 1.600 8 1.60000

Subtotal Recurring 8 368.720 8 368.72000

Subtotal (Model-I) 18.92600 8 372.470 8 391.39600

CNon Recurring One Time Grant (Only

committed liabilities) (Model-II)

25.23 Construction of Building (New)

25.24 Construction of Building KGBV sanctioned earlier

25.24(a) Additional Class Room Rooms 3.45000

25.24(b) Guard Room Rooms 1.32000

25.24(c) Boundary Wall School 5.0200025.25 Boudary Wall (Spillover only)25.26 Boring/Handpump (Spillover only)

25.27 Electricity /Water charges (Spillover only)

25.27(a) Solar Water Heater & Solar Light 2.97000

25.28Furniture/Equipment (including Kitchen

equipment)2.00000

25.29 TLM and equipment including library books 3.00000

25.30 Bedding (New) 0.37500

25.31 Replacement of Bedding (once in 3 Year) 0.37500

Subtotal Non Recurring

D Recurring Cost Per Annum (Model-II)

25.32Maintenance per girl student per month @ Rs.

1500/-9.00000

25.33 Stipend for girl student per month @ Rs. 100/- 0.60000

25.34Supplementary TLM, stationery and other

educational material @ Rs.1000/- per annum0.50000

25.35 Salaries(a) 1 Warden @ Rs. 25,000/- per month 3.00000

(b)3 Full time teachers as per RTE norms @ Rs.

20,000/- per month per teacher 7.20000

(c) 3 part time teachers @ Rs. 5,000/- per month per

teacher 1.80000

(d)1 Full time Accountant @ Rs. 10,000/- per month

1.20000

(e)

2 Support Staff – (Accountant/ Assistant, Peon,

Chowkidar) @ Rs. 5,000/- per month per staff 1.20000

Arti:SSA-AWPB-2014-15-PABMinits:Banda:16-06-2014 455 / 533

Page 456: U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 · 2015. 1. 6. · U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15

Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

Name of District : Banda -12

ActivityS. No.Physical

UnitRemarks

Outlay Recommendation for 2014-15

Spill OverDeferred laibility of

2014-15Fresh Recommended Total Recommended

(f) 1 Head cook @ Rs. 6,000/- per month 0.72000

(g)1 Asstt. Cooks @ Rs. 4,500/- per month per cook

0.54000

25.36Specific skill training @ Rs.1000/- per child per

annum0.50000

25.37Electricity/water charges @ Rs.1000/- per child

per annum0.50000

25.38Medical care/contingencies @ Rs. 1250 per child

per annum0.62500

25.39 Maintenance @ Rs.750/- per child per annum 0.37500

25.40

Miscellaneous (Educational Tour/ Exposure Visit

/ Sports Material etc.) @ Rs.750/- per child per

annum

0.37500

25.41Preparatory camps @ Rs.300/- per child per

annum0.15000

25.42PTAs/school functions @ Rs.300/- per child per

annum0.15000

25.43 Provision of Rent @ Rs.10000/- per annum 5.00000

25.43a Provision of Rent (6 months) 3.6000025.43b Provision of Rent (3 months) 1.8000025.43c Rent (Previous Year (2007-2012)25.44 Capacity building 0.25000

25.44(a)Physical/ Self Defence Training @ Rs.200/- per

child per annum0.10000

Subtotal Recurring

Subtotal (Model-II) Total (KGBV) 18.926 8 372.470 8 391.396

DISTRICT GRAND TOTAL (SSA+KGBV) 18.926 3.000 392094 11682.451 392094 11704.377

Arti:SSA-AWPB-2014-15-PABMinits:Banda:16-06-2014 456 / 533

Page 457: U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 · 2015. 1. 6. · U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15

Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

I ACCESS

1 Opening of New Schools

1.01 Upgradation of EGS to PSCentres /

School1.02 New PS School

1.03 Upgradation of PS to UPS / New UPS School

1.04 Composite Schools (for Urban Areas) School

1.05Residential Schools for specific category children

(For 100 children)

1.06Residential Hostel (for specific category of

children) (For 50 children)

1.07 Integration of Class V with Primary Schools

1.08Integration of Class VIII with Upper Primary

Schools

2Residential Schools for specific category

of children (For 100 Children)

Total - Residential Schools (For 100

children)

3Residential Hostel for specific category of

children (For 50 Children)

Total - Residential Schools (For 50

children)4 Transport/Escort Facility

4.01

Children in remote habitations with sparse

populations where opening of schools is

unviable

Child 0.03000

4.02

Urban deprived children/children without adult

protection in urban areas where schools are not

opened because availability of land is a problem

Child 0.03000

Sub Total

5Special Training for mainstreaming of Out-

of-School Children

5.03 Non-Residential (Fresh)(a) 12 months Child 0.06000(b) 9 months 0.04500(c) 6 months

(i)Special Training (by Special Instructors-NRBC)-

(1-5) Child 0.03000 752 22.560 752 22.56000

(ii) Special Training (by Special Instructors-NRBC)-

(6-8) Child 0.03000 547 16.410 547 16.41000

(d) 3 months Child 0.01500Sub Total 1299 38.970 1299 38.97000

Total (Special Training) 1299 38.970 1299 38.9705(B) House Hold Survey (HHS)

5(B).01 House Hold Survey through SMCHouse

Hold0.00001

Sub TotalII RETENTION6 Free Text Book

6.01Free Text Book (PS) for Parishadiya & Aided

Primary Schools (Workbooks not included)Child 0.00120 131456 157.747 131456 157.74720

6.01a

Free Text Book (PS) for 25% children of Class-1

in Private Recognised Primary Schools of other

Boards (Workbooks not included)

Child 0.00150

6.02 Free Brail Books (PS) 0.00150 20 0.030 20 0.03000

6.03 Free Large Print Books (PS) 0.00150

6.04Free Text Book (UPS) (Workbooks not included)

(Including KGBV Girls)Child 0.00200 33435 66.870 33435 66.87000

6.05 Free Brail Books (UPS) 0.00250

6.06 Free Large Print Books (PS) 0.00250Sub Total 164911 224.647 164911 224.647

7 Provision of 2 set of Uniforms

7.01 All Girls (Including KGBV Girls) Child 0.00400 134919 539.676 134919 539.67600

7.02 SC Boys Child 0.00400 27438 109.752 27438 109.75200

7.03 ST Boys Child 0.00400 2178 8.712 2178 8.71200

7.04 BPL Boys Child 0.00400 79158 316.632 79158 316.63200

7.05

Free Uniform for 25% children of Class-1 in

Private Recognised Primary Schools of other

Boards

Child0.00400

Sub Total 243693 974.772 243693 974.7727(A) Fee Reimbursement

7(A).01

Fee Reimbursement for Admission of children of

Disadvantaged Group & Weaker Section upto

25% of seats in Class-1 of Private Unaided

Recognised Schools

Child 0.05400

Sub Total

8 Teaching Learning Equipment (TLE)

8.01 TLE - New Primary School 31.20000 0.20000 31.200008.02 TLE - New Upper Primary School 0.50000 0.50000 0.50000

Name of District : Balrampur -11

ActivityS. No.Physical

UnitRemarks

Outlay Recommendation for 2014-15

Spill OverDeferred laibility of

2014-15Fresh Recommended Total Recommended

Arti:SSA-AWPB-2014-15-PABMinits:Balrampur:16-06-2014 457 / 533

Page 458: U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 · 2015. 1. 6. · U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15

Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

Name of District : Balrampur -11

ActivityS. No.Physical

UnitRemarks

Outlay Recommendation for 2014-15

Spill OverDeferred laibility of

2014-15Fresh Recommended Total Recommended

Sub Total 31.70000 31.70000III ENHANCING QUALITY9 New Teachers Salary

9.01 Primary Teachers (Regular) (Asstt. Teacher) Teacher 0.91500

9.01aHead Teacher for Primary (if the number of

children exceeds 150 in a school)Teacher

9.02 Primary Teachers (Contract) (S.M.) Teacher

9.03Subject specific Upper Primary Teachers

(Regular) (a) Science and Mathematics Teacher 1.26000(b) Social Studies Teacher 1.26000(c) Languages Teacher 1.26000

Sub Total (9.01 to 9.05)Add.Teacher against PTR

Sub Total (9.06 to 9.12)

Total (New Teacher's Salary-9.01 to 9.12)

Teachers Salary (Recurring-sanctioned

earlier)Primary teachers

9.13 Primary Teachers ( Regular)-Existing, in position Teacher 3.66000 417 1526.220 417 1526.22000

9.14Primary Teachers (Contract)-Existing, in

positionTeacher 0.55000

9.14(a) Primary Teachers (Contract)-under Training Teacher 0.38500 756 291.060 756 291.06000

9.14(b)Primary Teacher (Para Teachers Equal to

9.14(a) upgraded as Teachers)0.38500 696 267.960 696 267.96000

9.14(c) Primary Teachers (Para)- Vacant Teacher9.15 Primary Teachers (Vacant) Teacher 0.30500

9.16Head Teacher for Primary (if the number of

children exceeds 150)Teacher 5.04000 169 851.760 169 851.76000

9.16(b)Head Teacher for Primary (if the number of

children exceeds 150) VacantTeacher 0.42000

Additional teachers

9.17Additional Teachers - PS (Special BTC-

Regular) in positionTeacher 0.30500

9.18Additional Teachers - PS (Special BTC Under

Training)Teacher 0.87600

9.19 Additional Teachers - PS (Vacant) Teacher

9.20Others in position (Para Teachers upgraded

as Teachers)Teacher

Upper Primary teachers

9.21 UP Teachers (Regular)-Existing Teacher 5.04000 408 2056.320 408 2056.32000

9.22 UP Teachers (Contract)-Existing9.23 UP Teachers (Vacant) Teacher 1.26000

9.24Head Teacher for Upper Primary (if the number

of children exceeds 100)-ExistingTeacher 5.34000 462 2467.080 462 2467.08000

9.24a Head Teacher for Upper Primary (Vacant) Teacher 1.33500

9.25Subject specific Upper Primary Teachers

(Regular)(a) Science and Mathematics(b) Social Studies(c) Languages

9.32 Part Time Instructors in position(a) Art Education 0.77000 57 43.890 57 43.89000(b) Health and Physical Education 0.77000 53 40.810 53 40.81000(c) Work Education 0.77000 44 33.880 44 33.88000

9.32(A) Part Time Instructors Vacant(a) Art Education 0.42000(b) Health and Physical Education 0.42000(c) Work Education 0.42000

9.33

Others-Incentive to Teachers in Schools

Located in Naxal Affected Areas (@

Rs.1500/- per teachers per month)

Sub Total (9.13 to 9.33) 3062 7578.980 3062 7578.98TOTAL

(New Teachers Salary +Teachers Salary

Recurring)

3062 7578.980 3062 7578.98000

10 Teachers Training(a) Teachers

10.01

Refresher In-service Teachers' Training at BRC

level and above - 10 days (@ Rs.200/- per

head per day)

Teacher

(Target &

Ach.-13-14

in

Mandays)

0.00600

10.01(a)Continuous and Comprehensive Evauation [PS +

UPS)Teacher 0.01300 1448 18.824 1448 18.82400

10.01(b) Eary Reading and Numeracy Skills [PS] Teacher 0.00500 1448 7.240 1448 7.24000

10.01(c) Science [UPS] Teacher 0.00800 668 5.344 668 5.34400Recommended as

proposed

10.01(d) CWSN Teacher 0.00400

Arti:SSA-AWPB-2014-15-PABMinits:Balrampur:16-06-2014 458 / 533

Page 459: U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 · 2015. 1. 6. · U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15

Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

Name of District : Balrampur -11

ActivityS. No.Physical

UnitRemarks

Outlay Recommendation for 2014-15

Spill OverDeferred laibility of

2014-15Fresh Recommended Total Recommended

10.02

One day monthly cluster level meetings and

peer group training sessions for 10 months for

all teachers each year at CRC level - 10 days (@

Rs.100/- per head per day)

Teacher 0.01000

10.03(a)

Induction Training for Newly Recruited Teachers

for 6 Months (Special BTC)- @Rs.2000/- per

head per year

Teacher 0.02000

10.03(b)5 Days Training for Part Time Instructors @ Rs.

200/- per head per day) Teacher 0.01000

10.04

Training of untrained Teachers to acquire

professional qualifications over a two year

period.

Teacher 0.04700 704 33.088 704 33.08800

(b) Head Teachers

10.05Refresher Residencial In-service for 10 days at

BRC level and above

Head

Teacher(c) Resource Persons

10.06

Refresher Training for all Resource

Persons,Master Trainers, BRC & CRC faculty

and Coordinators for 5 days each year (@

Rs.200/- per head per day)

Resource

Person 0.00300 120 0.360 120 0.36000

Sub Total 4388 64.856 4388 64.856

11Academic Support through Block Resource

Centre (BRC)/ URC

11.01 Salary of Faculty and Staff

(a) 5 RPs at BRC for subject specific training in

positionRP 50 50

(b) 2 RPs for CWSN in position RP(b-i) 1 CWSN Resource Person RP 1.10000 20 22.000 20 22.00000

(b-ii) 1 Physiotherapist (Resource person for IE) RP

(c) 1 MIS Coordinator in position RP 1.86000

(d) 1 Datra Entry Operator in position RP 1.74000 10 17.400 10 17.40000

(e) 1 Accountant-cum-support staff in position RP 1.80000 10 18.000 10 18.00000

11.02 Furniture Grant BRC/ URC 1.00000

11.03Replacement of furniture, computer, TLE etc (

Once in 5 years)BRC/ URC 1.00000

11.04 Contingency Grant BRC/ URC 0.50000 10 5.000 10 5.00000

11.05 Meeting, TA BRC/ URC 0.30000 10 3.000 10 3.00000

11.06 TLM Grant BRC/ URC 0.10000

11.07 Maintenance Grant BRC/ URC 0.10000

Sub Total 10 65.400 10 65.40000

12Academic Support through Cluster

Resource Centres (CRC/UERC)

12.01Salary of Cluster Coordinator (on an average of

one Resource Person per 18 schools in a block)RP

12.02 Furniture GrantCRC/

UERC0.10000

12.03Replacement of furniture, computer, TLE etc.

once in 5 years

CRC/

UERC0.10000

12.04 Contingency Grant CRC/UERC 0.10000 102 10.200 102 10.20000

12.05 Meeting, TA CRC/UERC 0.12000 102 12.240 102 12.24000

12.06 TLM Grant CRC/UERC 0.03000

12.07Maintenance Grant

CRC/UERC 0.02000

Sub Total 204 22.440 204 22.44000

13Computer Aided Education in upper

primary schools under Innovation

13.01Computer Aided Education in upper primary

schoolsDistrict 0.01200 48 0.576 48 0.57600

Sub Total 48 0.576 48 0.5760014 Libraries in Schools14.01 (a) Primary School (per school) School 0.03000

14.02 (b) Upper Primary School (per school) School 0.10000

Sub TotalIV ANNUAL GRANTS15 Teachers' Grant15.01 Primary Teachers Teacher 0.0050015.02 Upper Primary Teachers Teacher 0.00500 668 3.340 668 3.34000

Sub Total 668 3.340 668 3.3400016 School Grant16.01 Primary School School 0.05000 1570 78.500 1570 78.5000016.02 Upper Primary School School 0.07000 694 48.580 694 48.58000

Sub Total 2264 127.080 2264 127.08000

Arti:SSA-AWPB-2014-15-PABMinits:Balrampur:16-06-2014 459 / 533

Page 460: U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 · 2015. 1. 6. · U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15

Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

Name of District : Balrampur -11

ActivityS. No.Physical

UnitRemarks

Outlay Recommendation for 2014-15

Spill OverDeferred laibility of

2014-15Fresh Recommended Total Recommended

17Research, Evaluation, Monitoring &

Supervision

17.01 REMS Activities School 0.00103 2264 2.329 2264 2.32878

17.02 Monitoring & Supervision School 0.00078 2264 1.775 2264 1.77513

17.03 House Hold Survey (Urban) in Million Plus Cities District 35.00000

Sub Total 4528 4.104 4528 4.1039118 Maintenance Grant

18.01 Maintenance in School having upto3 Classrooms School 0.07500 90 6.750 90 6.75000

18.01a Maintenance Grant School 0.07500 2136 160.200 2136 160.20000Sub Total 2226 166.950 2226 166.95000

VBRIDGING GENDER AND SOCIAL

CATEGORY GAPS

19 Interventions for CWSN (IE)

19.01 Provision for Inclusive Education Child 0.03000 972 29.160 972 29.16000

Sub Total 972 29.160 972 29.16000

20Innovativation Head up to Rs.50 Lakh per

district

20.01 Girls Education District 0.70000 9 6.300 9 6.30000

20.02 ECCE District20.03 Intervention for SC / ST children District

20.04 Intervention for Minority Community children District 5.100 5.10000

20.05 Intervention for Urban Deprived children District 10.00000

Sub Total 9 11.400 9 11.4000021 SMC/PRI Training

21.01Residential for 6 Resource Person per Block (3

days) (@ Rs.500/-)Blocks 0.09000

21.02Non-residential (3 days training of 6 SMC

members) (@ Rs.100/-)SMC 0.01800 2222 39.996 2222 39.99600

21.02(a)Non-residential (3 days training of 3 Members of

PRI/VECs/LA) (@ Rs.100/-)VEC/ WEC 0.00900

21.03

Seminar/Orientation of SMC Women members

and President/Vice President (@ Rs. 50,000/-

per block)

Blocks 0.50000

Sub Total 2222 39.996 2222 39.99600VI SCHOOL INFRASTRUCTURE22 Civil Works22.01 Primary School (Plain) (New) School 13.1550022.02 Primary School (Hilly/Rocky) (New) School 13.2750022.03 Upper Primary (Plain) (New) School 20.65500

22.04 Upper Primary School (Hilly/Rocky) (New) School 20.77500

22.04aComposite Schools for Urban Areas (Class I-

VIII)School 41.04000

22.05 ACR in lieu of upgraded Upper Primary School Rooms

22.06 Additional class rooms for adding Class VIII Rooms

22.07 Building Less (Pry) School 9.7500022.08 Building Less (UP) School 18.5900022.09 Dilapidated Building (Pry) School 9.7500022.10 Dilapidated Building (UP) School 18.59000

22.11 Additional Class Room (Rural) ( PS+UPS) Rooms 3.45000 200 690.000 200 690.00000

22.12 Additional Class Room (Urban) Rooms 3.4500022.13 Additional Class Room (Hill Area)22.14 Toilet/Urinals (PS & UPS) School 0.7000022.15 Separate Girls Toilet (Rural+Urban) School 0.7000022.16 CWSN friendly Toilets School 0.50000

22.17 Drinking Water Facility (for Urban Area Only)) School 0.15000

22.17a Drinking Water Facility (Plain PS & UPS) School 0.15000

22.17b Drinking Water Facility (Hilly/Rocky PS & UPS) School 0.15000

22.18a Boundary Wall PS (Total in Meters x .01105) 0.01749

22.18bBoundary Wall PS (For Gate) @Rs. 7000 x no. of

P.S.School 0.07800

22.18c Boundary Wall UPS (Total in Meters x .01105) 0.01749

22.18dBoundary Wall UPS (For Gate) @Rs. 7000 x no.

of UPSSchool 0.07800

22.19a Electrification in P.S./ Electrical Equipment School 0.11000

22.19b Electrification in U. P.S./ Electrical Equipment School 0.11000

22.20Office-cum-store-cum-Head Teacher's room

(Primary)Rooms

22.21Office-cum-store-cum-Head Teacher's room

(Upper Primary)Rooms

22.22Augumentation of training facility in BRC (one

time)BRC/ URC 5.00000

22.23 Child friendly Elements School 0.25000

22.24 Ramps with Handrails (Barrier Free Elements) School 0.06000

22.25 Handrails in existing Ramps School 0.01000

Arti:SSA-AWPB-2014-15-PABMinits:Balrampur:16-06-2014 460 / 533

Page 461: U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 · 2015. 1. 6. · U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15

Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

Name of District : Balrampur -11

ActivityS. No.Physical

UnitRemarks

Outlay Recommendation for 2014-15

Spill OverDeferred laibility of

2014-15Fresh Recommended Total Recommended

22.26 Whole School Develoipment School22.27 Retro-fitting and repairs School

22.28Residential Schools for specific category

of children

(a) Construction of Building including boundary

wall, Water and sanitation facilities, electric

installation (For 100 children)

Building 65.86000

(b) Construction of residential hostel Building 65.86000

(c) Refurnishing unused old buildings Building

22.29

Construction of Hostel in existing Govt UPS

including boundary wall, Water and sanitation

facilities, electric installation etc. (For 50

children)

7.00000

22.30Furniture for Govt. UPS (per child) (@ Rs.500/-

per child enrolled)Child 0.00500

22.31 Major Repairs for Primary School School 0.30000

22.32 Majr Repairs for Upper Primary School School 0.30000

22.33Others (Difference of Civil Wrks

sanctioned in pre.yr.)22.33a Others (Overhead Tank PS) School 0.1200022.33b Others (Overhead Tank UPS) School 0.12000

Sub Total (Civil WOrks) 200 690.000 200 690.00VII PROJECT MANAGEMENT COST23 Management23.01 Management up to 3.5%

(a) Project Management and MIS

(i) DPO ( Salary, Contigency, Consumables,

POL, TA & Computer etc)District 1 123.401 1 123.40100

(ii) EMIS Cell District 1 12.467 1 12.46650Sub Total (a) 1 1 1 135.868 1 135.868

(b) Training of Educational Administrators District

(c) School Mapping and Social Mapping District

Sub Total (23.01)

23.02Learning Enhancement Prog. (LEP) (P & UP) (up

to 2%)District 16.095 16.09455

23.03 Community Mobilization (up to 0.5%) District 1 45.000 1 45.00000

Sub Total (Management) 1 61.095 1 61.09455Total Management Cost 196.962 196.96205Total of SSA (Districs) 31.700 430704 10239.633 430704 10271.333

24 State Component23.01 Management23.02 REMS 0.0044923.03 SIEMAT

Sub Total

STATE SSA TOTAL 31.70000 430704 10239.633 430704 10271.33316

25

KGBV Financial Provision (give

separate costing sheets for different

Models)

Hostel

ANon Recurring One Time Grant (Only

committed liabilities) (Model-I)

25.01 Construction of Building (New)

25.02 Construction of Building KGBV sanctioned earlier

25.02(a) Additional Class Room Rooms 3.45000

25.02(b) Guard Room Rooms 1.32000

25.02(c) Boundary Wall School 5.0200025.03 Boudary Wall (Spillover only) 7.50000 7.50000

25.04

Boring/Handpump (Spillover only)

(minimum rates prescribed by State Drinking

Water Department subject to a ceiling of Rs.

1.00 lakhs)

5.00000 5.00000

25.05 Electricity /Water charges (Spillover only)

25.05(a) Solar Water Heater & Solar Light 2.97000

25.06Furniture/Equipment (including Kitchen

equipment)3.00000

25.07 TLM and equipment including library books 3.50000

25.08 Bedding (New) 0.75000

25.09 Replacement of Bedding (once in 3 Year) 1 0.75000 10 7.500 11 7.50000

Subtotal Non Recurring 12.50000 7.500 20.00000

B Recurring Cost Per Annum (Model-I)

25.10Maintenance per girl student per month @ Rs.

1500/-18.00000 11 198.000 11 198.00000

25.11 Stipend for girl student per month @ Rs. 100/- 1.20000 11 13.200 11 13.20000

25.12Supplementary TLM, stationery and other

educational material @ Rs.1000/- per annum1.00000 11 11.000 11 11.00000

25.13 Salaries

Arti:SSA-AWPB-2014-15-PABMinits:Balrampur:16-06-2014 461 / 533

Page 462: U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 · 2015. 1. 6. · U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15

Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

Name of District : Balrampur -11

ActivityS. No.Physical

UnitRemarks

Outlay Recommendation for 2014-15

Spill OverDeferred laibility of

2014-15Fresh Recommended Total Recommended

25.13.1 Additional Salaries:

(a) 1 Warden @ Rs. 25,000/- per month 3.00000 11 33.00000 11 33.00000

(b)4 Full time teachers as per RTE norms @ Rs.

20,000/- per month per teacher 9.60000 11 105.60000 11 105.60000

(c)

1 Urdu Teachers (only for blocks with muslim

population above 20% and select urban areas), if

required @ Rs. 12,000/- per month per teacher 1.44000 11 15.84000 11 15.84000

(d)3 part time teachers @ Rs. 5,000/- per month per

teacher 1.80000 11 19.80000 11 19.80000

(e)1 Full time Accountant @ Rs. 10,000/- per month

1.20000 11 13.20000 11 13.20000

(f)

2 Support Staff – (Accountant/ Assistant, Peon,

Chowkidar) @ Rs. 5,000/- per month per staff 1.20000 11 13.20000 11 13.20000

(g) 1 Head cook @ Rs. 6,000/- per month 0.72000 11 7.92000 11 7.92000

(h)2 Asstt. Cooks @ Rs. 4,500/- per month per cook

1.08000 11 11.88000 11 11.88000

25.14Specific skill training @ Rs.1000/- per child per

annum1.00000 11 11.000 11 11.00000

25.15Electricity/water charges @ Rs.1000/- per child

per annum1.00000 11 11.000 11 11.00000

25.16Medical care/contingencies @ Rs. 1250 per child

per annum1.25000 11 13.750 11 13.75000

25.17 Maintenance @ Rs.750/- per child per annum 0.75000 11 8.250 11 8.25000

25.18

Miscellaneous (Educational Tour/ Exposure Visit

/ Sports Material etc.) @ Rs.750/- per child per

annum

0.75000 11 8.250 11 8.25000

25.19Preparatory camps @ Rs.200/- per child per

annum0.20000 11 2.200 11 2.20000

25.20PTAs/school functions @ Rs.200/- per child per

annum0.20000 11 2.200 11 2.20000

25.21 Provision of Rent @ Rs.6000/- per annum 6.00000

25.21a Provision of Rent (6 months) 3.6000025.21b Provision of Rent (3 months) 1.8000025.21c Rent (Previous Year (2007-2012)

25.22 Capacity building 0.50000 11 5.500 11 5.50000

25.22(a)Physical/ Self Defence Training @ Rs.200/- per

child per annum0.20000 11 2.200 11 2.20000

Subtotal Recurring 11 506.990 11 506.99000

Subtotal (Model-I) 12.50000 11 514.490 11 526.99000

CNon Recurring One Time Grant (Only

committed liabilities) (Model-II)

25.23 Construction of Building (New)

25.24 Construction of Building KGBV sanctioned earlier

25.24(a) Additional Class Room Rooms 3.45000

25.24(b) Guard Room Rooms 1.32000

25.24(c) Boundary Wall School 5.0200025.25 Boudary Wall (Spillover only)25.26 Boring/Handpump (Spillover only)

25.27 Electricity /Water charges (Spillover only)

25.27(a) Solar Water Heater & Solar Light 2.97000

25.28Furniture/Equipment (including Kitchen

equipment)2.00000

25.29 TLM and equipment including library books 3.00000

25.30 Bedding (New) 0.37500

25.31 Replacement of Bedding (once in 3 Year) 0.37500

Subtotal Non Recurring

D Recurring Cost Per Annum (Model-II)

25.32Maintenance per girl student per month @ Rs.

1500/-9.00000

25.33 Stipend for girl student per month @ Rs. 100/- 0.60000

25.34Supplementary TLM, stationery and other

educational material @ Rs.1000/- per annum0.50000

25.35 Salaries(a) 1 Warden @ Rs. 25,000/- per month 3.00000

(b)3 Full time teachers as per RTE norms @ Rs.

20,000/- per month per teacher 7.20000

(c) 3 part time teachers @ Rs. 5,000/- per month per

teacher 1.80000

(d)1 Full time Accountant @ Rs. 10,000/- per month

1.20000

(e)

2 Support Staff – (Accountant/ Assistant, Peon,

Chowkidar) @ Rs. 5,000/- per month per staff 1.20000

Arti:SSA-AWPB-2014-15-PABMinits:Balrampur:16-06-2014 462 / 533

Page 463: U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 · 2015. 1. 6. · U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15

Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

Name of District : Balrampur -11

ActivityS. No.Physical

UnitRemarks

Outlay Recommendation for 2014-15

Spill OverDeferred laibility of

2014-15Fresh Recommended Total Recommended

(f) 1 Head cook @ Rs. 6,000/- per month 0.72000

(g)1 Asstt. Cooks @ Rs. 4,500/- per month per cook

0.54000

25.36Specific skill training @ Rs.1000/- per child per

annum0.50000

25.37Electricity/water charges @ Rs.1000/- per child

per annum0.50000

25.38Medical care/contingencies @ Rs. 1250 per child

per annum0.62500

25.39 Maintenance @ Rs.750/- per child per annum 0.37500

25.40

Miscellaneous (Educational Tour/ Exposure Visit

/ Sports Material etc.) @ Rs.750/- per child per

annum

0.37500

25.41Preparatory camps @ Rs.300/- per child per

annum0.15000

25.42PTAs/school functions @ Rs.300/- per child per

annum0.15000

25.43 Provision of Rent @ Rs.10000/- per annum 5.00000

25.43a Provision of Rent (6 months) 3.6000025.43b Provision of Rent (3 months) 1.8000025.43c Rent (Previous Year (2007-2012)25.44 Capacity building 0.25000

25.44(a)Physical/ Self Defence Training @ Rs.200/- per

child per annum0.10000

Subtotal Recurring

Subtotal (Model-II) Total (KGBV) 12.500 11 514.490 11 526.990

DISTRICT GRAND TOTAL (SSA+KGBV) 12.500 31.700 430715 10754.123 430715 10798.323

Arti:SSA-AWPB-2014-15-PABMinits:Balrampur:16-06-2014 463 / 533

Page 464: U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 · 2015. 1. 6. · U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15

Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

I ACCESS

1 Opening of New Schools

1.01 Upgradation of EGS to PSCentres /

School1.02 New PS School

1.03 Upgradation of PS to UPS / New UPS School

1.04 Composite Schools (for Urban Areas) School

1.05Residential Schools for specific category children

(For 100 children)

1.06Residential Hostel (for specific category of

children) (For 50 children)

1.07 Integration of Class V with Primary Schools

1.08Integration of Class VIII with Upper Primary

Schools

2Residential Schools for specific category

of children (For 100 Children)

Total - Residential Schools (For 100

children)

3Residential Hostel for specific category of

children (For 50 Children)

Total - Residential Schools (For 50

children)4 Transport/Escort Facility

4.01

Children in remote habitations with sparse

populations where opening of schools is

unviable

Child 0.03000

4.02

Urban deprived children/children without adult

protection in urban areas where schools are not

opened because availability of land is a problem

Child 0.03000

Sub Total

5Special Training for mainstreaming of Out-

of-School Children

5.03 Non-Residential (Fresh)(a) 12 months Child 0.06000(b) 9 months 0.04500(c) 6 months

(i)Special Training (by Special Instructors-NRBC)-

(1-5) Child 0.03000 241 7.230 241 7.23000

(ii) Special Training (by Special Instructors-NRBC)-

(6-8) Child 0.03000 108 3.240 108 3.24000

(d) 3 months Child 0.01500Sub Total 349 10.470 349 10.47000

Total (Special Training) 349 10.470 349 10.4705(B) House Hold Survey (HHS)

5(B).01 House Hold Survey through SMCHouse

Hold0.00001

Sub TotalII RETENTION6 Free Text Book

6.01Free Text Book (PS) for Parishadiya & Aided

Primary Schools (Workbooks not included)Child 0.00120 192413 230.896 192413 230.89560

6.01a

Free Text Book (PS) for 25% children of Class-1

in Private Recognised Primary Schools of other

Boards (Workbooks not included)

Child 0.00150

6.02 Free Brail Books (PS) 0.00150 87 0.131 87 0.13050

6.03 Free Large Print Books (PS) 0.00150

6.04Free Text Book (UPS) (Workbooks not included)

(Including KGBV Girls)Child 0.00200 70801 141.602 70801 141.60200

6.05 Free Brail Books (UPS) 0.00250 22 0.055 22 0.05500

6.06 Free Large Print Books (PS) 0.00250Sub Total 263323 372.683 263323 372.683

7 Provision of 2 set of Uniforms

7.01 All Girls (Including KGBV Girls) Child 0.00400 192413 769.652 192413 769.65200

7.02 SC Boys Child 0.00400 46987 187.948 46987 187.94800

7.03 ST Boys Child 0.00400 4570 18.280 4570 18.28000

7.04 BPL Boys Child 0.00400 85250 341.000 85250 341.00000

7.05

Free Uniform for 25% children of Class-1 in

Private Recognised Primary Schools of other

Boards

Child0.00400

Sub Total 329220 1316.880 329220 1316.8807(A) Fee Reimbursement

7(A).01

Fee Reimbursement for Admission of children of

Disadvantaged Group & Weaker Section upto

25% of seats in Class-1 of Private Unaided

Recognised Schools

Child 0.05400

Sub Total

8 Teaching Learning Equipment (TLE)

8.01 TLE - New Primary School 19.80000 0.20000 19.800008.02 TLE - New Upper Primary School 2.00000 0.50000 2.00000

Name of District : Balia -10

ActivityS. No.Physical

UnitRemarks

Outlay Recommendation for 2014-15

Spill OverDeferred laibility of

2014-15Fresh Recommended Total Recommended

Arti:SSA-AWPB-2014-15-PABMinits:Balia:16-06-2014 464 / 533

Page 465: U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 · 2015. 1. 6. · U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15

Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

Name of District : Balia -10

ActivityS. No.Physical

UnitRemarks

Outlay Recommendation for 2014-15

Spill OverDeferred laibility of

2014-15Fresh Recommended Total Recommended

Sub Total 21.80000 21.80000III ENHANCING QUALITY9 New Teachers Salary

9.01 Primary Teachers (Regular) (Asstt. Teacher) Teacher 0.91500

9.01aHead Teacher for Primary (if the number of

children exceeds 150 in a school)Teacher

9.02 Primary Teachers (Contract) (S.M.) Teacher

9.03Subject specific Upper Primary Teachers

(Regular) (a) Science and Mathematics Teacher 1.26000(b) Social Studies Teacher 1.26000(c) Languages Teacher 1.26000

Sub Total (9.01 to 9.05)Add.Teacher against PTR

Sub Total (9.06 to 9.12)

Total (New Teacher's Salary-9.01 to 9.12)

Teachers Salary (Recurring-sanctioned

earlier)Primary teachers

9.13 Primary Teachers ( Regular)-Existing, in position Teacher 3.66000 312 1141.920 312 1141.92000

9.14Primary Teachers (Contract)-Existing, in

positionTeacher 0.55000

9.14(a) Primary Teachers (Contract)-under Training Teacher 0.38500 2038 784.630 2038 784.63000

9.14(b)Primary Teacher (Para Teachers Equal to

9.14(a) upgraded as Teachers)0.38500 1106 425.810 1106 425.81000

9.14(c) Primary Teachers (Para)- Vacant Teacher9.15 Primary Teachers (Vacant) Teacher 0.30500

9.16Head Teacher for Primary (if the number of

children exceeds 150)Teacher 5.04000 296 1491.840 296 1491.84000

9.16(b)Head Teacher for Primary (if the number of

children exceeds 150) VacantTeacher 0.42000

Additional teachers

9.17Additional Teachers - PS (Special BTC-

Regular) in positionTeacher 0.30500

9.18Additional Teachers - PS (Special BTC Under

Training)Teacher 0.87600

9.19 Additional Teachers - PS (Vacant) Teacher

9.20Others in position (Para Teachers upgraded

as Teachers)Teacher

Upper Primary teachers

9.21 UP Teachers (Regular)-Existing Teacher 5.04000 1250 6300.000 1250 6300.00000

9.22 UP Teachers (Contract)-Existing9.23 UP Teachers (Vacant) Teacher 1.26000

9.24Head Teacher for Upper Primary (if the number

of children exceeds 100)-ExistingTeacher 5.34000 356 1901.040 356 1901.04000

9.24a Head Teacher for Upper Primary (Vacant) Teacher 1.33500

9.25Subject specific Upper Primary Teachers

(Regular)(a) Science and Mathematics(b) Social Studies(c) Languages

9.32 Part Time Instructors in position(a) Art Education 0.77000 169 130.130 169 130.13000(b) Health and Physical Education 0.77000 237 182.490 237 182.49000(c) Work Education 0.77000 180 138.600 180 138.60000

9.32(A) Part Time Instructors Vacant(a) Art Education 0.42000(b) Health and Physical Education 0.42000(c) Work Education 0.42000

9.33

Others-Incentive to Teachers in Schools

Located in Naxal Affected Areas (@

Rs.1500/- per teachers per month)

Sub Total (9.13 to 9.33) 5944 12496.460 5944 12496.46TOTAL

(New Teachers Salary +Teachers Salary

Recurring)

5944 12496.460 5944 12496.46000

10 Teachers Training(a) Teachers

10.01

Refresher In-service Teachers' Training at BRC

level and above - 10 days (@ Rs.200/- per

head per day)

Teacher

(Target &

Ach.-13-14

in

Mandays)

0.00600

10.01(a)Continuous and Comprehensive Evauation [PS +

UPS)Teacher 0.01300 2044 26.572 2044 26.57200

10.01(b) Eary Reading and Numeracy Skills [PS] Teacher 0.00500 2044 10.220 2044 10.22000

10.01(c) Science [UPS] Teacher 0.00800 729 5.832 729 5.83200Recommended as

proposed

10.01(d) CWSN Teacher 0.00400

Arti:SSA-AWPB-2014-15-PABMinits:Balia:16-06-2014 465 / 533

Page 466: U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 · 2015. 1. 6. · U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15

Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

Name of District : Balia -10

ActivityS. No.Physical

UnitRemarks

Outlay Recommendation for 2014-15

Spill OverDeferred laibility of

2014-15Fresh Recommended Total Recommended

10.02

One day monthly cluster level meetings and

peer group training sessions for 10 months for

all teachers each year at CRC level - 10 days (@

Rs.100/- per head per day)

Teacher 0.01000

10.03(a)

Induction Training for Newly Recruited Teachers

for 6 Months (Special BTC)- @Rs.2000/- per

head per year

Teacher 0.02000

10.03(b)5 Days Training for Part Time Instructors @ Rs.

200/- per head per day) Teacher 0.01000

10.04

Training of untrained Teachers to acquire

professional qualifications over a two year

period.

Teacher 0.04700 806 37.882 806 37.88200

(b) Head Teachers

10.05Refresher Residencial In-service for 10 days at

BRC level and above

Head

Teacher(c) Resource Persons

10.06

Refresher Training for all Resource

Persons,Master Trainers, BRC & CRC faculty

and Coordinators for 5 days each year (@

Rs.200/- per head per day)

Resource

Person 0.00300 216 0.648 216 0.64800

Sub Total 5839 81.154 5839 81.154

11Academic Support through Block Resource

Centre (BRC)/ URC

11.01 Salary of Faculty and Staff

(a) 5 RPs at BRC for subject specific training in

positionRP 90 90

(b) 2 RPs for CWSN in position RP(b-i) 1 CWSN Resource Person RP 1.10000 36 39.600 36 39.60000

(b-ii) 1 Physiotherapist (Resource person for IE) RP

(c) 1 MIS Coordinator in position RP 1.86000

(d) 1 Datra Entry Operator in position RP 1.74000 18 31.320 18 31.32000

(e) 1 Accountant-cum-support staff in position RP 1.80000 18 32.400 18 32.40000

11.02 Furniture Grant BRC/ URC 1.00000

11.03Replacement of furniture, computer, TLE etc (

Once in 5 years)BRC/ URC 1.00000

11.04 Contingency Grant BRC/ URC 0.50000 18 9.000 18 9.00000

11.05 Meeting, TA BRC/ URC 0.30000 18 5.400 18 5.40000

11.06 TLM Grant BRC/ URC 0.10000

11.07 Maintenance Grant BRC/ URC 0.10000

Sub Total 18 117.720 18 117.72000

12Academic Support through Cluster

Resource Centres (CRC/UERC)

12.01Salary of Cluster Coordinator (on an average of

one Resource Person per 18 schools in a block)RP

12.02 Furniture GrantCRC/

UERC0.10000

12.03Replacement of furniture, computer, TLE etc.

once in 5 years

CRC/

UERC0.10000

12.04 Contingency Grant CRC/UERC 0.10000 164 16.400 164 16.40000

12.05 Meeting, TA CRC/UERC 0.12000 164 19.680 164 19.68000

12.06 TLM Grant CRC/UERC 0.03000

12.07Maintenance Grant

CRC/UERC 0.02000

Sub Total 328 36.080 328 36.08000

13Computer Aided Education in upper

primary schools under Innovation

13.01Computer Aided Education in upper primary

schoolsDistrict 0.01200 48 0.576 48 0.57600

Sub Total 48 0.576 48 0.5760014 Libraries in Schools14.01 (a) Primary School (per school) School 0.03000

14.02 (b) Upper Primary School (per school) School 0.10000

Sub TotalIV ANNUAL GRANTS15 Teachers' Grant15.01 Primary Teachers Teacher 0.0050015.02 Upper Primary Teachers Teacher 0.00500 729 3.645 729 3.64500

Sub Total 729 3.645 729 3.6450016 School Grant16.01 Primary School School 0.05000 2073 103.650 2073 103.6500016.02 Upper Primary School School 0.07000 717 50.190 717 50.19000

Sub Total 2790 153.840 2790 153.84000

Arti:SSA-AWPB-2014-15-PABMinits:Balia:16-06-2014 466 / 533

Page 467: U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 · 2015. 1. 6. · U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15

Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

Name of District : Balia -10

ActivityS. No.Physical

UnitRemarks

Outlay Recommendation for 2014-15

Spill OverDeferred laibility of

2014-15Fresh Recommended Total Recommended

17Research, Evaluation, Monitoring &

Supervision

17.01 REMS Activities School 0.00103 2790 2.870 2790 2.86983

17.02 Monitoring & Supervision School 0.00078 2790 2.188 2790 2.18755

17.03 House Hold Survey (Urban) in Million Plus Cities District 35.00000

Sub Total 5580 5.057 5580 5.0573818 Maintenance Grant

18.01 Maintenance in School having upto3 Classrooms School 0.07500 625 46.875 625 46.87500

18.01a Maintenance Grant School 0.07500 2060 154.500 2060 154.50000Sub Total 2685 201.375 2685 201.37500

VBRIDGING GENDER AND SOCIAL

CATEGORY GAPS

19 Interventions for CWSN (IE)

19.01 Provision for Inclusive Education Child 0.00700 10019 70.133 10019 70.13300

Sub Total 10019 70.133 10019 70.13300

20Innovativation Head up to Rs.50 Lakh per

district

20.01 Girls Education District 0.70000 9 6.300 9 6.30000

20.02 ECCE District20.03 Intervention for SC / ST children District

20.04 Intervention for Minority Community children District

20.05 Intervention for Urban Deprived children District 10.00000

Sub Total 9 6.300 9 6.3000021 SMC/PRI Training

21.01Residential for 6 Resource Person per Block (3

days) (@ Rs.500/-)Blocks 0.09000

21.02Non-residential (3 days training of 6 SMC

members) (@ Rs.100/-)SMC 0.01800 2687 48.366 2687 48.36600

21.02(a)Non-residential (3 days training of 3 Members of

PRI/VECs/LA) (@ Rs.100/-)VEC/ WEC 0.00900

21.03

Seminar/Orientation of SMC Women members

and President/Vice President (@ Rs. 50,000/-

per block)

Blocks 0.50000

Sub Total 2687 48.366 2687 48.36600VI SCHOOL INFRASTRUCTURE22 Civil Works22.01 Primary School (Plain) (New) School 13.1550022.02 Primary School (Hilly/Rocky) (New) School 13.2750022.03 Upper Primary (Plain) (New) School 20.65500

22.04 Upper Primary School (Hilly/Rocky) (New) School 20.77500

22.04aComposite Schools for Urban Areas (Class I-

VIII)School 41.04000

22.05 ACR in lieu of upgraded Upper Primary School Rooms

22.06 Additional class rooms for adding Class VIII Rooms

22.07 Building Less (Pry) School 9.7500022.08 Building Less (UP) School 18.5900022.09 Dilapidated Building (Pry) School 9.7500022.10 Dilapidated Building (UP) School 18.59000

22.11 Additional Class Room (Rural) ( PS+UPS) Rooms 3.45000

22.12 Additional Class Room (Urban) Rooms 3.4500022.13 Additional Class Room (Hill Area)22.14 Toilet/Urinals (PS & UPS) School 0.7000022.15 Separate Girls Toilet (Rural+Urban) School 0.7000022.16 CWSN friendly Toilets School 0.50000

22.17 Drinking Water Facility (for Urban Area Only)) School 0.15000

22.17a Drinking Water Facility (Plain PS & UPS) School 0.15000

22.17b Drinking Water Facility (Hilly/Rocky PS & UPS) School 0.15000

22.18a Boundary Wall PS (Total in Meters x .01105) 0.01749

22.18bBoundary Wall PS (For Gate) @Rs. 7000 x no. of

P.S.School 0.07800

22.18c Boundary Wall UPS (Total in Meters x .01105) 0.01749

22.18dBoundary Wall UPS (For Gate) @Rs. 7000 x no.

of UPSSchool 0.07800

22.19a Electrification in P.S./ Electrical Equipment School 0.11000

22.19b Electrification in U. P.S./ Electrical Equipment School 0.11000

22.20Office-cum-store-cum-Head Teacher's room

(Primary)Rooms

22.21Office-cum-store-cum-Head Teacher's room

(Upper Primary)Rooms

22.22Augumentation of training facility in BRC (one

time)BRC/ URC 5.00000

22.23 Child friendly Elements School 0.25000

22.24 Ramps with Handrails (Barrier Free Elements) School 0.06000

22.25 Handrails in existing Ramps School 0.01000

Arti:SSA-AWPB-2014-15-PABMinits:Balia:16-06-2014 467 / 533

Page 468: U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 · 2015. 1. 6. · U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15

Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

Name of District : Balia -10

ActivityS. No.Physical

UnitRemarks

Outlay Recommendation for 2014-15

Spill OverDeferred laibility of

2014-15Fresh Recommended Total Recommended

22.26 Whole School Develoipment School22.27 Retro-fitting and repairs School

22.28Residential Schools for specific category

of children

(a) Construction of Building including boundary

wall, Water and sanitation facilities, electric

installation (For 100 children)

Building 65.86000

(b) Construction of residential hostel Building 65.86000

(c) Refurnishing unused old buildings Building

22.29

Construction of Hostel in existing Govt UPS

including boundary wall, Water and sanitation

facilities, electric installation etc. (For 50

children)

7.00000

22.30Furniture for Govt. UPS (per child) (@ Rs.500/-

per child enrolled)Child 0.00500

22.31 Major Repairs for Primary School School 0.30000

22.32 Majr Repairs for Upper Primary School School 0.30000

22.33Others (Difference of Civil Wrks

sanctioned in pre.yr.)22.33a Others (Overhead Tank PS) School 0.1200022.33b Others (Overhead Tank UPS) School 0.12000

Sub Total (Civil WOrks)VII PROJECT MANAGEMENT COST23 Management23.01 Management up to 3.5%

(a) Project Management and MIS

(i) DPO ( Salary, Contigency, Consumables,

POL, TA & Computer etc)District 1 172.472 1 172.47150

(ii) EMIS Cell District 1 19.988 1 19.98800Sub Total (a) 1 1 1 192.460 1 192.460

(b) Training of Educational Administrators District

(c) School Mapping and Social Mapping District

Sub Total (23.01)

23.02Learning Enhancement Prog. (LEP) (P & UP) (up

to 2%)District 23.526 23.52570

23.03 Community Mobilization (up to 0.5%) District 1 45.850 1 45.85000

Sub Total (Management) 1 69.376 1 69.37570Total Management Cost 261.835 261.83520Total of SSA (Districs) 21.800 629568 15182.575 629568 15204.375

24 State Component23.01 Management23.02 REMS 0.0044923.03 SIEMAT

Sub Total

STATE SSA TOTAL 21.80000 629568 15182.575 629568 15204.37468

25

KGBV Financial Provision (give

separate costing sheets for different

Models)

Hostel

ANon Recurring One Time Grant (Only

committed liabilities) (Model-I)

25.01 Construction of Building (New)

25.02 Construction of Building KGBV sanctioned earlier 63.44500 63.44500

25.02(a) Additional Class Room Rooms 3.45000

25.02(b) Guard Room Rooms 1.32000

25.02(c) Boundary Wall School 5.0200025.03 Boudary Wall (Spillover only) 7.50000 7.50000

25.04

Boring/Handpump (Spillover only)

(minimum rates prescribed by State Drinking

Water Department subject to a ceiling of Rs.

1.00 lakhs)

5.00000 5.00000

25.05 Electricity /Water charges (Spillover only)

25.05(a) Solar Water Heater & Solar Light 2.97000

25.06Furniture/Equipment (including Kitchen

equipment)3.00000

25.07 TLM and equipment including library books 3.50000

25.08 Bedding (New) 0.75000

25.09 Replacement of Bedding (once in 3 Year) 0.75000 13 9.750 13 9.75000

Subtotal Non Recurring 75.94500 9.750 85.69500

B Recurring Cost Per Annum (Model-I)

25.10Maintenance per girl student per month @ Rs.

1500/-18.00000 16 288.000 16 288.00000

25.11 Stipend for girl student per month @ Rs. 100/- 1.20000 16 19.200 16 19.20000

25.12Supplementary TLM, stationery and other

educational material @ Rs.1000/- per annum1.00000 16 16.000 16 16.00000

25.13 Salaries

Arti:SSA-AWPB-2014-15-PABMinits:Balia:16-06-2014 468 / 533

Page 469: U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 · 2015. 1. 6. · U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15

Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

Name of District : Balia -10

ActivityS. No.Physical

UnitRemarks

Outlay Recommendation for 2014-15

Spill OverDeferred laibility of

2014-15Fresh Recommended Total Recommended

25.13.1 Additional Salaries:

(a) 1 Warden @ Rs. 25,000/- per month 3.00000 16 48.00000 16 48.00000

(b)4 Full time teachers as per RTE norms @ Rs.

20,000/- per month per teacher 9.60000 16 153.60000 16 153.60000

(c)

1 Urdu Teachers (only for blocks with muslim

population above 20% and select urban areas), if

required @ Rs. 12,000/- per month per teacher 1.44000 16 23.04000 16 23.04000

(d)3 part time teachers @ Rs. 5,000/- per month per

teacher 1.80000 16 28.80000 16 28.80000

(e)1 Full time Accountant @ Rs. 10,000/- per month

1.20000 16 19.20000 16 19.20000

(f)

2 Support Staff – (Accountant/ Assistant, Peon,

Chowkidar) @ Rs. 5,000/- per month per staff 1.20000 16 19.20000 16 19.20000

(g) 1 Head cook @ Rs. 6,000/- per month 0.72000 16 11.52000 16 11.52000

(h)2 Asstt. Cooks @ Rs. 4,500/- per month per cook

1.08000 16 17.28000 16 17.28000

25.14Specific skill training @ Rs.1000/- per child per

annum1.00000 16 16.000 16 16.00000

25.15Electricity/water charges @ Rs.1000/- per child

per annum1.00000 16 16.000 16 16.00000

25.16Medical care/contingencies @ Rs. 1250 per child

per annum1.25000 16 20.000 16 20.00000

25.17 Maintenance @ Rs.750/- per child per annum 0.75000 16 12.000 16 12.00000

25.18

Miscellaneous (Educational Tour/ Exposure Visit

/ Sports Material etc.) @ Rs.750/- per child per

annum

0.75000 16 12.000 16 12.00000

25.19Preparatory camps @ Rs.200/- per child per

annum0.20000 16 3.200 16 3.20000

25.20PTAs/school functions @ Rs.200/- per child per

annum0.20000 16 3.200 16 3.20000

25.21 Provision of Rent @ Rs.6000/- per annum 6.00000

25.21a Provision of Rent (6 months) 3.6000025.21b Provision of Rent (3 months) 1.8000025.21c Rent (Previous Year (2007-2012)

25.22 Capacity building 0.50000 16 8.000 16 8.00000

25.22(a)Physical/ Self Defence Training @ Rs.200/- per

child per annum0.20000 16 3.200 16 3.20000

Subtotal Recurring 16 737.440 16 737.44000

Subtotal (Model-I) 75.94500 16 747.190 16 823.13500

CNon Recurring One Time Grant (Only

committed liabilities) (Model-II)

25.23 Construction of Building (New)

25.24 Construction of Building KGBV sanctioned earlier

25.24(a) Additional Class Room Rooms 3.45000

25.24(b) Guard Room Rooms 1.32000

25.24(c) Boundary Wall School 5.0200025.25 Boudary Wall (Spillover only)25.26 Boring/Handpump (Spillover only)

25.27 Electricity /Water charges (Spillover only)

25.27(a) Solar Water Heater & Solar Light 2.97000

25.28Furniture/Equipment (including Kitchen

equipment)2.00000

25.29 TLM and equipment including library books 3.00000

25.30 Bedding (New) 0.37500

25.31 Replacement of Bedding (once in 3 Year) 0.37500

Subtotal Non Recurring

D Recurring Cost Per Annum (Model-II)

25.32Maintenance per girl student per month @ Rs.

1500/-9.00000

25.33 Stipend for girl student per month @ Rs. 100/- 0.60000

25.34Supplementary TLM, stationery and other

educational material @ Rs.1000/- per annum0.50000

25.35 Salaries(a) 1 Warden @ Rs. 25,000/- per month 3.00000

(b)3 Full time teachers as per RTE norms @ Rs.

20,000/- per month per teacher 7.20000

(c) 3 part time teachers @ Rs. 5,000/- per month per

teacher 1.80000

(d)1 Full time Accountant @ Rs. 10,000/- per month

1.20000

(e)

2 Support Staff – (Accountant/ Assistant, Peon,

Chowkidar) @ Rs. 5,000/- per month per staff 1.20000

Arti:SSA-AWPB-2014-15-PABMinits:Balia:16-06-2014 469 / 533

Page 470: U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 · 2015. 1. 6. · U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15

Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

Name of District : Balia -10

ActivityS. No.Physical

UnitRemarks

Outlay Recommendation for 2014-15

Spill OverDeferred laibility of

2014-15Fresh Recommended Total Recommended

(f) 1 Head cook @ Rs. 6,000/- per month 0.72000

(g)1 Asstt. Cooks @ Rs. 4,500/- per month per cook

0.54000

25.36Specific skill training @ Rs.1000/- per child per

annum0.50000

25.37Electricity/water charges @ Rs.1000/- per child

per annum0.50000

25.38Medical care/contingencies @ Rs. 1250 per child

per annum0.62500

25.39 Maintenance @ Rs.750/- per child per annum 0.37500

25.40

Miscellaneous (Educational Tour/ Exposure Visit

/ Sports Material etc.) @ Rs.750/- per child per

annum

0.37500

25.41Preparatory camps @ Rs.300/- per child per

annum0.15000

25.42PTAs/school functions @ Rs.300/- per child per

annum0.15000

25.43 Provision of Rent @ Rs.10000/- per annum 5.00000

25.43a Provision of Rent (6 months) 3.6000025.43b Provision of Rent (3 months) 1.8000025.43c Rent (Previous Year (2007-2012)25.44 Capacity building 0.25000

25.44(a)Physical/ Self Defence Training @ Rs.200/- per

child per annum0.10000

Subtotal Recurring

Subtotal (Model-II) Total (KGBV) 75.945 16 747.190 16 823.135

DISTRICT GRAND TOTAL (SSA+KGBV) 75.945 21.800 629584 15929.765 629584 16027.510

Arti:SSA-AWPB-2014-15-PABMinits:Balia:16-06-2014 470 / 533

Page 471: U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 · 2015. 1. 6. · U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15

Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

I ACCESS

1 Opening of New Schools

1.01 Upgradation of EGS to PSCentres /

School1.02 New PS School

1.03 Upgradation of PS to UPS / New UPS School

1.04 Composite Schools (for Urban Areas) School

1.05Residential Schools for specific category children

(For 100 children)

1.06Residential Hostel (for specific category of

children) (For 50 children)

1.07 Integration of Class V with Primary Schools

1.08Integration of Class VIII with Upper Primary

Schools

2Residential Schools for specific category

of children (For 100 Children)

Total - Residential Schools (For 100

children)

3Residential Hostel for specific category of

children (For 50 Children)

Total - Residential Schools (For 50

children)4 Transport/Escort Facility

4.01

Children in remote habitations with sparse

populations where opening of schools is

unviable

Child 0.03000

4.02

Urban deprived children/children without adult

protection in urban areas where schools are not

opened because availability of land is a problem

Child 0.03000

Sub Total

5Special Training for mainstreaming of Out-

of-School Children

5.03 Non-Residential (Fresh)(a) 12 months Child 0.06000(b) 9 months 0.04500(c) 6 months

(i)Special Training (by Special Instructors-NRBC)-

(1-5) Child 0.03000 132 3.960 132 3.96000

(ii) Special Training (by Special Instructors-NRBC)-

(6-8) Child 0.03000 172 5.160 172 5.16000

(d) 3 months Child 0.01500Sub Total 304 9.120 304 9.12000

Total (Special Training) 304 9.120 304 9.1205(B) House Hold Survey (HHS)

5(B).01 House Hold Survey through SMCHouse

Hold0.00001

Sub TotalII RETENTION6 Free Text Book

6.01Free Text Book (PS) for Parishadiya & Aided

Primary Schools (Workbooks not included)Child 0.00120 224501 269.401 224501 269.40120

6.01a

Free Text Book (PS) for 25% children of Class-1

in Private Recognised Primary Schools of other

Boards (Workbooks not included)

Child 0.00150

6.02 Free Brail Books (PS) 0.00150 7 0.011 7 0.01050

6.03 Free Large Print Books (PS) 0.00150

6.04Free Text Book (UPS) (Workbooks not included)

(Including KGBV Girls)Child 0.00200 70407 140.814 70407 140.81400

6.05 Free Brail Books (UPS) 0.00250

6.06 Free Large Print Books (PS) 0.00250Sub Total 294915 410.226 294915 410.226

7 Provision of 2 set of Uniforms

7.01 All Girls (Including KGBV Girls) Child 0.00400 244388 977.552 244388 977.55200

7.02 SC Boys Child 0.00400 49408 197.632 49408 197.63200

7.03 ST Boys Child 0.00400 1112 4.448 1112 4.44800

7.04 BPL Boys Child 0.00400 199810 799.240 199810 799.24000

7.05

Free Uniform for 25% children of Class-1 in

Private Recognised Primary Schools of other

Boards

Child0.00400

Sub Total 494718 1978.872 494718 1978.8727(A) Fee Reimbursement

7(A).01

Fee Reimbursement for Admission of children of

Disadvantaged Group & Weaker Section upto

25% of seats in Class-1 of Private Unaided

Recognised Schools

Child 0.05400

Sub Total

8 Teaching Learning Equipment (TLE)

8.01 TLE - New Primary School 4.20000 0.20000 4.200008.02 TLE - New Upper Primary School 0.50000 0.50000 0.50000

Name of District : Baharaich -9

ActivityS. No.Physical

UnitRemarks

Outlay Recommendation for 2014-15

Spill OverDeferred laibility of

2014-15Fresh Recommended Total Recommended

Arti:SSA-AWPB-2014-15-PABMinits:Baharaich:16-06-2014 471 / 533

Page 472: U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 · 2015. 1. 6. · U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15

Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

Name of District : Baharaich -9

ActivityS. No.Physical

UnitRemarks

Outlay Recommendation for 2014-15

Spill OverDeferred laibility of

2014-15Fresh Recommended Total Recommended

Sub Total 4.70000 4.70000III ENHANCING QUALITY9 New Teachers Salary

9.01 Primary Teachers (Regular) (Asstt. Teacher) Teacher 0.91500

9.01aHead Teacher for Primary (if the number of

children exceeds 150 in a school)Teacher

9.02 Primary Teachers (Contract) (S.M.) Teacher

9.03Subject specific Upper Primary Teachers

(Regular) (a) Science and Mathematics Teacher 1.26000(b) Social Studies Teacher 1.26000(c) Languages Teacher 1.26000

Sub Total (9.01 to 9.05)Add.Teacher against PTR

Sub Total (9.06 to 9.12)

Total (New Teacher's Salary-9.01 to 9.12)

Teachers Salary (Recurring-sanctioned

earlier)Primary teachers

9.13 Primary Teachers ( Regular)-Existing, in position Teacher 3.66000 76 278.160 76 278.16000

9.14Primary Teachers (Contract)-Existing, in

positionTeacher 0.55000

9.14(a) Primary Teachers (Contract)-under Training Teacher 0.38500 2217 853.545 2217 853.54500

9.14(b)Primary Teacher (Para Teachers Equal to

9.14(a) upgraded as Teachers)0.38500 989 380.765 989 380.76500

9.14(c) Primary Teachers (Para)- Vacant Teacher9.15 Primary Teachers (Vacant) Teacher 0.30500

9.16Head Teacher for Primary (if the number of

children exceeds 150)Teacher 5.04000 534 2691.360 534 2691.36000

9.16(b)Head Teacher for Primary (if the number of

children exceeds 150) VacantTeacher 0.42000

Additional teachers

9.17Additional Teachers - PS (Special BTC-

Regular) in positionTeacher 0.30500

9.18Additional Teachers - PS (Special BTC Under

Training)Teacher 0.87600

9.19 Additional Teachers - PS (Vacant) Teacher

9.20Others in position (Para Teachers upgraded

as Teachers)Teacher

Upper Primary teachers

9.21 UP Teachers (Regular)-Existing Teacher 5.04000 169 851.760 169 851.76000

9.22 UP Teachers (Contract)-Existing9.23 UP Teachers (Vacant) Teacher 1.26000

9.24Head Teacher for Upper Primary (if the number

of children exceeds 100)-ExistingTeacher 5.34000 591 3155.940 591 3155.94000

9.24a Head Teacher for Upper Primary (Vacant) Teacher 1.33500

9.25Subject specific Upper Primary Teachers

(Regular)(a) Science and Mathematics(b) Social Studies(c) Languages

9.32 Part Time Instructors in position(a) Art Education 0.77000 214 164.780 214 164.78000(b) Health and Physical Education 0.77000 202 155.540 202 155.54000(c) Work Education 0.77000 149 114.730 149 114.73000

9.32(A) Part Time Instructors Vacant(a) Art Education 0.42000(b) Health and Physical Education 0.42000(c) Work Education 0.42000

9.33

Others-Incentive to Teachers in Schools

Located in Naxal Affected Areas (@

Rs.1500/- per teachers per month)

Sub Total (9.13 to 9.33) 5141 8646.580 5141 8646.58TOTAL

(New Teachers Salary +Teachers Salary

Recurring)

5141 8646.580 5141 8646.58000

10 Teachers Training(a) Teachers

10.01

Refresher In-service Teachers' Training at BRC

level and above - 10 days (@ Rs.200/- per

head per day)

Teacher

(Target &

Ach.-13-14

in

Mandays)

0.00600

10.01(a)Continuous and Comprehensive Evauation [PS +

UPS)Teacher 0.01300 2334 30.342 2334 30.34200

10.01(b) Eary Reading and Numeracy Skills [PS] Teacher 0.00500 2334 11.670 2334 11.67000

10.01(c) Science [UPS] Teacher 0.00800 1054 8.432 1054 8.43200Recommended as

proposed

10.01(d) CWSN Teacher 0.00400

Arti:SSA-AWPB-2014-15-PABMinits:Baharaich:16-06-2014 472 / 533

Page 473: U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 · 2015. 1. 6. · U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15

Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

Name of District : Baharaich -9

ActivityS. No.Physical

UnitRemarks

Outlay Recommendation for 2014-15

Spill OverDeferred laibility of

2014-15Fresh Recommended Total Recommended

10.02

One day monthly cluster level meetings and

peer group training sessions for 10 months for

all teachers each year at CRC level - 10 days (@

Rs.100/- per head per day)

Teacher 0.01000

10.03(a)

Induction Training for Newly Recruited Teachers

for 6 Months (Special BTC)- @Rs.2000/- per

head per year

Teacher 0.02000

10.03(b)5 Days Training for Part Time Instructors @ Rs.

200/- per head per day) Teacher 0.01000

10.04

Training of untrained Teachers to acquire

professional qualifications over a two year

period.

Teacher 0.04700 1050 49.350 1050 49.35000

(b) Head Teachers

10.05Refresher Residencial In-service for 10 days at

BRC level and above

Head

Teacher(c) Resource Persons

10.06

Refresher Training for all Resource

Persons,Master Trainers, BRC & CRC faculty

and Coordinators for 5 days each year (@

Rs.200/- per head per day)

Resource

Person 0.00300 180 0.540 180 0.54000

Sub Total 6952 100.334 6952 100.334

11Academic Support through Block Resource

Centre (BRC)/ URC

11.01 Salary of Faculty and Staff

(a) 5 RPs at BRC for subject specific training in

positionRP 75 75

(b) 2 RPs for CWSN in position RP(b-i) 1 CWSN Resource Person RP 1.10000 30 33.000 30 33.00000

(b-ii) 1 Physiotherapist (Resource person for IE) RP

(c) 1 MIS Coordinator in position RP 1.86000

(d) 1 Datra Entry Operator in position RP 1.74000

(e) 1 Accountant-cum-support staff in position RP 1.80000

11.02 Furniture Grant BRC/ URC 1.00000

11.03Replacement of furniture, computer, TLE etc (

Once in 5 years)BRC/ URC 1.00000

11.04 Contingency Grant BRC/ URC 0.50000 15 7.500 15 7.50000

11.05 Meeting, TA BRC/ URC 0.30000 15 4.500 15 4.50000

11.06 TLM Grant BRC/ URC 0.10000

11.07 Maintenance Grant BRC/ URC 0.10000

Sub Total 15 45.000 15 45.00000

12Academic Support through Cluster

Resource Centres (CRC/UERC)

12.01Salary of Cluster Coordinator (on an average of

one Resource Person per 18 schools in a block)RP

12.02 Furniture GrantCRC/

UERC0.10000

12.03Replacement of furniture, computer, TLE etc.

once in 5 years

CRC/

UERC0.10000

12.04 Contingency Grant CRC/UERC 0.10000 137 13.700 137 13.70000

12.05 Meeting, TA CRC/UERC 0.12000 137 16.440 137 16.44000

12.06 TLM Grant CRC/UERC 0.03000

12.07Maintenance Grant

CRC/UERC 0.02000

Sub Total 274 30.140 274 30.14000

13Computer Aided Education in upper

primary schools under Innovation

13.01Computer Aided Education in upper primary

schoolsDistrict 0.01200 48 0.576 48 0.57600

Sub Total 48 0.576 48 0.5760014 Libraries in Schools14.01 (a) Primary School (per school) School 0.03000

14.02 (b) Upper Primary School (per school) School 0.10000

Sub TotalIV ANNUAL GRANTS15 Teachers' Grant15.01 Primary Teachers Teacher 0.0050015.02 Upper Primary Teachers Teacher 0.00500 1054 5.270 1054 5.27000

Sub Total 1054 5.270 1054 5.2700016 School Grant16.01 Primary School School 0.05000 2480 124.000 2480 124.0000016.02 Upper Primary School School 0.07000 1054 73.780 1054 73.78000

Sub Total 3534 197.780 3534 197.78000

Arti:SSA-AWPB-2014-15-PABMinits:Baharaich:16-06-2014 473 / 533

Page 474: U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 · 2015. 1. 6. · U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15

Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

Name of District : Baharaich -9

ActivityS. No.Physical

UnitRemarks

Outlay Recommendation for 2014-15

Spill OverDeferred laibility of

2014-15Fresh Recommended Total Recommended

17Research, Evaluation, Monitoring &

Supervision

17.01 REMS Activities School 0.00103 3534 3.635 3534 3.63512

17.02 Monitoring & Supervision School 0.00078 3534 2.771 3534 2.77089

17.03 House Hold Survey (Urban) in Million Plus Cities District 35.00000

Sub Total 7068 6.406 7068 6.4060118 Maintenance Grant

18.01 Maintenance in School having upto3 Classrooms School 0.07500 960 72.000 960 72.00000

18.01a Maintenance Grant School 0.07500 2493 186.975 2493 186.97500Sub Total 3453 258.975 3453 258.97500

VBRIDGING GENDER AND SOCIAL

CATEGORY GAPS

19 Interventions for CWSN (IE)

19.01 Provision for Inclusive Education Child 0.03000 967 29.010 967 29.01000

Sub Total 967 29.010 967 29.01000

20Innovativation Head up to Rs.50 Lakh per

district

20.01 Girls Education District 0.70000 7 4.900 7 4.90000

20.02 ECCE District20.03 Intervention for SC / ST children District

20.04 Intervention for Minority Community children District 6.850 6.85000

20.05 Intervention for Urban Deprived children District 10.00000

Sub Total 7 11.750 7 11.7500021 SMC/PRI Training

21.01Residential for 6 Resource Person per Block (3

days) (@ Rs.500/-)Blocks 0.09000

21.02Non-residential (3 days training of 6 SMC

members) (@ Rs.100/-)SMC 0.01800 3468 62.424 3468 62.42400

21.02(a)Non-residential (3 days training of 3 Members of

PRI/VECs/LA) (@ Rs.100/-)VEC/ WEC 0.00900

21.03

Seminar/Orientation of SMC Women members

and President/Vice President (@ Rs. 50,000/-

per block)

Blocks 0.50000

Sub Total 3468 62.424 3468 62.42400VI SCHOOL INFRASTRUCTURE22 Civil Works22.01 Primary School (Plain) (New) School 13.1550022.02 Primary School (Hilly/Rocky) (New) School 13.2750022.03 Upper Primary (Plain) (New) School 20.65500

22.04 Upper Primary School (Hilly/Rocky) (New) School 20.77500

22.04aComposite Schools for Urban Areas (Class I-

VIII)School 41.04000

22.05 ACR in lieu of upgraded Upper Primary School Rooms

22.06 Additional class rooms for adding Class VIII Rooms

22.07 Building Less (Pry) School 9.7500022.08 Building Less (UP) School 18.5900022.09 Dilapidated Building (Pry) School 9.7500022.10 Dilapidated Building (UP) School 18.59000

22.11 Additional Class Room (Rural) ( PS+UPS) Rooms 3.45000 89 307.050 89 307.05000

22.12 Additional Class Room (Urban) Rooms 3.4500022.13 Additional Class Room (Hill Area)22.14 Toilet/Urinals (PS & UPS) School 0.7000022.15 Separate Girls Toilet (Rural+Urban) School 0.7000022.16 CWSN friendly Toilets School 0.50000

22.17 Drinking Water Facility (for Urban Area Only)) School 0.15000

22.17a Drinking Water Facility (Plain PS & UPS) School 0.15000

22.17b Drinking Water Facility (Hilly/Rocky PS & UPS) School 0.15000

22.18a Boundary Wall PS (Total in Meters x .01105) 0.01749

22.18bBoundary Wall PS (For Gate) @Rs. 7000 x no. of

P.S.School 0.07800

22.18c Boundary Wall UPS (Total in Meters x .01105) 0.01749

22.18dBoundary Wall UPS (For Gate) @Rs. 7000 x no.

of UPSSchool 0.07800

22.19a Electrification in P.S./ Electrical Equipment School 0.11000

22.19b Electrification in U. P.S./ Electrical Equipment School 0.11000

22.20Office-cum-store-cum-Head Teacher's room

(Primary)Rooms

22.21Office-cum-store-cum-Head Teacher's room

(Upper Primary)Rooms

22.22Augumentation of training facility in BRC (one

time)BRC/ URC 5.00000

22.23 Child friendly Elements School 0.25000

22.24 Ramps with Handrails (Barrier Free Elements) School 0.06000

22.25 Handrails in existing Ramps School 0.01000

Arti:SSA-AWPB-2014-15-PABMinits:Baharaich:16-06-2014 474 / 533

Page 475: U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 · 2015. 1. 6. · U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15

Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

Name of District : Baharaich -9

ActivityS. No.Physical

UnitRemarks

Outlay Recommendation for 2014-15

Spill OverDeferred laibility of

2014-15Fresh Recommended Total Recommended

22.26 Whole School Develoipment School22.27 Retro-fitting and repairs School

22.28Residential Schools for specific category

of children

(a) Construction of Building including boundary

wall, Water and sanitation facilities, electric

installation (For 100 children)

Building 65.86000

(b) Construction of residential hostel Building 65.86000

(c) Refurnishing unused old buildings Building

22.29

Construction of Hostel in existing Govt UPS

including boundary wall, Water and sanitation

facilities, electric installation etc. (For 50

children)

7.00000

22.30Furniture for Govt. UPS (per child) (@ Rs.500/-

per child enrolled)Child 0.00500

22.31 Major Repairs for Primary School School 0.30000

22.32 Majr Repairs for Upper Primary School School 0.30000

22.33Others (Difference of Civil Wrks

sanctioned in pre.yr.)22.33a Others (Overhead Tank PS) School 0.1200022.33b Others (Overhead Tank UPS) School 0.12000

Sub Total (Civil WOrks) 89 307.050 89 307.05VII PROJECT MANAGEMENT COST23 Management23.01 Management up to 3.5%

(a) Project Management and MIS

(i) DPO ( Salary, Contigency, Consumables,

POL, TA & Computer etc)District 1 155.022 1 155.02150

(ii) EMIS Cell District 1 19.288 1 19.28750Sub Total (a) 1 1 1 174.309 1 174.309

(b) Training of Educational Administrators District

(c) School Mapping and Social Mapping District

Sub Total (23.01)

23.02Learning Enhancement Prog. (LEP) (P & UP) (up

to 2%)District 27.145 27.14540

23.03 Community Mobilization (up to 0.5%) District 1 60.000 1 60.00000

Sub Total (Management) 1 87.145 1 87.14540Total Management Cost 261.454 261.45440Total of SSA (Districs) 4.700 822007 12360.967 822007 12365.667

24 State Component23.01 Management23.02 REMS 0.0044923.03 SIEMAT

Sub Total

STATE SSA TOTAL 4.70000 822007 12360.967 822007 12365.66711

25

KGBV Financial Provision (give

separate costing sheets for different

Models)

Hostel

ANon Recurring One Time Grant (Only

committed liabilities) (Model-I)

25.01 Construction of Building (New)

25.02 Construction of Building KGBV sanctioned earlier

25.02(a) Additional Class Room Rooms 3.45000

25.02(b) Guard Room Rooms 1.32000

25.02(c) Boundary Wall School 5.0200025.03 Boudary Wall (Spillover only) 7.50000 7.50000

25.04

Boring/Handpump (Spillover only)

(minimum rates prescribed by State Drinking

Water Department subject to a ceiling of Rs.

1.00 lakhs)

8.24000 8.24000

25.05 Electricity /Water charges (Spillover only)

25.05(a) Solar Water Heater & Solar Light 2.97000

25.06Furniture/Equipment (including Kitchen

equipment)3.00000

25.07 TLM and equipment including library books 3.50000

25.08 Bedding (New) 0.75000

25.09 Replacement of Bedding (once in 3 Year) 0.75000

Subtotal Non Recurring 15.74000 15.74000

B Recurring Cost Per Annum (Model-I)

25.10Maintenance per girl student per month @ Rs.

1500/-18.00000 15 270.000 15 270.00000

25.11 Stipend for girl student per month @ Rs. 100/- 1.20000 15 18.000 15 18.00000

25.12Supplementary TLM, stationery and other

educational material @ Rs.1000/- per annum1.00000 15 15.000 15 15.00000

25.13 Salaries

Arti:SSA-AWPB-2014-15-PABMinits:Baharaich:16-06-2014 475 / 533

Page 476: U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 · 2015. 1. 6. · U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15

Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

Name of District : Baharaich -9

ActivityS. No.Physical

UnitRemarks

Outlay Recommendation for 2014-15

Spill OverDeferred laibility of

2014-15Fresh Recommended Total Recommended

25.13.1 Additional Salaries:

(a) 1 Warden @ Rs. 25,000/- per month 3.00000 15 45.00000 15 45.00000

(b)4 Full time teachers as per RTE norms @ Rs.

20,000/- per month per teacher 9.60000 15 144.00000 15 144.00000

(c)

1 Urdu Teachers (only for blocks with muslim

population above 20% and select urban areas), if

required @ Rs. 12,000/- per month per teacher 1.44000 15 21.60000 15 21.60000

(d)3 part time teachers @ Rs. 5,000/- per month per

teacher 1.80000 15 27.00000 15 27.00000

(e)1 Full time Accountant @ Rs. 10,000/- per month

1.20000 15 18.00000 15 18.00000

(f)

2 Support Staff – (Accountant/ Assistant, Peon,

Chowkidar) @ Rs. 5,000/- per month per staff 1.20000 15 18.00000 15 18.00000

(g) 1 Head cook @ Rs. 6,000/- per month 0.72000 15 10.80000 15 10.80000

(h)2 Asstt. Cooks @ Rs. 4,500/- per month per cook

1.08000 15 16.20000 15 16.20000

25.14Specific skill training @ Rs.1000/- per child per

annum1.00000 15 15.000 15 15.00000

25.15Electricity/water charges @ Rs.1000/- per child

per annum1.00000 15 15.000 15 15.00000

25.16Medical care/contingencies @ Rs. 1250 per child

per annum1.25000 15 18.750 15 18.75000

25.17 Maintenance @ Rs.750/- per child per annum 0.75000 15 11.250 15 11.25000

25.18

Miscellaneous (Educational Tour/ Exposure Visit

/ Sports Material etc.) @ Rs.750/- per child per

annum

0.75000 15 11.250 15 11.25000

25.19Preparatory camps @ Rs.200/- per child per

annum0.20000 15 3.000 15 3.00000

25.20PTAs/school functions @ Rs.200/- per child per

annum0.20000 15 3.000 15 3.00000

25.21 Provision of Rent @ Rs.6000/- per annum 6.00000

25.21a Provision of Rent (6 months) 3.6000025.21b Provision of Rent (3 months) 1.8000025.21c Rent (Previous Year (2007-2012)

25.22 Capacity building 0.50000 15 7.500 15 7.50000

25.22(a)Physical/ Self Defence Training @ Rs.200/- per

child per annum0.20000 15 3.000 15 3.00000

Subtotal Recurring 15 691.350 15 691.35000

Subtotal (Model-I) 15.74000 15 691.350 15 707.09000

CNon Recurring One Time Grant (Only

committed liabilities) (Model-II)

25.23 Construction of Building (New)

25.24 Construction of Building KGBV sanctioned earlier

25.24(a) Additional Class Room Rooms 3.45000

25.24(b) Guard Room Rooms 1.32000

25.24(c) Boundary Wall School 5.0200025.25 Boudary Wall (Spillover only)25.26 Boring/Handpump (Spillover only)

25.27 Electricity /Water charges (Spillover only)

25.27(a) Solar Water Heater & Solar Light 2.97000

25.28Furniture/Equipment (including Kitchen

equipment)2.00000

25.29 TLM and equipment including library books 3.00000

25.30 Bedding (New) 0.37500

25.31 Replacement of Bedding (once in 3 Year) 0.37500

Subtotal Non Recurring

D Recurring Cost Per Annum (Model-II)

25.32Maintenance per girl student per month @ Rs.

1500/-9.00000

25.33 Stipend for girl student per month @ Rs. 100/- 0.60000

25.34Supplementary TLM, stationery and other

educational material @ Rs.1000/- per annum0.50000

25.35 Salaries(a) 1 Warden @ Rs. 25,000/- per month 3.00000

(b)3 Full time teachers as per RTE norms @ Rs.

20,000/- per month per teacher 7.20000

(c) 3 part time teachers @ Rs. 5,000/- per month per

teacher 1.80000

(d)1 Full time Accountant @ Rs. 10,000/- per month

1.20000

(e)

2 Support Staff – (Accountant/ Assistant, Peon,

Chowkidar) @ Rs. 5,000/- per month per staff 1.20000

Arti:SSA-AWPB-2014-15-PABMinits:Baharaich:16-06-2014 476 / 533

Page 477: U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 · 2015. 1. 6. · U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15

Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

Name of District : Baharaich -9

ActivityS. No.Physical

UnitRemarks

Outlay Recommendation for 2014-15

Spill OverDeferred laibility of

2014-15Fresh Recommended Total Recommended

(f) 1 Head cook @ Rs. 6,000/- per month 0.72000

(g)1 Asstt. Cooks @ Rs. 4,500/- per month per cook

0.54000

25.36Specific skill training @ Rs.1000/- per child per

annum0.50000

25.37Electricity/water charges @ Rs.1000/- per child

per annum0.50000

25.38Medical care/contingencies @ Rs. 1250 per child

per annum0.62500

25.39 Maintenance @ Rs.750/- per child per annum 0.37500

25.40

Miscellaneous (Educational Tour/ Exposure Visit

/ Sports Material etc.) @ Rs.750/- per child per

annum

0.37500

25.41Preparatory camps @ Rs.300/- per child per

annum0.15000

25.42PTAs/school functions @ Rs.300/- per child per

annum0.15000

25.43 Provision of Rent @ Rs.10000/- per annum 5.00000

25.43a Provision of Rent (6 months) 3.6000025.43b Provision of Rent (3 months) 1.8000025.43c Rent (Previous Year (2007-2012)25.44 Capacity building 0.25000

25.44(a)Physical/ Self Defence Training @ Rs.200/- per

child per annum0.10000

Subtotal Recurring

Subtotal (Model-II) Total (KGBV) 15.740 15 691.350 15 707.090

DISTRICT GRAND TOTAL (SSA+KGBV) 15.740 4.700 822022 13052.317 822022 13072.757

Arti:SSA-AWPB-2014-15-PABMinits:Baharaich:16-06-2014 477 / 533

Page 478: U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 · 2015. 1. 6. · U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15

Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

I ACCESS

1 Opening of New Schools

1.01 Upgradation of EGS to PSCentres /

School1.02 New PS School

1.03 Upgradation of PS to UPS / New UPS School

1.04 Composite Schools (for Urban Areas) School

1.05Residential Schools for specific category children

(For 100 children)

1.06Residential Hostel (for specific category of

children) (For 50 children)

1.07 Integration of Class V with Primary Schools

1.08Integration of Class VIII with Upper Primary

Schools

2Residential Schools for specific category

of children (For 100 Children)

Total - Residential Schools (For 100

children)

3Residential Hostel for specific category of

children (For 50 Children)

Total - Residential Schools (For 50

children)4 Transport/Escort Facility

4.01

Children in remote habitations with sparse

populations where opening of schools is

unviable

Child 0.03000

4.02

Urban deprived children/children without adult

protection in urban areas where schools are not

opened because availability of land is a problem

Child 0.03000

Sub Total

5Special Training for mainstreaming of Out-

of-School Children

5.03 Non-Residential (Fresh)(a) 12 months Child 0.06000(b) 9 months 0.04500(c) 6 months

(i)Special Training (by Special Instructors-NRBC)-

(1-5) Child 0.03000 382 11.460 382 11.46000

(ii) Special Training (by Special Instructors-NRBC)-

(6-8) Child 0.03000 171 5.130 171 5.13000

(d) 3 months Child 0.01500Sub Total 553 16.590 553 16.59000

Total (Special Training) 553 16.590 553 16.5905(B) House Hold Survey (HHS)

5(B).01 House Hold Survey through SMCHouse

Hold0.00001

Sub TotalII RETENTION6 Free Text Book

6.01Free Text Book (PS) for Parishadiya & Aided

Primary Schools (Workbooks not included)Child 0.00120 37865 45.438 37865 45.43800

6.01a

Free Text Book (PS) for 25% children of Class-1

in Private Recognised Primary Schools of other

Boards (Workbooks not included)

Child 0.00150

6.02 Free Brail Books (PS) 0.00150

6.03 Free Large Print Books (PS) 0.00150

6.04Free Text Book (UPS) (Workbooks not included)

(Including KGBV Girls)Child 0.00200 22269 44.538 22269 44.53800

6.05 Free Brail Books (UPS) 0.00250

6.06 Free Large Print Books (PS) 0.00250Sub Total 60134 89.976 60134 89.976

7 Provision of 2 set of Uniforms

7.01 All Girls (Including KGBV Girls) Child 0.00400 48785 195.140 48785 195.14000

7.02 SC Boys Child 0.00400 11343 45.372 11343 45.37200

7.03 ST Boys Child 0.00400

7.04 BPL Boys Child 0.00400 18777 75.108 18777 75.10800

7.05

Free Uniform for 25% children of Class-1 in

Private Recognised Primary Schools of other

Boards

Child0.00400

Sub Total 78905 315.620 78905 315.6207(A) Fee Reimbursement

7(A).01

Fee Reimbursement for Admission of children of

Disadvantaged Group & Weaker Section upto

25% of seats in Class-1 of Private Unaided

Recognised Schools

Child 0.05400

Sub Total

Name of District : Baghpat -8

ActivityS. No.Physical

UnitRemarks

Outlay Recommendation for 2014-15

Spill OverDeferred laibility

of 2014-15Fresh Recommended Total Recommended

Arti:SSA-AWPB-2014-15-PABMinits:Baghpat:16-06-2014 478 / 533

Page 479: U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 · 2015. 1. 6. · U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15

Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

Name of District : Baghpat -8

ActivityS. No.Physical

UnitRemarks

Outlay Recommendation for 2014-15

Spill OverDeferred laibility

of 2014-15Fresh Recommended Total Recommended

8 Teaching Learning Equipment (TLE)

8.01 TLE - New Primary School 0.200008.02 TLE - New Upper Primary School 4.30000 0.50000 4.30000

Sub Total 4.30000 4.30000III ENHANCING QUALITY9 New Teachers Salary

9.01 Primary Teachers (Regular) (Asstt. Teacher) Teacher 0.91500

9.01aHead Teacher for Primary (if the number of

children exceeds 150 in a school)Teacher

9.02 Primary Teachers (Contract) (S.M.) Teacher

9.03Subject specific Upper Primary Teachers

(Regular) (a) Science and Mathematics Teacher 1.26000(b) Social Studies Teacher 1.26000(c) Languages Teacher 1.26000

Sub Total (9.01 to 9.05)Add.Teacher against PTR

Sub Total (9.06 to 9.12)

Total (New Teacher's Salary-9.01 to 9.12)

Teachers Salary (Recurring-sanctioned

earlier)Primary teachers

9.13 Primary Teachers ( Regular)-Existing, in position Teacher 3.66000 193 706.380 193 706.38000

9.14Primary Teachers (Contract)-Existing, in

positionTeacher 0.55000

9.14(a) Primary Teachers (Contract)-under Training Teacher 0.38500 122 46.970 122 46.97000

9.14(b)Primary Teacher (Para Teachers Equal to

9.14(a) upgraded as Teachers)0.38500 342 131.670 342 131.67000

9.14(c) Primary Teachers (Para)- Vacant Teacher9.15 Primary Teachers (Vacant) Teacher 0.30500

9.16Head Teacher for Primary (if the number of

children exceeds 150)Teacher 5.04000 20 100.800 20 100.80000

9.16(b)Head Teacher for Primary (if the number of

children exceeds 150) VacantTeacher 0.42000

Additional teachers

9.17Additional Teachers - PS (Special BTC-

Regular) in positionTeacher 0.30500

9.18Additional Teachers - PS (Special BTC Under

Training)Teacher 0.87600

9.19 Additional Teachers - PS (Vacant) Teacher

9.20Others in position (Para Teachers upgraded

as Teachers)Teacher

Upper Primary teachers

9.21 UP Teachers (Regular)-Existing Teacher 5.04000 223 1123.920 223 1123.92000

9.22 UP Teachers (Contract)-Existing9.23 UP Teachers (Vacant) Teacher 1.26000

9.24Head Teacher for Upper Primary (if the number

of children exceeds 100)-ExistingTeacher 5.34000 56 299.040 56 299.04000

9.24a Head Teacher for Upper Primary (Vacant) Teacher 1.33500

9.25Subject specific Upper Primary Teachers

(Regular)(a) Science and Mathematics(b) Social Studies(c) Languages

9.32 Part Time Instructors in position(a) Art Education 0.77000 28 21.560 28 21.56000(b) Health and Physical Education 0.77000 32 24.640 32 24.64000(c) Work Education 0.77000 23 17.710 23 17.71000

9.32(A) Part Time Instructors Vacant(a) Art Education 0.42000(b) Health and Physical Education 0.42000(c) Work Education 0.42000

9.33

Others-Incentive to Teachers in Schools

Located in Naxal Affected Areas (@

Rs.1500/- per teachers per month)

Sub Total (9.13 to 9.33) 1039 2472.690 1039 2472.69TOTAL

(New Teachers Salary +Teachers Salary

Recurring)

1039 2472.690 1039 2472.69000

10 Teachers Training(a) Teachers

10.01

Refresher In-service Teachers' Training at BRC

level and above - 10 days (@ Rs.200/- per head

per day)

Teacher

(Target &

Ach.-13-14

in

Mandays)

0.00600

Arti:SSA-AWPB-2014-15-PABMinits:Baghpat:16-06-2014 479 / 533

Page 480: U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 · 2015. 1. 6. · U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15

Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

Name of District : Baghpat -8

ActivityS. No.Physical

UnitRemarks

Outlay Recommendation for 2014-15

Spill OverDeferred laibility

of 2014-15Fresh Recommended Total Recommended

10.01(a)Continuous and Comprehensive Evauation [PS +

UPS)Teacher 0.01300 487 6.331 487 6.33100

10.01(b) Eary Reading and Numeracy Skills [PS] Teacher 0.00500 487 2.435 487 2.43500

10.01(c) Science [UPS] Teacher 0.00800 293 2.344 293 2.34400Recommended as

proposed

10.01(d) CWSN Teacher 0.00400

10.02

One day monthly cluster level meetings and

peer group training sessions for 10 months for

all teachers each year at CRC level - 10 days (@

Rs.100/- per head per day)

Teacher 0.01000

10.03(a)

Induction Training for Newly Recruited Teachers

for 6 Months (Special BTC)- @Rs.2000/- per

head per year

Teacher 0.02000

10.03(b)5 Days Training for Part Time Instructors @ Rs.

200/- per head per day) Teacher 0.01000

10.04

Training of untrained Teachers to acquire

professional qualifications over a two year

period.

Teacher 0.04700

(b) Head Teachers

10.05Refresher Residencial In-service for 10 days at

BRC level and above

Head

Teacher(c) Resource Persons

10.06

Refresher Training for all Resource

Persons,Master Trainers, BRC & CRC faculty

and Coordinators for 5 days each year (@

Rs.200/- per head per day)

Resource

Person 0.00300 72 0.216 72 0.21600

Sub Total 1339 11.326 1339 11.326

11Academic Support through Block Resource

Centre (BRC)/ URC

11.01 Salary of Faculty and Staff

(a) 5 RPs at BRC for subject specific training in

positionRP 30 30

(b) 2 RPs for CWSN in position RP(b-i) 1 CWSN Resource Person RP 1.10000 12 13.200 12 13.20000

(b-ii) 1 Physiotherapist (Resource person for IE) RP

(c) 1 MIS Coordinator in position RP 1.86000

(d) 1 Datra Entry Operator in position RP 1.74000 3 5.220 3 5.22000

(e) 1 Accountant-cum-support staff in position RP 1.80000 7 12.600 7 12.60000

11.02 Furniture Grant BRC/ URC 1.00000

11.03Replacement of furniture, computer, TLE etc (

Once in 5 years)BRC/ URC 1.00000

11.04 Contingency Grant BRC/ URC 0.50000 6 3.000 6 3.00000

11.05 Meeting, TA BRC/ URC 0.30000 6 1.800 6 1.80000

11.06 TLM Grant BRC/ URC 0.10000

11.07 Maintenance Grant BRC/ URC 0.10000

Sub Total 6 35.820 6 35.82000

12Academic Support through Cluster

Resource Centres (CRC/UERC)

12.01Salary of Cluster Coordinator (on an average of

one Resource Person per 18 schools in a block)RP

12.02 Furniture Grant CRC/ UERC 0.10000

12.03Replacement of furniture, computer, TLE etc.

once in 5 yearsCRC/ UERC 0.10000

12.04 Contingency Grant CRC/UERC 0.10000 47 4.700 47 4.70000

12.05 Meeting, TA CRC/UERC 0.12000 47 5.640 47 5.64000

12.06 TLM Grant CRC/UERC 0.03000

12.07Maintenance Grant

CRC/UERC 0.02000

Sub Total 94 10.340 94 10.34000

13Computer Aided Education in upper

primary schools under Innovation

13.01Computer Aided Education in upper primary

schoolsDistrict 0.01200 48 0.576 48 0.57600

Sub Total 48 0.576 48 0.5760014 Libraries in Schools

Arti:SSA-AWPB-2014-15-PABMinits:Baghpat:16-06-2014 480 / 533

Page 481: U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 · 2015. 1. 6. · U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15

Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

Name of District : Baghpat -8

ActivityS. No.Physical

UnitRemarks

Outlay Recommendation for 2014-15

Spill OverDeferred laibility

of 2014-15Fresh Recommended Total Recommended

14.01 (a) Primary School (per school) School 0.03000

14.02 (b) Upper Primary School (per school) School 0.10000

Sub TotalIV ANNUAL GRANTS15 Teachers' Grant15.01 Primary Teachers Teacher 0.0050015.02 Upper Primary Teachers Teacher 0.00500 293 1.465 293 1.46500

Sub Total 293 1.465 293 1.4650016 School Grant16.01 Primary School School 0.05000 487 24.350 487 24.3500016.02 Upper Primary School School 0.07000 291 20.370 291 20.37000

Sub Total 778 44.720 778 44.72000

17Research, Evaluation, Monitoring &

Supervision

17.01 REMS Activities School 0.00103 778 0.800 778 0.80026

17.02 Monitoring & Supervision School 0.00078 778 0.610 778 0.61000

17.03 House Hold Survey (Urban) in Million Plus Cities District 35.00000

Sub Total 1556 1.410 1556 1.4102618 Maintenance Grant

18.01 Maintenance in School having upto3 Classrooms School 0.07500 165 12.375 165 12.37500

18.01a Maintenance Grant School 0.07500 522 39.150 522 39.15000Sub Total 687 51.525 687 51.52500

VBRIDGING GENDER AND SOCIAL

CATEGORY GAPS

19 Interventions for CWSN (IE)

19.01 Provision for Inclusive Education Child 0.03000 115 3.450 115 3.45000

Sub Total 115 3.450 115 3.45000

20Innovativation Head up to Rs.50 Lakh per

district

20.01 Girls Education District 0.70000 6 4.200 6 4.20000

20.02 ECCE District20.03 Intervention for SC / ST children District

20.04 Intervention for Minority Community children District

20.05 Intervention for Urban Deprived children District 10.00000

Sub Total 6 4.200 6 4.2000021 SMC/PRI Training

21.01Residential for 6 Resource Person per Block (3

days) (@ Rs.500/-)Blocks 0.09000

21.02Non-residential (3 days training of 6 SMC

members) (@ Rs.100/-)SMC 0.01800 677 12.186 677 12.18600

21.02(a)Non-residential (3 days training of 3 Members of

PRI/VECs/LA) (@ Rs.100/-)VEC/ WEC 0.00900

21.03

Seminar/Orientation of SMC Women members

and President/Vice President (@ Rs. 50,000/-

per block)

Blocks 0.50000

Sub Total 677 12.186 677 12.18600VI SCHOOL INFRASTRUCTURE22 Civil Works22.01 Primary School (Plain) (New) School 13.1550022.02 Primary School (Hilly/Rocky) (New) School 13.2750022.03 Upper Primary (Plain) (New) School 20.65500

22.04 Upper Primary School (Hilly/Rocky) (New) School 20.77500

22.04aComposite Schools for Urban Areas (Class I-

VIII)School 41.04000

22.05 ACR in lieu of upgraded Upper Primary School Rooms

22.06 Additional class rooms for adding Class VIII Rooms

22.07 Building Less (Pry) School 9.7500022.08 Building Less (UP) School 18.5900022.09 Dilapidated Building (Pry) School 9.7500022.10 Dilapidated Building (UP) School 18.59000

22.11 Additional Class Room (Rural) ( PS+UPS) Rooms 3.45000 50 172.500 50 172.50000

22.12 Additional Class Room (Urban) Rooms 3.45000 12 41.400 12 41.4000022.13 Additional Class Room (Hill Area)22.14 Toilet/Urinals (PS & UPS) School 0.70000 32 22.400 32 22.4000022.15 Separate Girls Toilet (Rural+Urban) School 0.7000022.16 CWSN friendly Toilets School 0.50000

22.17 Drinking Water Facility (for Urban Area Only)) School 0.15000 5 0.750 5 0.75000

22.17a Drinking Water Facility (Plain PS & UPS) School 0.15000 2 0.300 2 0.30000

22.17b Drinking Water Facility (Hilly/Rocky PS & UPS) School 0.15000

22.18a Boundary Wall PS (Total in Meters x .01105) 0.01749

22.18bBoundary Wall PS (For Gate) @Rs. 7000 x no. of

P.S.School 0.07800

Arti:SSA-AWPB-2014-15-PABMinits:Baghpat:16-06-2014 481 / 533

Page 482: U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 · 2015. 1. 6. · U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15

Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

Name of District : Baghpat -8

ActivityS. No.Physical

UnitRemarks

Outlay Recommendation for 2014-15

Spill OverDeferred laibility

of 2014-15Fresh Recommended Total Recommended

22.18c Boundary Wall UPS (Total in Meters x .01105) 0.01749

22.18dBoundary Wall UPS (For Gate) @Rs. 7000 x no.

of UPSSchool 0.07800

22.19a Electrification in P.S./ Electrical Equipment School 0.11000

22.19b Electrification in U. P.S./ Electrical Equipment School 0.11000

22.20Office-cum-store-cum-Head Teacher's room

(Primary)Rooms

22.21Office-cum-store-cum-Head Teacher's room

(Upper Primary)Rooms

22.22Augumentation of training facility in BRC (one

time)BRC/ URC 5.00000

22.23 Child friendly Elements School 0.25000

22.24 Ramps with Handrails (Barrier Free Elements) School 0.06000 16 0.960 16 0.96000

22.25 Handrails in existing Ramps School 0.0100022.26 Whole School Develoipment School22.27 Retro-fitting and repairs School

22.28Residential Schools for specific category

of children

(a) Construction of Building including boundary

wall, Water and sanitation facilities, electric

installation (For 100 children)

Building 65.86000

(b) Construction of residential hostel Building 65.86000

(c) Refurnishing unused old buildings Building

22.29

Construction of Hostel in existing Govt UPS

including boundary wall, Water and sanitation

facilities, electric installation etc. (For 50

children)

7.00000

22.30Furniture for Govt. UPS (per child) (@ Rs.500/-

per child enrolled)Child 0.00500

22.31 Major Repairs for Primary School School 0.30000

22.32 Majr Repairs for Upper Primary School School 0.30000

22.33Others (Difference of Civil Wrks

sanctioned in pre.yr.)22.33a Others (Overhead Tank PS) School 0.1200022.33b Others (Overhead Tank UPS) School 0.12000

Sub Total (Civil WOrks) 117 238.310 117 238.31VII PROJECT MANAGEMENT COST23 Management23.01 Management up to 3.5%

(a) Project Management and MIS

(i) DPO ( Salary, Contigency, Consumables,

POL, TA & Computer etc)District 1 98.669 1 98.66910

(ii) EMIS Cell District 1 8.814 1 8.81400Sub Total (a) 1 1 1 107.483 1 107.483

(b) Training of Educational Administrators District

(c) School Mapping and Social Mapping District

Sub Total (23.01)

23.02Learning Enhancement Prog. (LEP) (P & UP) (up

to 2%)District 5.442 5.44170

23.03 Community Mobilization (up to 0.5%) District 1 16.000 1 16.00000

Sub Total (Management) 1 21.442 1 21.44170Total Management Cost 128.925 128.92480Total of SSA (Districs) 4.300 146347 3439.129 146347 3443.429

24 State Component23.01 Management23.02 REMS 0.0044923.03 SIEMAT

Sub Total

STATE SSA TOTAL 4.30000 146347 3439.129 146347 3443.42906

25

KGBV Financial Provision (give

separate costing sheets for different

Models)

Hostel

ANon Recurring One Time Grant (Only

committed liabilities) (Model-I)

25.01 Construction of Building (New)

25.02 Construction of Building KGBV sanctioned earlier

25.02(a) Additional Class Room Rooms 3.45000

25.02(b) Guard Room Rooms 1.32000

25.02(c) Boundary Wall School 5.0200025.03 Boudary Wall (Spillover only) 3.00000 3.00000

25.04

Boring/Handpump (Spillover only)

(minimum rates prescribed by State Drinking

Water Department subject to a ceiling of Rs.

1.00 lakhs)

2.00000 2.00000

Arti:SSA-AWPB-2014-15-PABMinits:Baghpat:16-06-2014 482 / 533

Page 483: U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 · 2015. 1. 6. · U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15

Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

Name of District : Baghpat -8

ActivityS. No.Physical

UnitRemarks

Outlay Recommendation for 2014-15

Spill OverDeferred laibility

of 2014-15Fresh Recommended Total Recommended

25.05 Electricity /Water charges (Spillover only)

25.05(a) Solar Water Heater & Solar Light 2.97000

25.06Furniture/Equipment (including Kitchen

equipment)3.00000

25.07 TLM and equipment including library books 3.50000

25.08 Bedding (New) 0.75000

25.09 Replacement of Bedding (once in 3 Year) 0.75000 1 0.750 1 0.75000

Subtotal Non Recurring 5.00000 0.750 5.75000

B Recurring Cost Per Annum (Model-I)

25.10Maintenance per girl student per month @ Rs.

1500/-18.00000 2 36.000 2 36.00000

25.11 Stipend for girl student per month @ Rs. 100/- 1.20000 2 2.400 2 2.40000

25.12Supplementary TLM, stationery and other

educational material @ Rs.1000/- per annum1.00000 2 2.000 2 2.00000

25.13 Salaries

25.13.1 Additional Salaries:

(a) 1 Warden @ Rs. 25,000/- per month 3.00000 2 6.00000 2 6.00000

(b)4 Full time teachers as per RTE norms @ Rs.

20,000/- per month per teacher 9.60000 2 19.20000 2 19.20000

(c)

1 Urdu Teachers (only for blocks with muslim

population above 20% and select urban areas), if

required @ Rs. 12,000/- per month per teacher 1.44000 2 2.88000 2 2.88000

(d)3 part time teachers @ Rs. 5,000/- per month per

teacher 1.80000 2 3.60000 2 3.60000

(e)1 Full time Accountant @ Rs. 10,000/- per month

1.20000 2 2.40000 2 2.40000

(f)

2 Support Staff – (Accountant/ Assistant, Peon,

Chowkidar) @ Rs. 5,000/- per month per staff 1.20000 2 2.40000 2 2.40000

(g) 1 Head cook @ Rs. 6,000/- per month 0.72000 2 1.44000 2 1.44000

(h)2 Asstt. Cooks @ Rs. 4,500/- per month per cook

1.08000 2 2.16000 2 2.16000

25.14Specific skill training @ Rs.1000/- per child per

annum1.00000 2 2.000 2 2.00000

25.15Electricity/water charges @ Rs.1000/- per child

per annum1.00000 2 2.000 2 2.00000

25.16Medical care/contingencies @ Rs. 1250 per child

per annum1.25000 2 2.500 2 2.50000

25.17 Maintenance @ Rs.750/- per child per annum 0.75000 2 1.500 2 1.50000

25.18

Miscellaneous (Educational Tour/ Exposure Visit

/ Sports Material etc.) @ Rs.750/- per child per

annum

0.75000 2 1.500 2 1.50000

25.19Preparatory camps @ Rs.200/- per child per

annum0.20000 2 0.400 2 0.40000

25.20PTAs/school functions @ Rs.200/- per child per

annum0.20000 2 0.400 2 0.40000

25.21 Provision of Rent @ Rs.6000/- per annum 6.00000

25.21a Provision of Rent (6 months) 3.6000025.21b Provision of Rent (3 months) 1.8000025.21c Rent (Previous Year (2007-2012)

25.22 Capacity building 0.50000 2 1.000 2 1.00000

25.22(a)Physical/ Self Defence Training @ Rs.200/- per

child per annum0.20000 2 0.400 2 0.40000

Subtotal Recurring 2 92.180 2 92.18000

Subtotal (Model-I) 5.00000 2 92.930 2 97.93000

CNon Recurring One Time Grant (Only

committed liabilities) (Model-II)

25.23 Construction of Building (New)

25.24 Construction of Building KGBV sanctioned earlier

25.24(a) Additional Class Room Rooms 3.45000

25.24(b) Guard Room Rooms 1.32000

25.24(c) Boundary Wall School 5.0200025.25 Boudary Wall (Spillover only)25.26 Boring/Handpump (Spillover only)

25.27 Electricity /Water charges (Spillover only)

25.27(a) Solar Water Heater & Solar Light 2.97000

25.28Furniture/Equipment (including Kitchen

equipment)2.00000

25.29 TLM and equipment including library books 3.00000

Arti:SSA-AWPB-2014-15-PABMinits:Baghpat:16-06-2014 483 / 533

Page 484: U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 · 2015. 1. 6. · U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15

Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

Name of District : Baghpat -8

ActivityS. No.Physical

UnitRemarks

Outlay Recommendation for 2014-15

Spill OverDeferred laibility

of 2014-15Fresh Recommended Total Recommended

25.30 Bedding (New) 0.37500

25.31 Replacement of Bedding (once in 3 Year) 0.37500

Subtotal Non Recurring

D Recurring Cost Per Annum (Model-II)

25.32Maintenance per girl student per month @ Rs.

1500/-9.00000

25.33 Stipend for girl student per month @ Rs. 100/- 0.60000

25.34Supplementary TLM, stationery and other

educational material @ Rs.1000/- per annum0.50000

25.35 Salaries(a) 1 Warden @ Rs. 25,000/- per month 3.00000

(b)3 Full time teachers as per RTE norms @ Rs.

20,000/- per month per teacher 7.20000

(c) 3 part time teachers @ Rs. 5,000/- per month per

teacher 1.80000

(d)1 Full time Accountant @ Rs. 10,000/- per month

1.20000

(e)

2 Support Staff – (Accountant/ Assistant, Peon,

Chowkidar) @ Rs. 5,000/- per month per staff 1.20000

(f) 1 Head cook @ Rs. 6,000/- per month 0.72000

(g)1 Asstt. Cooks @ Rs. 4,500/- per month per cook

0.54000

25.36Specific skill training @ Rs.1000/- per child per

annum0.50000

25.37Electricity/water charges @ Rs.1000/- per child

per annum0.50000

25.38Medical care/contingencies @ Rs. 1250 per child

per annum0.62500

25.39 Maintenance @ Rs.750/- per child per annum 0.37500

25.40

Miscellaneous (Educational Tour/ Exposure Visit

/ Sports Material etc.) @ Rs.750/- per child per

annum

0.37500

25.41Preparatory camps @ Rs.300/- per child per

annum0.15000

25.42PTAs/school functions @ Rs.300/- per child per

annum0.15000

25.43 Provision of Rent @ Rs.10000/- per annum 5.00000

25.43a Provision of Rent (6 months) 3.6000025.43b Provision of Rent (3 months) 1.8000025.43c Rent (Previous Year (2007-2012)25.44 Capacity building 0.25000

25.44(a)Physical/ Self Defence Training @ Rs.200/- per

child per annum0.10000

Subtotal Recurring

Subtotal (Model-II) Total (KGBV) 5.000 2 92.930 2 97.930

DISTRICT GRAND TOTAL (SSA+KGBV) 5.000 4.300 146349 3532.059 146349 3541.359

Arti:SSA-AWPB-2014-15-PABMinits:Baghpat:16-06-2014 484 / 533

Page 485: U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 · 2015. 1. 6. · U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15

Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

I ACCESS

1 Opening of New Schools

1.01 Upgradation of EGS to PSCentres /

School1.02 New PS School

1.03 Upgradation of PS to UPS / New UPS School

1.04 Composite Schools (for Urban Areas) School

1.05Residential Schools for specific category children

(For 100 children)

1.06Residential Hostel (for specific category of

children) (For 50 children)

1.07 Integration of Class V with Primary Schools

1.08Integration of Class VIII with Upper Primary

Schools

2Residential Schools for specific category

of children (For 100 Children)

Total - Residential Schools (For 100

children)

3Residential Hostel for specific category of

children (For 50 Children)

Total - Residential Schools (For 50

children)4 Transport/Escort Facility

4.01

Children in remote habitations with sparse

populations where opening of schools is

unviable

Child 0.03000

4.02

Urban deprived children/children without adult

protection in urban areas where schools are not

opened because availability of land is a problem

Child 0.03000

Sub Total

5Special Training for mainstreaming of Out-

of-School Children

5.03 Non-Residential (Fresh)(a) 12 months Child 0.06000(b) 9 months 0.04500(c) 6 months

(i)Special Training (by Special Instructors-NRBC)-

(1-5) Child 0.03000 306 9.180 306 9.18000

(ii) Special Training (by Special Instructors-NRBC)-

(6-8) Child 0.03000 341 10.230 341 10.23000

(d) 3 months Child 0.01500Sub Total 647 19.410 647 19.41000

Total (Special Training) 647 19.410 647 19.4105(B) House Hold Survey (HHS)

5(B).01 House Hold Survey through SMCHouse

Hold0.00001

Sub TotalII RETENTION6 Free Text Book

6.01Free Text Book (PS) for Parishadiya & Aided

Primary Schools (Workbooks not included)Child 0.00120 172395 206.874 172395 206.87400

6.01a

Free Text Book (PS) for 25% children of Class-1

in Private Recognised Primary Schools of other

Boards (Workbooks not included)

Child 0.00150

6.02 Free Brail Books (PS) 0.00150 153 0.230 153 0.22950

6.03 Free Large Print Books (PS) 0.00150

6.04Free Text Book (UPS) (Workbooks not included)

(Including KGBV Girls)Child 0.00200 61375 122.750 61375 122.75000

6.05 Free Brail Books (UPS) 0.00250 12 0.030 12 0.03000

6.06 Free Large Print Books (PS) 0.00250Sub Total 233935 329.884 233935 329.884

7 Provision of 2 set of Uniforms

7.01 All Girls (Including KGBV Girls) Child 0.00400 191607 766.428 191607 766.42800

7.02 SC Boys Child 0.00400 42163 168.652 42163 168.65200

7.03 ST Boys Child 0.00400

7.04 BPL Boys Child 0.00400 24409 97.636 24409 97.63600

7.05

Free Uniform for 25% children of Class-1 in

Private Recognised Primary Schools of other

Boards

Child0.00400

Sub Total 258179 1032.716 258179 1032.7167(A) Fee Reimbursement

7(A).01

Fee Reimbursement for Admission of children of

Disadvantaged Group & Weaker Section upto

25% of seats in Class-1 of Private Unaided

Recognised Schools

Child 0.05400

Sub Total

8 Teaching Learning Equipment (TLE)

8.01 TLE - New Primary School 0.80000 0.20000 0.800008.02 TLE - New Upper Primary School 2.00000 0.50000 2.00000

Name of District : Badaun -7

ActivityS. No.Physical

UnitRemarks

Outlay Recommendation for 2014-15

Spill OverDeferred laibility of

2014-15Fresh Recommended Total Recommended

Arti:SSA-AWPB-2014-15-PABMinits:Badaun:16-06-2014 485 / 533

Page 486: U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 · 2015. 1. 6. · U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15

Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

Name of District : Badaun -7

ActivityS. No.Physical

UnitRemarks

Outlay Recommendation for 2014-15

Spill OverDeferred laibility of

2014-15Fresh Recommended Total Recommended

Sub Total 2.80000 2.80000III ENHANCING QUALITY9 New Teachers Salary

9.01 Primary Teachers (Regular) (Asstt. Teacher) Teacher 0.91500

9.01aHead Teacher for Primary (if the number of

children exceeds 150 in a school)Teacher

9.02 Primary Teachers (Contract) (S.M.) Teacher

9.03Subject specific Upper Primary Teachers

(Regular) (a) Science and Mathematics Teacher 1.26000(b) Social Studies Teacher 1.26000(c) Languages Teacher 1.26000

Sub Total (9.01 to 9.05)Add.Teacher against PTR

Sub Total (9.06 to 9.12)

Total (New Teacher's Salary-9.01 to 9.12)

Teachers Salary (Recurring-sanctioned

earlier)Primary teachers

9.13 Primary Teachers ( Regular)-Existing, in position Teacher 3.66000 101 369.660 101 369.66000

9.14Primary Teachers (Contract)-Existing, in

positionTeacher 0.55000

9.14(a) Primary Teachers (Contract)-under Training Teacher 0.38500 1479 569.415 1479 569.41500

9.14(b)Primary Teacher (Para Teachers Equal to

9.14(a) upgraded as Teachers)0.38500 1110 427.350 1110 427.35000

9.14(c) Primary Teachers (Para)- Vacant Teacher9.15 Primary Teachers (Vacant) Teacher 0.30500

9.16Head Teacher for Primary (if the number of

children exceeds 150)Teacher 5.04000 338 1703.520 338 1703.52000

9.16(b)Head Teacher for Primary (if the number of

children exceeds 150) VacantTeacher 0.42000

Additional teachers

9.17Additional Teachers - PS (Special BTC-

Regular) in positionTeacher 0.30500

9.18Additional Teachers - PS (Special BTC Under

Training)Teacher 0.87600

9.19 Additional Teachers - PS (Vacant) Teacher

9.20Others in position (Para Teachers upgraded

as Teachers)Teacher

Upper Primary teachers

9.21 UP Teachers (Regular)-Existing Teacher 5.04000 719 3623.760 719 3623.76000

9.22 UP Teachers (Contract)-Existing9.23 UP Teachers (Vacant) Teacher 1.26000

9.24Head Teacher for Upper Primary (if the number

of children exceeds 100)-ExistingTeacher 5.34000 254 1356.360 254 1356.36000

9.24a Head Teacher for Upper Primary (Vacant) Teacher 1.33500

9.25Subject specific Upper Primary Teachers

(Regular)(a) Science and Mathematics(b) Social Studies(c) Languages

9.32 Part Time Instructors in position(a) Art Education 0.77000 229 176.330 229 176.33000(b) Health and Physical Education 0.77000 210 161.700 210 161.70000(c) Work Education 0.77000 182 140.140 182 140.14000

9.32(A) Part Time Instructors Vacant(a) Art Education 0.42000(b) Health and Physical Education 0.42000(c) Work Education 0.42000

9.33

Others-Incentive to Teachers in Schools

Located in Naxal Affected Areas (@

Rs.1500/- per teachers per month)

Sub Total (9.13 to 9.33) 4622 8528.235 4622 8528.24TOTAL

(New Teachers Salary +Teachers Salary

Recurring)

4622 8528.235 4622 8528.23500

10 Teachers Training(a) Teachers

10.01

Refresher In-service Teachers' Training at BRC

level and above - 10 days (@ Rs.200/- per

head per day)

Teacher

(Target &

Ach.-13-14

in

Mandays)

0.00600

10.01(a)Continuous and Comprehensive Evauation [PS +

UPS)Teacher 0.01300 1770 23.010 1770 23.01000

10.01(b) Eary Reading and Numeracy Skills [PS] Teacher 0.00500 1770 8.850 1770 8.85000

10.01(c) Science [UPS] Teacher 0.00800 710 5.680 710 5.68000Recommended as

proposed

10.01(d) CWSN Teacher 0.00400

Arti:SSA-AWPB-2014-15-PABMinits:Badaun:16-06-2014 486 / 533

Page 487: U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 · 2015. 1. 6. · U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15

Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

Name of District : Badaun -7

ActivityS. No.Physical

UnitRemarks

Outlay Recommendation for 2014-15

Spill OverDeferred laibility of

2014-15Fresh Recommended Total Recommended

10.02

One day monthly cluster level meetings and

peer group training sessions for 10 months for

all teachers each year at CRC level - 10 days (@

Rs.100/- per head per day)

Teacher 0.01000

10.03(a)

Induction Training for Newly Recruited Teachers

for 6 Months (Special BTC)- @Rs.2000/- per

head per year

Teacher 0.02000

10.03(b)5 Days Training for Part Time Instructors @ Rs.

200/- per head per day) Teacher 0.01000

10.04

Training of untrained Teachers to acquire

professional qualifications over a two year

period.

Teacher 0.04700 1647 77.409 1647 77.40900

(b) Head Teachers

10.05Refresher Residencial In-service for 10 days at

BRC level and above

Head

Teacher(c) Resource Persons

10.06

Refresher Training for all Resource

Persons,Master Trainers, BRC & CRC faculty

and Coordinators for 5 days each year (@

Rs.200/- per head per day)

Resource

Person 0.00300 192 0.576 192 0.57600

Sub Total 6089 115.525 6089 115.525

11Academic Support through Block Resource

Centre (BRC)/ URC

11.01 Salary of Faculty and Staff

(a) 5 RPs at BRC for subject specific training in

positionRP 80 80

(b) 2 RPs for CWSN in position RP(b-i) 1 CWSN Resource Person RP 1.10000 32 35.200 32 35.20000

(b-ii) 1 Physiotherapist (Resource person for IE) RP

(c) 1 MIS Coordinator in position RP 1.86000

(d) 1 Datra Entry Operator in position RP 1.74000 18 31.320 18 31.32000

(e) 1 Accountant-cum-support staff in position RP 1.80000 16 28.800 16 28.80000

11.02 Furniture Grant BRC/ URC 1.00000

11.03Replacement of furniture, computer, TLE etc (

Once in 5 years)BRC/ URC 1.00000

11.04 Contingency Grant BRC/ URC 0.50000 16 8.000 16 8.00000

11.05 Meeting, TA BRC/ URC 0.30000 16 4.800 16 4.80000

11.06 TLM Grant BRC/ URC 0.10000

11.07 Maintenance Grant BRC/ URC 0.10000

Sub Total 16 108.120 16 108.12000

12Academic Support through Cluster

Resource Centres (CRC/UERC)

12.01Salary of Cluster Coordinator (on an average of

one Resource Person per 18 schools in a block)RP

12.02 Furniture GrantCRC/

UERC0.10000

12.03Replacement of furniture, computer, TLE etc.

once in 5 years

CRC/

UERC0.10000

12.04 Contingency Grant CRC/UERC 0.10000 137 13.700 137 13.70000

12.05 Meeting, TA CRC/UERC 0.12000 137 16.440 137 16.44000

12.06 TLM Grant CRC/UERC 0.03000

12.07Maintenance Grant

CRC/UERC 0.02000

Sub Total 274 30.140 274 30.14000

13Computer Aided Education in upper

primary schools under Innovation

13.01Computer Aided Education in upper primary

schoolsDistrict 0.01200 48 0.576 48 0.57600

Sub Total 48 0.576 48 0.5760014 Libraries in Schools14.01 (a) Primary School (per school) School 0.03000

14.02 (b) Upper Primary School (per school) School 0.10000

Sub TotalIV ANNUAL GRANTS15 Teachers' Grant15.01 Primary Teachers Teacher 0.0050015.02 Upper Primary Teachers Teacher 0.00500 710 3.550 710 3.55000

Sub Total 710 3.550 710 3.5500016 School Grant16.01 Primary School School 0.05000 1816 90.800 1816 90.8000016.02 Upper Primary School School 0.07000 763 53.410 763 53.41000

Sub Total 2579 144.210 2579 144.21000

Arti:SSA-AWPB-2014-15-PABMinits:Badaun:16-06-2014 487 / 533

Page 488: U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 · 2015. 1. 6. · U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15

Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

Name of District : Badaun -7

ActivityS. No.Physical

UnitRemarks

Outlay Recommendation for 2014-15

Spill OverDeferred laibility of

2014-15Fresh Recommended Total Recommended

17Research, Evaluation, Monitoring &

Supervision

17.01 REMS Activities School 0.00103 2579 2.653 2579 2.65279

17.02 Monitoring & Supervision School 0.00078 2579 2.022 2579 2.02211

17.03 House Hold Survey (Urban) in Million Plus Cities District 35.00000

Sub Total 5158 4.675 5158 4.6749018 Maintenance Grant

18.01 Maintenance in School having upto3 Classrooms School 0.07500 506 37.950 506 37.95000

18.01a Maintenance Grant School 0.07500 1988 149.100 1988 149.10000Sub Total 2494 187.050 2494 187.05000

VBRIDGING GENDER AND SOCIAL

CATEGORY GAPS

19 Interventions for CWSN (IE)

19.01 Provision for Inclusive Education Child 0.02600 2467 64.142 2467 64.14200

Sub Total 2467 64.142 2467 64.14200

20Innovativation Head up to Rs.50 Lakh per

district

20.01 Girls Education District 0.70000 8 5.600 8 5.60000

20.02 ECCE District20.03 Intervention for SC / ST children District

20.04 Intervention for Minority Community children District

20.05 Intervention for Urban Deprived children District 10.00000

Sub Total 8 5.600 8 5.6000021 SMC/PRI Training

21.01Residential for 6 Resource Person per Block (3

days) (@ Rs.500/-)Blocks 0.09000

21.02Non-residential (3 days training of 6 SMC

members) (@ Rs.100/-)SMC 0.01800 2476 44.568 2476 44.56800

21.02(a)Non-residential (3 days training of 3 Members of

PRI/VECs/LA) (@ Rs.100/-)VEC/ WEC 0.00900

21.03

Seminar/Orientation of SMC Women members

and President/Vice President (@ Rs. 50,000/-

per block)

Blocks 0.50000

Sub Total 2476 44.568 2476 44.56800VI SCHOOL INFRASTRUCTURE22 Civil Works22.01 Primary School (Plain) (New) School 13.1550022.02 Primary School (Hilly/Rocky) (New) School 13.2750022.03 Upper Primary (Plain) (New) School 20.65500

22.04 Upper Primary School (Hilly/Rocky) (New) School 20.77500

22.04aComposite Schools for Urban Areas (Class I-

VIII)School 41.04000

22.05 ACR in lieu of upgraded Upper Primary School Rooms

22.06 Additional class rooms for adding Class VIII Rooms

22.07 Building Less (Pry) School 9.7500022.08 Building Less (UP) School 18.5900022.09 Dilapidated Building (Pry) School 9.7500022.10 Dilapidated Building (UP) School 18.59000

22.11 Additional Class Room (Rural) ( PS+UPS) Rooms 3.45000

22.12 Additional Class Room (Urban) Rooms 3.4500022.13 Additional Class Room (Hill Area)22.14 Toilet/Urinals (PS & UPS) School 0.7000022.15 Separate Girls Toilet (Rural+Urban) School 0.7000022.16 CWSN friendly Toilets School 0.50000

22.17 Drinking Water Facility (for Urban Area Only)) School 0.15000

22.17a Drinking Water Facility (Plain PS & UPS) School 0.15000

22.17b Drinking Water Facility (Hilly/Rocky PS & UPS) School 0.15000

22.18a Boundary Wall PS (Total in Meters x .01105) 0.01749

22.18bBoundary Wall PS (For Gate) @Rs. 7000 x no. of

P.S.School 0.07800

22.18c Boundary Wall UPS (Total in Meters x .01105) 0.01749

22.18dBoundary Wall UPS (For Gate) @Rs. 7000 x no.

of UPSSchool 0.07800

22.19a Electrification in P.S./ Electrical Equipment School 0.11000

22.19b Electrification in U. P.S./ Electrical Equipment School 0.11000

22.20Office-cum-store-cum-Head Teacher's room

(Primary)Rooms

22.21Office-cum-store-cum-Head Teacher's room

(Upper Primary)Rooms

22.22Augumentation of training facility in BRC (one

time)BRC/ URC 5.00000

22.23 Child friendly Elements School 0.25000

22.24 Ramps with Handrails (Barrier Free Elements) School 0.06000

22.25 Handrails in existing Ramps School 0.01000

Arti:SSA-AWPB-2014-15-PABMinits:Badaun:16-06-2014 488 / 533

Page 489: U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 · 2015. 1. 6. · U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15

Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

Name of District : Badaun -7

ActivityS. No.Physical

UnitRemarks

Outlay Recommendation for 2014-15

Spill OverDeferred laibility of

2014-15Fresh Recommended Total Recommended

22.26 Whole School Develoipment School22.27 Retro-fitting and repairs School

22.28Residential Schools for specific category

of children

(a) Construction of Building including boundary

wall, Water and sanitation facilities, electric

installation (For 100 children)

Building 65.86000

(b) Construction of residential hostel Building 65.86000

(c) Refurnishing unused old buildings Building

22.29

Construction of Hostel in existing Govt UPS

including boundary wall, Water and sanitation

facilities, electric installation etc. (For 50

children)

7.00000

22.30Furniture for Govt. UPS (per child) (@ Rs.500/-

per child enrolled)Child 0.00500

22.31 Major Repairs for Primary School School 0.30000

22.32 Majr Repairs for Upper Primary School School 0.30000

22.33Others (Difference of Civil Wrks

sanctioned in pre.yr.)22.33a Others (Overhead Tank PS) School 0.1200022.33b Others (Overhead Tank UPS) School 0.12000

Sub Total (Civil WOrks)VII PROJECT MANAGEMENT COST23 Management23.01 Management up to 3.5%

(a) Project Management and MIS

(i) DPO ( Salary, Contigency, Consumables,

POL, TA & Computer etc)District 1 117.248 1 117.24750

(ii) EMIS Cell District 1 18.202 1 18.20150Sub Total (a) 1 1 1 135.449 1 135.449

(b) Training of Educational Administrators District

(c) School Mapping and Social Mapping District

Sub Total (23.01)

23.02Learning Enhancement Prog. (LEP) (P & UP) (up

to 2%)District 20.769 20.76850

23.03 Community Mobilization (up to 0.5%) District 1 53.000 1 53.00000

Sub Total (Management) 1 73.769 1 73.76850Total Management Cost 209.218 209.21750Total of SSA (Districs) 2.800 519702 10827.618 519702 10830.418

24 State Component23.01 Management23.02 REMS 0.0044923.03 SIEMAT

Sub Total

STATE SSA TOTAL 2.80000 519702 10827.618 519702 10830.41790

25

KGBV Financial Provision (give

separate costing sheets for different

Models)

Hostel

ANon Recurring One Time Grant (Only

committed liabilities) (Model-I)

25.01 Construction of Building (New)

25.02 Construction of Building KGBV sanctioned earlier

25.02(a) Additional Class Room Rooms 3.45000

25.02(b) Guard Room Rooms 1.32000

25.02(c) Boundary Wall School 5.0200025.03 Boudary Wall (Spillover only)

25.04

Boring/Handpump (Spillover only)

(minimum rates prescribed by State Drinking

Water Department subject to a ceiling of Rs.

1.00 lakhs)

10.19000 10.19000

25.05 Electricity /Water charges (Spillover only)

25.05(a) Solar Water Heater & Solar Light 2.97000

25.06Furniture/Equipment (including Kitchen

equipment)3.00000

25.07 TLM and equipment including library books 3.50000

25.08 Bedding (New) 0.75000

25.09 Replacement of Bedding (once in 3 Year) 0.75000 18 13.500 18 13.50000

Subtotal Non Recurring 10.19000 13.500 23.69000

B Recurring Cost Per Annum (Model-I)

25.10Maintenance per girl student per month @ Rs.

1500/-18.00000 18 324.000 18 324.00000

25.11 Stipend for girl student per month @ Rs. 100/- 1.20000 18 21.600 18 21.60000

25.12Supplementary TLM, stationery and other

educational material @ Rs.1000/- per annum1.00000 18 18.000 18 18.00000

25.13 Salaries

Arti:SSA-AWPB-2014-15-PABMinits:Badaun:16-06-2014 489 / 533

Page 490: U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 · 2015. 1. 6. · U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15

Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

Name of District : Badaun -7

ActivityS. No.Physical

UnitRemarks

Outlay Recommendation for 2014-15

Spill OverDeferred laibility of

2014-15Fresh Recommended Total Recommended

25.13.1 Additional Salaries:

(a) 1 Warden @ Rs. 25,000/- per month 3.00000 18 54.00000 18 54.00000

(b)4 Full time teachers as per RTE norms @ Rs.

20,000/- per month per teacher 9.60000 18 172.80000 18 172.80000

(c)

1 Urdu Teachers (only for blocks with muslim

population above 20% and select urban areas), if

required @ Rs. 12,000/- per month per teacher 1.44000 18 25.92000 18 25.92000

(d)3 part time teachers @ Rs. 5,000/- per month per

teacher 1.80000 18 32.40000 18 32.40000

(e)1 Full time Accountant @ Rs. 10,000/- per month

1.20000 18 21.60000 18 21.60000

(f)

2 Support Staff – (Accountant/ Assistant, Peon,

Chowkidar) @ Rs. 5,000/- per month per staff 1.20000 18 21.60000 18 21.60000

(g) 1 Head cook @ Rs. 6,000/- per month 0.72000 18 12.96000 18 12.96000

(h)2 Asstt. Cooks @ Rs. 4,500/- per month per cook

1.08000 18 19.44000 18 19.44000

25.14Specific skill training @ Rs.1000/- per child per

annum1.00000 18 18.000 18 18.00000

25.15Electricity/water charges @ Rs.1000/- per child

per annum1.00000 18 18.000 18 18.00000

25.16Medical care/contingencies @ Rs. 1250 per child

per annum1.25000 18 22.500 18 22.50000

25.17 Maintenance @ Rs.750/- per child per annum 0.75000 18 13.500 18 13.50000

25.18

Miscellaneous (Educational Tour/ Exposure Visit

/ Sports Material etc.) @ Rs.750/- per child per

annum

0.75000 18 13.500 18 13.50000

25.19Preparatory camps @ Rs.200/- per child per

annum0.20000 18 3.600 18 3.60000

25.20PTAs/school functions @ Rs.200/- per child per

annum0.20000 18 3.600 18 3.60000

25.21 Provision of Rent @ Rs.6000/- per annum 6.00000

25.21a Provision of Rent (6 months) 3.6000025.21b Provision of Rent (3 months) 1.8000025.21c Rent (Previous Year (2007-2012) 1 1

25.22 Capacity building 0.50000 18 9.000 18 9.00000

25.22(a)Physical/ Self Defence Training @ Rs.200/- per

child per annum0.20000 18 3.600 18 3.60000

Subtotal Recurring 18 829.620 18 829.62000

Subtotal (Model-I) 10.19000 18 843.120 18 853.31000

CNon Recurring One Time Grant (Only

committed liabilities) (Model-II)

25.23 Construction of Building (New)

25.24 Construction of Building KGBV sanctioned earlier

25.24(a) Additional Class Room Rooms 3.45000

25.24(b) Guard Room Rooms 1.32000

25.24(c) Boundary Wall School 5.0200025.25 Boudary Wall (Spillover only)25.26 Boring/Handpump (Spillover only)

25.27 Electricity /Water charges (Spillover only)

25.27(a) Solar Water Heater & Solar Light 2.97000

25.28Furniture/Equipment (including Kitchen

equipment)2.00000

25.29 TLM and equipment including library books 3.00000

25.30 Bedding (New) 0.37500

25.31 Replacement of Bedding (once in 3 Year) 0.37500

Subtotal Non Recurring

D Recurring Cost Per Annum (Model-II)

25.32Maintenance per girl student per month @ Rs.

1500/-9.00000

25.33 Stipend for girl student per month @ Rs. 100/- 0.60000

25.34Supplementary TLM, stationery and other

educational material @ Rs.1000/- per annum0.50000

25.35 Salaries(a) 1 Warden @ Rs. 25,000/- per month 3.00000

(b)3 Full time teachers as per RTE norms @ Rs.

20,000/- per month per teacher 7.20000

(c) 3 part time teachers @ Rs. 5,000/- per month per

teacher 1.80000

(d)1 Full time Accountant @ Rs. 10,000/- per month

1.20000

(e)

2 Support Staff – (Accountant/ Assistant, Peon,

Chowkidar) @ Rs. 5,000/- per month per staff 1.20000

Arti:SSA-AWPB-2014-15-PABMinits:Badaun:16-06-2014 490 / 533

Page 491: U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 · 2015. 1. 6. · U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15

Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

Name of District : Badaun -7

ActivityS. No.Physical

UnitRemarks

Outlay Recommendation for 2014-15

Spill OverDeferred laibility of

2014-15Fresh Recommended Total Recommended

(f) 1 Head cook @ Rs. 6,000/- per month 0.72000

(g)1 Asstt. Cooks @ Rs. 4,500/- per month per cook

0.54000

25.36Specific skill training @ Rs.1000/- per child per

annum0.50000

25.37Electricity/water charges @ Rs.1000/- per child

per annum0.50000

25.38Medical care/contingencies @ Rs. 1250 per child

per annum0.62500

25.39 Maintenance @ Rs.750/- per child per annum 0.37500

25.40

Miscellaneous (Educational Tour/ Exposure Visit

/ Sports Material etc.) @ Rs.750/- per child per

annum

0.37500

25.41Preparatory camps @ Rs.300/- per child per

annum0.15000

25.42PTAs/school functions @ Rs.300/- per child per

annum0.15000

25.43 Provision of Rent @ Rs.10000/- per annum 5.00000

25.43a Provision of Rent (6 months) 3.6000025.43b Provision of Rent (3 months) 1.8000025.43c Rent (Previous Year (2007-2012)25.44 Capacity building 0.25000

25.44(a)Physical/ Self Defence Training @ Rs.200/- per

child per annum0.10000

Subtotal Recurring

Subtotal (Model-II) Total (KGBV) 10.190 18 843.120 18 853.310

DISTRICT GRAND TOTAL (SSA+KGBV) 10.190 2.800 519720 11670.738 519720 11683.728

Arti:SSA-AWPB-2014-15-PABMinits:Badaun:16-06-2014 491 / 533

Page 492: U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 · 2015. 1. 6. · U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15

Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

I ACCESS

1 Opening of New Schools

1.01 Upgradation of EGS to PSCentres /

School1.02 New PS School

1.03 Upgradation of PS to UPS / New UPS School

1.04 Composite Schools (for Urban Areas) School

1.05Residential Schools for specific category children

(For 100 children)

1.06Residential Hostel (for specific category of

children) (For 50 children)

1.07 Integration of Class V with Primary Schools

1.08Integration of Class VIII with Upper Primary

Schools

2Residential Schools for specific category

of children (For 100 Children)

Total - Residential Schools (For 100

children)

3Residential Hostel for specific category of

children (For 50 Children)

Total - Residential Schools (For 50

children)4 Transport/Escort Facility

4.01

Children in remote habitations with sparse

populations where opening of schools is

unviable

Child 0.03000

4.02

Urban deprived children/children without adult

protection in urban areas where schools are not

opened because availability of land is a problem

Child 0.03000

Sub Total

5Special Training for mainstreaming of Out-

of-School Children

5.03 Non-Residential (Fresh)(a) 12 months Child 0.06000(b) 9 months 0.04500(c) 6 months

(i)Special Training (by Special Instructors-NRBC)-

(1-5) Child 0.03000 194 5.820 194 5.82000

(ii) Special Training (by Special Instructors-NRBC)-

(6-8) Child 0.03000 113 3.390 113 3.39000

(d) 3 months Child 0.01500Sub Total 307 9.210 307 9.21000

Total (Special Training) 307 9.210 307 9.2105(B) House Hold Survey (HHS)

5(B).01 House Hold Survey through SMCHouse

Hold0.00001

Sub TotalII RETENTION6 Free Text Book

6.01Free Text Book (PS) for Parishadiya & Aided

Primary Schools (Workbooks not included)Child 0.00120 266990 320.388 266990 320.38800

6.01a

Free Text Book (PS) for 25% children of Class-1

in Private Recognised Primary Schools of other

Boards (Workbooks not included)

Child 0.00150

6.02 Free Brail Books (PS) 0.00150 191 0.287 191 0.28650

6.03 Free Large Print Books (PS) 0.00150

6.04Free Text Book (UPS) (Workbooks not included)

(Including KGBV Girls)Child 0.00200 118814 237.628 118814 237.62800

6.05 Free Brail Books (UPS) 0.00250 10 0.025 10 0.02500

6.06 Free Large Print Books (PS) 0.00250Sub Total 386005 558.328 386005 558.328

7 Provision of 2 set of Uniforms

7.01 All Girls (Including KGBV Girls) Child 0.00400 279848 1119.392 279848 1119.39200

7.02 SC Boys Child 0.00400 105956 423.824 105956 423.82400

7.03 ST Boys Child 0.00400

7.04 BPL Boys Child 0.00400 45195 180.780 45195 180.78000

7.05

Free Uniform for 25% children of Class-1 in

Private Recognised Primary Schools of other

Boards

Child0.00400

Sub Total 430999 1723.996 430999 1723.9967(A) Fee Reimbursement

7(A).01

Fee Reimbursement for Admission of children of

Disadvantaged Group & Weaker Section upto

25% of seats in Class-1 of Private Unaided

Recognised Schools

Child 0.05400

Sub Total

8 Teaching Learning Equipment (TLE)

8.01 TLE - New Primary School 10.00000 0.20000 10.000008.02 TLE - New Upper Primary School 1.00000 0.50000 1.00000

Name of District : Azamgarh -6

ActivityS. No.Physical

UnitRemarks

Outlay Recommendation for 2014-15

Spill OverDeferred laibility of

2014-15Fresh Recommended Total Recommended

Arti:SSA-AWPB-2014-15-PABMinits:Azamgarh:16-06-2014 492 / 533

Page 493: U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 · 2015. 1. 6. · U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15

Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

Name of District : Azamgarh -6

ActivityS. No.Physical

UnitRemarks

Outlay Recommendation for 2014-15

Spill OverDeferred laibility of

2014-15Fresh Recommended Total Recommended

Sub Total 11.00000 11.00000III ENHANCING QUALITY9 New Teachers Salary

9.01 Primary Teachers (Regular) (Asstt. Teacher) Teacher 0.91500

9.01aHead Teacher for Primary (if the number of

children exceeds 150 in a school)Teacher

9.02 Primary Teachers (Contract) (S.M.) Teacher

9.03Subject specific Upper Primary Teachers

(Regular) (a) Science and Mathematics Teacher 1.26000(b) Social Studies Teacher 1.26000(c) Languages Teacher 1.26000

Sub Total (9.01 to 9.05)Add.Teacher against PTR

Sub Total (9.06 to 9.12)

Total (New Teacher's Salary-9.01 to 9.12)

Teachers Salary (Recurring-sanctioned

earlier)Primary teachers

9.13 Primary Teachers ( Regular)-Existing, in position Teacher 3.66000 357 1306.620 357 1306.62000

9.14Primary Teachers (Contract)-Existing, in

positionTeacher 0.55000

9.14(a) Primary Teachers (Contract)-under Training Teacher 0.38500 1531 589.435 1531 589.43500

9.14(b)Primary Teacher (Para Teachers Equal to

9.14(a) upgraded as Teachers)0.38500 1625 625.625 1625 625.62500

9.14(c) Primary Teachers (Para)- Vacant Teacher9.15 Primary Teachers (Vacant) Teacher 0.30500

9.16Head Teacher for Primary (if the number of

children exceeds 150)Teacher 5.04000 306 1542.240 306 1542.24000

9.16(b)Head Teacher for Primary (if the number of

children exceeds 150) VacantTeacher 0.42000

Additional teachers

9.17Additional Teachers - PS (Special BTC-

Regular) in positionTeacher 0.30500

9.18Additional Teachers - PS (Special BTC Under

Training)Teacher 0.87600

9.19 Additional Teachers - PS (Vacant) Teacher

9.20Others in position (Para Teachers upgraded

as Teachers)Teacher

Upper Primary teachers

9.21 UP Teachers (Regular)-Existing Teacher 5.04000 1959 9873.360 1959 9873.36000

9.22 UP Teachers (Contract)-Existing9.23 UP Teachers (Vacant) Teacher 1.26000

9.24Head Teacher for Upper Primary (if the number

of children exceeds 100)-ExistingTeacher 5.34000 739 3946.260 739 3946.26000

9.24a Head Teacher for Upper Primary (Vacant) Teacher 1.33500

9.25Subject specific Upper Primary Teachers

(Regular)(a) Science and Mathematics(b) Social Studies(c) Languages

9.32 Part Time Instructors in position(a) Art Education 0.77000 355 273.350 355 273.35000(b) Health and Physical Education 0.77000 357 274.890 357 274.89000(c) Work Education 0.77000 281 216.370 281 216.37000

9.32(A) Part Time Instructors Vacant(a) Art Education 0.42000(b) Health and Physical Education 0.42000(c) Work Education 0.42000

9.33

Others-Incentive to Teachers in Schools

Located in Naxal Affected Areas (@

Rs.1500/- per teachers per month)

Sub Total (9.13 to 9.33) 7510 18648.150 7510 18648.15TOTAL

(New Teachers Salary +Teachers Salary

Recurring)

7510 18648.150 7510 18648.15000

10 Teachers Training(a) Teachers

10.01

Refresher In-service Teachers' Training at BRC

level and above - 10 days (@ Rs.200/- per

head per day)

Teacher

(Target &

Ach.-13-14

in

Mandays)

0.00600

10.01(a)Continuous and Comprehensive Evauation [PS +

UPS)Teacher 0.01300 2305 29.965 2305 29.96500

10.01(b) Eary Reading and Numeracy Skills [PS] Teacher 0.00500 2305 11.525 2305 11.52500

10.01(c) Science [UPS] Teacher 0.00800 1127 9.016 1127 9.01600Recommended as

proposed

10.01(d) CWSN Teacher 0.00400

Arti:SSA-AWPB-2014-15-PABMinits:Azamgarh:16-06-2014 493 / 533

Page 494: U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 · 2015. 1. 6. · U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15

Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

Name of District : Azamgarh -6

ActivityS. No.Physical

UnitRemarks

Outlay Recommendation for 2014-15

Spill OverDeferred laibility of

2014-15Fresh Recommended Total Recommended

10.02

One day monthly cluster level meetings and

peer group training sessions for 10 months for

all teachers each year at CRC level - 10 days (@

Rs.100/- per head per day)

Teacher 0.01000

10.03(a)

Induction Training for Newly Recruited Teachers

for 6 Months (Special BTC)- @Rs.2000/- per

head per year

Teacher 0.02000

10.03(b)5 Days Training for Part Time Instructors @ Rs.

200/- per head per day) Teacher 0.01000

10.04

Training of untrained Teachers to acquire

professional qualifications over a two year

period.

Teacher 0.04700 965 45.355 965 45.35500

(b) Head Teachers

10.05Refresher Residencial In-service for 10 days at

BRC level and above

Head

Teacher(c) Resource Persons

10.06

Refresher Training for all Resource

Persons,Master Trainers, BRC & CRC faculty

and Coordinators for 5 days each year (@

Rs.200/- per head per day)

Resource

Person 0.00300 276 0.828 276 0.82800

Sub Total 6978 96.689 6978 96.689

11Academic Support through Block Resource

Centre (BRC)/ URC

11.01 Salary of Faculty and Staff

(a) 5 RPs at BRC for subject specific training in

positionRP 115 115

(b) 2 RPs for CWSN in position RP(b-i) 1 CWSN Resource Person RP 1.10000 46 50.600 46 50.60000

(b-ii) 1 Physiotherapist (Resource person for IE) RP

(c) 1 MIS Coordinator in position RP 1.86000

(d) 1 Datra Entry Operator in position RP 1.74000 22 38.280 22 38.28000

(e) 1 Accountant-cum-support staff in position RP 1.80000 23 41.400 23 41.40000

11.02 Furniture Grant BRC/ URC 1.00000

11.03Replacement of furniture, computer, TLE etc (

Once in 5 years)BRC/ URC 1.00000

11.04 Contingency Grant BRC/ URC 0.50000 23 11.500 23 11.50000

11.05 Meeting, TA BRC/ URC 0.30000 23 6.900 23 6.90000

11.06 TLM Grant BRC/ URC 0.10000

11.07 Maintenance Grant BRC/ URC 0.10000

Sub Total 23 148.680 23 148.68000

12Academic Support through Cluster

Resource Centres (CRC/UERC)

12.01Salary of Cluster Coordinator (on an average of

one Resource Person per 18 schools in a block)RP

12.02 Furniture GrantCRC/

UERC0.10000

12.03Replacement of furniture, computer, TLE etc.

once in 5 years

CRC/

UERC0.10000

12.04 Contingency Grant CRC/UERC 0.10000 279 27.900 279 27.90000

12.05 Meeting, TA CRC/UERC 0.12000 279 33.480 279 33.48000

12.06 TLM Grant CRC/UERC 0.03000

12.07Maintenance Grant

CRC/UERC 0.02000

Sub Total 558 61.380 558 61.38000

13Computer Aided Education in upper

primary schools under Innovation

13.01Computer Aided Education in upper primary

schoolsDistrict 0.01200 48 0.576 48 0.57600

Sub Total 48 0.576 48 0.5760014 Libraries in Schools14.01 (a) Primary School (per school) School 0.03000

14.02 (b) Upper Primary School (per school) School 0.10000

Sub TotalIV ANNUAL GRANTS15 Teachers' Grant15.01 Primary Teachers Teacher 0.0050015.02 Upper Primary Teachers Teacher 0.00500 1127 5.635 1127 5.63500

Sub Total 1127 5.635 1127 5.6350016 School Grant16.01 Primary School School 0.05000 2373 118.650 2373 118.6500016.02 Upper Primary School School 0.07000 1127 78.890 1127 78.89000

Sub Total 3500 197.540 3500 197.54000

Arti:SSA-AWPB-2014-15-PABMinits:Azamgarh:16-06-2014 494 / 533

Page 495: U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 · 2015. 1. 6. · U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15

Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

Name of District : Azamgarh -6

ActivityS. No.Physical

UnitRemarks

Outlay Recommendation for 2014-15

Spill OverDeferred laibility of

2014-15Fresh Recommended Total Recommended

17Research, Evaluation, Monitoring &

Supervision

17.01 REMS Activities School 0.00103 3500 3.600 3500 3.60014

17.02 Monitoring & Supervision School 0.00078 3500 2.744 3500 2.74423

17.03 House Hold Survey (Urban) in Million Plus Cities District 35.00000

Sub Total 7000 6.344 7000 6.3443818 Maintenance Grant

18.01 Maintenance in School having upto3 Classrooms School 0.07500 407 30.525 407 30.52500

18.01a Maintenance Grant School 0.07500 2861 214.575 2861 214.57500Sub Total 3268 245.100 3268 245.10000

VBRIDGING GENDER AND SOCIAL

CATEGORY GAPS

19 Interventions for CWSN (IE)

19.01 Provision for Inclusive Education Child 0.01000 7454 74.540 7454 74.54000

Sub Total 7454 74.540 7454 74.54000

20Innovativation Head up to Rs.50 Lakh per

district

20.01 Girls Education District 0.70000 10 7.000 10 7.00000

20.02 ECCE District20.03 Intervention for SC / ST children District

20.04 Intervention for Minority Community children District

20.05 Intervention for Urban Deprived children District 10.00000

Sub Total 10 7.000 10 7.0000021 SMC/PRI Training

21.01Residential for 6 Resource Person per Block (3

days) (@ Rs.500/-)Blocks 0.09000

21.02Non-residential (3 days training of 6 SMC

members) (@ Rs.100/-)SMC 0.01800 3271 58.878 3271 58.87800

21.02(a)Non-residential (3 days training of 3 Members of

PRI/VECs/LA) (@ Rs.100/-)VEC/ WEC 0.00900

21.03

Seminar/Orientation of SMC Women members

and President/Vice President (@ Rs. 50,000/-

per block)

Blocks 0.50000

Sub Total 3271 58.878 3271 58.87800VI SCHOOL INFRASTRUCTURE22 Civil Works22.01 Primary School (Plain) (New) School 13.1550022.02 Primary School (Hilly/Rocky) (New) School 13.2750022.03 Upper Primary (Plain) (New) School 0.53 20.65500 0.53108

22.04 Upper Primary School (Hilly/Rocky) (New) School 20.77500

22.04aComposite Schools for Urban Areas (Class I-

VIII)School 41.04000

22.05 ACR in lieu of upgraded Upper Primary School Rooms

22.06 Additional class rooms for adding Class VIII Rooms

22.07 Building Less (Pry) School 9.7500022.08 Building Less (UP) School 18.5900022.09 Dilapidated Building (Pry) School 9.7500022.10 Dilapidated Building (UP) School 18.59000

22.11 Additional Class Room (Rural) ( PS+UPS) Rooms 3.45000 273 941.850 273 941.85000

22.12 Additional Class Room (Urban) Rooms 3.4500022.13 Additional Class Room (Hill Area)22.14 Toilet/Urinals (PS & UPS) School 0.7000022.15 Separate Girls Toilet (Rural+Urban) School 0.7000022.16 CWSN friendly Toilets School 0.50000

22.17 Drinking Water Facility (for Urban Area Only)) School 0.15000

22.17a Drinking Water Facility (Plain PS & UPS) School 0.15000

22.17b Drinking Water Facility (Hilly/Rocky PS & UPS) School 0.15000

22.18a Boundary Wall PS (Total in Meters x .01105) 0.01749

22.18bBoundary Wall PS (For Gate) @Rs. 7000 x no. of

P.S.School 0.07800

22.18c Boundary Wall UPS (Total in Meters x .01105) 0.01749

22.18dBoundary Wall UPS (For Gate) @Rs. 7000 x no.

of UPSSchool 0.07800

22.19a Electrification in P.S./ Electrical Equipment School 0.11000

22.19b Electrification in U. P.S./ Electrical Equipment School 0.11000

22.20Office-cum-store-cum-Head Teacher's room

(Primary)Rooms

22.21Office-cum-store-cum-Head Teacher's room

(Upper Primary)Rooms

22.22Augumentation of training facility in BRC (one

time)BRC/ URC 5.00000

22.23 Child friendly Elements School 0.25000

22.24 Ramps with Handrails (Barrier Free Elements) School 0.06000

22.25 Handrails in existing Ramps School 0.01000

Arti:SSA-AWPB-2014-15-PABMinits:Azamgarh:16-06-2014 495 / 533

Page 496: U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 · 2015. 1. 6. · U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15

Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

Name of District : Azamgarh -6

ActivityS. No.Physical

UnitRemarks

Outlay Recommendation for 2014-15

Spill OverDeferred laibility of

2014-15Fresh Recommended Total Recommended

22.26 Whole School Develoipment School22.27 Retro-fitting and repairs School

22.28Residential Schools for specific category

of children

(a) Construction of Building including boundary

wall, Water and sanitation facilities, electric

installation (For 100 children)

Building 65.86000

(b) Construction of residential hostel Building 65.86000

(c) Refurnishing unused old buildings Building

22.29

Construction of Hostel in existing Govt UPS

including boundary wall, Water and sanitation

facilities, electric installation etc. (For 50

children)

7.00000

22.30Furniture for Govt. UPS (per child) (@ Rs.500/-

per child enrolled)Child 0.00500

22.31 Major Repairs for Primary School School 0.30000

22.32 Majr Repairs for Upper Primary School School 0.30000

22.33Others (Difference of Civil Wrks

sanctioned in pre.yr.)22.33a Others (Overhead Tank PS) School 0.1200022.33b Others (Overhead Tank UPS) School 0.12000

Sub Total (Civil WOrks) 0.53 273 941.850 273 942.38VII PROJECT MANAGEMENT COST23 Management23.01 Management up to 3.5%

(a) Project Management and MIS

(i) DPO ( Salary, Contigency, Consumables,

POL, TA & Computer etc)District 1 98.497 1 98.49670

(ii) EMIS Cell District 1 25.140 1 25.13950Sub Total (a) 1 1 1 123.636 1 123.636

(b) Training of Educational Administrators District

(c) School Mapping and Social Mapping District

Sub Total (23.01)

23.02Learning Enhancement Prog. (LEP) (P & UP) (up

to 2%)District 31.155 31.15520

23.03 Community Mobilization (up to 0.5%) District 1 60.000 1 60.00000

Sub Total (Management) 1 91.155 1 91.15520Total Management Cost 214.791 214.79140Total of SSA (Districs) 0.531 11.000 858331 22998.687 858331 23010.218

24 State Component23.01 Management23.02 REMS 0.0044923.03 SIEMAT

Sub Total

STATE SSA TOTAL 0.53108 11.00000 858331 22998.687 858331 23010.21836

25

KGBV Financial Provision (give

separate costing sheets for different

Models)

Hostel

ANon Recurring One Time Grant (Only

committed liabilities) (Model-I)

25.01 Construction of Building (New)

25.02 Construction of Building KGBV sanctioned earlier 99.75000 99.75000

25.02(a) Additional Class Room Rooms 3.45000

25.02(b) Guard Room Rooms 1.32000

25.02(c) Boundary Wall School 5.0200025.03 Boudary Wall (Spillover only)

25.04

Boring/Handpump (Spillover only)

(minimum rates prescribed by State Drinking

Water Department subject to a ceiling of Rs.

1.00 lakhs)

2.24000 2.24000

25.05 Electricity /Water charges (Spillover only)

25.05(a) Solar Water Heater & Solar Light 2.97000

25.06Furniture/Equipment (including Kitchen

equipment)3.00000

25.07 TLM and equipment including library books 3.50000

25.08 Bedding (New) 0.75000

25.09 Replacement of Bedding (once in 3 Year) 0.75000 15 11.250 15 11.25000

Subtotal Non Recurring 101.99000 11.250 113.24000

B Recurring Cost Per Annum (Model-I)

25.10Maintenance per girl student per month @ Rs.

1500/-18.00000 21 378.000 21 378.00000

25.11 Stipend for girl student per month @ Rs. 100/- 1.20000 21 25.200 21 25.20000

25.12Supplementary TLM, stationery and other

educational material @ Rs.1000/- per annum1.00000 21 21.000 21 21.00000

25.13 Salaries

Arti:SSA-AWPB-2014-15-PABMinits:Azamgarh:16-06-2014 496 / 533

Page 497: U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 · 2015. 1. 6. · U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15

Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

Name of District : Azamgarh -6

ActivityS. No.Physical

UnitRemarks

Outlay Recommendation for 2014-15

Spill OverDeferred laibility of

2014-15Fresh Recommended Total Recommended

25.13.1 Additional Salaries:

(a) 1 Warden @ Rs. 25,000/- per month 3.00000 21 63.00000 21 63.00000

(b)4 Full time teachers as per RTE norms @ Rs.

20,000/- per month per teacher 9.60000 21 201.60000 21 201.60000

(c)

1 Urdu Teachers (only for blocks with muslim

population above 20% and select urban areas), if

required @ Rs. 12,000/- per month per teacher 1.44000 21 30.24000 21 30.24000

(d)3 part time teachers @ Rs. 5,000/- per month per

teacher 1.80000 21 37.80000 21 37.80000

(e)1 Full time Accountant @ Rs. 10,000/- per month

1.20000 21 25.20000 21 25.20000

(f)

2 Support Staff – (Accountant/ Assistant, Peon,

Chowkidar) @ Rs. 5,000/- per month per staff 1.20000 21 25.20000 21 25.20000

(g) 1 Head cook @ Rs. 6,000/- per month 0.72000 21 15.12000 21 15.12000

(h)2 Asstt. Cooks @ Rs. 4,500/- per month per cook

1.08000 21 22.68000 21 22.68000

25.14Specific skill training @ Rs.1000/- per child per

annum1.00000 21 21.000 21 21.00000

25.15Electricity/water charges @ Rs.1000/- per child

per annum1.00000 21 21.000 21 21.00000

25.16Medical care/contingencies @ Rs. 1250 per child

per annum1.25000 21 26.250 21 26.25000

25.17 Maintenance @ Rs.750/- per child per annum 0.75000 21 15.750 21 15.75000

25.18

Miscellaneous (Educational Tour/ Exposure Visit

/ Sports Material etc.) @ Rs.750/- per child per

annum

0.75000 21 15.750 21 15.75000

25.19Preparatory camps @ Rs.200/- per child per

annum0.20000 21 4.200 21 4.20000

25.20PTAs/school functions @ Rs.200/- per child per

annum0.20000 21 4.200 21 4.20000

25.21 Provision of Rent @ Rs.6000/- per annum 6.00000

25.21a Provision of Rent (6 months) 3.6000025.21b Provision of Rent (3 months) 1.8000025.21c Rent (Previous Year (2007-2012)

25.22 Capacity building 0.50000 21 10.500 21 10.50000

25.22(a)Physical/ Self Defence Training @ Rs.200/- per

child per annum0.20000 21 4.200 21 4.20000

Subtotal Recurring 21 967.890 21 967.89000

Subtotal (Model-I) 101.99000 21 979.140 21 1081.13000

CNon Recurring One Time Grant (Only

committed liabilities) (Model-II)

25.23 Construction of Building (New)

25.24 Construction of Building KGBV sanctioned earlier

25.24(a) Additional Class Room Rooms 3.45000

25.24(b) Guard Room Rooms 1.32000

25.24(c) Boundary Wall School 5.0200025.25 Boudary Wall (Spillover only)25.26 Boring/Handpump (Spillover only)

25.27 Electricity /Water charges (Spillover only)

25.27(a) Solar Water Heater & Solar Light 2.97000

25.28Furniture/Equipment (including Kitchen

equipment)2.00000

25.29 TLM and equipment including library books 3.00000

25.30 Bedding (New) 0.37500

25.31 Replacement of Bedding (once in 3 Year) 0.37500

Subtotal Non Recurring

D Recurring Cost Per Annum (Model-II)

25.32Maintenance per girl student per month @ Rs.

1500/-9.00000

25.33 Stipend for girl student per month @ Rs. 100/- 0.60000

25.34Supplementary TLM, stationery and other

educational material @ Rs.1000/- per annum0.50000

25.35 Salaries(a) 1 Warden @ Rs. 25,000/- per month 3.00000

(b)3 Full time teachers as per RTE norms @ Rs.

20,000/- per month per teacher 7.20000

(c) 3 part time teachers @ Rs. 5,000/- per month per

teacher 1.80000

(d)1 Full time Accountant @ Rs. 10,000/- per month

1.20000

(e)

2 Support Staff – (Accountant/ Assistant, Peon,

Chowkidar) @ Rs. 5,000/- per month per staff 1.20000

Arti:SSA-AWPB-2014-15-PABMinits:Azamgarh:16-06-2014 497 / 533

Page 498: U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 · 2015. 1. 6. · U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15

Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

Name of District : Azamgarh -6

ActivityS. No.Physical

UnitRemarks

Outlay Recommendation for 2014-15

Spill OverDeferred laibility of

2014-15Fresh Recommended Total Recommended

(f) 1 Head cook @ Rs. 6,000/- per month 0.72000

(g)1 Asstt. Cooks @ Rs. 4,500/- per month per cook

0.54000

25.36Specific skill training @ Rs.1000/- per child per

annum0.50000

25.37Electricity/water charges @ Rs.1000/- per child

per annum0.50000

25.38Medical care/contingencies @ Rs. 1250 per child

per annum0.62500

25.39 Maintenance @ Rs.750/- per child per annum 0.37500

25.40

Miscellaneous (Educational Tour/ Exposure Visit

/ Sports Material etc.) @ Rs.750/- per child per

annum

0.37500

25.41Preparatory camps @ Rs.300/- per child per

annum0.15000

25.42PTAs/school functions @ Rs.300/- per child per

annum0.15000

25.43 Provision of Rent @ Rs.10000/- per annum 5.00000

25.43a Provision of Rent (6 months) 3.6000025.43b Provision of Rent (3 months) 1.8000025.43c Rent (Previous Year (2007-2012)25.44 Capacity building 0.25000

25.44(a)Physical/ Self Defence Training @ Rs.200/- per

child per annum0.10000

Subtotal Recurring

Subtotal (Model-II) Total (KGBV) 101.990 21 979.140 21 1081.130

DISTRICT GRAND TOTAL (SSA+KGBV) 102.521 11.000 858352 23977.827 858352 24091.348

Arti:SSA-AWPB-2014-15-PABMinits:Azamgarh:16-06-2014 498 / 533

Page 499: U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 · 2015. 1. 6. · U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15

Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

I ACCESS

1 Opening of New Schools

1.01 Upgradation of EGS to PSCentres /

School1.02 New PS School

1.03 Upgradation of PS to UPS / New UPS School

1.04 Composite Schools (for Urban Areas) School

1.05Residential Schools for specific category children

(For 100 children)

1.06Residential Hostel (for specific category of

children) (For 50 children)

1.07 Integration of Class V with Primary Schools

1.08Integration of Class VIII with Upper Primary

Schools

2Residential Schools for specific category

of children (For 100 Children)

Total - Residential Schools (For 100

children)

3Residential Hostel for specific category of

children (For 50 Children)

Total - Residential Schools (For 50

children)4 Transport/Escort Facility

4.01

Children in remote habitations with sparse

populations where opening of schools is

unviable

Child 0.03000

4.02

Urban deprived children/children without adult

protection in urban areas where schools are not

opened because availability of land is a problem

Child 0.03000

Sub Total

5Special Training for mainstreaming of Out-

of-School Children

5.03 Non-Residential (Fresh)(a) 12 months Child 0.06000(b) 9 months 0.04500(c) 6 months

(i)Special Training (by Special Instructors-NRBC)-

(1-5) Child 0.03000 83 2.490 83 2.49000

(ii) Special Training (by Special Instructors-NRBC)-

(6-8) Child 0.03000 63 1.890 63 1.89000

(d) 3 months Child 0.01500Sub Total 146 4.380 146 4.38000

Total (Special Training) 146 4.380 146 4.3805(B) House Hold Survey (HHS)

5(B).01 House Hold Survey through SMCHouse

Hold0.00001

Sub TotalII RETENTION6 Free Text Book

6.01Free Text Book (PS) for Parishadiya & Aided

Primary Schools (Workbooks not included)Child 0.00120 64570 77.484 64570 77.48400

6.01a

Free Text Book (PS) for 25% children of Class-1

in Private Recognised Primary Schools of other

Boards (Workbooks not included)

Child 0.00150

6.02 Free Brail Books (PS) 0.00150 84 0.126 84 0.12600

6.03 Free Large Print Books (PS) 0.00150

6.04Free Text Book (UPS) (Workbooks not included)

(Including KGBV Girls)Child 0.00200 35001 70.002 35001 70.00200

6.05 Free Brail Books (UPS) 0.00250 20 0.050 20 0.05000

6.06 Free Large Print Books (PS) 0.00250Sub Total 99675 147.662 99675 147.662

7 Provision of 2 set of Uniforms

7.01 All Girls (Including KGBV Girls) Child 0.00400 72070 288.280 72070 288.28000

7.02 SC Boys Child 0.00400 28358 113.432 28358 113.43200

7.03 ST Boys Child 0.00400

7.04 BPL Boys Child 0.00400 27171 108.684 27171 108.68400

7.05

Free Uniform for 25% children of Class-1 in

Private Recognised Primary Schools of other

Boards

Child0.00400

Sub Total 127599 510.396 127599 510.3967(A) Fee Reimbursement

7(A).01

Fee Reimbursement for Admission of children of

Disadvantaged Group & Weaker Section upto

25% of seats in Class-1 of Private Unaided

Recognised Schools

Child 0.05400

Sub Total

8 Teaching Learning Equipment (TLE)

8.01 TLE - New Primary School 0.60000 0.20000 0.600008.02 TLE - New Upper Primary School 0.50000 0.50000 0.50000

Name of District : Auraiya -5

ActivityS. No.Physical

UnitRemarks

Outlay Recommendation for 2014-15

Spill OverDeferred laibility of

2014-15Fresh Recommended Total Recommended

Arti:SSA-AWPB-2014-15-PABMinits:Auraiya:16-06-2014 499 / 533

Page 500: U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 · 2015. 1. 6. · U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15

Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

Name of District : Auraiya -5

ActivityS. No.Physical

UnitRemarks

Outlay Recommendation for 2014-15

Spill OverDeferred laibility of

2014-15Fresh Recommended Total Recommended

Sub Total 1.10000 1.10000III ENHANCING QUALITY9 New Teachers Salary

9.01 Primary Teachers (Regular) (Asstt. Teacher) Teacher 0.91500

9.01aHead Teacher for Primary (if the number of

children exceeds 150 in a school)Teacher

9.02 Primary Teachers (Contract) (S.M.) Teacher

9.03Subject specific Upper Primary Teachers

(Regular) (a) Science and Mathematics Teacher 1.26000(b) Social Studies Teacher 1.26000(c) Languages Teacher 1.26000

Sub Total (9.01 to 9.05)Add.Teacher against PTR

Sub Total (9.06 to 9.12)

Total (New Teacher's Salary-9.01 to 9.12)

Teachers Salary (Recurring-sanctioned

earlier)Primary teachers

9.13 Primary Teachers ( Regular)-Existing, in position Teacher 3.66000 334 1222.440 334 1222.44000

9.14Primary Teachers (Contract)-Existing, in

positionTeacher 0.55000

9.14(a) Primary Teachers (Contract)-under Training Teacher 0.38500 822 316.470 822 316.47000

9.14(b)Primary Teacher (Para Teachers Equal to

9.14(a) upgraded as Teachers)0.38500 589 226.765 589 226.76500

9.14(c) Primary Teachers (Para)- Vacant Teacher9.15 Primary Teachers (Vacant) Teacher 0.30500

9.16Head Teacher for Primary (if the number of

children exceeds 150)Teacher 5.04000 241 1214.640 241 1214.64000

9.16(b)Head Teacher for Primary (if the number of

children exceeds 150) VacantTeacher 0.42000

Additional teachers

9.17Additional Teachers - PS (Special BTC-

Regular) in positionTeacher 0.30500

9.18Additional Teachers - PS (Special BTC Under

Training)Teacher 0.87600

9.19 Additional Teachers - PS (Vacant) Teacher

9.20Others in position (Para Teachers upgraded

as Teachers)Teacher

Upper Primary teachers

9.21 UP Teachers (Regular)-Existing Teacher 5.04000 490 2469.600 490 2469.60000

9.22 UP Teachers (Contract)-Existing9.23 UP Teachers (Vacant) Teacher 1.26000

9.24Head Teacher for Upper Primary (if the number

of children exceeds 100)-ExistingTeacher 5.34000 172 918.480 172 918.48000

9.24a Head Teacher for Upper Primary (Vacant) Teacher 1.33500

9.25Subject specific Upper Primary Teachers

(Regular)(a) Science and Mathematics(b) Social Studies(c) Languages

9.32 Part Time Instructors in position(a) Art Education 0.77000 63 48.510 63 48.51000(b) Health and Physical Education 0.77000 63 48.510 63 48.51000(c) Work Education 0.77000 48 36.960 48 36.96000

9.32(A) Part Time Instructors Vacant(a) Art Education 0.42000(b) Health and Physical Education 0.42000(c) Work Education 0.42000

9.33

Others-Incentive to Teachers in Schools

Located in Naxal Affected Areas (@

Rs.1500/- per teachers per month)

Sub Total (9.13 to 9.33) 2822 6502.375 2822 6502.38TOTAL

(New Teachers Salary +Teachers Salary

Recurring)

2822 6502.375 2822 6502.37500

10 Teachers Training(a) Teachers

10.01

Refresher In-service Teachers' Training at BRC

level and above - 10 days (@ Rs.200/- per

head per day)

Teacher

(Target &

Ach.-13-14

in

Mandays)

0.00600

10.01(a)Continuous and Comprehensive Evauation [PS +

UPS)Teacher 0.01300 1007 13.091 1007 13.09100

10.01(b) Eary Reading and Numeracy Skills [PS] Teacher 0.00500 1007 5.035 1007 5.03500

10.01(c) Science [UPS] Teacher 0.00800 511 4.088 511 4.08800Recommended as

proposed

10.01(d) CWSN Teacher 0.00400

Arti:SSA-AWPB-2014-15-PABMinits:Auraiya:16-06-2014 500 / 533

Page 501: U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 · 2015. 1. 6. · U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15

Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

Name of District : Auraiya -5

ActivityS. No.Physical

UnitRemarks

Outlay Recommendation for 2014-15

Spill OverDeferred laibility of

2014-15Fresh Recommended Total Recommended

10.02

One day monthly cluster level meetings and

peer group training sessions for 10 months for

all teachers each year at CRC level - 10 days (@

Rs.100/- per head per day)

Teacher 0.01000

10.03(a)

Induction Training for Newly Recruited Teachers

for 6 Months (Special BTC)- @Rs.2000/- per

head per year

Teacher 0.02000

10.03(b)5 Days Training for Part Time Instructors @ Rs.

200/- per head per day) Teacher 0.01000

10.04

Training of untrained Teachers to acquire

professional qualifications over a two year

period.

Teacher 0.04700 609 28.623 609 28.62300

(b) Head Teachers

10.05Refresher Residencial In-service for 10 days at

BRC level and above

Head

Teacher(c) Resource Persons

10.06

Refresher Training for all Resource

Persons,Master Trainers, BRC & CRC faculty

and Coordinators for 5 days each year (@

Rs.200/- per head per day)

Resource

Person 0.00300 96 0.288 96 0.28800

Sub Total 3230 51.125 3230 51.125

11Academic Support through Block Resource

Centre (BRC)/ URC

11.01 Salary of Faculty and Staff

(a) 5 RPs at BRC for subject specific training in

positionRP 40 40

(b) 2 RPs for CWSN in position RP(b-i) 1 CWSN Resource Person RP 1.10000 16 17.600 16 17.60000

(b-ii) 1 Physiotherapist (Resource person for IE) RP

(c) 1 MIS Coordinator in position RP 1.86000

(d) 1 Datra Entry Operator in position RP 1.74000 8 13.920 8 13.92000

(e) 1 Accountant-cum-support staff in position RP 1.80000 7 12.600 7 12.60000

11.02 Furniture Grant BRC/ URC 1.00000

11.03Replacement of furniture, computer, TLE etc (

Once in 5 years)BRC/ URC 1.00000

11.04 Contingency Grant BRC/ URC 0.50000 8 4.000 8 4.00000

11.05 Meeting, TA BRC/ URC 0.30000 8 2.400 8 2.40000

11.06 TLM Grant BRC/ URC 0.10000

11.07 Maintenance Grant BRC/ URC 0.10000

Sub Total 8 50.520 8 50.52000

12Academic Support through Cluster

Resource Centres (CRC/UERC)

12.01Salary of Cluster Coordinator (on an average of

one Resource Person per 18 schools in a block)RP

12.02 Furniture GrantCRC/

UERC0.10000

12.03Replacement of furniture, computer, TLE etc.

once in 5 years

CRC/

UERC0.10000

12.04 Contingency Grant CRC/UERC 0.10000 78 7.800 78 7.80000

12.05 Meeting, TA CRC/UERC 0.12000 78 9.360 78 9.36000

12.06 TLM Grant CRC/UERC 0.03000

12.07Maintenance Grant

CRC/UERC 0.02000

Sub Total 156 17.160 156 17.16000

13Computer Aided Education in upper

primary schools under Innovation

13.01Computer Aided Education in upper primary

schoolsDistrict 0.01200 48 0.576 48 0.57600

Sub Total 48 0.576 48 0.5760014 Libraries in Schools14.01 (a) Primary School (per school) School 0.03000

14.02 (b) Upper Primary School (per school) School 0.10000

Sub TotalIV ANNUAL GRANTS15 Teachers' Grant15.01 Primary Teachers Teacher 0.0050015.02 Upper Primary Teachers Teacher 0.00500 511 2.555 511 2.55500

Sub Total 511 2.555 511 2.5550016 School Grant16.01 Primary School School 0.05000 1073 53.650 1073 53.6500016.02 Upper Primary School School 0.07000 511 35.770 511 35.77000

Sub Total 1584 89.420 1584 89.42000

Arti:SSA-AWPB-2014-15-PABMinits:Auraiya:16-06-2014 501 / 533

Page 502: U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 · 2015. 1. 6. · U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15

Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

Name of District : Auraiya -5

ActivityS. No.Physical

UnitRemarks

Outlay Recommendation for 2014-15

Spill OverDeferred laibility of

2014-15Fresh Recommended Total Recommended

17Research, Evaluation, Monitoring &

Supervision

17.01 REMS Activities School 0.00103 1584 1.629 1584 1.62932

17.02 Monitoring & Supervision School 0.00078 1584 1.242 1584 1.24196

17.03 House Hold Survey (Urban) in Million Plus Cities District 35.00000

Sub Total 3168 2.871 3168 2.8712818 Maintenance Grant

18.01 Maintenance in School having upto3 Classrooms School 0.07500 571 42.825 571 42.82500

18.01a Maintenance Grant School 0.07500 945 70.875 945 70.87500Sub Total 1516 113.700 1516 113.70000

VBRIDGING GENDER AND SOCIAL

CATEGORY GAPS

19 Interventions for CWSN (IE)

19.01 Provision for Inclusive Education Child 0.01100 4786 52.646 4786 52.64600

Sub Total 4786 52.646 4786 52.64600

20Innovativation Head up to Rs.50 Lakh per

district

20.01 Girls Education District 0.70000 7 4.900 7 4.90000

20.02 ECCE District20.03 Intervention for SC / ST children District

20.04 Intervention for Minority Community children District

20.05 Intervention for Urban Deprived children District 10.00000

Sub Total 7 4.900 7 4.9000021 SMC/PRI Training

21.01Residential for 6 Resource Person per Block (3

days) (@ Rs.500/-)Blocks 0.09000

21.02Non-residential (3 days training of 6 SMC

members) (@ Rs.100/-)SMC 0.01800 1516 27.288 1516 27.28800

21.02(a)Non-residential (3 days training of 3 Members of

PRI/VECs/LA) (@ Rs.100/-)VEC/ WEC 0.00900

21.03

Seminar/Orientation of SMC Women members

and President/Vice President (@ Rs. 50,000/-

per block)

Blocks 0.50000

Sub Total 1516 27.288 1516 27.28800VI SCHOOL INFRASTRUCTURE22 Civil Works22.01 Primary School (Plain) (New) School 3.07526 13.15500 3.0752622.02 Primary School (Hilly/Rocky) (New) School 13.2750022.03 Upper Primary (Plain) (New) School 20.65500

22.04 Upper Primary School (Hilly/Rocky) (New) School 20.77500

22.04aComposite Schools for Urban Areas (Class I-

VIII)School 41.04000

22.05 ACR in lieu of upgraded Upper Primary School Rooms

22.06 Additional class rooms for adding Class VIII Rooms

22.07 Building Less (Pry) School 9.7500022.08 Building Less (UP) School 18.5900022.09 Dilapidated Building (Pry) School 9.7500022.10 Dilapidated Building (UP) School 18.59000

22.11 Additional Class Room (Rural) ( PS+UPS) Rooms 3.45000 9 31.050 9 31.05000

22.12 Additional Class Room (Urban) Rooms 3.4500022.13 Additional Class Room (Hill Area)22.14 Toilet/Urinals (PS & UPS) School 0.70000 56 39.200 56 39.2000022.15 Separate Girls Toilet (Rural+Urban) School 0.70000 65 45.500 65 45.5000022.16 CWSN friendly Toilets School 0.50000

22.17 Drinking Water Facility (for Urban Area Only)) School 0.15000

22.17a Drinking Water Facility (Plain PS & UPS) School 0.15000 31 4.650 31 4.65000

22.17b Drinking Water Facility (Hilly/Rocky PS & UPS) School 0.15000

22.18a Boundary Wall PS (Total in Meters x .01105) 0.01749

22.18bBoundary Wall PS (For Gate) @Rs. 7000 x no. of

P.S.School 0.07800

22.18c Boundary Wall UPS (Total in Meters x .01105) 0.01749

22.18dBoundary Wall UPS (For Gate) @Rs. 7000 x no.

of UPSSchool 0.07800

22.19a Electrification in P.S./ Electrical Equipment School 0.11000

22.19b Electrification in U. P.S./ Electrical Equipment School 0.11000

22.20Office-cum-store-cum-Head Teacher's room

(Primary)Rooms

22.21Office-cum-store-cum-Head Teacher's room

(Upper Primary)Rooms

22.22Augumentation of training facility in BRC (one

time)BRC/ URC 5.00000

22.23 Child friendly Elements School 0.25000

22.24 Ramps with Handrails (Barrier Free Elements) School 0.06000

22.25 Handrails in existing Ramps School 0.01000

Arti:SSA-AWPB-2014-15-PABMinits:Auraiya:16-06-2014 502 / 533

Page 503: U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 · 2015. 1. 6. · U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15

Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

Name of District : Auraiya -5

ActivityS. No.Physical

UnitRemarks

Outlay Recommendation for 2014-15

Spill OverDeferred laibility of

2014-15Fresh Recommended Total Recommended

22.26 Whole School Develoipment School22.27 Retro-fitting and repairs School

22.28Residential Schools for specific category

of children

(a) Construction of Building including boundary

wall, Water and sanitation facilities, electric

installation (For 100 children)

Building 65.86000

(b) Construction of residential hostel Building 65.86000

(c) Refurnishing unused old buildings Building

22.29

Construction of Hostel in existing Govt UPS

including boundary wall, Water and sanitation

facilities, electric installation etc. (For 50

children)

7.00000

22.30Furniture for Govt. UPS (per child) (@ Rs.500/-

per child enrolled)Child 0.00500

22.31 Major Repairs for Primary School School 0.30000

22.32 Majr Repairs for Upper Primary School School 0.30000

22.33Others (Difference of Civil Wrks

sanctioned in pre.yr.)22.33a Others (Overhead Tank PS) School 0.1200022.33b Others (Overhead Tank UPS) School 0.12000

Sub Total (Civil WOrks) 3.08 161 120.400 161 123.48VII PROJECT MANAGEMENT COST23 Management23.01 Management up to 3.5%

(a) Project Management and MIS

(i) DPO ( Salary, Contigency, Consumables,

POL, TA & Computer etc)District 1 133.110 1 133.11010

(ii) EMIS Cell District 1 12.402 1 12.40200Sub Total (a) 1 1 1 145.512 1 145.512

(b) Training of Educational Administrators District

(c) School Mapping and Social Mapping District

Sub Total (23.01)

23.02Learning Enhancement Prog. (LEP) (P & UP) (up

to 2%)District 10.344 10.34355

23.03 Community Mobilization (up to 0.5%) District 1 38.000 1 38.00000

Sub Total (Management) 1 48.344 1 48.34355Total Management Cost 193.856 193.85565Total of SSA (Districs) 3.075 1.100 246933 7891.830 246933 7896.005

24 State Component23.01 Management23.02 REMS 0.0044923.03 SIEMAT

Sub Total

STATE SSA TOTAL 3.07526 1.10000 246933 7891.830 246933 7896.00519

25

KGBV Financial Provision (give

separate costing sheets for different

Models)

Hostel

ANon Recurring One Time Grant (Only

committed liabilities) (Model-I)

25.01 Construction of Building (New)

25.02 Construction of Building KGBV sanctioned earlier

25.02(a) Additional Class Room Rooms 3.45000

25.02(b) Guard Room Rooms 1.32000

25.02(c) Boundary Wall School 5.0200025.03 Boudary Wall (Spillover only)

25.04

Boring/Handpump (Spillover only)

(minimum rates prescribed by State Drinking

Water Department subject to a ceiling of Rs.

1.00 lakhs)

25.05 Electricity /Water charges (Spillover only)

25.05(a) Solar Water Heater & Solar Light 2.97000

25.06Furniture/Equipment (including Kitchen

equipment)3.00000

25.07 TLM and equipment including library books 3.50000

25.08 Bedding (New) 0.75000

25.09 Replacement of Bedding (once in 3 Year) 0.75000

Subtotal Non Recurring

B Recurring Cost Per Annum (Model-I)

25.10Maintenance per girl student per month @ Rs.

1500/-18.00000

25.11 Stipend for girl student per month @ Rs. 100/- 1.20000

25.12Supplementary TLM, stationery and other

educational material @ Rs.1000/- per annum1.00000

25.13 Salaries

Arti:SSA-AWPB-2014-15-PABMinits:Auraiya:16-06-2014 503 / 533

Page 504: U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 · 2015. 1. 6. · U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15

Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

Name of District : Auraiya -5

ActivityS. No.Physical

UnitRemarks

Outlay Recommendation for 2014-15

Spill OverDeferred laibility of

2014-15Fresh Recommended Total Recommended

25.13.1 Additional Salaries:

(a) 1 Warden @ Rs. 25,000/- per month 3.00000

(b)4 Full time teachers as per RTE norms @ Rs.

20,000/- per month per teacher 9.60000

(c)

1 Urdu Teachers (only for blocks with muslim

population above 20% and select urban areas), if

required @ Rs. 12,000/- per month per teacher 1.44000

(d)3 part time teachers @ Rs. 5,000/- per month per

teacher 1.80000

(e)1 Full time Accountant @ Rs. 10,000/- per month

1.20000

(f)

2 Support Staff – (Accountant/ Assistant, Peon,

Chowkidar) @ Rs. 5,000/- per month per staff 1.20000

(g) 1 Head cook @ Rs. 6,000/- per month 0.72000

(h)2 Asstt. Cooks @ Rs. 4,500/- per month per cook

1.08000

25.14Specific skill training @ Rs.1000/- per child per

annum1.00000

25.15Electricity/water charges @ Rs.1000/- per child

per annum1.00000

25.16Medical care/contingencies @ Rs. 1250 per child

per annum1.25000

25.17 Maintenance @ Rs.750/- per child per annum 0.75000

25.18

Miscellaneous (Educational Tour/ Exposure Visit

/ Sports Material etc.) @ Rs.750/- per child per

annum

0.75000

25.19Preparatory camps @ Rs.200/- per child per

annum0.20000

25.20PTAs/school functions @ Rs.200/- per child per

annum0.20000

25.21 Provision of Rent @ Rs.6000/- per annum 6.00000

25.21a Provision of Rent (6 months) 3.6000025.21b Provision of Rent (3 months) 1.8000025.21c Rent (Previous Year (2007-2012)

25.22 Capacity building 0.50000

25.22(a)Physical/ Self Defence Training @ Rs.200/- per

child per annum0.20000

Subtotal Recurring

Subtotal (Model-I)

CNon Recurring One Time Grant (Only

committed liabilities) (Model-II)

25.23 Construction of Building (New)

25.24 Construction of Building KGBV sanctioned earlier

25.24(a) Additional Class Room Rooms 3.45000

25.24(b) Guard Room Rooms 1.32000

25.24(c) Boundary Wall School 5.0200025.25 Boudary Wall (Spillover only)25.26 Boring/Handpump (Spillover only)

25.27 Electricity /Water charges (Spillover only)

25.27(a) Solar Water Heater & Solar Light 2.97000

25.28Furniture/Equipment (including Kitchen

equipment)2.00000

25.29 TLM and equipment including library books 3.00000

25.30 Bedding (New) 0.37500

25.31 Replacement of Bedding (once in 3 Year) 0.37500

Subtotal Non Recurring

D Recurring Cost Per Annum (Model-II)

25.32Maintenance per girl student per month @ Rs.

1500/-9.00000

25.33 Stipend for girl student per month @ Rs. 100/- 0.60000

25.34Supplementary TLM, stationery and other

educational material @ Rs.1000/- per annum0.50000

25.35 Salaries(a) 1 Warden @ Rs. 25,000/- per month 3.00000

(b)3 Full time teachers as per RTE norms @ Rs.

20,000/- per month per teacher 7.20000

(c) 3 part time teachers @ Rs. 5,000/- per month per

teacher 1.80000

(d)1 Full time Accountant @ Rs. 10,000/- per month

1.20000

(e)

2 Support Staff – (Accountant/ Assistant, Peon,

Chowkidar) @ Rs. 5,000/- per month per staff 1.20000

Arti:SSA-AWPB-2014-15-PABMinits:Auraiya:16-06-2014 504 / 533

Page 505: U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 · 2015. 1. 6. · U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15

Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

Name of District : Auraiya -5

ActivityS. No.Physical

UnitRemarks

Outlay Recommendation for 2014-15

Spill OverDeferred laibility of

2014-15Fresh Recommended Total Recommended

(f) 1 Head cook @ Rs. 6,000/- per month 0.72000

(g)1 Asstt. Cooks @ Rs. 4,500/- per month per cook

0.54000

25.36Specific skill training @ Rs.1000/- per child per

annum0.50000

25.37Electricity/water charges @ Rs.1000/- per child

per annum0.50000

25.38Medical care/contingencies @ Rs. 1250 per child

per annum0.62500

25.39 Maintenance @ Rs.750/- per child per annum 0.37500

25.40

Miscellaneous (Educational Tour/ Exposure Visit

/ Sports Material etc.) @ Rs.750/- per child per

annum

0.37500

25.41Preparatory camps @ Rs.300/- per child per

annum0.15000

25.42PTAs/school functions @ Rs.300/- per child per

annum0.15000

25.43 Provision of Rent @ Rs.10000/- per annum 5.00000

25.43a Provision of Rent (6 months) 3.6000025.43b Provision of Rent (3 months) 1.8000025.43c Rent (Previous Year (2007-2012)25.44 Capacity building 0.25000

25.44(a)Physical/ Self Defence Training @ Rs.200/- per

child per annum0.10000

Subtotal Recurring

Subtotal (Model-II) Total (KGBV)

DISTRICT GRAND TOTAL (SSA+KGBV) 3.075 1.100 246933 7891.830 246933 7896.005

Arti:SSA-AWPB-2014-15-PABMinits:Auraiya:16-06-2014 505 / 533

Page 506: U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 · 2015. 1. 6. · U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15

Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

I ACCESS

1 Opening of New Schools

1.01 Upgradation of EGS to PSCentres /

School1.02 New PS School

1.03 Upgradation of PS to UPS / New UPS School

1.04 Composite Schools (for Urban Areas) School

1.05Residential Schools for specific category children

(For 100 children)

1.06Residential Hostel (for specific category of

children) (For 50 children)

1.07 Integration of Class V with Primary Schools

1.08Integration of Class VIII with Upper Primary

Schools

2Residential Schools for specific category

of children (For 100 Children)

Total - Residential Schools (For 100

children)

3Residential Hostel for specific category of

children (For 50 Children)

Total - Residential Schools (For 50

children)4 Transport/Escort Facility

4.01

Children in remote habitations with sparse

populations where opening of schools is

unviable

Child 0.03000

4.02

Urban deprived children/children without adult

protection in urban areas where schools are not

opened because availability of land is a problem

Child 0.03000

Sub Total

5Special Training for mainstreaming of Out-

of-School Children

5.03 Non-Residential (Fresh)(a) 12 months Child 0.06000(b) 9 months 0.04500(c) 6 months

(i)Special Training (by Special Instructors-NRBC)-

(1-5) Child 0.03000 88 2.640 88 2.64000

(ii) Special Training (by Special Instructors-NRBC)-

(6-8) Child 0.03000 34 1.020 34 1.02000

(d) 3 months Child 0.01500Sub Total 122 3.660 122 3.66000

Total (Special Training) 122 3.660 122 3.6605(B) House Hold Survey (HHS)

5(B).01 House Hold Survey through SMCHouse

Hold0.00001

Sub TotalII RETENTION6 Free Text Book

6.01Free Text Book (PS) for Parishadiya & Aided

Primary Schools (Workbooks not included)Child 0.00120 104885 125.862 104885 125.86200

6.01a

Free Text Book (PS) for 25% children of Class-1

in Private Recognised Primary Schools of other

Boards (Workbooks not included)

Child 0.00150

6.02 Free Brail Books (PS) 0.00150 95 0.143 95 0.14250

6.03 Free Large Print Books (PS) 0.00150

6.04Free Text Book (UPS) (Workbooks not included)

(Including KGBV Girls)Child 0.00200 62321 124.642 62321 124.64200

6.05 Free Brail Books (UPS) 0.00250 22 0.055 22 0.05500

6.06 Free Large Print Books (PS) 0.00250Sub Total 167323 250.702 167323 250.702

7 Provision of 2 set of Uniforms

7.01 All Girls (Including KGBV Girls) Child 0.00400 126791 507.164 126791 507.16400

7.02 SC Boys Child 0.00400 42777 171.108 42777 171.10800

7.03 ST Boys Child 0.00400

7.04 BPL Boys Child 0.00400 54712 218.848 54712 218.84800

7.05

Free Uniform for 25% children of Class-1 in

Private Recognised Primary Schools of other

Boards

Child0.00400

Sub Total 224280 897.120 224280 897.1207(A) Fee Reimbursement

7(A).01

Fee Reimbursement for Admission of children of

Disadvantaged Group & Weaker Section upto

25% of seats in Class-1 of Private Unaided

Recognised Schools

Child 0.05400

Sub Total

8 Teaching Learning Equipment (TLE)

8.01 TLE - New Primary School 21.60000 0.20000 21.600008.02 TLE - New Upper Primary School 2.00000 0.50000 2.00000

Name of District : Ambedkar Nagar - 4

ActivityS. No.Physical

UnitRemarks

Outlay Recommendation for 2014-15

Spill OverDeferred laibility of

2014-15Fresh Recommended Total Recommended

Arti:SSA-AWPB-2014-15-PABMinits:Ambedkar Nagar:16-06-2014 506 / 533

Page 507: U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 · 2015. 1. 6. · U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15

Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

Name of District : Ambedkar Nagar - 4

ActivityS. No.Physical

UnitRemarks

Outlay Recommendation for 2014-15

Spill OverDeferred laibility of

2014-15Fresh Recommended Total Recommended

Sub Total 23.60000 23.60000III ENHANCING QUALITY9 New Teachers Salary

9.01 Primary Teachers (Regular) (Asstt. Teacher) Teacher 0.91500

9.01aHead Teacher for Primary (if the number of

children exceeds 150 in a school)Teacher

9.02 Primary Teachers (Contract) (S.M.) Teacher

9.03Subject specific Upper Primary Teachers

(Regular) (a) Science and Mathematics Teacher 1.26000(b) Social Studies Teacher 1.26000(c) Languages Teacher 1.26000

Sub Total (9.01 to 9.05)Add.Teacher against PTR

Sub Total (9.06 to 9.12)

Total (New Teacher's Salary-9.01 to 9.12)

Teachers Salary (Recurring-sanctioned

earlier)Primary teachers

9.13 Primary Teachers ( Regular)-Existing, in position Teacher 3.66000 178 651.480 178 651.48000

9.14Primary Teachers (Contract)-Existing, in

positionTeacher 0.55000

9.14(a) Primary Teachers (Contract)-under Training Teacher 0.38500 1510 581.350 1510 581.35000

9.14(b)Primary Teacher (Para Teachers Equal to

9.14(a) upgraded as Teachers)0.38500 611 235.235 611 235.23500

9.14(c) Primary Teachers (Para)- Vacant Teacher9.15 Primary Teachers (Vacant) Teacher 0.30500

9.16Head Teacher for Primary (if the number of

children exceeds 150)Teacher 5.04000 217 1093.680 217 1093.68000

9.16(b)Head Teacher for Primary (if the number of

children exceeds 150) VacantTeacher 0.42000

Additional teachers

9.17Additional Teachers - PS (Special BTC-

Regular) in positionTeacher 0.30500

9.18Additional Teachers - PS (Special BTC Under

Training)Teacher 0.87600

9.19 Additional Teachers - PS (Vacant) Teacher

9.20Others in position (Para Teachers upgraded

as Teachers)Teacher

Upper Primary teachers

9.21 UP Teachers (Regular)-Existing Teacher 5.04000 1107 5579.280 1107 5579.28000

9.22 UP Teachers (Contract)-Existing9.23 UP Teachers (Vacant) Teacher 1.26000

9.24Head Teacher for Upper Primary (if the number

of children exceeds 100)-ExistingTeacher 5.34000 201 1073.340 201 1073.34000

9.24a Head Teacher for Upper Primary (Vacant) Teacher 1.33500

9.25Subject specific Upper Primary Teachers

(Regular)(a) Science and Mathematics(b) Social Studies(c) Languages

9.32 Part Time Instructors in position(a) Art Education 0.77000 132 101.640 132 101.64000(b) Health and Physical Education 0.77000 143 110.110 143 110.11000(c) Work Education 0.77000 104 80.080 104 80.08000

9.32(A) Part Time Instructors Vacant(a) Art Education 0.42000(b) Health and Physical Education 0.42000(c) Work Education 0.42000

9.33

Others-Incentive to Teachers in Schools

Located in Naxal Affected Areas (@

Rs.1500/- per teachers per month)

Sub Total (9.13 to 9.33) 4203 9506.195 4203 9506.20TOTAL

(New Teachers Salary +Teachers Salary

Recurring)

4203 9506.195 4203 9506.19500

10 Teachers Training(a) Teachers

10.01

Refresher In-service Teachers' Training at BRC

level and above - 10 days (@ Rs.200/- per

head per day)

Teacher

(Target &

Ach.-13-14

in

Mandays)

0.00600

10.01(a)Continuous and Comprehensive Evauation [PS +

UPS)Teacher 0.01300 1347 17.511 1347 17.51100

10.01(b) Eary Reading and Numeracy Skills [PS] Teacher 0.00500 1347 6.735 1347 6.73500

10.01(c) Science [UPS] Teacher 0.00800 609 4.872 609 4.87200Recommended as

proposed

10.01(d) CWSN Teacher 0.00400

Arti:SSA-AWPB-2014-15-PABMinits:Ambedkar Nagar:16-06-2014 507 / 533

Page 508: U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 · 2015. 1. 6. · U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15

Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

Name of District : Ambedkar Nagar - 4

ActivityS. No.Physical

UnitRemarks

Outlay Recommendation for 2014-15

Spill OverDeferred laibility of

2014-15Fresh Recommended Total Recommended

10.02

One day monthly cluster level meetings and

peer group training sessions for 10 months for

all teachers each year at CRC level - 10 days (@

Rs.100/- per head per day)

Teacher 0.01000

10.03(a)

Induction Training for Newly Recruited Teachers

for 6 Months (Special BTC)- @Rs.2000/- per

head per year

Teacher 0.02000

10.03(b)5 Days Training for Part Time Instructors @ Rs.

200/- per head per day) Teacher 0.01000

10.04

Training of untrained Teachers to acquire

professional qualifications over a two year

period.

Teacher 0.04700 1098 51.606 1098 51.60600

(b) Head Teachers

10.05Refresher Residencial In-service for 10 days at

BRC level and above

Head

Teacher(c) Resource Persons

10.06

Refresher Training for all Resource

Persons,Master Trainers, BRC & CRC faculty

and Coordinators for 5 days each year (@

Rs.200/- per head per day)

Resource

Person 0.00300 120 0.360 120 0.36000

Sub Total 4521 81.084 4521 81.084

11Academic Support through Block Resource

Centre (BRC)/ URC

11.01 Salary of Faculty and Staff

(a) 5 RPs at BRC for subject specific training in

positionRP 50 50

(b) 2 RPs for CWSN in position RP(b-i) 1 CWSN Resource Person RP 1.10000 20 22.000 20 22.00000

(b-ii) 1 Physiotherapist (Resource person for IE) RP

(c) 1 MIS Coordinator in position RP 1.86000

(d) 1 Datra Entry Operator in position RP 1.74000 10 17.400 10 17.40000

(e) 1 Accountant-cum-support staff in position RP 1.80000 7 12.600 7 12.60000

11.02 Furniture Grant BRC/ URC 1.00000

11.03Replacement of furniture, computer, TLE etc (

Once in 5 years)BRC/ URC 1.00000

11.04 Contingency Grant BRC/ URC 0.50000 10 5.000 10 5.00000

11.05 Meeting, TA BRC/ URC 0.30000 10 3.000 10 3.00000

11.06 TLM Grant BRC/ URC 0.10000

11.07 Maintenance Grant BRC/ URC 0.10000

Sub Total 10 60.000 10 60.00000

12Academic Support through Cluster

Resource Centres (CRC/UERC)

12.01Salary of Cluster Coordinator (on an average of

one Resource Person per 18 schools in a block)RP

12.02 Furniture GrantCRC/

UERC0.10000

12.03Replacement of furniture, computer, TLE etc.

once in 5 years

CRC/

UERC0.10000

12.04 Contingency Grant CRC/UERC 0.10000 113 11.300 113 11.30000

12.05 Meeting, TA CRC/UERC 0.12000 113 13.560 113 13.56000

12.06 TLM Grant CRC/UERC 0.03000

12.07Maintenance Grant

CRC/UERC 0.02000

Sub Total 226 24.860 226 24.86000

13Computer Aided Education in upper

primary schools under Innovation

13.01Computer Aided Education in upper primary

schoolsDistrict 0.01200 48 0.576 48 0.57600

Sub Total 48 0.576 48 0.5760014 Libraries in Schools14.01 (a) Primary School (per school) School 0.03000

14.02 (b) Upper Primary School (per school) School 0.10000

Sub TotalIV ANNUAL GRANTS15 Teachers' Grant15.01 Primary Teachers Teacher 0.0050015.02 Upper Primary Teachers Teacher 0.00500 609 3.045 609 3.04500

Sub Total 609 3.045 609 3.0450016 School Grant16.01 Primary School School 0.05000 1420 71.000 1420 71.0000016.02 Upper Primary School School 0.07000 601 42.070 601 42.07000

Sub Total 2021 113.070 2021 113.07000

Arti:SSA-AWPB-2014-15-PABMinits:Ambedkar Nagar:16-06-2014 508 / 533

Page 509: U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 · 2015. 1. 6. · U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15

Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

Name of District : Ambedkar Nagar - 4

ActivityS. No.Physical

UnitRemarks

Outlay Recommendation for 2014-15

Spill OverDeferred laibility of

2014-15Fresh Recommended Total Recommended

17Research, Evaluation, Monitoring &

Supervision

17.01 REMS Activities School 0.00103 2021 2.079 2021 2.07883

17.02 Monitoring & Supervision School 0.00078 2021 1.585 2021 1.58460

17.03 House Hold Survey (Urban) in Million Plus Cities District 35.00000

Sub Total 4042 3.663 4042 3.6634218 Maintenance Grant

18.01 Maintenance in School having upto3 Classrooms School 0.07500 394 29.550 394 29.55000

18.01a Maintenance Grant School 0.07500 1473 110.475 1473 110.47500Sub Total 1867 140.025 1867 140.02500

VBRIDGING GENDER AND SOCIAL

CATEGORY GAPS

19 Interventions for CWSN (IE)

19.01 Provision for Inclusive Education Child 0.02400 2938 70.512 2938 70.51200

Sub Total 2938 70.512 2938 70.51200

20Innovativation Head up to Rs.50 Lakh per

district

20.01 Girls Education District 0.70000 9 6.300 9 6.30000

20.02 ECCE District20.03 Intervention for SC / ST children District

20.04 Intervention for Minority Community children District

20.05 Intervention for Urban Deprived children District 10.00000

Sub Total 9 6.300 9 6.3000021 SMC/PRI Training

21.01Residential for 6 Resource Person per Block (3

days) (@ Rs.500/-)Blocks 0.09000

21.02Non-residential (3 days training of 6 SMC

members) (@ Rs.100/-)SMC 0.01800 1937 34.866 1937 34.86600

21.02(a)Non-residential (3 days training of 3 Members of

PRI/VECs/LA) (@ Rs.100/-)VEC/ WEC 0.00900

21.03

Seminar/Orientation of SMC Women members

and President/Vice President (@ Rs. 50,000/-

per block)

Blocks 0.50000

Sub Total 1937 34.866 1937 34.86600VI SCHOOL INFRASTRUCTURE22 Civil Works22.01 Primary School (Plain) (New) School 175.834 13.15500 175.8340022.02 Primary School (Hilly/Rocky) (New) School 13.2750022.03 Upper Primary (Plain) (New) School 4.58564 20.65500 4.58564

22.04 Upper Primary School (Hilly/Rocky) (New) School 20.77500

22.04aComposite Schools for Urban Areas (Class I-

VIII)School 41.04000

22.05 ACR in lieu of upgraded Upper Primary School Rooms

22.06 Additional class rooms for adding Class VIII Rooms

22.07 Building Less (Pry) School 9.7500022.08 Building Less (UP) School 18.5900022.09 Dilapidated Building (Pry) School 9.7500022.10 Dilapidated Building (UP) School 18.59000

22.11 Additional Class Room (Rural) ( PS+UPS) Rooms 3.45000 26 89.700 26 89.70000

22.12 Additional Class Room (Urban) Rooms 3.4500022.13 Additional Class Room (Hill Area)22.14 Toilet/Urinals (PS & UPS) School 0.70000 45 31.500 45 31.5000022.15 Separate Girls Toilet (Rural+Urban) School 0.7000022.16 CWSN friendly Toilets School 0.50000

22.17 Drinking Water Facility (for Urban Area Only)) School 0.15000

22.17a Drinking Water Facility (Plain PS & UPS) School 0.15000 193 28.950 193 28.95000

22.17b Drinking Water Facility (Hilly/Rocky PS & UPS) School 0.15000

22.18a Boundary Wall PS (Total in Meters x .01105) 0.01749

22.18bBoundary Wall PS (For Gate) @Rs. 7000 x no. of

P.S.School 0.07800

22.18c Boundary Wall UPS (Total in Meters x .01105) 0.01749

22.18dBoundary Wall UPS (For Gate) @Rs. 7000 x no.

of UPSSchool 0.07800

22.19a Electrification in P.S./ Electrical Equipment School 0.11000

22.19b Electrification in U. P.S./ Electrical Equipment School 0.11000

22.20Office-cum-store-cum-Head Teacher's room

(Primary)Rooms

22.21Office-cum-store-cum-Head Teacher's room

(Upper Primary)Rooms

22.22Augumentation of training facility in BRC (one

time)BRC/ URC 5.00000

22.23 Child friendly Elements School 0.25000

22.24 Ramps with Handrails (Barrier Free Elements) School 0.06000

22.25 Handrails in existing Ramps School 0.01000

Arti:SSA-AWPB-2014-15-PABMinits:Ambedkar Nagar:16-06-2014 509 / 533

Page 510: U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 · 2015. 1. 6. · U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15

Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

Name of District : Ambedkar Nagar - 4

ActivityS. No.Physical

UnitRemarks

Outlay Recommendation for 2014-15

Spill OverDeferred laibility of

2014-15Fresh Recommended Total Recommended

22.26 Whole School Develoipment School22.27 Retro-fitting and repairs School

22.28Residential Schools for specific category

of children

(a) Construction of Building including boundary

wall, Water and sanitation facilities, electric

installation (For 100 children)

Building 65.86000

(b) Construction of residential hostel Building 65.86000

(c) Refurnishing unused old buildings Building

22.29

Construction of Hostel in existing Govt UPS

including boundary wall, Water and sanitation

facilities, electric installation etc. (For 50

children)

7.00000

22.30Furniture for Govt. UPS (per child) (@ Rs.500/-

per child enrolled)Child 0.00500

22.31 Major Repairs for Primary School School 0.30000

22.32 Majr Repairs for Upper Primary School School 0.30000

22.33Others (Difference of Civil Wrks

sanctioned in pre.yr.)22.33a Others (Overhead Tank PS) School 0.1200022.33b Others (Overhead Tank UPS) School 0.12000

Sub Total (Civil WOrks) 180.42 264 150.150 264 330.57VII PROJECT MANAGEMENT COST23 Management23.01 Management up to 3.5%

(a) Project Management and MIS

(i) DPO ( Salary, Contigency, Consumables,

POL, TA & Computer etc)District 1 95.764 1 95.76440

(ii) EMIS Cell District 1 14.441 1 14.44050Sub Total (a) 1 1 1 110.205 1 110.205

(b) Training of Educational Administrators District

(c) School Mapping and Social Mapping District

Sub Total (23.01)

23.02Learning Enhancement Prog. (LEP) (P & UP) (up

to 2%)District 15.460 15.46030

23.03 Community Mobilization (up to 0.5%) District 1 45.850 1 45.85000

Sub Total (Management) 1 61.310 1 61.31030Total Management Cost 171.515 171.51520Total of SSA (Districs) 180.420 23.600 414420 11517.343 414420 11721.363

24 State Component23.01 Management23.02 REMS 0.0044923.03 SIEMAT

Sub Total

STATE SSA TOTAL 180.41964 23.60000 414420 11517.343 414420 11721.36276

25

KGBV Financial Provision (give

separate costing sheets for different

Models)

Hostel

ANon Recurring One Time Grant (Only

committed liabilities) (Model-I)

25.01 Construction of Building (New)

25.02 Construction of Building KGBV sanctioned earlier 0.01000 0.01000

25.02(a) Additional Class Room Rooms 3.45000

25.02(b) Guard Room Rooms 1.32000

25.02(c) Boundary Wall School 5.0200025.03 Boudary Wall (Spillover only) 1.49000 1.49000

25.04

Boring/Handpump (Spillover only)

(minimum rates prescribed by State Drinking

Water Department subject to a ceiling of Rs.

1.00 lakhs)

25.05 Electricity /Water charges (Spillover only)

25.05(a) Solar Water Heater & Solar Light 2.97000

25.06Furniture/Equipment (including Kitchen

equipment)3.00000

25.07 TLM and equipment including library books 3.50000

25.08 Bedding (New) 0.75000

25.09 Replacement of Bedding (once in 3 Year) 0.75000 8 6.000 8 6.00000

Subtotal Non Recurring 1.50000 6.000 7.50000

B Recurring Cost Per Annum (Model-I)

25.10Maintenance per girl student per month @ Rs.

1500/-18.00000 8 144.000 8 144.00000

25.11 Stipend for girl student per month @ Rs. 100/- 1.20000 8 9.600 8 9.60000

25.12Supplementary TLM, stationery and other

educational material @ Rs.1000/- per annum1.00000 8 8.000 8 8.00000

25.13 Salaries

Arti:SSA-AWPB-2014-15-PABMinits:Ambedkar Nagar:16-06-2014 510 / 533

Page 511: U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 · 2015. 1. 6. · U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15

Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

Name of District : Ambedkar Nagar - 4

ActivityS. No.Physical

UnitRemarks

Outlay Recommendation for 2014-15

Spill OverDeferred laibility of

2014-15Fresh Recommended Total Recommended

25.13.1 Additional Salaries:

(a) 1 Warden @ Rs. 25,000/- per month 3.00000 8 24.00000 8 24.00000

(b)4 Full time teachers as per RTE norms @ Rs.

20,000/- per month per teacher 9.60000 8 76.80000 8 76.80000

(c)

1 Urdu Teachers (only for blocks with muslim

population above 20% and select urban areas), if

required @ Rs. 12,000/- per month per teacher 1.44000 8 11.52000 8 11.52000

(d)3 part time teachers @ Rs. 5,000/- per month per

teacher 1.80000 8 14.40000 8 14.40000

(e)1 Full time Accountant @ Rs. 10,000/- per month

1.20000 8 9.60000 8 9.60000

(f)

2 Support Staff – (Accountant/ Assistant, Peon,

Chowkidar) @ Rs. 5,000/- per month per staff 1.20000 8 9.60000 8 9.60000

(g) 1 Head cook @ Rs. 6,000/- per month 0.72000 8 5.76000 8 5.76000

(h)2 Asstt. Cooks @ Rs. 4,500/- per month per cook

1.08000 8 8.64000 8 8.64000

25.14Specific skill training @ Rs.1000/- per child per

annum1.00000 8 8.000 8 8.00000

25.15Electricity/water charges @ Rs.1000/- per child

per annum1.00000 8 8.000 8 8.00000

25.16Medical care/contingencies @ Rs. 1250 per child

per annum1.25000 8 10.000 8 10.00000

25.17 Maintenance @ Rs.750/- per child per annum 0.75000 8 6.000 8 6.00000

25.18

Miscellaneous (Educational Tour/ Exposure Visit

/ Sports Material etc.) @ Rs.750/- per child per

annum

0.75000 8 6.000 8 6.00000

25.19Preparatory camps @ Rs.200/- per child per

annum0.20000 8 1.600 8 1.60000

25.20PTAs/school functions @ Rs.200/- per child per

annum0.20000 8 1.600 8 1.60000

25.21 Provision of Rent @ Rs.6000/- per annum 6.00000

25.21a Provision of Rent (6 months) 3.6000025.21b Provision of Rent (3 months) 1.8000025.21c Rent (Previous Year (2007-2012)

25.22 Capacity building 0.50000 8 4.000 8 4.00000

25.22(a)Physical/ Self Defence Training @ Rs.200/- per

child per annum0.20000 8 1.600 8 1.60000

Subtotal Recurring 8 368.720 8 368.72000

Subtotal (Model-I) 1.50000 8 374.720 8 376.22000

CNon Recurring One Time Grant (Only

committed liabilities) (Model-II)

25.23 Construction of Building (New)

25.24 Construction of Building KGBV sanctioned earlier

25.24(a) Additional Class Room Rooms 3.45000

25.24(b) Guard Room Rooms 1.32000

25.24(c) Boundary Wall School 5.0200025.25 Boudary Wall (Spillover only)25.26 Boring/Handpump (Spillover only)

25.27 Electricity /Water charges (Spillover only)

25.27(a) Solar Water Heater & Solar Light 2.97000

25.28Furniture/Equipment (including Kitchen

equipment)2.00000

25.29 TLM and equipment including library books 3.00000

25.30 Bedding (New) 0.37500

25.31 Replacement of Bedding (once in 3 Year) 0.37500

Subtotal Non Recurring

D Recurring Cost Per Annum (Model-II)

25.32Maintenance per girl student per month @ Rs.

1500/-9.00000

25.33 Stipend for girl student per month @ Rs. 100/- 0.60000

25.34Supplementary TLM, stationery and other

educational material @ Rs.1000/- per annum0.50000

25.35 Salaries(a) 1 Warden @ Rs. 25,000/- per month 3.00000

(b)3 Full time teachers as per RTE norms @ Rs.

20,000/- per month per teacher 7.20000

(c) 3 part time teachers @ Rs. 5,000/- per month per

teacher 1.80000

(d)1 Full time Accountant @ Rs. 10,000/- per month

1.20000

(e)

2 Support Staff – (Accountant/ Assistant, Peon,

Chowkidar) @ Rs. 5,000/- per month per staff 1.20000

Arti:SSA-AWPB-2014-15-PABMinits:Ambedkar Nagar:16-06-2014 511 / 533

Page 512: U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 · 2015. 1. 6. · U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15

Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

Name of District : Ambedkar Nagar - 4

ActivityS. No.Physical

UnitRemarks

Outlay Recommendation for 2014-15

Spill OverDeferred laibility of

2014-15Fresh Recommended Total Recommended

(f) 1 Head cook @ Rs. 6,000/- per month 0.72000

(g)1 Asstt. Cooks @ Rs. 4,500/- per month per cook

0.54000

25.36Specific skill training @ Rs.1000/- per child per

annum0.50000

25.37Electricity/water charges @ Rs.1000/- per child

per annum0.50000

25.38Medical care/contingencies @ Rs. 1250 per child

per annum0.62500

25.39 Maintenance @ Rs.750/- per child per annum 0.37500

25.40

Miscellaneous (Educational Tour/ Exposure Visit

/ Sports Material etc.) @ Rs.750/- per child per

annum

0.37500

25.41Preparatory camps @ Rs.300/- per child per

annum0.15000

25.42PTAs/school functions @ Rs.300/- per child per

annum0.15000

25.43 Provision of Rent @ Rs.10000/- per annum 5.00000

25.43a Provision of Rent (6 months) 3.6000025.43b Provision of Rent (3 months) 1.8000025.43c Rent (Previous Year (2007-2012)25.44 Capacity building 0.25000

25.44(a)Physical/ Self Defence Training @ Rs.200/- per

child per annum0.10000

Subtotal Recurring

Subtotal (Model-II) Total (KGBV) 1.500 8 374.720 8 376.220

DISTRICT GRAND TOTAL (SSA+KGBV) 181.920 23.600 414428 11892.063 414428 12097.583

Arti:SSA-AWPB-2014-15-PABMinits:Ambedkar Nagar:16-06-2014 512 / 533

Page 513: U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 · 2015. 1. 6. · U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15

Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

I ACCESS

1 Opening of New Schools

1.01 Upgradation of EGS to PSCentres /

School1.02 New PS School

1.03 Upgradation of PS to UPS / New UPS School

1.04 Composite Schools (for Urban Areas) School

1.05Residential Schools for specific category children

(For 100 children)

1.06Residential Hostel (for specific category of

children) (For 50 children)

1.07 Integration of Class V with Primary Schools

1.08Integration of Class VIII with Upper Primary

Schools

2Residential Schools for specific category

of children (For 100 Children)

Total - Residential Schools (For 100

children)

3Residential Hostel for specific category of

children (For 50 Children)

Total - Residential Schools (For 50

children)4 Transport/Escort Facility

4.01

Children in remote habitations with sparse

populations where opening of schools is

unviable

Child 0.03000

4.02

Urban deprived children/children without adult

protection in urban areas where schools are not

opened because availability of land is a problem

Child 0.03000

Sub Total

5Special Training for mainstreaming of Out-

of-School Children

5.03 Non-Residential (Fresh)(a) 12 months Child 0.06000(b) 9 months 0.04500(c) 6 months

(i)Special Training (by Special Instructors-NRBC)-

(1-5) Child 0.03000 966 28.980 966 28.98000

(ii) Special Training (by Special Instructors-NRBC)-

(6-8) Child 0.03000 757 22.710 757 22.71000

(d) 3 months Child 0.01500Sub Total 1723 51.690 1723 51.69000

Total (Special Training) 1723 51.690 1723 51.6905(B) House Hold Survey (HHS)

5(B).01 House Hold Survey through SMCHouse

Hold0.00001

Sub TotalII RETENTION6 Free Text Book

6.01Free Text Book (PS) for Parishadiya & Aided

Primary Schools (Workbooks not included)Child 0.00120 267928 321.514 267928 321.51360

6.01a

Free Text Book (PS) for 25% children of Class-1

in Private Recognised Primary Schools of other

Boards (Workbooks not included)

Child 0.00150

6.02 Free Brail Books (PS) 0.00150 176 0.264 176 0.26400

6.03 Free Large Print Books (PS) 0.00150

6.04Free Text Book (UPS) (Workbooks not included)

(Including KGBV Girls)Child 0.00200 120361 240.722 120361 240.72200

6.05 Free Brail Books (UPS) 0.00250 51 0.128 51 0.12750

6.06 Free Large Print Books (PS) 0.00250Sub Total 388516 562.627 388516 562.627

7 Provision of 2 set of Uniforms

7.01 All Girls (Including KGBV Girls) Child 0.00400 283728 1134.912 283728 1134.91200

7.02 SC Boys Child 0.00400 104561 418.244 104561 418.24400

7.03 ST Boys Child 0.00400

7.04 BPL Boys Child 0.00400 36448 145.792 36448 145.79200

7.05

Free Uniform for 25% children of Class-1 in

Private Recognised Primary Schools of other

Boards

Child0.00400

Sub Total 424737 1698.948 424737 1698.9487(A) Fee Reimbursement

7(A).01

Fee Reimbursement for Admission of children of

Disadvantaged Group & Weaker Section upto

25% of seats in Class-1 of Private Unaided

Recognised Schools

Child 0.05400

Sub Total

8 Teaching Learning Equipment (TLE)

8.01 TLE - New Primary School 9.20000 0.20000 9.200008.02 TLE - New Upper Primary School 4.30000 0.50000 4.30000

Name of District : Allahabad -3

ActivityS. No.Physical

UnitRemarks

Outlay Recommendation for 2014-15

Spill OverDeferred laibility of

2014-15Fresh Recommended Total Recommended

Arti:SSA-AWPB-2014-15-PABMinits:Allahabad:16-06-2014 513 / 533

Page 514: U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 · 2015. 1. 6. · U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15

Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

Name of District : Allahabad -3

ActivityS. No.Physical

UnitRemarks

Outlay Recommendation for 2014-15

Spill OverDeferred laibility of

2014-15Fresh Recommended Total Recommended

Sub Total 13.50000 13.50000III ENHANCING QUALITY9 New Teachers Salary

9.01 Primary Teachers (Regular) (Asstt. Teacher) Teacher 0.91500

9.01aHead Teacher for Primary (if the number of

children exceeds 150 in a school)Teacher

9.02 Primary Teachers (Contract) (S.M.) Teacher

9.03Subject specific Upper Primary Teachers

(Regular) (a) Science and Mathematics Teacher 1.26000(b) Social Studies Teacher 1.26000(c) Languages Teacher 1.26000

Sub Total (9.01 to 9.05)Add.Teacher against PTR

Sub Total (9.06 to 9.12)

Total (New Teacher's Salary-9.01 to 9.12)

Teachers Salary (Recurring-sanctioned

earlier)Primary teachers

9.13 Primary Teachers ( Regular)-Existing, in position Teacher 3.66000 1467 5369.220 1467 5369.22000

9.14Primary Teachers (Contract)-Existing, in

positionTeacher 0.55000

9.14(a) Primary Teachers (Contract)-under Training Teacher 0.38500 873 336.105 873 336.10500

9.14(b)Primary Teacher (Para Teachers Equal to

9.14(a) upgraded as Teachers)0.38500 1439 554.015 1439 554.01500

9.14(c) Primary Teachers (Para)- Vacant Teacher9.15 Primary Teachers (Vacant) Teacher 0.30500

9.16Head Teacher for Primary (if the number of

children exceeds 150)Teacher 5.04000 485 2444.400 485 2444.40000

9.16(b)Head Teacher for Primary (if the number of

children exceeds 150) VacantTeacher 0.42000

Additional teachers

9.17Additional Teachers - PS (Special BTC-

Regular) in positionTeacher 0.30500

9.18Additional Teachers - PS (Special BTC Under

Training)Teacher 0.87600

9.19 Additional Teachers - PS (Vacant) Teacher

9.20Others in position (Para Teachers upgraded

as Teachers)Teacher

Upper Primary teachers

9.21 UP Teachers (Regular)-Existing Teacher 5.04000 1470 7408.800 1470 7408.80000

9.22 UP Teachers (Contract)-Existing9.23 UP Teachers (Vacant) Teacher 1.26000

9.24Head Teacher for Upper Primary (if the number

of children exceeds 100)-ExistingTeacher 5.34000 313 1671.420 313 1671.42000

9.24a Head Teacher for Upper Primary (Vacant) Teacher 1.33500

9.25Subject specific Upper Primary Teachers

(Regular)(a) Science and Mathematics(b) Social Studies(c) Languages

9.32 Part Time Instructors in position(a) Art Education 0.77000 186 143.220 186 143.22000(b) Health and Physical Education 0.77000 342 263.340 342 263.34000(c) Work Education 0.77000 238 183.260 238 183.26000

9.32(A) Part Time Instructors Vacant(a) Art Education 0.42000(b) Health and Physical Education 0.42000(c) Work Education 0.42000

9.33

Others-Incentive to Teachers in Schools

Located in Naxal Affected Areas (@

Rs.1500/- per teachers per month)

Sub Total (9.13 to 9.33) 6813 18373.780 6813 18373.78TOTAL

(New Teachers Salary +Teachers Salary

Recurring)

6813 18373.780 6813 18373.78000

10 Teachers Training(a) Teachers

10.01

Refresher In-service Teachers' Training at BRC

level and above - 10 days (@ Rs.200/- per

head per day)

Teacher

(Target &

Ach.-13-14

in

Mandays)

0.00600

10.01(a)Continuous and Comprehensive Evauation [PS +

UPS)Teacher 0.01300 2521 32.773 2521 32.77300

10.01(b) Eary Reading and Numeracy Skills [PS] Teacher 0.00500 2521 12.605 2521 12.60500

10.01(c) Science [UPS] Teacher 0.00800 1357 10.856 1357 10.85600Recommended as

proposed

10.01(d) CWSN Teacher 0.00400

Arti:SSA-AWPB-2014-15-PABMinits:Allahabad:16-06-2014 514 / 533

Page 515: U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 · 2015. 1. 6. · U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15

Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

Name of District : Allahabad -3

ActivityS. No.Physical

UnitRemarks

Outlay Recommendation for 2014-15

Spill OverDeferred laibility of

2014-15Fresh Recommended Total Recommended

10.02

One day monthly cluster level meetings and

peer group training sessions for 10 months for

all teachers each year at CRC level - 10 days (@

Rs.100/- per head per day)

Teacher 0.01000

10.03(a)

Induction Training for Newly Recruited Teachers

for 6 Months (Special BTC)- @Rs.2000/- per

head per year

Teacher 0.02000

10.03(b)5 Days Training for Part Time Instructors @ Rs.

200/- per head per day) Teacher 0.01000

10.04

Training of untrained Teachers to acquire

professional qualifications over a two year

period.

Teacher 0.04700 1099 51.653 1099 51.65300

(b) Head Teachers

10.05Refresher Residencial In-service for 10 days at

BRC level and above

Head

Teacher(c) Resource Persons

10.06

Refresher Training for all Resource

Persons,Master Trainers, BRC & CRC faculty

and Coordinators for 5 days each year (@

Rs.200/- per head per day)

Resource

Person 0.00300 252 0.756 252 0.75600

Sub Total 7750 108.643 7750 108.643

11Academic Support through Block Resource

Centre (BRC)/ URC

11.01 Salary of Faculty and Staff

(a) 5 RPs at BRC for subject specific training in

positionRP 105 105

(b) 2 RPs for CWSN in position RP(b-i) 1 CWSN Resource Person RP 1.10000 42 46.200 42 46.20000

(b-ii) 1 Physiotherapist (Resource person for IE) RP

(c) 1 MIS Coordinator in position RP 1.86000

(d) 1 Datra Entry Operator in position RP 1.74000 21 36.540 21 36.54000

(e) 1 Accountant-cum-support staff in position RP 1.80000 21 37.800 21 37.80000

11.02 Furniture Grant BRC/ URC 1.00000

11.03Replacement of furniture, computer, TLE etc (

Once in 5 years)BRC/ URC 1.00000

11.04 Contingency Grant BRC/ URC 0.50000 21 10.500 21 10.50000

11.05 Meeting, TA BRC/ URC 0.30000 21 6.300 21 6.30000

11.06 TLM Grant BRC/ URC 0.10000

11.07 Maintenance Grant BRC/ URC 0.10000

Sub Total 21 137.340 21 137.34000

12Academic Support through Cluster

Resource Centres (CRC/UERC)

12.01Salary of Cluster Coordinator (on an average of

one Resource Person per 18 schools in a block)RP

12.02 Furniture GrantCRC/

UERC0.10000

12.03Replacement of furniture, computer, TLE etc.

once in 5 years

CRC/

UERC0.10000

12.04 Contingency Grant CRC/UERC 0.10000 221 22.100 221 22.10000

12.05 Meeting, TA CRC/UERC 0.12000 221 26.520 221 26.52000

12.06 TLM Grant CRC/UERC 0.03000

12.07Maintenance Grant

CRC/UERC 0.02000

Sub Total 442 48.620 442 48.62000

13Computer Aided Education in upper

primary schools under Innovation

13.01Computer Aided Education in upper primary

schoolsDistrict 0.01200 48 0.576 48 0.57600

Sub Total 48 0.576 48 0.5760014 Libraries in Schools14.01 (a) Primary School (per school) School 0.03000

14.02 (b) Upper Primary School (per school) School 0.10000

Sub TotalIV ANNUAL GRANTS15 Teachers' Grant15.01 Primary Teachers Teacher 0.0050015.02 Upper Primary Teachers Teacher 0.00500 1357 6.785 1357 6.78500

Sub Total 1357 6.785 1357 6.7850016 School Grant16.01 Primary School School 0.05000 2575 128.750 2575 128.7500016.02 Upper Primary School School 0.07000 1337 93.590 1337 93.59000

Sub Total 3912 222.340 3912 222.34000

Arti:SSA-AWPB-2014-15-PABMinits:Allahabad:16-06-2014 515 / 533

Page 516: U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 · 2015. 1. 6. · U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15

Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

Name of District : Allahabad -3

ActivityS. No.Physical

UnitRemarks

Outlay Recommendation for 2014-15

Spill OverDeferred laibility of

2014-15Fresh Recommended Total Recommended

17Research, Evaluation, Monitoring &

Supervision

17.01 REMS Activities School 0.00103 3912 4.024 3912 4.02393

17.02 Monitoring & Supervision School 0.00078 3912 3.067 3912 3.06727

17.03 House Hold Survey (Urban) in Million Plus Cities District 35.00000

Sub Total 7824 7.091 7824 7.0912018 Maintenance Grant

18.01 Maintenance in School having upto3 Classrooms School 0.07500 282 21.150 282 21.15000

18.01a Maintenance Grant School 0.07500 3215 241.125 3215 241.12500Sub Total 3497 262.275 3497 262.27500

VBRIDGING GENDER AND SOCIAL

CATEGORY GAPS

19 Interventions for CWSN (IE)

19.01 Provision for Inclusive Education Child 0.01000 8152 81.520 8152 81.52000

Sub Total 8152 81.520 8152 81.52000

20Innovativation Head up to Rs.50 Lakh per

district

20.01 Girls Education District 0.70000 9 6.300 9 6.30000

20.02 ECCE District20.03 Intervention for SC / ST children District

20.04 Intervention for Minority Community children District

20.05 Intervention for Urban Deprived children District 10.00000

Sub Total 9 6.300 9 6.3000021 SMC/PRI Training

21.01Residential for 6 Resource Person per Block (3

days) (@ Rs.500/-)Blocks 0.09000

21.02Non-residential (3 days training of 6 SMC

members) (@ Rs.100/-)SMC 0.01800 3497 62.946 3497 62.94600

21.02(a)Non-residential (3 days training of 3 Members of

PRI/VECs/LA) (@ Rs.100/-)VEC/ WEC 0.00900

21.03

Seminar/Orientation of SMC Women members

and President/Vice President (@ Rs. 50,000/-

per block)

Blocks 0.50000

Sub Total 3497 62.946 3497 62.94600VI SCHOOL INFRASTRUCTURE22 Civil Works22.01 Primary School (Plain) (New) School 13.1550022.02 Primary School (Hilly/Rocky) (New) School 13.2750022.03 Upper Primary (Plain) (New) School 20.65500

22.04 Upper Primary School (Hilly/Rocky) (New) School 20.77500

22.04aComposite Schools for Urban Areas (Class I-

VIII)School 41.04000

22.05 ACR in lieu of upgraded Upper Primary School Rooms

22.06 Additional class rooms for adding Class VIII Rooms

22.07 Building Less (Pry) School 9.7500022.08 Building Less (UP) School 18.5900022.09 Dilapidated Building (Pry) School 9.7500022.10 Dilapidated Building (UP) School 18.59000

22.11 Additional Class Room (Rural) ( PS+UPS) Rooms 3.45000 135 465.750 135 465.75000

22.12 Additional Class Room (Urban) Rooms 3.4500022.13 Additional Class Room (Hill Area)22.14 Toilet/Urinals (PS & UPS) School 0.7000022.15 Separate Girls Toilet (Rural+Urban) School 0.7000022.16 CWSN friendly Toilets School 0.50000

22.17 Drinking Water Facility (for Urban Area Only)) School 0.15000

22.17a Drinking Water Facility (Plain PS & UPS) School 0.15000

22.17b Drinking Water Facility (Hilly/Rocky PS & UPS) School 0.15000

22.18a Boundary Wall PS (Total in Meters x .01105) 0.01749

22.18bBoundary Wall PS (For Gate) @Rs. 7000 x no. of

P.S.School 0.07800

22.18c Boundary Wall UPS (Total in Meters x .01105) 0.01749

22.18dBoundary Wall UPS (For Gate) @Rs. 7000 x no.

of UPSSchool 0.07800

22.19a Electrification in P.S./ Electrical Equipment School 0.11000

22.19b Electrification in U. P.S./ Electrical Equipment School 0.11000

22.20Office-cum-store-cum-Head Teacher's room

(Primary)Rooms

22.21Office-cum-store-cum-Head Teacher's room

(Upper Primary)Rooms

22.22Augumentation of training facility in BRC (one

time)BRC/ URC 5.00000

22.23 Child friendly Elements School 0.25000

22.24 Ramps with Handrails (Barrier Free Elements) School 0.06000

22.25 Handrails in existing Ramps School 0.01000

Arti:SSA-AWPB-2014-15-PABMinits:Allahabad:16-06-2014 516 / 533

Page 517: U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 · 2015. 1. 6. · U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15

Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

Name of District : Allahabad -3

ActivityS. No.Physical

UnitRemarks

Outlay Recommendation for 2014-15

Spill OverDeferred laibility of

2014-15Fresh Recommended Total Recommended

22.26 Whole School Develoipment School22.27 Retro-fitting and repairs School

22.28Residential Schools for specific category

of children

(a) Construction of Building including boundary

wall, Water and sanitation facilities, electric

installation (For 100 children)

Building 65.86000

(b) Construction of residential hostel Building 65.86000

(c) Refurnishing unused old buildings Building

22.29

Construction of Hostel in existing Govt UPS

including boundary wall, Water and sanitation

facilities, electric installation etc. (For 50

children)

7.00000

22.30Furniture for Govt. UPS (per child) (@ Rs.500/-

per child enrolled)Child 0.00500

22.31 Major Repairs for Primary School School 0.30000

22.32 Majr Repairs for Upper Primary School School 0.30000

22.33Others (Difference of Civil Wrks

sanctioned in pre.yr.)22.33a Others (Overhead Tank PS) School 0.1200022.33b Others (Overhead Tank UPS) School 0.12000

Sub Total (Civil WOrks) 135 465.750 135 465.75VII PROJECT MANAGEMENT COST23 Management23.01 Management up to 3.5%

(a) Project Management and MIS

(i) DPO ( Salary, Contigency, Consumables,

POL, TA & Computer etc)District 1 141.129 1 141.12920

(ii) EMIS Cell District 1 25.420 1 25.42000Sub Total (a) 1 1 1 166.549 1 166.549

(b) Training of Educational Administrators District

(c) School Mapping and Social Mapping District

Sub Total (23.01)

23.02Learning Enhancement Prog. (LEP) (P & UP) (up

to 2%)District 32.289 32.28945

23.03 Community Mobilization (up to 0.5%) District 1 45.850 1 45.85000

Sub Total (Management) 1 78.139 1 78.13945Total Management Cost 244.689 244.68865Total of SSA (Districs) 13.500 858433 22341.920 858433 22355.420

24 State Component23.01 Management23.02 REMS 0.0044923.03 SIEMAT

Sub Total

STATE SSA TOTAL 13.50000 858433 22341.920 858433 22355.41995

25

KGBV Financial Provision (give

separate costing sheets for different

Models)

Hostel

ANon Recurring One Time Grant (Only

committed liabilities) (Model-I)

25.01 Construction of Building (New)

25.02 Construction of Building KGBV sanctioned earlier

25.02(a) Additional Class Room Rooms 3.45000

25.02(b) Guard Room Rooms 1.32000

25.02(c) Boundary Wall School 5.0200025.03 Boudary Wall (Spillover only)

25.04

Boring/Handpump (Spillover only)

(minimum rates prescribed by State Drinking

Water Department subject to a ceiling of Rs.

1.00 lakhs)

25.05 Electricity /Water charges (Spillover only)

25.05(a) Solar Water Heater & Solar Light 2.97000

25.06Furniture/Equipment (including Kitchen

equipment)3.00000

25.07 TLM and equipment including library books 3.50000

25.08 Bedding (New) 0.75000

25.09 Replacement of Bedding (once in 3 Year) 0.75000 16 12.000 16 12.00000

Subtotal Non Recurring 12.000 12.00000

B Recurring Cost Per Annum (Model-I)

25.10Maintenance per girl student per month @ Rs.

1500/-18.00000 20 360.000 20 360.00000

25.11 Stipend for girl student per month @ Rs. 100/- 1.20000 20 24.000 20 24.00000

25.12Supplementary TLM, stationery and other

educational material @ Rs.1000/- per annum1.00000 20 20.000 20 20.00000

25.13 Salaries

Arti:SSA-AWPB-2014-15-PABMinits:Allahabad:16-06-2014 517 / 533

Page 518: U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 · 2015. 1. 6. · U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15

Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

Name of District : Allahabad -3

ActivityS. No.Physical

UnitRemarks

Outlay Recommendation for 2014-15

Spill OverDeferred laibility of

2014-15Fresh Recommended Total Recommended

25.13.1 Additional Salaries:

(a) 1 Warden @ Rs. 25,000/- per month 3.00000 20 60.00000 20 60.00000

(b)4 Full time teachers as per RTE norms @ Rs.

20,000/- per month per teacher 9.60000 20 192.00000 20 192.00000

(c)

1 Urdu Teachers (only for blocks with muslim

population above 20% and select urban areas), if

required @ Rs. 12,000/- per month per teacher 1.44000 20 28.80000 20 28.80000

(d)3 part time teachers @ Rs. 5,000/- per month per

teacher 1.80000 20 36.00000 20 36.00000

(e)1 Full time Accountant @ Rs. 10,000/- per month

1.20000 20 24.00000 20 24.00000

(f)

2 Support Staff – (Accountant/ Assistant, Peon,

Chowkidar) @ Rs. 5,000/- per month per staff 1.20000 20 24.00000 20 24.00000

(g) 1 Head cook @ Rs. 6,000/- per month 0.72000 20 14.40000 20 14.40000

(h)2 Asstt. Cooks @ Rs. 4,500/- per month per cook

1.08000 20 21.60000 20 21.60000

25.14Specific skill training @ Rs.1000/- per child per

annum1.00000 20 20.000 20 20.00000

25.15Electricity/water charges @ Rs.1000/- per child

per annum1.00000 20 20.000 20 20.00000

25.16Medical care/contingencies @ Rs. 1250 per child

per annum1.25000 20 25.000 20 25.00000

25.17 Maintenance @ Rs.750/- per child per annum 0.75000 20 15.000 20 15.00000

25.18

Miscellaneous (Educational Tour/ Exposure Visit

/ Sports Material etc.) @ Rs.750/- per child per

annum

0.75000 20 15.000 20 15.00000

25.19Preparatory camps @ Rs.200/- per child per

annum0.20000 20 4.000 20 4.00000

25.20PTAs/school functions @ Rs.200/- per child per

annum0.20000 20 4.000 20 4.00000

25.21 Provision of Rent @ Rs.6000/- per annum 6.00000

25.21a Provision of Rent (6 months) 3.6000025.21b Provision of Rent (3 months) 1.8000025.21c Rent (Previous Year (2007-2012)

25.22 Capacity building 0.50000 20 10.000 20 10.00000

25.22(a)Physical/ Self Defence Training @ Rs.200/- per

child per annum0.20000 20 4.000 20 4.00000

Subtotal Recurring 20 921.800 20 921.80000

Subtotal (Model-I) 20 933.800 20 933.80000

CNon Recurring One Time Grant (Only

committed liabilities) (Model-II)

25.23 Construction of Building (New)

25.24 Construction of Building KGBV sanctioned earlier

25.24(a) Additional Class Room Rooms 3.45000

25.24(b) Guard Room Rooms 1.32000

25.24(c) Boundary Wall School 5.0200025.25 Boudary Wall (Spillover only)25.26 Boring/Handpump (Spillover only)

25.27 Electricity /Water charges (Spillover only)

25.27(a) Solar Water Heater & Solar Light 2.97000

25.28Furniture/Equipment (including Kitchen

equipment)2.00000

25.29 TLM and equipment including library books 3.00000

25.30 Bedding (New) 0.37500

25.31 Replacement of Bedding (once in 3 Year) 0.37500

Subtotal Non Recurring

D Recurring Cost Per Annum (Model-II)

25.32Maintenance per girl student per month @ Rs.

1500/-9.00000

25.33 Stipend for girl student per month @ Rs. 100/- 0.60000

25.34Supplementary TLM, stationery and other

educational material @ Rs.1000/- per annum0.50000

25.35 Salaries(a) 1 Warden @ Rs. 25,000/- per month 3.00000

(b)3 Full time teachers as per RTE norms @ Rs.

20,000/- per month per teacher 7.20000

(c) 3 part time teachers @ Rs. 5,000/- per month per

teacher 1.80000

(d)1 Full time Accountant @ Rs. 10,000/- per month

1.20000

(e)

2 Support Staff – (Accountant/ Assistant, Peon,

Chowkidar) @ Rs. 5,000/- per month per staff 1.20000

Arti:SSA-AWPB-2014-15-PABMinits:Allahabad:16-06-2014 518 / 533

Page 519: U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 · 2015. 1. 6. · U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15

Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

Name of District : Allahabad -3

ActivityS. No.Physical

UnitRemarks

Outlay Recommendation for 2014-15

Spill OverDeferred laibility of

2014-15Fresh Recommended Total Recommended

(f) 1 Head cook @ Rs. 6,000/- per month 0.72000

(g)1 Asstt. Cooks @ Rs. 4,500/- per month per cook

0.54000

25.36Specific skill training @ Rs.1000/- per child per

annum0.50000

25.37Electricity/water charges @ Rs.1000/- per child

per annum0.50000

25.38Medical care/contingencies @ Rs. 1250 per child

per annum0.62500

25.39 Maintenance @ Rs.750/- per child per annum 0.37500

25.40

Miscellaneous (Educational Tour/ Exposure Visit

/ Sports Material etc.) @ Rs.750/- per child per

annum

0.37500

25.41Preparatory camps @ Rs.300/- per child per

annum0.15000

25.42PTAs/school functions @ Rs.300/- per child per

annum0.15000

25.43 Provision of Rent @ Rs.10000/- per annum 5.00000

25.43a Provision of Rent (6 months) 3.6000025.43b Provision of Rent (3 months) 1.8000025.43c Rent (Previous Year (2007-2012)25.44 Capacity building 0.25000

25.44(a)Physical/ Self Defence Training @ Rs.200/- per

child per annum0.10000

Subtotal Recurring

Subtotal (Model-II) Total (KGBV) 20 933.800 20 933.800

DISTRICT GRAND TOTAL (SSA+KGBV) 13.500 858453 23275.720 858453 23289.220

Arti:SSA-AWPB-2014-15-PABMinits:Allahabad:16-06-2014 519 / 533

Page 520: U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 · 2015. 1. 6. · U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15

Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

I ACCESS

1 Opening of New Schools

1.01 Upgradation of EGS to PSCentres /

School1.02 New PS School

1.03 Upgradation of PS to UPS / New UPS School

1.04 Composite Schools (for Urban Areas) School

1.05Residential Schools for specific category children

(For 100 children)

1.06Residential Hostel (for specific category of

children) (For 50 children)

1.07 Integration of Class V with Primary Schools

1.08Integration of Class VIII with Upper Primary

Schools

2Residential Schools for specific category

of children (For 100 Children)

Total - Residential Schools (For 100

children)

3Residential Hostel for specific category of

children (For 50 Children)

Total - Residential Schools (For 50

children)4 Transport/Escort Facility

4.01

Children in remote habitations with sparse

populations where opening of schools is

unviable

Child 0.03000

4.02

Urban deprived children/children without adult

protection in urban areas where schools are not

opened because availability of land is a problem

Child 0.03000

Sub Total

5Special Training for mainstreaming of Out-

of-School Children

5.03 Non-Residential (Fresh)(a) 12 months Child 0.06000(b) 9 months 0.04500(c) 6 months

(i)Special Training (by Special Instructors-NRBC)-

(1-5) Child 0.03000 1933 57.990 1933 57.99000

(ii) Special Training (by Special Instructors-NRBC)-

(6-8) Child 0.03000 1422 42.660 1422 42.66000

(d) 3 months Child 0.01500Sub Total 3355 100.650 3355 100.65000

Total (Special Training) 3355 100.650 3355 100.6505(B) House Hold Survey (HHS)

5(B).01 House Hold Survey through SMCHouse

Hold0.00001

Sub TotalII RETENTION6 Free Text Book

6.01Free Text Book (PS) for Parishadiya & Aided

Primary Schools (Workbooks not included)Child 0.00120 122300 146.760 122300 146.76000

6.01a

Free Text Book (PS) for 25% children of Class-1

in Private Recognised Primary Schools of other

Boards (Workbooks not included)

Child 0.00150

6.02 Free Brail Books (PS) 0.00150 82 0.123 82 0.12300

6.03 Free Large Print Books (PS) 0.00150

6.04Free Text Book (UPS) (Workbooks not included)

(Including KGBV Girls)Child 0.00200 84585 169.170 84585 169.17000

6.05 Free Brail Books (UPS) 0.00250

6.06 Free Large Print Books (PS) 0.00250Sub Total 206967 316.053 206967 316.053

7 Provision of 2 set of Uniforms

7.01 All Girls (Including KGBV Girls) Child 0.00400 167986 671.944 167986 671.94400

7.02 SC Boys Child 0.00400 51510 206.040 51510 206.04000

7.03 ST Boys Child 0.00400

7.04 BPL Boys Child 0.00400 50457 201.828 50457 201.82800

7.05

Free Uniform for 25% children of Class-1 in

Private Recognised Primary Schools of other

Boards

Child0.00400

Sub Total 269953 1079.812 269953 1079.8127(A) Fee Reimbursement

7(A).01

Fee Reimbursement for Admission of children of

Disadvantaged Group & Weaker Section upto

25% of seats in Class-1 of Private Unaided

Recognised Schools

Child 0.05400

Sub Total

8 Teaching Learning Equipment (TLE)

8.01 TLE - New Primary School 5.60000 0.20000 5.600008.02 TLE - New Upper Primary School 1.00000 0.50000 1.00000

Name of District : Aligarh-2

ActivityS. No.Physical

UnitRemarks

Outlay Recommendation for 2014-15

Spill OverDeferred laibility of

2014-15Fresh Recommended Total Recommended

Arti:SSA-AWPB-2014-15-PABMinits:Aligarh:16-06-2014 520 / 533

Page 521: U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 · 2015. 1. 6. · U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15

Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

Name of District : Aligarh-2

ActivityS. No.Physical

UnitRemarks

Outlay Recommendation for 2014-15

Spill OverDeferred laibility of

2014-15Fresh Recommended Total Recommended

Sub Total 6.60000 6.60000III ENHANCING QUALITY9 New Teachers Salary

9.01 Primary Teachers (Regular) (Asstt. Teacher) Teacher 0.91500

9.01aHead Teacher for Primary (if the number of

children exceeds 150 in a school)Teacher

9.02 Primary Teachers (Contract) (S.M.) Teacher

9.03Subject specific Upper Primary Teachers

(Regular) (a) Science and Mathematics Teacher 1.26000(b) Social Studies Teacher 1.26000(c) Languages Teacher 1.26000

Sub Total (9.01 to 9.05)Add.Teacher against PTR

Sub Total (9.06 to 9.12)

Total (New Teacher's Salary-9.01 to 9.12)

Teachers Salary (Recurring-sanctioned

earlier)Primary teachers

9.13 Primary Teachers ( Regular)-Existing, in position Teacher 3.66000 189 691.740 189 691.74000

9.14Primary Teachers (Contract)-Existing, in

positionTeacher 0.55000

9.14(a) Primary Teachers (Contract)-under Training Teacher 0.38500 1647 634.095 1647 634.09500

9.14(b)Primary Teacher (Para Teachers Equal to

9.14(a) upgraded as Teachers)0.38500 904 348.040 904 348.04000

9.14(c) Primary Teachers (Para)- Vacant Teacher9.15 Primary Teachers (Vacant) Teacher 0.30500

9.16Head Teacher for Primary (if the number of

children exceeds 150)Teacher 5.04000 327 1648.080 327 1648.08000

9.16(b)Head Teacher for Primary (if the number of

children exceeds 150) VacantTeacher 0.42000

Additional teachers

9.17Additional Teachers - PS (Special BTC-

Regular) in positionTeacher 0.30500

9.18Additional Teachers - PS (Special BTC Under

Training)Teacher 0.87600

9.19 Additional Teachers - PS (Vacant) Teacher

9.20Others in position (Para Teachers upgraded

as Teachers)Teacher

Upper Primary teachers

9.21 UP Teachers (Regular)-Existing Teacher 5.04000 853 4299.120 853 4299.12000

9.22 UP Teachers (Contract)-Existing9.23 UP Teachers (Vacant) Teacher 1.26000

9.24Head Teacher for Upper Primary (if the number

of children exceeds 100)-ExistingTeacher 5.34000 355 1895.700 355 1895.70000

9.24a Head Teacher for Upper Primary (Vacant) Teacher 1.33500

9.25Subject specific Upper Primary Teachers

(Regular)(a) Science and Mathematics(b) Social Studies(c) Languages

9.32 Part Time Instructors in position(a) Art Education 0.77000 144 110.880 144 110.88000(b) Health and Physical Education 0.77000 157 120.890 157 120.89000(c) Work Education 0.77000 128 98.560 128 98.56000

9.32(A) Part Time Instructors Vacant(a) Art Education 0.42000(b) Health and Physical Education 0.42000(c) Work Education 0.42000

9.33

Others-Incentive to Teachers in Schools

Located in Naxal Affected Areas (@

Rs.1500/- per teachers per month)

Sub Total (9.13 to 9.33) 4704 9847.105 4704 9847.11TOTAL

(New Teachers Salary +Teachers Salary

Recurring)

4704 9847.105 4704 9847.10500

10 Teachers Training(a) Teachers

10.01

Refresher In-service Teachers' Training at BRC

level and above - 10 days (@ Rs.200/- per

head per day)

Teacher

(Target &

Ach.-13-14

in

Mandays)

0.00600

10.01(a)Continuous and Comprehensive Evauation [PS +

UPS)Teacher 0.01300 1729 22.477 1729 22.47700

10.01(b) Eary Reading and Numeracy Skills [PS] Teacher 0.00500 1729 8.645 1729 8.64500

10.01(c) Science [UPS] Teacher 0.00800 780 6.240 780 6.24000Recommended as

proposed

10.01(d) CWSN Teacher 0.00400

Arti:SSA-AWPB-2014-15-PABMinits:Aligarh:16-06-2014 521 / 533

Page 522: U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 · 2015. 1. 6. · U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15

Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

Name of District : Aligarh-2

ActivityS. No.Physical

UnitRemarks

Outlay Recommendation for 2014-15

Spill OverDeferred laibility of

2014-15Fresh Recommended Total Recommended

10.02

One day monthly cluster level meetings and

peer group training sessions for 10 months for

all teachers each year at CRC level - 10 days (@

Rs.100/- per head per day)

Teacher 0.01000

10.03(a)

Induction Training for Newly Recruited Teachers

for 6 Months (Special BTC)- @Rs.2000/- per

head per year

Teacher 0.02000

10.03(b)5 Days Training for Part Time Instructors @ Rs.

200/- per head per day) Teacher 0.01000

10.04

Training of untrained Teachers to acquire

professional qualifications over a two year

period.

Teacher 0.04700 1029 48.363 1029 48.36300

(b) Head Teachers

10.05Refresher Residencial In-service for 10 days at

BRC level and above

Head

Teacher(c) Resource Persons

10.06

Refresher Training for all Resource

Persons,Master Trainers, BRC & CRC faculty

and Coordinators for 5 days each year (@

Rs.200/- per head per day)

Resource

Person 0.00300 156 0.468 156 0.46800

Sub Total 5423 86.193 5423 86.193

11Academic Support through Block Resource

Centre (BRC)/ URC

11.01 Salary of Faculty and Staff

(a) 5 RPs at BRC for subject specific training in

positionRP 65 65

(b) 2 RPs for CWSN in position RP(b-i) 1 CWSN Resource Person RP 1.10000 26 28.600 26 28.60000

(b-ii) 1 Physiotherapist (Resource person for IE) RP

(c) 1 MIS Coordinator in position RP 1.86000

(d) 1 Datra Entry Operator in position RP 1.74000

(e) 1 Accountant-cum-support staff in position RP 1.80000 13 23.400 13 23.40000

11.02 Furniture Grant BRC/ URC 1.00000

11.03Replacement of furniture, computer, TLE etc (

Once in 5 years)BRC/ URC 1.00000

11.04 Contingency Grant BRC/ URC 0.50000 13 6.500 13 6.50000

11.05 Meeting, TA BRC/ URC 0.30000 13 3.900 13 3.90000

11.06 TLM Grant BRC/ URC 0.10000

11.07 Maintenance Grant BRC/ URC 0.10000

Sub Total 13 62.400 13 62.40000

12Academic Support through Cluster

Resource Centres (CRC/UERC)

12.01Salary of Cluster Coordinator (on an average of

one Resource Person per 18 schools in a block)RP

12.02 Furniture GrantCRC/

UERC0.10000

12.03Replacement of furniture, computer, TLE etc.

once in 5 years

CRC/

UERC0.10000

12.04 Contingency Grant CRC/UERC 0.10000 123 12.300 123 12.30000

12.05 Meeting, TA CRC/UERC 0.12000 123 14.760 123 14.76000

12.06 TLM Grant CRC/UERC 0.03000

12.07Maintenance Grant

CRC/UERC 0.02000

Sub Total 246 27.060 246 27.06000

13Computer Aided Education in upper

primary schools under Innovation

13.01Computer Aided Education in upper primary

schoolsDistrict 0.01200 48 0.576 48 0.57600

Sub Total 48 0.576 48 0.5760014 Libraries in Schools14.01 (a) Primary School (per school) School 0.03000

14.02 (b) Upper Primary School (per school) School 0.10000

Sub TotalIV ANNUAL GRANTS15 Teachers' Grant15.01 Primary Teachers Teacher 0.0050015.02 Upper Primary Teachers Teacher 0.00500 780 3.900 780 3.90000

Sub Total 780 3.900 780 3.9000016 School Grant16.01 Primary School School 0.05000 1791 89.550 1791 89.5500016.02 Upper Primary School School 0.07000 881 61.670 881 61.67000

Sub Total 2672 151.220 2672 151.22000

Arti:SSA-AWPB-2014-15-PABMinits:Aligarh:16-06-2014 522 / 533

Page 523: U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 · 2015. 1. 6. · U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15

Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

Name of District : Aligarh-2

ActivityS. No.Physical

UnitRemarks

Outlay Recommendation for 2014-15

Spill OverDeferred laibility of

2014-15Fresh Recommended Total Recommended

17Research, Evaluation, Monitoring &

Supervision

17.01 REMS Activities School 0.00103 2672 2.748 2672 2.74845

17.02 Monitoring & Supervision School 0.00078 2672 2.095 2672 2.09503

17.03 House Hold Survey (Urban) in Million Plus Cities District 35.00000

Sub Total 5344 4.843 5344 4.8434818 Maintenance Grant

18.01 Maintenance in School having upto3 Classrooms School 0.07500 495 37.125 495 37.12500

18.01a Maintenance Grant School 0.07500 1983 148.725 1983 148.72500Sub Total 2478 185.850 2478 185.85000

VBRIDGING GENDER AND SOCIAL

CATEGORY GAPS

19 Interventions for CWSN (IE)

19.01 Provision for Inclusive Education Child 0.02300 3683 84.709 3683 84.70900

Sub Total 3683 84.709 3683 84.70900

20Innovativation Head up to Rs.50 Lakh per

district

20.01 Girls Education District 0.70000 7 4.900 7 4.90000

20.02 ECCE District20.03 Intervention for SC / ST children District

20.04 Intervention for Minority Community children District

20.05 Intervention for Urban Deprived children District 10.00000

Sub Total 7 4.900 7 4.9000021 SMC/PRI Training

21.01Residential for 6 Resource Person per Block (3

days) (@ Rs.500/-)Blocks 0.09000

21.02Non-residential (3 days training of 6 SMC

members) (@ Rs.100/-)SMC 0.01800 2523 45.414 2523 45.41400

21.02(a)Non-residential (3 days training of 3 Members of

PRI/VECs/LA) (@ Rs.100/-)VEC/ WEC 0.00900

21.03

Seminar/Orientation of SMC Women members

and President/Vice President (@ Rs. 50,000/-

per block)

Blocks 0.50000

Sub Total 2523 45.414 2523 45.41400VI SCHOOL INFRASTRUCTURE22 Civil Works22.01 Primary School (Plain) (New) School 13.1550022.02 Primary School (Hilly/Rocky) (New) School 13.2750022.03 Upper Primary (Plain) (New) School 20.65500

22.04 Upper Primary School (Hilly/Rocky) (New) School 20.77500

22.04aComposite Schools for Urban Areas (Class I-

VIII)School 41.04000

22.05 ACR in lieu of upgraded Upper Primary School Rooms

22.06 Additional class rooms for adding Class VIII Rooms

22.07 Building Less (Pry) School 9.7500022.08 Building Less (UP) School 18.5900022.09 Dilapidated Building (Pry) School 9.7500022.10 Dilapidated Building (UP) School 18.59000

22.11 Additional Class Room (Rural) ( PS+UPS) Rooms 3.45000 16 55.200 16 55.20000

22.12 Additional Class Room (Urban) Rooms 3.4500022.13 Additional Class Room (Hill Area)22.14 Toilet/Urinals (PS & UPS) School 0.7000022.15 Separate Girls Toilet (Rural+Urban) School 0.7000022.16 CWSN friendly Toilets School 0.50000

22.17 Drinking Water Facility (for Urban Area Only)) School 0.15000

22.17a Drinking Water Facility (Plain PS & UPS) School 0.15000

22.17b Drinking Water Facility (Hilly/Rocky PS & UPS) School 0.15000

22.18a Boundary Wall PS (Total in Meters x .01105) 0.01749

22.18bBoundary Wall PS (For Gate) @Rs. 7000 x no. of

P.S.School 0.07800

22.18c Boundary Wall UPS (Total in Meters x .01105) 0.01749

22.18dBoundary Wall UPS (For Gate) @Rs. 7000 x no.

of UPSSchool 0.07800

22.19a Electrification in P.S./ Electrical Equipment School 0.11000

22.19b Electrification in U. P.S./ Electrical Equipment School 0.11000

22.20Office-cum-store-cum-Head Teacher's room

(Primary)Rooms

22.21Office-cum-store-cum-Head Teacher's room

(Upper Primary)Rooms

22.22Augumentation of training facility in BRC (one

time)BRC/ URC 5.00000

22.23 Child friendly Elements School 0.25000

22.24 Ramps with Handrails (Barrier Free Elements) School 0.06000

22.25 Handrails in existing Ramps School 0.01000

Arti:SSA-AWPB-2014-15-PABMinits:Aligarh:16-06-2014 523 / 533

Page 524: U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 · 2015. 1. 6. · U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15

Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

Name of District : Aligarh-2

ActivityS. No.Physical

UnitRemarks

Outlay Recommendation for 2014-15

Spill OverDeferred laibility of

2014-15Fresh Recommended Total Recommended

22.26 Whole School Develoipment School22.27 Retro-fitting and repairs School

22.28Residential Schools for specific category

of children

(a) Construction of Building including boundary

wall, Water and sanitation facilities, electric

installation (For 100 children)

Building 65.86000

(b) Construction of residential hostel Building 65.86000

(c) Refurnishing unused old buildings Building

22.29

Construction of Hostel in existing Govt UPS

including boundary wall, Water and sanitation

facilities, electric installation etc. (For 50

children)

7.00000

22.30Furniture for Govt. UPS (per child) (@ Rs.500/-

per child enrolled)Child 0.00500

22.31 Major Repairs for Primary School School 0.30000

22.32 Majr Repairs for Upper Primary School School 0.30000

22.33Others (Difference of Civil Wrks

sanctioned in pre.yr.)22.33a Others (Overhead Tank PS) School 0.1200022.33b Others (Overhead Tank UPS) School 0.12000

Sub Total (Civil WOrks) 16 55.200 16 55.20VII PROJECT MANAGEMENT COST23 Management23.01 Management up to 3.5%

(a) Project Management and MIS

(i) DPO ( Salary, Contigency, Consumables,

POL, TA & Computer etc)District 1 100.175 1 100.17530

(ii) EMIS Cell District 1 18.344 1 18.34400Sub Total (a) 1 1 1 118.519 1 118.519

(b) Training of Educational Administrators District

(c) School Mapping and Social Mapping District

Sub Total (23.01)

23.02Learning Enhancement Prog. (LEP) (P & UP) (up

to 2%)District 19.299 19.29925

23.03 Community Mobilization (up to 0.5%) District 1 45.850 1 45.85000

Sub Total (Management) 1 65.149 1 65.14925Total Management Cost 183.669 183.66855Total of SSA (Districs) 6.600 508212 12239.554 508212 12246.154

24 State Component23.01 Management23.02 REMS 0.0044923.03 SIEMAT

Sub Total

STATE SSA TOTAL 6.60000 508212 12239.554 508212 12246.15403

25

KGBV Financial Provision (give

separate costing sheets for different

Models)

Hostel

ANon Recurring One Time Grant (Only

committed liabilities) (Model-I)

25.01 Construction of Building (New)

25.02 Construction of Building KGBV sanctioned earlier 0.25000 0.25000

25.02(a) Additional Class Room Rooms 3.45000

25.02(b) Guard Room Rooms 1.32000

25.02(c) Boundary Wall School 5.0200025.03 Boudary Wall (Spillover only) 3.00000 3.00000

25.04

Boring/Handpump (Spillover only)

(minimum rates prescribed by State Drinking

Water Department subject to a ceiling of Rs.

1.00 lakhs)

0.55000 0.55000

25.05 Electricity /Water charges (Spillover only)

25.05(a) Solar Water Heater & Solar Light 2.97000

25.06Furniture/Equipment (including Kitchen

equipment)3.00000

25.07 TLM and equipment including library books 3.50000

25.08 Bedding (New) 0.75000

25.09 Replacement of Bedding (once in 3 Year) 0.75000 11 8.250 11 8.25000

Subtotal Non Recurring 3.80000 8.250 12.05000

B Recurring Cost Per Annum (Model-I)

25.10Maintenance per girl student per month @ Rs.

1500/-18.00000 13 234.000 13 234.00000

25.11 Stipend for girl student per month @ Rs. 100/- 1.20000 13 15.600 13 15.60000

25.12Supplementary TLM, stationery and other

educational material @ Rs.1000/- per annum1.00000 13 13.000 13 13.00000

25.13 Salaries

Arti:SSA-AWPB-2014-15-PABMinits:Aligarh:16-06-2014 524 / 533

Page 525: U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 · 2015. 1. 6. · U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15

Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

Name of District : Aligarh-2

ActivityS. No.Physical

UnitRemarks

Outlay Recommendation for 2014-15

Spill OverDeferred laibility of

2014-15Fresh Recommended Total Recommended

25.13.1 Additional Salaries:

(a) 1 Warden @ Rs. 25,000/- per month 3.00000 13 39.00000 13 39.00000

(b)4 Full time teachers as per RTE norms @ Rs.

20,000/- per month per teacher 9.60000 13 124.80000 13 124.80000

(c)

1 Urdu Teachers (only for blocks with muslim

population above 20% and select urban areas), if

required @ Rs. 12,000/- per month per teacher 1.44000 13 18.72000 13 18.72000

(d)3 part time teachers @ Rs. 5,000/- per month per

teacher 1.80000 13 23.40000 13 23.40000

(e)1 Full time Accountant @ Rs. 10,000/- per month

1.20000 13 15.60000 13 15.60000

(f)

2 Support Staff – (Accountant/ Assistant, Peon,

Chowkidar) @ Rs. 5,000/- per month per staff 1.20000 13 15.60000 13 15.60000

(g) 1 Head cook @ Rs. 6,000/- per month 0.72000 13 9.36000 13 9.36000

(h)2 Asstt. Cooks @ Rs. 4,500/- per month per cook

1.08000 13 14.04000 13 14.04000

25.14Specific skill training @ Rs.1000/- per child per

annum1.00000 13 13.000 13 13.00000

25.15Electricity/water charges @ Rs.1000/- per child

per annum1.00000 13 13.000 13 13.00000

25.16Medical care/contingencies @ Rs. 1250 per child

per annum1.25000 13 16.250 13 16.25000

25.17 Maintenance @ Rs.750/- per child per annum 0.75000 13 9.750 13 9.75000

25.18

Miscellaneous (Educational Tour/ Exposure Visit

/ Sports Material etc.) @ Rs.750/- per child per

annum

0.75000 13 9.750 13 9.75000

25.19Preparatory camps @ Rs.200/- per child per

annum0.20000 13 2.600 13 2.60000

25.20PTAs/school functions @ Rs.200/- per child per

annum0.20000 13 2.600 13 2.60000

25.21 Provision of Rent @ Rs.6000/- per annum 6.00000

25.21a Provision of Rent (6 months) 3.6000025.21b Provision of Rent (3 months) 1.8000025.21c Rent (Previous Year (2007-2012)

25.22 Capacity building 0.50000 13 6.500 13 6.50000

25.22(a)Physical/ Self Defence Training @ Rs.200/- per

child per annum0.20000 13 2.600 13 2.60000

Subtotal Recurring 13 599.170 13 599.17000

Subtotal (Model-I) 3.80000 13 607.420 13 611.22000

CNon Recurring One Time Grant (Only

committed liabilities) (Model-II)

25.23 Construction of Building (New)

25.24 Construction of Building KGBV sanctioned earlier

25.24(a) Additional Class Room Rooms 3.45000

25.24(b) Guard Room Rooms 1.32000

25.24(c) Boundary Wall School 5.0200025.25 Boudary Wall (Spillover only)25.26 Boring/Handpump (Spillover only)

25.27 Electricity /Water charges (Spillover only)

25.27(a) Solar Water Heater & Solar Light 2.97000

25.28Furniture/Equipment (including Kitchen

equipment)2.00000

25.29 TLM and equipment including library books 3.00000

25.30 Bedding (New) 0.37500

25.31 Replacement of Bedding (once in 3 Year) 0.37500

Subtotal Non Recurring

D Recurring Cost Per Annum (Model-II)

25.32Maintenance per girl student per month @ Rs.

1500/-9.00000

25.33 Stipend for girl student per month @ Rs. 100/- 0.60000

25.34Supplementary TLM, stationery and other

educational material @ Rs.1000/- per annum0.50000

25.35 Salaries(a) 1 Warden @ Rs. 25,000/- per month 3.00000

(b)3 Full time teachers as per RTE norms @ Rs.

20,000/- per month per teacher 7.20000

(c) 3 part time teachers @ Rs. 5,000/- per month per

teacher 1.80000

(d)1 Full time Accountant @ Rs. 10,000/- per month

1.20000

(e)

2 Support Staff – (Accountant/ Assistant, Peon,

Chowkidar) @ Rs. 5,000/- per month per staff 1.20000

Arti:SSA-AWPB-2014-15-PABMinits:Aligarh:16-06-2014 525 / 533

Page 526: U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 · 2015. 1. 6. · U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15

Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

Name of District : Aligarh-2

ActivityS. No.Physical

UnitRemarks

Outlay Recommendation for 2014-15

Spill OverDeferred laibility of

2014-15Fresh Recommended Total Recommended

(f) 1 Head cook @ Rs. 6,000/- per month 0.72000

(g)1 Asstt. Cooks @ Rs. 4,500/- per month per cook

0.54000

25.36Specific skill training @ Rs.1000/- per child per

annum0.50000

25.37Electricity/water charges @ Rs.1000/- per child

per annum0.50000

25.38Medical care/contingencies @ Rs. 1250 per child

per annum0.62500

25.39 Maintenance @ Rs.750/- per child per annum 0.37500

25.40

Miscellaneous (Educational Tour/ Exposure Visit

/ Sports Material etc.) @ Rs.750/- per child per

annum

0.37500

25.41Preparatory camps @ Rs.300/- per child per

annum0.15000

25.42PTAs/school functions @ Rs.300/- per child per

annum0.15000

25.43 Provision of Rent @ Rs.10000/- per annum 5.00000

25.43a Provision of Rent (6 months) 3.6000025.43b Provision of Rent (3 months) 1.8000025.43c Rent (Previous Year (2007-2012)25.44 Capacity building 0.25000

25.44(a)Physical/ Self Defence Training @ Rs.200/- per

child per annum0.10000

Subtotal Recurring

Subtotal (Model-II) Total (KGBV) 3.800 13 607.420 13 611.220

DISTRICT GRAND TOTAL (SSA+KGBV) 3.800 6.600 508225 12846.974 508225 12857.374

Arti:SSA-AWPB-2014-15-PABMinits:Aligarh:16-06-2014 526 / 533

Page 527: U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 · 2015. 1. 6. · U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15

Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

I ACCESS

1 Opening of New Schools

1.01 Upgradation of EGS to PSCentres /

School1.02 New PS School

1.03 Upgradation of PS to UPS / New UPS School

1.04 Composite Schools (for Urban Areas) School

1.05Residential Schools for specific category children

(For 100 children)

1.06Residential Hostel (for specific category of

children) (For 50 children)

1.07 Integration of Class V with Primary Schools

1.08Integration of Class VIII with Upper Primary

Schools

2Residential Schools for specific category

of children (For 100 Children)

Total - Residential Schools (For 100

children)

3Residential Hostel for specific category of

children (For 50 Children)

Total - Residential Schools (For 50

children)4 Transport/Escort Facility

4.01

Children in remote habitations with sparse

populations where opening of schools is

unviable

Child 0.03000

4.02

Urban deprived children/children without adult

protection in urban areas where schools are not

opened because availability of land is a problem

Child 0.03000

Sub Total

5Special Training for mainstreaming of Out-

of-School Children

5.03 Non-Residential (Fresh)(a) 12 months Child 0.06000(b) 9 months 0.04500(c) 6 months

(i)Special Training (by Special Instructors-NRBC)-

(1-5) Child 0.03000 471 14.130 471 14.13000

(ii) Special Training (by Special Instructors-NRBC)-

(6-8) Child 0.03000 319 9.570 319 9.57000

(d) 3 months Child 0.01500Sub Total 790 23.700 790 23.70000

Total (Special Training) 790 23.700 790 23.7005(B) House Hold Survey (HHS)

5(B).01 House Hold Survey through SMCHouse

Hold0.00001

Sub TotalII RETENTION6 Free Text Book

6.01Free Text Book (PS) for Parishadiya & Aided

Primary Schools (Workbooks not included)Child 0.00120 158322 189.986 158322 189.98640

6.01a

Free Text Book (PS) for 25% children of Class-1

in Private Recognised Primary Schools of other

Boards (Workbooks not included)

Child 0.00150

6.02 Free Brail Books (PS) 0.00150 77 0.116 77 0.11550

6.03 Free Large Print Books (PS) 0.00150

6.04Free Text Book (UPS) (Workbooks not included)

(Including KGBV Girls)Child 0.00200 70718 141.436 70718 141.43600

6.05 Free Brail Books (UPS) 0.00250 10 0.025 10 0.02500

6.06 Free Large Print Books (PS) 0.00250Sub Total 229127 331.563 229127 331.563

7 Provision of 2 set of Uniforms

7.01 All Girls (Including KGBV Girls) Child 0.00400 178141 712.564 178141 712.56400

7.02 SC Boys Child 0.00400 50943 203.772 50943 203.77200

7.03 ST Boys Child 0.00400

7.04 BPL Boys Child 0.00400 7133 28.532 7133 28.53200

7.05

Free Uniform for 25% children of Class-1 in

Private Recognised Primary Schools of other

Boards

Child0.00400

Sub Total 236217 944.868 236217 944.8687(A) Fee Reimbursement

7(A).01

Fee Reimbursement for Admission of children of

Disadvantaged Group & Weaker Section upto

25% of seats in Class-1 of Private Unaided

Recognised Schools

Child 0.05400

Sub Total

8 Teaching Learning Equipment (TLE)

8.01 TLE - New Primary School 25.40000 0.20000 25.400008.02 TLE - New Upper Primary School 30.00000 0.50000 30.00000

Name of District : AGRA -1

S. No.Physical

UnitActivity Remarks

Outlay Recommendation for 2014-15

Spill OverDeferred laibility of

2014-15Fresh Recommended Total Recommended

Arti:SSA-AWPB-2014-15-PABMinits:Agra:16-06-2014 527 / 533

Page 528: U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 · 2015. 1. 6. · U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15

Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

Name of District : AGRA -1

S. No.Physical

UnitActivity Remarks

Outlay Recommendation for 2014-15

Spill OverDeferred laibility of

2014-15Fresh Recommended Total Recommended

Sub Total 55.40000 55.40000III ENHANCING QUALITY9 New Teachers Salary

9.01 Primary Teachers (Regular) (Asstt. Teacher) Teacher 0.91500

9.01aHead Teacher for Primary (if the number of

children exceeds 150 in a school)Teacher

9.02 Primary Teachers (Contract) (S.M.) Teacher

9.03Subject specific Upper Primary Teachers

(Regular) (a) Science and Mathematics Teacher 1.26000(b) Social Studies Teacher 1.26000(c) Languages Teacher 1.26000

Sub Total (9.01 to 9.05)Add.Teacher against PTR

Sub Total (9.06 to 9.12)

Total (New Teacher's Salary-9.01 to 9.12)

Teachers Salary (Recurring-sanctioned

earlier)Primary teachers

9.13 Primary Teachers ( Regular)-Existing, in position Teacher 3.66000 425 1555.500 425 1555.50000

9.14Primary Teachers (Contract)-Existing, in

positionTeacher 0.55000

9.14(a) Primary Teachers (Contract)-under Training Teacher 0.38500 1819 700.315 1819 700.31500

9.14(b)Primary Teacher (Para Teachers Equal to

9.14(a) upgraded as Teachers)0.38500 1124 432.740 1124 432.74000

9.14(c) Primary Teachers (Para)- Vacant Teacher9.15 Primary Teachers (Vacant) Teacher 0.30500

9.16Head Teacher for Primary (if the number of

children exceeds 150)Teacher 5.04000 290 1461.600 290 1461.60000

9.16(b)Head Teacher for Primary (if the number of

children exceeds 150) VacantTeacher 0.42000

Additional teachers

9.17Additional Teachers - PS (Special BTC-

Regular) in positionTeacher 0.30500

9.18Additional Teachers - PS (Special BTC Under

Training)Teacher 0.87600

9.19 Additional Teachers - PS (Vacant) Teacher

9.20Others in position (Para Teachers upgraded

as Teachers)Teacher

Upper Primary teachers

9.21 UP Teachers (Regular)-Existing Teacher 5.04000 1433 7222.320 1433 7222.32000

9.22 UP Teachers (Contract)-Existing9.23 UP Teachers (Vacant) Teacher 1.26000

9.24Head Teacher for Upper Primary (if the number

of children exceeds 100)-ExistingTeacher 5.34000 276 1473.840 276 1473.84000

9.24a Head Teacher for Upper Primary (Vacant) Teacher 1.33500

9.25Subject specific Upper Primary Teachers

(Regular)(a) Science and Mathematics(b) Social Studies(c) Languages

9.32 Part Time Instructors in position(a) Art Education 0.77000 105 80.850 105 80.85000(b) Health and Physical Education 0.77000 157 120.890 157 120.89000(c) Work Education 0.77000 106 81.620 106 81.62000

9.32(A) Part Time Instructors Vacant(a) Art Education 0.42000(b) Health and Physical Education 0.42000(c) Work Education 0.42000

9.33

Others-Incentive to Teachers in Schools

Located in Naxal Affected Areas (@

Rs.1500/- per teachers per month)

Sub Total (9.13 to 9.33) 5735 13129.675 5735 13129.68TOTAL

(New Teachers Salary +Teachers Salary

Recurring)

5735 13129.675 5735 13129.67500

10 Teachers Training(a) Teachers

10.01

Refresher In-service Teachers' Training at BRC

level and above - 10 days (@ Rs.200/- per

head per day)

Teacher

(Target &

Ach.-13-14

in

Mandays)

0.00600

10.01(a)Continuous and Comprehensive Evauation [PS +

UPS)Teacher 0.01300 2066 26.858 2066 26.85800

10.01(b) Eary Reading and Numeracy Skills [PS] Teacher 0.00500 2066 10.330 2066 10.33000

10.01(c) Science [UPS] Teacher 0.00800 1072 8.576 1072 8.57600Recommended as

proposed

10.01(d) CWSN Teacher 0.00400

Arti:SSA-AWPB-2014-15-PABMinits:Agra:16-06-2014 528 / 533

Page 529: U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 · 2015. 1. 6. · U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15

Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

Name of District : AGRA -1

S. No.Physical

UnitActivity Remarks

Outlay Recommendation for 2014-15

Spill OverDeferred laibility of

2014-15Fresh Recommended Total Recommended

10.02

One day monthly cluster level meetings and

peer group training sessions for 10 months for

all teachers each year at CRC level - 10 days (@

Rs.100/- per head per day)

Teacher 0.01000

10.03(a)

Induction Training for Newly Recruited Teachers

for 6 Months (Special BTC)- @Rs.2000/- per

head per year

Teacher 0.02000

10.03(b)5 Days Training for Part Time Instructors @ Rs.

200/- per head per day) Teacher 0.01000

10.04

Training of untrained Teachers to acquire

professional qualifications over a two year

period.

Teacher 0.04700 1162 54.614 1162 54.61400

(b) Head Teachers

10.05Refresher Residencial In-service for 10 days at

BRC level and above

Head

Teacher(c) Resource Persons

10.06

Refresher Training for all Resource

Persons,Master Trainers, BRC & CRC faculty

and Coordinators for 5 days each year (@

Rs.200/- per head per day)

Resource

Person 0.00300 192 0.576 192 0.57600

Sub Total 6558 100.954 6558 100.954

11Academic Support through Block Resource

Centre (BRC)/ URC

11.01 Salary of Faculty and Staff

(a) 5 RPs at BRC for subject specific training in

positionRP 80 80

(b) 2 RPs for CWSN in position RP(b-i) 1 CWSN Resource Person RP 1.10000 32 35.200 32 35.20000

(b-ii) 1 Physiotherapist (Resource person for IE) RP

(c) 1 MIS Coordinator in position RP 1.86000

(d) 1 Datra Entry Operator in position RP 1.74000 16 27.840 16 27.84000

(e) 1 Accountant-cum-support staff in position RP 1.80000 16 28.800 16 28.80000

11.02 Furniture Grant BRC/ URC 1.00000

11.03Replacement of furniture, computer, TLE etc (

Once in 5 years)BRC/ URC 1.00000

11.04 Contingency Grant BRC/ URC 0.50000 16 8.000 16 8.00000

11.05 Meeting, TA BRC/ URC 0.30000 16 4.800 16 4.80000

11.06 TLM Grant BRC/ URC 0.10000

11.07 Maintenance Grant BRC/ URC 0.10000

Sub Total 16 104.640 16 104.64000

12Academic Support through Cluster

Resource Centres (CRC/UERC)

12.01Salary of Cluster Coordinator (on an average of

one Resource Person per 18 schools in a block)RP

12.02 Furniture GrantCRC/

UERC0.10000

12.03Replacement of furniture, computer, TLE etc.

once in 5 years

CRC/

UERC0.10000

12.04 Contingency Grant CRC/UERC 0.10000 117 11.700 117 11.70000

12.05 Meeting, TA CRC/UERC 0.12000 117 14.040 117 14.04000

12.06 TLM Grant CRC/UERC 0.03000

12.07Maintenance Grant

CRC/UERC 0.02000

Sub Total 234 25.740 234 25.74000

13Computer Aided Education in upper

primary schools under Innovation

13.01Computer Aided Education in upper primary

schoolsDistrict 0.01200 48 0.576 48 0.57600

Sub Total 48 0.576 48 0.5760014 Libraries in Schools14.01 (a) Primary School (per school) School 0.03000

14.02 (b) Upper Primary School (per school) School 0.10000

Sub TotalIV ANNUAL GRANTS15 Teachers' Grant15.01 Primary Teachers Teacher 0.0050015.02 Upper Primary Teachers Teacher 0.00500 1072 5.360 1072 5.36000

Sub Total 1072 5.360 1072 5.3600016 School Grant16.01 Primary School School 0.05000 2192 109.600 2192 109.6000016.02 Upper Primary School School 0.07000 1079 75.530 1079 75.53000

Sub Total 3271 185.130 3271 185.13000

Arti:SSA-AWPB-2014-15-PABMinits:Agra:16-06-2014 529 / 533

Page 530: U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 · 2015. 1. 6. · U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15

Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

Name of District : AGRA -1

S. No.Physical

UnitActivity Remarks

Outlay Recommendation for 2014-15

Spill OverDeferred laibility of

2014-15Fresh Recommended Total Recommended

17Research, Evaluation, Monitoring &

Supervision

17.01 REMS Activities School 0.00103 3271 3.365 3271 3.36459

17.02 Monitoring & Supervision School 0.00078 3271 2.565 3271 2.56468

17.03 House Hold Survey (Urban) in Million Plus Cities District 35.00000

Sub Total 6542 5.929 6542 5.9292718 Maintenance Grant

18.01 Maintenance in School having upto3 Classrooms School 0.07500 897 67.275 897 67.27500

18.01a Maintenance Grant School 0.07500 2073 155.475 2073 155.47500Sub Total 2970 222.750 2970 222.75000

VBRIDGING GENDER AND SOCIAL

CATEGORY GAPS

19 Interventions for CWSN (IE)

19.01 Provision for Inclusive Education Child 0.02500 3740 93.500 3740 93.50000

Sub Total 3740 93.500 3740 93.50000

20Innovativation Head up to Rs.50 Lakh per

district

20.01 Girls Education District 0.70000 6 4.200 6 4.20000

20.02 ECCE District20.03 Intervention for SC / ST children District

20.04 Intervention for Minority Community children District

20.05 Intervention for Urban Deprived children District 10.00000

Sub Total 6 4.200 6 4.2000021 SMC/PRI Training

21.01Residential for 6 Resource Person per Block (3

days) (@ Rs.500/-)Blocks 0.09000

21.02Non-residential (3 days training of 6 SMC

members) (@ Rs.100/-)SMC 0.01800 2970 53.460 2970 53.46000

21.02(a)Non-residential (3 days training of 3 Members of

PRI/VECs/LA) (@ Rs.100/-)VEC/ WEC 0.00900

21.03

Seminar/Orientation of SMC Women members

and President/Vice President (@ Rs. 50,000/-

per block)

Blocks 0.50000

Sub Total 2970 53.460 2970 53.46000VI SCHOOL INFRASTRUCTURE22 Civil Works22.01 Primary School (Plain) (New) School 45.55 13.15500 45.5535522.02 Primary School (Hilly/Rocky) (New) School 13.2750022.03 Upper Primary (Plain) (New) School 16.91 20.65500 16.90944

22.04 Upper Primary School (Hilly/Rocky) (New) School 20.77500

22.04aComposite Schools for Urban Areas (Class I-

VIII)School 41.04 41.04000 41.04000

22.05 ACR in lieu of upgraded Upper Primary School Rooms

22.06 Additional class rooms for adding Class VIII Rooms

22.07 Building Less (Pry) School 9.7500022.08 Building Less (UP) School 18.5900022.09 Dilapidated Building (Pry) School 9.7500022.10 Dilapidated Building (UP) School 18.59000

22.11 Additional Class Room (Rural) ( PS+UPS) Rooms 3.45000

22.12 Additional Class Room (Urban) Rooms 3.4500022.13 Additional Class Room (Hill Area)22.14 Toilet/Urinals (PS & UPS) School 0.7000022.15 Separate Girls Toilet (Rural+Urban) School 0.70000 131 91.700 131 91.7000022.16 CWSN friendly Toilets School 0.50000

22.17 Drinking Water Facility (for Urban Area Only)) School 0.15000

22.17a Drinking Water Facility (Plain PS & UPS) School 0.15000 517 77.550 517 77.55000

22.17b Drinking Water Facility (Hilly/Rocky PS & UPS) School 0.15000

22.18a Boundary Wall PS (Total in Meters x .01105) 0.01749

22.18bBoundary Wall PS (For Gate) @Rs. 7000 x no. of

P.S.School 0.07800

22.18c Boundary Wall UPS (Total in Meters x .01105) 0.01749

22.18dBoundary Wall UPS (For Gate) @Rs. 7000 x no.

of UPSSchool 0.07800

22.19a Electrification in P.S./ Electrical Equipment School 0.11000

22.19b Electrification in U. P.S./ Electrical Equipment School 0.11000

22.20Office-cum-store-cum-Head Teacher's room

(Primary)Rooms

22.21Office-cum-store-cum-Head Teacher's room

(Upper Primary)Rooms

22.22Augumentation of training facility in BRC (one

time)BRC/ URC 5.00000

22.23 Child friendly Elements School 0.25000

22.24 Ramps with Handrails (Barrier Free Elements) School 0.06000

22.25 Handrails in existing Ramps School 0.01000

Arti:SSA-AWPB-2014-15-PABMinits:Agra:16-06-2014 530 / 533

Page 531: U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 · 2015. 1. 6. · U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15

Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

Name of District : AGRA -1

S. No.Physical

UnitActivity Remarks

Outlay Recommendation for 2014-15

Spill OverDeferred laibility of

2014-15Fresh Recommended Total Recommended

22.26 Whole School Develoipment School22.27 Retro-fitting and repairs School

22.28Residential Schools for specific category

of children

(a) Construction of Building including boundary

wall, Water and sanitation facilities, electric

installation (For 100 children)

Building 65.86000

(b) Construction of residential hostel Building 65.86000

(c) Refurnishing unused old buildings Building

22.29

Construction of Hostel in existing Govt UPS

including boundary wall, Water and sanitation

facilities, electric installation etc. (For 50

children)

7.00000

22.30Furniture for Govt. UPS (per child) (@ Rs.500/-

per child enrolled)Child 0.00500

22.31 Major Repairs for Primary School School 0.30000

22.32 Majr Repairs for Upper Primary School School 0.30000

22.33Others (Difference of Civil Wrks

sanctioned in pre.yr.)22.33a Others (Overhead Tank PS) School 0.1200022.33b Others (Overhead Tank UPS) School 0.12000

Sub Total (Civil WOrks) 103.50 648 169.250 648 272.75VII PROJECT MANAGEMENT COST23 Management23.01 Management up to 3.5%

(a) Project Management and MIS

(i) DPO ( Salary, Contigency, Consumables,

POL, TA & Computer etc)District 1 106.796 1 106.79620

(ii) EMIS Cell District 1 20.705 1 20.70500Sub Total (a) 1 1 1 127.501 1 127.501

(b) Training of Educational Administrators District

(c) School Mapping and Social Mapping District

Sub Total (23.01)

23.02Learning Enhancement Prog. (LEP) (P & UP) (up

to 2%)District 22.412 22.41200

23.03 Community Mobilization (up to 0.5%) District 1 45.850 1 45.85000

Sub Total (Management) 1 68.262 1 68.26200Total Management Cost 195.763 195.76320Total of SSA (Districs) 103.503 55.400 499944 15597.058 499944 15755.961

24 State Component23.01 Management23.02 REMS 0.0044923.03 SIEMAT

Sub Total

STATE SSA TOTAL 103.50299 55.40000 499944 15597.058 499944 15755.96136

25

KGBV Financial Provision (give

separate costing sheets for different

Models)

Hostel

ANon Recurring One Time Grant (Only

committed liabilities) (Model-I)

25.01 Construction of Building (New)

25.02 Construction of Building KGBV sanctioned earlier 1.29400 1.29400

25.02(a) Additional Class Room Rooms 3.45000

25.02(b) Guard Room Rooms 1.32000

25.02(c) Boundary Wall School 5.0200025.03 Boudary Wall (Spillover only) 4.50000 4.50000

25.04

Boring/Handpump (Spillover only)

(minimum rates prescribed by State Drinking

Water Department subject to a ceiling of Rs.

1.00 lakhs)

2.00000 2.00000

25.05 Electricity /Water charges (Spillover only)

25.05(a) Solar Water Heater & Solar Light 2.97000

25.06Furniture/Equipment (including Kitchen

equipment)3.00000

25.07 TLM and equipment including library books 3.50000

25.08 Bedding (New) 0.75000

25.09 Replacement of Bedding (once in 3 Year) 0.75000 8 6.000 8 6.00000

Subtotal Non Recurring 7.79400 6.000 13.79400

B Recurring Cost Per Annum (Model-I)

25.10Maintenance per girl student per month @ Rs.

1500/-18.00000 13 234.000 13 234.00000

25.11 Stipend for girl student per month @ Rs. 100/- 1.20000 13 15.600 13 15.60000

25.12Supplementary TLM, stationery and other

educational material @ Rs.1000/- per annum1.00000 13 13.000 13 13.00000

25.13 Salaries

Arti:SSA-AWPB-2014-15-PABMinits:Agra:16-06-2014 531 / 533

Page 532: U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 · 2015. 1. 6. · U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15

Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

Name of District : AGRA -1

S. No.Physical

UnitActivity Remarks

Outlay Recommendation for 2014-15

Spill OverDeferred laibility of

2014-15Fresh Recommended Total Recommended

25.13.1 Additional Salaries:

(a) 1 Warden @ Rs. 25,000/- per month 3.00000 13 39.00000 13 39.00000

(b)4 Full time teachers as per RTE norms @ Rs.

20,000/- per month per teacher 9.60000 13 124.80000 13 124.80000

(c)

1 Urdu Teachers (only for blocks with muslim

population above 20% and select urban areas), if

required @ Rs. 12,000/- per month per teacher 1.44000 13 18.72000 13 18.72000

(d)3 part time teachers @ Rs. 5,000/- per month per

teacher 1.80000 13 23.40000 13 23.40000

(e)1 Full time Accountant @ Rs. 10,000/- per month

1.20000 13 15.60000 13 15.60000

(f)

2 Support Staff – (Accountant/ Assistant, Peon,

Chowkidar) @ Rs. 5,000/- per month per staff 1.20000 13 15.60000 13 15.60000

(g) 1 Head cook @ Rs. 6,000/- per month 0.72000 13 9.36000 13 9.36000

(h)2 Asstt. Cooks @ Rs. 4,500/- per month per cook

1.08000 13 14.04000 13 14.04000

25.14Specific skill training @ Rs.1000/- per child per

annum1.00000 13 13.000 13 13.00000

25.15Electricity/water charges @ Rs.1000/- per child

per annum1.00000 13 13.000 13 13.00000

25.16Medical care/contingencies @ Rs. 1250 per child

per annum1.25000 13 16.250 13 16.25000

25.17 Maintenance @ Rs.750/- per child per annum 0.75000 13 9.750 13 9.75000

25.18

Miscellaneous (Educational Tour/ Exposure Visit

/ Sports Material etc.) @ Rs.750/- per child per

annum

0.75000 13 9.750 13 9.75000

25.19Preparatory camps @ Rs.200/- per child per

annum0.20000 13 2.600 13 2.60000

25.20PTAs/school functions @ Rs.200/- per child per

annum0.20000 13 2.600 13 2.60000

25.21 Provision of Rent @ Rs.6000/- per annum 6.00000

25.21a Provision of Rent (6 months) 3.6000025.21b Provision of Rent (3 months) 1.8000025.21c Rent (Previous Year (2007-2012)

25.22 Capacity building 0.50000 13 6.500 13 6.50000

25.22(a)Physical/ Self Defence Training @ Rs.200/- per

child per annum0.20000 13 2.600 13 2.60000

Subtotal Recurring 13 599.170 13 599.17000

Subtotal (Model-I) 7.79400 13 605.170 13 612.96400

CNon Recurring One Time Grant (Only

committed liabilities) (Model-II)

25.23 Construction of Building (New)

25.24 Construction of Building KGBV sanctioned earlier

25.24(a) Additional Class Room Rooms 3.45000

25.24(b) Guard Room Rooms 1.32000

25.24(c) Boundary Wall School 5.0200025.25 Boudary Wall (Spillover only)25.26 Boring/Handpump (Spillover only)

25.27 Electricity /Water charges (Spillover only)

25.27(a) Solar Water Heater & Solar Light 2.97000

25.28Furniture/Equipment (including Kitchen

equipment)2.00000

25.29 TLM and equipment including library books 3.00000

25.30 Bedding (New) 0.37500

25.31 Replacement of Bedding (once in 3 Year) 0.37500

Subtotal Non Recurring

D Recurring Cost Per Annum (Model-II)

25.32Maintenance per girl student per month @ Rs.

1500/-9.00000

25.33 Stipend for girl student per month @ Rs. 100/- 0.60000

25.34Supplementary TLM, stationery and other

educational material @ Rs.1000/- per annum0.50000

25.35 Salaries(a) 1 Warden @ Rs. 25,000/- per month 3.00000

(b)3 Full time teachers as per RTE norms @ Rs.

20,000/- per month per teacher 7.20000

(c) 3 part time teachers @ Rs. 5,000/- per month per

teacher 1.80000

(d)1 Full time Accountant @ Rs. 10,000/- per month

1.20000

(e)

2 Support Staff – (Accountant/ Assistant, Peon,

Chowkidar) @ Rs. 5,000/- per month per staff 1.20000

Arti:SSA-AWPB-2014-15-PABMinits:Agra:16-06-2014 532 / 533

Page 533: U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 · 2015. 1. 6. · U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15 Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

U.P. - SSA - RTE- ANNUAL WORK PLAN AND BUDGET - 2014-15

Phy. Fin. Phy. Fin. Unit Cost Phy. Fin. Phy. Fin.

Name of District : AGRA -1

S. No.Physical

UnitActivity Remarks

Outlay Recommendation for 2014-15

Spill OverDeferred laibility of

2014-15Fresh Recommended Total Recommended

(f) 1 Head cook @ Rs. 6,000/- per month 0.72000

(g)1 Asstt. Cooks @ Rs. 4,500/- per month per cook

0.54000

25.36Specific skill training @ Rs.1000/- per child per

annum0.50000

25.37Electricity/water charges @ Rs.1000/- per child

per annum0.50000

25.38Medical care/contingencies @ Rs. 1250 per child

per annum0.62500

25.39 Maintenance @ Rs.750/- per child per annum 0.37500

25.40

Miscellaneous (Educational Tour/ Exposure Visit

/ Sports Material etc.) @ Rs.750/- per child per

annum

0.37500

25.41Preparatory camps @ Rs.300/- per child per

annum0.15000

25.42PTAs/school functions @ Rs.300/- per child per

annum0.15000

25.43 Provision of Rent @ Rs.10000/- per annum 5.00000

25.43a Provision of Rent (6 months) 3.6000025.43b Provision of Rent (3 months) 1.8000025.43c Rent (Previous Year (2007-2012)25.44 Capacity building 0.25000

25.44(a)Physical/ Self Defence Training @ Rs.200/- per

child per annum0.10000

Subtotal Recurring

Subtotal (Model-II) Total (KGBV) 7.794 13 605.170 13 612.964

DISTRICT GRAND TOTAL (SSA+KGBV) 111.297 55.400 499957 16202.228 499957 16368.925

Arti:SSA-AWPB-2014-15-PABMinits:Agra:16-06-2014 533 / 533