Up Next…
Over Coming ITAR Regulations within Fusion Lifecycle
- Roland Brown, Project Manager
Roland Brown• Project Manager• Mechanical Engineer• 2 Years with Desert Tech
• Small Firearms Manufacturer • Has been in business for 10 years• 10 Million in Annual Revenue• 80-100 employees• 3 Firearm platforms in current production
Current Platforms:
Developed Pre-PLM & PDM
Developed Pre-PLM & PDM
PLM implemented mid-development
HTI
SRS
MDR
Before PLM: Product dev challenges were process driven…
Product management challenges resulting from this process:
• Lack of Product-level Change Control• No traceability or accountability • No Engineering or Business Change Analysis • Paper Based ECO (inconsistent use)
Someone identifies a “needed” change
Change is made(no formal discussion)
Engineering documents Revisioned (sometimes)
Our old process:
• NCMR: Problem tracking• CAPA: Problem analysis• ECR: Engineering Analysis and Buisness review (pre-change)• ECO: Tracks changes & drives revisions• ECN: Formal Task-driven implementation of ECO
NCMR
ECR ECO
This is where we wanted to be with PLM:
ECN
CAPA
Before PLM: Product dev challenges were process driven…
Which PLM solution?
Desert Tech’s PLM Requirements:
• Cloud/SaaS• Pre-built Processes• Ease of use and consistent UI• Process driven task assignment• Scalability• Configurable Workflow process (In House)• Wont break the bank $$$
All workspace Process approvals changed to Departmental-based
selection.
NPI inspired Task management for ECN
execution accountability
On-Prem CAD PDM integration to Cloud-based
FLC for file management
Solutions:
Challenges DT faced upon selecting Fusion Lifecycle…
• DT’s Very specific approval requirements (Departmental vs Team)• ECO Task Assignment (process driven & templatized)• Multi-Tenant Cloud & ITAR don’t play well together (typically)
Tailored Approval Processes Templatized Task Management PDM Integration
Departmental Approval Requirements:
3 Minute Video of DT Departmental Approval Requirements
ECO\ECN Task Assignment:
3 Minute Video of Templated Task Assignment for ECN-Phase Execution
Autodesk Fusion Lifecycle to SOLIDWORKS PDM Pro Integration
DesertTech’s 3 primary use cases for integration:1. PLM Item creation from PDM2. Metadata Sync between PDM and PLM3. Closed loop workflow sync (ECO manages PDM workflow)
Additional capability we’re not using:• Upload and attachment of derivative documents (e.g. pdf, step, x_t,
etc…)
PDM integration
1. Implement in phases
2. Configuration is an iterative processes
3. Targeted Training
Lessons learned:
(Doesn’t have to be ideal to start using it)
(Don’t bite off too much to start)
(Shorter and more frequent sessions)
(Build from a solid foundation)
(Perfection is a goal not a requirement)
(Let’s face it they won’t remember it anyway ☺)
The Road Ahead
• New Product Introduction (NPI)• Supplier Approval & Auditing (AML)• ERP integration