2
????????????? ON OFF FLASHJET PUMP Commissioning Check that the isolation valve on the pump is in open condition and observe the pump performance. Balancing line Piston valve Float trap To drain Strainer Pressure Gauge Motive steam in ENSURE DIRECTION OF DCV DURING ASSEMBLY CUSTOMERS SCOPE DISC CHECK VALVE INSTALLATION STEPS 1 A B C D 2 Condensate inlet Motive steam in Motive steam in Strainer cap 3 COMMISSIONING STEPS Flash take off
Transcript of Untitled-1 []€¦ · Title: Untitled-1 Author: SW Created Date: 3/31/2016 3:32:05 PM
?????????????
ON
OFF
FLASHJET PUMP
Commissioning
Check that the isolation valve on the pump is in open condition and observe the pump performance.
Balancing line
Piston valve
Float trap
To drain
Strainer
Pressure Gauge
Motive steam in
ENSURE DIRECTION OF DCV DURING ASSEMBLY
CUSTOMERS
SCOPE
DISC CHECK VALVE
INSTALLATION STEPS1 A
B
C
D
2
Condensate inlet
Motive steam in
Motive steam in
Strainer cap
3
COMMISSIONING STEPS
Flash take off
NRV NRV
FJP 1 FJP 2
FJP40 FJP80 FJP80X
PRECAUTIONS