Unlocking Remote Oilfield Development
Asia Oil Week : 25th to 27th June 2012
Singapore
Iain Baxter – Director of Business Development
Slide 1 © 2012 CompactGTL plc
Safe, operable & industry approved technology
Increase NPV of oilfield developments
Access & develop remote oilfields onshore & offshore
Slide 2 © 2012 CompactGTL plc
World Scale GTL
Gas Monetization
300MMscf/d ++
3 Proven & Operational GTL Processes Today
Modular GTL
Oilfield Access
<= 50MMscf/d
Slide 3 © 2012 CompactGTL plc
Conventional GTL vs CompactGTL
Shell Pearl - Qatar
140,000 bbl/d GTL Products
450 Football Fields
< 5,000 bbl/d
<< 1 Football Field
Slide 4 © 2012 CompactGTL plc
Stranded Oil !
$ $ $ $
Slide 5 © 2012 CompactGTL plc
What makes some oil “stranded” ?
Remote oilfields with
enforced gas flaring
legislation
Gas re-injection is :
- Not feasible or..
- Expensive or..
- A risk to the reservoir
No infrastructure
Gas export is :
- Not feasible or..
- Expensive or..
- Has no fair gas buyer
STOP !
Slide 6 © 2012 CompactGTL plc
Onshore Opportunity
Size by Region
Offshore Opportunity
Size by Region
≈ 800 Oilfields with Problematic Associated Gas @ <50MMscf/d
Analysis by Wood Mackenzie & Fugro Robertson
Slide 7 © 2012 CompactGTL plc
Options for Associated Gas
Reinjection & Flaring
Associated Gas MMscf/d
Dis
tan
ce
to
ma
rke
t fo
r co
nve
rte
d p
rod
uct
[k
m]
150
75
400
200
50
500
FLNG
CNG
Pipeline Gas to Wire
Slide 8 © 2012 CompactGTL plc
Revolutionary Solution for Remote Oilfields
Modular GTL : Convert Associated Gas to syncrude then
Co-mingle and transport with the natural crude
Image courtesy of SBM Offshore
OFFSHORE
ONSHORE
Slide 9 © 2012 CompactGTL plc
25MMscf/d GTL Integrated FPSO – SBM Offshore
Image courtesy of SBM Offshore
• Fully Integrated Design
• Up to 50,000 bbl/d Crude Production
• 2,000 bbl/d GTL Liquids Production
Slide 10 © 2012 CompactGTL plc
Facility Flow Scheme
Separators
Crude Export
Gas
Feed Water
Syncrude
Oil & Liquids Processing
Waste Water
No Oxygen Required !
High CO2 Possible !
Slide 11 © 2012 CompactGTL plc
Modular Plant – Critical for Oilfield Projects
Modular Plant
- Inherent Reliability
- Scaleability
- Operability
- High Turn Down
- Access to Site
- Reactor Changeout
Slide 12 © 2012 CompactGTL plc
GTL Economics vs Re-injection or Gas Export
Facilities Capital Cost PV
Gas Disposal
Crude Revenue
PV
Oilfield NPV
Operations & Tax
PV
Penalties or Delay
Operations & Tax
PV
GTL Opex
Gas Re-Injection or Pipeline to Market
Facilities Capital Cost PV
GTL Plant
Integrated CompactGTL
Oilfield NPV
Syncrude PV
Crude Revenue
PV
10MMscfd ANG Processed to
1,000 bpd Syncrude
Slide 13 © 2012 CompactGTL plc
GTL Economics : Liberating Shut-In Production
Facilities Capital Cost PV
Existing Crude
Revenue PV
Oilfield NPV
Operations & Tax
PV
Operations
& Tax PV
GTL Opex
Syncrude PV
Crude Revenue
PV
Existing or Planned Field subject to ANG
Flaring Cap
Facilities Capital Cost PV
GTL Plant
Integrated CompactGTL
Oilfield NPV
Liberated Crude
Revenue PV
10MMscfd ANG
Flaring cut liberates
10,000 bpd Production @ GOR=1,000
Slide 14 © 2012 CompactGTL plc
Case Study – Onshore West Africa
• Existing oilfield operation
• GOR = 1,000 >15 years life remaining
• Flaring reduction targets restricting production
• Re-injection prohibitive
• Terrain & distance prevent gas gathering
• 10MMscf/d plant gives 1,000 bpd syncrude
• 10,000 bpd liberated crude production
• Incremental NPV US$80MM
• Low sensitivity to CAPEX & OPEX
10 MMscfd Modular Onshore
GTL Plant
CompactGTL Solution
Slide 15 © 2012 CompactGTL plc
Case Study – Onshore West Africa
Incremental Cash Flow
Economic Metrics
Undiscou
nted
Profit
$MM
NPV 10
$MM
Reserves
MMboe
NPV10/Boe
$/Boe DPIR $/$
Payback
Year
Maximum
Exposure
$MM
-0.8 81.4 3.7 22.31 0.91 2015 102.5
-200
-100
0
100
200
300
400
2012
2013
2014
2015
2016
2017
2018
2019
2020
2021
2022
2023
2024
2025
2026
2027
2028
2029
2030
2031
2032
2033
2034
2035
2036$ M
illion
(Nom
inal)
Year
Full Field Gross Cash Flow
Full Field Annual Gross Cash Flow
Full Field Cumulative Gross Cash Flow
Economics by Fugro Robertson
Slide 16 © 2012 CompactGTL plc
• Gas pre-treatment
• Pre-reforming
• Reforming
• Waste heat recovery
• Process steam generation
• Syngas compression
• Fischer Tropsch synthesis
• FT cooling water system
• Tail gas recycling
World’s first modular fully integrated GTL
facility !
Image shown courtesy of Petrobras
Plant commissioned in December 2010.
CompactGTL technology now approved by Petrobras for
deployment
Slide 17 © 2012 CompactGTL plc
Delivery – World Class Clients & Partners
FEED & PM / Execution Reactor Manufacture
Catalyst Manufacture
FPSO Integration & PM / Execution
Clients Include
Majors & IOC’s
Slide 18 © 2012 CompactGTL plc
A ‘Win-Win’ for IOC’s, NOC’s & Governments
250 km
• Safe, operable & industry approved technology
• Access & develop remote oilfields onshore & offshore
• Increase oilfield NPV
Slide 19 © 2012 CompactGTL plc
Unlocking Remote Oilfield Development
Asia Oil Week : 25th to 27th June 2012
Singapore
Iain Baxter – Director of Business Development