Unlocking Myanmar’s Deepwater Potential:...
Transcript of Unlocking Myanmar’s Deepwater Potential:...
Myanmar-Norway Business Council: 24 May 2016
Unlocking Myanmar’s Deepwater Potential: Woodside’s Offshore Exploration 2015/16
Unlocking Myanmar’s Deepwater Potential 224 May 2016
About Woodside
Unlocking Myanmar’s Deepwater Potential 324 May 2016
• Australia’s largest
independent O&G company:
market cap ~A$23 billion
• A leading global LNG producer:
25+ years of supply to Asia
• Operation, exploration
and marketing interests
in 17 countries
• Operating in Myanmar
since 2013 through Woodside
Energy (Myanmar) Pte Ltd
Why Myanmar?
Unlocking Myanmar’s Deepwater Potential
424 May 2016
• Under explored deep water
areas
• Early-mover opportunities
• Aligned to Woodside’s core
deepwater skills and
technologies
• Partnerships with proven
operators
• An under-supplied but rapidly
growing domestic energy
market; plus export opportunities
Woodside Offshore Acreage
Unlocking Myanmar’s Deepwater Potential 524 May 2016
• Leading acreage holder in the
Rakhine Basin (46,000km2)
• Farm-ins to AD-7 and A-6
early 2013
o 3D surveys acquired within
first 12 months in each
block
• Four blocks awarded in 2013
offshore bid round; two as
operator
o Production Sharing
Contracts signed March
2015
Joint Venture Structure
Unlocking Myanmar’s Deepwater Potential 624 May 2016
BLOCK PARTICIPANTS SHARE OPERATOR
Block A-7 Woodside Energy (Myanmar) Pte Ltd 45% Woodside
BG Exploration & Production Myanmar Pte Ltd (BGEPM) 45%
Myanmar Petroleum Exploration & Production Company
Limited (MPEP)
10%
Block AD-5 Woodside Energy (Myanmar) Pte Ltd 55% Woodside
BG Exploration & Production Myanmar Pte Ltd (BGEPM) 45%
Block A-6 Woodside Energy (Myanmar) Pte Ltd 40% Woodside,
excepting
government
relations
(MPRL)
Total E&P Myanmar 40%
Myanmar Petroleum Resources (MPRL) E&P Pte Ltd 20%
Block AD-7 Posco Daewoo Corporation (operator) 60% Daewoo &
Woodside Woodside Energy (Myanmar) Pte Ltd (deepwater drilling
operator)
40%
Block A-4 Woodside Energy (Myanmar) Pte Ltd 45% BG Group
BG Exploration & Production Myanmar Pte Ltd (BGEPM) 45%
Myanmar Petroleum Exploration & Production Co. Ltd (MPEP) 10%
Block AD-2 Woodside Energy (Myanmar) Pte Ltd 45% BG Group
BG Exploration & Production Myanmar Pte Ltd (BGEPM) 55%
An Active Exploration Program
Unlocking Myanmar’s Deepwater Potential 724 May 2016
• Most active explorer offshore
Myanmar in 2015-16.
• Two exploration wells; first
deepwater discoveries in
Rakhine Basin
• More than 30,000 km2 of
seismic acquisition (16,000
km2 operated).
Shwe Yee
Htun-1 well
Nov 2015
Thalin-1 well
Jan 2016
3D seismic
Dec 2015
3D seismic
Dec 2015
3D seismic
April 2016
2D seismic
April 2016
Challenges of an Emerging Basin
Unlocking Myanmar’s Deepwater Potential 824 May 2016
• Proven petroleum system in
shallow water (Shwe).
• Deep water heightens the
challenges:
• Limited accessible data
• Complex geology
• Limited infrastructure;supply
chain
• Long lead times
• Limited weather windows.
• The 2015/16 drilling and
seismic campaign has
provided valuable learnings.
• Now gearing towards year-
round drilling windows.
Key
WEM holdings
3D surveys
2D surveys
Expl. wells
A-6: Shwe Yee Htun-1 Exploration Well
Unlocking Myanmar’s Deepwater Potential 924 May 2016
• 37 days drilling / logging, total
depth of 5306m
• 129m gas column; ~32m net
pay; 0.9 Tcf (2C gross)
• Under budget, no significant
HSE events
• Multiple channels running over
a large anticline
• 3D seismic to determine extent
of play
• Preparing for 2017 appraisal
drilling
Thalin-1A
Shwe Yee Htun-1
Shwe Field
Yadana Field
AD-2
A-6
AD-5 A-7
A-4
AD-7
AD-7: Thalin-1A Exploration Well
Unlocking Myanmar’s Deepwater Potential 1024 May 2016
• 18 days drilling / logging, total
depth of 3034m
• 64m gas column; ~62m net pay;
1.5 Tcf (2C gross)
• Under budget, no significant HSE
events
• 3D seismic to evaluate further
prospects
• Preparing for 2017 appraisal
drilling
• Located adjacent to Shwe field
(existing third party infrastructure)
Thalin-1A
Shwe Yee Htun-1
Shwe Field
Yadana Field
AD-2
A-6
AD-5 A-7
A-4
AD-7
A7 / AD-5 Seismic Campaign
Unlocking Myanmar’s Deepwater Potential 1124 May 2016
• 18 streamer configuration –
15.6km2 surface area
• Peak acquisition rate of
160km2 per day – survey
completed in 125 days
• Under budget, no significant
HSE incidents
• Survey extended into A-6 block
to build regional knowledge
• PSTM and PSDM
interpretation to determine
drillable prospects
Suitable technical image
A Responsible Operator
Unlocking Myanmar’s Deepwater Potential 1224 May 2016
• Conducted environmental impact
assessments prior to all activities
• Engagement with potentially
affected communities
• Social investment program,
including:
Internship Placements at Woodside
Head Office
Post-graduate scholarship
Early Childhood Development
Program in Ayeyarwady Region
Capacity building at Pathein
University – marine research
Flood relief assistance
Next steps
Unlocking Myanmar’s Deepwater Potential 1324 May 2016
• Four firm appraisal and exploration wells planned for 2017
• Interpret seismic acquired on new permits and progress to drill-drop
decisions late 2017
Indicative schematic –not to scale
AD7(Thalin)
Shwe Platform
Onshore Gas
Terminal
A6 (Shwe Yee Htun)
Indicative schematic –not to scale
Yadana
Yangon
Thalin
Shwe Yee Htun
AD-7, Thalin-1A 1.5 Tcf, 2C gross1
Subsea tieback option via Shwe
Platform2
Shwe has design capacity for an
additional 320 mmscf/d train
Planned full appraisal before end Q2
2017
Targeting Discovery to Concept Select
in 15 months
Pipeline gas Myanmar and China
A-6, Shwe Yee Htun 0.9 Tcf, 2C gross1
Tieback via Yadana or standalone2
Focused appraisal to continue volume
build
Pipeline gas Myanmar and Thailand