1 - 07.05.13 TECHNICAL INSTRUCTIONS UNLOADING PROCEDURE OF AN AIRFLOW CONTAINER LCO2 / LN2O

Transcript of UNLOADING PROCEDURE OF AN AIRFLOW · PDF fileUNLOADING PROCEDURE OF AN AIRFLOW CONTAINER LCO2...

Page 1: UNLOADING PROCEDURE OF AN AIRFLOW · PDF fileUNLOADING PROCEDURE OF AN AIRFLOW CONTAINER LCO2 / LN2O . 2 - 07.05.13 ... Wear all required safety equipments for discharging. 2. Never

1 - 07.05.13

TE

CH

NIC

AL

IN

ST

RU

CT

ION

S

UNLOADING PROCEDURE OF

AN AIRFLOW CONTAINER

LCO2 / LN2O

Page 2: UNLOADING PROCEDURE OF AN AIRFLOW · PDF fileUNLOADING PROCEDURE OF AN AIRFLOW CONTAINER LCO2 / LN2O . 2 - 07.05.13 ... Wear all required safety equipments for discharging. 2. Never

2 - 07.05.13

TE

CH

NIC

AL

IN

ST

RU

CT

ION

S

PHASE 1 : Preliminary check and first

manipulations before the discharge

1. Security rules

1. Wear all required safety equipments for

discharging.

2. Never open totally the valves.

3. Be aware of all gas related hazards

4. In case of Nitrous oxide, de sure that no grease is used and that the container is not located over asphalt.

Page 3: UNLOADING PROCEDURE OF AN AIRFLOW · PDF fileUNLOADING PROCEDURE OF AN AIRFLOW CONTAINER LCO2 / LN2O . 2 - 07.05.13 ... Wear all required safety equipments for discharging. 2. Never

3 - 07.05.13

TE

CH

NIC

AL

IN

ST

RU

CT

ION

S

PHASE 1 : Preliminary check and first

manipulations before the discharge

2. Open the side doors of the container and check its general state.

Page 4: UNLOADING PROCEDURE OF AN AIRFLOW · PDF fileUNLOADING PROCEDURE OF AN AIRFLOW CONTAINER LCO2 / LN2O . 2 - 07.05.13 ... Wear all required safety equipments for discharging. 2. Never

4 - 07.05.13

TE

CH

NIC

AL

IN

ST

RU

CT

ION

S

PHASE 1 : Preliminary check and first

manipulations before the discharge

3. Be sure that all the valves of both container and tank are fully closed.

Page 5: UNLOADING PROCEDURE OF AN AIRFLOW · PDF fileUNLOADING PROCEDURE OF AN AIRFLOW CONTAINER LCO2 / LN2O . 2 - 07.05.13 ... Wear all required safety equipments for discharging. 2. Never

5 - 07.05.13

TE

CH

NIC

AL

IN

ST

RU

CT

ION

S

PHASE 1 : Preliminary check and first

manipulations before the discharge

4. Connect DN40 Hose between the HC7 connection of the container and the Gas Valve of the tank.

HC7

Page 6: UNLOADING PROCEDURE OF AN AIRFLOW · PDF fileUNLOADING PROCEDURE OF AN AIRFLOW CONTAINER LCO2 / LN2O . 2 - 07.05.13 ... Wear all required safety equipments for discharging. 2. Never

6 - 07.05.13

TE

CH

NIC

AL

IN

ST

RU

CT

ION

S

PHASE 1 : Preliminary check and first

manipulations before the discharge

5. Connect DN50 Hose between the HC2 connection of the container and the liquid Valve of the tank.

HC2

Page 7: UNLOADING PROCEDURE OF AN AIRFLOW · PDF fileUNLOADING PROCEDURE OF AN AIRFLOW CONTAINER LCO2 / LN2O . 2 - 07.05.13 ... Wear all required safety equipments for discharging. 2. Never

7 - 07.05.13

TE

CH

NIC

AL

IN

ST

RU

CT

ION

S

PHASE 1 : Preliminary check and first

manipulations before the discharge

6. Purge the connected DN40 hose. Open the purge valve V33 of the container then, open slightly the Gas valve of the tank.

Let it open for 20 seconds then close V18.

V33

Page 8: UNLOADING PROCEDURE OF AN AIRFLOW · PDF fileUNLOADING PROCEDURE OF AN AIRFLOW CONTAINER LCO2 / LN2O . 2 - 07.05.13 ... Wear all required safety equipments for discharging. 2. Never

8 - 07.05.13

TE

CH

NIC

AL

IN

ST

RU

CT

ION

S

PHASE 1 : Preliminary check and first

manipulations before the discharge

7. Purge the connected DN50 hose. Open V17 & V35 for 5 seconds, close it then purge the hose opening the purge valve V18 of the container.

Do this operation 3 times.

V18

Page 9: UNLOADING PROCEDURE OF AN AIRFLOW · PDF fileUNLOADING PROCEDURE OF AN AIRFLOW CONTAINER LCO2 / LN2O . 2 - 07.05.13 ... Wear all required safety equipments for discharging. 2. Never

9 - 07.05.13

TE

CH

NIC

AL

IN

ST

RU

CT

ION

S

PHASE 1 : Preliminary check and first

manipulations before the discharge

8. Plug electrical cable on the BALS (REF 2402) plug of the container.

Page 10: UNLOADING PROCEDURE OF AN AIRFLOW · PDF fileUNLOADING PROCEDURE OF AN AIRFLOW CONTAINER LCO2 / LN2O . 2 - 07.05.13 ... Wear all required safety equipments for discharging. 2. Never

10 - 07.05.13

TE

CH

NIC

AL

IN

ST

RU

CT

ION

S

PHASE 1 : Preliminary check and first

manipulations before the discharge

9. Turn on the electrical panel using the red switch “ON" The light should turn on.

Attention : Do not use the pump if a sealing is on the red switch.

If the “POWER” light do not turn on, go to the table des causes.

Page 11: UNLOADING PROCEDURE OF AN AIRFLOW · PDF fileUNLOADING PROCEDURE OF AN AIRFLOW CONTAINER LCO2 / LN2O . 2 - 07.05.13 ... Wear all required safety equipments for discharging. 2. Never

11 - 07.05.13

TE

CH

NIC

AL

IN

ST

RU

CT

ION

S

PHASE 1 : Preliminary check and first

manipulations before the discharge

10.Open V2 and V4 valve of the container (yellow globe valves) using the dedicated key.

V2

V4

Page 12: UNLOADING PROCEDURE OF AN AIRFLOW · PDF fileUNLOADING PROCEDURE OF AN AIRFLOW CONTAINER LCO2 / LN2O . 2 - 07.05.13 ... Wear all required safety equipments for discharging. 2. Never

12 - 07.05.13

TE

CH

NIC

AL

IN

ST

RU

CT

ION

S

PHASE 2 : Cool-down of the pump

11. Start to cool down the pump by opening V7 et V17

The pump will be cold enough and

ready when the « ready » sign is lighted up (about 30 min).

If the sign do not light up after 40 min, go to table des causes.

Page 13: UNLOADING PROCEDURE OF AN AIRFLOW · PDF fileUNLOADING PROCEDURE OF AN AIRFLOW CONTAINER LCO2 / LN2O . 2 - 07.05.13 ... Wear all required safety equipments for discharging. 2. Never

13 - 07.05.13

TE

CH

NIC

AL

IN

ST

RU

CT

ION

S

PHASE 2 : Cool-down of the pump

12.During the cool down, make the equilibrium between the tank and the container :

– Open V19 then open the gas phase valve of the tank

V19

Page 14: UNLOADING PROCEDURE OF AN AIRFLOW · PDF fileUNLOADING PROCEDURE OF AN AIRFLOW CONTAINER LCO2 / LN2O . 2 - 07.05.13 ... Wear all required safety equipments for discharging. 2. Never

14 - 07.05.13

TE

CH

NIC

AL

IN

ST

RU

CT

ION

S

PHASE 2 : Cool-down of the pump

– Wait until the equilibrium is done. If the pressure of the tank is bellow the required pressure open V5 until you reach the minimum pressure then close it.

V5

Pressure gauge

Page 15: UNLOADING PROCEDURE OF AN AIRFLOW · PDF fileUNLOADING PROCEDURE OF AN AIRFLOW CONTAINER LCO2 / LN2O . 2 - 07.05.13 ... Wear all required safety equipments for discharging. 2. Never

15 - 07.05.13

TE

CH

NIC

AL

IN

ST

RU

CT

ION

S

PHASE 3 : Discharge of the container

13.Start the pump ("START" button).

If the pump does not start; go to table des causes.

Page 16: UNLOADING PROCEDURE OF AN AIRFLOW · PDF fileUNLOADING PROCEDURE OF AN AIRFLOW CONTAINER LCO2 / LN2O . 2 - 07.05.13 ... Wear all required safety equipments for discharging. 2. Never

16 - 07.05.13

TE

CH

NIC

AL

IN

ST

RU

CT

ION

S

PHASE 3 : Discharge of the container

14.open progressively the liquid phase valve of the tank

• progressively close V17 and open progressively V35 holding the differential pressure between the entry (PI1) and the exit (PI2) between 17 and 21 bar.

Page 17: UNLOADING PROCEDURE OF AN AIRFLOW · PDF fileUNLOADING PROCEDURE OF AN AIRFLOW CONTAINER LCO2 / LN2O . 2 - 07.05.13 ... Wear all required safety equipments for discharging. 2. Never

17 - 07.05.13

TE

CH

NIC

AL

IN

ST

RU

CT

ION

S

PHASE 3 : Discharge of the container

• Attention : If you experience a heavy leakage, stop the transfer, tight the flanges and/or change the joints then start again.

• Open V8 to raise the post pump pressure. If the pressure rises too much, close it.

• V17 should stay close during all transfer independently of the V35 position.

If a hazard appears, use the “STOP” button or the emergency stop button, close V2, V4 pulling on the emergency cable.

Page 18: UNLOADING PROCEDURE OF AN AIRFLOW · PDF fileUNLOADING PROCEDURE OF AN AIRFLOW CONTAINER LCO2 / LN2O . 2 - 07.05.13 ... Wear all required safety equipments for discharging. 2. Never

18 - 07.05.13

TE

CH

NIC

AL

IN

ST

RU

CT

ION

S

PHASE 3 : Discharge of the container

15.Stay close of the container during all the transfer period, if the container is equipped and when the buzz is on, press the “AWAKE MAN” button to keep the pump in function.

Page 19: UNLOADING PROCEDURE OF AN AIRFLOW · PDF fileUNLOADING PROCEDURE OF AN AIRFLOW CONTAINER LCO2 / LN2O . 2 - 07.05.13 ... Wear all required safety equipments for discharging. 2. Never

19 - 07.05.13

TE

CH

NIC

AL

IN

ST

RU

CT

ION

S

PHASE 3 : Discharge of the container

16.When the speed pump changes, or when the level reach « 0 », push the « STOP » button on the control panel

Page 20: UNLOADING PROCEDURE OF AN AIRFLOW · PDF fileUNLOADING PROCEDURE OF AN AIRFLOW CONTAINER LCO2 / LN2O . 2 - 07.05.13 ... Wear all required safety equipments for discharging. 2. Never

20 - 07.05.13

TE

CH

NIC

AL

IN

ST

RU

CT

ION

S

PHASE 3 : Discharge of the container

17.Shut down the electrical box alimentation (red switch)

Page 21: UNLOADING PROCEDURE OF AN AIRFLOW · PDF fileUNLOADING PROCEDURE OF AN AIRFLOW CONTAINER LCO2 / LN2O . 2 - 07.05.13 ... Wear all required safety equipments for discharging. 2. Never

21 - 07.05.13

TE

CH

NIC

AL

IN

ST

RU

CT

ION

S

PHASE 4 : End of discharging process

18.When you have shut down the electrical panel, close V35 of the container and the liquid phase valve on the receiving tank. Then open the purge valve (V18).

V35

V18

Page 22: UNLOADING PROCEDURE OF AN AIRFLOW · PDF fileUNLOADING PROCEDURE OF AN AIRFLOW CONTAINER LCO2 / LN2O . 2 - 07.05.13 ... Wear all required safety equipments for discharging. 2. Never

22 - 07.05.13

TE

CH

NIC

AL

IN

ST

RU

CT

ION

S

PHASE 4 : End of discharging process

19.Open V19 on the container, close the gas phase valve of the receiving container and open the purge valve of the container (V33).

V19

V33

Page 23: UNLOADING PROCEDURE OF AN AIRFLOW · PDF fileUNLOADING PROCEDURE OF AN AIRFLOW CONTAINER LCO2 / LN2O . 2 - 07.05.13 ... Wear all required safety equipments for discharging. 2. Never

23 - 07.05.13

TE

CH

NIC

AL

IN

ST

RU

CT

ION

S

PHASE 4 : End of discharging process

20.Close V7 and open V17 to purge the pump.

V7

V17

Page 24: UNLOADING PROCEDURE OF AN AIRFLOW · PDF fileUNLOADING PROCEDURE OF AN AIRFLOW CONTAINER LCO2 / LN2O . 2 - 07.05.13 ... Wear all required safety equipments for discharging. 2. Never

24 - 07.05.13

TE

CH

NIC

AL

IN

ST

RU

CT

ION

S

PHASE 4 : End of discharging process

21.Close V2 and V4 of the container (use the dedicated key or the security cable).

V2

V4

Page 25: UNLOADING PROCEDURE OF AN AIRFLOW · PDF fileUNLOADING PROCEDURE OF AN AIRFLOW CONTAINER LCO2 / LN2O . 2 - 07.05.13 ... Wear all required safety equipments for discharging. 2. Never

25 - 07.05.13

TE

CH

NIC

AL

IN

ST

RU

CT

ION

S

PHASE 4 : End of discharging process

22.Unplug the electrical cable.

Page 26: UNLOADING PROCEDURE OF AN AIRFLOW · PDF fileUNLOADING PROCEDURE OF AN AIRFLOW CONTAINER LCO2 / LN2O . 2 - 07.05.13 ... Wear all required safety equipments for discharging. 2. Never

26 - 07.05.13

TE

CH

NIC

AL

IN

ST

RU

CT

ION

S

PHASE 4 : End of discharging process

23.Disconnect the hoses and the HC2 and HC7 flences.

Attention : Cold burns hazards due to remaining liquid in the hoses.

Page 27: UNLOADING PROCEDURE OF AN AIRFLOW · PDF fileUNLOADING PROCEDURE OF AN AIRFLOW CONTAINER LCO2 / LN2O . 2 - 07.05.13 ... Wear all required safety equipments for discharging. 2. Never

27 - 07.05.13

TE

CH

NIC

AL

IN

ST

RU

CT

ION

S

PHASE 4 : End of discharging process

24.Close V17, V18 and V33.

V17

V18

V33

Page 28: UNLOADING PROCEDURE OF AN AIRFLOW · PDF fileUNLOADING PROCEDURE OF AN AIRFLOW CONTAINER LCO2 / LN2O . 2 - 07.05.13 ... Wear all required safety equipments for discharging. 2. Never

28 - 07.05.13

TE

CH

NIC

AL

IN

ST

RU

CT

ION

S

PHASE 4 : End of discharging process

25.Check that all the valves are closed and shut the containers doors.

Page 29: UNLOADING PROCEDURE OF AN AIRFLOW · PDF fileUNLOADING PROCEDURE OF AN AIRFLOW CONTAINER LCO2 / LN2O . 2 - 07.05.13 ... Wear all required safety equipments for discharging. 2. Never

29 - 07.05.13

TE

CH

NIC

AL

IN

ST

RU

CT

ION

S

P&ID Air Flow ISO Container