University of AthensATLAS BIS

MDT assembly http://www.phys.uoa.gr/Atlas/MDT

HEP 2001 Presented byHeraklion, 6-8 April 2001 D. Fassouliotis

• D. Fassouliotis• P. Ioannou• C. Kourkoumelis• V. Pancheluga• D. Pappas• E. Stefanidis• V. Birioukov (engineer from Protvino)

Page 2: University of Athens ATLAS BIS  MDT assembly phys.uoa.gr/Atlas/MDT

Physics Requirements of ATLAS Muon Spectrometer

•Acceptance•Efficiency•Momentum Resolution

H μμμμ

SM/SUSY Higgs New Vector Bosons

B+ J/ψK+

Beauty PhysicsCP violation

Page 3: University of Athens ATLAS BIS  MDT assembly phys.uoa.gr/Atlas/MDT
Page 4: University of Athens ATLAS BIS  MDT assembly phys.uoa.gr/Atlas/MDT

OUR AIM:Wire/Wire/checkcheck all the Monitored all the MonitoredDrift Tubes for the ATLASDrift Tubes for the ATLASBIS chambersBIS chambers

30,000 !! Tubes – 128 chambers

With Construction specifications…:

Wire position ± 25 μmWire tension 350 ± 15 grGas leak rate < 10-8 bar*l/s at 3 barLeak at 3.4 kV (gain 1.6*105) < 2nA/mFinished tube length 1671.50 ± 0.25 mm

…necessary to achieve the physics results

Page 5: University of Athens ATLAS BIS  MDT assembly phys.uoa.gr/Atlas/MDT

TO ACCOMPLISH AIM:

Build a clean room•20±1 oC•Class 50,000

Develop a wiring table+wiring tools•Flat top•Tube holders•Alignment of two end-plug-holders•End-plug insertion (coaxility tube/end-plug)•Tube pressure crimping•Speed of wire threading•Wire tensioning

Develop on-line QA of tube construction parameters•Length check•End-plug/tube axis coaxiality•Wire tension

SITE WAS CERTIFIED ON MAY 1999

Page 6: University of Athens ATLAS BIS  MDT assembly phys.uoa.gr/Atlas/MDT

End-plug assembly procedureVisual inspectionMeasure end-plug diameter Clean all components in ultrasonic bath with 100% ethyl alcohol.Insert twister / stopperInsert springInsert/crimp copper pinInsert O-ring

Daily operational tasksCheck of air-condition system Verification of 200 and 8 Atm pressures ActionsCalibration of mechanical tension meterCalibration of Tube Length fixing systemCalibration of Tube length measurement system Packing / Unpacking Tubes Check of alignment

Wiring procedure Place tube to first position / scan bar code Thread wire in tube Insert wire through the endplugsCrimp wire on the left hand side Move to second position / respect clockingPass wire through right hand side tube crimperFix length (choosing gaps) with movable LHS crimper Secure and Crimp tube Perform pretension / tension Crimp wire on the right hand side Tube is ready

QA/QC procedureFinished tube Length measurementCoaxiality measurementWire tension measurementDark Current measurement

Tube verification Measure wall thicknessVisual inspectionClean if needed

Wire verification Visual inspectionThrow part if needed

Page 7: University of Athens ATLAS BIS  MDT assembly phys.uoa.gr/Atlas/MDT

SINCE THEN

Several Improvements with the aim •Minimize failures (rejected tubes)•Increase Production Rate•Reach Production Stability•Decrease Maintenance Operations

Wiring table reinforcement / expansion freedom

End-Plug Preparation go/no-go gauge / copper pin crimper

Wiring Tooling Wire crimpers + base / tube clamps / pressure valves

Automatization See E. Stefanides presentation

QA/QC Tooling Tube length meas./ coaxiality meas. / tension meas.

Operational Details

Page 8: University of Athens ATLAS BIS  MDT assembly phys.uoa.gr/Atlas/MDT

Upper: View of the wiring table during Module 0 production.Lower: View of the wiring table after the reinforcement upgrade.

Page 9: University of Athens ATLAS BIS  MDT assembly phys.uoa.gr/Atlas/MDT

Go/no-go gauge

Tooling for copper pin crimping on the brass sleeve.

Page 10: University of Athens ATLAS BIS  MDT assembly phys.uoa.gr/Atlas/MDT

The wire crimper holder

The micrometric adjustable mount of the tube clamp

Page 11: University of Athens ATLAS BIS  MDT assembly phys.uoa.gr/Atlas/MDT

Novel wire tensionmeter in use

low-cost compact reliable

Page 12: University of Athens ATLAS BIS  MDT assembly phys.uoa.gr/Atlas/MDT

Finished Tube Length

Wire Tension

Some Results

Page 13: University of Athens ATLAS BIS  MDT assembly phys.uoa.gr/Atlas/MDT

Tube Assembly as a function of time

Page 14: University of Athens ATLAS BIS  MDT assembly phys.uoa.gr/Atlas/MDT

As a summary …

Minimize failures

Dramatic decrease of accidental incidents

Decrease of failures due to tolerances

Increase Production Rate

5 min /tube + 2 min end-plugs

Reach Production Stability

Average of ~45 tubes /day

5800 MDTs assembled so far !!!

Decrease Maintenance Operations

Finance providing Our commitments will be fulfilled

Page 15: University of Athens ATLAS BIS  MDT assembly phys.uoa.gr/Atlas/MDT

M D T P ro d u ction - S ta tu s 28 F eb .01

.

Greece

0

4

8

12

16

20

Jul-00 Sep-00 Nov-00 Jan-01 Mar-01 May-01 Jul-01

Time

No.

Cha

mbe

rs

Glued Chambers

Chambers with Services

Plan Glued Chambers