UNITED STATES NUCLEAR REGULATORY COMMISSION …-SNRC UNITED STATES NUCLEAR REGULATORY COMMISSION...
Transcript of UNITED STATES NUCLEAR REGULATORY COMMISSION …-SNRC UNITED STATES NUCLEAR REGULATORY COMMISSION...
![Page 1: UNITED STATES NUCLEAR REGULATORY COMMISSION …-SNRC UNITED STATES NUCLEAR REGULATORY COMMISSION Protecting People and the Environment PERIODIC BRIEFING ON NEW REACTO.R ISSUES February](https://reader036.fdocuments.net/reader036/viewer/2022071510/612f343e1ecc515869434aee/html5/thumbnails/1.jpg)
-SNRCUNITED STATES NUCLEAR REGULATORY COMMISSION
Protecting People and the Environment
PERIODIC BRIEFING ON NEWREACTO.R ISSUES
February 20,- 2008
Luis ReyesExecutive Director for Operations
![Page 2: UNITED STATES NUCLEAR REGULATORY COMMISSION …-SNRC UNITED STATES NUCLEAR REGULATORY COMMISSION Protecting People and the Environment PERIODIC BRIEFING ON NEW REACTO.R ISSUES February](https://reader036.fdocuments.net/reader036/viewer/2022071510/612f343e1ecc515869434aee/html5/thumbnails/2.jpg)
Agenda
* Overview of New Reactor Status.
* Advanced Reactor LicensingActivities
* Staff Planning for AdvancedReactors
2
![Page 3: UNITED STATES NUCLEAR REGULATORY COMMISSION …-SNRC UNITED STATES NUCLEAR REGULATORY COMMISSION Protecting People and the Environment PERIODIC BRIEFING ON NEW REACTO.R ISSUES February](https://reader036.fdocuments.net/reader036/viewer/2022071510/612f343e1ecc515869434aee/html5/thumbnails/3.jpg)
Accomplishments Since LastBriefing
• Completed acceptance reviews forAPI000, Bellefonte, Calvert CliffsPart 1, North Anna, South Texas
• Published final Limited WorkAuthorization rule in the FederalRegister
• Issued ESP for North Anna
3
![Page 4: UNITED STATES NUCLEAR REGULATORY COMMISSION …-SNRC UNITED STATES NUCLEAR REGULATORY COMMISSION Protecting People and the Environment PERIODIC BRIEFING ON NEW REACTO.R ISSUES February](https://reader036.fdocuments.net/reader036/viewer/2022071510/612f343e1ecc515869434aee/html5/thumbnails/4.jpg)
Current ReviewsDesign Certifications
Design Next Milestone
AP1000 Issue RAIs - July 2008
ESBWR Advance FSERto ACRSOctober 2008
EPR Complete acceptance review2/28/08
US- Complete acceptance reviewAPWR 2/29/08
4
![Page 5: UNITED STATES NUCLEAR REGULATORY COMMISSION …-SNRC UNITED STATES NUCLEAR REGULATORY COMMISSION Protecting People and the Environment PERIODIC BRIEFING ON NEW REACTO.R ISSUES February](https://reader036.fdocuments.net/reader036/viewer/2022071510/612f343e1ecc515869434aee/html5/thumbnails/5.jpg)
Current ReviewsCombined License Applications
Bellefonte Issue Preliminary SER andRAIs - September 2008
Lee.Station
Complete acceptance review2/25/08
CalvertCliffs
Receive complete application3/31108
NorthAnna
Issue review schedule2/27/08
South No dates established pendingTexas notification from applicant
5
![Page 6: UNITED STATES NUCLEAR REGULATORY COMMISSION …-SNRC UNITED STATES NUCLEAR REGULATORY COMMISSION Protecting People and the Environment PERIODIC BRIEFING ON NEW REACTO.R ISSUES February](https://reader036.fdocuments.net/reader036/viewer/2022071510/612f343e1ecc515869434aee/html5/thumbnails/6.jpg)
Expected COL Applications throughFY2008
" South Carolina E&G- Summer* Progress Energy- Harris* Progress Energy- Levy County, FL" Southern - Vogtle* Entergy- Grand Gulf* Entergy- River Bend* Exelon - Victoria County* PPL Generation - Berwick* AmerenUE - Callaway* TXU - Comanche Peak
6
![Page 7: UNITED STATES NUCLEAR REGULATORY COMMISSION …-SNRC UNITED STATES NUCLEAR REGULATORY COMMISSION Protecting People and the Environment PERIODIC BRIEFING ON NEW REACTO.R ISSUES February](https://reader036.fdocuments.net/reader036/viewer/2022071510/612f343e1ecc515869434aee/html5/thumbnails/7.jpg)
Advanced ReactorsLicensing Activities
7
![Page 8: UNITED STATES NUCLEAR REGULATORY COMMISSION …-SNRC UNITED STATES NUCLEAR REGULATORY COMMISSION Protecting People and the Environment PERIODIC BRIEFING ON NEW REACTO.R ISSUES February](https://reader036.fdocuments.net/reader036/viewer/2022071510/612f343e1ecc515869434aee/html5/thumbnails/8.jpg)
Potential Advanced Reactor Licensing ApplicationsAn estimated schedule by Fiscal Year (October through September)
2008 2009 20101 2011 2012 2013 2014 2015 2016 2017
~'f NGNP LS'____II____ _________ ____I____ ____I________________ ____________NGNP NRC`Active Piirtic'bation& R&D ActiVities ______
NGN Hearing:eng,.
, :,ý m 7, AB6MR'Pr-appj , caiof)okev le
7in5Tetigý E gram R !ie _____
4 re-applicatI6n,1Reviewi fosihjb 4 De!ies r.Ap p R ev'ia e . ,-,Galnqa Plreq.appicatiiohReview~<
P-~r n LE1eli-a- ]. pcaeDe i U-t 'pp198W
Ir-a 1. I S _S_ _ I' _ _ _ _ _ _ _ _ _
Legend:
NGNP. Activities! .:NGNP Licensing Review
an n e
ýjgp ApprovýV: F - eaing
1 R&DiI~pf rýict~urtýe DevelopmntibI Preajplicatiopn Rev~iew
NOTE: Schedules depicted for future activities represent nominal assumed review durations based on submittal time frames in letters ofintent from prospective applicants. Actual schedules will be determined when applications are docketed.
02/I6/2008
![Page 9: UNITED STATES NUCLEAR REGULATORY COMMISSION …-SNRC UNITED STATES NUCLEAR REGULATORY COMMISSION Protecting People and the Environment PERIODIC BRIEFING ON NEW REACTO.R ISSUES February](https://reader036.fdocuments.net/reader036/viewer/2022071510/612f343e1ecc515869434aee/html5/thumbnails/9.jpg)
Challenges
* Commission policy on priorities -
domestic partner requirement
* Congressional direction to accelerateNext Generation Nuclear Plant
* FY 2008 and FY 2009 budget foradvanced reactors
* Hiring/developing knowledgeable staffand contractors
* Developing regulatory infrastructure
9
![Page 10: UNITED STATES NUCLEAR REGULATORY COMMISSION …-SNRC UNITED STATES NUCLEAR REGULATORY COMMISSION Protecting People and the Environment PERIODIC BRIEFING ON NEW REACTO.R ISSUES February](https://reader036.fdocuments.net/reader036/viewer/2022071510/612f343e1ecc515869434aee/html5/thumbnails/10.jpg)
Advanced Reactor Program -
Project Management Infrastructure
o Separate from ongoing LWR licensing-Consolidate licensing projectmanagement function in, NRO for LWRsand Non-LWRs
* Office of Research continues researchon technical bases and providesexpertise to support licensing reviews
10
![Page 11: UNITED STATES NUCLEAR REGULATORY COMMISSION …-SNRC UNITED STATES NUCLEAR REGULATORY COMMISSION Protecting People and the Environment PERIODIC BRIEFING ON NEW REACTO.R ISSUES February](https://reader036.fdocuments.net/reader036/viewer/2022071510/612f343e1ecc515869434aee/html5/thumbnails/11.jpg)
UITED STATES NUCLEAR REGULATORY COMMISSION
Protecting People and the Environment
Staff Planning forAdvanced Reactors
February 20, 2008
Brian Sheron, Director
Office of Nuclear Regulatory Research
![Page 12: UNITED STATES NUCLEAR REGULATORY COMMISSION …-SNRC UNITED STATES NUCLEAR REGULATORY COMMISSION Protecting People and the Environment PERIODIC BRIEFING ON NEW REACTO.R ISSUES February](https://reader036.fdocuments.net/reader036/viewer/2022071510/612f343e1ecc515869434aee/html5/thumbnails/12.jpg)
Outline
* Potential Applications
* NGNP* HTGR Infrastructure Development* Other designs
- PBMR, Toshiba 4S, IRIS, Hyperion
* Concluding remarks
12
![Page 13: UNITED STATES NUCLEAR REGULATORY COMMISSION …-SNRC UNITED STATES NUCLEAR REGULATORY COMMISSION Protecting People and the Environment PERIODIC BRIEFING ON NEW REACTO.R ISSUES February](https://reader036.fdocuments.net/reader036/viewer/2022071510/612f343e1ecc515869434aee/html5/thumbnails/13.jpg)
Potential Applications
Toshiba LMR 30 2010 Galena#
PBMR, Pty, HTGR 500-600 2010 unknownLtd
Hyperion other 75 2012 unknown
NuScale MASLWR 30 2008 Pre- unknown
Power, Inc. application
IRIS PWR 1000 2012 unknown
# City of Galena Alaska13
![Page 14: UNITED STATES NUCLEAR REGULATORY COMMISSION …-SNRC UNITED STATES NUCLEAR REGULATORY COMMISSION Protecting People and the Environment PERIODIC BRIEFING ON NEW REACTO.R ISSUES February](https://reader036.fdocuments.net/reader036/viewer/2022071510/612f343e1ecc515869434aee/html5/thumbnails/14.jpg)
Next Generation Nuclear Plant(NGNP) Licensing Strategy
* Report to CongressAug 7, 2008
* NRC-DOE Licensing Strategy* NRC needs for technical infrastructure
development including analytical tools& data
* Resource requirements
14
![Page 15: UNITED STATES NUCLEAR REGULATORY COMMISSION …-SNRC UNITED STATES NUCLEAR REGULATORY COMMISSION Protecting People and the Environment PERIODIC BRIEFING ON NEW REACTO.R ISSUES February](https://reader036.fdocuments.net/reader036/viewer/2022071510/612f343e1ecc515869434aee/html5/thumbnails/15.jpg)
Non-LWR Technical Infrastructure
* NRC does not currently have thetechnical infrastructure to support reviewof non-LWR reactor designs
* NRC infrastructure was developed andrefined over the past: 40 years for LWRs
* We need to develop similar capabilitiesfor HTGR & LMR
15
![Page 16: UNITED STATES NUCLEAR REGULATORY COMMISSION …-SNRC UNITED STATES NUCLEAR REGULATORY COMMISSION Protecting People and the Environment PERIODIC BRIEFING ON NEW REACTO.R ISSUES February](https://reader036.fdocuments.net/reader036/viewer/2022071510/612f343e1ecc515869434aee/html5/thumbnails/16.jpg)
Technical Tools Strategy
* Applicants are expected to conduct theR&D needed to establish the safety basisfor the proposed design
* Pre-application reviews will be used toprovide feedback to applicants on policyissues and needed R&D
* Staff will utilize licensee-generatedinformation and leverage internationalinformation to the extent practical
16
![Page 17: UNITED STATES NUCLEAR REGULATORY COMMISSION …-SNRC UNITED STATES NUCLEAR REGULATORY COMMISSION Protecting People and the Environment PERIODIC BRIEFING ON NEW REACTO.R ISSUES February](https://reader036.fdocuments.net/reader036/viewer/2022071510/612f343e1ecc515869434aee/html5/thumbnails/17.jpg)
NRC non-LWR Confirmatory Analysis
NRC should develop independentcapability to assess the safetyperformance of non-LWRs
-Started development of some of theneeded tools for HTGR
Data for code validation will beneeded
• Staff will identify when NRC-fundedconfirmatory research is recommended
17
![Page 18: UNITED STATES NUCLEAR REGULATORY COMMISSION …-SNRC UNITED STATES NUCLEAR REGULATORY COMMISSION Protecting People and the Environment PERIODIC BRIEFING ON NEW REACTO.R ISSUES February](https://reader036.fdocuments.net/reader036/viewer/2022071510/612f343e1ecc515869434aee/html5/thumbnails/18.jpg)
NRC HTGR Confirmatory Analysis
o Fuel performance- MIT Cooperative Agreement-DOE- International collaboration
• Thermal fluids & Accident analysis- MELCOR-CFD
* Nuclear analysis- PARCS
18
![Page 19: UNITED STATES NUCLEAR REGULATORY COMMISSION …-SNRC UNITED STATES NUCLEAR REGULATORY COMMISSION Protecting People and the Environment PERIODIC BRIEFING ON NEW REACTO.R ISSUES February](https://reader036.fdocuments.net/reader036/viewer/2022071510/612f343e1ecc515869434aee/html5/thumbnails/19.jpg)
NRC HTGR Confirmatory Analysis
• Materials performance-High temp materials & graphite
• PRA quality and use-ASME developing PRA quality
standard for advanced reactors
* H 2 production facility hazards analysis
19
![Page 20: UNITED STATES NUCLEAR REGULATORY COMMISSION …-SNRC UNITED STATES NUCLEAR REGULATORY COMMISSION Protecting People and the Environment PERIODIC BRIEFING ON NEW REACTO.R ISSUES February](https://reader036.fdocuments.net/reader036/viewer/2022071510/612f343e1ecc515869434aee/html5/thumbnails/20.jpg)
NRC HTGR Confirmatory Analysis
* Data required to validate NRC codeswill be obtained from existing integraltest facilities, where possible
* Need for additional integral testfacilities will be assessed duringNGNP & PBMR pre-application reviews
-We may need an integral facility inUSA to address emerging issues
20
![Page 21: UNITED STATES NUCLEAR REGULATORY COMMISSION …-SNRC UNITED STATES NUCLEAR REGULATORY COMMISSION Protecting People and the Environment PERIODIC BRIEFING ON NEW REACTO.R ISSUES February](https://reader036.fdocuments.net/reader036/viewer/2022071510/612f343e1ecc515869434aee/html5/thumbnails/21.jpg)
Potential Collaborations* CSNI
" IRSN and CEA, France" N NR, S. Africa" European Commission (EC)* Germany
' United Kingdom• Japan Atomic Energy Research
Institute" China" Universities• Department of Energy
21
![Page 22: UNITED STATES NUCLEAR REGULATORY COMMISSION …-SNRC UNITED STATES NUCLEAR REGULATORY COMMISSION Protecting People and the Environment PERIODIC BRIEFING ON NEW REACTO.R ISSUES February](https://reader036.fdocuments.net/reader036/viewer/2022071510/612f343e1ecc515869434aee/html5/thumbnails/22.jpg)
Other designs
* NRC Skill set and tools are lacking forLMR and hydride reactor
* With adequate resources and staff, itwill take at least 5 years to developindependent capabilities for LMRFor PBMR, RES will not be able provideindependent capabilities for COLreview until 2013
22
![Page 23: UNITED STATES NUCLEAR REGULATORY COMMISSION …-SNRC UNITED STATES NUCLEAR REGULATORY COMMISSION Protecting People and the Environment PERIODIC BRIEFING ON NEW REACTO.R ISSUES February](https://reader036.fdocuments.net/reader036/viewer/2022071510/612f343e1ecc515869434aee/html5/thumbnails/23.jpg)
Concluding Remarks
• NRC could meet its commitment tosupport 2005 EPAct, provided:
-DOE selects an NGNP design andoperational envelope in early 2009
-DOE accelerates NGNP technologydevelopment
- pre-application review begun in 2010- policy/technical issues resolved by
2012
- Sufficient NRC resources available
23
![Page 24: UNITED STATES NUCLEAR REGULATORY COMMISSION …-SNRC UNITED STATES NUCLEAR REGULATORY COMMISSION Protecting People and the Environment PERIODIC BRIEFING ON NEW REACTO.R ISSUES February](https://reader036.fdocuments.net/reader036/viewer/2022071510/612f343e1ecc515869434aee/html5/thumbnails/24.jpg)
Concluding Remarks
• Implementation poses challenges toNRC- Developing necessary skill set &
infrastructure for the review- Adequate funding and personnel
- Resolve technical & policy issues- Interact closely with DOE andapplicants to ensure adequacy ofdata and tools
- Participate in internationalcollaborations
24
![Page 25: UNITED STATES NUCLEAR REGULATORY COMMISSION …-SNRC UNITED STATES NUCLEAR REGULATORY COMMISSION Protecting People and the Environment PERIODIC BRIEFING ON NEW REACTO.R ISSUES February](https://reader036.fdocuments.net/reader036/viewer/2022071510/612f343e1ecc515869434aee/html5/thumbnails/25.jpg)
Acronyms
" 4S: Super-Safe, Small, and Simple" CEA: Commiserate Energies Atomrique" CFD: Computational Fluid Dynamics" COL: Combined License" CSNI: Committee on the Safety of
Nuclear Installations" DOE: Department of Energy" EPAct: Energy Policy Act of 2005e EPR: Evolutionary Power Reactor
25
![Page 26: UNITED STATES NUCLEAR REGULATORY COMMISSION …-SNRC UNITED STATES NUCLEAR REGULATORY COMMISSION Protecting People and the Environment PERIODIC BRIEFING ON NEW REACTO.R ISSUES February](https://reader036.fdocuments.net/reader036/viewer/2022071510/612f343e1ecc515869434aee/html5/thumbnails/26.jpg)
Acronyms
• ESBWR: Economic Simplified BoilingWater Reactor
• ESP: Early Site Permit* FSER: Final Safety Evaluation Report* H2 : Hydrogen* HTGR: High Temperature Gas Reacti* IRIS: International Reactor, Innovati•
and Secure* IRSN: Institut Radioprotection et
Surete Nucleaire
t
3irire
26
![Page 27: UNITED STATES NUCLEAR REGULATORY COMMISSION …-SNRC UNITED STATES NUCLEAR REGULATORY COMMISSION Protecting People and the Environment PERIODIC BRIEFING ON NEW REACTO.R ISSUES February](https://reader036.fdocuments.net/reader036/viewer/2022071510/612f343e1ecc515869434aee/html5/thumbnails/27.jpg)
Acronyms
* LMR: Liquid Metal Cooled Reactor° LWR: Light Water Reactor* MASLWR: Multi-Application Light
Water Reactor• MELCOR: MELCOR Severe Accident
Code* MIT: Massachusetts Institute of
Technology• NGNP: Next Generation Nuclear Plant* NNR: National Nuclear Regulator
(Republic of South Africa)
27
![Page 28: UNITED STATES NUCLEAR REGULATORY COMMISSION …-SNRC UNITED STATES NUCLEAR REGULATORY COMMISSION Protecting People and the Environment PERIODIC BRIEFING ON NEW REACTO.R ISSUES February](https://reader036.fdocuments.net/reader036/viewer/2022071510/612f343e1ecc515869434aee/html5/thumbnails/28.jpg)
Acronyms
* PARCS: Purdue Advanced ReactorCore Simulator
• PBMR: Pebble Bed Modular Reactor* PRA: Probabilistic Risk Assessment* R & D: Research and Development* RAI: Request for Additional
Information* SER: Safety Evaluation Report• US-APWR: U.S. Advanced Pressurized
Water Reactor
28