AcceleratedSAP - March 23, 1999 Unit Test Scenario No. PP_01 SCENARIO: Create, Change & Display Bills of Material OWNER: PP BUSINESS CASE: Create, change & display Bills of Material (CAPTAN TECHNICAL) STATUS: DESCRIPTION: RUN NO.: EXPECTED RESULTS: Successful generation of Bill Of Material RUN DATE: 4/07/2003 SETUP DATA DATA OBJECT VALUE/CODE DESCRIPTION COMMENTS AND NOTES Material master TRANSACTIONAL STEPS No . BUSINESS PROCESS STEPS / BPP NUMBER TRANS. CODE INPUT DATA / SPECIAL INFORMATION OUTPUT DATA / RESULT TESTER / TEAM OK / ERROR 0 Creation of Bill of Material Logistics – Production – Master Data – Bills of Material – Bill of Material – Material BOM CS01 Following materials were selected to produce PMM. PMM is a intermediate product for CAPTAN Technical. 227 PMM – HALB (Intermediate) 220 CARBON DISULPHIDE 221 HYDROCHLORIC ACID 222 CHLORINE 224 TOLUENE BOM for PMM (227) Created Successfully with Batch size of 1202 Kgs. Others In Annexure BOM PP OK Comments: © Copyright SAP America, Inc. 1997. All rights reserved. Unauthorized duplication is strictly prohibited. document.doc

Transcript of Unit Test PP

Page 1: Unit Test PP

AcceleratedSAP - March 23, 1999

Unit Test Scenario No. PP_01

SCENARIO: Create, Change & Display Bills of Material OWNER: PPBUSINESS CASE: Create, change & display Bills of Material (CAPTAN TECHNICAL) STATUS:DESCRIPTION: RUN NO.:EXPECTED RESULTS: Successful generation of Bill Of Material RUN DATE: 4/07/2003SETUP DATADATA OBJECT VALUE/CODE DESCRIPTION COMMENTS AND NOTESMaterial master

TRANSACTIONAL STEPSNo. BUSINESS PROCESS STEPS /

BPP NUMBERTRANS. CODE

INPUT DATA / SPECIAL INFORMATION

OUTPUT DATA / RESULT

TESTER / TEAM

OK /ERROR

0 Creation of Bill of Material

Logistics – Production – Master Data – Bills of Material – Bill of Material – Material BOM

CS01 Following materials were selected to produce PMM. PMM is a intermediate product for CAPTAN Technical.

227 PMM – HALB (Intermediate)220 CARBON DISULPHIDE221 HYDROCHLORIC ACID222 CHLORINE224 TOLUENE

BOM for PMM (227) Created Successfully with Batch size of 1202 Kgs.

Others In Annexure BOM

PP OK

Comments:

Approval: _________________________ Date: ____/____/____

© Copyright SAP America, Inc. 1997. All rights reserved. Unauthorized duplication is strictly prohibited. document.doc

Page 2: Unit Test PP

AcceleratedSAP - March 23, 1999

Unit Test Scenario No. PP_02

SCENARIO: Create, Change & Display Resource Characteristic OWNER: PPBUSINESS CASE: Create all Resources Characteristic required for CAPTAN TECHNICAL STATUS:DESCRIPTION: RUN NO.:EXPECTED RESULTS: Successful Creation of Resource Characteristic RUN DATE: 4/07/2003SETUP DATADATA OBJECT VALUE/CODE DESCRIPTION COMMENTS AND NOTES

TRANSACTIONAL STEPSNo. BUSINESS PROCESS STEPS /

BPP NUMBERTRANS. CODE

INPUT DATA / SPECIAL INFORMATION

OUTPUT DATA / RESULT

TESTER / TEAM

OK /ERROR

0 Creation of Resource Characteristic

Logistics – Central Function – Batch Management - Batch Determination – Selection & Sort

CT04 Resources Characteristic created with & attached to class 019.

This Characteristic is used to select a resource from a list of resources.

Created Resource Characteristic CAPTAN_AG_NEUTSCH_FILTER.

PP

Comments:

Approval: _________________________ Date: ____/____/____

SAP, the SAP logo, R/3, AcceleratedSAP and ASAP are trademarks of SAP AG. document.doc

2 of 18

2

Page 3: Unit Test PP

AcceleratedSAP - March 23, 1999

Unit Test Scenario No. PP_03

SCENARIO: Create, Change & Display Resource Class with Class Type 019 OWNER: PPBUSINESS CASE: Create all Resources Classification required for CAPTAN TECHNICAL STATUS:DESCRIPTION: RUN NO.:EXPECTED RESULTS: Successful Creation of Resource Class with Class type 019 RUN DATE: 4/07/2003SETUP DATADATA OBJECT VALUE/CODE DESCRIPTION COMMENTS AND NOTES

TRANSACTIONAL STEPSNo. BUSINESS PROCESS STEPS /

BPP NUMBERTRANS. CODE

INPUT DATA / SPECIAL INFORMATION

OUTPUT DATA / RESULT

TESTER / TEAM

OK /ERROR

0 Create Resource Class With Class Type 019.

Logistics – Production Process -

CL01 Resources Class CAPTAN_ANF created using Class Type 019

Assigned Characteristic CAPTAN_AG_NEUTSCH_FI to this Class.

Created Resource class CAPTAN_ANF with class type 019.

PP Initially we There were no authorization.

Comments:

Approval: _________________________ Date: ____/____/____

SAP, the SAP logo, R/3, AcceleratedSAP and ASAP are trademarks of SAP AG. document.doc

3 of 18

3

Page 4: Unit Test PP

AcceleratedSAP - March 23, 1999

Unit Test Scenario No. PP_04

SCENARIO: Create, Change & Display Resource With Category 0008 OWNER: PPBUSINESS CASE: Create all Resources required for CAPTAN TECHNICAL STATUS:DESCRIPTION: RUN NO.:EXPECTED RESULTS: Successful Creation of Resource with Category 0008 RUN DATE: 4/07/2003SETUP DATADATA OBJECT VALUE/CODE DESCRIPTION COMMENTS AND NOTES

TRANSACTIONAL STEPSNo. BUSINESS PROCESS STEPS /

BPP NUMBERTRANS. CODE

INPUT DATA / SPECIAL INFORMATION

OUTPUT DATA / RESULT

TESTER / TEAM

OK /ERROR

0 Create Resource, Define Parameters for a Resource, & attach Shift to a Resource.

Logistics – Production Process – Master Data – Resources - Resource

CRC1 Created Resources R-501

Resource Category: 0008Standard Value Key: SAP7Rules for Utility data capturing No

Checking for all parameters.

Control Key: PI01Std. Value for all Parameter is

HR

Capacity Category: 0008Processing Formula: SAPC00Other Formula: SAPC00

Attached factory calendar & Shift.

Resource No R-501 in plant ANK1 with BOM usage 1 & Alternative BOM 2.

PP Information:

Cost center AKA021 not set up in controlling area RICA on 31.12.9999

1

Comments:

SAP, the SAP logo, R/3, AcceleratedSAP and ASAP are trademarks of SAP AG. document.doc

4 of 18

4

Page 5: Unit Test PP

AcceleratedSAP - March 23, 1999

Approval: _________________________ Date: ____/____/____

SAP, the SAP logo, R/3, AcceleratedSAP and ASAP are trademarks of SAP AG. document.doc

5 of 18

5

Page 6: Unit Test PP

AcceleratedSAP - March 23, 1999

Unit Test Scenario No. PP_05

SCENARIO: Create Production Version & Attach to a Master Recipe OWNER: PPBUSINESS CASE: STATUS:DESCRIPTION: RUN NO.:EXPECTED RESULTS: RUN DATE: 4/07/2003SETUP DATADATA OBJECT VALUE/CODE DESCRIPTION COMMENTS AND NOTES

TRANSACTIONAL STEPSNo. BUSINESS PROCESS STEPS /

BPP NUMBERTRANS. CODE

INPUT DATA / SPECIAL INFORMATION

OUTPUT DATA / RESULT

TESTER / TEAM

OK /ERROR

0 Create Production Version & attach the same to Master Recipe.

Logistics - Production Process – Master Data – Material Master – Production Version

C223 Create Production Version V001 for Material 1,2,4 Triazole (522) & attached the same to Recipe group 50000056 by selecting Type as Master Recipe.

Production Version V001 attached to 500000056 Version V002 attached to 500000057.

PP OK

Comments:

Approval: _________________________ Date: ____/____/____

SAP, the SAP logo, R/3, AcceleratedSAP and ASAP are trademarks of SAP AG. document.doc

6 of 18

6

Page 7: Unit Test PP

AcceleratedSAP - March 23, 1999

Unit Test Scenario No. PP_06

SCENARIO: Create, Change & Display Master Recipe for OWNER: PPBUSINESS CASE: STATUS:DESCRIPTION: RUN NO.:EXPECTED RESULTS: Successful Creation of Master RUN DATE: 4/07/2003SETUP DATADATA OBJECT VALUE/CODE DESCRIPTION COMMENTS AND NOTES

227 – Ank1 PMM

TRANSACTIONAL STEPSNo. BUSINESS PROCESS STEPS /

BPP NUMBERTRANS. CODE

INPUT DATA / SPECIAL INFORMATION

OUTPUT DATA / RESULT

TESTER / TEAM

OK /ERROR

0 Create Master Recipe.

Logistics – Production Process – Master Data – Recipe & Material List - Create

C201 Header Material: 227Plant: Ank1

Assigned PMM manufacturing Process to this Recipe along with Resource, Control Key, Destination & approximate time to complete an operation.

Recipe for PMM created with Recipe group number 500000040.

PP While Entering control Key ZP14, it generated an error [Control Key ZP14 not defined in Table T413].

Error rectified by Mahesh.

1 Change Master Recipe & Display Phase Relationship

Logistics – Production Process – Master Data – Recipe & Material List – Change

C202 After defining all Operations & relevant Phases, select all phases – Click on Generate Relationship Icon

Comments:

SAP, the SAP logo, R/3, AcceleratedSAP and ASAP are trademarks of SAP AG. document.doc

7 of 18

7

Page 8: Unit Test PP

AcceleratedSAP - March 23, 1999

Approval: _________________________ Date: ____/____/____

SAP, the SAP logo, R/3, AcceleratedSAP and ASAP are trademarks of SAP AG. document.doc

8 of 18

8

Page 9: Unit Test PP

AcceleratedSAP - March 23, 1999

Unit Test Scenario No. PP_07

SCENARIO: Create, Change Component Allocation in Recipe to Phases OWNER: PPBUSINESS CASE: STATUS:DESCRIPTION: RUN NO.:EXPECTED RESULTS: Allocation of Materials Assigned in BOM to a related Phase of Recipe RUN DATE: 4/07/2003SETUP DATADATA OBJECT VALUE/CODE DESCRIPTION COMMENTS AND NOTES

227 – Ank1 PMM

TRANSACTIONAL STEPSNo. BUSINESS PROCESS STEPS /

BPP NUMBERTRANS. CODE

INPUT DATA / SPECIAL INFORMATION

OUTPUT DATA / RESULT

TESTER / TEAM

OK /ERROR

0 Create Master Recipe & assign materials of BOM to Phases of Recipe

Logistics – Production Process – Master Data – Recipe & Material List – Change

C202 Header Material: 227Plant: Ank1

Select a Production Version through Materials View of Recipe & check for existence of BOM.

Materials defined in BOM are assigned to Recipe.

Assigned Materials to Phase of Recipe by selecting a Phase.

Recipe for PMM created with Recipe group number 500000040 along with Component Allocation to Phases.

PP OK

Comments:

Approval: _________________________ Date: ____/____/____

SAP, the SAP logo, R/3, AcceleratedSAP and ASAP are trademarks of SAP AG. document.doc

9 of 18

9

Page 10: Unit Test PP

AcceleratedSAP - March 23, 1999

Unit Test Scenario No. PP_09

SCENARIO: Create Reprocessing Process Order with Order type RP01 OWNER: PPBUSINESS CASE: STATUS:DESCRIPTION: RUN NO.:EXPECTED RESULTS: Successful creation of Process Order RUN DATE: 24/07/2003SETUP DATADATA OBJECT VALUE/CODE DESCRIPTION COMMENTS AND NOTES

TRANSACTIONAL STEPSNo. BUSINESS PROCESS STEPS /

BPP NUMBERTRANS. CODE

INPUT DATA / SPECIAL INFORMATION

OUTPUT DATA / RESULT

TESTER / TEAM

OK /ERROR

0 Create Reprocessing Process order

Logistics – Production Process – Process Order - Process Order - Create

COR1 Material – 431, Plant – Ank1, Scheduling – Forward.

Process Order No. 1000262 generated & Released.

Error: Scheduling parameters have not been entered in ANK1 for Order Type RP01.

Error on release: Checking rule not maintained for RP01.

Rectified by Customization

Comments:

Approval: _________________________ Date: ____/____/____SAP, the SAP logo, R/3, AcceleratedSAP and ASAP are trademarks of SAP AG. document.doc

10 of 18

10

Page 11: Unit Test PP

AcceleratedSAP - March 23, 1999

Unit Test Scenario No. PP_10

SCENARIO: Create Process Order OWNER: PPBUSINESS CASE: STATUS:DESCRIPTION: RUN NO.:EXPECTED RESULTS: Creation of Process Order RUN DATE: 24/07/2003SETUP DATADATA OBJECT VALUE/CODE DESCRIPTION COMMENTS AND NOTES

TRANSACTIONAL STEPSNo. BUSINESS PROCESS STEPS /

BPP NUMBERTRANS. CODE

INPUT DATA / SPECIAL INFORMATION

OUTPUT DATA / RESULT

TESTER / TEAM

OK /ERROR

0 Create Process Order

Logistics – Production Process – Process Order - Process Order – Create

COR1 227 – PMM, Plant – ANK1, Order Type: PI01

Successfully Created Process Order

PP OK

1 Create Process Order (Mass)

Logistics – Production Process – Process Order - Process Order – Create

COR8 Material - 422 – Dry Captan, Plant – ANK1, Order Type – PI01

Planned order 803447 was converted to process order 1000265

PP OK

2 Release Process Order

Logistics – Production Process – Process Order - Process Order – Change

COR2 Process Order – 1000214,Material: 227, Plant: ANK1.

Changed Scheduling type to Current Date. Assigned Batch & Released

Release Process Orders 1000214 to 1000220 for PMM.

PP OKSaved with warning due to material shortage & Control Recipe not generated.

3 Release Process Order (Mass)

Logistics – Production Process – Process Order - Process Order – Release

COR5 Order Type: PI01Plant: ANK1Material: 239 (Wet Captan)

Selected Process Order 1000222 & Released with Scheduling Type as Backwards.

PP OK

4 Control Recipe Creation & Transfer to Destination

Logistics – Production Process – Process Management – Control Recipe – Control Recipe

CO53 Plant: ANK1, Click on Created & SentSelect Process Order & Click on

Send

Control recipe: 100000000000000301Order: 000001000270

PP OK

SAP, the SAP logo, R/3, AcceleratedSAP and ASAP are trademarks of SAP AG. document.doc

11 of 18

11

Page 12: Unit Test PP

AcceleratedSAP - March 23, 1999Monitor

5 Process Message Monitor

Logistics – Production Process – Process Management – Control Recipe – Control Recipe Monitor

CO54 PP You are not authorized to use Transaction CO54

6 PI Sheet Data Entry and Display

Logistics – Production Process – Process Management – PI Sheet – Work list Maintain

CO55 Plant: ANK1Operating Group:

ANKLESHWAR

Temperature & Yield Data saved for Control Recipe 100000000000000301.

PP Data saved correctly, but no rights for PI sheet Display

7 PI Sheet Data Entry and Display

Logistics – Production Process – Process Management – PI Sheet – Find

CO60 Plant: ANK1 Order: 1000270

Execute

Temperature & Yield Data saved for Control Recipe 100000000000000301.

PP Data saved correctly, but no rights for PI sheet Display

8 PI Sheet Data Entry and Display

Logistics – Production Process – Process Management – PI Sheet – Work list Complete

CO64 Plant: ANK1 Order: 1000270

Execute

Temperature & Yield Data saved for Control Recipe 100000000000000301.

PP Data saved correctly, but no rights for PI sheet Display

9 PI Sheet Data Entry and Display

Logistics – Production Process – Process Management – PI Sheet – Work list Check

CO67 Plant: ANK1

Execute

PP Error: You do not have a display authorization for plant ANK1, address ANKLESHWAR

10 Define & test background jobs for process Message & Control Recipe

IMG Not to be done

11 Confirmation of process order with GR & GI COR6 Process Order: 1000214 Confirmed all phases of process order. Phases were confirmed by maintaining control key ZP14 in Master Recipe, where as for Final confirmation (Auto GR)

PP OK

SAP, the SAP logo, R/3, AcceleratedSAP and ASAP are trademarks of SAP AG. document.doc

12 of 18

12

Page 13: Unit Test PP

AcceleratedSAP - March 23, 1999used control key ZPI3.

Comments:

Approval: _________________________ Date: ____/____/____

SAP, the SAP logo, R/3, AcceleratedSAP and ASAP are trademarks of SAP AG. document.doc

13 of 18

13

Page 14: Unit Test PP

AcceleratedSAP - March 23, 1999

Unit Test Scenario No. PP_11

SCENARIO: Material Resource Planning OWNER: PPBUSINESS CASE: STATUS:DESCRIPTION: RUN NO.:EXPECTED RESULTS: RUN DATE: 20/07/2003SETUP DATADATA OBJECT VALUE/CODE DESCRIPTION COMMENTS AND NOTES

TRANSACTIONAL STEPSNo. BUSINESS PROCESS STEPS /

BPP NUMBERTRANS. CODE

INPUT DATA / SPECIAL INFORMATION

OUTPUT DATA / RESULT

TESTER / TEAM

OK /ERROR

0 MRP Run for a manufacturing plant with Lead time scheduling and capacity Loading

Logistics – Production Process - MRP – Planning – Total Planning – Single Item-Multi level Planning

MD02 Material: 431Plant: ANK1Processing key: NETCHPlanning Mode: 3Scheduling: 2

Planned orders created as xxxx/ PI01/Re for Header & all other intermediate materials.

PP MRP run was taking almost a hour for single material. Sorted out by applying Patch

1 MRP run with Scope of Planning

Logistics – Production Process - MRP – Planning – Total Planning - Online

MD01 Scope Of Planning: DEFA

Processing key: NETCHPlanning Mode: 3Scheduling: 2

Parallel Processing: ON

Planned orders created: 4 Planned orders deleted: 2 Requisitions created: 1 Dep. Req. created: 1 Lead time sch plnd ord.: 1 Capacity req. created: 4

PP OK

2 Evaluation of MRP run for Plant, MRP Controller & Procurement type

Logistics – Production Process – Production Planning – Demand Management – Environment – Stock/requirement List

MD04 Generated MRP ElementsStockCusOrdDelvryOrd.DSPldOrd

PP OK

3Comments:

SAP, the SAP logo, R/3, AcceleratedSAP and ASAP are trademarks of SAP AG. document.doc

14 of 18

14

Page 15: Unit Test PP

AcceleratedSAP - March 23, 1999

Approval: _________________________ Date: ____/____/____

SAP, the SAP logo, R/3, AcceleratedSAP and ASAP are trademarks of SAP AG. document.doc

15 of 18

15

Page 16: Unit Test PP

AcceleratedSAP - March 23, 1999

Unit Test Scenario No. PP_12

SCENARIO: Sales & Operation Planning, Mass Transfer of SOP to Demand Management for plant 1100 OWNER: BUSINESS CASE: Transform Sales Plan to Production Req. STATUS:DESCRIPTION: RUN NO.: 1EXPECTED RESULTS: The sales plan should be transferred from SOP version 001 to demand management 01 inactive

versionRUN DATE: 18/07/2003

SETUP DATADATA OBJECT VALUE/CODE DESCRIPTION COMMENTS AND NOTESMaterial master 311 & 313/ Plant 1100 Roger 1 l None

TRANSACTIONAL STEPSNo. BUSINESS PROCESS STEPS /

BPP NUMBERTRANS. CODE

INPUT DATA / SPECIAL INFORMATION

OUTPUT DATA / RESULT

TESTER / TEAM

OK /ERROR

0 Create Product Group

Logistics – Production Process - SOP – Product Group – Create

MC84 Product Group: ROGORPlant: AKO1

Assigned all SKUs of Rogor to Rogor group.

PP OK

1 Display Product Group

Logistics – Production Process - SOP – Product Group – Display

MC85 Product Group: ROGORPlant: AKO1

Assigned all SKUs of Rogor to Rogor group.

PP OK

2 Change Product Group

Logistics – Production Process - SOP – Product Group – Change

MC86 Product Group: ROGORPlant: AKO1

Assigned all SKUs of Rogor to Rogor group.

PP OK

3 Create Sales plan for material number 311 & 313 in plant 1100 in inactive version 001

Logistics – Production Process - SOP – Planning – For Material – Change

MC88 Date 311 31301/07/0315/07/0301/08/03

600090006000

300045004000

OK

4 Mass Processing Job (202) Activation

Logistics – Production Process - SOP – Planning – Mass Processing – Change

MC8E Status of all planning objects for scheduling set to “active”

OK

5 Mass Processing Job (202) scheduled MC8G Back Ground job scheduled properly

OK

SAP, the SAP logo, R/3, AcceleratedSAP and ASAP are trademarks of SAP AG. document.doc

16 of 18

16

Page 17: Unit Test PP

AcceleratedSAP - March 23, 1999Logistics – Production Process - SOP – Planning – Mass Processing – Schedule

4 Check the sales plan should be transferred from SOP version 001 to demand management 01 inactive version

MD62

Comments:

Approval: _________________________ Date: ____/____/____

SAP, the SAP logo, R/3, AcceleratedSAP and ASAP are trademarks of SAP AG. document.doc

17 of 18

17

Page 18: Unit Test PP

AcceleratedSAP - March 23, 1999

Unit Test Scenario No. PP_13

SCENARIO: Sales & Operation Planning OWNER: PPBUSINESS CASE: STATUS:DESCRIPTION: RUN NO.:EXPECTED RESULTS: RUN DATE: 20/07/2003SETUP DATADATA OBJECT VALUE/CODE DESCRIPTION COMMENTS AND NOTES

TRANSACTIONAL STEPSNo. BUSINESS PROCESS STEPS /

BPP NUMBERTRANS. CODE

INPUT DATA / SPECIAL INFORMATION

OUTPUT DATA / RESULT

TESTER / TEAM

OK /ERROR

Comments:

Approval: _________________________ Date: ____/____/____

SAP, the SAP logo, R/3, AcceleratedSAP and ASAP are trademarks of SAP AG. document.doc

18 of 18