Unified Planning Work Program Fiscal Year 2016 - … TRANSPORTATION COMMISSION OF SOUTHERN NEVADA...
Transcript of Unified Planning Work Program Fiscal Year 2016 - … TRANSPORTATION COMMISSION OF SOUTHERN NEVADA...
Regional
Transportation
Commission of
Southern
Nevada
Unified Planning Work Program Fiscal Year 2016
REGIONAL TRANSPORTATION COMMISSION OF SOUTHERN
NEVADA
DRAFT
UNIFIED PLANNING WORK PROGRAM
FISCAL YEAR 2016
The preparation of this report has been financed in part through grant[s] from the Federal
Highway Administration and Federal Transit Administration, U.S. Department of
Transportation, under the Metropolitan Planning Program, Section 104(f) of Title 23, U.S.
Code. The contents of this report do not necessarily reflect the official views or policy of the
U.S. Department of Transportation.
Approved by Federal Highway Administration and Federal Transit Administration
on June 24, 2015
Regional Transportation Commission of Southern Nevada
600 S. Grand Central Pkwy. Ste. 350
Las Vegas, NV 89106-4512
p. 702-676-1500
f. 702-676-1518
www.rtcsnv.com
Table of Contents
Preface……………………………………………………………………………………………………………………………………………Page 1
Introduction……………………………………………………………………………………………………………………………………Page 2
MAP-21…………………………………………………………………………………………………………………………………………..Page 6
Major Accomplishments………………………………………………………………………………………………………………….Page 8
Development Approach………………………………………………………………………………………………………………..Page 16
Budget…………………………………………………………………………………………………………………………………………..Page 17
Task 101………………………………………………………………………………………………………………………………………..Page 20
Task 201………………………………………………………………………………………………………………………………………..Page 30
Task 202………………………………………………………………………………………………………………………………………..Page 47
Task 301………………………………………………………………………………………………………………………………………..Page 57
Task 302………………………………………………………………………………………………………………………………………..Page 84
Non-UPWP Studies………………………………………………………………………………………………………………………..Page 87
Appendix……………………………………………………………………………………………………………………………………….Page 89
FY2016 Unified Planning Work Program Page 1
PREFACE
The Fiscal Year 2016 Unified Planning Work Program (UPWP) was developed by the
Metropolitan Planning Organization (MPO) Department of the Regional Transportation
Commission of Southern Nevada (RTC). The UPWP identifies transportation related planning
activities scheduled for the one-year period beginning July 1, 2015 and ending June 30,
2016 within the Las Vegas metropolitan area.
The UPWP plays a central role in the RTC’s federally-mandated responsibilities as the state-
designated MPO to ensure a comprehensive, coordinated, and continuing transportation
planning process for the Las Vegas urbanized area. To this end, the UPWP has been
assembled in consultation with the local, state, and federal agencies involved in supporting
the area’s multi-modal transportation system. The projects identified in the work program
foster comprehensive planning and support the goals and objectives of the Regional
Transportation Plan.
This document includes information related to project description; functional (agency)
responsibilities; project budget; project time line; and the corresponding products expected
with completion for each of the planning activities identified in the 2016 UPWP.
The UPWP for Fiscal Year 2016 was prepared in April, 2015; adopted by the Board of the
Regional Transportation Commission of Southern Nevada on June 11, 2015; and approved
by the Federal Highway Administration and Federal Transit Administration on June 24, 2015.
FY2016 Unified Planning Work Program Page 2
1: Introduction
The Unified Planning Work Program (UPWP) identifies transportation planning activities to be undertaken in the
Southern Nevada region using funding allocated by the Federal Highway Administration (FHWA) and the
Federal Transit Administration (FTA).
The Regional Transportation Commission of Southern Nevada (RTC) is the agency designated by the state of
Nevada to act as the Metropolitan Planning Organization (MPO) for Clark County. As the MPO, the RTC
coordinates transportation planning activities with member agencies within the metropolitan planning area.
The planning process brings together the RTC, local government agencies, transit operators, local public
service organizations, and the Nevada Department of Transportation (NDOT) to discuss regional priorities and
to select and program planning activities for inclusion in UPWP.
The RTC receives annual federal allocations from the FHWA and the FTA for metropolitan planning activities
identified in the UPWP. The UPWP also includes planning tasks that are state or locally funded.
The planning tasks included in the Fiscal Year 2016 UPWP are organized into two general categories of
activities:
Core planning activities that address basic MPO requirements for meeting federal certification of the
metropolitan planning process, including research and data gathering.
Studies that evaluate regional planning priorities. Using the planning study approach, solutions and
alternatives are produced, which may later become the basis for projects funded for implementation in the
Regional Transportation Plan (RTP) and Transportation Improvement Plan (TIP).
The 2016 UPWP covers the one-year period from July 1, 2015 through June 30, 2016.
Regional Planning Prospectus
The Federal Highway Administration (FHWA) requires that a metropolitan planning agreement be developed
between the various parties involved in the regional transportation planning process. This agreement must
clearly define the roles and responsibilities of each party in cooperatively carrying out the transportation
planning process and must include specific provisions for cooperatively developing and sharing information
related to the development of financial plans that support the Regional Transportation Plan (RTP), the
Transportation Improvement Program (TIP), and development of the annual listing of obligated projects.
In response to this federal requirement, the RTC has coordinated with the Nevada Department of
Transportation (NDOT) and the local jurisdictions to develop the ‘Southern Nevada Regional Planning
Prospectus’. This document, which is included as an Appendix to this FY 2016 UPWP, outlines the specific
roles and responsibilities of the RTC, NDOT, and the local agencies in carrying out the federal transportation
planning process in the Southern Nevada region.
The Metropolitan Planning Area
The Las Vegas Metropolitan Planning Area is often referred to as ‘Southern Nevada’ to distinguish the activities
of regional agencies from the jurisdictional functions of the Clark County government.
The U.S. Census Bureau estimates a population of 2,069,681 for Clark County, Nevada, which comprises more
than 72 percent of the state’s population. Most of the people of Southern Nevada reside in the Las Vegas
Valley, which is the name given locally to the urbanized area that includes the following jurisdictions:
The City of Las Vegas (pop 603,488)
The City of Henderson (pop 270,811)
The City of North Las Vegas (pop 226,877)
FY2016 Unified Planning Work Program Page 3
The unincorporated areas of Clark County that are within the urban Land Disposal Boundary designated by
the Bureau of Land Management (BLM) under the Southern Nevada Public Lands Management Act of 2002.
The total population of the unincorporated areas within the Las Vegas urbanized area is approximately
850,000.
Communities outside the Las Vegas Valley urban area include the cities of Boulder City (population 15,189),
which adjoins the Las Vegas Valley to the southeast; and the City of Mesquite (population 16,439), located in
the northeastern corner of Clark County. The unincorporated community of Laughlin, in the southern part of the
County, is home to a population of 7,323. A similar number of people live in the various communities of the
Moapa Valley, which lies halfway between Las Vegas and Mesquite.
The remainder of Clark County is sparsely populated desert environment, much of which is protected from
development under various federal, state, and local statutes and policies.
Southern Nevada Strong
In late 2011, the U.S. Department of Housing and
Urban Development (HUD) awarded a $3.5 million
grant to the Southern Nevada Regional Planning
Coalition to develop a comprehensive region-wide
sustainable communities plan. Approved in early
2015, this plan provides an integrated and
coherent framework to guide community
development in Southern Nevada over the next 20
years. Recommendations developed through this
planning effort include strategies for improving
access to transit; making neighborhoods more
pedestrian and bicycle friendly (Figure 1-7); re-orientation of land use and development patterns to reduce
VMT and lessen dependency on single occupancy vehicles; and strategies to nurture neighborhood cohesion
and public engagement.
The effort will also include application of the concepts developed by Southern Nevada Strong to four
opportunity sites: Maryland Parkway; Boulder Highway; Downtown North Las Vegas; and the Las Vegas
Medical District. The overall goal of the plan will be to ensure the continued prosperity of the Southern Nevada
economy while respecting and preserving its unique desert environment and improving the quality of life of its
residents and the long-term integrity of its communities.
Development of the Southern Nevada Strong Regional Plan was led by the City of Henderson. The
implementation phase is being led by the RTC.
Air Quality
Air quality is monitored by the Clark County Department of Air Quality and Environmental Management
(DAQEM). The RTC does conduct studies that ultimately have a positive impact on air quality in the region
through providing reduced congestion, and multi-modal options for users of the transportation system. In the
FY16 UPWP these projects include:
201-3640 Bicycle and Pedestrian Counts
201-9000 Clark County School District Walk Audits
202-3710 Bicycle and Pedestrian Planning
301-1720 Regional Schools Multimodal Transportation Study
Figure 1: Walkable Neighborhoods
FY2016 Unified Planning Work Program Page 4
301-9010 Spencer Greenway Transportation Trail and UNLV Campus Bike Plan Study
301-9025 Rural Streets Standards Study
301-9035 Transit Ridership and Transit Oriented Development Study
302-7206 Traffic Signal Timing Strategies
302-9045 Traffic Efficiency Study
Further detail on the scope of work for these studies is provided in the task sheets section later in this
document.
RTC Board of Commissioners
The RTC governing Board of Commissioners is composed of elected officials appointed from each of the local
jurisdictions in Clark County.
The Director of the Nevada Department of Transportation serves as an ex-officio member of the RTC Board for
participation in matters pertaining to planning.
FY2016 Unified Planning Work Program Page 5
FY2016 Unified Planning Work Program Page 6
2: MAP-21
On October 1, 2012, a new federal transportation funding authorization bill, known as ‘Moving Ahead for
Progress in the 21st Century’ (MAP-21) took effect. MAP-21 includes many important program changes,
including consolidation of the previous ‘Transportation Enhancements’, ‘Safe Routes to School’, and ‘Scenic
Byways’ programs into the new Transportation Alternatives’ program.
One of the most significant changes in focus with the MAP-21 program is a transition to performance based
planning and programming. Federally funded transportation improvements in Southern Nevada will be linked
to quantifiable performance targets to create an outcome–based investment strategy. While specific
transportation performance targets are still under development at the time of this writing, a set of seven
overall national goals were established in the MAP-21 legislation to guide the process of developing more
specific performance targets:
Freight Movement and Economic Vitality: To improve the national freight network, strengthen the ability of
rural communities to access national and international trade markets, and support regional economic
development.
Transportation Safety: To achieve a significant reduction in traffic fatalities and serious injuries on all public
roads.
Congestion Reduction: To achieve a significant reduction in congestion on the National Highway System.
Environmental Sustainability: To enhance the performance of the transportation system while protecting
and enhancing the natural environment.
System Reliability: To improve the efficiency of the surface transportation system.
Infrastructure Condition: To maintain the highway infrastructure asset system in a state of good repair.
Reduced Project Delivery Delays: To reduce project costs, promote jobs and the economy, and expedite the
movement of people and goods by accelerating project completion through eliminating delays in the project
development and delivery process, including reducing regulatory burdens and improving agency work
practices.
MAP-21 retains the eight planning factors developed in the previous transportation legislation. These eight
transportation planning factors, listed below, will continue to be taken into account by the RTC in developing
regional transportation plans and programs for Southern Nevada.
Support the economic vitality of the metropolitan area, especially by enabling global competitiveness,
productivity, and efficiency;
Increase the safety of the transportation system for motorized and non-motorized users;
Increase the security of the transportation system for motorized and non-motorized users;
Increase the accessibility and mobility of people and for freight;
Protect and enhance the environment, promote energy conservation, improve quality of life, and
promote consistency between transportation improvements and State and local planned growth and
economic development patterns;
Enhance the integration and connectivity of the transportation system, across and between modes, for
people and freight;
Promote efficient system management and operation; and,
Emphasize the preservation of the existing transportation system.
FY2016 Unified Planning Work Program Page 7
Planning Emphasis Areas
The FHWA and the FTA issued Planning Emphasis Areas (PEA’s) for inclusion in the FY 2016 UPWP. The RTC
has addressed these PEA’s throughout this document as detailed below.
MAP-21 Implementation
The transition to performance based planning and programming is underway, beginning with the development
and implementation of a performance management approach to transportation planning and programming
that supports the achievement of transportation system performance outcomes.
The RTC is implementing the performance based principles mentioned above through various means. One of
the tasks from the previous FY15 UPWP (202-3325-15) is Performance Based Planning. This task will be
continued in the current UPWP and is dedicated to analyzing, researching, and documenting our work as well
as determining the best measures to help guide the RTC’s work in a progressive and innovative manner.
Models of Regional Planning Cooperation
The guidance from the FHWA and FTA is to promote cooperation and coordination across MPO boundaries and
across State boundaries where appropriate to ensure a regional approach to transportation planning.
In February, 2015 the RTC accepted the role as lead collaborator and administrator for implementation of the
Southern Nevada Strong Regional Plan. One of the main purposes of the plan is to think and act regionally.
The RTC, as the MPO for the Southern Nevada Region, has the ability to provide a forum for cross-jurisdictional
cooperation on many levels. The implementation process is underway and many of the examples can be found
in the task list provided later in this document.
The RTC also participates in the Planning Executive Group (PEG). The PEG meets on a monthly basis and is an
opportunity for planners from all of the MPOs in Nevada to meet with the Nevada DOT, FHWA, and FTA.
Discussions center on improving communication, building better working relationships, ensuring compliance
with rules and regulations, and sharing best practices and lessons learned on projects. A key deliverable
accomplished in FY2015 was the completion of the Nevada Unified Transportation Plan Preview in which the
MPOs and NDOT worked collaboratively to identify long term funding needs. These entities will continue to
work together to synchronize messaging and draw attention to the transportation needs in the state.
Ladders of Opportunity
The intent of emphasizing Ladders of Opportunity is to offer access to essential services as part of the
transportation planning process and to identify connectivity gaps in access to these services.
The Southern Nevada Strong Regional Plan focuses on providing connections between employment, education,
and housing through providing multiple transportation options. The plan was completed in early 2015 and is
now in the early phases of implementation. The implementation of the goals of the plan will be consistent with
the Ladders of Opportunity goal of providing access to essential services as part of the transportation process.
Additionally, the RTC completed an update of the Public Participation Plan during FY15. This plan incorporates
many new strategies for conducting public outreach. These new methodologies are an extension of Southern
Nevada Strong as well, as the Southern Nevada Strong process involved many new and innovative methods of
reaching out to the public, including traditionally underserved populations. The RTC anticipates utilizing these
new outreach strategies in all aspects of our work, including the development of the next Regional
Transportation Plan, which is currently underway.
FY2016 Unified Planning Work Program Page 8
3: Fiscal Year 2015 UPWP Major Accomplishments
Most of the projects completed in FY2015 were originally funded in FY2014 as multi-year projects. The
majority of these multi-year projects wrapped up in FY2015 and are described below:
Public Participation Plan Update (Task 101-1500-15)
In preparation for the next Regional Transportation Plan, the Public Participation Plan (PPP) was updated to
provide guidance on the methodology to engage the public on MPO and Transit activities and documents. In
an effort to improve readability, the Public Participation Plan was reformatted to clearly differentiate which
processes apply to the RTC in its capacity as the MPO and the transit agency. The document also streamlined
some public comment processes to better align with the RTC's committee schedules. Lastly, the PPP identified
new tools and methodologies inspired by Southern Nevada Strong to more effectively engage the public.
FY2015-2019 Transportation Improvement Program (Task 101-3200-15)
The RTC develops a new Transportation Improvement Program (TIP) every other year to show how federal
funding is programmed in Southern Nevada. Notable improvements were made to the FY2015-2019 TIP to
improve the transparency of project details and the flexibility of the document. Transparency was improved by
updating project tables to show local match on all projects. Additionally, all project tables now show project
costs by funding, by phase, by year. This enables the public and policy makers to quickly identify how much of
the project costs are dedicated to preliminary engineering, right-of-way, and construction.
Another notable change to the FY2015-2019 TIP is the addition of a fifth illustrative year (2019). This
illustrative year affords the RTC and project sponsors added flexibility to make adjustments to regional
priorities beyond the mandated four year horizon of the TIP. The illustrative fifth year will also enable the RTC
to maintain an active four year list of projects for two consecutive years without having to develop a new TIP.
This will be accomplished by a TIP amendment at the end of FY2015 which will turn the illustrative 2019 into
the programmed year.
Travel Demand Model Enhancements and Validation (Task 201-2230-15)
All tasks will be 100% complete by 6/30/2016. By the end of FY15, this project will be about 60% completed.
This is a three-year project to support the development of the 2017-2040 RTP.
Major data gathering activities are essential requirements to support the model enhancements. These data
gathering activities include:
The recently completed freight data collection study.
2014/15 Household Travel Survey described elsewhere in this UPWP.
2014/15 On-Board Transit Survey described elsewhere in this UPWP.
2014/15 Hotel and Visitor Travel Survey described elsewhere in this UPWP.
2015-based projection of regional population extending out to 2040 and the corresponding projection
of parcel-level land use data, leading to the development of the 2015-2040 Planning Variables.
In FY15, all the above listed surveys and data gathering tasks will be completed and the Model Enhancement
tasks on the survey data quality checks, analysis and process will be completed. Additional travel time data
has been collected by separate contractors, this travel data along with FAST and RTC data will be processed
into the input for the validation of the model.
FY2016 Unified Planning Work Program Page 9
Traffic Micro-simulation Modeling Phase 2 (Task 201-2510-15)
The project developed a tool that provides a simple conversion method from RTCSNV regional travel demand
model data (TransCAD & macroscopic) to micro-simulation model data (Synchro & microscopic). This
conversion is completed through a Dynamic Traffic Assignment model (DTA and mesoscopic). NeXTA/DTALite
was selected as the DTA tool. The project wrapped up in June 2015.
The project provides the RTC with a tool to convert the regional Travel Demand Model (TDM) to a micro-
simulation model, and the ability to perform micro-simulation analysis.
Household Travel Survey (Task 201-2520-15)
The completed project provides very comprehensive statistical data on the number, length, purpose, mode,
time of day activities , and trips made by persons within the sample households during a specific 24-hour
travel day. Other datasets may also be collected and basic household information is also included. The survey
data can be used in the following steps of the travel demand forecast modeling process:
1. Trip production rates by trip purpose;
2. Trip distribution by time of day;
3. Trip length frequency distribution;
4. Modal share of travel;
5. Auto occupancies;
6. Vehicle operating speeds; and
7. Household vehicle ownership
The completed project will be very useful in validation and improvement of the travel demand model and for
the development of RTP and TIP. The data is also valuable for a more thorough understanding of regional
transportation patterns to assist regional and corridor transportation planning and analysis.
2014 Origin & Destination On-Board Transit Survey (Task 201-2530-15)
The completed project provides very comprehensive statistical data of passenger ridership patterns for the
entire RTC transit system. The data emphasizes origins and destinations, transfer locations, access and
egress modes, and other information. The survey data will be used for the validation and improvement of the
travel demand model and for the development of the RTP and TIP. The data is also valuable for a better
understanding of transit patterns, supporting enhanced transit operations and route planning, regional and
corridor transportation planning and analysis.
2014 Hotel Visitor Survey (Task 201-2540-15)
The completed project provides a better overall understanding of the people who visit the Las Vegas Valley,
where they go once they arrive, and the modes of transportation they utilize to navigate the region. The survey
gathered information on visitor trip origins and destinations, modes of travel, and actual trips that visitors
make for meals, business meetings, entertainment, and other recreational destinations. The data collected
will be used to better understand visitor travel and is very useful in validation and improvement of the travel
demand model and for the development of RTP and TIP.
FY2016 Unified Planning Work Program Page 10
Regional Traffic Counts (Task 201-2680-15)
Beginning in April 2014 and completed in December 2014, this project collected traffic counts for 205
locations in the Las Vegas area. The results were submitted to NDOT for AADT calculation and NDOT Annual
Traffic Report. The NDOT also uses the traffic counts to track traffic condition changes on the roadways. The
RTC will utilize the results to validate and calibrate the RTC travel demand model.
The RTC collects the counts for these locations on an annual basis following the standard set by the FHWA
Traffic Monitoring Manual. The next counting cycle is July 1, 2015 – June 30, 2016. Any count location
changes would be determined by NDOT.
Regional Bicycle and Pedestrian Counts (Task 201-3640-15)
Completed in December 2014, this study helped fill a critical data gap that had existed in understanding the
current levels of bicycle and pedestrian activity in Southern Nevada. The study was designed to help the RTC
achieve two objectives, 1) establish a preferred count collection methodology to document bicycle and
pedestrian use, and 2) collect counts at 24 selected locations that would reoccur in future years and be used
as a baseline to establish trends over time.
A preferred count strategy identified and recommended by this study was to quickly and relatively inexpensively
deploy automated counters to best determine peak hours for a particular location, and then subsequently use
manual counts (either live or video) to gather the most accurate data during those peak hours.
This study provided a reproducible baseline of multi-modal count data for the locations selected. While bicycle
and pedestrian volumes vary greatly throughout the region, they are highest close to schools and parks, as well
as downtown and in commercial districts with numerous destinations easily accessible without an automobile.
Future tracking of the changing levels of bicycling and walking in Southern Nevada can use this data as a
baseline for comparison.
Coordinated Public Transportation/Human Services Plan (Task 202-3480-15)
The RTC brought together stakeholders at a workshop held in October 2014 to discuss how transportation
providers and human service providers could synchronize services to address the transportation needs of the
community, especially for the elderly and disabled. The workshop assessed the needs of the community and
the strategies for meeting those needs identified in the 2008 Coordinated Public Transit – Human Services
Transportation Plan and made suggested changes. The Coordinated Transportation Plan was developed as a
result and this document guides how certain federal transit funding should be prioritized in the region. The
document brought before the advisory committees of the RTC for review and was adopted by the RTC Board in
March 2015.
Bicycle and Pedestrian Planning (Task 202-3710-15)
The Southern Nevada Health District (SNHD) secured federal Partnership to Improve Community Health (PICH)
grant funding from the Centers for Disease Control and Prevention (CDC). Included in the grant was an RTC
proposal to update the Regional Bicycle Pedestrian Plan and the RTC worked closely with the SNHD to develop
an interlocal contract. In support of a federal Rivers, Trails and Conservation Assistance (RTCA) grant received
by Southern Nevada Strong (SNS) from the National Park Service (NPS), the RTC facilitated the creation of an
inter-agency planning team to evaluate the feasibility of establishing a shared-use path and other community
enhancements along the Nevada Energy Spencer Utility Corridor. RTC staff also participated in Safe Routes to
FY2016 Unified Planning Work Program Page 11
Schools (SRTS) workshops in December 2014 and January 2015 to assist the Clark County School District
(CCSD) with developing action plans for ten elementary schools to improve student walking and bicycling to
school.
Southern Nevada Transportation Safety Plan (Task 202-3715-15)
The Transportation Safety Plan (TSP) has evolved from NDOT’s goal of “Zero Fatalities” and through the active
participation of the RTC and other relevant agencies in development of the Nevada Strategic Highway Safety
Plan. This plan will provide a project development processes focused on safety that can be used by the RTC
and its member agencies in Southern Nevada. The TSP evaluated what needs to be done to reduce the risk of
death and serious injury to all road users in Southern Nevada. The TSP established a vision, goals, objectives,
countermeasures, strategies, and performance measures to improve transportation safety. The TSP will also
identify strategies for addressing new areas of safety planning such as spatial analysis and utilization of
appropriate analytical methods from the Highway Safety Manual. The recommendations from the TSP will
provide input to the Regional Transportation Plan.
At the time of writing, the study was nearing completion but will be carried forward to FY2016 to address any
comments on the final draft.
Washington Avenue Complete Streets Study (Task 301-1470-15)
In close coordination with the City of Las Vegas and additional input from the City of North Las Vegas, Clark
County, and the public, the RTC evaluated Washington Avenue and Owens Avenue/Vegas Drive between Nellis
Boulevard and Rampart Boulevard. Both streets provide unique opportunities because of ample right-of-way
coupled with low traffic volumes. The focus of the study was to determine how retrofits to the existing corridors
could make better accommodations for bicyclists, pedestrians, and transit users. Analysis was performed to
ensure improved there would be minimal adverse impacts to vehicular traffic while making the corridor safer
for other users. The study identified proposed design treatments and planning-level cost estimates.
At the time of writing, the study was nearing completion but will be carried forward to FY2016 to address any
comments on the final draft.
North Las Vegas Complete Streets Corridor Ranking Study (Task 301-1480-15)
A broad based stakeholder working group was created to identify and help gather information regarding
community and livability indicators that provide insight regarding potential gaps in transportation
infrastructure. Additionally, parallel regional efforts like Southern Nevada Strong and Healthy Communities
were leveraged. The information gathered helped the group develop a set of evaluation criteria to identify
locations where complete street intervention is most beneficial to specific neighborhoods and the community
as a whole. Once locations are identified, potential street treatments will be identified. The study documented
a process that will facilitate future assessment and prioritization of candidate complete street corridors in the
City of North Las Vegas.
At the time of writing, the study was nearing completion but will be carried forward to FY2016 to address any
comments on the final draft.
FY2016 Unified Planning Work Program Page 12
Community Mobility Study for Central Las Vegas, Phase 2 (Task 301-1525-15)
Phase 1 of the Community Mobility Study was a Geographic Information Systems (GIS) analysis which
identified opportunities to improve transportation choices within a three mile radius of the Bonneville Transit
Center. Phase 2 of this study took the analysis to the next level by field checking the Phase 1
recommendations and providing specific design recommendations for all mobility analysis zones.
Recommendations were focused on improving bicycling, walking, transit, and elementary school access as well
as overcoming physical boundaries into and out of the study area. The study identified short and long-term
priorities and planning level cost estimates.
At the time of writing, the study was nearing completion but will be carried forward to FY2016 to address any
comments on the final draft.
Clark County Parking Study (Task 301-1710-15)
Completed in April 2015, this study examined parking supply and demand, through field surveys, for certain
nonresidential land use categories in unincorporated Clark County. The objective was to evaluate how closely
the County’s parking regulations included in Title 30.60 match actual observed parking demand.
The survey results suggest that minimum parking requirements in Title 30.60 provide more parking than
necessary in most instances. Reducing parking requirements in the Code to better align parking supply with
parking demand is likely to have a positive impact on a variety of social, environmental, economic, and public
health concerns. These benefits are consistent with the smart growth and sustainable development goals and
policies established in the County’s Comprehensive Plan and the RTP.
A potential Clark County Parking Study – Phase 2 is currently being evaluated. Phase 2 would develop and
examine potential changes to parking regulations to better align the Code with parking demand. Any potential
parking policy changes recommended by Phase 2 would be accompanied by a robust public outreach program.
Swenson Street/Twain Avenue Complete Streets Study (Task 301-1715-15)
Swenson Street is a major north–south arterial that has a variety of land uses and major developments. Twain
Avenue is an east-west collector intersecting with Swenson Street. The roadway facilities within these corridors
are primarily for motor vehicles, but are also used by bicycles, pedestrians, and transit users.
The RTC and Clark County have been conducting transportation planning studies in jurisdictions that look into
bicycle, pedestrian, and transit accommodations. Clark County is concerned with 1) what roadway corridors
can achieve transportation design features that place an emphasis to cycling, walking, and/or transit ridership
first before the automobile and 2) what roadway corridors have precedence for automobile traffic, but still
need mobility and safety improvements for bicyclists, pedestrians, and/or transit users.
The Swenson/Twain Complete Streets Study attempts to answer the second concern with regards to Swenson
Street from Harmon Avenue to Sahara Avenue; and Twain Avenue from Paradise Road to Maryland Parkway.
The main goal of the study is to create a plan that recommends design options for increased mobility and
safety consistent with the Complete Streets Design Guideline for livable communities.
Four different alternatives were considered for implementation throughout the corridor:
Alternative A – Wider Sidewalks Both Sides
Alternative B – Wider Sidewalks with Wider Sidewalk on One Side
Alternative C – Buffered Bike Lane Both Sides
Alternative D – Two-Way Cycle Track One Side
FY2016 Unified Planning Work Program Page 13
After review of the four alternatives, two alternatives were chosen, and a Multi-Modal Level of Service (MMLOS)
analysis was conducted on the two alternatives to compare the two alternatives to the existing conditions
along the corridors. After review of the two alternatives, the Technical Working Group chose to move forward
with Alternative A, and a conceptual design is being prepared for Alternative A.
This study will be carried forward to FY16 in order to address public comments and to complete the final draft.
Regional Schools Multimodal Transportation Access Study (Task 301-17201-15)
Completed in June 2015, this study focused specifically on developing siting recommendations for new school
sites to avoid some of the safety and school accessibility challenges facing Southern Nevada schools today.
The study also included recommendations on what can be done to improve safety and the overall bicycle and
pedestrian experiences adjacent to existing school sites to encourage more parents to walk or bike with their
children to school.
The distance a student lives from school impacts their ability to walk or bike to school. If large schools are
constructed in low density housing areas, most children are likely to live further away from the school. This will
heighten dependence on motorized transportation and force the school to provide more parking and
loading/unloading areas. Alternatively, if schools are relatively small and constructed in close proximity to
higher density housing, children will live nearby and will be more likely to walk or bike to school.
The study reviewed and compared national best practices for school siting with local agencies development
codes and comprehensive plans to identify deficiencies in Southern Nevada. The end result is a clear matrix of
recommended local and regional policies, guidelines and strategies to better identify future school site
locations and to include safe, multi-modal transportation options for students.
Regional Goods Movement Corridor Master Plan (Task 301-1725-15)
The Goods Movement Master Plan builds on previously collected information and studies. The project
assesses the capabilities of the infrastructure, identifies needs, and develops strategies for both near and long
term improvements. The identified strategies and recommendations will be used for further study and
analysis, and as input in the RTP planning process. The final product of this study will be a Regional Goods
Movement Corridor Master Plan that meets the guidelines established in MAP-21 and may inform and/or lead
to capital projects.
Eastern Avenue Mobility and Safety Plan (Task 301-1810-15)
Eastern Avenue is a major north-south arterial that crosses jurisdictional boundaries and has a variety of land
uses and major developments. The roadway conditions on this corridor allow for bicycle, pedestrian, and
transit uses; however, the corridor is widely known for its automobile traffic. Therefore, opportunities existed
for pedestrian mobility and safety enhancements that had not been fully evaluated.
Completed in June 2015, this study created a detailed plan that recommended preliminary design options for
increased non-motorized safety and mobility. An overarching acknowledgement for the study was that Eastern
Avenue is designed to move large volumes of vehicles, but context sensitive designs can improve mobility and
safety for bicyclists, pedestrians, and/or transit users without a significant impact on automobile Level of
Service.
This study was one of the first in Southern Nevada to use the 2010 Highway Capacity Manual’s multimodal
Level of Service analysis to analyze bicycle and pedestrian improvements. Additionally, since Eastern Avenue
FY2016 Unified Planning Work Program Page 14
is typical of large arterials in this region, the analysis and design template developed for this study can serve
as a useful model for future corridor studies.
Maryland Parkway Demonstration Site Analysis (Task 301-5515A-15)
In conjunction with the federal Sustainable Communities Initiative, the Regional Transportation Commission of
Southern Nevada (RTC) has been working with Southern Nevada Strong to develop a Regional Plan for
sustainable development. As part of this effort, a handful of demonstration sites were identified based on their
potential to be redeveloped into areas that can better integrate housing, transit and jobs. One of the proposed
demonstration sites was the Maryland Parkway corridor, which has been studied in detail by the RTC as part of
an Alternatives Analysis for transportation investment. The purpose of this UPWP task was to conduct a
planning study that considered the strategies identified in the Regional Plan and their potential application to
the Maryland Parkway corridor.
The study was initiated in February 2014 as the Alternatives Analysis report was being finalized. Outreach
activities included a presentation at the Southern Nevada Strong Summit (February 2014), public meeting
(May 2014) and engagement of the Maryland Parkway Coalition, a local group of property owners, businesses,
neighborhood associations and other stakeholders with interest in the Maryland Parkway corridor (May and
July 2014). The work on this study was completed in December 2014 and the final deliverable received was
the Maryland Parkway Implementation Strategy Report.
The findings of the study were presented to the Clark County Board of Commissioners in January 2015. In
response to one of the study’s recommendation, the jurisdiction’s Planning staff was directed to work on
developing an overlay district for Maryland Parkway. The intent of the overlay district would be to create a
common identity for the corridor and enable new, higher density, mixed-use development that is conducive to
more transportation choices like walking, bicycling and taking public transportation. Presentations on the
Maryland Parkway Implementation Strategy Report the process for development of an overlay district are
planned for the next Maryland Parkway Coalition meeting in March 2015. In addition, the study’s finding will
be considered in the upcoming environmental study for proposed transit capital investments in the Maryland
Parkway corridor, scheduled to begin in the spring of 2015.
City of Mesquite Traffic Impact Study Policy Review (Task 301-6307-15)
Completed in November 2014 this project reviewed the City of Mesquite policies related to Traffic Impact
Analysis (TIA) requirements, and made recommendations for improvements to the policy based on a review of
best practices, conditions specific to Mesquite, and input from primary stakeholders.
Recommendations include four levels of traffic impact study requirements, which are: no study required, letter,
TIA-Local, and TIA-Regional. This provides the benefit of multiple levels that are developed based on
stakeholder input, comparison to other jurisdictions, are fair and consistent for developers. Additionally, the
letter requirement does not require developer to hire Traffic Engineer, and TIA-Local and TIA-Regional protect
the City and regional transportation systems by requiring mitigation measures. The City of Mesquite Planning
Department coordinated with the City of Mesquite City Council for approval and adoption of the recommended
policy language and guidelines in this study.
FY2016 Unified Planning Work Program Page 15
The ‘Interstate 11’ Corridor.
The 2012 surface transportation reauthorization, known as Moving Ahead for Progress in the 21st Century Act
(MAP-21) (P.L. 112-141), designated the future freeway connecting Las Vegas and Phoenix as Interstate 11.
The RTC successfully coordinated with NDOT and transportation officials in Arizona to develop short, medium
and long-range plans for this new interstate highway. The ‘I-11 Corridor Study’, which was completed in
October 2014, evaluated potential alignments for a high capacity multi-modal facility that will accommodate
anticipated increases in demand along the corridor for the movement of people, freight, and other
commodities. The RTC will continue to coordinate with stakeholders concerning potential future I-11
alignments that will pass through and north of the Las Vegas Valley.
The Boulder City Bypass, which will be the first section of I-11 constructed, will provide a safer and faster
option for drivers who want to avoid stopping in Boulder City, Nevada. Current traffic congestion in Boulder City
will be reduced and mobility into and out of Southern Nevada will be improved. Development of the entire I-11
facility, along with the Boulder City Bypass, has the potential to allow for significant expansion of commerce,
tourism, and international trade opportunities to Southern Nevada and across the western United States.
As shown in the map below, the RTC is leading the effort to complete Phase 2 of the Bypass from Silverline
Road to the new Nevada Interchange, which was completed in October of 2010 as part of FHWA’s Hoover Dam
Bypass Project. Phase 1 includes improvements from Railroad Pass to Silverline Road, which is being
designed and constructed by the Nevada Department of Transportation (NDOT).
The passage of fuel revenue indexing in Clark County in 2013, which ties the sales tax for gasoline to the rate
of inflation, has resulted in $700 million in additional revenues to fund surface transportation infrastructure in
Southern Nevada. The Boulder City Bypass is now fully funded as a result of this new funding mechanism, with
the RTC earmarking approximately $52 million of fuel revenue indexing funds for the Bypass. Additionally, the
fuel revenue indexing funds will allow the RTC to Advance Construct Phase 2, with local funds used for the
initial construction repaid at a later date with Federal-aid highway dollars.
RTC’s total estimated construction cost for Phase 2 of the Bypass using a Design-Build project delivery method
is approximately $225,000,000. The RTC will fund construction of the Design-Build Project with
$213,750,000 in Federal-aid highway dollars from the Surface Transportation Program to be repaid in later
years. Construction of both Phase 1 and Phase 2 is scheduled to begin in the spring of 2015.
FY2016 Unified Planning Work Program Page 16
4: Fiscal Year 2016 UPWP Development Approach
The UPWP budget for FY 2016 includes RTC costs associated with the development and implementation of
core regional planning activities and project management of professional services contracts for planning
studies. During the development of the FY 2016 UPWP the RTC received a total of 15 proposals for
consideration from the local jurisdictions, including those studies arising from the RTC’s own assessment of
regional transportation needs.
MAP-21 encourages metropolitan areas to improve regional mobility through the provision of safe, efficient,
and convenient transportation systems. The federal legislation also requires the development of performance
measures to allow quantitative evaluation of regional transportation investments. The FY 2016 UPWP will
continue to achieve the goals of MAP-21 through a focus on the fulfillment of the RTC vision to “provide a
convenient, safe, and effective regional transportation system that enhances mobility and air quality for
citizens and visitors.”
In general, the expectation for the projects and studies included in the UPWP is to enhance the transportation
environment of the Southern Nevada region and expand multimodal options. This program extends well
beyond enhancements to the regional roadway network. Pedestrian, bicycle, transportation safety, and transit
facilities are also considered. Overall, the objective of the UPWP is to facilitate development of a multimodal
transportation system that serves both the Las Vegas urbanized area and the surrounding rural areas of Clark
County. There is an emphasis in the UPWP on conducting studies that will serve to improve both the mobility of
the Southern Nevada residential commuting population and ensuring the efficient flow of freight and
commercial goods that serve our regional economy. This program of projects will also provide mobility and
accessibility benefits to tourists traveling into and around the Southern Nevada region.
The UPWP is developed in consultation with state and local entities according to federal guidelines. Project
proposals are reviewed against eligibility criteria established by FHWA and FTA. Specifically, these criteria
preclude the use of federal planning funds for system operation plans, project development engineering, or
design studies for activities required under the National Environmental Policy Act (NEPA).
FY2016 Unified Planning Work Program Page 17
5: Planning Funds and FY 2016 UPWP Budget
There are two primary sources of federal funding available to support the MPO transportation planning
functions. The Federal Highway Administration (FHWA) administers funds under the Metropolitan Planning Area
Program (‘PL’), while the Federal Transit Administration (FTA) administers funds under the ‘Section 5303’
Program. Funds appropriated by Congress under these programs are apportioned among the states for
distribution to the MPO areas within the state.
Consolidated Planning Grant
In 2013, the RTC of Southern Nevada entered into a memorandum of understanding (MOU) to participate in
the U.S. Department of Transportation Consolidated Planning Grant program (CPG). Under the CPG
Agreement, FHWA-PL and FTA S.5303 funds are consolidated into a single source to fund the activities
authorized under the UPWP.
NDOT and the four MPOs in the state have also agreed to a formula under which the CPG funds are distributed
between the MPO areas.
FY 2016 funding
The funding expected to be available for the 2016 UPWP is based on three elements:
First, the amount expected to be expended thru the end of June, 2015 and hence the balance of the funds f
that will be carried forward to FY 2016.
Second, it is assumed that CPG funding for FFY 2016 will be the same as for FFY 2015.
Third, RTC is required to contribute at least 5% of the costs of the UPWP program from local, non-federal,
sources.
The result is set out in the table below.
Table 5-1: FY 2016 projections
FFY 2016 Distribution
CPG funds available for FFY 2015 $ 4,334,468
Draw-down thru Dec 31, 2014 <$2,432,741>
Anticipated draw-down thru June
30, 2015 <$1,479,536>
Balance projected, June 30, 2015 $422,190
Expected CPG funds for FFY 2016 $ 2,816,812
Total CPG funds available $3,239,002
Local match (5%) $170,474
Total $3,409,476
Funding Availability
The period covered by the 2016 UPWP corresponds with the RTC and State Fiscal Year starting July 1, 2015
and ending June 30, 2016. Federal CPG funds are apportioned and distributed for the Federal Fiscal Year that
starts October 1 each year.
Therefore the only funds available to be expended during the period thru the end of September are those
carried forward from the previous fiscal year. Likewise, the UPWP always needs to show sufficient balance at
the end of the UPWP period to cover expenditures until the start of the next Federal fiscal year the following
October.
FY2016 Unified Planning Work Program Page 18
2016 UPWP Task budgets
Initiated with the FY2015 UPWP, the RTC streamlined the budget process in groups of activities to be
performed under the UPWP into five main tasks:
1. Planning Administration, Coordination and Outreach (Task 101)
2. Data Collection and Analysis (Task 201)
3. Long Range Transportation Planning (Task 202)
4. Multi-Modal Transportation Planning (Task 301)
5. Intelligent Transportation Systems Planning (Task 302)
State and Federal agencies will track Consolidated Planning Grant expenditures with reference to the budgets
for these five tasks. This will simplify accounting procedures and also reduce the need for frequent
amendments to respond to minor changes in the budget for individual line items.
Detailed information on the objective, scope and timeline of the various UPWP activities within each task is
presented by sub-task in Chapter 6, as in previous UPWP documents. Budgetary information by sub-task is
presented for information and to assist RTC with monitoring progress.
Table 5-5 on the next page sets out the task and sub-task budgets for FY 2016.
FY2016 Unified Planning Work Program Page 19
FY 2
016
RTC
Cost
FY 2
015
Prof
essi
onal
Serv
ices
Con
trac
ts
(CA
RRY
OV
ER)
FY 2
016
Prof
essi
onal
Serv
ices
Con
trac
ts
(NEW
)
FY 2
016
Com
bine
d
Prof
essi
onal
Ser
vice
s
and
RTC
Cost
s
FY 2
016
Cons
olid
ated
Plan
ning
Gra
ntFY
201
6 lo
cal M
atch
TASK
101
PLA
NN
ING
AD
MIN
ISTR
ATI
ON
, CO
ORD
INA
TIO
N A
ND
OU
TREA
CH
101-
1500
-16
Gen
eral
Out
reac
h10
,000
$
-
$
-
$
10
,000
$
9,
500
$
50
0$
101-
2300
-16
Stak
ehol
der C
oord
inat
ion
75,0
00$
-$
-$
75,0
00$
71,2
50$
3,75
0$
101-
2310
-16
Plan
ning
Adm
inis
trat
ion
400,
000
$
-$
-$
400,
000
$
380,
000
$
20,0
00$
101-
3100
-16
Uni
fied
Pla
nnin
g W
ork
Prog
ram
30
,000
$
-
$
-
$
30
,000
$
28
,500
$
1,
500
$
101-
3200
-16
Tran
spor
tati
on Im
prov
emen
t Pro
gram
50
,000
$
-
$
-
$
50
,000
$
47
,500
$
2,
500
$
101-
3500
-16
Envi
ronm
enta
l Jus
tice
/Tit
le V
I/La
dder
s of
Opp
ortu
nity
2,00
0$
-$
-$
2,00
0$
1,90
0$
100
$
101-
3600
-16
Mis
cella
neou
s1,
000
$
-
$
-
$
1,
000
$
95
0$
50$
Task
101
Tot
al56
8,00
0$
-
$
-
$
56
8,00
0$
53
9,60
0$
28
,400
$
TASK
201
DA
TA C
OLL
ECTI
ON
201-
2116
-16
Trav
el D
eman
d M
odel
250,
000
$
-$
-$
250,
000
$
237,
500
$
12,5
00$
201-
2206
-16
Ann
ual P
opul
atio
n Fo
reca
st22
,000
$
-
$
12
,000
$
34
,000
$
32
,300
$
1,
700
$
201-
2230
-16
Trav
el D
eman
d M
odel
Enh
ance
men
ts &
Val
idat
ion
-$
-$
500,
000
$
500,
000
$
475,
000
$
25,0
00$
201-
2520
-16
Hou
seho
ld T
rave
l Sur
vey
250
$
2,
000
$
-
$
2,
250
$
2,
138
$
11
3$
201-
2530
-16
2014
Ori
gin
& D
esti
nati
on O
n-Bo
ard
Tran
sit S
urve
y25
0$
2,00
0$
-$
2,25
0$
2,13
8$
113
$
201-
2680
-16
Regi
onal
Tra
ffic
Cou
nts
4,00
0$
-$
230,
000
$
234,
000
$
222,
300
$
11,7
00$
201-
3640
-16
Regi
onal
Bic
ycle
and
Ped
estr
ian
Coun
ts2,
500
$
-
$
50
,000
$
52
,500
$
49
,875
$
2,
625
$
201-
9000
-16
CCSD
Wal
king
Aud
its
2,50
0$
-$
50,0
00$
52,5
00$
49,8
75$
2,62
5$
Task
201
Tot
al28
1,50
0$
4,
000
$
84
2,00
0$
1,
127,
500
$
1,
071,
125
$
56
,375
$
TASK
202
LON
G R
AN
GE
TRA
NSP
ORT
ATI
ON
PLA
NN
ING
202-
3325
-16
Perf
orm
ance
-bas
ed P
lann
ing
50,0
00$
-$
-$
50,0
00$
47,5
00$
2,50
0$
202-
3710
-16
Bicy
cle
& P
edes
tria
n Pl
anni
ng
10,0
00$
-$
-$
10,0
00$
9,50
0$
500
$
202
-371
5-16
Tr
ansp
orta
tion
Saf
ety
Plan
ning
2,00
0$
10,0
00$
-$
12,0
00$
11,4
00$
600
$
202-
9005
-16
Regi
onal
Tra
nspo
rtat
ion
Plan
& V
isio
ning
10,0
00$
-$
150,
000
$
160,
000
$
152,
000
$
8,00
0$
Task
202
Tot
al72
,000
$
10
,000
$
15
0,00
0$
23
2,00
0$
22
0,40
0$
11
,600
$
TASK
301
MU
LTI-
MO
DA
L TR
AN
SPO
RTA
TIO
N S
TUD
IES
301-
1470
-16
Was
hing
ton
Ave
nue
Com
plet
e St
reet
s St
udy
500
$
5,
000
$
-
$
5,
500
$
5,
225
$
27
5$
301-
1480
-16
Nor
th L
as V
egas
Com
plet
e St
reet
s Co
rrid
or R
anki
ng S
tudy
250
$
1,
216
$
-
$
1,
466
$
1,
393
$
73
$
301
-152
5-16
Co
mm
unit
y M
obili
ty S
tudy
for C
entr
al L
as V
egas
, Pha
se 2
500
$
5,
000
$
-
$
5,
500
$
5,
225
$
27
5$
301-
1715
-16
Swen
son
Stre
et/T
wai
n A
venu
e Co
mpl
ete
Stre
ets
Stud
y2,
500
$
79
,000
$
-
$
81
,500
$
77
,425
$
4,
075
$
301
-172
0-16
Re
gion
al S
choo
ls M
ulti
mod
al T
rans
port
atio
n A
cces
s St
udy
1,00
0$
15,0
00$
-$
16,0
00$
15,2
00$
800
$
301-
9010
-16
Spen
cer G
reen
way
Tra
nspo
rtat
ion
Trai
l & U
NLV
Cam
pus
Bike
Pla
n5,
000
$
-
$
15
0,00
0$
15
5,00
0$
14
7,25
0$
7,
750
$
301-
9015
-16
City
of H
ende
rson
AD
A T
rans
itio
n Pl
an5,
000
$
-
$
75
,000
$
80
,000
$
76
,000
$
4,
000
$
301-
9020
-16
Clar
k Co
unty
Par
king
Stu
dy -
Phas
e 2
5,00
0$
-$
100,
000
$
105,
000
$
99,7
50$
5,25
0$
301-
9025
-16
Clar
k Co
unty
Rur
al S
tree
ts S
tand
ards
Stu
dy5,
000
$
-
$
75
,000
$
80
,000
$
76
,000
$
4,
000
$
301-
9030
-16
Nor
thea
st V
alle
y Tr
ansp
orta
tion
Net
wor
k St
udy
5,00
0$
-$
100,
000
$
105,
000
$
99,7
50$
5,25
0$
301-
9035
-16
RTC
Tran
sit R
ider
ship
and
TO
D S
tudy
5,00
0$
-$
150,
000
$
155,
000
$
147,
250
$
7,75
0$
301-
9040
-16
RTC
Truc
k A
rter
ial R
oute
Stu
dy5,
000
$
-
$
15
0,00
0$
15
5,00
0$
14
7,25
0$
7,
750
$
Task
301
Tot
al39
,750
$
10
5,21
6$
80
0,00
0$
94
4,96
6$
89
7,71
8$
47
,248
$
TASK
302
INTE
LLIG
ENT
TRA
NSP
ORT
ATI
ON
SYS
TEM
(ITS
) STU
DIE
S
302
-720
6-16
Tr
affi
c Si
gnal
Tim
ing
Stra
tegi
es in
Las
Veg
as1,
500
$
15
0,00
0$
-
$
15
1,50
0$
14
3,92
5$
7,
575
$
Task
302
Tot
al1,
500
$
15
0,00
0$
-
$
15
1,50
0$
14
3,92
5$
7,
575
$
962,
750
$
269,
216
$
1,79
2,00
0$
3,02
3,96
6$
2,87
2,76
8$
151,
198
$
Tota
l
FY16
Uni
fied
Pla
nnin
g W
ork
Prog
ram
FY2016 Unified Planning Work Program Page 20
Proposed activities under the 2016 UPWP are grouped under five tasks. Individual activities are described as
sub-tasks with each task.
Task 101, Planning Administration, Coordination and Outreach.
This task covers the core planning activities of the Metropolitan Planning Organization. These include:
The annual development and maintenance of the Unified Planning Work Program (UPWP);
The maintenance of the Transportation Improvement Program (TIP)
The maintenance of the Regional Transportation Plan (RTP)
Also included are the MPO’s responsibilities for Environmental Justice and for compliance with Title VI
of the Civil Rights Act.
Task 101 includes the RTC costs associated with these core programs, coordination with local, state and
federal partners, coordination with other stakeholders and general outreach.
Any consultant support related to these core activities is covered under other tasks, so the only costs identified
are those associated with RTC staff time and related in-house expenditures.
Specific sub-tasks are:
101-1500, General Outreach
101-2300, Stakeholder Coordination
101-2310, Planning Administration
101-3100, Unified Planning Work Program
101-3200, Transportation Improvement Program
101-3500, Environmental Justice and Title VI
101-3600, Miscellaneous Supporting Activities
Task 101, 2016 Budget
The following costs are included under Task 101:
FY 2016 RTC costs: $568,000
Professional Services Costs: $ 0
Combined costs: $568,000
The source of funds for Task 101 is:
Consolidated Planning Grant: $539,600
Local funds (5% match) $ 28,400
FY2016 Unified Planning Work Program Page 21
Sub Task 101-1500-16: General Outreach
Purpose: Throughout the transportation planning process, RTC staff performs various
functions concerning the time and materials used for advertising, preparation, and
conducting public involvement activities associated with the development and
implementation of plans and programs.
Previous Work:
Public outreach, meetings and promotion in support of the Regional Transportation
Plan (RTP), the Transportation Improvement Program (TIP), the Unified Planning Work
Program (UPWP) projects and studies, and the Public Participation Plan (PPP).
Methodology:
Through both mainstream and innovative means the RTC will develop, coordinate,
and conduct public outreach related to all activities listed in the UPWP. Examples
include: conducting public meetings, participating in “pop-up meetings”, having a
presence at community events, publishing documents, developing press releases,
and addressing and tracking public comments.
General outreach is led by the RTC’s Department of Government Affairs, Media, and
Marketing.
Participating Agencies:
Clark County, City of Las Vegas, City of North Las Vegas, City of Henderson, City of
Boulder City, City of Mesquite, Nevada Department of Transportation, and the
Regional Transportation Commission of Southern Nevada (Lead Agency)
Budget:
Sub Task 101-1500-16 FY 2016 Budget
Total Project Cost $10,000
Professional Services Contract -0-
RTC Cost $10,000
Funding Sources
Consolidated Planning Grant (95%) $9,500
Local Match (5%) $500
Total FY16 Project Budget $10,000
Schedule and Deliverables:
Report on public outreach activities.
Inventory of display materials in support of RTC public outreach activities.
General Outreach is an on-going activity
FY2016 Unified Planning Work Program Page 22
Sub Task 101-2300-16: Stakeholder Coordination
Purpose: Stakeholder Coordination covers all activities related to the continued coordination
of the Southern Nevada regional transportation planning process with local agencies,
Nevada Department of Transportation, U.S. Department of Transportation, and also the
coordination of activities with other regional planning agencies on inter-regional issues.
Methodology:
General liaison with the Nevada Department of Transportation (NDOT), coordination
in development of the State Highway Safety Plan (SHSP), participation in meetings,
workshops, and coordination with NDOT in development of the Southern Nevada
Regional ITS Architecture, participation in activities of the Southern Nevada Regional
Planning Coalition (SNRPC), and inter-regional meetings and workshops.
Stakeholder Coordination is performed by the Metropolitan Planning Organization,
Government Affairs, Media and Marketing, and Executive Management.
Participating Agencies:
Nevada Department of Transportation, Southern Nevada Regional Planning Coalition
(SNRPC), and the Regional Transportation Commission of Southern Nevada (Lead
Agency)
Budget:
Sub Task 101-2300-16 FY 2016 Budget
Total Project Cost $75,000
Professional Services Contract -0-
RTC Cost $75,000
Funding Sources
Consolidated Planning Grant (95%) $71,250
Local Match (5%) $3,750
Total FY16 Project Budget $75,000
Schedule and Deliverables:
Coordination with local, state, and federal agencies on Southern Nevada regional
transportation planning issues.
Stakeholder Coordination is an on-going activity.
FY2016 Unified Planning Work Program Page 23
Sub Task 101-2310-16: Planning Administration
Purpose: Activities included under this sub task include the overall administration of the
Metropolitan Planning Organization (MPO) transportation planning process. These tasks are
on-going activities required to meet federal and state regulations.
Methodology:
Planning Administration occurs through the conduct of various meetings of regional
stakeholders, including the Transportation Access Advisory Committee, Executive
Advisory Committee, Nevada Department of Transportation liaison meetings,
Metropolitan Planning Subcommittee, RTC Board of Commissioners, and multiple
other regional transportation coordination committees and groups. Also included in
this task item is professional development of RTC staff through the maintenance of
RTC staff membership in professional planning organizations.
The Metropolitan Planning Organization (MPO) is responsible for this task.
Expected Products:
Continuous coordination with local agencies and stakeholders, inclusion of feedback and
concepts discussed during committee meetings and other special meetings into the
development and administration of the Southern Nevada Regional Transportation Plan
(RTP), Transportation Improvement Program (TIP), and Unified Planning Work Program
(UPWP), including coordination of modifications and amendments to these documents.
Administration of professional services contracts as outlined in the Fiscal Year 2016 UPWP.
Participating Agencies:
Clark County, City of Las Vegas, City of North Las Vegas, City of Henderson, City of
Boulder City, City of Mesquite, Clark County Department of Air Quality, Nevada
Department of Transportation, Regional Transportation Commission of Southern
Nevada (Lead Agency), Federal Highway Administration (FHWA), and the Federal
Transit Administration (FTA).
Budget:
Sub Task 101-2310-16 FY 2016 Budget
Total Project Cost $400,000
Professional Services Contract -0-
RTC Cost $400,000
Funding Sources
Consolidated Planning Grant (95%) $380,000
Local Match (5%) $20,000
Total FY16 Project Budget $400,000
FY2016 Unified Planning Work Program Page 24
Schedule and Deliverables:
Planning Administration is an on-going activity.
FY2016 Unified Planning Work Program Page 25
Sub Task 101-3100-16: Unified Planning Work Program
Purpose: The Unified Planning Work Program (UPWP) includes coordination of transportation
planning activities in the Southern Nevada region during the fiscal year.
Previous Work:
The UPWP is updated annually and previous work includes the development,
administration, and amending of the document.
Methodology:
RTC staff will, though stakeholder communication and the oversight of RTC
committees develop, administer, amend, and implement the UPWP as required.
The Metropolitan Planning Organization (MPO) is responsible for this task.
Participating Agencies:
Clark County, City of Las Vegas, City of North Las Vegas, City of Henderson, City of
Boulder City, City of Mesquite, Nevada Department of Transportation, Regional
Transportation Commission of Southern Nevada (Lead Agency), Federal Highway
Administration (FHWA), and the Federal Transit Administration (FTA).
Budget:
Sub Task 101-3100-16 FY 2016 Budget
Total Project Cost $30,000
Professional Services Contract -0-
RTC Cost $30,000
Funding Sources
Consolidated Planning Grant (95%) $28,500
Local Match (5%) $1,500
Total FY16 Project Budget $30,000
Schedule and Deliverables:
The development of the Fiscal Year 2017 UPWP and amendments/modifications to
the FY 2016 UPWP.
The FY 2017 UPWP will be completed by May, 2016 while amendments and work
related to the UPWP are on-going.
FY2016 Unified Planning Work Program Page 26
Sub Task 101-3200-16: Transportation Improvement Program
Purpose: Activities included under this sub task include administration and maintenance of
the current FY 2015-2019 Transportation Improvement Program (TIP), including processing
of modifications and amendments. The activity also includes the development of the FY
2017–2021 TIP.
Previous Work:
Development and maintenance of the TIP is an on-going activity. Most recently The
FY 2015-19 TIP was approved by the RTC of Southern Nevada Board of
Commissioners on August 14, 2014.
Methodology:
Determine that sufficient federal, state, and local revenue sources are available to
fund projects programmed in the TIP.
Ensure that all non-exempt projects included in the TIP and subsequent amendments
come from a conforming Long Range Transportation Plan, as required under the
Clean Air Act Amendments of 1990.
Ensure that the TIP gives priority to eligible Transportation Control Measure (TCM)
projects as identified in the air quality State Implementation Plans.
Utilize the RTC Project Evaluation and Prioritization Process to select projects for
inclusion in the TIP.
Coordinate administration and maintenance of the TIP program with the Statewide
TIP (STIP) by NDOT to ensure subsequent integration of the Clark County TIP into the
STIP.
Provide reasonable opportunity for public comment in accordance with the RTC
Public Participation Plan and federal regulations.
Incorporate Environmental Justice and ADA considerations, as appropriate.
Prepare modifications and amendments to the TIP.
Coordinate modifications and amendments of the TIP program with the Statewide TIP
(STIP) by NDOT, to ensure subsequent integration of changes to the Clark County TIP
into the STIP.
Participate in the development of eSTIP.
Participating Agencies:
Clark County, City of Las Vegas, City of North Las Vegas, City of Henderson, City of
Boulder City, City of Mesquite, Nevada Department of Transportation, Regional
Transportation Commission of Southern Nevada (Lead Agency)
FY2016 Unified Planning Work Program Page 27
Budget:
Sub Task 101-3200-16 FY 2016 Budget
Total Project Cost $50,000
Professional Services Contract -0-
RTC Cost $50,000
Funding Sources
Consolidated Planning Grant (95%) $47,500
Local Match (5%) $2,500
Total FY16 Project Budget $50,000
Schedule and Deliverables:
Process amendments & administrative modifications to the FY 2015-19 TIP
FY 2015-19 TIP update
Development of a new FY 2017-2021 TIP.
The TIP is an on-going activity.
FY2016 Unified Planning Work Program Page 28
Sub Task 101-3500-16: Environmental Justice/Title VI/Ladders of Opportunity
Purpose: Activities included under this sub task include development of products and
procedures to implement Executive Order 12898: ‘Federal Actions to Address Environmental
Justice in Minority Populations and Low-Income Populations’, the Civil Rights Act of 1964-
Title VI, and provide Ladders of Opportunity to traditionally underserved populations in
accordance with subsequent USDOT Guidance and Regulations.
Previous Work:
Title VI Program Update Report (2010), Civil Rights Act of 1964-Title VI Program
Report (1998), Title VI Program Update Report (2009), and Title VI Reports for the
MPO and Transit (2013).
Methodology:
Completion of Environmental Justice updates to monitor the effectiveness of the
transportation system in providing Ladders of Opportunity for low-income, minority,
elderly, and traditionally underserved populations as required.
The Metropolitan Planning Organization (MPO) is responsible for this task.
Participating Agencies:
Clark County, City of Las Vegas, City of North Las Vegas, City of Henderson, City of
Boulder City, City of Mesquite, Clark County Department of Air Quality, Nevada
Department of Transportation, Regional Transportation Commission of Southern
Nevada (Lead Agency), Federal Highway Administration (FHWA), and the Federal
Transit Administration (FTA).
Budget:
Sub Task 101-3500-16 FY 2016 Budget
Total Project Cost $2,000
Professional Services Contract -0-
RTC Cost $2,000
Funding Sources
Consolidated Planning Grant (95%) $1,900
Local Match (5%) $100
Total FY16 Project Budget $2,000
Schedule and Deliverables:
Environmental Justice, Title VI, and Ladders of Opportunity are on-going activities.
FY2016 Unified Planning Work Program Page 29
Sub Task 101-3600-16: Miscellaneous
Objective: This task item covers all activities related to efficient planning administrative work
as well as to provide for costs associated with planning and administration including but not
limited to travel, membership dues, software licenses, office supplies, copying and printing,
professional licenses, registration, lodging, and meals in support of other UPWP eligible
activities.
Participating Agencies:
Regional Transportation Commission of Southern Nevada
Budget:
Sub Task 101-3600-16 FY 2016 Budget
Total Project Cost $1,000
Professional Services Contract -0-
RTC Cost $1,000
Funding Sources
Consolidated Planning Grant (95%) $950
Local Match (5%) $50
Total FY16 Project Budget $1,000
Schedule and Deliverables:
The activities under the Miscellaneous category are on-going.
FY2016 Unified Planning Work Program Page 30
Task 201, Data Collection and Analysis
This task covers the gathering of data needed to support the MPO’s planning activities and the analysis of that
data as part of the development of the Regional Transportation Plan and other planning studies.
Activities include:
The maintenance of the regional travel demand forecast model and upgrades to keep up with the
state-of-the-practice;
Execution of model runs and analysis to support traffic and transit studies and the demonstration of
air quality conformity;
Undertaking travel surveys to support the calibration of the model;
Improving the technical capability of the RTC to perform more detailed transportation analyses needed
by RTC, NDOT or our partner local agencies;
Development of population and land use forecasts;
RTC’s participation in a region program of traffic counts; and,
Developing techniques and methods to inventory bicycle and pedestrian activity.
Several of these activities will require extensive professional support from outside consultancies. The costs of
professional services contracts are included under Task 201. Task 201 includes the RTC costs associated
with these data collection and analytical activities as well as the procurement of professional services
contracts and their administrative and financial oversight
Specific sub-tasks are:
201-2116, Travel Demand Model
201-2206, Annual Population Forecast
201-2230, Travel Demand Model Enhancements and Validation Work Program
201-2680, Regional Traffic Counts
201-3640, Regional Bicycle and Pedestrian Counts
201-9000, Clark County School District Walking Audits
Task 201, 2016 Budget
The following costs are included under Task 201:
FY 2016 RTC costs: $ 281,000
Professional Services Costs: $ 842,000
Combined costs: $ 1,123,000
The source of funds for Task 201 is:
Consolidated Planning Grant: $ 1,066,850
Local funds (5% match) $ 56,150
FY2016 Unified Planning Work Program Page 31
Sub Task 201-2116-16: Travel Demand Model
Objective: Travel Demand Forecasting (TDF) is an essential tool that the RTC employs to
estimate future travel conditions and regional mobility needs. The information generated
from the process provides decision makers with the background to determine future
transportation system improvement needs, which are programmed into the Regional
Transportation Plan (RTP) and Transportation Improvement Plan (TIP).
Previous Work:
RTC 2009 model update.
FY 2013-2035 Regional Transportation Plan (RTP) modeling results, including
modifications and amendments.
FY 2013-2016 Transportation Improvement Program (TIP) modeling results and
amendments.
Travel Demand Modeling run results for various corridor studies by either consultants
or RTC.
Travel Demand Modeling run results by consultants in coordination with RTC
modeling technical support.
Methodology:
Improve the network structure and coding procedures and qualities (ongoing).
Update the travel demand model network with all highway, roadway, and transit
networks, park and ride facilities, and intersection signal projects with regard to any
amendments to the 2013-35 RTP.
Test and apply the update versions of the RTC Travel Demand Model as they are
developed under UPWP Task 201-2230.
Coordinate with the consultant to resolve any technical issues that may arise during
routine modeling activities.
Research and implement the incorporation of bicycle and pedestrian trips and
‘Complete Streets’ design elements into RTC modeling procedures.
Develop tools to transform data and networks from the TransCAD model to VISSIM.
The work is performed by RTC modeling staff and the project consultant.
Participating Agencies:
Clark County, City of Las Vegas, City of North Las Vegas, City of Henderson, City of
Boulder City, City of Mesquite, Clark County Department of Air Quality, Nevada
Department of Transportation, Regional Transportation Commission of Southern
Nevada (Lead Agency)
FY2016 Unified Planning Work Program Page 32
Budget:
Sub Task 201-2116-16 FY 2016 Budget
Total project cost $250,000
Of which:
RTC Costs (including general staff
support and project oversight) $250,000
Professional Services Contract -0-
Funding Sources
Consolidated Planning Grant (95%) $237,500
RTC Sales Tax Local Match (combined) $12,500
Total FY16 Project Budget $250,000
Schedule and Deliverables:
Updated model inputs, highway and transit networks.
Model results as needed to support RTP amendments or model data needs of UPWP
studies.
VISSIM modeling results for corridors and/or intersections.
Tests of air quality emissions projections using ‘MOVES’.
Report detailing modeling results.
Modeling work is an on-going activity
FY2016 Unified Planning Work Program Page 33
Sub Task 201-2206-16: Annual Population Forecast
Purpose: To provide long-term population forecasts for the Southern Nevada region.
Results of this task will be used as control totals for development of the RTC Planning
Variables, which are inputs to the RTC Travel Demand Model.
Previous Work:
Annual Population Forecasts are an on-going activity.
Methodology:
Coordinate with local jurisdictions, SNWA, and CBER to develop regional population
projections, report progress, and discuss issues raised during the planning process.
The work is performed by RTC modeling staff and the project consultant.
Participating Agencies:
Clark County, City of Las Vegas, City of North Las Vegas, City of Henderson, City of
Boulder City, City of Mesquite, Nevada Department of Transportation, Southern
Nevada Water Authority, Clark County School District, University of Nevada, Las
Vegas, Regional Transportation Commission of Southern Nevada (Lead Agency)
Budget:
Sub Task 201-2206-16 FY 2016 Budget
Total Project Cost $34,000
Professional Services Contract $12,000
RTC Cost $22,000
Funding Sources
Consolidated Planning Grant (95%) $32,300
Local Match (5%) $1,700
Total FY16 Project Budget $34,000
Schedule and Deliverables:
Population Forecasts: Long-Term Projections for Clark County, Nevada
Completion Date: June, 2016
FY2016 Unified Planning Work Program Page 34
Sub Task 201-2230-16: Travel Demand Model Enhancements & Validation
Purpose: Travel Demand Forecasting (TDF) is an essential tool that the RTC employs to
estimate future travel conditions and regional mobility needs.
Previous Work:
RTC 2005 Household Travel Survey.
RTC 2006 Hotel/Visitor Travel Survey.
RTC 2009 model update.
FY 2013-2035 Regional Transportation Plan (RTP) modeling results, including
modifications and amendments.
FY 2013-2016 Transportation Improvement Program (TIP) modeling results and
amendments.
Travel Demand Modeling run results for various corridor studies by either consultants
or RTC.
Travel Demand Modeling run results by consultants in coordination with RTC
modeling technical support.
Methodology:
The current travel demand forecast model relies upon household and transit travel data that
pre-date the recent recession and no longer uses the most up-to-date forms of the basic
software packages for both travel forecasting and emissions analysis.
The RTC is therefore embarking on a multi-year program of model enhancements to support
the development of the 2017-2040 Regional Transportation Plan (RTP).
Major data gathering activities in support of these enhancements include:
The recently completed freight data collection study, UPWP #5260-12/13.
2014/15 Household Travel Survey described elsewhere in this UPWP.
2014/15 On-Board Transit Survey described elsewhere in this UPWP.
2014/15 Hotel and Visitor Travel Survey described elsewhere in this UPWP.
2015-based projection of regional population extending out to 2040 and the
corresponding projection of parcel-level land use data, leading to the development of
the 2015-2040 Planning Variables.
FY2016 Unified Planning Work Program Page 35
The Model Enhancement and Validation task will take these new data sets and other
software updates to produce the 2015 Travel Demand Forecast Model. That model will be
calibrated to observed travel conditions and validated according to current best practices.
The final stage of this task will support the execution of model runs for the 2017-2040 RTP
and associated air quality conformity analysis.
Update model code to TransCAD 6.2.
Develop methodology for utility programs to use TransCAD output and the output from
the emission model ‘MOVES’ to produce statistics for conformity analysis.
Research and utilize the Las Vegas freight data collected in 2012/13 into the model.
Research and process the NDOT truck traffic data by truck type and utilize the data to
improve the freight element in the travel demand model.
Research and process the transit stop data and utilize the information to refine the
transit coding and procedures in the travel demand model.
Research and implement bike and pedestrian trips into the model.
Refine the TAZ system to create smaller TAZs around major transit services and future
high growth areas.
Improve the network structure and coding procedures and qualities, which is an on-
going task.
Use new data from household survey, transit on-board survey, visitor survey, and
counts to calibrate and validate the travel demand model (FY15-16).
Test and apply the new updated version of the RTC Travel Demand Model (FY15-16).
Research and develop procedures for validation and post processing of the modeled
link speed against real data (FY15-16).
Incorporate and implement any new elements into the travel demand model as new
requirements arise (FY15-16).
Coordinate with the RTC Information Technologies department to maintain and
update the Modeling Group personal computers to maintain compatibility with Travel
Demand Model software.
Additional task elements:
o Select a sub consultant to update/compile input to run MOVES version 2014.
o Develop/update the utility program to automate MOVES v2014 running
procedures and for Conformity Analysis
o Process additional household survey data due to the survey sample size
increased from 4,000 to 7,000
o Additional efforts to evaluate the utilization of the new visitor survey data
collected in a nontraditional alternate way.
FY2016 Unified Planning Work Program Page 36
o Process the AirSage travel time data by aggregated travel zones (started in
FY15)
o Process and use HERE data for roadway travel time calibration
o Supporting work to graphic and statistic work for all survey data.
o Update all utility programs to work with new model and develop procedures to
incorporate performance based measure element in TransCAD utility
programs
Participating Agencies:
Clark County, City of Las Vegas, City of North Las Vegas, City of Henderson, City of
Boulder City, Clark County Department of Air Quality, Nevada Department of
Transportation, Regional Transportation Commission of Southern Nevada (Lead
Agency)
Budget:
Sub Task 201-2230-16 FY 2016 Budget
Total Project Cost $500,000
Professional Services Contract $500,000
RTC Cost -0-
Funding Sources
Consolidated Planning Grant (95%) $475,000
Local Match (5%) $25,000
Total FY16 Project Budget $500,000
Schedule and Deliverables:
Enhanced transit and freight structures in the model.
Utility programs to pipeline TransCAD model results with the U.S. EPA ‘MOVES’ model.
RTC 2012 Travel Demand Model calibrated and validated with new data.
Updated highway and transit network.
Report detailing the modeling results.
Completion date: June 30, 2016
FY2016 Unified Planning Work Program Page 37
Sub Task 201-2520-16: Household Travel Survey
Objective: Traditionally, the most important building block for development of urban and
regional travel demand models has been the household travel survey. In a household travel
survey, respondents are contacted in their homes and are queried about their household
characteristics, the personal characteristics of members of the household, and about recent
travel experiences. The travel survey provides data that can be used in the following steps
of the travel demand forecast modeling process:
1. Trip production rates by trip purpose;
2. Trip distribution by time of day;
3. Trip length frequency distribution;
4. Modal share of travel;
5. Auto occupancies;
6. Vehicle operating speeds; and
7. Household vehicle ownership.
The travel survey process can be divided into five general stages: Survey planning, survey
design, field implementation, data preparation, and data analysis. The 2015 Household
Travel Survey is an eighteen month project with two phases. The survey will start with the
first phase and will focus on survey planning, survey design (including a pilot survey), and
field implementation. This second phase included in the Fiscal Year 2015 UPWP and will
focus on data preparation and data analysis. The first phase of the project was completed
in FY 2014 and included tasks 1-4 detailed below. The second phase will be completed in
FY 2015 and includes tasks 5-7.
The survey will collect data on the number, length, purpose, mode, and time of day activities
and trips are made by persons within the sample households during a specific 24-hour
travel day. Other datasets may also be collected. Basic information shall also be included
about the households. Ideally, the survey data collection should be completed before the
end of the school year and a sufficient number of households should be sampled.
Previous Work:
2005 Travel Survey
1996 Travel Survey
Task Elements:
Task 1 – Issue a Request for Proposals (RFP) and select a consultant (or consultant
team):
o Use of an RFP process to select the consultant is appropriate given that
household travel surveys require specialized skills and experience. RTC will
follow standard agency procedures for issuing the RFP and selecting a
consultant.
FY2016 Unified Planning Work Program Page 38
o The study’s organization includes defining communication links and finalizing
the scope of work and project schedule.
Task 2 – Survey Planning: The scope and goals of the travel survey will be refined
during the survey planning stage. This stage consists primarily of researching
existing successful household survey projects, identification of issues that have
arisen since the previous survey (e.g., has development in the suburban fringes of
the region affected commute to work patterns?), and hypothesizing about
relationships that may affect future modeling requirements (e.g., expectation to see a
higher transit mode share for residents of transit-oriented development districts).
The survey planning stage is the time to consider model development needs and the
resulting survey data requirements. This step also includes review of the existing RTC
travel demand model structure and input requirements, assessment of model
development and improvement needs, and development of recommendations for
survey data to be collected.
Task 3 – Survey Design: Once the goals for the new travel survey have been
identified, three tasks should be performed:
1) Compile useful background information for the survey effort.
2) Design the overall survey effort based on recognition of data needs and
available data sources.
3) Organization of the survey team and survey resources.
Decisions made during the survey design process allow the survey team to develop a
sampling plan and the preliminary survey instruments. The survey will cover the
model area, comprising the urban Las Vegas Valley and the adjoining community of
Boulder City. The survey will not cover the outlying parts of the region.
Task 4 – Survey Pre-test: As part of the survey design, a survey pre-test will be
conducted and the results will be evaluated. The survey pre-test allows the survey
team to rethink survey design issues, including the overall design of the survey, the
survey sampling procedures, and the survey instruments. In addition, the pre-test
can identify areas where additional fieldworker training would be helpful.
Task 5 – Finalize the survey instrument and define the sample frame.
Task 6 – Conduct survey field work and quality control.
Task 7 – Implementation and completion of household survey data collection.
Expected Products:
Survey instrument
Travel survey data to update the travel demand model
FY2016 Unified Planning Work Program Page 39
Completion Date: June 2015
Financial Responsibility: Regional Transportation Commission of Southern Nevada
Functional Responsibility (Staffing):
Regional Transportation Commission of Southern Nevada (Project Manager)
Project Consultant
Participating Agencies:
Regional Transportation Commission of Southern Nevada
Nevada Department of Transportation
City of Las Vegas
Clark County
City of North Las Vegas
City of Henderson
City of Boulder City
Budget:
Sub Task 201-2520-16 FY 2016 Budget
Total Project Cost $2,250
Professional Services Contract
(includes unexpended funds previously
included in 2014 & 2015 UPWP)
$2,000
RTC Cost $250
Funding Sources
Consolidated Planning Grant (95%) $2,138
Local Match (5%) $113
Total FY16 Project Budget $2,250
FY2016 Unified Planning Work Program Page 40
Sub Task 201-2530-16: 2014 Origin & Destination On-Board Transit Survey
Objective: This project will carry out a comprehensive survey of passenger ridership patterns
for the entire RTC transit system. The project will emphasize origins and destinations,
transfer locations, access and egress modes, and other information. This survey will be
conducted on all existing RTC transit routes.
Previous Work:
Transit Origin and Destination On-Board Survey (2006-2007)
Before and After Studies for RTC Transit (On-Board Survey on Boulder Highway and
Sahara Avenue)
Maryland Parkway Alternative Analysis (On-Board Survey for Route 109)
Task Elements:
Task 1 – Issue a Request for Proposals (RFP) and select a consultant (or consultant
team)
Task 2 – Survey Planning:
o Develop scope of work and schedule.
o Develop survey sample size and strategy (Note: the survey will cover the RTC
Transit service area, comprising the urban Las Vegas Valley and the adjoining
community of Boulder City. The survey will not cover the outlying parts of the
region).
o Develop final survey instrument.
Task 3 - Surveying: Based on direction from the Federal Transit Administration (FTA),
the data collection method for the main survey is being changed from paper
method originally scoped to person-tablet method. In addition to the main
survey, On-To-Off data collection will be added and conducted on 20% of the
system ridership.
o Implement to On-to-Off Survey.
o Pretest the survey instrument.
o Implementation of the on-board survey.
o Implement stop survey.
o Carry out survey monitoring and quality assurance.
Task 4 – Data Creation:
o Develop survey database, including a Geographic Information Systems (GIS)
database.
o Carry out internal and external survey validation activities.
Task 5 – Report Development:
o Develop final report, data analysis, statistics, and graphics.
o Develop final database and GIS database.
o Present report to RTC committees and the RTC.
FY2016 Unified Planning Work Program Page 41
Expected Products:
Final report that includes the methodology, survey results, data analysis, statistics,
and associated graphics.
Database of survey results.
Completion Date: June 2015
Financial Responsibility: Regional Transportation Commission of Southern Nevada
Functional Responsibility (Staffing):
Regional Transportation Commission of Southern Nevada (Project Manager)
Project Consultant
Participating Agencies:
Regional Transportation Commission of Southern Nevada
City of Las Vegas
Clark County
City of North Las Vegas
City of Henderson
City of Boulder City
Budget:
Sub Task 201-2530-16 FY 2016 Budget
Total Project Cost $2,250
Professional Services Contract
(includes unexpended funds previously
included in 2014 & 2015 UPWP)
$2,000
RTC Cost $250
Funding Sources
Consolidated Planning Grant (95%) $2,138
Local Match (5%) $113
Total FY16 Project Budget $2,250
FY2016 Unified Planning Work Program Page 42
Sub Task 201-2680-16: Regional Traffic Counts
Purpose: To collect traffic counts for approximately 270 locations in Clark County area to
validate the RTC Travel Demand Model, augment existing Nevada Department of
Transportation (NDOT) traffic counts program and provide supporting information for traffic
operational improvements in Southern Nevada.
Previous Work:
Regional Traffic Counts is an on-going task.
Methodology:
Specify count locations in Clark County with the assistance of NDOT.
Determine optimal counter tie points and document locations.
Prioritize count locations according to greatest need for supporting data.
Collect volume counts at the specified locations under the standards prescribed in
the Federal Highway Administration Traffic Monitoring Manual.
Prepare a report documenting the process and the results.
Transmit the collected data to NDOT for inclusion in their Annual Count Report.
The Regional Transportation Commission of Southern Nevada (Project Manager) and
a project consultant complete the regional traffic counts.
Participating Agencies:
Regional Transportation Commission of Southern Nevada (Lead Agency) and the
Nevada Department of Transportation
Budget:
Sub Task 201-2680-16 FY 2016 Budget
Total Project Cost $234,000
Professional Services Contract $230,000
RTC Cost $4,000
Funding Sources
Consolidated Planning Grant (95%) $222,300
Local Match (5%) $11,700
Total FY16 Project Budget $234,000
Schedule and Deliverables:
Monthly reports that document the process and traffic count information for counted
locations in that month.
Completion Date: June 2016
FY2016 Unified Planning Work Program Page 43
Sub Task 201-3640-16: Regional Bicycle and Pedestrian Counts
Purpose: The purpose is to conduct bicycle and pedestrian counts to be able to identify
existing demand and determine specific tangible benefits of proposed improvements when
applying for project funding. The data collected in this study will help quantify bicycle and
pedestrian demand trends over time.
Previous Work: The original count program collected data at 24 locations, additionally
the Southern Nevada Health District (SNHD) has collected trail usage data and prepared
reports for five discrete trail sections. Data was collected using infrared sensors and
validated with manual counts.
Methodology: Collect bicycle and pedestrian counts at the same 24 count locations from
the original study – and add new data collection locations. Counts will be performed during
the scheduled K-12 school year. All counts at each location will be performed for 12
continuous hours (7:00 am – 7:00 pm) during one weekday (Tuesday – Thursday) and one
Saturday.
Specific tasks to be performed by a consultant team and managed by RTC staff include:
Collecting counts using either of the following methods:
o Manual counts; or
o Video technology.
Ensuring collection methodology and data gathered is consistent with the original
count program and National Bicycle and Pedestrian Documentation Project (NBPD)
methodologies;
Identifying preferred count locations for new sites. Consideration for new sites
should include:
o Existing and proposed bicycle/pedestrian facilities (including off-street multi-
use paths);
o Transit access; and
o Stakeholder recommendations, including the SNHD, the Clark County School
District, the Regional Open Space and Trails Work Group, and the Pedestrian
Safety Task Force.
Participating Agencies: Regional Transportation Commission of Southern Nevada (Lead
Agency)
FY2016 Unified Planning Work Program Page 44
Budget:
Sub Task 201-3640-16 FY 2016 Budget
Total Project Cost $52,500
Professional Services Contract $50,000
RTC Cost $2,500
Funding Sources
Consolidated Planning Grant (95%) $49,875
Local Match (5%) $2,625
Total FY16 Project Budget $52,500
Schedule and Deliverables:
Data and analysis to be provided to the RTC should include:
Data sheets in Excel format
Develop and apply sidewalk factors as they relate to the percentage of bicyclists
riding on the sidewalk
Analyze and segregate bicycle volume variations by the type of bicycle facility present
on the roadway
A summary report that includes methodology, maps, and trends
Completion Date: June 30, 2016
FY2016 Unified Planning Work Program Page 45
Sub Task: 201-9000-16 - School Walk Audits
Purpose: Expand the Clark County School District (CCSD) Safe Routes to School (SRTS)
program efforts in providing school communities with technical assistance and tools to
improve safety and to encourage more walking and bicycling to and from school.
Previous Work:
CCSD Previous SRTS Walk Audits and School Action Plans, SNS Regional Plan, RTC
Regional Schools Multimodal Transportation Access Study, Southern Nevada Strong
(SNS) Regional Plan, City of Henderson Comprehensive Plan, City of Las Vegas
Master Plan, City of North Las Vegas Comprehensive Master Plan, Clark County
Comprehensive Plan
Methodology:
Convene kick-off meeting and at least two SRTS Advisory Committee meetings
Schedule walk audits at up to 15 schools identified by the SRTS Coordinator in
coordination with relevant school and jurisdictional representatives
Conduct up to 15 walk audit field investigations within one-half mile of each school to
identify existing conditions, barriers, opportunities, and safety issues, including an
assessment of adjacent intersections, sidewalks and bicycle facilities, sight distance
and visibility conditions, traffic control devices (signs, signals, and pavement
markings), and student drop-off and pick-up areas
Prepare a written and illustrative SRTS walk audit report summarizing each walk
audit findings and priority recommendations for infrastructure (engineering and
maintenance) improvements and other program (education, encouragement, and
enforcement) strategies
Develop planning level cost estimates for recommended engineering/infrastructure
improvements at each school
Prioritize recommendations resulting from the 15 walk audits within the existing
project prioritization matrix
Coordinate with the relevant jurisdictional representatives, including CCSD Facilities,
to update the SRTS improvement recommendation priority list from the first 50 walk
audits
Implement a strategy to update 47 SRTS school action plans
Assist the 47 schools in filling out a one-page SRTS Achievement Level Program
partnership form and remit to the SRTS Coordinator
Participating Agencies:
Clark County School District (Lead Agency), City of Henderson, City of Las Vegas, City
of North Las Vegas, Regional Transportation Commission of Southern Nevada
FY2016 Unified Planning Work Program Page 46
Budget:
Sub Task 201-9000-16 FY 2016 Budget
Total Project Cost $52,500
Professional Services Contract $50,000
RTC Cost $2,500
Funding Sources
Consolidated Planning Grant (95%) $49,875
Local Match (5%) $2,625
Total FY16 Project Budget $52,500
Schedule and Deliverables:
New SRTS Walk Audit Reports (including field review forms, maps, and photos)
New Data Gathering and Evaluation Report (including meeting summaries, updated
priority recommendations, and cost estimates)
Updated SRTS School Action Plans
Completed SRTS Achievement Level Program Partnership Forms
Completion Date: June 30, 2016
FY2016 Unified Planning Work Program Page 47
Task 202, Long Range Transportation Planning
The next update of the Regional Transportation Plan will need to address a number of issues in more depth
than is supported by current knowledge, data and policies.
This task covers a number of key issues, some related to the provisions of MAP-21, some related to issues
raised in the 2011 MPO Certification Review, and some related to matters of local concern that RTC wishes to
address more extensively in the next RTP.
Activities include:
Development and application of visioning techniques as part of efforts to engage the community in
RTP development;
Creation of a framework for performance-based planning in accordance with MAP-21;
On-going coordination of transit with human services;
Development of policies and proposals related to bicycle and pedestrian planning;
Development of policies and proposals related to the various aspects of transportation safety
planning.
Some of these activities will require professional support from outside consultancies but the greater part of the
work will be performed with RTC resources. The Task 202 budget reflects this.
Specific sub-tasks are:
202-3300, Regional Transportation Plan & Visioning
202-3325, Performance-Based Planning
202-3710, Bicycle and Pedestrian Planning
202-3715, Transportation Safety Planning
Task 202, 2016 Budget
The following costs are included under Task 202:
FY 2016 RTC costs: $ 72,000
Professional Services Costs: $ 160,000
Combined costs: $ 232,000
The source of funds for Task 202 is:
Consolidated Planning Grant: $ 220,400
Local funds (5% match) $ 11,600
FY2016 Unified Planning Work Program Page 48
Sub Task 202-3300-16: Transportation Visioning and RTP Development
Objective: In 2011, the Federal Highway Administration and Federal Transit Administration
conducted a Federal Certification Review of the planning process for Southern Nevada. The
report, which was received in October of 2012, identified several recommendations on how
to improve the planning process. One of those recommendations states, “The public should
be given the opportunity to actively influence the direction of plans and programs as they are
developed rather than just reacting to a draft after major decisions have been made. The
RTC should seek out opportunities to use innovative approaches to gain public
involvement”.
To address this recommendation, the RTC will implement an outreach effort to engage the
public on development of a transportation vision for Southern Nevada. The Visioning
Process will gauge public sentiments on the transportation priorities for the region. It is
anticipated that the results of the Visioning Process will influence development of the next
Regional Transportation Plan (RTP) and Transportation Improvement Program (TIP).
Additionally, the results are anticipated to influence the processes by which the RTC will
prioritize projects for funding as well as measure their performance.
It is important that the Visioning Process employ innovative approaches to engage a broad
cross section of the public. Special efforts should also be made to engage environmental
justice (EJ) populations including those that are low-income/no income, minority, limited
English proficiency, elderly, or disabled.
Different strategies are anticipated to be warranted to reach-out to disparate populations.
These may include general public and stakeholder meetings, community charrettes, paper
or digital surveys, and use of social media. It is important to demonstrate public buy-in to
the methodology and the results of the visioning process because of the influence it will play
in future transportation decisions.
Previous Work:
RTC Regional Transportation Plan for FY 2013–2035 (2013)
RTC Transportation Improvement Program for FY 2013–2016 (2013)
RTC Public Participation Plan (amended in 2012)
Task Elements:
Task 1 – Develop Stakeholder and Public Participation Methodology: The Visioning
Process must be multi-jurisdictional and address key transportation planning issues
and needs. This task will involve the following components:
o Develop procedures, practices, and strategies to obtain the opinions of
stakeholders and the public throughout the Visioning Process (methods should be
FY2016 Unified Planning Work Program Page 49
developed to ensure engagement of a diversified stakeholder audience including
EJ populations);
o The internet, including social networking tools, should be considered to expand
the audience and opportunities for input;
o Outline performance measures to demonstrate engagement by a diverse cross
section of stakeholders and gauge the effectiveness of public outreach;
o Create a schedule for the completion of all public engagement activities
associated with the overall task;
o Formulate techniques for analyzing and statistically quantifying stakeholder
comments and input;
o Identify facilitation techniques that utilize visualization or interactive tools to
foster dialogue and educate stakeholders about complex issues; and
o Develop strategies for linking the results of the Visioning Process to the regional
transportation planning process.
Task 2 – Develop Branding Scheme, Marketing Plan, and Marketing Templates: The
marketing plan is essential to effectively educate members of the public about the
overall Visioning Process, the importance of their input, and their role in the various
stages of the process. This task will involve the following components:
o Create a branding scheme for the Visioning Process which can be applied to the
Regional Transportation Plan. This includes the creation of titles, logos, slogans,
and visual themes;
o Prepare templates for outreach materials in both English and Spanish for use
online and in print using the branding scheme; and
o Develop a marketing plan for public outreach and education during the Visioning
Process.
Task 3 – Implement Stakeholder Outreach: The consultant will be expected to
implement an array of public education and engagement techniques. This task will
involve the following components:
o Facilitate and/or assist with the facilitation of community outreach meetings,
workshops, charrettes, or other public participation opportunities;
o Facilitate and/or assist with stakeholder meetings targeted at project sponsors
which may include local and state agencies; and
o Prepare materials for public outreach in both English and Spanish including text
and graphics on the website, online and/or printed surveys, agenda materials,
media releases, topic papers, fact sheets, and mailings.
Task 4 – Develop a project prioritization Process: The consultant will be expected to
synthesize the results of the visioning process as well as information from key
stakeholders to develop a project prioritization process. This task will involve the
following components:
o Review and incorporate federal requirements, especially those related to
performance measures;
o Seek consensus on a project prioritization process that addresses public and
stakeholder feedback;
FY2016 Unified Planning Work Program Page 50
o Work with RTC staff to prioritize the use of federal funding controlled by the RTC
Task 5 – Develop the RTP: The consultant will be expected to pull in the different
elements of the project prioritization process to the final draft of the RTP. This task
will involve the following components:
o Develop and implement an innovative strategy for public engagement for the RTP
and TIP;
o Incorporate the feedback received into the final draft of the document;
Expected Products:
Interim report on task elements
Final report detailing the methodology and results of the Visioning Process
Completion Date: June 2016
Financial Responsibility: Regional Transportation Commission of Southern Nevada
Functional Responsibility (Staffing):
Regional Transportation Commission of Southern Nevada (Project Manager)
Project Consultant
Participating Agencies:
Regional Transportation Commission of Southern Nevada
Nevada Department of Transportation
City of Las Vegas
Clark County
City of North Las Vegas
City of Henderson
City of Mesquite
City of Boulder City
Budget:
Sub Task 202-3300-16 FY 2016 Budget
Total Project Cost $160,000
Professional Services Contract
$150,000
RTC Cost $10,000
Funding Sources
Consolidated Planning Grant (95%) $152,000
Local Match (5%) $8,000
Total FY16 Project Budget $160,000
FY2016 Unified Planning Work Program Page 51
Sub Task 202-3325-16: Performance-Based Planning
Purpose: Advancing the current practices in data management, documentation, monitoring,
and analysis to meet the performance management goals and objectives of Moving Ahead
for Progress in the 21st Century (MAP-21).
Previous Work:
Transportation Improvement Impacts (Appendix 4) to the FY 2013-2035 Regional
Transportation Plan (RTP)
Las Vegas Valley Arterial Development Study (2009)
RTC FAST Dashboard
NDOT Crash GIS database
Methodology:
Research federal statutes, regulations, and guidance related to performance
measures.
Research examples of performance measure objectives and targets implemented by
other regional transportation planning agencies.
Coordinate with NDOT, RTC Transit, and RTC FAST on goals, objectives, and targets to
meet required U.S. DOT performance measure regulations.
Document existing RTC performance measures and objectives by category; such as
highway, arterial, transit, multimodal, safety, freight, and sustainability.
Analyze baseline conditions, trends, and expected system performance.
Identify and analyze potential alternative transportation scenarios to meet
performance measure objectives and targets.
Analyze performance outcomes based on anticipated funding levels.
Identify additional data in Southern Nevada that is readily available to support
supplementary performance measures and objectives.
Develop, update, and maintain a database of the selected performance measure
objectives and targets as part of an on-going, long-term effort.
Develop and document best practices for monitoring and evaluation procedures and
standards.
Monitor system performance relative to identified targets.
Evaluate observed impacts of investments and strategies.
Develop statistics and graphics using the performance measure objectives and
targets.
Present the selected performance measure objectives to selected RTC committees.
Develop recommendations regarding linkages between the selected performance
measures, the Congestion Management Process (CMP), and project prioritization
processes.
FY2016 Unified Planning Work Program Page 52
Participating Agencies:
Clark County, City of Las Vegas, City of North Las Vegas, City of Henderson, City of
Boulder City, Nevada Department of Transportation, Private sector freight industry
partners, and the Regional Transportation Commission of Southern Nevada (Lead
Agency)
Budget:
Sub Task 202-3325-16 FY 2016 Budget
Total Project Cost $50,000
Professional Services Contract -0-
RTC Cost $50,000
Funding Sources
Consolidated Planning Grant (95%) $47,500
Local Match (5%) $2,500
Total FY16 Project Budget $50,000
Schedule and Deliverables:
Analysis of performance-based planning and programming approaches implemented
by other regional transportation planning agencies nationwide.
A report documenting the establishment and integration into the RTC metropolitan
planning process of a performance-based approach to transportation decision-
making in support of national goals.
Database of the selected performance measure objectives and targets.
Recommendations for performance measure linkage to the CMP and RTC project
prioritization processes.
Performance Based Planning is an on-going task.
FY2016 Unified Planning Work Program Page 53
Sub Task 202-3710-16: Bicycle & Pedestrian Planning
Purpose: This task includes planning activities related to the continued efforts in the
development and expansion of an interconnected regional bicycle and pedestrian
transportation network, and the evaluation of the key role these networks play in the
development and implementation of the Southern Nevada ‘Complete Streets’ strategy.
Pedestrian safety has become an increasingly critical concern in the region, and training for
improved pedestrian safety and awareness is included in this task item.
Previous Work:
Complete Streets Study (2012), Alternative Mode Transportation Master Plan, Bicycle
and Pedestrian Plan (2008)
Methodology:
Develop the Regional Bicycle and Pedestrian Plan, which includes:
o Creation of a working group composed of various stakeholders.
o Update the goals, objectives, and strategies for the regional bicycle and
sidewalk system.
o Coordination on planning studies and activities (including several tasks
described in the FY 2014 UPWP) that aim to improve regional bicycle and
pedestrian networks.
o Revision of existing and planned bicycle lane, bicycle route, and shared-use
path numbers as necessary.
Development of a new regional bicycle map to update the existing bicycle network
and include new segments. Update the bicycle map format, information, and
graphics.
Update the RTC website to include new bicycle and pedestrian information and
coordinate with RTC Communications staff on improving the RTC Regional Bicycle
Network web page.
Continue development of the Southern Nevada ‘Complete Streets’ initiative, which
includes:
o Coordination with the jurisdictional planning/community development
departments in supporting their Complete Streets planning efforts and
incorporation of Complete Streets policies into their plan documents.
o Coordination with multiple stakeholders in development of an RTC Complete
Streets Funding Program, which targets set-asides for certain fund sources
and determines project eligibility.
Development of a regional pedestrian safety and awareness training program.
FY2016 Unified Planning Work Program Page 54
Participating Agencies:
Clark County, City of Las Vegas, City of North Las Vegas, City of Henderson, City of
Boulder City, City of Mesquite, Nevada Department of Transportation, Regional
Transportation Commission of Southern Nevada (Lead Agency)
Budget:
Sub Task 202-3710-16 FY 2016 Budget
Total Project Cost $10,000
Professional Services Contract
-0-
RTC Cost $10,000
Funding Sources
Consolidated Planning Grant (95%) $9,500
Local Match (5%) $500
Total FY16 Project Budget $10,000
Schedule and Deliverables:
Bicycle and Pedestrian Planning is an on-going activity.
FY2016 Unified Planning Work Program Page 55
Sub Task 202-3715-16: Transportation Safety Planning
Purpose: Completion of the Southern Nevada Transportation Safety Plan (TSP)
Previous Work:
RTC Pedestrian Safety Action Plan (2009), RTC Regional Transportation Plan for FY
2013–2035 (2012), RTC Non-Motorized Alternative Transportation Mode Master
Plan (2005; ongoing), RTC Bicycle and Pedestrian Plan (2008), Various planning
studies under previous Unified Planning Work Programs.
Methodology:
Task 1 – Review Current State of Transportation Safety in the Las Vegas Valley:
Conduct a review of the current state of road safety in the Las Vegas Valley
including fatal and injury crash statistics, overall crash trends, as well as safety
trends for subgroups such as pedestrians, bicyclists, young drivers, and older drivers.
This task will also include a review of funding available for transportation safety.
Task 2 – Establish Regional Vision and Goals for Transportation Safety: Facilitate
stakeholder workshops to establish a regional transportation safety vision statement
and develop safety goals for the Las Vegas Valley.
Task 3 – Emphasis Areas: Evaluate the applicability of the five existing Nevada
Strategic Highway Safety Plan emphasis areas to the Las Vegas Valley. Evaluate the
effectiveness of the program within the Las Vegas Valley, availability of relevant data,
and effectiveness of performance measures in Southern Nevada. Make
recommendations, if appropriate, on improving the effectiveness of the NV SHSP in
the Las Vegas Valley.
Task 4 – Project Selection: Develop a project prioritization method to select safety
projects in Southern Nevada under performance measures developed in Task 3
which can be utilized by RTC in developing the next Regional Transportation Plan.
Task 5 – Highway Safety Manual Implementation: Conduct a review of the
development of the Regional Transportation Plan, network screening and the entire
project development process. Make recommendations for incorporating the
procedures outlined in the Highway Safety Manual into these processes. This task is
to be consistent with the Nevada Highway Safety Manual Implementation Plan.
Task 6–Safety Countermeasures Report: Review and make recommendations on key
safety countermeasures that will address the primary causes of fatal and injury
crashes in the Las Vegas Valley.
Task 7 – Safety Data Reporting Review: Review current procedures for crash data
collection and dissemination and make recommendations to improve the procedures
in support of this TSP.
Task 8 – Pedestrian and Bicycle Safety Action Plan: Update the 2009 PSAP GIS
based crash analysis including spatial analysis and identification of high crash
corridors and intersections. The crash analysis is to include the last three years of
the most recently available data for both pedestrian and bicycle crashes.
FY2016 Unified Planning Work Program Page 56
Task 9 - Transportation Safety Plan Final Report: prepare an implementation plan
that identifies what needs to be done to carry out the recommended aspects of each
task of this plan.
Participating Agencies:
Regional Transportation Commission of Southern Nevada (Lead Agency), Nevada
Department of Transportation, City of Las Vegas, Clark County, City of North Las
Vegas, City of Henderson
Budget:
Sub Task 202-3715-16 FY 2016 Budget
Total Project Cost $12,500
Professional Services Contract
$10,000
RTC Cost $2,000
Funding Sources
Consolidated Planning Grant (95%) $11,400
Local Match (5%) $600
Total FY16 Project Budget $12,000
Schedule and Deliverables:
Interim report on task elements
Final Transportation Safety Plan
Final Bicycle and Pedestrian Safety Action Plan
Completion Date: June, 2016
FY2016 Unified Planning Work Program Page 57
Task 301, Multi-Modal Transportation Studies
While the primary focus of the planning program in the coming year will be on tasks supporting the
development of the next Regional Transportation Plan update, RTC maintains a robust program of planning
studies to assist RTC and its partner agencies in framing solutions to emerging transportation challenges
across the region.
Activities include:
Studies that support the implementation of “complete street” concepts in various local jurisdictions
and circumstances – often these studies also have a significant safety component;
Working with the Clark County School District to improve the planning of access to schools in the
interests of improving the mobility and safety of students;
Further developing our undertaking of freight traffic and the need for targeted investments to support
freight movement;
Assisting Clark County with a review of the planning process as it relates to parking provision;
RTC has supported a local initiative to develop a more sustainable regional planning framework using
a Grant issued under the Sustainable Communities Program of the US Department of Housing and
Urban Development. The UPWP includes a task to study the potential to implement this framework in
a corridor where possible transportation capital improvements were studied under the 2014 UPWP;
Assisting the City of Mesquite in a review and update of the way it reviews the transportation impacts
of proposed developments.
All of these activities are being undertaken by outside consultancies under professional services contracts with
RTC. The costs of these professional services contracts are included under Task 301. This Task also includes
the RTC costs associated with the procurement of professional services contracts and their administrative and
financial oversight.
Specific sub-tasks are:
301-1720, Regional Schools Multimodal Access Study
301-9010, Spencer Greenway Transportation Trail and UNLV Campus Bike Plan
301-9015, City of Henderson Americans with Disabilities Act Transition Plan
301-9020, Clark County Parking Study – Phase 2
301-9025, Clark County Rural Streets Standards Study
301-9030, Northeast Valley Transportation Network Study
301-9035, RTC Transit Ridership and Transit Oriented Development Study
301-9040, RTC Truck Arterial Route Study
FY2016 Unified Planning Work Program Page 58
Task 301, 2016 Budget
The following costs are included under Task 301:
FY 2016 RTC costs: $ 37,050
Professional Services Costs:
Work carried over from 2015 $ 26,250
New work planned for 2016 $ 800,000
Combined costs: $ 863,300
The source of funds for Task 301 is:
Consolidated Planning Grant: $ 820,135
Local funds (5% match) $ 43,165
FY2016 Unified Planning Work Program Page 59
Sub Task 301-1470-16: Washington Avenue Complete Streets Study
Objective: Develop a feasibility study to evaluate opportunities along Washington Avenue
and Vegas Drive/Owens Avenue between Rampart Boulevard and Nellis Boulevard for
‘Complete Streets’ treatments. Washington Avenue and Vegas Drive/Owens Avenue are
excellent ‘Complete Street’ candidates as they have ample rights-of-way through most of the
corridor and do not carry high traffic volumes. Analysis of the parallel corridors also provides
an opportunity to explore innovative treatments, especially where rights-of-way may be
constrained. Portions of the corridors include a wide median island that could be narrowed
to accommodate wider sidewalks, bicycle lanes, and/or enhanced transit stops. The study
will also look at connecting existing land uses along the corridor which include several
schools, parks, municipal buildings, and recreational facilities, including Cashman Field.
The study will build upon concepts recently developed in the Regional Complete Streets
Study. Short and long term improvements will be identified to make the corridor more
inviting for transit, bicycle, and pedestrian users. Improvements along the corridor might
include dedicated transit lanes, widened sidewalks, bicycle lanes, landscaping, protected
pedestrian crossings, connectivity with the regional trail system, and enhanced transit stops
where appropriate.
Previous Work:
RTC Transit Mode Options Study
RTC Regional Transportation Plan and Short-Range Transit Plan
RTC Long-Range Transit Survey
RTC Non-Motorized Alternative Transportation Mode Master Plan
City of Las Vegas Community Mobility Study for Central Las Vegas
Task Elements:
Identify and coordinate with any other transportation projects or studies on or
adjacent to Washington Avenue and Vegas Drive/Owens Avenue.
Identify existing right-of-way, land use generators, roadway geometrics, and sidewalk
conditions including ADA compliance.
Identify existing and future roadway traffic volumes and projected growth trends
along the corridor and at all major intersections.
Research existing data and studies that quantify pedestrian and bicycle volumes on
the corridor. Conduct pedestrian and bicycle counts on the corridor if data does not
exist.
Research existing data, studies, and future projections that quantify transit use on
the corridors.
Inventory potential bicycle/pedestrian oriented land uses along the corridor
Review speed restrictions along the corridor, including school zones.
Develop critical roadway alternatives including travel lane configurations, speed limit
analysis, intersection and mid-block designs, and other feasible strategies.
FY2016 Unified Planning Work Program Page 60
Explore connectivity and possible expansion of each alternative to the regional trail
system, particularly the Bonanza Trail.
Evaluate advantages and disadvantages to each alternative.
Draft report, recommendations, and presentations.
Develop cost estimates for design, right-of-way, and construction of identified
improvements.
Identify possible funding sources to supplement existing local (RTC and/or City of Las
Vegas) and federal funds for implementation of recommended Complete Streets
improvements.
Public outreach activities.
Expected Products:
Draft report, short and long term recommendations, and presentations.
Final report defining and evaluating alternatives, preliminary cost estimates,
description of right-of-way needs, recommendations, description of recommended
project concept and financing mechanisms, and cost estimates for implementation
and operating support.
Completion Date: June 2016
Financial Responsibility: Regional Transportation Commission of Southern Nevada
Functional Responsibility (Staffing):
Regional Transportation Commission of Southern Nevada (Project Manager)
Project consultant
Participating Agencies:
Regional Transportation Commission of Southern Nevada, City of Las Vegas, City of
North Las Vegas, Clark County
Budget:
Sub Task 301-1470-16 FY 2016 Budget
Total Project Cost $5,500
Professional Services Contract
(includes unexpended funds previously
included in 2015 UPWP)
$5,000
RTC Cost $500
Funding Sources
Consolidated Planning Grant (95%) $5,225
Local Match (5%) $225
Total FY16 Project Budget $5,500
FY2016 Unified Planning Work Program Page 61
Sub Task 301-1480-16: North Las Vegas Complete Streets Corridor Ranking Study
Objective: The goal for the City of North Las Vegas is to have a truly multimodal
transportation network that serves all destinations, transportation modes, and users. All
types of travel mode users are found in North Las Vegas today, including motor vehicle,
pedestrian, bicycle, and transit. Unfortunately, walking and bicycling can feel uncomfortable
for some users and may be perceived as unsafe for others. In an effort to make North Las
Vegas a more sustainable community, a key element is to create a safe and inviting
experience for all transportation users.
Complete Streets are roadways designed to safely and comfortably accommodate all
transportation users. The objective of this study is to identify and assess candidate
corridors for implementation of Complete Street treatments as identified in the RTC
‘Complete Streets Study’. These treatments may include pavement reductions, lane
reductions, roundabouts, completion of bicycle and pedestrian facilities, and other related
multimodal improvements. The study will evaluate existing and planned corridors for
feasibility of Complete Streets implementation, either through new development, or as part
of the City of North Las Vegas maintenance and improvement plans.
Previous Work:
North Las Vegas Major Downtown Area Study (2013)
Community Mobility Study for Central Las Vegas (2013)
RTC Complete Streets Study (2012)
North Las Vegas Comprehensive Trails and Bicycle Master Plan (2012)
North Las Vegas 2006 North Fifth Street Transit Supportive Concept Plan
North Las Vegas Downtown Master Plan & Investment Strategy
North Las Vegas Comprehensive Plan
North Las Vegas Visioning 2025 Strategic Plan
Task Elements:
Task 1 – Collect and review existing information, maps, and relevant studies.
Research best practices for Complete Streets implementation, design and
construction with emphasis on safety and access.
Task 2 – Develop criteria in order to rank and determine the priority of implementing
Complete Streets treatments on various street segment and intersection candidates.
Task 3 – Identify street segments and intersections for Complete Streets
improvements:
o Use the RTC regional model to determine anticipated traffic volumes and
potential for reduction in number of lanes.
o Evaluate current condition of the pedestrian and bicycle environment along
the street and intersection candidates.
o Identify locations where pavement width may be reduced to provide
pedestrian improvements and bicycle facilities.
FY2016 Unified Planning Work Program Page 62
o Identify corridors that may be restriped in conjunction with pavement
maintenance to provide new or improved non-motorized facilities.
o Develop a map showing locations where improvements to pedestrian and
bicycle infrastructure are needed and classify by 1) priority of need and 2)
type of improvement recommended for each location.
Task 4 – Develop conceptual plans for Complete Street improvements on several
selected locations:
o Evaluate potential impacts to air quality model.
o Recommend methods to manage traffic speeds.
o Identify approximate costs for improvements, whether it is for new installation
or retrofit improvements.
o Evaluate impacts to maintenance activities.
Task 5 – Identify possible funding sources for implementation of recommended
Complete Streets improvements. Recommend changes to current policies and
procedures that inhibit funding opportunities.
Task 6 – Develop a final report and presentation(s).
Expected Products:
Technical memorandum summarizing Tasks 1 thru 3.
Technical memorandum summarizing Task 4.
Public memorandum summarizing public outreach (if necessary).
Draft and Final Report.
The project will be completed by June 30, 2016
Financial Responsibility: Regional Transportation Commission of Southern Nevada
Functional Responsibility:
Regional Transportation Commission of Southern Nevada (Project Manager)
Project Consultant
Participating Agencies:
Regional Transportation Commission of Southern Nevada
City of North Las Vegas
Budget:
Sub Task 301-1480-16: FY 2016 Budget
Total Project Cost $1,300
Professional Services Contract $1,250
RTC Cost $50
Funding Sources
Consolidated Planning Grant (95%) $1,235
Local Match (5%) $65
Total FY16 Project Budget $1,300
FY2016 Unified Planning Work Program Page 63
Sub Task 301-1525-16: Community Mobility Study for Central Las Vegas, Phase 2
Objective: Downtown Las Vegas has long served as the hub of the entire Las Vegas Valley
and has a rich legacy of business, commerce, entertainment, lodging, and culture. This
legacy is at risk unless proper infrastructure is developed to address the needs of the
downtown core and mature areas immediately around the core.
Phase 1 of the Community Mobility Study for Central Las Vegas was developed to identify
infrastructure gaps in Downtown Las Vegas and the adjacent neighborhoods surrounding it.
The other major deliverable was a list of recommendations that can improve transportation
deficiencies and maintain/improve the economic viability of the area. Phase 2 of this study
will apply additional analysis to the recommendations developed in Phase 1 in order to
identify specific infrastructure improvements with associated preliminary cost estimates.
Phase 1 established 36 zones, evaluated alternative mode connectivity, and identified
macroscopic and mesoscopic opportunities (through Geographic Information Systems
software) within a three-mile radius of the newly built Bonneville Transit Center to better link
residents and employees to destinations within the study area. This study will take the
analysis further within each zone to identify and prioritize specific infrastructure
improvements, including preliminary cost estimates and measures of effectiveness.
Previous Work:
Community Mobility Study for Central Las Vegas – Phase 1 (2013)
RTC Regional Transportation Plan for FY 2009 – 2030 (2008)
RTC Non-Motorized Alternative Transportation Mode Master Plan (2005; ongoing)
RTC Bicycle and Pedestrian Plan (2008)
Las Vegas Downtown Pedestrian Circulation Study (2008)
Downtown Traffic Capacity, Transit, and Parking Needs Study (2007)
Various planning studies under previous Unified Planning Work Programs
Task Elements:
Task 1 – Review the list of recommendations from Phase 1 of the study with the
Technical Working Group and evaluate the list based on feasibility. Feasibility will be
determined by relative importance of the suggested project and initial cost
estimates/right-of-way availability. Develop a final list of recommendations that will
be used for the remainder of Phase 2.
Task 2 – Based on the final list of recommendations, identify alternative mode
improvement opportunities to include (but not limited to) enhanced pedestrian
crossings, sidewalk improvements, crosswalk enhancements, pedestrian access
locations, bicycle facilities (lanes, routes, boulevards, and parking) and transit stop
enhancements.
FY2016 Unified Planning Work Program Page 64
Task 3 – Develop conceptual designs for each of the recommendations, based on
field review, right-of-way/utility constraints, and other potential implementation
issues.
Task 4 – Determine with the Technical Working Group the preferred conceptual
design for each recommended capital improvement. Develop preliminary cost
estimates for the preferred conceptual design and a benchmarks system to
determine effectiveness.
Task 5 – Conduct public outreach during the study process, particularly between
tasks 3 and 4 and after task 4.
Task 6 – Prepare Draft Final Plan and present to the Technical Working Group for
feedback and comments.
Task 7 – Prepare Final Plan.
Expected Products:
Technical memorandum summarizing Task 1.
Technical memorandum summarizing Tasks 2 thru 4.
Public memorandum summarizing public outreach.
Draft and Final Plan.
Completion Date: June, 2016
Financial Responsibility: Regional Transportation Commission of Southern Nevada
Functional Responsibility (Staffing):
Regional Transportation Commission of Southern Nevada (Project Manager)
Project Consultant
Participating Agencies:
Regional Transportation Commission of Southern Nevada
Nevada Department of Transportation
City of Las Vegas
Clark County
City of North Las Vegas
FY2016 Unified Planning Work Program Page 65
Budget:
Sub Task 301-1525-16 FY 2016 Budget
Total Project Cost $5,500
Professional Services Contract
(includes unexpended funds previously
included in 2014 UPWP)
$5,000
RTC Cost $500
Funding Sources
Consolidated Planning Grant (95%) $5,225
Local Match (5%) $225
Total FY16 Project Budget $5,500
FY2016 Unified Planning Work Program Page 66
Sub Task 301-1720-16: Regional Schools Multimodal Transportation Access Study
Purpose: This study will evaluate current conditions of multi-modal transportation options to
schools utilizing data collected from 50 walking audits at CCSD schools, trail usage data
collected by the Southern Nevada Health District, relevant RTC transportation data, and
local agency comprehensive plans. The results of the analysis will provide recommended
regional policies to better identify future school site locations and to include safe, multi-
modal transportation options for students.
Previous Work:
CCSD – Asset Management Supply/Demand Analysis, Southern Nevada Regional
Planning Coalition (SNRPC) – Regional Policy Plan, RTC Bicycle and Pedestrian Plan,
City of North Las Vegas Comprehensive Master Plan, City of Las Vegas
Comprehensive Plan, City of Henderson Comprehensive Plan, City of Boulder City
Comprehensive Plan, Clark County Comprehensive Plan
Methodology:
Review and evaluate existing school policies included in municipal, county, and
regional comprehensive plans.
Review and analyze data collected from walking audits.
Review and analyze trail usage data collected by the Southern Nevada Health
District.
Review and analyze relevant transportation data from RTC.
Evaluate current conditions at five existing schools – one in each local jurisdiction.
Share findings and data with the SNRPC Regional Schools Policy Plan Working
Group.
Recommend policy changes to identify school site locations with improved
circulation and access.
Recommend off-street and on-street improvements that will improve access at
future school facilities.
Develop regional policies for school site identification to promote multimodal
transportation options to future students.
Final report and presentation to SNRPC Board.
The work will be prepared by a project consultant under the direction of RTC staff.
Participating Agencies:
Clark County School District, Southern Nevada Health District, City of North Las
Vegas, City of Henderson, City of Las Vegas, Clark County, City of Boulder City,
Regional Transportation Commission of Southern Nevada (Lead Agency), Southern
Nevada Regional Planning Coalition
FY2016 Unified Planning Work Program Page 67
Budget:
Sub Task 301-1720-16 FY 2016 Budget
Total Project Cost $16,000
Professional Services Contract
Carryover $15,000
RTC Cost $1,000
Funding Sources
Consolidated Planning Grant (95%) $15,200
Local Match (5%) $800
Total FY16 Project Budget $16,000
Schedule and Deliverables:
Evaluation report of existing conditions and recommended changes/modifications to
existing school policies in local, county and regional comprehensive plans as it
relates to identification of school sites and multi-modal transportation options.
Final report including regional policies on multi-modal transportation options,
accessibility and streetscape design to provide guidance for school site selection.
Final report including recommended improvements for increased multi-modal
access at future school sites.
Completion Date: Fall of 2015
FY2016 Unified Planning Work Program Page 68
Sub Task: 301-9010-16 – Spencer Greenway Transportation Trail and UNLV Campus Bike
Plan
Purpose: There has been a significant need, which was identified in the Southern Nevada
Strong Regional Plan, to promote multi-modal access between Downtown Las Vegas and the
University of Nevada Las Vegas (UNLV) campus. This project will review the existing Spencer
corridor and associated routes for impediments and barriers to an alt-mode trail between
Downtown Las Vegas and UNLV.
Previous Work:
RTC Regional Transportation Plan for FY 2009–2030, RTC Non-Motorized Alternative
Transportation Mode Master Plan, RTC Bicycle and Pedestrian Plan, Regional Bicycle
and Pedestrian Counts Study, Maryland Parkway Alternatives Analysis, Sahara
Avenue Corridor/Bus Rapid Transit Study, East Charleston Boulevard Corridor &
Parking Study, Regional Bicycle Network Gap Analysis, UNLV Multimodal Transit Hub
Feasibility Study
Methodology:
Create a study working group with area stakeholders to determine important goals
and objectives.
Collect data on existing and proposed multi-use trails plans, bicycle plans, and transit
routes in the region.
Review existing ownership, right-of-way and easements along the Spencer alignment
between Charleston Avenue and Katie Avenue.
Conduct outreach event(s) within the regions to gather ideas from the public for
potential improvements related to the trail and greenway.
Based on research and existing conditions, develop alignment alternatives for the
multi-use trail improvements.
Develop concepts and alternatives for a greenway that would enhance the existing
Spencer NVE corridor.
Identify possible funding sources to supplement existing local funds for both the
development and maintenance of identified facilities.
Develop draft and final reports.
Present the findings to the RTC and local jurisdictions.
Participating Agencies:
City of Las Vegas (Lead Agency), Clark County, Clark County School District, University
of Nevada Las Vegas, Regional Transportation Commission of Southern Nevada
FY2016 Unified Planning Work Program Page 69
Budget:
Sub Task 301-9010-16 FY 2016 Budget
Total Project Cost $155,000
Professional Services Contract $150,000
RTC Cost $5,000
Funding Sources
Consolidated Planning Grant (95%) $147,250
Local Match (5%) $7,750
Total FY16 Project Budget $155,000
Schedule and Deliverables:
Draft and final report that details multiple options for development of a greenway
along the Spencer Utility Corridor
Draft and final UNLV Campus Bike Plan
Presentations to the RTC board and local jurisdictions
Completion Date: June 30, 2016
FY2016 Unified Planning Work Program Page 70
Sub Task 301-9015-16: City of Henderson ADA Transition Plan
Purpose: The purpose of the City of Henderson ADA Transition Plan is to update and/or
create a new plan to include the necessary assessment of public rights-of-way. Once the
Public Rights-of-Way Accessibility Guidelines (PROWAG) are adopted by the Department of
Justice, they will become enforceable standards under Title II of the ADA. The City of
Henderson wants to take a proactive approach in understanding creating a sensible ADA
Transition Plan that incorporates PROWAG.
Previous Work: ADA Working Group.
Methodology: Phase I, identify the disabilities of the general population of Clark County
Nevada that affect mobility and public right of way use. Based on impact to the user and
percentage of the population affected create a matrix of type of facility and priority for
modifications. For example, are ambulatory ability or visual acuity disabilities more
prevalent thus prioritizing projects like audible crossing equipment at signals VS. rebuilding
curb ramps.
Phase II, prepare a sample transition plan for 3 or 4 representative areas on arterials and
collectors. For Example the Downtown Water Street corridor, Nevada State College area,
Stephanie Street near the Galleria Mall and 1 TBD.
The work will be completed by a consultant with oversight from the RTC and City of
Henderson.
Participating Agencies: City of Henderson and Regional Transportation Commission of
Southern Nevada
Budget:
Sub Task 301-9015-16 FY 2016 Budget
Total Project Cost $80,000
Professional Services Contract $75,000
RTC Cost $5,000
Funding Sources
Consolidated Planning Grant (95%) $76,000
Local Match (5%) $4,000
Total FY16 Project Budget $80,000
FY2016 Unified Planning Work Program Page 71
Sub Task 301-9015-16 FY 2017 Budget
Total Project Cost $80,000
Professional Services Contract $75,000
RTC Cost $5,000
Funding Sources
Consolidated Planning Grant (95%) $76,000
Local Match (5%) $4,000
Total FY17 Project Budget $80,000
Schedule and Deliverables: The study should help the City Henderson in understanding the
disabilities of the general population in Clark County, the items within Public Right of Way
that impact them, and prioritization of the types of improvements. The study is expected to
be completed within 1 year of kick-off.
FY2016 Unified Planning Work Program Page 72
Sub Task 301-9020-16: Clark County Regional Parking Study – Phase 2
Purpose: Phase two will identify what specific changes need to be made to the County’s
parking regulations in Title 30 to bring parking policies in line with the smart growth and
sustainable development policies and goals in the County’s Comprehensive Plan and the
Regional Transportation Commission’s (RTC) Regional Transportation Plan (RTP).
Previous Work: Phase one of the Clark County Regional Parking Study examined parking
supply and demand, through field surveys, for certain nonresidential land use categories in
selected urban towns of unincorporated Clark County, Nevada. The objective of the study
was to evaluate how closely the County’s parking regulations match actual parking demand.
Results of the study indicate that parking demand is lower than the minimum parking
requirements in all of the nonresidential land use categories except for places of worship.
Therefore, a change in the parking regulations is necessary to bring parking policies in line
with the smart growth and sustainable development policies and goals in the County’s
Comprehensive Plan and the RTP.
Methodology:
Task 1: Utilize results from Phase one of the study to generate proposed changes to
Clark County parking regulations.
Task 2: Utilize results from Phase one of the study and industry best practices to
generate proposed design changes to parking and locations.
Task 3: Create a draft of proposed changes to the parking standards.
Task 4: Form a working group with industry stakeholders to evaluate and provide
input on proposed changes to parking standards.
Task 5: Hold public open houses to provide information to the public and solicit input
on proposed changes to parking standards.
Task 6: Incorporate changes from industry stakeholders and public into proposed
parking standards.
Task 7: Present proposed changes to Clark County parking standards to the Clark
County Board of County Commissioners.
Task 8: Incorporate changes from Clark County Board of County Commissioners into
final changes for parking standards.
Task 9: Present final parking ordinance to the Clark County Board of County
Commissioners for adoption, and present final draft to the Regional Transportation
Board.
Participating Agencies:
Clark County and the RTC of Southern Nevada
FY2016 Unified Planning Work Program Page 73
Budget:
Sub Task 301-9020-16 FY 2016 Budget
Total Project Cost $105,000
Professional Services Contract $100,000
RTC Cost $5,000
Funding Sources
Consolidated Planning Grant (95%) $99,750
Local Match (5%) $5,250
Total FY16 Project Budget $105,000
Sub Task 301-9020-17 FY 2017 Budget
Total Project Cost $105,000
Professional Services Contract $100,000
RTC Cost $5,000
Funding Sources
Consolidated Planning Grant (95%) $99,750
Local Match (5%) $5,250
Total FY17 Project Budget $105,000
Schedule and Deliverables:
Final ordinance with new parking design standards and new parking standards for
Title 30.
Draft and final report
The study is expected to be completed by June 30, 2017.
FY2016 Unified Planning Work Program Page 74
Sub Task 301-9025-16: Complete Streets in Non-Urban Areas
Purpose: The purpose of the study is to determine the various types and locations of multi-
modal facilities in the public right-of-way that will provide alternative modes of transportation
within the rural residential neighborhood bounded by the CC-215 Beltway to the north and
west, Lone Mountain Road to the south and Durango Drive on the east. The County is also
concerned with identifying safety improvements as a component to the design options and
in general with respect to the overall needs of the RNP area.
Previous Work:
Clark County Minimum Design Standards for Non-Urban Roadways (2000)
Clark County Transportation Element (2008)
Clark County Trails Program/SNRPC Trail Program
RTC Regional Transportation Plan 2013-2035 (2012)
RTC Complete Streets Design Guidelines for Livable Communities (2013)
Methodology:
Research existing studies, land use plans, design standards for non-urban roadways,
existing and proposed development-related documentation, and future
transportation plans/projects for the area. Identify and evaluate roadways by width
(60’, 80’, 100’).
Identify existing and future roadway traffic volumes and project growth trends along
east-west corridors of Lone Mountain Road, Ann Road, Centennial Parkway; and
north-south corridors of Hualapai Way, Fort Apache Rd and Durango Drive. Include in
the projections the completion of bridge projects along CC-215.
Monitor and evaluate current pedestrian, bicycle and equestrian volumes. Conduct
counts where data does not exist. Identify opportunities for safety improvements for
all roadway users.
Identify all impacts to users as a result of non-urban design standards, including
roadway and shoulder maintenance, drainage, intersection safety and mobility
including lighting.
Conduct interviews with key staff from Clark County Departments impacted including
Comprehensive Planning, Public Works, Commission District Liaison and Town Board
members.
Solicit public participation and input on study utilizing methods including but not
limited to a Town Board presentation, community and business outreach meetings,
social media, and online surveys featuring visual preference selection of any
proposed design standard alternatives.
Participating Agencies: Clark County and the Regional Transportation Commission of
Southern Nevada
FY2016 Unified Planning Work Program Page 75
Budget:
Sub Task 301-9025-16 FY 2016 Budget
Total Project Cost $80,000
Professional Services Contract $75,000
RTC Cost $5,000
Funding Sources
Consolidated Planning Grant (95%) $76,000
Local Match (5%) $4,000
Total FY16 Project Budget $80,000
Schedule and Deliverables:
Prepare Draft study and evaluation plan presented to Clark County before proceeding
with study.
Prepare Final Draft Plan for feedback and comments.
Technical memorandum summarizing each task.
Public memorandum summarizing public outreach.
Draft and Final document.
Compete the study by December 2016
FY2016 Unified Planning Work Program Page 76
Sub Task 301-9030-16: Evaluate Northeast Valley Transportation Network Study
Purpose: The Northeast region of the Las Vegas valley is poised to develop large amounts of
warehouse and industrial park projects. The Apex Industrial Park, the Speedway industrial
area, the auto auction properties, and Nellis AFB growth will contribute to the increase in
road congestion. These changes will have a cumulative impact on the existing
transportation network. In anticipation of further growth, a study to evaluate and program
future transportation projects in the Northeast region is warranted.
This study will evaluate current conditions of the transportation network and model what the
network looks like when the industrial develops are completed. The baseline would utilize
data collected from relevant RTC transportation data, and local agency comprehensive
plans. The results of the analysis will provide recommended regional policies to better
identify future road projects.
Previous Work:
Southern Nevada Regional Planning Coalition (SNRPC) – Regional Policy Plan
City of North Las Vegas Comprehensive Master Plan
City of Las Vegas Comprehensive Plan
City of Henderson Comprehensive Plan
City of Boulder City Comprehensive Plan
Clark County Comprehensive Plan
Methodology:
Review and evaluate existing policies included in municipal, county and regional
comprehensive plans
Review and analyze relevant transportation data from RTC
Evaluate current conditions along current high traffic areas
Share findings and data with the SNRPC Regional Transportation Working Group
Recommend policy changes to identify improved circulation
Develop regional policies and project to meets the needs of future growth
Final report and presentation to SNRPC Board
Participating Agencies:
City of North Las Vegas
City of Las Vegas
Clark County
Regional Transportation Commission of Southern Nevada
Southern Nevada Regional Planning Coalition
FY2016 Unified Planning Work Program Page 77
Budget:
Sub Task 101-1500-16 FY 2016 Budget
Total Project Cost $105,000
Professional Services Contract $100,000
RTC Cost $5,000
Funding Sources
Consolidated Planning Grant (95%) $99,750
Local Match (5%) $5,250
Total FY16 Project Budget $105,000
Sub Task 101-1500-17 FY 2017 Budget
Total Project Cost $105,000
Professional Services Contract $100,000
RTC Cost $5,000
Funding Sources
Consolidated Planning Grant (95%) $99,750
Local Match (5%) $5,250
Total FY17 Project Budget $105,000
Schedule and Deliverables:
Evaluation report of existing conditions and recommended changes/modifications to
existing transportation network.
Final report including regional policies on transportation options.
Final report including recommended improvements for increased capacity.
Completion expected by June 30, 2017
FY2016 Unified Planning Work Program Page 78
Sub Task 301-9035-16: TOD Program Development
Purpose: Consultant to provide a national review of TOD incentive programs and develop a
tool to estimate increased transit ridership resulting from increased densities around transit
stations. The project included outreach to private developers and local financial lenders.
The study is in line with the goals and objectives of the Southern Nevada Strong (SNS)
Regional Plan to develop long-term economic success and stronger communities by
integrating reliable transportation, quality housing, and job opportunities
Previous Work: Southern Nevada Strong (SNS) Regional Plan
Methodology:
Task 1: Project Management
Consultant will communicate regularly with the RTC Project Manager and conduct monthly
project management functions to ensure the project progresses according to schedule,
within budget, and that deliverables meet the quality standards expected by the RTC and its
partners. These functions include coordination with internal consultant staff, RTC and
participating agency staff, as well as monthly accounting and invoicing.
Task 2: Community and Stakeholder Involvement
The findings of this study will largely be utilized by the RTC to assess the feasibility of a TOD
subsidy program. The TOD program will likely be both funded and operated by the RTC.
Therefore, outreach to national organizations and other agencies that operate TOD incentive
programs should be emphasized.
Coordination with local agencies with experience in redevelopment planning and zoning
issues will be important to ensure local factors are represented in the study methodology
and final TOD incentive tool.
While SNS identified the challenges to implementing TOD locally and the need to provide
subsidies, further outreach to the development community and local finance institutions is
essential. It is envisioned that this outreach will occur toward the end of the study to allow
for a preview of the software tool developed while also allowing for feedback to be
incorporated into the final study.
The following meetings and outreach activities are anticipated:
Kick-off meeting with RTC and local stakeholders to preview the upcoming study
methodology, and solicit feedback on any potential considerations.
In addition to coordination with peer MPOs and agencies that implement TOD
programs, up to 4 peer exchange meetings will occur to ensure industry best
practices are implemented. These meetings may use technology to enable virtual
meetings.
FY2016 Unified Planning Work Program Page 79
Up to 2 meetings with the developer community toward the end of the study to
explain the purpose of the study, review methodology, and preview the tool
developed to determine the potential project-level subsidy. These may be one-on-one
meetings.
Up to 2 meetings with local financial lenders toward the end of the study to explain
the purpose of the study, review methodology, and preview the tool developed to
determine the potential project-level subsidy. These may be one-on-one meetings.
Up to 1 presentation to the RTC Metropolitan Subcommittee (MPS) will be made
towards the end of the study.
Up to 1 presentation to the RTC Board of Commissioners will be made towards the
end of the study.
o One-on-one briefings with members of the RTC Board of Commissioners will
be conducted as necessary throughout the project.
Outreach meetings to the general public are not anticipated to be scheduled.
Task 3: National Best Practices Review of TOD Programs
Conduct a national search of exemplary TOD program findings, practices, policies,
processes, standards and incentives. This review will help the RTC understand industry best
practices. Preliminary identification of funding sources for TOD activities will be included,
with special attention on direct financial participation (bonds, loans, grants). The aim of this
review is to find an existing TOD program(s) to utilize as a model for a potential RTC TOD
Program. It is anticipated that any existing program will be adjusted to fit local context.
This review can include the up to 4 peer exchange meetings with other agencies
implementing TOD programs.
Task 4: TOD Incentive Development
The RTC has preliminary identified the Portland, Oregon MPO’s TOD program (Attachment
#2) as a transferrable model to potentially implement in Southern Nevada. The program is
based on an understanding that TOD transit ridership is influenced primarily by density and
proximity to high quality transit – with the program’s focus on how to incentivize density.
Portland TOD projects that receive public funding must have two attributes:
Cost premiums associated with building more densely than the base case
(structured parking, firewall separations, elevators, wider footings); and
Increased transit ridership resulting from more density compared to the baseline
development pattern.
FY2016 Unified Planning Work Program Page 80
This study seeks to develop a methodology and tool to determine the “transit ridership
delta” in Southern Nevada, and its resulting farebox revenue benefit to the RTC over 30-
years.
The RTC currently does not have the ability to quantify the number of potential transit
trips generated from residential and mix-use. Quantifying transit demand is currently
limited to region-wide survey estimates provided by the U.S. Census Bureau’s ACS, which
only includes commute trips, and the RTC Travel Demand Model, which is a regional
estimate of transit trips based on a Household Travel Survey. Further, data on transit
boarding’s and aligning’s does not identify the trip origin or destination, and surveys of
passengers on transit vehicles do not capture all transit users from a specific
development.
TOD is a scalable concept, meaning the methodology and software tool created for this
study to determine TOD subsidies should be dynamic and able to respond to different
proposed densities and varying transit environments (e.g. transit headways and transit
technology – Streetcar, BRT, LRT, and Commuter Rail).
Participating Agencies:
Regional Transportation Commission of Southern Nevada (Project Manager)
Project Consultant
Budget:
Sub Task 301-9035-16 FY 2016 Budget
Total Project Cost $155,000
Professional Services Contract $150,000
RTC Cost $5,000
Funding Sources
Consolidated Planning Grant (95%) $147,250
Local Match (5%) $7,750
Total FY16 Project Budget $155,000
Schedule and Deliverables:
Monthly progress report and invoice
Meeting agendas, presentations and summaries of all meetings with external
stakeholders.
White Paper: National Scan of MPO TOD Programs;
o Implementation recommendations to the RTC.
Technical Memo: Methodology used to develop TOD software tool.
FY2016 Unified Planning Work Program Page 81
Software Tool: MS Excel or MS Access (or similar) to dynamically calculate the public
subsidy to incentivize dense, mixed-use private development projects.
Completion date: June 30, 2016
FY2016 Unified Planning Work Program Page 82
Sub Task 301-9040-16: Truck Arterial Route Study
Purpose: The purpose of this study is to conduct an assessment of safety, operational,
capacity, geometric, and weight requirements of the defined arterial truck routes, and
recommend improvements to ensure they meet minimum requirements to support freight
movement needs.
Previous Work:
Regional Goods Corridor Master Plan, I-11 & Intermountain West Corridor Study,
NDOT Freight Plan (under development), Boulder Highway Bypass Study, Las Vegas
Region Freight Data Study, I-15 Freight Transportation Corridor Study, Analysis of
Alternatives for Accommodating Trucks on Southern Nevada Urban Freeways, Las
Vegas Valley Arterial Development Study
Methodology:
Review and utilize the outcomes from Regional Goods Movement Corridor Plan to
select corridors or bottle necks identified by the plan for further study and perform
the following tasks.
Review and coordinate with the State Freight Plan and other related studies.
Identify additional stakeholders that can be invited to participate in the TAC
chartered for the Regional Goods Movement Corridor Master Plan. Meet with the
TAC at key intervals in the study, and conduct individual interviews as needed.
From crash data, truck volume data and other sources, conduct a safety
assessment, including safety incidents at highway-rail crossings.
Conduct turning movement counts at key intersections identified in the Regional
Goods Movement Corridor Plan, NDOT truck counts, model outputs, observations
from the other data collection tasks, and other available sources.
Identify geometric and operational constraints for truck movements.
Identify other obstacles to truck movements and safety on arterial truck corridors.
Recommend specific improvement and mitigation strategies for improving safety,
operational, capacity, and geometric constraints. Recommend specific wayfinding
and informational signage along defined arterial truck routes to notify all users of
the road that these corridors may experience a larger share of freight traffic than
other corridors.
Develop short and long-term improvement plans for and to preserve oversized
vehicle corridors, defining roadway design standards to accommodate necessary
height and width requirements.
Develop implementation plan, including identification of potential funding and
revenue sources.
FY2016 Unified Planning Work Program Page 83
Develop an implementation plan that includes cost estimates for the recommended
improvement strategies, and prioritizes them according to a set of criteria supported
by the TAC.
Develop an annual truck spot improvement program to quickly address restrictive
conditions that may exist on major freight corridors.
The project will be completed by a project consultant under the direction of RTC
staff.
Participating Agencies:
Clark County, City of Las Vegas, City of North Las Vegas, City of Henderson, City of
Boulder City, Clark County Department of Air Quality, Nevada Department of
Transportation, Regional Transportation Commission of Southern Nevada (Lead
Agency)
Budget:
Sub Task 301-9040-16 FY 2016 Budget
Total Project Cost $155,000
Professional Services Contract $150,000
RTC Cost $5,000
Funding Sources
Consolidated Planning Grant (95%) $147,250
Local Match (5%) $7,750
Total FY16 Project Budget $155,000
Schedule and Deliverables:
Final Report with recommended improvement strategies for selected corridoes and
sites
Completion Date: June 30, 2016
FY2016 Unified Planning Work Program Page 84
Task 302, Intelligent Transportation Systems Planning
The RTC, though it’s Freeway and Arterial System of Transportation (FAST) unit has played a major role in the
development of ITS systems in the region. The MPO has provided support to these activities by funding capital
investments in the RTP and TIPs.
The further development of the FAST system is also supported by the inclusion of ITS-related planning activities
in the UPWP.
Activities comprise an investigation of how best to update signal timing strategies to respond to changing
patterns of traffic.
This activity requires extensive professional support from outside consultancies. The costs of professional
services contracts are included under Task 302.
Task 302 includes the RTC costs associated with the procurement of professional services contracts and their
administrative and financial oversight.
Specific sub-tasks are:
302-7206, Traffic Signal Timing Strategies in Las Vegas
Task 302, 2016 Budget
The following costs are included under Task 302:
FY 2016 RTC costs: $ 3,000
Professional Services Costs:
Work carried over from 2015 $ 150,000
Combined costs: $ 153,000
The source of funds for Task 201 is:
Consolidated Planning Grant: $ 143,925
Local funds (5% match) $ 7,575
FY2016 Unified Planning Work Program Page 85
Sub Task 302-7206-16: Traffic Signal Timing Strategies in Las Vegas
Purpose: Conduct state of the art review of existing methods and measures of traffic signal
timing strategies on arterial roadways. Identify these various strategies with costs and
guidelines.
Previous Work:
Traffic Management Center, Intelligent Transportation Systems (ITS) Regional
Architecture
Task Elements:
Task 1 – Meet with FAST and local agencies to obtain feedback on existing
conditions and problem areas.
Task 2 – Contact other traffic management agencies to analyze their approach to
similar problems and issues. Conduct a literature review of traffic signal timing
strategies.
Task 3 – Analyze and evaluate two existing 5-mile corridors. Analyze and evaluate
ten existing intersections.
Task 4 – Recommend strategies of mitigating identified problems and issues.
Identify all capital, operations, and maintenance costs for all technologies and
strategies identified.
Task 5 – Develop a plan document and associated presentations.
Work will be completed by a project consultant with oversight by RTC staff.
Participating Agencies:
Freeway and Arterial System of Transportation (Lead Agency), Regional
Transportation Commission of Southern Nevada, City of Las Vegas, City of
Henderson, City of North Las Vegas, Clark County
Budget:
Sub Task 302-7206-16 FY 2016 Budget
Total Project Cost $151,500
Professional Services Contract (carried
over from 2015) $150,000
RTC Cost $1,500
Funding Sources
Consolidated Planning Grant (95%) $143,925
Local Match (5%) $7,575
Total FY16 Project Budget $151,500
FY2016 Unified Planning Work Program Page 86
Schedule and Deliverables:
Stakeholder agreement on the plan document, including an implementation strategy,
guidelines, budget, and timeline.
Final plan document and any presentations associated with the study.
Completion Date: June 30, 2016
FY2016 Unified Planning Work Program Page 87
NON-UPWP PLANNING STUDY
Sponsoring Agency: Southern Nevada Health District
Title: Regional Bicycle and Pedestrian Plan for Southern Nevada
Objective:
The RTC will update and revise the Regional Bicycle and Pedestrian Plan. A consultant will
be hired to work with RTC staff and oversee stakeholder engagement, identify best
practices, incorporate findings from complimentary reports from Southern Nevada, perform
analysis, develop the plan, and garner support for final adoption. The updated plan will be
included as an appendix to the Regional Transportation Plan (RTP) and will help the RTC
identify and prioritize funding for bicycle and pedestrian infrastructure and could
influence road design and construction to accommodate such facilities in the future. The
Regional Bicycle and Pedestrian Plan will address how Southern Nevada measures
performance for bicycling and walking in accordance with federal mandates. The updated
plan will support the inclusion of elements that meet the RTC’s Complete Streets Policy and
will help determine project prioritization for regional funding programs.
Previous Related Work:
Bicycle and Pedestrian Plan (2008)
Task Elements:
Solicit a Request for Proposal (RFP) and finalize a contract with a consultant to work
with RTC staff and facilitate revision of the Regional Bicycle and Pedestrian Plan.
Prepare Existing Conditions/Data Report to gather and synthesize existing data,
studies, reports, and policies including existing bicycle and pedestrian data, recent
RTC studies, local and regional plans, and recommendations from local jurisdictions
and other stakeholders. Compile recommendations that will be used to inform plan
revisions.
Convene an advisory committee of key stakeholders to help inform and guide plan
development. The advisory committee will meet at least quarterly until the revised
plan is adopted. Prepare and distribute advisory committee minutes.
Attend required meetings and maintain involvement in related coalitions, safety task
forces, and work groups including Partners for a Healthy Nevada coalition.
Develop a Stakeholders Participation Plan to document public and agency
involvement and to identify outreach strategies (project website, public surveys,
stakeholder interviews, etc.) to share plan development updates.
FY2016 Unified Planning Work Program Page 88
Expected Products:
A Regional Bicycle and Pedestrian Plan for Southern Nevada that encourages and prioritizes
future investments in bicycle and pedestrian infrastructure and influences road design and
construction to accommodate bicycle and pedestrian facilities.
Completion Date: June 2016
Financial Responsibility: Southern Nevada Health District
Functional Responsibility: Regional Transportation Commission of Southern Nevada
Participating Agencies: Regional Transportation Commission of Southern Nevada
Financial Data: $100,000 (Federal Partnership to Improve Community Health Grant)
FY2016 Unified Planning Work Program Page 89
Appendix 1
Southern Nevada Regional Planning Prospectus
The purpose of this Prospectus is to outline the roles and responsibilities of the Nevada
Department of Transportation (NDOT) and the Regional Transportation Commission of
Southern Nevada (RTCSNV), as required by 23 CFR Section 450.314. The Prospectus
was first incorporated into the Unified Planning Work Program (UPWP) in Fiscal Year 2014.
I. General Roles & Responsibilities
RTCSNV will perform the transportation planning process for the Southern Nevada
Metropolitan Planning Area (the region) and develop procedures to coordinate
transportation planning activities in accordance with applicable federal regulations
and guidance. The region is defined as the County of Clark in the State of Nevada and
includes the incorporated cities of Boulder City, Henderson, Las Vegas, Mesquite, and North
Las Vegas as well as unincorporated areas of the County.
The transportation process will, at a minimum, consist of:
A. Development of an annual Unified Planning Work Program (UPWP) that lists and
describes all transportation planning studies and tasks to be completed during the
year.
B. Development and update of a long-range, multimodal metropolitan transportation
plan, known as the Regional Transportation Plan (RTP).
C. Development and maintenance of a short-range regional transportation improvement
program (TIP).
D. Financial planning to ensure plans and programs are fiscally constrained within
anticipated funding levels.
E. Development of planning studies and system performance monitoring, including
highway corridor and intersection studies, transit system studies, application of
advanced computer techniques, and transportation data collection and archiving.
F. Public outreach to the community throughout the transportation planning process,
including the electronic dissemination of reports and supporting information on the
RTCSNV website, and consideration of public comments. Public outreach activities
should take into account the needs of persons with limited proficiency in English.
G. Ensuring low income or minority populations, including the elderly and persons with
disabilities, are not significantly or disproportionately impacted.
H. Development and implementation of a Congestion Management Process (CMP) as
appropriate.
I. Ensuring plans, projects, and programs are consistent with, and conform to, air
quality goals for reducing transportation-related emissions and attaining National
Ambient Air Quality Standards.
FY2016 Unified Planning Work Program Page 90
II. The Regional Transportation Plan (RTP)
The RTP will be prepared and compiled through a cooperative process between federal
agencies, the Nevada Department of Transportation , RTCSNV (including
RTCSNV in its capacity as the provider of public transportation), the Clark County
Department of Air Quality (acting under delegated authority as the Air Agency for Southern
Nevada), and the local city and county governments in the region.
Responsibilities of the Regional Transportation Commission
A. The RTCSNV will be responsible for preparing and developing the Regional
Transportation Plan (20-25 year time frame). The RTP will be converted into a
format that will allow it to be downloaded from the internet.
B. The RTCSNV may develop an executive summary report for the region that
includes the key issues facing the area and identifies high priority programs and
projects.
C. The RTCSNV will provide opportunities for the public and other interested parties to
provide input during the development of the Regional Transportation Plan, in
accordance with the Public Participation Plan. The draft of each update to the RTP
will be made available for public and agency review and comment. Prior to taking
formal action on the Plan or Plan update, the RTCSNV Board will be informed of the
extent and nature of comments received and the response to such comments.
D. The RTCSNV will develop and keep up-to-date a list of those roadways and transit
facilities deemed to be ‘regionally significant’ in accordance 23 CFR 450.322.
E. The RTCSNV will, in cooperation with NDOT, develop estimates of future inflation to
be used to convert project costs and revenues to a ‘year of expenditure’ basis.
F. The RTCSNV will coordinate with the Clark County Department of Air Quality to assess
air quality impacts and conduct the regional emissions assessment of the RTP.
G. The RTCSNV, acting as the transit agency for the region, will ensure the RTP includes
information on local bus capital projects that are consistent with the transit capital
program. The RTP will also identify future bus needs and services, including new
routes, service expansion, vehicle needs, and operating financial needs.
Responsibilities of the Nevada Department of Transportation
H. The Nevada Department of Transportation (NDOT) will provide the following
information and data in support of developing the RTP:
1. An estimate of federal funds expected to be available over the 20-25 year
time frame of the plan for highway and transit programs. This estimate of
funds will be provided at a time mutually agreed upon by the RTCSNV and
NDOT so that the fiscal limits of the RTP can be determined before project
prioritization begins.
FY2016 Unified Planning Work Program Page 91
2. A list of projects in Southern Nevada, developed in cooperation with the
RTCSNV, to be undertaken by NDOT over the 20-25 year time frame of the Plan
using federal program funds reserved in the State of Nevada for use
anywhere in the state. The state’s regionally significant project list will be
provided at a time mutually agreed upon by the RTCSNV and NDOT so that air
quality conformity analysis can be performed at the appropriate time in the
course of RTP development.
3. A list of projects in Southern Nevada for which funds have been earmarked or
otherwise designated in federal transportation legislation.
4. An estimate of state funds expected to be expended on transportation
projects in the region over the 20-25 year time frame of the Plan. In the
interests of public information and to assist the RTCSNV in demonstrating
the fiscal feasibility of the Plan, NDOT will also provide information as to
how these expenditures relate to the state transportation revenues
available after allowing for the cost of maintenance, operations, debt
service, administration, and other draws on these fund sources.
5. Traffic count data and other performance indicators for state roads in the
region.
I. For those federal program funds intended to be distributed between various entities
or regions within the state, NDOT will either provide the basis for the allocation
between areas as defined by law, or will work cooperatively with the RTCSNV and
other jurisdictions to establish mutually agreed formulae for the allocation between
areas of such funds for forecasting and financial planning purposes.
NDOT will provide information on projects to be undertaken in Southern Nevada using
transit or other federal program funds allocated to non-urbanized areas of the state, and will
consult with the RTCSNV for selecting such projects.
III. Transportation Improvement Program (TIP)
The TIP will be prepared and compiled through a cooperative process between federal
agencies, NDOT, the RTCSNV (including the RTCSNV in its capacity as the
provider of public transportation), and the local city and county governments in the region.
Responsibilities of the Regional Transportation Commission
A. The RTCSNV will be responsible for preparing and developing the Transportation
Improvement Program (4-year time frame) for the region. The TIP will be converted
into a format that will allow it to be downloaded from the internet. The RTCSNV
will maintain the TIP by tracking changes to projects (schedule, scope, and cost)
made through the amendment and administrative action processes.
B. The RTCSNV, in consultation with NDOT and local city and county governments, shall
develop the list of locally-sponsored transportation projects to be included in the TIP.
FY2016 Unified Planning Work Program Page 92
1. In the case of the Congestion Mitigation and Air Quality Program (CMAQ) (or any
successor funding program of similar intent), the RTCSNV shall also consult
with the Clark County Department of Air Quality in the development of the list of
projects to be included in the TIP.
2. In the case of the Transportation Alternatives Program (or any successor
funding program of similar intent), the RTCSNV shall also consult with all
eligible project sponsors in the development of the list of projects to be
included in the TIP.
C. The RTCSNV, as the provider of public transportation services, shall develop the list of
transit projects to be included in the TIP.
1. In the Southern Nevada urbanized area, the RTCSNV shall consult with not-for-
profit agencies and other providers of specialized transportation and human
services, in accordance with the Coordinated Public Transit-Human Services
Plan.
2. For Southern Nevada non-urbanized area transit programs, the RTCSNV shall
consult with NDOT and other providers of transportation services to the non-
urbanized parts of the region.
D. The RTCSNV shall develop a comprehensive list of projects for all projects in the TIP.
In order to illustrate the entire scope of the project to the policy board and the
general public, the project list will contain detailed project descriptions,
estimated total project costs at completion, and complete project schedule by
phases.
E. The RTCSNV will develop an estimate of anticipated local funds to be expended on
transit projects identified in the TIP. In the interests of public information and to
assist in demonstrating the fiscal feasibility of the TIP, the RTCSNV will also
document how these expenditures relate to the local revenues available for
transit after allowing for the cost of maintenance, operations, debt service,
administration, and other draws on these fund sources.
F. The RTCSNV will provide information on proposed TIP amendments and
administrative modifications relating to projects sponsored by the RTCSNV or
local entities. Amendments and administrative modifications will include a
project description that provides sufficient detail to explain the proposed changes
to the RTCSNV Board, as well as a justification for the change.
Responsibilities of the Nevada Department of Transportation
G. NDOT will prepare an initial list of NDOT-sponsored projects to be included in each
new TIP. This list will be based on the current TIP and an assessment of which
projects will be obligated for funding before the end of the current federal fiscal year.
FY2016 Unified Planning Work Program Page 93
H. NDOT will provide information on proposed TIP amendments and modifications
relating to projects sponsored by NDOT. Amendments will include a project
description that provides sufficient detail to allow the proposed changes to be
explained to the RTCSNV Board, as well as a justification for the change.
I. NDOT will provide a list of projects to be undertaken on Native American tribal lands
under the Indian Reservation Roads (IRR) program within the Southern Nevada
region.
J. NDOT will provide a list of projects to be undertaken under the Federal Lands
Highways program within the Southern Nevada region.
K. NDOT will provide a list of projects obligated during the federal fiscal year at the
end of each program year. The annual list of obligated projects should include both
highway and transit projects and should identify the fund source and the amount
obligated in accordance with 23 CFR 450.332.
L. NDOT will provide annually, for each federal fund source, the revenues available
(including both unobligated funds carried forward from prior years and the amount
appropriated during the fiscal year), the total amount obligated, any other deductions
and the balance of funds remaining at the end of the fiscal year.
IV. Statewide Transportation Improvement Program (STIP)
A. NDOT will develop a four - year STIP including projects in each MPO and the rural
regions of the state, and will be responsible for securing the approval of the STIP by
the United States Department of Transportation.
B. The TIP, as developed by the RTCSNV, will be incorporated into the STIP
without change, directly or by reference.
C. NDOT, in consultation with the RTCSNV and the other MPOs in the state, shall
develop procedures for the modification and amendment of the STIP. NDOT
shall be responsible for notifying the RTCSNV of the effective date of
modifications and the approval date of amendments.
V. Public Transportation Planning
A. The RTCSNV, acting as the transit agency for the region, will ensure the RTP and TIP
include all transit projects (both capital and operating) that are funded by federal
program funds.
B. The RTCSNV will consult with NDOT to ensure that both the RTP and TIP include
information on transit projects in the non-urbanized parts of the region that are
funded by federal program funds.
FY2016 Unified Planning Work Program Page 94
C. The RTCSNV will include in the RTP information on the transit system and will outline
the objectives of the RTCSNV in respect to the various types and modes of public
transportation in the region.
D. As part of its outreach activities, the RTCSNV will provide opportunities for other
providers of public transportation, not-for-profits, and providers of specialized
transportation services to be involved in the development of the RTP and TIP. The
RTCSNV will also provide these firms and agencies with advice, information, and
consultation on transportation programs within the region.
VI. Air Quality Planning
A. The preparation of a new or revised RTP will be coordinated with the State Air Quality
Implementation Plan (SIP) and transportation demand management and
transportation system management (TDM/TSM) measures.
B. In accordance with the Clean Air Act and U.S. EPA conformity regulations (40 CFR,
Part 51), the RTCSNV, acting as the regional MPO, makes an air quality conformity
determination on any new or revised RTP prior to Plan approval. Any such new or
revised RTP is also provided to the FHWA and the FTA with a request that these
federal agencies approve the conformity finding.
VII. Public Participation Program
A. The RTCSNV will develop and maintain a Public Participation Plan that sets out the
procedures to include the public and interested parties in the development of the
Regional Transportation Plan, Transportation Improvement Program, and other
elements of the regional planning process, to seek public input and comment, and to
inform decision-makers of the extent and nature of comments received and response
to such comments.
B. The RTCSNV will annually review and evaluate its public participation program.
C. The RTCSNV will maintain a list of interested organizations and individuals who will
receive notices of MPO plans, programs, and projects.
D. The RTCSNV will work to ensure that low-income, minority, and transit
dependent areas are afforded an adequate opportunity to participate in the
transportation planning process, receive a fair share of the transportation
improvement benefits, and do not endure a disproportionate transportation
burden.
E. The RTCSNV will maintain its website to provide clear and concise information on the
regional transportation planning process and provide an opportunity for downloading
reports and documents. This will include developing project and study summaries,
FY2016 Unified Planning Work Program Page 95
converting reports into PDF or text format, and maintaining a list of available
documents. The website will provide links to other associated organizations and
agencies.
VIII. Fiscal/Financial Planning
A. NDOT will provide the RTCSNV with up-to-date fiscal and financial information and
projections on the statewide and regional transportation improvement programs to
the extent practicable.
B. This will include anticipated federal funding resources by federal aid category by
year for the four years covered by the TIP, and by five-year intervals for the 20-25
year time frame of the RTP for inclusion in the TIP and RTP financial charts.
C. For each federal program for which funds are sub-allocated to Southern Nevada,
NDOT will provide an annual statement identifying:
1. Unobligated funds brought forward from the previous year;
2. Funds appropriated during the year;
3. Fund obligated during the year and any adjustments thereto;
4. Unobligated fund balance.
D. For each federal transit program for which funds are allocated to the Las Vegas
Urbanized Area, the RTCSNV will provide an annual statement identifying:
1. Unobligated funds brought forward from the previous year;
2. Funds appropriated during the year;
3. Funds obligated during the year and any adjustments thereto;
4. Unobligated fund balance.
E. NDOT will notify the RTCSNV when the anticipated cost of a project, regardless of
funding category, has changed in accordance with the agreed upon TIP/STIP
amendment and administrative action process.
IX. Performance Measurement and the Management of Congestion
A. In developing the RTP and TIP, RTCSNV will incorporate the national goals,
measures, and standards of system performance established under the
provisions of MAP-21.
B. RTCSNV will coordinate with NDOT in the establishment of multimodal
transportation system performance targets for the region. These will
reflect national goals and standards as applied to the circumstances and
priorities of the region.
C. RTCSNV will cooperate with NDOT to collect data and conduct system
performance monitoring. RTCSNV will report on progress toward meeting
system performance targets as part of the biennial development of major
FY2016 Unified Planning Work Program Page 96
TIP updates, and will assist NDOT as needed in meeting state reporting
requirements under MAP-21.
D. To address the national goal of reducing congestion, RTCSNV will gather
and analyze data to define the extent and duration of congestion in the
region, to identify the causes of congestion, and to identify congestion
management strategies.
E. As part of the Congestion Management Process (CMP), the RTCSNV will
develop implementation activities in coordination with NDOT to address
congestion and other performance issues, and will include priority
projects in the RTP and TIP.
X. Intelligent Transportation Systems (ITS) Program
A. The Freeway and Arterial System of Transportation (FAST), a department of the
RTCSNV, coordinates the planning, development, and operation of the Southern
Nevada ITS program in cooperation with NDOT and local agencies.
B. NDOT will maintain the statewide ITS architecture and will work with FAST to
ensure consistency with the Regional ITS Architecture for the Southern Nevada
Metropolitan Planning Area.
C. NDOT, in cooperation with FAST, is responsible for identifying freeway ITS capital
projects and operating strategies for inclusion in the RTP and TIP.
D. Local agencies, in cooperation with FAST, are responsible for identifying arterial
roadway ITS capital projects and operating strategies for inclusion in the RTP and TIP.
Amendments to this Prospectus
This Statement defining t h e Southern Nevada Regional Transportation Planning Process
may be amended from time to time to coincide with development o f the annual UPWP
approval as jointly deemed necessary or in the best interests of all parties, including federal
transportation agencies.
Effective Date
This Statement will be effective after it has been endorsed by the RTCSNV as part of the
Fiscal Year 2014 UPWP, and as soon as that UPWP has been approved by NDOT and the
relevant federal transportation agencies.
No Limitation on Statutory Authority
Nothing contained in this Statement is intended to or shall limit the authority or
responsibilities assigned to signatory organizations under Nevada law, federal law, local
ordinance, or interlocal agreement.
FY2016 Unified Planning Work Program Page 97