UNECE-IRU eTIR Pilot Project · UNECE-IRU eTIR Pilot Project Geneva, June 2014 André Sceia –...

34
UNECE-IRU eTIR Pilot Project Geneva, June 2014 André Sceia UNECE Raphaël Hirt IRU

Transcript of UNECE-IRU eTIR Pilot Project · UNECE-IRU eTIR Pilot Project Geneva, June 2014 André Sceia –...

Page 1: UNECE-IRU eTIR Pilot Project · UNECE-IRU eTIR Pilot Project Geneva, June 2014 André Sceia – UNECE Raphaël Hirt – IRU

UNECE-IRU eTIR Pilot Project

Geneva, June 2014

André Sceia – UNECE

Raphaël Hirt – IRU

Page 2: UNECE-IRU eTIR Pilot Project · UNECE-IRU eTIR Pilot Project Geneva, June 2014 André Sceia – UNECE Raphaël Hirt – IRU

At its seventy-sixth session, the Inland Transport Committee (ITC)

urged TIR Contracting Parties to accelerate efforts to complete and

launch the eTIR Project (ECE/TRANS/240).

As a possible way forward, UNECE and IRU propose a joint pilot, which

makes use of the already computerized elements of the TIR system

(both at customs and the private sector), while, at the same time, fully

respecting the long term eTIR vision (ECE/TRANS/WP.30/2014/9 ).

Background

2

Page 3: UNECE-IRU eTIR Pilot Project · UNECE-IRU eTIR Pilot Project Geneva, June 2014 André Sceia – UNECE Raphaël Hirt – IRU

To conduct, in the short term, a paper-less TIR procedure between two

pilot countries, on the basis of investments already made and at

minimal costs.

To make the first (simplified but yet realistic) step towards the

implementation of a fully functional eTIR system, as described in the

eTIR Reference Model.

Pilot project objectives

3

Page 4: UNECE-IRU eTIR Pilot Project · UNECE-IRU eTIR Pilot Project Geneva, June 2014 André Sceia – UNECE Raphaël Hirt – IRU

Engagement of two TIR Contracting Parties, which dispose of a

computerized national customs system and which are already

connected to the Real-Time SafeTIR (RTS) and TIR Electronic Pre

Declaration (EPD) systems of IRU.

IRU central databases, used for RTS and EPD, will act as repositories

for the electronic exchange of TIR operation related data between

customs (C2C) and for the data on TIR guarantees.

Data will automatically be replicated in a UNECE managed database,

representing a minimalistic version of the future eTIR international

system.

Main concepts

4

Page 5: UNECE-IRU eTIR Pilot Project · UNECE-IRU eTIR Pilot Project Geneva, June 2014 André Sceia – UNECE Raphaël Hirt – IRU

eTIR pilot high-level architecture

5

TIR associations TIR associations TIR holders TIR holders

IRU

TIR holders TIR associations

TIR DB

InternalPortal

UNECE

ITDB TIR guarantee &

transport DB

Trusted DataExchange Web

Services

Customs Customs Customs

UNECEPortalWebServicese ITDB

Web Services

Page 6: UNECE-IRU eTIR Pilot Project · UNECE-IRU eTIR Pilot Project Geneva, June 2014 André Sceia – UNECE Raphaël Hirt – IRU

6

Pilot Progressive transition Full eTIR

Step 1 Step 2 Step 3 Step 4 Step 5 …

# of countries 2 2 2 2 2 P

rogre

ssiv

e g

eogra

phic

al e

xpansio

n

All

# of customs offices 4 All All All All All

# of operators 2 All All All All All

Max # of loading and

unloading

2 4 4 4 4 4 (maybe

more)

eTIR message

standard partial

partial

Use of any

declaration

mechanism

EPD only

EPD only

EPD only

Fully functional

eTIR international

system light

light

light

light

Schedule (months) 3 6 3 6 3

Transition towards the full eTIR

Page 7: UNECE-IRU eTIR Pilot Project · UNECE-IRU eTIR Pilot Project Geneva, June 2014 André Sceia – UNECE Raphaël Hirt – IRU

eTIR longer-term high-level architecture

Customs Customs Customs

UNECE

TIR associations TIR associations TIR holders TIR holders

IRU

TIR holders TIR associations

TIR DB

InternalPortal

DriverMobile PortalITDB

TIR guarantee &

transport DB

Trusted DataExchange Web

Services

UNECEPortalWebServicese

ITDB Web Services

7

Page 8: UNECE-IRU eTIR Pilot Project · UNECE-IRU eTIR Pilot Project Geneva, June 2014 André Sceia – UNECE Raphaël Hirt – IRU

8

THE LANDSCAPE

USERS APPLICATIONS

TIR

HOLDER

ASSOCIATION

CUSTOMS

NATIONAL

CUSTOMS

SYSTEM

C

IRU SYSTEM

CENTRAL

CUSTOMS

C

SYSTEMS

UNECE SYSTEM

UNECE

Portal

e

National Customs Application

8

ITDB

Page 9: UNECE-IRU eTIR Pilot Project · UNECE-IRU eTIR Pilot Project Geneva, June 2014 André Sceia – UNECE Raphaël Hirt – IRU

9

eTIR GUARANTEE ISSUANCE

9

Page 10: UNECE-IRU eTIR Pilot Project · UNECE-IRU eTIR Pilot Project Geneva, June 2014 André Sceia – UNECE Raphaël Hirt – IRU

10

John has just been requested

to perform a new hauling

service for one of his clients

Itinerary:

Starting in country A and

finishing in country B

TIR holder

B

A

Page 11: UNECE-IRU eTIR Pilot Project · UNECE-IRU eTIR Pilot Project Geneva, June 2014 André Sceia – UNECE Raphaël Hirt – IRU

11

But John has no TIR

electronic guarantee

available at the moment

So John decides to

order a new TIR

electronic guarantee

TIR holder

No eGuarantee

Available

Page 12: UNECE-IRU eTIR Pilot Project · UNECE-IRU eTIR Pilot Project Geneva, June 2014 André Sceia – UNECE Raphaël Hirt – IRU

Association

12

The association opens the order,

checks the detailed information about

John and issues to him a TIR

electronic guarantee

Page 13: UNECE-IRU eTIR Pilot Project · UNECE-IRU eTIR Pilot Project Geneva, June 2014 André Sceia – UNECE Raphaël Hirt – IRU

TIR holder

13

TIR guarantee data • TIR holder information

• TIR electronic guarantee

details (validity, status, etc.)

Activities Messages

John receives an issuance note

confirming the availability of his TIR

electronic guarantee

e ITDB

eGuarantee

issued

Page 14: UNECE-IRU eTIR Pilot Project · UNECE-IRU eTIR Pilot Project Geneva, June 2014 André Sceia – UNECE Raphaël Hirt – IRU

14

eTIR TRANSPORT

14

Page 15: UNECE-IRU eTIR Pilot Project · UNECE-IRU eTIR Pilot Project Geneva, June 2014 André Sceia – UNECE Raphaël Hirt – IRU

TIR holder

15

John is now ready to make his EPD

and will have to enter all countries

specific data

Page 16: UNECE-IRU eTIR Pilot Project · UNECE-IRU eTIR Pilot Project Geneva, June 2014 André Sceia – UNECE Raphaël Hirt – IRU

EPD notification

TIR holder

16

The IRU system will send John’s EPD to

the central customs of countries A and B.

Activities Messages

A

B

C

C

Page 17: UNECE-IRU eTIR Pilot Project · UNECE-IRU eTIR Pilot Project Geneva, June 2014 André Sceia – UNECE Raphaël Hirt – IRU

Customs reference

TIR holder

17

All central customs approve John’s EPD

(in their national customs systems). John

receives customs’ references and print his

TIR electronic guarantee ref.

number/barcode .

Activities Messages

A

B

C

C

Page 18: UNECE-IRU eTIR Pilot Project · UNECE-IRU eTIR Pilot Project Geneva, June 2014 André Sceia – UNECE Raphaël Hirt – IRU

TIR electronic guarantee reference (example)

eGuarantee reference XB43215678

X B 4 3 2 1 5 6 7 8

18

Page 19: UNECE-IRU eTIR Pilot Project · UNECE-IRU eTIR Pilot Project Geneva, June 2014 André Sceia – UNECE Raphaël Hirt – IRU

TIR holder

19

John’s truck

arrives at the

customs office of

departure (in

country A) and

he shows his

TIR electronic

guarantee ref.

number/barcode

B

A

Page 20: UNECE-IRU eTIR Pilot Project · UNECE-IRU eTIR Pilot Project Geneva, June 2014 André Sceia – UNECE Raphaël Hirt – IRU

Customs office of departure : Country A

20

The customs officer logs in to

his customs system...

And checks the TIR electronic

guarantee information

TIR guarantee data • TIR holder information

• TIR electronic guarantee

details (validity, status, etc.)

Activities Messages

C

National Customs Application

National Customs Application

Page 21: UNECE-IRU eTIR Pilot Project · UNECE-IRU eTIR Pilot Project Geneva, June 2014 André Sceia – UNECE Raphaël Hirt – IRU

Release for transit • Cargo information

• Equipment information

• Seals information

Customs office of departure : Country A

21

• Controls the goods

• Checks accompanying documents

• Seals the cargo

• Updates the system

and releases the truck for transit

Activities Messages

C

National Customs Application

e ITDB

Page 22: UNECE-IRU eTIR Pilot Project · UNECE-IRU eTIR Pilot Project Geneva, June 2014 André Sceia – UNECE Raphaël Hirt – IRU

TIR holder : Country A

22

John’s truck

arrives at the

customs office of

exit (en route) in

country A and he

shows his TIR

electronic

guarantee ref.

number/barcode

B

A

Page 23: UNECE-IRU eTIR Pilot Project · UNECE-IRU eTIR Pilot Project Geneva, June 2014 André Sceia – UNECE Raphaël Hirt – IRU

Customs office of exit : Country A

23

Checks the TIR operation data

Checks the seal(s) on the load

compartment

• Updates the system

and confirms the exit of country A

Activities Messages

National Customs Application

Exit notification

C

e ITDB

Page 24: UNECE-IRU eTIR Pilot Project · UNECE-IRU eTIR Pilot Project Geneva, June 2014 André Sceia – UNECE Raphaël Hirt – IRU

B

A

After the truck has left country A, the central customs

services reconcile information from the customs

offices of departure and exit (en route) and send a

discharge message.

Discharge

Central Customs : Country A

24

Activities Messages

C

C

e ITDB

Page 25: UNECE-IRU eTIR Pilot Project · UNECE-IRU eTIR Pilot Project Geneva, June 2014 André Sceia – UNECE Raphaël Hirt – IRU

TIR holder : Country B

25

John’s truck

arrives at the

customs office of

entry (en route)

in country B and

he shows his

TIR electronic

guarantee ref.

number/barcode

B

A

Page 26: UNECE-IRU eTIR Pilot Project · UNECE-IRU eTIR Pilot Project Geneva, June 2014 André Sceia – UNECE Raphaël Hirt – IRU

1.TIR transport data • TIR holder information

• TIR electronic guarantee details

(validity, status, etc.)

• Cargo information

• Equipment information

• Seals information

• Journey history

2.Release for transit • Cargo information

• Equipment information

• Seals information

Customs office of entry : Country B

26

Checks the TIR electronic

guarantee and information about

the previous TIR operation

Checks the accompanying

documents

Checks the seal(s) on the load

compartment

• Updates the system

and confirms the entry in country B

Activities Messages

National Customs Application

1

2

C

2

e ITDB

AMENDED

AMENDED

Page 27: UNECE-IRU eTIR Pilot Project · UNECE-IRU eTIR Pilot Project Geneva, June 2014 André Sceia – UNECE Raphaël Hirt – IRU

TIR holder : Country B

27

John’s truck

arrives at the

customs office of

termination in

country B and he

shows his TIR

electronic

guarantee ref.

number/barcode

B

A

Page 28: UNECE-IRU eTIR Pilot Project · UNECE-IRU eTIR Pilot Project Geneva, June 2014 André Sceia – UNECE Raphaël Hirt – IRU

Customs office of termination: Country B

28

Activities Messages

Checks the TIR operation data

• Removes the seal(s) on the load

compartment

Controls the goods

and updates the system

National Customs Application

Final termination

(SafeTIR)

C

e ITDB

Page 29: UNECE-IRU eTIR Pilot Project · UNECE-IRU eTIR Pilot Project Geneva, June 2014 André Sceia – UNECE Raphaël Hirt – IRU

B

A

Central Customs: Country B

29

Activities Messages

Discharge

After the truck has reached the customs office of

termination in country B, the central customs

services reconcile information from the customs

offices of entry (en route) and termination and send

a discharge message.

C

e ITDB

C

Page 30: UNECE-IRU eTIR Pilot Project · UNECE-IRU eTIR Pilot Project Geneva, June 2014 André Sceia – UNECE Raphaël Hirt – IRU

30

CONTROLS, AUDIT AND CLAIMS

30

Page 31: UNECE-IRU eTIR Pilot Project · UNECE-IRU eTIR Pilot Project Geneva, June 2014 André Sceia – UNECE Raphaël Hirt – IRU

Associations: Carnets Control

31

Associations log in to the

Association Portal to get

access to real time information

about the level of risk for all

TIR electronic guarantees they

have issued. They can quickly

view current issues as well as

the ratio of issues (past and/or

present) per TIR holder.

Once having selected a TIR

electronic guarantee, associations

have a visual dashboard of all

messages sent during the journey

(or missing).

Activities

eGuarantee

Country A Country B

Page 32: UNECE-IRU eTIR Pilot Project · UNECE-IRU eTIR Pilot Project Geneva, June 2014 André Sceia – UNECE Raphaël Hirt – IRU

Customs: Irregularities Report

32

Customs log in to the Customs

Portal and go to the Irregularities

control page.

They have access to real time

information about potential

irregularities concerning all TIR

electronic guarantees used in

their country. They can also

quickly view/track their pre-

notifications, notifications and

payment requests.

Activities

Page 33: UNECE-IRU eTIR Pilot Project · UNECE-IRU eTIR Pilot Project Geneva, June 2014 André Sceia – UNECE Raphaël Hirt – IRU

Customs: Claims, audits and other

33

At any time, customs can

retrieve TIR data from the IRU

and UNECE systems, e.g. for

claims or audit purposes.

Activities

UNECE

Portal

TIR transport data • TIR holder information

• TIR electronic guarantee

details (validity, status, etc.)

• Cargo information

• Equipment information

• Seals information

• Journey history

Messages

C

e ITDB

Page 34: UNECE-IRU eTIR Pilot Project · UNECE-IRU eTIR Pilot Project Geneva, June 2014 André Sceia – UNECE Raphaël Hirt – IRU