Undulator Week 3. Magnet Power Supplies Phase 4 Installation Antonio de Lira Kristi Luchini. Undulator Magnet PS Phase 4 Installation Agenda. Installation Program - Scope Rack Profiles & System Characteristics Overall Schedule Open Items Magnet PS Controls By Kristi Luchini. - PowerPoint PPT Presentation

Transcript of Undulator Week 3

Page 1: Undulator Week 3

A. de Lira & K. Luchini

Undulator Week 3 – Magnet PS [email protected]

Tue, 4/29/20081

Undulator Week 3

Magnet Power Supplies

Phase 4 Installation

Antonio de Lira

Kristi Luchini

Page 2: Undulator Week 3

A. de Lira & K. Luchini

Undulator Week 3 – Magnet PS [email protected]

Tue, 4/29/20082

Undulator Magnet PS Phase 4 InstallationAgenda

Installation Program - Scope

Rack Profiles & System Characteristics

Overall Schedule

Open Items

Magnet PS ControlsBy Kristi Luchini

Page 3: Undulator Week 3

A. de Lira & K. Luchini

Undulator Week 3 – Magnet PS [email protected]

Tue, 4/29/20083

Undulator Magnet PS – PH4 Installation ProgramOriginal Scope

B913 – UND 54 MCORs

18 QUAD – MCOR6

36 X/YCOR – MCOR1 – Not part of Phase IV

B921 – UND + DUMP 45 MCORs

15 QUAD – MCOR6

30 X/YCOR – MCOR1 – Not part of Phase IV

03 Intermediate PS – DUMP

06 MCORs – DUMP

Page 4: Undulator Week 3

A. de Lira & K. Luchini

Undulator Week 3 – Magnet PS [email protected]

Tue, 4/29/20084

Undulator Magnet PS - PH4 Installation Program

54 MCORs - UND 18 QUAD – Phase IV 36 X/YCOR (?)

B913 B921

45 MCORs – UND 15 QUAD – Phase IV 30 X/YCOR (?)03 Intermediate PS – DUMP06 MCORs – DUMP

Page 5: Undulator Week 3

A. de Lira & K. Luchini

Undulator Week 3 – Magnet PS [email protected]

Tue, 4/29/20085

Undulator Magnet PS Installation Program - B913

54 MCORs

Page 6: Undulator Week 3

A. de Lira & K. Luchini

Undulator Week 3 – Magnet PS [email protected]

Tue, 4/29/20086

Undulator Magnet PS Installation Program – B921

03 Intermediate

45 MCORs – UND

06 MCORs - DUMP

Page 7: Undulator Week 3

A. de Lira & K. Luchini

Undulator Week 3 – Magnet PS [email protected]

Tue, 4/29/20087

Undulator Magnet PS – Electrical Interconnections

Undulator magnet PS are NOT interlocked(except for GND fault)

Page 8: Undulator Week 3

A. de Lira & K. Luchini

Undulator Week 3 – Magnet PS [email protected]

Tue, 4/29/20089

Overall ScheduleMagnet PS Cable Plant (Phase 4)

Ponce Rodriguez – This review

01/30/08 Site Visit

02/19/08 Bid Opening

03/04/08 Award

04/01/08 Installation Start

10/31/08 Installation Complete

Schedule

Detailed schedule Integrated with Project Office’s Installation Schedule

Page 9: Undulator Week 3

A. de Lira & K. Luchini

Undulator Week 3 – Magnet PS [email protected]

Tue, 4/29/200810

Schedule – B913

Page 10: Undulator Week 3

A. de Lira & K. Luchini

Undulator Week 3 – Magnet PS [email protected]

Tue, 4/29/200811

Schedule – B921

Page 11: Undulator Week 3

A. de Lira & K. Luchini

Undulator Week 3 – Magnet PS [email protected]

Tue, 4/29/200812

Equipment Status / Rack Readiness

B913 B921

Page 12: Undulator Week 3

A. de Lira & K. Luchini

Undulator Week 3 – Magnet PS [email protected]

Tue, 4/29/200813

Open Items

66 MCORs for UND correctors MCOR modules to come from PEP

MCOR modules have been requested already

D. MacNair has a new design for a MCOR1

No performance requirements document PCD will assume 25 ppm/C is fineNote: Support buildings will have temperature control: 75 ± 5F

Page 13: Undulator Week 3

A. de Lira & K. Luchini

Undulator Week 3 – Magnet PS [email protected]

Tue, 4/29/200814

Undulator Magnet PS - Controls

Magnet PS Control Systems Kristi Luchini

Page 14: Undulator Week 3

A. de Lira & K. Luchini

Undulator Week 3 – Magnet PS [email protected]

Tue, 4/29/200815

Magnet PS ControlsProcurement Status

Description % Received

VME Crate and I/O 100

PLC Crates and I/O 100

* Terminal Servers 100

Cat6 Patch Panels 100

Cat6 Intra-rack cables 100

MCOR to VME Intra-rack cables 100

* Equipment within PS racks

Page 15: Undulator Week 3

A. de Lira & K. Luchini

Undulator Week 3 – Magnet PS [email protected]

Tue, 4/29/200816

System Architecture

OPI OPI

EPICS IOC

VME Crate

Bulk PS

PLC PS Protection

System MCOR

16 Magnets@6 Amps max

Note: configure for 1 or 6 A

Ethernet

Terminal Server

Timing (Fiber Optic)

Page 16: Undulator Week 3

A. de Lira & K. Luchini

Undulator Week 3 – Magnet PS [email protected]

Tue, 4/29/200817

Software

IP Addresses Network Nodes – DoneSoftware – Done (for 10Hz feedback)Databases - April 28 to May 10, 2008

polynomials (I vs B) as magnets are measured. Displays

B913: Complete May 5, 2008 B921: Complete May 10, 2008

Pre-Installation checkout in B15B913: May 10-15, 2008B921: May 15-20, 2008

System Checkout - Network checkout and system integrationB913: Oct 31 - Nov 11, 2008 (54 MCORs), Install racks July 10-15B921: Oct 29 – Dec 4, 2008 (45 MCORs), Install racks July 22-30

Page 17: Undulator Week 3

A. de Lira & K. Luchini

Undulator Week 3 – Magnet PS [email protected]

Tue, 4/29/200818

Page 18: Undulator Week 3

A. de Lira & K. Luchini

Undulator Week 3 – Magnet PS [email protected]

Tue, 4/29/200819

Page 19: Undulator Week 3

A. de Lira & K. Luchini

Undulator Week 3 – Magnet PS [email protected]

Tue, 4/29/200820

Page 20: Undulator Week 3
Page 21: Undulator Week 3

A. de Lira & K. Luchini

Undulator Week 3 – Magnet PS [email protected]

Tue, 4/29/200822

Page 22: Undulator Week 3