Basics of SAP Standard Cost estimate-Understanding the flow of cost settings-Part 1
There is a lot of forum question answers and content available in SCN about Standard CostingNote-This is a beginner's and basic guide to understand cost estimate and various settings behind it.
This document is intended to explain the cost flows to a standard cost estimate. Explaining various settings in
background. I will try to explain this from backward from Cost estimate to configuration. This will answer some
basic questions like Material Cost, Overhead Cost, Labor etc. in a standard cost.
When you take a look at a material cost estimate what you will understand the Quantity Structure, Valuation,
Costing Dates etc.
• Standard cost of a material looks like in T-Code- CK13n (you can view this from costing-2 view inmaterial master too T-Code-MM03.)
• I will try to walk through these 6 tabs below explaining basic configurations and data flows from
different configuration to Standard Cost estimate.
Screenshot-1
• For our analysis purpose I have selected standard layout 1SAP02-Costing items (overview)
•
there are several layout available in standard SAP and user can define their own too.
8/9/2019 Understanding the Flow of Cost Settings-Part 1
http://slidepdf.com/reader/full/understanding-the-flow-of-cost-settings-part-1 2/9
Basics of SAP Standard Cost estimate- Understanding the flow of cost settings-Part 1
Generated by Jive on 2014-07-30+02:00
2
Screenshot-2
Screenshot-3
1-Costing Data-It contains data like Costing variant, Costing Version, Lot Size and Transfer Control. Lets talk about Costing
Messages and Costing status later on.
8/9/2019 Understanding the Flow of Cost Settings-Part 1
http://slidepdf.com/reader/full/understanding-the-flow-of-cost-settings-part-1 3/9
Basics of SAP Standard Cost estimate- Understanding the flow of cost settings-Part 1
Generated by Jive on 2014-07-30+02:00
3
Screenshot -4
•Costing variant-Configuration Costing Variant in T-code OKKN- (Will cover in more detailed way inpart 2.)
-Assign various Control parameters like Costing Type, Valuation variant, Date Control QTY structure Control,
Transfer Control etc.
-Maintain parameters different Tabs like Control, Qty Structure, Addictive Cost, Assignment and Misc.
8/9/2019 Understanding the Flow of Cost Settings-Part 1
http://slidepdf.com/reader/full/understanding-the-flow-of-cost-settings-part-1 4/9
Basics of SAP Standard Cost estimate- Understanding the flow of cost settings-Part 1
Generated by Jive on 2014-07-30+02:00
4
Screenshot 5
• Costing Version configuration using T CODE- OKYD
-Number that serves to differentiate between cost estimates for the same material.
Screenshot 6
• Lot Size
- The costing lot size in the material master record is usually used as a basis for costing all materials, however
one can manually change the lot size during cost estimate.
• Transfer Control-Configure in T-code OKKM usually used the standard.
Screenshot 7
- This controls how costing with quantity structure searches for existing cost estimates when existing costing
data are transferred to another cost estimate. In this example we assigned PC02 in TCODE OKKN.
2-Costing Dates-we will learn more about date control in Costing variant
8/9/2019 Understanding the Flow of Cost Settings-Part 1
http://slidepdf.com/reader/full/understanding-the-flow-of-cost-settings-part-1 5/9
Basics of SAP Standard Cost estimate- Understanding the flow of cost settings-Part 1
Generated by Jive on 2014-07-30+02:00
5
Screenshot 8
-Costing Date from -Date from which the cost estimate is valid.
-Costing Date to- This date determines the date up to which the cost estimate is valid
-Qty Structure Date-Date with which the quantity structure is selected for the cost estimate with quantity
structure.
-Valuation Date-Date on which the materials and activities in a cost estimate are valuated.
3-Qty Structure-It contains BOM and Routing data. ( Usually PP functionality)
Screenshot 9
8/9/2019 Understanding the Flow of Cost Settings-Part 1
http://slidepdf.com/reader/full/understanding-the-flow-of-cost-settings-part-1 6/9
Basics of SAP Standard Cost estimate- Understanding the flow of cost settings-Part 1
Generated by Jive on 2014-07-30+02:00
6
• Bill Of Material (BOM)- T CODE- SET up CS01 , To view T-code -CS03
Screenshot 10
If you go back and refer my screenshot 3 the detailed cost (M) comes from this settings.
Note- we will have to do cost component settings too will cover the point in net part.
• Routings- Create Routings T-Cod-CA01 ( PP functionality) to view CA03
- A routing shows operations in a sequence. This form the basis for
Lead time scheduling. Product costing, capacity planning, Refer screenshot 3 Cost Internal Activity (E) comes
from this settings. We will understand more detail in my next part about assigning work center, activity and
activity planning.
Screenshot 11
4- Valuation- It contains the currency, Costing sheet and Overhead key.
T CODE-KZS2-Creating and maintaining Costing Sheet,
T CODE-KOOK-Defining and changing Overhead key
8/9/2019 Understanding the Flow of Cost Settings-Part 1
http://slidepdf.com/reader/full/understanding-the-flow-of-cost-settings-part-1 7/9
Basics of SAP Standard Cost estimate- Understanding the flow of cost settings-Part 1
Generated by Jive on 2014-07-30+02:00
7
Screenshot 12
if you refer to screenshot 3 Overhead cost (G) flows from this settings from costing sheet and overhead key.
• Costing Sheet-It controls the calculation of Overhead basically we use one costing sheet for each
object for which system is to determine overhead costs. ( will see more detail in my next part)
• The Overhead Key-The overhead key is used to determine order-specific or material-relatedoverhead rates. The overhead amounts depend on the plant and the overhead key. The overhead
depends primarily on the overhead key. If an overhead key is not maintained for the material or theorder, overhead is to be determined in relation to the plant.
After defining a costing sheet that points to two condition tables. In the first table, the overhead amount
depends on the overhead key. In the second table, the overhead amount depends on the plant. An access
sequence determines which conditions have priority.
5- HISTORY- It contains the user and costing run date data.
Screenshot 13
Cost By/Marked By/released By- The user names who performed respective costing run task.
8/9/2019 Understanding the Flow of Cost Settings-Part 1
http://slidepdf.com/reader/full/understanding-the-flow-of-cost-settings-part-1 8/9
Basics of SAP Standard Cost estimate- Understanding the flow of cost settings-Part 1
Generated by Jive on 2014-07-30+02:00
8
Some large companies have different person to mark the cost and different person to release the cost as it
rectifies the human errors if any. But in my experience i have seen mostly it is performed by the same person.
Costing run - usually this data updated when we use T-code CK40n to do standard costing in case of individual
material costing using CK11n this field will not populate. So we can always go and check that costing run data
to verify the settings at that point of time.
6-Costs-Baiscally it is summarization and cost component view
TCODE-OKTZ setting up cost component Structure (we will see in detail in part 2 of this document)
•
If you refer back screenshot 8 breaking out cost like overhead, labor and material based on thesesettings here.In Product Cost Controlling, the cost component structure determines how the resultsof material costing are updated. The cost component structure groups the costs for each material
according to cost component (such as material costs, internal activities, external activities, andoverhead). If the material is used in the production of another material, the cost component split
(which breaks down the costs according to material costs, internal activities, external activities,overhead, and so forth) remains in the system when the costs are rolled up
Screenshot 14
Error Log- Identifies the messages if costed with error or without error.
Intention of creating this document is to reach out to the beginners and those who wanted to know and
understand the flow of Standard Costing. i will update the document as n when some more points needs to be
included .
8/9/2019 Understanding the Flow of Cost Settings-Part 1
http://slidepdf.com/reader/full/understanding-the-flow-of-cost-settings-part-1 9/9
Basics of SAP Standard Cost estimate- Understanding the flow of cost settings-Part 1
Generated by Jive on 2014-07-30+02:00
9
This is my first document and I should thank Ajay , Forum members,and SCN SAP ERP Financials -
Controlling
I was nervous to put together the basics in a document and publish it in SCN. I will continue edit it for
improvement.
The next part of document will update the more detailed configuration and steps to understand Basics ofStandard costing
Refer to next part here http://scn.sap.com/docs/DOC-49167
Best Regards
Hrusikesh Dalai