NMSE OCTOBER 2007 UNCONFIRMED MINUTES OCTOBER 22 – 24, 2007 PITTSBURGH MARRIOTT CITY CENTER PITTSBURGH, PENNSYLVANIA These minutes are not final until confirmed by the Task Group in writing or by vote at a subsequent meeting. Information herein does not constitute a communication or recommendation from the Task Group and shall not be considered as such by any agency. MONDAY, OCTOBER 22, 2007 – WEDNESDAY, OCTOBER 24, 2007 1.0 OPENING COMMENTS 1.1 Call to Order/Quorum Check The meeting was called to order by Chairperson Mark Gleason at 1:00pm on Monday, 22 OCT 2007. A quorum was established with representatives present. 1.2 New Task Group Members 1.3 Appointment of Secretary Since the Task Group has not received any volunteers from the members for a new secretary, one will be picked at the beginning of each Nadcap Meeting, based on alphabetical order of attending Task Group members by last name. Windsor Amundsen from Honeywell will be taking the minutes for this meeting. 1.4 Introductions and Routing of Attendance Roster ATTENDANCE User Members Present: Name Company Windsor Amundsen Honeywell; Task Group Secretary Page 1 of 17

Transcript of UNCONFIRMED MINUTES - Performance Review...

Page 1: UNCONFIRMED MINUTES - Performance Review Institutecdn.p-r-i.org/.../11/17NMSEOCT07Minutes-Pittsburgh... · Web viewWe reviewed the draft checklist for Electrochemical Drilling (7116/1).

NMSEOCTOBER 2007

UNCONFIRMED MINUTES OCTOBER 22 – 24, 2007

PITTSBURGH MARRIOTT CITY CENTERPITTSBURGH, PENNSYLVANIA

These minutes are not final until confirmed by the Task Group in writing or by vote at a subsequent meeting. Information herein does not constitute a communication or recommendation from the Task Group and shall not be considered as such by any agency.

MONDAY, OCTOBER 22, 2007 – WEDNESDAY, OCTOBER 24, 2007

1.0 OPENING COMMENTS

1.1 Call to Order/Quorum Check

The meeting was called to order by Chairperson Mark Gleason at 1:00pm on Monday, 22 OCT 2007. A quorum was established with representatives present.

1.2 New Task Group Members

1.3 Appointment of Secretary

Since the Task Group has not received any volunteers from the members for a new secretary, one will be picked at the beginning of each Nadcap Meeting, based on alphabetical order of attending Task Group members by last name. Windsor Amundsen from Honeywell will be taking the minutes for this meeting.

1.4 Introductions and Routing of Attendance Roster

ATTENDANCE User Members Present:

Name CompanyWindsor Amundsen Honeywell; Task Group SecretarySilvia Baeza Vought AircraftMarc Belanger Bombardier AerospaceGary Burns GE AviationTara Campbell Rolls Royce, PLCDavid Day GE Aviation; AQS Liaison Peter Edwards AirbusHarold Finch Spirit Aero SystemsWilliam Fitzgerald Northrop-GrummanJacob Franklin Bell Helicopter - TextronMark Gleason GE Aviation; Task Group ChairpersonGlen Heide Boeing

Page 1 of 11

Page 2: UNCONFIRMED MINUTES - Performance Review Institutecdn.p-r-i.org/.../11/17NMSEOCT07Minutes-Pittsburgh... · Web viewWe reviewed the draft checklist for Electrochemical Drilling (7116/1).

NMSEOCTOBER 2007

Roland Hudon Pratt WhitneyJim Kruba Boeing Serge Labbe Heroux-Devtek Marc-Andre Lefebvre Heroux Devtek Ross Lizee BombardierTom Lowther HoneywellSusan Margheim Rockwell CollinsScott Patterson GoodrichJeremy Phillips Cessna Aircraft; Task Group Vice ChairpersonK.T. Quader BoeingAngelie Vincent Spirit Aero SystemsKirk Whalen Heroux Devtek

Other Participants/Members:

Name CompanyBryon Alter BG&S PeeningDennis Berglund Tri-Process CompanyStarr Berglund Tri-Process CompanyErnestine Cruz Tri-Process CompanySusan Dika Moeller AerospaceJ Kim Ell MicrotronicsMark Finkeldei Nex-Tech ProcessingDel Harmon Cincinnati Thermal SprayDave Jones Nex-Tech ProcessingGreg Judy PCC AirfoilsJames Kernan Corpus Christy Army DepotLi Li Barnes AerospaceKyle Lindsey Danville Metal StampingEd Mayer Meyer Tool Inc.Jay McMurray Metal Improvement Corp.Mark Molden Ferco TechHarry Moser Agie CharmillesKM Nosek MicrotronicsEric Oswald Unison Engine Components Tim Scarlett Danville Metal StampingRichard Scott Rich TechnologyMark Singer Kessington Machine ProductsJackie Sternot Pako Inc.Gary Thompson Darchem EngineeringJohn Vanhouwe Eldim BV Sulzer Metco

PRI Staff:Rick Sovich PRIJennifer Kornrumpf PRI

Page 2 of 11

Page 3: UNCONFIRMED MINUTES - Performance Review Institutecdn.p-r-i.org/.../11/17NMSEOCT07Minutes-Pittsburgh... · Web viewWe reviewed the draft checklist for Electrochemical Drilling (7116/1).

NMSEOCTOBER 2007

1.5 Approval of Minutes

Motion is made to accept meeting minutes from the July quarterly meeting in Istanbul. Motion passes.

2.0 TASK GROUP METRICS AND STAFF REPORT

Joe Barr has been hired by PRI to assist Richard Sovich with audit review. Joe Barr is not currently delegated. We are currently at 86% merit eligibility for NCMSE suppliers. Balloting by Primes of audits is discussed. We are getting excellent participation from NCMSE primes for audit review. Auditor verses auditor requirements was discussed. The goal is 130% auditor capacity to be able to cover all the requirements. Unrestricted auditors for ITAR audits have been an issue in the past. Two additional unrestricted auditors have been added to the Auditor base. We discussed the relative numbers of new audits compared to re-accreditation audits. We expect 2008 to peak for NMSE audits and to level out due to the effects of the merit program.

3.0 SSC PRESENTATION

Jay McMurray presents his information on the Supplier Support Committee. The Supplier Support Committee provides an avenue for suppliers to get information about the Nadcap process. Ad hoc committees are formed for specific purposes e.g. communications and mentoring, 25 mile rule, etc. SSC has volunteer mentors to assist new suppliers with newcomer issues. SSC meeting sent out a survey in 2007, the results of which will be discussed this week. Checklist requirements that are not covered by specific specifications are an issue which is being discussed. Auditor consistency and redundant audits is discussed and brought to the attention of the NMC. The SSC meeting is to be held October 23, 2007 from 4:15 to 6:15 PM.

After four years of great service Jay Mc Murray will resign from his duties on the SSC effective this week.

Page 3 of 11

Page 4: UNCONFIRMED MINUTES - Performance Review Institutecdn.p-r-i.org/.../11/17NMSEOCT07Minutes-Pittsburgh... · Web viewWe reviewed the draft checklist for Electrochemical Drilling (7116/1).

NMSEOCTOBER 2007

4.0 CHECKLIST & HANDBOOK REVISIONS

The ballot for Prime Specific Supplement Sheet AC7117S was reviewed for comment resolution line by line. The applicable Prime addressed the comment or the Task Group decided on comments that were non-persuasive. All of the Comments were either answered with no action or an update was recorded. The updated Supplement Sheets will be scrubbed for questions that are possibly a high risk for export control violations. The final version will be to Task Group under a 14 day affirmation ballot. The ballot resolution ran over the allotted time and was decided by the Task Group to continue through completion during opportune time slots over the next two days of the meeting.

ACTION ITEM: Rick Sovich/Don Buehler will review the AC7117S supplement sheets for possible ITAR/EAR issues. Due Date: 30Nov07

ACTION ITEM: PRI Staff to issue 14 day affirmation Ballot for AC7117S within one week of ITAR review and finalization.

5.0 NIP/NOP/NTGOP UPDATES

Updates to NIP/NOP/NTGOP were reviewed.

6.0 SPECIFICATION CHANGES

Jay McMurray reviewed latest meeting from the Surface Enhancement Division FD&E Meeting held on 08Oct2007. Ballot on changes to J444 (Cast Shot and Grit Size Specifications for Peening and Cleaning) is currently underway. Jay discussed zero block accuracy (Test Strip, Holder, and Gauge for shot peening) and the decision that the flatness call-out for gauges were too restrictive and did not add value. It was decided that paragraph 6.4 of J442 be modified to 0.002”. The following question is brought up at an SAE surface enhancement meeting: “On the question of equipment used to test media, it is a recommended practice to use the Ro-Tap machine”. The uses of a Ro-Tap equivalent machine is discussed but no actions were taken.

Page 4 of 11

Page 5: UNCONFIRMED MINUTES - Performance Review Institutecdn.p-r-i.org/.../11/17NMSEOCT07Minutes-Pittsburgh... · Web viewWe reviewed the draft checklist for Electrochemical Drilling (7116/1).

NMSEOCTOBER 2007

7.0 SUPPLIER TRAINING

Supplier training was limited to the presentation given by Eric Oswald, Smith’s Aerospace-Terra Haute, due to a lower supplier turn-out than expected. Eric presented helpful hints on audit preparation. Suggestions include total preventative maintenance for each machine, periodic testing being performed, verification that all new work meets customer requirements, checklists, sketches, routers, any other form of instruction is up to date and is being used, review of customer specifications for any changes or may have become obsolete. Verify that machines are calibrated and all media being used is also calibrated. Insure that all schedules are up to date and labs are current. All calibration equipment is to be current. Make specs available to the operators. Operators are the life blood of a company. Presentation is attached below.

Rick Sovich briefly discussed upcoming training opportunities. Subject matter covers how to do pre-audit preparation, preparation of self audit, where all the information lies in e-audit.net, etc. The Training will be attached to eAuditNet. Jeremy Philips and Windsor Amundsen to form ad-hoc group to create supplier training for U.S. suppliers. Tara Campbell and Pete Edwards to create supplier training for European-UK suppliers

ACTION ITEM: PRI Staff to post supplier training to eAuditNet. Due Date: 30 Nov 2007.

ACTION ITEM: North American Ad Hoc Supplier Training Team to conference and frame out scope and timeline for NCSI training. Due Date: 14 Dec 2007.

ACTION ITEM: European Ad Hoc Supplier Training Team to conference and frame out scope and timeline for NCSI training. Due Date: 14 Dec 2007.

8.0 SUPPLIER – OPEN ISSUES

Time required for conducting an audit is discussed. Some auditors seem to be dragging out the audit. It is a function of what you find, how job audits turn out, and how things work.

The loss of merit for a supplier was discussed. Rick Sovich to discuss the issue privately with those concerned.

The Task Group discussed the definition of major and minor findings. Systemic or potential product impact constitutes a major finding. Primes are to determine potential product impact. A minor is defined as any single system failure or lapse in conformance with the applicable standard or audit criteria. A major is defined as the absence of, or systemic breakdown of, the process control and / or the Quality

Page 5 of 11

Page 6: UNCONFIRMED MINUTES - Performance Review Institutecdn.p-r-i.org/.../11/17NMSEOCT07Minutes-Pittsburgh... · Web viewWe reviewed the draft checklist for Electrochemical Drilling (7116/1).

NMSEOCTOBER 2007

Management System, or any non-conformance where the effect impacts, or has the potential to impact, the integrity of the product.

The Task Group discussed auditor indiscretions, subjectivity, and inconsistencies. Auditors must show a link between the checklist and the finding. One auditor posed the question to an operator “Would you like photos if you could get them?” to which the operator responded, “Yes”.

9.0 NEW BUSINESS (Open Meeting)

No new business

10.0 Review Agenda for Next Meeting

Future meeting topics are discussed. One of which involved the extent to which Nadcap auditors should be discussing Quality issues, e.g. is supplier following their quality system. Sometimes there was no procedure or the procedure was not being followed.

Auditors wanted to have the ability to investigate potential product impact. We discussed the new definition of major and minor findings. Systemic or potential

product impact constitutes a major finding. Primes are to determine potential product impact. A minor is defined as any single system failure or lapse in conformance with the applicable standard or audit criteria. A major is defined as the absence of, or systemic breakdown of, the process control and / or the Quality Management System, or any non-conformance where the effect impacts or has the potential to impact the integrity of the product.

Training requirements are mandated in AS9100.

11.0 AMS 2430 & AMS 2431 – ADDITION OF ROTAP REQUIREMENTS

Due to the unavailability for the Task Group Member that was to report out on this subject, this topic is postponed until the Feb 2008 meeting in Rome.

12.0 FAILURE CRITERIA REVIEW

Mark Gleason presented a comprehensive analysis of Failure criteria combined with auditor metrics. NOP-011 defines audit failure criteria. Audits resulting in major findings are discussed along with NM Initial Total NCR’s. If a supplier is failing the criteria but has numerous processes, the NMSE Task Group takes this into account during the failure ballot process. The numbers of NCR’s have gone down and NMSE has more reaccreditation than initial audits. The audit checklists were improved and the number of findings dropped as a result of the baseline effort, a great audit handbook, good corrective actions administered by the Staff Engineer and good supplier training. This data is being reviewed by the Standardization Committee as well, with an annual reassessment. There was no statistical variation between the current and most recent staff engineer. Auditors are not consistent,

Page 6 of 11

Page 7: UNCONFIRMED MINUTES - Performance Review Institutecdn.p-r-i.org/.../11/17NMSEOCT07Minutes-Pittsburgh... · Web viewWe reviewed the draft checklist for Electrochemical Drilling (7116/1).

NMSEOCTOBER 2007

some are tougher than others. There is a statistical difference between auditors; however some data is skewed due to several new auditors that are just getting up to speed. We are trying to minimize auditor variation through training. None of the auditors are outside of the two sigma limits within the NMSE Task Group. Weld and NDT task groups do have auditors outside of the two sigma region. We are seeking ways to further minimize auditor variation.

13.0 AQS SUMMARY OF AS9100 REQUIREMENTS

This topic was postponed until the Feb 2007 meeting in Rome, due to the decision of the Task Group to continue the resolution of the Prime Specific Supplement Sheets.

ACTION ITEM: PRI Staff to update the RAIL to reflect this presentation from our AQS liaison. Update due by 15 Nov 2007.

14.0 PRIME PARTICIPATION – AUDIT REVIEW

As presented earlier in the NMC Metrics, participation in audit review is good, however it appears that a few individuals are carrying the load and we would like to see more participation from all primes. The act of audit review helps keep you in touch with your supplier base and the issues that can become NMSE topics for meetings. Without this participation in audit reviews, good opportunities for improvement are not being realized.

15.0 STAFF ENGINEER METRICS

This is a closed session attended only by Primes. Rick Sovich presented to the Task Group a report of NM and SE audits over the past quarter, including information on major and minor findings.

15.1 Auditor Metrics

Mark Gleason discussed differences between auditors considering how many major and minor findings are written per average audit. No one is outside of two sigma limits. In NM, Auditor No. 2 is low and Auditor No. 8 is high. These two outliers are no longer Nadcap Auditors. Auditors are cautioned by Richard Sovich, to not advise suppliers even in the interest of best practice, as the auditor job is to impartially and professionally administer the Nadcap checklist and support Task Group interpretations as expressed in the Audit handbook.

Page 7 of 11

Page 8: UNCONFIRMED MINUTES - Performance Review Institutecdn.p-r-i.org/.../11/17NMSEOCT07Minutes-Pittsburgh... · Web viewWe reviewed the draft checklist for Electrochemical Drilling (7116/1).

NMSEOCTOBER 2007

15.2 Delegation Report

The Delegation Report was presented by Rick Sovich; Concurrence rate was excellent at over 99%. The Delegation Report is attached.

15.3 Audits >90 Days

There were no audits over 90 days that were not in Task Group Review.

16.0 AUDIT REVIEW

Audits were suggested by Boeing, RR Plc, and a review of an audit that had exceeded failure criteria. The audit numbers will not be posted for confidential reasons however will be available on a need to know basis from the Staff Engineer.

The failure review audit concerned export controlled parts and all restricted Task Group Members left the meeting room. The presentation of evidence and review resulted in the voiding of two NCR’s and sustaining of two other NCR’s that were questioned. Roland Hudon was very active in the decision making process as PW was the Prime/Customer for several parts in question.

An Asian audit was reviewed. One previous NCR noted that laser power output was not

being measured, nor was it being measured at the workpiece as required by Nadcap. Mark Gleason was able to explain to the group that laser power output was being measured, just not at the workpiece. The GE specification was not clear that power output be made at the workpiece. This resulted in some confusion with the supplier. Windsor Amundsen of Honeywell agrees to go back into eAuditNet and approve the audit.

T K Quader discussed an SE Audit. TK Quader poses the question to the task group, “Are our auditors looking at enough job audits?” He would have expected someone to say that it was a systemic issue. Rick Sovich states that most auditors will sample for recurrence of the NCR if suspected, however this would be appropriate.

Tara Campbell of Rolls Royce PLC requests that the task group discuss a European Audit. Tara was not satisfied with the risk mitigation efforts associated with the findings. Evidently there was a large range on the display for nozzle speed. It was reported that the supplier had a bad display. The display was wandering all over the place, though nozzle speed was set at, and in fact was running at, 200 mm/min. The display has since been corrected and the audit sent to Task Group Review.

Page 8 of 11

Page 9: UNCONFIRMED MINUTES - Performance Review Institutecdn.p-r-i.org/.../11/17NMSEOCT07Minutes-Pittsburgh... · Web viewWe reviewed the draft checklist for Electrochemical Drilling (7116/1).

NMSEOCTOBER 2007

Richard Sovich reports to the Task Group that he is working with Joe Barr on responses to NCRs to make sure that they get out in a timely fashion.

17.0 NEW BUSINESS (Closed Meeting)

We discussed what to do in the event of a paper audit. We determined that there would not be two consecutive paper audits (job audits). Roland Hudon and KT Quader agree to review the procedure for audit guidelines and report back to the group.

ACTION ITEM: Roland Hudon and KT Quader will review and summarize the current audit guidelines and report out at the Feb 2008 meeting in Rome. The presentation is due to PRI Staff by 11 Jan 2008.

Tara Campbell presented an MFN flyer advertising training in shot peen. The Nadcap “Partners in Education” logo was prominently displayed across the page from, and the same size as, an endorsement from another organization. The Task Group expressed concern that the “Partners in Education” trademark was too similar to the Nadcap logo and supplier confusion over endorsement may occur. It was reminded to the Task Group that this issue was reviewed at past meeting and has gone to the highest levels and has been closed. It was also reminded that this issue should not be raised at the Task Group level as it has been very disruptive. If individuals still have issues, it is suggested to go to your company representative on the NMC.

17.1 Task Group Leadership Succession Plan

Task Group succession was discussed. Mark Gleason will step down as NMSE Task Group Chairperson after this meeting. Jeremy Phillips volunteered for the TG Chairperson, was nominated by Mark Gleason and was unanimously approved by quorum hand vote as the NMSE candidate for Task Group Chairperson. Windsor Amundsen volunteered for TG Vice-Chairperson, was nominated by Roland Hudon and was unanimously approved by quorum hand vote, as the NMSE candidate for Task Group Vice Chairperson. It was also agreed by the Task Group that a limit of three years will be considered the time limit for serving as the Task Group Chairperson and Vice Chairperson, but retained the flexibility to extend beyond that time if circumstances required otherwise. A review of procedures shall be conducted to assure all requirements have been met. The secretarial duties will be rotated amongst the participating primes.

ACTION ITEM: Rick Sovich will review the procedures governing the selection process for the Chair and Vice Chair to assure all requirements for the selection process were fulfilled.

Page 9 of 11

Page 10: UNCONFIRMED MINUTES - Performance Review Institutecdn.p-r-i.org/.../11/17NMSEOCT07Minutes-Pittsburgh... · Web viewWe reviewed the draft checklist for Electrochemical Drilling (7116/1).

NMSEOCTOBER 2007

18.0 AUDITOR TRAINING

A discussion of the meaning of “training programs”, as it relates to training operators in NMSE processes. Training is not required currently for NM. Right now it is very subjective. Nothing in the handbook or in our specs specifies what should go into a training program.

It was agreed that Auditors shall not judge content of training programs.

19.0 AC7116/1 ELECTROCHEMICAL DRILLINGWe reviewed the draft checklist for Electrochemical Drilling (7116/1). This checklist will soon be sent out for ballot. The technical content of the checklist will remain essentially unchanged. Information will be disseminated to the entire group, and then the checklist will go out for ballot.

ACTION ITEM: PRI Staff will send the checklist out to 45 day ballot along with information summary provided by Mark Gleason. Due Date: 30 Nov 2007.

20.0 ITAR UPDATE

Don Buhler gave a limited presentation and a lengthy question and answer period for an Open session of the NMSE. It was very well done and thought provoking. Don asked the NMSE Group to review their checklists for questions that may have answers that could potentially violate ITAR or Export Control regulations.

ACTION ITEM: Rick Sovich will coordinate an Ad Hoc Group to review the checklist questions and supplement questions in accordance with Don’s instruction.

21.0 SSC REPRESENTATIVE REPORT

Jay McMurray reviewed the pervious days SSC meeting and presented the 2007 Supplier Survey.

Page 10 of 11

Page 11: UNCONFIRMED MINUTES - Performance Review Institutecdn.p-r-i.org/.../11/17NMSEOCT07Minutes-Pittsburgh... · Web viewWe reviewed the draft checklist for Electrochemical Drilling (7116/1).

NMSEOCTOBER 2007

22.0 NEXT MEETING

Meeting Date and Location

The next meeting will be on 25–27 FEB 2008 in Rome, Italy

23.0 ADJOURNMENT

The meeting was adjourned on 24 Oct 2007 at 12:00 PM.

Minutes prepared by: Windsor Amundsen of HoneywellEmail address: [email protected]

***** For PRI Staff use only: ******

Are procedural/form changes required based on changes/actions approved during this meeting? (select one)

YES* NO

*If yes, the following information is required:

Documents requiring revision:

Who is responsible: Due date: