Date: December /2014. Name : Umer Nazir Date of birth : 01/11/1979 Nationality : Pakistani Current Position : Senior Survey inspector. Experience : 15 years. Contact : 00966 59 22 12 783 Pakistan : 0092 334 508 4728, Skype: umer.nazir16 Email : [email protected] Qualification: Education : Passed Intermediate & secondary education examination for Azad Jammu Kashmir Mirpur, Kashmir, Pakistan. - FSC for (faculty of science in pre engineering) from Rawalakot Degree College for Azad Jammu Kashmir board of Education Mirpur, Pakistan. Mirpur, Pakistan, Year 1999. - Diploma in surveying Punjab board of technical education Lahore, Pakistan, Year 2000. - Tow year’s diploma in survey engineering from modern institute of informatics and management MIIM Islamabad, for Punjab board of technical education Lahore, Pakistan, 2012. - Training : Course name, Period Year - Advance diploma in information technology. 250 hours 2002 - AUTO CAD 2004. Six months 2006 - Microsoft Office 200x (Professional Edition). 2 days 2006 - Civil 3D land desktop 2009. 3 days 2009 - Eagle point survey software. 3 days 2010 oto

Transcript of Umer CV

Date: December /2014.

Name : Umer Nazir

Date of birth : 01/11/1979 Nationality : Pakistani Current Position : Senior Survey inspector.

Experience : 15 years. Contact : 00966 59 22 12 783

Pakistan : 0092 334 508 4728, Skype: umer.nazir16

Email : [email protected]

Qualification:

Education : Passed Intermediate & secondary education examination for Azad Jammu Kashmir Mirpur, Kashmir, Pakistan.

- FSC for (faculty of science in pre engineering) from Rawalakot Degree College for

Azad Jammu Kashmir board of Education Mirpur, Pakistan. Mirpur, Pakistan,

Year 1999. - Diploma in surveying Punjab board of technical education Lahore, Pakistan,

Year 2000.

- Tow year’s diploma in survey engineering from modern institute of informatics and

management MIIM Islamabad, for Punjab board of technical education Lahore, Pakistan, 2012.

-

Training :

Course name, Period Year

- Advance diploma in information technology. 250 hours 2002

- AUTO CAD 2004.

Six months 2006

- Microsoft Office 200x (Professional Edition). 2 days 2006

- Civil 3D land desktop 2009.

3 days 2009

- Eagle point survey software.

3 days 2010

oto

Experience : 15 years.

1) Position : Land Surveyor (Supervision)

Duration : Nov 2011 to 17 Nov 2014

Employer : Dar-Al-Riyadh Consultant engineering architect. Projects : Ministry of Housing, Infrastructure Construction Supervision Consultant,

(MOH), KSA. 1- Project name : MOH balding and Infrastructure, Rafha, ksa. Duration : 2 years Type of project : MOH Infrastructure Client : Ministry of Housing Project Value : 83 Million SR Role in this

project : Land Surveyor.

Infrastructure. - Provide assistance to the Resident Engineer/Project Engineer with

- Serve as the site person responsible for coordinating the daily site

survey works.

- Prepare responses to the Contractors when required.

- Submit daily report on site survey activities as directed by the Resident

Engineer / Project Manager.

- Supervise and remain vigilant regarding all aspects of the survey

works.

- Respond with appropriate and necessary levels of survey works to

provide quality assurance in accordance with Contract Documents.

- Assist the contractor on required survey procedures.

- Coordinate with the contractor for any survey works.

- Observe the safety procedures followed by the contractor.

- Review the adequacy and accuracy of the survey records,

Topographical Survey.

- Traversing Survey.

- Layout pipe line at tender drawing

- Calculation of vertical & horizontal alignment

- Layout of substation, water pipe line, link roads to substation.

- Dealing with sub contractors, client & consultant.

- The land title surveys, Boundary Surveys, horizontal and vertical

control Surveys.

- Topographic surveys, Building Location Surveys.

- Foundation Location Surveys, Utility and Pipeline Surveys, Land

planning Survey.

- Staking Global Positioning.

2- Project name : KING ABDULLA FINANCIAL DISTRICT (KAFD) Duration : From: 2011 To: Sept 2013 (2 Years) Type of project : Building. Client : RIC, Riyadh. Project Value 7.8 billion US Dollar Contract value : Scope of work : The financial sector and related industries, hosting the head quarters of

the Capital Market Authority, the Stock Exchange, banks, financial institutions and other service providers such as accountants, auditors, lawyers, analysts, rating agencies, consultants, and IT providers. The King Abdullah Financial District provides the next generation of development and will ensure the sustained dominance of Saudi Arabia as the largest economy and financial centre within the region. (KAFD) is a new development under construction near King Fahad Road in the Asahafa area of Riyadh, Saudi Arabia being undertaken by the Riyadh Investment Corporation[3] on behalf of the Pension Authority of the Kingdom of Saudi Arabia, consisting of 34 towers in an area of 1.6 million square meters. It will provide more than 3 million square meters of space for various uses, 62,000 parking spaces and accommodation for 12,000 residents. In 2011 it was the largest project in the world seeking green building accreditation. Bombardier won a $241m USD contract to build an automated monorail for the development. The district is designed to keep it isolated from close contact with the strictly monitored Riyadh society.[7] The design guidelines do not separate the sexes in the district. The KAFD master plan was designed and overseen by Danish Architects Henning Larsen Henning Larsen Architects.

Role in this project

: Surveyor (Supervision)

- Provide assistance to the Resident Engineer/Project Engineer with prompt exchange of correspondence, submittals and RFI's to all relevant parties. Dealing with sub contractors, client & consultant.

- Serve as the site person responsible for coordinating the daily site survey works. Staking Global Positioning.

- Submit daily report on site survey activities as directed by the Resident Engineer / Project Manager.

- Supervise and remain vigilant regarding all aspects of the survey works. Topographic surveys, Building Location Surveys, Land Development.

- Respond with appropriate and necessary levels of survey works to provide quality assurance in accordance with Contract Documents.

- Assist the contractor on required survey procedures. - Coordinate with the contractor for any survey works. - Observe the safety procedures followed by the contractor. - Review the adequacy and accuracy of the survey records, - Traversing Survey, Topographical Survey. - Layout of substation, water pipe line, link roads to substation.

2) Position : Chief surveyor Duration : Feb 2011 to Nov 2011

Employer : Saudi Landscape & Contracting (SALCO) 1- Projects : (KAPSARC) Type of project : Hardscape, Landscape and Irrigation. Client : Armco. Project Value Hole project 2 billion US Dollar Contract value : Scope of work : King Abdullah Petroleum Studies and Research Centre (KAPSARC) is a

future-oriented research and policy centre Committed to energy and environmental exploration and production and analysis. The 887,000 sq feet KAPSARC campus is Located in Riyadh, Saudi Arabia. The Entire complex will be LEED Platinum Rated upon completion, which is the highest Level achievable under U.S. Green Building Council specifications. SAS Global’s involvement in this project has been to supply HSE & QA/QC management staff, Commercial teams, MEP & Commissioning staff & Interior design project management staff.

- Provide assistance site Engineer/ site surveyors and report Project manager with prompt exchange of correspondence, submittals and RFI's to all relevant parties.

- Serve as the site person responsible for coordinating the daily site survey works.

- Prepare responses to the sub Contractors when required. - Submit daily report on site survey activities as directed to Project

Manager. - Supervise and remain vigilant regarding all aspects of the survey

works. - Coordinate with the consultant for any survey works. - Observe the safety procedures followed by the Client and consultants. - Traversing Survey, Topographical Survey. - Calculation of vertical & horizontal alignment - Layout of substation, water pipe line, link roads to substation. - Dealing with sub contractors, client & consultant. - The land title surveys, Boundary Surveys, horizontal and vertical

control Surveys. Land planning Survey. - Land Development Surveys, staking Global Positioning.

2- Projects : The Main Lines of Sewage Systems Project name : Sewage Network Al Ula. Duration : Sept 2010 To: Feb 2011 Type of project : Infrastructure. Client : Ministry of Water and Electricity Contract value : 16,926,933 SR. Role in this

project : Chief Surveyor

- All kind of survey work traversing Survey, sating out & calculations. - Layout pipe line at tender drawing, Layout pipe line at tender drawing,

supervision & control Surveyors team. - Layout of substation, water pipe line, link roads to substation.

- Dealing with sub contractors, client & consultant.

- The land title surveys, Boundary Surveys.

- Building Location Surveys.

- Foundation Location Surveys, Utility and Pipeline Surveys, Land

planning Survey.

- Serve as the site person responsible for coordinating the daily site

survey works.

- Prepare responses to the Contractors when required.

- Submit daily report on site survey activities as directed by the Resident

Engineer / Project Manager.

- Supervise and remain vigilant regarding all aspects of the survey

works.

- Respond with appropriate and necessary levels of survey works to

provide quality assurance in accordance with Contract Documents.

- Assist the contractor on required survey procedures.

- Coordinate with the consultant for any survey works.

- Observe the safety procedures followed by the consultant.

- Layout pipe line at tender drawing

- Layout of substation, water pipe line, link roads to substation.

- Topographic surveys, Building Location Surveys.

- Foundation Location Surveys, Utility and Pipeline Surveys, Land

planning Survey.

3- Project name : Rehabilitation of King Fahd Park and Palm Area Duration : Sept 2010 To: March 2011. Type of project : Soft And Hard Landscape Works. Client : Al Madinah Regional Municipality Contract value : 46,766,989.00 SR. Scope of work :

The central garden of Al Madina Al Munawarah is located at a distance of

five kilometers in the south of the Prophet’s Mosque, and on the borders

of the second circular road in Quba area which is famous of abundance of

groundwater and density of palm farms therein. It is bordered by the

district of Prince Naif from the north ,and Al Shabebah district from the

west, and a plot of land related to the Department of Water and Sanitary

Drainage in Al Madinah Munawarah from the east and south, and the total

area of the garden amounts to (4.3) m2.

Also, a number of entertainment parks have been established throughout

Al Madinah Al Munawarah including: Bae’gan park situated in universities

road near Prince Muhammad Bin Abdul Aziz‘s Sports City.

Role in this : Project.

- All kind of survey work traversing Survey, sating out & calculations. - Layout pipe line at tender drawing, supervision & control Surveyors team. - Layout of substation, water pipe line, link roads to substation. - Dealing with sub contractors, client & consultant. - The land title surveys, Boundary Surveys, horizontal and vertical control

Surveys. - Topographic surveys, Building Location Surveys. - Foundation Location Surveys, Utility and Pipeline Surveys, Land planning

Survey. - Road and utility design surveys, Subdivision. - Surveys, construction staking Global Positioning. - Provide assistance site Engineer/ site surveyors and report Project

manager. - Calculate levels and coordinates prepare necessary site repots and

calculations for site surveyors.

4- Project name : Civil construction work, Road building pipeline deferent position in Madina region.

Duration : From: September 2010 To: March 2011.

Type of project : Civil construction work.

Client : Al Madinah Regional Municipality

Contract value : Multiple positions different value for each project.

Role in this

project :

Chief Surveyor.

- All kind of survey work traversing Survey, sating out & calculations. - Layout pipe line at tender drawing, Layout pipe line at tender drawing,

supervision & control Surveyors team. - Layout of substation, water pipe line, link roads to substation. - Dealing with sub contractors, client & consultant. - The land title surveys, Boundary Surveys, horizontal and vertical

control Surveys. - Topographic surveys, Building Location Surveys. - Foundation Location Surveys, Utility and Pipeline Surveys, Land

planning Survey. - Road and utility design surveys, Subdivision. - Surveys, construction staking Global Positioning.

- Provide assistance site Engineer/ site surveyors and report Project

manager. - Calculate levels and coordinates prepare necessary site repots and

calculations for site surveyors.

5

- Project name : Tabuk Sewage project.

Duration : From: May 2009 To: Jul 2010.

Type of project : Infrastructure.

Client : Ministry of Water and Electricity.

Contract value : 52,641,034 SR

Scope of work : The implementation and completion of a series of infrastructure and

utility services projects in Tabuk region. The projects include construction

of new residential major and secondary roads. These included the cost of

studies, construction and supervision of water and sewage projects at a

cost of million, flood protection walls around water treatment plants in

Tabuk.

Role in this

project : Chief Surveyor

- All kind of survey work traversing Survey, sating out & calculations. - Layout pipe line at tender drawing - Layout of substation, water pipe line, link roads to substation. - Dealing with sub contractors, client & consultant. - The land title surveys, Boundary Surveys, horizontal and vertical

control Surveys. - Topographic surveys, Building Location Surveys. - Foundation Location Surveys, Utility and Pipeline Surveys, Land

planning Survey. - Road and utility design surveys, Subdivision. - Surveys, construction staking Global Positioning.

- Provide assistance site Engineer/ site surveyors and report Project manager.

- Calculate levels and coordinates prepare necessary site repots and calculations for site surveyors.

3) Position : Senior land surveyor Duration : Jan2006- May 2008

Employer : Al Jabar and partner, Qatar.

Projects : Qatari Diar, Lusail City

1- Project name : Infrastructure of the Safe Lusail North and Water front Commercial districts of Lusail

City.

Duration : From: Jun 2007 To: May 2008.

Type of project : Infrastructure.

Client : Qatari Diar real estate investment company Lusail Doha Qatar

Contract value :

Scope of work : More than 200,000 residents will live in Lusail’s scenic surroundings, with 170,000 people expected to work in the city’s different districts, and 80,000 expected to visit its entertainment and recreation facilities. Lusail City’s 19 districts will encompass not only new residential, commercial, hospitality, and retail opportunities, but a full array of community needs, complete with schools, mosques, medical facilities, sport, entertainment and shopping centers.

Role in this project

: Senior land Surveyor.

- All kind of survey work traversing Survey, sating out & calculations. - Layout pipe line at tender drawing

- Calculation of vertical & horizontal alignment

- Layout of substation, water pipe line, link roads to substation.

- Dealing with sub contractors, client & consultant.

- The land title surveys, Boundary Surveys, horizontal and vertical

control Surveys.

- Topographic surveys, Building Location Surveys.

- Foundation Location Surveys, Utility and Pipeline Surveys, Land

planning Survey.

- Road and utility design surveys, Subdivision.

- Land Development Surveys, hydrographic surveys, construction staking

Global Positioning.

- Engineering Design Surveys, Construction layouts, Industrial

development Surveys.

2- Project name : Integrated Gas and Gas to Liquids project.

Duration : From: Jan 2006 To: Jun 2007.

Type of project : Oil and Gas industry.

Client : Development and Production Sharing Agreement with Government of the State Qatar, 100% Shell funding.

Project Value : Value of hole project $18 billion-$19 billion

Scope of work : Pearl GTL is a world-scale project located in Ras Laffan Industrial City, 80 km north of Doha, Qatar. With full ramp-up achieved towards the end of 2012, Pearl GTL is the world’s largest source of gas-to-liquids (GTL) products, capable of producing 140,000 barrels of GTL products each day. The plant also produces 120,000 barrels of oil per day of natural gas l iquids and ethane.

Role in this project

: Senior land Surveyor

- All kind of survey work traversing Survey, sating out & calculations. - Layout pipe line at tender drawing

- Calculation of vertical & horizontal alignment

- Layout of substation, water pipe line, link roads to substation.

- Dealing with sub contractors, client & consultant.

- The land title surveys, Boundary Surveys, horizontal and vertical

control Surveys.

- Topographic surveys, Building Location Surveys.

- Foundation Location Surveys, Utility and Pipeline Surveys, Land

planning Survey.

- Road and utility design surveys, Subdivision.

- Land Development Surveys, hydrographic surveys, construction staking

Global Positioning.

- Engineering Design Surveys, Construction layouts, Industrial

development Surveys.

4) Position : Senior land surveyor Duration : Feb 2004- may 2006

Employer : National survey engineering, U.A.E.

Projects : Burj Khalifah (Burj Dubai).

1- Project name : World tower, Burj Dubai.

Duration : From: Jun 2007 To: may 2008

Type of project : Mixed Use

Client : Emaar Properties PJSC

Contract value : 1.5bn USD

Scope of work : Burj Khalifah (Burj Dubai) is the tallest man-made structure ever built. The building is part of the 2 km2 development called Downtown Dubai. The mixed use development will include residential units, offices, hotels and residential apartments. The tower is composed of three elements arranged around a central core. As it rises from the flat desert base, each element is set back in an upward-spiraling helical pattern, decreasing the mass of the tower as it reaches toward the sky and thereby decreasing the wind effects.

Role in this project : Senior land Surveyor - All kind of survey work traversing Survey, sating out & calculations. - Layout pipe line at tender drawing

- Calculation of vertical & horizontal alignment

- Layout of substation, water pipe line, link roads to substation.

- Dealing with sub contractors, client & consultant.

- The land title surveys, Boundary Surveys, horizontal and vertical control

Surveys, Topographic surveys, Building Location Surveys.

- Foundation Location Surveys, Utility and Pipeline Surveys, Land planning

Survey.

- Road and utility design surveys, Subdivision.

- Land Development Surveys, hydrographic surveys, construction staking Global

Positioning.

- Engineering Design Surveys, Construction layouts, Industrial development

Surveys.

2- Project name : Pam Jumeirah Island U.A.E

Duration : From: Mar 2003To: May 2006

Type of project : Mixed Use

Client : Nakheel

Project Value : Hole project, It cost about 12.9 Billion USD.

Contract value :

Scope of work :

The Palm Jumeirah is an artificial archipelago created using land reclamation by Nakheel, a company owned by the Dubai government in United Arab Emirates and was designed and developed by HHCP architects. It is one of three planned islands called the Palm Islands (Palm Jumeirah, Palm Jebel Ali and Palm Deira) which would have extended into the Persian Gulf, increasing Dubai's shoreline by a total of 520 kilometers (320 mi). The Palm Jumeirah is the smallest and the original of three Palm Islands originally under development by Nakheel. It is located on the Jumeirah coastal area of the emirate of Dubai, in the United Arab Emirates (UAE). Palm Jumeirah is the largest man-made island of the world for which construction was started in June 2001. More than 40000 workers from South Asia were involved in the construction work of the island, which was a mammoth task involving new techniques. The island was created by pouring in several million tons of sand into the deep sea bed with the help of dredgers. A special technique known as “rain bowing” was used in the process of reclamation of the land. Natural rock has been used in the creation of a natural breakwater in the island, which was created mainly to encourage sea life habitations. The total estimates cost involved in the project are almost US$12.3 billion. The first residential units were handed over to the proud residents in 2006. Today, nearly 500 families are already residing here and enjoying in one of the dream destinations of the world. It is expected that by the end of the year 2009, 28 hotels in the Crescent will open their doors to welcome the tourists. Palm Jumeirah is set to become a tourist hot-spot in just a few years. To visit this most beautiful man-made island in the world.

Role in this project : Senior land Surveyor.

- Provide assistance to the Resident Engineer/Project Engineer with

- Serve as the site person responsible for coordinating the daily site survey

works.

- Prepare responses to the Contractors when required.

- Submit daily report on site survey activities as directed by the Resident

Engineer / Project Manager.

- Supervise and remain vigilant regarding all aspects of the survey works.

Topographical Survey.

- Respond with appropriate and necessary levels of survey works to

provide quality assurance in accordance with Contract Documents.

- Assist the consultant on required survey procedures.

- Coordinate with the consultant for any survey works.

- Observe the safety procedures followed by the contractor.

- Review the adequacy and accuracy of the survey records,

- Traversing Survey.

- Layout pipe line at tender drawing

- Calculation of vertical & horizontal alignment

- Layout of substation, water pipe line, link roads to substation.

- Dealing with sub contractors, client & consultant.

- The land title surveys, Boundary Surveys, horizontal and vertical control

Surveys.

- Topographic surveys, Building Location Surveys.

- Planning Survey. Staking Global Positioning. Traversing Survey.

- Layout of substation, water pipe line, link roads to substation.

- Location Survey Levels.

- Foundation Location Surveys, Utility and Pipeline Surveys, Land planning

Survey.

- Road and utility design surveys, Subdivision.

- Land Development Surveys, hydrographic surveys, construction staking Global

Positioning.

- Engineering Design Surveys, Construction layouts, Industrial development

Surveys.

5) Position : Land surveyor. Duration : Dec 2001 - Mar 2003.

Employer : Al Nasar Contracting Company LL.C.

Projects : Mixed Use

1- Project name : Shuweihat Water Transmission Scheme - Lot C

Duration : 2 years

Type of project : Water works/ pumping station/ infrastructure/ complete Civil and Building Works.

Client : Abu Dhabi Water & electricity Authority (ADWEA).

Project Value (by US Dollar)

Contract value : (by US Dollar)

Scope of work : The Shuweihat Water Transmission Scheme consists of mussaffah and Mirfa pumping stations, plus a parallel double pipeline 1600mm dia, 250kms in length, with a transfer capacity of 100 million gallons of water per day. The capacity of the system will be increased from 100 million gallons a day (MGD) to 180 million gallons a day (MGD) to facilitate water transmission from the Shuweihat Phase 2 independent water and power project. Al Nasr Contracting Co was awarded with The Subcontract Scope of Works comprise the complete Civil and Building Works associated with the Mirfa Pumping Station as per the specifications, drawings and BOQ.

Role in this project

: Land surveyor

- All kind of survey work traversing Survey, sating out & calculations.

- Layout pipe line at tender drawing

- Calculation of vertical & horizontal alignment

- Layout of substation, water pipe line, link roads to substation.

- The land title surveys, Boundary Surveys, Topographic surveys,

Building Location Surveys.

- Foundation Location Surveys, Utility and Pipeline Surveys, Land

planning Survey. Leveling setting out and established control points.

- Road and utility design surveys, Subdivision.

6) Position : land surveyor Duration : Apr 2001-Dec 2001

Employer : Habib Rafiq (Pvt.) Limited

Projects : Worked as a civil surveyor Lahore, Pakistan.

1- Project name : Lahore International Airport.

Duration : From: Jun 2007 To: may 2008

Type of project : Mixed Use

Client : CAA

Contract value :

Scope of work : Allama Iqbal International Airport (AIIAP) (formerly known as Lahore International Airport) is the second largest, and third busiest, airport in Pakistan. The airport handles an average of 75–80 flights each day, but the

number of flights increases during the Hajj season and the airport handles about four million passengers a year. The completion of the new air terminal complex and its subsequent opening

in March 2003 increased the capacity with the aim of accommodating up to 6.5 million passengers a year by 2015.

Role in this project

: Land surveyor.

- Survey, sating out & calculations. - Layout pipe line

- Calculation of vertical & horizontal alignment.

- Layout of substation, water pipe line, link roads to substation.

- The land title surveys, Boundary Surveys, horizontal and vertical

control Surveys.

- Topographic surveys, Building Location Surveys.