UMATILLA ARMY DEPOT REUSE AUTHORITY REDEVELOPMENT … · Due to the nature of the process, size of...

49
DRAFT SUBMITTAL PART I UMATILLA ARMY DEPOT REUSE AUTHORITY May 28, 2010 Prepared for UMADRA by the Dana Mission Support Team “Solutions Planning for the Changing Environment of the Umatilla Chemical Depot” REDEVELOPMENT PLAN AND IMPLEMENTATION STRATEGY “This study was prepared under contract with the Confederated Tribes of the Umatilla Indian Reservation, Oregon, on behalf of the Umatilla Army Depot Reuse Authority with financial support from the Office of Economic Adjustment, Department of Defense. The content reflects the views of the UMADRA and does not necessarily reflect the views of the Office of Economic Adjustment.”

Transcript of UMATILLA ARMY DEPOT REUSE AUTHORITY REDEVELOPMENT … · Due to the nature of the process, size of...

Page 1: UMATILLA ARMY DEPOT REUSE AUTHORITY REDEVELOPMENT … · Due to the nature of the process, size of documents, and general maintenance of the information included in the UMCD Base

DRAFT SUBMITTAL PART I

UMATILLA ARMY DEPOT REUSE AUTHORITY

May 28, 2010

Prepared for UMADRA by the Dana Mission Support Team “Solutions Planning for the Changing Environment of the Umatilla Chemical Depot”

REDEVELOPMENT PLAN AND IMPLEMENTATION STRATEGY

“This study was prepared under contract with the Confederated Tribes of the Umatilla Indian Reservation, Oregon, on behalf of the Umatilla Army Depot Reuse Authority with financial support from the Office of Economic Adjustment, Department of Defense. The content reflects the views of the UMADRA and does not necessarily reflect the views of the Office of Economic Adjustment.” 

Page 2: UMATILLA ARMY DEPOT REUSE AUTHORITY REDEVELOPMENT … · Due to the nature of the process, size of documents, and general maintenance of the information included in the UMCD Base

UMADRA    Redevelopment Plan and Implementation Strategy            

Submittal Part I: Draft_00 

 

DMST_RPIS_D00_052810

 Editor’s Note:  

 

Due  to  the  nature  of  the  process,  size  of  documents,  and  general  maintenance  of  the 

information  included  in  the UMCD  Base  Reuse  Plan,  culmination  of  documents will  occur 

after the Public Comment period and UMADRA review is complete. The Submittal Package is 

composed of many parts and parcels, all of which  can be  found at our website under  the 

Documents tab, DMST Reports (www.missionumatilla.com). We have attempted to maintain 

the reports in a fashion that although currently separate, will make sense once the submittal 

document  is  completed.  As  Submittal  Part  I,  this  document  contains  the master  acronym 

listing  for  the  full  submittal  and  other  submittal  requirements  in  the  front  pages  (not 

numbered).  

The remainder of the document is relevant to this specific document. (pages i – 34) 

 

The  UMADRA will  have  a  review  of  the  “complete”  package  in  July  of  this  year  and  the 

“complete” package will be posted for public viewing. A full technical edit will be completed 

prior to delivery of the Submittal and will be posted on the website at that time. 

 

Thank you.

Page 3: UMATILLA ARMY DEPOT REUSE AUTHORITY REDEVELOPMENT … · Due to the nature of the process, size of documents, and general maintenance of the information included in the UMCD Base

UMADRA    Redevelopment Plan and Implementation Strategy            

Submittal Part I: Draft_00 

 

DMST_RPIS_D00_052810

Approved by the Umatilla Army Depot Reuse Authority on July _____, 2010

UMADRA - LOCAL REDEVELOPMENT AUTHORITY MEMBERS

William (Bill) Hansell, Chairman/Commissioner

George Anderson, Attorney

Terry Tallman, Vice-Chair/ County Judge

Carla McLane, County Planner

Kim Puzey, Port Director

John Turner, Port Commissioner/President BMCC

Gary Neal, General Manager

Lisa Mittelsdorf (alt), Director of Economic Development

Joe Taylor, Port Commissioner/Agriculture

Dr. Rodney Skeen, Contract Manager/PhD, PE Env.

Carl Scheeler, Wildlife Program Manager

Rosenda Shippentower, Tribal Board of Trustees Treasurer

William Quaempts, Tribal Board of Trustees, Member at Large

EX-OFFICIO LRA BOARD MEMBERS

Scott Fairley, Governor’s Office

LTC. Christian Rees, Oregon National Guard

REPRESENTATION

Page 4: UMATILLA ARMY DEPOT REUSE AUTHORITY REDEVELOPMENT … · Due to the nature of the process, size of documents, and general maintenance of the information included in the UMCD Base

UMADRA    Redevelopment Plan and Implementation Strategy            

Submittal Part I: Draft_00 

 

DMST_RPIS_D00_052810

DANA MISSION SUPPORT TEAM – LRA SUPPORT STAFF

William Dana, ME/PE Program Mngr/President

Donald Chance, PhD Executive Director

Kimberley Swentik Executive Admin./MSE PM

Brian Cole Planning Specialist

Dennis Walters Facilitator/Vice President

Nancy Ness Homeless Assessment/Admin

Barry C.K. Moravek Communications Specialist/VP Western Operations

Richard (Dick) Stone Communications Subject Matter Expert

Jay Cornish Chief Environmental Scientist/Biologist

Bernard Fineberg, EE/PE Electrical Engineer, PE

Ross Dunfee, CE/PE Civil Engineer, PE

Richard (Dick) Walker, EE/PE Electrical Engineer, PE

Tom Burkhart, ME/PE Mechanical Engineer – Systems, PE

Ruthmeri Gleason Webmaster/Technical Editor

Kathy Murray, CPPA Certified Personal Property Administrator

Steve Antonioli Economic Analyst

Kevin Bradford Graphics/Technical Expert

John Hanson Assessor/Chemical Engineer

Timothy McAnarney BRAC Technical Specialist

Mario Fiori, PhD BRAC Senior Advisor

Stephen Heck Air Quality, EPA Superfund Subject Matter Expert

Steve Mallory, AIA, CSI Principal Architect

LRA SUPPORT STAFF

Page 5: UMATILLA ARMY DEPOT REUSE AUTHORITY REDEVELOPMENT … · Due to the nature of the process, size of documents, and general maintenance of the information included in the UMCD Base

UMADRA    Redevelopment Plan and Implementation Strategy            

Submittal Part I: Draft_00 

 

DMST_RPIS_D00_052810

MASTER ACRONYM KEY Acronym  Definition  Document A  Agriculture  Redevelopment/Implementation Strategy 

Infrastructure AC  asbestos cement (pipe)  

Ecosystem 

ACM   asbestos containing material (>1% by weight asbestiform minerals)  

Environmental Assessment 

Facilities Assessment 

Environmental Assessment 

ADA  ammunition disposal area 

Redevelopment/Implementation Strategy 

ADSL  Asymmetric Digital Subscriber Line  Infrastructure 

AOC   area of concern   Environmental Assessment 

AQI   air quality index   Ecosystem 

ATSDR   Agency for Toxic Substances and Disease Registry   Ecosystem 

B.P.   before present   Ecosystem 

BCP   Base Cleanup Plan (U.S. Army, 1995)   Environmental Assessment 

BEA  Bureau of Economic Assessment  Market Assessment 

bgs   below ground surface   Environmental Assessment 

Economic Assessment 

Land Use 

BLM  Bureau of Land Management 

Redevelopment/Implementation Strategy 

BLS  US Bureau of Labor Statistics  Market Assessment 

BMCC  Blue Mountain Community College  Economic Assessment 

BR&E  Business Retension & Expansion  Economic Assessment 

Economic Assessment 

Land Use 

Market Assessment 

Redevelopment Alternatives 

Environmental Assessment 

Homeless 

Redevelopment/Implementation Strategy 

BRAC  Base Realignment and Closure 

Public Outreach Summary 

BTEX   benzene, toluene, ethylbenzene, and xylene   Environmental Assessment 

Facilities Assessment BTU 

British thermal unit  Infrastructure 

CAB  Cement Asbestos Board  Facilities Assessment 

Homeless CAPECO   Community Action Program East Central Oregon 

Redevelopment/Implementation Strategy 

CAT  Category  Infrastructure 

Environmental Assessment CERCLA   Comprehensive Environmental Response, Compensation, and Liability Act   Redevelopment/Implementation Strategy 

Environmental Assessment CERFA   Community Environmental Response Facilitation Act  

Ecosystem 

Page 6: UMATILLA ARMY DEPOT REUSE AUTHORITY REDEVELOPMENT … · Due to the nature of the process, size of documents, and general maintenance of the information included in the UMCD Base

UMADRA    Redevelopment Plan and Implementation Strategy            

Submittal Part I: Draft_00 

 

DMST_RPIS_D00_052810

Acronym  Definition  Document Environmental Assessment 

Ecosystem 

CFR   Code of Federal Regulations  

Homeless 

cfs  Cubic feet per second  Land Use 

CL   confidence limit(s)   Environmental Assessment 

CMU  Concrete Masonry Unit  Facilities Assessment 

COE  Corp of Engineers  Land Use 

CSEPP  Chemical Stockpile Emergency Preparedness Program  Economic Assessment 

Economic Assessment 

Land Use 

Environmental Assessment 

Ecosystem 

Homeless 

CTUIR  Confederated Tribes of the Umatilla Indian Reservation 

Redevelopment/Implementation Strategy 

D&D  Decontamination and Decommissioning  Redevelopment/Implementation Strategy 

DBP   disinfection by‐products   Ecosystem 

DEQ  Oregon Department of Environmental Quality  Infrastructure 

Economic Assessment 

Facilities Assessment 

Market Assessment 

Redevelopment/Implementation Strategy 

DMST  Dana Mission Support Team 

Public Outreach Summary 

Redevelopment Alternatives DoD  Department of Defense 

Homeless 

DPI  Disposable Personal Income  Market Assessment 

DRMO     Facilities Assessment 

ECF  Entry Control Facility  Infrastructure 

ECP   Environmental Condition of Property (report)   Environmental Assessment 

EFU  exclusive farm use  Land Use 

ESD   explanation of significant differences   Environmental Assessment 

FAA  Federal Aviation Administration  Economic Assessment 

FEMA  Federal Emergency Management Agency  Redevelopment/Implementation Strategy 

FICWD   Federal Interagency Committee for Wetlands Delineation  

Ecosystem 

FOSET   finding of suitability to early transfer   Environmental Assessment 

FOSL   finding of suitability to lease   Environmental Assessment 

FOST   finding of suitability to transfer   Environmental Assessment 

FR2  Farm Residential  Land Use 

Environmental Assessment ft   feet  

Ecosystem 

GAC   granular activated carbon   Environmental Assessment 

GDP  Gross Domestic Product  Market Assessment 

Page 7: UMATILLA ARMY DEPOT REUSE AUTHORITY REDEVELOPMENT … · Due to the nature of the process, size of documents, and general maintenance of the information included in the UMCD Base

UMADRA    Redevelopment Plan and Implementation Strategy            

Submittal Part I: Draft_00 

 

DMST_RPIS_D00_052810

Acronym  Definition  Document Environmental Assessment gpm   gallons per minute  

Ecosystem 

GIS  Geographic Information System  Redevelopment/Implementation Strategy 

Environmental Assessment GWMA   Groundwater Management Area  

Ecosystem 

HC/I  Highway Commercial/Industrial  Redevelopment/Implementation Strategy 

HQ/HI   hazard quotient/hazard index   Environmental Assessment 

hr   hour   Ecosystem 

HSP   Homeless Service Provider  Homeless 

Homeless HUD   U.S. Department Of Housing And Urban Development 

Redevelopment/Implementation Strategy 

HVAC  Heating, ventilating, and air conditioning  Facilities Assessment 

I  Industrial  Redevelopment/Implementation Strategy 

ILRA  Implementation Local Reuse Authority  Redevelopment/Implementation Strategy 

IMPLAN  IMpact Analysis for PLANning  Economic Assessment 

INRMP   Integrated Natural Resources Management Plan   Ecosystem 

IWW   Institute for Water and Watersheds (at Oregon State University)  

Ecosystem 

K  Thousand  Infrastructure 

KSF  Key Success Factor  Economic Assessment 

KVA  Kilovolt‐Ampere  Infrastructure 

LAN  Local Area Network  Infrastructure 

LBA   Legally Binding Agreement  Homeless 

LCDC  Land Conservation and Development Commission  Land Use 

LEIC   lifetime excess incidence of cancer   Environmental Assessment 

Market Assessment 

Redevelopment Alternatives 

Environmental Assessment 

Economic Assessment 

Land Use 

Homeless 

Redevelopment/Implementation Strategy 

LRA  Local Redevelopment Authority 

Public Outreach Summary 

LTC  Lieutenant Colonel   Public Outreach Summary 

LTM   long‐term monitoring   Environmental Assessment 

LUB   Lower Umatilla Basin   Ecosystem 

M‐COFT  Mobile Conduct of Fire Trainer Pad  Redevelopment/Implementation Strategy 

Environmental Assessment MCL   maximum contaminant level (in drinking water)  

Ecosystem 

MEC   munitions and explosives of concern   Environmental Assessment 

Environmental Assessment mg/L   milligrams per liter (= parts per million)  

Ecosystem 

Page 8: UMATILLA ARMY DEPOT REUSE AUTHORITY REDEVELOPMENT … · Due to the nature of the process, size of documents, and general maintenance of the information included in the UMCD Base

UMADRA    Redevelopment Plan and Implementation Strategy            

Submittal Part I: Draft_00 

 

DMST_RPIS_D00_052810

Acronym  Definition  Document mph   miles per hour   Ecosystem 

MPN   most probable number (of microbes)   Ecosystem 

MT  Military Training  Redevelopment/Implementation Strategy 

MVA  Million Volt‐Amperes  Infrastructure 

NAAQS   National Ambient Air Quality Standard   Ecosystem 

NEC  National Electrical Code  Facilities Assessment 

NEPA   National Environmental Policy Act   Environmental Assessment 

NFPA 70  National Fire Protection Association  Facilities Assessment 

Market Assessment 

Redevelopment Alternatives 

Homeless 

NOI  Notice of Interest 

Redevelopment/Implementation Strategy 

NPL   National Priorities List (under CERCLA)   Environmental Assessment 

OAR   Oregon Administrative Rules   Environmental Assessment 

OB/OD   open burning/open detonation   Environmental Assessment 

Environmental Assessment ODEQ   Oregon Department of Environmental Quality  

Ecosystem 

ODGAMI  Oregon Department of Geology and Mineral Industries  Economic Assessment 

ODHS/DWP   Oregon Department of Human Services/Drinking Water Program  

Ecosystem 

ODOT  Oregon Department of Transportation  Redevelopment Alternatives 

Economic Assessment OEA  Office of Economic Adjustment 

Homeless 

OEA  Office of Economic Adjustment  Redevelopment/Implementation Strategy 

Economic Assessment OEDA  Oregon Economic Development Association 

Market Assessment 

OHTAC   Oregon Historic Trails Advisory Council   Ecosystem 

OMD  Oregon Military Department  Redevelopment Alternatives 

Land Use 

Redevelopment Alternatives 

Environmental Assessment 

ORNG  Oregon National Guard 

Redevelopment/Implementation Strategy 

ONHIC   Oregon Natural Heritage Information Center   Ecosystem 

OSHA  Occupational Safety and Health Administration  Facilities Assessment 

OSHA  Occupational Safety and Health Act  Redevelopment/Implementation Strategy 

Environmental Assessment OU   operable unit  

Ecosystem 

P.L.   public law   Environmental Assessment 

PAH   polyaromatic hydrocarbon   Environmental Assessment 

PBC   Public Benefit Conveyance  Homeless 

PBC  Public Benefit Conveyance  Redevelopment/Implementation Strategy 

pCi/l   pico‐Curie/liter   Environmental Assessment 

Page 9: UMATILLA ARMY DEPOT REUSE AUTHORITY REDEVELOPMENT … · Due to the nature of the process, size of documents, and general maintenance of the information included in the UMCD Base

UMADRA    Redevelopment Plan and Implementation Strategy            

Submittal Part I: Draft_00 

 

DMST_RPIS_D00_052810

Acronym  Definition  Document pCi/l   pico‐Curie/liter   Ecosystem 

PILT  Payment in Lieu of Taxes  Redevelopment/Implementation Strategy 

Plan  Redevelopment Plan and Implementation Strategy  Redevelopment/Implementation Strategy 

PM10   particulate matter 10 – microns (or less) in diameter   Ecosystem 

PM2.5   particulate matter 2.5 – microns (or less) in diameter   Ecosystem 

PMB  Personnel and Maintenance Building  Infrastructure 

PNNL  Pacific National Laboratory  Redevelopment Alternatives 

Environmental Assessment ppb(m)   parts per billion (million)  

Ecosystem 

PRG   preliminary remediation goals   Environmental Assessment 

PSB  Personal Support Building  Infrastructure 

Infrastructure PVC  polyvinyl chloride (pipe)  

Ecosystem 

RA   risk assessment (human health or ecological)   Environmental Assessment 

RAC   remedial action complete   Environmental Assessment 

RCRA   Resource Conservation and Recovery Act (as amended)   Environmental Assessment 

RCRA  Resource Conservation and Recovery Act  Redevelopment/Implementation Strategy 

Environmental Assessment RDX   Royal Demolition Explosive (hexahydro–1,3,5–trinitro–1,3,5–triazine)  Ecosystem 

RI/FS   remedial investigation/feasibility study   Environmental Assessment 

ROD   record of decision   Environmental Assessment 

ROD  Record of Decision  Redevelopment/Implementation Strategy 

RPIS  Redevelopment Plan and Implementation Strategy  Redevelopment/Implementation Strategy 

RR1  Rural Residential  Land Use 

Ecosystem RTE  rare, threatened, endangered (plant‐animal species)  

Ecosystem 

RV  Recreational Vehicle  Facilities Assessment 

S/S   solidification/stabilization   Environmental Assessment 

SAIC   Science Applications International Corporation   Ecosystem 

SETH     Facilities Assessment 

Sq ft  Square feet  Facilities Assessment 

ssp.   subspecies (of a particular species)   Ecosystem 

SWRI  Southwest Research Institute  Facilities Assessment 

TCLP   toxicity characteristic leach procedure   Environmental Assessment 

TCP  Traditional Cultural Properties  Land Use 

TCPC  Tank Crew Proficiency Course  Redevelopment/Implementation Strategy 

TNT   2,4,6 – trinitrotoluene   Environmental Assessment 

TNT 2,4,6 –   trinitrotoluene   Ecosystem 

TSCA   Toxic Substances Control Act   Environmental Assessment 

TCSA  Toxic Substances Control Act  Redevelopment/Implementation Strategy 

TSDF   treatment, storage, or disposal facility   Environmental Assessment 

U.S.C.   United States Code   Environmental Assessment 

Page 10: UMATILLA ARMY DEPOT REUSE AUTHORITY REDEVELOPMENT … · Due to the nature of the process, size of documents, and general maintenance of the information included in the UMCD Base

UMADRA    Redevelopment Plan and Implementation Strategy            

Submittal Part I: Draft_00 

 

DMST_RPIS_D00_052810

Acronym  Definition  Document Ecosystem 

UADTZ  Umatilla Army Depot Transition Zone  Land Use 

Economic Assessment UEC  Umatilla Electrical Cooperative 

Infrastructure 

UFSG   Unhealthy for Sensitive Groups   Ecosystem 

UGB  Urban Growth Boundary  Land Use 

Market Assessment 

Redevelopment Alternatives 

Homeless 

Redevelopment/Implementation Strategy 

UMADRA  Umatilla Army Depot Reuse Authority 

Public Outreach Summary 

Facilities Assessment 

Infrastructure 

Market Assessment 

Redevelopment Alternatives 

Environmental Assessment 

Economic Assessment 

Land Use 

Ecosystem 

Homeless 

UMCD  Umatilla Chemical Depot 

Public Outreach Summary 

Facilities Assessment 

Infrastructure 

Redevelopment Alternatives 

Environmental Assessment 

Economic Assessment 

Ecosystem 

UMCDF  Umatilla Chemical Disposal Facility or Umatilla Chemical Agent Disposal Facility 

Redevelopment/Implementation Strategy 

UPRR  Union Pacific Railroad  Infrastructure 

Land Use 

Environmental Assessment 

USACE  United States Army Corp of Engineers 

Ecosystem 

USDoD   United States Department of Defense   Environmental Assessment 

Land Use 

Environmental Assessment 

USEPA  United States Environmental Protection Agency 

Ecosystem 

Land Use USFS  United States Forest Service 

Ecosystem 

Redevelopment Alternatives 

Ecosystem 

USFWS  United States Fish and Wildlife Service 

Redevelopment/Implementation Strategy 

UXO   unexploded ordnance  Environmental Assessment 

Page 11: UMATILLA ARMY DEPOT REUSE AUTHORITY REDEVELOPMENT … · Due to the nature of the process, size of documents, and general maintenance of the information included in the UMCD Base

UMADRA    Redevelopment Plan and Implementation Strategy            

Submittal Part I: Draft_00 

 

DMST_RPIS_D00_052810

Acronym  Definition  Document Redevelopment/Implementation Strategy 

V  Volt  Infrastructure 

VA  Volt‐Ampere  Infrastructure 

VAT  Vinyl asbestos tile  Facilities Assessment 

WDC‐URS  Washington Demilitarization Company‐URS Corp  Facilities Assessment 

WGI  Washington Group International  Facilities Assessment 

WR  Wildlife Refuge  Redevelopment/Implementation Strategy 

Environmental Assessment μg/L   micrograms per liter (= parts per billion)  

Ecosystem 

Environmental Assessment μg/m3   micrograms per dry standard cubic meter  

Ecosystem 

 

Page 12: UMATILLA ARMY DEPOT REUSE AUTHORITY REDEVELOPMENT … · Due to the nature of the process, size of documents, and general maintenance of the information included in the UMCD Base

UMADRA    Redevelopment Plan and Implementation Strategy            

Submittal Part I: Draft_00 

 

DMST_RPIS_D00_052810 i

TABLE OF CONTENTS  TABLE OF CONTENTS........................................................................................................................................... i 

LISTING OF FIGURES........................................................................................................................................... ii 

ACRONYM KEY ................................................................................................................................................ iii 

EXECUTIVE SUMMARY .................................................................................................................................. 1 

SECTION ONE: PLANNING PROCESS.............................................................................................................. 2 

Redevelopment Plan—Overview ............................................................................................................. 3 

Summary of Plan Components................................................................................................................. 4 

SECTION TWO: REDEVELOPMENT PLAN.....................................................................................................14 

REDEVELOPMENT ZONES .......................................................................................................................16 

Military Training Zone.........................................................................................................................17 

Wildlife Refuge Zone...........................................................................................................................20 

Industrial Zone ....................................................................................................................................22 

Restricted Industrial............................................................................................................................23 

Highway Commercial and Industrial Zone .........................................................................................24 

Agriculture...........................................................................................................................................25 

SPECIAL CONSIDERATIONS .....................................................................................................................26 

Shrub‐Step Policy ................................................................................................................................26 

Environmental Clean‐Up.....................................................................................................................27 

Water and Sewer Infrastructure.........................................................................................................28 

Rail Salvage..........................................................................................................................................28 

Road Policy ..........................................................................................................................................29 

Law Enforcement Policy......................................................................................................................29 

Security ................................................................................................................................................29 

Fire Protection Policy ..........................................................................................................................29 

INTEGRATION WITH COUNTY ZONING CODES ......................................................................................30 

SECTION THREE: IMPLEMENTATION STRATEGY .........................................................................................31 

Case for a No‐Cost Economic Development Conveyance .....................................................................32 

Recommending an Implementing LRA...................................................................................................33 

 

Page 13: UMATILLA ARMY DEPOT REUSE AUTHORITY REDEVELOPMENT … · Due to the nature of the process, size of documents, and general maintenance of the information included in the UMCD Base

UMADRA    Redevelopment Plan and Implementation Strategy            

Submittal Part I: Draft_00 

 

DMST_RPIS_D00_052810 ii

LISTING OF TABLES

Table 1: The Planning Process....................................................................................................................... 2 

Table 2: Prioritized Key Strategies ................................................................................................................ 5 

Table 3: At‐a‐glance Alternatives................................................................................................................12 

Table 4: Redevelopment Zone Acreage ......................................................................................................16 

Table 5: Description of Zones .....................................................................................................................16 

Table 6: ORNG Staffing, Facilities, & Land Requirements...........................................................................18 

Table 7: Migratory Bird Species ..................................................................................................................21 

 

LISTING OF FIGURES  Figure 1: UMCD Redevelopment Plan ........................................................................................................14 

Figure 2: UMCD Proposed Land Reuse .......................................................................................................15 

Figure 3: Military Training Zone..................................................................................................................17 

Figure 4: Wildlife Refuge Zone....................................................................................................................20 

Figure 5: Industrial Zone .............................................................................................................................22 

Figure 6: Restricted Industrial Zone............................................................................................................23 

Figure 7: Highway Commercial/Industrial Zone .........................................................................................24 

Figure 8: Implementation Strategy .............................................................................................................31 

 

 

Page 14: UMATILLA ARMY DEPOT REUSE AUTHORITY REDEVELOPMENT … · Due to the nature of the process, size of documents, and general maintenance of the information included in the UMCD Base

UMADRA    Redevelopment Plan and Implementation Strategy            

Submittal Part I: Draft_00 

 

DMST_RPIS_D00_052810 iii

 

ACRONYM KEY ACRONYM  DEFINITION A  Agriculture 

ADA   Ammunition Disposal Area 

BLM  Bureau of Land Management 

BRAC  Base Realignment and Closure 

CAPECO  Community Action Program of East Central Oregon 

CERCLA  Comprehensive Environmental Response, Compensation, and Liability Act 

CTUIR  Confederated Tribes of the Umatilla Indian Reservation 

D&D  Decontamination and Decommissioning 

DMST  Dana Mission Support Team 

FEMA  Federal Emergency Management Agency 

GIS  Geographic Information System 

HC/I  Highway Commercial/Industrial 

HUD  US Department of Housing and Urban Development 

I  Industrial 

ILRA  Implementation Local Reuse Authority 

LRA  Local Redevelopment Authority 

M‐COFT  Mobile Conduct of Fire Trainer Pad 

MT  Military Training 

NOI  Notices of Interest 

OEA  Office of Economic Adjustment 

ONG  Oregon National Guard 

OSHA  Occupational Safety and Health Act 

PBC  Public Benefit Conveyance 

PILT  Payment in Lieu of Taxes 

Plan  Redevelopment Plan and Implementation Strategy 

RCRA  Resource Conservation and Recovery Act 

ROD  Record of Decision 

RPIS  Redevelopment Plan and Implementation Strategy 

TCPC  Tank Crew Proficiency Course 

TCSA  Toxic Substances Control Act 

UMADRA  Umatilla Army Depot Reuse Authority 

UMDCF  Umatilla Chemical Demilitarization Facility 

USFWS  US Fish and Wildlife Service 

UXO  Unexploded Ordinance 

WR  Wildlife Refuge 

Page 15: UMATILLA ARMY DEPOT REUSE AUTHORITY REDEVELOPMENT … · Due to the nature of the process, size of documents, and general maintenance of the information included in the UMCD Base

UMADRA    Redevelopment Plan and Implementation Strategy            

Submittal Part I: Draft_00 

 

DMST_RPIS_D00_052810 iv

This page intentionally left blank

Page 16: UMATILLA ARMY DEPOT REUSE AUTHORITY REDEVELOPMENT … · Due to the nature of the process, size of documents, and general maintenance of the information included in the UMCD Base

UMADRA    Redevelopment Plan and Implementation Strategy            

Submittal Part I: Draft_00 

 

DMST_RPIS_D00_052810                                 1

EXECUTIVE SUMMARY The Umatilla Army Depot Reuse Authority (LRA) has developed this Redevelopment Plan and Implementation Strategy (RPIS or Redevelopment Plan or Plan) for the Umatilla Chemical Depot (UMCD). The Depot, which is approximately 17,000 acres in size exclusive of restrictive easements, is located in Northern Morrow and Umatilla counties in northeastern Oregon. Originally listed in the 1988 Base Realignment and Closure (BRAC) process, the Department of Defense ultimately recommended closure of UMCD during the 2005 BRAC round of announcements. The chemical demilitarization operation at UMCD is anticipated to culminate in 2012 (or later). The LRA was established in order to address the economic impacts associated with the closure of UMCD, and to facilitate environmental goals as well as reuse opportunities by the Oregon National Guard. Leaders of the region as well as representatives supporting the State of Oregon’s interests have served on the LRA for over two decades. This Redevelopment Plan and Homeless Assistance submission to HUD and the Military Department is in conformance with Public Law 101-510, Section 2905(b)(7)(K)(iii)—“the Secretary of Defense shall dispose of buildings and property under clause (i) in accordance with the Record of Decision or other decision document prepared by the Secretary in accordance with the National Environmental Policy Act of 1969 (42 U.S.C. 4321 et seq.). In preparing the Record of Decision or other decision document, the Secretary shall give substantial deference to the Redevelopment Plan. This Redevelopment Plan is important because the Military Department will use it to conduct the property disposal environmental analysis required by NEPA. The Military Department treats the Plan as a part of the proposed federal action for the installation. The Plan also serves as the basis for consideration of land transfers and the establishment of Economic Development Conveyances. This RPIS is divided into three overarching sections: Section One: Planning Process. The LRA utilized an extensive planning process as governed by the Department of Defense Office of Economic Adjustment (OEA). The process employed a series of methods to collect information about the status and condition of UMCD as well as the thoughts and desires of the general public about reuse options. A total of ten tasks were completed by the LRA contractor, the Dana Mission Support Team (DMST), between the period of July 2009 and June 2010. Section Two: Redevelopment Plan. The Redevelopment Plan recommends specific redevelopment land use zones to accommodate the three overarching goals of economic development, environmental preservation, and military reuse. Section Three: Implementation Strategy. The Implementation Strategy makes specific recommendations regarding conveyance mechanisms for the land, a follow-on analysis specific to infrastructure recommendations, a ten-year business plan, and the establishment of an Implementing LRA to manage the economic development conveyances being recommended.

A Plan for the Future This Redevelopment Plan and

Implementation Strategy makes a series of recommendations to the US

Department of the Army for the reuse of the Umatilla Chemical Depot in order to create jobs, preserve the environment, and foster the development of a training facility for the Oregon National Guard.

Page 17: UMATILLA ARMY DEPOT REUSE AUTHORITY REDEVELOPMENT … · Due to the nature of the process, size of documents, and general maintenance of the information included in the UMCD Base

UMADRA    Redevelopment Plan and Implementation Strategy            

Submittal Part I: Draft_00 

 

DMST_RPIS_D00_052810                                 2

SECTION ONE: PLANNING PROCESS The LRA conducted a competitive process during the Spring/Summer of 2009 and selected the Dana Mission Support Team (DMST), a joint effort by Dana Engineering, Inc. and MSE Technology Applications, Inc., to conduct the BRAC-defined planning process under the guidance of the Department of Defense Office of Economic Adjustment (OEA). A task oriented process outlined by the LRA and OEA provided the guiding factors used by the DMST to meet the following objectives:

Development of a broad, current assessment of the land, buildings, and infrastructure Inventorying of economic development and reuse opportunities Assessment of the current environmental condition of UMCD Completion of a market analysis Identification of homeless service opportunities Consideration of viable alternatives for redevelopment Provision of widespread opportunities for public input Development of the Redevelopment Plan and Implementation Strategy (RPIS)

THE PLANNING PROCESS Inputs  Outputs 

Procedure  Amount  Date *  Tasks/Reports  Date *  Purpose 

LRA Meetings  12  Monthly Public Outreach/ 

Comment  (four reports) 

August October November 

Public outreach:  identification of community’s 

future vision of UMCD; Values Mapping 

Website Feedback  Ongoing  Entire Year  Land Analysis  October Description of the 

characteristics of the land 

Direct Feedback to LRA Members and 

DMST Staff Ongoing 

July June 

Facilities  November Summary of UMCDF, Administrative Area, 

warehouses, igloos, etc. 

Public Meetings  2 August 

September  

Environmental Assessment 

November General summary of the 

environmental condition of the land and buildings 

Focus Group Sessions 

3 October November 

 Infrastructure  December 

Summary of airport runway, grounding network, electrical 

distribution, gravel resources, potable water 

supply, roads, railway, storm drains, sanitary wastewater, natural gas, and UMCDF 

facilities 

Public Hearings  2 April June 

Social and Economic Assessment 

December Summary of the economic 

reuse opportunities at UMCD 

Market Assessment 

December 

Determination of the market demand for short‐term leasing and long‐term potential at UMCD 

Alternatives Report 

April Presentation of five general alternatives for UMCD reuse. 

* The dates in this table refer to the range of dates from July 2009 – June 2010. 

 

Redevelopment Plan and 

Implementation Study 

June Final recommendation by the LRA to the Department of the 

Army and HUD 

Table 1: The Planning Process

Page 18: UMATILLA ARMY DEPOT REUSE AUTHORITY REDEVELOPMENT … · Due to the nature of the process, size of documents, and general maintenance of the information included in the UMCD Base

UMADRA    Redevelopment Plan and Implementation Strategy            

Submittal Part I: Draft_00 

 

DMST_RPIS_D00_052810                                 3

The DMST established an administrative office in Umatilla, Oregon to ensure responsive communications with the LRA and the general public. Under the leadership of the LRA, the DMST helped to coordinate LRA meetings, public meetings, focus group sessions, and public hearings to produce this RPIS. The preceding table briefly summarizes the inputs and outputs of the planning process. Redevelopment Plan—Overview

There are eight overarching factors that govern the opportunities and limitations with respect to reuse at UMCD:

The state and national economy is recovering from a deep recession, and 1,170 individuals will lose their jobs or be relocated due to the pending UMCD closure. A significant portion of those positions are unique in character in that they were created as temporay project based jobs with special skill sets affiliated with the demilitarization of chemical weapons.

UMCD offers significant locational and access-infrastructure advantages. The existing condition of the buildings and infrastructure at UMCD, with the exception of the

UMCDF structures, are generally substandard. Many of the UMCD structures have unique military applications and are not easily converted to alternative uses.

The immediate region, especially as defined by the Ports of Morrow and Umatilla as well as the economic development efforts of CTUIR, offers job creation opportunities that may lessen some of the need for economic reuse at UMCD.

UMCD’s physical expanse and existing site conditions offers large-scale reuse opportunities generally in short supply elsewhere including military training, habitat preservation, and certain types of large scale industrial and institutional applications.

Preservation of shrub-steppe is a major environmental priority for the LRA. The Oregon National Guard has a specific, immediate opportunity to develop a training

facility. A general analysis of development assets yields limited economic development possibilities.

The most promising strategies for reuse include energy development, telecommunication businesses, transportation distribution centers, attracting government funding, environmental restoration, and business recruitment.

All of the factors listed immediately above have impacted both the Redevelopment Plan as well as the Implementation Strategy. Set against the backdrop of these factors are three overarching goals established by the LRA:

Economic Development (job creation) Environmental Preservation (with a special emphasis on

the shrub-steppe habitat) Military Reuse (accommodating the needs and plans of the

Oregon National Guard) During a Values Mapping discussion held by the LRA in the summer of 2009, the above three overarching goals were weighted. The economic development and environmental preservation goals each hold a 40% weight while the military reuse goal holds a 20% weight. The weighting scheme developed by the LRA relates to the relative priority of the three objectives, not to a direct allocation of acreage. The LRA believes that this Redevelopment Plan and Implementation Strategy not only addresses all of the factors identified above, but also accommodates these three overarching goals.

Overarching GoalsEconomic Development 

Environmental Preservation Military Reuse

Page 19: UMATILLA ARMY DEPOT REUSE AUTHORITY REDEVELOPMENT … · Due to the nature of the process, size of documents, and general maintenance of the information included in the UMCD Base

UMADRA    Redevelopment Plan and Implementation Strategy            

Submittal Part I: Draft_00 

 

DMST_RPIS_D00_052810                                 4

Summary of Plan Components

As noted in the previous table, the planning process has been comprised of nine tasks (in addition to the administrative work). While each of these tasks has been approached independently, the DMST has also worked to ensure that the findings and conclusions of each respective task informs other tasks in the planning process. As such, this RPIS is an integrated plan. Each of the respective planning tasks and corresponding reports has their own executive summary. The information that immediately follows is, in effect, an executive summary of the executive summaries in order to provide a very high-level overview of the findings of the planning process. (Note: the following summary presents the high-level findings for Tasks 2 – 10. Task 1 represents the administrative work related to this planning process.) Initial Planning and Public Outreach (Task 2): Due to the importance of Initial Planning and Public Outreach, four separate reports were completed by the DMST on behalf of the LRA related to communications and outreach. The first report summarizes the results of an LRA meeting that utilized a proprietary DMST approach, Values Mapping®, to envision the “characteristics of an outstanding LRA Board” and the “characteristics of outstanding land use for the UMCD”. The results of this meeting helped to build consensus related to the internal and external functions of the LRA. A second report summarizes the results of the early public outreach workshop that was conducted on October 20, 2009. This report collected information from the general public on “outstanding land use for the UMCD”. The results show that the general public supports economic development, natural resource management, environmental stewardship, contributions to livability, and thoughtful planning as the top priorities.

Public Outreach Extensive outreach to the general public has helped to ensure that the LRA is being responsive to 

community needs and expectations. 

A third report summarizes the findings from two focus group sessions conducted on October 27, 2009. The report provides a summary of what the general public expects to happen, what concerns they have, what suggestions they have, what economic benefits and environmental protection objectives they have, and offers insight on the proposed use by the Oregon National Guard. Finally, the fourth report summarizes the results of 18 personal interviews that were conducted of LRA members and community opinion leaders in the fall of 2009. The report summarizes responses to seven specific questions: duration of involvement, personal vision, personal expectations, limitations for reuse, planning concerns, suggestions to LRA, and governance options. The findings of all of the public outreach sessions have been incorporated by the LRA into the draft reports and this Redevelopment Plan and Implementation Strategy. The public input was fully considered by the LRA in arriving at its final Plan.

Page 20: UMATILLA ARMY DEPOT REUSE AUTHORITY REDEVELOPMENT … · Due to the nature of the process, size of documents, and general maintenance of the information included in the UMCD Base

UMADRA    Redevelopment Plan and Implementation Strategy            

Submittal Part I: Draft_00 

 

DMST_RPIS_D00_052810                                 5

Morrow and Umatilla County Social and Economic Assessment (Task 3): The LRA has an opportunity unique to all of Oregon—planning for the development and preservation of 20,000 “new” acres. Never before in Oregon has this amount of land become instantly available for planning and reuse.

The DMST assisted the LRA by utilizing a proprietary methodology to assess the development assets at UMCD, and to prioritize redevelopment strategies based upon their greatest likelihood of success.

This approach, referred to as Building Communities, analyzes 85 key success factors essential for advancing one or more of 25 alternate land reuse strategies. Both social and economic factors are considered in this analysis.

This Social and Economic Assessment begins by summarizing the relative comparative advantage of UMCD with respect to the 85 key success factors. These factors include social factors such as health care and quality neighborhoods as well as economic factors such as infrastructure and a quality labor force. For each of the factors, a score of between ‘0’ and ‘4’ is identified, and a brief synopsis explaining the key success factor score is presented.

The Social and Economic Assessment also presents regional economic trends, real estate trends, short-term reuse opportunities, and an analysis of maintenance costs associated with the preservation of the UMCD resources. Finally, the Social and Economic Assessment provides an analysis of the potential impacts of job losses due to the closure of UMCD. An analysis completed by WorkSource Oregon (also known as the Oregon Employment Department) identified the economic reliance and impact of UMCD on adjacent communities and counties. In total, approximately 1,170 employees work at UMCD, with 635 residing in Morrow and Umatilla Counties. The total annual estimated payroll of the depot workers for the two counties is $44,654,000. In addition to the direct employment, an additional 252 induced jobs are supported in the region. In total, therefore, an estimated 907 jobs representing total labor income of $52 million annually will be lost at UMCD upon closure if mitigating actions are not taken. Industries that will be most impacted by the decline in household spending resulting from the closure of UMCD include food and drinking places, offices of physicians/dentists/health practitioners, real estate establishments, private hospitals, retail, and wholesale trade.

TOP STRATEGIES PRIORITIZED BY KEY SUCCESS FACTOR RESULTS INCLUDE (SCORED ON A SCALE OF 0‐100): 

STRATEGY  POINTS 

Energy Development  91.3 

Telecommunications Businesses  83.8 

Transportation Distribution Center  77.5 

Attracting Government Funding  75.0 

Environmental Restoration  73.8 

Business Recruitment  73.0 

Table 2: Prioritized Key Strategies

Economic AssessmentThe LRA used an objective approach to identify reuse opportunities that have the 

greatest likelihood for success. 

Page 21: UMATILLA ARMY DEPOT REUSE AUTHORITY REDEVELOPMENT … · Due to the nature of the process, size of documents, and general maintenance of the information included in the UMCD Base

UMADRA    Redevelopment Plan and Implementation Strategy            

Submittal Part I: Draft_00 

 

DMST_RPIS_D00_052810                                 6

UMCD Land and Facilities Assessment (Task 4): The DMST completed two separate land/facilities reports, one summarizing the characteristics of the land and the other report summarizing the conditions of the facilities at UMCD. Land: In total, the UMCD currently occupies 17,054 acres acquired either through purchase or Federal land transfer. In addition to fee simple land acquisition and transfers from the Public Domain, the Army also acquired by direct purchase and condemnation a number of restrictive easements for an additional 2,674 acres for a total of 19,728 acres. There are 1,411 Army owned structures encompassing approximately 3.6 million square feet. The Depot can be divided into 15 specific land use sub-areas. The storage and demolition of ordnance and buffer zone land uses account for more than three-quarters of the Depot’s acres of ownership and restrictive easements. The land area is a semi-arid desert. The land cover outside of the administrative area is largely a drought-adapted steppe with a native shrub-steppe vegetation type. Elevations on the Depot range from 400 to 677 feet above sea level. The topography, with the exception of Coyote Coulee that cuts across the facility along a north 30-degree east axis, is largely flat to gently rolling terrain with slopes ranging from 0% to 7%. In general, topography does not represent a land use constraint on the Depot for any major land use with the exception of Coyote Coulee. The slopes in Coyote Coulee range from 5% to 10% along the western edge to 30% to 45% along the eastern edge of the escarpment. The UMCD has excellent access to road, rail, and river transport. The Base contains approximately 196 miles of internal roadway, of which 160 miles are paved. The southeastern corner of the UMCD is adjacent to the intersection of Interstate 84 and Interstate 82. Immediately adjacent to the Depot, the Union Pacific Railroad operates one of the principle east-west rail line networks - a major factor in base location in 1941. The Depot, itself, has an internal rail network of approximately 50 miles of railroad track. Rail car loading facilities are available to and from Columbia River barges. The landmass occupied by the Depot is part of a far larger region that constituted the historic homeland of the Cayuse, Umatilla, and Walla Walla Tribes. The Umatilla people occupied villages from Umatilla Rapids to Roosevelt Washington along the Columbia River taking advantage of abundant Salmon resources as a primary food source. The existing water rights on the Depot represent a potential “limiting factor” in terms of reuse for intensive agriculture or industrial land uses. If all the current water rights on the Depot were applied exclusively for irrigated agriculture it is estimated that only 450 to 700 acres of the Depot’s 17,054 acres could be brought into production depending upon the crop type. It should be anticipated that no further groundwater water rights of any significance could be issued under the “critical ground water areas” designation currently imposed by the State of Oregon. The Port of Umatilla currently holds a water right to draw water from the Columbia River and retains substantial water rights equal to 80,000 gallons per minute of which less that 25% is currently allocated. The Port had an appraisal on the value of the water right conducted in 2000, where the value of water right was estimated at between $39 million - $51 million. Providing water to the site could be utilized as “matching funds” for development projects. Water capacity may also be available from the City of Irrigon’s municipal system for industrial, institutional, or commercial land uses.

Land and BuildingsThe UMCD offers a large expanse of land as well as a large number of buildings (in various 

shapes and conditions) unique to the region. 

Page 22: UMATILLA ARMY DEPOT REUSE AUTHORITY REDEVELOPMENT … · Due to the nature of the process, size of documents, and general maintenance of the information included in the UMCD Base

UMADRA    Redevelopment Plan and Implementation Strategy            

Submittal Part I: Draft_00 

 

DMST_RPIS_D00_052810                                 7

A review of BLM records has affirmed that formerly withdrawn lands from the public domain that includes 18 of 20 separate parcels have mineral rights retained by the BLM. Generally, the owner of the surface (fee less minerals) can use aggregate for his or her own purpose on site, but cannot commercially sell aggregate for off-site use without acquiring those rights from the BLM. There are two sections of land from the formerly withdrawn lands where mineral rights were not retained. The other “non-withdrawn” tracts acquired by the Army when the Depot was first established were primarily sections of land that were initially railroad grants in 1896 and 1906. These grants were for the fee estate including minerals and would have included mineral rights at the time of acquisition. Later tracts acquired through condemnation would have also included mineral rights. Facilities: This report also assesses the major facilities across UMCD. The assessment looks at the following general areas: Administrative areas, 100, 200 and 400 warehouse areas, K Block facilities, igloos, and the currently operating Umatilla Chemical Disposal Facility (UMCDF) where the remainder of the UMCD chemical weapons is being destroyed. The older UMCD facilities span across the entire Army Depot. Depot structures, with the exception of the UMCDF, were constructed to military base standard structures of the 1940’s era. Only a small number of structures have been occupied or used for the entire Depot life. Many were or still remain, un-used, un-occupied, or have been neglected for several years. Conditions of the older major buildings and facilities at the Depot were evaluated by performing technical walkdown surveys, reviews of existing documentation, and interviews of Depot personnel for various architectural and engineering aspects. Overview inspections were conducted for the headquarters and administration buildings, warehouses and warehouses converted to offices, shop facilities, the fire and emergency response facility, on-base housing, military billets, recreational facilities including the gym, swimming pool, and the hall, and the dining hall and other older or deteriorating structures. The facilities report is primarily a qualitative assessment of structures deemed for possible re-use. Detailed in-depth quantitative analyses of structures are necessary to establish valid re-use alternatives and the levels of required refurbishment and associated costs. For example, specific quantitative data including structural conditions, earthquake resistance, major dimensions/sizes, strengths of structural members, conditions and code compliance of wiring inside walls, and other data was not gathered for the purposes of this report. Some building and facility engineering drawings for some facilities were available; however specifications for the facilities were not found nor provided. Military standard design criteria and loads, material specifications, standard details, etc. from the 1940’s and 1950’s era could not be obtained to support preliminary conclusions. Costs of surviving re-uses will depend upon the type of re-use selected, the decisions on the level of code compliance, and will require detailed quantitative building assessments for the intended reuse.

Page 23: UMATILLA ARMY DEPOT REUSE AUTHORITY REDEVELOPMENT … · Due to the nature of the process, size of documents, and general maintenance of the information included in the UMCD Base

UMADRA    Redevelopment Plan and Implementation Strategy            

Submittal Part I: Draft_00 

 

DMST_RPIS_D00_052810                                 8

Infrastructure Assessment (Task 5): This report presents the broad assessment of conditions of infrastructure across UMCD. Unfortunately, drawings, specifications and other documentation describing as-built infrastructure and current conditions is almost non-existent according to Army personnel. Conclusions reached in this report are preliminary and require more in-depth physical examinations and inspections in order to support LRA Redevelopment Planning and decision making. The evaluation team encountered certain limitations during the building and infrastructure inspection. Internal building utilities were mostly covered by walls and the team did not remove or demolish any barriers (e.g. walls) to make observations. The team additionally did not perform any tests for asbestos, lead-based paint, potential contaminates or condition of existing materials (e.g. pavement, structural integrity, wire insulation). The team consists of professionals with many years of design and construction experience that are able to identify potential discrepancies from current acceptable standards for safety and occupancy. The team did make infrastructure observations beyond the original scope of work in an attempt to identify possible resources that may have value for future reuse, specifically, the electrical ground circuit, the airport runway and the gravel resources. While these may or may not have value for future use, the resources should be documented and considered. If additional resources are available to the LRA, it is recommended by the DMST that additional infrastructure analysis be completed in order to develop a specific infrastructure Redevelopment Plan consistent with the reuses and implementation strategy identified in this Plan.

THIS REPORT CONTAINS THE FOLLOWING INFRASTRUCTURE ELEMENTS:  • Airport Runway • Electrical Ground Connectivity • Electrical Power Distribution • Gravel Resources • Potable Water • Roadways • Railroad • Storm Drainage • Sanitary Sewer • Umatilla Chemical Demilitarization Facility Infrastructure

 

Infrastructure Much of the 

infrastructure at UMCD will require significant improvement in order that many of the reuse alternatives become 

feasible. 

Page 24: UMATILLA ARMY DEPOT REUSE AUTHORITY REDEVELOPMENT … · Due to the nature of the process, size of documents, and general maintenance of the information included in the UMCD Base

UMADRA    Redevelopment Plan and Implementation Strategy            

Submittal Part I: Draft_00 

 

DMST_RPIS_D00_052810                                 9

Environmental Assessment (Task 6): The environmental assessment did not identify any environmental constraints that will preclude the presently envisioned redevelopment of UMCD. Mutually agreeable demarcation of economic and environmental-related reuse zones, and careful planning of future activities within each of those zones, will clearly support acceptance and subsequent implementation of the Redevelopment Plan.

Environmental ConditionThe LRA has identified the remaining “environmental clean‐up” requirements that must be addressed in order to 

redevelop UMCD.  The U.S. Army has two major options regarding environmental cleanup of UMCD under the Base Closure and Realignment Act of 1988 (BRAC; P.L. 100-526) and Defense Closure and Realignment Act of 1990 (P.L. 101-510). These options are:

1. Cleanup of all operable units under authority of the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA; 42 U.S.C. 9601-9675, as amended) to those conditions set by the OU-specific Record of Decision (ROD). In such case, the site-specific covenant then documents that all known remedial actions were taken prior to property transfer from the Army to the Local Redevelopment Authority (LRA). The deed should specify that the Army will be responsible for remediating any contamination after date of transfer (start arising only from military service actions). This includes an access agreement with the LRA to perform such cleanup [CERCLA Section 120(h)(4)(D); or,

2. Property transfer occurs prior to completion of ROD requirements, but only after clear and

mutually agreed upon stipulations exist as to the respective (Army vs. LRA) responsibilities regarding, “who, what, when, and where” for completing the necessary site-specific remedial actions. Such agreements will probably include engineering controls (eg. physical barriers) and/or institutional controls (eg. deed restrictions). The purpose of these land use controls is protection of human health and the environment before, during, and sometimes after site-specific cleanup.

Furthermore, the roles and responsibilities of the Army and LRA regarding non-CERCLA cleanup actions must be clearly defined and agreed upon prior to transfer of a particular property. Such regulatory-based actions at UMCD include:

1. Decontamination and decommissioning (D&D) of the Umatilla Chemical Agent Disposal Facility (UMCDF) under authority of the Resource Conservation and Recovery Act (RCRA; 42 U.S.C. §6901 et seq., as amended).

2. Removal of lead-based paint, asbestos containing materials, polychlorinated biphenyls, and

radon gas mitigation in structures, all under authority of the Toxic Substances Control Act (TSCA; 15 U.S.C. §2601 et. seq.).

3. Removal of other substances or materials that could pose serious hazard to onsite workers

(eg. accumulated bio-hazardous wastes in presently unused buildings) under Section 5(a)1, General Duty Clause, of the Occupational Safety and Health Act (OSH; P.L. 91-596, as amended).

The LRA will work closely with the Army to ensure that property-specific cleanup is indeed appropriate to its future reuse, as defined to the extent possible by the UMCD Redevelopment Plan. This plan must accommodate the following Army-led remedial actions that will probably continue for the next 20 years:

Page 25: UMATILLA ARMY DEPOT REUSE AUTHORITY REDEVELOPMENT … · Due to the nature of the process, size of documents, and general maintenance of the information included in the UMCD Base

UMADRA    Redevelopment Plan and Implementation Strategy            

Submittal Part I: Draft_00 

 

DMST_RPIS_D00_052810                                 10

1. Monitoring of selenium attenuation in alluvial groundwater at the Active Landfill site (OU 5); 2. Monitoring of RDX/TNT removal (via enhanced bio-physical treatment processes) in alluvial

groundwater at the Explosives Washout Lagoon Site (OU 3); 3. Monitoring effectiveness of removing unexploded ordnance (UXO) at the Ammunition

Disposal Area (ADA; OU 4). The LRA will build upon the Army’s significant cleanup programs made over the past 30 years if the following actions occur:

1. Ongoing and planned remediation of the industrial areas (eg. west warehouses and operations buildings) is protective of present and future worker health and safety;

2. Removal or retrofit of existing buildings and infrastructure (eg. utilities, roads) incorporates

timely and appropriate environmental decontamination efforts (eg. removal of avian feces or other residual contamination) prior to initiating site-specific demolition or reconstruction activities;

3. Identification and mitigation of project-specific environmental impacts early in the planning

process via performing site-specific biological and socio-cultural surveys and subsequent application of best management (environmental engineering) practices, respectively.

The creation and maintenance of an active partnership between the Army and LRA will expedite the property transfer process, and promote the long-term economic and environmental goals for reuse of the UMCD. Such relationship should result in:

1. Achieving highest and best use of the Depot’s industrial areas (including the UMCDF); 2. Enhancing military training activities by the Oregon National Guard;

3. Preserving (and possibly restoring) the Depot’s extensive shrub-steppe plant and animal

communities;

4. Protecting Native American sacred sites and significant historical sites present at the Depot. Market Assessment (Task 7): The Market Assessment forecasts market demand for short-term leasing and long-term potential for redevelopment based upon regional economic conditions, trends, and pressures affecting redevelopment. The scope of this study addresses land use types including agricultural, commercial, industrial, and recreational.

Market AssessmentDespite a challenging state and national 

economy, UMCD does afford reuse 

opportunities consistent with emerging market 

conditions. 

Obstacles and challenges to redevelopment of the UMCD are identified and mitigating actions to these challenges are suggested. In an economic context the condition of the national, state, and regional economy is challenged. With the national unemployment rate recently near 10%, and a state and local unemployment rate even higher, communities and businesses across America are simply looking to “keep what they have”, rather than engage in significant job-creating investments. On the brighter side, the forecast for the national, state, and regional economy is improving.

Page 26: UMATILLA ARMY DEPOT REUSE AUTHORITY REDEVELOPMENT … · Due to the nature of the process, size of documents, and general maintenance of the information included in the UMCD Base

UMADRA    Redevelopment Plan and Implementation Strategy            

Submittal Part I: Draft_00 

 

DMST_RPIS_D00_052810                                 11

This Market Assessment provides high-level economic statistics showing the trends and current conditions of the economy. The relevance of the economic statistics to the reuse decision making by the LRA is emphasized in this analysis. The report analyzes four types of land reuses: agriculture, commercial, industrial, and recreational. The following are the conclusions from this analysis:

• Industrial reuse opportunities clearly represent the greatest prospect for UMCD. Outstanding access and location, combined with the prospect for huge parcel sizes, affords numerous industrial reuse opportunities.

• Commercial and recreational uses are also possible, but are not likely to dominate the reuse of the UMCD. If specific alternatives for commercial and recreational reuse opportunities are considered desirable then the site selection is most likely to occur in the southeastern quadrant of UMCD, and capitalize on access to Interstate 84 and Interstate 82.

• Value-added agriculture opportunities may be possible, but the viability of this strategy is

impacted by the availability of water and the existing capacity of the Port of Morrow and Port of Umatilla to accommodate such development.

Despite these opportunities, significant obstacles and challenges hamper many of the reuse possibilities that a typical community could advance. The key success factor methodology utilized by DMST concludes that 38 of 85 development factors rank substandard. This eliminates most economic development strategies from viable implementation. Focusing upon development strategies with greater success potential is recommended by DMST. Despite the limited opportunities, the top strategies that remain stand a significant likelihood of success. The State of Oregon identifies three industrial development strategies as the top strategies for 2010 and 2011. Simultaneously, the key success factor analysis for UMCD pinpoints these three strategies as the approaches with the greatest likelihood for success:

• Energy Development • Transportation Distribution Centers/Logistics • Telecommunications Businesses

Finally, this market analysis forecasts that demand for reuse opportunities will increase as the state and national recession dissipates. In fact, the timing for the reuse of UMCD may coincide very well with a rebounding economy. Homeless Accommodation Assessment (Task 8): A Homeless Assistance Plan to the U.S. Department of Housing and Urban Development (HUD) was drafted in conformance with BRAC procedures. The report addresses:

Homeless AccommodationTwo homeless service providers expressed interest in personal property in order to fulfill their 

respective missions. 

• Information about homelessness in the communities in the vicinity of the installation

• Notices of Interest proposing assistance to homeless persons and/or families

• Legally binding agreements for buildings, property, funding, and/or services

• An assessment of the balance between economic and other development needs

Page 27: UMATILLA ARMY DEPOT REUSE AUTHORITY REDEVELOPMENT … · Due to the nature of the process, size of documents, and general maintenance of the information included in the UMCD Base

UMADRA    Redevelopment Plan and Implementation Strategy            

Submittal Part I: Draft_00 

 

DMST_RPIS_D00_052810                                 12

• A description of outreach undertaken by the LRA Twelve of the Notices of Interest (NOIs) were submitted from state or local entities seeking Public Benefit Conveyances, two were from homeless service providers, and one was from a private interest. The two NOIs from homeless assistance providers requested personal property. The Agape House request for personal property includes office equipment, office furniture, a forklift, pallet jacks, mechanical tools, and woodworking tools to better serve their clients. CAPECO requested the use of two igloos and any and all household goods appropriate for independent living quarters. The LRA assigned a sub-committee to review the Notices of Interest and approval was made for the two homeless service providers. Redevelopment Alternatives Assessment (Task 9): The LRA was required to consider a series of Alternatives before selecting a Final Redevelopment Plan and Implementation Strategy.

Alternatives Five prospective alternatives 

were presented and considered by the LRA before 

selecting the preferred alternative. 

Five Alternatives were prepared that considered alternate land use scenarios and alternative governance structures in recognition that the successful advancement of an implementation strategy required a broad consensus among the regional and state stakeholders. Each of the five alternatives, therefore, is described not only with respect to their land use implications, but also their governance structure. The table below provides an at-a-glance review of the alternatives that were considered

ALTERNATIVE  DESCRIPTION 

#1—Preferred A proactive approach by the LRA to designate specific land for industrial, commercial, military, and open spaces purposes 

#2—Large‐Scale Development size standards (perhaps defined by an investment amount, jobs, or other parameters) that would be required in order for development activity to occur 

#3—County Line  Each county would have total autonomy as to the identification of specific land uses 

#4—Collaborative   County Line 

A Joint Powers Agreement would be developed that would recognize the individual desires of the counties but be incorporated in one overarching plan agreed by the entire LRA. Implementation activities would be governed by a local entity (probably the respective Port District) 

#5—No Action Concluding that there is not sufficient benefit to prescribe and implement specific land uses, the LRA would disband leaving total authority for land reuse to the US Department of the Army  

Table 3: At-a-glance Alternatives In addition to the five Alternatives, three options were provided with respect to the management of the shrub-steppe habitat. The first option would set aside land specific for the preservation of shrub-steppe. The second option would create a management overlay zone allowing shrub-steppe preservation in conjunction with additional objectives. The third option would provide for a combination of the first two options.

Page 28: UMATILLA ARMY DEPOT REUSE AUTHORITY REDEVELOPMENT … · Due to the nature of the process, size of documents, and general maintenance of the information included in the UMCD Base

UMADRA    Redevelopment Plan and Implementation Strategy            

Submittal Part I: Draft_00 

 

DMST_RPIS_D00_052810                                 13

In addition to the description of the Alternatives, three additional sections of this report are presented:

An analysis of many of the suggested large-scale reuse opportunities analyzed in the context of the five Alternatives

An analysis of the 16 submitted Notices of Interest and their “fit” with the five Alternatives Land use maps for each Alternative

Final Redevelopment Plan – Summary (Task 10): This document, the Redevelopment Plan and Implementation Strategy, is the culmination of the work completed in Tasks 1 – 9 above. That is, this Redevelopment Plan, and the associated Implementation Strategy, is the direct result of the substantial outreach and communication; analysis of land, buildings, infrastructure, and environmental conditions; consideration of market conditions; outreach to homeless organizations; and a review of the feedback received as a result of the presentation of five alternatives. This RPIS document not only summarizes the ten tasks that have been completed, but also presents a recommended land use plan containing a Military Training zone, Wildlife Refuge zone, Industrial zones, a Highway Commercial/Industrial zone, and an Agricultural zone associated with an anticipated land exchange to facilitate industrial zoning and development elsewhere near the UMCD. The specific acreages for each zone are identified in this Plan based upon a GIS analysis, and suggestions as to specific allowable activities within each zone are made.

Final Plan The final Plan summarizes the planning process, 

Redevelopment Plan, and Implementation Strategy 

for UMCD. 

Finally, the RPIS offers an Implementation Strategy that is the result of thorough consideration by LRA members to determine the most appropriate conveyances for the respective portions of UMCD. Very important in the overall recommendation is the case made for a no-cost economic development conveyance for all of the industrial land. Such a conveyance would allow the greatest level of flexibility for redevelopment in challenging economic times while maintaining the organizational capacity and financial capability by local organizations to reuse the land.

Page 29: UMATILLA ARMY DEPOT REUSE AUTHORITY REDEVELOPMENT … · Due to the nature of the process, size of documents, and general maintenance of the information included in the UMCD Base

UMADRA    Redevelopment Plan and Implementation Strategy            

Submittal Part I: Draft_00 

SECTION TWO: REDEVELOPMENT PLAN

Figure 1: UMCD Redevelopment Plan The Redevelopment Plan section of this document presents the five zones that have been selected by the LRA for reuse of UMCD. These zones are graphically depicted in the figure above. A GIS-based map also presents the reuse plan on the following page. This Redevelopment Plan section contains three subsections:

Redevelopment Zones Special Considerations Integration with County Zoning Codes

The Redevelopment Zones subsection presents five land use zones: Military Training, Wildlife Refuge, Industrial, Highway Commercial/Industrial, and Agricultural. For each of these zones, a general description of the allowable activities is provided. The Special Consideration subsection presents eight issues that are of paramount importance to the LRA generally related to specific requirements, opportunities, obligations, and policies desired by the LRA as the redevelopment effort moves into the implementation phase. The Integration with County Zoning Codes subsection recognizes that this RPIS will inform the respective county planners on how to update their respective zoning codes to accommodate this Plan.

 

DMST_RPIS_D00_052810                                 14

Page 30: UMATILLA ARMY DEPOT REUSE AUTHORITY REDEVELOPMENT … · Due to the nature of the process, size of documents, and general maintenance of the information included in the UMCD Base

UMADRA    Redevelopment Plan and Implementation Strategy            

Submittal Part I: Draft_00 

 

DMST_RPIS_D00_052810                                 15

Figure 2: UMCD Proposed Land Reuse

Page 31: UMATILLA ARMY DEPOT REUSE AUTHORITY REDEVELOPMENT … · Due to the nature of the process, size of documents, and general maintenance of the information included in the UMCD Base

UMADRA     Redevelopment Plan and Implementation Strategy            

Submittal Part I: Draft_00 

 

DMST_RPIS_D00_052810  16

REDEVELOPMENT ZONES

This Redevelopment Plan is comprised of five major redevelopment zones: Military Training (MT) Wildlife Refuge (WR) Industrial (I) Highway Commercial/Industrial (HC/I) Agriculture (A)

As shown on the map on the previous page, approximately 75% of the overall acreage is split between the Military Training and Wildlife Refuge uses. The table at right presents the total acreage for each of the respective Redevelopment Zones. (Note: The acreage estimates are based on a GIS analysis that will have some variance with more accurate field survey techniques. There is approximately a 100-acre discrepancy between the 17,054 acres of known ownership at UMCD at the GIS based redevelopment zone acreage analysis.) The Industrial Zone is comprised of two sub-zoning designations:

General Industrial Restricted Industrial

The table below provides a broad overview of the general redevelopment activity that will take place in each of the respective Redevelopment Zones and sub-zones.

Description of Redevelopment Zones Zone  Sub‐Zone  General Description of Redevelopment Activity 

Military Training Land that is set‐aside and secured for use by the Oregon National Guard for military training exercises 

Wildlife Refuge Land managed by the US Fish and Wildlife Service to preserve the shrub‐steppe habitat for existing and potential wildlife species 

General  General industrial uses of the land  Industrial 

Restricted  Industrial use that is limited to the utilization of igloos for storage 

Highway Commercial/Industrial 

Acreage that is set aside for Highway Commercial/Industrial Redevelopment opportunities 

Agriculture  Exclusive Use Agriculture to be used in a land exchange for nearby Industrial Zoning 

Table 5: Description of Zones

Redevelopment Zone Acreages Zone  Acres 

Military Training  7,421 

Wildlife Refuge  5,613 

Industrial  1,794 

Highway Commercial/Industrial  1,348 

Agriculture  655 

County Road ROW (estimated)  120 

Total  16,951 

Table 4: Redevelopment Zone Acreage

Page 32: UMATILLA ARMY DEPOT REUSE AUTHORITY REDEVELOPMENT … · Due to the nature of the process, size of documents, and general maintenance of the information included in the UMCD Base

UMADRA     Redevelopment Plan and Implementation Strategy            

Submittal Part I: Draft_00 

 

DMST_RPIS_D00_052810  17

Military Training Zone

Since the early 1980s, the Department of the Army, through the Corps of Engineers, has licensed the Oregon Army National Guard use of the UMCD. The license authorized construction projects and maintenance of UMCD facilities at ORNG expense.

Historical facility uses include a 25M live-fire range, field maintenance shop and vehicle compound, tank crew proficiency course, billeting, dining facility, helipad, and simulations. Previous LRA and ORNG negotiations included a recommended federal-to-federal transfer agreement dated March 21, 2000. The original proposed property transfer included the Ammunition Disposal Area (ADA) (1,760 acres), K-block (1,400-1,500 acres), area south of ADA (20 acres), three ammunition bunkers, buildings 36, 52, 53, and 54 until replaced in K-Block, and building 115 until new maintenance facility is available. The current interest of the ORNG is summarized below:

The Department of the Army has acknowledged that the ORNG has valid training requirements and a long history of use at the UMCD, and encourages the LRA to work with Major General Raymond F. Rees, Adjutant General, Oregon in development of a plan to maintain the training requirements of the ORNG.

Maintain the ORNG’s range and training activities and facilities while working in concert with area representatives to provide economic and resource management opportunities for the local communities. The proposal by ORNG has the endorsement of United States Army Vice Chief of Staff General Peter W. Chiarelli. Chiarelli has recommended that the proposal by ORNG be included in the redevelopment plan.

Capitalize on the opportunity to use vacated demilitarization facilities, ranges, and field training areas to establish a formal Intermediate Training Complex (ITC).

The ORNG presence on the UMCD is beneficial to the surrounding communities, the State of Oregon, and the nation in support of ongoing Overseas Contingency Operations.

The ORNG has an active natural resource management program that is conducive to the conservation of shrub-steppe habitat values on the UMCD.

The current proposal by ORNG includes the development of an ITC with specifications as follows:

Designed to support individual and collective training Training facilities are focused on individual through platoon weapons proficiency and

company maneuvers Full-time manning support and cantonment facilities Small arms range and maneuver space Construction will generally be limited to the requirements to support training companies (100-

150 soldiers each) training simultaneously The required facilities include:

Company Supply and Administration (8,940 sq. ft) Open bay barracks (570 beds including classrooms and laundry

Figure 3: Military Training Zone

Page 33: UMATILLA ARMY DEPOT REUSE AUTHORITY REDEVELOPMENT … · Due to the nature of the process, size of documents, and general maintenance of the information included in the UMCD Base

UMADRA     Redevelopment Plan and Implementation Strategy            

Submittal Part I: Draft_00 

 

DMST_RPIS_D00_052810  18

Dining facilities (200 people per company) (13,500 sq. ft Consolidated Dining Facility) ID Processing Center (1,044 sq. ft) Field Maintenance Shop (6,144 sq. ft. building plus vehicle parking area) M1 Abrams Tank Simulation Conduct of Fire Trainer (SIMCOFT) Facility Range Operations building (2,508 sq. ft.) Ammunition Holding Area Small Arms Live-Fire Range Complex Tank Crew Proficiency Course (TCPC) (two miles by 1 mile) Mobile Conduct of Fire Trainer Pad (M-COFT) Helipad Fuel Storage and issue point Supporting Infrastructure including Utilities and Roadways

One of the factors to overcome with the designation of land for use by the ORNG is the inability for the respective taxing authorities (Umatilla County, Morrow County, Port of Umatilla, and Port of Morrow) to benefit from property taxes under the federal Payment in Lieu of Taxes (PILT) program. While land designated for use as a US Fish and Wildlife-managed refuge is eligible for federal PILT payments, the land owned and managed by the ORNG is not. While federal PILT payments are not available, the ORNG offers other economic benefits including personnel and their associated payroll, expenditures in nearby communities, and the ability to design and construct the road network through portions UMCD. The estimated support staff for the ITC would be 17 employees with an annual projected salary of $879,259. The table below summarizes the facilities, soldiers trained, firing range requirements, and land use requirements of the ORNG at UMCD.

Oregon National Guard Staffing, Facilities, and Land Requirements 

Facility Annual 

Throughput Requirement 

Firing Points/Lanes 

Land  Use 

Requirements 

Intermediate Training Center  9,780 Soldiers  �  NA  100 acres 

Ammunition Supply Point  NA  NA  35 acres 

Field Maintenance Shop/Unit Training Equipment Site �  NA    NA 

Range Operations and Maintenance Facilities  NA  NA  25 acres 

Combat Pistol Qualification Course  196 Soldiers  15  553 acres 

25m Zero Range  644 Soldiers  16  811 acres 

Modified Record Fire Range  644 Soldiers  16  1,446 acres 

Grenade Launcher Range  51 Soldiers  4  60 acres 

Maneuver Training Area *  3,260 Soldiers �  NA  5,200 acres 

Total 8,230 acres

Change to 7,421 *Annual throughput requirement is based on commanders seeking 100 percent qualification of all personnel on their assigned weapon. *Weapons surface danger zones overlap decreasing the total land use requirement. *All ranges are constructed to TC 25‐8 standards. �Based on all units assigned to training for four three‐day periods per year. �Included in the ITC acreage. �Based on four field training exercises per year. 

 

Table 6: ORNG Staffing, Facilities, & Land Requirements  

Page 34: UMATILLA ARMY DEPOT REUSE AUTHORITY REDEVELOPMENT … · Due to the nature of the process, size of documents, and general maintenance of the information included in the UMCD Base

UMADRA     Redevelopment Plan and Implementation Strategy            

Submittal Part I: Draft_00 

 

DMST_RPIS_D00_052810  19

The decision by the Oregon National Guard to accept the ADA area has a significant benefit to the federal government. The policy for the environmental clean-up of the land is dictated by the specific plans for the reuse of such land. If, for example, the Reuse Plan called for residential development, it would be incumbent upon the federal government to clean up the ADA area to a degree necessary to safely construct residential housing. One estimate for this clean-up projected this expense at $20 million. Given that the ADA area will be utilized by the Oregon National Guard, no clean up activity will be necessary for this property. The LRA views this as a win/win with the federal government, and requests that this agreement for the reuse of the ADA area be considered in the request for a no-cost economic development conveyance. Administrative Area District: Despite the fact that the Administrative Area at UMCD has benefited from the greatest long-term commitment to use and maintenance of the buildings, the Administrative Area represents one of the least sought after portions of the 20,000 acre-facility. While the administrative complex is comprised of structures that can be immediately occupied, the 1940s era construction is largely outdated, inefficient, and subject to higher maintenance costs than new construction. The most accessible and highly-visible portion of UMCD is the Administrative Area, a 191-acre campus with direct access to Interstate 84. The Administrative Area is comprised of buildings that have formed the headquarters for the military operations since 1941. Most of the structures are World War II-era buildings that have been maintained sufficient for military standards, but would require significant improvements in order to meet building code requirements. Throughout the public process to outline the future of UMCD, very little interest was expressed by either public or private entities for reuse of the complex. While on one hand the complex contained structures and settings that uniquely present the history of UMCD, the specific ownership and management of this area is somewhat uncertain. Recognizing the need to have centralized management and maintenance of the Administrative Area, the Oregon National Guard has stepped forward to utilize the Administrative Area not only for their needs, but also to facilitate the use of the Administrative Area by other state agencies. Future reuse of the Administrative Area may also include other public and private uses. The ORNG has experience managing Memorandums of Understanding/Agreement with public and private interests to utilize land and facilities.

Institutional and Civic Use Zone PurposeThe former depot Administrative Area is well suited for a variety of institutional and civic uses that may be developed on a shared facility basis. The area is intended as the cantonment area for the Oregon National Guard’s training facility designated on 7,230 acres adjacent to the Administrative Area. Other institutional users may include the Oregon Department of Transportation, Oregon State Police, and Red Cross. The area is well suited for further development as a regional emergency services center serving the entire Pacific Northwest. It also has the potential to serve as a training facility for state and local law enforcement.  Other institutional and civic use applications may include a visitor center associated with the proposed U.S. Fish and Wildlife Service refuge adjacent to the designation. That facility or an adjacent building may also serve as a historic interpretative center for Interstate travelers regarding the role and former activities of the Depot. Commercial educational services and major event entertainment such as a site for an Eastern Oregon State Fair Grounds have also been suggested. Limited subsidiary commercial travel services may be offered, 

Page 35: UMATILLA ARMY DEPOT REUSE AUTHORITY REDEVELOPMENT … · Due to the nature of the process, size of documents, and general maintenance of the information included in the UMCD Base

UMADRA     Redevelopment Plan and Implementation Strategy            

Submittal Part I: Draft_00 

 

DMST_RPIS_D00_052810  20

Wildlife Refuge Zone

Leadership at CTUIR has generated a response by the US Fish and Wildlife Service (USFWS) to establish a 5,613 acre wildlife refuge to preserve and support the shrub-steppe habitat as well as other plant and wildlife species at UMCD. The USFWS proposes to manage the shrub-steppe and grassland habitats of the UMCD as a unit of the National Wildlife Refuge System for the benefit of the American people. This would include a jurisdictional transfer of the land from the Department of Defense to the Department of Interior/USFWS. UMCD represents some of the last large contiguous tracts of shrub-steppe habitat on the Columbia Plateau. USFWS indicates that protection of these habitats is critical to assuring the long term viability of shrub-steppe species including burrowing owls and long billed curlews within the Columbia Plateau in Oregon. The current breeding population of owls on UMCD is a local, regional, and nationally significant population and may be the largest in the state. The area has potential for providing opportunities for environmental education and public uses where appropriate and would provide economic stimulus for the surrounding towns. Transfer to the USFWS for management could occur as soon as the current mission is completed. UMCD is located within the Pacific Flyway zone. Habitats within the area serve as resting, feeding, and nesting areas for migratory birds, wildlife, and invertebrates. Species current listing status was obtained from Oregon Department of Fish and Wildlife (2008) and USFWS (2008). Burrowing Owls are declining in the northern half of their breeding range. The breeding range does include UMCD, and most of the western half of the United States as well as parts of Canada and Mexico. The annual population decline is approximately 1.5%, with a cumulative decline of approximately 45% over the past 40 years. The overall breeding range for the Burrowing Owls has been reduced by 56% during this 40-year period. The following migratory bird species have occurred on the area during at least portions of the year. Each species current (9/12/2009) listed status for this region is listed on the following page.

Figure 4: Wildlife Refuge Zone

Page 36: UMATILLA ARMY DEPOT REUSE AUTHORITY REDEVELOPMENT … · Due to the nature of the process, size of documents, and general maintenance of the information included in the UMCD Base

UMADRA     Redevelopment Plan and Implementation Strategy            

Submittal Part I: Draft_00 

 

DMST_RPIS_D00_052810  21

Migratory Bird Species Species Name  Listing Status 

Northern sagebrush lizard  Sceloporus graciosus graciosus  Federal Species of Concern/State Sensitive 

Bald eagle  Haliaaetus leucocephalus  Federal Monitor/State Threatened 

Burrowing owl  Athene cunicularia  Federal Species of Concern/State Sensitive 

Loggerhead shrike  Lanius ludovicianus  Federal Species of Concern/State Sensitive 

Sage sparrow  Amphispiza belli  Federal Species of Concern/State Sensitive 

Ferruginous hawk  Buteo regalis  Federal Species of Concern/State Sensitive 

Swainson’s hawk  Buteo swainsoni  Federal Species of Concern/State Sensitive 

Long‐billed curlew  Numenius americanus  Federal Species of Concern/State Sensitive 

Peregrine falcon  Falco peregrius  State Sensitive 

Lewis’ woodpecker  Melanerpes lewis  Federal Species of Concern/State Sensitive 

Grasshopper sparrow  Ammodramus savannarum  State Sensitive 

Green‐tailed towhee  Pipilo chlorurus  Federal Species of Concern 

Brewer’s sparrow  Spizella breweri  Federal Species of Concern 

Table 7: Migratory Bird Species The USFWS does not anticipate any immediate facilities expansion. Visitor services programs which may include environmental education, interpretation, wildlife observation, and limited facilities could be incorporated into the management of the area. In the long run, new visitor facilities could be constructed for the wildlife area. With respect to fire suppression, the USFWS has a program that addresses this significant concern. Opportunities for a multi-agency fire suppression plan governing the entire UMCD would ensure that the future property owners coordinate and collaborate fire suppression efforts. It is in the interest of development authorities (most notably the Ports of Morrow and Umatilla) that the land designated at UMCD for National Wildlife Refuge status contributes toward the future capability of the port districts to advance their industrial development interests in other locations. (See: “Special Considerations” later in this chapter). That is, the establishment of this habitat conservation area along with other resource management conservation measures included in the Plan should serve to enable the respective port districts to advance their development projects in other areas of lesser habitat significance with the knowledge that one of the two largest and best preserved reserves in the Columbia Basin of shrub-steppe habitat has been protected. Easily lost in the redevelopment of UMCD is the realization that much of the 17,000 acres of land that has been reserved for military and industrial purposes under the Redevelopment Plan is now being designated for habitat and wildlife preservation in some capacity. (See: Special Considerations section.) It should be noted that this Plan advocates for the protection of shrub-steppe not only in the refuge area, but beyond this designated area. The shrub-steppe areas of UMCD would also be protected by a shrub-steppe overlay that may allow for the advancement of shrub-steppe preservation with economic goals simultaneously. The specific areas of UMCD outside of the refuge area to be protected by the shrub-steppe overlay would be determined during the plan implementation phase.

Page 37: UMATILLA ARMY DEPOT REUSE AUTHORITY REDEVELOPMENT … · Due to the nature of the process, size of documents, and general maintenance of the information included in the UMCD Base

UMADRA     Redevelopment Plan and Implementation Strategy            

Submittal Part I: Draft_00 

 

DMST_RPIS_D00_052810  22

Industrial Zone

Two distinct areas for industrial zoning are included in this Redevelopment Plan. As shown in the map at right, there are two major areas for industrial reuse:

Land in the southwestern corner The UMCDF area

The largest segment of Industrial-zoned land forms the entirety of the southern border of UMCD within Morrow County, and includes the industrial warehouses and some of the igloos south of the most southern boundary of the ADA area. Figure 5: Industrial Zone

Industrial Land‐Use Zone Purpose The industrial land use is intended to accommodate a broad range of both heavy and light industrial applications in areas that have largely been previously committed to associated activities. The land use designation in the plan is primarily associated with existing brownfield sites with developed transportation links, both rail and Interstate highway, well situated for future industrial development after infrastructure modernization and building remediation. The acreage associated with the previously committed developed areas is significant enough to accommodate larger scale industrial applications that are often difficult to locate. Moreover, the location of these areas is at some distance from urban concentrations reducing urban interface conflicts and transportation related impacts.  The designation is intended to accommodate a range of potential future industrial categories including industrial services: manufacturing and production; warehouse, freight movement and distribution; wholesale sales; and utility and energy related applications. Industrial services may include firms engaged in the repair or servicing of industrial, business or consumer machinery, equipment, products or by‐products. Manufacturing and production firms, both light and heavy, may be involved in the manufacturing, processing, fabrication, packaging, or assembly of goods.  Warehouse, freight movement, and distribution activities may include but not be limited to major wholesale distribution centers; truck or rail terminals, warehouse complexes, emergency services stockpile and distribution facilities; and terminals for the storage and shipment of agriculture products.  Utility and energy related applications could include energy recovery plants, NEO‐electric grid Hub, and alternative energy development. 

Page 38: UMATILLA ARMY DEPOT REUSE AUTHORITY REDEVELOPMENT … · Due to the nature of the process, size of documents, and general maintenance of the information included in the UMCD Base

UMADRA     Redevelopment Plan and Implementation Strategy            

Submittal Part I: Draft_00 

 

DMST_RPIS_D00_052810  23

Industrial Reuse of UMCDF Area: By far the greatest economic value at UMCD is represented by the Umatilla Chemical Disposal Facility (UMCDF). The facility, which contains entirely modern structures, was constructed at an approximate cost of $700 million. The facility became operational in 2004. Two primary complications exist for reuse and salvage at UMCDF: 1) portions of the structures are contaminated by their chemical demilitarization mission, and 2) the existing permit with the Oregon Department of Environmental Quality would require modification in order to reuse or salvage many of the structures. Despite these two challenges, the upside for reuse and salvage is significant. A broad engineering ballpark estimate of value at 2% - 5% of the original construction cost would yield between $14 million and $35 million for the LRA. It would be required that the LRA plan to reinvest any salvage earnings back into the job-creating mission.

The DMST has concluded that there is significant potential value in preserving and reusing equipment and structures at UMCDF. From a reuse perspective, the buildings with the greatest industrial redevelopment value at UMCD are virtually all located at UMCDF. Opportunities for industrial development benefiting from modern buildings, utilities, and other infrastructure can be significant. Where industrial reuse is not possible or preferred, capturing the salvage value of the equipment and structures can facilitate the broader economic development mission at UMCD. A more in-depth analysis of the reuse and salvage value of the UMCDF facility could be part of the follow-on infrastructure analysis and business plan overseen by an Implementing LRA. The LRA would need to work with Oregon leaders and the Oregon Department of Environmental Quality to continue measures that have already been initiated by the LRA to modify the DEQ permit so that valuable assets are not otherwise destroyed. The demolition of certain contaminated facilities will still be a requirement of the RCRA permit. Preliminary discussions have been held with the Port of Umatilla to be the lead agency to coordinate the UMCDF reuse and salvage strategy under the auspices of an Implementing LRA. Restricted Industrial

This land, bordered by General Industrial zoning to the west, south, and east will be limited to the utilization of the igloos for storage. Use of the roads for ingress and egress to the igloos will be allowed, but all traffic and industrial use must be sensitive to the objective of the preservation of the shrub-steppe habitat. As such, all traffic in the Restricted Industrial zone must remain on the roads. A total of 942 acres are designated as Restricted Industrial.

Figure 6: Restricted Industrial Zone

Page 39: UMATILLA ARMY DEPOT REUSE AUTHORITY REDEVELOPMENT … · Due to the nature of the process, size of documents, and general maintenance of the information included in the UMCD Base

UMADRA     Redevelopment Plan and Implementation Strategy            

Submittal Part I: Draft_00 

 

DMST_RPIS_D00_052810  24

Highway Commercial and Industrial Zone

Only the far Southeastern corner of UMCD is suggested for potential future highway commercial development in combination with industrial development, hence the combined Commercial-Industrial designation. The area may be exclusively or primarily used for industrial applications with limited or no highway commercial development dependent upon market demand. Various factors combine to limit the likelihood of retail commercial development at UMCD:

Existing commercial land is already zoned and available within urban growth boundaries of neighboring Oregon communities

Commercial development is generally more successful when it is in greater direct proximity to residential areas

Oregon’s land use system strives to minimize the distance between commercial and residential areas

The existing infrastructure system is generally insufficient for large-scale commercial development

Offsetting these competing factors for commercial development is the significant access and visibility afforded by the southeast corner of UMCD to both Interstate 84 and Interstate 82.

Figure 7: Highway Commercial/Industrial Zone

Highway Commercial/Industrial Zone Purpose The Highway Commercial/Industrial designation is designed to accommodate a range of industrial and commercial land uses. Located at the junction of two Interstates, portions of the designated area are well suited for highway related commercial applications that may include food and vehicle services, lodging, and large‐scale truck stops classified as industrial services.  The designation is also intended to accommodate a range of potential future industrial categories including industrial services; manufacturing and production; warehouse, freight movement and distribution; wholesale sales; and utility and energy related applications.  Significant portions of the designation have been previously committed to industrial style land uses. Industrial services may include firms engaged in the repair or servicing of industrial, business or consumer machinery, equipment, products or by‐products. Manufacturing and production firms, both light and heavy, may be involved in the manufacturing, processing, fabrication, packaging, or assembly of goods. Warehouse, freight movement, and distribution activities may include but not be limited to major wholesale distribution centers; truck or rail terminals, warehouse complexes, emergency services stockpile and distribution facilities; and terminals for the storage and shipment of agricultural products. Utility and energy related applications could include energy recovery plants, NEO electric grid Hub, and alternative energy development.  

Page 40: UMATILLA ARMY DEPOT REUSE AUTHORITY REDEVELOPMENT … · Due to the nature of the process, size of documents, and general maintenance of the information included in the UMCD Base

UMADRA     Redevelopment Plan and Implementation Strategy            

Submittal Part I: Draft_00 

 

DMST_RPIS_D00_052810  25

Agriculture

One of the small exceptions to the generally-rectangular overall shape of UMCD is a 655-acre portion of land near the west end of the northern boundary of UMCD. The City of Irrigon has a strong interest to develop additional industrial land within its current (or possibly extended) urban growth boundary. It is the intention of the LRA to exchange this section of land with another section of land located within the City of Irrigon urban growth boundary in order that such land can be utilized for industrial purposes.

Figure 8: Agricultural

Agriculture Land Use Zone Purpose The agriculture land use zone is intended for exclusive use agricultural applications as recognized under the Oregon Land Use System and as contained in the Morrow County Zoning Code. Such uses may include irrigated agriculture or grazing lands. 

Page 41: UMATILLA ARMY DEPOT REUSE AUTHORITY REDEVELOPMENT … · Due to the nature of the process, size of documents, and general maintenance of the information included in the UMCD Base

UMADRA     Redevelopment Plan and Implementation Strategy            

Submittal Part I: Draft_00 

 

DMST_RPIS_D00_052810  26

SPECIAL CONSIDERATIONS In addition to the primary redevelopment zones presented above, this Redevelopment Plan also presents a series of special considerations that are of importance to the LRA. These considerations generally relate to specific requirements, opportunities, obligations, and policies desired by the LRA as the redevelopment effort moves into the implementation phase. Shrub-Step Policy The UMCD is situated within the Artemisia-Agropyron (A-A) steppe zone within the lower Umatilla Basin. The UMCD complex represents one of the two largest remaining bitterbrush shrub-steppe habitats in the Columbia Basin. In the early stages of the planning process the LRA recognized and prioritized the accommodation of three principle objectives. One of those objectives was the retention and management of the shrub-steppe habitat values embodied on the UMCD. The other two critical objectives were the mitigation of economic impacts associated with the closure of the Base and accommodation of a vitally important training facility for the Oregon National Guard. Habitat Land-Banking Intent - To maximize the accommodation of all three objectives, the RPIS represents a strategy that blends interrelated considerations both on and off the UMCD. In the case of shrub-steppe habitat conservation the RPIS aggressively employs four land use designations and/or conservation techniques as described below to optimally conserve shrub-steppe values while simultaneously addressing the other principle objectives of the plan. In so doing, it was the specific intent of the LRA members to provide a large, managed reserve of some of the highest quality shrub-steppe habitat in the region as part of the RPIS so that potential commercial and industrial development elsewhere in the Umatilla and Morrow county region could potentially proceed in future years with the knowledge that important resource values had been adequately protected on the UMCD. By intentionally restricting or eliminating the economic development options on significant portions of the UMCD for important habitat conservation objectives, community leaders as represented on the LRA have specifically developed a tradeoff strategy designed to retain and pursue economic development options judged to exist in more suitable locations elsewhere, both on the UMCD and the adjacent region. U.S. Fish and Wildlife Service Habitat Refuge - The RPIS calls for the establishment of a US Fish and Wildlife Service Refuge on the UMCD for dedicated management of bitterbrush shrub-steppe resource values. The proposed Refuge would be 5,613 acres in size or approximately 33% of the UMCD. Restricted Industrial District - Beyond the federal Refuge, three other mechanisms are recommended in the Plan to expand the footprint of the shrub-steppe habitat protection objective. As previously noted, the first of those mechanisms is the establishment of a “Restricted Industrial District” in the southwest quadrant of the Depot located in Morrow County. The District would be 942 acres in size. Under the RPIS this District would receive special protections under the Morrow County Zoning Ordinance allowing for the industrial or commercial use of the existing igloos storage bunkers and road network located in the designation, but it would strictly prohibit any further development of industrial land uses on existing undisturbed land or any activities beyond the basic igloo footprint that

Page 42: UMATILLA ARMY DEPOT REUSE AUTHORITY REDEVELOPMENT … · Due to the nature of the process, size of documents, and general maintenance of the information included in the UMCD Base

UMADRA     Redevelopment Plan and Implementation Strategy            

Submittal Part I: Draft_00 

 

DMST_RPIS_D00_052810  27

could constitute a risk or disturbance to habitat values. It is also the intent that these same types of protections would be included as restrictive conservation covenants or lease restrictions by an Implementation LRA if so selected by the Department of Defense as the conveyance vehicle. Resource Management Plan by the Oregon National Guard - The Oregon National Guard has a distinguished track record and established planning and natural resource management protocol for the protection of sensitive habitat values. The ORNG also has the financial resources for such activities. Under the RPIS, that area designated as the Oregon National Guard Training District has as its primary purpose the provision of a critical training facility. A secondary objective of the District, however, is to provide a habitat buffer and habitat expansion, where appropriate, to compliment the adjacent U.S. Fish and Wildlife Service Wildlife Refuge. The Oregon National Guard Training District is 7,421 acres in size, supplementing the resource values of the 5,613 acre Refuge District. Many of the areas designated within the Oregon National Guard Training District and the Guard’s training activities themselves, are conducive to the conservation of shrub-steppe habitat values. The Oregon National Guard has committed to the development of a natural resources plan and management protocol that, to the extent possible, blends resource protection with the primary mission of the District (military training). These measures are likely to be similar or largely identical in nature to those that the Army has maintained over time that has resulted in the high quality shrub-steppe resource that is present today. Conservation Covenants in Select Industrial Areas - The final of the four conservation measures undertaken in the RPIS to support shrub-steppe habitat values is the potential establishment of conservation covenants or lease term restrictions in select areas of the UMCD designated for Industrial or Highway Commercial/Industrial zone designation. The overriding land-use objective in these limited District designations under the RPIS is economic development to compensate for the impacts associated with Base closure. Most of the areas in question have already been committed to some form of development and significant disturbance under previous Army activities. However, in select locations under certain redevelopment scenarios it may be possible to accommodate certain natural resource management objectives while simultaneously meeting the primary objective of industrial or commercial development. Where appropriate, these measures would be implemented by the Implementation LRA through the use of conservation covenants or lease term restrictions. Precautions for fire management or the protection of highly sensitive resource values, heritage or natural, would likely be a primary consideration. Environmental Clean-Up

One of the most significant concerns of the LRA is the poor environmental condition of portions of the land and buildings at UMCD. Specifically, due to the nature of the original construction (World War II-era), many of the building have residual asbestos and lead-based paint. In order that the industrial and warehousing structures be reused, the LRA strongly requests that the Army remediate all of the asbestos and lead-based paint on the existing structures as well as portions of existing structures that have deteriorated and separated from existing buildings (siding on the industrial warehouses in the southwest corner of UMCD, for example). In addition to asbestos and lead-based paint, the LRA requests continued operations of the pump-and-treat system as well as remediation of solid waste landfills on the sight.

Page 43: UMATILLA ARMY DEPOT REUSE AUTHORITY REDEVELOPMENT … · Due to the nature of the process, size of documents, and general maintenance of the information included in the UMCD Base

UMADRA     Redevelopment Plan and Implementation Strategy            

Submittal Part I: Draft_00 

 

DMST_RPIS_D00_052810  28

The Planning Process section of this RPIS summarizes the environmental condition of the property, and prescribes specific recommendations and activities that the LRA requests of the federal government. As such, these activities and recommendations are incorporated into this RPIS. Water and Sewer Infrastructure

The Infrastructure Report in this Redevelopment Plan provides significant detail on the condition—and deficiencies—of the existing water and sewer systems. With the exception of the systems serving UMCDF, the sewer and water infrastructure is generally deficient in terms of meeting the general reuse opportunities and recommendations outlined in this Redevelopment Plan. In general, the water and sewer systems have been maintained to the degree necessary in order to meet the evolving military/defense mission of UMCD. Given the period of time that has elapsed since the primary military function of UMCD, the water and sewer systems not only would fail to meet the military uses of the past, but also the Industrial and the Highway Commercial/Industrial uses of the future. It is strongly recommended that a water and sewer master plan be developed for UMCD that fosters the projected uses at UMCD. In other words, future projected uses consistent with the land use plan outlined in this Redevelopment Plan should define the specific sewer and water infrastructure capacity and design of the improved system. Without significant planning—and ultimately, construction—of an improved water and sewer system, the possibility of virtually all of the prospective reuse alternatives are negated at UMCD. Notably, two significant variables affect the availability of water at UMCD—one negative and one positive. The Oregon Department of Water Resources has designated the area as a critical groundwater area. This designation establishes significant restrictions on the area in terms accessing groundwater resources. On the positive side, the Port of Umatilla has substantial water rights that could be applied to future reuses at UMCD if certain economic development goals and objectives are met. In addition, the City of Irrigon has expressed interest in extending their municipal sewer and water infrastructure to UMCD. In general, the existing water rights on UMCD would be allocated on a prorated share basis within Morrow County and Umatilla County. A detailed utilities plan for both water and wastewater will need to be prepared in the future to ascertain the most cost effective and rational development approach associated the provision of basic utility services. Rail Salvage

The historic military use at UMCD required an extensive network of rail lines that allowed for transport of munitions to the igloo storage areas as well as to some of the industrial buildings. In general, the gauge of the rail is not sufficient for present-day rail transportation. Nonetheless, the rail has significant potential value as salvage. In total, UMCD has approximately 52 miles of rail. A preliminary estimate of the salvage value of the rail is $3 million - $5 million. One of the objectives of the future business plan would be to further clarify the salvage strategy and reuse value.

Page 44: UMATILLA ARMY DEPOT REUSE AUTHORITY REDEVELOPMENT … · Due to the nature of the process, size of documents, and general maintenance of the information included in the UMCD Base

UMADRA     Redevelopment Plan and Implementation Strategy            

Submittal Part I: Draft_00 

 

DMST_RPIS_D00_052810  29

Road Policy

This Redevelopment Plan recommends the development of a road network that serves the following objectives:

Allows access, restricted where appropriate, to the redevelopment zones (Military Training, Wildlife Refuge, Industrial, Highway Commercial/Industrial)

Allows traffic to pass to and through UMCD for improved access associated with the City of Irrigon area

Recognizes the security considerations of the Oregon National Guard Designates certain portions of the road system as County Right-of-Way (necessary, for

example, through the wildlife refuge) Allows for the development and maintenance of the road system in a sustainable fashion,

largely developed by the Oregon National Guard

Law Enforcement Policy

Historically, the Department of the Army has provided for the security and law enforcement requirements at UMCD. Because the reuse of UMCD will entail ownership and management by multiple agencies and organizations, an interagency agreement for the provision of law enforcement should be established. A collaboration of federal, state, and local authorities should be considered in order that the people and property throughout the complex be protected. Security

Security is a consideration for all of the reuse zones within UMCD. Security is a paramount concern for the Oregon National Guard. As such, land owned and managed by the Oregon National Guard will have a secured perimeter fence. Security for other reuses will be established as reuse activities are defined. Fire Protection Policy

The suppression of wildfire on the 17,000-acre complex has historically been a significant concern and responsibility of the Army. As recently as 2009, for example, a 3,000-acre fire consumed portions of UMCD at a fire suppression cost of approximately $500,000. As the Oregon National Guard and the US Fish and Wildlife Service will be responsible for approximately 75% of the overall land mass, an interagency agreement between the two agencies and other relevant organizations such as rural fire districts should be established in order to protect the people, natural environment, and built environment at UMCD.

Page 45: UMATILLA ARMY DEPOT REUSE AUTHORITY REDEVELOPMENT … · Due to the nature of the process, size of documents, and general maintenance of the information included in the UMCD Base

UMADRA     Redevelopment Plan and Implementation Strategy            

Submittal Part I: Draft_00 

 

DMST_RPIS_D00_052810  30

INTEGRATION WITH COUNTY ZONING CODES

Both Morrow and Umatilla Counties will need to draft zoning code language specific to the various reuse functions prescribed in this plan:

Military Training Facility Wildlife Refuge Institutional/Public (for the Administrative Area) General Industrial Restricted Industrial Highway Commercial/Industrial

Both counties also have detailed, approved planning provisions in place for areas surrounding the Depot lands. The most appropriate and efficient approach to accommodate the transfer of the Depot site with respect to Oregon’s land planning requirements is through the use of a “post acknowledgment plan and ordinance amendment”. The land use designations suggested in the LRA Master Plan can be incorporated into the respective Morrow and Umatilla county comprehensive plans, following the “post acknowledgement amendment process” and approved by LCDC. If the planned uses are similar to the surrounding uses or similar to the current uses at the site this process would likely be sufficient. If significant changes in zoning are required under the LRA’s Master Plan then a “Goal 13 Exception Request” may be required in the amendment process. The consensus of state and local planning officials it is that there will be no requirement to consider potential off-sets from existing inventories of industrial or commercial lands already designated in the Morrow County, Umatilla County, Hermiston, Umatilla, or Irrigon urban growth boundaries.

Page 46: UMATILLA ARMY DEPOT REUSE AUTHORITY REDEVELOPMENT … · Due to the nature of the process, size of documents, and general maintenance of the information included in the UMCD Base

UMADRA     Redevelopment Plan and Implementation Strategy            

Submittal Part I: Draft_00 

 

DMST_RPIS_D00_052810  31

SECTION THREE: IMPLEMENTATION STRATEGY The LRA has indicated its intent to move into an implementation phase after the approval of this RPIS. As shown in the schematic below, the LRA is recommending three types of conveyance mechanisms:

• Federal legislation for land transfer to state ownership • Federal agency-to-agency transfer • Economic development conveyance

Figure 9: Implementation Strategy Federal Legislation for Land Transfer to State Ownership - For the land that would be transferred to the ORNG, the LRA recommends federal legislation for land transfer to state ownership. In total, 7,421 acres would be transferred through this process. In the event that congressional legislation cannot be obtained, the back-up approach recommended by the LRA is for a Public Benefit Conveyance (PBC) through the Federal Emergency Management Agency. Federal Agency-to-Agency Transfer - For the property to be owned and managed by the US Fish and Wildlife Service, the LRA recommends an agency-to-agency transfer from the Department of the Army to the US Fish and Wildlife Service. Economic Development Conveyance - For the lands that would be zoned either Industrial or Highway Commercial/Industrial, the LRA recommends a no-cost economic development conveyance.

Page 47: UMATILLA ARMY DEPOT REUSE AUTHORITY REDEVELOPMENT … · Due to the nature of the process, size of documents, and general maintenance of the information included in the UMCD Base

UMADRA     Redevelopment Plan and Implementation Strategy            

Submittal Part I: Draft_00 

 

DMST_RPIS_D00_052810  32

Case for a No-Cost Economic Development Conveyance The LRA understands that a strong case should be made for a no-cost economic development conveyance. Toward this end, the LRA offers the reasons why a no-cost economic development conveyance should be made. Reason #1: Immediate Job Loss - The curtailment of chemical demilitarization activities at UMCD will cause a short-term loss of over 1,170 jobs. Reason #2: Residual Environmental Problems - Because most of the structures at UMCD are of World War II-era construction, the buildings are covered with lead-based paint and asbestos materials. Reuse of many of the structures will require a significant expense by the Implementing LRA in order to make future use of such structures. Reason #3: Poor Physical Condition of Building and Infrastructure - The buildings and infrastructure systems throughout UMCD have been in a state of deterioration for decades. While the Army has maintained certain structures and portions of the infrastructure in a satisfactory condition for a small segment of the overall property, huge expenses will be faced by the Implementing LRA for any buildings that are deemed reusable. In addition, upgrades to the sewer and water systems will be significant in order to utilize the property for future industrial and commercial use. Reason #4: Positive Solution on the ADA Area - Because the LRA and the Oregon National Guard have agreed that the ORNG should reuse the ADA area located in the Northwestern quadrant of UMCD, the Army will not be required to remediate the land to dispose of unexploded ordnance to a higher land-use classification such as residential. It is estimated that the military reuse of the land, which will not trigger environmental clean-up, may create savings of as much as $20 million. Reason #5: Poor Market Conditions - Not only is the national economy only beginning to recover from a deep recession, but the status of the State of Oregon economy is significantly worse than the national average. Compounding this matter is the fact that the unemployment rates for Morrow and Umatilla County have been at or above the state average. This results in an economic climate whereby industrial reuse in the short term is highly unlikely. Reason #6: Strained Local Budgets - Not only has the economy had a challenging effect on the capacity to utilize the land, but it has also drained the budgets of the entities the land would be transferred to. This, coupled with diminishing economic development resources at the state level, limits the ability for public investment for redevelopment. Reason #7: Competing Local Industrial Assets - While the LRA recognizes many redevelopment opportunities for UMCD, the region is also blessed with other industrial development assets and industrial parks that must also be developed, serviced, and maintained. In certain respects, industrial land reuse opportunities at UMCD represent a phase of development beyond the immediate opportunities at existing industrial parks. Balancing this, however, are certain unique development opportunities only afforded by the expanse of land and available infrastructure at UMCD. In short, the redevelopment of industrial land through economic development conveyances is a part of a broader portfolio of economic development opportunities being managed by local development authorities.

Page 48: UMATILLA ARMY DEPOT REUSE AUTHORITY REDEVELOPMENT … · Due to the nature of the process, size of documents, and general maintenance of the information included in the UMCD Base

UMADRA     Redevelopment Plan and Implementation Strategy            

Submittal Part I: Draft_00 

 

DMST_RPIS_D00_052810  33

Reason #8: Meeting the Army’s Needs - The LRA has understood that it is a priority of the Army to have the needs of the Oregon National Guard met. The LRA approved this Redevelopment Plan with the understanding that the needs of the ORNG are entirely met. Respectfully, the LRA requests a no-cost economic development conveyance with this agreement in mind. Recommending an Implementing LRA During its May 20, 2010 regular meeting, the LRA voted unanimously to establish an Implementing LRA for the lands that are recommended to be transferred through an economic development conveyance. The LRA considered a variety of conveyance mechanisms, and opted for an Implementing LRA as the mechanism that provides the greatest flexibility for job creation. As noted in this RPIS, the LRA strongly recommends a no-cost economic development conveyance in order to maintain the greatest capacity and latitude for job creation. Because of the significant task laid before the (future) Implementing LRA, it will be necessary for the ILRA to have a full understanding of the opportunities and risks associated with the lands conveyed by an economic development conveyance. While the opportunity for industrial redevelopment and salvage is significant, the responsibilities to the ILRA to maintain facilities, address structural and environmental deficiencies, and upgrade utilities are enormous. Specifically, some of the challenges to the ILRA are as follows:

• Specific needed improvements to infrastructure are unknown • The total cost for infrastructure improvements is unknown • The salvage market for rail needs to be investigated • Specific opportunities for the reuse and salvage of equipment at UMCDF needs to be further

investigated • A plan for the administration—and administrative costs—of the LRA needs to be determined • Policies with respect to development vis-à-vis development at competing industrial sites

(both ports, local communities, CTUIR) need to be developed • A marketing plan for industrial development needs to be defined • A plan to transition from military to civilian use needs to be defined

A business plan including a ten-year cash flow pro forma would help to set the priorities for ILRA, and to address any financial risks that must be overcome. In addition, an infrastructure analysis must be completed that identifies the infrastructure improvements necessary consistent with the implementation of the Redevelopment Plan. Per the requirements of the OEA, an Implementing LRA must implement the Redevelopment Plan, apply for and receive property via an economic development conveyance, meet OEA-defined criteria, and be designated locally while being recognized by the OEA. Implementing LRAs must have the following capacity:

• Buy, lease, and sell land • Borrow and lend money, and grant mortgages for debt obligations • Enter into contracts • Issue bonds backed by revenues of the community using the bond proceeds

Implementing LRAs must also demonstrate the authority to enter into legal commitments including

Page 49: UMATILLA ARMY DEPOT REUSE AUTHORITY REDEVELOPMENT … · Due to the nature of the process, size of documents, and general maintenance of the information included in the UMCD Base

UMADRA     Redevelopment Plan and Implementation Strategy            

Submittal Part I: Draft_00 

 

DMST_RPIS_D00_052810  34

holding title and incurring debt and managing real property. Additionally, Implementing LRAs must have accountability to the respective governmental jurisdictions that they represent. Finally, Implementing LRAs must establish that a public entity, such as a City or County, will assume the obligation if the LRA is dissolved. During its May 20, 2010 meeting, the LRA considered various forms and structural models for the establishment of an Implementing LRA. During the meeting, it was noted that the State of Oregon does not currently have statutes that provide for the establishment of such a state-recognized organization. The LRA agreed to continue to examine various structural models, and will work with OEA to create such a structure. The primary considerations in the establishment of an Implementing LRA include management, legal, financial, political, consideration of Redevelopment Plan land uses, and the oversight of a business plan and infrastructure analysis.