Ultrasonic Testing Report

2
TCR ARABIA P.O Box 3422, Opp Gasoline Station, beside Al-kadi Tent factory, near King Abdul-aziz Sea Port - Dammam 31471, Saudi Arabia. Tel: +966-3-8475785-231 E-Mail: [email protected] www.tcr-arabia.com ULTRASONIC TESTING REPORT Client: General Electricity Location: PP11 Dhuruma, Riyadh Date Tested: October 16 – 17, 2015 Project: Dhuruma O&M STG-10 Test Procedure: QCP/TCR/UT/1.0REV.1 Report No.: Reference Code: ASME V Article 4 Acceptance Standard: AS PER PROCEDURE Page: 1 of 1 INSPECTION PARAMETERS Flaw Detector MODSONIC Model/SN E3494-0912 Examination System A – Scan Calibration block Step Wedge, V2 Block Scanning dB +6dB Reference dB 54 dB Couplant Ultra Gel Defect Report Level - Probe Angle Probe Type Crystal Size Frequency Defect Reject Level As per procedure Material Bearing Metal Range 100mm TR Probe Twin- Crystal 10mm 4MHz Sensitivi ty 80% BWE Area Scanned Accessible Area Surface Condition Normal TEST RESULTS S.I No. Description Observation Result 1 Turbine End Thrust Pad T2(Top) NUA Acceptable 2 Turbine End Thrust Pad T3 (Top) NUA Acceptable 3 Turbine End Thrust Pad T4 (Top) NUA Acceptable 4 Turbine End Thrust Pad T5 (Top) NUA Acceptable 5 Turbine End Thrust Pad T6 (Bottom) NUA Acceptable 6 Turbine End Thrust Pad T7 (Bottom) NUA Acceptable 7 Turbine End Thrust Pad T8 (Bottom) NUA Acceptable 8 Turbine End Thrust Pad T1 (Bottom) NUA Acceptable 9 Turbine Side Tilting Pad T1-B2 NUA Acceptable 10 Turbine Side Tilting Pad T1-B3 NUA Acceptable 11 Turbine Side Tilting Pad T1-B4 NUA Acceptable 12 Turbine Side Tilting Pad T1-U1 NUA Acceptable 13 Turbine Side Tilting Pad T1-U5 NUA Acceptable Inspected by: RONEL CUSTODIO Reviewed by: TCR ARABIA NDT Level II TCR ARABIA NDT Level III Date: October 21, 2015 Date:

description

REPORT

Transcript of Ultrasonic Testing Report

Page 1: Ultrasonic Testing Report

TCR ARABIAP.O Box 3422, Opp Gasoline Station, beside Al-kadi Tent factory, near King Abdul-aziz Sea Port - Dammam

31471, Saudi Arabia.Tel: +966-3-8475785-231 E-Mail: [email protected] www.tcr-arabia.com

ULTRASONIC TESTING REPORTClient: General Electricity Location: PP11 Dhuruma, Riyadh Date Tested: October 16 – 17, 2015Project: Dhuruma O&M STG-10 Test Procedure: QCP/TCR/UT/1.0REV.1 Report No.:Reference Code: ASME V Article 4 Acceptance Standard: AS PER PROCEDURE Page: 1 of 1

INSPECTION PARAMETERSFlaw Detector MODSONIC Model/SN E3494-0912

Examination System A – Scan Calibration block Step Wedge, V2 BlockScanning dB +6dB Reference dB 54 dB Couplant Ultra Gel

Defect Report Level -Probe Angle Probe Type Crystal Size Frequency

Defect Reject Level As per procedure

Material Bearing Metal

Range 100mm0°

TR ProbeTwin-Crystal

10mm 4MHzSensitivity 80% BWE

Area Scanned Accessible Area Surface Condition Normal

TEST RESULTSS.I No. Description Observation Result

1 Turbine End Thrust Pad T2(Top) NUA Acceptable2 Turbine End Thrust Pad T3 (Top) NUA Acceptable3 Turbine End Thrust Pad T4 (Top) NUA Acceptable4 Turbine End Thrust Pad T5 (Top) NUA Acceptable5 Turbine End Thrust Pad T6 (Bottom) NUA Acceptable6 Turbine End Thrust Pad T7 (Bottom) NUA Acceptable7 Turbine End Thrust Pad T8 (Bottom) NUA Acceptable8 Turbine End Thrust Pad T1 (Bottom) NUA Acceptable9 Turbine Side Tilting Pad T1-B2 NUA Acceptable

10 Turbine Side Tilting Pad T1-B3 NUA Acceptable11 Turbine Side Tilting Pad T1-B4 NUA Acceptable12 Turbine Side Tilting Pad T1-U1 NUA Acceptable13 Turbine Side Tilting Pad T1-U5 NUA Acceptable14 Turbine Side Tilting Pad T1-U9 NUA Acceptable15 Generator Side Tilting Pad T2-UR NUA Acceptable16 Generator Side Tilting Pad T2-UC NUA Acceptable17 Generator Side Tilting Pad T2-ULL NUA Acceptable18 Generator Side Tilting Pad T2-BC NUA Acceptable19 Generator Side Tilting Pad T2-BR NUA Acceptable20 Generator Side Tilting Pad T2-BL NUA Acceptable

NOTE: NUA (No Unbonded Area)

ATTACHMENTS: Three (3) pages of photos.

Inspected by: RONEL CUSTODIO

Reviewed by:

TCR ARABIA NDT Level II TCR ARABIA NDT Level IIIDate: October 21, 2015 Date: