THIN IS IN!!!
Ultra-Thin Overlay Mix (UT mix)
![Page 2: Ultra-Thin Overlay Mix (UT mix) - Texas A&M University · Pilot Program – Test Section Cost Analysis – SHOW ME THE MONEY!!! Estimate for UT Mix Test Section Total Tonnage = 120.00](https://reader033.fdocuments.net/reader033/viewer/2022051910/5fffdefd2df4fe2dde6691f3/html5/thumbnails/2.jpg)
Background Thin Overlay (TOM) – 1” HMA Started 2009 Saved over $8 million to date Original test section has no distress Default overlay for the Austin District
![Page 3: Ultra-Thin Overlay Mix (UT mix) - Texas A&M University · Pilot Program – Test Section Cost Analysis – SHOW ME THE MONEY!!! Estimate for UT Mix Test Section Total Tonnage = 120.00](https://reader033.fdocuments.net/reader033/viewer/2022051910/5fffdefd2df4fe2dde6691f3/html5/thumbnails/3.jpg)
What is UT Mix? ½” HMA Overlay Aggregate: SAC A Grade 2 Microsurface (Sandstone) Asphalt Binder: 7.0-7.3% PG 76-22
![Page 4: Ultra-Thin Overlay Mix (UT mix) - Texas A&M University · Pilot Program – Test Section Cost Analysis – SHOW ME THE MONEY!!! Estimate for UT Mix Test Section Total Tonnage = 120.00](https://reader033.fdocuments.net/reader033/viewer/2022051910/5fffdefd2df4fe2dde6691f3/html5/thumbnails/4.jpg)
Potential Applications – Preventative Maintenance
Frictional Wearing Course Overlays Reset surface
serviceability properties For old, highly oxidized
pavements with low skid resistance and/or superficial cracking
For structurally adequate pavements only
![Page 5: Ultra-Thin Overlay Mix (UT mix) - Texas A&M University · Pilot Program – Test Section Cost Analysis – SHOW ME THE MONEY!!! Estimate for UT Mix Test Section Total Tonnage = 120.00](https://reader033.fdocuments.net/reader033/viewer/2022051910/5fffdefd2df4fe2dde6691f3/html5/thumbnails/5.jpg)
Potential Applications – Preventative Maintenance
Alternate to 1 or 2 Course Surface Treatment For pavement needing a
highly flexible surface, but could also benefit from good ride quality associated with HMA
For pavement with a number of seal coats, shallow rutting, patching, and other distresses, such as flushing or raveling
![Page 6: Ultra-Thin Overlay Mix (UT mix) - Texas A&M University · Pilot Program – Test Section Cost Analysis – SHOW ME THE MONEY!!! Estimate for UT Mix Test Section Total Tonnage = 120.00](https://reader033.fdocuments.net/reader033/viewer/2022051910/5fffdefd2df4fe2dde6691f3/html5/thumbnails/6.jpg)
Pilot Program Lab Design Target Density = 97.5% (TGC) Target Asphalt Content = 7.3%
Field Test Section Location: Ramming Paving – Buda Plant Haul Road Original Thin Overlay Mix (TOM) Test Section
constructed in 2009
![Page 7: Ultra-Thin Overlay Mix (UT mix) - Texas A&M University · Pilot Program – Test Section Cost Analysis – SHOW ME THE MONEY!!! Estimate for UT Mix Test Section Total Tonnage = 120.00](https://reader033.fdocuments.net/reader033/viewer/2022051910/5fffdefd2df4fe2dde6691f3/html5/thumbnails/7.jpg)
Pilot Program – Test Section Two bonding courses Calumet “Trackless Tack” @ 0.1 gal/SY Ergon E-Tac @ 0.1 gal/SY Control Section with no tack
Two rolling patterns 2 high frequency vibratory passes & 2 static passes 4 static passes
![Page 8: Ultra-Thin Overlay Mix (UT mix) - Texas A&M University · Pilot Program – Test Section Cost Analysis – SHOW ME THE MONEY!!! Estimate for UT Mix Test Section Total Tonnage = 120.00](https://reader033.fdocuments.net/reader033/viewer/2022051910/5fffdefd2df4fe2dde6691f3/html5/thumbnails/8.jpg)
700’
39’
24’
500’
TOTAL = 4370 SY UTOM HMA = [55 lbs/SY * 4370 SY]/2000 = ~120 TONS
ERGON E-TAC
CALUMET – TRACKLESS TACK
Control
Ramming Buda Plant - Test Section Lay Out
HMA PLANT
Vibe/Static
Static Only
![Page 9: Ultra-Thin Overlay Mix (UT mix) - Texas A&M University · Pilot Program – Test Section Cost Analysis – SHOW ME THE MONEY!!! Estimate for UT Mix Test Section Total Tonnage = 120.00](https://reader033.fdocuments.net/reader033/viewer/2022051910/5fffdefd2df4fe2dde6691f3/html5/thumbnails/9.jpg)
Pilot Program – Test Section October 10, 2012: Construction Day Overcast to Partly Cloudy Ambient Temperature = 85 F Pavement Temperatures = 90-105 F Wind = 5-10 mph Humidity = 86%
![Page 10: Ultra-Thin Overlay Mix (UT mix) - Texas A&M University · Pilot Program – Test Section Cost Analysis – SHOW ME THE MONEY!!! Estimate for UT Mix Test Section Total Tonnage = 120.00](https://reader033.fdocuments.net/reader033/viewer/2022051910/5fffdefd2df4fe2dde6691f3/html5/thumbnails/10.jpg)
Pilot Program – Test Section Preparation
![Page 11: Ultra-Thin Overlay Mix (UT mix) - Texas A&M University · Pilot Program – Test Section Cost Analysis – SHOW ME THE MONEY!!! Estimate for UT Mix Test Section Total Tonnage = 120.00](https://reader033.fdocuments.net/reader033/viewer/2022051910/5fffdefd2df4fe2dde6691f3/html5/thumbnails/11.jpg)
Pilot Program – Test Section Bonding Course – Trackless Tack Coat TTI will be performing bond strength testing
![Page 12: Ultra-Thin Overlay Mix (UT mix) - Texas A&M University · Pilot Program – Test Section Cost Analysis – SHOW ME THE MONEY!!! Estimate for UT Mix Test Section Total Tonnage = 120.00](https://reader033.fdocuments.net/reader033/viewer/2022051910/5fffdefd2df4fe2dde6691f3/html5/thumbnails/12.jpg)
Pilot Program – Test Section Placement – Lay Down Operation
![Page 13: Ultra-Thin Overlay Mix (UT mix) - Texas A&M University · Pilot Program – Test Section Cost Analysis – SHOW ME THE MONEY!!! Estimate for UT Mix Test Section Total Tonnage = 120.00](https://reader033.fdocuments.net/reader033/viewer/2022051910/5fffdefd2df4fe2dde6691f3/html5/thumbnails/13.jpg)
Pilot Program – Test Section Placement – Lay Down Operation
![Page 14: Ultra-Thin Overlay Mix (UT mix) - Texas A&M University · Pilot Program – Test Section Cost Analysis – SHOW ME THE MONEY!!! Estimate for UT Mix Test Section Total Tonnage = 120.00](https://reader033.fdocuments.net/reader033/viewer/2022051910/5fffdefd2df4fe2dde6691f3/html5/thumbnails/14.jpg)
Pilot Program – Test Section Placement – Cool Down Rate = ~8○F per minute
Thermal Images
![Page 15: Ultra-Thin Overlay Mix (UT mix) - Texas A&M University · Pilot Program – Test Section Cost Analysis – SHOW ME THE MONEY!!! Estimate for UT Mix Test Section Total Tonnage = 120.00](https://reader033.fdocuments.net/reader033/viewer/2022051910/5fffdefd2df4fe2dde6691f3/html5/thumbnails/15.jpg)
Pilot Program – Test Section Compaction Experiment: Vibratory vs. Static Mix did not consolidate nor move with either
compaction.
![Page 16: Ultra-Thin Overlay Mix (UT mix) - Texas A&M University · Pilot Program – Test Section Cost Analysis – SHOW ME THE MONEY!!! Estimate for UT Mix Test Section Total Tonnage = 120.00](https://reader033.fdocuments.net/reader033/viewer/2022051910/5fffdefd2df4fe2dde6691f3/html5/thumbnails/16.jpg)
Pilot Program – Test Section Compaction Experiment: Vibratory vs. Static Better Texture with Static Only
STATIC VIBRATORY
![Page 17: Ultra-Thin Overlay Mix (UT mix) - Texas A&M University · Pilot Program – Test Section Cost Analysis – SHOW ME THE MONEY!!! Estimate for UT Mix Test Section Total Tonnage = 120.00](https://reader033.fdocuments.net/reader033/viewer/2022051910/5fffdefd2df4fe2dde6691f3/html5/thumbnails/17.jpg)
Pilot Program – Test Section Compaction
Experiment: Vibratory vs. Static
Vibratory compaction migrated tack to the surface – fat spots
Both compaction methods produced good permeability properties Drain Down Time
(Vibratory) = 16 minutes Drain Down Time
(Static) = 9 minutes
![Page 18: Ultra-Thin Overlay Mix (UT mix) - Texas A&M University · Pilot Program – Test Section Cost Analysis – SHOW ME THE MONEY!!! Estimate for UT Mix Test Section Total Tonnage = 120.00](https://reader033.fdocuments.net/reader033/viewer/2022051910/5fffdefd2df4fe2dde6691f3/html5/thumbnails/18.jpg)
Pilot Program – Test Section
0.5” Tiny TOM
1” TOM
![Page 19: Ultra-Thin Overlay Mix (UT mix) - Texas A&M University · Pilot Program – Test Section Cost Analysis – SHOW ME THE MONEY!!! Estimate for UT Mix Test Section Total Tonnage = 120.00](https://reader033.fdocuments.net/reader033/viewer/2022051910/5fffdefd2df4fe2dde6691f3/html5/thumbnails/19.jpg)
Pilot Program – Test Section Cost Analysis – SHOW ME THE MONEY!!!
Estimate for UT Mix Test Section
Total Tonnage = 120.00 TonsTotal Per Ton
Gr 2 Delta Material Material 13.00$ per ton 1,560.00$ Haul 14.25$ per ton 1,710.00$ 3,270.00$ 27.25$
Valero 76-22 Material 725.00$ per ton 6,351.00$ 7.3 % JMF Haul 35.00$ per ton 306.60$ 6,657.60$ 55.48$
Labor - Equip - Haul to Place 4,600.00$ 38.33$
Asphalt Plant Operating 1,080.00$ 9.00$
Track-Less Tack 2.70$ per gallon 215.00 est. gal 580.50$ 4.84$
Total Cost = 16,188.10$ 134.90$ per ton3.54$ per SY
![Page 20: Ultra-Thin Overlay Mix (UT mix) - Texas A&M University · Pilot Program – Test Section Cost Analysis – SHOW ME THE MONEY!!! Estimate for UT Mix Test Section Total Tonnage = 120.00](https://reader033.fdocuments.net/reader033/viewer/2022051910/5fffdefd2df4fe2dde6691f3/html5/thumbnails/20.jpg)
UT Mix - Future Issue with obtaining target AC with fine mixes Target AC = 7.2%; Actual AC = 7.8-8.0%
Develop Special Specification Vary AC to match required performance Strict temperature requirements for placement Static Compaction Water Flow Rate ≥ 2 minutes
Proposed Project – Hamilton Pool Road Old, oxidized HMA with marginal skid resistance
![Page 21: Ultra-Thin Overlay Mix (UT mix) - Texas A&M University · Pilot Program – Test Section Cost Analysis – SHOW ME THE MONEY!!! Estimate for UT Mix Test Section Total Tonnage = 120.00](https://reader033.fdocuments.net/reader033/viewer/2022051910/5fffdefd2df4fe2dde6691f3/html5/thumbnails/21.jpg)
Thank you! Questions?