Ultra-fast Longitudinal Feedbacks for the European...

62
Ultra-fast Longitudinal Feedbacks for the European XFEL H. Schlarb, S. Pfeiffer, Ch. Schmidt, on behalf of the DESY LbSyn and LLRF Team Outline: Introduction Longitudinal diagnostics Feedbacks

Transcript of Ultra-fast Longitudinal Feedbacks for the European...

Page 1: Ultra-fast Longitudinal Feedbacks for the European XFELaccelconf.web.cern.ch/AccelConf/ICALEPCS2013/talks/frcobab02_talk.pdf · Ultra-fast Longitudinal Feedbacks for the European

Ultra-fast Longitudinal Feedbacks for the European XFEL

H. Schlarb, S. Pfeiffer, Ch. Schmidt, on behalf of the

DESY LbSyn and LLRF Team

Outline: • Introduction • Longitudinal diagnostics • Feedbacks

Page 2: Ultra-fast Longitudinal Feedbacks for the European XFELaccelconf.web.cern.ch/AccelConf/ICALEPCS2013/talks/frcobab02_talk.pdf · Ultra-fast Longitudinal Feedbacks for the European

H. Schlarb, DESY, ICALEPCS 2013, San Francisco, California, Oct. 11. 2013

Longitudinal jitter sources – Generic FEL Layout –

RF gun Accelerator Undulator γ

Photo-cathode laser

Pump-probe laser

Long/transverse beam quality & arrival time - conventional: for low peak currents ~ 10-50A

Sources are:

Photo-cathode laser pulse shape t/λ Phase of RF gun (non-relativistic electrons) t First accelerator cavities (non-relativistic electrons) t/λ Seed and Pump-probe laser t Charge fluctuation though collective effects λ/(t) t: arrival time λ: longitudinal change distribution

Seed laser

2

Page 3: Ultra-fast Longitudinal Feedbacks for the European XFELaccelconf.web.cern.ch/AccelConf/ICALEPCS2013/talks/frcobab02_talk.pdf · Ultra-fast Longitudinal Feedbacks for the European

H. Schlarb, DESY, ICALEPCS 2013, San Francisco, California, Oct. 11. 2013

Sources are:

Photo-cathode laser pulse shape t/λ Phase of RF gun (non-relativistic electrons) t First accelerator cavities (non-relativistic electrons) t/λ Seed and Pump-probe laser t Accelerator prior to bunch compressor t/λ Charge fluctuation though collective effects λ/(t) t: arrival time λ: longitudinal change distribution

RF gun Accelerator Undulator γ

bunch compressor Main Linac

Photo-cathode laser

Pump-probe laser

Seed laser

3 Longitudinal jitter sources – Generic FEL Layout –

Long/transverse beam quality & arrival time - conventional: for high peak currents ~ 500 - 20000 A

Page 4: Ultra-fast Longitudinal Feedbacks for the European XFELaccelconf.web.cern.ch/AccelConf/ICALEPCS2013/talks/frcobab02_talk.pdf · Ultra-fast Longitudinal Feedbacks for the European

H. Schlarb, DESY, ICALEPCS 2013, San Francisco, California, Oct. 11. 2013

4

δi=∆E/E0

si

Vacc

Energy chirp + energy dependent path length

s/c

Accelerator

~ 0.1…1.0%

~ 10 … 1 ps

~ 100…10 fs

σE,s ~0.01…0.001%

Sharing process

Tolerances on RF stability: … what will be required?

sf

δf

Page 5: Ultra-fast Longitudinal Feedbacks for the European XFELaccelconf.web.cern.ch/AccelConf/ICALEPCS2013/talks/frcobab02_talk.pdf · Ultra-fast Longitudinal Feedbacks for the European

H. Schlarb, DESY, ICALEPCS 2013, San Francisco, California, Oct. 11. 2013

5 Tolerances on RF stability: … what will be required?

Page 6: Ultra-fast Longitudinal Feedbacks for the European XFELaccelconf.web.cern.ch/AccelConf/ICALEPCS2013/talks/frcobab02_talk.pdf · Ultra-fast Longitudinal Feedbacks for the European

H. Schlarb, DESY, ICALEPCS 2013, San Francisco, California, Oct. 11. 2013

6 Tolerances on RF stability: … what will be required?

Amplitude

If E0 << E1 and E0‘<< E1‘ 6…3.5 ..4

Tolerance ∝ Compression Phase & arrival

Page 7: Ultra-fast Longitudinal Feedbacks for the European XFELaccelconf.web.cern.ch/AccelConf/ICALEPCS2013/talks/frcobab02_talk.pdf · Ultra-fast Longitudinal Feedbacks for the European

H. Schlarb, DESY, ICALEPCS 2013, San Francisco, California, Oct. 11. 2013

7 Tolerances on RF stability: … what will be required?

Example: C=100, dI/I<10% ⇒ φ≈0.014° and dV/V ≈ 2.5e-4

Amplitude

If E0 << E1 and E0‘<< E1‘ 6…3.5 ..4

Tolerance ∝ Compression Phase & arrival

Page 8: Ultra-fast Longitudinal Feedbacks for the European XFELaccelconf.web.cern.ch/AccelConf/ICALEPCS2013/talks/frcobab02_talk.pdf · Ultra-fast Longitudinal Feedbacks for the European

H. Schlarb, DESY, ICALEPCS 2013, San Francisco, California, Oct. 11. 2013

8 Tolerances on RF stability: … what will be required?

Example: C=100, dI/I<10% ⇒ φ≈0.014° and dV/V ≈ 2.5e-4

Amplitude

If E0 << E1 and E0‘<< E1‘ 6…3.5 ..4

Tolerance ∝ Compression Phase & arrival

Amplitude Phase Arrival

Page 9: Ultra-fast Longitudinal Feedbacks for the European XFELaccelconf.web.cern.ch/AccelConf/ICALEPCS2013/talks/frcobab02_talk.pdf · Ultra-fast Longitudinal Feedbacks for the European

H. Schlarb, DESY, ICALEPCS 2013, San Francisco, California, Oct. 11. 2013

9 Tolerances on RF stability: … what will be required?

Example: C=100, dI/I<10% ⇒ φ≈0.014° and dV/V ≈ 2.5e-4

Amplitude

If E0 << E1 and E0‘<< E1‘ 6…3.5 ..4

Tolerance ∝ Compression Phase & arrival

Amplitude Phase Arrival

Example:10fs, C>>1,R56~0.10m ⇒ φ≈0.005° L-band and dV/V ≈ 3e-5

Page 10: Ultra-fast Longitudinal Feedbacks for the European XFELaccelconf.web.cern.ch/AccelConf/ICALEPCS2013/talks/frcobab02_talk.pdf · Ultra-fast Longitudinal Feedbacks for the European

H. Schlarb, DESY, ICALEPCS 2013, San Francisco, California, Oct. 11. 2013

10 Tolerances on RF stability: … what will be required?

> Impacts the peak current / longitudinal beam profile

> Arrival time jitter:

> Mitigation: through multi-staged compression, but this adds cost > Coupling: between (∆tf , C, E) as function of (V, φ, ∆tini) > Significant complexity added: Harmonic cavity / Laser pulse shaping

Example: C=100, dI/I<10% ⇒ φ≈0.014° and dV/V ≈ 2.5e-4

Amplitude

If E0 << E1 and E0‘<< E1‘ 6…3.5 ..4

Tolerance ∝ Compression Phase & arrival

Amplitude Phase Arrival

Example:10fs, C>>1,R56~0.10m ⇒ φ≈0.005° L-band and dV/V ≈ 3e-5

Page 11: Ultra-fast Longitudinal Feedbacks for the European XFELaccelconf.web.cern.ch/AccelConf/ICALEPCS2013/talks/frcobab02_talk.pdf · Ultra-fast Longitudinal Feedbacks for the European

H. Schlarb, DESY, ICALEPCS 2013, San Francisco, California, Oct. 11. 2013

Longitudinal Diagnostics Arrival timing

& Compression

11

Page 12: Ultra-fast Longitudinal Feedbacks for the European XFELaccelconf.web.cern.ch/AccelConf/ICALEPCS2013/talks/frcobab02_talk.pdf · Ultra-fast Longitudinal Feedbacks for the European

H. Schlarb, DESY, ICALEPCS 2013, San Francisco, California, Oct. 11. 2013

> Optical synchronization system @ FLASH using mode locked laser

12 Synchronization – Pulsed optically, example FLASH

Page 13: Ultra-fast Longitudinal Feedbacks for the European XFELaccelconf.web.cern.ch/AccelConf/ICALEPCS2013/talks/frcobab02_talk.pdf · Ultra-fast Longitudinal Feedbacks for the European

H. Schlarb, DESY, ICALEPCS 2013, San Francisco, California, Oct. 11. 2013

> Optical synchronization system @ FLASH using mode locked laser

13

Master Laser ~ 5fs phase noise

Synchronization – Pulsed optically, example FLASH

Page 14: Ultra-fast Longitudinal Feedbacks for the European XFELaccelconf.web.cern.ch/AccelConf/ICALEPCS2013/talks/frcobab02_talk.pdf · Ultra-fast Longitudinal Feedbacks for the European

H. Schlarb, DESY, ICALEPCS 2013, San Francisco, California, Oct. 11. 2013

> Optical synchronization system @ FLASH using mode locked laser

14

Master Laser ~ 5fs phase noise

Synchronization – Pulsed optically, example FLASH

Page 15: Ultra-fast Longitudinal Feedbacks for the European XFELaccelconf.web.cern.ch/AccelConf/ICALEPCS2013/talks/frcobab02_talk.pdf · Ultra-fast Longitudinal Feedbacks for the European

H. Schlarb, DESY, ICALEPCS 2013, San Francisco, California, Oct. 11. 2013

> Optical synchronization system @ FLASH using mode locked laser

15

Master Laser ~ 5fs phase noise

Synchronization – Pulsed optically, example FLASH

Page 16: Ultra-fast Longitudinal Feedbacks for the European XFELaccelconf.web.cern.ch/AccelConf/ICALEPCS2013/talks/frcobab02_talk.pdf · Ultra-fast Longitudinal Feedbacks for the European

H. Schlarb, DESY, ICALEPCS 2013, San Francisco, California, Oct. 11. 2013

> Optical synchronization system @ FLASH using mode locked laser

16

Master Laser ~ 5fs phase noise

Link stabilization

Synchronization – Pulsed optically, example FLASH

Page 17: Ultra-fast Longitudinal Feedbacks for the European XFELaccelconf.web.cern.ch/AccelConf/ICALEPCS2013/talks/frcobab02_talk.pdf · Ultra-fast Longitudinal Feedbacks for the European

H. Schlarb, DESY, ICALEPCS 2013, San Francisco, California, Oct. 11. 2013

> Optical synchronization system @ FLASH using mode locked laser

17

Master Laser ~ 5fs phase noise

Link stabilization

Synchronization – Pulsed optically, example FLASH

Page 18: Ultra-fast Longitudinal Feedbacks for the European XFELaccelconf.web.cern.ch/AccelConf/ICALEPCS2013/talks/frcobab02_talk.pdf · Ultra-fast Longitudinal Feedbacks for the European

H. Schlarb, DESY, ICALEPCS 2013, San Francisco, California, Oct. 11. 2013

> Optical synchronization system @ FLASH using mode locked laser

18

Master Laser ~ 5fs phase noise

Link stabilization

TiSa opt. cross-corr. ~ 5fs rms

Synchronization – Pulsed optically, example FLASH

Page 19: Ultra-fast Longitudinal Feedbacks for the European XFELaccelconf.web.cern.ch/AccelConf/ICALEPCS2013/talks/frcobab02_talk.pdf · Ultra-fast Longitudinal Feedbacks for the European

H. Schlarb, DESY, ICALEPCS 2013, San Francisco, California, Oct. 11. 2013

> Optical synchronization system @ FLASH using mode locked laser

19

Master Laser ~ 5fs phase noise

Link stabilization

Slop ~ 60as/mV TiSa opt. cross-corr. ~ 5fs rms

Synchronization – Pulsed optically, example FLASH

Page 20: Ultra-fast Longitudinal Feedbacks for the European XFELaccelconf.web.cern.ch/AccelConf/ICALEPCS2013/talks/frcobab02_talk.pdf · Ultra-fast Longitudinal Feedbacks for the European

H. Schlarb, DESY, ICALEPCS 2013, San Francisco, California, Oct. 11. 2013

20

uncorrelated jitter over 4300 shots: 8.4 fs (rms)

> Uses optical reference laser pulses (single shot)

> Used at FLASH/FERMI/PSI

> Key exp. : two BAMs 60m distance

> Standard diag. at FLASH

Synchronization – Pulsed optical, arrival monitor

Page 21: Ultra-fast Longitudinal Feedbacks for the European XFELaccelconf.web.cern.ch/AccelConf/ICALEPCS2013/talks/frcobab02_talk.pdf · Ultra-fast Longitudinal Feedbacks for the European

H. Schlarb, DESY, ICALEPCS 2013, San Francisco, California, Oct. 11. 2013

21

> Present system: <10fs resolution @ 250 pC

> New System: goal <10fs @ 20pC charge

Increase bandwidth of monitor to ~ 40 GHz

+ bandwidth increase of front-end (MZI/cables/RF)

Improve readout of electronics (MTCA.4 based)

Synchronization – Pulsed optical, arrival monitor

General purpose FMC carrier

DAMC-FMC25 DFMC-BAM

ADC 250MSPS incl. PD/clock circ.

Paper on this conference: THPPC140

Page 22: Ultra-fast Longitudinal Feedbacks for the European XFELaccelconf.web.cern.ch/AccelConf/ICALEPCS2013/talks/frcobab02_talk.pdf · Ultra-fast Longitudinal Feedbacks for the European

H. Schlarb, DESY, ICALEPCS 2013, San Francisco, California, Oct. 11. 2013

22

> Based on coherent emission of Far-IR radiation

> Radiation process: CSR/CER/CDR/CTR/CGR

> Detectors: Pyro / 0.1-1THz Photo-detectors

> Single detector arrangement provides estimate on σz

> Typically cross-calibration with deflecting cav. required!

> Problem: pulse shape variation not detected!

C. Behrens et al., IPAC10, MOPD090

Arrangement at FLASH (Coh. Diff.) Diff. radiation

Phase scan

Form-factor Coh. spectral intensity

INFN / S. Wesch et al.,

Bunch compression monitor (BCM)

Pyro-element LiTaO3 (2mm x 2mm x 27 um)

Page 23: Ultra-fast Longitudinal Feedbacks for the European XFELaccelconf.web.cern.ch/AccelConf/ICALEPCS2013/talks/frcobab02_talk.pdf · Ultra-fast Longitudinal Feedbacks for the European

H. Schlarb, DESY, ICALEPCS 2013, San Francisco, California, Oct. 11. 2013

Feedbacks

23

Page 24: Ultra-fast Longitudinal Feedbacks for the European XFELaccelconf.web.cern.ch/AccelConf/ICALEPCS2013/talks/frcobab02_talk.pdf · Ultra-fast Longitudinal Feedbacks for the European

H. Schlarb, DESY, ICALEPCS 2013, San Francisco, California, Oct. 11. 2013

Linear Accelerators at DESY in Hamburg

European XFEL – currently under construction

FLASH – in operation (test bench for XFEL)

Blue box: arrival time and compression feedback

3.5 km

350 m

24

Page 25: Ultra-fast Longitudinal Feedbacks for the European XFELaccelconf.web.cern.ch/AccelConf/ICALEPCS2013/talks/frcobab02_talk.pdf · Ultra-fast Longitudinal Feedbacks for the European

H. Schlarb, DESY, ICALEPCS 2013, San Francisco, California, Oct. 11. 2013

System Overview – FLASH and XFEL

RF Field

I/Q control

25

Page 26: Ultra-fast Longitudinal Feedbacks for the European XFELaccelconf.web.cern.ch/AccelConf/ICALEPCS2013/talks/frcobab02_talk.pdf · Ultra-fast Longitudinal Feedbacks for the European

H. Schlarb, DESY, ICALEPCS 2013, San Francisco, California, Oct. 11. 2013

System Overview – FLASH and XFEL

RF Field

I/Q control

Pulsed operation 10 Hz

2ms pulse length (Filling, Flattop

and Decay)

2400 Bunches @ 3MHz (FLASH), 2700 Bunches @ 4.5MHz (XFEL)

26

Page 27: Ultra-fast Longitudinal Feedbacks for the European XFELaccelconf.web.cern.ch/AccelConf/ICALEPCS2013/talks/frcobab02_talk.pdf · Ultra-fast Longitudinal Feedbacks for the European

H. Schlarb, DESY, ICALEPCS 2013, San Francisco, California, Oct. 11. 2013

System Overview – FLASH and XFEL

RF Field

I/Q control

Pulsed operation 10 Hz

2ms pulse length (Filling, Flattop

and Decay)

2400 Bunches @ 3MHz (FLASH), 2700 Bunches @ 4.5MHz (XFEL)

27

Several feedbacks with different time scales involved: • Learn feed forwards ~100 mHz RF meas. FF drive Beam SP shape • Slow feedback ~ 1 Hz Beam SP • Fast feedback ~ 30kHz/100kHz RF meas. RF drive Beam RF drive • Ultra-fast ~ 500 kHz Beam NRF drive + parameter optimization to keep optimum feedback operation points Poster on Global FB:

Page 28: Ultra-fast Longitudinal Feedbacks for the European XFELaccelconf.web.cern.ch/AccelConf/ICALEPCS2013/talks/frcobab02_talk.pdf · Ultra-fast Longitudinal Feedbacks for the European

H. Schlarb, DESY, ICALEPCS 2013, San Francisco, California, Oct. 11. 2013

System Overview – FLASH and XFEL

Bunch Arrival Time Bunch Compression

4 Inputs 2 Outputs

28

Page 29: Ultra-fast Longitudinal Feedbacks for the European XFELaccelconf.web.cern.ch/AccelConf/ICALEPCS2013/talks/frcobab02_talk.pdf · Ultra-fast Longitudinal Feedbacks for the European

H. Schlarb, DESY, ICALEPCS 2013, San Francisco, California, Oct. 11. 2013

Bunch Arrival Time and Bunch Compression Feedback

1) Set-Point Adaptation

2) Extended Controller

3) RF field and beam error combination

Possibilities of beam-based feedback (not complete)

1) Good if latency of beam-based signals is larger than the latency for RF field signals [M...Modulation, BBF...maps beam errors to RF-field errors] 2) Good if the dynamic behavior for the beam-based signals and RF field signals differs 3) Good if the latency of signals are equal

Page 30: Ultra-fast Longitudinal Feedbacks for the European XFELaccelconf.web.cern.ch/AccelConf/ICALEPCS2013/talks/frcobab02_talk.pdf · Ultra-fast Longitudinal Feedbacks for the European

H. Schlarb, DESY, ICALEPCS 2013, San Francisco, California, Oct. 11. 2013

Bunch Arrival Time and Bunch Compression Feedback

1) Set-Point Adaptation

2) Extended Controller

3) RF field and beam error combination

Final implementation at FLASH (simplified)

Possibilities of beam-based feedback (not complete)

Page 31: Ultra-fast Longitudinal Feedbacks for the European XFELaccelconf.web.cern.ch/AccelConf/ICALEPCS2013/talks/frcobab02_talk.pdf · Ultra-fast Longitudinal Feedbacks for the European

H. Schlarb, DESY, ICALEPCS 2013, San Francisco, California, Oct. 11. 2013

LLRF LLRF

LLRF

LLRF

> Large bunch spacing at FLASH (~ us) allow for intra-bunch feedbacks

Gun ACC1 3rd ACC2 ACC3 ACC4 ACC7

~ ~ BAM BAM BCM BCM BAM BAM

Toroid Toroid Toroid

Laser

LLRF

φ A φ A φ A φ

Phase in RF-Gun Ampl. and phase ACC1&ACC39 Ampl and phase ACC23

BC2 BC3

Ultra-Fast beam based feedbacks 31

• Bunch rep. Rate: 500kHz, 50 Bunche

• Proposed BBF

• Active on ACC1 and ACC23 • BAM4 is an out-of-loop measurement (highest resolution)

12 fs

System Latency

System Bandwidth

Page 32: Ultra-fast Longitudinal Feedbacks for the European XFELaccelconf.web.cern.ch/AccelConf/ICALEPCS2013/talks/frcobab02_talk.pdf · Ultra-fast Longitudinal Feedbacks for the European

H. Schlarb, DESY, ICALEPCS 2013, San Francisco, California, Oct. 11. 2013

> Demonstration of synchronization for FEL users experiment

> Beam based feedback using Bunch Arrival Monitor & optical lock of TiSa laser

> FEL pulse arrival measured with laser based THz streaking (A. Cavalieri)

Fast beam based feedbacks & optical lock of TiSa Laser

33 fs rms

Residual jitter to be investigated (many possible sources!)

32

S. Schulz, SPIE13

Page 33: Ultra-fast Longitudinal Feedbacks for the European XFELaccelconf.web.cern.ch/AccelConf/ICALEPCS2013/talks/frcobab02_talk.pdf · Ultra-fast Longitudinal Feedbacks for the European

H. Schlarb, DESY, ICALEPCS 2013, San Francisco, California, Oct. 11. 2013

Fast beam based feedbacks – next step –

Gun ACC1 3rd ACC2 ACC3 ACC4 ACC7

~ ~

BAM BCM BCM BAM

BAM

Laser

LLRF LLRF LLRF

A φ A φ

BC2 BC3 R56=180mm R56=43mm

R56=0.8mm FLASH 1

FLASH 2 FLASH 3

FB simulation using measure data

x 2.5

WP13: 2013-2016

33

Page 34: Ultra-fast Longitudinal Feedbacks for the European XFELaccelconf.web.cern.ch/AccelConf/ICALEPCS2013/talks/frcobab02_talk.pdf · Ultra-fast Longitudinal Feedbacks for the European

H. Schlarb, DESY, ICALEPCS 2013, San Francisco, California, Oct. 11. 2013

Fast beam based feedbacks – next step –

Gun ACC1 3rd ACC2 ACC3 ACC4 ACC7

~ ~

BAM BCM BCM BAM

BAM

Laser

LLRF LLRF LLRF

A φ A φ

BC2 BC3 R56=180mm R56=43mm

R56=0.8mm FLASH 1

FLASH 2 FLASH 3

NRF cavity

FB simulation using measure data

x 2.5

WP13: 2013-2016

34

Page 35: Ultra-fast Longitudinal Feedbacks for the European XFELaccelconf.web.cern.ch/AccelConf/ICALEPCS2013/talks/frcobab02_talk.pdf · Ultra-fast Longitudinal Feedbacks for the European

H. Schlarb, DESY, ICALEPCS 2013, San Francisco, California, Oct. 11. 2013

Fast beam based feedbacks – next step –

Gun ACC1 3rd ACC2 ACC3 ACC4 ACC7

~ ~

BAM BCM BCM BAM

BAM

Laser

LLRF LLRF LLRF

A φ A φ

BC2 BC3 R56=180mm R56=43mm

R56=0.8mm FLASH 1

FLASH 2 FLASH 3

NRF cavity

FB simulation using measure data

x 2.5

REGAE buncher

WP13: 2013-2016

35

Page 36: Ultra-fast Longitudinal Feedbacks for the European XFELaccelconf.web.cern.ch/AccelConf/ICALEPCS2013/talks/frcobab02_talk.pdf · Ultra-fast Longitudinal Feedbacks for the European

H. Schlarb, DESY, ICALEPCS 2013, San Francisco, California, Oct. 11. 2013

Fast beam based feedbacks – next step –

Gun ACC1 3rd ACC2 ACC3 ACC4 ACC7

~ ~

BAM BCM BCM BAM

BAM

Laser

LLRF LLRF LLRF

A φ A φ

BC2 BC3 R56=180mm R56=43mm

R56=0.8mm FLASH 1

FLASH 2 FLASH 3

NRF cavity

FB simulation using measure data

x 2.5 RE

GA

E

FLASH NRF FB

Influence of cavity coupling

REGAE buncher

WP13: 2013-2016

36

Page 37: Ultra-fast Longitudinal Feedbacks for the European XFELaccelconf.web.cern.ch/AccelConf/ICALEPCS2013/talks/frcobab02_talk.pdf · Ultra-fast Longitudinal Feedbacks for the European

H. Schlarb, DESY, ICALEPCS 2013, San Francisco, California, Oct. 11. 2013

Fast beam based feedbacks – next step –

Gun ACC1 3rd ACC2 ACC3 ACC4 ACC7

~ ~

BAM BCM BCM BAM

BAM

Laser

LLRF LLRF LLRF

A φ A φ

BC2 BC3 R56=180mm R56=43mm

R56=0.8mm FLASH 1

FLASH 2 FLASH 3

NRF cavity

FB simulation using measure data

x 2.5

- Latency ~ 0.7us - Actuator bandwidth: NRF (0.5–1.0MHz) - Mod. Power (1kW) - No infl. on orbit - Goal: < 5fs rms

RE

GA

E

FLASH NRF FB

Influence of cavity coupling

REGAE buncher

WP13: 2013-2016

37

Page 38: Ultra-fast Longitudinal Feedbacks for the European XFELaccelconf.web.cern.ch/AccelConf/ICALEPCS2013/talks/frcobab02_talk.pdf · Ultra-fast Longitudinal Feedbacks for the European

H. Schlarb, DESY, ICALEPCS 2013, San Francisco, California, Oct. 11. 2013

Layout longitudinal FBs for European XFEL

Gun I1 3rd

~ ~

Laser

BC0 L1 L2 L2 L2 L3

BC1 BC2

L3 L3 COLL

BAM

BPMs

BCM EO

LLRF LLRF

LLRF

A/φ BAM BCM EO

BAM

LLRF

A/φ A/φ BAM BCM SPEC

BAM

LLRF

A/φ

LLRF

A/φ

LLRF

A/φ

OXC

LLRF

A

LLRF

A BPMs BPMs BPMs

uTCA

~ ~

BAM

BAM BAM

Toroid

Presenter
Presentation Notes
Before you start editing the slides of your talk change to the Master Slide view: � Menu button “View”, Master, Slide Master:� Edit the following 2 items in the 1st slide:� 1) 1st row in the violet header: � Delete the existent text and write the title of your talk into this text field� 2) The 2 rows in the footer area: Delete the text and write the information � regarding your talk (same as on the Title Slide) into this text field. � If you want to use more partner logos position them left � beside the DESY logo in the footer area � Close Master View
Page 39: Ultra-fast Longitudinal Feedbacks for the European XFELaccelconf.web.cern.ch/AccelConf/ICALEPCS2013/talks/frcobab02_talk.pdf · Ultra-fast Longitudinal Feedbacks for the European

H. Schlarb, DESY, ICALEPCS 2013, San Francisco, California, Oct. 11. 2013

Layout longitudinal FBs for European XFEL

Gun I1 3rd

~ ~

Laser

BC0 L1 L2 L2 L2 L3

BC1 BC2

L3 L3 COLL

BAM

BPMs

BCM EO

LLRF LLRF

LLRF

A/φ BAM BCM EO

BAM

LLRF

A/φ A/φ BAM BCM SPEC

BAM

LLRF

A/φ

LLRF

A/φ

LLRF

A/φ

OXC

LLRF

A

LLRF

A BPMs BPMs BPMs

uTCA

~ ~

BAM

BAM BAM

Toroid OXC

BBF Charge

BBF Osc. BBF BBO

3 feedback loops to stabilize photoinjector laser & charge

Presenter
Presentation Notes
Before you start editing the slides of your talk change to the Master Slide view: � Menu button “View”, Master, Slide Master:� Edit the following 2 items in the 1st slide:� 1) 1st row in the violet header: � Delete the existent text and write the title of your talk into this text field� 2) The 2 rows in the footer area: Delete the text and write the information � regarding your talk (same as on the Title Slide) into this text field. � If you want to use more partner logos position them left � beside the DESY logo in the footer area � Close Master View
Page 40: Ultra-fast Longitudinal Feedbacks for the European XFELaccelconf.web.cern.ch/AccelConf/ICALEPCS2013/talks/frcobab02_talk.pdf · Ultra-fast Longitudinal Feedbacks for the European

H. Schlarb, DESY, ICALEPCS 2013, San Francisco, California, Oct. 11. 2013

Layout longitudinal FBs for European XFEL

Gun I1 3rd

~ ~

Laser

BC0 L1 L2 L2 L2 L3

BC1 BC2

L3 L3 COLL

BAM

BPMs

BCM EO

LLRF LLRF

LLRF

A/φ BAM BCM EO

BAM

LLRF

A/φ A/φ BAM BCM SPEC

BAM

LLRF

A/φ

LLRF

A/φ

LLRF

A/φ

OXC

LLRF

A

LLRF

A BPMs BPMs BPMs

uTCA

~ ~

BAM

BAM BAM

Toroid OXC

BBF Charge

BBF Osc. BBF BBO

3 feedback loops to stabilize photoinjector laser & charge

BBF Gun BBF I1 BBF L1 BBF L2

4 feedback loops to stabilize arrival times, compression, shape & energy

Presenter
Presentation Notes
Before you start editing the slides of your talk change to the Master Slide view: � Menu button “View”, Master, Slide Master:� Edit the following 2 items in the 1st slide:� 1) 1st row in the violet header: � Delete the existent text and write the title of your talk into this text field� 2) The 2 rows in the footer area: Delete the text and write the information � regarding your talk (same as on the Title Slide) into this text field. � If you want to use more partner logos position them left � beside the DESY logo in the footer area � Close Master View
Page 41: Ultra-fast Longitudinal Feedbacks for the European XFELaccelconf.web.cern.ch/AccelConf/ICALEPCS2013/talks/frcobab02_talk.pdf · Ultra-fast Longitudinal Feedbacks for the European

H. Schlarb, DESY, ICALEPCS 2013, San Francisco, California, Oct. 11. 2013

Layout longitudinal FBs for European XFEL

Gun I1 3rd

~ ~

Laser

BC0 L1 L2 L2 L2 L3

BC1 BC2

L3 L3 COLL

BAM

BPMs

BCM EO

LLRF LLRF

LLRF

A/φ BAM BCM EO

BAM

LLRF

A/φ A/φ BAM BCM SPEC

BAM

LLRF

A/φ

LLRF

A/φ

LLRF

A/φ

OXC

LLRF

A

LLRF

A BPMs BPMs BPMs

uTCA

~ ~

BAM

BAM BAM

Toroid OXC

BBF Charge

BBF Osc. BBF BBO

3 feedback loops to stabilize photoinjector laser & charge

BBF Gun BBF I1 BBF L1 BBF L2

4 feedback loops to stabilize arrival times, compression, shape & energy

BBF L3 1 feedback loop to stabilize final beam energy

Presenter
Presentation Notes
Before you start editing the slides of your talk change to the Master Slide view: � Menu button “View”, Master, Slide Master:� Edit the following 2 items in the 1st slide:� 1) 1st row in the violet header: � Delete the existent text and write the title of your talk into this text field� 2) The 2 rows in the footer area: Delete the text and write the information � regarding your talk (same as on the Title Slide) into this text field. � If you want to use more partner logos position them left � beside the DESY logo in the footer area � Close Master View
Page 42: Ultra-fast Longitudinal Feedbacks for the European XFELaccelconf.web.cern.ch/AccelConf/ICALEPCS2013/talks/frcobab02_talk.pdf · Ultra-fast Longitudinal Feedbacks for the European

H. Schlarb, DESY, ICALEPCS 2013, San Francisco, California, Oct. 11. 2013

Thanks for attention

42

Page 43: Ultra-fast Longitudinal Feedbacks for the European XFELaccelconf.web.cern.ch/AccelConf/ICALEPCS2013/talks/frcobab02_talk.pdf · Ultra-fast Longitudinal Feedbacks for the European

H. Schlarb, DESY, ICALEPCS 2013, San Francisco, California, Oct. 11. 2013

>Coherent radiation: bunch compression monitoring (BCM) and long. FB!

RF gun

FEL experimental

area

bypass Laser bunch

compressor

undulators

Diffraction screen

BCM φACC1 LFB

Off-axis screen

ABCM

kicker 20m THz beam line

28g

Readout system Pyro-detectors

+

- -

wavelength [µm] Cor

rela

tion

with

SAS

E po

wer

THz spectrometer

THz diffr. gratings

λ>λ1

λ1>λ>λ0

⇒opt. when 35µm is max. (σt ~ 30 fs spike duration)

Normalized THZ spectral intensity

wavelength [µm]

shot

50

0

150

100

200

250

10 20 30 40 50 60 70

SASE power

Present state:

• Integrated THz signal (>λ0) used to stabilize ACC1 phase • Development of single shot spectrometer (ABCM) • Reveals importance of spectral information for FEL operation

Next steps:

• Investigation of online, suited for macro-pulse operation using CSR • Compact THz spectrometer (next generation) • Electronics allowing for readout + processing > 1 MHz for long. feedback systems

ABCM

Courtesy: H. Delsim-Hashemi, B. Schmidt

Bunch compression monitor CRISP4 43

Page 44: Ultra-fast Longitudinal Feedbacks for the European XFELaccelconf.web.cern.ch/AccelConf/ICALEPCS2013/talks/frcobab02_talk.pdf · Ultra-fast Longitudinal Feedbacks for the European

H. Schlarb, DESY, ICALEPCS 2013, San Francisco, California, Oct. 11. 2013

Synchronization reference system using optical pulses

End-station

Laser MLO MO-RF

Laser pulse Arrival beam/laser DWC/Kly

A & φ cavity

Desired point-to-point stability ~ 10 fs

<5fs

Direct

Distribution

LO-RF

Optical link Optical link <5fs <5fs

Optical link

Other lasers

44

Presenter
Presentation Notes
Before you start editing the slides of your talk change to the Master Slide view: � Menu button “View”, Master, Slide Master:� Edit the following 2 items in the 1st slide:� 1) 1st row in the violet header: � Delete the existent text and write the title of your talk into this text field� 2) The 2 rows in the footer area: Delete the text and write the information � regarding your talk (same as on the Title Slide) into this text field. � If you want to use more partner logos position them left � beside the DESY logo in the footer area � Close Master View
Page 45: Ultra-fast Longitudinal Feedbacks for the European XFELaccelconf.web.cern.ch/AccelConf/ICALEPCS2013/talks/frcobab02_talk.pdf · Ultra-fast Longitudinal Feedbacks for the European

H. Schlarb, DESY, ICALEPCS 2013, San Francisco, California, Oct. 11. 2013

Synchronization reference system using optical pulses

End-station

Laser MLO MO-RF

Laser pulse Arrival beam/laser DWC/Kly

A & φ cavity

Desired point-to-point stability ~ 10 fs

<5fs

Direct

Distribution

LO-RF

Optical link Optical link <5fs <5fs

Optical link

EDFL, soliton, ∆t~200fs, f=216MHz SESAM, P > 100mW, phase noise < 5fs (≥1kHz)

Other lasers

45

Presenter
Presentation Notes
Before you start editing the slides of your talk change to the Master Slide view: � Menu button “View”, Master, Slide Master:� Edit the following 2 items in the 1st slide:� 1) 1st row in the violet header: � Delete the existent text and write the title of your talk into this text field� 2) The 2 rows in the footer area: Delete the text and write the information � regarding your talk (same as on the Title Slide) into this text field. � If you want to use more partner logos position them left � beside the DESY logo in the footer area � Close Master View
Page 46: Ultra-fast Longitudinal Feedbacks for the European XFELaccelconf.web.cern.ch/AccelConf/ICALEPCS2013/talks/frcobab02_talk.pdf · Ultra-fast Longitudinal Feedbacks for the European

H. Schlarb, DESY, ICALEPCS 2013, San Francisco, California, Oct. 11. 2013

Synchronization reference system using optical pulses

Narrow Band.

End-station

Laser MLO MO-RF

Laser pulse Arrival beam/laser DWC/Kly

A & φ cavity

Desired point-to-point stability ~ 10 fs

<5fs

Direct

Distribution

LO-RF

Optical link Optical link <5fs <5fs

Optical link

EDFL, soliton, ∆t~200fs, f=216MHz SESAM, P > 100mW, phase noise < 5fs (≥1kHz)

Other lasers

46

Presenter
Presentation Notes
Before you start editing the slides of your talk change to the Master Slide view: � Menu button “View”, Master, Slide Master:� Edit the following 2 items in the 1st slide:� 1) 1st row in the violet header: � Delete the existent text and write the title of your talk into this text field� 2) The 2 rows in the footer area: Delete the text and write the information � regarding your talk (same as on the Title Slide) into this text field. � If you want to use more partner logos position them left � beside the DESY logo in the footer area � Close Master View
Page 47: Ultra-fast Longitudinal Feedbacks for the European XFELaccelconf.web.cern.ch/AccelConf/ICALEPCS2013/talks/frcobab02_talk.pdf · Ultra-fast Longitudinal Feedbacks for the European

H. Schlarb, DESY, ICALEPCS 2013, San Francisco, California, Oct. 11. 2013

Synchronization reference system using optical pulses

Narrow Band.

End-station

Laser MLO MO-RF

Laser pulse Arrival beam/laser DWC/Kly

A & φ cavity

Desired point-to-point stability ~ 10 fs

<5fs

Direct

Distribution

LO-RF

Optical link Optical link <5fs <5fs

Optical link

EDFL, soliton, ∆t~200fs, f=216MHz SESAM, P > 100mW, phase noise < 5fs (≥1kHz)

Free space distribution + EDFA

Other lasers

47

Presenter
Presentation Notes
Before you start editing the slides of your talk change to the Master Slide view: � Menu button “View”, Master, Slide Master:� Edit the following 2 items in the 1st slide:� 1) 1st row in the violet header: � Delete the existent text and write the title of your talk into this text field� 2) The 2 rows in the footer area: Delete the text and write the information � regarding your talk (same as on the Title Slide) into this text field. � If you want to use more partner logos position them left � beside the DESY logo in the footer area � Close Master View
Page 48: Ultra-fast Longitudinal Feedbacks for the European XFELaccelconf.web.cern.ch/AccelConf/ICALEPCS2013/talks/frcobab02_talk.pdf · Ultra-fast Longitudinal Feedbacks for the European

H. Schlarb, DESY, ICALEPCS 2013, San Francisco, California, Oct. 11. 2013

Synchronization reference system using optical pulses

Narrow Band.

End-station

Laser MLO MO-RF

Laser pulse Arrival beam/laser DWC/Kly

A & φ cavity

Desired point-to-point stability ~ 10 fs

<5fs

Direct

Distribution

LO-RF

Optical link Optical link <5fs <5fs

Optical link

EDFL, soliton, ∆t~200fs, f=216MHz SESAM, P > 100mW, phase noise < 5fs (≥1kHz)

Free space distribution + EDFA

Dispersion comp., Polarization contr., Collinear bal. opt. cross-corr.

Other lasers

48

Presenter
Presentation Notes
Before you start editing the slides of your talk change to the Master Slide view: � Menu button “View”, Master, Slide Master:� Edit the following 2 items in the 1st slide:� 1) 1st row in the violet header: � Delete the existent text and write the title of your talk into this text field� 2) The 2 rows in the footer area: Delete the text and write the information � regarding your talk (same as on the Title Slide) into this text field. � If you want to use more partner logos position them left � beside the DESY logo in the footer area � Close Master View
Page 49: Ultra-fast Longitudinal Feedbacks for the European XFELaccelconf.web.cern.ch/AccelConf/ICALEPCS2013/talks/frcobab02_talk.pdf · Ultra-fast Longitudinal Feedbacks for the European

H. Schlarb, DESY, ICALEPCS 2013, San Francisco, California, Oct. 11. 2013

Synchronization reference system using optical pulses

Narrow Band.

Two color bal. Opt. cross-corr.

End-station

Laser MLO MO-RF

Laser pulse Arrival beam/laser DWC/Kly

A & φ cavity

Desired point-to-point stability ~ 10 fs

<5fs

Direct

Distribution

LO-RF

Optical link Optical link <5fs <5fs

Optical link

EDFL, soliton, ∆t~200fs, f=216MHz SESAM, P > 100mW, phase noise < 5fs (≥1kHz)

Free space distribution + EDFA

Dispersion comp., Polarization contr., Collinear bal. opt. cross-corr.

Other lasers

49

Presenter
Presentation Notes
Before you start editing the slides of your talk change to the Master Slide view: � Menu button “View”, Master, Slide Master:� Edit the following 2 items in the 1st slide:� 1) 1st row in the violet header: � Delete the existent text and write the title of your talk into this text field� 2) The 2 rows in the footer area: Delete the text and write the information � regarding your talk (same as on the Title Slide) into this text field. � If you want to use more partner logos position them left � beside the DESY logo in the footer area � Close Master View
Page 50: Ultra-fast Longitudinal Feedbacks for the European XFELaccelconf.web.cern.ch/AccelConf/ICALEPCS2013/talks/frcobab02_talk.pdf · Ultra-fast Longitudinal Feedbacks for the European

H. Schlarb, DESY, ICALEPCS 2013, San Francisco, California, Oct. 11. 2013

Synchronization reference system using optical pulses

Narrow Band.

EOMs/ Seeding

Two color bal. Opt. cross-corr.

End-station

Laser MLO MO-RF

Laser pulse Arrival beam/laser DWC/Kly

A & φ cavity

Desired point-to-point stability ~ 10 fs

<5fs

Direct

Distribution

LO-RF

Optical link Optical link <5fs <5fs

Optical link

EDFL, soliton, ∆t~200fs, f=216MHz SESAM, P > 100mW, phase noise < 5fs (≥1kHz)

Free space distribution + EDFA

Dispersion comp., Polarization contr., Collinear bal. opt. cross-corr.

Other lasers

50

Presenter
Presentation Notes
Before you start editing the slides of your talk change to the Master Slide view: � Menu button “View”, Master, Slide Master:� Edit the following 2 items in the 1st slide:� 1) 1st row in the violet header: � Delete the existent text and write the title of your talk into this text field� 2) The 2 rows in the footer area: Delete the text and write the information � regarding your talk (same as on the Title Slide) into this text field. � If you want to use more partner logos position them left � beside the DESY logo in the footer area � Close Master View
Page 51: Ultra-fast Longitudinal Feedbacks for the European XFELaccelconf.web.cern.ch/AccelConf/ICALEPCS2013/talks/frcobab02_talk.pdf · Ultra-fast Longitudinal Feedbacks for the European

H. Schlarb, DESY, ICALEPCS 2013, San Francisco, California, Oct. 11. 2013

Synchronization reference system using optical pulses

Narrow Band.

Direct/ Interferometer

EOMs/ Seeding

Two color bal. Opt. cross-corr.

End-station

Laser MLO MO-RF

Laser pulse Arrival beam/laser DWC/Kly

A & φ cavity

Desired point-to-point stability ~ 10 fs

<5fs

Direct

Distribution

LO-RF

Optical link Optical link <5fs <5fs

Optical link

EDFL, soliton, ∆t~200fs, f=216MHz SESAM, P > 100mW, phase noise < 5fs (≥1kHz)

Free space distribution + EDFA

Dispersion comp., Polarization contr., Collinear bal. opt. cross-corr.

Other lasers

51

Presenter
Presentation Notes
Before you start editing the slides of your talk change to the Master Slide view: � Menu button “View”, Master, Slide Master:� Edit the following 2 items in the 1st slide:� 1) 1st row in the violet header: � Delete the existent text and write the title of your talk into this text field� 2) The 2 rows in the footer area: Delete the text and write the information � regarding your talk (same as on the Title Slide) into this text field. � If you want to use more partner logos position them left � beside the DESY logo in the footer area � Close Master View
Page 52: Ultra-fast Longitudinal Feedbacks for the European XFELaccelconf.web.cern.ch/AccelConf/ICALEPCS2013/talks/frcobab02_talk.pdf · Ultra-fast Longitudinal Feedbacks for the European

H. Schlarb, DESY, ICALEPCS 2013, San Francisco, California, Oct. 11. 2013

Synchronization reference system using optical pulses

Narrow Band.

Direct/ Interferometer

EOMs/ Seeding

Two color bal. Opt. cross-corr.

End-station

Laser MLO MO-RF

Laser pulse Arrival beam/laser DWC/Kly

A & φ cavity

Desired point-to-point stability ~ 10 fs

<5fs

Direct

Distribution

LO-RF

Optical link Optical link <5fs <5fs

Optical link

EDFL, soliton, ∆t~200fs, f=216MHz SESAM, P > 100mW, phase noise < 5fs (≥1kHz)

Free space distribution + EDFA

Dispersion comp., Polarization contr., Collinear bal. opt. cross-corr.

Other lasers

52

Presenter
Presentation Notes
Before you start editing the slides of your talk change to the Master Slide view: � Menu button “View”, Master, Slide Master:� Edit the following 2 items in the 1st slide:� 1) 1st row in the violet header: � Delete the existent text and write the title of your talk into this text field� 2) The 2 rows in the footer area: Delete the text and write the information � regarding your talk (same as on the Title Slide) into this text field. � If you want to use more partner logos position them left � beside the DESY logo in the footer area � Close Master View
Page 53: Ultra-fast Longitudinal Feedbacks for the European XFELaccelconf.web.cern.ch/AccelConf/ICALEPCS2013/talks/frcobab02_talk.pdf · Ultra-fast Longitudinal Feedbacks for the European

H. Schlarb, DESY, ICALEPCS 2013, San Francisco, California, Oct. 11. 2013

Synchronization reference system using optical pulses

Narrow Band.

Direct/ Interferometer

EOMs/ Seeding

Two color bal. Opt. cross-corr.

End-station

Laser MLO MO-RF

Laser pulse Arrival beam/laser DWC/Kly

A & φ cavity

Desired point-to-point stability ~ 10 fs

<5fs

Direct

Distribution

LO-RF

Optical link Optical link <5fs <5fs

Optical link

FB

EDFL, soliton, ∆t~200fs, f=216MHz SESAM, P > 100mW, phase noise < 5fs (≥1kHz)

Free space distribution + EDFA

Dispersion comp., Polarization contr., Collinear bal. opt. cross-corr.

Other lasers

53

Presenter
Presentation Notes
Before you start editing the slides of your talk change to the Master Slide view: � Menu button “View”, Master, Slide Master:� Edit the following 2 items in the 1st slide:� 1) 1st row in the violet header: � Delete the existent text and write the title of your talk into this text field� 2) The 2 rows in the footer area: Delete the text and write the information � regarding your talk (same as on the Title Slide) into this text field. � If you want to use more partner logos position them left � beside the DESY logo in the footer area � Close Master View
Page 54: Ultra-fast Longitudinal Feedbacks for the European XFELaccelconf.web.cern.ch/AccelConf/ICALEPCS2013/talks/frcobab02_talk.pdf · Ultra-fast Longitudinal Feedbacks for the European

H. Schlarb, DESY, ICALEPCS 2013, San Francisco, California, Oct. 11. 2013

Synchronization reference system using optical pulses

Narrow Band.

Direct/ Interferometer

EOMs/ Seeding

Two color bal. Opt. cross-corr.

End-station

Laser MLO MO-RF

Laser pulse Arrival beam/laser DWC/Kly

A & φ cavity

Desired point-to-point stability ~ 10 fs

<5fs

Direct

Distribution

LO-RF

Optical link Optical link <5fs <5fs

Optical link

FB

EDFL, soliton, ∆t~200fs, f=216MHz SESAM, P > 100mW, phase noise < 5fs (≥1kHz)

Free space distribution + EDFA

Dispersion comp., Polarization contr., Collinear bal. opt. cross-corr.

Other lasers

Main issue: robustness, stability and maintainability ⇒ Prototype at FLASH

54

Presenter
Presentation Notes
Before you start editing the slides of your talk change to the Master Slide view: � Menu button “View”, Master, Slide Master:� Edit the following 2 items in the 1st slide:� 1) 1st row in the violet header: � Delete the existent text and write the title of your talk into this text field� 2) The 2 rows in the footer area: Delete the text and write the information � regarding your talk (same as on the Title Slide) into this text field. � If you want to use more partner logos position them left � beside the DESY logo in the footer area � Close Master View
Page 55: Ultra-fast Longitudinal Feedbacks for the European XFELaccelconf.web.cern.ch/AccelConf/ICALEPCS2013/talks/frcobab02_talk.pdf · Ultra-fast Longitudinal Feedbacks for the European

H. Schlarb, DESY, ICALEPCS 2013, San Francisco, California, Oct. 11. 2013

55 Work accomplished 2011-2013

> System overview

HF-Oscillator

Local RF (uLOG) Felddetectors (uDWC) DAQ (SIS8300L) Controller (uTC)

Clocks

Vector Modulator Klystron

Waveguide

FPGA ADC

ADC

DAC DAC

ADC

LO

for ref

probe

Cavities

ZF

HF

FPGA

HF

FB Feedback loop

AMC

uLOG

RTM

AMC RTM

RTM

eRTM

X 8

Page 56: Ultra-fast Longitudinal Feedbacks for the European XFELaccelconf.web.cern.ch/AccelConf/ICALEPCS2013/talks/frcobab02_talk.pdf · Ultra-fast Longitudinal Feedbacks for the European

H. Schlarb, DESY, ICALEPCS 2013, San Francisco, California, Oct. 11. 2013

56 Work accomplished 2011-2013: XFEL LLRF System

KLYSTRON

CM1 CM2 CM3 CM4

LLRF slave BEAM

LLRF master

Talk: J. Branlard

< 28U Rack

• MTCA.4 incl. complete suite: LLRF/Diag./ Interlocks/HOM Challenges: • Total: 27 RF station / 800 cavities / >3000 RF signals • Stability requirements < 0.01% & 0.01deg

Page 57: Ultra-fast Longitudinal Feedbacks for the European XFELaccelconf.web.cern.ch/AccelConf/ICALEPCS2013/talks/frcobab02_talk.pdf · Ultra-fast Longitudinal Feedbacks for the European

H. Schlarb, DESY, ICALEPCS 2013, San Francisco, California, Oct. 11. 2013

System gain with notch

1/T ~ 3 MHz

57 1st to 2nd generation MTCA.4 modules

> Core modules: Down converter 1.3GHz → IF=54Mhz

SIS8300 10ch, 16bit, 125 MSPS

Controller V5 based

Vector modulator, 2 channel

> Digitizer ⇒ SIS8300L Resource limitation & communication limitation

→ XC6VLX130T-2FFG1156C

→ 6.6 Gbps transfer rate to controller

Up-Conversion

Section

1st generation Power supply chain

Frontend

Mixer 10

Channels

10 channel ADCs (125Msps, 16-Bits) AC, DC Coupled

Vector Modulator (uVM) LLRF Controller (uTC)

Down Converter (uDWC) Digitizer (uADC)

Cal

ibra

ted

cont

rolle

r gai

n

50

Delay time [us]

60kHz

780kHz

Page 58: Ultra-fast Longitudinal Feedbacks for the European XFELaccelconf.web.cern.ch/AccelConf/ICALEPCS2013/talks/frcobab02_talk.pdf · Ultra-fast Longitudinal Feedbacks for the European

H. Schlarb, DESY, ICALEPCS 2013, San Francisco, California, Oct. 11. 2013

First test of DWC8VM1 at [email protected]:

First test with RF intra-pulse FB

~ 50-60 fs rms

~ 25 fs rms

5us

Poster: M. Hoffmann

58

Page 59: Ultra-fast Longitudinal Feedbacks for the European XFELaccelconf.web.cern.ch/AccelConf/ICALEPCS2013/talks/frcobab02_talk.pdf · Ultra-fast Longitudinal Feedbacks for the European

H. Schlarb, DESY, ICALEPCS 2013, San Francisco, California, Oct. 11. 2013

Diagnostics developments – time domain – 59

Page 60: Ultra-fast Longitudinal Feedbacks for the European XFELaccelconf.web.cern.ch/AccelConf/ICALEPCS2013/talks/frcobab02_talk.pdf · Ultra-fast Longitudinal Feedbacks for the European

H. Schlarb, DESY, ICALEPCS 2013, San Francisco, California, Oct. 11. 2013

Diagnostics developments – time domain –

>Time domain longitudinal bunch profiling:

• Electro-optical technique (birefringence crystal)

• Time domain approach with stretched laser pulse + cross-correlation in BBO for encoding (EOTD)

• Bench marked with transverse deflecting structure

⇒ Good agreement with expectation

⇒ Resolution 55fs rms (65 µm GaP crystal)

>Collaboration: Abertey & Dundee Uni., Daresbury Lab., FELIX / FOM and DESY (See talk WEBAU04)

>Next development steps:

• Robust source: mode-locked Yb-fiber laser ∆tFWHM<100fs (30fs has been achieved)

• Suitable for operation in acc. tunnel

• Packaging of laser: IRUVX-FP7 proposal

> in collaboration with BESSY (T. Quast)

• Fast line camera readout (1030nm, >1MHz)

• Technique: EO spectral or spatial

60

Page 61: Ultra-fast Longitudinal Feedbacks for the European XFELaccelconf.web.cern.ch/AccelConf/ICALEPCS2013/talks/frcobab02_talk.pdf · Ultra-fast Longitudinal Feedbacks for the European

H. Schlarb, DESY, ICALEPCS 2013, San Francisco, California, Oct. 11. 2013

Diagnostics developments – time domain –

>Time domain longitudinal bunch profiling:

• Electro-optical technique (birefringence crystal)

• Time domain approach with stretched laser pulse + cross-correlation in BBO for encoding (EOTD)

• Bench marked with transverse deflecting structure

⇒ Good agreement with expectation

⇒ Resolution 55fs rms (65 µm GaP crystal)

>Collaboration: Abertey & Dundee Uni., Daresbury Lab., FELIX / FOM and DESY (See talk WEBAU04)

>Next development steps:

• Robust source: mode-locked Yb-fiber laser ∆tFWHM<100fs (30fs has been achieved)

• Suitable for operation in acc. tunnel

• Packaging of laser: IRUVX-FP7 proposal

> in collaboration with BESSY (T. Quast)

• Fast line camera readout (1030nm, >1MHz)

• Technique: EO spectral or spatial

Courtesy: A. Winter, DESY Ö. Ilday, Bilkent Uni. Ankara DIPAC07:WEPB03

cavity GVD

61

Page 62: Ultra-fast Longitudinal Feedbacks for the European XFELaccelconf.web.cern.ch/AccelConf/ICALEPCS2013/talks/frcobab02_talk.pdf · Ultra-fast Longitudinal Feedbacks for the European

H. Schlarb, DESY, ICALEPCS 2013, San Francisco, California, Oct. 11. 2013

62 XFEL Longitudinal FBs – Overview -

• Photo cathode laser: - Synchronization - Pulse shape - Charge feedback

• RF gun phase • L0 / L1 / L2 compression / arrival / (shape) • L3 (last RF stations) energy feedback • L3 (all RF stations) distributed energy gain scheduling feedback