5/21/2018 Ultimate Final SCADA Presentation
1/37
Development & Implementation of a
SCADA System for Load Control of the
Power System Simulator (PSS)
Ahmed Fayez 199905252
Mohammed Adnan 199901444
Khalid Yousif 199900237
Salman Al katheeri 199900317
-
5/21/2018 Ultimate Final SCADA Presentation
2/37
Presentation Layout
SCADA Introduction
SCADA Hardware
RTU
PSS
Wiring SCADA Software
ISaGraF
Citect
DNP
Future Work Demonstration
-
5/21/2018 Ultimate Final SCADA Presentation
3/37
Introduction
-
5/21/2018 Ultimate Final SCADA Presentation
4/37
Introduction (What Is SCADA?)
Stands for supervisory control And data
acquisition.
SCADA systems are used in industrial
processes: steel making, power generation(conventional and nuclear) and distribution.
There Are 4 Components In the SCADA
System.
-
5/21/2018 Ultimate Final SCADA Presentation
5/37
SCADA Components
Field Instrumentation.
Sensors, devices to control.
Remote Terminal Units.
RTU Vs. PLC Communications Network.
Equipment needed to transfer data to and from different sites
Central Monitoring Station
Collecting information gathered by the remote stations togenerate the necessary action
-
5/21/2018 Ultimate Final SCADA Presentation
6/37
Disadvantages Of Relay Systems
Relays used only for on/off control. Complicated control systems
Expensive System.
System takes up much floor and space.
Control relays are power- hungry,heat
generation.
Any change in control program requires the
rewiring of relays.
For complicated control systems, it is difficult to
troubleshoot and locate the faults.
-
5/21/2018 Ultimate Final SCADA Presentation
7/37
Advantages Of SCADA systems
Easily programmed or reprogrammed
Easy maintained (self diagnostic).
Capability to do arithmetic function.
The ability to communicate with othercontroller or a master host computer.
PLCs. were able to move past simple on/off
control to more complex schemes as PIDcontrol.
-
5/21/2018 Ultimate Final SCADA Presentation
8/37
Applications Of SCADA
Almost every business in the manufacturing
sector and many in the service sector
Aerospace
Bottling and Canning
Chemicals Plants
Petroleum, Petrochemical
-
5/21/2018 Ultimate Final SCADA Presentation
9/37
Remote Terminal Unit (RTU)
-
5/21/2018 Ultimate Final SCADA Presentation
10/37
PDS eNET OVERVIEW
DIGITAL / ANALOG INPUTS
32 x Digital Inputs
9-28V DC Operation range
LED Indication (Disable Option)
Optically Isolated (1500V peak)
12 x Analog Inputs0-5V,1-5V,0-10V,0-20mA, 4-20mA
(selectable per channel)
Surge Protection
-
5/21/2018 Ultimate Final SCADA Presentation
11/37
4 x Analog Outputs
Internal / External power supply Source
0-20mA, 4-20mA
(Voltage output with external resistor)
Short circuit protected
NET OVERVIEWeRTU PDS
DIGITAL / ANALOG OUTPUTS
-
5/21/2018 Ultimate Final SCADA Presentation
12/37
RTU Scan Time
-
5/21/2018 Ultimate Final SCADA Presentation
13/37
Power System Simulator
-
5/21/2018 Ultimate Final SCADA Presentation
14/37
Power System Simulator ( PSS):
The objective of the PSS is to
simulate a real power system.
Power system should be divide
in to three sections , the
generator station, transmission
line and load ( distribution
section ).
-
5/21/2018 Ultimate Final SCADA Presentation
15/37
PSS Parts
1- Generator Stations:
The generator station contains two internal generators and athird external generator.
Separately excited synchronous generator is the type of the
machine which used in PSS. The DC motor in PSS is used as prime mover.
The DC motor in PSS is Shunt DC motor type.
-
5/21/2018 Ultimate Final SCADA Presentation
16/37
2- Transmission lines: It is represented by wires that are different in shape and
size.
The size and shape is depended on the level voltages and
the load.
-
5/21/2018 Ultimate Final SCADA Presentation
17/37
3- The loads:
As in the real power system, the PSS has three type of load:
Residential.
Commercial .
Industrial.
The difference between these come from values of :
- Load.
- Power consumption.
- Power factor for each type. Also the difference rises in the
peak load timing for each type.
-
5/21/2018 Ultimate Final SCADA Presentation
18/37
Sensors
In the industry field is now using computers to control and
motions and sequences of machines.
PLC cannot see, hear, feel or tester processes by themselves
but use industrial sensors to give industrial controllers these
capabilities. In our project the Sensors are used as feedback to PLC from
PSS to enhance the system performance.
-
5/21/2018 Ultimate Final SCADA Presentation
19/37
Sensors
There were different types of sensor that will be used like Voltage
sensor, current sensor, frequency sensor and power sensor.
Current sensor have rating of 0 5 A.
Voltage sensor has a rating of 0 - 150 V. Frequency sensor, it has a rating of 0 -100Hz.
Power sensor, it has rating of 0- 5 A and 0 150 v.
The outputs from all sensors which going to RTU were 4 20 mA. It is
used this rating to sense any problem in system .
-
5/21/2018 Ultimate Final SCADA Presentation
20/37
Wiring
-
5/21/2018 Ultimate Final SCADA Presentation
21/37
Wiring
Auxiliary Switch
Output Port Input Port
Relay1(External)
Common
12V
0V
Internal Relay
0V
Common
Transistor
Switch
12V
R1
220V Start
-
5/21/2018 Ultimate Final SCADA Presentation
22/37
0 V
From RTU Power
Supply
12 V+
0
0
+
COM 1 2 3 4 5 Com 1 2 3 4
220 V
T.BControl Circuit
A
B
C
Coil 1
Ax 1
A
B
C
Coil 2
Ax 2
ON
NOff
3Phase Motor
M
COM IN 1 IN 2 IN 3 IN 4 IN 5
RTU 12 V
-
5/21/2018 Ultimate Final SCADA Presentation
23/37
ISaGRAF
-
5/21/2018 Ultimate Final SCADA Presentation
24/37
ISaGRAF
-
5/21/2018 Ultimate Final SCADA Presentation
25/37
The Citect Interface
-
5/21/2018 Ultimate Final SCADA Presentation
26/37
The DNP
-
5/21/2018 Ultimate Final SCADA Presentation
27/37
The DNP
-
5/21/2018 Ultimate Final SCADA Presentation
28/37
Future Plans
-
5/21/2018 Ultimate Final SCADA Presentation
29/37
Future Plans
Stand by generator.
Adding generator 2 to the system.
Power factor correction.
Load scheduling.
Improving the previous SCADA program.
-
5/21/2018 Ultimate Final SCADA Presentation
30/37
Stand by generator
The whole system will be supplied by the main
supplying unit.
A simulated fault will be applied on the system.
During that generator 1 will be on a stand by mode. When the fault occur the main supplying unit will be
disconnected from the loads by using circuit breakers
and generator 1 will be supplying the whole system
instead. All of this process will be done Automatically by the
program.
-
5/21/2018 Ultimate Final SCADA Presentation
31/37
Adding generator 2
Generator 2 will be connected to the system using frequency and
current sensors.
Generator 2 will be also controlled by the program which will be
installed on the RTU.
Generator 2 will be as a back up if generator 1 didnt workproperly.
-
5/21/2018 Ultimate Final SCADA Presentation
32/37
Back Up generator
-
5/21/2018 Ultimate Final SCADA Presentation
33/37
Power factor correction
Capacitor banks are used to correct the power factor..
The value of the capacitance will depend on the value
of the load.
Capacitor banks will inject reactive power into the
system.
The reactive power will decrease the current in thecircuitreduce the losses in the transmission lines.
-
5/21/2018 Ultimate Final SCADA Presentation
34/37
Load Scheduling
There are two types of loads: Resistive load and active load.
1. The resistive load are two types:
Critical: supplying vital instruments &machines .
Non-critical: Ex: lighting gardens.
2. The active load: Simulated By a resistor and inductance in series.
-
5/21/2018 Ultimate Final SCADA Presentation
35/37
Load Scheduling
When the system suffers from overload on the
generator the program disconnect the non-critical
loads immediately.
Thus in the program all of the loads will be identifiedso that the program can do this process
Automatically.
-
5/21/2018 Ultimate Final SCADA Presentation
36/37
Improving the SCADA program
Some blocks will be added to increase the speed
of analyses process. This process will be applied
on the LADDER program.
The Graphical Interface will be enhanced. Thisprocess will be applied on Citect.
-
5/21/2018 Ultimate Final SCADA Presentation
37/37
Thanks for Listening
Now, well make a demo for our
work..