UK/Netherlands SNS HackathonOutput Report Gallery
April 2019
2
| UK / Netherland SNS Hackathon Output Report Gallery
Share the love
The four ‘Rs’ – Rules, reviews, reuse and recycle
• Shared learnings review made mandatory as part of a Decommissioning programme
• Contracts should be focussed on special decom activity as opposed to traditional contracts
• Early engagement between operators and suppliers required to provide clarity of upcoming demand in the market place
• More clarity of project requirements passed down to all tiers of the supply chain ( not just Tier 1 contractors).
• Shared learnings review made mandatory as part of a Decommissioning programme
• Contracts should be focussed on special decom activity as opposed to traditional contracts
• Early engagement between operators and suppliers required to provide clarity of upcoming demand in the market place
• More clarity of project requirements passed down to all tiers of the supply chain ( not just Tier 1 contractors).
• Shared learnings review made mandatory as part of a Decommissioning programme
• Contracts should be focussed on special decom activity as opposed to traditional contracts
• Early engagement between operators and suppliers required to provide clarity of upcoming demand in the market place
• More clarity of project requirements passed down to all tiers of the supply chain ( not just Tier 1 contractors)
• Common regulation between the UK and Netherlands
Early involvement with the supply chain with reuse a priority
• External engagement with all regularity bodies to join the dots including authority’s and technology bodies e.g. OGTC
• The next step considering alternative uses e.g. CO2 storage or hydrogen production
• Early review of reuse/recycle alternatives
Share the love
The Four ‘Rs’ – Rules, reviews, reuse and recycle
RRRR
• Shared learnings review made mandatory as part of a Decommissioning programme
• Contracts should be focussed on special decom activity as opposed to traditional contracts
• Early engagement between operators and suppliers required to provide clarity of upcoming demand in the market place
• More clarity of project requirements passed down to all tiers of the supply chain ( not just Tier 1 contractors)
• Common regulation between the UK and Netherlands
Early involvement with the supply chain with reuse a priority
• External engagement with all regularity bodies to join the dots including authority’s and technology bodies e.g. OGTC
• The next step considering alternative uses e.g. CO2 storage or hydrogen production
• Early review of reuse/recycle alternatives
Share the love
The Four ‘Rs’ – Rules, reviews, reuse and recycle
RRRR
3
| UK / Netherland SNS Hackathon Output Report Gallery
The web of success
Probe the melon
• Early engagement with a range of non-traditional supply companies
• An industry programme of activity managed by specialist Decom integrators
• Industry wide forums sharing learning across all operators
• Learning from the most recent successful projects
• Early pre-tender work by the operators to examine new approaches and cost saving alternatives.
• Using existing well data to understand all issues within the well before starting the work
• Evolve contracting strategies to partnering agreements as opposed to lowest cost models
• Establish trusting relationship with all suppliers – let supply companies get on with the job
• Open book contracting -cost price plus overheads and profits
• Performance incentives for outstanding delivery.
• Early engagement with a range of non-traditional supply companies
• An industry programme of activity managed by specialist Decom integrators
• Industry wide forums sharing learnings across all operators
• Learning from the most recent successful projects
• Early pre-tender work by the operators to examine new approaches and cost saving alternatives
• Using existing well data to understand all issues within the well before starting the work
• Evolve contracting strategies to partnering agreements as opposed to lowest cost models
• Establish trusting relationship with all suppliers – let supply companies get on with the job
• Open book contracting -cost price plus overheads and profits
• Performance incentives for outstanding delivery
The web of success
Probe the Melon
• Early engagement with a range of non-traditional supply companies
• An industry programme of activity managed by specialist Decom integrators
• Industry wide forums sharing learnings across all operators
• Learning from the most recent successful projects
• Early pre-tender work by the operators to examine new approaches and cost saving alternatives
• Using existing well data to understand all issues within the well before starting the work
• Evolve contracting strategies to partnering agreements as opposed to lowest cost models
• Establish trusting relationship with all suppliers – let supply companies get on with the job
• Open book contracting -cost price plus overheads and profits
• Performance incentives for outstanding delivery
The web of success
Probe the Melon
4
| UK / Netherland SNS Hackathon Output Report Gallery
Flexi decom
Speedy removal
Rigless
• Funded concept competitions
• Don’t be frightened to try new approaches- break away from how it was always done
• Operator to present overall project scope on website
• Regulator to take a firmer line on aligning activity
• Common UK/Netherlands regulations.
• Multi operator campaigns
• Use of innovative walk to work vessels as alternatives to helicopters
• Floatation as an alternative to lifting
• Consider use of explosives for cutting
• Start decom engineering during late life production phase.
• Self-propelled jack up rigs
• Multi use vessels with cranes and diving spread
• Selecting operator with past experience to lead the JV project.
• Funded concept competitions
• Don’t be frightened to try new approaches- break away from how it was always done
• Operator to present overall project scope on website
• Regulator to take a firmer line on aligning activity
• Common UK/Netherlands regulations
• Self-propelled jack up rigs
• Multi use vessels with cranes and diving spread
• Selecting operator with past experience to lead the JV project
Flexi Decom
Rigless
Speedy removal
• Multi operator campaigns • Use of innovative walk to work vessels as alternatives to helicopters
• Floatation as an alternative to lifting
• Consider use of explosives for cutting
• Start decom engineering during late life production phase
• Funded concept competitions
• Don’t be frightened to try new approaches- break away from how it was always done
• Operator to present overall project scope on website
• Regulator to take a firmer line on aligning activity
• Common UK/Netherlands regulations
• Self-propelled jack up rigs
• Multi use vessels with cranes and diving spread
• Selecting operator with past experience to lead the JV project
Flexi Decom
Rigless
Speedy removal
• Multi operator campaigns • Use of innovative walk to work vessels as alternatives to helicopters
• Floatation as an alternative to lifting
• Consider use of explosives for cutting
• Start decom engineering during late life production phase
• Funded concept competitions
• Don’t be frightened to try new approaches- break away from how it was always done
• Operator to present overall project scope on website
• Regulator to take a firmer line on aligning activity
• Common UK/Netherlands regulations
• Self-propelled jack up rigs
• Multi use vessels with cranes and diving spread
• Selecting operator with past experience to lead the JV project
Flexi Decom
Rigless
Speedy removal
• Multi operator campaigns • Use of innovative walk to work vessels as alternatives to helicopters
• Floatation as an alternative to lifting
• Consider use of explosives for cutting
• Start decom engineering during late life production phase
5
| UK / Netherland SNS Hackathon Output Report Gallery
Remove risk
• Starting point should be what does ‘endpoint’ look like
• Can supply chain take the ‘keys’ of the platform and complete all works (but who takes the risk??)
• How do we quantify all financial risks in a decom project – can insurance products be viable.
• Starting point should be what does ‘end point’ look like
• Can supply chain take the ‘keys’ of the platform and complete all works (but who takes the risk??)
• How do we quantify all financial risks in a decom project – can insurance products be viable
• Contracting strategies designed specifically for decom projects
• Collaboration period for contractors to understand project complexity
• Define what can be fixed price
• Guaranteed maximum price with incentives for contractors to achieve lower
• Fit for purpose specifications no need for gold standards
• Look to nuclear decom for alternative models
Remove Risk
Contracting strategies
Contracting strategies
• Contracting strategies designed specifically for decom projects
• Collaboration period for contractors to understand project complexity
• Define what can be fixed price
• Guaranteed maximum price with incentives for contractors to achieve lower
• Fit for purpose specifications no need for gold standards
• Look to nuclear decom for alternative models.`
• Starting point should be what does ‘end point’ look like
• Can supply chain take the ‘keys’ of the platform and complete all works (but who takes the risk??)
• How do we quantify all financial risks in a decom project – can insurance products be viable
• Contracting strategies designed specifically for decom projects
• Collaboration period for contractors to understand project complexity
• Define what can be fixed price
• Guaranteed maximum price with incentives for contractors to achieve lower
• Fit for purpose specifications no need for gold standards
• Look to nuclear decom for alternative models
Remove Risk
Contracting strategies
6
| UK / Netherland SNS Hackathon Output Report Gallery
Partnership
• Sharing expertise with offshore wind
• Sharing logistics e.g. walk to work vessels
• Introducing lower cost solutions from offshore wind e.g. contracting strategies
• Could hydrogen manufacturing utilise existing infrastructure in conjunction with offshore wind
• Put wind turbines on old jackets.
• Sharing expertise with offshore wind
• Sharing logistics e.g. walk to work vessels
• Introducing lower cost solutions from offshore wind e.g. contracting strategies
• Could hydrogen manufacturing utilise existing infrastructure in conjunction with offshore wind
• Put wind turbines on old jackets
Partnership
Reuse
• How to create a market for reuse equipment– e-bay model
• The legal requirement and cost of re-certifications needs to be reduced to make this viable
• Use old platforms onshore for training
• Should regulator/government require reuse as part of decommissioning programme
• Learn from the Netherlands reuse examples on regulatory drivers
• Ethical versus cost – Could third world countries benefit.
• How to create a market for reuse equipment – e-bay model
• The legal requirement and cost of re-certifications needs to be reduced to make this viable
• Use old platforms onshore for training
• Should regulator/government require reuse as part of decommissioning programme
• Learn from the Netherlands reuse examples on regulatory drivers
• Ethical versus cost – Could third world countries benefit
Reuse
• Could the polythene ropes be dissolved and concrete blocks left behind
• Operators study on the benefits and disadvantages of leaving mattresses behind
• Could mattresses be used in coastal protections projects
• Seabed ’JCB’ to load mattresses into seabed skips
• Seabed burial
Mattresses
7
| UK / Netherland SNS Hackathon Output Report Gallery
Mattresses
• Could the polythene ropes be dissolved and concrete blocks left behind
• Operators study on the benefits and disadvantages of leaving mattresses behind
• Could mattresses be used in coastal protections projects
• Seabed ’JCB’ to load mattresses into seabed skips
• Seabed burial.
• How to create a market for reuse equipment – e-bay model
• The legal requirement and cost of re-certifications needs to be reduced to make this viable
• Use old platforms onshore for training
• Should regulator/government require reuse as part of decommissioning programme
• Learn from the Netherlands reuse examples on regulatory drivers
• Ethical versus cost – Could third world countries benefit
Reuse
• Could the polythene ropes be dissolved and concrete blocks left behind
• Operators study on the benefits and disadvantages of leaving mattresses behind
• Could mattresses be used in coastal protections projects
• Seabed ’JCB’ to load mattresses into seabed skips
• Seabed burial
Mattresses
Reward for all
• Common guidelines between the UK and Netherlands to encourage cross border projects
• Flexible and multiskilled workforce
• More focus on data gathering prior to starting project.
• Common guidelines between the UK and Netherlands to encourage cross border projects
• Flexible and multiskilled workforce
• More focus on data gathering prior to starting project
• Step by step planning prior to commence of work
• Multiple assets decommissioned under a single project
• Multi operator and regional campaigns
Reward for all
Strictly Decom
Time Bandit
• Don’t let time schedules drive up costs – need flexible scheduling • Where appropriate delay work until new technology developed
• Adopt cost models to mitigate lost weather time and allow all year working
• Operators to be transparent and share project information at an early stage
8
| UK / Netherland SNS Hackathon Output Report Gallery
Strictly decom
• Step by step planning prior to commence of work
• Multiple assets decommissioned under a single project
• Multi operator and regional campaigns.
• Common guidelines between the UK and Netherlands to encourage cross border projects
• Flexible and multiskilled workforce
• More focus on data gathering prior to starting project
• Step by step planning prior to commence of work
• Multiple assets decommissioned under a single project
• Multi operator and regional campaigns
Reward for all
Strictly Decom
Time Bandit
• Don’t let time schedules drive up costs – need flexible scheduling • Where appropriate delay work until new technology developed
• Adopt cost models to mitigate lost weather time and allow all year working
• Operators to be transparent and share project information at an early stage
Time bandit
• Don’t let time schedules drive up costs – need flexible scheduling
• Where appropriate delay work until new technology developed
• Adopt cost models to mitigate lost weather time and allow all year working
• Operators to be transparent and share project information at an early stage.
• Common guidelines between the UK and Netherlands to encourage cross border projects
• Flexible and multiskilled workforce
• More focus on data gathering prior to starting project
• Step by step planning prior to commence of work
• Multiple assets decommissioned under a single project
• Multi operator and regional campaigns
Reward for all
Strictly Decom
Time Bandit
• Don’t let time schedules drive up costs – need flexible scheduling • Where appropriate delay work until new technology developed
• Adopt cost models to mitigate lost weather time and allow all year working
• Operators to be transparent and share project information at an early stage
9
| UK / Netherland SNS Hackathon Output Report Gallery
Getting the right partner/culture
• Partnerships with supply chain
• Collaboration with others
• Trusted trader
• We need to find the right culture for decom.
• Partnerships with supply chain
• Collaboration with others
• Trusted trader
• We need to find the right culture for decom
Getting the right partner / culture
One stop shop
• Is there a one stop shop in the supply chain to allow scope to be outsourced?
• Is there potential to farm out/offload this work
• Could this one stop shop become a model approach for others?
• Are there any off-the-shelf solutions available.
• Is there a one stop shop in the supply chain to allow scope to be outsourced?
• Is there potential to farm out / offload this work
• Could this one stop shop become a model approach for others?
• Are there any off-the-shelf solutions available
One Stop Shop
ONE STOP SHOP
10
| UK / Netherland SNS Hackathon Output Report Gallery
Combining with others
• Synergies with Brownfield projects to combine scope?
• Could subsea and topsides scopes be integrated?
• Is there value in UK work being integrated into Netherlands scopes?
• Not worth building in-house capability as scope small.
• Could the work piggy backed onto another operators workload?
• Can we share vessels/equipment?
• Synergies with Brownfield projects to combine scope?
• Could subsea and topsides scopes be integrated? • Is there value in UK work being integrated into Netherlands scopes?
• Not worth building in-house capability as scope small.
• Could the work piggy backed onto another operators workload?
• Can we share vessels / equipment?
Combining with others
Simplified decom
• Simplification is best for decommissioning
• Is there a need for a reverse tender simplified contract?
• What would simplification look like?
• How would this address risk?
• Lean decom.
• Simplification is best for decommissioning
• Is there a need for a reverse tender simplified contract? • What would simplification look like?
• How would this address risk?
• Lean decom
Simplified decom
www.ogauthority.co.uk