UhdeIndia - Bharat Petroleum · Uhde India Private Limited, Dugal Plaza, 3 rd Floor, Prem Nagar,...

170
Registered Office Registered Office Registered Office Registered Office: Uhde India Private Limited, Uhde House, LBS Marg, Vikhroli W, Mumbai 400 083, India Phone: +91-22-67968000 Fax: +91-22-25784327 E-mail: [email protected] Internet: www.thyssenkrupp.com Pune Office : Uhde India Private Limited, Dugal Plaza, 3 rd Floor, Prem Nagar, Bibwewadi Road, Pune 411 037, India Phone : +91-20-66081100 Fax : +91-20-66081300 E-mail : [email protected] Chairman of the Management Board Chairman of the Management Board Chairman of the Management Board Chairman of the Management Board : Dr.M.Thiemann Managing Director : Dr.B.Lueke Executive Directors : Sales : P.D.Samudra, Engineering : Dr.I.Dayasagar, Implementation : R.Sethuraman, Commercial : T.K.Vijayan, Pune Operations : S.Rudra Bankers: Deutsche Bank, Mumbai. Calyon Bank, Mumbai. Union Bank of India, Mumbai. State Bank of India, Mumbai. Punjab National Bank, Pune IncomeTaxPAN: AAACU1416H Uhde India Uhde India Private Limited, Dugal Plaza, 3 rd Floor, Prem Nagar, Bibwewadi Road, Pune 411 037, India TENDER RFQ / Tender No. : U6509 - 3187/ABM Tender Issue Date: 19.10.2011 Tender For : Supply of Alloy Steel Pipe Contract No: 66-6509-700 Due Date: 12.00 Hrs of 08.11.2011. Dear Sirs, Please submit your competitive offer in strict conformity to the documents enclosed. Kindly return the, ‘Acknowledgement & Intention to Bid Form’, immediately on receipt of this enquiry. Offers shall be furnished as per the ITB enclosed here with. Thanking you, Yours faithfully, Uhde India Private Limited VINAYAK DEO/ ABHIJEET MITHARI

Transcript of UhdeIndia - Bharat Petroleum · Uhde India Private Limited, Dugal Plaza, 3 rd Floor, Prem Nagar,...

Page 1: UhdeIndia - Bharat Petroleum · Uhde India Private Limited, Dugal Plaza, 3 rd Floor, Prem Nagar, Bibwewadi Road, Pune 411 037, India TENDER RFQ / Tender No. : U6509 - 3187/ABM

RegisteredOfficeRegisteredOfficeRegisteredOfficeRegisteredOffice:�Uhde�India�Private�Limited,�Uhde�House,�LBS�Marg,�Vikhroli��W�,�Mumbai�400�083,�India� �

Phone:�+91-22-67968000�Fax:�+91-22-25784327�E-mail:�[email protected]��Internet:�www.thyssenkrupp.com�

Pune�Office�:�Uhde�India�Private�Limited,�Dugal�Plaza,�3rd�Floor,�Prem�Nagar,�Bibwewadi�Road,�Pune�411�037,�India�

Phone�:�+91-20-66081100�Fax�:�+91-20-66081300�E-mail�:�[email protected]

ChairmanoftheManagementBoardChairmanoftheManagementBoardChairmanoftheManagementBoardChairmanoftheManagementBoard:�Dr.M.Thiemann�Managing�Director�:�Dr.B.Lueke��

Executive�Directors�:�Sales�:�P.D.Samudra,�Engineering�:�Dr.I.Dayasagar,�Implementation�:�R.Sethuraman,�Commercial�:�T.K.Vijayan,�Pune�Operations�:�S.Rudra�

Bankers::::Deutsche Bank, Mumbai. Calyon Bank, Mumbai. Union Bank of India, Mumbai. State Bank of India, Mumbai. Punjab National Bank, Pune

IncomeTaxPAN::::AAACU1416H

Uhde�India�

Uhde India Private Limited, Dugal Plaza, 3rd

Floor, Prem Nagar, Bibwewadi Road, Pune 411 037, India

TENDER

RFQ / Tender No. : U6509 - 3187/ABM Tender Issue Date: 19.10.2011 Tender For : Supply of Alloy Steel Pipe Contract No: 66-6509-700 Due Date: 12.00 Hrs of 08.11.2011. Dear Sirs, Please submit your competitive offer in strict conformity to the documents enclosed.

Kindly return the, ‘Acknowledgement & Intention to Bid Form’, immediately on receipt of this enquiry.

Offers shall be furnished as per the ITB enclosed here with.

Thanking you, Yours faithfully, Uhde India Private Limited VINAYAK DEO/ ABHIJEET MITHARI

Page 2: UhdeIndia - Bharat Petroleum · Uhde India Private Limited, Dugal Plaza, 3 rd Floor, Prem Nagar, Bibwewadi Road, Pune 411 037, India TENDER RFQ / Tender No. : U6509 - 3187/ABM

��

Uhde�India�

Uhde�India�Private�Limited,�Dugal�Plaza,�3rd�Floor,�Prem�Nagar,�Bibwewadi�Road,�Pune�411�037,�India� ���

� � � APPENDIX-ITORFQNO.U6509-3187/ABMEnclosures:��

A$ Acknowledgement�Letter�B$ Instructions�To�Bidders�)ITB$�C$ Special�Purchase�Conditions�)SPC$�D$ General�Purchase�Conditions�)For�Imported�Equipment�/�Materials$��E$ General�Purchase�Conditions�)For�Indigenous�Materials�and�Equipments$�F$ Commercial�Questionnaire�)for�foreign�bidders$�G$ Commercial�Questionnaire�)for�Indian�bidders$�H$ Integrity�Pact�I$ Engineering�Specifications�for�Piping�Materials�)Doc.�No.�6509-PI-EB-00002�Rev.�03$���J$ Price�Bid�form.�K$ Technical�Specifications�L$ Scope�of�Inspection�Document.��

IMPORTANTPOINTSTOBENOTED:��

A$ Due�date�for�submission�of�bids:�12:00Hrsof08/11/11�at�UIPL�Pune�office�B$ Technical�un-priced�bid�opening:�14:00Hrsofbidduedate�at�UIPL�Pune�office��C$ Requireddeliveryperiod�:��

i. Indian�bidders:�Within�05monthsFOTatsite�from�the�date�of�placement�of�Fax�/�Letter�of�Intent.�

ii. Foreign�bidders:�Within�04monthsFOBportofdispatch�from�the�date�of�placement�of�Fax�/�Letter�of�Intent.�

�D$ Bid�Validity:�Bids�shall�remain�valid�for�FOUR�months�after�the�deadline�for�bid�submission.��E$ Offer�evaluation�and�ordering�basis:�Single�Item��F$ Bid�security�/�Earnest�Money�Deposit�)EMD$:�`̀̀̀15,00,000/-ORUS$31,250/-�G$ Bidders�to�note�the�Bid�Rejection�Criteria�mentioned�in�ITB�H$ Bidders�to�submit�STATEMENT�OF�DEVIATIONS�/�ACCEPTANCE�TO�TENDER�DOCUMENTS�as�per�

format�indicated�in�ITB�I$ Bidders�to�submit�TECHNICAL�DEVIATION�SHEET�as�per�format�indicated�in�ITB�J$ Bidders�to�submit�COMMERCIAL�DEVIATION�SHEET�as�per�format�indicated�in�ITB�K$ Bidders�to�submit�Scope�of�Inspection�Document��L$ Quantity�Tolerance�:�+1SingleRandomLength�M$ Offers�to�be�submitted�in�UIPL�Pune�office�

�NOTE:���

• Fax�duly�filled�“Acknowledgement�Letter”�form�immediately�after�receipt�of�the�enquiry.�This�will�help�us�in�contacting�the�correct�person�in�case�of�any�amendment�/�clarifications�in�the�enquiry�/�offer.�

Page 3: UhdeIndia - Bharat Petroleum · Uhde India Private Limited, Dugal Plaza, 3 rd Floor, Prem Nagar, Bibwewadi Road, Pune 411 037, India TENDER RFQ / Tender No. : U6509 - 3187/ABM

ACKNOWLEDGEMENT LETTER

(Project No.: 66-6509)

Attn: Mr. Abhijeet Mithari / Mr. Vinayak Deo Uhde India Private Limited Dugal Plaza, 3

rd Floor, 692 A / 3 C,

Prem Nagar, Bibwewadi, Off. Pune-Satara Road, Pune – 411 037 Tel:- 020- 6608 1100 Fax: 020- 6608 1300

Sub: Confirmation to Bid Tender / Enquiry No.: ______________________ Date: ____/______/________ Work / Supply Item:______________________________ Dear Sirs, We hereby acknowledge receipt of a complete set of bid document along with enclosures for subject works/scope of supply as per table of contents for our use in preparing the bid. We undertake that the contents of the above tender document shall be kept confidential and further that the drawings, specifications and documents shall not be transferred and that the said documents are to be used only for the purpose for which they are intended.

A) We intend to bid as requested for the subject items and furnish following details with respect to our offices:

Quoting Office Contact person at Mumbai / Pune, if any, for Indian

bidders OR Contact person in India, if any, for foreign bidders

i) Postal address: ii) Telephone number:

iii) Telefax Number:

iv) Email Address:

v) Contact Person:

vi) Mobile No.:

i) Postal address: ii) Telephone number:

iii) Telefax Number:

iv) Email Address:

v) Contact Person:

vi) Mobile No.:

B) We confirm that our offer shall be submitted within due date. C) We are unable to bid for the reasons given below and we are returning the entire set of tender documents.

Reasons for non-submission of bid: ------------------------------------------------------------------------------------------------------ ----------------------------------------------------------------------------------------------------------- Company’s Name: Signature: Name: Designation: Date: Note: Bidder is requested to furnish the details mentioned at (A), (B) OR (C) immediately after receipt of tender documents.

Page 4: UhdeIndia - Bharat Petroleum · Uhde India Private Limited, Dugal Plaza, 3 rd Floor, Prem Nagar, Bibwewadi Road, Pune 411 037, India TENDER RFQ / Tender No. : U6509 - 3187/ABM

Uhde India Pvt. Ltd.

ITB for 66-6509-700 Tender No.: U6509-3187/ABM Page 1 of 22

Instructions To Bidders (ITB) Project No.: 66-6509-700

Tender No.: U6509-3187/ABM Client: Bharat Petroleum Corporation Limited

CONTENTS 1.0 INTRODUCTION

2.0 IMPORTANT POINTS TO BE NOTED

3.0 BIDDERS QUALIFICATION CRITERIA

4.0 BIDDING DOCUMENTS

5.0 BID DOCUMENT FEES AND COST OF BIDDING

6.0 DUE DATE FOR SUBMISSION OF BIDS

7.0 MODIFICATION AND WITHDRAWAL OF BIDS

8.0 LATE BIDS

9.0 BID VALIDITY

10.0 BID REJECTION CRITERIA

11.0 OPENING OF TECHNICAL & UNPRICED COMMERCIAL BIDS

12.0 OPENING OF PRICE BIDS

13.0 SITE LOCATION / SITE VISIT

14.0 COMPLETE SCOPE OF SUPPLIES / WORK

15.0 AMENDMENT OF BIDDING DOCUMENTS

16.0 BIDDING DOCUMENTS AND DEVIATIONS

17.0 LANGUAGE OF BIDS

18.0 PRICE BID

19.0 CURRENCIES OF BID

20.0 QUERIES / CLARIFICATIONS

21.0 FORMAT AND SIGNING OF BID

22.0 ALL PAGES TO BE INITIALLED

23.0 CORRECTIONS AND ERASURES

24.0 CLARIFICATIONS OF BIDS

25.0 TECHNO-COMMERCIAL EXAMINATION OF BIDS

26.0 EVALUATION AND COMPARISON OF PRICES

27.0 REBATE

28.0 CONTACTING BPCL

29.0 BPCL’S RIGHT TO ACCEPT / REJECT BIDS

30.0 CONFIDENTIALITY OF DOCUMENTS

31.0 PREPERATION & SUBMISSION OF BIDS – TWO BID SYSTEM

32.0 CUT-OUT SLIPS TO BE USED BY VENDORS FOR PASTING ON COVERS CONTAINING BIDS

33.0 PROFORMA OF LETTER OF AUTHORITY FOR ATTENDING TECHNICAL BID OPENING AND PRICE BID OPENING

34.0 PROFORMA OF DECLARATION OF BLACK LISTING / HOLIDAY LISTING

35.0 QUALIFICATION CRITERIA CONFIRMATION SHEET

36.0 CONFIDENTIALITY AGREEMENT

37.0 CHECK LIST FOR SUBMISSION OF BID

Page 5: UhdeIndia - Bharat Petroleum · Uhde India Private Limited, Dugal Plaza, 3 rd Floor, Prem Nagar, Bibwewadi Road, Pune 411 037, India TENDER RFQ / Tender No. : U6509 - 3187/ABM

Uhde India Pvt. Ltd.

ITB for 66-6509-700 Tender No.: U6509-3187/ABM Page 2 of 22

1.0 INTRODUCTION 1.1 M/S Bharat Petroleum Corporation Ltd (BPCL) intends to set-up a new Continuous Catalytic

Regeneration Reformer Unit (CCR) of 1.2 MMTPA capacity and matching Naphtha Hydro Treatment unit (NHT) including Pressure Swing Adsorber (PSA) unit in Mumbai Refinery and has appointed Uhde India Pvt Ltd (UIPL) –Pune as Project Management Consultant (PMC) for the same.

1.2 UIPL for and on behalf of BPCL invites Sealed Bids under single stage two bid system, for the entire

work / supply covered under the Bidding Document. All bids are to be completed and returned in accordance with and within the time period as indicated below.

2.0 IMPORTANT POINTS TO BE NOTED:

a) Due date for submission of bids: As indicated in Appendix-1. b) Technical un-priced bid opening: As indicated in Appendix-1. c) Required delivery period: As indicated in Appendix-1. d) Bid Validity: As indicated in Appendix-1. e) Offer evaluation and ordering basis: As indicated in Appendix-1. f) Bid security / Earnest Money Deposit (EMD): As indicated in Appendix-1. g) Bidders to note the Bid Rejection Criteria mentioned in ITB. h) Bidders to sign “Confidentiality Agreement” as per attached format j) Offers to be submitted at UIPL Pune office

3.0 BIDDERS QUALIFICATION CRITERIA: Offers of bidders fulfilling all the qualification criteria as mentioned below will only be considered for

further technical & commercial evaluation.

3.1 Technical Criteria

a) Bidder should have completed as a manufacturer during the five preceding years (to be reckoned from the last day of month previous to the one in which tender is floated) at least one supply of similar item. Similar item means Alloy Steel (Chrome- Moly) longitudinal seam welded pipes of size equal to or more than 24” diameter and the pipes should have been certified by any of the following inspection agencies.

- Lloyds - Bureau Veritas - DNV - TUV

b) The manufacturing set-up of the bidder should have valid ISO Quality Management System certification.

c) If the bidder is authorized representative / trader / stockist of manufacturer then bidder shall furnish the details of pipe manufacturer from whom the pipes are being offered and all supporting documents from each manufacturer so as to prove the compliance to the criteria mentioned in point 3.1 (a) and 3.1 (b) above. Post order change in the name of manufacturer shall not be allowed.

d) The bidder shall submit signed copy of “Integrity Pact” along with the offer as per the format attached.

e) The Bidder shall not be on Holiday list of BPCL/ UIPL.

Page 6: UhdeIndia - Bharat Petroleum · Uhde India Private Limited, Dugal Plaza, 3 rd Floor, Prem Nagar, Bibwewadi Road, Pune 411 037, India TENDER RFQ / Tender No. : U6509 - 3187/ABM

Uhde India Pvt. Ltd.

ITB for 66-6509-700 Tender No.: U6509-3187/ABM Page 3 of 22

3.2 Financial Criteria

a) Bidder shall have supplied in previous 5 (five) years period, (to be reckoned from the last day of month previous to the one in which tender is floated) at least one Purchase Order having similar items as defined in para 3.1 (a) above and value of such similar items is not less than INR 7,30,00,000/- (Rupees seven crore thirty lacs only) or USD 14,60,000/-

OR Bidder shall have supplied in the previous 5 (five) years period, (to be reckoned from the last day of month previous to the one in which tender is floated) at least two Purchase Orders having similar items as defined in para 3.1 (a) above and value of such similar items in each Purchase Order is not less than INR 4,86,00,000/- (Rupees four crore eighty six lacs only) or USD 9,72,000/-.

b) The average annual turnover of the bidder during the preceding 3 (three) financial years (FY 2008-2009 to 2010-2011) should be at least INR 23,31,00,000/- (Rupees twenty three crores thirty one lacs only) OR USD 46,62,000/-.

c) The bidder shall have earned a net profit for the last three consecutive years and the financial net worth of the Bidder as per the latest audited annual report shall be positive.

Offers of bidders fulfilling all the qualification criteria as mentioned above will be considered for further technical and commercial evaluation.

3.3 Other Criteria: Besides above mentioned points, the following will also be part of Qualification Criteria:

a) BPCL / UIPL reserve the right to accept / reject any or all qualification documents at their sole discretion without assigning any reason whatsoever.

b) BPCL/UIPL at its discretion reserve the right to verify information submitted and inspects the bidder’s facilities to confirm their capabilities.

c) Vendors would be qualified based on data and documents provided by them and also based on information available with BPCL with regard to the vendor’s credentials.

d) Offers of the qualified vendors only shall be considered for further evaluation.

e) BPCL/UIPL decision on any matter regarding short listing of parties shall be final and any applicant shall not enter into any correspondence with BPCL unless asked for.

3.4 The following minimum documents should be submitted by the Bidders to prove qualification criteria:

a) Company Broacher with Audited Balance sheets for the last 3 financial years. b) Quality Control and Assurance Plan of the Company. c) Customer certificates / documentary evidence supporting on schedule delivery performance. d) Details of similar supplies executed in the last five years. e) All supporting documents along with Qualification Criteria Confirmation sheet (format attached)

4.0 BIDDING DOCUMENTS Bidding documents consist of ,

1) Scope of work / supply 2) Acknowledgement Letter format 3) Instructions to Bidders (ITB) 4) General Purchase Conditions (GPC) 5) Special Purchase Conditions (SPC) 6) Commercial Questionnaire (Indigenous Bidders) 7) Commercial Questionnaire (Foreign Bidders)

Page 7: UhdeIndia - Bharat Petroleum · Uhde India Private Limited, Dugal Plaza, 3 rd Floor, Prem Nagar, Bibwewadi Road, Pune 411 037, India TENDER RFQ / Tender No. : U6509 - 3187/ABM

Uhde India Pvt. Ltd.

ITB for 66-6509-700 Tender No.: U6509-3187/ABM Page 4 of 22

The bidder is expected to examine the bidding documents, including all instructions, FORMs, General Purchase Conditions, Special Purchase Conditions, Technical Specifications, Drawings and other documents and to fully familiarize itself with the requirements of the bidding documents. Failure to furnish all the information required by the Bidding Documents or the submission of a bid not substantially responsive to the Bidding Documents in every respect may result in the rejection of the Bid.

Immediately on receipt of Bidding Document, Bidder shall acknowledge the receipt and confirm his intention

to bid for the tendered work / scope of supply as per the Acknowledgement format given in Bidding Document.

5.0 BID DOCUMENT FEES AND COST OF BIDDING Interested vendors after downloading the bid document shall submit the Bid document fees of INR

1000/- OR USD 25/- in the form of DD in the name of “Bharat Petroleum Corporation Ltd.” payable at Mumbai

The bidder shall bear all costs associated with the preparation and delivery of its bid including (but not

limited to) costs and expenses related to visits to the site(s) and other locations, and the cost of any tests, investigations, evaluations and consultations. BPCL/UIPL will in no case be responsible or liable for any costs regardless of the outcome of the bidding process.

6.0 DUE DATE FOR SUBMISSION OF BIDS: 6.1 Due Date for Submission of Bids.: As indicated in item sr. no. 2 above 6.2 The Original bid, together with required copies must be received by the designated authority on or

before the due date. 6.3 The BPCL/UIPL may, at its discretion, extend the deadline for the submission of bids by amending the

bidding documents, in which case all rights and obligations of the BPCL/UIPL and bidders previously subject to the deadline, will thereafter be subject to the deadline as extended.

7.0 MODIFICATION AND WITHDRAWAL OF BIDS 7.1 The bidder may modify or withdraw his bid after the bid’s submission, provided that written notice of the

modification or withdrawal is received by BPCL/UIPL prior to the deadline prescribed for submission of bids.

7.2 The bidder’s modification or withdrawal notice shall be prepared, sealed, marked and dispatched in accordance with the provisions for submission of bids.

7.3 A bid may not be withdrawn or modified after the deadline for submission of bids during the period of bid validity without forfeiting the bid security unless the modification shall be made upon an invitation by the BPCL/UIPL permitting the bidder to modify the bid.

7.4 If a bid is properly modified within the foregoing provisions, the bid as modified shall constitute the bid offer.

8.0 LATE BIDS: Any bid received by BPCL/UIPL after the deadline for submission of the bids (including any extension(s)

hereof) will be declared “Late” and rejected and returned unopened to the bidder. 9.0 BID VALIDITY: 9.1 Bids shall remain valid for a period as indicated in Sr. no. 2 above.Not withstanding the above, the

BPCL/UIPL may solicit the bidder’s consent to an extension of the period of bid validity. The request and the responses thereto shall be made in writing (by fax/ email).

9.2 If the bidder agrees to the extension request, the validity of the bid security shall also be suitably extended.

9.3 A bidder may refuse the request without forfeiting his bid Security.

Page 8: UhdeIndia - Bharat Petroleum · Uhde India Private Limited, Dugal Plaza, 3 rd Floor, Prem Nagar, Bibwewadi Road, Pune 411 037, India TENDER RFQ / Tender No. : U6509 - 3187/ABM

Uhde India Pvt. Ltd.

ITB for 66-6509-700 Tender No.: U6509-3187/ABM Page 5 of 22

9.4 A bidder accepting the request for extension shall not be permitted to modify his bid because of the extension, unless specifically invited to do so.

10.0 BID REJECTION CRITERIA 10.1 Prior to detailed bid evaluation, BPCL will determine the substantial responsiveness of each bid with

respect to the bidding documents. A substantially responsive bid is one which conforms to the terms, conditions and specification of the Bidding Documents without material deviation. A material deviation is one which affects in any substantial way the scope, quality or performance of the works, or which limits in any substantial way, inconsistent with the bidding documents, the BPCL’s rights or the bidder’s obligations as envisaged in the bidding documents, and the rectification of which deviation or reservation would affect unfairly the competitive position of other bidders presenting substantially responsive bids. Further examination of only such bids as are determined to be substantially responsive shall be taken up, unless otherwise determined by BPCL/UIPL.

10.2 The following provisions of the bidding document must be adhered to without any deviations, failing

which the bid shall be considered to be non-responsive and may be rejected.

i. Defects Liability Period

ii. Submission of prices without any erasures or corrections

iii. Bids with Price Variation Clause (PVC) shall not be acceptable.

11.0 OPENING OF TECHNICAL & UNPRICED COMMERCIAL BIDS: 11.1 Technical and unpriced commercial bids shall be opened at UIPL Pune office at 16.00 hrs on the due

date as mentioned above in presence of the bidder’s representatives. Only the name of the bidders who have responded to the enquiry and EMD details will be read before the bidder’s representatives(s) duly authorized to attend such opening by a person competent and having the Power of Attorney to bind the Bidder. The Bidder’s representative(s) who choose to attend and are present shall sign a register evidencing their attendance.

11.2 The Bidder’s names, modification and Bid withdrawals, and the presence or absence of the requisite Bid Security, and such other details as BPCL/UIPL may, at its discretion, consider appropriate, will be announced and recorded at the opening.

12.0 OPENING OF PRICE BIDS Substantially responsive bidders will be shortlisted by BPCL/UIPL for opening of price part of their bids.

Date, time and venue for opening of price bids will be informed to the shortlisted bidders subsequently. Only the final bid cost will be read before the bidder’s representative(s) duly authorized to attend such opening by a person competent and having the Power of Attorney to bind the Bidder. The Bidder’s representative(s) who choose to attend and are present shall sign a register evidencing their attendance.

13.0 SITE LOCATION / SITE VISIT The Project Site is located in Mahul near Chembur, Mumbai City in the State of Maharashtra. Mumbai

City is well connected by Rail and Road from other parts of India. The bidder is advised to visit and examine the site of works and its surroundings and obtain for itself on

its own responsibility all information that may be necessary for preparing the bid and entering into the Contract. Claims of any kind due to variation or ignorance of site conditions and environmental conditions will not be eligible in any circumstances.

The bidder and any of its personnel or authorized representatives will be granted permission by BPCL

to enter upon its premises and lands for the purpose of such inspection. It is understood that as an

Page 9: UhdeIndia - Bharat Petroleum · Uhde India Private Limited, Dugal Plaza, 3 rd Floor, Prem Nagar, Bibwewadi Road, Pune 411 037, India TENDER RFQ / Tender No. : U6509 - 3187/ABM

Uhde India Pvt. Ltd.

ITB for 66-6509-700 Tender No.: U6509-3187/ABM Page 6 of 22

implicit condition of such permission, the bidder, its personnel and/or authorised representative(s) shall be understood to have released and indemnified BPCL and its personnel from and against all liability in respect thereof and to have assumed all responsibility for personal injury (whether fatal or otherwise), loss of or damage to person or property and any other loss, damage, cost and expenses incurred as a result of such visit, including those sustained by any negligence or other act of tort on the part of BPCL and/or its personnel and Consultants. During such visits the Bidder shall abide by all the rules and regulations, as applicable. Bidders may contact UIPL for site visit purpose.

14.0 COMPLETE SCOPE OF SUPPLIES/WORK 14.1 The complete scope of supplies and work/services has been defined in the bidding documents. Only

those bidders who take complete responsibility and who bid for the complete scope of supplies and work/services as contained in the bidding document may be considered for further evaluation.

14.2 Waiver of deviations and conditions (if any), should be submitted by the Bidders before the opening of

the Priced Bid failing which the Priced Bid of concerned Bidder shall not be opened. 15.0 AMENDMENT OF BIDDING DOCUMENTS 15.1 At any time prior to the deadline for submission of bids as well as up to priced bid opening, BPCL/UIPL

may, for any reason whether at its own initiative or in response to a clarification or modification requested by any prospective Bidder(s), modify the Bidding documents.

15.2 The modifications/amendment will be notified in writing or by fax to all prospective bidders who have

been issued the Bidding documents, and shall be part of the Bidding documents and shall be binding on all bidders. The Bidders will be required to acknowledge receipt of any such amendment to the Bidding documents. Bidders shall confirm the inclusion of Addendum / Corrigendum in their bid and shall follow the instructions issued along with addendum / corrigendum.

15.3 Bidders shall examine the Bidding documents thoroughly and inform BPCL/UIPL of any apparent

conflict, discrepancy or error, so that BPCL/UIPL may issue appropriate clarification(s) or amendment(s), if required.

16.0 BIDDING DOCUMENTS AND DEVIATIONS It is expected that bidders will submit bids based strictly on the terms and conditions and specifications

contained in the bidding documents and will not stipulate any deviations. Should it, however, become unavoidable, deviations should be separately and specifically stipulated only in the “Deviation Sheet”. Deviations mentioned anywhere else in the offer other than the “Deviation Sheet” shall not be acceptable considered for bid evaluation. BPCL/UIPL reserves the right to reject as non-responsive any bid containing major deviation(s).

17.0 LANGUAGE OF BIDS 17.1 The Bid prepared by the bidder, all documents attached to and/or relating to the bid and all

correspondence exchanged by the Bidder and BPCL/UIPL, shall be written in English language only. 17.2 Any printed literature furnished by the bidder may be written in any other language provided that this

literature is accompanied by an authenticated English translation, in which case, for purpose of interpreting the Bid, the English translation shall govern.

18.0 PRICE BID 18.1 The item wise Bid prices shall be filled in the “Format for Submitting Prices”. 18.2 Bidders shall quote indicting separately basic cost, all taxes, duties, levies, octroi applicable, packing &

forwarding charges, transportation charges etc. and the final landed cost at site.

Page 10: UhdeIndia - Bharat Petroleum · Uhde India Private Limited, Dugal Plaza, 3 rd Floor, Prem Nagar, Bibwewadi Road, Pune 411 037, India TENDER RFQ / Tender No. : U6509 - 3187/ABM

Uhde India Pvt. Ltd.

ITB for 66-6509-700 Tender No.: U6509-3187/ABM Page 7 of 22

18.3 Bidders shall indicate the applicable present rate of excise / customs duty, CVD, education cess and

VAT/CST, Service Tax, the same shall be payable on production of documentary evidence issued from concerned authority.

18.4 This part shall not contain any condition whatsoever failing which the Bids shall be liable to be rejected.

In case of any correction, the bidder shall put its signature and its stamp. Eraser fluid will not be allowed for making any correction.

18.5 The prices quoted by the bidder shall remain firm and fixed and shall be valid until completion of the

Contract and shall not be subject to variation/escalation on any account except as otherwise specifically provided in the Contract documents.

18.6 A Counter trade proposals shall not be considered in the evaluation of Bids or otherwise. 18.7 It shall be the duty of the supplier to duly observe and perform all laws, rules, regulations, orders and

formalities applicable to Excise Duty, Sales Tax, VAT, Service tax, Customs Duty, Countervailing Duty etc. on the import, manufacture, sale and/or supply of any material to the BPCL and performance of the works under the Contract. The supplier/contractor shall keep BPCL indemnified from and against any and all claims, demands, prosecutions, actions, proceedings, penalties, damages, demurrages and/or other levies whatsoever made or levied by any Court, Tribunal or the Customs or other Authorities with respect to any alleged breach, evasion or infraction of such duties, taxes, charges or levies or any breach or infraction of any applicable laws, rules, regulations, orders or formalities concerning the same and from the consequence thereof.

18.8 The bidder shall indicate the total quoted price both in figures as well as in words in the format for

submitting prices. 19.0 CURRENCIES OF BID 19.1 Foreign Bidders may quote prices for materials and services to be imported into India either in Indian

Rupees or in Foreign Currency or in a combination of Indian Rupees and Foreign Currency. 19.2 Bidders shall quote the price for materials and services to be procured from India and for expenses to

be incurred in Indian Rupees only in Indian Rupees. 19.3 For evaluation purposes, the foreign currency bid price shall be converted to Indian Rupees by

considering Bill selling foreign exchange rate declared on Reserve Bank of India web site as on the date of priced bid opening.

20.0 QUERIES / CLARIFICATIONS 20.1 The bidder is requested to submit any queries / clarification / information pertaining to Bidding

Document in writing delivered by hand or by mail. This shall be addressed to Mr. Vinayak Deo / Mr. Abhijeet Mithari – UHDE India Pvt. Ltd., Pune within one week from the date of receipt of bidding documents. Any failure by Bidder to submit queries / clarification / information pertaining to Bidding Documents in writing shall not absolve the Bidder, after subsequent placement of Order / Contract, of his responsibility to perform the work in accordance with the Order / Contract.

20.2 UIPL’s responses to Bidder’s queries/clarifications raised will be furnished as expeditiously as possible

to all the vendors who have been issued Bidding Documents. Any modification of the Bidding Documents which may become necessary, shall be sent to all bidders through the issue of an Addendum.

21.0 FORMAT AND SIGNING OF BID

Page 11: UhdeIndia - Bharat Petroleum · Uhde India Private Limited, Dugal Plaza, 3 rd Floor, Prem Nagar, Bibwewadi Road, Pune 411 037, India TENDER RFQ / Tender No. : U6509 - 3187/ABM

Uhde India Pvt. Ltd.

ITB for 66-6509-700 Tender No.: U6509-3187/ABM Page 8 of 22

21.1 The original and all copies of the bid shall be typed or written in indelible ink and shall be signed by the bidder or a person or persons duly authorised to sign on behalf of the bidder. Such authorization shall be indicated by written power of attorney accompanying the bid. All pages of the bid, except for unamended printed literature, shall be initialed by the person signing the bid. The name and position held by each person signing must be typed or printed below the signature.

21.2 The bid shall contain no interlineations, erasures or overwriting except as necessary to correct errors

made by the bidder, in which case, such corrections shall be signed in full by the person or persons signing the bid.

22.0 ALL PAGES TO BE INITIALLED 22.1 All signatures in bids shall be dated and shall bear a seal of the bidder. In addition, all pages of the bids

before submission of the bid shall be initialed at lower right hand corner by the Bidder or by a person holding a Power of Attorney authorizing him to sign on behalf of the bidder. The un-priced technical bid shall include all pages of tender enquiry (commercial part and technical part) duly signed and stamped by the bidder.

22.2 The Bidder shall sign and affix its seal on all pages of the Priced bid. 23.0 CORRECTIONS AND ERASURES 23.1 Bidders are required to fill in the tender documents with due care so as to avoid any

cuttings/corrections/alterations in the entries made in the tender papers. 23.2 In case any corrections are required, the original writings shall be neatly cut/ penned through and re-

written nearby. No overwriting or erasure of original writings by use of ‘white fluid’ or the like is permitted. In case any erasure using ‘white correcting fluid’ is found, the tender may be liable to be rejected.

23.3 All cuttings/ corrections/ alterations shall be signed in full by the tenderer with date. Numerical figures

shall be written both in figures as well in words. 24.0 CLARIFICATIONS OF BIDS To assist in the examination, evaluation and comparison of bids, BPCL/UIPL may, at its discretion, ask

the bidder for a clarification of his bid. All responses to a request for clarification shall be in writing, and no change in the price or substance of the bid shall be permitted unless specifically sought by BPCL/UIPL.

25.0 TECHNO-COMMERCIAL EXAMINATION OF BIDS 25.1 BPCL/UIPL will examine or cause to be examined the bids to determine whether they are complete,

whether required bid securities have been furnished, whether the documents have been properly signed, and whether the bids are generally in order.

25.2 The bids without requisite Bid Security and/or not in the prescribed proforma will not be considered and

bids of such bidders shall be rejected. 25.3 BPCL/UIPL will determine to its subjective satisfaction whether the bidder has submitted a responsive

bid and is qualified to satisfactorily perform the work, and such determination shall not be open to question.

25.4 The determination will also take into account the bidder’s financial and technical capabilities, as well as

such other qualifications as BPCL/UIPL deem necessary and appropriate.

Page 12: UhdeIndia - Bharat Petroleum · Uhde India Private Limited, Dugal Plaza, 3 rd Floor, Prem Nagar, Bibwewadi Road, Pune 411 037, India TENDER RFQ / Tender No. : U6509 - 3187/ABM

Uhde India Pvt. Ltd.

ITB for 66-6509-700 Tender No.: U6509-3187/ABM Page 9 of 22

26.0 EVALUATION AND COMPARISON OF PRICES 26.1 In evaluating the bids, BPCL will determine for each bid the evaluated Bid Price by adding the prices for

following items: a) Landed Price at site for supplies & services after taking in to consideration quoted Packing &

Forwarding charges, all taxes & duties, Statuary levies, octroi, octroi service charge and Transportation Charges after deducting CENVAT / set-off benefit available to BPCL.

b) Any other loading towards factors like Power & Utilities consumption etc as indicated in Special Conditions of Purchase.

26.2 To facilitate evaluation and comparison of prices, the BPCL/UIPL will convert all bid prices expressed in

Foreign Currency into Indian Rupees at selling rate of the concerned foreign currency declared on the web site of Reserve Bank of India on the date of opening of price Bids.

27.0 REBATE No suo - moto reduction in price(s) by bidders is permissible after opening of the bid. If any Bidder

unilaterally reduces the price(s) quoted by him in his bid after opening of bids, such reduction shall not be considered for comparison of prices but shall be binding on the Bidder if he happens to be selected for award of work.

28.0 CONTACTING BPCL A bidder shall not contact BPCL on any matter relating to his bid from the time of bid opening to the

time, that the Contract is awarded, unless requested to do in writing. Any effort by a bidder to influence BPCL in BPCL’s decisions in respect of bid evaluation or contract award will result in the rejection of that bidder’s bid.

29.0 BPCL’S RIGHT TO ACCEPT/REJECT BIDS 29.1 BPCL/UIPL reserves the right to accept or reject any bid and to annul the bidding process and reject all

bids at any time prior to award of Contract without thereby incurring any liability to the affected bidder(s) or any obligation to inform the affected bidder(s) of the ground of BPCL’s / UIPL’s action.

29.2 BPCL/UIPL shall not be obliged to award the Order / Contract to the lowest evaluated bidder if

BPCL/UIPL apprehends that it will not be in the interest of BPCL/UIPL to award the Order / Contract at the lowest evaluated price or to the lowest evaluated bidder.

30.0 CONFIDENTIALITY OF DOCUMENTS Bidders shall treat the bidding documents and contents therein as strictly confidential. If at any time,

during the bid preparation period, Bidder decides to decline to bid; all documents must be immediately returned to BPCL.

Password of the Part 2 of the bid document shall be issued to interested bidders only against

submission of duly signed and stamped “Confidentiality Agreement” as per the attached format and bid document fees.

31.0 PREPARATION & SUBMISSION OF BIDS – TWO BID SYSTEM 31.1 The bidder is required to prepare bid in a format as outlined below in order to achieve the objective of

maintaining a uniform proposal structure from all bidders. a) Technical Bid: Shall contain documents / information as below,

i) UIPL Technical specification sheets duly signed & stamped ii) Technical deviation sheet indicating No deviation / Deviations if any

Page 13: UhdeIndia - Bharat Petroleum · Uhde India Private Limited, Dugal Plaza, 3 rd Floor, Prem Nagar, Bibwewadi Road, Pune 411 037, India TENDER RFQ / Tender No. : U6509 - 3187/ABM

Uhde India Pvt. Ltd.

ITB for 66-6509-700 Tender No.: U6509-3187/ABM Page 10 of 22

iii) Makes of major bought out items b) Unpriced Commercial Bid: Shall contain documents / information as below,

i) Commercial conditions ii) Duly filled, signed and stamped commercial questionnaire iii) Commercial deviation sheet indicating No deviation / Deviations if any to tender documents

like GPC, SPC, ITB, SCC iv) Unpriced copy of Schedule of Rates (SOR) indicating “Q” for quoted items and “NQ” for not

quoted items.

c) Price Bid: Format for submitting prices with duly filled prices 31.2 SUBMISSION OF BIDS:

Bidder(s) will be required to submit in their one bigger sealed cover marked as “Offer against Enquiry No. XXXX for Item XXXX” containing the following documents in three separate sealed envelops before the due date & time in UIPL’s Pune Office at the address UHDE India Pvt. Ltd. Dugal plaza, 2

nd Floor,

692 A/3C, Prem Nagar, Bibwewadi Off. Pune-Satara Road, Pune 411 037 (Maharashtra) India. Contact person: Mr. Abhijeet Mithari / Mr. Vinayak Deo Tel: +91 20 6608 1155 / 9420

i. Envelope 1: Technical Bid containing following documents:

a) Four sets (one original + Three photo copies) of Technical Bid b) One set of tender document duly stamped and signed on each page c) One soft copy in CD

ii. Envelope 2: Unpriced Commercial Bid containing following documents:

a) Four sets (one original + three photo copies) of Un priced Commercial Bid b) One soft copy in CD

iii. Envelope 3: Price Bid containing following documents:

a) Format for Submitting Prices with duly filled prices.

Each envelope shall be super scribed with the names of documents it contains.

The bidders shall ensure submission of prices without any erasures or corrections with signatures in original on the priced sheet(s) of the original bid. Bidders shall also specify total bid price, wherever applicable, in figures as well as in words.

Page 14: UhdeIndia - Bharat Petroleum · Uhde India Private Limited, Dugal Plaza, 3 rd Floor, Prem Nagar, Bibwewadi Road, Pune 411 037, India TENDER RFQ / Tender No. : U6509 - 3187/ABM

Uhde India Pvt. Ltd.

ITB for 66-6509-700 Tender No.: U6509-3187/ABM Page 11 of 22

CUT-OUT SLIPS TO BE USED BY VENDORS FOR PASTING ON COVER / ENVELOPES CONTAINING

BIDS

Cover – 1: Containing Sealed Envelops 1, 2 & 3:

DO NOT OPEN – THIS IS A QUOTATION

COVER-1: CONTAINING SEPARATE SEALED ENVELOPS 1, 2 & 3

(Project No. 66-6509) Project : Continuous Catalytic Regeneration Reformer Unit (CCR).

Client: BHARAT PETROLEUM CORPORATION LTD., Mumbai Refinery PMC: M/s. UHDE INDIA PVT LTD.

Bid document No. : -----------------------------------------------------------------------------------------

Item : ------------------------------------------------------------------------------------------------------------ Bid due date & time : --------------------------------------------------------------------------------------

From:

To:

UHDE India Pvt. Ltd. Dugal plaza, 2nd Floor, 692 A/3C, Prem Nagar, Bibwewadi Off. Pune-Satara Road, Pune 411 037 (Maharashtra) India. Contact person: Mr. Abhijeet Mithari / Mr. Vinayak Deo Tel: +91 20 6608 1155 / 9420

Page 15: UhdeIndia - Bharat Petroleum · Uhde India Private Limited, Dugal Plaza, 3 rd Floor, Prem Nagar, Bibwewadi Road, Pune 411 037, India TENDER RFQ / Tender No. : U6509 - 3187/ABM

Uhde India Pvt. Ltd.

ITB for 66-6509-700 Tender No.: U6509-3187/ABM Page 12 of 22

ENVELOPE 1: TECHNICAL BID

DO NOT OPEN – THIS IS A QUOTATION

ENVELOPE-1: TECHNICAL BID

(Project No. 66-6509) Project : Continuous Catalytic Regeneration Reformer Unit (CCR).

Client: BHARAT PETROLEUM CORPORATION LTD., Mumbai Refinery PMC: M/s. UHDE INDIA PVT LTD.

Bid document No. : -----------------------------------------------------------------------------------------

Item : ------------------------------------------------------------------------------------------------------------ Bid due date & time : --------------------------------------------------------------------------------------

From:

To:

UHDE India Pvt. Ltd. Dugal plaza, 2nd Floor, 692 A/3C, Prem Nagar, Bibwewadi Off. Pune-Satara Road, Pune 411 037 (Maharashtra) India. Contact person: Mr. Abhijeet Mithari / Mr. Vinayak Deo Tel: +91 20 6608 1155 / 9420

Page 16: UhdeIndia - Bharat Petroleum · Uhde India Private Limited, Dugal Plaza, 3 rd Floor, Prem Nagar, Bibwewadi Road, Pune 411 037, India TENDER RFQ / Tender No. : U6509 - 3187/ABM

Uhde India Pvt. Ltd.

ITB for 66-6509-700 Tender No.: U6509-3187/ABM Page 13 of 22

ENVELOPE 2: UNPRICED COMMERCIAL BID

DO NOT OPEN – THIS IS A QUOTATION

ENVELOPE-2: UNPRICED COMMERCIAL BID

(Project No. 66-6509) Project : Continuous Catalytic Regeneration Reformer Unit (CCR).

Client: BHARAT PETROLEUM CORPORATION LTD., Mumbai Refinery PMC: M/s. UHDE INDIA PVT LTD.

Bid document No. : -----------------------------------------------------------------------------------------

Item : ------------------------------------------------------------------------------------------------------------ Bid due date & time : --------------------------------------------------------------------------------------

From:

To:

UHDE India Pvt. Ltd. Dugal plaza, 2nd Floor, 692 A/3C, Prem Nagar, Bibwewadi Off. Pune-Satara Road, Pune 411 037 (Maharashtra) India. Contact person: Mr. Abhijeet Mithari / Mr. Vinayak Deo Tel: +91 20 6608 1155 / 9420

Page 17: UhdeIndia - Bharat Petroleum · Uhde India Private Limited, Dugal Plaza, 3 rd Floor, Prem Nagar, Bibwewadi Road, Pune 411 037, India TENDER RFQ / Tender No. : U6509 - 3187/ABM

Uhde India Pvt. Ltd.

ITB for 66-6509-700 Tender No.: U6509-3187/ABM Page 14 of 22

ENVELOPE 3: PRICE BID

(Envelope – 2 : ORIGINAL EMD)

Client : BHARAT PETROLEUM CORPORATION LTD

PMC : M/s. UHDE INDIA PVT LTD.

Project : Import of LPG at JNPT & Development of refrigerated storage at Uran LPG Plant.

Bid document No. : -----------------------------------------------------------------------------------------

Item : ------------------------------------------------------------------------------------------------------------

Bid due date & time : --------------------------------------------------------------------------------------

From : ---------------------------------------------------- To :----------------------------------------------

(To be pasted on the envelop containing ORIGINAL EMD)

DO NOT OPEN – THIS IS A QUOTATION

ENVELOPE-3: PRICE BID

(Project No. 66-6509) Project : Continuous Catalytic Regeneration Reformer Unit (CCR).

Client: BHARAT PETROLEUM CORPORATION LTD., Mumbai Refinery PMC: M/s. UHDE INDIA PVT LTD.

Bid document No. : -----------------------------------------------------------------------------------------

Item : ------------------------------------------------------------------------------------------------------------ Bid due date & time : --------------------------------------------------------------------------------------

From:

UHDE India Pvt. Ltd. Dugal plaza, 2nd Floor, 692 A/3C, Prem Nagar, Bibwewadi Off. Pune-Satara Road, Pune 411 037 (Maharashtra) India. Contact person: Mr. Abhijeet Mithari / Mr. Vinayak Deo Tel: +91 20 6608 1155 / 9420

Page 18: UhdeIndia - Bharat Petroleum · Uhde India Private Limited, Dugal Plaza, 3 rd Floor, Prem Nagar, Bibwewadi Road, Pune 411 037, India TENDER RFQ / Tender No. : U6509 - 3187/ABM

Uhde India Pvt. Ltd.

ITB for 66-6509-700 Tender No.: U6509-3187/ABM Page 15 of 22

PROFORMA OF LETTER OF AUTHORITY FOR ATTENDING TECHNICAL BID OPENING AND PRICE BID OPENING

To, DATE: Deputy General Manager (RMP), Bharat Petroleum Corporation Ltd, Refinery, Mahul, Mumbai, Mumbai – 400074 (Maharashtra). India Dear Sirs, We …………………. Hereby authorize following representative (s) to attend the technical bid opening and

priced bid opening against your Tender / Enquiry No. ………….. for …………………………………… 1. Name & Designation………………….. Signature …………….. 2. Name & Designation………………….. Signature …………….. We confirm that we shall be bound by all and whatsoever our representative (s) shall commit. Yours faithfully,

Signature ………………….

Name & Designation …………………. For & on behalf of ………………….

Note: This Letter of Authority should be on the letterhead of the bidder and should be signed by a person

competent and having the power of attorney to bind the bidder.

Page 19: UhdeIndia - Bharat Petroleum · Uhde India Private Limited, Dugal Plaza, 3 rd Floor, Prem Nagar, Bibwewadi Road, Pune 411 037, India TENDER RFQ / Tender No. : U6509 - 3187/ABM

Uhde India Pvt. Ltd.

ITB for 66-6509-700 Tender No.: U6509-3187/ABM Page 16 of 22

PROFORMA OF DECLARATION OF BLACK LISTING / HOLIDAY LISTING In the case of a Proprietary Concern: I hereby declare that neither I in the name of my Proprietary concern M/s. ………….. which is submitting the accompanying Bid / Tender nor any other concern in which I am proprietor nor in any partnership firm in which I am involved as a Managing Partner have been placed on black list or holiday list declared by Bharat Petroleum Corporation Limited or Uhde India Pvt. Limited, except as indicated below : (Here given particulars of black listing or holiday listing and in absence thereof state “NIL”). In the case of a Partnership Firm We hereby declare that neither we, M/s. …………………… submitting the accompanying Bid / Tender nor any partner involved in the management of the said firm either in his individual capacity or as proprietor of any firm or concern have or has been placed on black list or holiday list declared by Bharat Petroleum Corporation Limited or UHDE India Pvt. Ltd., except as indicated below: (Here given particulars of black listing or holiday listing and in absence thereof state “NIL”). In the case of Company We hereby declared that we have not been placed on any holiday list or black list declared by Bharat Petroleum Corporation Limited or UHDE India Pvt. Ltd., except as indicated below: (Here given particulars of black listing or holiday listing and in absence thereof state “NIL”). It is understood that if this declaration is found to be false in any particular, Bharat Petroleum Corporation Limited or UHDE India Pvt. Ltd., shall have the right to reject my / our bid, and, if the bid has resulted in a contract, the contract is liable to be terminated. Place: ……………… Signature of the Bidder……….. Date: ……………… Name of the Signatory ………….

Page 20: UhdeIndia - Bharat Petroleum · Uhde India Private Limited, Dugal Plaza, 3 rd Floor, Prem Nagar, Bibwewadi Road, Pune 411 037, India TENDER RFQ / Tender No. : U6509 - 3187/ABM

Uhde India Pvt. Ltd.

ITB for 66-6509-700 Tender No.: U6509-3187/ABM Page 17 of 22

Qualification Criteria Confirmation Sheet

Tender No: U6509-3187/ABM

S.N.

Vendor Qualification Criteria Vendor

confirmation

List of supporting documents

attached

1 Technical / Execution criteria:

a

Bidder should have completed as a manufacturer during the five preceding years (to be reckoned from the last day of month previous to the one in which tender is floated) at least one supply of similar item. Similar item means Alloy Steel (Chrome- Moly) longitudinal seam welded pipes of size equal to or more than 24” diameter and the pipes should have been certified by any of the following inspection agencies.

- Lloyds - Bureau Veritas - DNV - TUV

Confirmed / Not Confirmed refer deviation sheet

b The manufacturing set-up of the bidder should have valid ISO Quality Management System certification.

Confirmed / Not Confirmed refer deviation sheet

c

If the bidder is authorized representative / trader / stockist of manufacturer then bidder shall furnish the details of pipe manufacturer from whom the pipes are being offered and all supporting documents from each manufacturer so as to prove the compliance to the criteria mentioned in point 1 (a) and 1 (b) above. Post order change in the name of manufacturer shall not be allowed.

Confirmed / Not Confirmed refer deviation sheet

d The bidder shall submit signed copy of “Integrity Pact” along with the offer as per the format attached.

Confirmed / Not Confirmed refer deviation sheet

e The Bidder shall not be on Holiday list of BPCL/ UIPL. Confirmed / Not Confirmed refer deviation sheet

2 Financial criteria:

a

Bidder shall have supplied in previous 5 (five) years period, (to be reckoned from the last day of month previous to the one in which tender is floated) at least one Purchase Order having similar items as defined in para 1 (a) above and value of such similar items is not less than INR 7,30,00,000/- (Rupees seven crore thirty lacs only) or USD 14,60,000/-.

Confirmed / Not Confirmed refer deviation sheet

OR a

Bidder shall have supplied in the previous 5 (five) years period, (to be reckoned from the last day of month previous to the one in which tender is floated) at least two Purchase Orders having similar items as defined in para 1 (a) above and value of such similar items in each Purchase Order is not less than INR 4,86,00,000/- (Rupees four crore eighty six lacs only) or USD 9,72,000/-.

Confirmed / Not Confirmed refer deviation sheet

Page 21: UhdeIndia - Bharat Petroleum · Uhde India Private Limited, Dugal Plaza, 3 rd Floor, Prem Nagar, Bibwewadi Road, Pune 411 037, India TENDER RFQ / Tender No. : U6509 - 3187/ABM

Uhde India Pvt. Ltd.

ITB for 66-6509-700 Tender No.: U6509-3187/ABM Page 18 of 22

S.N.

Vendor Qualification Criteria Vendor

confirmation

List of supporting documents

attached

b

The average annual turnover of the bidder during the preceding 3 (three) financial years (FY 2008-2009 to 2010-2011) should be at least INR 23,31,00,000/- (Rupees twenty three crores thirty one lacs only) OR USD 46,62,000/-.

Confirmed / Not Confirmed refer deviation sheet

c

The bidder shall have earned a net profit for the last three consecutive years and the financial net worth of the Bidder as per the latest audited annual report shall be positive.

Confirmed / Not Confirmed refer deviation sheet

3 Documents submitted:

a Company Broacher with Audited Balance sheets for the last 3 financial years.

Submitted / Not submitted refer deviation sheet

b Quality Control and Assurance Plan of the Company. Submitted / Not submitted refer deviation sheet

c Details of similar supplies executed in the last five years & copies of purchase orders to substantiate technical / execution criteria.

Submitted / Not submitted refer deviation sheet

(Signature of Vendor with Company seal) : Name of the Authorized Signatory : Designation : Date :

Page 22: UhdeIndia - Bharat Petroleum · Uhde India Private Limited, Dugal Plaza, 3 rd Floor, Prem Nagar, Bibwewadi Road, Pune 411 037, India TENDER RFQ / Tender No. : U6509 - 3187/ABM

Uhde India Pvt. Ltd.

ITB for 66-6509-700 Tender No.: U6509-3187/ABM Page 19 of 22

CONFIDENTIALITY AGREEMENT THIS CONFIDENTIALITY AGREEMENT (“Agreement”) is made by and between Axens, a French company organized as a "Société Anonyme" and having its main office at 89 boulevard Franklin

Roosevelt, F 92508 Rueil-Malmaison, France ("Axens") and ___________________, a company organized under the laws of _______ having its main office at

____________________________________ ("Bidder"). WHEREAS, Axens possesses certain license rights and valuable know-how related to the naphtha hydrotreater

process and to the continuous catalytic regeneration (CCR) reformer process (collectively the “Process”) originally developed by IFP of France (“IFP”);

WHEREAS, for the CCR and NHT project under consideration (the “Project”), Bharat Petroleum Corporation

Limited ("Owner”) has selected the Process for a new unit to be located at Mumbai refinery, India (“Unit”); and

WHEREAS, in order for Bidder to make a proposal to Owner for construction relating to the Project, and, if

selected, to perform all or part of the detailed engineering and/or supply of any item (as applicable) required by the Process for the implementation of the Project (the “Purpose”), Bidder desires to have access to information of IFP and/or Axens.

NOW THEREFORE in consideration of the promises and mutual covenants herein contained, the parties hereto

agree to the following: 1 Disclosure of information. Axens will furnish at its sole discretion to Bidder, or authorize Owner to disclose to

Bidder, the Confidential Information as defined in article 2 hereunder. 2 Confidential Information. All information, whether, technical, commercial, or otherwise, whether written or oral,

provided, directly or indirectly, by Owner or Axens to Bidder under this Agreement, or which Bidder might acquire or discover during visits to facilities of IFP, Axens or third parties where such information is designed or exploited, or during discussions with Axens, IFP and/or Owner, together with all analyses, compilations, forecasts, studies or other documents that contain or otherwise reflect such information, shall be deemed the “Confidential Information” hereunder.

3 Use of Confidential Information. All Confidential Information received hereunder shall be kept confidential and shall not, without the prior written consent of Axens, be disclosed by Bidder, in any manner whatsoever, in whole or in part, and it shall not be used by Bidder, other than for the Purpose. Moreover, Bidder shall only disclose the Confidential Information to its officers, directors and employees who need to know such Confidential Information for the Purpose, who are informed by Bidder of the confidential nature of the Confidential Information and who shall be bound to act in accordance with the terms and conditions of this Agreement.

4 Ownership of Confidential Information. Bidder hereby agrees that the Confidential Information disclosed hereunder is and will remain the property of IFP and Axens and that drawings or other written, printed or electronic data included therein are not to be copied or reproduced, mechanically or otherwise, without the express permission of Axens, except for such copies that Bidder reasonably requires for the Purpose.

5 Non-Confidential Information. The term “Confidential Information” shall not include such information furnished hereunder that Bidder can prove:

a) was, at the time of disclosure, in the public domain or which subsequently enters the public domain through no act or failure to act by Bidder; or

b) was developed by or was in the possession of Bidder prior to being furnished to Bidder by Axens or on its behalf, provided that the source of such Confidential Information was not known to Bidder to be prohibited from disclosing the Confidential Information to Bidder by a legal, contractual or fiduciary obligation to Axens; or

c) Was or became available to Bidder on a non-confidential basis from a third party that is not known to Bidder to be prohibited from disclosing the Confidential Information to Bidder by a legal, contractual or fiduciary obligation to Axens.

However, in situations a) through c) above (the “Non-Confidential Information”), Bidder undertakes not to

disclose that any of such Non-Confidential Information lawfully in its possession is included in the Confidential Information.

6 The exceptions of article 5 shall not apply to any information furnished hereunder which: a) Is specific and, at the time of its disclosure hereunder, merely embraced by general information within the

exceptions, or b) Is a combination of features of the Confidential Information, unless the combination itself, its principle of operation

and method of use are within the exceptions.

Page 23: UhdeIndia - Bharat Petroleum · Uhde India Private Limited, Dugal Plaza, 3 rd Floor, Prem Nagar, Bibwewadi Road, Pune 411 037, India TENDER RFQ / Tender No. : U6509 - 3187/ABM

Uhde India Pvt. Ltd.

ITB for 66-6509-700 Tender No.: U6509-3187/ABM Page 20 of 22

7 Third-Party Disclosure. Despite the restrictions on disclosure contained in this Agreement, but only to the extent necessary for the Purpose, Bidder may disclose part of the Confidential Information to the following third parties:

a) a vendor of commodity equipment or materials or a supplier of construction labor who will receive only a minor or non-critical portion, as determined by Axens in its sole and absolute discretion, of the Confidential Information and who, prior to such disclosure, has signed an agreement with Bidder or Axens containing restrictions on use and disclosure at least equivalent to those contained in this Agreement; or

b) any other third party, including but not limited to, any detailed engineering contractor or manufacturer of specially-designed equipment, who, prior to such disclosure, has signed an agreement with Axens containing appropriate restrictions on use and disclosure;

c) an Affiliate of Bidder that needs to know Confidential Information in connection with the Purpose and who, prior to such disclosure, has been informed by Bidder of the confidential nature and of the confidentiality obligations attached to such Confidential Information; provided, however, that (a) Bidder warrants that such Affiliate shall respect said confidentiality obligation and (b) Bidder has notified to Axens the name of the Affiliates to which Bidder has disclosed Confidential Information under this Article 7c) immediately after such disclosure.

For the purpose of this Agreement, “Affiliate” means, in relation with any one of the parties, any company which,

directly or indirectly, controls, is controlled by, or is under common control with such party. A company is controlled by the ownership of more than fifty percent (50%) of its voting rights.

8 Legally Compelled Disclosure. In the event that Bidder who is provided with the Confidential Information pursuant to

this Agreement becomes legally compelled (by oral questions, interrogatories, requests for information or documents, subpoena, civil investigative demand or similar process) to disclose any of the Confidential Information to third parties other than those identified above, Bidder will provide Axens with prompt notice so that Axens may seek a protective order or other appropriate remedy and/or waive compliance with the provisions of this Agreement. In any such event, Bidder will use its best efforts to ensure that the Confidential Information will be accorded confidential treatment.

9 Disclaimer of Warranties. Axens makes no representations and extends no warranties or conditions of any kind,

either express or implied, by operation of law or otherwise, with respect to the accuracy or completeness of the Confidential Information furnished hereunder. In no event shall Axens nor any of its Affiliates or subsidiaries be liable to Bidder for special, indirect, incidental or consequential damages, including, without limitation, loss of profits or goodwill, capital, loss of work expenses or claims, with respect to the Confidential Information.

10 Equitable Relief. Notwithstanding the provision of article 16, Bidder acknowledges that remedies at law are

inadequate to protect against breach of this Agreement and agrees in advance, without prejudice to any rights to judicial relief Axens may otherwise have, to the granting of equitable relief, including an injunction and specific performance, in Axens’ favor without proof of actual damages or posting a bond.

11 Completion. Upon completion of the Purpose, or should Owner decide not to incorporate Axens' technology or not

to proceed with the construction of the Unit under contract with Bidder, whichever occurs first, Bidder will return to Axens or destroy, at Axens' option, all of the Confidential Information in Bidder's possession (including, all originals, and all copies and derivations therefrom, in any medium); provided, however, that Bidder may retain one copy of the Confidential Information in a locked and limited access file for the sole purpose of determining Bidder's compliance under this Agreement. If requested by Axens, an appropriate officer of Bidder will certify to Axens that all such material has been so returned or destroyed.

12 Term. Bidder's obligations under this Agreement to protect the Confidential Information from unintentional disclosure shall terminate 20 (twenty) years after Bidder's receipt of the Confidential Information in question.

13 No License. Nothing in this Agreement shall be construed as granting Bidder a license, an option on a license or

any right to operate under any patent, technology or know-how which IFP or Axens may, now or hereafter, have the right to license.

14 Governing Language. The governing language of this Agreement shall be English. 15 Governing Law. This Agreement and any dispute arising from the performance or breach hereof shall be governed

by and construed and enforced in accordance with the laws of Switzerland, without reference to conflict of law principles.

16 Dispute resolution. The parties shall endeavor to solve amicably any dispute arising out of or relating to this

Agreement. Any dispute which cannot be solved through this process shall be settled finally according to the Rules of Arbitration of the International Chamber of Commerce by one or more arbitrators appointed in accordance with the said rules. Such arbitration shall be conducted in English and shall be held in Geneva, Switzerland, or any alternate mutually agreeable location. Judgment upon the awards rendered may be entered in any court having

Page 24: UhdeIndia - Bharat Petroleum · Uhde India Private Limited, Dugal Plaza, 3 rd Floor, Prem Nagar, Bibwewadi Road, Pune 411 037, India TENDER RFQ / Tender No. : U6509 - 3187/ABM

Uhde India Pvt. Ltd.

ITB for 66-6509-700 Tender No.: U6509-3187/ABM Page 21 of 22

jurisdiction thereof or application may be made to such court for a judicial acceptance of the awards and an order of enforcement as the case may be.

17 Assignment. This Agreement is not assignable in whole or in part by either party without the previous written

consent of the other party; provided, however, that it may be assigned by either party without such consent to a successor to substantially all of such party’s business assets, including that part concerned with this Agreement. Confidentiality and limited use obligations between the parties and the provisions with respect to dispute resolution and applicable law shall survive any assignment of this Agreement.

IN WITNESS WHEREOF, the parties hereto have caused this Agreement to be executed by their duly authorized

representative as of the date last written below. [_______________________] Axens By ___________________________ By ______________________________ Name printed __________________ Jean-Pierre Smith Title __________________ Director of Legal Affairs Date __________________ Date __________________

Page 25: UhdeIndia - Bharat Petroleum · Uhde India Private Limited, Dugal Plaza, 3 rd Floor, Prem Nagar, Bibwewadi Road, Pune 411 037, India TENDER RFQ / Tender No. : U6509 - 3187/ABM

Uhde India Pvt. Ltd.

ITB for 66-6509-700 Tender No.: U6509-3187/ABM Page 22 of 22

CHECK LIST FOR SUBMISSION OF BID Bidder is requested to fill this check list and ensure that all details/documents have been furnished as called for

in the Bidding Document along with duly filled in, signed & stamped checklist Please confirm & ensure compliance:

SR Description Yes / No

1 Envelope 1:

a) Technical bid

2 Envelope 2:

b) Unpriced commercial bid

c) Duly filled Commercial Questionnaire.

3 Envelope 3:

a) Format for Submitting Prices with duly filled prices SIGNATURE OF BIDDER : ___________________ NAME OF BIDDER : ___________________ COMPANY SEAL : ___________________

Page 26: UhdeIndia - Bharat Petroleum · Uhde India Private Limited, Dugal Plaza, 3 rd Floor, Prem Nagar, Bibwewadi Road, Pune 411 037, India TENDER RFQ / Tender No. : U6509 - 3187/ABM

Uhde India Pvt. Ltd.

Page 1 of 10

Special Purchase Conditions (SPC) Piping ITEMS

Project No.: 66-6509 Client: Bharat Petroleum Corporation Limited

TABLE OF CONTENTS

1.0 PRICE BASIS

2.0 DELIVERY BASIS

3.0 CURRENCY OF QUOTE

4.0 DOCUMENTATION CHARGES

5.0 OFFER EVALUATION AND ORDERING BASIS

6.0 PART ORDER

7.0 FIRMNESS OF PRICES

8.0 SUPERVISION CHARGES

9.0 DURATION OF SUPERVISION SERVICES

10.0 TRANSIT INSURANCE

11.0 PAYMENT TERMS

12.0 PERFORMANCE BANK GUARANTEE

13.0 SPARE PARTS

14.0 TAXES & DUTIES

15.0 DEFECT LIABILITY PERIOD

16.0 DELAYED DELIVERY

17.0 INSPECTION AND TESTING

18.0 BID EVALUATION 19.0 TECHNICAL AND COMMERCIAL LOADING

20.0 FORMAT FOR SUBMITTING PRICE

21.0 INTERPRETATION OF CONTRACT DOCUMENTS

22.0 IRRECONCILABLE CONFLICTS

Page 27: UhdeIndia - Bharat Petroleum · Uhde India Private Limited, Dugal Plaza, 3 rd Floor, Prem Nagar, Bibwewadi Road, Pune 411 037, India TENDER RFQ / Tender No. : U6509 - 3187/ABM

Uhde India Pvt. Ltd.

Page 2 of 10

1.0 Price Basis:

Indian bidder: FOT Site. Transportation charges to be indicated separately as per the price bid format below.

Foreign bidder: FOB Port of Shipment. Packing & Forwarding charges up to FOB shall be included in quoted price. Export permit/licence if required shall be supplier’s responsibility & any expenditure towards same will by borne by the supplier. Refer price bid format below.

2.0 Delivery Basis:

Indian vendor: Date of receipt of material at site shall be considered as date of delivery. Foreign vendor: Date of clean Bill of Lading shall be considered as date of delivery.

3.0 Currency of quote: Change in currency once quoted shall not be allowed. 4.0 Documentation charges: Shall be included in quoted prices. 5.0 Offer evaluation and ordering basis: Refer Appendix 1 6.0 Part Order: In case of part order all lump sum charges quoted extra if any viz. testing, third

party, packing, crating, handling, transportation, etc., shall be considered on prorata value basis.

7.0 Firmness of prices: Quoted prices shall remain firm and fixed till complete execution of the

order. 8.0 Supervision Charges: Not applicable 9.0 Duration of supervision services: Not applicable 10.0 TRANSIT INSURANCE:

Indian Vendor: Shall be covered by BPCL and the same shall not be included in the quoted prices.

Foreign Vendor:

Prices quoted must exclude transit insurance charges from FOB International Port of Exit as the same shall be arranged by BPCL. However, all transit insurance charges for inland transit up to FOB International Port of Exit must be included in quoted prices.

11.0 PAYMENT TERMS

Indian Vendor

100% Payment shall be released through NEFT within 30 days on receipt and acceptance of materials at site and submission of Performance Bank Guarantee equal to 10 % of Total Order Value Foreign Vendor: 100% Payment shall be made through irrevocable letter of credit upon submission of shipping documents and performance bank guarantee of 10% of order value.

Page 28: UhdeIndia - Bharat Petroleum · Uhde India Private Limited, Dugal Plaza, 3 rd Floor, Prem Nagar, Bibwewadi Road, Pune 411 037, India TENDER RFQ / Tender No. : U6509 - 3187/ABM

Uhde India Pvt. Ltd.

Page 3 of 10

Bank Charges: All Bank charges and stamp duties payable outside India in connection with payments to be made shall be borne by the supplier. All bank charges and stamp duties payable in India shall be borne by BPCL

12.0 PERFORMANCE BANK GUARANTEE (PBG):

For order value upto Rs.10 lakh, PBG shall not be applicable. 13.0 Spare Parts: Not applicable. 14.0 TAXES & DUTIES:

14.1 Any Statutory variation in excise duty / VAT on finished goods, within the contractual delivery date, shall be on owner’s account, against submission of documentary evidence. However, in case of delay in delivery beyond the contractual date, for reasons not attributable to buyer, any increase in these rates shall be borne by seller, whereas any decrease shall be passed on to the owner.

14.2 Any variation in Excise duty / VAT at the time of supplies for any reasons, other

than statutory including variations due to turnover, shall be borne by vendor.

14.3 If CST/MVAT/ED is not applicable at present due to any reason, the same shall be borne by vendor if it becomes applicable later.

14.4 Further, in case of delay in delivery, due to reasons attributable to seller, any new

or additional taxes, duties or levies imposed after the contractual delivery date shall be on seller’s account.

14.5 Any differential in taxes and duties will be cost loaded on case to case basis.

However, if a supplier states that taxes/duties are not applicable at present and will be charged as applicable at the time of delivery then his bid shall be loaded by the maximum rate of taxes/duties applicable as on the date of price evaluation.

14.6 Material supplied will be eligible for CENVAT Credit and vendor shall furnish all

documents as required to avail the same.

14.7 In case of CST, C form shall be provided In case of MVAT, no concessional form shall be provided

14.8 For the purpose of applicability of statutory variations on trade tax/sales tax,

excise duty and education cess (including imposition of any new taxes/duties/levies, etc.) under above terms, each staggered delivery lot (due in a specific month as per delivery schedule) shall be considered delivery date for the respective lot(s).

14.9 Foreign Exchange Rate Variation/Custom Duty Variation For Indian Bidders (On

Built-In Import Content): Prices shall remain firm and fixed without any escalation for statutory variation in customs duty rate and on account of FE variation.

14.10 For foreign suppliers, all taxes, duties and levies of any kind payable up to FOB

International Port of Exit shall be borne by supplier. 15.0 “DEFECT LIABILITY PERIOD” in respect of:

(i) Bulk Consumables shall be the date of delivery plus 6 (six) months

Page 29: UhdeIndia - Bharat Petroleum · Uhde India Private Limited, Dugal Plaza, 3 rd Floor, Prem Nagar, Bibwewadi Road, Pune 411 037, India TENDER RFQ / Tender No. : U6509 - 3187/ABM

Uhde India Pvt. Ltd.

Page 4 of 10

(ii) In the case of other Material(s) shall be 18 (eighteen) months from the date of delivery or 12 (twelve) months after the same have been put in service or commissioned, whichever is earlier;

(iii) In the case of altered or replaced Material(s):

(a) With respect to Bulk Consumables, shall be 6 (six) months from the date of alteration, repair or replacement as the case may be; and

(b) With respect to other Material(s), shall be 12 (twelve) months from the date of alteration, repair or replacement as the case may be.

16.0 DELAYED DELIVERY :

a) Delayed delivery clause for Foreign vendors shall be applicable as per clause no. 17 of the General Purchase Conditions for Imported Equipment / materials.

b) Delayed delivery clause for Indigenous vendors shall be applicable as per clause no. 9.0 (i) of the General Purchase Conditions for Indigenous Materials and Equipments.

17.0 INSPECTION AND TESTING

17.1 For Indian vendors, goods are subject to inspection by Owner/ UIPL for which no extra charges shall be payable by Owner. Travel, living and personnel expenses of Owner’s inspectors shall be borne by Owner. Travel, living and personnel expenses of UIPL’s inspectors shall be borne by UIPL. All built in import content shall be subjected to inspection by Third Party Inspection Agency nominated by BPCL for which charges are included in quoted prices and no additional charges will be paid by Owner.

17.2 For foreign vendors goods and services are subject to third party inspection.

Foreign bidders shall quote third party inspection charges separately.

17.3 Third Party Inspection Agency where ever applicable shall be nominated by BPCL. In general the following TPIA’s are in the approved list viz. Lloyds, DNV, BV or equivalent. However the bidder has option to specify in his bid the choice of the equivalent TPIA with supporting documents of PTR.

17.4 In addition to any tests to be conducted by the Vendor under the Contract or any

applicable codes or standards, the Material(s) shall be subject to inspection and/or testing by Inspector(s) (including Third Party Inspector(s)) at any time prior to shipment and/or despatch and to final inspection within a reasonable time after arrival at the Project Site. The Inspector(s) shall have the right to carry out the inspection or testing, which will include inspection and testing of the raw materials at manufacturers shop, at fabricators shop and at the time of actual despatch before and/or after completion of packing.

17.5 In addition to testing and inspection by Inspectors, BPCL may nominate an

institutional agency like Boiler-Inspectorate for official testing of coded equipment. The Vendor shall ensure that all procedures for preparation and performance of tests prescribed by such institution shall be scrupulously complied and observed.

17.6 Unless otherwise specified in the Contract, the inspection shall be carried out as

per the relevant standards/scope of inspection provided along with the Tender Enquiry/Purchase Order. All charges for Third Party Inspectors shall be borne by the Vendor and BPCL shall reimburse these charges at actual against documentary proof of payment (limited to the amount indicated in the Contract

Page 30: UhdeIndia - Bharat Petroleum · Uhde India Private Limited, Dugal Plaza, 3 rd Floor, Prem Nagar, Bibwewadi Road, Pune 411 037, India TENDER RFQ / Tender No. : U6509 - 3187/ABM

Uhde India Pvt. Ltd.

Page 5 of 10

towards third party inspection,) unless such inspection has become infructuous for any cause.

17.7 All manufacturers’ mill test certificates and analytical reports from material

laboratories in respect of raw materials employed and components incorporated shall have to be presented by the Vendor.

17.8 Before shipping or despatch, the Material(s) will have to be checked and

stamped by the Inspector(s) who may forbid the use and dispatch of any equipment and/or Material(s) which during tests and inspection fail(s) to comply with the specifications, codes and testing or other contractual requirements applicable thereto, and the Vendor shall not tender such rejected Material(s) for supply to BPCL nor shall incorporate the same in any Material(s) to be tendered for supply to BPCL.

17.9 The Vendor will inform BPCL at least eight (8) days in advance of the exact

place, date and time of tendering the Material(s) for required inspection and provide free access to the Inspector(s) during normal working hours at Vendor’s or his/its sub-Suppliers’ works, and place at the disposal of the Inspector(s) all useful means for undertaking the Inspection, checking the results of tests performed, marking the Material(s), getting additional tests conducted and final stamping of the Material(s).

17.10 All tests will be performed at the Vendors’ expense and if required by the

Inspector(s), shall be conducted in accordance with the Inspector’s instructions. The Vendor shall also bear the expense for the preparation and rendering of tests required by the Boiler Inspectorate or other statutory testing or certifying agencies/institutions.

17.11 Unless otherwise specified, all charges for the Inspection shall be borne by the

Vendor.

17.12 BPCL may, at its own expense, have its representative(s) witness any test or inspection. In order to enable BPCL’s / UIPL’s representative(s) to witness the tests/inspections, the Vendor shall notify BPCL/UIPL at least 15 (fifteen) days in advance, of the schedule of all inspection hold points prior to the initiation of equipment fabrication. BPCL shall be notified eight (8) calendar days in advance of any changes in the schedule of inspection. BPCL will advise the Vendor in advance whether it intends to have its representative(s) be present at any of the inspections.

17.13 Even if the inspection and tests are fully carried out, the Vendor shall not be

absolved from its responsibilities to ensure that the Material(s), raw materials, components and other inputs are supplied strictly to conform and comply with all the requirements of the Contract at all stages, whether during manufacture and fabrication, or at the time of Delivery as on arrival at site and after its erection or start up or consumption, and during the defect liability period. The inspections and tests are merely intended to prima facie satisfy BPCL that the Material(s) and the parts and components comply with the requirements of the Contract.

17.14 The Vendor’s responsibility shall also not be anywise reduced or discharged

because BPCL or BPCL’s representative(s) or Inspector(s) shall have examined or commented on the Vendor’s drawings or specifications or shall have witnessed the tests or required any chemical or physical or other tests or shall have stamped or approved or certified any Material(s).

17.15 Unless otherwise specifically permitted by the Contract, no Material(s) shall be

dispatched for delivery or delivered under the Contract without being stamped or otherwise approved for delivery by the Inspector(s).

Page 31: UhdeIndia - Bharat Petroleum · Uhde India Private Limited, Dugal Plaza, 3 rd Floor, Prem Nagar, Bibwewadi Road, Pune 411 037, India TENDER RFQ / Tender No. : U6509 - 3187/ABM

Uhde India Pvt. Ltd.

Page 6 of 10

17.16 Notwithstanding approval by the Inspector(s), if on testing and/or inspection after

receipt of the Material(s) at Project Site, any Material(s) is/are found not to be in strict conformity with the contractual requirements or specifications, BPCL shall have the right to reject the same and hold the Vendor liable for non-performance of the Contract.

18.0 Bid Evaluation:

18.1 Where only Indian Bids are under comparison

Bids shall be evaluated on the basis net effective price (i.e. landed cost at site including all taxes and duties, freight charges and third party inspection charges (if applicable) minus CENVAT benefit / set off available to BPCL ).

18.2 Where only Foreign Bids are under comparison

Bids shall be evaluated on CIF port of entry basis including third party inspection charges (if applicable) considering ocean freight and marine insurance as 6% of FOB price for Europe /Japan/Asia and 9% of FOB price for Australia / American continent. In case of pipes where ever the supplier has not indicated stowage charges, 0.6% shall be loaded on the FOB price. CENVAT benefit / set off available to BPCL shall be considered during price evaluation.

18.3 Where Indian as well as Foreign Bids are under comparison

Domestic Bidders:

Bids shall be evaluated on the basis net effective price (i.e. landed cost at site including all taxes and duties, freight charges and third party inspection charges (if applicable) minus CENVAT benefit / set off available to BPCL ). Foreign Bidders:

Bids shall be evaluated on the basis of landed cost at Site including third party inspection charges by third party inspection agency (nominated by BPCL) if applicable

a) F.O.B. price quoted by the bidder (including stowage charges in case of pipes) b) Ocean freight and marine insurance as under: Europe / Japan / Asia : 6% of FOB price Australia / American Continent : 9% of FOB price

c) Prevailing rate of Customs duty calculated with Landing Charges @ 1% of CIF

Value d) C.V.D. at prevailing rate. ED Cess on CVD, Special Additional duty, as

applicable. e) Port handling charges @ 2% of FOB value f) Inland freight charges from Mumbai port(India) to project site(s) @2% of landed

cost, i.e., sl.no.(a )to (d)

g) Octroi charges as per prevailing rate, clearing charges etc.

Page 32: UhdeIndia - Bharat Petroleum · Uhde India Private Limited, Dugal Plaza, 3 rd Floor, Prem Nagar, Bibwewadi Road, Pune 411 037, India TENDER RFQ / Tender No. : U6509 - 3187/ABM

Uhde India Pvt. Ltd.

Page 7 of 10

h) In case of pipes, where the supplier has not indicated stowage charges, 0.6% shall be loaded to the FOB price.

Cenvat benefit available to BPCL shall be considered during price evaluation.

18.4 Inspection Charges:

Foreign bidders shall quote third party inspection charges separately. Third party inspection charges shall be considered for evaluation while arriving at Suppliers’ landed prices. TPI charges shall not be applicable for Indian vendors as the materials supplied by Indian vendors shall be inspected by UIPL. TPI if any for indigenous items decided by owner, charges will be borne by BPCL.

18.5 Other Conditions Related To The Bid Evaluation:

i. Canvassing in any form will make the bid liable for rejection. ii. Unsolicited clarifications to the offer and/or change in prices during its validity period would render the bid liable for outright rejection. iii. Bidders are advised to ensure that their bids are complete in all respects and conform to our terms, conditions and Bid Evaluation criteria (applicable only for press tenders / contracts) of RFQ. Bids not complying with Owner’s requirement may be rejected without seeking any clarifications. v. Bid should be complete covering the individual item wise total scope of work indicated in the Bid documents. vi. OWNER reserves the right to split the quantities / items of the RFQ / Tender while placement of order between more than one vendors as required. vii. OWNER also reserves the right to consolidate the quantities of RFQ / Tender where it is commercially prudent to place single order.

18.6 Foreign Exchange Rate: Foreign suppliers’ bid shall be compared considering Bill collection selling market rate of foreign exchange declared on the web site of Reserve Bank of India on the day of opening of Price Bids.

19.0 Technical and Commercial Loading

a) Basis of Loading

The Foreign Bids shall be loaded on FOB Port of Exit prices and the Indian Bids shall be loaded on FOT Dispatch Point prices.

b) Technical Loading: Technical loading , cost loading in respect of utilities etc., if applicable shall be considered as stipulated in technical specifications.

c) Commercial Loading:

i) Differential Payment Terms

Any differential payment terms offered by a supplier as against the terms specified in the GPC shall be loaded @ 14% simple interest per annum for the applicable period. In case a supplier asks for release of final payment (due after receipt and acceptance of materials) along with dispatch documents, loading for one month will be considered.

Page 33: UhdeIndia - Bharat Petroleum · Uhde India Private Limited, Dugal Plaza, 3 rd Floor, Prem Nagar, Bibwewadi Road, Pune 411 037, India TENDER RFQ / Tender No. : U6509 - 3187/ABM

Uhde India Pvt. Ltd.

Page 8 of 10

ii) Deviation to Performance Bank Guarantee (PBG) clause:

Performance Bank Guarantee by vendors (for 10% of order value) shall be furnished. However, for order value upto Rs. 10.00 lakh, PBG will not be applicable. In case a supplier offers to give a PBG for less than 10% of order value, or for a lesser period than what is provided in GPC / SPC / ITB loading shall be done for the differential amount and/ or the differential period.

For differential period/ amount loading, the following example will amplify the methodology (if GPC / SPC / ITB specifies 10% PBG/CPBG for 18 months):

For differential period : 10% for 18 months - No loading 10% for 12 months - 10% x 6/18 = 3.3% 10% for 6 months - 10% x 12/18 = 6.7% No PBG - 10 %

In case of Differential Amount Amount Offered by Bidder Loading a) 10% Nil b) Less than 10% Differential between the offered percentage and 10%

iii) DEVIATION TO PRICE REDUCTION CLAUSE:

i. In case a vendor does not accept the price reduction clause or takes exception to the percentage rate, loading shall be done to the extent of maximum of 5% of the order value or the differential percentage not agreed by the vendor.

ii. In case vendor takes an exception that price reduction in case of delayed

delivery should be restricted to 5% of delayed portion only and not on total order value, then price loading @ 5% shall be done.

iv) Freight charges:

Indian Suppliers shall quote firm freight charges up to destination by road transport. If a vendor does not quote freight charges, his offer shall be loaded with maximum freight charges as quoted by the other bidders or prorated (with respect to approx. distance) on maximum freight charges as quoted by the other bidders whichever is more.

v) Octroi Charges : Bidders to quote octroi charges in terms of % as applicable at

the time of bidding. If Octrai is not applicable, bidder shall clearly state “ Not Applicable” . If a bidder does not quote octroi charges or mentions only “As applicable”, his offer shall be loaded with maximum octroi charges as applicable/quoted by the other bidders.

vi) Material is required at BPCL warehouse/site on door delivery basis. Freight &

octroi shall be paid by the supplier. Freight shall be paid by BPCL as per Purchase Order conditions. Octroi will be reimbursed at actuals on documentary proof, subject to maximum Octroi charges as indicated in the price bids.

Page 34: UhdeIndia - Bharat Petroleum · Uhde India Private Limited, Dugal Plaza, 3 rd Floor, Prem Nagar, Bibwewadi Road, Pune 411 037, India TENDER RFQ / Tender No. : U6509 - 3187/ABM

Uhde India Pvt. Ltd.

Page 9 of 10

vii) Any differential in taxes and duties will be cost loaded on case to case basis. However, if a supplier states that taxes/duties are not applicable at present and will be charged as applicable at the time of delivery then his bid shall be loaded by the maximum rate of taxes/duties applicable as on the date of price valuation.

20.0 FORMAT FOR SUBMITTING PRICE Bidders shall submit itemized price sheet as per the format given in a soft copy (excel file).

“ALL BIDDERS MUST SUBMIT THEIR PRICE BIDS ALONG WITH ALL THE SHEETS IN

ORIGINAL. ALL SHEETS INCUDING ANY ATTACHMENTS ETC. MUST BE SIGNED AND

STAMPED ON ALL THE PAGES AND THE ENVELOPE MUST BE SEALED WITH

ADHESIVE ON ALL THE SIDES. NON COMPLIANCE TO THIS CONDITION SHALL

RESULT IN REJECTION OF OFFER.”

In addition to the itemized price sheet bidders shall indicated following details in the price bid on a separate sheet.

a) INDIAN VENDORS:

Sr. No.

Description

1 Packing & forwarding charges Included

2 Excise Duty @ _____%

3 CST @_________% OR MVAT @ _________%

4 Octroi @________ % (in terms of percentage)

5 Octroi service charges @ _____ % of Octroi amount

6 Transportation charges Included

7 Sales Tax @ ______% applicable on transportation charges

8 Excise Duty @ ______% applicable on transportation charges

b) FOREIGN VENDORS:

Sr. No.

Description

1 Price basis for rates indicated in itemized price sheet: FOB, port of shipment basis as per INCO terms 2000.

2 Third Party Inspection Charges

3 Any other charges (if applicable), not covered herein above.

The bidder shall include in his price, the cost of all documentation as per the enquiry specifications. All necessary statutory Licensed, approvals, etc. for the manufacture and supply, shall be vendor’s responsibility at no extra cost to the purchaser. 21.0 INTERPRETATION OF CONTRACT DOCUMENTS

Page 35: UhdeIndia - Bharat Petroleum · Uhde India Private Limited, Dugal Plaza, 3 rd Floor, Prem Nagar, Bibwewadi Road, Pune 411 037, India TENDER RFQ / Tender No. : U6509 - 3187/ABM

Uhde India Pvt. Ltd.

Page 10 of 10

21.1 The several Contract Documents forming the Contract are to be read together as a whole and are to be taken as mutually explanatory.

21.2 Should there be any doubt or ambiguity in the interpretation of the Contract

Documents or in any of them, the Vendor shall prior to commencing the relative supply or work for supply under the Contract apply in writing to BPCL for resolution of the doubt or ambiguity. Should the Vendor fail to apply to BPCL within 7 days from the date of receipt of the Order for its clarification as aforesaid, the Vendor shall perform the relative work and/or make the relative supply at his own risk.

21.3 Any item of supply or service relative thereto shown, indicated or included by

expression or implication in any document forming part of the Contract shall be deemed to form part of the Scope of Supply with the intent that the indication or inclusion of the supply or service within any of the said documents shall be a sufficient indication of the Scope of Supply or service covered by the Contract.

21.4 No verbal agreement or assurance, representation or understanding given by

any employee or officer of BPCL/UIPL or so understood by the Vendor shall anywise bind BPCL or alter the Contract Documents unless specifically given in writing and signed by or on behalf of BPCL as an Agreed Variation to the relative term(s) in the Contract Document(s).

21.5 Clause headings given in this or any other Contract Documents are intended only

as a general guide for convenience in reading and segregating the general subject of the various clauses, but shall not govern the meaning or import of the clauses there under appearing or confine or otherwise affect the interpretation thereof.

22.0 IRRECONCILABLE CONFLICTS

In the event of an irreconcilable conflict between the provision of General Purchase Conditions and/or the Special Purchase Conditions and/or Addendum (s) and/or the Agreed Variations to the Tender Documents and/or the Purchase Order and/or between any of the other said documents so that the conflicting provision(s) cannot co-exist, to the extent of such irreconcilable conflict, the following order of precedence shall apply so that the conflicting provision(s) in the document lower in the order of precedence set out below shall give way to the conflicting provision(s) in the document higher in the order of precedence, namely: (i) Purchase Order; (ii) Addendum(s) / Addenda (s) to the Tender Document; (iii) Special Purchase Conditions; (iv) General Purchase Conditions; (v) Other Contract Documents.

Page 36: UhdeIndia - Bharat Petroleum · Uhde India Private Limited, Dugal Plaza, 3 rd Floor, Prem Nagar, Bibwewadi Road, Pune 411 037, India TENDER RFQ / Tender No. : U6509 - 3187/ABM
Page 37: UhdeIndia - Bharat Petroleum · Uhde India Private Limited, Dugal Plaza, 3 rd Floor, Prem Nagar, Bibwewadi Road, Pune 411 037, India TENDER RFQ / Tender No. : U6509 - 3187/ABM
Page 38: UhdeIndia - Bharat Petroleum · Uhde India Private Limited, Dugal Plaza, 3 rd Floor, Prem Nagar, Bibwewadi Road, Pune 411 037, India TENDER RFQ / Tender No. : U6509 - 3187/ABM
Page 39: UhdeIndia - Bharat Petroleum · Uhde India Private Limited, Dugal Plaza, 3 rd Floor, Prem Nagar, Bibwewadi Road, Pune 411 037, India TENDER RFQ / Tender No. : U6509 - 3187/ABM
Page 40: UhdeIndia - Bharat Petroleum · Uhde India Private Limited, Dugal Plaza, 3 rd Floor, Prem Nagar, Bibwewadi Road, Pune 411 037, India TENDER RFQ / Tender No. : U6509 - 3187/ABM
Page 41: UhdeIndia - Bharat Petroleum · Uhde India Private Limited, Dugal Plaza, 3 rd Floor, Prem Nagar, Bibwewadi Road, Pune 411 037, India TENDER RFQ / Tender No. : U6509 - 3187/ABM
Page 42: UhdeIndia - Bharat Petroleum · Uhde India Private Limited, Dugal Plaza, 3 rd Floor, Prem Nagar, Bibwewadi Road, Pune 411 037, India TENDER RFQ / Tender No. : U6509 - 3187/ABM
Page 43: UhdeIndia - Bharat Petroleum · Uhde India Private Limited, Dugal Plaza, 3 rd Floor, Prem Nagar, Bibwewadi Road, Pune 411 037, India TENDER RFQ / Tender No. : U6509 - 3187/ABM
Page 44: UhdeIndia - Bharat Petroleum · Uhde India Private Limited, Dugal Plaza, 3 rd Floor, Prem Nagar, Bibwewadi Road, Pune 411 037, India TENDER RFQ / Tender No. : U6509 - 3187/ABM
Page 45: UhdeIndia - Bharat Petroleum · Uhde India Private Limited, Dugal Plaza, 3 rd Floor, Prem Nagar, Bibwewadi Road, Pune 411 037, India TENDER RFQ / Tender No. : U6509 - 3187/ABM
Page 46: UhdeIndia - Bharat Petroleum · Uhde India Private Limited, Dugal Plaza, 3 rd Floor, Prem Nagar, Bibwewadi Road, Pune 411 037, India TENDER RFQ / Tender No. : U6509 - 3187/ABM
Page 47: UhdeIndia - Bharat Petroleum · Uhde India Private Limited, Dugal Plaza, 3 rd Floor, Prem Nagar, Bibwewadi Road, Pune 411 037, India TENDER RFQ / Tender No. : U6509 - 3187/ABM
Page 48: UhdeIndia - Bharat Petroleum · Uhde India Private Limited, Dugal Plaza, 3 rd Floor, Prem Nagar, Bibwewadi Road, Pune 411 037, India TENDER RFQ / Tender No. : U6509 - 3187/ABM
Page 49: UhdeIndia - Bharat Petroleum · Uhde India Private Limited, Dugal Plaza, 3 rd Floor, Prem Nagar, Bibwewadi Road, Pune 411 037, India TENDER RFQ / Tender No. : U6509 - 3187/ABM
Page 50: UhdeIndia - Bharat Petroleum · Uhde India Private Limited, Dugal Plaza, 3 rd Floor, Prem Nagar, Bibwewadi Road, Pune 411 037, India TENDER RFQ / Tender No. : U6509 - 3187/ABM
Page 51: UhdeIndia - Bharat Petroleum · Uhde India Private Limited, Dugal Plaza, 3 rd Floor, Prem Nagar, Bibwewadi Road, Pune 411 037, India TENDER RFQ / Tender No. : U6509 - 3187/ABM

Comm Questionnaire –Imp (66-6509) Page 1 of 3

Commercial Questionnaire (FOR IMPORTED MATERIALS AND EQUIPMENT)

Project No.: 66-6509 Client: Bharat Petroleum Corporation Limited

Vendor Name: M/s. _______________________________________________________________

Enquiry No.______________________________________________________________________

Vendor’s Offer Ref. No. : ___________________________________________________________

Tel No. ____________________________________ Fax No._____________________________

Contact Person : ______________________________E-Mail _____________________________

1. DULY SIGNED & STAMPED COPIES OF THIS “QUESTIONNAIRE”, WITH ALL THE CLAUSES

DULY CONFIRMED/ PRECISELY REPLIED TO BY THE VENDOR, SHALL BE ENCLOSED WITH EACH AND EVERY SET OF VENDOR'S UNPRICED QUOTATION.

2. FAILURE ON THE PART OF VENDOR IN NOT RETURNING THIS DULY FILLED-UP

"QUESTIONNAIRE WITH ALL THE SETS OF UNPRICED QUOTATION AND/OR SUBMITTING INCOMPLETE REPLIES MAY LEAD TO REJECTION OF VENDOR'S QUOTATION”.

S. No.

DESCRIPTION VENDOR’S CONFIRMATION

1 Bid Validity period: Confirm Offer validity of Four Months from final bid due date.

Confirmed / Not Confirmed refer deviation sheet

2

Delivery Period:

Please quote earliest firm Delivery period on FOB International Port of Exit basis from the date of Fax of Acceptance only.

Indicate approximate sailing period from port of exit to port of destination.

Quoted delivery period: _______ weeks FOB International Port of Exit basis from the date of fax of acceptance.

Approximate sailing period from port of exit to port of destination:______________

(A) If the bidder is authorized representative / trader / stockist of manufacturer then bidder shall furnish the details of pipe manufacturer from whom the pipes are being offered.

_________________________________________________________________ / Not Applicable as a manufacturer

3

(B) Confirm acceptance to Scope of Inspection document. Confirmed

4 Confirm that the prices have been furnished as per “Format For Submitting Price” indicated in Special Purchase Conditions (SPC)

Furnished / Not furnished refer deviation sheet

5

All bidders must submit their price bids along with all the sheets in original. All sheets including any attachments etc. Must be signed and stamped on all the pages and the envelope must be sealed with adhesive on all the sides. Non compliance to this condition shall result in rejection of offer.

Noted & Confirmed

6 Currency of Quote: Furnish the currency of quote.

Currency of Quote:

__________________________

7 Indicate name, address, telephone nos., fax nos., e-mail address of your Banker for L/C opening

Page 52: UhdeIndia - Bharat Petroleum · Uhde India Private Limited, Dugal Plaza, 3 rd Floor, Prem Nagar, Bibwewadi Road, Pune 411 037, India TENDER RFQ / Tender No. : U6509 - 3187/ABM

Comm Questionnaire –Imp (66-6509) Page 2 of 3

S. No.

DESCRIPTION VENDOR’S CONFIRMATION

8 Indicate manufacturer’s name and address

9 Country of Origin: Indicate country of origin from where the goods have been offered.

Country of Origin:

__________________________

10 Indicate mode of shipment Sea / Air

11 Indicate International Port of Exit.

Material shall be despatched

from :____________________

Country:____________________

12 Indicate approximate shipping weight (net and gross) & volume of the consignment.

Approximate shipping weight:

Volume: _______________

13

Expected number of days for Supervision of erection & commissioning: On-site training:

_____ Days / Not applicable

______ Days / Not applicable

14 Bidders to submit entire tender document duly signed & stamped on each page.

Submitted

15 All deviations to Technical Specifications have been indicated on a separate deviation sheet. Any deviations indicated in bid elsewhere other than Deviation Sheet shall not be acceptable.

Confirmed

16

All deviations to Tender Commercial Conditions (Appendix1, ITB, GPC, SPC, GCC) have been indicated on a separate deviation sheet as per the format indicated in ITB. Any deviation indicated in bid elsewhere other than Deviation Sheet shall not be acceptable.

Confirmed

17 Any additional terms and conditions not mentioned in deviations list shall not be acceptable.

Confirmed

18 Price bid and price implications (if any) shall indicate only prices. Any terms and conditions mentioned in price bid / price implications shall not be acceptable.

Confirmed

19

Whether any of the Directors of Vendor is a relative of any Director of BPCL/UIPL or the vendor is a firm in which any Director of BPCL/UIPL or his relative is a Partner or the vendor is a private company in which any director of BPCL/UIPL is a member or Director.

YES / NO

Page 53: UhdeIndia - Bharat Petroleum · Uhde India Private Limited, Dugal Plaza, 3 rd Floor, Prem Nagar, Bibwewadi Road, Pune 411 037, India TENDER RFQ / Tender No. : U6509 - 3187/ABM

Comm Questionnaire –Imp (66-6509) Page 3 of 3

S. No.

DESCRIPTION VENDOR’S CONFIRMATION

20

Please confirm you have not been placed on black list or holiday list declared by Bharat Petroleum Corporation Limited or Uhde India Pvt. Limited. Please confirm that you have filled in, signed and attached the enclosed "Proforma of Declaration of Black Listing / Holiday Listing" along with your unpriced offer.

Not black listed or put on holiday list.

Black listed or Put on holiday list as indicated in Declaration of Black Listing / Holiday Listing

Furnished

21 Confirm readiness for signing of integrity pact without any deviations in the event of placement of order.

Confirmed

22

Printed terms and conditions, if any, appearing in quotation, shall not be applicable in the event of order. In case of contradiction between the confirmations given above and terms & conditions mentioned elsewhere in the offer, the confirmation given herein above shall prevail.

Confirmed & Accepted

(Signature of Vendor with Company seal)

Name of the Authorised Signatory :

Designation :

Date :

Page 54: UhdeIndia - Bharat Petroleum · Uhde India Private Limited, Dugal Plaza, 3 rd Floor, Prem Nagar, Bibwewadi Road, Pune 411 037, India TENDER RFQ / Tender No. : U6509 - 3187/ABM

Comm Questionnaire –Ind (66-6509) Page 1 of 2

Commercial Questionnaire (FOR INDIGENOUS MATERIALS AND EQUIPMENT)

Project No.: 66-6509 Client: Bharat Petroleum Corporation Limited

Vendor Name: M/s. _______________________________________________________________

Enquiry No.__________________________________________________________________

Vendor’s Offer Ref. No. : ___________________________________________________________

Tel No. ____________________________________ Fax No._____________________________

Contact Person : ______________________________E-Mail _____________________________

1. DULY SIGNED & STAMPED COPIES OF THIS “QUESTIONNAIRE”, WITH ALL THE CLAUSES

DULY CONFIRMED/ PRECISELY REPLIED TO BY THE VENDOR, SHALL BE ENCLOSED WITH EACH AND EVERY SET OF VENDOR'S UNPRICED QUOTATION.

2. FAILURE ON THE PART OF VENDOR IN NOT RETURNING THIS DULY FILLED-UP

"QUESTIONNAIRE WITH ALL THE SETS OF UNPRICED QUOTATION AND/OR SUBMITTING INCOMPLETE REPLIES MAY LEAD TO REJECTION OF VENDOR'S QUOTATION”.

S.No. DESCRIPTION VENDOR’S CONFIRMATION

1 Bid Validity: Bids shall remain valid for FOUR months after the deadline for bid submission.

Confirmed / Not Confirmed refer deviation sheet

2

Delivery Period:

Please confirm shortest delivery period from the date of Fax of Acceptance only.

Quoted delivery period: _______ delivered at site from the date of LOI / FOI

(A) If the bidder is authorized representative / trader / stockist of manufacturer then bidder shall furnish the details of pipe manufacturer from whom the pipes are being offered.

_________________________________________________________________ / Not Applicable as a manufacturer 3

(B) Confirm acceptance to Scope of Inspection document. Confirmed

4 Prices have been furnished as per “Format For Submitting Price” indicated in Special Purchase Conditions (SPC)

Furnished / Not furnished refer deviation sheet

5

All bidders must submit their price bids along with all the sheets in original. All sheets including any attachments etc. Must be signed and stamped on all the pages and the envelope must be sealed with adhesive on all the sides. Non compliance to this condition shall result in rejection of offer.

Noted & Confirmed

6 Specify Despatch Point

Material shall be despatched from :____________________

State:____________________

7 Bidders to confirm that no other taxes & duties are applicable on transportation charges.

Applicable _________ % / Not applicable

8

Octroi Charges: Bidders to quote octroi charges in terms of % as applicable current rate.

Octroi service charges - Bidders to quote as % of octroi charges, if applicable.

Applicable __________ % /

Not applicable

Applicable _______ % of Octroi / Not applicable

Page 55: UhdeIndia - Bharat Petroleum · Uhde India Private Limited, Dugal Plaza, 3 rd Floor, Prem Nagar, Bibwewadi Road, Pune 411 037, India TENDER RFQ / Tender No. : U6509 - 3187/ABM

Comm Questionnaire –Ind (66-6509) Page 2 of 2

S.No. DESCRIPTION VENDOR’S CONFIRMATION

9

Excise Duty: a. Tarrif sub heading no. b. Present rate of Excise Duty payable extra on finished

products (including spares). c. Maximum rate applicable (If present rate is nil or

concessional)

10 Sales tax payable extra, Specify CST/ MVAT and the present rate applicable

CST: ________% against form C

MVAT:_________%

11 Bidders to submit entire tender document duly signed & stamped on each page.

Submitted

12 All deviations to Technical Specifications have been indicated on a separate deviation sheet. Any deviations indicated in bid elsewhere other than Deviation Sheet shall not be acceptable.

Confirmed

13

All deviations to Tender Commercial Conditions (Appendix1, ITB, GPC, SPC, GCC) have been indicated on a separate deviation sheet as per the format indicated in ITB. Any deviation indicated in bid elsewhere other than Deviation Sheet shall not be acceptable.

Confirmed

14 Any additional terms and conditions not mentioned in deviations list shall not be acceptable.

Confirmed

15 Price bid and price implications (if any) shall indicate only prices. Any terms and conditions mentioned in price bid / price implications shall not be acceptable.

Confirmed

16

Whether any of the Directors of Vendor is a relative of any Director of BPCL/UIPL or the vendor is a firm in which any Director of BPCL/UIPL or his relative is a Partner or the vendor is a private company in which any director of BPCL/UIPL is a member or Director.

YES / NO

17

Please confirm you have not been placed on black list or holiday list declared by Bharat Petroleum Corporation Limited or Uhde India Pvt. Limited. Please confirm that you have filled in, signed and attached the enclosed "Proforma of Declaration of Black Listing / Holiday Listing" along with your unpriced offer.

Not black listed or put on holiday list.

Black listed or Put on holiday list as indicated in Declaration of Black Listing / Holiday Listing

Furnished

18 Confirm readiness for signing of integrity pact without any deviations in the event of placement of order.

Confirmed

19

Printed terms and conditions, if any, appearing in quotation, shall not be applicable in the event of order. In case of contradiction between the confirmations given above and terms & conditions mentioned elsewhere in the offer, the confirmation given herein above shall prevail.

Confirmed & Accepted

(Signature of Vendor with Company seal)

Name of the Authorised Signatory :

Designation :

Date :

Page 56: UhdeIndia - Bharat Petroleum · Uhde India Private Limited, Dugal Plaza, 3 rd Floor, Prem Nagar, Bibwewadi Road, Pune 411 037, India TENDER RFQ / Tender No. : U6509 - 3187/ABM

INTEGRITY PACT

Between

Bharat Petroleum Corporation Limited (BPCL) hereinafter referred to as "The Principal",

And ……………………….. hereinafter referred to as "The Bidder/Contractor/Supplier"

Preamble The Principal intends to award, under laid down organization procedures, contract/s for ……………….. The Principal values full compliance with all relevant laws and regulations, and the principles of economic use of resources, and of fairness and transparency in its relations with its Bidder/s, Contractor/s and Supplier/s. In order to achieve these goals, the Principal cooperates with the renowned international Non-Governmental Organisation "Transparency International" (TI). Following TI's national and international experience, the Principal will appoint an Independent External Monitor who will monitor the tender process and the execution of the contract for compliance with the principles mentioned above.

Section 1 - Commitments of the Principal (1) The Principal commits itself to take all measures necessary to prevent corruption and to

observe the following principles:

a) No employee of the Principal, personally or through family members, will in connection with the tender, or the execution of the contract, demand, take a promise for or accept, for himself/herself or third person, any material or immaterial benefit which he/she is not legally entitled to.

b) The Principal will, during the tender process, treat all Bidders with equity and

reason. The Principal will, in particular, before and during the tender process, provide to all Bidders the same information and will not provide to any Bidder confidential / additional information through which the Bidder could obtain an advantage in relation to the tender process or the contract execution.

c) The Principal will exclude from the process all known prejudiced persons.

(2) If the Principal obtains information on the conduct of any of its employees which is a

criminal offence under the relevant Anti-Corruption Laws of India, or if there be a substantive suspicion in this regard, the Principal will inform its Vigilance Office and in addition can initiate disciplinary actions.

Section 2 - Commitments of the Bidder / Contractor/Supplier (1) The Bidder / Contractor/Supplier commits itself to take all measures necessary to

prevent corruption. He commits himself to observe the following principles during his participation in the tender process and during the contract execution.

a) The Bidder / Contractor/Supplier will not, directly or through any other person or

firm, offer, promise or give to any of the Principal's employees involved in the tender process or the execution of the contract or to any third person, any material or immaterial benefit which he/she is not legally entitled to, in order to

Page 57: UhdeIndia - Bharat Petroleum · Uhde India Private Limited, Dugal Plaza, 3 rd Floor, Prem Nagar, Bibwewadi Road, Pune 411 037, India TENDER RFQ / Tender No. : U6509 - 3187/ABM

obtain in exchange, any advantage of any kind whatsoever during the tender process or during the execution of the contract.

b) The Bidder / Contractor/Supplier will not enter with other Bidders into any

undisclosed agreement or understanding, whether formal or informal. This applies in particular to prices, specifications, certifications, subsidiary contracts, submission or non-submission of bids or any other actions to restrict competitiveness or to introduce cartelisation in the bidding process.

c) The Bidder / Contractor/Supplier will not commit any offence under the relevant

Anti-Corruption Laws of India; further the Bidder / Contractor/Supplier will not use improperly, for purposes of competition or personal gain, or pass on to others, any information or document provided by the Principal as part of the business relationship, regarding plans, technical proposals and business details, including information contained or transmitted electronically.

d) The Bidder / Contractor/Supplier will, when presenting his bid, disclose any and

all payments he has made, is committed to, or intends to make to agents, brokers or any other intermediaries in connection with the award of the contract.

(2) The Bidder / Contractor/Supplier will not instigate third persons to commit offences

outlined above or be an accessory to such offences.

Section 3 - Disqualification from tender process and exclusion from future contracts If the Bidder, before contract award, has committed a transgression through a violation of Section 2 or in any other form such as to put his reliability or credibility as Bidder into question, the Principal is entitled to disqualify the Bidder from the tender process or to terminate the contract, if already signed, for such reason. (1) If the Bidder/Contractor/Supplier has committed a transgression through a violation of

Section 2 such as to put his reliability or credibility into question, the Principal is also entitled to exclude the Bidder / Contractor/Supplier from future contract award processes. The imposition and duration of the exclusion will be determined by the severity of the transgression. The severity will be determined by the circumstances of the case, in particular the number of transgressions, the position of the transgressors within the company hierarchy of the Bidder and the amount of the damage. The exclusion will be imposed for a minimum of 6 months and maximum of 3 years.

(2) A transgression is considered to have occurred if the Principal after due consideration of

the available evidences, concludes that no reasonable doubt is possible. (3) The Bidder accepts and undertakes to respect and uphold the Principal's absolute right

to resort to and impose such exclusion and further accepts and undertakes not to challenge or question such exclusion on any ground, including the lack of any hearing before the decision to resort to such exclusion is taken. This undertaking is given freely and after obtaining independent legal advice.

(4) If the Bidder / Contractor/Supplier can prove that he has restored / recouped the damage

caused by him and has installed a suitable corruption prevention system, the Principal may revoke the exclusion prematurely.

Section 4 - Compensation for Damages (1) If the Principal has disqualified the Bidder from the tender process prior to the award

according to Section 3, the Principal is entitled to demand and recover from the Bidder liquidated damages equivalent to Earnest Money Deposit/Bid Security.

Page 58: UhdeIndia - Bharat Petroleum · Uhde India Private Limited, Dugal Plaza, 3 rd Floor, Prem Nagar, Bibwewadi Road, Pune 411 037, India TENDER RFQ / Tender No. : U6509 - 3187/ABM

(2) If the Principal has terminated the contract according to Section 3, or if the Principal is

entitled to terminate the contract according to Section 3, the Principal shall be entitled to demand and recover from the Contractor/Supplier liquidated damages equivalent to Security Deposit / Performance Bank Guarantee.

(3) The Bidder agrees and undertakes to pay the said amounts without protest or demur

subject only to condition that if the Bidder / Contractor/Supplier can prove and establish that the exclusion of the Bidder from the tender process or the termination of the contract after the contract award has caused no damage or less damage than the amount of the liquidated damages, the Bidder / Contractor/Supplier shall compensate the Principal only to the extent of the damage in the amount proved.

Section 5 - Previous Transgression (1) The Bidder declares that no previous transgression occurred in the last 3 years with any

other Company in any country conforming to the TI approach or with any other Public Sector Enterprise in India that could justify his exclusion from the tender process.

(2) If the Bidder makes incorrect statement on this subject, he can be disqualified from the

tender process or the contract, if already awarded, can be terminated for such reason.

Section 6 - Equal treatment of all Bidders / Contractors /Suppliers/ Subcontractors (1) The Bidder/Contractor/Supplier undertakes to demand from all subcontractors a

commitment in conformity with this Integrity Pact, and to submit it to the Principal before contract signing.

(2) The Principal will enter into agreements with identical conditions as this one with all

Bidders, Contractors/Suppliers and Subcontractors. (3) The Principal will disqualify from the tender process all Bidders who do not sign this Pact

or violate its provisions.

Section 7 – Punitive Action against violating Bidders / Contractors /

Suppliers/Subcontractors If the Principal obtains knowledge of conduct of a Bidder, Contractor, Supplier or Subcontractor, or of an employee or a representative or an associate of a Bidder, Contractor, Supplier or Subcontractor which constitutes corruption, or if the Principal has substantive suspicion in this regard, the Principal will inform the Vigilance Office.

Section 8 - Independent External Monitors

(1) The Principal has appointed competent and credible Independent External Monitors for

this Pact. The task of the Monitor is to review independently and objectively, whether and to what extent the parties comply with the obligations under this agreement.

(2) The Monitor is not subject to instructions by the representatives of the parties and

performs his functions neutrally and independently. He reports to the Chairperson of the Board of the Principal.

(3) The Bidder/Contractor/Supplier accepts that the Monitor has the right to access without

restriction to all Project documentation of the Principal including that provided by the Bidder/Contractor/Supplier. The Bidder/Contractor/Supplier will also grant the Monitor, upon his request and demonstration of a valid interest, unrestricted and unconditional

Page 59: UhdeIndia - Bharat Petroleum · Uhde India Private Limited, Dugal Plaza, 3 rd Floor, Prem Nagar, Bibwewadi Road, Pune 411 037, India TENDER RFQ / Tender No. : U6509 - 3187/ABM

access to this project documentation. The same is applicable to Subcontractors. The Monitor is under contractual obligation to treat the information and documents of the Bidder/Contractor/Supplier/ Subcontractor with confidentially.

(4) The Principal will provide to the Monitor sufficient information about all meetings among

the parties related to the Project provided such meetings could have an impact on the contractual relations between the Principal and the Bidder/Contractor/Supplier. The parties offer to the Monitor the option to participate in such meetings.

(5) As soon as the Monitor notices, or believes to notice, a violation of this agreement, he

will so inform the Management of the Principal and request the Management to discontinue or heal the violation, or to take other relevant action. The Monitor can in this regard submit non-binding recommendation. Beyond this, the Monitor has no right to demand from the parties that they act in a specific manner, refrain from action or tolerate action. However, the Independent External Monitor shall give an opportunity to the Bidder/Contractor/Supplier to present its case before making its recommendations to the Principal.

(6) The Monitor will submit a written report to the Chairperson of the Board of the Principal

within 8 to 10 weeks from the date of reference or intimation to him by the 'Principal' and, should the occasion arise, submit proposals for correcting problematic situations.

(7) If the Monitor has reported to the Chairperson of the Board a substantiated suspicion of

an offence under relevant Anti-Corruption Laws of India, and the Chairperson has not, within reasonable time, taken visible action to proceed against such offence or reported it to the Vigilance Office, the Monitor may also transmit this information directly to the Central Vigilance Commissioner, Government of India.

(8) The word 'Monitor' would include both singular and plural.

Section 9 - Pact Duration This Pact begins when both parties have legally signed it. It expires for the Contractor/Supplier 12 months after the last payment under the respective contract, and for all other Bidders 6 months after the contract has been awarded. If any claim is made / lodged during this time, the same shall be binding and continue to be valid despite the lapse of this pact as specified above, unless it is discharged / determined by Chairperson of the Principal.

Page 60: UhdeIndia - Bharat Petroleum · Uhde India Private Limited, Dugal Plaza, 3 rd Floor, Prem Nagar, Bibwewadi Road, Pune 411 037, India TENDER RFQ / Tender No. : U6509 - 3187/ABM

Section 10 - Other provisions (1) This agreement is subject to Indian Law. Place of performance and jurisdiction is the

Registered Office of the Principal, i.e. Mumbai. The Arbitration clause provided in the main tender document / contract shall not be applicable for any issue / dispute arising under Integrity Pact.

(2) Changes and supplements as well as termination notices need to be made in writing.

Side agreements have not been made. (3) If the Bidder/Contractor/Supplier is a partnership or a consortium, this agreement must

be signed by all partners or consortium members. (4) Should one or several provisions of this agreement turn out to be invalid, the remainder

of this agreement remains valid. In this case, the parties will strive to come to an agreement to their original intentions.

……………………… ………………………………….. For the Principal For the Bidder/Contractor/ Supplier Place ……………… Witness 1 : …………………. (Signature/Name/Address) Date ………………. Witness 2 : …………………. (Signature/Name/Address)

Page 61: UhdeIndia - Bharat Petroleum · Uhde India Private Limited, Dugal Plaza, 3 rd Floor, Prem Nagar, Bibwewadi Road, Pune 411 037, India TENDER RFQ / Tender No. : U6509 - 3187/ABM
Page 62: UhdeIndia - Bharat Petroleum · Uhde India Private Limited, Dugal Plaza, 3 rd Floor, Prem Nagar, Bibwewadi Road, Pune 411 037, India TENDER RFQ / Tender No. : U6509 - 3187/ABM

6509-PI-EB-00002 BPCL UAN

Total Pages

ENGINEERING SPECIFICATION FOR PIPING MATERIALS

66-6509-700

2 of

107

© 2010 Uhde India

APPLICABLE LICENSOR’S DOCUMENTS

Standard No.

Title Pages

IN-042.0 Standard material specification: Carbon steel for pressure vessels. (Application to Plain carbon steel and Carbon steel with clad or overlay)

19

IN-42.1 Standard material specification : Low alloy steel for pressure vessel (Application to 1 ¼ Cr-1/2 Mo and 1 1/4Cr-1/2Mo with clad or overlay)

13

IN-043 Standard material specification for Wet H2S services ( Application to Carbon Steels)

14

Page 63: UhdeIndia - Bharat Petroleum · Uhde India Private Limited, Dugal Plaza, 3 rd Floor, Prem Nagar, Bibwewadi Road, Pune 411 037, India TENDER RFQ / Tender No. : U6509 - 3187/ABM

6509-PI-EB-00002 BPCL UAN

Total Pages

ENGINEERING SPECIFICATION FOR PIPING MATERIALS

66-6509-700

3 of

107

© 2010 Uhde India

Index 1. Scope 2. Definitions

3. Codes and Standards

3.1 Design 3.2 Manufacturing 3.3 Dimensional 3.4 Testing

4. Components 4.1 Piping Identification System 4.2 Pipe Class Definition 4.3 Fluid and Category 4.4 Pipe 4.5 Fittings 4.6 Flanges 4.7 Gaskets 4.8 Fasteners 4.9 Gate / Globe / Check / Needle / Ball / Butterfly Valves 4.10 Spectacle Blinds, Paddle Blanks and Spacers and Blinds for Pressure Testing 4.11 Sight Flow Indicators 4.12 Y-Strainers and T-Strainers 4.13 Fabricated Special Parts 4.14 Document Submission 4.15 Guarantee 4.16 Maintenance Spares 4.17 List of recommended foundries for valve castings 4.18 Body / Seat Test Pressure for Valves, Strainers and Sight Glasses 4.19 By-pass arrangement for valves 4.20 Compliance Sheet

5. Requirements in “HIC Resistant Steels” 5.1. Pipe 5.2. Fittings 5.3. Flanges 5.4. Gaskets 5.5. Fasteners 5.6. Gate / Globe / Check / Needle / Ball / Butterfly Valves 5.7. Spectacle Blinds, Paddle Blanks and Spacers and Blinds for Pressure Testing 5.8. Piping Speciality Items

5.8.1. Sight Flow Indicators 5.8.2. Y-Strainers and T-Strainers 5.8.3. Fabricated Special Parts

5.9. Tests – Hardness and Corrosion 5.10. Post Order Production Tests

6. Requirements in “Hydrogen service”

7. Requirements for Low Alloy Steel and Stainless Steel components

Page 64: UhdeIndia - Bharat Petroleum · Uhde India Private Limited, Dugal Plaza, 3 rd Floor, Prem Nagar, Bibwewadi Road, Pune 411 037, India TENDER RFQ / Tender No. : U6509 - 3187/ABM

6509-PI-EB-00002 BPCL UAN

Total Pages

ENGINEERING SPECIFICATION FOR PIPING MATERIALS

66-6509-700

4 of

107

© 2010 Uhde India

8. Requirements for Cement Lined Piping (Later)

9. Heat Treatment

10. Tests and Examination

11. Inspection

12. Positive Material Identification

13. Reports and Certificates

14. Marking

15. Packing and Shipment

16. Substitutions

17. Non destructive Testing (Site)

18. Bolt Torquing and Hot Bolting

19. Abbreviations

20. Restrictions

Page 65: UhdeIndia - Bharat Petroleum · Uhde India Private Limited, Dugal Plaza, 3 rd Floor, Prem Nagar, Bibwewadi Road, Pune 411 037, India TENDER RFQ / Tender No. : U6509 - 3187/ABM

6509-PI-EB-00002 BPCL UAN

Total Pages

ENGINEERING SPECIFICATION FOR PIPING MATERIALS

66-6509-700

5 of

107

© 2010 Uhde India

1. SCOPE 1.1 This specification includes the Part 1 of UIPL Piping specification document no. 6509-PI-EC-00001. The

applicable sections of this document are clearly highlighted. 1.2 This specification uses the definition of piping line classes described in M/s. AXENS FEED document

“Process Data Book”, Chapter 6-specification of this project. Deviation, if any shall be highlighted and AXENS approval shall be obtained on the same.

1.3 This specification covers the supplementary requirements to all the piping classes and component data

by making use of M/s. AXENS Standard Material specifications as listed in “Applicable Licensor’s Documents’ in the Index.

1.4 This specification covers the design, manufacturing, fabrication, testing, inspection, certification,

marking, shipping and brief purchase requirements for components and it supplements the purchase descriptions in the purchase orders. These requirements shall form part of the inquiry and purchase order.

1.5 The bidders of piping components to note, the Chapters 1, 2, and 3 are information only. 1.6 For all the bidders, who happen to be traders, it is mandatory for the bidder to provide, at the time of

offer, the complete execution philosophy and strategy in case of order placement. E.g. For welded pipes, the source of plates, rolling mill, welding shop NDE shall be enclosed as a part of offer. Failing to comply with the above requirement, the bidder’s offer shall be disqualified.

Page 66: UhdeIndia - Bharat Petroleum · Uhde India Private Limited, Dugal Plaza, 3 rd Floor, Prem Nagar, Bibwewadi Road, Pune 411 037, India TENDER RFQ / Tender No. : U6509 - 3187/ABM

6509-PI-EB-00002 BPCL UAN

Total Pages

ENGINEERING SPECIFICATION FOR PIPING MATERIALS

66-6509-700

6 of

107

© 2010 Uhde India

2. DEFINITIONS

For the purpose of understanding of this specification, the following definitions apply:

Category D Fluid Service As defined in ASME B31.3 and indicated in the Project Line List – Fluid Category “D”

Normal Fluid Service As defined in ASME B31.3 and indicated in the Project Line List – Fluid Category “NF” HIC Resistant Steels Process streams associated with AXENS pipe classes defined with Special Requirement identified by character ‘H’ as per definition of Pipe Class in Process Data Book. These are also identified in Project Line List – Fluid Category “NF”. The HIC resistant items are identified with a suffix ‘H’ and requirements are clearly specified in the technical data sheets. Wet H2SService Not Applicable as of now. Hydrogen Service Process streams containing relatively pure hydrogen (95% OR MORE) or hydrogen along with other hydrocarbons wherein the partial pressure of hydrogen is more than 50 psia and the temperature is more than 220 deg. C is classified as “Hydrogen Service”. The items in Hydrogen service are identified with suffix ‘X’ and requirements are clearly specified in the technical data sheets. Special Requirement Process streams associated with AXENS pipe classes defined with Special Requirement identified by character ‘C’ as per definition of Pipe Class in Process Data Book. These are also identified in Project Line List – Fluid Category “NF”.

Page 67: UhdeIndia - Bharat Petroleum · Uhde India Private Limited, Dugal Plaza, 3 rd Floor, Prem Nagar, Bibwewadi Road, Pune 411 037, India TENDER RFQ / Tender No. : U6509 - 3187/ABM

6509-PI-EB-00002 BPCL UAN

Total Pages

ENGINEERING SPECIFICATION FOR PIPING MATERIALS

66-6509-700

7 of

107

© 2010 Uhde India

3. CODES AND STANDARDS Latest edition of all standards, codes and specifications on the date of award pf contract referred to herein form a part of the requirements of this specification. Piping material standards referenced in this specification shall be in accordance with those referenced in Appendix E of ASME B31.3 3.1 Design ASME ASME B31.1 – Power Piping ASME B31.3 – Process Piping ASME Section II, Part C – Material Specification – Welding Electrodes and Filler Metals ASME Section VIII Division 1, Boiler and Pressure Vessel Code for Pressure Vessels ASME Section IX Welding and Brazing Qualification API API RP 941 – Steels for Hydrogen Service at Elevated Temperatures and Pressures in Petroleum Refineries and Petrochemical Plants API RP 945 – Avoiding Environmental Cracking in Amine Units API 1104 – Welding of Pipelines and related facilities NACE T-8-16 – Guidelines from Technical Committee MR 0103 – Materials Resistant to Sulphide Stress Cracking in Corrosive Petroleum Refining Environments. MR 0175 – Metals for sulphide stress cracking and stress corrosion cracking resistance in sour oilfield environments. IP 8X194 – Materials and Fabrication Practices for New Pressure Vessels Used in Wet H2S Refinery Service RP 170 – Protection of austenitic stainless steels and other austenitic alloys from polythionic acid stress corrosion cracking during shutdown of refinery equipment. RP 0472 – Methods and controls to prevent in-service environmental cracking of carbon steel weldments in corrosive petroleum refining environments. IS IBR – Indian Boiler Regulations 3.2 Manufacturing ASTM A20 – Standard specification for general requirements for steel plates for pressure vessels. A36 – Standard specification for carbon structural steel. A53 – Standard specification for pipe—steel, black and hot dipped, zinc-coated, welded, and seamless. A105 – Standard specification for Forgings Carbon Steel for Piping Components A106 – Standard specification for Seamless Carbon Steel Pipe for High Temperature Service A123 – Standard specification for zinc (hot-dip galvanized) coatings on iron and steel products. A153 – Standard specification for Zinc Coating (Hot-dipped) on Iron and Steel Hardware A182 – Standard specification for forged or rolled alloy-steel pipe flanges, forged fittings, and valves and parts for high-temperature service. A193 – Standard specification for Alloy Steel and Stainless Steel Bolting Materials for High Temperature Service A194 – Standard specification for Carbon and Alloy Steel Nuts for Bolts for High Pressure and high Temperature Service A216 – Standard specification for Steel Castings, Carbon, suitable for Fusion Welding, for High Temperature Service

Page 68: UhdeIndia - Bharat Petroleum · Uhde India Private Limited, Dugal Plaza, 3 rd Floor, Prem Nagar, Bibwewadi Road, Pune 411 037, India TENDER RFQ / Tender No. : U6509 - 3187/ABM

6509-PI-EB-00002 BPCL UAN

Total Pages

ENGINEERING SPECIFICATION FOR PIPING MATERIALS

66-6509-700

8 of

107

© 2010 Uhde India

A217 – Standard specification for Standard specification for steel castings, martensitic stainless and alloy, for pressure-containing parts, suitable for high temperature service. A234 – Standard specification for Pipe Fittings of Wrought Carbon Steel for Moderate and Elevated Temperatures A240 – Standard specification for chromium and chromium nickel stainless steel plate, sheet, and strip for pressure vessels and for general applications. A264 – Standard specification for stainless chromium-nickel steel-clad plate, sheet, and strip. A307 – Standard specification for carbon steel bolts and studs, 60,000 psi tensile strength. A312 – Seamless and Welded Austenitic Stainless Steel Pipes A320 – Standard specification for Alloy Steel Bolting Materials for Low Temperature Service A333 – Standard specification for Seamless and Welded Pipes for Low Temperature Service A335 – Standard specification for Seamless Ferritic Alloy-Steel Pipe for High Temperature Service A350 – Standard specification for Forgings, Carbon and Low Alloy Steel, requiring Notch Toughness Testing for Piping Components A351 – Standard specification for castings, austenitic, austenitic ferritic (duplex), for pressure-containing parts. A352 – Standard specification for Steel Castings, Ferritic and Martensitic, for Pressure containing Parts suitable for Low Temperature Service A358 – Standard specification for Electric Fusion Welded Austenitic Chromium-Nickel Alloy Steel Pipe for High-Temperature Service A387 – Standard specification for pressure vessel plates, alloy steel, chromium-molybdenum. A395 – Standard specification for ferritic ductile iron pressure retaining castings for use at elevated temperatures. A403 – Standard specification for wrought austenitic stainless steel piping fittings. A409 – Standard specification for Large Diameter Austenitic Steel Pipe for Corrosive and High Temperature Service A420 – Standard specification for Piping Fittings of Wrought Carbon Steel and Alloy Steel for Low Temperature Service A453 – Standard specification for high-temperature bolting materials, with expansion coefficients comparable to austenitic stainless steels. A494 – Specification for Casting Nickel and Nickel alloys. A515 – Standard specification for pressure vessel plates, carbon steel, for intermediate- and higher-temperature service. A516 – Standard specification for pressure vessel plates, carbon steel, for moderate- and lower-temperature service. A537 – Standard specification for pressure vessel plates, heat-treated, carbon-manganese-silicon steel. A587 – Standard specification for electric-resistance-welded low carbon steel pipe for the chemical industry. A671 – Standard specification for Electric Fusion Welded Steel Pipe for Atmospheric and Lower Temperatures A672 – Standard specification for Electric Fusion Welded Pipe for High Pressure Service at Moderate Temperatures A691 – Standard specification for Carbon and Alloy Steel Pipe, Electric Fusion Welded for High Pressure at High Temperature. A694 – Standard specification for Forgings, Carbon and Alloy Steel, for Pipe Flanges, Fittings, Valves and Parts for High Pressure Transmission Service. B61 – Standard specification for steam or valve bronze castings. B62 – Standard specification for composition bronze or ounce metal castings. B366 – Specification for factory made wrought Nickel and Nickel alloy fittings B462 – Specification for Forged or Rolled Nickel alloy pipe flanges, forged fittings, and valves and parts for corrosive high temperature service. B584 – Specification for B619 – Specification for Welded Nickel and Nickel Cobalt Alloy Pipe B622 – Specification for Seamless Nickel and Nickel Cobalt Alloy Pipe and Tube

Page 69: UhdeIndia - Bharat Petroleum · Uhde India Private Limited, Dugal Plaza, 3 rd Floor, Prem Nagar, Bibwewadi Road, Pune 411 037, India TENDER RFQ / Tender No. : U6509 - 3187/ABM

6509-PI-EB-00002 BPCL UAN

Total Pages

ENGINEERING SPECIFICATION FOR PIPING MATERIALS

66-6509-700

9 of

107

© 2010 Uhde India

API API 594 – Check Valves—Water and Wafer-Lug and Double Flanged Type API 6D – Specification for Pipeline Valves API 599 – Metal Plug Valves Flanged and Welding Ends API 600 – Bolted Bonnet Steel Gate Valves for Petroleum and Natural Gas Industries API 602 – Compact Steel Gate Valves Flanged Threaded Welding and Extended Body Ends API 607 – Fire Test for Soft-Seated Quarter-Turn Valves API 609 – Butterfly Valves Double Flanged, Lug and Wafer Type API 5L – Specification for Line Pipe AWWA C300 – Reinforced concrete pressure pipe, steel-cylinder type C301 – Reinforced concrete pressure pipe, steel-cylinder type C302 – Reinforced concrete pressure pipe, no cylinder type C504 - Rubber-seated butterfly valves MSS SP-6 – Standard finishes for contact faces of pipe flanges and connecting-end flanges of valves and fittings. SP-25 – Standard marking system for valves, fittings, flanges, and unions. SP-43 – Wrought stainless steel butt-welding fittings SP-44 – Steel Pipeline Flanges. SP-67 – Butterfly valves. SP-68 – High-pressure butterfly valves with offset design. SP-75 – High Test Wrought Butt Welding Fittings SP-79 – Socket Welding Reducer Inserts SP-80 – Bronze Gate, Globe and Check Valves SP-81 – Stainless Steel, Bonnetless, Flanged Knife Gate Valves. SP-95 – Swage (d) nipples and bull plugs. SP-97 – Integrally Reinforced forged branch outlet fittings – socket welding, threaded and butt-welding ends 3.3 Dimensional The dimensional standards intended for usage are identified against each piping component in the following pages. ASME B1.20.1 – Pipe Threads, General Purpose (in) B16.5 – Pipe Flanges and Flanged Fittings B16.9 – Factory-made wrought butt-welding fittings B16.10 – Face-to-Face and End-to-End Dimensions of Valves. B16.11 – Forged fittings, socket welding and threaded B16.20 – Metallic Gaskets for Pipe Flanges—Ring-Joint, Spiral- Wound, and Jacketed. B16.21 – Nonmetallic Flat Gaskets for Pipe Flanges. B16.24 – Cast copper alloy pipe flanges and fittings. B16.25 – Butt-welding ends B16.34 – Valves, flanged, threaded and welding end B16.47 – Large Diameter Steel Flanges B16.48 – Steel Line Blanks. B16.49 – Factory-made Wrought Steel Butt Welding Induction Bends for Transportation and Distribution Systems B18.2.1 – Square and Hexagonal Bolts and Screws (Inch Series) B18.2.2 – Square and Hexagonal Nuts (Inch Series) B36.10/B36.10M – Welded and Seamless Wrought Steel Pipe B36.19/B36.19M – Stainless Steel Pipe AWWA

Page 70: UhdeIndia - Bharat Petroleum · Uhde India Private Limited, Dugal Plaza, 3 rd Floor, Prem Nagar, Bibwewadi Road, Pune 411 037, India TENDER RFQ / Tender No. : U6509 - 3187/ABM

6509-PI-EB-00002 BPCL UAN

Total Pages

ENGINEERING SPECIFICATION FOR PIPING MATERIALS

66-6509-700

10 of

107

© 2010 Uhde India

AWWA C207 – Steel pipe flanges for waterworks service—sizes 4–144 in. (100–3600 mm). AWWA C208 – Dimensions for fabricated steel water pipe fittings BS 3799 - Unions 3.4 Testing ASME A370 – Standard specification for Test Methods and Definitions for Mechanical Testing of Steel Products A530 – General Requirements for specialized Carbon and Alloy Steel Pipe A578 – Standard specification for Straight Beam Ultrasonic Examination of Plain and clad Steel for Special Applications A700 – Practices for Packaging, Marking, and Loading Methods for Steel Products for Domestic Shipment. Materials A770 – Through Thickness Tension Testing API API 574 – Inspection Practices for Piping System Components API 589 – Fire Test for Evaluation of Valve Stem Packing API 598 – Valve Inspection and Testing NACE TM0284 – Test Method, Evaluation of Pipeline and Pressure Vessels Steels for resistance to Hydrogen Induced Cracking TM0177 – Testing of Metals for resistance to Sulphide Stress Cracking at Ambient temperature ASTM E10 – Test for Brinell Hardness of Metallic Materials E18 – Rockwell Hardness and Rockwell Superficial Hardness of Metallic Materials E45 – Determining the Inclusion Content of Steel E92 – Vickers Hardness of Metallic Materials E112 – Standard test methods for determining average grain size. E114 – Standard practice for ultrasonic pulse-echo straight-beam examination by the contact method. E140 – Standard Hardness Conversion Tables for Metals E165 – Standard test method for liquid penetrant examination E446 – Standard reference radiographs for steel castings up to 2 in. (51 mm) thickness E709 – Standard guide for magnetic particle examination ANSI B16.104/FCI70-2 – Control Valve Seat Leakage

Page 71: UhdeIndia - Bharat Petroleum · Uhde India Private Limited, Dugal Plaza, 3 rd Floor, Prem Nagar, Bibwewadi Road, Pune 411 037, India TENDER RFQ / Tender No. : U6509 - 3187/ABM

6509-PI-EB-00002 BPCL UAN

Total Pages

ENGINEERING SPECIFICATION FOR PIPING MATERIALS

66-6509-700

11 of

107

© 2010 Uhde India

4 - COMPONENTS The components are arranged in Pipe Classes. The definition of Piping Identification System and Pipe Class is explained on pages 12, 13. The selection of components in compiling these pipe classes shall be governed by the Process Data Book and applicable Licensor’s Documents as mentioned in the Index on page 2. . It shall be noted that “Full Use” of “Flange Rating” has been made while selecting wall thickness of pipes and fittings. For an entire list of pipe classes refer to Part 1B of UIPL Piping Specification document no. 6509-PI-EC-00001. The basic material, minimum corrosion allowance, nominal pressure, facing shall be as specified in Part 1B. For details of branch connections such as type of branch and its applicable size range refer to Part 3B of UIPL Piping Specification document no. 6509-PI-EC-00001. For components utilized in each pipe class refer to Part 4 of UIPL Piping Specification document no. 6509-PI-EC-00001. Each component is identified with a unique part no. / Uhde code, rating or class, size range, material and its grade, standard, end connection and notes (as and where applicable). For valves additionally, material for body, body seat and packing is identified in this part. For insulation table, standard special part sketches refer to Part 5 of UIPL Piping Specification document no. 6509-PI-EC-00001. In addition, Chapters 4.1 to 4.12 describe in detail all the applicable supplementary requirements for all those components which are defined for usage in pipe lines with Fluid Category “D” or “NF” as indicated on page 6. In addition, Chapters 5.1 to 5.12 describe in detail all the applicable supplementary requirements for all those components which are defined for usage in pipe lines with Fluid Category “NF” as indicated on page 6 and are required to be fully qualified as “HIC Resistant Steels”. Components for usage as “HIC Resistant Steels” are identified with a Suffix ‘H’ in the Uhde Part No. Chapters 6.1 to 6.12 describe in detail all the applicable supplementary requirements for all those components which are defined for usage in pipe lines with Hydrogen service as indicated on page 6 and are required to be fully qualified as “Hydrogen service” compliant. Components for usage in “Hydrogen service” are identified with a Suffix ‘X’ in Uhde Part no. Materials to ‘EN’ specifications shall not be used in this project unless mentioned specifically as ‘mandatory’ by M/s. Axens. However those requirements expressed by M/s. AXENS as governing e.g. Charpy V-notch Test Impact Energy Values are incorporated in this specification and shall be binding while procuring the individual items. Wherever the term ‘SS’ is used for the purpose of this document, it shall mean at least ‘3’ series austenitic stainless steel unless specified otherwise. Chapters 16, 17, 18 and 20 are not applicable for the bidders of piping components.

Page 72: UhdeIndia - Bharat Petroleum · Uhde India Private Limited, Dugal Plaza, 3 rd Floor, Prem Nagar, Bibwewadi Road, Pune 411 037, India TENDER RFQ / Tender No. : U6509 - 3187/ABM

6509-PI-EB-00002 BPCL UAN

Total Pages

ENGINEERING SPECIFICATION FOR PIPING MATERIALS

66-6509-700

12 of

107

© 2010 Uhde India

4.1 Piping Identification System (Reproduced From AXENS Process Data Book, Page … of …)

6”- P - 140- 0301- A3S1RF – H 7 - Insulation class 6 - Pipe Class Designation code 5 – Line Sequential numbers (two digits) 4 - P&ID Number (two digits) 3 - Unit Number (three or four digits) 2 - Fluid 1 - Nominal Pipe Size

Notes: The utility lines have a simplified identification system. Size and piping class are not shown. The number changes after control valves and main equipment. The number is different for lines connected to equipment in parallel. Each type of fluid will have a separate numbering sequence. Drains and vents without permanent flows are neither identified nor listed. Design pressures and temperatures are shown on piping specification sheets.

Page 73: UhdeIndia - Bharat Petroleum · Uhde India Private Limited, Dugal Plaza, 3 rd Floor, Prem Nagar, Bibwewadi Road, Pune 411 037, India TENDER RFQ / Tender No. : U6509 - 3187/ABM

6509-PI-EB-00002 BPCL UAN

Total Pages

ENGINEERING SPECIFICATION FOR PIPING MATERIALS

66-6509-700

13 of

107

© 2010 Uhde India

4.2 Pipe Class Definition (Reproduced From AXENS Process Data Book, Page … of …) 4.2.1 - Material for pipe (one or two digits – letter +number)

ASME spec. used by Axens Type Material

For schedule or thickness calculation

For flange ratings

A CS (MDMT(1) higher than or equal minus 5 degree C)

A106 – Gr. B A105

B CS (MDMT(1) higher or equal minus 45 degree C and lower than minus 5 degree C)

A333 – Gr. 6 A350 Gr. LF 2

C CS – 3.5% Ni Low Alloyed Steel A333 – Gr. 3 A350 Gr. LF 3

E 1 1/4Cr - 1/2 Mo A335 - P11 A182 – F11

M SS-TP304L A312 – TP304L A182 – F304L

N SS - TP321 A312 – TP321 A182 – F321

X HastelloyTM C276 B619 – N10276 B462 – N10276

(1) MDMT: Minimum Design Metal Temperature 4.2.2 - Corrosion allowance (one digit - number)

0 0 mm 3 3.0 mm

1 0.75mm 5 5.0 mm

2 1.5 mm 6 6.0 mm

4.2.3 - Special requirement (one digit - letter)

Wet H2S or amine services Specific requirement

S Category 1 : Moderate service "Wet H2S resistant steels"(*)

R Internal lining

C PWHT(**) mandatory for corrosion reason H Category 2 : Severe service "HIC resistant steels"(*)

L Internally cement lined

I For Steam as per IBR G Inside / Outside Galvanized

X Hydrogen service U Underground service

M Valves with Monel Trim Y Valves with Monel Trim

(*) Refer to Axens Standard Material Specification IN-43 (**) PWHT : Post Weld Heat Treatment 4.2.4 - Flange rating (one or two digits - number)

Item ASME Class ISO (EN 1759-1) Item ASME Class ISO (EN 1759-1)

1 150 ISO PN 20 9 900 ISO PN 150

3 300 ISO PN 50 15 1500 ISO PN 250

6 600 ISO PN 100 25 2500 ISO PN 420

Upon request: Rating according to EN 1092-1 (PN 2.5 to PN 100) 4.2.5 Flange facing (two digits - letters)

RF Raised face RJG – Gravity lines

RJ Ring Type Joint RJL – Lift lines

C Self Energizing Connector

Page 74: UhdeIndia - Bharat Petroleum · Uhde India Private Limited, Dugal Plaza, 3 rd Floor, Prem Nagar, Bibwewadi Road, Pune 411 037, India TENDER RFQ / Tender No. : U6509 - 3187/ABM

6509-PI-EB-00002 BPCL UAN

Total Pages

ENGINEERING SPECIFICATION FOR PIPING MATERIALS

66-6509-700

14 of

107

© 2010 Uhde India

4.2.6 - Insulation (one digit - letter)

Item Designation Item Designation

H Heat Conservation T Traced

P Personal Protection (*) J Jacketing

C Refrigeration conservation

(*) If operating temperature is higher than 60 deg. C

Page 75: UhdeIndia - Bharat Petroleum · Uhde India Private Limited, Dugal Plaza, 3 rd Floor, Prem Nagar, Bibwewadi Road, Pune 411 037, India TENDER RFQ / Tender No. : U6509 - 3187/ABM

6509-PI-EB-00002 BPCL UAN

Total Pages

ENGINEERING SPECIFICATION FOR PIPING MATERIALS

66-6509-700

15 of

107

© 2010 Uhde India

4.3 - Fluid and Category (Reproduced From AXENS Process Data Book, Page … of …)

Pipe Class

Fluid code

Fluid Description Fluid Content Fluid Category

A2G1RF IA Instrument Air Utility D

A2I1RF LP Low Pressure Steam Utility D

A2I3RF MP Medium Pressure Steam Utility NF

BFW Boiler Feed water Utility NF

A2D1RF RW Raw Cooling water Utility D

SW Service Water Utility D

PA Plant Air Utility D

N Nitrogen Utility D

CWR Cooling water Return Utility D

CWS Cooling water Supply Utility D

A2L1RF FW Fire Fighting Water Utility D

A21RF ATM Vent to atmosphere Air D

O2 + N2

BFW Boiler feed water H2O D

DMW De-mineralized water H2O D

FG Fuel gas H2+HC NF

HC

FL Flare H2 NF

H2+HC

HC

N2

IA Instrument air O2+N2 D

N Nitrogen N2 D

OWS

Oily water sewer (open system H2O

NF

P Process H2 NF

H2+HC

HC

N2

N2+CO2+O2

PA Process air (oil free) Air D

AIR+H2O

A23RF BFW Boiler feed water H2O NF

FG Fuel gas H2+HC NF

MP Medium pressure steam H2O NF

N Nitrogen N2 NF

P Process H2 NF

H2+HC

HC

N2

A23RJ P Process H2 NF

A26RF P Process HC NF

A2X6RF P Process H2+HC NF + HIC

H2+HC+H2S NF + HIC

Page 76: UhdeIndia - Bharat Petroleum · Uhde India Private Limited, Dugal Plaza, 3 rd Floor, Prem Nagar, Bibwewadi Road, Pune 411 037, India TENDER RFQ / Tender No. : U6509 - 3187/ABM

6509-PI-EB-00002 BPCL UAN

Total Pages

ENGINEERING SPECIFICATION FOR PIPING MATERIALS

66-6509-700

16 of

107

© 2010 Uhde India

A3U1RF OWS Oily water Sewer NF

V Vent D

A31RF ATM Vent to atmosphere N2 D

DMW De-mineralized water H2O D

FL Flare

N Nitrogen N2 D

OWS

Oily water sewer (open system H2O

NF

P Process H2O+NaOH NF

H2O+NaOH+Na salts

N2+CO2+O2

N2+CO2+O2+H2O+HCl

A33RF ATM Vent to atmosphere N2 NF

N Nitrogen N2 NF

A3C3RF P Process HC+H2+H2S+NH3+H2O NF + PWHT

A3C6RF P Process HC+H2+H2S+NH3+H2O NF + PWHT

A3H1RF P Process HC NF + HIC

HC+H2+H2S+NH3+H2O

SWS Sour water sewer H2O NF + HIC

HC+H2+H2S+NH3+H2O

A3H1RFU CBD Continuous Blow Down Utility NF + HIC

OWS Oily water sewer NF + HIC

P Process HC NF + HIC

V Vent HC NF + HIC

A3H3RF P Process HC NF + HIC

HC+H2+H2S+NH3+H2O

HC+H2O

HC+H2S+H2

PW Process water H2O+H2+H2S+NH3+HC NF + HIC

H2 Hydrogen H2 NF + HIC

SWS Sour water sewer HC+H2+H2S+NH3+H2O NF + HIC

A3H6RF P Process HC+H2+H2S+NH3+H2O NF + HIC

A53RF N Nitrogen N2+Fines NF

B21RF P Process HC NF

HC+H2

B23RF P Process HC NF

HC+H2

C23RF FG Fuel gas HC+H2 NF

FL Flare HC+H2 NF

P Process HC NF

HC + H2

E31RF P Process H2 NF

H2+HC

E33RF N Nitrogen N2 NF

P Process H2 NF

H2+Fines

H2+HC

E3X3RF P Process H2+HC NF + HIC

H2+HC+H2S

E33RJ CA Catalyst Catalyst+H2 NF

Catalyst+N2

Page 77: UhdeIndia - Bharat Petroleum · Uhde India Private Limited, Dugal Plaza, 3 rd Floor, Prem Nagar, Bibwewadi Road, Pune 411 037, India TENDER RFQ / Tender No. : U6509 - 3187/ABM

6509-PI-EB-00002 BPCL UAN

Total Pages

ENGINEERING SPECIFICATION FOR PIPING MATERIALS

66-6509-700

17 of

107

© 2010 Uhde India

M21RF ATM Vent to atmosphere N2+CO2+O2+H2O (1) D

DMW De-mineralized water H2O NF

FL Flare Corrosion inhibitor NF

N Nitrogen N2 D

P Process C2HCl3 NF

Chlor. Ag.+HC

Corrosion inhibitor

H2O

H2O+NaOH

HC

N2+CO2+O2+H2O (1)

Sulf. Ag.

Sulf. Ag.+HC

M23RF P Process Chlor. Ag.+HC NF

H2O

Sulf. Ag.+HC

N21RF P Process N2+CO2+O2+H2O+HCl NF

N23RF DMW De-mineralized water H2O NF

N Nitrogen N2 NF

P Process Chlor. Ag. NF

N2+CO2+H2O+HCl

N2+CO2+O2

N2+CO2+O2+H2O

N2+CO2+O2+H2O+HCl

PA Process air (oil free) Air NF

N26RF P Process HC+H2+H2S+NH3+H2O NF

N2X6RF P Process HC+H2 NF + HIC

X01RF P Process H2O+NaOH+Na salts NF

N2+CO2+O2+H2O+NaOH+Na salts

Page 78: UhdeIndia - Bharat Petroleum · Uhde India Private Limited, Dugal Plaza, 3 rd Floor, Prem Nagar, Bibwewadi Road, Pune 411 037, India TENDER RFQ / Tender No. : U6509 - 3187/ABM

6509-PI-EB-00002 BPCL UAN

Total Pages

ENGINEERING SPECIFICATION FOR PIPING MATERIALS

66-6509-700

18 of

107

© 2010 Uhde India

4.4 - PIPE 4.4.1 ASME specifications specified against each product are governing. This includes mechanical properties, chemical properties, dimensions and supplementary requirements as applicable. In case of any conflict between this document and technical data sheet, the later shall govern. 4.4.2 Carbon steel and Alloy Steel pipes shall be as per ASME B36.10 and Stainless Steel / Exotic Material pipes shall be as per ASME B36.19 4.4.3. Threaded pipe shall be A106 Gr. B with Galvanizing internally as well as externally with Zinc deposited by the hot dip process in accordance with A153 or an equivalent standard and confirm to ASME with tapered threading as per B1.20.1.(NPT). 4.4.4 Threaded and coupled Galvanized steel pipe shall be furnished with one threaded coupling each end in forged steel A105, Class 3000. Couplings for Galvanized pipe shall also be galvanized. 4.4.5 Steam Pipes shall be IBR approved as per Reg. 2(k) of IBR rules and their max. Carbon content shall be limited to 0.25 %. Others impurities such as S, P and Mn shall be as prescribed in IBR regulation. 4.4.6 Carbon Steel, LTCS, Alloy Steel Pipes shall be seamless up to 14” and EFW (E=1) for 16” and above. 4.4.7 Stainless Steel Pipes shall be seamless up to 8” and EFW (E=1) for 10” and above. 4.4.8 Welded pipe shall have a single straight seam. Wherever EFW pipes are used, with or without the addition of filler material, these pipes shall be 100% radiographed. 4.4.9 All Carbon Steel Pipes except carbon steels requiring compliance with chapter 5 shall have a max. carbon content of 0.25%. Additionally carbon equivalent shall be restricted to 0.42%. The Carbon equivalent shall be derived from the below mentioned formula: CE = C+Mn/6 + (Cr+Mo+V)/5 + (Ni+Cu)/15 4.4.10 All LTCS pipes CE or Ceq shall be as follows:

CE < 0.43% for thickness < 2” CE < 0.46% for thickness >= 2”

4.4.11 For LTCS plates CE or Ceq shall be as follows: CE < 0.42% for thickness < 2” CE < 0.45% for thickness >= 2” 4.4.12 Usage of Spiral-welded pipe, double seam pipe, furnace butt-welded pipe and furnace lap-welded pipe is NOT PERMITTED. 4.4.13 Pipes with NPS smaller than 2” wherein socket welded fittings are intended for usage shall have Plain Ends (PE), meaning Cut Square with axis of pipe (un-beveled). 4.4.14 All other pipes with NPS smaller than 2”, wherein socket welded fittings are NOT permitted, shall be procured with beveled ends and shall be joined in field using butt welding technique. 4.4.15 Pipes with wall thicknesses 22 mm and smaller shall have ends prepared as per details of Figure 2a of ASME B16.25 and for wall thicknesses greater than 22 mm the ends shall be prepared as per details of Figure 3a of ASME B16.25.

Page 79: UhdeIndia - Bharat Petroleum · Uhde India Private Limited, Dugal Plaza, 3 rd Floor, Prem Nagar, Bibwewadi Road, Pune 411 037, India TENDER RFQ / Tender No. : U6509 - 3187/ABM

6509-PI-EB-00002 BPCL UAN

Total Pages

ENGINEERING SPECIFICATION FOR PIPING MATERIALS

66-6509-700

19 of

107

© 2010 Uhde India

4.4.16 Pipe shall be supplied in “Random Length” of minimum 4m. “Single Random Length” of 6m or “Double Random Length” of 8 to 12m for any pipe size is however acceptable. The same shall be highlighted by supplier at the time of procurement. 4.4.17 Deleted. 4.4.18 For details of heat treatment, Tests, Non-destructive examination, radiography, NDE refer Chapter 9, 10. For details of inspection, PMI refer Chapter 11, 12. For HIC compliant materials the items shall comply with all the requirements of Chapter 5 in addition to Chapters 9, 10, 11 and 12.

Page 80: UhdeIndia - Bharat Petroleum · Uhde India Private Limited, Dugal Plaza, 3 rd Floor, Prem Nagar, Bibwewadi Road, Pune 411 037, India TENDER RFQ / Tender No. : U6509 - 3187/ABM

6509-PI-EB-00002 BPCL UAN

Total Pages

ENGINEERING SPECIFICATION FOR PIPING MATERIALS

66-6509-700

20 of

107

© 2010 Uhde India

4.5 - FITTINGS 4.5.1 Fittings include Elbows, Tees, Reducers, Caps and Branch Connections. 4.5.2 ASME specifications specified against each product are governing. This includes mechanical properties, chemical properties, dimensions and supplementary requirements as applicable. In case of any conflict between this document and technical data sheet, the later shall govern. 4.5.3 Usage of Seamless as well as Welded fittings is PERMITTED. Refer Chapter 20 for Restrictions. 4.5.4 Butt welded fittings shall be used for NS more than 1 ½”. 4.5.5 Butt welded elbows shall be large radius R=1.5D 4.5.6 Usage of in-line Socket Welded fittings including 90 degree and 45 degree elbows, full couplings, unions, sockolets, is PERMITTED. Refer Chapter 20 for Restrictions. 4.5.7 Socket welded fittings shall be used for all NS less than 2” 4.5.8 Usage of Miters is acceptable only in specific cases. Refer Chapter 20 for Restrictions. 4.5.9 Usage of all types of socket welded branch connections including equal Tees, reducing Tees, sockolets and half-Couplings is PERMITTED. Refer Chapter 20 for Restrictions. 4.5.10 Usage of fabricated branches connections - Stub-ons (for one size lesser than run pipe) and Stub-ins (for more than one size lesser than run size), with or without reinforcement pad is PERMITTED. The RF Pad shall have a tell-tail hole which is threaded and not flame cut. The diameter of pad shall be twice the outside diameter of branch pipe, unless otherwise specified. Thickness of the pad shall be same as the run pipe, unless otherwise specified. Reinforcing pads shall be the same material as the pipe. Refer Chapter 20 for Restrictions.

4.5.11 Usage of Screwed Fittings (including Unions with elastomer sealing) is PERMITTED. They shall be Galvanized internally as well as externally and confirm to ASME with tapered threading as per B1.20.1. The minimum rating shall be Class 3000. The galvanizing shall be Zinc coating as per A123 or A153 or any equivalent standard. Refer Chapter 20 for Restrictions. 4.5.12 Branch connections in carbon steel piping compliant with chapter 5, alloy steel piping (sockolets in E31RF), stainless steel pipng, carbon steel requiring PWHT compliance is restricted to weldolets, equal and reduced wrought tees only. 4.5.13 Usage of Screwed Connections and Miters is acceptable only in specific cases. Refer Chapter 20 for Restrictions. 4.5.14 Large diameter fittings that the material standards (ANSI) do not cover in size or shape shall be designed in accordance with ANSI B31.3 and be manufactured to have the same quality as the requirements of the applicable material standards. 4.5.15 For longitudinally welded tees, set-on type branching is NOT PERMITTED. 4.5.16 When certain Components (e.g. Weldolets, Sockolets, Sweepolets etc..) confirm entirely to Manufacturer’s Std, the design of these components shall meet the requirements of ASME B31.3. 4.5.17 Manufacturer shall submit drawings / catalogues of these above items along with the offer & also for approval before manufacturing.

Page 81: UhdeIndia - Bharat Petroleum · Uhde India Private Limited, Dugal Plaza, 3 rd Floor, Prem Nagar, Bibwewadi Road, Pune 411 037, India TENDER RFQ / Tender No. : U6509 - 3187/ABM

6509-PI-EB-00002 BPCL UAN

Total Pages

ENGINEERING SPECIFICATION FOR PIPING MATERIALS

66-6509-700

21 of

107

© 2010 Uhde India

4.5.18 All Carbon Steel fittings except carbon steels requiring compliance with chapter 5 shall have a max. carbon content shall be restricted to 0.25%. Additionally, the carbon equivalent shall be restricted to 0.42%. The Carbon content shall be derived from the below mentioned formula: CE = C+Mn/6 + (Cr+Mo+V)/5 + (Ni+Cu)/15 4.5.19 All LTCS fittings CE or Ceq shall be as follows:

CE < 0.43% for thickness < 2” CE < 0.46% for thickness >= 2”

4.5.20 For LTCS plates CE or Ceq shall be as follows: CE < 0.42% for thickness < 2” CE < 0.45% for thickness >= 2” 4.5.21 Laterals fabricated by joining sections of pipe are PERMITTED. 4.5.22 Tees fabricated by joining sections of pipe are NOT PERMITTED. 4.5.23 Light Weight butt welded fittings manufactured to MSS-SP-43 or A403 Class CR are NOT PERMITTED. 4.5.24 SS fittings of welded construction shall be in accordance with the standard and class specified (e.g. ASME A403 Class W, WX, WU) 4.5.25 For Unions with elastomer sealing the pressure / temperature rating shall be indicated by the supplier / manufacturer. 4.5.26 Use of Butt Welding Stub ends with backing flanges is NOT PERMITTED. 4.5.27 Cast fittings are NOT PERMITTED. 4.5.28 For weldolets, the parameters OD1xThk1 specify the details of the RUN pipe while the parameters OD2xThk2 specify the details of the branch pipe. 4.5.29 Usage of Street Elbows is NOT PERMITTED. 4.5.30 Usage of Short radius elbows is NOT PERMITTED. 4.5.31 Thickness of all fittings shall be same as that of corresponding pipe excepting reducers wherein the thickness shall match the wall thickness of higher schedule pipe and the fitting shall be tapered on a 1:4 gradient to ensure that the fitting matches the lower schedule pipe wall. 4.5.32 If derated fittings are used, care should be taken to ensure that their thickness is higher than the corresponding pipe. This is especially applicable to pipelines with pressure fluctuations. Extent of derating shall be indicated by supplier and UIPL / BPCL written approval is required for acceptance. 4.5.33 For fittings specified as SMLS in the description shall be made in seamless construction and shall contain no welds. 4.5.34 Butt welded components shall have Beveled Ends (BE). These shall be machined ends in accordance with ASME B16.25. 4.5.35 Socket welded components shall have internal sockets in accordance with ASME B16.11

Page 82: UhdeIndia - Bharat Petroleum · Uhde India Private Limited, Dugal Plaza, 3 rd Floor, Prem Nagar, Bibwewadi Road, Pune 411 037, India TENDER RFQ / Tender No. : U6509 - 3187/ABM

6509-PI-EB-00002 BPCL UAN

Total Pages

ENGINEERING SPECIFICATION FOR PIPING MATERIALS

66-6509-700

22 of

107

© 2010 Uhde India

4.5.36 Pipe items such as nipples, plugs, swages shall be male threaded to ASME B1.20.1 NPT. 4.5.37 Unions shall be as per BS3799 and they shall be used for NS less than 2” 4.5.38 Deleted. 4.5.39 For details of heat treatment, Tests, Nondestructive examination, radiography, NDE refer Chapter 9, 10. For details of inspection, PMI refer Chapter 11, 12. For HIC compliant materials the items shall comply with all the requirements of Chapter 5 in addition to Chapters 9, 10, 11 and 12.

Page 83: UhdeIndia - Bharat Petroleum · Uhde India Private Limited, Dugal Plaza, 3 rd Floor, Prem Nagar, Bibwewadi Road, Pune 411 037, India TENDER RFQ / Tender No. : U6509 - 3187/ABM

6509-PI-EB-00002 BPCL UAN

Total Pages

ENGINEERING SPECIFICATION FOR PIPING MATERIALS

66-6509-700

23 of

107

© 2010 Uhde India

4.6 - FLANGES 4.6.1. Usage of Flanges of all construction types such as Socket Welded, Slip-on, Weld Neck is permitted. Refer Chapter 20 for Restrictions. 4.6.2. ASME specifications specified against each product are governing. This includes mechanical properties, chemical properties, dimensions and supplementary requirements as applicable. In case of any conflict between this document and technical data sheet, the later shall govern. 4.6.3. Usage of Plate Flanges with flat face is acceptable in specifc cases. Requirements are specified in individual technical data sheets. Refer Chapter 20 for Restrictions. 4.6.4. Usage of Epoxy lined flanges is acceptable in specific cases. Requirements are specified in individual technical data sheets. Refer Chapter 20 for Restrictions. 4.6.5. All flanges shall be of forged one piece material (seamless) and plate shall not be substituted without written approval from the Purchaser. 4.6.6. For ring joint flanges, blinds and spacers the hardness shall be as follows:

Sr. No. Flange Material Min. Hardness of Groove

1 Carbon Steel 140 BHN

2 Alloy Steel (1Cr to 5Cr-1/2 Mo) 150 BHN

3 SS type 304, 316, 321, 347 160 BHN

4 SS type 304L, 316L 140 BHN

5 Exotic material (UNS N06625) 200 BHN

4.6.7. Butt welding ends shall be in accordance with ASME B16.25. The weld contours shall be as follows:

Sr. No. Material Flange end Thickness Weld Contour

1 CS up to 22 mm Fig. 2 Type A

2 AS/SS up to 10 mm Fig. 4

3 AS/SS 10 mm to 25 mm Fig. 5 Type A

4.6.8. Ring Joint Flanges shall have a flat bottom groove in accordance with ASME B16.20 with the intersection between the bottom and the sides of the groove machined to a smooth 0.125 inch (3mm) minimum radius. 4.6.9. All Carbon Steel Flanges except carbon steels requiring compliance with chapter 5 shall have a max. Carbon content shall be restricted to 0.25%. Additionally, the carbon equivalent shall be restricted to 0.42%. The Carbon content shall be derived from the below mentioned formula: CE = C+Mn/6 + (Cr+Mo+V)/5 + (Ni+Cu)/15 4.6.10. All LTCS flanges CE or Ceq shall be as follows:

CE < 0.43% for thickness < 2” CE < 0.46% for thickness >= 2”

4.6.11. For LTCS plates CE or Ceq shall be as follows: CE < 0.42% for thickness < 2” CE < 0.45% for thickness >= 2”

Page 84: UhdeIndia - Bharat Petroleum · Uhde India Private Limited, Dugal Plaza, 3 rd Floor, Prem Nagar, Bibwewadi Road, Pune 411 037, India TENDER RFQ / Tender No. : U6509 - 3187/ABM

6509-PI-EB-00002 BPCL UAN

Total Pages

ENGINEERING SPECIFICATION FOR PIPING MATERIALS

66-6509-700

24 of

107

© 2010 Uhde India

4.6.12. Flanges up to NS 24” shall be as per ASME B16.5. Flanges above NS 24” shall be as per ASME B16.47 Series B unless specified otherwise. 4.6.13. Flanges for rating more than Class 600 shall be with ring type joints unless otherwise specified. The details are specified in individual pipe class and technical data sheets. 4.6.14. Orifice flanges shall be ordered in pairs. Pressure tap holes shall be female threaded ½” NPT. They shall be supplied with jackscrews and bolts but without gaskets. Bolting material shall be as specified in Chapter 4.8. 4.6.15. Bolt hole for NS50, 80 and 100 orifice flanges shall be 1.6mm smaller than B16.5. 4.6.16. Jack Screws shall be provided for facilitating disassembly of flanged joints. The flange sizes that need Jack screw arrangement is as follows:

a. Sizes 16” and above for flanges with rating 900 and above b. Sizes 24” and above for flanges with rating 150, 300 & 600.

4.6.17. Each jack screw provided flange shall have a machine bolt mounted in a drilled hole on the flange centre line. Machine bolt shall be regular with one heavy hexagonal nut. A slot 0.06 inch wider than the width across flats of the nut shall be provided in the flange. The depth of the slot shall admit the nut so that there is no interference with the joining of the flanges when bolted together. 4.6.18. Slip-on flanges NS >=4” shall have 1/8” dia hole drilled through hub for venting of gases during welding. 4.6.19. Usage and supply of class 400 flanges is acceptable in specific cases. Requirements are specified in individual technical data sheets. Refer Chapter 20 for Restrictions. 4.6.20. Weld Neck Flanges shall be butt welded and shall have Beveled Ends (BE). These shall be machined ends in accordance with ASME B16.25. 4.6.21. Socket welded flanges shall have internal sockets in accordance with ASME B16.11 4.6.22. All socket weld flanges shall be suitable for pipe OD as per ASME B36.10 / B36.19 as applicable and unless specified otherwise. 4.6.23. Ends of threaded flanges shall be female threaded to ASME B1.20.1 (NPT). 4.6.24 Contact Surface Finish The surface finishes for flanges shall always be machined serrated Concentric and be obtained by cylindrical machining so that no radial tool marks are created on the finish surface during machining. Flange surface finish shall be as per type of facing in accordance with ASME B16.5. Serrations shall be concentric for all Raised Face & Flat Face flanges. Refer chapter 20 for restrictions. The Manufacturer shall use whatever machining methods, nose radius of tool and feed rate suitable to achieve the surface finish. Flange roughness shall be judged by visual comparison using a Comparator equal to the following:

a) GAR Microfinish Model 522 b) FLEXITALLIC Microsurf Model 319 c) MITUTOYO Surftest Model 211

Contact Surface Finish indicated in table below defines the acceptable ranges of finish identified by a Nominal Finish which is used in the Purchase Specifications. The values are specified in AARH units

Page 85: UhdeIndia - Bharat Petroleum · Uhde India Private Limited, Dugal Plaza, 3 rd Floor, Prem Nagar, Bibwewadi Road, Pune 411 037, India TENDER RFQ / Tender No. : U6509 - 3187/ABM

6509-PI-EB-00002 BPCL UAN

Total Pages

ENGINEERING SPECIFICATION FOR PIPING MATERIALS

66-6509-700

25 of

107

© 2010 Uhde India

(Arithmetic Average Roughness Height, See ASME B46.1) expressed in micrometers (microinches in paranthesis) for flanges in accordance with ASME / MSS / AWWA.

Rating Gasket Type Nominal Finish Allowable Minimum Allowable Maximum Service

Class 150 Sheet None 3.2(125) 6.4(250) -

Class >=150 Spiral Wound 125 3.2(125) 6.4(250) -

Class >=300 Ring Joint None Smooth 1.5(63) -

Non-metallic flange facing shall be as per Manufacturer’s standard. 4.6.25. Deleted. 4.6.26. For details of heat treatment, Tests, Non-destructive examination, radiography, refer Chapter 9, 10. For details of inspection, PMI refer Chapter 11, 12. For HIC compliant materials the items shall comply with all the requirements of Chapter 5 in addition to Chapters 9, 10, 11 and 12.

Page 86: UhdeIndia - Bharat Petroleum · Uhde India Private Limited, Dugal Plaza, 3 rd Floor, Prem Nagar, Bibwewadi Road, Pune 411 037, India TENDER RFQ / Tender No. : U6509 - 3187/ABM

6509-PI-EB-00002 BPCL UAN

Total Pages

ENGINEERING SPECIFICATION FOR PIPING MATERIALS

66-6509-700

26 of

107

© 2010 Uhde India

4.7 - GASKETS 4.7.1 Gaskets are identified in each pipe class columns with a Uhde Part No., followed by designation which indicates type of gasket and material which indicates Spiral/Filler. 4.7.2. ASME specifications specified against each product are governing. This includes mechanical properties, chemical properties, dimensions and supplementary requirements as applicable. In case of any conflict between this document and technical data sheet, the later shall govern. 4.7.3. All gasket design shall be such that the gasket factor (m) and minimum gasket design seating stress (y) conforms to the requirements of ASME B16.5. 4.7.4. Usage of Non-metallic Flat Ring Compressed Asbestos Free Gaskets is acceptable only in specific cases. Requirements are specified in individual technical data sheets.Refer Chapter 20 for Restrictions. 4.7.5. All spiral wound Gaskets shall be supplied with Inner and Outer Rings for all ratings, with minimum thickness 4.5mm unless specified otherwise. The inner ring bore shall be equal to pipe bore. 4.7.6. The preferred materials of construction for Spiral Wound Gaskets are given below.

Body Material Class Gasket Inner Ring Outer Ring

A105-WCB <1500 304/GRAF SS304 CS

LF2-LCB <1500 304/GRAF SS304 CS

F11-WC9 <1500 304/GRAF SS304 SS 304

F304L-CF3 <1500 316L/GRAF SS316L SS 304

F321-CF8C <1500 321/GRAF SS321 SS 304

4.7.7. Gaskets for RTJ flanges shall have octagonal cross-section and they shall be in either Soft Iron or SS / AS material of construction. Details are specified in individual technical data sheets. 4.7.8. The Chemical Composition for Soft Iron Gaskets shall be as follows: C=<0.24%, Mn=<1.35%, P=<0.02%, S=<0.01%, Ni=<0.25%, Si=<0.35% 4.7.9. Ring Type Gaskets shall be Hardness tested and the hardness shall be as follows:

Sr. No. Ring Material Min. Hardness

1 Soft Iron 90 BHN

2 Alloy Steel (1Cr to 5Cr-1/2 Mo) 120 BHN

3 SS type 304, 316, 321, 347 130 BHN

4 SS type 304L, 316L 120 BHN

5 Exotic material (UNS N06625) 160 BHN

4.7.10. Other than Ring Type Gaskets, all other gaskets are exempt from Hardness Testing. 4.7.11. HIC and SSC Tests are NOT required for Gaskets. 4.7.12. The MOC for Gasket is explained below: MOC: 304/GRAF refers to Spiral Wound, Windings SS304 with Grafoil filler MOC: 316L/GRAFrefers to Spiral Wound, Windings SS316L with Grafoil filler MOC: 321/GRAF refers to Spiral Wound, windings SS321 with Grafoil filler

Page 87: UhdeIndia - Bharat Petroleum · Uhde India Private Limited, Dugal Plaza, 3 rd Floor, Prem Nagar, Bibwewadi Road, Pune 411 037, India TENDER RFQ / Tender No. : U6509 - 3187/ABM

6509-PI-EB-00002 BPCL UAN

Total Pages

ENGINEERING SPECIFICATION FOR PIPING MATERIALS

66-6509-700

27 of

107

© 2010 Uhde India

4.7.13. Deleted. 4.7.14. For details of heat treatment, Tests, Nondestructive examination, radiography, Chapter 9, 10. For details of inspection, PMI refer Chapter 11, 12. For HIC compliant materials the items shall comply with all the requirements of Chapter 5 in addition to Chapters 9, 10, 11 and 12.

Page 88: UhdeIndia - Bharat Petroleum · Uhde India Private Limited, Dugal Plaza, 3 rd Floor, Prem Nagar, Bibwewadi Road, Pune 411 037, India TENDER RFQ / Tender No. : U6509 - 3187/ABM

6509-PI-EB-00002 BPCL UAN

Total Pages

ENGINEERING SPECIFICATION FOR PIPING MATERIALS

66-6509-700

28 of

107

© 2010 Uhde India

4.8 - FASTENERS 4.8.1. Fasteners are identified in each piping class columns with an Uhde Part No., followed by designation, Size Range and Dimensional Standard. 4.8.2. ASME specifications specified against each product are governing. This includes mechanical properties, chemical properties, dimensions and supplementary requirements as applicable. In case of any conflict between this document and technical data sheet, the later shall govern. 4.8.3. Stud Bolts full length threaded to ASME B18.2.1 shall be used. They shall be INCH SIZE (NON METRIC) and shall be provided with two hexagonal heavy nuts to ASME B18.2.2. 4.8.4. Thread standard for Bolt is ASME B1.20.1 CL.2A and thread standard for Nut is ASME B1.20.1 CL.2B 4.8.5. UNC threads for Bolt diameter less than or equal to 1” and UN8 threads for Bolt diameter more than 1”. 4.8.6. End machining of studs shall be as per DIN 976, Type B. 4.8.7. Length parameter of Stud Bolt indicated is in Millimetres and shall not include the height of end points (chamfers). It shall however have provision for minimum of one (1) thread and a maximum of three (3) threads outside each nut and complete with 2 nuts to facilitate bolt tensioning. 4.8.8. When Machine Bolts are used (for tapped wafer valves), the allowance for the height of point shall be included in the specified length and it shall be calculated as 1.5 times the pitch. 4.8.9. The tolerance on length of stud bolts and machine bolts shall be +3mm and -0mm. 4.8.10. Threads shall be rolled or formed. Threading shall be done only after heat treatment of bolts. 4.8.11. Cut threads are NOT permitted. 4.8.12. The preferred materials of construction for Fasteners are given below:

Fluid Category “D” / “NF” Fluid with requirement as per chapter 5 and PWHT as per M/s. AXENS

Body Material

Bolting Nut Bolting Nut

A105-WCB A193 Gr. B7 A194 Gr. 2H A193 Gr. B7M A194 Gr. 2HM

LF2-LCB A320 Gr.L7 A194 Gr.4 A320 Gr. L7M A194 Gr. 4M

F11-WC9 A193 Gr. B16 A194 Gr. 4 A193 Gr. B16 A194 Gr. 4

F304L-CF3 A193 Gr. B8 Cl2 A194 Gr. 8 A193 Gr. B8 Cl2 A194 Gr. 8MA

F321-CF8C A193 Gr. B8T Cl2 A194 Gr. 8T A193 Gr. 8C Cl2 A194 Gr. 8MA 4.8.13. Other than piping compliant with chapter 5 where all fasteners shall match the requirement of MR-0175, all other fasteners are exempt from Hardness Testing. 4.8.14. HIC and SSC Tests are NOT required for Fasteners. PMI test is applicable as per chapter 12. 4.8.15. All studs and Bolts shall have Chemical Test Certificates. This should be requested at the time of procurement. 4.8.16 Fasteners and washers (if required) when galvanized shall be electro-galvanized.

Page 89: UhdeIndia - Bharat Petroleum · Uhde India Private Limited, Dugal Plaza, 3 rd Floor, Prem Nagar, Bibwewadi Road, Pune 411 037, India TENDER RFQ / Tender No. : U6509 - 3187/ABM

6509-PI-EB-00002 BPCL UAN

Total Pages

ENGINEERING SPECIFICATION FOR PIPING MATERIALS

66-6509-700

29 of

107

© 2010 Uhde India

4.8.17 Usage of bolting in A453 Gr. 660 shall be as follows: a. When used bar shall be made from vacuum-arc re-melted steel and stress rupture tests at 650°C

shall be conducted for each heat of steel. b. Material test reports shall be submitted in which the manufacturer records the results of the tests

conducted. c. In addition to the test results the documents shall also show the heat, lot or melt identifications, state

the type of heat treatment, give the actual impact test results or any other results of the test specifically required.

d. Additionally, report shall show the results of chemical analysis and mechanical tests required by the basic material specification.

4.8.18. Deleted. 4.8.19. For details of heat treatment, Tests, Nondestructive examination, radiography, Chapter 9, 10. For details of inspection, PMI refer Chapter 11, 12. For HIC compliant materials the items shall comply with all the requirements of Chapter 5 in addition to Chapters 9, 10, 11 and 12.

Page 90: UhdeIndia - Bharat Petroleum · Uhde India Private Limited, Dugal Plaza, 3 rd Floor, Prem Nagar, Bibwewadi Road, Pune 411 037, India TENDER RFQ / Tender No. : U6509 - 3187/ABM

6509-PI-EB-00002 BPCL UAN

Total Pages

ENGINEERING SPECIFICATION FOR PIPING MATERIALS

66-6509-700

30 of

107

© 2010 Uhde India

4.9 – VALVES (GATE / GLOBE / CHECK / NEEDLE / BALL / BUTTERFLY) 4.9.1 ASME specifications specified against each product are governing. This includes mechanical properties, chemical properties, dimensions and supplementary requirements as applicable. In case of any conflict between this document and technical data sheet, the later shall govern. 4.9.2 All Pipe class shall consist of Gate, Globe, Lift Check, Dual Plate Check, Swing Check, Ball and Butterfly valves as basic valve types. Any other valve type shall be built later on. 4.9.3 General 4.9.3.1 Vendor shall supply valves in accordance with the Valve Specification sheets along with auxiliaries, if any, such as Gear Operator, Bypasses, Locking Arrangement, Drains etc. wherever specified in the specification sheets, supplementary requirements and other enclosures if any specified in the technical specification 4.9.3.2 Vendor shall quote in strict accordance with the valve technical specification sheets, supplementary requirements and all other enclosures to the technical specification. Deviations to the specification/data sheets, supplementary requirements and other enclosures of the technical specification, if any, shall be stated in the “compliance form”. 4.9.3.3 All codes and standards for manufacture, testing, inspection etc. shall be of latest editions 4.9.3.4. Vendor shall confirm suitability of offered valves for fluid /duty conditions, mentioned if any. 4.9.4 Design and Construction 4.9.4.1 Valves shall be designed, manufactured, tested, inspected and marked as per the design manufacturing standards (latest editions) indicated in the respective valve specification sheets. Any conflict between the technical specification, enclosures and referred standard codes shall be brought to the notice of the UIL/purchaser for clarifications, but generally enclosures of the technical specification including supplementary requirements shall govern 4.9.4.2 Face to face / End to end dimension / End details / Bore details Unless otherwise specified in the technical specification the following standard construction features shall be followed:

i. Face to Face and End to End dimensions of flanged and butt welded valves in CS/LTCS/AS/Ss/Exotic materials of construction shall be in accordance with ASME B16.10 wherever applicable except butterfly and diaphragm valves.

ii. For sizes not listed in ASME B 16.10 the Face-to-Face dimension shall be to BS 2080. For ball

valves for sizes not listed in ASME B16.10, the Face-to-Face dimensions shall be as per API 6D.

iii. Any deviation from the face to face dimension and end to end dimension shall be pointed out in

the quotation.

iv. Rubber seated butterfly valves shall have face to face dimension as per Table 1 of API 609.

v. Metal seated butterfly valves shall have face to face dimension as per Table 2 of API 609.

vi. Other sandwich type valves such as Dual Plate Wafer Check or Single Plate Wafer Check valves shall have face to face dimension as per API 594.

Page 91: UhdeIndia - Bharat Petroleum · Uhde India Private Limited, Dugal Plaza, 3 rd Floor, Prem Nagar, Bibwewadi Road, Pune 411 037, India TENDER RFQ / Tender No. : U6509 - 3187/ABM

6509-PI-EB-00002 BPCL UAN

Total Pages

ENGINEERING SPECIFICATION FOR PIPING MATERIALS

66-6509-700

31 of

107

© 2010 Uhde India

vii. Lined Y-type globe, diaphragm, ball, plug valves shall have face to face dimension as per

respective design manufacturing standard or ASME B 16.10 as the case may be before lining.

viii. Socket welded and screwed valves shall have end to end dimension to manufacturer’s standard.

ix. Socket welded valves shall have internal sockets in accordance with ASME B16.11

x. For all butt weld end valves the bevel end (BE) preparation shall be as per ASME B16.25. For

all socket weld end valves the ends shall be as per ASME B16.11 xi. Ends connections of screwed end valves shall be female threaded to ASME B1.20.1 NPT. xii. End flanges of valves shall be in accordance with ASME B16.5 for NPS 24 and smaller and in

accordance with ASME B16.47 Series B for NPS 26 and larger.

xiii. Bores of butt welded valves shall confirm to ASME B36.10 or B36.19 wherever applicable.

xiv. Valves manufactured to ASME B16.34 (globe & check) and all ball / plug valves shall be “regular bore” unless otherwise specified. Full bore design, if required shall be specified in technical specification. Manufacturer’s recommended velocity criteria at valve ports shall be met.

4.9.4.3 Butt welded valves manufactured by machining off the flanges of a flanged valve or machining the Socket welding ends of SW valves are NOT acceptable. 4.9.4.4 All flanged valves shall have flanges integral (except forged valves) with the valve body. For forged valves with weld-on flanges, the valve shall be with BW ends welded with forged WN flanges. The weld joint shall be 100% radiographed. 4.9.4.5 Valve body/bonnet shall be forged / cast as specified. Forging is acceptable in place of casting but not vice-versa. 4.9.4.6 All sandwich type valves shall have self-centering feature. 4.9.4.7 Glandless Piston Valves of non-regulating and regulating type shall be as per Manufacturer’s standard design, with face to face dimension as per ASME B16.10. 4.9.4.8 Safety Gas Tight Valves (SGTV), Isolation Gas Tight Valves (IGTV), Catalyst Transfer Gas tight Valves (CTGTV), Catalyst Transfer Catalyst Tight Valves (CTCTV) shall be as per M/s. Axens specification. 4.9.5 Gate / Globe / Check Valves 4.9.5.1 The valve design shall be outside screw and yoke type (OS & Y) when manufactured as per API600, BS1873, API602, BS EN-ISO15761, BS5154 (bronze valves). All cast valves irrespective of rating and material shall have minimum wall thickness as per API 600. All bolted bonnet gate valves shall confirm to API 600. Globe and Y-Globe Valves shall confirm to BS 1873 and API 600, wherever applicable. Compact (forged) steel valves shall confirm to BS EN ISO 15761 or API 602 or API 606 or ASME 16.34. 4.9.5.2 All Gate and Globe Valves shall be furnished with back seat arrangement.

Page 92: UhdeIndia - Bharat Petroleum · Uhde India Private Limited, Dugal Plaza, 3 rd Floor, Prem Nagar, Bibwewadi Road, Pune 411 037, India TENDER RFQ / Tender No. : U6509 - 3187/ABM

6509-PI-EB-00002 BPCL UAN

Total Pages

ENGINEERING SPECIFICATION FOR PIPING MATERIALS

66-6509-700

32 of

107

© 2010 Uhde India

4.9.5.3 The integral and renewable seating for Gate, Globe and Check Valve shall be as listed below:

Sr. No. MOC Back Seat Disc Seat Body Seat

1 Forged C.S./LTCS/AS Valves Integral Integral Renewable

2 Forged SS/Exotic material Integral Integral Integral

3 Cast C.S/LTCS/AS valve Renewable Integral Renewable

4 Cast SS/Exotic material Integral Integral Integral

4.9.5.4 Renewable seat rings shall be seal welded and threaded seats are not acceptable. 4.9.5.5 Globe valves shall be of full bore design unless otherwise specified. 4.9.5.6 Regulating type globe valve shall have parabolic disc with linear flow character. Regulating type globe valve shall be provided with guided disc for size 2” and above. Non-regulating type globe valve shall have plug type disc 4.9.5.7 Gate valve & bellow sealed globe valves shall have rising stem non-rising hand-wheel design. Globe valve shall have rising stem and rising hand-wheel design. Gate valve shall have solid wedge up to 1 ½” size and the wedge shall be flexible for sizes above 1 ½”. 4.9.5.8 Extended Bonnet wherever specified in the valve data sheet to BS:6364 shall be for "Non-cold box application" unless otherwise specified in the technical specification. Even if not called for in technical specification, if indicated “Cryogenic" service shall be supplied with bonnet extension of 250mm suitable for Cold Box application. 4.9.5.9. All dual plate check valves shall be supplied with fasteners required for valve erection. Deviation to this clause is not permitted. Fastener length shall be compatible to ASME B16.5 for relevant pipe class rating. 4.9.5.10. Swing Check Valves shall confirm to BS1868 or API 600 or ASME B16.34, where applicable. Swing check valve shall have dash pot arrangement for nominal sizes 10” and above. For all swing check valves the hinge pin shall be inside the body. The valve body shall not be punctured. Dual plate wafer check valves shall confirm to API 594. For dual plate check valves design shall be retainer less type. 4.9.5.11. Manufacturer’s straight run requirements of pipe, upstream and downstream of the check valves from any obstruction such as other type of valves or fittings shall be met. When they are installed in the vertical run of pipe, the manufacturer’s recommended practice for straight run requirements of pipe and spring torque design shall be followed. 4.9.5.12. For check valves, where the weight of valve necessitates provisions of lifting lugs, eyebolts and such standard devices the same shall be provided 4.9.5.13. Wherever check valve disc assembly is supported from the cover of the check valves, the following shall be ascertained:

a. Positive location/positioning of cover must be provided to ensure correct alignment of the valve disc b. Hinge pin design must permit accurate alignment of the disc and valve seat

4.9.5.14 In case of spring loaded Check Valves the valve manufacturer shall furnish the Cv value in the construction feature drawing submitted with the offer 4.9.5.15 Bellow seal feature of bellow sealed valve shall comply with BS EN-ISO 15761. Bellow design shall be such that no torsion is developed on bellow. The life cycle of bellow shall be minimum 10000 cycles 4.9.6 By-Pass

Page 93: UhdeIndia - Bharat Petroleum · Uhde India Private Limited, Dugal Plaza, 3 rd Floor, Prem Nagar, Bibwewadi Road, Pune 411 037, India TENDER RFQ / Tender No. : U6509 - 3187/ABM

6509-PI-EB-00002 BPCL UAN

Total Pages

ENGINEERING SPECIFICATION FOR PIPING MATERIALS

66-6509-700

33 of

107

© 2010 Uhde India

4.9.6.1 By-pass requirement for gate valves is indicated in the respective data sheets. As a rule following shall be followed:

Sr. No. Rating Criteria

1 Class 150 on sizes 26" and above

2 Class 300 on sizes 16" and above

3 Class 600 on sizes 6" and above

4 Class 900 on sizes 4" and above

5 ASME 1500 Class on sizes 4" and above

6 ASME 2500 Class on sizes 3" and above

4.9.6.2 By-pass valve shall be a globe valve. The material specification shall be same or equivalent as of main valve. The sizes shall be as under:

Sr. No. Main Valve Size Min. by-pass Valve Size

1 Less than or equal to 4" 1/2"

2 Greater than 4" & less than 10" 3/4"

3 Equal to or greater than 10" 1"

4.9.6.3 Vendor shall supply the by-pass valve duly tested and fitted to the main valve. 4.9.6.4 By-pass piping & fittings shall be of compatible material and design of main valve. 4.9.6.5 Valves with by-pass shall have the direction of flow marked on the main valve. 4.9.6.6 By-pass attachment to the main valve body shall be welded. Screwed connection type is NOT PERMITTED. 4.9.6.7 All fillet welds for by-pass installation shall be 100% examined by DP/MP test. 4.9.6.8 NDT of by-pass valve shall be in line with main valve 4.9.6.9 The by-pass piping arrangement shall be such that clearance between main valve body & by-pass assembly shall be the minimum possible for layout reasons. Vendor shall follow figure on page 53 of this document. 4.9.7 Ball / Plug / butterfly Valves 4.9.7.1 Ball valves and Plug valves shall be of “regular bore design” unless otherwise specified in the technical data sheet. They shall confirm to ISO 17292 / ASME B16.34 wherever applicable and shall meet the fire safe design and anti-static requirements of API 607. Butterfly Valves shall confirm to API 609 wherever applicable. PTFE soft seated butterfly valves shall meet the fire safe requirements of API 607. 4.9.7.2 Ball valve shall be of two piece design and with blow out proof stem. Ball Valves of three-piece or screw-Pin design are NOT PERMITTED. 4.9.7.3 Steel Plug Valves shall confirm to BS 5353 / API 599 short pattern regular bore design. They shall have top entry body construction with integral stem and solid taper plug. Inverted plug are NOT permitted. 4.9.7.4 Soft seated BW/SW end ball/plug valves shall have a 100 mm long seamless pipe nipple (compatible to body material) welded to each end of the valve. Nipples are to be welded prior to assembling Teflon /soft seats/seals. Schedule of nipple shall be indicated in the valve specification sheet. 4.9.7.5 When soft-seated, the Pressure -Temp. rating of soft seating material shall be submitted for review.

Page 94: UhdeIndia - Bharat Petroleum · Uhde India Private Limited, Dugal Plaza, 3 rd Floor, Prem Nagar, Bibwewadi Road, Pune 411 037, India TENDER RFQ / Tender No. : U6509 - 3187/ABM

6509-PI-EB-00002 BPCL UAN

Total Pages

ENGINEERING SPECIFICATION FOR PIPING MATERIALS

66-6509-700

34 of

107

© 2010 Uhde India

4.9.7.6 Bidder to ensure while quoting for fire safe design valves that he has been qualified for supplying these valves by certifying authorities like Lloyds etc. Bidder's offer will be valid only for those size ranges approved by the certifying authority as per the guideline laid down in EN12266 Part II. 4.9.7.7 Ball valves shall be floating ball type/ trunnion mounted type as per following

Sr. No Class NS Feature

1 150 8” & below Floating Ball

10” & above Trunnion mounted

2 300 4” & below Floating Ball

6” & above Trunnion mounted

3 600 & above 1.5”& below Floating Ball

2” & above Trunnion mounted

4.9.7.8 Triple eccentric butterfly valves are PERMITTED in valve sizes 10” and above for ratings class 150/300 and for sizes 8” and above in class 600. They shall be double flanged and gear operated. 4.9.7.9 All Butterfly valves shall have integral disc seat and renewable sleeve body seat 4.9.7.10. All butterfly valves shall be of lugged construction with tapped holes for sizes below 16”, above which they shall supplied in double flanged design. The supply shall also include machine head bolts for lugged valves with tapped holes. 4.9.7.11 All sandwich type valves shall have self-centering feature 4.9.8 Lined Valves 4.9.8.1 Sleeved butterfly valves are valves wherein the entire body of the valve is lined either by moulded liner or by a loose liner. In either case, for rubber sleeves the same shall confirm to IS 4682 or equivalent DIN / ASME / BS / any international standard with minimum thickness of 3mm on the flange facing. 4.9.8.2 When the lining is provided in PTFE /FEP/PFA/PVDF thickness of lining shall be minimum 3mm after machining. 4.9.9 Basis for material selection: Following basis shall be considered while selecting material of construction for Yoke, Yoke bush, Gland Flange, Gland etc.:

Sr. No.

Item Description

1 Disc

Same as body material for cast valves and equivalent to trim material for forged valves

2 Bonnet Same as body material

3 Thrust collar Same as plug material

4 Yoke Same as body/bonnet material

5 Gland Flange Minimum equivalent to body/bonnet but only forged. In case of cast iron or ductile iron the gland flange shall be ASTM A105

6 Yoke Bush Ni-resist

7 Gland Gland material shall be same as trim material

8 Compressor for diaphragm valve

Same as body material

9 Hand Malleable iron/Carbon steel

Page 95: UhdeIndia - Bharat Petroleum · Uhde India Private Limited, Dugal Plaza, 3 rd Floor, Prem Nagar, Bibwewadi Road, Pune 411 037, India TENDER RFQ / Tender No. : U6509 - 3187/ABM

6509-PI-EB-00002 BPCL UAN

Total Pages

ENGINEERING SPECIFICATION FOR PIPING MATERIALS

66-6509-700

35 of

107

© 2010 Uhde India

wheel/lever

10 Locking plate Locking plate material shall be minimum SS304. In case of integral design, locking plate material same as body material is acceptable

11 Bellow material of Bellow seal Valve

Shall be minimum SS321

4.9.10 Trim 4.9.10.1. The trim material wherever indicated in the specification shall mean the following: • Body seating surface • Disc / Gate seating surface • Stem • Bushing or deposited weld for backseat and stem hole guide • Small internal parts normally in contact with the service fluid excluding the pin that is used to make a stem to disc connection. This pin shall be made of minimum austenitic stainless steel material 4.9.10.2. For all gate/globe/check and other metal seated valves wherever differential hardness exists within the trim (e.g. Trim no. 8 as per API 600) the body seat ring shall have the higher hardness. The body seat ring shall be seal welded type. 4.9.10.3 Wherever possible trim materials shall be specified in the purchase description by numbers, the same shall be based on API standards 600 and 602. Combination Trim 1 (F6-13%Cr) is minimum. 4.9.10.4. A minimum differential hardness of 50 BHN shall be provided between seats and wedges or discs and between stem and mating parts for all trim materials. 4.9.10.5. Where this differential is not possible due to metallurgy of the trim, one of the mating surfaces such as seats, back seats and the like shall be hard faced with Stellite no. 6 or an approved equal material and the other mating face shall be hard faced with Stellite no. 21 or an approved material to provide differential hardness required. 4.9.10.6. Hard facing, if used shall be Stellite No. 6. 4.9.10.7 Hardness differential is not required when both surfaces are hard-faced. 4.9.10.8 The final minimum hard facing for stelliting / hard facing by deposition shall be 0.8mm to 1.6mm. 4.9.10.9 Usage of Combination Trim 8 in lieu of Trim 1 is PERMITTED in all services except carbon steel piping requiring compliance with chapter 5, alloy steel piping, stainless piping and carbon steel with PWHT requirement as per M/s. AXENS. 4.9.10.10 Gate valves shall have a solid / flexible wedge as mentioned in 4.9.5.7. The wedge shall be split type in services where temperature exceeds 400 deg. C and rating is more than class 300. 4.9.10.11 Gate valves with drilled wedges making them unidirectional to shut-off are NOT acceptable. 4.9.10.12 Back seating is required for all gate / globe valves to permit repacking under pressure while the valve is in the open position. 4.9.10.13 The shaft materials commonly used such as A479 UNS S20910 or A276 UNS S20910 or 17-4PH are not considered to be Copper bearing alloys. 4.9.10.14 Stem material for butterfly valves to be specified by vendor in his offer

Page 96: UhdeIndia - Bharat Petroleum · Uhde India Private Limited, Dugal Plaza, 3 rd Floor, Prem Nagar, Bibwewadi Road, Pune 411 037, India TENDER RFQ / Tender No. : U6509 - 3187/ABM

6509-PI-EB-00002 BPCL UAN

Total Pages

ENGINEERING SPECIFICATION FOR PIPING MATERIALS

66-6509-700

36 of

107

© 2010 Uhde India

4.9.10.15 Valves for steam service, rating 300# and above requiring IBR certification shall always be provided with stellited seatings. 4.9.10.16 Valves for rating 900# and above shall be provided with stellited seating. 4.9.10.17 For gate / globe valve of NS 2½” & above the body seat / wedge disc seat can be provided of 13% Cr overlay over WCB in place of solid 13% Cr. 4.9.10.18 Stem shall be forged or machined from forged/rolled bar. No casting is permitted. However, integral stem of cast stainless steel ball valve is acceptable. 4.9.10.19 In case of ‘Non NACE’ and ‘Non H2’ service valves wherever stem material is specified as 13% Cr, the valve manufacturer shall provide minimum hardness of 200 BHN. Wherever 13% Cr is specified for Body Seat and Disc Seat, the hardness of Body Seat shall be 300 BHN and that of Disc Seat shall be 250 BHN. 4.9.11 Body-Bonnet Gasket 4.9.11.1. The body-bonnet gasket shall have corrosion resistance equal to or greater than that of the body and bonnet materials. 4.9.11.2. Unless otherwise specified in the purchase description, the bonnet gasket for bolted bonnet valves shall be in accordance with the standard that the valve is designed to except that valves designed to ASME B16.34 shall have bonnet gaskets in accordance with API 600. 4.9.11.3. The Body-Bonnet Gasket shall be of fully confined type, spiral wound without inner and outer rings. 4.9.11.4. Usage of Non-metallic material (PTFE/TFE/GRAPHITE) for Flat Ring Body-Bonnet Gaskets, O-Rings for Body-Bonnet / Body joints, stem packings is acceptable in specific cases. Refer Chapter 20 for Restrictions. 4.9.11.5. The preferred materials of construction for Spiral Wound Gaskets are given below. (Also Refer to Chapter 4.7 – Gaskets)

Body Material Class Gasket

A105-WCB <1500 304/GRAF

LF2-LCB <1500 304/GRAF

F11-WC9 <1500 304/GRAF

F304L-CF3 <1500 304L/GRAF

F321-CF8C <1500 321/GRAF

4.9.11.6. Spiral wound bonnet gaskets are to be provided with inner/outer ring except when encapsulated gaskets type body-bonnet joints are employed. Outer ring may be avoided in case of non-circular spiral wound gasket used in 150 # valve provided the outermost layer of spiral touches the bolts ascertaining the centering. 4.9.12. Stem Packing 4.9.12.1. All Valve stem packing shall be renewable with valve on stream or open position. It shall consist of corrosion-inhibited die-formed Grafoil packing (intermediate rings, 3 nos. minimum) with two braided anti-extrusion end rings (graphite filaments / yarn having 99% Carbon reinforced with SS Wire for temp. less than 425 deg. C and with Inconel Wire for temp. more than 425 deg. C). The joints shall be staggered at 120 degrees so that every fourth joint is at the same position as the first.

Page 97: UhdeIndia - Bharat Petroleum · Uhde India Private Limited, Dugal Plaza, 3 rd Floor, Prem Nagar, Bibwewadi Road, Pune 411 037, India TENDER RFQ / Tender No. : U6509 - 3187/ABM

6509-PI-EB-00002 BPCL UAN

Total Pages

ENGINEERING SPECIFICATION FOR PIPING MATERIALS

66-6509-700

37 of

107

© 2010 Uhde India

4.9.12.2. For valves with size less than 2”, entire packing in die-formed Grafoil / Graphite is permitted. 4.9.12.3. Usage of PTFE / TFE valve stem packing is acceptable only in specific cases. Refer Chapter 20 for Restrictions. 4.9.12.4. O-ring emergency stem seals of ball valves shall be of PTFE or VITON-A. 4.9.12.5. The valve manufacturer shall indicate the maximum temperature limit for packing material installed. 4.9.12.6. For all valves in vacuum service, lantern rings shall be provided. The lantern ring shall have a threaded plug. Depth of stem packing shall be suitably increased to accommodate the same. Live loading arrangement with Beleville springs shall also be provided. All valves in vacuum service shall be tested for vacuum. 4.9.12.7. Usage of Asbestos in any form is NOT PERMITTED. 4.9.12.8. Packing is identified for each valve in each piping class. Refer to Uhde Part No. of valve, for details. The abbreviation “FLEX+GRPH+BRD+RING” refers to 4.9.6.1 above. For operating temperatures more than 538 deg. C, the stem packing shall consist of Flexible Graphite with Inconel Wire mesh – “FLEX +GRPH+INC+WIRE”. 4.9.13 Body Fasteners All Clauses from Chapter 4.8 are applicable for the fasteners supplied by vendors along with valve. 4.9.14 Operation 4.9.14.1 Wrench operated valves are NOT PERMITTED. 4.9.14.2 Generally the valves are hand wheel or lever operated. 4.9.14.3 Ball, Plug and Butterfly valves shall be provided with lever operators and shall have "open" position indicators with limit stops. 4.9.14.4 Butterfly valves shall be provided with a notched throttling plate. The throttling plate is considered as a disc positioner and shall not be treated as a locking mechanism. 4.9.14.5 Hand wheel diameter shall not exceed 750 mm and lever length shall not exceed 500 mm on both sides. 4.9.14.6 The maximum hand-wheel diameter shall not be greater than 750mm for all valves NS =< 36”. 4.9.14.7 Hand-wheel closing direction shall be clockwise. 4.9.14.8 Vendor shall indicate dimensions of valve spindle / handwheel position during both open & closed position in the drawing. 4.9.14.9 Effort to operate shall not exceed 35 kgs. at hand wheel periphery. However, failing to meet the above requirements, vendor shall offer gear operated valve.

Page 98: UhdeIndia - Bharat Petroleum · Uhde India Private Limited, Dugal Plaza, 3 rd Floor, Prem Nagar, Bibwewadi Road, Pune 411 037, India TENDER RFQ / Tender No. : U6509 - 3187/ABM

6509-PI-EB-00002 BPCL UAN

Total Pages

ENGINEERING SPECIFICATION FOR PIPING MATERIALS

66-6509-700

38 of

107

© 2010 Uhde India

4.9.14.10. When gear operators are required, they shall be provided in accordance with below mentioned table:

Rating Gate Globe Ball / Plug Butterfly

Class 150 >=14” >=14” >=6” >=10”

Class 300 >=12” >=12” >=6” >=8”

Class 600 >=10” >=10” >=4”

Class 800/900 >=8” >=6” >=3”

Class 1500 >=6” >=4” >=3”

Class 2500 >=3” >=3”

For sizes lower than these ranges, hand wheel / lever shall be provided. 4.9.14.11 Gear operated valves shall be supplied with position indicators for open / close positions along with limit stops as under:

a. For Gate / Globe / Diaphragm Valves, totally enclosed bevel gear in grease case with grease nipples/plugs.

b. For Ball / Plug / Butterfly Valves, totally enclosed helical worm or combination of helical worm and spur gear in grease case with grease nipples/plugs.

c. For pressure balance plug valves the gear operator shall be as per manufacturer’s recommendation 4.9.14.12. The gear operators shall be manufacturer’s standard and weatherproof. 4.9.14.13. On gear operators the maximum allowable rim-pull shall be 35 kgs 4.9.14.14. Unless otherwise specified the gear operator shall be side hand-wheel horizontal axis type. 4.9.14.15 Valves with chain or gear operators shall have an indicator to show if open or closed. 4.9.14.16 Gear operator shall be so designed to operate effectively with the differential pressure across the closed valve equal to the cold non-shock pressure rating. 4.9.14.17. Where gear operator is not called for as per clauses above but vendor recommends a gear operator, he shall highlight such case(s) and quote separate prices for the valve and gear operator. 4.9.14.18 Quarter turn lever operated valves viz. ball, plug and butterfly shall be provided with a locking mechanism for all sizes as a standard constructional feature. Locking arrangement shall be for both open & closed position. 4.9.14.19. Car Seal Open (CSO) and Car Seal Close (CSC) shall be considered at par with Mechanically Locked Open and Locked Close arrangements. 4.9.14.20. Standard Locking mechanism shall consist of Chain and Numbered Padlock with key which shall be installed on all valves Locked Open and Locked Close. 4.9.14.21 Modular key-operated interlocks with coded-card linear-key concept shall be restricted to valves requiring interlock for sizes 10” and above in class 150/300 and for sizes 8” and above in class 600. 4.9.14.22 Locked open or car sealed open valves shall include metal tags permanently attached to the valve. The tag shall read: "This valve must not be closed without written permission from responsible authority". The stems of locked open or car sealed open valves shall be installed in horizontal position. 4.9.14.23. The supply of lug type valves includes the stud bolts and nuts for all the threaded holes. Bolting material shall be in accordance with chapter 4.8.

Page 99: UhdeIndia - Bharat Petroleum · Uhde India Private Limited, Dugal Plaza, 3 rd Floor, Prem Nagar, Bibwewadi Road, Pune 411 037, India TENDER RFQ / Tender No. : U6509 - 3187/ABM

6509-PI-EB-00002 BPCL UAN

Total Pages

ENGINEERING SPECIFICATION FOR PIPING MATERIALS

66-6509-700

39 of

107

© 2010 Uhde India

4.9.15 General Points 4.9.15.1. Where no specific applicable design standard exists or when certain types of components differ somewhat from the standards mentioned in this specification, the design of all pressure containing components / valves shall confirm to the requirements of ASME B31.3 and ASME B16.34 respectively. 4.9.15.2. Any exceptions to the purchase description shall be clearly stated as such in the quotation. 4.9.15.3. All Carbon Steel Valve Bodies and Bonnets except carbon steels requiring compliance with chapter 5 shall have a max. carbon content restricted to 0.25%. Additionally, the carbon equivalent shall be restricted to 0.42%. The Carbon content shall be derived from the below mentioned formula: CE = C+Mn/6 + (Cr+Mo+V)/5 + (Ni+Cu)/15 4.9.15.4. All LTCS pipes CE or Ceq shall be as follows:

CE < 0.43% for thickness < 2” CE < 0.46% for thickness >= 2”

4.9.15.5. For LTCS plates CE or Ceq shall be as follows: CE < 0.42% for thickness < 2” CE < 0.45% for thickness >= 2” 4.9.15.6. For valves described "IBR", valves shall be in accordance with the latest IBR (Indian Boiler Regulation) including the requirements specified in the specification. SW/BW end carbon steel valves under IBR, the chemical composition shall conform to the following: Carbon (Max) : 0.25% Others (S, P, Mn) : As per IBR Regulations The above composition is not valid for non-IBR valves. 4.9.15.7. Deleted. 4.9.15.8. For details of heat treatment, Tests, Non-destructive examination, radiography, refer Chapter 9, 10. For details of inspection, PMI refer Chapter 11, 12. For HIC compliant materials the items shall comply with all the requirements of Chapter 5 in addition to Chapters 9, 10, 11 and 12. 4.9.15.9. All IBR valves shall be painted red on Body / Bonnet cover joint for easy identification.

Page 100: UhdeIndia - Bharat Petroleum · Uhde India Private Limited, Dugal Plaza, 3 rd Floor, Prem Nagar, Bibwewadi Road, Pune 411 037, India TENDER RFQ / Tender No. : U6509 - 3187/ABM

6509-PI-EB-00002 BPCL UAN

Total Pages

ENGINEERING SPECIFICATION FOR PIPING MATERIALS

66-6509-700

40 of

107

© 2010 Uhde India

4.10 Spectacle Blinds, Paddle Blanks and Spacers, Blinds for Pressure Testing. 4.10.1 Spectacle Blinds in Figure 8 design shall be used up to NS 200 (8”). 4.10.2 Pair of Paddle Blanks and Spacers shall be used for NS more than 200 (8”). 4.10.3 The dimensions of Spectacle Blinds and Paddle Blanks with Spacers shall be as per ASME B16.48. The nominal sizes that are not covered in ASME B16.48, supply shall be as per Uhde drawing. 4.10.4 Spectacle blinds, paddle blanks and spacers without raised face are NOT PERMITTED. 4.10.5 Blinds for pressure testing shall be designed as per ASME B31.3. 4.10.6 Using slip plates in place of test blinds is NOT PERMITTED. 4.10.7 All Carbon Steel items except carbon steels requiring compliance with chapter 5 shall have a max. carbon content restricted to 0.25%. Additionally, the carbon equivalent shall be restricted to 0.42%. The Carbon content shall be derived from the below mentioned formula: CE = C+Mn/6 + (Cr+Mo+V)/5 + (Ni+Cu)/15 4.10.8 All LTCS forged items CE or Ceq shall be as follows:

CE < 0.43% for thickness < 2” CE < 0.46% for thickness >= 2”

4.10.9 For LTCS plates CE or Ceq shall be as follows: CE < 0.42% for thickness < 2” CE < 0.45% for thickness >= 2” 4.10.10 Deleted. 4.10.11. For details of heat treatment, Tests, Non-destructive examination, radiography, refer Chapter 9, 10. For details of inspection, PMI refer Chapter 11, 12. For HIC compliant materials the items shall comply with all the requirements of Chapter 5 in addition to Chapters 9, 10, 11 and 12.

Page 101: UhdeIndia - Bharat Petroleum · Uhde India Private Limited, Dugal Plaza, 3 rd Floor, Prem Nagar, Bibwewadi Road, Pune 411 037, India TENDER RFQ / Tender No. : U6509 - 3187/ABM

6509-PI-EB-00002 BPCL UAN

Total Pages

ENGINEERING SPECIFICATION FOR PIPING MATERIALS

66-6509-700

41 of

107

© 2010 Uhde India

4.11 - SIGHT FLOW INDICATORS 4.11.1 ASME specifications specified against each product are governing. This includes mechanical properties, chemical properties, dimensions and supplementary requirements as applicable. For Glass the supplier shall provide all details including basis for selection of material, calculation for thickness, burst test pressure, mechanical properties, results of tests carried out, Past Track Record (last 2 years). 4.11.2 Sight Glasses or Sight Flow Indicators shall be armoured with metal net and double glass on each side. 4.11.3 Seals and gaskets in sight flow indicators are permitted in PTFE subject to temperature limit of 204 deg. C 4.11.4 All Carbon Steel items except carbon steels requiring compliance with chapter 5 shall have a max. carbon content restricted to 0.25%. Additionally, the carbon equivalent shall be restricted to 0.42%. The Carbon content shall be derived from the below mentioned formula: CE = C+Mn/6 + (Cr+Mo+V)/5 + (Ni+Cu)/15 4.11.5 All LTCS items CE or Ceq shall be as follows:

CE < 0.43% for thickness < 2” CE < 0.46% for thickness >= 2”

4.11.6. Hydrotest for sight glass shall be done at a pressure of 1.5 times the design pressure specified in the technical specification 4.11.7. Lined sight glass shall have face to face dimension as per manufacturer's standard. 4.11.8. Deleted. 4.11.9. For details of heat treatment, Tests, Non-destructive examination, radiography, refer Chapter 9, 10. For details of inspection refer Chapter 11, 12. For HIC compliant materials the items shall comply with all the requirements of Chapter 5 in addition to Chapters 9, 10, 11 and 12.

Page 102: UhdeIndia - Bharat Petroleum · Uhde India Private Limited, Dugal Plaza, 3 rd Floor, Prem Nagar, Bibwewadi Road, Pune 411 037, India TENDER RFQ / Tender No. : U6509 - 3187/ABM

6509-PI-EB-00002 BPCL UAN

Total Pages

ENGINEERING SPECIFICATION FOR PIPING MATERIALS

66-6509-700

42 of

107

© 2010 Uhde India

4.12 - Y-STRAINERS AND T-STRAINERS 4.12.1 ASME specifications specified against each product are governing. This includes mechanical properties, chemical properties, dimensions and supplementary requirements as applicable. For Perforated Sheet and Wire Mesh used, the supplier shall provide all details including material used, dimensional details, calculation for burst test pressure, back pressure at 50% clogging, % open area calculation, Past Track Record (2 years) of Sub-Suppliers (wherever applicable) etc.. 4.12.2 In Y-Strainers the straining element shall consist of a combination of drilled / perforated sheet and a wire mesh firmly secured to the outside of the drilled / perforated sheet. The approximate ratio between the straining area and the section of pipe shall be 3:1. The seal rings shall be non-asbestos, graphoil based flat rings with or without spiral windings. Refer chapter 20 for Restrictions. 4.12.3 In T-Strainers the straining element shall consist of a combination of drilled / perforated sheet and a wire mesh firmly secured to the outside of the drilled / perforated sheet mounted in specific configuration to achieve maximum open area to pipe area ratio. It shall be housed inside a standard wrought tee. The approximate ratio between the straining area and the section of pipe shall be 2:1. The effective area of the screen assembly shall not be less than 150 percent of the cross sectional area of the pipe to achieve the desired ratio the length of the element shall be varied. Refer chapter 20 for Restrictions. 4.12.4 For both Y-Type and T-Strainers, Hardness test is applicable when used in carbon steel piping requiring compliance with chapter 5. 4.12.5 For both Y-Type and T-Strainers, HIC and SSC tests are applicable when used in carbon steel piping requiring compliance with chapter 5 4.12.6 For both Y-Type and T-Strainers, the internals shall be in SS material of construction. 4.12.7 For both Y-Type and T-Strainers, the internals are exempt from HIC and SSC Test however the hardness control shall be governed by NACE MR 0175 guidelines when used in carbon steel piping requiring compliance with chapter 5 4.12.8 For both Y-Type and T-Strainers, body fasteners and gaskets shall be in accordance with Chapter 4.7 and 4.8 respectively. 4.12.9 For both Y-Type and T-Strainers, drain arrangements when required shall be free of threaded designs. 4.12.10 All Carbon Steel items except carbon steels requiring compliance with chapter 5 shall have a max. Carbon content restricted to 0.25%. Additionally, the carbon equivalent shall be restricted to 0.42%. The Carbon content shall be derived from the below mentioned formula: CE = C+Mn/6 + (Cr+Mo+V)/5 + (Ni+Cu)/15 4.12.11 All LTCS pipes CE or Ceq shall be as follows:

CE < 0.43% for thickness < 2” CE < 0.46% for thickness >= 2”

4.12.13 For LTCS plates CE or Ceq shall be as follows: CE < 0.42% for thickness < 2” CE < 0.45% for thickness >= 2”

Page 103: UhdeIndia - Bharat Petroleum · Uhde India Private Limited, Dugal Plaza, 3 rd Floor, Prem Nagar, Bibwewadi Road, Pune 411 037, India TENDER RFQ / Tender No. : U6509 - 3187/ABM

6509-PI-EB-00002 BPCL UAN

Total Pages

ENGINEERING SPECIFICATION FOR PIPING MATERIALS

66-6509-700

43 of

107

© 2010 Uhde India

4.12.14 Strainers shall be designed, fabricated, and inspected in accordance with ASME Section VIII, Division 1. 4.12.15 Strainers shall be designed and fabricated to prevent damage due to vibration, differential pressure, pulsating flow, and impact of objects. Screens of mesh size 20 or finer shall be reinforced with perforated plates or heavier screen with steel bars. 4.12.16 ASME Class 900 and greater cast strainer bodies and integral flanges in hydrogen service shall have a casting quality factor of 100 percent. The examination shall be performed by radiography in accordance with ASME Section VIII, Division 1, Appendix 7. For 2 inch and smaller strainer bodies, if radiography is not possible, a helium mass spectrometer test (probe technique) in accordance with ASME Section V, Subsection A, Article 10, Appendix V is acceptable. Casting repairs and identification shall meet the requirements of paragraph 7-4 and 7-5 of Appendix 7 of ASME Section VIII, Division 1 4.12.17 Inline Y-Type and T-Type strainers shall have a flanged clean out connection 4.12.18 Strainers for centrifugal pump and centrifugal compressor suction lines shall be either a perforated plate with 5/32 inch (4mm) diameter holes, or 5 mesh screen with 62 percent open area . The effective area of the screen assembly shall not be less than 150 percent of the pipe cross sectional area. A temporary 40 mesh (400 micron), 0.01 inch (0.254mm) diameter wire overlay screen cloth shall be installed for start-up 4.12.19 Strainers for reciprocating compressor suction lines shall be either a perforated plate with 5/32 inch (4mm) diameter holes, or 5 mesh screen with 62 percent open area. The effective area of the screen assembly shall not be less than 150 percent of the pipe cross sectional area. A temporary 80 mesh (177 micron), 0.01 inch (0.254mm) diameter wire overlay screen cloth shall be installed for start-up 4.12.20 Strainer bodies for basket strainer shall be provided with tapped NPT blow-off connections 4.12.21 Strainers shall be provided with bolted top covers for easy removal of strainer elements 4.12.22 Large capacity fabricated strainers shall be provided with their own floor mounting stands 4.12.23 Strainer element withdrawal space needs to be indicated in constructional feature drawing 4.12.24 For 150# flanged end unlined strainers face to face dimension shall be as per ASME B16.10 (Y-type Globe Valve, Class 150). However, for strainers above 150# rating and ends other than that stated above, face to face dimension shall be as per manufacturer's standard. 4.12.25. Deleted. 4.12.26. For details of heat treatment, Tests, Non-destructive examination, radiography, refer Chapter 9, 10. For details of inspection, PMI refer Chapter 11, 12. For HIC compliant materials the items shall comply with all the requirements of Chapter 5 in addition to Chapters 9, 10, 11 and 12. 4.12.27. For conical strainers, one plain spacer as shown in the drawing shall be supplied.

Page 104: UhdeIndia - Bharat Petroleum · Uhde India Private Limited, Dugal Plaza, 3 rd Floor, Prem Nagar, Bibwewadi Road, Pune 411 037, India TENDER RFQ / Tender No. : U6509 - 3187/ABM

6509-PI-EB-00002 BPCL UAN

Total Pages

ENGINEERING SPECIFICATION FOR PIPING MATERIALS

66-6509-700

44 of

107

© 2010 Uhde India

4.13 Fabricated Special Parts 4.13.1 ASME specifications specified against each product are governing. This includes mechanical properties, chemical properties, dimensions and supplementary requirements as applicable. For all special parts, the supplier shall provide all details including MTC, physical properties reports, chemical analysis reports, Past Track Record. 4.13.2 OD and nominal wall thickness of Nipples shall be in accordance with ASME B36.10 / 19. Length of the Nipple in millimeters shall be 100mm for NS less than 2” 4.13.3 All Carbon Steel Valve Bodies and Bonnets except carbon steels requiring compliance with chapter 5 shall have a max. carbon content restricted to 0.25%. Additionally, the carbon equivalent shall be restricted to 0.42%. The Carbon content shall be derived from the below mentioned formula: CE = C+Mn/6 + (Cr+Mo+V)/5 + (Ni+Cu)/15 4.13.4 All LTCS pipes CE or Ceq shall be as follows:

CE < 0.43% for thickness < 2” CE < 0.46% for thickness >= 2”

4.13.5 For LTCS plates CE or Ceq shall be as follows: CE < 0.42% for thickness < 2” CE < 0.45% for thickness >= 2” 4.13.6. Deleted. 4.13.7 Special parts include the following but are not limited to: Injection quills 3D/5D/7D/15D/20D bends and returns Spray nozzles Sampling systems complete with sample bottles or bombs, tubing, valves etc.. Perforated internal pipes Wire meshes Sleeves Sampling Valves Catalyst Gas Tight valves Items with non standard nominal sizes Gulley Traps Hoses Steam Traps Condensate Traps Fabricated Laterals Distributors Compact Steam Trapping Manifolds Compact Steam Traps Compact Steam Trapping manifolds and Trapping stations shall be as per Manufacturer’s standard design, with forged multi-way manifolds. 4.13.8 Hydrotest for hoses shall be done at a pressure of 1.6 times the design pressure and the bursting pressure shall be minimum 3.15 times design pressure(Hydro) (only certificate), specified in the technical specification.

Page 105: UhdeIndia - Bharat Petroleum · Uhde India Private Limited, Dugal Plaza, 3 rd Floor, Prem Nagar, Bibwewadi Road, Pune 411 037, India TENDER RFQ / Tender No. : U6509 - 3187/ABM

6509-PI-EB-00002 BPCL UAN

Total Pages

ENGINEERING SPECIFICATION FOR PIPING MATERIALS

66-6509-700

45 of

107

© 2010 Uhde India

4.13.9 Bidder to furnish model No., capacity curve, minimum/maximum Pressure and minimum differential pressure for trap selected. 4.13.10 Bidder may offer suitable alternative type of trap. If offered trap size differs from line size, bidder to provide suitable Reducer/Expander to match the line size. Steam traps shall have face to face dimension as per manufacturer's standard 4.13.11 Deleted. 4.13.12 For details of heat treatment, Tests, Non-destructive examination, radiography, refer Chapter 9, 10. For details of inspection refer Chapter 11, 12. For HIC compliant materials the items shall comply with all the requirements of Chapter 5 in addition to Chapters 9, 10, 11 and 12.

Page 106: UhdeIndia - Bharat Petroleum · Uhde India Private Limited, Dugal Plaza, 3 rd Floor, Prem Nagar, Bibwewadi Road, Pune 411 037, India TENDER RFQ / Tender No. : U6509 - 3187/ABM

6509-PI-EB-00002 BPCL UAN

Total Pages

ENGINEERING SPECIFICATION FOR PIPING MATERIALS

66-6509-700

46 of

107

© 2010 Uhde India

4.14 Document Submission Bidder shall submit with the offer the following: Construction feature drawings indicating all construction features, dimensional details and weights. Descriptive and illustrative catalogue information are not acceptable Drawings for valves accessories like gear operator, locking arrangement, motor operators, limit switches etc. giving major salient dimensions One copy of the valve specification sheets signed as "accepted" with seal by the manufacturer with all deviations marked clearly under the deviation column. Deviation indicated elsewhere will not be entertained. The sheet must bear the seal & signature of the bidder in technical specification sheet. The bidder shall indicate the drawing number and revision number of the construction feature drawing submitted along with offer Procedure as per above clause shall also be followed by way of declaring “acceptance” or deviation (if any) against each clause of this document in the blank space provided for the same If the bidder is regretting or has no deviation to state for any specific valve code the bidder shall clearly specify on the applicable valve specification sheet as "regret" or "no deviation". Failure to submit documents as specified in clauses above, shall lead to rejection of the offer After the placement of order on successful bidder: On the issue of Letter/Fax of Intent, UIL shall issue order specification after incorporating all the acceptable/agreed deviations in the specification. The construction feature drawing submitted along with offer shall be approved by UIL and sent to vendor along with the order technical specification. The order specification along with approved drawing shall form an integral part of the order. No deviation to specification shall be permitted after placement of order Approval of drawings shall be valid only for construction features & dimensions. Material specification shall be as per Technical Specification. In case the drawing is approved with comments, then the drawing shall not be re-submitted for final approval. These comments shall be incorporated in final documentation drawings Test reports shall be supplied for all mandatory tests as per the applicable code. Test reports shall also be furnished for any supplementary tests as specified in technical specification sheet or any other technical document forming part of valve enquiry For final documentation: The final drawing submitted for documentation shall incorporate the material and dimensional details as per the order specification with the constructional features remaining unchanged. Refer chapter 4.20 for summary of engineering and final documents

Page 107: UhdeIndia - Bharat Petroleum · Uhde India Private Limited, Dugal Plaza, 3 rd Floor, Prem Nagar, Bibwewadi Road, Pune 411 037, India TENDER RFQ / Tender No. : U6509 - 3187/ABM

6509-PI-EB-00002 BPCL UAN

Total Pages

ENGINEERING SPECIFICATION FOR PIPING MATERIALS

66-6509-700

47 of

107

© 2010 Uhde India

4.15 Guarantee All valves and their components shall be guaranteed for trouble-free operation for a period of 12 months from the date of commissioning unless otherwise specified in any other document.

4.16 Maintenance Spares Bidder should furnish a complete list of maintenance spares required for two years trouble-free operation along with recommended quantities and quote the price for the same.

Page 108: UhdeIndia - Bharat Petroleum · Uhde India Private Limited, Dugal Plaza, 3 rd Floor, Prem Nagar, Bibwewadi Road, Pune 411 037, India TENDER RFQ / Tender No. : U6509 - 3187/ABM

6509-PI-EB-00002 BPCL UAN

Total Pages

ENGINEERING SPECIFICATION FOR PIPING MATERIALS

66-6509-700

48 of

107

© 2010 Uhde India

4.17 LIST OF RECOMMENDED FOUNDRIES FOR VALVE CASTINGS

MATERIALS NAME OF FOUNDRY

CS SS AS REMARKS

M/s Ambaraams, Shimoga √ √ √

M/s J. Son Foundry P. Ltd., Sangli √ √ √

M/s Malnad Alloy Castings Pvt. Ltd., Shimoga √ √ √

M/s Shri Venkateshwara Enterprises, Bellary √ √ √

M/s Creative Castings Ltd., Junagadh √ √ √

M/s The Indian Smelting & Refining Co.Ltd., Thane √ √ √

M/s 21st Century Castings, Udyog Nagar. √ √ -

M/s Galaxy Spatromelt Pvt. Ltd., Nashik. √ √ -

M/s Victory Alloy Steel Pvt. Ltd., Badlapur √ - -

M/s Oswal Industries, Mehsana √ √ -

M/s Secals Ltd., Chennai √ √ √

M/s Alagendran, Coimbatore √ √ √

M/s NECO Alloys and castings, Nagpur √ √ √

Note: Additionally foundries approved by reputed 3rd party inspection agencies like LRIS, EIL, BV, DNV, ABS Tech, SGS, TUV are acceptable for which documentary proof shall be produced immediately on placement of order.

Page 109: UhdeIndia - Bharat Petroleum · Uhde India Private Limited, Dugal Plaza, 3 rd Floor, Prem Nagar, Bibwewadi Road, Pune 411 037, India TENDER RFQ / Tender No. : U6509 - 3187/ABM

6509-PI-EB-00002 BPCL UAN

Total Pages

ENGINEERING SPECIFICATION FOR PIPING MATERIALS

66-6509-700

49 of

107

© 2010 Uhde India

Page 110: UhdeIndia - Bharat Petroleum · Uhde India Private Limited, Dugal Plaza, 3 rd Floor, Prem Nagar, Bibwewadi Road, Pune 411 037, India TENDER RFQ / Tender No. : U6509 - 3187/ABM

6509-PI-EB-00002 BPCL UAN

Total Pages

ENGINEERING SPECIFICATION FOR PIPING MATERIALS

66-6509-700

50 of

107

© 2010 Uhde India

Page 111: UhdeIndia - Bharat Petroleum · Uhde India Private Limited, Dugal Plaza, 3 rd Floor, Prem Nagar, Bibwewadi Road, Pune 411 037, India TENDER RFQ / Tender No. : U6509 - 3187/ABM

6509-PI-EB-00002 BPCL UAN

Total Pages

ENGINEERING SPECIFICATION FOR PIPING MATERIALS

66-6509-700

51 of

107

© 2010 Uhde India

Page 112: UhdeIndia - Bharat Petroleum · Uhde India Private Limited, Dugal Plaza, 3 rd Floor, Prem Nagar, Bibwewadi Road, Pune 411 037, India TENDER RFQ / Tender No. : U6509 - 3187/ABM

6509-PI-EB-00002 BPCL UAN

Total Pages

ENGINEERING SPECIFICATION FOR PIPING MATERIALS

66-6509-700

52 of

107

© 2010 Uhde India

Page 113: UhdeIndia - Bharat Petroleum · Uhde India Private Limited, Dugal Plaza, 3 rd Floor, Prem Nagar, Bibwewadi Road, Pune 411 037, India TENDER RFQ / Tender No. : U6509 - 3187/ABM

6509-PI-EB-00002 BPCL UAN

Total Pages

ENGINEERING SPECIFICATION FOR PIPING MATERIALS

66-6509-700

53 of

107

© 2010 Uhde India

Page 114: UhdeIndia - Bharat Petroleum · Uhde India Private Limited, Dugal Plaza, 3 rd Floor, Prem Nagar, Bibwewadi Road, Pune 411 037, India TENDER RFQ / Tender No. : U6509 - 3187/ABM

6509-PI-EB-00002 BPCL UAN

Total Pages

ENGINEERING SPECIFICATION FOR PIPING MATERIALS

66-6509-700

54 of

107

© 2010 Uhde India

4.20 COMPLIANCE SHEET 4.20.1. Vendor to indicate YES/NO against all clauses under column captioned ‘Compliance’. 4.20.2. In case of non compliance vendor to indicate deviation against relevant clauses.

COMPONENT TYPE CLAUSE NO.

COMPILANCE (YES/NO)

DEVIATION (In case of Non-Compliance)

4.4.1

4.4.2

4.4.3

4.4.4

4.4.5

4.4.6

4.4.7

4.4.8

4.4.9

4.4.10

4.4.11

4.4.12

4.4.13

4.4.14

4.4.15

4.4.16

4.4.17

PIP

ES

4.4.18

4.5.2

4.5.3

4.5.4

4.5.5

4.5.6

4.5.7

4.5.8

4.5.9

4.5.10

4.5.11

4.5.12

4.5.13

4.5.14

4.5.15

4.5.16

4.5.17

4.5.18

4.5.19

4.5.20

FIT

TIN

GS

(EL

BO

WS

, R

ED

UC

ER

S,

CA

PS

, C

OU

PL

ING

, T

EE

)

4.5.21

Page 115: UhdeIndia - Bharat Petroleum · Uhde India Private Limited, Dugal Plaza, 3 rd Floor, Prem Nagar, Bibwewadi Road, Pune 411 037, India TENDER RFQ / Tender No. : U6509 - 3187/ABM

6509-PI-EB-00002 BPCL UAN

Total Pages

ENGINEERING SPECIFICATION FOR PIPING MATERIALS

66-6509-700

55 of

107

© 2010 Uhde India

CLAUSE NO. COMPILANCE (YES/NO)

DEVIATION (In case of Non-Compliance)

4.5.22

4.5.23

4.5.24

4.5.25

4.5.26

4.5.27

4.5.28

4.5.29

4.5.30

4.5.31

4.5.32

4.5.33

4.5.34

4.5.35

4.5.36

4.5.37

4.5.38

4.6.2

4.6.3

4.6.4

4.6.5

4.6.6

4.6.7

4.6.8

4.6.9

4.6.10

4.6.11

4.6.12

4.6.13

4.6.14

4.6.15

4.6.16

4.6.17

4.6.18

4.6.19

4.6.20

4.6.21

4.6.22

4.6.23

4.6.24

4.6.25

FL

AN

GE

S

4.6.26

4.7.1

4.7.2

GASKETS

4.7.3

FITTINGS

Page 116: UhdeIndia - Bharat Petroleum · Uhde India Private Limited, Dugal Plaza, 3 rd Floor, Prem Nagar, Bibwewadi Road, Pune 411 037, India TENDER RFQ / Tender No. : U6509 - 3187/ABM

6509-PI-EB-00002 BPCL UAN

Total Pages

ENGINEERING SPECIFICATION FOR PIPING MATERIALS

66-6509-700

56 of

107

© 2010 Uhde India

CLAUSE NO. COMPILANCE (YES/NO)

DEVIATION (In case of Non-Compliance)

4.7.4

4.7.5

4.7.6

4.7.7

4.7.8

4.7.9

4.7.10

4.7.11

4.7.12

4.7.13

4.7.14

4.8.2

4.8.3

4.8.4

4.8.5

4.8.6

4.8.7

4.8.8

4.8.9

4.8.10

4.8.11

4.8.12

4.8.13

4.8.14

4.8.15

4.8.16

4.8.17

4.8.18

FA

ST

EN

ER

S

4.8.19

4.9.1

4.9.2

4.9.3.1

4.9.3.2

4.9.3.3

4.9.3.4

4.9.4.1

4.9.4.2

4.9.4.3

4.9.4.4

4.9.4.5

4.9.4.6

4.9.4.7

4.9.4.8

4.9.5.1

V A

L V

E S

(G

AT

E, G

LO

BE

, C

HE

CK

, B

AL

L,

BU

TT

ER

FL

Y,

PIS

TO

N)

4.9.5.2

GASKET

Page 117: UhdeIndia - Bharat Petroleum · Uhde India Private Limited, Dugal Plaza, 3 rd Floor, Prem Nagar, Bibwewadi Road, Pune 411 037, India TENDER RFQ / Tender No. : U6509 - 3187/ABM

6509-PI-EB-00002 BPCL UAN

Total Pages

ENGINEERING SPECIFICATION FOR PIPING MATERIALS

66-6509-700

57 of

107

© 2010 Uhde India

CLAUSE NO. COMPILANCE (YES/NO)

DEVIATION (In case of Non-Compliance)

4.9.5.3

4.9.5.4

4.9.5.5

4.9.5.6

4.9.5.7

4.9.5.8

4.9.5.9

4.9.5.10

4.9.5.11

4.9.5.12

4.9.5.13

4.9.5.14

4.9.5.15

4.9.6.1

4.9.6.2

4.9.6.3

4.9.6.4

4.9.6.5

4.9.6.6

4.9.6.7

4.9.6.8

4.9.6.9

4.9.7.1

4.9.7.2

4.9.7.3

4.9.7.4

4.9.7.5

4.9.7.6

4.9.7.7

4.9.7.8

4.9.7.9

4.9.7.10

4.9.7.11

4.9.8

4.9.9

4.9.10.1

4.9.10.2

4.9.10.3

4.9.10.4

4.9.10.5

4.9.10.6

4.9.10.7

4.9.10.8

4.9.10.9

4.9.10.10

VALVES

Page 118: UhdeIndia - Bharat Petroleum · Uhde India Private Limited, Dugal Plaza, 3 rd Floor, Prem Nagar, Bibwewadi Road, Pune 411 037, India TENDER RFQ / Tender No. : U6509 - 3187/ABM

6509-PI-EB-00002 BPCL UAN

Total Pages

ENGINEERING SPECIFICATION FOR PIPING MATERIALS

66-6509-700

58 of

107

© 2010 Uhde India

CLAUSE NO. COMPILANCE (YES/NO)

DEVIATION (In case of Non-Compliance)

4.9.10.11

4.9.10.12

4.9.10.13

4.9.10.14

4.9.10.15

4.9.10.16

4.9.10.17

4.9.10.18

4.9.10.19

4.9.11.1

4.9.11.2

4.9.11.3

4.9.11.4

4.9.11.5

4.9.11.6

4.9.12.1

4.9.12.2

4.9.12.3

4.9.12.4

4.9.12.5

4.9.12.6

4.9.12.7

4.9.12.8

4.9.13

4.9.14.1

4.9.14.2

4.9.14.3

4.9.14.4

4.9.14.5

4.9.14.6

4.9.14.7

4.9.14.8

4.9.14.9

4.9.14.10

4.9.14.11

4.9.14.12

4.9.14.13

4.9.14.14

4.9.14.15

4.9.14.16

4.9.14.17

4.9.14.18

4.9.14.19

4.9.14.20

4.9.14.21

VALVES

Page 119: UhdeIndia - Bharat Petroleum · Uhde India Private Limited, Dugal Plaza, 3 rd Floor, Prem Nagar, Bibwewadi Road, Pune 411 037, India TENDER RFQ / Tender No. : U6509 - 3187/ABM

6509-PI-EB-00002 BPCL UAN

Total Pages

ENGINEERING SPECIFICATION FOR PIPING MATERIALS

66-6509-700

59 of

107

© 2010 Uhde India

CLAUSE NO. COMPILANCE (YES/NO)

DEVIATION (In case of Non-Compliance)

4.9.14.22

4.9.14.23

4.9.15.1

4.9.15.2

4.9.15.3

4.9.15.4

4.9.15.5

4.9.15.6

4.9.15.7

4.9.15.8

4.9.15.9

4.10.1

4.10.2

4.10.3

4.10.4

4.10.5

4.10.6

4.10.7

4.10.8

4.10.9

4.10.10

BL

IND

S &

SP

AC

ER

S

4.10.11

4.11.1

4.11.2

4.11.3

4.11.4

4.11.5

4.11.6

4.11.7

4.11.8

SIG

HT

FL

OW

IN

DIC

AT

OR

S

4.11.9

4.12.1

4.12.2

4.12.3

4.12.4

4.12.5

4.12.6

4.12.7

4.12.8

4.12.9

4.12.10

4.12.11

4.12.12

4.12.13

ST

RA

INE

RS

4.12.14

VALVES

Page 120: UhdeIndia - Bharat Petroleum · Uhde India Private Limited, Dugal Plaza, 3 rd Floor, Prem Nagar, Bibwewadi Road, Pune 411 037, India TENDER RFQ / Tender No. : U6509 - 3187/ABM

6509-PI-EB-00002 BPCL UAN

Total Pages

ENGINEERING SPECIFICATION FOR PIPING MATERIALS

66-6509-700

60 of

107

© 2010 Uhde India

CLAUSE NO. COMPILANCE (YES/NO)

DEVIATION (In case of Non-Compliance)

4.12.15

4.12.16

4.12.17 4.12.18

4.12.19

4.12.20

4.12.21

4.12.22

4.12.23

4.12.24

4.12.25

4.12.26

4.12.27

4.13.1

4.13.2

4.13.3

4.13.4

4.13.5

4.13.6

4.13.7

4.13.8

4.13.9

4.13.10

4.13.11

FA

BR

ICA

TE

D S

PE

CIA

L P

AR

TS

4.13.12

4.14

4.15

4.16

4.17

GENERAL

4.18

Chapters Remarks by Bidders

9

10

11

12

13

14

MANDATORY COMPLIANCE

15 Note: 1. Clauses mentioned in general category is applicable for all the items.

2. Compliance to all clauses in chapters 9 to 15 is mandatory. Deviations are not acceptable. Bidders to put their remarks against the relevant chapters mentioned column in above table. 3. Chapters 16, 17, 18 and 20 are not applicable for the bidders of piping components. 4. Chapter 19 is for information only.

STRAINER

Page 121: UhdeIndia - Bharat Petroleum · Uhde India Private Limited, Dugal Plaza, 3 rd Floor, Prem Nagar, Bibwewadi Road, Pune 411 037, India TENDER RFQ / Tender No. : U6509 - 3187/ABM

6509-PI-EB-00002 BPCL UAN

Total Pages

ENGINEERING SPECIFICATION FOR PIPING MATERIALS

66-6509-700

61 of

107

© 2010 Uhde India

5. Requirements in “HIC Resistant Steels” NACE MR-0175 shall apply. Additionally, the technical notes mentioned below shall apply: The steel making process shall produce steel with high resistance to Hydrogen Sulphide attack i.e. SSC and HIC. The steel plates shall be manufactured by either basic oxygen furnace process with heated ladle refining and vacuum degassing or by electric furnace vacuum degassed process. Steel made by Basic Oxygen Process or Acid Bessemer process is NOT PERMITTED. The following treatments during steel making are mandatory:

- Steel shall be made by low sulphur and low phosphorus refining process and shall be vacuum degassed while molten.

- Steel shall be calcium treated for inclusion morphology control. To determine the effectiveness of calcium treatment, inclusion count check shall be performed as per ASTM E45 (Microscopic Method)

- Steel shall be specifically treated to control non-metallic inclusions like metallic oxide clusters, silicates and magnesium sulphide etc..

The manufacturer shall take particular care to control the rolling and heat treatment conditions so as to eliminate low temperature transformation microstructures associated with segregation such as bainite band or islets of martensite, in order to reduce the propagation of HIC. Carbon equivalent shall be computed as per the following formulae, depending upon the Carbon content: If C =< 0.12, Pcm = C + Si/30 + (Mn+Cu+Cr)/20 + Ni/60 + Mo/15 + V/10 + 5B If C > 0.12, CE = C + Mn/6 + (Cr+Mo+V)/5 + Ni+Cu/15

Page 122: UhdeIndia - Bharat Petroleum · Uhde India Private Limited, Dugal Plaza, 3 rd Floor, Prem Nagar, Bibwewadi Road, Pune 411 037, India TENDER RFQ / Tender No. : U6509 - 3187/ABM

6509-PI-EB-00002 BPCL UAN

Total Pages

ENGINEERING SPECIFICATION FOR PIPING MATERIALS

66-6509-700

62 of

107

© 2010 Uhde India

5.1 PIPE All clauses in chapter 4.4 shall apply, additionally the below mentioned clauses shall also apply. Only following ASME specifications against each product are permitted.

1. A106 Gr. B SMLS 2. A672 Gr. CC60 CL 32 EFW (Longitudinal)

5.1.1 Chemical Composition This shall be carried out on heat as well as on finished product as per relevant product material specifications and shall meet the requirements of Table – 1. Table 1 – Chemical Composition and Hardness Requirement for Welded & Seamless Pipes

Element Limits Remarks

C 0.20% max

Mn As specified in standards

Si More than 0.15%, 0.35% max

P 0.010% max

S 0.002% max

Cu As specified in standards Ni < 1% max

B -

Al -

Cr As specified in standards

Mo As specified in standards

V As specified in standards

Nb -

Ti -

Ca/s -

V+Nb+Ti -

Ni+Cu -

N -

Cr+Mo -

Al/N -

Other Elements

O2 < 0.0020% - 0.0025%

Pcm -

CE < 0.42% for thickness < 2” < 0.45% for thickness >=2”

< 0.43% for thickness < 2” < 0.46% for thickness >=2” (for A333 Gr.6)

Hardness Base Metal 22 HRC (237 BHN)

Hardness Production Welds

200 BHN

Additional Test

Acidified test solution A per NACE standard TM0284-2003 with CLR =< 5%

MTR to include values of CLR, CSR, CTR as per NACE standard TM0284 and CE

Pipes shall be supplied in Quenched and Tempered or Normalized Condition. * Impact test A516 Gr. 60, S5, UT to A578 for thickness > 1 ½”, Z35 quality as per A770

Page 123: UhdeIndia - Bharat Petroleum · Uhde India Private Limited, Dugal Plaza, 3 rd Floor, Prem Nagar, Bibwewadi Road, Pune 411 037, India TENDER RFQ / Tender No. : U6509 - 3187/ABM

6509-PI-EB-00002 BPCL UAN

Total Pages

ENGINEERING SPECIFICATION FOR PIPING MATERIALS

66-6509-700

63 of

107

© 2010 Uhde India

5.1.2 Mechanical Properties The following mechanical properties shall only be acceptable over and above that specified in the relevant product material specification:

- UTS = 77000 psi (max) on finished product - Ratio of Yield to Tensile Strength shall not exceed 0.8 on finished product.

5.1.3 Hardness Test Hardness shall be maximum HRC22 on base metal, welds and finished product and shall be measured as per CL.5.9.1.1 5.1.4 HIC Test This shall be carried out on one pipe (material-wise and type of construction-wise i.e. seamless and welded separately per heat irrespective of size / thickness as per CL.5.9.2.2. HIC test requirement is as follows:

a. Seamless Pipe: Seamless pipe shall contain Max. Phosphorus and Sulphur as per Table – 1, otherwise HIC testing is required. If the bidder is unable to offer seamless pipe with Phosphorus and Sulphur content less than or equal to Table – 1, then HIC testing shall be carried out on pipe where the check analysis exceeds the above value.

b. Welded Pipe: HIC testing shall be carried out for welded pipes irrespective of P and S % values.

5.1.5 SSC Test SSC test is not required. In case of deviation of P and S % values from Table – 1 on the chemical analysis of the finished product or UTS being greater than 77000 psi, the manufacturer shall either conduct SSC test on every heat (as per CL. 5.9.2.3) successfully OR reject all the finished products made from that heat. 5.1.6 In case clauses 5.1.4 and 5.1.5 are not possible to implement due to reasons beyond control, the material produced by qualified mill and duly certified by them as having been produced as HIC resistant steel shall be used after approval of these certificates by UIPL/BPCL. In this case UIPL/BPCL would reserve the right to test the material at random at the cost of the supplier / contractor / stockist. In case of any failed result, the entire lot shall be rejected. 5.1.7 Non Destructive Examination For details of NDE refer to Chapter 10. In addition, the following shall also apply: The inside and outside diameters of all pipes shall be visually examined. The longitudinal seam of the welded pipe shall be subjected to 100% radiography. Repair welds are not permitted on any size. 5.1.8 Welded pipes shall be tested as plates. i.e. all test applicable to plate materials are applicable to welded pipes. 5.1.9 Thermal stress relieving (PWHT) shall be done on all welds even if it is not required by code / material standard.

Page 124: UhdeIndia - Bharat Petroleum · Uhde India Private Limited, Dugal Plaza, 3 rd Floor, Prem Nagar, Bibwewadi Road, Pune 411 037, India TENDER RFQ / Tender No. : U6509 - 3187/ABM

6509-PI-EB-00002 BPCL UAN

Total Pages

ENGINEERING SPECIFICATION FOR PIPING MATERIALS

66-6509-700

64 of

107

© 2010 Uhde India

5.2 FITTINGS Fittings include Elbows, Tees, Reducers, Caps and Branch Connections All clauses in chapter 4.5 shall apply, additionally the below mentioned clauses shall also apply. Only following ASME specifications against each product are permitted.

1. A105 (up to 4540 kg) Forged 2. A234 Gr. WPB /WPWX SMLS / Welded

5.2.1 Chemical Composition This shall be carried out on heat as well as on finished product as per relevant product material specifications and shall meet the requirements of Table – 3 Table – 3 Chemical Composition and Hardness Requirement for Welded & Seamless Fittings

Element Limits Remarks

C 0.20% max

Mn

Si More than 0.15%, 0.35% max

P 0.025% max

Ni < 1% max

S 0.020% max

N 0.01% max

Ca/S 2-3

Al/N 2.0 min

B 0.002% max

Pcm -

CE < 0.42% for thickness < 2” < 0.45% for thickness >=2”

Hardness Base Metal 22 HRC (237 BHN)

Hardness Production Welds

200 BHN

Additional Test Acidified test solution A per NACE standard TM0284-2003 with CLR =< 5%

Note 1: All other unspecified elements like Cu, Cr, Mo, V, Nb, Ti etc.. shall be as specified in respective specification.

Note 2: Steel shall be produced as HIC resistant steel with inclusion content and morphology control and shall be free of elongated manganese sulphide inclusions.

Note 3: Ratio Ca/S is not applicable when S=<0.0015%, however Ca up to 50 ppm shall be permitted.

Fittings shall be supplied in Quenched and Tempered or Normalized or Normalized and Tempered condition. However all bends formed by induction bending shall be tempered afterwards to meet hardness requirements. 5.2.2 Mechanical Properties These shall be as per specified product material specification and CL. 5.1.2 5.2.3 Hardness Test These shall be as per CL 5.1.3 and 5.9.1.1.

Page 125: UhdeIndia - Bharat Petroleum · Uhde India Private Limited, Dugal Plaza, 3 rd Floor, Prem Nagar, Bibwewadi Road, Pune 411 037, India TENDER RFQ / Tender No. : U6509 - 3187/ABM

6509-PI-EB-00002 BPCL UAN

Total Pages

ENGINEERING SPECIFICATION FOR PIPING MATERIALS

66-6509-700

65 of

107

© 2010 Uhde India

5.2.4 HIC Test This shall be carried out on one finished product (material-wise and type of construction-wise i.e. seamless and welded separately per heat irrespective of size / thickness / type of fittings as per CL.5.9.2.2. HIC test requirement is as follows:

a. Forged: HIC Testing is required for all forged items. b. Wrought: The requirements for wrought fittings are the same as for the seamless or welded pipe

from which the fittings are wrought. HIC test is required for this category of items also. 5.2.5 SSC Test SSC test is not required. In case of deviation of P and S % values from Table – 1 on the chemical analysis of the finished product or UTS being greater than 77000 psi, the manufacturer shall either conduct SSC test on every heat (as per CL. 5.9.2.3) successfully OR reject all the finished products made from that heat. 5.2.6 In case clauses 5.2.4 and 5.2.5 are not possible to implement due to reasons beyond control, the material produced by qualified mill and duly certified by them as having been produced as HIC resistant steel shall be used after approval of these certificates by UIPL/BPCL. In this case UIPL/BPCL would reserve the right to test the material at random at the cost of the supplier / contractor / stockist. In case of any failed result, the entire lot shall be rejected. 5.2.7 Non Destructive Examination For details of NDE refer to Chapter 10. 5.2.8. Thermal stress relieving (PWHT) shall be done on all welds even if it is not required by code / material standard

Page 126: UhdeIndia - Bharat Petroleum · Uhde India Private Limited, Dugal Plaza, 3 rd Floor, Prem Nagar, Bibwewadi Road, Pune 411 037, India TENDER RFQ / Tender No. : U6509 - 3187/ABM

6509-PI-EB-00002 BPCL UAN

Total Pages

ENGINEERING SPECIFICATION FOR PIPING MATERIALS

66-6509-700

66 of

107

© 2010 Uhde India

5.3 FLANGES All clauses in chapter 4.6 shall apply, additionally the below mentioned clauses shall also apply. Only following ASME specifications against each product are permitted. 1. A105 Forged 5.3.1 Chemical Composition This shall be carried out on heat as well as on finished product as per relevant product material specifications and shall meet the requirements of Table – 4 Table – 4 Chemical Composition and Hardness Requirement for Flanges

Element Limits Remarks

C 0.20% max

P 0.025% max

Ni < 1% max

S 0.020% max

Pcm

CE < 0.42% for thickness < 2” < 0.45% for thickness >=2”

Hardness Base Metal 22 HRC (237 BHN)

Hardness Production Welds

200 BHN

Additional Test Acidified test solution A per NACE standard TM0284-2003 with CLR =< 5%

Note 1: All other elements shall be as specified in the basic specification

Note 2: The forgings shall be produced by inclusion count and morphology control

Flanges shall be supplied in Quenched and Tempered or Normalized or Normalized and Tempered condition. 5.3.2 Mechanical Properties These shall be as per specified product material specification and CL. 5.1.2 5.3.3 Hardness Test These shall be as per CL 5.1.3 and 5.9.1.1. 5.3.4 HIC Test This shall be carried out on one finished product each material-wise per heat irrespective of size / type of flange (Weld Neck, Blind etc..) and Pressure Rating as per CL.5.9.2.2. HIC testing is required only if chemical composition exceeds Table – 4 limits. 5.3.5 SSC Test SSC test is not required. In case of deviation of P and S % values from Table – 4 on the chemical analysis of the finished product or UTS being greater than 77000 psi, the manufacturer shall either conduct SSC test on every heat (as per CL. 5.9.2.3) successfully OR reject all the finished products made from that heat. 5.3.6 In case clauses 5.2.4 and 5.2.5 are not possible to implement due to reasons beyond control, the material produced by qualified mill and duly certified by them as having been produced as HIC resistant steel shall be used after approval of these certificates by UIPL/BPCL. In this case UIPL/BPCL would reserve the right to test the material at random at the cost of the supplier / contractor / stockist.

Page 127: UhdeIndia - Bharat Petroleum · Uhde India Private Limited, Dugal Plaza, 3 rd Floor, Prem Nagar, Bibwewadi Road, Pune 411 037, India TENDER RFQ / Tender No. : U6509 - 3187/ABM

6509-PI-EB-00002 BPCL UAN

Total Pages

ENGINEERING SPECIFICATION FOR PIPING MATERIALS

66-6509-700

67 of

107

© 2010 Uhde India

5.3.7 Non Destructive Examination For details of NDE refer to Chapter 10.

Page 128: UhdeIndia - Bharat Petroleum · Uhde India Private Limited, Dugal Plaza, 3 rd Floor, Prem Nagar, Bibwewadi Road, Pune 411 037, India TENDER RFQ / Tender No. : U6509 - 3187/ABM

6509-PI-EB-00002 BPCL UAN

Total Pages

ENGINEERING SPECIFICATION FOR PIPING MATERIALS

66-6509-700

68 of

107

© 2010 Uhde India

5.4 Gaskets Refer Chapter 4.7 5.5 Fasteners Refer Chapter 4.8

Page 129: UhdeIndia - Bharat Petroleum · Uhde India Private Limited, Dugal Plaza, 3 rd Floor, Prem Nagar, Bibwewadi Road, Pune 411 037, India TENDER RFQ / Tender No. : U6509 - 3187/ABM

6509-PI-EB-00002 BPCL UAN

Total Pages

ENGINEERING SPECIFICATION FOR PIPING MATERIALS

66-6509-700

69 of

107

© 2010 Uhde India

5.6 GATE / GLOBE / CHECK / BALL / NEEDLE VALVES All clauses in chapter 4.9 shall apply, additionally the below mentioned clauses shall also apply. Valve body shall be of forged construction or cast construction as per Table – 5. Forged construction valves offered in lieu of cast construction are also acceptable. Other components and trim materials and other requirements shall be as per valve specification sheets. Generally, SS316 with max hardness of HRC22 is used. If trim is hard faced with Stellite, hardness upto max HRC43 is allowed. 5.6.1 Chemical Composition This shall be carried out on heat / cast as well as on finished product as per relevant product material specifications and shall meet the requirements of Table – 5 Table – 5 Chemical Composition and Hardness Requirement for Gate / Globe / Check / Ball / Needle Valves

Element Limits Remarks

C 0.20% max

Mn

Si More than 0.15%, 0.35% max

P 0.025% max

Ni < 1% max

S 0.020% max

Pcm

CE < 0.42% for thickness < 2” < 0.45% for thickness >=2”

Hardness Base Metal 22 HRC (237 BHN)

Hardness Production Welds

200 BHN

Additional Test Acidified test solution A per NACE standard TM0284-2003 with CLR =< 5%

Note 1: All other unspecified elements shall be as specified in the basic specification A216

Note 2: For Forged construction the composition shall be as per Table - 4

1. A105 Forged 2. A216 Gr. WCB Casting

Fittings shall be supplied in Quenched and Tempered or Normalized or Normalized and Tempered condition. 5.6.2 Mechanical Properties These shall be as per specified product material specification and CL. 5.1.2 5.6.3 Hardness Test All valve bodies, bonnets, liquid level chambers, pressure retaining parts and all parts having contact with sour gas / liquid shall be thermal stress relieved after welding as per CL. 5.1.3 and 5.9.1.1.

Page 130: UhdeIndia - Bharat Petroleum · Uhde India Private Limited, Dugal Plaza, 3 rd Floor, Prem Nagar, Bibwewadi Road, Pune 411 037, India TENDER RFQ / Tender No. : U6509 - 3187/ABM

6509-PI-EB-00002 BPCL UAN

Total Pages

ENGINEERING SPECIFICATION FOR PIPING MATERIALS

66-6509-700

70 of

107

© 2010 Uhde India

5.6.4 HIC Test HIC test shall be carried out on one finished product (material-wise and type of construction-wise i.e. cast and forged separately) per heat irrespective of size / rating / type of valve as per CL.5.9.2.2. 5.6.5 SSC Test SSC test is not required. In case of deviation of P and S % values from Table – 5 on the chemical analysis of the finished product or UTS being greater than 77000 psi, the manufacturer shall conduct SSC test on every heat (as per CL.5.9.2.3) successfully OR reject all the finished products made from that heat. 5.6.6 In case clauses 5.6.4 and 5.6.5 are not possible to implement due to reasons beyond control, the material produced by qualified mill and duly certified by them as having been produced as HIC resistant steel shall be used after approval of these certificates by UIPL/BPCL. In this case UIPL/BPCL would reserve the right to test the material at random at the cost of the supplier / contractor / stockist. 5.6.7 Non Destructive Examination For details of NDE refer to Chapter 11. In addition, the following shall also apply: All valve castings shall be 100% radiographed irrespective of rating. The procedure, areas to be radiographed and acceptance limits shall be as per ASME B16.34, Annexure – B. Dye Penetrant or Magnetic Particle Testing shall also be done on all castings. Procedure and acceptance criteria shall be as per ASME B16.34. For all forgings Ultrasonic Testing and Magnetic Particle Testing shall be carried out. For all Valves, Helium Leak Test as per Chapter 10.12 is mandatory.

Page 131: UhdeIndia - Bharat Petroleum · Uhde India Private Limited, Dugal Plaza, 3 rd Floor, Prem Nagar, Bibwewadi Road, Pune 411 037, India TENDER RFQ / Tender No. : U6509 - 3187/ABM

6509-PI-EB-00002 BPCL UAN

Total Pages

ENGINEERING SPECIFICATION FOR PIPING MATERIALS

66-6509-700

71 of

107

© 2010 Uhde India

5.7 Spectacle Blinds, Paddle Blanks and Spacers, Blinds for Pressure Testing. All clauses in chapter 4.10 shall apply, additionally the below mentioned clauses shall also apply. Only following ASME specifications against each product are permitted.

1. A516 Gr. 60 Plate 5.7.1 Chemical Composition This shall be carried out on heat as well as on finished product as per relevant product material specifications and shall meet the requirements of Table – 6 Table – 6 Chemical Composition and Hardness Requirement for Spectacle Blinds, Paddle Blanks and Spacers, Blinds.

Element Limits Remarks

C 0.20% max

Mn As specified in standards

Si More than 0.15%, 0.35% max

P 0.02% max

S 0.003% max

Cu 0.35% max

Ni 0.20% max

B 0.002% max

Al 0.01% - 0.05%

Cr 0.25% max

Mo 0.08% max

V 0.08% max

Nb 0.05% max

Ti 0.02% max

Ca/s Between 2 and 3 (Note below)

V+Nb+Ti 0.12% max

Ni+Cu 0.50% max

N 0.01% max

Cr+Mo 0.25% max

Al/N 2.0 min

Other Elements

O2 < 0.0020% - 0.0025%

Pcm 0.21 max.

CE < 0.42% for thickness < 2” < 0.45% for thickness >=2”

Hardness Base Metal 22 HRC (237 BHN)

Hardness Production Welds

200 BHN

Additional Test Acidified test solution A per NACE standard TM0284-2003 with CLR =< 5%

5.7.2 Mechanical Properties These shall be as per specified product material specification and CL. 5.1.2

Page 132: UhdeIndia - Bharat Petroleum · Uhde India Private Limited, Dugal Plaza, 3 rd Floor, Prem Nagar, Bibwewadi Road, Pune 411 037, India TENDER RFQ / Tender No. : U6509 - 3187/ABM

6509-PI-EB-00002 BPCL UAN

Total Pages

ENGINEERING SPECIFICATION FOR PIPING MATERIALS

66-6509-700

72 of

107

© 2010 Uhde India

5.7.3 Hardness Test These shall be as per CL 5.1.3 and 5.9.1.1. 5.7.4 HIC Test HIC test shall be carried out on one finished product (material-wise and type of construction-wise i.e. cast and forged separately) per heat irrespective of size / rating / type of valve as per CL.5.9.2.2. 5.7.5 SSC Test SSC test is not required. In case of deviation of P and S % values from Table – 5 on the chemical analysis of the finished product or UTS being greater than 77000 psi, the manufacturer shall conduct SSC test on every heat (as per CL.5.9.2.3) successfully OR reject all the finished products made from that heat. 5.7.6 In case clauses 5.7.4 and 5.7.5 are not possible to implement due to reasons beyond control, the material produced by qualified mill and duly certified by them as having been produced as HIC resistant steel shall be used after approval of these certificates by UIPL/BPCL. In this case UIPL/BPCL would reserve the right to test the material at random at the cost of the supplier / contractor / stockist. 5.7.7 Non Destructive Examination For details of NDE refer to Chapter 11. In addition, the following shall also apply: All welding shall be 100% radiographed irrespective of rating. The procedure, areas to be radiographed and acceptance limits shall be as per ASME B16.34, Annexure – B. For all forgings Ultrasonic Testing and Magnetic Particle Testing shall be carried out. 5.7.8 Thermal stress relieving (PWHT) shall be done on all welds even if it is not required by code / material standard, however for non-critical components such as handle, rods which are part of larger items, PWHT of entire item may be waived-off provided a buttering layer is used between the main item and the handle / rod.

Page 133: UhdeIndia - Bharat Petroleum · Uhde India Private Limited, Dugal Plaza, 3 rd Floor, Prem Nagar, Bibwewadi Road, Pune 411 037, India TENDER RFQ / Tender No. : U6509 - 3187/ABM

6509-PI-EB-00002 BPCL UAN

Total Pages

ENGINEERING SPECIFICATION FOR PIPING MATERIALS

66-6509-700

73 of

107

© 2010 Uhde India

5.8 Piping Speciality Items Y-Strainers, T-Strainers, Hinged Closure members, Corrosion Probes, Spray Nozzles, Sample Bombs, Sampling Tubes, Valves and accessories, Shut Down Valves, 3D/5D bends are considered as Piping Speciality Items.(with flanges for flanges on t-type strainer, with fittings for tees on t-type strainer, with blind plates, with fittings) 5.8.1 Sight Flow Indicators All the clauses of 4.11 shall apply. In addition all clauses of this chapter shall apply. 5.8.2 Y-Strainers and T-Strainers All the clauses of 4.12 shall apply. In addition all clauses of this chapter shall apply. 5.8.3 Fabricated Special Parts All clauses of 4.13 shall apply. In addition all clauses of this chapter shall apply. 5.8.4 Hardness Test These shall be as per CL 5.1.3 and 5.9.1.1. 5.8.5 HIC Test HIC test on finished product shall be limited to cast / forged bodies. In case of items fabricated from fittings and flanges, requirements as mentioned in Table -3 and Table -4 under cl. 5.2 and 5.3 respecively are applicable. 5.8.6 SSC Test SSC test is not required. In case of deviation of P and S % values from Table – 5 on the chemical analysis of the finished product or UTS being greater than 77000 psi, the manufacturer shall conduct SSC test on every heat (as per CL.5.9.2.3) successfully OR reject all the finished products made from that heat. 5.8.7 In case clauses 5.8.5 and 5.8.6 are not possible to implement due to reasons beyond control, the material produced by qualified mill and duly certified by them as having been produced as HIC resistant steel shall be used after approval of these certificates by UIPL/BPCL. In this case UIPL/BPCL would reserve the right to test the material at random at the cost of the supplier / contractor / stockist. 5.8.8 Non Destructive Examination For details of NDE refer to Chapter 11. In addition, the following shall also apply: All welding and castings shall be 100% radiographed irrespective of rating. The procedure, areas to be radiographed and acceptance limits shall be as per ASME B16.34, Annexure – B. For all forgings Ultrasonic Testing and Magnetic Particle Testing shall be carried out. 5.8.9 All welds in fabricated items shall undergo PWHT. The hardness of weld shall be lower than 200 BHN for carbon steel and 225 BHN for Alloy steel.

Page 134: UhdeIndia - Bharat Petroleum · Uhde India Private Limited, Dugal Plaza, 3 rd Floor, Prem Nagar, Bibwewadi Road, Pune 411 037, India TENDER RFQ / Tender No. : U6509 - 3187/ABM

6509-PI-EB-00002 BPCL UAN

Total Pages

ENGINEERING SPECIFICATION FOR PIPING MATERIALS

66-6509-700

74 of

107

© 2010 Uhde India

5.9 TESTS – HARDNESS AND CORROSION 5.9.1 Hardness Test 5.9.1.1 Maximum hardness shall be limited to 200 BHN (for Carbon steel) and 225 BHN (for Alloy steel) at all places including weldments and measurement shall be as per ASTM E18 or ASTM E92 or ASTM E10. 5.9.1.2 Hardness test shall be conducted on sample of each heat and on each finished product. Waiver may be given only for those products which can get damaged due to hardness test. For small products which cannot be hardness tested individually the manufacturer shall conduct test on a random basis by selecting components from production run or stores batches to ensure that the product complies fully with hardness requirements. The products for which hardness values are found in excess of specified value shall be rejected. If the hardness on the sample of heat is more than the acceptable value, then the entire raw material from the heat shall be rejected. 5.9.2 Corrosion Tests 5.9.2.1 Selection of Test samples a. Test specimen shall be taken from per heat of the finished product. Where the specimen cannot be taken from the finished product, a representative test specimen shall be taken from the same heat, heat treated in the same batch or charge as the product and shall undergo the same amount of working as the most worked section of the finished product. b. In case the finished product is of welded type, the test piece shall include the parent metal, weld metal and Heat Affected Zone (HAZ). 5.9.2.2 HIC Test a. The test shall be performed on a set of three test specimens of the finished product. The test shall be performed as per NACE TM0284 and the acceptance criteria shall be as follows: The orientation of the specimens is illustrated in NACE-TM0284 however one set of specimens shall be taken from the center of the plate/pipe for both HIC & Mechanical Testing.

1. Crack Sensitivity Ratio (CSR) shall not exceed 0.009% 2. Crack Length Ratio (CLR) shall not exceed 5% (average of 3 sections)

Both the above conditions must be met by all the samples. Samples shall be as per clause 5.9.2.1. Additionally the below mentioned conditions shall also be met.

3. Longitudinal Crack Thickness (LCT) shall not exceed 0.1mm 4. Transverse or stepwise Crack Thickness (TCT) shall not exceed 0.1mm 5. Crack Thickness Ratio (CTR) shall not exceed 3% (average of 3 sections) 6. Surface blistering is acceptable

b. In case any one of the above samples fails to meet the acceptance criteria, three more additional specimen from the product from which the first set of specimens were taken, shall be retested and results reported. c. In case of failure of any of the samples in ‘b’ above, two additional products shall be selected from the same heat (usually the first and the last pipe / plate of each heat) and six specimens shall be tested (three from each product). In case of failure of any one of the six samples, the entire lot from that particular heat shall be rejected and retesting shall not be permitted.

Page 135: UhdeIndia - Bharat Petroleum · Uhde India Private Limited, Dugal Plaza, 3 rd Floor, Prem Nagar, Bibwewadi Road, Pune 411 037, India TENDER RFQ / Tender No. : U6509 - 3187/ABM

6509-PI-EB-00002 BPCL UAN

Total Pages

ENGINEERING SPECIFICATION FOR PIPING MATERIALS

66-6509-700

75 of

107

© 2010 Uhde India

5.9.2.3 SSCC Test (Sulphide Stress Corrosion Cracking) The test shall be carried out as per NACE TM0177. Samples shall be taken as per 5.9.2.1.a. Reporting of Test Results Curves shall be reported as per NACE TM0177 for various stress levels between 72% and 90% of SMYS. Acceptance Criteria At 72% of SMYS, ‘Time to Failure’ shall not be less than 720 hrs. 5.10 Post Order Production Tests On placement of order, the manufacturer shall carry out all the tests as listed henceforth under each product and furnish test certificates for the same duly ‘witnessed and certified’ by any of the company accredited third party agency referred in clause 5.4. The test certificates shall meet all the requirements of this chapter.

Page 136: UhdeIndia - Bharat Petroleum · Uhde India Private Limited, Dugal Plaza, 3 rd Floor, Prem Nagar, Bibwewadi Road, Pune 411 037, India TENDER RFQ / Tender No. : U6509 - 3187/ABM

6509-PI-EB-00002 BPCL UAN

Total Pages

ENGINEERING SPECIFICATION FOR PIPING MATERIALS

66-6509-700

76 of

107

© 2010 Uhde India

6. PIPING ITEMS IN HYDROGEN SERVICE All the relevant clauses in chapter 4 are applicable in addition to the ones mentioned in this chapter. These requirements are additionally mentioned for items in ‘Hydrogen service’. 6.1. Carbon Steel Pipes, Fittings and Flanges 6.1.1. All weld joints shall be 100% radiographed in accordance with paragraph UW-51 of ASME boiler and pressure vessel code, Section-VIII, Division 1. 6.1.2. All welds on wall thickness ¾” (19 mm) and thicker shall be postweld heat treated (PWHT). 6.1.3. All pipes, flanges and fittings having wall thickness 3/8” and thicker shall be normalized. 6.1.4. The hardness of weld and heat affected zone shall be limited to 200 BHN max. 6.2 Alloy Steel (Cr-Mo) Pipes, Fittings and Flanges 6.2.1 All weld joints shall be 100% radiographed in accordance with paragraph UW-51 of ASME boiler and pressure vessel code, Section-VII, Division 1. 6.2.2 All welds including socket and seat welds shall be post weld heat treated (PWHT). 6.2.3 All pipes, flanges and fittings shall be normalized and tempered. The normalizing and tempering heat treatment shall be a separate heating operation, not the hot forming operation. 6.2.4 The maximum hardness of any pressure containing component or weld (after PWHT) shall be 225 BHN. 6.2.5 The alloy content of welds shall be verified by chemical analysis. Tests shall be conducted when changes in weld wire and/or weld flux are made, or when a new set of electrode is used. 6.2.6 Maximum room temperature tensile strength of all pressure containing components and welds shall be 100,000 PSI. 6.2.7 Serration on the flange face shall be concentric for hydrogen service. Spiral serration is not acceptable. 6.3 Stainless Steel Pipes, Fittings and Flanges 6.3.1. All weld joints shall be 100% radiographed in accordance with paragraph UW-51 of ASME Boiler and pressure vessel code, Section VII, Division 1. 6.3.2. All pipes, flanges & fittings shall be solution annealed and pickled. 6.3.3. Weld deposits shall be checked for ferrite content. A ferrite number (FN) of not less than 3% and not more than 10% is required to avoid sigma phase embrittlement during post weld heat treatment and high temperature service. FN may be determined by use of a ferrite scope or may be calculated using Schaeffler or Delong diagrams (The Delong Diagram should be used if “FCAW” welding is performed). Ferrite scope measurements must be made prior to post weld heat treatment to be meaningful.

Page 137: UhdeIndia - Bharat Petroleum · Uhde India Private Limited, Dugal Plaza, 3 rd Floor, Prem Nagar, Bibwewadi Road, Pune 411 037, India TENDER RFQ / Tender No. : U6509 - 3187/ABM

6509-PI-EB-00002 BPCL UAN

Total Pages

ENGINEERING SPECIFICATION FOR PIPING MATERIALS

66-6509-700

77 of

107

© 2010 Uhde India

VALVES These notes are applicable to all valves in Hydrogen service in addition to the requirements specified in chapter 4.9. 1.4 All welds shall be PWHT & Stress Relieved. 6.4 Carbon Steel and Alloy steel Valves 6.4.1. All valve castings shall be 100% radio-graphed. 6.4.2. All casting and test bars shall be heat treated together, casting shall be in the solution heat treated and pickled condition. 6.4.3. Critical body & Bonnet casting sections, typically defined by ANSI B-16.34, shall be radiographed and shall meet ASTM E-446 (Up to 2” Thick); category A, B & CA-Level 2, category CB, CC & CD-level 3, category D,E,F,G-level 0. 6.4.4. Bend tests and magnetic particle inspection of the entire surface of body and bonnet castings shall be in accordance with ASTM A 217, with supplementary requirements S3 & S4. Evaluation of magnetic particle inspection shall be in accordance with MSS-SP-53 except that no lineal discontinuities shall be allowed. 6.4.5. The Brinell hardness of heat treated casting shall not exceed 200 BHN for carbon steel and 225BHN for alloy steel. 6.4.6. Repair to defective castings shall be outlined in writing to the Consultant before repair commences. Repair method shall be approved prior to welding. Casting shall be preheated to a minimum of 400 F prior to welding and all chromium molybdenum alloys shall be post weld heat treated after welding is complete. 6.4.7 Charpy V-notch impact testing to be done for valve material in accordance with UG84 of ASME code, Section VII, Div.I. One set of CVN impact tests is required for each heat of material. Impact energies at 30 Deg.F(-1 deg C must average greater than 13FT LBS (18 joules), per set of three specimens, with a minimum of 10 FT. LBS (14 joules). Vendor shall report Charpy bar impact test results to purchaser before shipment is made. 6.4.8. Carbon Steel and Alloy steel castings shall be normalized and tempered. This is mandatory for items in Hydrogen service. 6.4.9. Dye peneterant test shall be in accordance with ASTM B165 procedure B8. 6.4.10. The tensile stress for A.S. shall be less than 100,000 PSI for alloy steel. 6.5 Stainless Steel Valves 6.5.1 All castings and test bars shall be heat treated together, casting shall be in the solution heat treated and pickled condition. 6.5.2 Critical body and bonnet casting sections, typically defined by ANSI B-16.34,shall be radiographed and shall meet ASTM E-446 (up to 2” thick); category A,B & CA-level 2, category CB, CC & CD-level 3, category D, E, F & G-level 0. 6.5.3 The entire surface of all castings shall be inspected Dye penetrant after pickling. Dye penetrant Examination shall be in accordance with ASTM E-165, procedure B-2, of ASTM E-165, procedure B-2. Interpretation shall be in accordance with Appendix 8, of ASME section VIII, Div.I; except that all bright red indications (regardless of size) and clusters of pink indications (potential porosity) shall be cause for removal of metal until further dye examination indicates no indications or only isolated pink indications.

Page 138: UhdeIndia - Bharat Petroleum · Uhde India Private Limited, Dugal Plaza, 3 rd Floor, Prem Nagar, Bibwewadi Road, Pune 411 037, India TENDER RFQ / Tender No. : U6509 - 3187/ABM

6509-PI-EB-00002 BPCL UAN

Total Pages

ENGINEERING SPECIFICATION FOR PIPING MATERIALS

66-6509-700

78 of

107

© 2010 Uhde India

6.5.4 Welds shall be 100% radiographed and evaluated in accordance with paragraph 336.4.5 of ANSI/ASME B-31.3 with a minimum casting quality factor of 0.95. 6.5.5. All valve castings shall be 100% radio-graphed. 6.6 Helium Leak test All in valves in Hydrogen service shall be subjected to helium leak test. Refer chapter 10.12 for details.

Page 139: UhdeIndia - Bharat Petroleum · Uhde India Private Limited, Dugal Plaza, 3 rd Floor, Prem Nagar, Bibwewadi Road, Pune 411 037, India TENDER RFQ / Tender No. : U6509 - 3187/ABM

6509-PI-EB-00002 BPCL UAN

Total Pages

ENGINEERING SPECIFICATION FOR PIPING MATERIALS

66-6509-700

79 of

107

© 2010 Uhde India

7. Low Alloy Steel (1¼Cr-½ Mo) and Stainless Steel components NACE MR-0175 shall apply, if specified in technical data sheet. The technical notes mentioned below shall apply as per the material.

7A. For Alloy Steels (1 ¼ Cr- ½ Mo): 7A.1.1. Maximum room temperature Ultimate Tensile Strength of all pressure containing components and welds shall not exceed 100,000 PSI. 7A.1.2. Fillet welds to pressure retaining components shall be ground to a smooth, concave contour. 7A.1.3. Pressure retaining welds, whether shop or field shall be 100% radiographed. Branch welds that cannot be radiographed shall be 100% ultrasonically examined. Radiography welded pipes & components shall be conducted only after heat treatment. 7A.1.4. Accelerated cooling from the austenitic temperature range is acceptable, where permitted by the applicable product form specification.

Table 7 – Chemical Composition and Hardness requirements for Welded Alloy Steel Pipes (By Heat Analysis)

Element Operating Temp < 380 Deg. C

Operating Temp > 380 deg. C Remarks

C 0.17% max 0.15% max

Mn

Si 0.65% max

P 0.015% max 0.010% max (target 0.008%)

Ni 0.30% max 0.25% max

S 0.005% max 0.005% max (target 0.002%) Other Elements

Cu 0.30% max 0.20% max

O2 - O2 - 30ppm max

Al - 0.04% max

V - 0.010% max

Sn - 0.010% max

As - 0.012% max

Sb - 0.004% max

N2 - 80 ppm max

Nb - 0.010% max

Ti - 0.01% max

P + Sn - 0.015% max (target 0.012%)

Pcm - -

CE - -

Hardness Base Metal

- 220 BHN

Hardness Production Welds

220 BHN 220 BHN

Additional Test

- J < 180 with J = (Si + Mn) * (P + Sn) * 10

4 (target 150)

Impact Test

CVN 55J at -18 deg. C

Page 140: UhdeIndia - Bharat Petroleum · Uhde India Private Limited, Dugal Plaza, 3 rd Floor, Prem Nagar, Bibwewadi Road, Pune 411 037, India TENDER RFQ / Tender No. : U6509 - 3187/ABM

6509-PI-EB-00002 BPCL UAN

Total Pages

ENGINEERING SPECIFICATION FOR PIPING MATERIALS

66-6509-700

80 of

107

© 2010 Uhde India

The above requirements are applicable with restriction of chemical composition for all alloy steel welded pipes, welded fittings and forged flanges. 7A.2. Plate fabrication: Pipes shall be fabricated from plates as per A387 Gr.11, Class 2 supplied in Annealed or Normalized and Tempered Condition or in heat treated condition achieved by - accelerated cooling from the austenitic temperature range by air blasting or liquid quenching, followed by tempering. All plates should preferably be ordered from steel made by the electric furnace and vacuum degassing process. Nevertheless, basic oxygen furnace process with heated ladle refining and vacuum degassing may also be considered as acceptable. The tempering temperature shall be adapted so as to give the required mechanical properties after post-weld heat treatment. The product analysis content of tin and phosphorous for pressure retaining components and welding consumables shall be less than 0.015% and 0.012% respectively. The percentage limits are weight percent. It shall consequently be noted that, depending on cases, the Minimum temperature of Tempering may sometimes be higher than the one defined for the final Post-Weld Heat Treatment of the equipment. 7A.3. Impact test properties Charpy V-Notch (CVN) impact testing is required for all pressure retaining components, welds and heat affected zone. The average of three impact test values at testing temperature shall not be less than 40ft.lb (55J) without individual value below 35ft.lb (47J). Testing temperature shall be the lower of the Minimum Design Metal Temperature (MDMT) and -18 deg. C (0 deg. F). Note: One shall note that sulphur does act on resilience properties and sulphur content shall consequently be kept as low as possible to obtain high CVN energy. 7B. For Stainless Steels: 7B.1. IGC Test is applicable as per Cl. 10.5

Page 141: UhdeIndia - Bharat Petroleum · Uhde India Private Limited, Dugal Plaza, 3 rd Floor, Prem Nagar, Bibwewadi Road, Pune 411 037, India TENDER RFQ / Tender No. : U6509 - 3187/ABM

6509-PI-EB-00002 BPCL UAN

Total Pages

ENGINEERING SPECIFICATION FOR PIPING MATERIALS

66-6509-700

81 of

107

© 2010 Uhde India

9. HEAT TREATMENT All welds involving carbon steels and LTCS on wall thickness ¾” (20 mm) and thicker shall be post weld heat treated (PWHT). All welds involving Carbon steel and compliant to Chapter 5 (‘HIC Resistant’) shall be subjected to PWHT irrespective of wall thickness.

All carbon steel and LTCS pipe, fittings, and flanges in seamless construction having wall thickness 3/8” and more shall be supplied in normalized condition. All weld involving carbon steel pipe, fittings, and flanges compliant to Chapter 5 (‘HIC Resistant’) shall be subjected to Heat treatment (PWHT) as per NACE MR 0175 even if it is not specified by code. All valve castings and test bars in Carbon Steel, Alloy Steel and Stainless Steel shall be heat treated together. Repair to defective castings shall be outlined in writing to the Purchaser before repair commences. Repair method shall be approved prior to welding. Castings shall be preheated to a minimum of 400 deg. F prior to welding.

Repairs on defective castings of Cr-Mo alloys shall be post weld heat treated after welding is complete. All welds on valves shall be post weld heat treated and thermal stress relieved depending on the level of distortion.

All welds in Alloy Steel including socket and seal welds shall be post weld heat treated. All Pipes, Fittings and flanges in Alloy Steel shall be normalized and tempered. The normalizing and tempering heat treatment shall be a separate operation, not the hot forming operation. Alloy Steel Castings shall be supplied in Normalized and Tempered condition. The hardness of heat treated Alloy Steel castings and pressure containing components or welds (after PWHT) shall not be more than 220 BHN. All welds in Stainless Steels shall be solution annealed. All Stainless steel pipes shall be supplied in solution annealed condition. All pipe, fittings, flanges, castings in stainless steels shall be supplied in solution annealed and pickled condition.

The hardness of heat treated stainless steel castings shall not be more than 235 BHN. All flange facings and threaded connections (if any) must be protected against oxidation during heat treatment. For all items of SS 321 / SS321H / SS347 grades, stabilization heat treatment comprising of resolution annealing shall be done. It shall be carried out subsequent to normal solution annealing. Soaking temperature and holding time for stabilizing heat treatment shall be 900 deg. C or temperature lower than that used for initial solution annealing whichever is higher and four hours respectively. The temperature has to be agreed between purchaser and vendor.

Specified heat treatment for carbon steel and alloy steel solution annealing for stainless steel pipes shall be carried out after weld repairs; number of weld repairs at same spot shall be restricted to maximum two (2) by approved repair procedure.

Page 142: UhdeIndia - Bharat Petroleum · Uhde India Private Limited, Dugal Plaza, 3 rd Floor, Prem Nagar, Bibwewadi Road, Pune 411 037, India TENDER RFQ / Tender No. : U6509 - 3187/ABM

6509-PI-EB-00002 BPCL UAN

Total Pages

ENGINEERING SPECIFICATION FOR PIPING MATERIALS

66-6509-700

82 of

107

© 2010 Uhde India

10. TESTS AND EXAMINATION All materials shall be new materials with all surfaces clean and free from defects, weld spatter, arc strike, rust, dirt, sand, scale, paint or any other foreign substance. Vendor/Manufacturer shall have and maintain a quality control system which will establish that all specified requirements including raw material control system, manufacturing, heat treatment, NDT and all other tests will be met. Vendor shall submit Q.A. plan along with offer / quotation to UIPL. Vendors shall offer the products for UIPL inspection at manufacturer’s place with all necessary gauges and measuring instruments. The requirements mentioned are a minimum and any other requirement as mentioned in the Purchase Order / Specification shall also be fulfilled by the Vendor. The following evaluation shall be carried out by each vendor and UIPL shall carry out sample inspection based on an agreed QAP / ITP for the project: Items qualifying to this include all piping components. For valves, each and every valve shall be subjected to all the mandatory tests and checks called in the respective codes/technical specification and as elaborated below: Non-destructive testing (if specified in the technical specification or any other technical document forming part of valve enquiry) shall be reviewed for 100% of the manufacturer's exposures Every valve, its components and auxiliaries be subjected to additional mandatory tests and checks if any called in the respective codes 10.1 Chemical Properties This shall be carried out on heat / cast as well as on finished product as per relevant product material specifications. All HIC compliant materials shall meet the requirements of Chapter 5. For welds, alloy content of the weld shall be verified by chemical analysis. Test shall be conducted when changes in weld wire and/ or weld flux are made, or when a new set of electrode is used. Check analysis shall be carried out as per ASTM A530 for pipes as per ASTM A312 and pipe size > 8” and thickness > Sch.120, Check analysis shall also be carried out as per supplementary requirement S1 of ASTM A312. 10.2 Mechanical Properties These shall be as per specified product material specification. All HIC compliant materials shall meet the requirements of Chapter 5. 10.3 Non Destructive Examination 20% fittings / flanges shall be subjected to hardness test. Butt weld edge preparation of 20% fittings / flanges shall be subjected to DP test. RT if specified, 100% examination shall be performed by the manufacturer. UT if specified, 100% examination shall be performed by the manufacturer.

Page 143: UhdeIndia - Bharat Petroleum · Uhde India Private Limited, Dugal Plaza, 3 rd Floor, Prem Nagar, Bibwewadi Road, Pune 411 037, India TENDER RFQ / Tender No. : U6509 - 3187/ABM

6509-PI-EB-00002 BPCL UAN

Total Pages

ENGINEERING SPECIFICATION FOR PIPING MATERIALS

66-6509-700

83 of

107

© 2010 Uhde India

For seamless pipes, each length of pipe with following specifications shall be ultrasonically tested as per ASTM E 213 or ASTM A 388.

� Size up to 4 inches and Sch > 120 � Size > 5 inches and thk. > 12 mm.

Dye penetrant test shall be on accordance with ASTM B165, procedure B8. Interpretation shall be in accordance with Appendix 8 of ASME Section VIII, Division 1(CS/AS)

Dye penetrant examination shall be in accordance with ASTM E165, procedure B-2. Interpretation shall be in accordance with Appendix 8 of ASME Section VIII, Division 1, except that all bright red indications (regardless of size) and clusters of pink indications (potential porosity) shall be cause for removal of metal until further dye examination indicates no indications or only isolated pink indications. (SS) 10.4 Charpy V-Notch Test In case of seamless and welded LTCS and Alloy steel pipes, fittings, flanges, castings, forgings, all parent material including weld and heat affected zones shall be impact tested (on charpy V notch) at the temperature indicated below and the corresponding energy values shall be complied with: Supplier shall report CVN impact test results to purchaser before shipment is made. One set of CVN impact tests is required for each heat of material. For LTCS forgings (LF2,CL1), the minimum impact energy requirement shall be 27J at -45 deg. C For 3 ½ Nickel forgings (LF3), the minimum impact energy requirement shall be 27J at -52 deg. C For LTCS pipes, fittings, castings (LCB), the minimum impact energy requirement shall be 27J at -45ºC. For 3 ½ Nickel pipes, fittings, castings the minimum impact energy requirement shall be 27J at -52 deg. C Charpy V-Notch impact testing shall be done for all Carbon steel welded pipes. If MDMT is not specified, impact test valves shall be not less than those indicated in EN 10028-2, with minimum 34J at 0

O C.

Charpy V-Notch impact testing shall be done for Carbon Steel in HIC Resistant Steels, LTCS and Alloy Steel valve material in accordance with UG-84 of ASME Section VIII, Division 1.

Charpy V-notch impact testing is required for all carbon steel compliant with chapter 5, LTCS and Alloy Steel pressure retaining longitudinally fusion welded pipe, components and welds. Impact tests shall be conducted in accordance with the requirements of ASME B31.3, except that there shall be no exemptions from impact testing and the test temperature shall be the lower of the design minimum metal temperature and 0°F (-18°C). The test specimens shall be supplied in the same heat treated condition as the new pipe 10.5 Inter-Granular Corrosion Test IGC Test shall be carried out for one fitting as furnished in each lot. The definition of ‘lot’ shall be the total quantity ordered per heat per size. Failure report in this test for the sample shall lead rejection of complete lot ordered. For all austenitic stainless steel, inter-granular corrosion test shall have to be conducted as per following: ASTM A262 Practice "B" with acceptance criteria of "60 mils/Year (Max.)” for all castings.

OR ASTM A262 Practice “E” with acceptance criteria of “No cracks observed from 20X magnification” and “Absence of inter-granular attack determined by metallographic examination of microscopic structure to be observed from 250X magnification” for all materials other than casting.

Page 144: UhdeIndia - Bharat Petroleum · Uhde India Private Limited, Dugal Plaza, 3 rd Floor, Prem Nagar, Bibwewadi Road, Pune 411 037, India TENDER RFQ / Tender No. : U6509 - 3187/ABM

6509-PI-EB-00002 BPCL UAN

Total Pages

ENGINEERING SPECIFICATION FOR PIPING MATERIALS

66-6509-700

84 of

107

© 2010 Uhde India

ASTM A262 Practice “C” with acceptance criteria of “15 mils/year (Max)” for all materials forged, rolled, wrought and castings in SS310, SS316 and SS16H materials of construction and those specified for HIC / H2 / NACE service. For the IGC test as described in above clause two sets of samples shall be drawn from each solution annealing / stabilization heat treated lot (total quantity ordered per heat per size). One set corresponding to highest carbon content and other set corresponding to the highest rating / thickness. 10.6 Ferrite Number Check Weld deposits shall be checked for Ferrite Content. A Ferrite Number (FN) of less than 3% and not more than 10% is required to avoid Sigma Phase Embrittlement during Post Weld Heat Treatment and High Temperature Service. FN may be determined by use of a Ferrite Scope or may be calculated using Schaeffler or Delong Diagrams. The Delong Diagram should be used if “FCAW” welding is performed.

Magnetic Ferritescope measurements must be made prior to Post Weld Heat Treatment to be considered meaningful. 10.7 Hydro-Testing of Components Refer Chapter 4.18 for test pressures of Body / Seat for valves, Strainers and Sight Glasses (without glass) Hydro-test of Pipes Hydrostatic tests shall be applied to each length of pipe and be in accordance with the requirements of Clause 21 of ASTM A530/A530M or Clause 22.2 of ASTM A999 (as applicable) unless otherwise specified. Water used for hydro tests should typically have a chloride content not exceeding 25 ppm for all SS items. 100% of the pipes shall be hydro tested by the manufacturer. Hydro-test of Valves Body / Bonnet, Seat and Back Seat of all valves shall be hydro-tested. The weld joint between valve body and the pipe nipple shall be 100% radiographed for BW end valves and 100% DP tested for SW end valves. No repair welding shall be done on valve bodies during manufacturing. Pneumatic Test for Valves Pneumatic testing shall be applicable to valve seat for all valves. In addition to above all S.W. and B.W. valves shall be DP tested at both ends Spark test shall be carried out for lined valves. PTFE lined valves shall be tested at 20 KV and rubber lined valves shall be tested at 6 KV per MM of lining thickness The testing pressure against each type/rating/material is indicated vide Annexure-I to this document.

Page 145: UhdeIndia - Bharat Petroleum · Uhde India Private Limited, Dugal Plaza, 3 rd Floor, Prem Nagar, Bibwewadi Road, Pune 411 037, India TENDER RFQ / Tender No. : U6509 - 3187/ABM

6509-PI-EB-00002 BPCL UAN

Total Pages

ENGINEERING SPECIFICATION FOR PIPING MATERIALS

66-6509-700

85 of

107

© 2010 Uhde India

The testing standard to be followed shall be as follows:

Sr. no. Description Standard

1 API Standard Valves (Eg: API600, API602) API 598

2 British Standard Valves (BS EN ISO 15761, BS5351, BS5353 etc) EN 12266, Part I

3 Fire Safe Design

For British Standard Valves EN12266, Part II

For API Standard Valves API607

6

7

The leakage rate shall be 'Rate A' as per BS 6755 Part 1 except check valves. For check valves the leakage rate shall be "Rate C". Metal seated butterfly valves shall meet the leakage rates of API 598. In addition to the normal seat test, all Check Valves shall be tested for leakage at 25% of the specified seat test pressure. Also a test shall be carried out to ensure that all Check Valves start opening at 0.2 kg/cm2(g) on the inlet side Any additional testing listed in the technical specification sheet and/or mentioned as separate enclosure to the enquiry document shall be carried out as per the laid guidelines All the valves manufactured as per any International Standard shall be tested as per guidelines laid in the respective standards 10.8 Radiography All welded fittings shall be supplied with 100% radiography. All shop weld joints in Carbon Steel, Alloy Steel, Stainless Steel shall be 100 % radiographed in accordance with paragraph UW-51 of ASME boiler and pressure vessel code, Section-VIII, Division 1. All shop girth welds shall be 100% radiographed and evaluated in accordance with paragraph 336.4.5 of ASME B31.3 with a minimum casting quality factor of 0.95. If radiography is not possible, UT shall be used. For cast valve flanges and bodies with flange rating of class 900 or greater shall be examined in accordance with paragraph 7.2 thru’ 7.5 of Appendix VII ASME Section VIII Div. 1 regardless of casting quality factor. For welds of all Alloy Steel components, RT shall be used on all welds prior to PWHT only provided that UT is made before and after PWHT. For welds of all Alloy Steel components UT shall be used before and after PWHT and after Hydro-test, if RT is not possible. All valve castings for HIC resistant service and Hydrogen service shall be supplied with 100% radiography. 100% radiography means entire quantity for all sizes has to be radiographed. For all other services, radiographic quality castings shall be used. All valve castings for general service shall be supplied with radiography as table under clause 10.8.1. For fittings, 10% radiography means 10% of the quantity ordered per size, per heat, per lot and for pipes, 10% radiography means 10% of the running pipe length per lot / per size / per visit.

Page 146: UhdeIndia - Bharat Petroleum · Uhde India Private Limited, Dugal Plaza, 3 rd Floor, Prem Nagar, Bibwewadi Road, Pune 411 037, India TENDER RFQ / Tender No. : U6509 - 3187/ABM

6509-PI-EB-00002 BPCL UAN

Total Pages

ENGINEERING SPECIFICATION FOR PIPING MATERIALS

66-6509-700

86 of

107

© 2010 Uhde India

Where extent of radiography is specified as 300mm per pipe length it shall be distributed at least two places along the pipe length. Required radiography may be performed before or after PWHT, if performed before PWHT, an additional radiography or alternatively ultrasonic examination shall be performed after PWHT. 10.8.1. RADIOGRAPHY OF CAST VALVES Valves under critical, very highly critical, lethal and toxic services shall be radiographed as specified in respective data sheets or any other technical document forming part of valve enquiry. When specifically not mentioned in individual data sheets, valve castings shall undergo radiographic examination as specified hereunder:

Material Rating Size Range Radiography

Class 150 24" and below 10%

Class 150 26" and above 100%

Class 300 16" and below 10%

Class 300 18" and above 100%

All

Class 600 & above All sizes 100%

Radiography procedure, areas of casting to be radiographed shall be as per ASME B16.34 and acceptance criteria shall be as per ASME B16.34 Appendix-I. However, for areas of casting to be radiographed for types of valve not covered in ASME B16.34, vendor shall enclose details of areas to be radiographed in line with ASME B16.34. Critical body and bonnet casting sections, typically defined by ASME B16.34, shall be radiographed and shall meet ASTM E446 (up to 2” thick); Category A, B and CA level 2, Category CB, CC and CD level 3, Category D, E, F, G level 0. (SS Valves)

For Stainless Steel Valves, welds shall be 100% radiographed and evaluated in accordance with paragraph 336.4.5 of ASME B31.3 with a minimum casting quality factor of 0.95. If radiography is not possible, UT shall be used. (SS Valves) Following inspection procedure shall be applicable where 10% radiography of casting is specified: 10% radiography means, 10% of the quantity ordered per size per heat per foundry per tag number. Fraction shall be rounded off to 1 to decide the number of castings to be radiographed. In case of rejection, double the quantity of the casting to be radiographed as determined by 6.3(a) above shall be offered for radiography. In the event of further rejection of single casting, the whole lot shall be radiographed. The extent of radiography shall be restricted only to the critical areas as defined in ASME B16.34. Acceptance of radiography is level 3 as defined in ASTM E446. Radiography wherever specified in the data sheets or as per clause 6.1 shall be done by X-ray/GAMMA-ray to get the required sensitivity. 10.9 Cryogenic Testing For Cryogenic Service Valves, as a pre-qualification, low temperature carbon steel (LTCS) & 3 ½ Ni steel valves for cryogenic applications shall be subjected to cryogenic test as per BS 6364 and test shall be witnessed and certified by UIL or UIL nominated inspection agency. The vendor has to submit test certificate for prototype valves along with the offer. Prototype test carried on a particular size, rating and design will qualify valves of sizes equal to and below the particular size of the same rating and design.

Page 147: UhdeIndia - Bharat Petroleum · Uhde India Private Limited, Dugal Plaza, 3 rd Floor, Prem Nagar, Bibwewadi Road, Pune 411 037, India TENDER RFQ / Tender No. : U6509 - 3187/ABM

6509-PI-EB-00002 BPCL UAN

Total Pages

ENGINEERING SPECIFICATION FOR PIPING MATERIALS

66-6509-700

87 of

107

© 2010 Uhde India

Wherever specified, cryogenic testing as per BS 6364 shall be carried out at temperature (-45°C) and (-52°C) for "LTCS" and “3 ½ Ni steel” valves respectively. Wherever impact test of SS studs/nuts is called for in the data sheet, the impact value shall be 27J at the intended service temperature specified in the data sheets

10.10 Repairs to Defective Castings Repair to defective castings shall be outlined in writing to the Purchaser before repair commences. Repair method shall be approved prior to welding. 10.11 IBR CERTIFICATION For fittings, flanges and valves described "IBR" test certificate in form III-C shall be furnished, signed by IBR Inspection Authority or an approved representative. For pipes described “IBR” test certificate in form III-A / III-D shall be furnished, signed by IBR Inspection Authority or an approved representative. 10.12 Helium Leak Test for Valves

Manufacturer’s certification of the following inspection is required. Helium leak test for valves is applicable for Hydrogen service and HIC service.

10.12.1 A leak test of valve body to be conducted using Helium. Body/bonnet/cover joints and stuffing box of

all valves shall be Helium leak tested as per ASME Section V, Sub-section A, Article 10 (Tracer and Probe Technique), Appendix V at a minimum of 25% of the allowable cold working pressure as per ASME B16.34.

Test Duration shall be as follows:

Test duration in minutes

NS Pressure Class

Up to 300 600 800 & 900 1500 2500

Up to 2” 3 6 9 12 12

3” to 6” 6 9 12 15 18

8” to 16” 9 9 12 15 18

18” to 24” 9 12 15 18 21

10.12.2 Total leakage rate measured cumulatively at all joints shall be less than 0.0001 ml/s of helium.

10.12.3 Any evidence of leakage through casting shall be cause for rejection.

10.12.4 Any leakage past the backseat shall be cause for rejection.

10.12.5 Any indication of helium of 50 ppm above the ambient helium level is cause for rejection. 10.12.6 For valves, class 900 and above a high pressure leak test of valve body shall be conducted using

helium. The pressure shall be 1.5 times the design pressure and duration shall be minimum 10 min. leakages are NOT permitted.

10.13 Spark Testing For sleeved butterfly valves, spark testing of sleeve shall be carried out at 6KV / mm of thickness of rubber lining.

Page 148: UhdeIndia - Bharat Petroleum · Uhde India Private Limited, Dugal Plaza, 3 rd Floor, Prem Nagar, Bibwewadi Road, Pune 411 037, India TENDER RFQ / Tender No. : U6509 - 3187/ABM

6509-PI-EB-00002 BPCL UAN

Total Pages

ENGINEERING SPECIFICATION FOR PIPING MATERIALS

66-6509-700

88 of

107

© 2010 Uhde India

For PTFE lined valves the thickness too shall be 3mm minimum and spark testing shall be carried out at 20KV. 10.14 Strip Test Strip test shall be carried out for minimum 1% of offered quantity on random basis. The size of valve for strip test shall be at the discretion of valve Inspector or TPI. 10.15 Manufacturer’s Certification Manufacturer’s certification of the above inspection is required: 10.16 Quality Assurance Procedure / Inspection and Test Plan Quality Assurance Manual shall be furnished for company’s review which should include the schemes for the raw material quality insurance, product quality assurance, storage and traceability of products and quality control procedures for each component (i.e. pipes, fittings, flanges, valves etc..)

Page 149: UhdeIndia - Bharat Petroleum · Uhde India Private Limited, Dugal Plaza, 3 rd Floor, Prem Nagar, Bibwewadi Road, Pune 411 037, India TENDER RFQ / Tender No. : U6509 - 3187/ABM

6509-PI-EB-00002 BPCL UAN

Total Pages

ENGINEERING SPECIFICATION FOR PIPING MATERIALS

66-6509-700

89 of

107

© 2010 Uhde India

11. INSPECTION All shop test / material certificates and records as defined in the technical specifications shall confirm to the corresponding ASME / ASTM / API / BS / IBR / NACE specifications Surface of fitting shall be free from rust, rust preventive coating, mill scales etc.. CS fittings shall be offered in shot blasted condition. SS fittings shall be offered after pickling and passivation. Flanges shall be offered in machined condition before applying rust preventive. Fittings and flanges shall not be repaired by welding without UIPL’s written approval. Dimensional inspection – manufacturer must ensure that 100% pipes, fittings, flanges, gaskets are dimensionally inspected by them before offering to UIPL. Dimensional inspection – Fasteners with ‘GO’ and ‘NO GO’ gauge. Permissible variation in length shall be according to the applicable material standards for all items on a random basis. Tolerance of outside diameter and thickness shall confirm to each applicable material standard. Radiography - UIPL shall review 25% of the films. Ultrasonic Testing – UIPL shall witness 25%. Visual Inspection of Fittings – 100% by UIPL. Dimensional Inspection of Pipes – 40% for NS < 8” and 100% for NS >= 8” by UIPL Dimensional inspection of fittings– 40% for NS < 8” and 100% for NS >= 8” by UIPL Dimensional inspection of flanges– 40% for NS < 8” and 100% for NS >= 8” by UIPL Dimensional inspection of gaskets– 40% for NS < 8” and 100% for NS >= 8” by UIPL Dimensional Inspection of fasteners – 100% by UIPL Chemical / Physical / IGC test / DP / UT shall be randomly witnessed by UIPL. For valves, UIPL shall randomly review Chemical / Physical / IGC test reports and witness DP / UT tests. Hydro-test of pipes – 25% witness by UIPL UIPL inspection reserves the right to IGC test as per practice ‘E’ on sensitized condition of SS304L and SS321, SS321H All welds of fabricated components and fabricated valves shall be carried out and examined in accordance with ASME B31.3 All the above testing shall be done per lot, per size per visit.

Page 150: UhdeIndia - Bharat Petroleum · Uhde India Private Limited, Dugal Plaza, 3 rd Floor, Prem Nagar, Bibwewadi Road, Pune 411 037, India TENDER RFQ / Tender No. : U6509 - 3187/ABM

6509-PI-EB-00002 BPCL UAN

Total Pages

ENGINEERING SPECIFICATION FOR PIPING MATERIALS

66-6509-700

90 of

107

© 2010 Uhde India

Any non-conformity during sampling inspection shall lead to rejection of total lot of material offered for inspection. Weld repairs are NOT permitted without Purchaser’s approval. The fabricator shall furnish welding procedures and procedure qualifications, including seal and repair welds for Purchaser’s approval. The fabricator must certify that Post Weld Heat Treatment (PWHT) if specified was performed as required. Heat treatment chart & sample material should be preserved for review. The prototype fire safe test certificate shall be produced to the UIPL inspector during inspection of fire safe valves. Material/Production/Heat Treatment Certificate shall be 100% reviewed. The completeness of each piece shall be verified Surface, dimension, identification, marking, leakage and functioning shall be witnessed by inspector for 25% of the pieces Review of Fire safe test certificates furnished against each size by the approving authority. In case of motor operated valves, functional/operational checks as per the requirements of the specifications shall be made on each valve.

Page 151: UhdeIndia - Bharat Petroleum · Uhde India Private Limited, Dugal Plaza, 3 rd Floor, Prem Nagar, Bibwewadi Road, Pune 411 037, India TENDER RFQ / Tender No. : U6509 - 3187/ABM

6509-PI-EB-00002 BPCL UAN

Total Pages

ENGINEERING SPECIFICATION FOR PIPING MATERIALS

66-6509-700

91 of

107

© 2010 Uhde India

12. POSITIVE MATERIAL IDENTIFICATION 12.1 Scope 12.1.1 This specification applies to the requirements for Positive Material Identification (PMI) to be

performed at the vendor's works on Metallic Alloy Materials procured either directly by the Owner/UIPL/ LSTK contractor of indirectly through the sub-vendors.

12.1.2 Any post order deviation from this specification must be approved by Owner/UIPL in the Deviation/ Waiver Permit format enclosed with the bid document else were.

12.1.3 This specification covers the procedures and methodology to be adopted to assure that the chemical composition of the alloy material is consistent with the material specifications as specified in purchase documents using 'Alloy Analyzer’ at the time of final inspection before dispatch.

12.1.4 The scope of this specification shall include but shall not be limited to Positive Material Identification (PMI) to be performed on Alloy Materials listed below:

- Alloy Steel Pipes including Clad Pipes - Alloy Steel Flanges & Forgings - Alloy Steel Fittings including- Clad Fitting - Alloy Steel Fasteners - Alloy Cast & Forged steel valves. - Alloy Steel Instrumentation Items (Control Valves, Safety Valves etc.) - Longitudinal Pipe & Fittings Welds. - Gaskets (for Ring Type Joints)

Following items shall be excluded from scope of PMI examination. - Gaskets other than for Ring Type Joints.

12.1.5 All grades of material supplies including Stainless Steels shall be liable for PMI test at site. In case of any defective materials being found at site, the LSTK contractor shall be responsible to effect replacement of such defective materials at project site without any additional cost/delays.

12.2 REFERENCE DOCUMENTS API Recommended Practice 578 (First Edition, May 1999) - Material Verification Program for new and Existing Alloy Piping Systems. 12.3 DEFINITIONS 12.3.1 LSTK contractor: Any Supplier or Manufacturer on whom an order is placed for the supply of

referred items. This definition shall also include any sub-vendor or manufacturer on whom a sub-order is placed.

12.3.2 Inspection Lot: A group of items offered for inspection covered under same size, Heat and Heat treatment lot.

12.3.3 Alloy Material: Any metallic material (including welding filler materials) that contains alloying elements such as chromium, nickel, molybdenum or vanadium, which are intentionally added to enhance mechanical or physical properties and/or corrosion resistance.

12.4 PMI EXAMINATION 12.4.1 The LSTK contractor shall submit a procedure of PMI to comply with the requirements of this

Specification Approval of PMI Procedure shall be obtained from Owner/UIPL prior to Commencing manufacture/ inspection of product.

12.4.2 PMI examination of alloy materials is independent of any certification, markings or colour coding that may exist and is aimed at verifying that the alloys used are as per specified grades.

12.4.3 The Vendor shall identify all incoming alloy materials and maintain full traceability of all alloy materials, including all off-cuts. Transfer of identification marks shall be undertaken prior to cutting to ensure maintenance of identification on off-cuts.

12.4.4 The Vendor shall ensure that all alloy materials are segregated and stored in separately identified locations to prevent the mix up of materials of different alloy specifications or alloy material with carbon steel. Non Ferro-magnetic materials shall be segregated at all times from Ferro-magnetic materials.

Page 152: UhdeIndia - Bharat Petroleum · Uhde India Private Limited, Dugal Plaza, 3 rd Floor, Prem Nagar, Bibwewadi Road, Pune 411 037, India TENDER RFQ / Tender No. : U6509 - 3187/ABM

6509-PI-EB-00002 BPCL UAN

Total Pages

ENGINEERING SPECIFICATION FOR PIPING MATERIALS

66-6509-700

92 of

107

© 2010 Uhde India

12.4.5 PMI examination is subject to surveillance inspection by Owner/UIPL. 12.5 ACCEPTABLE METHODS FOR PMI 12.5.1 The method used for PMI examination shall provide a quantitative determination of the alloying

elements like Cr, Mo, Ni, and V in Alloy Steel items. 12.5.2 Instruments or methods used for PMI examination shall be able to provide quantitative, recordable,

elemental composition results for positive identification of alloying elements present. 12.5.3 The acceptable instruments for alloy analyzer shall be either "X-Ray fluorescence spectrometer" or

"Optical Emission" type each capable of verifying the percentage of alloy elements, within specified range.

12.5.4 Chemical spot testing, magnets, alloy sorters and other methods using eddy current or triboelectric testing methods are not acceptable for PMI examination. Portable type X-Ray fluorescence spectrometer is not acceptable.

12.5.5 The PMI instrument used shall have the sensitivity to detect the alloying elements in the specified range.

12.5.6 All PMI instruments shall have been serviced within a 6 month period of the time of use to verify the suitability of batteries, sources etc., and the data of the last service shall be stated on the PMI Report Form (Sample enclosed).

12.5.7 Each analyzer must be calibrated according to the manufacturer's specification at the beginning and end of each shift. Instrument must be checked against known standard for each alloy type to be inspected during the shift.

12.5.8 Certified samples, with full traceability of a known alloy materials shall be available for use as a random spot check on the instrument calibration.

12.5.9 The surfaces to be examined shall be prepared by light grinding or abrasive paper and solvent cleaner. Evidence of Arc burn resulting from examination shall be removed by light grinding or abrasive paper.

12.5.10 No permanent marks, which are injurious to the usage of product in service, are acceptable. 12.5.11 Alloy Steel ring type joint Gaskets shall be inspected by using X-Ray fluorescence instrument. 12.5.12 Testing shall be done as per the procedures outlined by the manufactures of alloy analyzer being

used. Modification of these procedures if any must be approved by Owner/UIPL. 12.5.13 The persons performing PMI shall demonstrate their capabilities to the satisfaction of Owner/UIPL

visiting engineer. If the vendor has qualified operator on their rolls, he may perform the examination. Otherwise PMI examination shall be sub-contracted to an independent testing agency approved by UIPL.

12.5.14 Whenever material is identified as not meeting requirements by the visiting engineer a rejection note shall be issued.

12.6 EXTENT OF PMI EXAMINATION Following sampling plans shall be applicable for PMI examination of various alloy items.

A. Flanges, Fittings Valves, RTJ Gaskets - 100% B. Pipes - 100% (for pipes procured from traders).

- 2 random samples drawn from each size/Heat/Lot (for pipes procured directly from Mills).

C. Fasteners Lot Size Sample Size Upto 100 2% (Min 2) 101 to 500 1% (Min 3) 501 and above 0.5% (Min 5)

Note:

a. For Welded Pipes and Fittings, PMI shall be performed on Base Metal as well as weldment. b. Whenever any sample drawn to PMI test on the basis of percentage selection in B & C above, fails

to meet specification requirements, 100% of items of lot shall be tested for PMI.

Page 153: UhdeIndia - Bharat Petroleum · Uhde India Private Limited, Dugal Plaza, 3 rd Floor, Prem Nagar, Bibwewadi Road, Pune 411 037, India TENDER RFQ / Tender No. : U6509 - 3187/ABM

6509-PI-EB-00002 BPCL UAN

Total Pages

ENGINEERING SPECIFICATION FOR PIPING MATERIALS

66-6509-700

93 of

107

© 2010 Uhde India

12.7 RECORDING AND DOCUMENTATION The results of PMI examination shall be recorded in a Report Format as enclosed with this specification.

POSITIVE MATERIAL IDENTIFICATION REPORT BULK MATERIALS

Page: of

Project: Client: Job No.:

PMI Report No. Vendor / Sub-vendor

Purchase Order no.: Purchase Requisition no.: Bulk Item type(As per requisition)

Testing agency: PMI Location:

Material Specification / Grade: No. of items in Lot:

Requisition Item No. / Description: Alloy Content, Weight Percent Remarks: Accept/Reject

Element Cr Mo Ni V

Specified Range

Actual Observation

1.

2.

3.

4.

5.

6.

7.

8.

Instrument Type ID: Last Service Date

Inspection Agency

Witnessed By:

12.8 MARKING 12.8.1 All alloy materials tested by PMI shall be identified using either of the following methods by

indicating "PMI OK" a) Bar Code/Hologram Sticker b) A low stress stamp marking.

Page 154: UhdeIndia - Bharat Petroleum · Uhde India Private Limited, Dugal Plaza, 3 rd Floor, Prem Nagar, Bibwewadi Road, Pune 411 037, India TENDER RFQ / Tender No. : U6509 - 3187/ABM

6509-PI-EB-00002 BPCL UAN

Total Pages

ENGINEERING SPECIFICATION FOR PIPING MATERIALS

66-6509-700

94 of

107

© 2010 Uhde India

13. REPORTS AND CERTIFICATES Review of manufacturing / inspection procedure followed by the manufacturer. Identification / review of raw material test certificate / records. Review of heat treatment procedure and heat treatment charts. Review of manufacturer’s test certificate / reports. Verification of marking / stamping on each item Manufacturer’s certificate shall be countersigned by UIPL after satisfactory inspection. IBR approved material must be offered to UIPL with original IBR certificate or IBR endorsed certificate. In case of endorsed certificate, endorsement must be done by the Chief of IBR. 13.1 Material Test Certificate Test certificate furnished shall bear the following details:

- Product Name - Heat Number - Raw Material Source - Forge Shop / Casting Foundry / Manufacturer - Chemical Composition (with Carbon Equivalent) - Mechanical Properties (UTS, Hardness, YS, Ratio of YS to UTS, impact properties etc. - Material Designation (ASME, MSS-SP, BS etc.) - Test Results - Witnessed and Certified with proper seal and signature of accredited inspection agency. Any certificate not meeting these requirements shall be rejected.

Page 155: UhdeIndia - Bharat Petroleum · Uhde India Private Limited, Dugal Plaza, 3 rd Floor, Prem Nagar, Bibwewadi Road, Pune 411 037, India TENDER RFQ / Tender No. : U6509 - 3187/ABM

6509-PI-EB-00002 BPCL UAN

Total Pages

ENGINEERING SPECIFICATION FOR PIPING MATERIALS

66-6509-700

95 of

107

© 2010 Uhde India

14. MARKING Pipes, flanges, fittings, valves, special parts shall be furnished with weatherproof marking as per respective technical specification sheets. However, for NS 1” and smaller items, the code no. and size shall be minimum specified and other details should be furnished with a metal tag in the packing box. In addition, information about heat number and heat treatment shall be indicated. Pipes manufactured to other standard shall be marked as per relevant code. If standard is silent on marking, material spec, size and pressure rating shall be marked by punching. Colour coding and banding shall be implemented for all items irrespective of material / size / type of construction. The details of colour coding are shall be as per following table:

PIPES FITTINGS Sr No Specification Colour

Sr No Specification Colour

1 A106 Gr B NO COLOUR 1 A234 Gr WPB NO COLOUR

2 A106 Gr B H2 service PINK 2 A234 Gr WPB H2 service PINK

3 A106 Gr B NACE service BROWN 3 A234 Gr WPB NACE service BROWN

4 A106 Gr B IBR service RED 4 A234 Gr WPB IBR service RED

5 A106 Gr B Galvanized GREEN 5 A234 Gr WPB Galvanized GREEN

6 A 672 Gr B60 CL22 PINK + BROWN 6 A105 NO COLOUR

7 A 672 Gr B60 CL22 IBR Service PINK + RED 7 A105 H2 Service PINK

8 IS 1239 / 3589 WHITE 8 A105 IBR service RED

9 API 5L Gr B GREEN + PINK 9 A105 Galvanized GREEN

10 A 333 Gr 3 YELLOW 10 A420 Gr WPL3 / WPL3-W YELLOW

11 A 333 Gr 6 ORANGE 11 A420 Gr WPL6 / WPL6-W ORANGE

12 A 671 Gr CC60 CL32 YELLOW + PINK 12 A234 Gr WP 11 GREY

13 A 335 Gr P 11 GREY 13 A403 Gr WP 304L SKY BLUE

14 A 691 Gr 1.25 CR CL42 GREY + PINK 14 A403 Gr WP 321 VIOLET

15 A 312 TP 304L SKY BLUE 15 A403 Gr WP 321H YELLOW + RED

16 A 358 TP 304L BLUE + PINK 16 A350 Gr LF2 Class 1 ORANGE

17 A 312 TP 321 VIOLET 17 A350 Gr LF3 Class 2 YELLOW

18 A 358 TP 321 VIOLET + WHITE 18 A182 Gr F11 Class 2 GREY

19 A 312 TP 321H YELLOW + RED 19 A312 TP 304L GREY

FLANGES 20 A312 TP 321 VIOLET

1 A105 NO COLOUR 21 A312 TP 321H YELLOW + RED

2 A105 H2 service PINK 22 A106 WHITE

3 A105 NACE service BROWN

4 A105 IBR service RED FASTENERS

5 A105 Galvanized GREEN 1 A193 Gr B7 / A194 2H NO COLOUR

6 A516 Gr 60 WHITE 2 A193 Gr B7M / A194 2HM BROWN

7 A350 LF2 Class 1 ORANGE 3 A320 Gr L7 / A194 Gr 4 YELLOW

8 A350 LF3 Class 2 YELLOW 4 A193 Gr B16 / A194 Gr 4 PINK

9 A182 F 11 CL2 GREY 5 A193 Gr B8 / A194 Gr 8 SKY BLUE

10 A182 F 304L SKY BLUE 6 A193 Gr. B8T CL1 GREY

11 A182 F 321 VIOLET

12 A182 F 321H YELLOW + RED

Page 156: UhdeIndia - Bharat Petroleum · Uhde India Private Limited, Dugal Plaza, 3 rd Floor, Prem Nagar, Bibwewadi Road, Pune 411 037, India TENDER RFQ / Tender No. : U6509 - 3187/ABM

6509-PI-EB-00002 BPCL UAN

Total Pages

ENGINEERING SPECIFICATION FOR PIPING MATERIALS

66-6509-700

96 of

107

© 2010 Uhde India

Gaskets

Sr. No. Specification Colour

1 Synthetic Fiber NO COLOUR

2 Soft Iron WHITE

3 A 387 Gr 11 GREY

4 SPWD SS304 + Flex Graphite YELLOW

5 SPWD SS304L + Flex Graphite SKY BLUE

6 SPWD SS316 + Flex Graphite PINK

7 SPWD SS321 + Flex Graphite VIOLET

8 SPWD SS316 + MICA RED

9 SPWD SS321 + MICA GREEN

NACE service indicated above includes items identified for ‘HIC Resistant’ service in the technical data sheets (Refer chapter 5). Paint or ink for marking shall not contain any harmful metal or metal salts such as zinc, lead or copper which causes corrosive attack on heating. Painting for piping components as per above table shall be done as shown in the figures below:

Pipe with one colour Pipe with two colours

Reducer with one colour Reducer with two colours

Elbow with one colour Elbow with two colours

Page 157: UhdeIndia - Bharat Petroleum · Uhde India Private Limited, Dugal Plaza, 3 rd Floor, Prem Nagar, Bibwewadi Road, Pune 411 037, India TENDER RFQ / Tender No. : U6509 - 3187/ABM

6509-PI-EB-00002 BPCL UAN

Total Pages

ENGINEERING SPECIFICATION FOR PIPING MATERIALS

66-6509-700

97 of

107

© 2010 Uhde India

Tee with one or two colours Cap with one or two colours

Reducer with one colour Reducer with two colours

Stub Bolt Nuts Painting for valves: Unless otherwise specified in technical data sheet, painting and protective coating shall be done as per clause 9.1 of API-600. Pipes manufactured according to ASME / ASME / API I MSS shall be marked as per code and MSS-SP-25. Schedule number of butt welding ends shall be marked. Rust protection for flanges shall be performed according to t manufacturer’s standard. Rust prevention shall be required only for the exterior surfaces of the flanges. Rust preventive on machined surfaces to be welded shall be easily removable with a petroleum solvent and the same shall not be harmful to welding. Rust protection for pipes shall be performed according to manufacturer’s standard only to the external surface of the pipes. As far as possible, hard stamping shall be avoided for wall thickness less than 3.2mm. Any other suitable means of identification shall be used instead. 100% Pipes, fittings, flanges shall be stamped with “UIPL” control marks after satisfactory inspection. In case of Gaskets & Fasteners- Boxes shall be sealed by UIPL.

Page 158: UhdeIndia - Bharat Petroleum · Uhde India Private Limited, Dugal Plaza, 3 rd Floor, Prem Nagar, Bibwewadi Road, Pune 411 037, India TENDER RFQ / Tender No. : U6509 - 3187/ABM

6509-PI-EB-00002 BPCL UAN

Total Pages

ENGINEERING SPECIFICATION FOR PIPING MATERIALS

66-6509-700

98 of

107

© 2010 Uhde India

Material identification stamps (cold stamping) including punch marks are large hardness impressions (portable hardness tester e.g. Poldi Tester) are NOT permitted on components used in Hydrogen Service.

Cold stamping on the outside shall be performed before heat treatment, depth and sharpness of indentation shall be compatible with wall thickness of the component.

Stamping after heat treatment is NOT permitted. Valve markings shall be as per design manufacturing standard and the identification indicated in the BOM attached. Marking shall be done on Stainless steel / Aluminium tag which should be secured to the valve. Each pipe, forging, flange, valve and other product form shall be legibly stamped or stencilled showing the specification number, grade, and class. When metal stamping is used it shall be on the long edge of each component as it leaves the mill. Metal stamping on rolled surfaces shall be done with a “low stress” stamp. Markings shall be protected from erosion, wear, or other events that may render them unreadable.

Page 159: UhdeIndia - Bharat Petroleum · Uhde India Private Limited, Dugal Plaza, 3 rd Floor, Prem Nagar, Bibwewadi Road, Pune 411 037, India TENDER RFQ / Tender No. : U6509 - 3187/ABM

6509-PI-EB-00002 BPCL UAN

Total Pages

ENGINEERING SPECIFICATION FOR PIPING MATERIALS

66-6509-700

99 of

107

© 2010 Uhde India

15. PACKING AND SHIPMENT All components including Valves shall be protected for shipment, storage or while in transit in such a manner so as to avoid damage or atmospheric corrosion to the inside and outside surfaces and all other parts. All Pipes shall be thoroughly cleaned from inside and with ends plugged properly. Pipes in carbon steel shall be externally protected. The protective coating shall be a thin soft film preservative consisting of a rust inhibitor in petroleum oil. Selection of protective coating is left to the discretion of the supplier. Galvanized pipe need not to be coated. Machined surfaces of all flanges and all threaded and welded ends shall be protected against damage during transit and storage. For flanges machined surfaces (threads, bevel ends etc..) shall be coated with easily removable rust preventive grease or protective coating (corrosion inhibitor) and the surface shall then be covered with heavy duty plastic or wooden or metallic covers. Protective coating as per ASTM A700 Table 1 type A shall be applied for all pipe, fittings and flanges before delivery. Where wooden fiber or metal covers are used, plastic sheet shall be placed between the flange and the cover for additional protection. Gate and Globe Valves shall be shipped in the closed position. Plug and Ball Valves shall be shipped in the open position. Resilient-seated butterfly valves shall be shipped with the disc cracked slightly open but the disc shall not protrude beyond the valve body. After pressure testing all valves shall be completely drained and dried with dry air. The external surface of oxidable valves, except stem and sealing surfaces shall be painted with a protective primer. Painting of stainless, bronze and metallic valves is NOT required. Un-machined exterior surfaces shall be painted with Aluminium. Rust protection for inside of valves shall be performed according to the manufacturer’s standard. Facings of flanged valves and butt welding ends shall be protected with metal, hard board, heavy solid plastic or solid wood protectors securely attached to the valve. Valves with threaded or socket welded ends or drain taps shall have the ends protected with metal, wood or plastic plugs. Austenitic stainless steel valves shall be protected from chloride attack during shipment or storage (e.g. exposure to seawater etc.) All valves shall be packed after inspection taking particular care for protection of the valve yokes and flanges. The flanges shall be closed with plate covers. Ends of threaded and socket welded valves shall be closed using plastic caps. Valves shall be shipped with the stem packing installed. Valves having pressure grease seal gland packing arrangement for Stem shall be supplied free of grease. The grease sealing arrangement shall be well protected to prevent damage during shipping. All valves shall be properly covered by suitable protective means to avoid any damage during transportation. Butt welding ends of valves shall be capped or properly protected. All the valves shall be cleaned at shop and cleaning procedure may be in accordance with manufacturer’s standard. The extent of cleaning shall include the cleaning of shop dirt, filings, loose weld spatter, chips, fluxes, welding flux deposits, etc.

Page 160: UhdeIndia - Bharat Petroleum · Uhde India Private Limited, Dugal Plaza, 3 rd Floor, Prem Nagar, Bibwewadi Road, Pune 411 037, India TENDER RFQ / Tender No. : U6509 - 3187/ABM

6509-PI-EB-00002 BPCL UAN

Total Pages

ENGINEERING SPECIFICATION FOR PIPING MATERIALS

66-6509-700

100 of

107

© 2010 Uhde India

16. SUBSTITUTIONS Substitutions are applicable to all piping. Refer Chapter 20 for Restrictions. Items and/or models specified or referenced by Manufacturer and Figure Numbers are not intended to exclude equal items offered by other Manufacturers. Products of reputable Manufacturers and of comparable type, quality and characteristics may be submitted to the Purchaser for review. All components and valves not in accordance with the requirements of this specification and the purchase descriptions shall be clearly stated as such in the quotation. Other national material and component standards considered equivalent or superior may be substituted for the material standards required herein. All supplementary requirements of the original specification such as impact tests, preheat, post-weld heat treatment, tensile strength etc. where applicable shall apply to the substituted material. The following substitutions DO NOT REQUIRE Purchaser’s Approval: Pipe to A106 in place of A53 or API-5L (non expanded) Pipe to A106 or API-5L Seamless in place of A53 Seamless in place of Welded pipe or fittings Forgings in place of Plate or Sheet Pipe Electric Fusion Welded to A358 Class 5 in place of EFW A312 The following substitutions DO REQUIRE Purchaser’s Approval Each substitution of material must be approved by the Purchaser. Substitutions between any grades of austenitic stainless steel are NOT permitted without the Purchaser’s approval. Thickness lower than those specified Pipe to API-5L or A53 (of equal grade and type) in place of A106 Welded pipe in place of Seamless pipe. Supplementary heat treatment or mechanical tests shall be required for Welded pipe. Electric resistance welded pipe in place of electric fusion welded pipe. Seamless in place of welded pipe is acceptable provided that the minimum wall thickness is not less than the nominal wall thickness. Fittings fabricated out of more than two halves. Grade of material different from that specified. Where pressure containing parts have been specified as forged, substitution with castings is NOT permitted without Purchaser’s approval. Forged parts may substitute castings.

Page 161: UhdeIndia - Bharat Petroleum · Uhde India Private Limited, Dugal Plaza, 3 rd Floor, Prem Nagar, Bibwewadi Road, Pune 411 037, India TENDER RFQ / Tender No. : U6509 - 3187/ABM

6509-PI-EB-00002 BPCL UAN

Total Pages

ENGINEERING SPECIFICATION FOR PIPING MATERIALS

66-6509-700

101 of

107

© 2010 Uhde India

17. Non Destructive Testing (Site) The attachment welds for the branch connections, support, and other attachment to piping shall be continuous, full penetration with a smooth weld profile, and free of high local stress concentration. Fillet weld shall be ground to a smooth concave contour. All process lines with carbon steel material of construction consisting of seamless pipes and fittings or welded construction shall be 100% Post Weld Heat Treated (PWHT) based on ASME B31.3.

Sr. No

Material Fluid Service Type of Connection

Rating NDE Level (in %)

RT MT PT Visual

Butt Welds All ratings 100 -- -- 100 Hydrogen Service / NACE Service / Very Toxic Service

All Welds other than BW

All ratings

-- -- 100 100

Butt Welds All ratings 10 -- -- 100 Normal Service (Category N) All other welds All ratings -- -- 20 100

Butt Welds < 600 5 -- -- 100 Category D Fluid (Utility service) All other welds < 600 -- -- 10 100

Butt Welds >= 600 10 -- -- 100

1 Carbon Steel / LTCS

Category D Fluid (Utility service) All other welds >= 600 -- -- 20 100

Butt Welds All ratings 100 -- -- 100 Hydrogen Service / NACE Service / Very Toxic Service

All Welds other than BW

All ratings

-- -- 100 100

Butt Welds All ratings 100 -- -- 100 Normal Service (Category N) All other welds All ratings -- -- 100 100

Butt Welds < 600 100 -- -- 100 Category D Fluid (Utility service) All other welds < 600 -- -- 100 100

Butt Welds >= 600 100 -- -- 100

2 Alloy Steel

Category D Fluid (Utility service) All other welds >= 600 -- -- 100 100

Butt Welds All ratings 100 -- -- 100 Hydrogen Service / NACE Service / Very Toxic Service

All Welds other than BW

All ratings All ratings

-- -- 100 100

Butt Welds All ratings 100 -- -- 100 Normal Service (Category N) All other welds All ratings -- -- 100 100

Butt Welds All ratings 100 -- -- 100

3 Stainless Steels

Category D Fluid (Utility service) All other welds All ratings -- -- 100 100

Notes:

• Indicated percentages apply to all welders involved

• All other welds include Socket welds, Fillet welds and Branch connection.

• Ultrasonic examination may be applied instead of radiography if: 1. The configuration precludes radiography. 2. Nominal wall thickness is more than 10mm

• Branch connections including small nipples shall be radiographed unless waived off by BPCL / UIPL.

• Film quality requirements: 1. Fine grain film (Class II) for X-Ray 2. Ultra fine grain film (Class I) for gamma ray

MT = Magnetic particle examination PT = Liquid penetrant examination BW = Butt welds.

Page 162: UhdeIndia - Bharat Petroleum · Uhde India Private Limited, Dugal Plaza, 3 rd Floor, Prem Nagar, Bibwewadi Road, Pune 411 037, India TENDER RFQ / Tender No. : U6509 - 3187/ABM

6509-PI-EB-00002 BPCL UAN

Total Pages

ENGINEERING SPECIFICATION FOR PIPING MATERIALS

66-6509-700

102 of

107

© 2010 Uhde India

18. Bolt Torquing and Hot Bolting 18.1 Flange joints shall be made up by hand using ring spanners of appropriate dimensions. Lengthening of spanners by means of pipe, crowbars and similar equipment is NOT PERMITTED. This applies to:

Sr. Rating NS Bolt Size Range

1 Class 150 ½” up to and including 24” ½” to 1 ¼”

2 Class 300 ½” up to and including 20” ½” to 1 ¼”

3 Class 600 ½” up to and including 6” ½” to 1”

4 Class 900 ½” up to and including 3” ¾” to 7/8”

5 Class 1500 ½” up to and including 2” ¾” to 7/8”

18.2 Flange joints shall be made up by hand using torque wrenches of appropriate dimensions. This applies to:

Sr. Rating NS Bolt Size Range

1 Class 300 24” 1 ½”

1 Class 600 8” up to and including 14” 1 1/8” to 1 3/8”

2 Class 900 4” up to and including 12” 1 1/8” to 1 3/8”

3 Class 1500 3” up to and including 4” 1 1/8” to 1 1/4”

18.3 Flange joints shall be made up by hand using hydraulic bolt (torque or stretch device). This applies to:

Sr. Rating NS Bolt Size

1 Class 600 16” and larger 1 ½” and over

2 Class 900 14” and larger 1 ½” and over

3 Class 1500 5” and larger 1 ½” and over

4 Any Class All joints subject to high temperature or cyclic duties 1” and over

Joints with leakage history

Joints where high accuracy is required

Any joint as specified by the licensor.

5 Any Class All Joints 2” and over

6 Any Class If required per stress analysis Any size

Flange connections with bolting or nominal diameter requirements that match table in 18.3 above shall have sufficient clearance and access to allow the use of hydraulic tensioning equipment. The selection of equipment supplier, tensioning procedure and supporting calculations shall be subject to approval by BPCL / UIPL. Stud bolts shall be longer by one diameter to facilitate the bolt tensioning for all sizes specified in table above. Bolt torquing shall be done in at least three passes and the limiting (maximum) torque shall be indicated by the agency. The limiting (maximum) bolt torque must be worked out on the basis of maximum recommended compression for rubber gaskets (1200 psi), compressed sheet gasket (15,000 psi), spiral wound gasket (30,000 psi) and allowable stress for bolt material. Bolt tightening patterns shall be as per ASME - PCC – 1 (2010) F-1.3 or F-1.4

Page 163: UhdeIndia - Bharat Petroleum · Uhde India Private Limited, Dugal Plaza, 3 rd Floor, Prem Nagar, Bibwewadi Road, Pune 411 037, India TENDER RFQ / Tender No. : U6509 - 3187/ABM

6509-PI-EB-00002 BPCL UAN

Total Pages

ENGINEERING SPECIFICATION FOR PIPING MATERIALS

66-6509-700

103 of

107

© 2010 Uhde India

An applied bolt stress of 30,000 to 40,000 psi and typically 35,000 psi is adequate on most duties. It should not exceed generally 50% of the bolt material yield stress. The applied bolt stresses shall be individually calculated for particularly critical or problematic joints.

Page 164: UhdeIndia - Bharat Petroleum · Uhde India Private Limited, Dugal Plaza, 3 rd Floor, Prem Nagar, Bibwewadi Road, Pune 411 037, India TENDER RFQ / Tender No. : U6509 - 3187/ABM

6509-PI-EB-00002 BPCL UAN

Total Pages

ENGINEERING SPECIFICATION FOR PIPING MATERIALS

66-6509-700

104 of

107

© 2010 Uhde India

19. ABBREVIATIONS MT - Magnetic Particle Examination NDT - Nondestructive Examination NS - Nominal Pipe Size PT - Liquid Penetrant Examination RT- Radiographic Examination UT - Ultrasonic Examination EFW Electric-fusion weld that it signifies manual or automatic

electric arc welding, with or without the addition of filler metal. CLR - Crack Length Ratio CSR - Crack Sensitivity Ratio CTR - Crack Thickness Ratio MDMT- Minimum design metal temperature Within the context of this specification, the following words shall have the meaning stated. Component: refers to pipes, fittings, flanges or type of valves or plates.

Page 165: UhdeIndia - Bharat Petroleum · Uhde India Private Limited, Dugal Plaza, 3 rd Floor, Prem Nagar, Bibwewadi Road, Pune 411 037, India TENDER RFQ / Tender No. : U6509 - 3187/ABM

6509-PI-EB-00002 BPCL UAN

Total Pages

ENGINEERING SPECIFICATION FOR PIPING MATERIALS

66-6509-700

105 of

107

© 2010 Uhde India

20. RESTRICTIONS

20.1 Nominal Pipe Size (NPS) – The minimum process pipe size considered is 1”1/2 considering supporting on pipe rack. Smaller sizes may be permitted for instrument connections, steam tracing, auxiliaries, utilities, etc. 20.2 Non-standard pipe sizes 1¼", 2½", 3½", 5" and odd diameter above 5” e.g. 22” shall not be used. Standard pipe sizes listed in ASME B36.10/36.19 shall be followed. Tubing shall be used in place of Piping for sizes less than ½”. 20.3 Where equipment is supplied with non-standard nozzle sizes, these shall be adjusted to a standard size by means of a reducing fitting immediately adjacent to the equipment and companion flange shall be included by supplier in his scope. 20.4 Usage of Pipes with threaded and coupled ends is restricted to Instrument Air service. 20.5 Usage of Cement Lined Pipes is restricted to Fire Water Service for NS >= 4”. The thickness indicated in wall thickness table for cement steel piping (Refer Part 4 of UIPL Piping Specification doc no. 6509-PI-US-0001) is for bare pipe without liner thickness. The liner thickness is indicated in the respective technical specification. 20.6 For all lines with NPS smaller than 2”, minimum wall thickness shall not be less than Sch.80 in case of the carbon steel / Low Temperature Carbon Steel and Low Alloy Steel; and not less than Sch.40S in case of Stainless steel / Hastelloy pipes. 20.7 Low Alloy Steel pipes for catalyst lift lines and Gravity Flow lines in Regeneration unit shall have a minimum wall thickness of Sch.160 and Sch.80 respectively. 20.8 Impulse piping for Steam Service shall be minimum sch.160. 20.9 Usage of Seamless as well as Welded fittings is permitted in all Fluid Categories. However, they shall have to be compliant with chapter 5 when used in carbon steel piping requiring full compliance with HIC. 20.10 Usage of in-line Socket Welded fittings including 90 degree and 45 degree elbows, full couplings, unions, sockolets, is permitted except for carbon steel piping compliant with chapter 5, alloy steels (except E31RF), stainless steels and carbon steel with PWHT as per M/s. AXENS . 20.11 Usage of Miters is permitted only in lines vented to atmosphere. They shall be of 1.5D or 1D design. 20.12 Usage of all types of socket welded branch connections including equal Tees, reducing Tees, sockolets and half-Couplings is permitted except in carbon steel piping requiring full compliance with chapter 5, alloy steel piping (except E31RF), stainless steel piping and carbon steel requiring PWHT as per M/s. AXENS. 20.13 Usage of fabricated branches connections - Stub-ons (for one size lesser than run pipe) and Stub-ins (for more than one size lesser than run size), with or without reinforcement pad is permitted except in carbon steel piping compliant with chapter 5, alloy steel, stainless steel and carbon steel with PWHT requirement as per M/s. AXENS. 20.14 Usage of Screwed Fittings (including Unions with elastomer sealing) is permitted only in Instrument Air up to NS less than 6”. 20.15 Usage of Screwed Connections and Miters is NOT PERMITTED in carbon steel piping compliant with chapter 5, alloy steel piping, stainless steel piping and carbon steel with PWHT requirement as per M/s. AXENS.

Page 166: UhdeIndia - Bharat Petroleum · Uhde India Private Limited, Dugal Plaza, 3 rd Floor, Prem Nagar, Bibwewadi Road, Pune 411 037, India TENDER RFQ / Tender No. : U6509 - 3187/ABM

6509-PI-EB-00002 BPCL UAN

Total Pages

ENGINEERING SPECIFICATION FOR PIPING MATERIALS

66-6509-700

106 of

107

© 2010 Uhde India

20.16 Usage of Flanges of all construction types such as Socket Welded, Slip-on, Weld Neck IS PERMITTED except in carbon steel piping compliant with chapter 5, alloy steel piping, stainless steel piping and carbon steel with PWHT requirement as per M/s. AXENS, where only Weld Neck flanges have been specified. 20.17 Usage of Plate Flanges with flat face to AWWA C204 CL. D is restricted to Fire Water Service. 20.18 Usage of Epoxy lined flanges is permitted for Cement Lined Pipes in Fire Water Service. 20.19 Flanges for Class 900 in High Pressure Steam Service shall be Class 1500 with ring type joints. 20.20 Usage of class 400 flanges is NOT PERMITTED except when required on nozzles for compressors, pumps and turbines. 20.21 Usage of Non-metallic Flat Ring Compressed Asbestos Free Gaskets is restricted to all carbon steel piping except Fire Water Service. E. g. ARAMID, BUTLY RUBBER, PTFE etc.. Their minimum thickness shall be 1.5mm 20.22 Gaskets for Fire Water Service shall be full face, 1.5mm thick, flexible graphite with SS 304 or SS 316 corrugated insert, as per ASME B16.21. 20.23 Bolting for temp. 539 deg. C to 650 deg. C for SS321 and SS347 piping shall be 8T consisting of A193 Grade B8T Class 1 with A194 Grade 8T nuts 20.24 Bolting for SS304L piping shall be B8 or S30400 consisting of A193 Grade B8 Class 2 / A194 Grade 8 and shall be restricted to maximum temperature of 450°C 20.25 Use of Brass or Bronze Valves and Copper and Copper Bearing Alloys in internal and external body parts is restricted to Instrument Air and Fire Water. Usage of Screwed Valves is permitted in Instrument Air Service for NS less than 2”. Bonnet design for Screwed Valves shall be Union Type. 20.26 Use of Ball / Plug Valves with PTFE / TFE seats / linings is PERMITTED up to 204 deg. c. except in carbon steel piping requiring compliance with chapter 5, alloy steel piping, stainless steel piping and carbon steel with PWHT requirement as per M/s. AXENS. 20.27 Usage of Non-metallic material (PTFE/TFE/GRAPHITE) for Flat Ring Body-Bonnet Gaskets, O-Rings for Body-Bonnet / Body joints, stem packing is restricted to Ball Valves and Plug Valves with seats or linings in PTFE. 20.28 The preferred location for swing check, tilting check, and dual plate wafer check valves is in the horizontal run of piping. 20.29 Usage of Asbestos in any form, in any part is NOT PERMITTED. 20.30 If two check valves are required to be in series, then both have to be of different constructional features. E.g. Swing Check and Dual Plate etc.. This aspect is P &ID governed.. 20.31 Usage of Glandless Piston Valves is restricted to Steam and Condensate Service for heat tracing purpose in ratings class 150 and 300. 20.32 Usage of Compact Steam Trapping Manifolds is restricted to Steam Tracing. 20.33 Usage of Compact Steam Traps is restricted to line traps. 20.34 Usage of double flanged, class 150, soft seated, Ductile CI, Butterfly Valve to AWWA C504 is restricted to Cooling Water Service for all sizes 12” and above.

Page 167: UhdeIndia - Bharat Petroleum · Uhde India Private Limited, Dugal Plaza, 3 rd Floor, Prem Nagar, Bibwewadi Road, Pune 411 037, India TENDER RFQ / Tender No. : U6509 - 3187/ABM

6509-PI-EB-00002 BPCL UAN

Total Pages

ENGINEERING SPECIFICATION FOR PIPING MATERIALS

66-6509-700

107 of

107

© 2010 Uhde India

20.35 For Safety Gas Tight Valves (SGTV), Isolation Gas Tight Valves (IGTV), Catalyst Transfer Gas tight Valves (CTGTV), Catalyst Transfer Catalyst Tight Valves (CTCTV) the requirement for minimum wall thickness shall be as indicated by M/s. Axens in the respective valve specification. 20.36 Refer to Table 1B of UIPL Piping Specification document no. 6509-PI-US-0001, for details of surface finish for various piping classes. For process streams consisting predominantly of hydrogen, the serrations on flange faces shall be CONCENTRIC only. 20.37 Substitutions are applicable to all piping except carbon steel requiring compliance with chapter 5, alloy steel, stainless steel and carbon steel with PWHT requirement as per M/s. AXENS. 20.38 Flange joints shall be made up by hand using hydraulic bolt tension (torque or stretch device). This applies to all flange joints in carbon steels with compliance to Chapter 5, Alloy Steels, Stainless Steels and Carbon steels wherein PWHT has been specified by M/s. AXENS – for all bolt diameters 1 ½” and over. 20.39 Material for external vacuum stiffening rings shall be the same material as the pipe when the design temperature is greater than 650°F (340°C). When the design temperature is 650°F (340°C) or less, the material may be carbon steel 20.40 All the pressure retaining welds in hydrogen service, including the internals welded on pressure parts, have to be full penetration type. 20.41 All welding (including potential weld repairs) shall be completed before final PWHT. While welding stiffeners, ribs, webs and other items to already heat treated components in an assembly, a buttering layer (of high alloy deposits) of suitable weld chemistry shall be first applied to avoid necessity of PWHT.

Page 168: UhdeIndia - Bharat Petroleum · Uhde India Private Limited, Dugal Plaza, 3 rd Floor, Prem Nagar, Bibwewadi Road, Pune 411 037, India TENDER RFQ / Tender No. : U6509 - 3187/ABM

Contract No. : 66-6509-BPCL - CCR Project

Enquiry No.: U6509-3187 ABM Currency

Sr.No. Item Code Size 1 Size 2 OD 1 Thk 1 OD 2 Thk 2 Qty. Unit Price Total Price Remarks

1 P W735ZX 36" - 914 24 - - 777

777 Total:

* Note : Unit of Measurement for Pipe is Metre and for Other Items is Number

1) For Unpriced Bid, Use notation 'Q' for Quoted and 'NQ' for Not-Quoted

2) For detail instructions, please refer ITB enclosed.

PRICE BID FORM

Bidder Name:

Offer

Bidder's Signature & Stamp.

Date:

Page 169: UhdeIndia - Bharat Petroleum · Uhde India Private Limited, Dugal Plaza, 3 rd Floor, Prem Nagar, Bibwewadi Road, Pune 411 037, India TENDER RFQ / Tender No. : U6509 - 3187/ABM

Contract No. 66-6509-BPCL - CCR Project

See Details

Enquiry No. U6509-3187 ABM

Sr.No. Item Code Specification Item Details

Confirm to spec

(Y/N) Deviations

1 P W735ZX ORDER-DESIGNATION PIPE, EFW, AS (H2 SERVICE)

STANDARD B36.10M

CONNECTION BW ENDS, SCH NON STD

DESCRIPTIONS LW

MATERIAL

A691 GR 1.25CR CL.42

FOR GENL TECH. REQ. REFER DOC.

6509-PI-EB-00002.

PMI & IMPACT TEST APPLICABLE. REFER

CH.10 & 12 OF DOC NO. 6509-PI-EB-00002.

FOR H2 SERVICE REQUIREMENTS REFER

CH.6 OF DOC NO. 6509-PI-EB-00002.

Bidder's Signature & Stamp.

Date:

See Details

Page 170: UhdeIndia - Bharat Petroleum · Uhde India Private Limited, Dugal Plaza, 3 rd Floor, Prem Nagar, Bibwewadi Road, Pune 411 037, India TENDER RFQ / Tender No. : U6509 - 3187/ABM

UAN: 66-6509-700 / BPCL-CCR Scope of Inspection for Pipes sourced from Traders or Manufacturers.

1. This document shall be read in conjunction with the following specification:

A. UIPL Item Code / Specification B. 6509-PI-EB-00002, Rev.1 GES for Piping Materials.

2. Following requirements shall be complied with in addition to all the clauses

mentioned in 1A and 1B above whenever material is sourced from Traders:

a) The pipes shall be relatively new, unused and sourced from reputed

mills. b) All pipes shall be furnished with Inspection certificate EN 10204 - 3.2. c) Witness of hydro test is not applicable if pipes are offered for inspection at

Traders warehouse. However all offered pipes shall be certified in Mill Test Certificate (MTC) for 100% hydro test at mill and the original MTC shall be reviewed.

d) Usage of below mentioned criteria for inspection:

Situation Conclusion

Photocopy of MTC (duly endorsed by original supplier) and co-relatable with pipes for Heat no., NDT, hydro-test report, manufacturing details, OD, ID, thickness etc. and meeting all requirements of 1A and 1B as mentioned above.

Sample Check testing - per heat, per size, per Item Code (for Physical and chemical properties). Review of Certificates shall be by TPIA / UIPL.

MTC available in original, however not co-relatable with pipes for Heat no., NDT, hydro-test report, manufacturing details, OD, ID, thickness etc.

Pipe not acceptable.

Original or Photocopy of MTC for pipes not available

Pipe not acceptable.

e) Stamping / Etching / Stenciling as per requirements of 1A and 1B. f) Issue of release order with UIPL Item Code against each ordered size.

3. Following requirements shall be complied with, for material sourced from Manufacturers:

a) All pipes shall be furnished with Inspection certificate EN 10204 - 3.2 and are in accordance with requirements of 1A and 1B as above.