UCH POWER PROJECT

27
UCH POWER PROJECT

description

UCH POWER PROJECT. Electric Service. Colonies, jobs. 586 MW. Scope Of The Project. Financers. Dutch and German banks ABN Amro Deutsche Bank NDFC World Bank IFC Bank of China. MARKET SUMMARY. MARKET SUMMARY(80’S &90’s). 81-91 : 9% & 10.9%. 31,500 GWH . 7100 MV:Cpty. - PowerPoint PPT Presentation

Transcript of UCH POWER PROJECT

Page 1: UCH POWER PROJECT

UCH POWER PROJECT

Page 2: UCH POWER PROJECT

Project beginnin

g

Costing $690 M

586 MW

Dera Murad Jamali

OGDC

low-Btu gas

Page 3: UCH POWER PROJECT

586 MW

Electric Service

Colonies,jobs

Scope Of The

Project

Page 4: UCH POWER PROJECT

Financers

Dutch and German banks

ABN Amro

Deutsche Bank

NDFC

World Bank

IFC

Bank of China

Page 5: UCH POWER PROJECT
Page 6: UCH POWER PROJECT

MARKET SUMMARY

Page 7: UCH POWER PROJECT

MARKET SUMMARY(80’S &90’s)

81-91 : 9% & 10.9%

7100 MV:Cpty

31,500 GWH

600 & 800 MV

Forecasted incr demand :

16,323MV

Page 8: UCH POWER PROJECT

NEED ANALYSIS

Resources indigenous to

Pakistan

Avoiding import of foreign fuel:$2

billion

Agriculture sector nominal consumer electricity(18.2%) :15.8% in 1987 to

1991

Page 9: UCH POWER PROJECT

NEED ANALYSISDemand growth:

9.4%

GDP growth of

6.4%: 1991-92

June 1991: 32% of villages

(electricity)

Higher propensity of

electricity consumption

Demographic and economic

changes

Page 10: UCH POWER PROJECT
Page 11: UCH POWER PROJECT

Imported 34% of energy requirements

Page 12: UCH POWER PROJECT
Page 13: UCH POWER PROJECT

PROJECT Partners

Page 14: UCH POWER PROJECT

PARTICIPANTS

California Energy Company Inc Hawkins Oil & Gas Inc. Hasan Group Kiewit Energy Company Tenaska Inc.

Page 15: UCH POWER PROJECT

LOCATION• Dera Murad Jamali, District

Nasirabad, Balochistan

Page 16: UCH POWER PROJECT
Page 17: UCH POWER PROJECT

ADVANTAGES OF SELECTED SITE

Close to

water

WAPDA’s transmission system

Major

road

system

Page 18: UCH POWER PROJECT

FUEL SUPPLYLow btu gas from UCH

gas field

US.$1.20

• OGDC is the lease operator of Uch gas field

• Per unit price charged by the UCH is

Page 19: UCH POWER PROJECT

FUEL SUPPLY

GAS FROM OGDC

STORED AT PLANT:FIEL

D GATE

GAS PIPELINE IS 66KM

LONG

Page 20: UCH POWER PROJECT
Page 21: UCH POWER PROJECT

FUEL FOR THE START UP & SHUTDOWN

1500,000 GALLONS

Fuel will be trucked to location

Page 22: UCH POWER PROJECT

INTERCONNECTION WITH NATIONAL GRID

Near the 220 KV national grid QUETTA LOAD CENTER LINKED OTHER LOAD

CENTER

Page 23: UCH POWER PROJECT

BENEFITS OF LOW BTU GAS

DISPLACES EQUIVALENT VOLUME OF OIL

FREE FOREIGN ECXHANGE

FAR LOWER IMPACT ON ENVIRONMENT

CONBUSTION RESULT IN LEAST EMISSION OF

POLLUTION

Page 24: UCH POWER PROJECT

MACHINES USED

Gas turbines

Generators

(steam & gas)

Steam turbines

Page 25: UCH POWER PROJECT
Page 26: UCH POWER PROJECT

GENERAL BENEFITS

High therm

al efficie

ncy

Low capital costs

Low environmental impacts

Indigenous fuel

Page 27: UCH POWER PROJECT

CRITICAL ANALYSIS

& CONCLUSI

ON