UCH POWER PROJECT
description
Transcript of UCH POWER PROJECT
UCH POWER PROJECT
Project beginnin
g
Costing $690 M
586 MW
Dera Murad Jamali
OGDC
low-Btu gas
586 MW
Electric Service
Colonies,jobs
Scope Of The
Project
Financers
Dutch and German banks
ABN Amro
Deutsche Bank
NDFC
World Bank
IFC
Bank of China
MARKET SUMMARY
MARKET SUMMARY(80’S &90’s)
81-91 : 9% & 10.9%
7100 MV:Cpty
31,500 GWH
600 & 800 MV
Forecasted incr demand :
16,323MV
NEED ANALYSIS
Resources indigenous to
Pakistan
Avoiding import of foreign fuel:$2
billion
Agriculture sector nominal consumer electricity(18.2%) :15.8% in 1987 to
1991
NEED ANALYSISDemand growth:
9.4%
GDP growth of
6.4%: 1991-92
June 1991: 32% of villages
(electricity)
Higher propensity of
electricity consumption
Demographic and economic
changes
Imported 34% of energy requirements
PROJECT Partners
PARTICIPANTS
California Energy Company Inc Hawkins Oil & Gas Inc. Hasan Group Kiewit Energy Company Tenaska Inc.
LOCATION• Dera Murad Jamali, District
Nasirabad, Balochistan
ADVANTAGES OF SELECTED SITE
Close to
water
WAPDA’s transmission system
Major
road
system
FUEL SUPPLYLow btu gas from UCH
gas field
US.$1.20
• OGDC is the lease operator of Uch gas field
• Per unit price charged by the UCH is
FUEL SUPPLY
GAS FROM OGDC
STORED AT PLANT:FIEL
D GATE
GAS PIPELINE IS 66KM
LONG
FUEL FOR THE START UP & SHUTDOWN
1500,000 GALLONS
Fuel will be trucked to location
INTERCONNECTION WITH NATIONAL GRID
Near the 220 KV national grid QUETTA LOAD CENTER LINKED OTHER LOAD
CENTER
BENEFITS OF LOW BTU GAS
DISPLACES EQUIVALENT VOLUME OF OIL
FREE FOREIGN ECXHANGE
FAR LOWER IMPACT ON ENVIRONMENT
CONBUSTION RESULT IN LEAST EMISSION OF
POLLUTION
MACHINES USED
Gas turbines
Generators
(steam & gas)
Steam turbines
GENERAL BENEFITS
High therm
al efficie
ncy
Low capital costs
Low environmental impacts
Indigenous fuel
CRITICAL ANALYSIS
& CONCLUSI
ON