TYPE OF WORK
FY 2014 SUMMARY MILEAGE
LONG TERM
FINANCING
FEDERAL / STATE AIDS
COUNTY LEVY
LOCAL SOURCES
OTHER SOURCES
TOTAL COST
ADT
PE
CTH II -- Winnebago County to USH 10 0.76 $40,000 $10,000 $50,000 1,290
PE
CTH J -- Little Wolf River Bridge --- $45,600 $11,400 $57,000 155
PE
CTH E -- Crystal River Bridge --- $160,000 $40,000 $200,000 2,820
PE
CTH B -- STH 49 to Railroad 3.62 $80,000 $20,000 $100,000 760
R/W
CTH I -- CTH Y and Paape Rd Intersections 0.75 $25,000 $25,000 585
2014
*PE Preliminary Engineering *RW Right of way acquisition *C Construction *P Paving *B Bridge*ADT Average Daily Traffic
![Page 2: TYPE OF WORK FY 2014 SUMMARYMILEAGE LONG TERM FINANCING FEDERAL / STATE AIDS COUNTY LEVY LOCAL SOURCES OTHER SOURCES TOTAL COST ADT PE CTH II -- Winnebago.](https://reader036.fdocuments.net/reader036/viewer/2022090102/5a4d1bab7f8b9ab0599cad4a/html5/thumbnails/2.jpg)
TYPE OF WORK
FY 2014 SUMMARY MILEAGE
LONG TERM
FINANCING
FEDERAL / STATE AIDS
COUNTY LEVY
LOCAL SOURCES
OTHER SOURCES
TOTAL COST
ADT
C/P
CTH B -- Euclid Avenue to Railroad 0.84 $30,262 $1,045,120 $231,018 $1,306,400 2,350
C/P
CTH T -- Collier Road to CTH N 4.62 $2,477,308 $2,477,308 1,135
C/P
CTH F -- Lincoln Street to City Limits 0.26 $400,000 $200,000 $600,000 375
B
CTH C -- Bridge over Little Wolf River --- $542,260 $135,570 $677,830 775
P
CTH E -- Waushara County Line to Lind Center Road 5.98 $1,067,430 $1,054,320 $2,121,750 2,400
P
CTH T -- CTH D to Collier Road 3.09 $171,564 $462,618 $634,182 930
2014
*PE Preliminary Engineering *RW Right of way acquisition *C Construction *P Paving *B Bridge*ADT Average Daily Traffic
![Page 3: TYPE OF WORK FY 2014 SUMMARYMILEAGE LONG TERM FINANCING FEDERAL / STATE AIDS COUNTY LEVY LOCAL SOURCES OTHER SOURCES TOTAL COST ADT PE CTH II -- Winnebago.](https://reader036.fdocuments.net/reader036/viewer/2022090102/5a4d1bab7f8b9ab0599cad4a/html5/thumbnails/3.jpg)
2014 TotalsMILEAGE
LONG TERM
FINANCING
FEDERAL / STATE AIDS
COUNTY LEVY
LOCAL SOURCES
OTHER SOURCES
TOTAL COST
19.92 $4,000,000 $3,138,864 $910,606 $200,000 $8,249,470
2014 GoalsPE
Our goal is 5.0 miles - 4.38 miles
RWOur goal is 5.0 miles - 0.75 miles
COur goal is 5.0 miles - 5.72 miles
P Our goal is 17.0 miles - 14.79 miles
*PE Preliminary Engineering *RW Right of way acquisition *C Construction *P Paving
![Page 4: TYPE OF WORK FY 2014 SUMMARYMILEAGE LONG TERM FINANCING FEDERAL / STATE AIDS COUNTY LEVY LOCAL SOURCES OTHER SOURCES TOTAL COST ADT PE CTH II -- Winnebago.](https://reader036.fdocuments.net/reader036/viewer/2022090102/5a4d1bab7f8b9ab0599cad4a/html5/thumbnails/4.jpg)
CTH “T” Collier Road to CTH “D”Construction & Paving
Scheduled for 2014
2014
CTH “J” Little Wolf River BridgePreliminary Engineering
Scheduled for 2014
CTH “C”Bridge over Little Wolf
RiverBridge Replacement Scheduled for 2014
CTH “B”STH 49 to Railroad
Preliminary Engineering Scheduled for 2014
CTH “F” Lincoln St. to City LimitsConstruction & Paving
Scheduled for 2014