Graeme MaxwellTyndall National [email protected]
Tyndall 2025 – Core equipment upgrade and transition towards Smart ManufacturingENRIS 2019 – Enschede 16th - 18th June 2019
Where Are we?
Tyndall – Infrastructure numbers
• 18,000 m2 of buildings.
• 1,200 m2 of cleanrooms.
• Pumping 250 l/s of fluid.
• Conditioning 120 m³/s of fresh air.
• Exhausting 40 m³/s of air.
• Approximately 11 GW energy pa
• 7.8 M kWhrs for electricity
• 3.2 M kWhrs for gas
Tyndall - Operational numbers
• 500+ researchers & engineers, students, support staff
o Approx 250 staff, the rest are students/ postdocs
• 51 nationalities
• ca. €38M Income each year
o 85% of which is competitively won
o 25% industry funding
• Over 200 industry partnerships and customers worldwide
• 230+ peer reviewed publications pa
• 22 EU H2020 projects
• 20 Industry Researchers-in-Residence
• ISO 9001; ISO 500001; ISO 17025
Tyndall Growth Plan
• Identified as part of the National Development Plan
• Involves ~ €50M capital upgrade and the construction of an addition building
• Designed to facilitate a doubling in size as part of Tyndall 2025 strategic plan
“We will … upgrade and expand the Tyndall National Institute in Cork to stay at the forefront of new technologies and build on its successful industry engagement model in sectors such as health and life sciences, ICT, energy and agri-tech.”
- Government of Ireland, National Develop Plan 2018 - 2027
Elements of the core equipment upgrade plan
1. Building the case – need simple message2. Clarifying existing and identifying emerging research
themes and alignment with national thematic centres –eg CONFIRM – Smart Manufacture
3. Mapping to capability requirements4. Prioritisation5. Procurement6. Review and revise
7
Capital status in fab areas
Capital item YOP 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022
Wafer / device pre- and post conditioning
Semitool SRD 1991
6" Semitool <1995
4" Semitool <1995
Rapid thermal Anealler AST SHS 1000 RTP 1991
Bio Rad benchtop furnace <1995
Carbolite Furnace 1991
KARL SUSS SCRIBER 1991
Semitool SAT (Spray Acid Tool) 2004
Jet first rapid Thermal Annealer (Jet first 150) 2010
Laser Dicer 2013
Material deposition
ELECTROTECH DELTA PECVD 1992
Nordiko Sputterer 2550 1991
Furnace A STACK 1991
FURNACE B STACK 1991
FURNACE C STACK 1991
Furnace D STACK 1991
Ion Implanter 1991
Nordiko Sputterer <1995
PECVD, STS 310 PC , Doped and undoped oxides 2001
STS Multiplex CVD 2005
Sputterer - PlasmalabSystem400 - Oxford Instrument 2005
Temscal 2005
Fiji F202DCS System ALD 2009
EVG 501 Bonder 2009
Thermco 6" Furnace 2010
AML Bonder 2010
EVG 301 Cleaner bonder 2012
SCIL Embosser 2012
Temescal installed in 2012 2012
Leybold Optics Syrus Pro Evaporator 2013
Wafer / device patterning
Canon 600 aligner Main Fab 1991
Ultratech 1500 1X Stepper 1991
Mask Plate Cleaner 1991
DNS Resist Develop Tracks 1991
DNS SOG Tracks 1991
SUSS MICROTEK- Mask Aligner MA 1006 III-V <1995
IMP Direct write <1995
DNS Tracks <1995
EVG 420 <1995
JEOL JBX6000 FS/E electron beam lithography tool 2001
Suss MA6 DUV aligner III-V 2010
Material removal
Matrix Asher 1992
PLASMOD ASHER IIIV-E33 <1995
Trikon ICP Etcher Metal Etch 2001
Trikon M0RI Etch Silicon and Oxide 2001
Trikon PERIE Etcher Nitride and Oxide 2001
Multiplex Ion Etcher (ICP) 2005
STS ASE / AOE 2005
CHEMICAL DELAYERING & PLANARIZATION (LOGITECH) 2007
ICP - PlasmalabSystem100 - Oxford Instruments 2009
PLA Asher 2010
Diener Asher 2011
Oxford PlasmaPro ICP Etcher 2013
Material / device metrology & analysis
CV Plotter 1998
Prometrix Omnimap RS35 1991
Profileometer P-15 1991
Nanospec <2000
Nanometrics Thin Film AB63+AB55 III-V <2000Tencor Surfscan 4500 2000
Nanospec 3000 2002
Gaertner Elipsometer in Fab 2008
Nikon Line Measurement Equipment 2008
Dektak Profiler 2009
Woollman Ellipsometer 2010
SEM in Block C Cleanroom 2011Dektak (Mems) 2011
Jeol SEM 6610LV 2012
JEOL SEM 6490LV 2012
Material / device functional test
Cascade semi-automatic prober 2006
Precision oscilloscope 2006
Autogarde cascade prober 2007PNA & Multimeter Head Controller 2007
Picofox automatic spectrometer 2008
Manual prober 2008
Device Forensics - reliability, packaging, DPA, analysis
Reliability Test equipment 1995
Royce Pull Tester 1995
Microsectioning equipment 2000
Decapsulation tool 2001
Logitech PM5 Grinder 2002
Dicing Saw 2004
Scanning acoustic microscope 2015
CT scanning X-ray 2015
Infrastructure
Spectron Gas Cabinets 1991
DI plant - various vintage on parts. <1999
Block A air handling units almost at full capacity - limited ability for new tools2008
Age Service status
Being depreciated - less than 7 years old Full backup available
Out of warranty but servicable - 5 year window Some backup available
Old / Obsolete - over 12 years old No or very limited backup available
Capital status in fab areas
Capital item YOP 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022
Wafer / device pre- and post conditioning
Semitool SRD 1991
6" Semitool <1995
4" Semitool <1995
Rapid thermal Anealler AST SHS 1000 RTP 1991
Bio Rad benchtop furnace <1995
Carbolite Furnace 1991
KARL SUSS SCRIBER 1991
Semitool SAT (Spray Acid Tool) 2004
Jet first rapid Thermal Annealer (Jet first 150) 2010
Laser Dicer 2013
Material deposition
ELECTROTECH DELTA PECVD 1992
Nordiko Sputterer 2550 1991
Furnace A STACK 1991
FURNACE B STACK 1991
FURNACE C STACK 1991
Furnace D STACK 1991
Ion Implanter 1991
Nordiko Sputterer <1995
PECVD, STS 310 PC , Doped and undoped oxides 2001
STS Multiplex CVD 2005
Sputterer - PlasmalabSystem400 - Oxford Instrument 2005
Temscal 2005
Fiji F202DCS System ALD 2009
EVG 501 Bonder 2009
Thermco 6" Furnace 2010
AML Bonder 2010
EVG 301 Cleaner bonder 2012
SCIL Embosser 2012
Temescal installed in 2012 2012
Leybold Optics Syrus Pro Evaporator 2013
Wafer / device patterning
Canon 600 aligner Main Fab 1991
Ultratech 1500 1X Stepper 1991
Mask Plate Cleaner 1991
DNS Resist Develop Tracks 1991
DNS SOG Tracks 1991
SUSS MICROTEK- Mask Aligner MA 1006 III-V <1995
IMP Direct write <1995
DNS Tracks <1995
EVG 420 <1995
JEOL JBX6000 FS/E electron beam lithography tool 2001
Suss MA6 DUV aligner III-V 2010
Age Service status
Being depreciated - less than 7 years old Full backup available
Out of warranty but servicable - 5 year window Some backup available
Old / Obsolete - over 12 years old No or very limited backup available
Equipment audit & obsolescence
Thanks to Kay Gastinger at NTNU for the format
Inputs to capability requirements
8
#2 Current & upcomingproject activities -
defines 1-5 yearrequirements
#1 Equipment audit & obsolescence
Immediate – 5 year view
#3 Stakeholder input& roadmapping -
outlines 5-10 year time horizon
Tooling choices1-5 years procurement
horizon1-15 year operational
horizon
Current capability areas
• 3 lines in 2 cleanroomso CMOS – 4” line, cassette to cassette operationo MEMs line – 4” with some 6” tooling. Manual wafer processingo Compound Semiconductor (III-V) line – pieces, 2”, 3” wafers and 6”-
8” Si for heterogeneous integration. Manual processing
• Flexible fabrication protocols but needs strict rules on traffic flow through/from the different lines
o Direction of traffic is CMOS ↔ MEMs → III-V
• Decision to move tooling to 8“ capableo Better tooling available – 4” & 6” tooling becoming legacy product or
nicheo Supports higher TRL agenda o Aligns with commercial partners – ease of downstreaming and direct
wafer exchangeo Does not preclude processing smaller wafers if necessaryo 4” silicon becoming harder to source
9
Input #2 Current & upcoming project activities
• Existing programmes (1- 4 year time horizon)o EU & ERCo SFI PI awards and new/existing centreso EI – Enterprise Irelando Commercial
• Currently >250 research contracts with combined value >€150M
• Submitted proposals (2-6 year time horizon)o EU & ERCo SFI PI awards and renewal of existing centres
• 80 proposals submitted and awaiting a funding decision with a value of >€62M
• Provides themes for existing programmes (1-5 years)
10
Input #3 Roadmapping activities
• Tyndall engagement:
o White Papers of EARTO, European Association of RTOso EC Reports on Digital Innovation Hubs and Digital Platformso Photonics 21 Roadmap
• ECS SRA, Electronic Components and Systems Strategic Research Agenda • EPoSS SRA, Strategic Research Agenda of European Platform of Smart Systems • AENEAS SRA, Strategic Research Agenda of Association for European
Nanoelectronics Activitieso ESFRI Roadmap, European Science Forum for Research Infrastructureso ETP Nanomedicineo NEREID-European Nanoelectronics Roadmap o AIOTI White Papers, Alliance of Internet Of Things Innovationo ESTHER Medtech initiative Roadmapo EPIC Reports, European Photonics Industry Consortium
• IRDS, International Roadmap for Devices & Systemso PSMA Roadmap, Power Sources Manufacturers Associationo iNEMI Roadmap, International Electronics Manufacturing Initiativeo Roadmap on Si Photonicso Photonics Packaging Standards
11
Distillation & consistency check
• Nano-scale integration o Wafer surface pre-and post conditioning criticalo E-beam lithography fundamentalo FIB / SEM / TEM upgrades & tooling
• Heterogeneous functionalities, technologies, processes & deviceso Deposition & etch toolingo ALD & ALE for 2D material processingo Wafer bonding & release processeso In line metrology tooling o Cryogenic measurement capability
• Smart system-in-package technologieso TSVo BEOL technologies – material & device integrationo Plating & wet etch systemso Device and sub-system characterisationo Device Forensics
12
2017/2018 Capital items procured
Ebeam - Elionix Awaiting lab refurb – expect Q3 2019
AlN / AlScN cluster tool - Evatec Awaiting block C refurb –expect Q4 2019
Plasma etchers - SPTS & Oxford for III/V Awaiting block C refurb –expect Q4 2019
AFM & Nano-indenter - Bruker Operational – OACF & FW lab
Ferrotec Temescal ebeam evaporator Operational – block C
Linewidth measurement tool - Promicron Operational – block C
Mask aligners – III/V & silicon Operational – blocks A&C
Profilometers – Tencor for III/V, silicon & MEMS Operational – blocks A&C
HF vapour etcher – Memsstar for MEMS, silicon, III/V Awaiting block C refurb –expect Q4 2019
EVG coater – CMOS line Operational – block A
2019/2020 Capital items in process & plannedPECVD tool – III/V Tender spec under review Block C
RTA for III/V Tender spec under review Block C
Resist lines for MEMS & III/V & Ebeam incvapour priming
Tender spec under review Block C & ebeam lab
O2 plasma asher for silicon / MEMS Tender complete. Contract being processed
Silicon fab
200mm clean wafer cleaning systems – SAT, SOT, SRD
Tender being generated Blocks A & C
Dielectric Deposition System – MEMS & silicon
Vendor discussions Block A
Plasma / 3 beam FIB Vendor discussions New lab
Helium free SQUID-VSM with combined DC/vibrating magnetometer
Vendor discussions Replace existing
Peripheral equipment for ebeam lab Tenders being generated Ebeam lab
All cleanroom build costs, HVAC, water, waste, gas installations etc
Tenders being generatedVarious
Environmental TEM - inc EELs &HAADFLaser spike annealCryoprobe station – Quantum - III/V
Specs being discussed New labs required
>2020 capital items identified, but will be reviewed in 2020
€47 million funding36 investigators42 industry partners8 core RPO’s8 national research and technology centres16 international collaborators
Alignment to Smart Manufacturing Agenda – SFI funded thematic centre
Tyndall provides testbed facility for Smart Manufacturing targeted projectsthrough the fabrication facility and associated infrastructure.
Targeted Project Example – Predictive Maintenance Testbed
• Resonates with all manufacturing organisations - significant opportunity for rapid ROI
• Sensorising plant room equipment and electrical distribution panels feeding new and existing equipment with industrial partners AnalogDevices Inc. and Verdigris Technologies
o All sensors have wireless connectivity and data managed in the cloud
• Monitor equipment signatureso Electrical current signature - hardware and AI to disaggregate signals on
distribution boards to deliver virtual meters on downstream machines
o Vibration signature – three axis vibration analysis using modules fixed to motors / pumps
• Project aims to assess benefits of sensors acting in isolation and value of sensor data fusion in terms of accuracy of signatures for predictive maintenance
• Started Q2 2019 – currently rolling out hardware
Motor Current Signature Analysis
• System monitors energy usage (cost), phase balance, harmonic distortion, power factor etc
• AI system learns behaviours of the tools and canalarm on deviations / trends
Vibration sensors
Vibration excursion identifiedand tracked over 2 month period• Sensor ID - mcsvu2hdd on chillerpump PU7001
Summary
• Introduced Tyndall National Institute
• Outlined the approach taken for a major capital refresh and scale up to 8” wafer capability
• Highlighted start of activities in predictive maintenance as part of Smart Manufacturing programme