![Page 1: Tutorial: IEEE CSI Business Development Workshop 1.2 IEEE CSI Background & SunBlazer Status Ray Larsen CSI Co-Chair, Project Manager SLAC NAL, Stanford.](https://reader035.fdocuments.net/reader035/viewer/2022070401/56649f1f5503460f94c37f8f/html5/thumbnails/1.jpg)
![Page 2: Tutorial: IEEE CSI Business Development Workshop 1.2 IEEE CSI Background & SunBlazer Status Ray Larsen CSI Co-Chair, Project Manager SLAC NAL, Stanford.](https://reader035.fdocuments.net/reader035/viewer/2022070401/56649f1f5503460f94c37f8f/html5/thumbnails/2.jpg)
Tutorial:
IEEE CSI Business Development Workshop
1.2 IEEE CSI Background & SunBlazer Status
Ray LarsenCSI Co-Chair, Project ManagerSLAC NAL, Stanford University
![Page 3: Tutorial: IEEE CSI Business Development Workshop 1.2 IEEE CSI Background & SunBlazer Status Ray Larsen CSI Co-Chair, Project Manager SLAC NAL, Stanford.](https://reader035.fdocuments.net/reader035/viewer/2022070401/56649f1f5503460f94c37f8f/html5/thumbnails/3.jpg)
CSI Report to NPSS AdCom - R. Larsen
37/7/2012
![Page 4: Tutorial: IEEE CSI Business Development Workshop 1.2 IEEE CSI Background & SunBlazer Status Ray Larsen CSI Co-Chair, Project Manager SLAC NAL, Stanford.](https://reader035.fdocuments.net/reader035/viewer/2022070401/56649f1f5503460f94c37f8f/html5/thumbnails/4.jpg)
CSI Report to NPSS AdCom - R. Larsen
4
SunBlazer Power Station
7/7/2012
** 1.5 KW serves 40-80 homes** 6 units deployed in Haiti June 2011** 9 more shipped for final assembly in Port au Prince, deploy August 2012
![Page 5: Tutorial: IEEE CSI Business Development Workshop 1.2 IEEE CSI Background & SunBlazer Status Ray Larsen CSI Co-Chair, Project Manager SLAC NAL, Stanford.](https://reader035.fdocuments.net/reader035/viewer/2022070401/56649f1f5503460f94c37f8f/html5/thumbnails/5.jpg)
CSI SunBlazer Project Haiti - R. Larsen
5
Background
• Community Solutions Working Group began June 2009 under HTC in parallel with main HTC development of small single-user system development
• Focused on community-scale easily expandable solutions using Commercial Off-The-Shelf (COTS)components, quick deployment into severely energy-impoverished areas
• Key to success needed strong partnership with Non-Government Organization (NGO) capable of rapid deployment and long range growth
1/28/2012
![Page 6: Tutorial: IEEE CSI Business Development Workshop 1.2 IEEE CSI Background & SunBlazer Status Ray Larsen CSI Co-Chair, Project Manager SLAC NAL, Stanford.](https://reader035.fdocuments.net/reader035/viewer/2022070401/56649f1f5503460f94c37f8f/html5/thumbnails/6.jpg)
CSI SunBlazer Project Haiti - R. Larsen
6
The Business Plan
• Business plan needed to demonstrate sustainable growth potential that could attract venture capital or sizable loans for community entrepreneurial businesses
• First technical model developed in June-November 2009, a 1 kW Solar or Solar + Wind generator to charge customer batteries delivered to homes for lighting and small appliances, recharged as needed
• First business model showed that loans for initial few units (e.g. 10) and bootstrapping based on low income stream from $1-2/day wages of customers not viable
1/28/2012
![Page 7: Tutorial: IEEE CSI Business Development Workshop 1.2 IEEE CSI Background & SunBlazer Status Ray Larsen CSI Co-Chair, Project Manager SLAC NAL, Stanford.](https://reader035.fdocuments.net/reader035/viewer/2022070401/56649f1f5503460f94c37f8f/html5/thumbnails/7.jpg)
CSI SunBlazer Project Haiti - R. Larsen
7
Business Plan – Sirona • NGO partner joined with CSI in October 2009, Sirona-
Cares Foundation (SCF), already established in job-creation biofuel farming programs in Haiti, developed viable plan in December 2009:– Develop in-country manufacturing, total service and
growth organization– Train community entrepreneurs who franchise generator,
home equipment from parent company/manufacturer– Base affordable homeowner fee, total income on current
costs of kerosene, candles– Size basic generator to serve at least 40 families, 240
people – Obtain venture/loan funding to expand manufacturing to
serve 1 million people in first 5 years
1/28/2012
![Page 8: Tutorial: IEEE CSI Business Development Workshop 1.2 IEEE CSI Background & SunBlazer Status Ray Larsen CSI Co-Chair, Project Manager SLAC NAL, Stanford.](https://reader035.fdocuments.net/reader035/viewer/2022070401/56649f1f5503460f94c37f8f/html5/thumbnails/8.jpg)
CSI SunBlazer Project Haiti - R. Larsen
8
SunBlazer Product Design
• SunBlazer is mobile 1.5kW PV Solar trailer with house batteries and 20 sub-chargers for up to 40 home packs serving home lighting kits
• Developed by CSI members including IEEE, non-IEEE members; corporate CEOs, heads of NGOs, academics, students
• All efforts volunteer, pro-bono or corporate donations of employee paid-for time; prototyping, assembly space; time for deployment & training; weekly project meetings
1/28/2012
![Page 9: Tutorial: IEEE CSI Business Development Workshop 1.2 IEEE CSI Background & SunBlazer Status Ray Larsen CSI Co-Chair, Project Manager SLAC NAL, Stanford.](https://reader035.fdocuments.net/reader035/viewer/2022070401/56649f1f5503460f94c37f8f/html5/thumbnails/9.jpg)
CSI SunBlazer Project Haiti - R. Larsen
9
IEEE-Sirona Pilot Program
• Sirona proposed 2-stage pilot program to prove market viability: 6 SunBlazers in 2011; 9 more in 2012
• IEEE various entities provided seed funding of $400K 2010 -2011; $50K to date in 2012 plus PES budget pending
• Pilot 1 deployed on schedule in 6 different communities in June-July 2011; highly successful 6 month performance; fully subscribed, waiting lists in all communities
• Pilot 2 shipped to Sirona-Haiti startup factory in June for final assembly in Haiti
1/28/2012
![Page 10: Tutorial: IEEE CSI Business Development Workshop 1.2 IEEE CSI Background & SunBlazer Status Ray Larsen CSI Co-Chair, Project Manager SLAC NAL, Stanford.](https://reader035.fdocuments.net/reader035/viewer/2022070401/56649f1f5503460f94c37f8f/html5/thumbnails/10.jpg)
CSI SunBlazer Project Haiti - R. Larsen
10
Sirona Field Developments
• First 6 months performance showed that recharge rate of homeowners is far less than 1 per day maximum planned for.
• Next 9 units therefore being equipped with twice the number of battery packs and home lighting kits, 80 per trailer, serving 480 persons per unit, 4320 people per 9 trailers
1/28/2012
![Page 11: Tutorial: IEEE CSI Business Development Workshop 1.2 IEEE CSI Background & SunBlazer Status Ray Larsen CSI Co-Chair, Project Manager SLAC NAL, Stanford.](https://reader035.fdocuments.net/reader035/viewer/2022070401/56649f1f5503460f94c37f8f/html5/thumbnails/11.jpg)
CSI SunBlazer Project Haiti - R. Larsen
11
Keys to Success
• IEEE CSI-Sirona partnership advanced SunBlazer prototypes from concept to deployment in 7 months
• Credits to:– Strong support from IEEE agencies for funding: HTC, NPSS,
PES, Region 9, IEEE Canada, IEEE Foundation– Focused dedicated partner Sirona creating new
entrepreneurial organization in Haiti in 6 months– Contributions of CSI corporate partners Nextek and Russell,
designing with COTS components for short time to market
• Set up for manufacturing making excellent progress with Haiti government connections playing key role to USAID funding
• IEEE-CSI encouraged to expand globally• Sirona can support new business partnership
development, build seed units for IEEE new ventures1/28/2012
![Page 12: Tutorial: IEEE CSI Business Development Workshop 1.2 IEEE CSI Background & SunBlazer Status Ray Larsen CSI Co-Chair, Project Manager SLAC NAL, Stanford.](https://reader035.fdocuments.net/reader035/viewer/2022070401/56649f1f5503460f94c37f8f/html5/thumbnails/12.jpg)
CSI SunBlazer Project Haiti - R. Larsen
12
IEEE CSI Plans for 2012Month
Feb Approval for new CSI Affordable Electricity IEEE Foundation Fund
Design 1-2 day technical-business development workshop in conjunction with July IEEE Power Africa 2012 renewable energy Conference Encourage CSI members to submit papers to Africa conferenceDevelop plan, budget & Schedule for 2-day workshop, conference attendance, fees, local arrangements coordination (changed to 3.5 days)
March Deliver all subassemblies, 9 trailers to Haiti assembly plant (Done June)
Issue workshop invitations to known opportunities for new startups in Africa through IEEE members, Sections, trusted NGOs (Done)Begin fundraising for seed funds designated for 10 new initiatives patterned on IEEE- Sirona model in Africa, India (Starting)
Apr-Jun Continue forming potential partnerships in Africa, India for 10 startups
July Conduct workshop; deliver conference papers; solidify partnerships
Aug-Dec Launch up to 10 new initiatives
All year Continue developing technical models, design for cost, seek synergies of range of products to improve coverage, economics
1/28/2012
![Page 13: Tutorial: IEEE CSI Business Development Workshop 1.2 IEEE CSI Background & SunBlazer Status Ray Larsen CSI Co-Chair, Project Manager SLAC NAL, Stanford.](https://reader035.fdocuments.net/reader035/viewer/2022070401/56649f1f5503460f94c37f8f/html5/thumbnails/13.jpg)
CSI Report to NPSS AdCom - R. Larsen
137/7/2012
IEEE CSI Foundation BrochureKudos to Albe Larsen for initial design and dogged pursuit and Peter Clout for constructive ideas and diplomacy under fire
Pull-Up PostersThe 6-ft high posters on Slide 2 are the product of the Albe-Peter-Cisneros team
![Page 14: Tutorial: IEEE CSI Business Development Workshop 1.2 IEEE CSI Background & SunBlazer Status Ray Larsen CSI Co-Chair, Project Manager SLAC NAL, Stanford.](https://reader035.fdocuments.net/reader035/viewer/2022070401/56649f1f5503460f94c37f8f/html5/thumbnails/14.jpg)
CSI SunBlazer Project Haiti - R. Larsen
14
Haiti Project in Pictures
• The following photos illustrate key phases of development of the product in parallel with the business plan.
• Sample photos from factory in Long Island Jan 2011 to deployment in Haiti June 2011
1/28/2012
![Page 15: Tutorial: IEEE CSI Business Development Workshop 1.2 IEEE CSI Background & SunBlazer Status Ray Larsen CSI Co-Chair, Project Manager SLAC NAL, Stanford.](https://reader035.fdocuments.net/reader035/viewer/2022070401/56649f1f5503460f94c37f8f/html5/thumbnails/15.jpg)
CSI SunBlazer Project Haiti - R. Larsen
151/28/2012
6 of 10 trailers in factory –Jan 2011
![Page 16: Tutorial: IEEE CSI Business Development Workshop 1.2 IEEE CSI Background & SunBlazer Status Ray Larsen CSI Co-Chair, Project Manager SLAC NAL, Stanford.](https://reader035.fdocuments.net/reader035/viewer/2022070401/56649f1f5503460f94c37f8f/html5/thumbnails/16.jpg)
CSI SunBlazer Project Haiti - R. Larsen
16
Wayne Gutschow of Nextek demonstrates panel deployment
1/28/2012
![Page 17: Tutorial: IEEE CSI Business Development Workshop 1.2 IEEE CSI Background & SunBlazer Status Ray Larsen CSI Co-Chair, Project Manager SLAC NAL, Stanford.](https://reader035.fdocuments.net/reader035/viewer/2022070401/56649f1f5503460f94c37f8f/html5/thumbnails/17.jpg)
CSI SunBlazer Project Haiti - R. Larsen
17
Battery Pack & Lighting Kit
1/28/2012
![Page 18: Tutorial: IEEE CSI Business Development Workshop 1.2 IEEE CSI Background & SunBlazer Status Ray Larsen CSI Co-Chair, Project Manager SLAC NAL, Stanford.](https://reader035.fdocuments.net/reader035/viewer/2022070401/56649f1f5503460f94c37f8f/html5/thumbnails/18.jpg)
CSI SunBlazer Project Haiti - R. Larsen
181/28/2012
Lighting Kit Packing Demo
Boxes of 4.2WLED Bulbs
CeilingFixturesw/Pull Chain
![Page 19: Tutorial: IEEE CSI Business Development Workshop 1.2 IEEE CSI Background & SunBlazer Status Ray Larsen CSI Co-Chair, Project Manager SLAC NAL, Stanford.](https://reader035.fdocuments.net/reader035/viewer/2022070401/56649f1f5503460f94c37f8f/html5/thumbnails/19.jpg)
CSI SunBlazer Project Haiti - R. Larsen
19
Lighting kits boxed & stowed
1/28/2012
![Page 20: Tutorial: IEEE CSI Business Development Workshop 1.2 IEEE CSI Background & SunBlazer Status Ray Larsen CSI Co-Chair, Project Manager SLAC NAL, Stanford.](https://reader035.fdocuments.net/reader035/viewer/2022070401/56649f1f5503460f94c37f8f/html5/thumbnails/20.jpg)
CSI SunBlazer Project Haiti - R. Larsen
20
First completed SunBlazer in Factory
1/28/2012
Wayne Gutschow, Project Mgr., VP Nextek; Art Gutschow, Volunteer Tech; Ron Parigoris, Mechanical Engineer
![Page 21: Tutorial: IEEE CSI Business Development Workshop 1.2 IEEE CSI Background & SunBlazer Status Ray Larsen CSI Co-Chair, Project Manager SLAC NAL, Stanford.](https://reader035.fdocuments.net/reader035/viewer/2022070401/56649f1f5503460f94c37f8f/html5/thumbnails/21.jpg)
CSI SunBlazer Project Haiti - R. Larsen
21
SunBlazer Design
1/28/2012
SunBlazer in Production Mode, Station & Home Batteries
& Controls Secured
SunBlazer Floor Plan
![Page 22: Tutorial: IEEE CSI Business Development Workshop 1.2 IEEE CSI Background & SunBlazer Status Ray Larsen CSI Co-Chair, Project Manager SLAC NAL, Stanford.](https://reader035.fdocuments.net/reader035/viewer/2022070401/56649f1f5503460f94c37f8f/html5/thumbnails/22.jpg)
CSI SunBlazer Project Haiti - R. Larsen
221/28/2012
SunBlazer Home Pack Charging Bay & 48-12V Chargers
![Page 23: Tutorial: IEEE CSI Business Development Workshop 1.2 IEEE CSI Background & SunBlazer Status Ray Larsen CSI Co-Chair, Project Manager SLAC NAL, Stanford.](https://reader035.fdocuments.net/reader035/viewer/2022070401/56649f1f5503460f94c37f8f/html5/thumbnails/23.jpg)
231/28/2012CSI SunBlazer Project Haiti - R. Larsen
SunBlazer Trailer Logo with Donor Logos; Community Logo; Home Pack Operating Instructions
Humanitarian InitiativesCommittee
![Page 24: Tutorial: IEEE CSI Business Development Workshop 1.2 IEEE CSI Background & SunBlazer Status Ray Larsen CSI Co-Chair, Project Manager SLAC NAL, Stanford.](https://reader035.fdocuments.net/reader035/viewer/2022070401/56649f1f5503460f94c37f8f/html5/thumbnails/24.jpg)
SunBlazerSolar
chargingstation
concept,design &
production
WAYNE GUTSCHOW
![Page 25: Tutorial: IEEE CSI Business Development Workshop 1.2 IEEE CSI Background & SunBlazer Status Ray Larsen CSI Co-Chair, Project Manager SLAC NAL, Stanford.](https://reader035.fdocuments.net/reader035/viewer/2022070401/56649f1f5503460f94c37f8f/html5/thumbnails/25.jpg)
50 WATT EQUIV.
8 WATT TOTAL DRAW
660MA @ 12V
12.8 HRS – 17AH
14 HRS – 18 AH
![Page 26: Tutorial: IEEE CSI Business Development Workshop 1.2 IEEE CSI Background & SunBlazer Status Ray Larsen CSI Co-Chair, Project Manager SLAC NAL, Stanford.](https://reader035.fdocuments.net/reader035/viewer/2022070401/56649f1f5503460f94c37f8f/html5/thumbnails/26.jpg)
EDISON BASE
27 ELEMENTS
3500K WARM WHITE
CONSTANT CURRENT DRIVER
![Page 27: Tutorial: IEEE CSI Business Development Workshop 1.2 IEEE CSI Background & SunBlazer Status Ray Larsen CSI Co-Chair, Project Manager SLAC NAL, Stanford.](https://reader035.fdocuments.net/reader035/viewer/2022070401/56649f1f5503460f94c37f8f/html5/thumbnails/27.jpg)
LAMP BASE
COMMERCIALLY AVAILABLE
INEXPENSIVE
SWITCHED
TABLE, WALL ORCEILING
![Page 28: Tutorial: IEEE CSI Business Development Workshop 1.2 IEEE CSI Background & SunBlazer Status Ray Larsen CSI Co-Chair, Project Manager SLAC NAL, Stanford.](https://reader035.fdocuments.net/reader035/viewer/2022070401/56649f1f5503460f94c37f8f/html5/thumbnails/28.jpg)
SLA BATTERY
17-18 AH
![Page 29: Tutorial: IEEE CSI Business Development Workshop 1.2 IEEE CSI Background & SunBlazer Status Ray Larsen CSI Co-Chair, Project Manager SLAC NAL, Stanford.](https://reader035.fdocuments.net/reader035/viewer/2022070401/56649f1f5503460f94c37f8f/html5/thumbnails/29.jpg)
JUMPSTARTKIT
FEATURE RICH
![Page 30: Tutorial: IEEE CSI Business Development Workshop 1.2 IEEE CSI Background & SunBlazer Status Ray Larsen CSI Co-Chair, Project Manager SLAC NAL, Stanford.](https://reader035.fdocuments.net/reader035/viewer/2022070401/56649f1f5503460f94c37f8f/html5/thumbnails/30.jpg)
ADDED
2ND RECEPTACLE
MANUAL C/B
LVD CIRCUIT
WIRE HARNESS
JUMP START
SECURITY
![Page 31: Tutorial: IEEE CSI Business Development Workshop 1.2 IEEE CSI Background & SunBlazer Status Ray Larsen CSI Co-Chair, Project Manager SLAC NAL, Stanford.](https://reader035.fdocuments.net/reader035/viewer/2022070401/56649f1f5503460f94c37f8f/html5/thumbnails/31.jpg)
FINAL ASSEMBLY
100% TEST
![Page 32: Tutorial: IEEE CSI Business Development Workshop 1.2 IEEE CSI Background & SunBlazer Status Ray Larsen CSI Co-Chair, Project Manager SLAC NAL, Stanford.](https://reader035.fdocuments.net/reader035/viewer/2022070401/56649f1f5503460f94c37f8f/html5/thumbnails/32.jpg)
Home battery kit
14 lbs. / 14 hrs
mileage 1hr / lb.
Cell phone charge
Safe at night
High visibility
![Page 33: Tutorial: IEEE CSI Business Development Workshop 1.2 IEEE CSI Background & SunBlazer Status Ray Larsen CSI Co-Chair, Project Manager SLAC NAL, Stanford.](https://reader035.fdocuments.net/reader035/viewer/2022070401/56649f1f5503460f94c37f8f/html5/thumbnails/33.jpg)
how to charge
114 watt-hrs
individual charging
day or night
![Page 34: Tutorial: IEEE CSI Business Development Workshop 1.2 IEEE CSI Background & SunBlazer Status Ray Larsen CSI Co-Chair, Project Manager SLAC NAL, Stanford.](https://reader035.fdocuments.net/reader035/viewer/2022070401/56649f1f5503460f94c37f8f/html5/thumbnails/34.jpg)
20 at a time
![Page 35: Tutorial: IEEE CSI Business Development Workshop 1.2 IEEE CSI Background & SunBlazer Status Ray Larsen CSI Co-Chair, Project Manager SLAC NAL, Stanford.](https://reader035.fdocuments.net/reader035/viewer/2022070401/56649f1f5503460f94c37f8f/html5/thumbnails/35.jpg)
HOMEBATTERY
CHARGERS
36-65V IN
12V OUT
3 AMPS
3 stage chargingProgrammableSealed constructionSOC indicator Operation to 122 deg F6” x 3” x 2.5”
![Page 36: Tutorial: IEEE CSI Business Development Workshop 1.2 IEEE CSI Background & SunBlazer Status Ray Larsen CSI Co-Chair, Project Manager SLAC NAL, Stanford.](https://reader035.fdocuments.net/reader035/viewer/2022070401/56649f1f5503460f94c37f8f/html5/thumbnails/36.jpg)
STATIONBATTERY
BANK
DEKA 8A4DLTPHigh cycle life > 900 cycles @ anticipated DOD
Rack of four units = 4’ x 2’ x 1’
Combined weight of four = 516 lbs
Operating temperature to 140 deg F
![Page 37: Tutorial: IEEE CSI Business Development Workshop 1.2 IEEE CSI Background & SunBlazer Status Ray Larsen CSI Co-Chair, Project Manager SLAC NAL, Stanford.](https://reader035.fdocuments.net/reader035/viewer/2022070401/56649f1f5503460f94c37f8f/html5/thumbnails/37.jpg)
STATIONBATTERY
BANK
DEKA 8A4DLTPStorage Capacity = (2.52 kWh x 4) 10.08 kWh2.65 kWh load = 26% DOD for 20 batteries
Energy to rechargeplus 5 % conv. loss = 2.78 kWh
x2 cycles / day = 5.56 kWh
12 Volt 200 Ah AGM cells
![Page 38: Tutorial: IEEE CSI Business Development Workshop 1.2 IEEE CSI Background & SunBlazer Status Ray Larsen CSI Co-Chair, Project Manager SLAC NAL, Stanford.](https://reader035.fdocuments.net/reader035/viewer/2022070401/56649f1f5503460f94c37f8f/html5/thumbnails/38.jpg)
SOLARARRAY
SHARPNU-U245P1
Array power = 1470 watts Array voltage = 91.2 VmpArray current = 16 Imp
Array area = ~100 ft2Weight w/o mounting = 264 lbs
6 - 245 watt, 30.4 VmpTwo strings of three panels
![Page 39: Tutorial: IEEE CSI Business Development Workshop 1.2 IEEE CSI Background & SunBlazer Status Ray Larsen CSI Co-Chair, Project Manager SLAC NAL, Stanford.](https://reader035.fdocuments.net/reader035/viewer/2022070401/56649f1f5503460f94c37f8f/html5/thumbnails/39.jpg)
SOLARRADIATION
BYPVWATTS
Station Identification
City: San_Juan
State: Puerto_Rico
Latitude: 18.43° N
Longitude: 66.00° W
Elevation: 19 m
PV System Specifications
DC Rating: 1.5 kW
DC to AC Derate Factor: 0.960
AC Rating: 1.4 kW
Array Type: Fixed Tilt
Array Tilt: 18.4°
Array Azimuth: 180.0°
Energy Specifications
Cost of Electricity: 11.9 ¢/kWh
Same latitude as Haiti
AC rating adjusted for DC equivalent
![Page 40: Tutorial: IEEE CSI Business Development Workshop 1.2 IEEE CSI Background & SunBlazer Status Ray Larsen CSI Co-Chair, Project Manager SLAC NAL, Stanford.](https://reader035.fdocuments.net/reader035/viewer/2022070401/56649f1f5503460f94c37f8f/html5/thumbnails/40.jpg)
SOLARRADIATION
BYPVWATTS
Avg. daily productionon lowest producingmonth = 6.3 kWh
Avg. for year = 7.205 kWh/day
Battery load of 5.56 kWh (2.78 kWh x 2) represents 77% of avg. daily production
Results
MonthSolar
Radiation(kWh/m
2/day)
AC Energy(kWh)
Energy Value
($)
1 5.16 210 24.99
2 5.58 206 24.51
3 6.08 247 29.39
4 5.97 235 27.96
5 5.50 222 26.42
6 5.62 221 26.30
7 5.75 232 27.61
8 5.78 232 27.61
9 5.85 226 26.89
10 5.40 217 25.82
11 4.85 189 22.49
12 4.77 193 22.97
Year 5.53 2630 312.97
![Page 41: Tutorial: IEEE CSI Business Development Workshop 1.2 IEEE CSI Background & SunBlazer Status Ray Larsen CSI Co-Chair, Project Manager SLAC NAL, Stanford.](https://reader035.fdocuments.net/reader035/viewer/2022070401/56649f1f5503460f94c37f8f/html5/thumbnails/41.jpg)
SUNBLAZER CHARGELAYOUT
AUTOMATICPARALLEL
OPERATION
AC
89 V
54 V
54 V
![Page 42: Tutorial: IEEE CSI Business Development Workshop 1.2 IEEE CSI Background & SunBlazer Status Ray Larsen CSI Co-Chair, Project Manager SLAC NAL, Stanford.](https://reader035.fdocuments.net/reader035/viewer/2022070401/56649f1f5503460f94c37f8f/html5/thumbnails/42.jpg)
SUNBLAZERLOAD
LAYOUT
AUTOMATIC LOAD MONITORING ON
STATION BATTERIES
54 V
54 V
LVD
14 V
LVD control
x 20x 20
![Page 43: Tutorial: IEEE CSI Business Development Workshop 1.2 IEEE CSI Background & SunBlazer Status Ray Larsen CSI Co-Chair, Project Manager SLAC NAL, Stanford.](https://reader035.fdocuments.net/reader035/viewer/2022070401/56649f1f5503460f94c37f8f/html5/thumbnails/43.jpg)
PACKAGE
SOLAR PANELS
CHARGE CONTROLLER
STATION BATTERIES
12V CHARGERS
LVD CONTROLLVD
![Page 44: Tutorial: IEEE CSI Business Development Workshop 1.2 IEEE CSI Background & SunBlazer Status Ray Larsen CSI Co-Chair, Project Manager SLAC NAL, Stanford.](https://reader035.fdocuments.net/reader035/viewer/2022070401/56649f1f5503460f94c37f8f/html5/thumbnails/44.jpg)
12V CHARGERS
TWO INDIVIDUAL BANKS
![Page 45: Tutorial: IEEE CSI Business Development Workshop 1.2 IEEE CSI Background & SunBlazer Status Ray Larsen CSI Co-Chair, Project Manager SLAC NAL, Stanford.](https://reader035.fdocuments.net/reader035/viewer/2022070401/56649f1f5503460f94c37f8f/html5/thumbnails/45.jpg)
CHARGING BAY
![Page 46: Tutorial: IEEE CSI Business Development Workshop 1.2 IEEE CSI Background & SunBlazer Status Ray Larsen CSI Co-Chair, Project Manager SLAC NAL, Stanford.](https://reader035.fdocuments.net/reader035/viewer/2022070401/56649f1f5503460f94c37f8f/html5/thumbnails/46.jpg)
SINGLE BUTTON CONTROL OF ALL
CHARGERS
![Page 47: Tutorial: IEEE CSI Business Development Workshop 1.2 IEEE CSI Background & SunBlazer Status Ray Larsen CSI Co-Chair, Project Manager SLAC NAL, Stanford.](https://reader035.fdocuments.net/reader035/viewer/2022070401/56649f1f5503460f94c37f8f/html5/thumbnails/47.jpg)
LOADING UP
20-25 BATTERIES/DAY
![Page 48: Tutorial: IEEE CSI Business Development Workshop 1.2 IEEE CSI Background & SunBlazer Status Ray Larsen CSI Co-Chair, Project Manager SLAC NAL, Stanford.](https://reader035.fdocuments.net/reader035/viewer/2022070401/56649f1f5503460f94c37f8f/html5/thumbnails/48.jpg)
FIELD TESTDATA
>20 DEG. OFF BEST ANGLE FOR N.Y.
LATITUDE
kWh collected kWh Load Irradiance Mid-day SoC End of Day SoC
Friday 4-15 5.65 5.6 100 100 100
Sat 4-16 1.26 5.6 10 80 52
Sun 4-17 7.36 5.6 75 100 80
Mon 4-18 5.14 5.6 70 100 70
Tue 4-19 2.01 2.8 30 80 50
Wed 4-20 4.51 2.8 50 100 95
Thur 4-21 5.95 5.6 90 100 70
Friday 4-22 3.99 5.6 65 90 80
Sat 4-23 1.12 2.8 10 60 50
Sun 4-24 4.84 2.8 95 85 100
![Page 49: Tutorial: IEEE CSI Business Development Workshop 1.2 IEEE CSI Background & SunBlazer Status Ray Larsen CSI Co-Chair, Project Manager SLAC NAL, Stanford.](https://reader035.fdocuments.net/reader035/viewer/2022070401/56649f1f5503460f94c37f8f/html5/thumbnails/49.jpg)
CHARGE CONTROLLER
CIRCUIT BREAKERS
![Page 50: Tutorial: IEEE CSI Business Development Workshop 1.2 IEEE CSI Background & SunBlazer Status Ray Larsen CSI Co-Chair, Project Manager SLAC NAL, Stanford.](https://reader035.fdocuments.net/reader035/viewer/2022070401/56649f1f5503460f94c37f8f/html5/thumbnails/50.jpg)
AC CHARGER
CABLE FEED THROUGH
![Page 51: Tutorial: IEEE CSI Business Development Workshop 1.2 IEEE CSI Background & SunBlazer Status Ray Larsen CSI Co-Chair, Project Manager SLAC NAL, Stanford.](https://reader035.fdocuments.net/reader035/viewer/2022070401/56649f1f5503460f94c37f8f/html5/thumbnails/51.jpg)
CSI SunBlazer Project Haiti - R. Larsen
511/28/2012
Sirona SunBlazer Training Session at Mission of Hope, Grand Goave, Haiti, June 20, 2011L to R: Ray Larsen, IEEE CSI; Delvar Jean-Philippe & Guillaume Gerold, Sirona-Haiti Technicians; Michelle
Lacourciere, Director Sirona Cares Foundation; Paul Lacourciere, CEO SironaFuels & Sirona-Haiti; Rev. Lexidan Edmé, President Mission of Hope International
![Page 52: Tutorial: IEEE CSI Business Development Workshop 1.2 IEEE CSI Background & SunBlazer Status Ray Larsen CSI Co-Chair, Project Manager SLAC NAL, Stanford.](https://reader035.fdocuments.net/reader035/viewer/2022070401/56649f1f5503460f94c37f8f/html5/thumbnails/52.jpg)
CSI SunBlazer Project Haiti - R. Larsen
521/28/2012
SunBlazer Staging & Training Area, Mission on Hope Schoolyard and Orphanage
![Page 53: Tutorial: IEEE CSI Business Development Workshop 1.2 IEEE CSI Background & SunBlazer Status Ray Larsen CSI Co-Chair, Project Manager SLAC NAL, Stanford.](https://reader035.fdocuments.net/reader035/viewer/2022070401/56649f1f5503460f94c37f8f/html5/thumbnails/53.jpg)
CSI SunBlazer Project Haiti - R. Larsen
531/28/2012
Hands-On Control Panel Training, Grand Goave Haiti, June 21, 2011
![Page 54: Tutorial: IEEE CSI Business Development Workshop 1.2 IEEE CSI Background & SunBlazer Status Ray Larsen CSI Co-Chair, Project Manager SLAC NAL, Stanford.](https://reader035.fdocuments.net/reader035/viewer/2022070401/56649f1f5503460f94c37f8f/html5/thumbnails/54.jpg)
CSI SunBlazer Project Haiti - R. Larsen
541/28/2012
First SunBlazer Negotiates Potholes Leaving Staging Area for St. Etienne
![Page 55: Tutorial: IEEE CSI Business Development Workshop 1.2 IEEE CSI Background & SunBlazer Status Ray Larsen CSI Co-Chair, Project Manager SLAC NAL, Stanford.](https://reader035.fdocuments.net/reader035/viewer/2022070401/56649f1f5503460f94c37f8f/html5/thumbnails/55.jpg)
CSI SunBlazer Project Haiti - R. Larsen
551/28/2012
Welcoming Party at St. Etienne pushing unit across ditch & up hill to final location
![Page 56: Tutorial: IEEE CSI Business Development Workshop 1.2 IEEE CSI Background & SunBlazer Status Ray Larsen CSI Co-Chair, Project Manager SLAC NAL, Stanford.](https://reader035.fdocuments.net/reader035/viewer/2022070401/56649f1f5503460f94c37f8f/html5/thumbnails/56.jpg)
561/28/2012 CSI SunBlazer Project Haiti - R. Larsen
First of 6 SunBlazer Deployments in Haiti
St Etienne, June 23 2011, Top of the Mountain
![Page 57: Tutorial: IEEE CSI Business Development Workshop 1.2 IEEE CSI Background & SunBlazer Status Ray Larsen CSI Co-Chair, Project Manager SLAC NAL, Stanford.](https://reader035.fdocuments.net/reader035/viewer/2022070401/56649f1f5503460f94c37f8f/html5/thumbnails/57.jpg)
CSI SunBlazer Project Haiti - R. Larsen
571/28/2012
Marisa Plumb, IEEE Spectrum Reporter, & Brendan McCoy (EE), IEEE HTC Summer Intern,
Anse à Veau, Haiti
Wayne Gutschow, VP Engineering, NextekPhilippe Barjon, IEEE, CSI Co-Chair for Haiti at Nextek
assembly plant, Bohemia NY
![Page 58: Tutorial: IEEE CSI Business Development Workshop 1.2 IEEE CSI Background & SunBlazer Status Ray Larsen CSI Co-Chair, Project Manager SLAC NAL, Stanford.](https://reader035.fdocuments.net/reader035/viewer/2022070401/56649f1f5503460f94c37f8f/html5/thumbnails/58.jpg)
CSI SunBlazer Project Haiti - R. Larsen
581/28/2012
Clockwise: Michera Dieugoit and Michera E’Drice, new SunBlazer owners at Anse-à-VeauJohn Lorts, Owner Russell Engineering, inventor mobile SunBlazer design & namePhilippe Barjon, IEEE, CSI Co-Chair for Haiti, after checkout at rugged remote Marmelade
![Page 59: Tutorial: IEEE CSI Business Development Workshop 1.2 IEEE CSI Background & SunBlazer Status Ray Larsen CSI Co-Chair, Project Manager SLAC NAL, Stanford.](https://reader035.fdocuments.net/reader035/viewer/2022070401/56649f1f5503460f94c37f8f/html5/thumbnails/59.jpg)
CSI SunBlazer Project Haiti - R. Larsen
591/28/2012
Home Battery Pack & Lighting Kit; First Light at Anse à Veau, Haiti
![Page 60: Tutorial: IEEE CSI Business Development Workshop 1.2 IEEE CSI Background & SunBlazer Status Ray Larsen CSI Co-Chair, Project Manager SLAC NAL, Stanford.](https://reader035.fdocuments.net/reader035/viewer/2022070401/56649f1f5503460f94c37f8f/html5/thumbnails/60.jpg)
CSI SunBlazer Project Haiti - R. Larsen
601/28/2012
Proud new SunBlazer business owner Sostene Pierre & family, local Magistrate and shop owner at Marmelade, enjoying first light in shop (L). Turning on first light kit at trailer for large crowd (R)
Battery
Pack