Turnkey and Engineering desalination station
Transcript of Turnkey and Engineering desalination station
-
7/29/2019 Turnkey and Engineering desalination station
1/301
2013TURNKEY & ENGINEERING SYSTEMS
CL EN MAIN & INGNIEIRE DES SYSTMES
LABEAU TUNISIE
-
7/29/2019 Turnkey and Engineering desalination station
2/30
NTRODUTION
SEA WATER DESALINATION STATION
Main ActivitiesWe are leader in Water & Seawater treatment Systems andPlants sector since more than 20 years.
We are active in design as engineering company ofDesalination systems and stations with capacity until30000m3/day and we are active as design and manufacturingwith a wide range of small-medium size products.
Engineering companyOver 20 years of experience and our devotion to qualitypermitted us to become specialists in water treatment andparticularly in sea water desalination. As engineeringcompany we are able to design turn-key desalinationstations until 30000 m3/day and more to organize the
production by our specialized supervision, to organize andsupervison commissioning and plant running.
QUALITYall our plants are designed and manufactured accordinghighest level of quality and the ofcial standard internationalrules.
WHAT WE DOWe design your desalination station for you! Based on ourexperience we offer our service to design and organize theinstallation of a new desalination station.
Moreover one of the most important matter is that cost torealize your station will be halved by the direct purchasingof material to the most important and qualied suppliersat discounted price.We have the possibility to access to special discount thanksto our position of engineering consultant company, that rstselect the products and the suppliers and then decide whichbetween them are correct to use in our projects.
Our main objective is: to offer to our customers a service.Your requirements are analysed in every details by an highlyspecialized engineers staff. Our solutions are discussed withyour technicians in order to offer you the best decisions foryour needs.
ORGANIZATION
Nothing is left to chance, every steps, every actions are
organized according our engineering programs.
1. Analysis of siteTo realize your desalination station, we will provide rst toexamine the site of installation.Geological analysis of that area are very important todevelop the best project and offer the best solution.These type of information should be analyzed in differenttime of the year, due the matter that working contidionscan be different season by season.
2. Design and drawingFull and detailed drawing will be realized by our staff, about:- civil works required- parts and components realization- equipment installation
Based on our 3D drawing your staff will be able to realizethe civil works required for the correct installation of thecomponents and equipments of station.
At same time, will be realized also the drawings about theparts of the plants to manufacture, like the structures forthe vessel or bases for pumps, etc.
3. Civil works and realization procedures
We will provide to supply the exact procedures for the thecivil works and the realization of the parts required for theinstallation of the plant.These procedures together with the 3D drawings will permitto your staff to realize the work required.
4. SupervisionAll the procedures required for the realization of the station,like the civil works and the realization of the parts, will besupervised by our technical staff, to be sure that time andway in the realization are respected.
5. Order listtogether with the procedures you will get also the list of theorders of materials to purchase to suppliers.This procedure permits you to purchase the materialsdirectly to the most important brand suppliers and getmaximum discount (OEM discount).This allows to halve the costs of realization
-
7/29/2019 Turnkey and Engineering desalination station
3/303
6. InstallationAs for the realization, also for the installation, will besupplied the procedures to follow for the correct endingof the works.
All the procedures of installation, performed by your staffwill be supervised by our engineers, so to guarantee the
correct realization and the respect of time.
7. Commissioning and runningThe nal trial and commissioning will be performed by ourengineers at presence of your technical staff.Full details on the user and technical assistant procedureswill be given to your user engineers, so to guarantee thecorrect use of the station and the correct maintenance of it.
We offer also the possibility to supervise the running ofthe plants according specic agreement, so to guaranteeperfect performance of the station and the working people.
Advantages using Labeau T.enginnering co.Choosing our solution, you choose our experience.We have realized several stations in this way, offering greatopportunity to our customer and start business cooperationfor the present and the future.
Our solution is:- We put you in the condition to realize by yourself yourdesalination station- to pay half price respect to common market price.- to start a cooperation with us to realize in your area in the
future also other stations bigger than present.
We offer
Italian engineering: our experience based on 20 years ofworking and desing in water treatment, by italian specializedengineers.Best material: only best and high qaulity materials andcomponents are used in our projects. We have contact everyday with the most important manuacturers and suppliers ofplants components, this permit us to selct the best one andchoise the correct solution for your area and your needs.
Economic: Best material but at OEM price. Only by usand choosing our solution you can get halfed prices respectthe common price list.Long duration: We work for duration. high quality ofcomponents is the rst guarantee for long years duration.Together with our maintenance planning you are in theposition to have a long life station.CHOOSE LABEAU T.ENGINEERING CO. fOR DESALINATION.
-
7/29/2019 Turnkey and Engineering desalination station
4/30
Local Company
Geneal Contractor
Labeau T.Engineering co.
partnership
Tender or
Order
Design &
Drawings
civil works
Design & Drawings
civil works
realization
civil works
Supervision
Equipments &componentsORDERS LIST
ORDER TOSUPPLIERS
Construction
PROCEDURES
CONSTRUCTION
PARTS & STRUCTURES
Construction
Design & Drawings
Construction
Supervision
DESIGN & ENGINEERING
-
7/29/2019 Turnkey and Engineering desalination station
5/305
INSTALLATION
PARTS & STRUCTURES
INSTALLATION
PROCEDURES
Installation
Design & Drawings
Installation
Supervision
COMMISSIONING
PROCEDURES
RUNNING &
CONDUCTION
RUNNINGSUPERVISION
-
7/29/2019 Turnkey and Engineering desalination station
6/30
DESIGN & ENGINEERING
Full an detailed analysis of area of installation
The area of installation of the new desalination station, is veryimportant and particular attention and analysis have to be per-
formed.
Geological and sea water analysis made in different time of
the year and seasons are the basic job to develop to prepare the
correct bases for the best project.
Below its indicated the way of a pipeline to link the area sitewith the wells area.
1 ANALYSIS OF INSTALLATION AREA
-
7/29/2019 Turnkey and Engineering desalination station
7/307
-
7/29/2019 Turnkey and Engineering desalination station
8/30
3D drawing of the site area with the buildings and the facility required
for the correct working of the station.
Also the architecture used for the project will be studied according the
context of the country of installation, the buildings present in the area
or close to it.
A full station includes: main building with the desalination devices, of-
ce building with facility for the workmen as showers, sleeping rooms, but
also meeting room to meet visitors and technical buildings for electricity
device, water pools for different services.
2 3D DRAWING OF SITE
DESIGN & ENGINEERING
-
7/29/2019 Turnkey and Engineering desalination station
9/309
-
7/29/2019 Turnkey and Engineering desalination station
10/30
Highpressurepumpwithenergyrecovery
Qty 1x100%3Capacity: 180m/h.
Head: 620m.
EnergyrecoveryQty 1x100%
Multimedia FeedPumpQty 2+1
3Capacity: 170m/h./eachHead: 30m.
FeedPumpsQty 2+1
3Capacity: 170m/h./eachHead: 30m.
IntakeWellsPumpQty 4+1
3Capacity: 100m/h.eachHead: 80m.
CLEAN
SodiumHypochlorite
1000lt
FEEDPUMPS
CLEANINGTANK
CLEANINGPUMP
CARTRIDGE FILTER
DRAIN
DRAIN
OVER FULL
DILUTIONLINE
DRAIN
DILUTIONLINE
DRAIN
8
9
121314
16
25
28
31
32
33
35
11
17
17
32
LSA
LSA
RH
EC
PH
MGBN01BB001
5000lit
tankQty 1x100%
MaterialHDPECapacity: 1000lt
HypochloriteSodium
Cleaning/FlushingpumpQty 1x100%
3Capacity: 90m/h.Head: 40m.
Cleaning/FlushingtankQty 1+1x100%
Capacity: 5000+ 10000lt.Material: HDPE
HypochloriteDosingPump
Qty 1+1Capacity max 10lit/hr
Head: 100m
Sodium
ReverseOsmosisMembranesQty 24x6
3Capacity: 62,50m /h.
R.O. UNIT STAGE 1 121314
121314
3300m
31050m
PO-1
Filteredwater Pool
PO-2
Raw water Pool
Highpressurepumpwithenergyrecovery
Qty 1x100%3Capacity: 180m/h.
Head: 620m.
EnergyrecoveryQty 1x100%
CLEANDRAIN
DRAIN
8
9
121314
16
25
33
11
17
17
RHPH
PermeateWater3
62,5m/h.
PermeateWater3
125m/h.
CartridgeFiltersQty 1x100%
3Capacity: 180m /h.Material: GRP
CartridgeFiltersQty 1x100%
3Capacity: 180m/h.Material: GRP
ReverseOsmosisMembranesQty 21x6
3Capacity: 62,50m /h.
R.O. UNIT STAGE 1 121314
121314
FeCl3
Ferric
Chloride
1000lt
DRAIN
DILUTIONLINE
LSA
FeCl Ferric Chloride3Qty 1x100%
MaterialHDPECapacity: 1000lt
FeCl Ferric Chloride3
DosingPumpQty 1+1
Capacity max 10lit/hrHead: 100m
ACID
DOSINGTANKDOSINGTANK
ANTISCALANTSODIUMBISULPHITE
DOSINGTANK
DRAIN DRAIN DRAIN
DILUTIONLINE
500lit
343637
LSA LSA
LSA
500lit 500lit
SodiumMeta BisulphiteDosingPumpQty 1x100%
Capacity 0,8lit/hr
Sodium Meta BisulphitetankQty 1x100%
MaterialHDPECapacity: 500lit
AntiscalantDosingPumpQty 1x100%
Capacity 0,14lit/hr
Soda NaOHDosingPumpQty 1x100%
Capacity 1,47lit/hr
Antiscalant tankQty 1x100%
MaterialHDPECapacity: 500lit
Soda tankQty 1x100%
MaterialHDPECapacity: 1000lit
PermeateWater362,5m/h.
SodiumHypochlorite1000lt
tankQty 1x100%
MaterialHDPECapacity: 1000lt
HypochloriteSodium
HypochloriteDosingPump
Qty 1+1Capacity max 2,37lit/hr
Sodium
SodiumHydroxide
1000lt
Sodium HydroxideQty 1x100%MaterialHDPE
Capacity: 1000lt
tank
P1.1
P2.3
P3.1
P1.2
P1.3
P1.5
DO-1.1 DO-1.2
P1.4
P2.2
P2.1
P3.2
P3.3
DO-1.3 DO-1.4
DOC
1.1FL2
DOC
1.2
DOC
1.3
DOC1.4 DOC
1.5
DOC
1.6
FL1
HP1
HP2
FL3-1/3
CP1.2CP1.1
Multimedia FiltersQty 6x100%
3: 360m/h.CapacityMaterial: GRP
3600m
3
600m
Backwashing water Pool
PO-3
BrinewaterPool
PO-5
P4.1
P6.1
P5.1
P4.2
P6.2
P5.2
CLEAN
DRAIN
CLEAN
DRAIN
CLEAN
DRAIN
CLEAN
DRAIN
CLEAN
DRAIN
CLEAN
DRAI N
CLEAN
DRAIN
CLEAN
DRAIN
CLEAN
DRAIN
CLEAN
DRAIN
CLEAN
DRAIN
CLEAN
DRAIN
OPERATIONAL PROJECT
Design
LAYOUT
SWRO Plant
RoMP30003
Prod. 2500m /20h
Review
DESCRIPTION
First release
DATA
1:50
10.10.11
PROGETTO INFORMATIONS
(SizeA0- H. cm.420)
P ro j ec t b y D at a
Nomefile
TavolaN
TN-110-1975.12371
RO.MP3000.04 P+I.cdr
Oct. 2011
LEGENDA
LABEAU TUNISIE sarl7033 - 51 Cite Marine,Ghar El Mehl - Tunisie
www.labeau.110mb.com / [email protected]
GLOBE VALVE N.O.
penumatic control butterfly valve
MotorM
normaly openpenumatic butterfly valve
normaly close
RH RH controller
EC Electro conductivity analyser
PH Analayser
check valve
butterfly valve
gate valve
ball valve
safety valve
pump
dosing pump
level switch alarmLSA
pressure indicatorPI
motorM
(ABBREVATIONS)
pneumatic butterfly valve
pneumatic / diaphragm
(KINDOFDRIVING)
pneumatic
pneumatic/Analog Control
PH
Scale
Customer:
Object
Project def ine 10.10.11
Clarification
MDP
Final Clarification
ITALIAN ENGINEERING
spropertyofLabeauTunisiesarl-Tunisia,anyreproductionand/ordistributionwithoutLabeauTunisieapprovalisunlawful.
DRAIN
DRAIN
36
37
LSA
LSA
DOE
1.1
DOE
1.2
DOF
1.1
DOF1.2
OVER FULL
INTERMEDIE
PERMEATE TANK
DRAIN
LSA
5000lit
3
1500m
ProductwaterPool
PO-4
3
1500m
ProductwaterPool
PO-4
ACID
DOSINGTANKDOSINGTANK
ANTISCALANTSODIUMBISULPHITE
DOSINGTANK
DRAIN DRAIN DRAIN
DILUTIONLINE
500lit
343637
LSA LSA
LSA
500lit 500lit
SodiumMeta BisulphiteDosingPumpQty 1x100%
Capacity 0,8lit/hr
Sodium Meta BisulphitetankQty 1x100%
MaterialHDPECapacity: 500lit
AntiscalantDosingPumpQty 1x100%
Capacity 0,14lit/hr
Soda NaOHDosingPumpQty 1x100%
Capacity 1,47lit/hr
Antiscalant tankQty 1x100%
MaterialHDPE
Capacity: 500lit
Soda tankQty 1x100%
MaterialHDPE
Capacity: 1000lit
DOB
1.1
DOB
1.2
DOB
1.3
DOB1.4 DOB
1.5
DOB
1.6
CO2
ServiceWater350m/h.
P7.1
15.10.11
3D drawing of the site area with the buildings and the facili-
ty required for the correct working of the station.
Also the architecture used for the project will be studiedaccording the context of the country of installation, the bu-
ildings present in the area or close to it.
A full station includes: main building with the desalina-
tion devices, ofce building with facility for the workmen
as showers, sleeping rooms, but also meeting room to meet
visitors and technical buildings for electricity device, water
pools for different services.
3 2D DRAWING OF SITE
DESIGN & ENGINEERING
-
7/29/2019 Turnkey and Engineering desalination station
11/3011
LEGENDA
Customer:
ITALIAN ENGINEERING
spropertyofLabeauTunisiesarl-Tunisia,anyreproductionand/ordistributionwithoutLabeauTunisieapprovalisunlawful.
HP01
HP01
(9)
P2.1
P2.3
P2.2
P3.1
P3.3
P3.2
P4.1
P5.2
P4.2
P5.1
P 6
. 2
P 6
. 1
STOP
STOP
1 Raw water pool
2 Filtered water pool
3 Backwashing water pool
4 Reject water pool
5 Multimedia filters
6 Cartridge filters
7 RO Train 1
8 RO Train 2
9 C.I.P.
10 Lime Stone Filtration
11 Carbon dioxide Injection
P2.1-P2.3 Intake pumps
P3.1-P3.3 Feed pumps
P4.1-P4.2 Brackish pumps
P5.1-P5.2 Reject pumps
P6.1-P6.2 Permeate tanks
(1)
(2)
(3)
(4)
56
8
10
11
7
5
OPERATIONAL PROJECT
Design
LAYOUT
SWRO Plant
RoMP30003
Prod. 2500m /20h
Review
DESCRIPTION
First release
DATA
1:50
10.10.11
PROGETTO INFORMATIONS
(Size A0 - H. cm.420)
Proje ct b y Da ta
Nome file
Tavola N
TN-110-1975.12371B
RO.MP3000.04 top.cdr
Oct. 2011
LABEAU TUNISIE sarl7033 - 51 Cite Marine,Ghar El Mehl - Tunisie
www.labeau.110mb.com/[email protected]
Scale
Object
P ro je ct d ef in e 1 0. 10 .11
Clarification
MDP
FinalClarification
15.10.11
ISO
IntegratedSystem
Organization
-
7/29/2019 Turnkey and Engineering desalination station
12/30
P&Id drawing permits to offer the complete layout of
the working procedure of the station.
On the left a sample of the hydraulic layout of ta
3000m3/day station.
Different solutions are possible according the philo-
sophy in the design of the desalination station.
Every section is clearly identied and readable and
offer immediately vision about the working.
4 P&ID DRAWING OF THE PLANT
DESIGN & ENGINEERING
-
7/29/2019 Turnkey and Engineering desalination station
13/3013
Some parts and components according the size and ca-
pacity of the station can be prepared in our factory
Below is visible the preparation of 3x1500m3/day sea
water desalination station that then will be composed
on the site.
in this case pre-treatment station composed by sand
lters is placed outside the contyainers.
5CONSTRUCTION OF PREASSEBLED PLANT
-
7/29/2019 Turnkey and Engineering desalination station
14/30
Hereby some example of the progression and developng of the
civil works on site.
As usual its very important the correct realization of the civil
works on the site. The perfect realization of this job permits of
offer the correct correspondence with the pre-pared compo-
nents and parts.
Its very important that direction of the civil works will be
organized and manage together with one of our director.
We prefer organize the civl works procedure according our Eu-ropean style, so to offer guarantee in the correct realization
and also respect of the expected time
6 CIVIL WORKS
DESIGN & ENGINEERING
-
7/29/2019 Turnkey and Engineering desalination station
15/3015
Below examples on the installation of the apparatuses,
components and prepared parts on the site of installation.
The civil works direction, has to be conduct to organize
a perfect planning in the realization of the job, in the ma-
nage of the workmen, step by step according the needs of
the contractor and the delivery time of the materials.
7 - INSTALLATION OF APPARATUS
-
7/29/2019 Turnkey and Engineering desalination station
16/30
DESIGN & ENGINEERING
EGYPT - Private Company
Model RoMP PLUS 20000
Water Sea Water
Production 4x5000 m3/day (Total 20000m3/day)
Note Design on turn-key basis realized
on request of an Egyptian private
company
-
7/29/2019 Turnkey and Engineering desalination station
17/3017
-
7/29/2019 Turnkey and Engineering desalination station
18/30
DESIGN & ENGINEERING
EGYPT - Private Company
Model RoMP PLUS 2500
Water Sea Water
Production 2x1250 m3/day (Total 20000m3/day)
Note Design on turn-key basis realized
on request of an Egyptian private
company for Egyptian Army.
-
7/29/2019 Turnkey and Engineering desalination station
19/3019
-
7/29/2019 Turnkey and Engineering desalination station
20/30
DESIGN & ENGINEERING
YEMEN - Private Company
Model RoMPROS3050
Water Sea Water
Production 4x500+3x350 m3/day (Total
2500m3/day)
Note Design on turn-key basis realized on
request of an Yemen company for asugar factory.
-
7/29/2019 Turnkey and Engineering desalination station
21/3021
-
7/29/2019 Turnkey and Engineering desalination station
22/30
SWRO PLANTS
IRAN - Municipal Company
Model RoMP PLUS
Water Sea Water
Production 3x1500 m3/day (Total 4500 m3/day)
Quantity: 1 pcs
Note Special plant installed inside contai-
ner
-
7/29/2019 Turnkey and Engineering desalination station
23/3023
-
7/29/2019 Turnkey and Engineering desalination station
24/30
SWRO PLANTS
-
7/29/2019 Turnkey and Engineering desalination station
25/3025
EQYPT- Municipal Company
Model RoMP 3000 I
Water Sea Water
Production 3000 m3/day (Total 3000 m3/day)
Quantity: 1 pcs
Note Special plant installed inside a clo-
sed shed - photo about RO section
-
7/29/2019 Turnkey and Engineering desalination station
26/30
SWRO PLANTS
-
7/29/2019 Turnkey and Engineering desalination station
27/3027
EQYPT- Municipal Company
Model RoMP 1500 I
Water Sea Water
Production 1500 m3/day (Total 1500 m3/day)
Quantity: 1 pcs
Note Special plant installed inside a clo-
sed shed - photo about RO section
-
7/29/2019 Turnkey and Engineering desalination station
28/30
BWRO PLANTS
ITALY and other country - Washing Car industry
Model Duplex Softener
Water Tap/Brackish Water
Production 20/30 m3/h.
Quantity: more than 30pcs installed
Note Duplex softener as pretreatment for
washing car industry.
SOUTH AFRICA - Dealer Company
Model Sand Filtration
Water Brackish Water
Production 200 m3/h. (4800 m3/day)
Quantity: 1 pcs
Note Special Sand fltration as pretreat-
ment for local industry.
-
7/29/2019 Turnkey and Engineering desalination station
29/3029
MAIN LABEAU REFERENCE
IRLAND Dublin - Pharmaceutical Company
Model SOFT-AD50DX
Water Tap Water Production 50 m3/h. (1200m3/day)
Quantity: 1 pcs
Note Special duplex Softener to produce
water for pharmaceutical purpose
-
7/29/2019 Turnkey and Engineering desalination station
30/30
Water Treatment Systems ProductionLABEAU T.Engineering co.
Printed
in
tunisie
Activity of Labeau T.Engineering co.
We project, manufacture and delivery water purication systems for our customers.
Our projects are MADE BYITALIAN ENGINEERING - based on more than 20 years
of experience
High quality is guarantee by the long experience and by the exclusive use of high
quality components and parts made in EU, USA or JAPAN. None economical material
is used in none part of the plants. Also best quality of stainless steel (S.S. Duplex inthe material that is contact with sea water) and best brands present in the market.
Every components and parts is certied by the manufucturer and specic documents
can be available.
Each installation problem is discussed and resolved by our technical ofce within 24h.
Every situation is monitored and reported so to propose to our customers updating or
modication.
Labeau Corporation worldwideLabeau Corporation brings more than 20 years
experience to designing and building advanced water
purifcation systems.
Labeau Tunisie is distributed to the global market
exclusively through industrial water treatment
companies worldwide.
Our industry-leading manufacturing capability enables
us to guarantee immediate shipment anywhere in
the world for standard Labeauproducts, backed by
a level of technical, service and parts support that is
unparalleled in the water industry.
Labeau is the result of the substantial investment that
each year we have made in R&D.
We work with development partners worldwide for the
continual advancement of industrial water treatment
technology.