  • 7/29/2019 Turnkey and Engineering desalination station

    1/301

    2013TURNKEY & ENGINEERING SYSTEMS

    CL EN MAIN & INGNIEIRE DES SYSTMES

    LABEAU TUNISIE

  • 7/29/2019 Turnkey and Engineering desalination station

    2/30

    NTRODUTION

    SEA WATER DESALINATION STATION

    Main ActivitiesWe are leader in Water & Seawater treatment Systems andPlants sector since more than 20 years.

    We are active in design as engineering company ofDesalination systems and stations with capacity until30000m3/day and we are active as design and manufacturingwith a wide range of small-medium size products.

    Engineering companyOver 20 years of experience and our devotion to qualitypermitted us to become specialists in water treatment andparticularly in sea water desalination. As engineeringcompany we are able to design turn-key desalinationstations until 30000 m3/day and more to organize the

    production by our specialized supervision, to organize andsupervison commissioning and plant running.

    QUALITYall our plants are designed and manufactured accordinghighest level of quality and the ofcial standard internationalrules.

    WHAT WE DOWe design your desalination station for you! Based on ourexperience we offer our service to design and organize theinstallation of a new desalination station.

    Moreover one of the most important matter is that cost torealize your station will be halved by the direct purchasingof material to the most important and qualied suppliersat discounted price.We have the possibility to access to special discount thanksto our position of engineering consultant company, that rstselect the products and the suppliers and then decide whichbetween them are correct to use in our projects.

    Our main objective is: to offer to our customers a service.Your requirements are analysed in every details by an highlyspecialized engineers staff. Our solutions are discussed withyour technicians in order to offer you the best decisions foryour needs.

    ORGANIZATION

    Nothing is left to chance, every steps, every actions are

    organized according our engineering programs.

    1. Analysis of siteTo realize your desalination station, we will provide rst toexamine the site of installation.Geological analysis of that area are very important todevelop the best project and offer the best solution.These type of information should be analyzed in differenttime of the year, due the matter that working contidionscan be different season by season.

    2. Design and drawingFull and detailed drawing will be realized by our staff, about:- civil works required- parts and components realization- equipment installation

    Based on our 3D drawing your staff will be able to realizethe civil works required for the correct installation of thecomponents and equipments of station.

    At same time, will be realized also the drawings about theparts of the plants to manufacture, like the structures forthe vessel or bases for pumps, etc.

    3. Civil works and realization procedures

    We will provide to supply the exact procedures for the thecivil works and the realization of the parts required for theinstallation of the plant.These procedures together with the 3D drawings will permitto your staff to realize the work required.

    4. SupervisionAll the procedures required for the realization of the station,like the civil works and the realization of the parts, will besupervised by our technical staff, to be sure that time andway in the realization are respected.

    5. Order listtogether with the procedures you will get also the list of theorders of materials to purchase to suppliers.This procedure permits you to purchase the materialsdirectly to the most important brand suppliers and getmaximum discount (OEM discount).This allows to halve the costs of realization

  • 7/29/2019 Turnkey and Engineering desalination station

    3/303

    6. InstallationAs for the realization, also for the installation, will besupplied the procedures to follow for the correct endingof the works.

    All the procedures of installation, performed by your staffwill be supervised by our engineers, so to guarantee the

    correct realization and the respect of time.

    7. Commissioning and runningThe nal trial and commissioning will be performed by ourengineers at presence of your technical staff.Full details on the user and technical assistant procedureswill be given to your user engineers, so to guarantee thecorrect use of the station and the correct maintenance of it.

    We offer also the possibility to supervise the running ofthe plants according specic agreement, so to guaranteeperfect performance of the station and the working people.

    Advantages using Labeau T.enginnering co.Choosing our solution, you choose our experience.We have realized several stations in this way, offering greatopportunity to our customer and start business cooperationfor the present and the future.

    Our solution is:- We put you in the condition to realize by yourself yourdesalination station- to pay half price respect to common market price.- to start a cooperation with us to realize in your area in the

    future also other stations bigger than present.

    We offer

    Italian engineering: our experience based on 20 years ofworking and desing in water treatment, by italian specializedengineers.Best material: only best and high qaulity materials andcomponents are used in our projects. We have contact everyday with the most important manuacturers and suppliers ofplants components, this permit us to selct the best one andchoise the correct solution for your area and your needs.

    Economic: Best material but at OEM price. Only by usand choosing our solution you can get halfed prices respectthe common price list.Long duration: We work for duration. high quality ofcomponents is the rst guarantee for long years duration.Together with our maintenance planning you are in theposition to have a long life station.CHOOSE LABEAU T.ENGINEERING CO. fOR DESALINATION.

  • 7/29/2019 Turnkey and Engineering desalination station

    4/30

    Local Company

    Geneal Contractor

    Labeau T.Engineering co.

    partnership

    Tender or

    Order

    Design &

    Drawings

    civil works

    Design & Drawings

    civil works

    realization

    civil works

    Supervision

    Equipments &componentsORDERS LIST

    ORDER TOSUPPLIERS

    Construction

    PROCEDURES

    CONSTRUCTION

    PARTS & STRUCTURES

    Construction

    Design & Drawings

    Construction

    Supervision

    DESIGN & ENGINEERING

  • 7/29/2019 Turnkey and Engineering desalination station

    5/305

    INSTALLATION

    PARTS & STRUCTURES

    INSTALLATION

    PROCEDURES

    Installation

    Design & Drawings

    Installation

    Supervision

    COMMISSIONING

    PROCEDURES

    RUNNING &

    CONDUCTION

    RUNNINGSUPERVISION

  • 7/29/2019 Turnkey and Engineering desalination station

    6/30

    DESIGN & ENGINEERING

    Full an detailed analysis of area of installation

    The area of installation of the new desalination station, is veryimportant and particular attention and analysis have to be per-

    formed.

    Geological and sea water analysis made in different time of

    the year and seasons are the basic job to develop to prepare the

    correct bases for the best project.

    Below its indicated the way of a pipeline to link the area sitewith the wells area.

    1 ANALYSIS OF INSTALLATION AREA

  • 7/29/2019 Turnkey and Engineering desalination station

    7/307

  • 7/29/2019 Turnkey and Engineering desalination station

    8/30

    3D drawing of the site area with the buildings and the facility required

    for the correct working of the station.

    Also the architecture used for the project will be studied according the

    context of the country of installation, the buildings present in the area

    or close to it.

    A full station includes: main building with the desalination devices, of-

    ce building with facility for the workmen as showers, sleeping rooms, but

    also meeting room to meet visitors and technical buildings for electricity

    device, water pools for different services.

    2 3D DRAWING OF SITE

    DESIGN & ENGINEERING

  • 7/29/2019 Turnkey and Engineering desalination station

    9/309

  • 7/29/2019 Turnkey and Engineering desalination station

    10/30

    Highpressurepumpwithenergyrecovery

    Qty 1x100%3Capacity: 180m/h.

    Head: 620m.

    EnergyrecoveryQty 1x100%

    Multimedia FeedPumpQty 2+1

    3Capacity: 170m/h./eachHead: 30m.

    FeedPumpsQty 2+1

    3Capacity: 170m/h./eachHead: 30m.

    IntakeWellsPumpQty 4+1

    3Capacity: 100m/h.eachHead: 80m.

    CLEAN

    SodiumHypochlorite

    1000lt

    FEEDPUMPS

    CLEANINGTANK

    CLEANINGPUMP

    CARTRIDGE FILTER

    DRAIN

    DRAIN

    OVER FULL

    DILUTIONLINE

    DRAIN

    DILUTIONLINE

    DRAIN

    8

    9

    121314

    16

    25

    28

    31

    32

    33

    35

    11

    17

    17

    32

    LSA

    LSA

    RH

    EC

    PH

    MGBN01BB001

    5000lit

    tankQty 1x100%

    MaterialHDPECapacity: 1000lt

    HypochloriteSodium

    Cleaning/FlushingpumpQty 1x100%

    3Capacity: 90m/h.Head: 40m.

    Cleaning/FlushingtankQty 1+1x100%

    Capacity: 5000+ 10000lt.Material: HDPE

    HypochloriteDosingPump

    Qty 1+1Capacity max 10lit/hr

    Head: 100m

    Sodium

    ReverseOsmosisMembranesQty 24x6

    3Capacity: 62,50m /h.

    R.O. UNIT STAGE 1 121314

    121314

    3300m

    31050m

    PO-1

    Filteredwater Pool

    PO-2

    Raw water Pool

    Highpressurepumpwithenergyrecovery

    Qty 1x100%3Capacity: 180m/h.

    Head: 620m.

    EnergyrecoveryQty 1x100%

    CLEANDRAIN

    DRAIN

    8

    9

    121314

    16

    25

    33

    11

    17

    17

    RHPH

    PermeateWater3

    62,5m/h.

    PermeateWater3

    125m/h.

    CartridgeFiltersQty 1x100%

    3Capacity: 180m /h.Material: GRP

    CartridgeFiltersQty 1x100%

    3Capacity: 180m/h.Material: GRP

    ReverseOsmosisMembranesQty 21x6

    3Capacity: 62,50m /h.

    R.O. UNIT STAGE 1 121314

    121314

    FeCl3

    Ferric

    Chloride

    1000lt

    DRAIN

    DILUTIONLINE

    LSA

    FeCl Ferric Chloride3Qty 1x100%

    MaterialHDPECapacity: 1000lt

    FeCl Ferric Chloride3

    DosingPumpQty 1+1

    Capacity max 10lit/hrHead: 100m

    ACID

    DOSINGTANKDOSINGTANK

    ANTISCALANTSODIUMBISULPHITE

    DOSINGTANK

    DRAIN DRAIN DRAIN

    DILUTIONLINE

    500lit

    343637

    LSA LSA

    LSA

    500lit 500lit

    SodiumMeta BisulphiteDosingPumpQty 1x100%

    Capacity 0,8lit/hr

    Sodium Meta BisulphitetankQty 1x100%

    MaterialHDPECapacity: 500lit

    AntiscalantDosingPumpQty 1x100%

    Capacity 0,14lit/hr

    Soda NaOHDosingPumpQty 1x100%

    Capacity 1,47lit/hr

    Antiscalant tankQty 1x100%

    MaterialHDPECapacity: 500lit

    Soda tankQty 1x100%

    MaterialHDPECapacity: 1000lit

    PermeateWater362,5m/h.

    SodiumHypochlorite1000lt

    tankQty 1x100%

    MaterialHDPECapacity: 1000lt

    HypochloriteSodium

    HypochloriteDosingPump

    Qty 1+1Capacity max 2,37lit/hr

    Sodium

    SodiumHydroxide

    1000lt

    Sodium HydroxideQty 1x100%MaterialHDPE

    Capacity: 1000lt

    tank

    P1.1

    P2.3

    P3.1

    P1.2

    P1.3

    P1.5

    DO-1.1 DO-1.2

    P1.4

    P2.2

    P2.1

    P3.2

    P3.3

    DO-1.3 DO-1.4

    DOC

    1.1FL2

    DOC

    1.2

    DOC

    1.3

    DOC1.4 DOC

    1.5

    DOC

    1.6

    FL1

    HP1

    HP2

    FL3-1/3

    CP1.2CP1.1

    Multimedia FiltersQty 6x100%

    3: 360m/h.CapacityMaterial: GRP

    3600m

    3

    600m

    Backwashing water Pool

    PO-3

    BrinewaterPool

    PO-5

    P4.1

    P6.1

    P5.1

    P4.2

    P6.2

    P5.2

    CLEAN

    DRAIN

    CLEAN

    DRAIN

    CLEAN

    DRAIN

    CLEAN

    DRAIN

    CLEAN

    DRAIN

    CLEAN

    DRAI N

    CLEAN

    DRAIN

    CLEAN

    DRAIN

    CLEAN

    DRAIN

    CLEAN

    DRAIN

    CLEAN

    DRAIN

    CLEAN

    DRAIN

    OPERATIONAL PROJECT

    Design

    LAYOUT

    SWRO Plant

    RoMP30003

    Prod. 2500m /20h

    Review

    DESCRIPTION

    First release

    DATA

    1:50

    10.10.11

    PROGETTO INFORMATIONS

    (SizeA0- H. cm.420)

    P ro j ec t b y D at a

    Nomefile

    TavolaN

    TN-110-1975.12371

    RO.MP3000.04 P+I.cdr

    Oct. 2011

    LEGENDA

    LABEAU TUNISIE sarl7033 - 51 Cite Marine,Ghar El Mehl - Tunisie

    www.labeau.110mb.com / [email protected]

    GLOBE VALVE N.O.

    penumatic control butterfly valve

    MotorM

    normaly openpenumatic butterfly valve

    normaly close

    RH RH controller

    EC Electro conductivity analyser

    PH Analayser

    check valve

    butterfly valve

    gate valve

    ball valve

    safety valve

    pump

    dosing pump

    level switch alarmLSA

    pressure indicatorPI

    motorM

    (ABBREVATIONS)

    pneumatic butterfly valve

    pneumatic / diaphragm

    (KINDOFDRIVING)

    pneumatic

    pneumatic/Analog Control

    PH

    Scale

    Customer:

    Object

    Project def ine 10.10.11

    Clarification

    MDP

    Final Clarification

    ITALIAN ENGINEERING

    spropertyofLabeauTunisiesarl-Tunisia,anyreproductionand/ordistributionwithoutLabeauTunisieapprovalisunlawful.

    DRAIN

    DRAIN

    36

    37

    LSA

    LSA

    DOE

    1.1

    DOE

    1.2

    DOF

    1.1

    DOF1.2

    OVER FULL

    INTERMEDIE

    PERMEATE TANK

    DRAIN

    LSA

    5000lit

    3

    1500m

    ProductwaterPool

    PO-4

    3

    1500m

    ProductwaterPool

    PO-4

    ACID

    DOSINGTANKDOSINGTANK

    ANTISCALANTSODIUMBISULPHITE

    DOSINGTANK

    DRAIN DRAIN DRAIN

    DILUTIONLINE

    500lit

    343637

    LSA LSA

    LSA

    500lit 500lit

    SodiumMeta BisulphiteDosingPumpQty 1x100%

    Capacity 0,8lit/hr

    Sodium Meta BisulphitetankQty 1x100%

    MaterialHDPECapacity: 500lit

    AntiscalantDosingPumpQty 1x100%

    Capacity 0,14lit/hr

    Soda NaOHDosingPumpQty 1x100%

    Capacity 1,47lit/hr

    Antiscalant tankQty 1x100%

    MaterialHDPE

    Capacity: 500lit

    Soda tankQty 1x100%

    MaterialHDPE

    Capacity: 1000lit

    DOB

    1.1

    DOB

    1.2

    DOB

    1.3

    DOB1.4 DOB

    1.5

    DOB

    1.6

    CO2

    ServiceWater350m/h.

    P7.1

    15.10.11

    3D drawing of the site area with the buildings and the facili-

    ty required for the correct working of the station.

    Also the architecture used for the project will be studiedaccording the context of the country of installation, the bu-

    ildings present in the area or close to it.

    A full station includes: main building with the desalina-

    tion devices, ofce building with facility for the workmen

    as showers, sleeping rooms, but also meeting room to meet

    visitors and technical buildings for electricity device, water

    pools for different services.

    3 2D DRAWING OF SITE

    DESIGN & ENGINEERING

  • 7/29/2019 Turnkey and Engineering desalination station

    11/3011

    LEGENDA

    Customer:

    ITALIAN ENGINEERING

    spropertyofLabeauTunisiesarl-Tunisia,anyreproductionand/ordistributionwithoutLabeauTunisieapprovalisunlawful.

    HP01

    HP01

    (9)

    P2.1

    P2.3

    P2.2

    P3.1

    P3.3

    P3.2

    P4.1

    P5.2

    P4.2

    P5.1

    P 6

    . 2

    P 6

    . 1

    STOP

    STOP

    1 Raw water pool

    2 Filtered water pool

    3 Backwashing water pool

    4 Reject water pool

    5 Multimedia filters

    6 Cartridge filters

    7 RO Train 1

    8 RO Train 2

    9 C.I.P.

    10 Lime Stone Filtration

    11 Carbon dioxide Injection

    P2.1-P2.3 Intake pumps

    P3.1-P3.3 Feed pumps

    P4.1-P4.2 Brackish pumps

    P5.1-P5.2 Reject pumps

    P6.1-P6.2 Permeate tanks

    (1)

    (2)

    (3)

    (4)

    56

    8

    10

    11

    7

    5

    OPERATIONAL PROJECT

    Design

    LAYOUT

    SWRO Plant

    RoMP30003

    Prod. 2500m /20h

    Review

    DESCRIPTION

    First release

    DATA

    1:50

    10.10.11

    PROGETTO INFORMATIONS

    (Size A0 - H. cm.420)

    Proje ct b y Da ta

    Nome file

    Tavola N

    TN-110-1975.12371B

    RO.MP3000.04 top.cdr

    Oct. 2011

    LABEAU TUNISIE sarl7033 - 51 Cite Marine,Ghar El Mehl - Tunisie

    www.labeau.110mb.com/[email protected]

    Scale

    Object

    P ro je ct d ef in e 1 0. 10 .11

    Clarification

    MDP

    FinalClarification

    15.10.11

    ISO

    IntegratedSystem

    Organization

  • 7/29/2019 Turnkey and Engineering desalination station

    12/30

    P&Id drawing permits to offer the complete layout of

    the working procedure of the station.

    On the left a sample of the hydraulic layout of ta

    3000m3/day station.

    Different solutions are possible according the philo-

    sophy in the design of the desalination station.

    Every section is clearly identied and readable and

    offer immediately vision about the working.

    4 P&ID DRAWING OF THE PLANT

    DESIGN & ENGINEERING

  • 7/29/2019 Turnkey and Engineering desalination station

    13/3013

    Some parts and components according the size and ca-

    pacity of the station can be prepared in our factory

    Below is visible the preparation of 3x1500m3/day sea

    water desalination station that then will be composed

    on the site.

    in this case pre-treatment station composed by sand

    lters is placed outside the contyainers.

    5CONSTRUCTION OF PREASSEBLED PLANT

  • 7/29/2019 Turnkey and Engineering desalination station

    14/30

    Hereby some example of the progression and developng of the

    civil works on site.

    As usual its very important the correct realization of the civil

    works on the site. The perfect realization of this job permits of

    offer the correct correspondence with the pre-pared compo-

    nents and parts.

    Its very important that direction of the civil works will be

    organized and manage together with one of our director.

    We prefer organize the civl works procedure according our Eu-ropean style, so to offer guarantee in the correct realization

    and also respect of the expected time

    6 CIVIL WORKS

    DESIGN & ENGINEERING

  • 7/29/2019 Turnkey and Engineering desalination station

    15/3015

    Below examples on the installation of the apparatuses,

    components and prepared parts on the site of installation.

    The civil works direction, has to be conduct to organize

    a perfect planning in the realization of the job, in the ma-

    nage of the workmen, step by step according the needs of

    the contractor and the delivery time of the materials.

    7 - INSTALLATION OF APPARATUS

  • 7/29/2019 Turnkey and Engineering desalination station

    16/30

    DESIGN & ENGINEERING

    EGYPT - Private Company

    Model RoMP PLUS 20000

    Water Sea Water

    Production 4x5000 m3/day (Total 20000m3/day)

    Note Design on turn-key basis realized

    on request of an Egyptian private

    company

  • 7/29/2019 Turnkey and Engineering desalination station

    17/3017

  • 7/29/2019 Turnkey and Engineering desalination station

    18/30

    DESIGN & ENGINEERING

    EGYPT - Private Company

    Model RoMP PLUS 2500

    Water Sea Water

    Production 2x1250 m3/day (Total 20000m3/day)

    Note Design on turn-key basis realized

    on request of an Egyptian private

    company for Egyptian Army.

  • 7/29/2019 Turnkey and Engineering desalination station

    19/3019

  • 7/29/2019 Turnkey and Engineering desalination station

    20/30

    DESIGN & ENGINEERING

    YEMEN - Private Company

    Model RoMPROS3050

    Water Sea Water

    Production 4x500+3x350 m3/day (Total

    2500m3/day)

    Note Design on turn-key basis realized on

    request of an Yemen company for asugar factory.

  • 7/29/2019 Turnkey and Engineering desalination station

    21/3021

  • 7/29/2019 Turnkey and Engineering desalination station

    22/30

    SWRO PLANTS

    IRAN - Municipal Company

    Model RoMP PLUS

    Water Sea Water

    Production 3x1500 m3/day (Total 4500 m3/day)

    Quantity: 1 pcs

    Note Special plant installed inside contai-

    ner

  • 7/29/2019 Turnkey and Engineering desalination station

    23/3023

  • 7/29/2019 Turnkey and Engineering desalination station

    24/30

    SWRO PLANTS

  • 7/29/2019 Turnkey and Engineering desalination station

    25/3025

    EQYPT- Municipal Company

    Model RoMP 3000 I

    Water Sea Water

    Production 3000 m3/day (Total 3000 m3/day)

    Quantity: 1 pcs

    Note Special plant installed inside a clo-

    sed shed - photo about RO section

  • 7/29/2019 Turnkey and Engineering desalination station

    26/30

    SWRO PLANTS

  • 7/29/2019 Turnkey and Engineering desalination station

    27/3027

    EQYPT- Municipal Company

    Model RoMP 1500 I

    Water Sea Water

    Production 1500 m3/day (Total 1500 m3/day)

    Quantity: 1 pcs

    Note Special plant installed inside a clo-

    sed shed - photo about RO section

  • 7/29/2019 Turnkey and Engineering desalination station

    28/30

    BWRO PLANTS

    ITALY and other country - Washing Car industry

    Model Duplex Softener

    Water Tap/Brackish Water

    Production 20/30 m3/h.

    Quantity: more than 30pcs installed

    Note Duplex softener as pretreatment for

    washing car industry.

    SOUTH AFRICA - Dealer Company

    Model Sand Filtration

    Water Brackish Water

    Production 200 m3/h. (4800 m3/day)

    Quantity: 1 pcs

    Note Special Sand fltration as pretreat-

    ment for local industry.

  • 7/29/2019 Turnkey and Engineering desalination station

    29/3029

    MAIN LABEAU REFERENCE

    IRLAND Dublin - Pharmaceutical Company

    Model SOFT-AD50DX

    Water Tap Water Production 50 m3/h. (1200m3/day)

    Quantity: 1 pcs

    Note Special duplex Softener to produce

    water for pharmaceutical purpose

  • 7/29/2019 Turnkey and Engineering desalination station

    30/30

    Water Treatment Systems ProductionLABEAU T.Engineering co.

    Printed

    in

    tunisie

    Activity of Labeau T.Engineering co.

    We project, manufacture and delivery water purication systems for our customers.

    Our projects are MADE BYITALIAN ENGINEERING - based on more than 20 years

    of experience

    High quality is guarantee by the long experience and by the exclusive use of high

    quality components and parts made in EU, USA or JAPAN. None economical material

    is used in none part of the plants. Also best quality of stainless steel (S.S. Duplex inthe material that is contact with sea water) and best brands present in the market.

    Every components and parts is certied by the manufucturer and specic documents

    can be available.

    Each installation problem is discussed and resolved by our technical ofce within 24h.

    Every situation is monitored and reported so to propose to our customers updating or

    modication.

    Labeau Corporation worldwideLabeau Corporation brings more than 20 years

    experience to designing and building advanced water

    purifcation systems.

    Labeau Tunisie is distributed to the global market

    exclusively through industrial water treatment

    companies worldwide.

    Our industry-leading manufacturing capability enables

    us to guarantee immediate shipment anywhere in

    the world for standard Labeauproducts, backed by

    a level of technical, service and parts support that is

    unparalleled in the water industry.

    Labeau is the result of the substantial investment that

    each year we have made in R&D.

    We work with development partners worldwide for the

    continual advancement of industrial water treatment

    technology.