TURNING INFORMATION INTO SOLUTIONS FOR CONTINUOUS OPERATIONAL IMPROVEMENT Kent A. Lackey, P.E. Vice President 5 September 2017

Transcript of TURNING INFORMATION INTO SOLUTIONS FOR ......TURNING INFORMATION INTO SOLUTIONS FOR CONTINUOUS...

Page 1: TURNING INFORMATION INTO SOLUTIONS FOR ......TURNING INFORMATION INTO SOLUTIONS FOR CONTINUOUS OPERATIONAL IMPROVEMENT Kent A. Lackey, P.E. Vice President 5 September 2017 Overview

TURNING INFORMATION INTO SOLUTIONS FOR CONTINUOUS OPERATIONAL IMPROVEMENT

Kent A. Lackey, P.E. Vice President 5 September 2017

Page 2: TURNING INFORMATION INTO SOLUTIONS FOR ......TURNING INFORMATION INTO SOLUTIONS FOR CONTINUOUS OPERATIONAL IMPROVEMENT Kent A. Lackey, P.E. Vice President 5 September 2017 Overview

Overview of Asset360

Implementation of Asset360 with the City of Lawrence and Winston-Salem

Successes

Future Improvements and Challenges

Conclusions and Moving Forward

AGENDA

2

Page 3: TURNING INFORMATION INTO SOLUTIONS FOR ......TURNING INFORMATION INTO SOLUTIONS FOR CONTINUOUS OPERATIONAL IMPROVEMENT Kent A. Lackey, P.E. Vice President 5 September 2017 Overview

Global Spend$XXB

U.S. Spend$XXB

• Asset360 is a smart analytics platform that captures, integrates, and analyzes data to optimize plant performance.

• Allows disparate/separate datasets from different systems to be viewed on a single platform.

• Process engineers remotely monitor data and suggest operational changes to lower energy and chemical costs and improve plant performance.

Black & Veatch3

Overview

Page 4: TURNING INFORMATION INTO SOLUTIONS FOR ......TURNING INFORMATION INTO SOLUTIONS FOR CONTINUOUS OPERATIONAL IMPROVEMENT Kent A. Lackey, P.E. Vice President 5 September 2017 Overview

Global Spend$XXB

U.S. Spend$XXB

• OptimizeSave energy and chemicals

• Detect and DiagnoseAlerts

Issues Management

• Aggregate and CalculateMerge data

Calculate Key Performance Indicators (KPIs) related to cost, energy and chemicals

Black & Veatch4

Smart Integrated Infrastructure

ASSET360TM

Platform

OperationalIntelligence

AdaptivePlanning

360°view

• Strategic PlanningMaintenance and Reliability

Compliance

• Tactical PlanningDevelop and track current year

plans and budget

Risk and Resilience Planning

• Asset PlanningPredictive tool

Configure alerts to look for deviations in performance

Page 5: TURNING INFORMATION INTO SOLUTIONS FOR ......TURNING INFORMATION INTO SOLUTIONS FOR CONTINUOUS OPERATIONAL IMPROVEMENT Kent A. Lackey, P.E. Vice President 5 September 2017 Overview

Global Spend$XXB

U.S. Spend$XXB

• Integration of data from any source. SCADA, PLC, LIMS…

• Display and Trend any data in the system regardless of source

• Raw and Calculated data available for custom trends and charts over any user defined time range

• Utilize static and real time data sets for disparate data analysis and analysis

Black & Veatch5

Leverage & Expand Current Systems: Beyond SCADA / PLC…

Page 6: TURNING INFORMATION INTO SOLUTIONS FOR ......TURNING INFORMATION INTO SOLUTIONS FOR CONTINUOUS OPERATIONAL IMPROVEMENT Kent A. Lackey, P.E. Vice President 5 September 2017 Overview

Global Spend$XXB

U.S. Spend$XXB

• KPI’s aggregated / integrated across any system.

• Direct / Calculated KPI’s in user definable trends / history• Cost, Process, Maintenance

• Default KPI’s Include:• Total Cost: Energy, Chemicals, etc.

• Individual or Aggregated KPI’s

• User Defined KPI’s:• Can display/use (for calc’s) any data

captured by an SCADA or asset data collection system. Unlimited

• User created custom trends with any data

Black & Veatch6

KPI Capture, Integration & Display

Page 7: TURNING INFORMATION INTO SOLUTIONS FOR ......TURNING INFORMATION INTO SOLUTIONS FOR CONTINUOUS OPERATIONAL IMPROVEMENT Kent A. Lackey, P.E. Vice President 5 September 2017 Overview

Global Spend$XXB

U.S. Spend$XXB

• Immediate visual status of assets geographically

• Leverages asset data integrated into the system

• Asset data available without going to another view / tool in ASSET360™

• Enables potentially faster onboarding for operators / new employees to the operation

Black & Veatch7

Geographically Access Asset Status / Information

Page 8: TURNING INFORMATION INTO SOLUTIONS FOR ......TURNING INFORMATION INTO SOLUTIONS FOR CONTINUOUS OPERATIONAL IMPROVEMENT Kent A. Lackey, P.E. Vice President 5 September 2017 Overview

Global Spend$XXB

U.S. Spend$XXB

• Reports made with graphs, tables, and gauges from performance analyst

• Can be used to quickly determine performance of plant

Black & Veatch8

BI Reporting Tool

Page 9: TURNING INFORMATION INTO SOLUTIONS FOR ......TURNING INFORMATION INTO SOLUTIONS FOR CONTINUOUS OPERATIONAL IMPROVEMENT Kent A. Lackey, P.E. Vice President 5 September 2017 Overview

Global Spend$XXB

U.S. Spend$XXB

• Create custom trends from all available data (raw and calculated).

• Compare relative events using “pinning” feature.

Black & Veatch9

Data Explorer

Page 10: TURNING INFORMATION INTO SOLUTIONS FOR ......TURNING INFORMATION INTO SOLUTIONS FOR CONTINUOUS OPERATIONAL IMPROVEMENT Kent A. Lackey, P.E. Vice President 5 September 2017 Overview

Global Spend$XXB

U.S. Spend$XXB

• Prioritizes issues

• Calculates impact

• Allows transparent discussion among engineers and plant staff

Black & Veatch10

Issues Management

Page 11: TURNING INFORMATION INTO SOLUTIONS FOR ......TURNING INFORMATION INTO SOLUTIONS FOR CONTINUOUS OPERATIONAL IMPROVEMENT Kent A. Lackey, P.E. Vice President 5 September 2017 Overview

Implementing Asset360TM with the City of Lawrence

11

Page 12: TURNING INFORMATION INTO SOLUTIONS FOR ......TURNING INFORMATION INTO SOLUTIONS FOR CONTINUOUS OPERATIONAL IMPROVEMENT Kent A. Lackey, P.E. Vice President 5 September 2017 Overview

Global Spend$XXB

U.S. Spend$XXB

Black & Veatch12

Linking SCADA and LIMS Data to Asset360TM

LIMS

NOAA River Data

Lawrence PI System

KAW WTPSCADA

Clinton WTPSCADA

Reservoir Data

B&V PI System / Data Center

CMMS

Weather Data

Distribution System Data

Army Corps Data

Kansas River WWTPSCADA

PI Cloud Connect

BV solution – Scalable Data Integration

Page 13: TURNING INFORMATION INTO SOLUTIONS FOR ......TURNING INFORMATION INTO SOLUTIONS FOR CONTINUOUS OPERATIONAL IMPROVEMENT Kent A. Lackey, P.E. Vice President 5 September 2017 Overview

Global Spend$XXB

U.S. Spend$XXB

• The PI system is used to perform calculations with SCADA and LIMS data to display operational performance indicators like:Sludge Retention Time (SRT)Food to Microorganism Ratio (F:M) Removal percentages of wastewater constituents

Black & Veatch13

Programming Calculations into PI

Page 14: TURNING INFORMATION INTO SOLUTIONS FOR ......TURNING INFORMATION INTO SOLUTIONS FOR CONTINUOUS OPERATIONAL IMPROVEMENT Kent A. Lackey, P.E. Vice President 5 September 2017 Overview

Global Spend$XXB

U.S. Spend$XXB

• Kansas River WWTP PlotsChemical use, energy use, and costingTreatment effectiveness

• Performance plots for activated sludge treatmentBOD, ammonia, airflowDissolved OxygenSRT, F:M ratio

Black & Veatch14

Creating Plots in Asset360TM

Page 15: TURNING INFORMATION INTO SOLUTIONS FOR ......TURNING INFORMATION INTO SOLUTIONS FOR CONTINUOUS OPERATIONAL IMPROVEMENT Kent A. Lackey, P.E. Vice President 5 September 2017 Overview

Global Spend$XXB

U.S. Spend$XXB

• Process engineer performs weekly checks of plant performance using the Performance Analystand BI Reporting tools.

• Can dive deeper using Data Explorer application

• Communication is performed through the Issues Management application

• Graphs are linked to the issue’s discussion board, and then weekly check is sent out to the client and other engineers at Black & Veatch

Black & Veatch15

Weekly Checks

Page 16: TURNING INFORMATION INTO SOLUTIONS FOR ......TURNING INFORMATION INTO SOLUTIONS FOR CONTINUOUS OPERATIONAL IMPROVEMENT Kent A. Lackey, P.E. Vice President 5 September 2017 Overview

Implementing Asset360TM with Winston-Salem

16

Page 17: TURNING INFORMATION INTO SOLUTIONS FOR ......TURNING INFORMATION INTO SOLUTIONS FOR CONTINUOUS OPERATIONAL IMPROVEMENT Kent A. Lackey, P.E. Vice President 5 September 2017 Overview

Global Spend$XXB

U.S. Spend$XXB

Black & Veatch17

Linking SCADA and LIMS Data to Asset360TM

B&V Data Interface Server

B&V PI System / Data Center

BV solution – Scalable Data Integration

Page 18: TURNING INFORMATION INTO SOLUTIONS FOR ......TURNING INFORMATION INTO SOLUTIONS FOR CONTINUOUS OPERATIONAL IMPROVEMENT Kent A. Lackey, P.E. Vice President 5 September 2017 Overview

Global Spend$XXB

U.S. Spend$XXB

• 2 WWTPS

• Muddy Creek, 21 mgd capacity

• Archie Elledge, 30 mgd capacity

• Consolidated Biosolids Treatment

• Digested Sludge from MC to AW

• Dewatering/Thermal Drying at AE

• Combined Heat and Power at MC

• Future: Plant Influent Interconnection

Black & Veatch18

Holistic Approach to Wastewater Treatment

Archie ElledgeWWTP

Muddy Creek WWTP

Muddy Creek Basin

South Fork Basin

ElledgeBasin

South Fork PSNew MC

Transfer PS

Page 19: TURNING INFORMATION INTO SOLUTIONS FOR ......TURNING INFORMATION INTO SOLUTIONS FOR CONTINUOUS OPERATIONAL IMPROVEMENT Kent A. Lackey, P.E. Vice President 5 September 2017 Overview

Global Spend$XXB

U.S. Spend$XXB

Black & Veatch19

Holistic Approach to Wastewater Treatment

Muddy Creek

WWTP

Archie ElledgeWWTP

Transfer Force Main

ISIS

IS Online Influent Sampler

• Significant Future Changes to Treatment

• Day Storage at Both Plants

• Online Influent Sampling (BOD/COD/TKN/VFA/TSS)

• Flow and Load Based Influent Management

• Gas to Grid Combined Heat and Power

• Operational Decision Making will Significantly Change

Page 20: TURNING INFORMATION INTO SOLUTIONS FOR ......TURNING INFORMATION INTO SOLUTIONS FOR CONTINUOUS OPERATIONAL IMPROVEMENT Kent A. Lackey, P.E. Vice President 5 September 2017 Overview

Global Spend$XXB

U.S. Spend$XXB

• The system will consolidate data from both plant SCADA systems and LIMS and support operational decision making from a “total” wastewater treatment perspective• System-wide total cost management• Process unit, plant and system-wide energy management• Effective use of day storage for flow and load management• Centralized biosolids management optimization• Ongoing aeration optimization• Combined Heat and Power management optimization

Black & Veatch20

How Does Performance Management Fit In

Page 21: TURNING INFORMATION INTO SOLUTIONS FOR ......TURNING INFORMATION INTO SOLUTIONS FOR CONTINUOUS OPERATIONAL IMPROVEMENT Kent A. Lackey, P.E. Vice President 5 September 2017 Overview

Global Spend$XXB

U.S. Spend$XXB

• Winston-Salem Digester Flow

Individual Digester Flow

User created plot

Single or Compound data trend creation

• Performance plots for anaerobic digestion system

Flow

Temperature

Levels

Black & Veatch21

Creating Plots in Asset360TM

Page 22: TURNING INFORMATION INTO SOLUTIONS FOR ......TURNING INFORMATION INTO SOLUTIONS FOR CONTINUOUS OPERATIONAL IMPROVEMENT Kent A. Lackey, P.E. Vice President 5 September 2017 Overview

Global Spend$XXB

U.S. Spend$XXB

• The system is able to use current calculations from existing spreadsheets and data from SCADA and LIMS display operational performance indicators like:Sludge Retention Time (SRT)Food to Microorganism Ratio (F:M) Removal percentages of wastewater constituents

Black & Veatch22

Utilizing Existing Calculations for Aeration Optimization

Page 23: TURNING INFORMATION INTO SOLUTIONS FOR ......TURNING INFORMATION INTO SOLUTIONS FOR CONTINUOUS OPERATIONAL IMPROVEMENT Kent A. Lackey, P.E. Vice President 5 September 2017 Overview

Global Spend$XXB

U.S. Spend$XXB

Black & Veatch23

Operational Intelligence at the Process Unit, Plant and System Level

Page 24: TURNING INFORMATION INTO SOLUTIONS FOR ......TURNING INFORMATION INTO SOLUTIONS FOR CONTINUOUS OPERATIONAL IMPROVEMENT Kent A. Lackey, P.E. Vice President 5 September 2017 Overview

Black & Veatch24

Process Performance Optimization – Achieving the Lowest Total Cost of Treatment – Providing the Full Picture

Page 25: TURNING INFORMATION INTO SOLUTIONS FOR ......TURNING INFORMATION INTO SOLUTIONS FOR CONTINUOUS OPERATIONAL IMPROVEMENT Kent A. Lackey, P.E. Vice President 5 September 2017 Overview

Global Spend$XXB

U.S. Spend$XXB

• Process engineer performs weekly checks of plant performance using the Performance Analystand BI Reporting tools.

• Can dive deeper using Data Explorer application

• Communication is performed through the Issues Management application

• Graphs are linked to the issue’s discussion board, and then weekly check is sent out to the client and other engineers at Black & Veatch

Black & Veatch25

Weekly Checks

Page 26: TURNING INFORMATION INTO SOLUTIONS FOR ......TURNING INFORMATION INTO SOLUTIONS FOR CONTINUOUS OPERATIONAL IMPROVEMENT Kent A. Lackey, P.E. Vice President 5 September 2017 Overview

Conclusions and Moving Forward

26

Page 27: TURNING INFORMATION INTO SOLUTIONS FOR ......TURNING INFORMATION INTO SOLUTIONS FOR CONTINUOUS OPERATIONAL IMPROVEMENT Kent A. Lackey, P.E. Vice President 5 September 2017 Overview

Global Spend$XXB

U.S. Spend$XXB

• Asset360TM is a powerful platform for data consolidation and operational intelligence

• Ongoing process of improving data quality issues and adding features beneficial to water clients

• Has helped to identify and solve process issues at the City of Lawrence / Winston-Salem

• Use with existing systems (e.g. OSISoft/Pi, Schneider Wonderware / SCADA) or without.

Black & Veatch27

Conclusions