Transcript of Turbo
Kiril Levkov, CEO
LLC TurboEnergy2015
TurboSphere
INNOVATIVE MACHINE FOR UTILIZATION OF
NATURAL GAS OVERPRESSURE
ENERGY
Natural gas transmission system
75 b
ar
12 b
ar
3-6 barIndustry Residential
Compressor(spends 4-8% of transported gas)
Well
20,3 bar 0,1 bar
Electricity15-500 kW
Overpressureenergy
3 - 55 bar>500 m3/h
3
Low grade heat energy20 - 40 C
TurboSphere – 3 in 1:Turbine wheel
Heat exchangerGenerator
Velocity: 3000 rpm;Size: from 600x600x600 mm;Weight: from 300 kg;
Advantages
Low velocity
Internal multistage heating
The possibility of regulating
Work without fuel consumption
No need for extra equipmentImpermeability
4
The existing turboexpanders from 1000 kW Limited objects
TurboSphere from 15 kW Thousands of objects!
Manufacture and supply Consumers
TurboSphere(15-500kW)
Natural gas consumersindustry, electric and heat generation
Natural gas distributors Gazprom, Beltopgaz, gazsystem etc.
Outsourcing(partners)
B2g market50% of sales
B2b market50% of sales
5
TurboEnergy
R&D and engineering
2015 2020 2025 2030 20350
200
400
600
800
1000
Size of the market, bln. RUB
Series5USAEuropeRussia
Belaru
s
Russia
Europ
eUSA
010000200003000040000500006000070000
Quantity of units
low pressurehigh pressure
56%17%
22%
6%
Market by power range
0-30 kW
30-60 kW
60-200 kW
200-450 kW
6
Costs: overpressure energy – $ 0 waste heat – $ 0 TurboSphere – $1500-2000 per 1kWLCOE during 8 years – 2-4 ¢/kWh payback period – 3-4 year.
…for own needs …for saleElectricity (15-500 kW)
7
Project teamKirill LEVKOVProject managerEducation: Belarusian National Technical University, profession - Industrial heat power engineering, Master of Science.
Key experience and knowledge: energy carrier production and distribution systems, turbomachinery, business-planning, innovative management.
Achievements: awards from contests, exhibitions and conferences. Training programs and studies abroad (USA, Germany, Syria, Lithuania). More than 30 scientific publications.
Leonid LEVKOVChief project developerEducation: Belarusian Polytechnic Institute, profession - Heat and gassupply and ventilation.
Key experience: 50 years of work in technical equipment design, development and appliance of energy saving technologies, project realization of heat and gas supply, ventilation and air conditioning systems.
Knowledge: gas and thermodynamics, energyefficiency, etc.
Achievements: invention of a new turbine type.
ALEKSANDR PANKOV
Chief mechanic-technologist
ALEKSANDR NOVIKOV
Chief designer
SERGEI SVERCHKOV
Developer
ELENA SHCHEMELEVA
Project manager
MATVEI CHERENKOV
Mechanical engineer
MAKSIM NEKHAICHIK
Electrical engineer
ANDREI TABATCHIKOV
Designer-technologist
VLADIMIR ROMANIUK
Scientific leader
More than 12 professionals
8
Achievements
9
Patented technology
21 Honor diplomas
Skolkovo minigrant
More than 15 partners: industry, engineering, R&D, sales
- TurboSphere prototype 10kW
Road map
2004-2014 2015-2016 2017-…
The idea, patent, R&D,model sample, preliminary test
Pilot project, certification, IP
Commercialization
Science and research department
Production and testing laboratory
Production
Invested resources: Required investment: Further fundingfrom
10
14
42
CAPEX, mln RUB OPEX, mln RUB
7
3110 12
Financial plan
2015 2016 2017 2018 2019 2020
-30.0
-20.0
-10.0
0.0
10.0
20.0
NPV (r=30%)
Mln
. RU
B
11
2015 2016 2017 2018 2019 20200
5
10
15
un
its
Planning manufacture
ParameterMeasu
reTurboSphere DGU-8 TRex 370 MDG-20 MTG 160
Picture -
Country - CIS UkraineCzech
RepublicRussia Germany
Electric power kW15, 30,
(60, 120, 250, 500)8 - 10 11 - 15 20 160
Rotational velocity rpm 3000 3000 3000 40000 45000
Flow rate m3/h 500 - 50000 1800 - 10000 1500 - 2000 17000 3000 - 10000
Input pressure bar 3-55 10-75 15-23 54 40
Stages of expansion - 3-20 1 1 1 1
Dimensions mm 820х600х820 N/A 400х600 N/A 1.093х955х735
Gas heating type - internalexhaust gases
external - boiler heater
Installation site - GRS and CGS GRS GRS GRS GRS
Source type -
rejected heat gas gas - gas
Voltage V 380 220/380 400 380 400
Cost$ Per 1 kW
1500 - 2000 N/A 4000 N/A ~7000
Comparison with analogues
Partners:Key partners:
Principles of cooperation:Joint realizationSelf-financingNo property transfer
Technology development, testtraining and carrying out
Production and testing base,
TurboSphere trial operation
Construction documentation development,
TurboSphere and testbed production