Tunnel UG2 (Electrical) Respond to MM

31
8/22/2019 Tunnel UG2 (Electrical) Respond to MM http://slidepdf.com/reader/full/tunnel-ug2-electrical-respond-to-mm 1/31  MMC GAMUDA KVMRT (T) SDN. BHD. PROJEK MASS RAPID TRANSIT LEMBAH KLANG UNDERGROUND WORKS (TUNNELS, STATIONS & ASSOCIATED STRUCTURES) BETWEEN SEMANTAN NORTH PORTAL AND MALURI SOUTH PORTAL D E S I G N / DOCUMENT R E V I E W S H E E T TUNNEL PRE-FINAL M&E ISD  –  MGKT REPLIES MMC Gamuda KVMRT (T) Joint Venture KVMRT/MG/SBK/UG/OP/PQP/DQP/0013, Rev. 02 Page 1 of 31 To : MMC Gamuda KVMRT (T) Sdn.Bhd. Date : 12 August 02/07/2013 To : MOTT MACDONALD (MALAYSIA) SDN BHD Date : 11/7/2013 04/04/2013 Submittal : TUNNEL UG2 PREFINAL M&E ISD DWG/SPEC/CALCS/OTHER : DRAWINGS Submittal Stage : PREFINAL DESIGN Our Ref. : Your Ref. : Division/Discipline : M&E Reviewer : ID/KP/NA Discipline Head Initial : IAN DONOHUE Reviewer : Project Manager : JOHN ROBINSON SERVICE: ELECTRICAL Item Referenced Document Rev Comments Responses Code 1 General General Comments: 1. The level of information provided within this submission is not sufficient for an ISD. Plan layouts throughout the UG2 tunnels indicating all services under the MGKT scope are expected. Please reissue as a complete submission. All other comments are for information. Please only provide drawings relevant to the submission. The information is all relevant. Please indicate what is expected for an ISD. All electrical tunnel services are shown in detail. MGJV‟s statement is incorrect, all electrical services under the contract scope of work are applicable in the tunnel. MM request a detailed explanation from MGJV as all statements made under this „General‟ item are very vague, unacceptable and made due to lack of project information.  Although there is no need for lightning protection inside the tunnel, the tunnel beyond the South Portal is a Cut & Cover construction with partial and total enclosed noise barriers which should be lightning protected, hence the full package of lightning protection drawings in the tunnel package. Please number DRR pages in future. 3

Transcript of Tunnel UG2 (Electrical) Respond to MM

Page 1: Tunnel UG2 (Electrical) Respond to MM

8/22/2019 Tunnel UG2 (Electrical) Respond to MM

http://slidepdf.com/reader/full/tunnel-ug2-electrical-respond-to-mm 1/31

 

MMC GAMUDA KVMRT (T) SDN. BHD.PROJEK MASS RAPID TRANSIT LEMBAH KLANG

UNDERGROUND WORKS (TUNNELS, STATIONS & ASSOCIATED STRUCTURES) BETWEEN

SEMANTAN NORTH PORTAL AND MALURI SOUTH PORTAL 

D E S I G N / DOCUMENT R E V I E W S H E E T

TUNNEL PRE-FINAL M&E ISD  –  MGKT REPLIES

MMC Gamuda KVMRT (T) Joint VentureKVMRT/MG/SBK/UG/OP/PQP/DQP/0013, Rev. 02  Page 1 of 31 

To : MMC Gamuda KVMRT (T) Sdn.Bhd.Date : 12 August

02/07/2013

To : MOTT MACDONALD (MALAYSIA) SDN BHDDate :

11/7/2013 04/04/2013 

Submittal : TUNNEL UG2 PREFINAL M&E ISD DWG/SPEC/CALCS/OTHER : DRAWINGS

Submittal Stage : PREFINAL DESIGN

Our Ref. : Your Ref. :

Division/Discipline : M&E Reviewer : ID/KP/NA Discipline Head Initial : IAN DONOHUE

Reviewer : Project Manager : JOHN ROBINSON

SERVICE: ELECTRICAL

Item Referenced Document Rev Comments Responses Code

1 General General Comments:

1. The level of information provided within this submission is not

sufficient for an ISD. Plan layouts throughout the UG2 tunnels

indicating all services under the MGKT scope are expected.

Please reissue as a complete submission. All other comments

are for information. Please only provide drawings relevant to

the submission.

The information is all relevant. Please indicatewhat is expected for an ISD. All electrical tunnelservices are shown in detail. MGJV‟s statement isincorrect, all electrical services under the contractscope of work are applicable in the tunnel. MM

request a detailed explanation from MGJV as allstatements made under this „General‟ item arevery vague, unacceptable and made due to lack ofproject information.

 Although there is no need for lightning protectioninside the tunnel, the tunnel beyond the SouthPortal is a Cut & Cover construction with partialand total enclosed noise barriers which should belightning protected, hence the full package oflightning protection drawings in the tunnelpackage.

Please number DRR pages in future.

3

Page 2: Tunnel UG2 (Electrical) Respond to MM

8/22/2019 Tunnel UG2 (Electrical) Respond to MM

http://slidepdf.com/reader/full/tunnel-ug2-electrical-respond-to-mm 2/31

 

MMC GAMUDA KVMRT (T) SDN. BHD.PROJEK MASS RAPID TRANSIT LEMBAH KLANG

UNDERGROUND WORKS (TUNNELS, STATIONS & ASSOCIATED STRUCTURES) BETWEEN

SEMANTAN NORTH PORTAL AND MALURI SOUTH PORTAL 

D E S I G N / DOCUMENT R E V I E W S H E E T

TUNNEL PRE-FINAL M&E ISD  –  MGKT REPLIES

MMC Gamuda KVMRT (T) Joint VentureKVMRT/MG/SBK/UG/OP/PQP/DQP/0013, Rev. 02  Page 2 of 31 

Item Referenced Document Rev Comments Responses Code

9/7/2013

 As this submission is for tunnel electrical ISD, we expect to see

the:

i. Electrical system within the tunnel for UG2 section.

 All electrical circuitry and relevant equipment areshown in the drawings

ii. Electrical schematic for tunnel lights and power socket

outlets.

Schematics form part of the electrical package andhave been submitted

iii. Tunnel lighting design and control circuits. Control circuitry is shown

iv. Electrical interfaces with BMS and FSCADA in terms of

I/O list.

 All interfaces are shown

v. Detailed comments on every drawing which are

provided in this DRR.

Noted, to be commented on

The current submission has 23 typical detail drawings which

mostly shows single details in very big scale and takes up a

drawing. We suggest that the details are shown in an appropriatescale and combined wherever it is addressing the same

area/detail/type and wherever is possible. Our suggestions are

given in this DRR which can reduce the total typical drawing for

lightning protection to 8 drawings.

MM take note of your suggestion but will notnecessarily make any changes to the existing as

all relevant information is shown

Noted.

2 KVMRT/MG/SBK/UG2/TNL/EL/TNB/LOD/1001 D00D01 

1. Typographical error at drawing titles:

SCM/1101/D02 – SWITCHES instead of SWTCHES

Noted, will be changed 2

9/7/2013 Noted, will be updated

Page 3: Tunnel UG2 (Electrical) Respond to MM

8/22/2019 Tunnel UG2 (Electrical) Respond to MM

http://slidepdf.com/reader/full/tunnel-ug2-electrical-respond-to-mm 3/31

 

MMC GAMUDA KVMRT (T) SDN. BHD.PROJEK MASS RAPID TRANSIT LEMBAH KLANG

UNDERGROUND WORKS (TUNNELS, STATIONS & ASSOCIATED STRUCTURES) BETWEEN

SEMANTAN NORTH PORTAL AND MALURI SOUTH PORTAL 

D E S I G N / DOCUMENT R E V I E W S H E E T

TUNNEL PRE-FINAL M&E ISD  –  MGKT REPLIES

MMC Gamuda KVMRT (T) Joint VentureKVMRT/MG/SBK/UG/OP/PQP/DQP/0013, Rev. 02  Page 3 of 31 

Item Referenced Document Rev Comments Responses Code

Please ensure it is updated in revised drawing.

6/8/2013

Please ensure it is updated in revised drawing.

TYP/1031/D00 to TYP/1034/D00 – SHEET instead of SHHET Noted, will be changed

9/7/2013

Please ensure it is updated in revised drawing.

6/8/2013

Please ensure it is updated in revised drawing.

Noted, will be updated

3 KVMRT/MG/SBK/UG2/TNL/EL/TNB/LOS/1001 D00D01 

1. Please include the meaning of these abbreviations:

TMO, MT, ELU

There are no abbreviations on this drawing 2

9/7/2013

These are used in drawing „.../LV/SCM/1102‟. Abbreviation to be

shown in „…/TNB/LOS/1102‟. 

6/8/2013

Please ensure it is updated in revised drawing.

Noted, to be updated

4 KVMRT/MG/SBK/UG2/TNL/EL/TNB/LOS/1002 D00D01 

1. Refer General Comments Refer general response 2

9/7/2013

Please ensure it is updated in revised drawing.

6/8/2013

Please ensure it is updated in revised drawing.

Noted, to be updated

Page 4: Tunnel UG2 (Electrical) Respond to MM

8/22/2019 Tunnel UG2 (Electrical) Respond to MM

http://slidepdf.com/reader/full/tunnel-ug2-electrical-respond-to-mm 4/31

 

MMC GAMUDA KVMRT (T) SDN. BHD.PROJEK MASS RAPID TRANSIT LEMBAH KLANG

UNDERGROUND WORKS (TUNNELS, STATIONS & ASSOCIATED STRUCTURES) BETWEEN

SEMANTAN NORTH PORTAL AND MALURI SOUTH PORTAL 

D E S I G N / DOCUMENT R E V I E W S H E E T

TUNNEL PRE-FINAL M&E ISD  –  MGKT REPLIES

MMC Gamuda KVMRT (T) Joint VentureKVMRT/MG/SBK/UG/OP/PQP/DQP/0013, Rev. 02  Page 4 of 31 

Item Referenced Document Rev Comments Responses Code

5 KVMRT/MG/SBK/UG2/TNL/EL/LV/SCM/1001 D00D01 

1 Please omit the schematic for Escape Shaft 2. Noted, will be removed 2

9/7/2013

Please ensure it is updated in revised drawing.

6/8/2013

Please ensure it is updated in revised drawing.

Noted, will be updated

2 Please revise the information provided in Legend considering

the omission of Escape Shaft 2.

Noted, will be removed 2

9/7/2013

Please ensure it is updated in revised drawing.

6/8/2013

Please ensure it is updated in revised drawing.

Noted, will be updated

3 Please add note: The ATS and UPS are part of the same

package and will be supplied by the designated UPS supplier.

This is not an UPS drawing but a LV distributionschematic

2

9/7/2013

Electrical contractor should know that the UPS is a client

supplied item! So please add note.

Noted, note will be added

Page 5: Tunnel UG2 (Electrical) Respond to MM

8/22/2019 Tunnel UG2 (Electrical) Respond to MM

http://slidepdf.com/reader/full/tunnel-ug2-electrical-respond-to-mm 5/31

 

MMC GAMUDA KVMRT (T) SDN. BHD.PROJEK MASS RAPID TRANSIT LEMBAH KLANG

UNDERGROUND WORKS (TUNNELS, STATIONS & ASSOCIATED STRUCTURES) BETWEEN

SEMANTAN NORTH PORTAL AND MALURI SOUTH PORTAL 

D E S I G N / DOCUMENT R E V I E W S H E E T

TUNNEL PRE-FINAL M&E ISD  –  MGKT REPLIES

MMC Gamuda KVMRT (T) Joint VentureKVMRT/MG/SBK/UG/OP/PQP/DQP/0013, Rev. 02  Page 5 of 31 

Item Referenced Document Rev Comments Responses Code

6/8/2013

Please ensure it is updated in revised drawing.

4 Please indicate the unit for 33kV transformer, i.e. 33kV /

0.415Kv

Noted, will be updated 2

9/7/2013Please ensure it is updated in revised drawing.

6/8/2013

Please ensure it is updated in revised drawing.

Noted, will be updated

6 KVMRT/MG/SBK/UG2/TNL/EL/LV/SCM/1101 D02D03 

1. Refer General Comments Refer general response. This is specific for thetunnel ONLY and nowhere else on the MGJVcontract is this applicable !

2

9/7/2013

Is this tunnel light request switch? We do not need this in

tunnel based on specification and PDP/MRTC unless it is an

authority requirement. Please advise.

6/8/2013

Tunnel request light switch to be removed. Please ensure it is

removed in revised drawing.

The use of the tunnel light switch should bediscussed

7 KVMRT/MG/SBK/UG2/TNL/EL/LV/SCM/1102 D02D03 

1 Please liase with BMS contractor and follow the typical I/O

points jointly developed in BMS-UGW workshops.

6/8/2013

Noted

This is not a BMS drawing, this is a generaldemarcation layout and configuration of a controlsystem

Page 6: Tunnel UG2 (Electrical) Respond to MM

8/22/2019 Tunnel UG2 (Electrical) Respond to MM

http://slidepdf.com/reader/full/tunnel-ug2-electrical-respond-to-mm 6/31

 

MMC GAMUDA KVMRT (T) SDN. BHD.PROJEK MASS RAPID TRANSIT LEMBAH KLANG

UNDERGROUND WORKS (TUNNELS, STATIONS & ASSOCIATED STRUCTURES) BETWEEN

SEMANTAN NORTH PORTAL AND MALURI SOUTH PORTAL 

D E S I G N / DOCUMENT R E V I E W S H E E T

TUNNEL PRE-FINAL M&E ISD  –  MGKT REPLIES

MMC Gamuda KVMRT (T) Joint VentureKVMRT/MG/SBK/UG/OP/PQP/DQP/0013, Rev. 02  Page 6 of 31 

Item Referenced Document Rev Comments Responses Code

9/7/2013

Tunnel lighting control has FSCADA and BMS interface.

Therefore, please show the I/O.

6/8/2013

Please ensure it is updated in revised drawing.

Noted, to be shown

2 The scope of work for UGW is up until ITB only. Please revise

the demarcation and interface diagram accordingly.

Noted, will be changed 2

9/7/2013

Please ensure it is updated in revised drawing.

6/8/2013

Please ensure it is updated in revised drawing.

Noted, to be updated

3 Please include „TMO‟ and MT‟ in Abbreviations.  Noted, will be changed 2

9/7/2013

Please ensure it is updated in revised drawing.

6/8/2013

Please ensure it is updated in revised drawing.

Noted, to be updated

8 KVMRT/MG/SBK/UG2/TNL/EL/TNB/LS/1001 D00

D01 

General

This is not a tunnel CSD/SEM drawing. The

2

Page 7: Tunnel UG2 (Electrical) Respond to MM

8/22/2019 Tunnel UG2 (Electrical) Respond to MM

http://slidepdf.com/reader/full/tunnel-ug2-electrical-respond-to-mm 7/31

 

MMC GAMUDA KVMRT (T) SDN. BHD.PROJEK MASS RAPID TRANSIT LEMBAH KLANG

UNDERGROUND WORKS (TUNNELS, STATIONS & ASSOCIATED STRUCTURES) BETWEEN

SEMANTAN NORTH PORTAL AND MALURI SOUTH PORTAL 

D E S I G N / DOCUMENT R E V I E W S H E E T

TUNNEL PRE-FINAL M&E ISD  –  MGKT REPLIES

MMC Gamuda KVMRT (T) Joint VentureKVMRT/MG/SBK/UG/OP/PQP/DQP/0013, Rev. 02  Page 7 of 31 

Item Referenced Document Rev Comments Responses Code

1 Please indicate the electrical service for the bored tunnel

section.

CSD/SEM drawing package will be issuedseparately.

9/7/2013

This is tunnel electrical devices drawings. Therefore, please show

all the electrical services.

6/8/2013

Please ensure it is updated in revised drawing.

Noted, to be shown

2. Please indicate the lighting arrangement, tunnel lighting box &

tunnel power box in the drawing.

This is not a tunnel CSD/SEM drawing. TheCSD/SEM drawing package will be issuedseparately

2

9/7/2013

This is tunnel ISD electrical drawings. Therefore, please show

lighting, power, earthing, LV containment and lightning

protection systems on this drawing.

6/8/2013

Please ensure it is updated in revised drawing. Noted on the

no lightning protection to be shown in this drawing.

Noted, to be shown, however, there is NOlightning protection !

Plan 

3. Please indicate the tunnel chainage on plan drawing.

This is not a chainage drawing, this is alongitudinal section of the cut & cover tunnelsection at the South Portal

2

9/7/2013

Tunnel cut and covers chainage (civil and continuous) must be

Noted, to be shown

Page 8: Tunnel UG2 (Electrical) Respond to MM

8/22/2019 Tunnel UG2 (Electrical) Respond to MM

http://slidepdf.com/reader/full/tunnel-ug2-electrical-respond-to-mm 8/31

 

MMC GAMUDA KVMRT (T) SDN. BHD.PROJEK MASS RAPID TRANSIT LEMBAH KLANG

UNDERGROUND WORKS (TUNNELS, STATIONS & ASSOCIATED STRUCTURES) BETWEEN

SEMANTAN NORTH PORTAL AND MALURI SOUTH PORTAL 

D E S I G N / DOCUMENT R E V I E W S H E E T

TUNNEL PRE-FINAL M&E ISD  –  MGKT REPLIES

MMC Gamuda KVMRT (T) Joint VentureKVMRT/MG/SBK/UG/OP/PQP/DQP/0013, Rev. 02  Page 8 of 31 

Item Referenced Document Rev Comments Responses Code

shown.

6/8/2013

Please ensure it is updated in revised drawing.

Longitudinal Section

4. Please label the building located below ground level at thebeginning of cut & cover structure.

This is not a building, refer to drawingKVMRT/MG/SBK/UG2/TNL/EL/TNB/LS/1003 RevD00. A note will however be added to this locationto refer to the same drawing

2

9/7/2013

Isn‟t it South Portal building? 

6/8/2013

No note was added. Please ensure it is added in revised

drawing.

Refer to initial comment

9 KVMRT/MG/SBK/UG2/TNL/EL/TNB/LS/1002 D00

D01 

1. Please refer to Item 8 (1) and Item 8 (2) Refer to comments on Item 8(1) and Item 8(2) 2

9/7/2013

Refer replies to comments on Item 8(1) and Item 8(2).

6/8/2013

Refer replies to comments on Item 8(1) and Item 8(2). 

Refer to comments on Item 8(1) and Item 8(2)

10 KVMRT/MG/SBK/UG2/TNL/EL/TNB/LS/1003 D00

D01 

1 Please include the longitudinal section drawing. Refer to drawingKVMRT/MG/SBK/UG2/TNL/EL/TNB/LS/1001 RevD00. A note will however be added to this drawingto refer to the said drawing

2

9/7/2013

Noted. 

Page 9: Tunnel UG2 (Electrical) Respond to MM

8/22/2019 Tunnel UG2 (Electrical) Respond to MM

http://slidepdf.com/reader/full/tunnel-ug2-electrical-respond-to-mm 9/31

 

MMC GAMUDA KVMRT (T) SDN. BHD.PROJEK MASS RAPID TRANSIT LEMBAH KLANG

UNDERGROUND WORKS (TUNNELS, STATIONS & ASSOCIATED STRUCTURES) BETWEEN

SEMANTAN NORTH PORTAL AND MALURI SOUTH PORTAL 

D E S I G N / DOCUMENT R E V I E W S H E E T

TUNNEL PRE-FINAL M&E ISD  –  MGKT REPLIES

MMC Gamuda KVMRT (T) Joint VentureKVMRT/MG/SBK/UG/OP/PQP/DQP/0013, Rev. 02  Page 9 of 31 

Item Referenced Document Rev Comments Responses Code

2 Please refer to Item 8 (1) and Item 8 (2) Refer to comments on Item 8(1) and Item 8(2) 2

9/7/2013

Refer replies to comments on Item 8(1) and Item 8(2).

6/8/2013

No note was added. Please ensure it is added in revised

drawing.

Refer to comments on Item 8(1) and Item 8(2)

11 KVMRT/MG/SBK/UG2/TNL/EL/TNB/TYP/1001 D00

D01 

1 The tunnel cross section drawing is not in accordance with the

latest layout agreed. Please revise. 

The tunnel cross section‟s purpose is to show thelocation of the different disciplines. The final spaceproofing of the tunnel is still in abeyance.

2

9/7/2013

The final space proofing drawings were issued to us by MM.

Please ensure it reflects the same in the revised set of this

submission.

6/8/2013

Please ensure it is updated in revised drawing.

Noted, to be shown

2 Please ensure the lux level for tunnel lighting meets NFPA130

requirement.

Noted, will be checked. 2

9/7/2013

Please ensure it is updated in revised drawing.

6/8/2013

Please ensure it is updated in revised drawing.

Noted, to be updated

12 KVMRT/MG/SBK/UG2/TNL/EL/TNB/TYP/1002 D00

D01 

1 On tunnel power box SLD, the ELD is provided to only one of

the outgoing circuits. Please explain.

It is standard electrical principles to be used forSPN outlets only as the TPN SSO‟s are normally

2

Page 10: Tunnel UG2 (Electrical) Respond to MM

8/22/2019 Tunnel UG2 (Electrical) Respond to MM

http://slidepdf.com/reader/full/tunnel-ug2-electrical-respond-to-mm 10/31

 

MMC GAMUDA KVMRT (T) SDN. BHD.PROJEK MASS RAPID TRANSIT LEMBAH KLANG

UNDERGROUND WORKS (TUNNELS, STATIONS & ASSOCIATED STRUCTURES) BETWEEN

SEMANTAN NORTH PORTAL AND MALURI SOUTH PORTAL 

D E S I G N / DOCUMENT R E V I E W S H E E T

TUNNEL PRE-FINAL M&E ISD  –  MGKT REPLIES

MMC Gamuda KVMRT (T) Joint VentureKVMRT/MG/SBK/UG/OP/PQP/DQP/0013, Rev. 02  Page 10 of 31 

Item Referenced Document Rev Comments Responses Code

used for equipment that will have a leakagecurrent and therefore will cause nuisance trippingof the ELD (example, welding machines)

9/7/2013

Please use standardized drawing as discussed previously.

 ACAD drawing given to MM.

MM not in agreement and therefore status quo tobe kept

2 Please include „ELU‟ in Abbreviations  Noted, will be included 2

9/7/2013

Please ensure it is updated in revised drawing.

Noted, to be updated

13 KVMRT/MG/SBK/UG2/TNL/EL/E/TYP/1001 D00

D01 

1 Refer General Comments Refer general response  2

9/7/2013

Suggest to combine drawing no „../E/TYP/1001‟ and

„../E/TYP/1002‟ details in a single drawing as it shows the

details of reinforcement and contacts for continuity.

6/8/2013Please state reason why

MM not in agreement

14 KVMRT/MG/SBK/UG2/TNL/EL/E/TYP/1002 D00

D01 

1 Refer General Comments Refer general response  2

9/7/2013

Suggest to combine drawing no „../E/TYP/1001‟ and

„../E/TYP/1002‟ details in a single drawing as it shows the

details of reinforcement and contacts for continuity.

6/8/2013

MM not in agreement

Page 11: Tunnel UG2 (Electrical) Respond to MM

8/22/2019 Tunnel UG2 (Electrical) Respond to MM

http://slidepdf.com/reader/full/tunnel-ug2-electrical-respond-to-mm 11/31

 

MMC GAMUDA KVMRT (T) SDN. BHD.PROJEK MASS RAPID TRANSIT LEMBAH KLANG

UNDERGROUND WORKS (TUNNELS, STATIONS & ASSOCIATED STRUCTURES) BETWEEN

SEMANTAN NORTH PORTAL AND MALURI SOUTH PORTAL 

D E S I G N / DOCUMENT R E V I E W S H E E T

TUNNEL PRE-FINAL M&E ISD  –  MGKT REPLIES

MMC Gamuda KVMRT (T) Joint VentureKVMRT/MG/SBK/UG/OP/PQP/DQP/0013, Rev. 02  Page 11 of 31 

Item Referenced Document Rev Comments Responses Code

Please state reason why

15 KVMRT/MG/SBK/UG2/TNL/EL/E/TYP/1003 D00

D01 

1 Refer General Comments Refer general response  2

9/7/2013

Suggest to combine drawing no „../E/TYP/1003‟,„../E/TYP/1004‟ and „../E/TYP/1005‟ details in a single drawing

as details shown are on earthing pit.

6/8/2013

Please state reason why

MM not in agreement

16 KVMRT/MG/SBK/UG2/TNL/EL/E/TYP/1004 D00

D01 

1. Please indicate the depth of the inspection pit & earth rod

size.

This drawing is showing general layout andinformation. Each rod size (length) and pit sizewill be specific to site conditions, soil resistivitytests and detail calculations.

The generic Note on the drawing clearly indicatesthat all information on any of the general drawinglayouts should be read in conjunction with „alllightning protection drawings‟. 

2

9/7/2013

Suggest to combine drawing no „../E/TYP/1003‟,

„../E/TYP/1004‟ and „../E/TYP/1005‟ details in a single drawing

as details shown are on earthing pit.

6/8/2013

Please state reason why

MM not in agreement

17 KVMRT/MG/SBK/UG2/TNL/EL/E/TYP/1005 D00 1 Please refer to comment on item 16 (1) above. Refer to comment on Item 16 (1) 2

Page 12: Tunnel UG2 (Electrical) Respond to MM

8/22/2019 Tunnel UG2 (Electrical) Respond to MM

http://slidepdf.com/reader/full/tunnel-ug2-electrical-respond-to-mm 12/31

 

MMC GAMUDA KVMRT (T) SDN. BHD.PROJEK MASS RAPID TRANSIT LEMBAH KLANG

UNDERGROUND WORKS (TUNNELS, STATIONS & ASSOCIATED STRUCTURES) BETWEEN

SEMANTAN NORTH PORTAL AND MALURI SOUTH PORTAL 

D E S I G N / DOCUMENT R E V I E W S H E E T

TUNNEL PRE-FINAL M&E ISD  –  MGKT REPLIES

MMC Gamuda KVMRT (T) Joint VentureKVMRT/MG/SBK/UG/OP/PQP/DQP/0013, Rev. 02  Page 12 of 31 

Item Referenced Document Rev Comments Responses Code

D01 

9/7/2013

Suggest to combine drawing no „../E/TYP/1003‟,

„../E/TYP/1004‟ and „../E/TYP/1005‟ details in a single drawing

as details shown are on earthing pit.

6/8/2013

Please state reason why

MM not in agreement

18 KVMRT/MG/SBK/UG2/TNL/EL/E/TYP/1006 D00

D01 

1. Only copper tape to be used as down conductor as per

M&WS.

Both material (Cu and Alu) are shown on thedrawing, again, this is a generic drawing and thesame comments as per Item 16 (1) are applicable

2

9/7/2013

Suggest to combine drawing no „../E/TYP/1006‟, and

„../E/TYP/1007‟ details in a single drawing as details shown

are for connectors and clamps.

6/8/2013

Please state reason why

MM not in agreement

19 KVMRT/MG/SBK/UG2/TNL/EL/E/TYP/1007 D00

D01 

1. Refer General Comments Refer general response  2

9/7/2013

Suggest to combine drawing no „../E/TYP/1006‟, and„../E/TYP/1007‟ details in a same drawing as details shown arefor connectors and clamps.

6/8/2013

Please state reason why

MM not in agreement

20 KVMRT/MG/SBK/UG2/TNL/EL/E/TYP/1008 D01 1 Refer General Comments  Refer general response  2

Page 13: Tunnel UG2 (Electrical) Respond to MM

8/22/2019 Tunnel UG2 (Electrical) Respond to MM

http://slidepdf.com/reader/full/tunnel-ug2-electrical-respond-to-mm 13/31

 

MMC GAMUDA KVMRT (T) SDN. BHD.PROJEK MASS RAPID TRANSIT LEMBAH KLANG

UNDERGROUND WORKS (TUNNELS, STATIONS & ASSOCIATED STRUCTURES) BETWEEN

SEMANTAN NORTH PORTAL AND MALURI SOUTH PORTAL 

D E S I G N / DOCUMENT R E V I E W S H E E T

TUNNEL PRE-FINAL M&E ISD  –  MGKT REPLIES

MMC Gamuda KVMRT (T) Joint VentureKVMRT/MG/SBK/UG/OP/PQP/DQP/0013, Rev. 02  Page 13 of 31 

Item Referenced Document Rev Comments Responses Code

D02 

9/7/2013

Suggest to combine drawing no „../E/TYP/1008‟,„../E/TYP/1009‟ and „../E/TYP/1010‟ details in a single drawing.  

6/8/2013

Please state reason why

MM not in agreement

21 KVMRT/MG/SBK/UG2/TNL/EL/E/TYP/1009 D01

D02 

1 Refer General Comments Refer general response  2

9/7/2013

Suggest to combine drawing no „../E/TYP/1008‟,„../E/TYP/1009‟ and „../E/TYP/1010‟ details in a single drawing  

6/8/2013

Please state reason why

MM not in agreement

22 KVMRT/MG/SBK/UG2/TNL/EL/E/TYP/1010 D01

D02 

1 Refer General Comments  Refer general response  2

9/7/2013

Suggest to combine drawing no „../E/TYP/1008‟,„../E/TYP/1009‟ and „../E/TYP/1010‟ details in a single drawing.  

MM not in agreement

23 KVMRT/MG/SBK/UG2/TNL/EL/E/TYP/1011 D01

D02 

1 Refer General Comments  Refer general response  1

24 KVMRT/MG/SBK/UG2/TNL/EL/E/TYP/1012 D01D02 

1 Air termination conductor should be 12.5mm diameter and not

less than 450mm above ridge level. Please amend.

Please be specific where this requirement isdocumented

2

9/7/2013

Requirements are as stipulated in M&WS 529.3.2.

Suggest to combine drawing no „../E/TYP/1012‟,

„../E/TYP/1014‟ and „../E/TYP/1015‟ details in a single drawing.

MM not in agreement

Page 14: Tunnel UG2 (Electrical) Respond to MM

8/22/2019 Tunnel UG2 (Electrical) Respond to MM

http://slidepdf.com/reader/full/tunnel-ug2-electrical-respond-to-mm 14/31

 

MMC GAMUDA KVMRT (T) SDN. BHD.PROJEK MASS RAPID TRANSIT LEMBAH KLANG

UNDERGROUND WORKS (TUNNELS, STATIONS & ASSOCIATED STRUCTURES) BETWEEN

SEMANTAN NORTH PORTAL AND MALURI SOUTH PORTAL 

D E S I G N / DOCUMENT R E V I E W S H E E T

TUNNEL PRE-FINAL M&E ISD  –  MGKT REPLIES

MMC Gamuda KVMRT (T) Joint VentureKVMRT/MG/SBK/UG/OP/PQP/DQP/0013, Rev. 02  Page 14 of 31 

Item Referenced Document Rev Comments Responses Code

 As it shows information on roof

6/8/2013

Please state reason why

25 KVMRT/MG/SBK/UG2/TNL/EL/E/TYP/1013 D01

D02 

1 Refer General Comments Refer general response  2

9/7/2013

Suggest to combine drawing no „../E/TYP/1012‟,

„../E/TYP/1014‟ and „../E/TYP/1015‟ details in a single drawing.

 As it shows information on roof

6/8/2013

Please state reason why

MM not in agreement

26 KVMRT/MG/SBK/UG2/TNL/EL/E/TYP/1014 D01

D02 

1 Refer General Comments Refer general response  2

9/7/2013

Suggest to combine drawing no „../E/TYP/1012‟,

„../E/TYP/1014‟ and „../E/TYP/1015‟ details in a single drawing.

 As it shows information on roof

6/8/2013

Please state reason why

MM not in agreement

27 KVMRT/MG/SBK/UG2/TNL/EL/E/TYP/1015 D01

D02 

1 Refer General Comments Refer general response  2

9/7/2013

Suggest to combine drawing no „../E/TYP/1012‟,

MM not in agreement

Page 15: Tunnel UG2 (Electrical) Respond to MM

8/22/2019 Tunnel UG2 (Electrical) Respond to MM

http://slidepdf.com/reader/full/tunnel-ug2-electrical-respond-to-mm 15/31

 

MMC GAMUDA KVMRT (T) SDN. BHD.PROJEK MASS RAPID TRANSIT LEMBAH KLANG

UNDERGROUND WORKS (TUNNELS, STATIONS & ASSOCIATED STRUCTURES) BETWEEN

SEMANTAN NORTH PORTAL AND MALURI SOUTH PORTAL 

D E S I G N / DOCUMENT R E V I E W S H E E T

TUNNEL PRE-FINAL M&E ISD – 

 MGKT REPLIES

MMC Gamuda KVMRT (T) Joint VentureKVMRT/MG/SBK/UG/OP/PQP/DQP/0013, Rev. 02  Page 15 of 31 

Item Referenced Document Rev Comments Responses Code

„../E/TYP/1014‟ and „../E/TYP/1015‟ details in a single drawing.

 As it shows information on roof

6/8/2013

Please state reason why

28 KVMRT/MG/SBK/UG2/TNL/EL/E/TYP/1016 D01

D02 

1 Refer General Comments Refer general response  2

9/7/2013

Suggest to combine drawing no „../E/TYP/1016‟,

„../E/TYP/1017‟, „../E/TYP/1021‟ and „../E/TYP/1022‟ details in

a single drawing.

6/8/2013

Please state reason why

MM not in agreement

29 KVMRT/MG/SBK/UG2/TNL/EL/E/TYP/1017 D01

D02 

1 Refer General Comments Refer general response  2

9/7/2013

Suggest to combine drawing no „../E/TYP/1016‟,

„../E/TYP/1017‟, „../E/TYP/1021‟ and „../E/TYP/1022‟ details in

a single drawing.

6/8/2013

Please state reason why

MM not in agreement

30 KVMRT/MG/SBK/UG2/TNL/EL/E/TYP/1018 D01

D02 

1 According to MW&S, earthing conductor shall be buried at

least 750mm below ground. Please revise.

Noted, will be updated 2

Page 16: Tunnel UG2 (Electrical) Respond to MM

8/22/2019 Tunnel UG2 (Electrical) Respond to MM

http://slidepdf.com/reader/full/tunnel-ug2-electrical-respond-to-mm 16/31

 

MMC GAMUDA KVMRT (T) SDN. BHD.PROJEK MASS RAPID TRANSIT LEMBAH KLANG

UNDERGROUND WORKS (TUNNELS, STATIONS & ASSOCIATED STRUCTURES) BETWEEN

SEMANTAN NORTH PORTAL AND MALURI SOUTH PORTAL 

D E S I G N / DOCUMENT R E V I E W S H E E T

TUNNEL PRE-FINAL M&E ISD – 

 MGKT REPLIES

MMC Gamuda KVMRT (T) Joint VentureKVMRT/MG/SBK/UG/OP/PQP/DQP/0013, Rev. 02  Page 16 of 31 

Item Referenced Document Rev Comments Responses Code

9/7/2013

Suggest to combine drawing no „../E/TYP/1018‟,

„../E/TYP/1019‟, „../E/TYP/1020‟ and „../E/TYP/1023‟ details in

a single drawing.

6/8/2013

Please state reason why

MM not in agreement

31 KVMRT/MG/SBK/UG2/TNL/EL/E/TYP/1019 D01

D02 

1. Please refer to comment on item 30 (1) above. Noted, will be updated 2

9/7/2013

Suggest to combine drawing no „../E/TYP/1018‟, „../E/TYP/1019‟,

„../E/TYP/1020‟ and „../E/TYP/1023‟ details in a single drawing. 

6/8/2013

Please state reason why

MM not in agreement

32 KVMRT/MG/SBK/UG2/TNL/EL/E/TYP/1020 D01

D02 

1 Please refer to comment on item 30 (1) above. Noted, will be updated 2

9/7/2013

Suggest to combine drawing no „../E/TYP/1018‟,

„../E/TYP/1019‟, „../E/TYP/1020‟ and „../E/TYP/1023‟ details in

a single drawing.

6/8/2013

Please state reason why

MM not in agreement

33 KVMRT/MG/SBK/UG2/TNL/EL/E/TYP/1021 D01

D02 

1. Refer General Comments Refer general response 2

Page 17: Tunnel UG2 (Electrical) Respond to MM

8/22/2019 Tunnel UG2 (Electrical) Respond to MM

http://slidepdf.com/reader/full/tunnel-ug2-electrical-respond-to-mm 17/31

 

MMC GAMUDA KVMRT (T) SDN. BHD.PROJEK MASS RAPID TRANSIT LEMBAH KLANG

UNDERGROUND WORKS (TUNNELS, STATIONS & ASSOCIATED STRUCTURES) BETWEEN

SEMANTAN NORTH PORTAL AND MALURI SOUTH PORTAL 

D E S I G N / DOCUMENT R E V I E W S H E E T

TUNNEL PRE-FINAL M&E ISD – 

 MGKT REPLIES

MMC Gamuda KVMRT (T) Joint VentureKVMRT/MG/SBK/UG/OP/PQP/DQP/0013, Rev. 02  Page 17 of 31 

Item Referenced Document Rev Comments Responses Code

9/7/2013

Suggest to combine drawing no „../E/TYP/1016‟,

„../E/TYP/1017‟, „../E/TYP/1021‟ and „../E/TYP/1022‟ details in

a single drawing.

6/8/2013

Please state reason why

MM not in agreement

34 KVMRT/MG/SBK/UG2/TNL/EL/E/TYP/1022 D01

D02 

1. Refer General Comments Refer general response 2

9/7/2013

Suggest to combine drawing no „../E/TYP/1016‟,

„../E/TYP/1017‟, „../E/TYP/1021‟ and „../E/TYP/1022‟ details in

a single drawing.

6/8/2013

Please state reason why

MM not in agreement

35 KVMRT/MG/SBK/UG2/TNL/EL/E/TYP/1023 D01

D02 

1. Please refer to comment on item 30 (1) above. Noted, will be updated 2

9/7/2013

Suggest to combine drawing no „../E/TYP/1018‟,

„../E/TYP/1019‟, „../E/TYP/1020‟ and „../E/TYP/1023‟ details in

a single drawing.

6/8/2013

Please state reason why

MM not in agreement

36 KVMRT/MG/SBK/UG2/TNL/EL/E/TYP/1024 D01 1 Refer General Comments Refer general response 2

Page 18: Tunnel UG2 (Electrical) Respond to MM

8/22/2019 Tunnel UG2 (Electrical) Respond to MM

http://slidepdf.com/reader/full/tunnel-ug2-electrical-respond-to-mm 18/31

 

MMC GAMUDA KVMRT (T) SDN. BHD.PROJEK MASS RAPID TRANSIT LEMBAH KLANG

UNDERGROUND WORKS (TUNNELS, STATIONS & ASSOCIATED STRUCTURES) BETWEEN

SEMANTAN NORTH PORTAL AND MALURI SOUTH PORTAL 

D E S I G N / DOCUMENT R E V I E W S H E E T

TUNNEL PRE-FINAL M&E ISD – 

 MGKT REPLIES

MMC Gamuda KVMRT (T) Joint VentureKVMRT/MG/SBK/UG/OP/PQP/DQP/0013, Rev. 02  Page 18 of 31 

Item Referenced Document Rev Comments Responses Code

D02 

9/7/2013

Kindly provide space proofing details in your revised drawing.

6/8/2013

Please ensure it is updated in revised drawings.

Noted, to be shown

37 KVMRT/MG/SBK/UG2/TNL/EL/E/TYP/1025 D01

D02 

1 Refer General Comments Refer general response 2

9/7/2013

i. Tunnel earthing bonding systems should reflect the

bonding for system in tunnel as per design. Please

show. 

6/8/2013

Please ensure it is updated in revised drawings.

Noted, to be shown

ii. Please use cable hangers instead of cable baskets.

6/8/2013

Please ensure it is updated in revised drawings.

Noted, to be shown

iii. Please include details of 10mm2 and 150mm2 BCEW

bonding.

6/8/2013

Please ensure it is updated in revised drawings.

Noted, to be shown

38 KVMRT/MG/SBK/UG2/TNL/EL/E/TYP/1026 D01 1 Please indicate the EMI filter will be under which contractor‟s The EMI filter is shown as an integral part of the 2

Page 19: Tunnel UG2 (Electrical) Respond to MM

8/22/2019 Tunnel UG2 (Electrical) Respond to MM

http://slidepdf.com/reader/full/tunnel-ug2-electrical-respond-to-mm 19/31

 

MMC GAMUDA KVMRT (T) SDN. BHD.PROJEK MASS RAPID TRANSIT LEMBAH KLANG

UNDERGROUND WORKS (TUNNELS, STATIONS & ASSOCIATED STRUCTURES) BETWEEN

SEMANTAN NORTH PORTAL AND MALURI SOUTH PORTAL 

D E S I G N / DOCUMENT R E V I E W S H E E T

TUNNEL PRE-FINAL M&E ISD – 

 MGKT REPLIES

MMC Gamuda KVMRT (T) Joint VentureKVMRT/MG/SBK/UG/OP/PQP/DQP/0013, Rev. 02  Page 19 of 31 

Item Referenced Document Rev Comments Responses Code

D02  scope of work. M&E technical rooms therefore will be suppliedand installed by electrical contractor, if needed.

9/7/2013

This is contradicting with you Cochrane ISD response. Which

is correct? By civil or systems?

6/8/2013

Please put note to indicate that it‟s by others. 

Systems

2 Is there any water pipe for UG2? If not, please remove it from

earthing & bonding diagram.

 All fire hydrants are fed with „water‟ ??  2

9/7/2013

There is already one indicated for fire hydrant. So please

remove „water‟. 

6/8/2013

Please ensure it is updated in revised drawings.

Noted, to be removed

3 Please change M&E technical rooms to LV Switch Room. Noted, will be changed 2

9/7/2013

Please ensure it is updated in revised drawing.

6/8/2013

Please ensure it is updated in revised drawings.

Noted, will be updated

4 There will be no cable containment in tunnel. Please revise. There will be cable containment at crossovers and 2

Page 20: Tunnel UG2 (Electrical) Respond to MM

8/22/2019 Tunnel UG2 (Electrical) Respond to MM

http://slidepdf.com/reader/full/tunnel-ug2-electrical-respond-to-mm 20/31

 

MMC GAMUDA KVMRT (T) SDN. BHD.PROJEK MASS RAPID TRANSIT LEMBAH KLANG

UNDERGROUND WORKS (TUNNELS, STATIONS & ASSOCIATED STRUCTURES) BETWEEN

SEMANTAN NORTH PORTAL AND MALURI SOUTH PORTAL 

D E S I G N / DOCUMENT R E V I E W S H E E T

TUNNEL PRE-FINAL M&E ISD – 

 MGKT REPLIES

MMC Gamuda KVMRT (T) Joint VentureKVMRT/MG/SBK/UG/OP/PQP/DQP/0013, Rev. 02  Page 20 of 31 

Item Referenced Document Rev Comments Responses Code

at ES3 and South Portal entrances from the tunnel

9/7/2013

Noted. Please indicate in the drawings of the cable

containments refer to J-hangers.

6/8/2013

Please ensure it is updated in revised drawings.

Noted, to be shown

5 „FIBRE OPTIC ARMOURED CABLE SHEATH‟  and „HV

CABLE SHROUD TO EARTHING GRID‟ are  outside of our

scope of work. Please revise.

Noted, will be changed 2

9/7/2013

Please ensure it is updated in revised drawing.

6/8/2013

Please ensure it is updated in revised drawings.

Noted, to be updated

6 Please change „JET FANS‟ to „AXIAL FANS‟.  Noted, will be changed 2

9/7/2013

Please ensure it is updated in revised drawing.

6/8/2013

Please ensure it is updated in revised drawings.

Noted, to be updated

7 Is it necessary to have „HVAC DUCTING AND SUPPORT

STEEL STRUCTURAL STEEL MEMBERS‟? Please clarify.

Inside the station box (part of tunnel) all extractand supply ventilation equipment has to be

1

Page 21: Tunnel UG2 (Electrical) Respond to MM

8/22/2019 Tunnel UG2 (Electrical) Respond to MM

http://slidepdf.com/reader/full/tunnel-ug2-electrical-respond-to-mm 21/31

 

MMC GAMUDA KVMRT (T) SDN. BHD.PROJEK MASS RAPID TRANSIT LEMBAH KLANG

UNDERGROUND WORKS (TUNNELS, STATIONS & ASSOCIATED STRUCTURES) BETWEEN

SEMANTAN NORTH PORTAL AND MALURI SOUTH PORTAL 

D E S I G N / DOCUMENT R E V I E W S H E E T

TUNNEL PRE-FINAL M&E ISD – 

 MGKT REPLIES

MMC Gamuda KVMRT (T) Joint VentureKVMRT/MG/SBK/UG/OP/PQP/DQP/0013, Rev. 02  Page 21 of 31 

Item Referenced Document Rev Comments Responses Code

bonded. Equipotential bonding is basic electricalprinciples.

9/7/2013

Noted

8 Is it necessary to bond fire doors in tunnel? Please advise. All electrical conductive material in the tunnelsshould be bonded, again, basic earthing

principles.

1

9/7/2013

Noted

9 Please amend „insulation membrane‟ to „earth insulation

membrane.

Noted, will be added 2

9/7/2013

Please ensure it is updated in revised drawing.

6/8/2013

Please ensure it is updated in revised drawings.

Noted, to be updated

10 Please clarify what does the „CASE‟ in „LOCATION CASE IN

TUNNEL‟ refers to? 

System equipment 2

9/7/2013

Could it be shown as system equipment instead of Location Case

in the drawing?

6/8/2013

To be shown by Systems

Page 22: Tunnel UG2 (Electrical) Respond to MM

8/22/2019 Tunnel UG2 (Electrical) Respond to MM

http://slidepdf.com/reader/full/tunnel-ug2-electrical-respond-to-mm 22/31

 

MMC GAMUDA KVMRT (T) SDN. BHD.PROJEK MASS RAPID TRANSIT LEMBAH KLANG

UNDERGROUND WORKS (TUNNELS, STATIONS & ASSOCIATED STRUCTURES) BETWEEN

SEMANTAN NORTH PORTAL AND MALURI SOUTH PORTAL 

D E S I G N / DOCUMENT R E V I E W S H E E T

TUNNEL PRE-FINAL M&E ISD – 

 MGKT REPLIES

MMC Gamuda KVMRT (T) Joint VentureKVMRT/MG/SBK/UG/OP/PQP/DQP/0013, Rev. 02  Page 22 of 31 

Item Referenced Document Rev Comments Responses Code

Please ensure it is updated in revised drawings.

11 Please clarify what does „ONLY AT CERTAIN LENGTHS IN

TUNNEL‟ means. 

Only where there are signal cables. 2

9/7/2013

Could the separate box be removed and written in brackets

after note “10mm2

BCEW TO BE BONDED TO EACH S&T

BRACKET”?

6/8/2013

Please state reason why.

MM not in agreement

39 KVMRT/MG/SBK/UG2/TNL/EL/E/TYP/1027 D01

D02 

1 Tunnel cross section drawing is not in accordance to latest

layout. Please check.

The tunnel cross section‟s purpose is to show thelocation of the different disciplines. The finalspace proofing of the tunnel is still in abeyance.

2

9/7/2013

The final space proofing drawings have been finalized by MM.Please ensure it reflects the same in the revised set of this

submission.

6/8/2013

Please ensure it is updated in revised drawings.

Noted, to be shown

2 Please follow the outcome from tunnel CSD/SEM coordination

meeting with systems contractor.

This is the point made in Item 39 (1) 1

9/7/2013

Page 23: Tunnel UG2 (Electrical) Respond to MM

8/22/2019 Tunnel UG2 (Electrical) Respond to MM

http://slidepdf.com/reader/full/tunnel-ug2-electrical-respond-to-mm 23/31

 

MMC GAMUDA KVMRT (T) SDN. BHD.PROJEK MASS RAPID TRANSIT LEMBAH KLANG

UNDERGROUND WORKS (TUNNELS, STATIONS & ASSOCIATED STRUCTURES) BETWEEN

SEMANTAN NORTH PORTAL AND MALURI SOUTH PORTAL 

D E S I G N / DOCUMENT R E V I E W S H E E T

TUNNEL PRE-FINAL M&E ISD – 

 MGKT REPLIES

MMC Gamuda KVMRT (T) Joint VentureKVMRT/MG/SBK/UG/OP/PQP/DQP/0013, Rev. 02  Page 23 of 31 

Item Referenced Document Rev Comments Responses Code

Noted.

40 KVMRT/MG/SBK/UG2/TNL/EL/E/TYP/1028 D01

D02 

1 Please change the label „ESCAPE SHAFT‟ to „SOUTH

PORTAL BUILDING‟. 

The South Portal will also be used as an escapeshaft and the „escape „shaft‟ wording refers to theshaft for escaping within the South Portal

2

9/7/2013

Please change it to South Portal building to avoid confusion.

6/8/2013

Please ensure it is updated in revised drawings.

Noted, to be changed

2. There are no M&E services shown in this drawing. Please

explain the reason why this drawing is included in this

submission.

 Although there are no disciplines shown on thisdrawing, it is part of the entire tunnel design

2

9/7/2013

This drawing shows the same details as per drawing

„…/TNB/LS/1001‟ to „…/TNB/LS/1003‟. Please keep either one

of the drawings only.

6/8/2013

Please state reason why.

MM in disagreement

41 KVMRT/MG/SBK/UG2/TNL/EL/E/TYP/1029 D01

D02 

1 Please refer to comment from Item 40 (1) and Item 40 (2)

above.

Refer to responses in Item 40 (1) and Item 40 (2) 2

9/7/2013

 As this is part of tunnel electrical ISD, please show the

electrical services in these cross sections.

Refer to responses in Item 40 (1) and Item 40 (2)

Page 24: Tunnel UG2 (Electrical) Respond to MM

8/22/2019 Tunnel UG2 (Electrical) Respond to MM

http://slidepdf.com/reader/full/tunnel-ug2-electrical-respond-to-mm 24/31

 

MMC GAMUDA KVMRT (T) SDN. BHD.PROJEK MASS RAPID TRANSIT LEMBAH KLANG

UNDERGROUND WORKS (TUNNELS, STATIONS & ASSOCIATED STRUCTURES) BETWEEN

SEMANTAN NORTH PORTAL AND MALURI SOUTH PORTAL 

D E S I G N / DOCUMENT R E V I E W S H E E T

TUNNEL PRE-FINAL M&E ISD – 

 MGKT REPLIES

MMC Gamuda KVMRT (T) Joint VentureKVMRT/MG/SBK/UG/OP/PQP/DQP/0013, Rev. 02  Page 24 of 31 

Item Referenced Document Rev Comments Responses Code

6/8/2013

Please refer item 40 (1) and item 40 (2).

2 The emergency walkway structure detail is inaccurate. Please

check.

The tunnel walkway structure in relation to allother disciplines is in abeyance. Refer tocomment in Item 39 (1) and item 39 (2)

2

9/7/2013

 As this is part of tunnel electrical ISD, please show the

electrical services in these cross sections.

6/8/2013

Please refer item 39(1) and item 39 (2).

The tunnel walkway structure in relation to allother disciplines is in abeyance. Refer tocomment in Item 39 (1) and item 39 (2)

42 KVMRT/MG/SBK/UG2/TNL/EL/E/TYP/1030 D00

D01 

1. Please refer to comment from Item 40 (2) above. Refer to response in item 40(2) 2

9/7/2013

i. Please check with your architects or C&S team on the

final agreement on noise barriers at this area 

6/8/2013

Please confirm that noise barrier has been coordinated with

architects or C&S team. 

Noted, will check

ii. Please show electrical services at these cross sections

so that it is relevant to serve tunnel ISD electrical

submission.

6/8/2013

Refer to response in item 40(2)

Page 25: Tunnel UG2 (Electrical) Respond to MM

8/22/2019 Tunnel UG2 (Electrical) Respond to MM

http://slidepdf.com/reader/full/tunnel-ug2-electrical-respond-to-mm 25/31

 

MMC GAMUDA KVMRT (T) SDN. BHD.PROJEK MASS RAPID TRANSIT LEMBAH KLANG

UNDERGROUND WORKS (TUNNELS, STATIONS & ASSOCIATED STRUCTURES) BETWEEN

SEMANTAN NORTH PORTAL AND MALURI SOUTH PORTAL 

D E S I G N / DOCUMENT R E V I E W S H E E T

TUNNEL PRE-FINAL M&E ISD – 

 MGKT REPLIES

MMC Gamuda KVMRT (T) Joint VentureKVMRT/MG/SBK/UG/OP/PQP/DQP/0013, Rev. 02  Page 25 of 31 

Item Referenced Document Rev Comments Responses Code

Please refer item 40 (2).

43 KVMRT/MG/SBK/UG2/TNL/EL/E/TYP/1031 D00

D01 

1. Please show the cable transition details coming from circular

tunnel cross section to this cross section.

Cable routing will follow the shown cable hangers. 2

9/7/2013

The final space proofing drawings have been finalized by MM.

Please ensure it reflects the same in the revised set of this

submission.

6/8/2013

Please ensure it is updated in revised drawings.

Noted, will be updated

44 KVMRT/MG/SBK/UG2/TNL/EL/E/TYP/1032 D00

D01 

1. Please refer General Comments. Refer General response 2

9/7/2013

i. Please check with your architects or C&S team on the

final agreement on noise barriers at this area.

6/8/2013

Please confirm that noise barrier has been coordinated with

architects or C&S team. 

Noted, will check

ii. Please show electrical services at these cross sections

so that it is relevant to serve tunnel ISD electrical

submission.

6/8/2013

Please refer item 40 (2). 

Refer to response in item 40(2)

45 KVMRT/MG/SBK/UG2/TNL/EL/E/TYP/1033 D00

D01 

1. Only copper tape to be used as down conductor as per

M&WS. Please amend.

The copper tape has been changed to BCEW intechnical meetings held circa 2012 (and minuted)

Page 26: Tunnel UG2 (Electrical) Respond to MM

8/22/2019 Tunnel UG2 (Electrical) Respond to MM

http://slidepdf.com/reader/full/tunnel-ug2-electrical-respond-to-mm 26/31

 

MMC GAMUDA KVMRT (T) SDN. BHD.PROJEK MASS RAPID TRANSIT LEMBAH KLANG

UNDERGROUND WORKS (TUNNELS, STATIONS & ASSOCIATED STRUCTURES) BETWEEN

SEMANTAN NORTH PORTAL AND MALURI SOUTH PORTAL 

D E S I G N / DOCUMENT R E V I E W S H E E T

TUNNEL PRE-FINAL M&E ISD – 

 MGKT REPLIES

MMC Gamuda KVMRT (T) Joint VentureKVMRT/MG/SBK/UG/OP/PQP/DQP/0013, Rev. 02  Page 26 of 31 

Item Referenced Document Rev Comments Responses Code

9/7/2013

Noted. We suppose the change was by PDP. Kindly give us a

copy of instructions/change request for our reference.

6/8/2013

Noted 

Please liaise directly with PDP via MRTC

2. Viaduct structure is not under UGW scope. Please check. This NOT viaduct but tunnel at cut & coverbeyond South Portal !

2

9/7/2013

i. Please check with your architects or C&S team on the

final agreement on noise barriers at this area.

6/8/2013

Please confirm that noise barrier has been coordinated with

architects or C&S team. 

Noted, will check

ii. Please show electrical services at these cross sections

so that it is relevant to serve tunnel ISD electrical

submission.

6/8/2013

Please refer item 40 (2). 

Refer to response in item 40(2)

46 KVMRT/MG/SBK/UG2/TNL/EL/E/TYP/1034 D00

D01 

1. Viaduct structure is not under UGW scope. Please check. This NOT viaduct but tunnel at cut & coverbeyond South Portal !

2

9/7/2013

i. Please check with your architects or C&S team on the

final agreement on noise barriers at this area.

6/8/2013

Noted, will check

Page 27: Tunnel UG2 (Electrical) Respond to MM

8/22/2019 Tunnel UG2 (Electrical) Respond to MM

http://slidepdf.com/reader/full/tunnel-ug2-electrical-respond-to-mm 27/31

 

MMC GAMUDA KVMRT (T) SDN. BHD.PROJEK MASS RAPID TRANSIT LEMBAH KLANG

UNDERGROUND WORKS (TUNNELS, STATIONS & ASSOCIATED STRUCTURES) BETWEEN

SEMANTAN NORTH PORTAL AND MALURI SOUTH PORTAL 

D E S I G N / DOCUMENT R E V I E W S H E E T

TUNNEL PRE-FINAL M&E ISD – 

 MGKT REPLIES

MMC Gamuda KVMRT (T) Joint VentureKVMRT/MG/SBK/UG/OP/PQP/DQP/0013, Rev. 02  Page 27 of 31 

Item Referenced Document Rev Comments Responses Code

Please confirm that noise barrier has been coordinated with

architects or C&S team. 

ii. Please show electrical services at these cross sections

so that it is relevant to serve tunnel ISD electrical

submission.

6/8/2013

Please refer item 40 (2). 

Refer to response in item 40(2)

47 KVMRT/MG/SBK/UG2/TNL/EL/E/LP/0001 D00 1. All tunnel light switch is not required. Please remove it

from the layout and associated legend and description.

2. Tunnel light fitting to be spaced at 7m along tunnel.

Please amend the layout and associated legend and

description. 

2

48 KVMRT/MG/SBK/UG2/TNL/EL/E/LP/0002 D00 1. All tunnel light switch is not required. Please remove it

from the layout and associated legend and description.

2

2. Tunnel light fitting to be spaced at 7m along tunnel.

Please amend the layout and associated legend and

description.

3. Please include single line diagram drawing for tunnel

light and socket outlet distribution board.49 KVMRT/MG/SBK/UG2/TNL/EL/E/LP/0003 D00 1. All tunnel light switch is not required. Please remove it

from the layout and associated legend and description.

2

2. Tunnel light fitting to be spaced at 7m along tunnel.

Please amend the layout and associated legend and

description.

3. Please include single line diagram drawing for tunnel

light and socket outlet distribution board.

50 KVMRT/MG/SBK/UG2/TNL/EL/E/LP/0004 D00 1. All tunnel light switch is not required. Please remove it

from the layout and associated legend and description.

2

2. Tunnel light fitting to be spaced at 7m along tunnel.

Please amend the layout and associated legend and

Page 28: Tunnel UG2 (Electrical) Respond to MM

8/22/2019 Tunnel UG2 (Electrical) Respond to MM

http://slidepdf.com/reader/full/tunnel-ug2-electrical-respond-to-mm 28/31

 

MMC GAMUDA KVMRT (T) SDN. BHD.PROJEK MASS RAPID TRANSIT LEMBAH KLANG

UNDERGROUND WORKS (TUNNELS, STATIONS & ASSOCIATED STRUCTURES) BETWEEN

SEMANTAN NORTH PORTAL AND MALURI SOUTH PORTAL 

D E S I G N / DOCUMENT R E V I E W S H E E T

TUNNEL PRE-FINAL M&E ISD – 

 MGKT REPLIES

MMC Gamuda KVMRT (T) Joint VentureKVMRT/MG/SBK/UG/OP/PQP/DQP/0013, Rev. 02  Page 28 of 31 

Item Referenced Document Rev Comments Responses Code

description.

3. Please include single line diagram drawing for tunnel

light and socket outlet distribution board.

51 KVMRT/MG/SBK/UG2/TNL/EL/E/LP/0005 D00 1. All tunnel light switch is not required. Please remove it

from the layout and associated legend and description.

2

2. Tunnel light fitting to be spaced at 7m along tunnel.

Please amend the layout and associated legend and

description.

3. Please include single line diagram drawing for tunnel

light and socket outlet distribution board.

52 KVMRT/MG/SBK/UG2/TNL/EL/E/LP/0006 D00 1. All tunnel light switch is not required. Please remove it

from the layout and associated legend and description.

2

2. Tunnel light fitting to be spaced at 7m along tunnel.

Please amend the layout and associated legend and

description.

3. Please include single line diagram drawing for tunnel

light and socket outlet distribution board.

53 KVMRT/MG/SBK/UG2/TNL/EL/E/LP/0007 D00 1. All tunnel light switch is not required. Please remove it

from the layout and associated legend and description.

2

2. Tunnel light fitting to be spaced at 7m along tunnel.

Please amend the layout and associated legend and

description.

3. Please include single line diagram drawing for tunnel

light and socket outlet distribution board.

54 KVMRT/MG/SBK/UG2/TNL/EL/E/LP/0008 D00 1. All tunnel light switch is not required. Please remove it

from the layout and associated legend and description.

2

2. Tunnel light fitting to be spaced at 7m along tunnel.

Please amend the layout and associated legend and

description.

3. Please include single line diagram drawing for tunnel

Page 29: Tunnel UG2 (Electrical) Respond to MM

8/22/2019 Tunnel UG2 (Electrical) Respond to MM

http://slidepdf.com/reader/full/tunnel-ug2-electrical-respond-to-mm 29/31

 

MMC GAMUDA KVMRT (T) SDN. BHD.PROJEK MASS RAPID TRANSIT LEMBAH KLANG

UNDERGROUND WORKS (TUNNELS, STATIONS & ASSOCIATED STRUCTURES) BETWEEN

SEMANTAN NORTH PORTAL AND MALURI SOUTH PORTAL 

D E S I G N / DOCUMENT R E V I E W S H E E T

TUNNEL PRE-FINAL M&E ISD – 

 MGKT REPLIES

MMC Gamuda KVMRT (T) Joint VentureKVMRT/MG/SBK/UG/OP/PQP/DQP/0013, Rev. 02  Page 29 of 31 

Item Referenced Document Rev Comments Responses Code

light and socket outlet distribution board.

55 KVMRT/MG/SBK/UG2/TNL/EL/E/LP/0009 D00 1. All tunnel light switch is not required. Please remove it

from the layout and associated legend and description.

2

2. Tunnel light fitting to be spaced at 7m along tunnel.

Please amend the layout and associated legend and

description.

3. Please include single line diagram drawing for tunnel

light and socket outlet distribution board.

56 KVMRT/MG/SBK/UG2/TNL/EL/E/LP/0010 D00 1. All tunnel light switch is not required. Please remove it

from the layout and associated legend and description.

2

2. Tunnel light fitting to be spaced at 7m along tunnel.

Please amend the layout and associated legend and

description.

3. Please include single line diagram drawing for tunnel

light and socket outlet distribution board.

57 KVMRT/MG/SBK/UG2/TNL/EL/E/LP/0011 D00 1. All tunnel light switch is not required. Please remove it

from the layout and associated legend and description.

2

2. Tunnel light fitting to be spaced at 7m along tunnel.

Please amend the layout and associated legend and

description.

3. Please include single line diagram drawing for tunnel

light and socket outlet distribution board.

58 KVMRT/MG/SBK/UG2/TNL/EL/E/LP/0012 D00 1. All tunnel light switch is not required. Please remove it

from the layout and associated legend and description.

2

2. Tunnel light fitting to be spaced at 7m along tunnel.

Please amend the layout and associated legend and

description.

3. Please include single line diagram drawing for tunnel

light and socket outlet distribution board.

59 KVMRT/MG/SBK/UG2/TNL/EL/E/LP/0013 D00 1. All tunnel light switch is not required. Please remove it 2

Page 30: Tunnel UG2 (Electrical) Respond to MM

8/22/2019 Tunnel UG2 (Electrical) Respond to MM

http://slidepdf.com/reader/full/tunnel-ug2-electrical-respond-to-mm 30/31

 

MMC GAMUDA KVMRT (T) SDN. BHD.PROJEK MASS RAPID TRANSIT LEMBAH KLANG

UNDERGROUND WORKS (TUNNELS, STATIONS & ASSOCIATED STRUCTURES) BETWEEN

SEMANTAN NORTH PORTAL AND MALURI SOUTH PORTAL 

D E S I G N / DOCUMENT R E V I E W S H E E T

TUNNEL PRE-FINAL M&E ISD – 

 MGKT REPLIES

MMC Gamuda KVMRT (T) Joint VentureKVMRT/MG/SBK/UG/OP/PQP/DQP/0013, Rev. 02  Page 30 of 31 

Item Referenced Document Rev Comments Responses Code

from the layout and associated legend and description.

2. Tunnel light fitting to be spaced at 7m along tunnel.

Please amend the layout and associated legend and

description.

3. Please include single line diagram drawing for tunnel

light and socket outlet distribution board.

60 KVMRT/MG/SBK/UG2/TNL/EL/E/LP/0014 D00 1. All tunnel light switch is not required. Please remove it

from the layout and associated legend and description.

2

2. Tunnel light fitting to be spaced at 7m along tunnel.

Please amend the layout and associated legend and

description.

3. Please include single line diagram drawing for tunnel

light and socket outlet distribution board.

61 KVMRT/MG/SBK/UG2/TNL/EL/E/LP/0015 D00 1. All tunnel light switch is not required. Please remove it

from the layout and associated legend and description.

2

2. Tunnel light fitting to be spaced at 7m along tunnel.

Please amend the layout and associated legend and

description.

3. Please include single line diagram drawing for tunnel

light and socket outlet distribution board.

62 KVMRT/MG/SBK/UG2/TNL/EL/E/LP/0016 D00 1. All tunnel light switch is not required. Please remove it

from the layout and associated legend and description.

2

2. Tunnel light fitting to be spaced at 7m along tunnel.

Please amend the layout and associated legend and

description.

3. Please include single line diagram drawing for tunnel

light and socket outlet distribution board.

63 KVMRT/MG/SBK/UG2/TNL/EL/E/LP/0017 D00 1. All tunnel light switch is not required. Please remove it

from the layout and associated legend and description.

2

2. Tunnel light fitting to be spaced at 7m along tunnel.

Page 31: Tunnel UG2 (Electrical) Respond to MM

8/22/2019 Tunnel UG2 (Electrical) Respond to MM

http://slidepdf.com/reader/full/tunnel-ug2-electrical-respond-to-mm 31/31

 

MMC GAMUDA KVMRT (T) SDN. BHD.PROJEK MASS RAPID TRANSIT LEMBAH KLANG

UNDERGROUND WORKS (TUNNELS, STATIONS & ASSOCIATED STRUCTURES) BETWEEN

SEMANTAN NORTH PORTAL AND MALURI SOUTH PORTAL 

D E S I G N / DOCUMENT R E V I E W S H E E T

TUNNEL PRE-FINAL M&E ISD – 

 MGKT REPLIES

MMC Gamuda KVMRT (T) Joint VentureKVMRT/MG/SBK/UG/OP/PQP/DQP/0013, Rev. 02  Page 31 of 31 

Item Referenced Document Rev Comments Responses Code

Please amend the layout and associated legend and

description.

3. Please include single line diagram drawing for tunnel

light and socket outlet distribution board.

64 KVMRT/MG/SBK/UG2/TNL/EL/E/LP/0018 D00 1. All tunnel light switch is not required. Please remove it

from the layout and associated legend and description.

2

2. Tunnel light fitting to be spaced at 7m along tunnel.

Please amend the layout and associated legend anddescription.

3. Please include single line diagram drawing for tunnel

light and socket outlet distribution board.

65 KVMRT/MG/SBK/UG2/TNL/EL/E/LP/0019 D00 1. All tunnel light switch is not required. Please remove it

from the layout and associated legend and description.

2

2. Tunnel light fitting to be spaced at 7m along tunnel.

Please amend the layout and associated legend and

description.

3. Please include single line diagram drawing for tunnel

light and socket outlet distribution board.

66 KVMRT/MG/SBK/UG2/TNL/EL/E/LP/0020 D00 1. All tunnel light switch is not required. Please remove it

from the layout and associated legend and description.

2

2. Tunnel light fitting to be spaced at 7m along tunnel.

Please amend the layout and associated legend and

description.

3. Please include single line diagram drawing for tunnel

light and socket outlet distribution board.

Note : Code 1 denotes ApprovedCode 2 denotes Approved in principal with commentsCode 3 denotes Disapproved