DEPARTMENT NAME: Tufting
OFFICER TUFTING: Kazim Raza
MONTHLY PERFORMANCE REVIEW FOR THE MONTH OF APRIL
2012
-
7/28/2019 Tuffting aPR 12
2/10
109
1) Status of Monthly Accomplishment of Departmental Objectives:
S.# Objective & Target to achieve Action to be taken Current Progress & Status Reason for not
achieving target
Verified By
1- To reduce rejection rate of
fiber from 1.5% to 1% with in
next 6 month.
To train worker by operation
training monthly basis and
monitoring weekly basis by
preventive maintenance
100 %
2- Ensure 100% compliance of
Gantt chart and completeproduction by 25th of each
month.
Daily Monitoring and check
and balance as per Ganttchart for completion
production plan
100%
3- Ensure all workers are
wearing shoes and cap on
daily basis.
Keep house keeping and
monitoring daily basis100%
4- During lunch time A/C package
unit & lights should be turned off.
Work done according to objective 100%
-
7/28/2019 Tuffting aPR 12
3/10
110
2) Status of Open & Follow-up Corrective Preventive Action Request
S
#
CPAR # Brief Description of Problem Open Follow-
up
Closing
Date
Verified by
MR
1 Nil
S # Complaint #/
Info Note #
Brief Description of Problem Corrective Measure Taken Complaint Status
Ok / Not ok
1 Information
Note by QC
Wild Fiber OK YES
4) Status of Pending Demands and Work Orders:
S # PD #/
WO #
DM/WO Date Detail Description Current Status of Work Remarks
3) Status of Recurring Information Notes & Complaint (refer to memo book):
-
7/28/2019 Tuffting aPR 12
4/10
111
5) Monthly Variance Report (Planned V/s Actual Production):
S# Product Planned Qty
In CTNS
Achieved Qty
In CTNS
% of
Achievement
Reason for Not Achieving Target
1 Perfect 103680 118050 113% -------
2 Angular 86400 111100 128% -------
3 Bio Junior ------ ------ ------ -------
4 Smoker 51840 67700 130% -------
5 New Classic 164160 204600 124% -------
6 Flex Adult 75600 99800 132% -------
7 AntiPlaque 205920 185300 89.9% -------
8 Falcon 83520 81800 97.9% -------
9 Righto 97920 87300 89.1% -------
10 Antibac 17280 17600 101% -------
11 Gumpro 25920 25900 99.9% -------
12 Proclean 51840 ------- 0% Handle not available
13 Flex Junior 20160 20160 100% -------14 Sensation 54720 11000 20.1% Handle not available
15 Clarity 64800 93100 143% -------
16 Little Star ------- -------- -------- -------
Verified by Production Planning & Control: Sign______________________
-
7/28/2019 Tuffting aPR 12
5/10
112
6) Production Rejection Report:
S# Product Issuance Qty
(kg / pcs)
Rejected Qty
(kg/ pcs)
%
Rejection
Threshold
Value
Reason for Rejection
1 Fiber 690 3.50 0.50 % 1% -------
2 Aluminum Wire --- --- --- 1.25% -------
3 Nikle wire 399 1.9 0.72 % 1.25% -------
4 Total Brush
rejection
1123410 8570 0.7 % .67% -------
7) Status of Machine Down Time (KESC Failure, Preventive Maintain, and Break Down):
S # Machine/
Equipment #
Problem Details Reason for failure of m/c Total
MDT
Mins
Remarks
(work Done &
Details)
1 NIL
-
7/28/2019 Tuffting aPR 12
6/10
113
8) Status of Scheduled Preventive Maintenance:
S # Machine# Maintenance Details Planned
Date
Actual
Date
Reason for achieving
deadline
Current
Status
(ok /Not ok)
1 TB 1 - - - - -
2 TB 2 - - - - -
3 TB 3 - - - - -
4 TB 4- - - -
-
Verified by Plant Engineering: Sign_______________
-
7/28/2019 Tuffting aPR 12
7/10114
9) Manpower Utilization and Overtime Status:
Grade/Description Total
Personnel
Working
Days
(A)
Absenteeis
m in Days
( X)
Actual
Workin
g Days
( X-A)
Actual
Working
Hours
( X-A * per
shift Hours)
% Age
Efficiency
O/T
Hours
% O/T %
Planned
%
Unplanned
Contractor Worker 27 837 142 695 5560 83 % 2493 --- 100
%
00 %
Permanent Worker 02 62 17 45 360 72 % 122 --- ----- ----
Contract Supervisor - - - - - - -
Supervisor M-grade 04 124 40 84 672 67% 195 ---- --- ----
Production Officer - - - - - - - - - -
-
7/28/2019 Tuffting aPR 12
8/10115
10) Details of Accident / Incident:
S# Date of
incident
FIR/AIR
#
Problem Description Corrective Action Taken Status/Remarks
- - - - -
Verified by Administration: Sign _______________________
Improvement in Process Flow Details Improvement Required
(If Any)
Any Improvement done on Product
Effective Man power utilization in theDepartment
Ant improvement done to make work
flow efficient:
11) Major Achievement of Section / Department during the month :
-
7/28/2019 Tuffting aPR 12
9/10116
12) Major Mistakes By Department / Complaint by other Departments:
S # Problem Description Countermeasure Status(Ok / Not Ok)
13) Departmental Training Status:
S # Date Trainer Training Need No. of
Participants
Venue Duration
(Hrs)
01 Nil
-